Status. This Supplement is part of Draft v1.0 of the Manual. Neer prepared it as a proposal for applying the Manual in the Union Territory of the Andaman and Nicobar Islands. The Union Territory is administered by the President through an Administrator, the Lieutenant Governor, under Article 239 of the Constitution, so the authority that could adopt this Supplement is the Andaman and Nicobar Administration. The islands are linked to West Bengal through the jurisdiction of the Calcutta High Court and through language, not through law: no West Bengal Act, rule or authority applies in them.
Not adopted. This Supplement has not been adopted, notified or endorsed by the Andaman and Nicobar Administration or the Lieutenant Governor, or by any of the Administration's departments, the Sri Vijaya Puram Municipal Council, the Andaman Public Works Department (APWD), any panchayat or Tribal Council, the Andaman and Nicobar Coastal Zone Management Authority or any other agency, nor by the Government of West Bengal or any of its departments. Where it names a body, it describes the role that body would have if the Manual and this Supplement were adopted. It does not say the body has agreed to that role. Until the Administration adopts it, the regulations, bye-laws, Master Plans and approval conditions in force in the Union Territory continue to apply.
S1.1 Scope
S1.1.1 This Supplement applies to the Union Territory of the Andaman and Nicobar Islands, in its three districts:
- (a) South Andaman, including the Sri Vijaya Puram Municipal Council (SVPMC; formerly the Port Blair Municipal Council, renamed after Port Blair was renamed Sri Vijaya Puram in September 2024, as reported), with 24 wards over about 41 km², and the Port Blair Planning Area;
- (b) North and Middle Andaman; and
- (c) Nicobar.
It applies in the area of the Municipal Council, in the planning areas notified under the Andaman and Nicobar Islands Town and Country Planning Regulation, 1994 (the TCP Regulation) and the Andaman and Nicobar Islands Town and Country Planning Rules, 2005, in panchayat areas, and to works of APWD and other departments of the Administration, subject to Clause S1.11 for tribal reserves.
S1.1.2 How this Supplement works. In the islands, the chapters and annexes of the Manual apply as written, except as modified by Table S1.1 and Clauses S1.3 to S1.12. Where the Manual names a West Bengal body, statute or rule, the Union Territory instrument or body in Table S1.1 or Table S1.2 is read in its place. Clauses S1.5 (subsided land and tide-locked outfalls) and S1.11 (tribal reserves) take precedence over any clause of the Manual that they contradict. Clause, table, annex and form numbers do not change.
S1.1.3 Values marked [TBC] are to be confirmed from the primary source before adoption. Until they are confirmed, the clause concerned states the rule that applies in the meantime.
S1.1.4 Large projects in the islands, including the Great Nicobar project, are subject to the conditions of their environmental clearance and of the Island Coastal Regulation Zone Notification, 2019. The Manual and this Supplement apply to them in addition to those conditions and do not relax any of them.
S1.2 How the Manual applies: clause-by-clause modifications
S1.2.1 The clauses of the Manual listed in Table S1.1 apply in the islands with the changes shown. Clauses not listed apply unchanged.
Table S1.1 — Modifications to the Manual for the Andaman and Nicobar Islands
| Manual clause | What changes in the islands |
|---|---|
| 1.3.1 Notification | Statutory effect would be given (a) within the Municipal Council, by an amendment to the Port Blair Municipal Council Building Bye-Laws (Notification No. 161/99/F.No.3-53/97-LSG of 13-10-1999), confirmed by the Lieutenant Governor under the municipal law in force (see the commentary below this table); (b) in the planning areas, by rules or Master Plan conditions under the TCP Regulation and the TCP Rules, 2005; and (c) in panchayat areas, by an amendment to the building-operation rules under the Andaman and Nicobar (Panchayat Administration) Rules, 1997, whose text could not be read for this draft [TBC]. The West Bengal instruments do not apply. |
| Building rules ("KMCBR/WBMBR" throughout) | Read as the Port Blair Municipal Council Building Bye-Laws, 1999, as amended (an amendment of 2018 is reported to have taken effect on 21-02-2019; its text was not read [TBC]), within the Municipal Council; and as the TCP Rules, 2005 and the Master Plans of the Port Blair Planning Area (2012) and of Swaraj Dweep and Shaheed Dweep (2015) in their planning areas. A TCP (Amendment) Regulation, 2026 is reported to have been promulgated on 28-07-2026; its content was not read [TBC]. |
| 1.3.2 State Stormwater Technical Committee | The committee would be constituted by the Lieutenant Governor. CPHEEO (2019) allows a committee "constituted by State/UT Government". |
| 1.4.1 Approving Authority | The Municipal Council within its limits; the Town and Country Planning Unit of APWD (Chief Engineer and Town Planner) in the planning areas; the panchayat or other authority that grants building permission under the rules in force elsewhere; and APWD or the department concerned for its own works. Tribal areas: Clause S1.11. |
| 1.5.3 RWH | Bye-law 4.8 applies: every person who constructs, reconstructs, adds to or alters a building "shall provide a proper spout /tank for collection of rain water which shall be utilized for various domestic purpose other than drinking". It sets no threshold, size or recharge rule. It is modified by Clause S1.8, which makes storage for use the first requirement. |
| 1.6 Tiers | The Municipal Council and the Town and Country Planning Unit of APWD are Tier B authorities, and so are all other authorities in the islands (set by this Supplement). The Municipal Council may opt into Tier A under Clause 1.6.4. |
| 1.8, 1.9 Other instruments and roles | The West Bengal instruments (the KMC Act 1980, KMCBR 2009, WBMBR 2007, the T&CP Act 1979, the West Bengal Inland Fisheries Act 1984 and the East Kolkata Wetlands Act 2006) do not apply in the islands. Roles are as in Table S1.2. |
| 1.10.2 Waiver of detention | Applies, but not to a site that drains to land on the register of Clause S1.5.3 or to a creek or channel that is tide-locked under Clause S1.5.4. |
| 2.3 Approved sources of design rainfall | Clause S1.4. The interim CWC source of Clause 2.3.6 and the CWC floor of Clause 2.3.3(b) do not apply: no CWC flood estimation subzone covers the islands. Where the Manual refers to the NIH-DHAARA value or to the value under Clause 2.3.6, the value under Clause S1.4.1 is meant. |
| 2.11.4 Antecedent moisture; pre-monsoon dates | Clause S1.4.5. |
| 4.4, 8.8, 8.11 Retention, infiltration and recharge | Modified by Clauses S1.8 and S1.9. |
| 5.7 Tidal tailwater | Applies, with Clause S1.6. Every level shall be on the post-2004 datum of Clause S1.5.1. |
| 5.8 Riverine backwater | Applies to the short perennial streams and tidal creeks of the islands. Below the Dhanikhari dam, the spill and release of the dam shall be included as in Clause 5.8.3; its operating rule and spillway capacity are [TBC]. |
| 5.10, 5.11 Outfall-closed check; tide gates | Clauses S1.5.4 and S1.5.5. |
| 5.13 Sand bars | Applies to creek mouths where a bar forms. |
| 6.11 Floor levels | The plinth of bye-law 6.1, "not less than 30cm above the ground or site level", is a minimum only. Clause 6.11 applies, with the levels on the post-2004 datum of Clause S1.5.1, and the higher level governs. In the coastal band, Clause S1.7.4. |
| 6.11.6, 7.12 Coastal band | Clause S1.7. |
| 7.4 Setbacks | Bye-law 4.7 requires precautions within 15 m of "any tank, reservoir, water course, river fresh water channel or well" so that the drainage of a building does not pass into it, but it does not keep the bank clear. As in West Bengal, the hydraulic corridor of Clause 7.4 applies, with its Zone 1 minimum, and is stricter than the bye-laws (set by this Supplement). |
| Chapter 7 custodian and NOC | Whether APWD or the Municipal Council owns and maintains the major storm drains and nallahs of Sri Vijaya Puram is [TBC]. Until it is confirmed, where the Manual names I&WD as custodian or requires its NOC, the Authority shall consult APWD and record its response. |
| 8.12 Erosion and sediment control | Clause S1.10. |
| 10.4.4(c) GIS data | The islands lie in UTM zone 46N (EPSG:32646), not in zone 45N (EPSG:32645), which covers West Bengal. |
| 10.16 Post-event review | Led by the disaster management authority of the Union Territory, in place of WBSDMA, with the Deputy Commissioner of the district; the names of the bodies are [TBC]. |
| Chapter 11 Basin plans | The planning unit is the island, and on South Andaman each creek catchment that drains to the harbour of Sri Vijaya Puram. Plans shall map the land on the register of Clause S1.5.3. |
Commentary. The bye-laws of 1999 were confirmed by the Lieutenant Governor under section 202(3) of the Andaman and Nicobar Islands (Municipal) Regulation, 1994, and they cite that Regulation. The Municipal Council's own website, however, says it works under the Andaman and Nicobar Islands (Municipal Board's) Regulation, 1957. Which Regulation is now in force, and so the route by which an amendment to the bye-laws would be made, could not be resolved for this draft [TBC]; Table S1.1 therefore refers to the municipal law in force. The texts of the Municipal Regulation of 1994, the TCP Regulation and the Protection of Aboriginal Tribes Regulation, 1956 could not be retrieved from India Code. The bye-laws already contain the hooks this Supplement needs: site drainage by surface water drains "if the Authority so requires" (bye-law 4.1), "measures for checking the erosion of soil and sliding due to excavation" before any site is approved (4.5), precautions near water (4.7), rainwater collection (4.8), foundations that resist "sliding of the sub-stratum on sloping ground" (5.4) and a plinth of at least 30 cm (6.1). What they lack is a size for the rainwater store, any detention or peak-flow rule, an erosion plan of stated content, and a floor level tied to the tide and to the subsidence of 2004. All authorities are Tier B because only one urban local body exists in the Union Territory and it issued 134 building permits in 2024-25.
Table S1.2 — Roles in the Union Territory
| Body | Role under this Manual |
|---|---|
| Lieutenant Governor (Administrator); Andaman and Nicobar Administration | Would amend the bye-laws and rules (Table S1.1, 1.3.1) and constitute the committee of Clause 1.3.2; directions under Clause S1.11. |
| Sri Vijaya Puram Municipal Council | Approving Authority within its limits; maintenance of streets, roads and drains, a listed function of the Council; distribution of water; receives handed-over assets (Clause 10.14). |
| APWD: Town and Country Planning Unit (Chief Engineer and Town Planner) | Approving Authority in the planning areas; keeper of the Master Plans; would prepare the rules of Table S1.1. |
| APWD (works, water supply) | Bulk water supply, including the Dhanikhari dam; public works; custodian of drains and nallahs subject to the [TBC] in Table S1.1. |
| Panchayats; Tribal Councils | Approving Authority where the rules in force make them one; Tribal Councils as in Clause S1.11. |
| Andaman and Nicobar Coastal Zone Management Authority | Appraises ICRZ plans and clears projects under the ICRZ Notification (Clause S1.7). |
| Disaster management authority of the Union Territory; Deputy Commissioners | Warnings, event records, post-event review (Table S1.1, 10.16). |
| IMD (Meteorological Centre, Sri Vijaya Puram); INCOIS; Survey of India; National Hydrographic Office | Rainfall records and cyclone warnings; tide gauges and sea-level products; datums and tide tables (Clauses S1.4 to S1.6). |
S1.3 West Bengal values and island soils
S1.3.1 Where the Manual gives a value or rule for a West Bengal zone, district or body, it does not apply in the islands unless this Supplement applies it. In particular, the rainfall zones of Annex 2A, the CWC subzones and the West Bengal soil classes of Chapter 3 do not extend to the islands.
S1.3.2 Soils. Until a field test is made, the hydrologic soil group shall be taken as C on the hill soils of the islands, and as D on the subsided land of Clause S1.5.3, on mangrove and tidal mud and on land within 100 m of a tidal creek (set by this Supplement). A field test is required above Tier B.
Commentary. No soil-group mapping for the islands was found. The hill soils over the siltstones, sandstones and ophiolites around Sri Vijaya Puram are shallow, and on steep slopes rain runs off quickly; subsided and tidal land is waterlogged. Clause S1.3.2 takes the cautious group in each case until a test is made.
S1.4 Design rainfall and season
S1.4.1 Source. NIH-DHAARA coverage of the islands is [TBC]. Until it is confirmed, design depths shall be taken as follows:
- (a) Within 10 km of the IMD observatory at Sri Vijaya Puram, from the station IDF relationship of Tamrakar and Goel (2018), Clause S1.4.2. For the purpose of Clause 2.3.2(b), this Supplement treats that relationship, published in IMD's journal MAUSAM from 32 years of IMD hourly records, as approved for this use (set by this Supplement).
- (b) Elsewhere, from a frequency analysis of the IMD record at the nearest IMD station with a long record (Sri Vijaya Puram, Mayabunder, Long Island, Hut Bay, Car Nicobar or Nancowry), or at another station agreed with the Authority: for 24 hours and longer, from the daily record; for shorter durations, from the recording-gauge record of the same station where it is available, and otherwise by ratios agreed with the Authority under Clause 2.6.2.
- (c) In every case, the method, record length and values shall be stated on Form 2-1. Where NIH-DHAARA covers the site, its value shall be reported and the greater of the two values used (Clause 2.3.2).
S1.4.2 Port Blair IDF relationship. Tamrakar and Goel (2018) fitted the Gumbel (EV1) distribution to annual maxima of 1 to 24 hours at Port Blair, 1969–2000, and recommend a relationship (their Eq. 3) with K = 5.816, x = 0.232, a = 0.529 and b = 0.733, with i in cm/h, T in years and t in hours. The form of the equation could not be read from the published copy; it is taken as i = K·T^x / (t + a)^b [TBC], to be confirmed against the paper before use. Until it is confirmed, the designer shall check the values from it against Table S1.3 and report the check. The paper's conversion from 24-hour to shorter durations (its Eq. 11) shall not be used until its form is confirmed [TBC].
Table S1.3 — Annual maximum rainfall depths at Port Blair, 1969–2000 (mm)
| Duration | 1 h | 2 h | 3 h | 6 h | 12 h | 24 h |
|---|---|---|---|---|---|---|
| Mean of annual maxima | 55.9 | 77.2 | 89.3 | 109.7 | 131.9 | 171.6 |
| Largest annual maximum | 122.0 | 205.2 | 249.2 | 272.1 | 285.7 | 404.8 |
Source: Tamrakar and Goel (2018), Table 1. Evidence for checking only; not design values (Clause 2.3.4(c)).
S1.4.3 Annual and monthly rainfall. For rainwater storage (Clause S1.8) the designer shall use the monthly record of the station of Clause S1.4.1. For Sri Vijaya Puram, the mean annual rainfall is 2,815 mm over 1991–2020 and 2,914 mm over 1947–2023, computed from the annual series of the Directorate of Economics and Statistics. The "normal" of 3,180 mm printed on the same sheet shall not be used until its period is known.
S1.4.4 The climate factor of Clause 2.8 applies.
S1.4.5 Season and antecedent moisture. The islands have two rainy seasons: the south-west monsoon from May to September and a second season from October to December, of the north-east monsoon and cyclonic storms; January to April is dry. In the islands (set by this Supplement):
- (a) AMC III applies to every design storm from June to September, and to cyclone design storms in May and from October to December; AMC II applies otherwise;
- (b) the pre-monsoon date by which works are completed and earthworks stabilised, set at 15 May for West Bengal, is 30 April; and
- (c) a second inspection of drains, sluices and tide gates shall be made by 30 September, before the October–December season.
Commentary. Port Blair's annual rainfall ranged from 1,950 mm (1979) to 4,362 mm (1961) over 1947–2023. In 2021–2023, less than 30 mm fell from January to April 2023, the monsoon arrived in May with 100–494 mm, and September 2023 brought 1,060 mm; October to December brought 86–307 mm a month. Other stations differ: Long Island received 4,844 mm in 2019, Car Nicobar 2,317–2,985 mm in 2015–19. Tamrakar and Goel found that Port Blair falls in none of the zones of the generalised Indian IDF formulae, which Clause 2.3.4(a) already excludes. Their relationship meets Clause 2.3.2(a), with 32 years of hourly data, and 2.3.2(c) only near the observatory; it was published in IMD's journal but not issued by IMD, which is why Clause S1.4.1(a) states that this Supplement accepts it. The CWC flood estimation subzones stop at the mainland, so the CWC floor cannot apply. The single-day falls of Cyclone Lehar, which crossed near Port Blair on 25 November 2013, were 243 mm at Mayabunder and 213 mm at Port Blair (secondary source). The cyclone months are why the dates of Clause S1.4.5 differ from West Bengal's. These records are evidence only and are not design values.
S1.5 Subsided land and tide-locked outfalls
S1.5.1 Post-2004 datum. Every level used under the Manual in the islands (outfall inverts, tide and surge levels, flood levels, floor levels and ground levels) shall be referred to a datum established after the earthquake of 26 December 2004, connected to a Survey of India benchmark levelled after that date. The datum, the benchmark and the date of its levelling shall be stated on Form 5-1.
S1.5.2 No pre-2005 levels without conversion. Levels, drawings, tide-gauge records and tide-table datums from before 2005 shall not be used unless they have been converted to the datum of Clause S1.5.1 by a documented connection. No single offset for the subsidence shall be applied across a site or an island in place of a survey: the vertical movement varied from place to place (Commentary).
S1.5.3 Register of tidal low land. The Approving Authority should keep a register and map of land that has flooded on ordinary tides since 2004. Until the register is published, a designer shall treat as tidal low land any land that the site survey shows to be flooded at mean high water springs on the post-2004 datum. Tidal low land:
- (a) is part of the tidal waterbody for the purposes of Chapters 5 and 7, not land available for storage;
- (b) shall not be counted as detention or retention storage; and
- (c) shall not receive a drain outfall except through a sluice or tide gate designed under Clause S1.5.5.
S1.5.4 Outfall-closed check. The outfall-closed check of Clause 5.10 is the governing design case for every drain, storage facility and pumped system whose outfall discharges to a creek, inlet or tidal low land in South Andaman or the Nicobars. Where the tailwater of Clause S1.6 is above the outfall invert for the whole design storm, the outfall shall be treated as fully closed (Clause 5.9.4).
S1.5.5 Sluices and tide gates. Clause 5.11 applies to every sluice, flap gate and tide gate on a drain or creek. In addition (set by this Supplement):
- (a) every sluice or gate shall have an owner named in the drainage report and a maintenance schedule under Chapter 10;
- (b) it shall be inspected before 30 April and 30 September (Clause S1.4.5) and after every cyclone warning for the island; and
- (c) a gate that has failed shall be reported to the Approving Authority, and the land it protects shall be treated as tidal low land under Clause S1.5.3 until it is repaired.
Commentary. The earthquake moved the islands unevenly. GPS points measured before and after it show the control point at Port Blair down by 0.87 m, Car Nicobar down by 1.05 m and Campbell Bay down by 1.36 m, while Diglipur in the north rose by 0.63 m and Hut Bay by 0.36 m (Earnest et al., 2005). At the tide gauge in Port Blair, sea level after the earthquake stood "~1 m above the pre-earthquake datum, indicating subsidence of the gauge itself". At Sipighat, near the city, the same study found "flooding even during low tides", with houses "submerged to the level of window sills". Other studies give subsidence of 0.5–2.8 m along the islands (secondary source). Low land around the city therefore sits about a metre lower relative to the sea than it did before 2004, and drawings and datums from before that date are offset by an amount that varies from place to place. Sluices matter: a defunct sluice at Kadakachang let seawater flood fields near Stewart Gunj, and a sluice at Wandoor, damaged by rain, let seawater into Wandoor and Humfraygunj (secondary sources). In June 2025 waterlogging at School Line, Mohanpura and Gandhi Market in Sri Vijaya Puram was reported to be worse "when tides run high" (secondary source). The tsunami of 2004 ran up about 3.5 m at Munda Pahar and Chidiya Tapu; the Manual does not design drainage for tsunami, which is a matter for the disaster management plan.
S1.6 Tides, surge and sea level
S1.6.1 Tide levels. Current values of MHWS and HAT at Sri Vijaya Puram, on the post-2004 datum, are [TBC] from the Survey of India or the National Hydrographic Office. Until they are confirmed, the designer shall take MHWS and HAT from the current Indian Tide Tables for Port Blair, state the edition and the chart datum used, and connect the chart datum to the datum of Clause S1.5.1 under Clause 5.7.2(b). Tide-gauge records of PSMSL station 206 (Port Blair) shall not be used to set design levels: the long record ends in 1964, and PSMSL notes that the recent data appear to use a different datum.
S1.6.2 Extreme sea level. For the coastal band (Clause S1.7.4) and for the check of critical assets, the designer shall report the INCOIS 100-year extreme sea level for Port Blair: 1.88 m above the baseline mean sea level now, rising to 2.41 m (SSP2-4.5) and 2.65 m (SSP5-8.5) by 2100. The INCOIS baseline mean sea level is that of 1980–2014, a period that spans the subsidence of 2004; how it relates to the datum of Clause S1.5.1 is [TBC], and the designer shall state the connection used.
S1.6.3 Storm surge. Until Annex 5A gives surge levels for the islands [TBC], the surge terms of Clause 5.7.3 shall come from a site-specific study under Clause 5.7.3(c). The study shall report the surge of Cyclone Lehar (Clause S1.12) as a check.
S1.6.4 Sea-level allowance. Clause 5.7.4 applies. Because the INCOIS projection for Port Blair rises by 0.54–0.77 m by 2100, the sensitivity run of Clause 5.7.4(c) shall be reported for every element with a design life of more than 25 years (set by this Supplement).
Commentary. The tide at Port Blair is moderate: a gauge on Ross Island from 1890 gave a mean range at ordinary springs of about 6.6 ft, or 2.0 m (secondary source), and INCOIS gives a tidal maximum of 1.19 m above mean sea level and a surge-and-setup term of 0.64 m. INCOIS notes that "the high ESL change at Port Blair results from the MSL rise". The difficulty is the datum, not the range: the land moved in 2004, the long PSMSL record ends in 1964, and no current table of MHWS and MLWS for the city was found for this draft.
S1.7 Coastal zone, mangroves and reefs
S1.7.1 ICRZ. Works shall comply with the Island Coastal Regulation Zone Notification, 2019 (S.O. 1242(E), 8 March 2019) and with the ICRZ plan or Integrated Island Management Plan (IIMP) of the island approved under it. The High Tide Line is the one demarcated by NCSCM in that plan. Until the plan for an island is approved, the plans under the Island Protection Zone Notification, 2011 continue to be followed, as paragraph 5 of the 2019 Notification provides.
S1.7.2 No-development zones. No stormwater facility shall be built in a No Development Zone except as the Notification or the approved plan permits. The Notification sets the zone, measured landward from the High Tide Line, by the size of the island, subject to the exceptions it allows:
- (a) 100 m on the larger islands (more than 1,000 km²: South, Middle and North Andaman and Great Nicobar);
- (b) 50 m on the islands of the second group, such as Baratang, Little Andaman, Swaraj Dweep and Car Nicobar; and
- (c) 20 m on the smaller islands managed through IIMPs.
Along tidal creeks the zone extends as the Notification provides.
S1.7.3 Mangroves and corals. Mangroves and corals are in ICRZ-IA. No drain, outfall or stormwater facility shall be built within the 20 m buffer of a mangrove stand larger than 1,000 m², or on or across a coral area, except as the Notification permits. Every outfall in ICRZ-IA, and every outfall into a mangrove creek or a reef lagoon, shall have the clearance of the Andaman and Nicobar Coastal Zone Management Authority before approval.
S1.7.4 Coastal band and floor levels. Clause 6.11.6 applies, with the High Tide Line of Clause S1.7.1 and the levels on the datum of Clause S1.5.1.
S1.7.5 Untreated runoff. No runoff from a construction site, road or paved area shall be discharged directly into a mangrove stand, a reef lagoon or a coral area. Such runoff shall first pass through the treatment of Chapter 8 (Clause 8.10) and, during construction, the controls of Clause S1.10.
Commentary. As of the Chief Secretary's affidavit to the National Green Tribunal in April 2024, the ICRZ plans of Great Nicobar (1 June 2021) and Little Andaman (12 September 2022) had been approved, seven plans had been reviewed by the Technical Scrutiny Committee, and the plans for South Andaman and the Shaheed Dweep IIMP had been sent to NCSCM; whether the South Andaman plan has since been approved is [TBC]. Mangrove cover in the islands is about 400 km² (secondary source). Dense mangrove was lost after 2004 through subsidence and the tsunami, and part of it has recovered; around the south-west of Port Blair most mangroves died, and Rhizophora survived (secondary sources). Sediment washed from land is one of the factors studied in the recovery of the islands' reefs after bleaching (secondary source), which is why Clauses S1.7.5 and S1.10 keep construction runoff off them.
S1.8 Water scarcity: rainwater storage first
S1.8.1 Rooftop storage. Every new building, and every building that is reconstructed, added to or altered, shall collect roof water through gutters, a first-flush diverter and a filter into a storage tank for use, as bye-law 4.8 requires. The tank shall be sized by the designer for a stated non-potable demand through the dry months of January to April, using the monthly rainfall of Clause S1.4.3, and the size and the calculation shall be stated in the drainage report. A minimum capacity per square metre of roof is [TBC] for the Approving Authority to set.
S1.8.2 Use. Bye-law 4.8 limits stored rainwater to domestic uses "other than drinking". That limit continues unless the Administration's health authority decides otherwise.
S1.8.3 Retention. The retention requirement of Clause 4.4 is met first by rooftop storage drawn down by use, and then by infiltration under Clause S1.9. A storage tank counts toward retention only for the volume its stated demand draws down within 72 hours (Clause 8.11.4), and it is assumed full at the start of every design storm and is not counted as detention (Clauses 4.11 and 8.11.5).
S1.8.4 Overflow. Clause 8.11.6 applies: the overflow shall discharge at grade to the site drainage, never to a neighbouring plot.
Commentary. The islands receive nearly 3,000 mm of rain a year, yet water is short every dry season. Sri Vijaya Puram depends on the Dhanikhari dam, whose storage was raised by a heightening of about 5 m (the reported capacities after it conflict). In March 2023 supply was cut by 30% after a weak monsoon, and in September 2025 supply from the Garacharma plant fell to 30%, with water every third day, and residents were asked to "use rainwater for non-domestic needs" (secondary sources). On these islands, rainwater is a supply to be stored first, and recharge comes second. Bye-law 4.8 already requires a tank but gives it no size; Clause S1.8.1 adds the sizing basis.
S1.9 Groundwater, infiltration and hill slopes
S1.9.1 Saline intrusion. No recharge well, recharge shaft or borewell shall receive stormwater or roof water:
- (a) on tidal low land (Clause S1.5.3);
- (b) within the coastal band of Clause 6.11.6, or within the same distance of a tidal creek; or
- (c) elsewhere, unless a hydrogeological report accepted by the Authority shows fresh water at the recharge depth.
This rule is set by this Supplement. Infiltration at the surface (vegetated open space, shallow depressions and permeable paving) meeting Clause 8.8 is allowed.
S1.9.2 Hill slopes. On ground steeper than 15°, on ground above such a slope, and in any area mapped as prone to landslides (set by this Supplement):
- (a) no infiltration facility, recharge structure or soakaway shall be built unless a geotechnical report accepted by the Authority shows that it will not destabilise the slope;
- (b) roof and pavement water shall be collected and led in lined drains or chutes to the foot of the slope or to a stable outfall, with energy dissipation at the outlet (Chapter 9); and
- (c) the drainage report shall show how the measures required by bye-laws 4.5 and 5.4 against erosion and sliding are met.
Commentary. CGWB reports "a constant threat of saline sea water intrusion" in the Port Blair municipal area, with brackish water in deeper formations (secondary source; the CGWB site could not be reached for this draft). Recharge that draws salt water up would harm the wells that rural areas use. Landslides are a drainage matter in the city. A study of the Kamaraj landslide at Brookshabad found a slope of about 30° (55%) and a slip surface about 6 m deep, and concluded that "most of the landslides … took place owing to the steep slopes, which consist of weak materials and high rainfall"; Cyclone Vardah's three to four days of continuous rain in December 2016 "triggered minor to moderate landslides" around Port Blair (Ansary et al., 2023). A study of shallow landslides around Port Blair flagged slopes of 15–35° as highly prone (secondary source), which is why Clause S1.9.2 starts at 15°. In September 2025 a road in the city was closed for fear of a landslide after rain, and slips have recurred at Haddo and on Fire Brigade Road (secondary sources).
S1.10 Erosion and sediment control
S1.10.1 Clause 8.12 applies in the islands with these changes (set by this Supplement):
- (a) an ESC plan is required for every development with land disturbance, whatever its area; below the 0.1 ha threshold of Clause 8.12.1 the Authority may accept a simplified plan showing items (a), (c) and (f) of that clause;
- (b) in Clause 8.12.2, the monsoon period is May to December and the date for stabilisation is 30 April;
- (c) sediment basins under Clause 8.12.3(c) shall be sized for the May–September monsoon; and
- (d) no dewatering discharge or sediment-laden runoff shall reach a mangrove stand, a reef lagoon or a coral area.
Commentary. Bye-law 4.5 already requires measures against erosion and sliding before a site is approved. Clause S1.10.1 turns that requirement into a plan with stated content and extends it to every site, because on steep island catchments a small cleared plot can deliver sediment straight to a creek and the reef beyond.
S1.11 Tribal reserves
S1.11.1 Nothing in the Manual or this Supplement applies to, or authorises any work in, an area declared as a reserved area or buffer zone under the Andaman and Nicobar Islands (Protection of Aboriginal Tribes) Regulation, 1956. Drainage works in such an area are a matter for the Administration under that Regulation, and the Manual applies there only as the Administration directs.
S1.11.2 In the Nicobar district, where the Tribal Councils are the local bodies, the Manual applies only as the Administration directs, in consultation with the Tribal Council concerned.
Commentary. Section 3 of the 1956 Regulation empowers the Administrator to declare reserved areas (secondary source); a later amendment added buffer zones, but its year is reported as both 2010 and 2012 [TBC]. The Jarawa reserve on South and Middle Andaman and the Onge reserve are among the reserved areas (secondary sources). The Nicobar district has seven Tribal Councils, at Car Nicobar, at Chowra, Teressa, Katchal, Nancowry and Kamorta, and for Great and Little Nicobar (Directorate of Economics and Statistics, 2024-25).
S1.12 Event evidence
Commentary. The earthquake and tsunami of 26 December 2004 are described in Clause S1.5. Cyclone Lehar made its first landfall near Port Blair on 25 November 2013, with winds of about 110 km/h and a storm surge of about 1–1.5 m that "inundated low-lying areas" (secondary source); about 2,000 people were evacuated on Little Andaman and 1,500 on Havelock (Swaraj Dweep). Cyclone Vardah brought three to four days of heavy rain to Port Blair in December 2016 and set off landslides (Clause S1.9); its rainfall totals are [TBC]. In June 2025 drains in Sri Vijaya Puram were reported to be "not designed to handle the volume" at School Line, Mohanpura and Gandhi Market, and the main market was waterlogged again in June 2026 (secondary sources). These records are evidence only and are not design values (Clause 2.3.4(c)).
To be confirmed
The following are needed before this Supplement could be adopted:
- which municipal law is in force (the Municipal Regulation of 1994 or the Municipal Board's Regulation of 1957), and the text of the 2018 amendment to the bye-laws;
- current MHWS and HAT at Sri Vijaya Puram on a post-2004 datum, from the Survey of India or the National Hydrographic Office, and the connection of the INCOIS baseline to that datum;
- the form of Eq. 3 and Eq. 11 of Tamrakar and Goel (2018);
- whether NIH-DHAARA covers the islands;
- whether the South Andaman ICRZ plan has been approved since April 2024;
- whether APWD or the Municipal Council owns the major storm drains and nallahs of Sri Vijaya Puram, and whether a drainage master plan exists;
- the TCP Rules, 2005, the TCP (Amendment) Regulation, 2026 and the Panchayat Administration Rules, 1997, for any drainage or rainwater clause;
- the operating rule and spillway capacity of the Dhanikhari dam;
- surge levels for the islands for Annex 5A, the rainfall of Cyclone Vardah, and a minimum rainwater tank capacity;
- the names of the disaster management bodies for Clause 10.16; and
- the year of the amendment to the PAT Regulation that added buffer zones.
References
- Andaman and Nicobar Administration (1999). Notification No. 161/99/F.No.3-53/97-LSG, 13-10-1999: Port Blair Municipal Council Building Bye-Laws (A&N Gazette Extraordinary No. 164), bye-laws 2.19, 4.1, 4.5, 4.6, 4.7, 4.8, 5.4 and 6.1. https://pbmc.gov.in/pdf/Building_Byelaw.pdf
- Sri Vijaya Puram Municipal Council. About us. https://pbmc.gov.in/aboutus
- APWD, Chief Engineer and Town Planner. Press note and proposal for amendment of the A&N Islands Town and Country Planning Regulation, 1994 (c. 2019). https://andamannicobar.gov.in/admin-pannel/pressupload/1-24-AMENDMENT%20OF%20ANITCP%20REGULATION.pdf
- Directorate of Economics and Statistics, A&N Administration. Weather Data: Port Blair (1947–2023). https://ecostat.andamannicobar.gov.in/pdf/weather.pdf ; comparative statement of rainfall at Port Blair, 2021–2023. https://ecostat.andamannicobar.gov.in/2023/TotalRainfallPB3years.pdf ; Basic Statistics 2018-19, ch. 2 (Climate). https://ecostat.andamannicobar.gov.in/basicstatPDF2018_19/2.Climate.pdf ; Basic Statistics 2024-25, ch. 28 (Local Self Government). https://ecostat.andamannicobar.gov.in/basicstatPDF2024_25/28.LocalselfGovernment.pdf
- IMD, Meteorological Centre Sri Vijaya Puram. 24-hour rainfall, 06-11-2026. https://mausam.imd.gov.in/portblair/mcdata/rain24.pdf
- Tamrakar, S. and Goel, N.K. (2018). Development of intensity duration frequency relationships for Port Blair, Andaman and Nicobar Islands, India. MAUSAM 69(1):123–132. doi:10.54302/mausam.v69i1.241
- Earnest, A., Rajendran, C.P., Rajendran, K., Anu, R., Arun, G.M. and Mohan, P.M. (2005). Near-field observations on the co-seismic deformation associated with the 26 December 2004 Andaman–Sumatra earthquake. Current Science 89(7):1237–1244.
- Gahalaut, V.K. et al. (2006). GPS constraints on the 2004 Sumatra–Andaman earthquake. Earth and Planetary Science Letters (secondary).
- Ansary, M. et al. (2023). Characterization of site-specific landslide in Port Blair. Disaster & Development 12(1):157–171, National Institute of Disaster Management. https://nidm.mha.gov.in/journal/PDF/Journal/NIDMJOURNAL_JanJun2023/NIDMJOURNAL_JanJun2023j.pdf
- MoEF&CC (2019). Island Coastal Regulation Zone Notification, 2019, S.O. 1242(E), 08-03-2019. https://environmentclearance.nic.in/writereaddata/CRZ_Notifications/ICRZ_Notification_2019/0.pdf
- NGT, O.A. 249/2023 with O.A. 795/2023. Affidavits on behalf of the Chief Secretary, A&N Administration (April 2024) (ICRZ plan status). https://www.greentribunal.gov.in/
- INCOIS (2025). Extreme sea levels along the Indian coast, TR-04 (Port Blair). https://incois.gov.in/documents/Reports/TechnicalReports/TR_ESSO-INCOIS-OMDA-TR-04(2025)_20250725114934.pdf
- PSMSL. Station 206, Port Blair. https://psmsl.org/data/obtaining/stations/206.php
- Indian Antiquary, vol. 58 (Ross Island tide gauge) (secondary).
- PIB (2026). Great Nicobar Project: Strategic Importance, Sustainable Development, 01-05-2026.
- CGWB. Ground water resources and NAQUIM 2.0 study, Port Blair (search summaries only; the CGWB site could not be reached).
- Andaman and Nicobar Islands (Municipal) Regulation, 1994; Andaman and Nicobar Islands Town and Country Planning Regulation, 1994; Andaman and Nicobar Islands (Protection of Aboriginal Tribes) Regulation, 1956 (India Code records; texts not retrieved).
- Andaman Sheekha, The Wave Andaman and Nicobar Times: renaming of Port Blair (2024); Dhanikhari dam; Kadakachang and Wandoor sluices; water cuts (2023, 2025); waterlogging in Sri Vijaya Puram (June 2025, June 2026); landslides at Haddo and Fire Brigade Road (secondary).
- Wikipedia, Cyclone Lehar (secondary); ICAR abstract on salinity at Port Blair after the tsunami (secondary); CIFOR-ICRAF and APN-GCR on Andaman mangroves (secondary); Rufford Foundation project on sediment and coral recovery (secondary).
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Note 2 to Table 4.1).
Commentary. The islands differ from the West Bengal delta in almost every respect that matters to drainage. They are hilly, with short perennial streams, tidal creeks and mangrove-lined inlets; they receive about 2,800–2,900 mm of rain a year from two monsoons; and the city of Sri Vijaya Puram depends for its water on a dam, the Dhanikhari, and runs short every dry season. The earthquake of 26 December 2004 lowered much of the land around the city by nearly a metre, so that some of it now floods on ordinary tides. Their law is that of the Union Territory: the building bye-laws of the Municipal Council, the TCP Regulation and the regulations of the Administration. The Manual's engineering applies to the islands with the changes set out here. Bengali is the largest mother tongue in the Union Territory (about 28% at the 2011 Census, as reported), and Hindi and English are its official languages.