Draft v1.0 prepared by NEER. Not adopted by the Government of West Bengal or the Andaman and Nicobar Administration, and has no legal force. About this draft

Chapter 11Basin and City Stormwater Master Plans


11.1 Purpose and scope

11.1.1 Chapters 2 to 10 control one project at a time. This chapter sets the requirements for the plan that ties those projects together: the Basin Stormwater Master Plan (BSMP). A BSMP is prepared for each drainage basin of a city or urban area. A city's set of BSMPs makes up its City Stormwater Master Plan.

11.1.2 A BSMP shall:

  • (a) map flood hazard for the basin under existing and future conditions;
  • (b) set the level of service each part of the drainage system must achieve (Clause 11.6);
  • (c) identify the works, storage and land needed to reach that level of service, and rank them (Clauses 11.7 and 11.8);
  • (d) reserve land for regional storage, pukur and tank restoration, and major flow paths in the statutory land-use plan (Clause 11.9);
  • (e) set the basin-specific inputs that site designs under Chapter 4 depend on: regional facilities, the fee-in-lieu unit rate, and any basin release rate stricter than Chapter 4 (Clause 11.8.3); and
  • (f) recommend catchments for notification as flood-sensitive (Clause 4.5.4).

11.1.3 Relationship to site design. Site criteria (Chapters 4 to 8) apply whether or not a BSMP exists. A BSMP may make the site criteria stricter for its basin. It shall not relax them, except through the regional detention and fee-in-lieu routes of Clauses 4.13 and 4.5.6.

Commentary. Kolkata has drainage master plans, but they are not published. KMC's sewerage and drainage works under KEIIP follow its Sewerage and Drainage Master Plan of December 2007 and its 2014 Action Plan to Mitigate Flood, Cyclone and Water Logging (ADB 2016), neither of which was found. The older metropolitan Drainage Master Plan of CMPO was based on a storm of "once in two months (6 times in a year)" with 70% imperviousness, and a CPHEEO appraisal under JNNURM recorded that 75% of its primary drains but only 20% of its pumping stations had been built (CPHEEO appraisal note). The ADB-funded Kolkata Environmental Improvement Project (from 2000) and KEIIP (approved in 2013) built combined sewers, drains and pumping stations, mostly in the areas added to the city in 1984, when KMC served 45% of its population with sewerage and drainage (ADB 2016); ADB approved a further USD 200 million for the KMC Sustainability, Hygiene and Resilience (Sector) Project (KMC-SHARP) in February 2025, including combined trunk sewers and a larger flood early-warning system (ADB 2025). Outside Kolkata, I&WD's Ghatal Master Plan for the Shilabati, Kangsabati and Rupnarayan basin is reported to be funded by the State alone from 2025–26, at ₹1,500 crore over two years, although another report says the Centre approved it (press reports), and Siliguri Municipal Corporation sought experts for a drainage master plan for its 47 wards in 2022 (press report). No storm water master plan or stated design return period was found, in the sources reviewed for this Manual, for Howrah, Bidhannagar, New Town, Asansol, Durgapur or Haldia. A site-level manual cannot fix basin-level problems: lost tank storage, outfalls locked by the tide or held up by the Hooghly, pumping stations too small for the storm, river reaches raised by DVC releases, and drains that are adequate on their own but overload the next reach. Comparable manuals pair site criteria with basin planning:

  • Denver's Mile High Flood District prepares major drainageway master plans that set regional facilities and release rates.
  • The Kansas City APWA criteria rest on regional watershed studies (MARC).
  • England's Surface Water Management Plans (Defra, Surface Water Management Plan Technical Guidance, 2010) set a phased method of preparation, risk assessment, options and implementation.
  • Malaysia's MSMA requires drainage master plans for urban areas.

This chapter adapts that method to West Bengal's pumped and tide-locked outfalls in Kolkata and Howrah, where the city slopes away from the Hooghly and drains east through outfall channels and the East Kolkata Wetlands to the Kulti; its combined sewers, which carry storm water and sewage together; the pukurs that once stored the city's rain; the rivers whose levels are set by DVC releases on the lower Damodar and at Ghatal, and by the Teesta and the Mahananda in North Bengal; the embanked islands of the Sundarbans; and a SW monsoon flanked by damaging cyclone storms in May and in October and November.


11.2 Definitions

Term Meaning in this Manual
Basin The land draining to one outfall to the sea, a river, or a major waterbody, as delineated under Clause 11.3.
Basin Stormwater Master Plan (BSMP) The plan for one basin prepared under this chapter.
Lead Authority The body responsible for preparing a BSMP (Clause 11.4).
Level of service (LoS) The flood performance a part of the drainage system must achieve, expressed as an AEP and an outcome (Clause 11.6).
Flood hazard map A map of flood extent, depth, velocity and hazard class (H1–H6, Chapter 6) for a stated AEP and scenario.
Regional facility A storage, conveyance or outfall work serving more than one development, identified in a BSMP.
Capital Improvement Programme (CIP) The ranked, costed list of works in a BSMP (Clause 11.8.4).

11.3 Planning unit: the basin, not the ward

11.3.1 BSMPs shall be prepared by hydrological basin, not by ward, zone or local-body boundary. Where a basin crosses local-body boundaries, one BSMP shall cover the whole basin.

11.3.2 Basin boundaries shall be delineated from the digital elevation model of Clause 11.5.2, checked against the drain network, road embankments, canals and tank supply channels. Diversions between basins, whether by canal, drain or surplus course, shall be mapped and represented in the model.

11.3.3 For the main urban areas, and for the river reaches that flood every few years, the basins are at least the following:

  • Kolkata, eastern outfall basins (to the Kulti): the basins that drain east through the pumping stations of KMC and I&WD (including Ballygunge, Palmer Bazar and Dhapa Lock) and the storm-water and dry-weather-flow channels from Bantala to the Kulti through the East Kolkata Wetlands, with the level of the Kultigang as the boundary condition and the catchment of each main pumping station as a sub-basin;
  • Kolkata, north-east, with Bidhannagar and New Town: the Kestopur canal from the Chitpur lock, and the Bagjola canal to the Kulti pump house, each with its whole catchment across KMC, South Dum Dum, Bidhannagar and New Town;
  • Kolkata, south: Tolly's Nullah (Adi Ganga), from the Hooghly to the Bidyadhari, with the tidal Hooghly as its boundary condition, and the added-area catchments of KEIIP (Churial, Begore, Monikhali and the South Suburban catchment) that drain to the Churial and other canals;
  • Howrah: the basins of Howrah Municipal Corporation, whose land lies lower than the Hooghly, with the tidal Hooghly as the boundary condition;
  • Lower Damodar and Ghatal: the Damodar–Mundeswari reach below the DVC dams and the Shilabati, Kangsabati and Rupnarayan basin at Ghatal, with releases from Maithon and Panchet as a boundary condition;
  • Siliguri: the Mahananda through the city, with the Teesta–Mahananda link canal and the Teesta below the Gajoldoba barrage, including the bed raised by the sediment of the October 2023 flood, as boundary conditions to be checked; and
  • Sundarbans: each embanked island with a Tier A or Tier B body on it, as a polder basin draining through the sluices in its embankment to the tidal creeks.

Other Tier A bodies, including Asansol, Durgapur and the Municipalities of the Kolkata Metropolitan Area, shall define their basins in the first BSMP that covers them. Where I&WD or DVC has a design flood, a high flood level, an embankment crest level or an operating rule for a river, canal, lock, sluice or dam that a town lies on, the BSMP shall take its river boundary conditions from it, and shall show those levels against its own 1% AEP map.

Basin Stormwater Master Plan (BSMP) — process and links to site design 1. Basin set-up Delineate by basin, not ward (Cl. 11.3) Lead Authority + partners 2. Data DEM, drains, tanks, tides, flood marks (Cl. 11.5) 3. Model 1D–2D, 24–72 h storms, tide, continuous sim. calibrate to past floods 4. Gap vs LoS Scenarios: existing, future ± site controls, climate (Cl. 11.6–11.7) 5. Options Restore tanks first, then regional storage, conveyance, outfalls 6. Outputs (Cl. 11.8.4) — approved by State Stormwater Technical Committee • Flood hazard maps 10% / 1% / 0.2% AEP • Flood-sensitive catchments, basin release rates • Regional facility sites and fee-in-lieu rate • Capital Improvement Programme, ranked • Pre-monsoon maintenance programme • Monitoring network • Open data + public map viewer • Annual report, pre-monsoon Land-use plan Statutory master plan: reserve storage sites, flow paths, hazard zoning (Cl. 11.9) Site design Ch 4 release rates, regional detention and fee-in-lieu (Cl. 4.13, 4.5.6) Floors and setbacks 1% AEP future-with-plan map sets floor levels (Ch 6) and setbacks (Ch 7) Public works CIP funds: ULB, State, Union; O&M and desilting (Ch 10) Review every 10 yr, after a >1% AEP event, or plan revision (Cl. 11.11)

Figure 11.1 — Basin Stormwater Master Plan process and its links to site design. Original drawing for this Manual. The phase structure is adapted from Defra, Surface Water Management Plan Technical Guidance (2010), and Mile High Flood District master planning practice.

Commentary. Water does not follow ward boundaries. A ward-by-ward drain plan can pass the problem to the next ward, and to the next local body. Responsibility in West Bengal is divided by body as well as by boundary. KMC owns every public drain in Kolkata and must provide its outfall (KMC Act 1980, sections 277 and 280), but the rivers, the embankments and the main outfall canals beyond the city, such as the Bagjola and Kestopur canals and the channels to the Kulti, are I&WD's (I&WD; press reports). The exact boundary between KMC's drains and I&WD's khals was not found. Section 277(2) lets the State require KMC to pay for outfall works when the river channels decay, as the Bidyadhari did. KMDA plans the metropolitan area, NKDA develops and regulates New Town, and Howrah, Bidhannagar and the other Corporations and Municipalities own their own drains. The canals show why the basin has to be the unit. The Bagjola canal is the main outlet for South Dum Dum, New Town and Bidhannagar and ends at a pump house at Kulti that is reported to be too small (press reports); the Kestopur canal runs from the Chitpur lock on the Hooghly towards the Bidyadhari (I&WD). Downstream, the storm-water and dry-weather-flow channels to the Kulti pass through the East Kolkata Wetlands, which EKWMA manages under the East Kolkata Wetlands Act 2006. On the lower Damodar, the river level at the outfalls of Howrah and Hooghly districts is set by releases from DVC's Maithon and Panchet dams, not by local rain. This clause makes the basin the planning unit. It also requires the Bagjola canal to be treated as a link, because it already carries the storm water of several local bodies to one outfall.


11.4 Who prepares, and when

11.4.1 Lead Authority.

  • For a basin wholly within Kolkata: KMC.
  • For a basin of the Kolkata Metropolitan Area that crosses local-body boundaries (for example the Bagjola and Kestopur basins, which drain parts of KMC, South Dum Dum, Bidhannagar and New Town): KMDA, with KMC, the Municipal Corporations, the Municipalities and NKDA in the basin as partners.
  • For a basin wholly within Howrah: Howrah Municipal Corporation; for one wholly within New Town: NKDA; for one wholly within Bidhannagar: Bidhannagar Municipal Corporation.
  • For Siliguri: Siliguri Municipal Corporation, with SJDA as partner. For Asansol and Durgapur: the Municipal Corporation concerned, with ADDA as partner.
  • For basins that drain to a river, canal, khal or embankment under I&WD's control (for example the outfall channels to the Kulti, the Bagjola and Kestopur canals, Tolly's Nullah, the lower Damodar and Mundeswari, the Ghatal basin and the Mahananda at Siliguri): the urban body above as Lead Authority for the urban basin, with I&WD for the river, canal or embankment and as partner. Where the river level is set by releases from DVC dams or the Teesta barrage, the BSMP shall take its release scenarios from DVC or I&WD and record them.
  • For the embanked islands of the Sundarbans and other polders: I&WD, with the local bodies on the island as partners.
  • For other basins that cross local-body boundaries: the Municipal Corporation or Municipality with the largest share of the basin, with the development authority for the area and the other local bodies as partners.
  • In Tier B bodies: the Lead Authority is named by UD&MA. Basins draining to a common river reach or canal may be grouped into one district-level plan.

WBCZMA shall be consulted on every BSMP that proposes works in the Coastal Regulation Zone, and EKWMA on every BSMP whose basin drains through the East Kolkata Wetlands. Every BSMP that proposes a discharge to an I&WD canal or khal shall record I&WD's consent to it.

I&WD shall be a partner in every BSMP that includes a river, canal or tank under its control.

11.4.2 When a BSMP is required.

  • (a) Every Tier A body shall approve BSMPs covering its whole area within 3 years of this Manual taking effect.
  • (b) A BSMP is required before:
    • any regional detention or fee-in-lieu is accepted under Clause 4.13;
    • a fee held under Clause 4.5.6.3 is spent; and
    • a basin-specific release rate is applied under Clause 11.8.3.
  • (c) A Tier B body shall prepare a BSMP where its Lead Authority, or the State Stormwater Technical Committee, finds recurrent flooding of buildings or arterial roads.

11.4.3 Preparation. BSMPs shall be prepared by, or under the direction of, an engineer empanelled as a Stormwater Design Professional (Chapter 10) with experience in basin-scale modelling.


11.5 Data and surveys

11.5.1 Each BSMP shall assemble and publish (Clause 11.10) the data in Table 11.1:

Table 11.1 — Minimum data and surveys for a BSMP

Data Minimum requirement
Terrain Digital elevation model from LiDAR or photogrammetry, with vertical accuracy of 0.15 m RMSE or better in urban areas, tied to the Survey of India datum
Drain network Inventory of all public drains, culverts and outfalls with invert levels, sizes, condition and silt depth; private drains above 600 mm
Waterbodies Survey of every tank, pukur, pond and marsh under Chapter 7: FTL, MWL, bund level, stage–storage, sluices, surplus weirs, supply channels, encroachment
Rivers and canals Cross-sections at no more than 200 m spacing and at every structure
Outfalls and coast Tidal datums and surge values (Annex 5A), with the datum of every level named (chart datum, GTS/MSL or the Kidderpore Old Datum); outfall invert levels against high tide and against river flood levels; locks, sluices, tide gates and pumping stations on the outfall channels, with their capacities and operating rules; embankment crest levels and breach history; the high flood levels of I&WD; releases from the DVC dams and the Teesta barrage upstream
Rainfall and levels All available rain gauges (IMD, including the Kolkata (Alipore), Dum Dum, Diamond Harbour, Canning, Haldia, Digha, Bankura, Malda, Jalpaiguri and Bagdogra stations; the rain and river gauges of I&WD under the National Hydrology Project; and KMC's ward and borough rain gauges) and water-level records, including those for the September 1978 (south Bengal), May 2020 (Cyclone Amphan), October 2023 (the Teesta), September 2024 (DVC releases on the lower Damodar and at Ghatal) and September 2025 (Kolkata) events
Flood evidence Surveyed flood marks and mapped flood extents from past events, including public reports
Land use Existing land use and imperviousness; future land use from the statutory master plan
Soils and groundwater HSG map (Annex 3A); seasonal high groundwater; aquifer and recharge zones
Sewer interaction Known sewage cross-connections, dry-weather flow in drains, and solid-waste hotspots

Commentary. The 0.15 m accuracy has no direct precedent; this Manual sets it because on the flat delta of Kolkata and Howrah, on the embanked islands of the Sundarbans and on the floodplains of the lower Damodar and the Ghatal basin a small error in ground level moves the flood edge a long way, and the 1% extent from the BSMP sets floor levels (Chapter 6) and setbacks (Chapter 7). Past flood marks matter as much as models. The September 1978 (south Bengal), May 2020 (Cyclone Amphan), October 2023 (the Teesta), September 2024 (DVC releases on the lower Damodar and at Ghatal) and September 2025 (Kolkata) events are the best calibration data West Bengal has, and much of the evidence is held in photographs, news reports and residents' records that should be collected before it is lost.


11.6 Levels of service

11.6.1 Each BSMP shall adopt the following minimum levels of service. A BSMP may adopt stricter levels.

Table 11.2 — Minimum levels of service

Element Minimum level of service
Minor system The design AEP of Chapter 6 (Table 6.1)
Habitable buildings No flooding above floor level in the 1% AEP (100-yr) event
Critical facilities (hospitals, emergency services, substations, water and sewage plants) No flooding of the facility in the 0.2% AEP (500-yr) event; access road passable in the 1% AEP event
Evacuation routes and arterial roads Passable (hazard class H2 or better, Chapter 6) in the 1% AEP event
Ponding drain time Surface water cleared from roads within 6 hours after rain ends in the 10% AEP (10-yr) event
Tank and pukur storage No net loss of flood storage below the MWL in the basin, measured against the earliest available survey
Outfalls Functioning under the joint and outfall-closed cases of Chapter 5

Commentary. The building and road levels repeat Chapter 6, so that the basin plan and the site designs aim at the same outcome. The 0.2% AEP for critical facilities, the 6-hour ponding drain time and the no-net-loss rule for tank storage have no direct precedent and are set by this Manual. The drain time reflects what residents notice most after a storm. The no-net-loss rule reflects a loss of storage that nobody has measured. Section 17A of the West Bengal Inland Fisheries Act 1984 has barred the filling of water areas since 1994, rule 8 of the West Bengal Municipal (Building) Rules 2007 bars it in the municipalities without the State's approval, and the East Kolkata Wetlands Act 2006 requires a water body of no less area to be made within the wetlands for any that is filled (all as reported). Yet KMC's own pond lists, 1,634 water bodies in 1996 and 3,874 in 2006 (as reported), do not agree with each other or with the NATMO count, and no survey of their storage was found. KMC has begun GIS mapping of its ponds, and Bidhannagar identified more than 150 water bodies for restoration in 2024 (press reports).


11.7 Modelling and scenarios

11.7.1 Model. Each BSMP shall use a coupled 1D–2D hydraulic model of:

  • the minor system;
  • the major (overland) system;
  • rivers, canals and tanks; and
  • the outfalls.

Methods shall follow Chapter 3. Tidal and river boundaries shall follow Chapter 5.

11.7.2 Design storms. The model shall be run for the design storms of Chapter 2, including the 24-, 48- and 72-hour storms, for at least the 50%, 10%, 1% and 0.2% AEPs. Areal reduction shall be applied under Clause 2.7.3.

11.7.3 Continuous simulation. Basins with tank cascades shall also be run by continuous simulation (Clause 3.13), using the full IMD gridded daily record where available and at least 30 years, disaggregated by the temporal patterns of Annex 2D. This shows how full the tanks are when the design storms arrive, and how often heavy rain coincides with a closed outfall. The two-step approach of Clause 3.13.5 may be used: a simplified storage model is run for the whole record, and the coupled 1D–2D model of Clause 11.7.1 is run only for the design storms, starting from the tank levels the continuous run gives. A continuous run of the full 1D–2D model is not required.

11.7.4 Scenarios. Each BSMP shall model at least:

  • (a) Existing: existing land use, network, tanks and outfalls;
  • (b) Future, uncontrolled: future land use under the statutory master plan, with no site controls;
  • (c) Future, controlled: future land use with the site controls of Chapter 4;
  • (d) Future, with plan: scenario (c) plus the works of the CIP; and
  • (e) Climate: scenarios (a) and (d), with the climate factors of Clause 2.8, the sea-level allowance of Chapter 5 and, in Kolkata and the delta, land subsidence over the design life (Kolkata is subsiding at 2.8–5.5 mm a year, comparable to the rise in sea level at Diamond Harbour).

11.7.5 Calibration. The model shall be calibrated and validated under Clause 3.15, using at least two of the September 1978 (south Bengal), May 2020 (Cyclone Amphan), October 2023 (the Teesta), September 2024 (DVC releases on the lower Damodar and at Ghatal) and September 2025 (Kolkata) events where data exist.

Figure 11.2 — BSMP model schematic Schematic plan of a basin model: design rainfall over sub-catchments; two tanks in cascade with surplus course; a 1D drain network linked to a 2D surface grid; a river or canal reach with an inter-basin link; an outfall with a flap gate and pumps; and a tidal or river level boundary. Numbered notes on the right explain each element. BSMP model: elements required by Clause 11.7 (schematic, not to scale) Sea / receiving water 1 S1 S2 S3 2 Upper tank Lower tank start level start level 3 2D surface 5 4 River / canal (1D) 6 Inter-basin link Gate Pumps 7 8 1 Design rainfall Ch. 2 storms incl. 24, 48, 72 h; 50%, 10%, 1%, 0.2% AEP; areal reduction (Cl. 2.7.3, 11.7.2) 2 Sub-catchments Runoff by Ch. 3 methods; land use for each scenario (a)–(e) of Cl. 11.7.4 3 Tanks and ponds Surveyed FTL, MWL, stage–storage, sluices, surplus weirs (Cl. 11.5.1); start level from continuous run (Cl. 3.13.5, 11.7.3) 4 1D drain network Minor system: drains, pipes, culverts with surveyed inverts and silt (Cl. 11.5.1) 5 2D surface Major (overland) system on the DEM, 0.15 m RMSE or better; exchange with 1D at inlets and manholes 6 Rivers and canals (1D) Sections ≤ 200 m apart and at every structure; diversions between basins mapped (Cl. 11.3.2) 7 Outfall Flap or tide gates and pumps; joint and outfall-closed cases of Ch. 5 8 Downstream boundary Tide (MHWS; HAT + surge + sea-level allowance) or river level, per Ch. 5 Calibrate and validate with at least two major past flood events where data exist (Cl. 11.7.5).

Figure 11.2 — Elements of the BSMP model required by Clause 11.7: sub-catchments, the 1D drain and channel network, the 2D surface, tanks and pukurs with starting levels from continuous simulation, and the tidal or river boundary at the outfall (schematic, not to scale). Original drawing for this Manual, adapted from common coupled 1D–2D urban flood modelling practice.

Commentary. Scenario (b) against scenario (c) shows what the site rules achieve on their own. Scenario (d) shows what the public works add. This comparison is also the evidence base for notifying flood-sensitive catchments (Clause 4.5.4) and for setting a stricter basin release rate (Clause 11.8.3).


11.8 Options, outputs and the Capital Improvement Programme

11.8.1 Options hierarchy. Options shall be considered in the following order, the basin-scale form of the hierarchy in Clause 1.2:

  1. Protect and restore storage: pukurs, tanks, marshes and floodplains, including desilting to the original bed and recovering encroached area (Chapter 7);
  2. Regional retention and detention, sited by modelling so that releases do not coincide with the main-stem peak (Clause 4.13);
  3. Conveyance upgrades to drains, canals and culverts;
  4. Outfall works: locks, sluices and tide gates on the outfall channels, pumping stations and the storage behind them, and the sluices through the Sundarbans and river embankments;
  5. Property-level protection where works cannot reach the level of service; and
  6. Non-structural measures: flood warning (for example the flood early-warning system built for KMC under KEIIP, I&WD's daily flood reports and river gauges, IMD district rainfall and cyclone warnings read with the predicted spring tides, and advance notice of releases from DVC's Maithon and Panchet dams), flood-hazard zoning, emergency planning and public information.

11.8.2 Option assessment. Each option shall be assessed for:

  • reduction in flood risk (buildings and people flooded; expected annual damage);
  • capital and 30-year maintenance cost;
  • land required;
  • effect on groundwater recharge, arsenic-affected aquifers and saline intrusion (Chapter 8);
  • effect on downstream basins and the Bagjola canal; and
  • who benefits.

11.8.3 Basin release rates. Where scenario (c) does not meet the level of service, the BSMP may set a basin-specific permissible site discharge (m³/s/ha) stricter than Chapter 4, by AEP and sub-catchment. The rate takes effect under the notification procedure of Clause 4.5.4.

11.8.4 Outputs. Each BSMP shall produce:

  • (a) flood hazard maps (extent, depth, velocity, hazard class) for the 10%, 1% and 0.2% AEPs, existing and future-with-plan. The 1% AEP future-with-plan map becomes the reference map for floor levels (Chapter 6) and setbacks (Chapter 7);
  • (b) recommended flood-sensitive catchments and any basin release rates (Clauses 4.5.4 and 11.8.3);
  • (c) regional facility sites, with storage volumes, land needs and the sites they serve;
  • (d) the fee-in-lieu unit rate for the basin (Clause 4.13.3);
  • (e) the Capital Improvement Programme: works ranked by risk reduction per rupee, with cost, phasing and agency;
  • (f) a pre-monsoon maintenance programme: desilting, gate and pump testing, and tank operating rules (Chapter 10); and
  • (g) monitoring needs: new rain gauges, level sensors and flood-mark survey points.

Commentary. Restoring storage comes first because Kolkata's storage is being lost while its drains are being enlarged. A NATMO estimate put the city's ponds at about 8,731 and a later count from satellite imagery about 4,889, a loss of about 44% (as reported), and Salt Lake and New Town were built on reclaimed wetland (as reported). The pukurs and the East Kolkata Wetlands still hold much of the city's rain. The storm of 23 September 2025, 185.6 mm in three hours at Alipore (IMD 2025) and about 332 mm in a few hours at a KMC gauge in Garia (press reports), was many times the 6.35 mm/h for which the city's first sewers were built (Gupta 2005), so storage and flow paths have to take what conveyance cannot. Conveyance upgrades on their own move water faster to an outfall that may be tide-locked, or limited by the capacity of its pumping station. Groundwater sets narrow limits on recharge in most of West Bengal. In the delta the soils are clays and clay loams over a high water table, and arsenic above the permissible limit has been reported in 79 blocks of 8 districts (CGWB, as reported; an older count), so recharge wells that carry surface water into the aquifers are not suitable there (Chapter 8). Kolkata is subsiding at 2.8–5.5 mm a year, over a growing area (Thakur et al. 2026), and an earlier study linked faster subsidence near Salt Lake to pumping from the confined aquifer (as reported). In the Sundarbans and on the Medinipur coast the soils and groundwater are saline. The lateritic plateau of Purulia, Bankura and Asansol–Durgapur is where recharge structures are most likely to work, subject to soil tests. The CGWB year book for West Bengal could not be obtained for this Manual. This is why groundwater, arsenic and saline intrusion are assessment criteria. This Manual ranks projects by risk reduction per rupee so that limited budgets go first where most people are protected.


11.9 Integration with land-use planning

11.9.1 An approved BSMP shall be incorporated into the statutory land-use plan: the land-use and development plans made under the West Bengal Town and Country (Planning and Development) Act 1979 by KMDA, SJDA, ADDA and the other development authorities, the plans of NKDA for New Town, and, for the East Kolkata Wetlands, the management plan under the East Kolkata Wetlands (Conservation and Management) Act 2006. In particular:

  • (a) regional facility sites, restored tank flood storage, and major flow paths shall be reserved in the plan;
  • (b) the 1% AEP hazard map shall be shown, and Chapter 7 setbacks applied to it;
  • (c) land in hazard classes H5–H6 in the 1% AEP event shall not be zoned for new habitable development; and
  • (d) the open space of layouts within a basin should be located, where possible, to form part of the major flow paths or regional storage shown in the BSMP.

11.9.2 Where a land-use plan is revised before a BSMP is approved, the planning authority shall use the best available flood mapping and record the BSMP as pending.

Commentary. West Bengal has no flood-line system and no floodplain zoning law. CAG asked I&WD to enact the Model Flood Plain Zoning Bill (CAG 2019), and no such law was found. The KMC Building Rules 2009 require a plinth of at least 60 cm, placed in relation to the crest of the road so that the site drains, and let an owner raise the whole site by up to 600 mm, with the Commissioner's permission, where the area is prone to waterlogging (Rules 105 and 76), but they fix no flood level. In the municipalities, rule 8 of the West Bengal Municipal (Building) Rules 2007 limits buildings within 15 m of a river bank to a height of 5 m, a length of 20 m and 200 m² of covered area, with gaps of 15 to 30 m between them (as reported). No metre setback from a khal or pond was found in the KMC rules, which instead reward owners who keep a pond (Rules 65A, 74(4) and 81(9)). The East Kolkata Wetlands Act 2006 bars any change in the character of the wetlands without sanction. On the coast, the State's Coastal Zone Management Plan under the CRZ Notification 2019 had not been approved by December 2025, and the State has disputed keeping the 2011 high tide line, which WBCZMA says "no longer exists" on its eroding coast (NGT affidavits). A BSMP gives the land-use plans the 1% AEP drainage-flood map that they need. Using open space land as storage or flow path has no direct precedent; this Manual adopts it because the KMC Building Rules 2009 already allow sewers, underground reservoirs and septic tanks within the mandatory open space of a plot, exclude a garden covered with permeable material from floor area and height, and relax the setback, height and road-width rules where a water body and any heritage building together cover at least a quarter of the plot (Rules 65A, 74(4) and 81(9)); because that land then serves as open space, storage placed in it must stay usable as one. Placing it on the flow path costs the developer nothing extra and gives the basin storage it would otherwise have to buy.


11.10 Consultation and publication

11.10.1 A draft BSMP shall be published for public comment for at least 60 days, with public meetings in each affected local body.

11.10.2 After approval, the following shall be published as open data:

  • the model files;
  • the flood hazard maps;
  • the data of Clause 11.5.1, except security-sensitive asset details; and
  • the CIP.

They shall also be shown on a public map viewer.

Commentary. Publishing the maps lets buyers, lenders, insurers and residents see flood hazard before they build or buy. Publishing the model lets designers use the same boundary conditions as the Authority, so site designs and the basin plan stay consistent. This matches the publication approach of Chapter 10.


11.11 Approval, review and reporting

11.11.1 Approval. BSMPs shall be approved by the State Stormwater Technical Committee (Chapter 1), after review of the model and of the public comments.

11.11.2 Review. Each BSMP shall be reviewed:

  • every 10 years;
  • within 2 years of an event exceeding the 1% AEP design depth in the basin (Clause 2.14); and
  • when the statutory land-use plan is revised.

11.11.3 Annual report. The Lead Authority shall publish an annual implementation report before each SW monsoon (by 15 May). The report shall show:

  • CIP progress;
  • the fee-in-lieu ledger (Clause 4.13.4);
  • maintenance completed; and
  • any flooding against the levels of service.

11.12 Interim arrangements

11.12.1 Until a BSMP is approved for a basin:

  • (a) all site criteria of Chapters 4 to 8 apply in full;
  • (b) regional detention and fee-in-lieu under Clause 4.13 are not available, except the holding of fees under Clause 4.5.6.3;
  • (c) floor levels and setbacks use the best available mapping, and the methods of Chapters 6 and 7 where no mapping exists; and
  • (d) public drain projects shall include a basin-level check that their outfall and downstream reaches can take the design flow under the Chapter 5 tailwater cases.

References (chapter)

Annexes and forms

Annex / Form Content
11A BSMP terms of reference template
11B Basin lists and boundaries for Tier A bodies
11C Depth–damage curves for West Bengal building types
11D BSMP data and model publication standard
Form 11-1 Annual implementation report