Chapter 5Downstream and Tailwater Analysis
5.1 Purpose and scope
5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.
- The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
- The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.
5.1.2 This chapter applies to:
- (a) every site to which Chapter 4 applies;
- (b) every minor- and major-system drainage project under Chapter 6; and
- (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.
5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.
5.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Analysis point | A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3). |
| Contributing catchment | The whole area draining to an analysis point, on and off site. |
| Major drain | A channel listed as a major drain in the basin plan or Annex 5B, or any river, I&WD canal, the khals and outfall channels of Kolkata and its suburbs (such as Tolly's Nullah, the Circular Canal, the Beleghata, Kestopur and Bagjola canals and the storm-water flow channel from Bantala to the Kultigang), any khal or drainage channel maintained by I&WD or a local body, any irrigation canal that receives storm water, or a tidal creek. |
| Chart datum (CD) | The datum of the published tide tables and nautical charts, to which tidal heights are referred. |
| Mean sea level (MSL) | Average sea level over a long period at a tide gauge. |
| MHWS | Mean high water springs: the average of high waters at spring tides. |
| HAT | Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years). |
| Storm surge | The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones. |
| Still-water level | Astronomical tide plus surge, excluding individual waves. |
| Sea-level allowance (SLA) | The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4). |
| Tailwater | The water level at the downstream end of a drain, outlet or storage. |
| Tide-lock | The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge. |
| Lock window | A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero. |
| Sand bar | A bar of beach sand that partly or fully closes a river mouth or creek inlet. |
| Project datum | The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2). |
5.3 Extent of the downstream analysis
5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:
- (a) the point at which the project area is 10% or less of the contributing catchment;
- (b) the next tank, pukur or other waterbody with a surplus weir or controlled outlet; or
- (c) the next major drain, or the sea.
The end point itself shall be analysed (Figure 5.1).
5.3.2 Where the analysis ends at a tank or pukur under 5.3.1(b), it shall report:
- the change in the tank's maximum water level; and
- the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.
If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.
5.3.3 Analysis points shall be set at least at:
- (a) each site outfall;
- (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
- (c) each culvert, bridge or road crossing;
- (d) each location recorded as flood-prone by the local body, KMC, WBSDMA or I&WD; and
- (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.
5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:
- the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
- no flood-prone location is recorded within 500 m downstream; and
- the site does not drain to a tidal or backwater-affected outfall.
Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next pukur or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).
Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for West Bengal. In Kolkata, where storm water pumped from the city's eastern basins travels some 27 km along the outfall channels from Bantala, past the East Kolkata Wetlands, before it reaches the tidal Kultigang (I&WD), and in the municipalities of the Kolkata Metropolitan Area, where a drain can pass through a chain of pukurs, bils and khals before it reaches the Hooghly or an I&WD channel, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.
5.4 What the analysis must check
5.4.1 Scenarios. Each analysis shall compare:
- (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
- (b) With project: the same, with the project and all its controls (Chapter 4) in place.
Where the Authority's basin plan defines future land use, the Authority may also require:
- (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.
5.4.2 Quantities to be checked at every analysis point:
- (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
- (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
- (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
- (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
- (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.
5.4.3 Storms. The analysis shall use:
- 50%, 10% and 1% AEP;
- the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
- the 24-, 48- and 72-hour storms in every case.
The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.
5.4.4 Method. The analysis shall:
- use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
- include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
- not use the Rational Method at any analysis point, because it cannot represent timing.
Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.
5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.
Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in Kolkata's south suburban catchment, which the KEIIP environmental assessment describes as experiencing "frequent and prolonged waterlogging" (KMC, 2015), at Behala, where the basin behind the pumping station stays flooded while the canal is high at high tide (same source), and in the Ghatal basin of Paschim Medinipur, described as a bowl that cannot drain (press reports). Detention that prolongs releases can lengthen that time even when it lowers the peak.
5.5 Acceptance criteria
5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":
- (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
- (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
- (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
- (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
- (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.
5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.
5.5.3 Where the criteria are not met, the project shall do one or more of the following:
- (a) reduce release rates or increase storage (Chapter 4);
- (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
- (c) contribute to a regional facility under Clause 4.13; or
- (d) under Clause 5.5.4, change the release strategy.
5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:
- (a) the varied strategy meets 5.5.1;
- (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
- (c) the outfall-closed check (Clause 5.10) is met.
Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.
5.6 Tailwater: general and non-tidal outfalls
5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.
5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:
- for a receiving pipe, its obvert; or
- for a receiving open drain, its full-bank level less freeboard (Chapter 6).
5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.
5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.
5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.
5.7 Tidal tailwater: datums, surge and sea-level allowance
5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:
Table 5.1 — Design tailwater levels for tidal outfalls
| Design case | Tailwater |
|---|---|
| Minor-system design (Chapter 6) | MHWS + SLA |
| Major-system design and storage design | HAT + surge + SLA, with the surge term defined in Clause 5.7.3 |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA |
The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.
5.7.2 Sources and datums.
- (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
- (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
- (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the Hooghly from Garden Reach at Kolkata to Diamond Harbour, Haldia and Sagar Island, where a tidal bore runs up the river on spring tides (CWPRS), the Kultigang at the end of Kolkata's outfall channels, which joins the Raimangal estuary, and the tidal rivers and creeks (khanris) of the Sundarbans), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
- (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.
5.7.3 Storm surge.
- (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
- (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
- (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
- (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.
5.7.4 Sea-level allowance. The SLA shall be:
- (a) +0.3 m minimum for every element;
- (b) greater than 0.3 m where the State, KMDA or the Authority adopts a higher projection for the planning area, for example a projection of relative sea-level rise for Kolkata that adds the INCOIS (2025) estimates for Diamond Harbour of about 0.58 m (SSP2-4.5) and 0.80 m (SSP5-8.5) of mean-sea-level rise by 2100 to the land subsidence measured in the city (Clause 5.8.5(f)); and
- (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.
Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.
Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:
- MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
- MHWS to HAT for a major storm; and
- "Effect of climate change: additional 0.3 m".
CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because Cyclone Aila, whose surge at Sagar Island in May 2009 was observed to be "around 3.3" (the unit is not stated) above the predicted level and which breached about 177 km of the Sundarbans embankments (I&WD), Cyclone Amphan, which IMD reported sent tidal waves of 15 ft over low-lying parts of the 24 Parganas and Purba Medinipur in May 2020, and the INCOIS (2025) estimate that surge and wave set-up add about 1.16 m to the 100-year sea level at Diamond Harbour, showed why it is needed in West Bengal.
Indian tide tables have been published by the Survey of India since the nineteenth century; in West Bengal, PSMSL holds tide-gauge records from Kidderpore for 1881–1931 (station 48), from Garden Reach at Kolkata from 1932 (station 369, which PSMSL flags for quality control and notes is significantly affected by river flow), from Sagar for 1937–1987 (station 417), from Diamond Harbour from 1948 (station 543) and from Haldia from 1971 (station 1270) (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. Its 2025 technical report gives 100-year extreme sea levels for one West Bengal site, Diamond Harbour: 3.79 m above mean sea level at present, made up mainly of a modelled tidal maximum of 2.57 m and 1.16 m of surge and wave set-up, and 4.34 m (SSP2-4.5) or 4.46 m (SSP5-8.5) by 2100, when mean-sea-level rise of 0.58 m or 0.80 m is partly offset by a fall of 3 cm or 12 cm in the tidal maximum. It gives no value for Kolkata, Haldia, Sagar, Digha or the Sundarbans. No surge return-level product for the Hooghly estuary, the Sundarbans or the Purba Medinipur coast suitable for design was found during research, and the values of MHWS and HAT relative to chart datum for Garden Reach, Diamond Harbour, Haldia and Sagar were not seen [TBC], which is why Annex 5A is needed. The sources also mix datums: the INCOIS levels are above mean sea level, the tide tables use chart datum, and older Kolkata levels are given relative to the Kidderpore Old Datum (KOD) (CWPRS). Every level used under this chapter shall therefore name its datum. The tide is large: the maximum range at the mouth of the Hooghly is about 17 ft (about 5.2 m), and a bore of up to about 8 ft runs up the river on practically every spring tide (CWPRS, data of 1963–64). The long-term sea-level trend is 3.73 ± 0.53 mm/yr at Diamond Harbour for 1948–2015 and 2.62 ± 0.47 mm/yr at Haldia for 1971–2023 (PSMSL, which makes no correction for land movement). Kolkata's ground is sinking at 2.8–5.5 mm/yr (2017–2022) over a growing area (Thakur et al., 2026), as fast as the sea is rising, and relative sea-level rise at a Kolkata outfall is the sum of the two; Clause 5.8.5(f) adds it to the sea-level allowance of Clause 5.7.4.
5.8 Riverine backwater
5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:
- in Kolkata and Howrah: the Hooghly, tidal at the city, with the gravity outfalls through its levee and the locks at its junctions with the city's canals, such as Chitpur lock (Clause 5.8.5);
- in Kolkata's eastern and southern basins and the suburbs: Tolly's Nullah, the Circular Canal and the Beleghata, Kestopur and Bagjola canals, the canals that receive the storm-water flow of the KMC pumping stations (such as the Churial, Begore, Rania, Western and Parnashree canals), and the storm-water flow channel from Bantala to the Kultigang past the East Kolkata Wetlands, with the pumped and lock-gated outfalls of Clause 5.8.5;
- in Howrah, Hooghly and Purba Bardhaman: the Damodar, Mundeswari and Rupnarayan, with the releases of Maithon and Panchet (Clause 5.8.3);
- in Paschim Medinipur: the Shilabati, Kangsabati and Rupnarayan of the Ghatal basin (Clause 5.8.5);
- in North Bengal: the Teesta below the Gajoldoba barrage, with its releases (Clause 5.8.3), the Mahananda at Siliguri and Malda, and the Jaldhaka and Torsa;
- on the coast and in the Sundarbans: the Hooghly at Diamond Harbour, Haldia and Sagar, the creeks of the Purba Medinipur coast, and every river or creek reach into which a town drain discharges through a sluice in an embankment (Clause 5.8.5); and
- elsewhere: any river or I&WD channel listed in Annex 5B.
5.8.2 River levels. River water levels shall be taken from:
- (a) I&WD design flood levels or recorded highest flood levels for the reach, where published; or
- (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
- the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
- the tidal boundary of Clause 5.7 at the mouth; and
- the sand-bar condition of Clause 5.13.
5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example Maithon and Panchet on the Damodar above Howrah, Hooghly and Purba Bardhaman, or the Teesta barrage at Gajoldoba above Jalpaiguri), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.
5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:
- (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
- (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).
The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.
5.8.5 Pumped and lock-gated outfalls, the East Kolkata outfall channels, embankment sluices, dam-release and backwater reaches, I&WD drainage channels and khals, and subsidence.
-
(a) Pumped and lock-gated outfalls. For an outfall to a canal, khal or channel that reaches a river only through a pumping station, a lock or a sluice gate (for example the KMC pumping stations at Ballygunge, Palmer Bazar and Dhapa Lock, the I&WD stations at Uttarbhag, Chowbhaga and Keorapukur, the pump house at Kulti at the tail of the Bagjola canal, and Chitpur lock on the Circular Canal), or into a drain that itself discharges to such a canal, the designer shall identify the body that operates each station, lock or gate, and obtain its installed capacity, its operating levels and the sill of each gate. The tailwater at the outfall shall be the higher of:
- the level of Clause 5.7 or Clause 5.8 in the water body beyond the station, lock or gate; and
- the maximum level in the canal or khal behind it, computed by routing it as a storage with the inflow of the whole catchment that drains to it, including any part outside the town, its storage as surveyed in its present condition, net of silt, encroachment and vegetation, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity less the largest pump (set by this Manual), with gravity discharge through a lock or gate only while the level beyond it is lower.
Where a lock or gate can discharge for only part of each tide, or is closed for the whole of a river flood, the lock windows of Clause 5.10 shall be extended to that period (Clause 5.10.6). A capacity that has been approved but not yet commissioned, such as the reported upgrade of the Kulti pump house from 1,650 to 4,000 cusec, shall not be counted.
-
(b) Outfall channels through the East Kolkata Wetlands. For an outfall to the storm-water flow channel from Bantala to the Kultigang, or to a canal that discharges to it, the downstream boundary of the model shall be the tidal level of Clause 5.7 in the Kultigang at the outfall, with each pumping station on the route at its capacity under (a), until I&WD publishes a design water level for the channel [TBC]. No storage in the wetlands or their bheris shall be counted in a project's design. No drain, bund, outfall or pumping station that discharges to the wetlands, or alters a water body in them, shall be designed under this Manual without the sanction required by the East Kolkata Wetlands (Conservation and Management) Act, 2006 (as reported); this Manual authorises none of them.
-
(c) Embankment sluices. For a drain that discharges through a sluice in an embankment to a tidal river or creek (in the Sundarbans, on the Purba Medinipur coast, or along the Hooghly and its tributaries), the sluice shall be treated as a gate under (a), and the land and drains behind the embankment routed as a closed storage for as long as the level outside stands above the level inside. Floor levels and pumped outfalls behind an embankment shall also be checked for a breach of the embankment, with the land behind it filled to the level beyond it.
-
(d) Dam-release and backwater reaches. For an outfall to a river reach whose level is set by releases from dams or a barrage upstream (for example the Damodar, the Mundeswari and the Rupnarayan below Maithon and Panchet, for Howrah, Hooghly and Purba Bardhaman; the Shilabati, Kangsabati and Rupnarayan of the Ghatal basin; or the Teesta below the Gajoldoba barrage), or by the tidal Hooghly downstream, the river level of Clause 5.8.2 shall:
- include the releases of Clause 5.8.3 from every dam and barrage above the reach, combined as they occurred in the largest recorded event, unless an operating rule in force staggers them;
- be computed with the downstream boundary of the river model at the tidal boundary of Clause 5.9.3 where the reach is tidal, or at the recorded level of the receiving river in the largest recorded event, unless the model is carried far enough downstream that moving the boundary changes the level at the outfall by less than 10 mm;
- for the major-system cases, be not less than the highest recorded flood level at the outfall, where I&WD or the local body has recorded one; and
- on the Teesta and the other rivers of North Bengal, use bed levels from a survey made after October 2023, because the South Lhonak outburst of 4 October 2023 sent silt down the Teesta (set by this Manual).
-
(e) I&WD drainage channels, khals and canals. Town drainage shall not be discharged to an I&WD drainage channel, khal or irrigation canal without the consent of I&WD or of the channel's owner. Where consent is given:
- the discharge shall not exceed the rate the consent allows;
- the tailwater is the higher of the channel's design water level as I&WD states it and its level in the coincident case of Clause 5.8.4, with the channel level computed from all the storm water it receives, including other towns' drains and pumped discharges; and
- the outfall shall have a flap gate (Clause 5.11) where the design water level is above the outfall invert.
-
(f) Subsidence. For an outfall in Rainfall Zones WB-Z5 and WB-Z6 (Annex 2A) to a tidal water body, or to a channel whose level is set by one, the SLA of Clause 5.7.4 shall be increased by the land subsidence expected over the design life of the element. The rate shall be the one measured at or near the site by levelling or by satellite radar (PS-InSAR); where no measurement is available, it shall be 5.5 mm/yr, the upper end of the range measured in Kolkata for 2017–2022 (Thakur et al., 2026) (set by this Manual). The sensitivity run of Clause 5.7.4(c) shall double the sea-level part of the SLA and keep the subsidence part.
No pump, lock, sluice or release operation that helps drainage, such as pumping a canal down before a storm, opening a lock or sluice early or staggering dam releases, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the canal, khal, river or channel (Clause 5.12.3).
Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. West Bengal's rivers break that assumption in two ways. Kolkata's khals and outfall channels have small catchments in the city and its suburbs, so the storm that fills the town drains also fills them, and their outlet is held by the tide or by the pumps. The Damodar is the opposite case: its flood comes from rain on the Chota Nagpur plateau, largely in Jharkhand, and reaches Howrah, Hooghly and Purba Bardhaman through the dams at Maithon and Panchet. But the plains are wet at the same time. In the storm of 26–29 September 1978, 369.6 mm fell at Alipore on 28 September, 409.3 mm at Uluberia on 29 September and 387.7 mm at Durgapur on 27 September (IMD), so the river flood and the town storm came from one system. In the north, the Teesta and the Torsa rise on rain in the hills while the same monsoon falls on Jalpaiguri, the wettest district of the State at about 3,720 mm a year (Guhathakurta et al., 2020). Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.
Clause 5.8.3 reflects two West Bengal cases. Below the Damodar Valley Corporation's dams, a government statement reported in the press put the combined peak release from Maithon and Panchet at about 2.5 lakh cusec (about 7,080 m³/s) from 08:00 to 18:00 on 17 September 2024, reduced to 80,000 cusec by 06:50 on 19 September; other reports gave more than 3 lakh cusec, DVC's own engineer was quoted at 1.7 lakh cusec, and a letter from the State Government cited about 5 lakh cusec, so the figures conflict. Howrah, Hooghly, Paschim and Purba Medinipur, Bankura and Purulia were flooded, with the Shilabati above danger level at Ghatal (press reports). The releases are decided by a committee on which West Bengal and Jharkhand are represented (as reported), and its operating rule was not found. In the north, more than 8,000 m³/s was reported released from the Teesta barrage when the South Lhonak glacial lake in Sikkim burst on 4 October 2023, and the flood left silt in the Teesta and in the Teesta–Mahananda link canal (secondary sources). No published operating rule or release hydrograph for any of these structures was found, so until one is published the largest recorded release applies, and that record is itself to be obtained from DVC and I&WD.
Clause 5.8.5 is set by this Manual. In West Bengal the tailwater at a town outfall is set less often by the open tide or a free river than by a structure and how it is worked: a pumping station, a lock, an embankment sluice or a dam.
The first is Kolkata's pumped and lock-gated system. The city slopes east from the Hooghly's levee. Tolly's Nullah was opened in 1777, the Circular Canal in 1820 and Chitpur lock in 1833; the Bidyadhari, the old outfall, was abandoned in 1928, and under the Kulti Outfall Scheme two parallel channels now carry the city's storm water and dry-weather flow separately for 27 km from Bantala to the Kultigang, "connected with the live Raimangal estuary" (I&WD). I&WD lists KMC's main pumping stations at Ballygunge (1,233 cusec), Palmer Bazar (1,184 cusec) and Dhapa Lock (480 cusec), its own stations at Uttarbhag, Chowbhaga and Keorapukur, and more than twenty smaller ones. The Bagjola canal, the main outlet for South Dum Dum, Bidhannagar and New Town, ends at a pump house at Kulti of 1,650 cusec that is reported to be inadequate; an upgrade to 4,000 cusec is reported as approved by CWC, but its status was not found (press reports). The KEIIP pumping stations discharge storm-water flow to the Churial, Begore, Rania, Western, Parnashree, Bagjola and other canals and Tolly's Nullah (KMC, 2017). When a lock is shut or a canal stands high, the canal becomes a closed reservoir for its catchment, and its outflow is whatever the pumps can lift. Clause 5.8.5(a) therefore routes the canal behind its station, with the whole catchment that drains to it, its present, silted storage, and only the pumping that is really available. It does not count the largest pump, for the same reason that Clause 5.12.2(b) requires a standby pump on every new station: a station cannot rely on every unit running through a storm. No operating rule for any lock, sluice or pumping station on the outfall channels, and no design water level for them, was found in the public domain.
The second is the East Kolkata Wetlands. The city's storm water and sewage pass east by the wetlands, a Ramsar site of 12,500 ha since 19 August 2002 (MoEF&CC), protected by the East Kolkata Wetlands (Conservation and Management) Act, 2006, under which their area and character are to be kept intact and a change of use needs sanction (as reported), and by the Calcutta High Court's judgment of 1992 that stopped further reclamation (secondary sources). Their storage role in a design storm was not researched, and they are not a detention basin for development. Clause 5.8.5(b) gives them no storage credit and leaves every work in them to the Act.
The third is the embankment. The islands of the Sundarbans, which became a Ramsar site of 423,000 ha on 30 January 2019 (MoEF&CC), and much of the coast and the lower rivers, lie behind I&WD embankments, about 3,122 km in the Sundarbans alone, and drain through sluices at low tide. Cyclone Aila breached about 177 km of them on 25 May 2009 and severely damaged a further 601 km (I&WD), and in Cyclone Yaas in May 2021, 51 embankment breaches were reported in Purba Medinipur and 24 in South 24 Parganas (press reports). Behind a sluice, the drainage of a town such as Canning, Kakdwip, Namkhana or Gosaba is a polder problem. Clause 5.8.5(c) treats the sluice as a gate and the embankment as one that can breach.
The fourth is the dam-release reach. Howrah, Hooghly and Purba Bardhaman lie below Maithon and Panchet, so their outfalls to the Damodar, the Mundeswari and the Rupnarayan are set by releases decided outside the State as well as inside it (Clause 5.8.3). The Ghatal basin, on the Shilabati, Kangsabati and Rupnarayan, is described as a bowl that cannot drain; the State is reported to be carrying out the Ghatal Master Plan from its own funds from 2025–26 (press reports). In the north, the Teesta at Jalpaiguri flows below the Gajoldoba barrage, and the 2023 outburst raised its bed with silt (secondary sources), which is why Clause 5.8.5(d) asks for a bed survey made after it. West Bengal has no flood lines and no floodplain zoning law: the CAG asked I&WD in 2019 to adopt the model flood plain zoning bill, and found flood works "taken up at different locations depending on priority and availability of funds without being linked to a comprehensive plan" (CAG, 2019). Clause 5.8.5(d) therefore uses the highest recorded flood level as a floor for the major-system cases.
The fifth is subsidence. Kolkata's ground is sinking at 2.8 to 5.5 mm/yr (2017–2022), over a growing area, and earlier studies gave rates of up to 12 mm/yr (Thakur et al., 2026), against a sea-level trend of 3.73 mm/yr at Diamond Harbour (PSMSL). Over a 50-year design life, subsidence at the upper end of the measured range adds about 0.28 m, nearly as much as the minimum SLA of Clause 5.7.4, and relative sea-level rise at a Kolkata outfall is the sum of the two. PSMSL makes no correction for land movement, and a tidal level taken from a tide table and connected to a benchmark that is itself sinking understates the future tailwater. Clause 5.8.5(f) adds the subsidence to the SLA, with the upper end of the measured range as the default because the subsiding area is reported to be growing.
5.9 Joint-probability cases
5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.
Table 5.2 — Joint-probability cases for tidal and riverine outfalls
| Case | Rainfall | Tailwater | Applies to | Basis |
|---|---|---|---|---|
| J1 | Minor-system design AEP, Tc to 24 h | MHWS + SLA (tidal curve) | Minor system | Clause 2.12(a); Clause 5.7.1 |
| J2 | 1% AEP, all durations of Clause 2.5.2 | HAT + surge + SLA | Major system, detention, tanks, pumped systems | Clause 5.7.1 |
| J3 | 10% AEP, 48 h | 1% AEP still-water level + SLA | Major system, detention, tanks, pumped systems | Clause 2.12(b) |
| J4 | Design AEP, 48 h (72 h reported) | Tidal curve per J1 with two 6 h lock windows (Clause 5.10) | All storage and every gated or tide-affected outfall | Clause 5.10 |
| R1 | Site design AEP | River at 10% AEP level | Riverine outfalls | Clause 5.8.4(a) |
| R2 | Site 10% AEP | River at design-AEP level | Riverine outfalls | Clause 5.8.4(b) |
5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).
5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.
5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.
Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.
5.10 Outfall-closed (tide-locked) storage check
5.10.1 Where it applies. The check applies to:
- every storage facility;
- every minor- and major-system element; and
- every pumped system
whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).
5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:
- the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
- AMC III.
The 72-hour storm shall also be run and reported.
5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:
- (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
- (b) During each lock window, gravity discharge is zero.
- (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
- (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.
5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:
- (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
- (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
- (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.
In volume terms, over each lock window and the full storm:
V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)
This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).
5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).
5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:
- sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
- the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.
Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.
Commentary. The outfall-closed check is the distinctive West Bengal requirement in this Manual. Kolkata shows why. The city falls away from the Hooghly, so its gravity outfalls to the river work only through locks and gates while the river is low, and its eastern basins depend on pumps that discharge to canals which are themselves tidal. At the KEIIP pumping station at Behala Flying Club the storm-water pumps have to run in parallel, and the basin stays flooded because discharge through the outfall "is partially achieved due to high water levels in the canal, particularly during tidal period" (KMC, 2015). On 23 September 2025, 185.6 mm fell at Alipore in three hours (IMD, 2025), and the waterlogging was blamed on "disfigured drainage and choked canals, coupled with heightened high tide"; nine to twelve people died, most of them electrocuted (press reports). The coast is harder still. The maximum tidal range at the mouth of the Hooghly is about 17 ft, and a tidal bore runs up the river on practically every spring tide (CWPRS), so a gravity outfall above low water but below high water can discharge for only part of each tide, and a sluice through a Sundarbans embankment stays shut for as long as the river outside stands high. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.
The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.
Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.
5.11 Flap gates, tide gates and non-return valves
5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.
5.11.2 Hydraulics. The design shall include:
- the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
- the reduction in effective outfall capacity when the gate is partly open.
Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.
5.11.3 Construction.
- (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
- (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
- (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
- (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
- (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.
5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:
- the major-system tailwater (J2) at the point of connection; or
- the maximum stage in the outfall-closed check (Clause 5.10).
Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.
5.11.5 Inspection. Gates and valves shall be inspected and operated:
- before 15 May each year;
- after every event in which they closed against a storm flow; and
- as set in the maintenance plan (Chapter 10).
Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. Both failures matter in West Bengal. Kolkata's eastern drainage passes locks and gates such as Chitpur lock, built in 1833 where the Circular Canal meets the Hooghly (I&WD), whose operators have warned of damage at full-moon high tides (press reports). The Sundarbans drain through sluices in about 3,122 km of I&WD embankments, of which about 177 km were breached and a further 601 km severely damaged in Cyclone Aila in May 2009 (I&WD); a sluice jammed open lets the tide behind the embankment, and one held shut by silt keeps the land behind it flooded after the water outside has fallen. The 15 May inspection date is set ahead of the SW monsoon.
5.12 Pumped outfalls
5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:
- the outfall-closed check of Clause 5.10;
- the drawdown requirement of Clause 4.7; or
- the J2 and J3 cases.
Pumping shall not be used where a gravity solution meets these requirements.
5.12.2 Capacity.
- (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
- (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
- (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.
5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.
5.12.4 Power supply. Pumping stations shall have either:
- two independent power supplies; or
- standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.
Changeover shall be automatic.
5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:
- the 1% AEP flood level + 0.5 m; and
- HAT + surge + SLA + 0.5 m.
Access to the station shall remain usable in the 1% AEP event.
5.12.6 Discharge arrangement. Rising mains shall discharge:
- over a level above the J2 tailwater; or
- through a non-return valve and a flap gate.
The arrangement shall prevent back-siphoning.
5.12.7 Controls and monitoring. Each station shall have:
- automatic level control;
- remote alarms for high level, pump failure and power failure, sent to the operator; and
- a level and run-time log kept for at least 5 years.
Wet wells shall be sized to keep pump starts within the manufacturer's limits.
5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).
5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 15 May each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).
Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.
5.13 Sand-bar closure of river mouths
5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes any river or creek mouth on the Purba Medinipur coast or in the Sundarbans that a pre-monsoon survey shows closed or restricted by sand or silt, and any other mouth listed in Annex 5B.
5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless I&WD certifies that:
- a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
- the programme is funded for the current season.
5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:
- (a) the tidal tailwater of Clause 5.7; and
- (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.
5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless I&WD has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.
5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.
Commentary. The research for this Manual found no record of seasonal sand-bar closure at the mouths of West Bengal's rivers or creeks, and no I&WD or municipal procedure for clearing them. In the delta the outfalls close with silt rather than sand: the Bidyadhari, once Kolkata's outfall, declined and was finally abandoned by the Government in 1928, which is why the city now drains to the Kulti (I&WD), and silt from the 2023 South Lhonak outburst was reported in the Teesta–Mahananda link canal (secondary sources). Silting of that kind is dealt with by the present-condition storage of Clause 5.8.5(a) and the river bed survey of Clause 5.8.5(d). So Clause 5.13.4 gives no credit for cutting at present, and the mouths to which Clause 5.13.1 applies, on the Purba Medinipur coast and in the Sundarbans, are to be confirmed by pre-monsoon survey and listed in Annex 5B. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.
5.14 Documentation
Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:
- a plan of the analysis extent showing:
- the site;
- each analysis point with its contributing catchment area and the site's percentage of it; and
- the end point and the reason it was chosen (Clause 5.3);
- the model description:
- software and version;
- the network schematic, with survey sources for the drains and crossings;
- land use and CN for off-site areas;
- any upstream detention included; and
- calibration or validation evidence where available;
- for each analysis point, AEP and duration, the existing and with-project:
- peak flow;
- time to peak;
- maximum water level and velocity; and
- duration of inundation (Clause 5.4);
- the comparison against Clause 5.5, with each failure identified and the remedy adopted;
- the tailwater derivation:
- tide-table edition and port;
- MHWS, HAT and MSL relative to chart datum;
- the datum connection to the Survey of India benchmark and the project datum;
- surge source and value;
- SLA; and
- river levels and their sources (Clauses 5.6 to 5.8);
- the joint-case table of Clause 5.9 with results;
- the outfall-closed check (Clause 5.10):
- storm and lock alignment;
- stage hydrographs; and
- the volume balance for each lock window;
- a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
- pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
- the sand-bar assumption and supporting I&WD certification, where relevant (Clause 5.13); and
- inspection and maintenance requirements for Chapter 10.
Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §6.3.6 and Table 6.2 (coastal tailwater; +0.3 m climate allowance). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- MoHUA / CPHEEO (2013). Manual on Sewerage and Sewage Treatment Systems (pumping stations).
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.5, ten-percent downstream analysis). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Vol. 1 (Standard #8) and Vol. 2 §3.1.9. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- MARC. The Evolution of Regional Stormwater Design Standards. https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- Irrigation and Waterways Department, Government of West Bengal. Kolkata Metropolis Drainage (history of the outfalls, Kulti Outfall Scheme, installed pumping capacities), web page as archived on 1 May 2026. https://web.archive.org/web/20260501071330/https://wbiwd.gov.in/index.php/applications/kolkata_drainage
- Irrigation and Waterways Department, Government of West Bengal. AILA (embankment damage in the Sundarbans, May 2009), web page as archived on 1 May 2026. https://web.archive.org/web/20260501071547/https://wbiwd.gov.in/index.php/applications/aila
- Kolkata Municipal Corporation for the Asian Development Bank (2015). Initial Environmental Examination, Kolkata Environmental Improvement Investment Program, Tranche 1: Sewerage and Drainage, updated and revised final report, October 2015 (combined system; pumping stations; Behala Flying Club). https://ewsdata.rightsindevelopment.org/files/documents/23/ADB-42266-023_TfN9hJv.pdf
- Kolkata Municipal Corporation for the Asian Development Bank (2017). Initial Environmental Examination, Kolkata Environmental Improvement Investment Program, Tranche 2, March 2017, Table 37 (salient design considerations; canals receiving storm-water flow). https://www.adb.org/sites/default/files/project-documents/42266/42266-025-iee-en_0.pdf
- Asian Development Bank (2016). Periodic Financing Request Report, Kolkata Environmental Improvement Investment Program, Tranche 2, Project 42266-025. https://ewsdata.rightsindevelopment.org/files/documents/25/ADB-42266-025_dnsshKo.pdf
- Comptroller and Auditor General of India (2019). Report No. 2 of 2019: Performance Audit of Implementation of Flood Control Measures in West Bengal, Chapter 6. https://cag.gov.in/webroot/uploads/download_audit_report/2019/7.%20Chapter%206-0624302347a92f2.77846330.pdf
- Ministry of Environment, Forest and Climate Change (2024). 80 Ramsar sites of India (East Calcutta Wetlands; Sunderbans Wetland). https://moef.gov.in/uploads/2024/03/80-Ramsar-sites-of-India-31-01-2024.pdf
- Government of West Bengal. East Kolkata Wetlands (Conservation and Management) Act, 2006 (West Bengal Act VII of 2006), ss.2, 9 to 11 (as reported in an unofficial text). https://wbxpress.com/east-kolkata-wetlands-conservation-management-act-2006/
- India Meteorological Department (2013). Extremes of Temperature and Rainfall for Indian Stations (up to 2012) (Alipore, Uluberia, Durgapur). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- Guhathakurta, P. et al. (2020). Observed Rainfall Variability and Changes over West Bengal State. Met Monograph ESSO/IMD/HS/Rainfall Variability/29(2020)/53, India Meteorological Department.
- Press reports on the DVC releases of September 2024, reporting a government statement (ThePrint, Devdiscourse; seen through search summaries); on the Kulti pump house (The Telegraph); on the Ghatal Master Plan (The Statesman, Millennium Post); on Cyclone Yaas (Down To Earth, The Wire, The Telegraph); and on the Kolkata flood of 23 September 2025 (Down To Earth). https://www.downtoearth.org.in/climate-change/unexpected-interaction-of-atmospheric-conditions-not-cloudburst-caused-kolkatas-intense-180mm-rainfall-in-3-hours-says-imd
- Survey of India. Tidal Predictions: Geodetic and Research Branch. https://www.geographyandyou.com/survey-of-india/tidal-predictions-geodetic-and-research-branch-survey-of-india
- GLOSS. India national report (tide-gauge network and datums). https://gloss-sealevel.org/gloss/gloss/sites/gloss/files/publications/documents/india_ge9.pdf
- Adani Ports (2025). Tide Table 2025, Dahej (notes on NHO INP-12 coverage and data sources). https://www.adaniports.com/-/media/Project/Ports/PortsAndTerminals/Dahej-Port/Marine-Documents/Tide-Table-2025-Dahej.pdf
- INCOIS. Storm-surge and swell-surge warning services. https://incois.gov.in/
- INCOIS (2025). Technical Report ESSO-INCOIS-OMDA-TR-04(2025) (extreme sea-level components and projections, Diamond Harbour). https://incois.gov.in/documents/Reports/TechnicalReports/TR_ESSO-INCOIS-OMDA-TR-04(2025)_20250725114934.pdf
- PSMSL. Stations 543, Diamond Harbour; 1270, Haldia; 369, Garden Reach; 417, Saugor; and 48, Kidderpore (station pages); and relative sea-level trends table. https://psmsl.org/data/obtaining/stations/543.php ; https://psmsl.org/data/obtaining/stations/1270.php ; https://psmsl.org/data/obtaining/stations/369.php ; https://psmsl.org/products/trends/trends.txt
- Gole, C.V. and Vaidyaraman, P.P. Salinity distribution and effect of fresh water flows in the Hooghly River. Coastal Engineering Proceedings (ICCE), Chapter 79 (CWPRS; tidal range and bores, data of 1963–64). https://icce-ojs-tamu.tdl.org/icce/article/download/2492/2157/10823
- Thakur, A.K., Singh, A., Garg, R.D. and Jain, K. (2026). Spatiotemporal analysis and forecasting of ground deformation in Kolkata using PS-InSAR. ISPRS Annals XI-3-2026, 943. https://isprs-annals.copernicus.org/articles/XI-3-2026/943/2026/isprs-annals-XI-3-2026-943-2026.pdf
- India Meteorological Department (2020). Super Cyclonic Storm "AMPHAN" over the southeast Bay of Bengal (16th–21st May, 2020): A Report, 14 June 2020. https://internal.imd.gov.in/press_release/20200614_pr_840.pdf
- India Meteorological Department (2025). Press Release: Extremely Heavy Rainfall over Kolkata, 23 September 2025. https://internal.imd.gov.in/press_release/20250923_pr_4321.pdf
- FHWA. HEC-22 Urban Drainage Design Manual (current edition), Table 7.3 (coincident frequencies).
- Purdue University JTRP (2023). Development of a Multiple Water Course Joint Probability Analysis Procedure for Indiana Watersheds, FHWA/IN/JTRP-2023/09. https://docs.lib.purdue.edu/jtrp/1820
- PUB Singapore (2025). Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3. https://info.corenet.gov.sg/docs/default-source/pub-circulars/pub-circular_cop-7th-ed-addendum-no-3_16-apr-2025.pdf?sfvrsn=5a2c1e1a_2
Annexes and forms
| Annex / Form | Content |
|---|---|
| 5A | Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment |
| 5B | Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map |
| 5C | Worked example: outfall-closed check for a site beside a khal in Kolkata's eastern suburbs |
| Form 5-1 | Downstream and Tailwater Report |
| Form 5-2 | Simplified Downstream Statement (small sites) |
Commentary. West Bengal's drains fail in two places that site design does not see. At the outfall, the tide and the pumps decide. Kolkata lies on the natural levee of the Hooghly, about 130 km above its mouth, and the land slopes east, away from the river (I&WD), so most of the city's storm water is lifted by pumping stations into outfall channels that run past the East Kolkata Wetlands to the Kultigang. KMC's three main stations, at Ballygunge, Palmer Bazar and Dhapa Lock, have about 2,900 cusec installed between them (I&WD), and in a storm the KEIIP stations pump storm-water flow mixed with sewage to the canals (KMC, 2015). When the canals stand high at high tide, the basins behind them stay flooded. Downstream, the rivers rise on dam releases: in September 2024 the combined release from Maithon and Panchet on the Damodar reached about 2.5 lakh cusec, and parts of Howrah, Hooghly and the two Medinipurs were flooded (press reports). On the coast, cyclones bring surge and rain together, and the Sundarbans drain through sluices in about 3,122 km of I&WD embankments, of which Cyclone Aila breached about 177 km in May 2009 (I&WD). A detention basin that meets every release rate in Chapter 4 still fails if the drain below it is already full, or if its outfall is shut. This chapter makes both failure modes part of the design.