Draft v1.0 prepared by NEER. Not adopted by the Government of Bihar or any authority or local body, and has no legal force. About this draft

Bihar · Draft v1.0

Bihar Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Bihar Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Bihar.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Bihar or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Urban Development and Housing Department (UDHD), the Water Resources Department (WRD), the Bihar Urban Infrastructure Development Corporation (BUIDCO), the Patna Metropolitan Area Authority (PMAA), any Nagar Nigam, Nagar Parishad, Nagar Panchayat or other local body, or any other agency. Where it names a body, such as the Minor Water Resources Department, the Revenue and Land Reforms Department, the Rural Development Department, the Environment, Forest and Climate Change Department, the Bihar State Wetland Authority, the Bihar State Pollution Control Board (BSPCB), the Bihar State Disaster Management Authority (BSDMA), the Bihar Industrial Area Development Authority (BIADA), WRD's Flood Management Improvement Support Centre (FMISC), the Patna Municipal Corporation (PMC) or a district administration, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The building byelaws, master plans, drainage schemes and approval conditions in force continue to apply.

Names. Some places and rivers have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • Purnia is also spelt Purnea, the form of IMD's observatory and of older sources; Munger was formerly Monghyr, Danapur Dinapur, and Chhapra is written Chapra for the IMD station. The CWC Flood Estimation Report for subzone 1(f) writes Darbangha for Darbhanga. Older sources name the former Shahbad district, now Bhojpur, Buxar, Rohtas and Kaimur, and their "Bihar" includes districts now in Jharkhand;
  • IMD has two observatories in Patna with long records: Patna (A), the airport observatory, called Patna (A) in this Manual, whose series is used for statistics; and the older Patna observatory in the city, whose highest day is quoted as a historical maximum. Patna also has an automatic weather station at Anisabad;
  • Gandhi Ghat and Dighaghat are CWC gauges on the Ganga in Patna, and Sripalpur is the CWC gauge on the Punpun; the names refer to the gauges;
  • the Kosi is also written Koshi; the Burhi Gandak Budhi Gandak; the Sone Son; and Kabartal Kanwar Tal or Kabar Tal. Gogabil is also written Gogabeel, the form its community reserve notification uses.

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies need a word of explanation:

  • a Nagar Nigam is a Municipal Corporation, a Nagar Parishad a Municipal Council and a Nagar Panchayat the smallest class of municipality, all under the Bihar Municipal Act, 2007. All three are urban local bodies (ULBs). Under that Act, public drains and public tanks vest in the Municipality;
  • a sump house is the term used in Patna for a drainage pumping station (DPS): a sump and pumps that lift the water of a city's drains into the river when the river is high and the outfall sluices are shut. This Manual uses the two terms for the same thing;
  • BUIDCO is the Bihar Urban Infrastructure Development Corporation Limited, a company of UDHD that builds storm water drainage and sewerage schemes. The Bihar Rajya Jal Parshad (the Bihar State Water and Sewerage Board), which formerly ran Patna's sump houses, was merged into BUIDCO, with its assets, projects and staff, by the Bihar State Water and Sewage Board (Repeal) Act, 2017 (Bihar Act 3 of 2018);
  • PMAA is the Patna Metropolitan Area Authority, constituted under section 11 of the Bihar Urban Planning and Development Act, 2012, which prepares the Patna Master Plan 2031;
  • WRD (Jal Sansadhan Vibhag) holds the rivers, embankments, canals and flood works and notifies the floodplain zones of embanked rivers. Its FMISC issues the daily flood bulletin, generally from 15 June to 15 October;
  • the Minor Water Resources Department (Laghu Jal Sansadhan Vibhag), written Minor WRD where space is short, holds minor irrigation, including the ahar and pyne systems of south Bihar, and is the State groundwater agency named in this Manual;
  • an anchal is a circle, the revenue subdivision of a district under a Circle Officer, to whom the courts often send disputes over public land and ponds under the Bihar Public Land Encroachment Act, 1956; and
  • Jal-Jeevan-Hariyali (the Jal-Jeevan-Hariyali Abhiyan) is a State campaign, launched in 2019, in which fifteen departments take part with the Rural Development Department as the nodal department, to free public water bodies of encroachment and restore them. No statute or notified scheme for it was found.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
  • HFL is the highest flood level recorded at a gauge, as CWC and WRD use it. It is not a design level, and sources sometimes give different values for the same gauge;
  • PMC is the Patna Municipal Corporation, not a project management consultant;
  • WRD is the Water Resources Department; the Minor Water Resources Department is a separate department;
  • UDHD is also written UD&HD; and
  • SWD is a storm water drain.

The sense is clear from the context. Hindi, Bhojpuri, Maithili and Magahi terms used in the text, such as pokhar (पोखर; also pokhra and talab, a pond or tank that holds rainwater), ahar (आहर, a reservoir that stores rain and flood water for irrigation), pyne (पैन, also pain or payeen, the channel that feeds or draws from an ahar), chaur (चौर, a low depression in the floodplain where rainwater stands for months), maun (an oxbow lake, the local name the Ramsar information sheet for Kabartal records), tal (ताल, a large shallow lake or seasonally waterlogged low land, as in the Mokama tal), diara (दियारा, also diyara, the sandy alluvial land of a river's active floodplain and its islands), nala (natural drain or large storm drain), nali (small street drain), bandh or tatbandh (बाँध, तटबंध, an embankment) and jaljamav (जलजमाव, waterlogging), are explained where they first appear.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Bihar's cities flood for three reasons. Patna showed the first in September 2019, when four days of rain, less than a 50-year day on the CWC maps, fell on drains that had not been cleaned and sump houses that did not run; it showed the second in August 1975, when the Sone and the Ganga crossed into the city and stood in it for days, and in September 2026 the Ganga at Gandhi Ghat was reported above the highest level it had reached, in 2016; and the third shows in a drainage system whose drains, sump houses and ponds are split among PMC, BUIDCO and WRD, and whose nalas carry the city's sewage.

  1. Monsoon storms on flat land, with no design storm and drains that fail. No design return period, design storm or rainfall intensity–duration–frequency (IDF) relationship has been published for the drains of any city in Bihar, and no analysis of short-duration rainfall has been published for any station in the State. The land is very flat: the Bihar catchment worked as an example in the CWC flood estimation report for the Middle Ganga Plains, on the Muzaffarpur–Sagauli railway, falls about 5 cm in a kilometre. Patna's drainage system "was laid about 200 years ago and is in bad condition", the Comptroller and Auditor General (CAG) found. From 26 to 29 September 2019 Patna received between about 211 and 226 mm of rain, as reported; Rajendra Nagar and Kankarbagh stood knee- to waist-deep for days, and the National Disaster Response Force (NDRF) rescued more than 4,000 people. About 38 of the city's 39 sump houses were reported not to be working, and the State's inquiry was reported to have found that pumps were not started on time and drains were not cleaned. On 18 October 2019 the Patna High Court directed the State to report which sump houses had been working and what was done after the weather forecast. Patna (A)'s highest day, 273.5 mm on 20 September 1967, was larger than those four days together, and the records elsewhere are far larger: 498.9 mm at Dinapur on 25 June 1897, 520.0 mm at Motihari on 25 August 2005, 436.0 mm at Muzaffarpur on 26 September 2007 and 580.0 mm at Majarganj in Sitamarhi district on 11 August 1987, up to about twice the 50-year day on the CWC maps. Rajendra Nagar and Kankarbagh have been reported to waterlog every monsoon since the 1970s; roofs, roads and paving now send more water to the drains, and faster.
  2. Rivers lock the outfalls. Patna is surrounded on three sides by rivers, the Ganga to the north, the Sone to the west and the Punpun to the south, and its drains reach them through sluices and pumps. When the rivers rise the sluices on the Ganga and the Punpun are closed and the drains are pumped; a Rajya Sabha reply of 27 November 2024 counted 56 permanent and 28 temporary drainage pumping stations, without making clear whether for Patna or the State. In August 1975 the waters of the Sone and the Ganga crossed the Patna Canal into the city, and ground floors stood under water for five to seven days, as reported; the Ganga's highest level at Dighaghat, 52.52 m, dates from that flood. At Gandhi Ghat the Ganga's danger level is 48.60 m and its highest recorded level 50.52 m, reached in August 2016; on 5 and 6 September 2026 it was reported at 50.53–50.57 m, above that record, though CWC's bulletin of 31 October 2026 still lists 50.52 m. On the Punpun at Sripalpur the highest level, 53.91 m in 1976, stands 3.31 m above the danger level, and the Punpun's backwater shuts the outfalls of south Patna. North Bihar's rivers run between embankments: WRD counts about 3,800 km of them, 3,606 km in north Bihar, and classes 68.80 lakh ha of the State's 94.16 lakh ha, about 73%, as flood-prone. On 18 August 2008 the Kosi breached its eastern afflux embankment at Kusaha, in Nepal, and turned across north Bihar; about three million people were reported homeless. In August 2017 floods in north Bihar were reported to have killed 514 people in 19 districts. The Burhi Gandak at Muzaffarpur, the Bagmati at Hayaghat in Darbhanga district and the Mahananda at Purnia have all stood 1.8–3.2 m above their danger levels at their recorded highs, and about half of the highest levels that CWC lists for its gauges in north Bihar were set after 2015.
  3. Drains, sump houses and ponds split among agencies, with sewage in the nalas. The Bihar Municipal Act, 2007 vests public drains in the Municipality. But the sump houses and trunk drains that the Bihar Rajya Jal Parshad ran passed to BUIDCO when a law of 2018 merged the Parshad into it, and PMC stated in a counter-affidavit of May 2025, as quoted, that the drainage system is "not directly under" it; no order dividing Patna's drains between PMC and BUIDCO was found. The rivers, embankments and floodplains are held by WRD; ahars and pynes by the Minor Water Resources Department; the restoration of ponds by the Jal-Jeevan-Hariyali campaign; notified wetlands by the Bihar State Wetland Authority; and industrial areas by BIADA. In practice the nalas also carry sewage. The Bihar State Pollution Control Board identified 19 drains in Patna discharging 628.5 million litres a day (MLD) to the Ganga and the Punpun, against six sewage treatment plants (STPs) of 350 MLD sanctioned, and sewers served about a fifth of the city, the CAG found. On 5 March 2025 the National Green Tribunal (NGT), quoting its joint committee in a case on Patna's sewage, recorded that steps should be taken to keep storm water separate from sewage, and that BUIDCO should plan the diversion of sewage to the nearest STP. In Darbhanga, a petition before the NGT alleges that new storm drains have been connected to the sewers.

Behind all three lies lost storage. The pokhars, ahars, chaurs and tals that once held rain are protected mainly by campaign and by encroachment law. The Bihar Building Byelaws 2014 bar building within 9 m of a tank's highest water mark, but the draft that would replace them has no such buffer, and the Municipal Act still lets a Municipality order a tank or pond filled up if it appears injurious to health. The State reports that Jal-Jeevan-Hariyali has freed 28,685 ponds, ahars, pynes and wells of encroachment and restored 26,381 ponds; other counts differ, and the State was reported to have lost more than 100,000 ponds in three decades. In Darbhanga the NGT directed in March 2023 that encroachments around three ponds be removed within three months; in November 2024 the petitioners told the Tribunal that no work had been done. In north Bihar, Kabartal in Begusarai, designated a Ramsar site on 21 July 2020, is the largest of 18 connected wetlands that the monsoon floods to a depth of up to 1.5 m; in the south, about 1,062 km² of the Mokama group of tals is waterlogged each monsoon and drains slowly to the Ganga, as reported.

Design for Bihar therefore has to cover a monsoon that comes early in the east and late in the west, on a plain that the rivers hold for weeks. The monsoon normally reaches Purnia by 13 June, Patna and Gaya by 16 June and Chhapra by 18 June, and withdraws between 6 and 10 October; June to September brings about 86% of the year's rain. Annual normals run from about 858 mm at Arwal and Jehanabad to 2,215 mm at Kishanganj, and 985 mm at Patna. May is already wet in the north-east (a May normal of 166.5 mm in Kishanganj district), and large days have fallen before the onset: 271.8 mm at Motihari on 29 May 2006, and 214.6 mm at Sabour on 22 April 1971. Heavy rain continues to the withdrawal: Buchaha in Muzaffarpur district recorded 458.2 mm on 4 October 1961. Of the 113 storms and depressions that affected Bihar from 1891 to 2010, 43 came in September, more than in any other month. WRD's daily flood bulletin runs from 15 June to 15 October.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the river or the receiving nala is high and the sluice or flap gate is shut, or when the pumps that serve it are running at full capacity.

The Manual also sets how public drains, roads, nalas, pokhars, chaurs and other water bodies, gated and pumped outfalls and basin-wide master plans are designed, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Bihar's south-west monsoon from mid-June to early October and the intense storms that come with it; the Ganga, the Sone, the Punpun, the Gandak, the Burhi Gandak, the Bagmati, the Kosi and the Mahananda, their embankments and the sluiced and pumped outfalls of the cities on their banks; the diara and the chaurs of the floodplain, the sands of the Kosi, the shallow water table of the north Bihar plain, the arsenic in the aquifers of the Ganga belt and the fluoride in the south, the tal lands, and the hard rock and thin soils of the plateau fringe; the pokhars and the ahar-pyne systems; and cities whose dense old cores, new colonies and basements turn ordinary storms into floods.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Reports for the three subzones that cover Bihar, 1(f) Middle Ganga Plains north of the Ganga, 1(d) Sone south of the Ganga and west of the Kiul, and 1(g) Lower Ganga Plains in the south-east, as the interim source. No published analysis of short-duration rainfall for a station in the State was found; a report of the National Institute of Hydrology (NIH) on short-interval rainfall in the Punpun basin is known but could not be obtained for this Manual. Frequency analysis of hourly rainfall by NIH, Roorkee, for comparison only.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Bihar Urban Planning and Development Act, 2012; the Bihar Building Byelaws 2014, with the Draft Bihar Building Byelaws 2026 that would replace them; the Bihar Municipal Act, 2007; the Bihar Ground Water (Regulation and Control of Development and Management) Act, 2006; the Bihar State Water and Sewage Board (Repeal) Act, 2017; the Bihar Public Land Encroachment Act, 1956; the Bihar Irrigation Act, 1997; the Bihar Ease of Doing Business Act, 2026; WRD's order of 6 March 2025 on the floodplain zoning of embanked rivers; the River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016; the Wetlands (Conservation and Management) Rules, 2017; and the orders of the Patna High Court and the NGT on drains, sewage and ponds. This Manual follows them or, where disclosed, makes them stricter. The Byelaws 2014 were issued by UDHD Notification No. 577 (file 11/न०वि०(मा०)-06/2013), Patna, 8 December 2014 (as printed in their official Hindi text); only their bye-laws on restrictions, site requirements, plantation, basements and rainwater harvesting and their zoning table were read. The Bihar Urban Planning and Development Act was searched rather than read section by section, and the Irrigation Act was read only in extracts.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain in Bihar can cite 1, 2, 5 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has no panel for any station in Bihar, and the range it gives for the Gangetic plain puts the largest 3-hour depth below the largest 1-hour depth. The CWC reports for the State's three subzones date from 1985 to 1994, and their short-storm ratios change at the Ganga: in Patna, on the south bank, the ratios of subzone 1(d) give a 50-year hour of about 96–104 mm, while at Hajipur, across the river, those of 1(f) give about 74–87 mm. The reanalysis grids of NIH-DHAARA read 77.0 mm for that hour at Patna; at 24 hours they read well above the CWC maps over north and north-east Bihar (526 mm for a 50-year day at Kishanganj, against about 320–360 mm on the map) and below them at Gaya (227 mm, against about 280–320 mm). The station records lie above all of them: Motihari's 520.0 mm day of 2005 and Muzaffarpur's 436.0 mm of 2007 exceed the 100-year values on the maps. No sub-daily station record has been published to show which short-storm value is right.

Bihar has no drainage design standard of its own. Research for this Manual found no design standard, IDF relationship or circular of UDHD, BUIDCO, WRD, PMAA, PMC or any other Nagar Nigam that fixes return periods or design rainfall for storm drains. In particular:

  • The State is building drains without a published design storm. The State budget for 2026 was reported to provide about ₹3,559 crore for 38 storm water drainage schemes, and BUIDCO's project in Patna was reported to cover 103 drain lines and 185 km of drains in nine packages. No detailed project report (DPR) stating the return period, intensity or runoff coefficient of any of them was found, and no State guideline for urban storm drainage was found. The Bihar Municipal Act, 2007 requires each Municipality to make a drainage and sewerage code (s.219), but none was found for any city. This Manual is offered as a technical companion to these schemes and to the byelaws: it supplies the design storm, detention and buffer values that they leave open. It has not been adopted by UDHD, BUIDCO or any other body;
  • The building byelaws require recharge but not detention. The Byelaws 2014 make rainwater harvesting mandatory on plots of every size, with recharge pits or trenches of at least 6 m³ for every 100 m² of roof (bye-law 51), require surface-water drains within the curtilage where the Authority asks and its written approval to connect them to a sewer (bye-law 30(D)), and ask for tree cover on at least 5% of the land (bye-law 32). The Draft Bihar Building Byelaws 2026, posted on 5 June 2026 and not notified as of September 2026, would require a rainwater harvesting proposal on plots of 100 m² and more and drop the pit volume. The Bihar Ground Water (Regulation and Control of Development and Management) Act, 2006 lets the Authority it creates direct rainwater harvesting on premises of 1,000 m² and more in notified areas, and lets a local body make it a condition of plan approval (s.18); whether the Act has been brought into force was not confirmed [TBC]. No rule requires on-site detention, limits peak runoff or sets "zero runoff";
  • Basements are barred from flood-prone areas, but the areas are not defined. The Byelaws 2014 do not allow basements in low-lying or flood-prone areas (bye-law 47(1)), and the draft of 2026 keeps the rule and asks site plans to show the normal flood-affected areas and contours at 0.5 m where the slope is steeper than 1 in 20. Neither text says how a flood-prone area is to be drawn;
  • The only pond buffer is 9 m, and the draft drops it. The Byelaws 2014 bar building within 9 m of the highest water mark of a tank unless the owner shows that its drainage will not reach the tank (bye-law 30(B)), in natural waterways or drains shown in the Development Plan or drainage plan (bye-law 29(A)), and over or under a municipal drain (bye-law 29(D)). The draft of 2026 bars permanent construction only within a water body's boundary, with no buffer. The Municipal Act vests public tanks in the Municipality (s.177), but also lets it order a tank or pond filled up if it appears injurious to health (ss.184 and 251(e)). No setback in metres from nalas was found in any rule read for this Manual;
  • The floodplain rule covers embanked rivers, not city nalas. WRD's Order No. 143 of 6 March 2025 makes the land between the embankments of a river embanked on both banks, or from the embankment to 500 m beyond the far bank of one embanked on one side, a Prohibited Zone: no permanent construction, and temporary structures only beyond 250 m from the bank, with the district administration to monitor. Rivers without embankments are left to a second phase, in which NIH is to map the 5-, 25- and 100-year floodplains of the Ganga from Chausa to Manihari under an agreement of 3 August 2025. The River Ganga Authorities Order, 2016 defines the floodplain by the flood of once in a hundred years, and the Wetlands Rules bar permanent construction within 50 m of the mean high flood level of a notified wetland; no wetland in Bihar was found finally notified under them. None of these reaches the nalas and pokhars inside a city;
  • A new law removes drainage clearances for enterprises. Schedule V of the Bihar Ease of Doing Business Act, 2026 lists a storm water drain NOC, a Revenue Department NOC for land near water bodies or nalas, a Collector's NOC for development on wetland and an Irrigation Department NOC for sites near canals as "Not required" for enterprises. Whether it reaches the sanction of building plans for housing is not clear. A drainage submittal under this Manual therefore belongs within building-plan sanction, not in a separate NOC; and
  • No document sets the river level for which an outfall is designed. The warning and danger levels and the highest flood levels published for river gauges are flood-warning levels and records, not design levels, and sources give different values for some gauges, as at Gandhi Ghat in September 2026.

So each agency and each local body interprets the central manual its own way. PMC and the other Nagar Nigams, the Nagar Parishads and Nagar Panchayats, BUIDCO, PMAA, WRD, BIADA, road agencies, their consultants and funding agencies fill the gaps differently. Two drains on the same street, built by different agencies, can be sized for different storms from different rainfall sources. A nala built by BUIDCO can pass through wards cleaned by PMC and end at a sump house and a sluice on the Ganga or the Punpun, with no agreed level at which the sluice is shut or the pumps started. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall across the three CWC subzones, with a floor for short storms where no station analysis exists (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls to rivers and nalas, sluiced, gated or pumped, against a design river level (Chapter 5);
  • corridors and setbacks along nalas and around pokhars and chaurs, which no rule now sizes, proposed by this Manual (Chapter 7);
  • recharge only where the water table and groundwater quality allow it, and treatment where nalas carry sewage (Chapter 8); and
  • basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Nagar Nigam, PMAA or BIADA can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); UDHD, Government of Bihar, Bihar Building Bye-Laws, 2014 (English text, "Dec-2014"; Notification No. 577 (file 11/न०वि०(मा०)-06/2013), Patna, 8 December 2014, as printed in the official Hindi text), bye-laws 29, 30, 32, 47 and 51 and Table 1, and Guidebook on Application, Approval & Occupancy Procedure under Bihar Building Bye Laws, 2014; UDHD, Draft Bihar Building Byelaws 2026 (posted 5 June 2026), clauses 1, 6, 23, 24 and 41 and Tables 5 and 6; Bihar Urban Planning and Development Act, 2012 (Bihar Act 20 of 2012), s.11; Bihar Municipal Act, 2007, ss.177, 183, 184, 193, 195, 196, 198, 201, 219, 251 and 252; Bihar Ground Water (Regulation and Control of Development and Management) Act, 2006, ss.1(3) and 18; Bihar State Water and Sewage Board (Repeal) Act, 2017 (Bihar Act 3 of 2018), Bihar Gazette (Extraordinary) No. 311, 5 April 2018; Bihar Public Land Encroachment Act, 1956; Bihar Irrigation Act, 1997 (extracts); Bihar Ease of Doing Business Act, 2026 (Act No. 32 of 2026), Bihar Gazette (Extraordinary) No. 1120, 16 September 2026, Schedule V; WRD, Government of Bihar, Order No. 143 of 6 March 2025, Implementation of Flood Plain Zoning for embanked rivers (Hindi), and the supplementary affidavit of the Chief Secretary, Bihar, of 12 January 2026 in NGT O.A. 200/2014 (M.C. Mehta v. Union of India), annexing it with BUIDCO's drain-status table of 13 December 2025; River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016, cl.3(l); Wetlands (Conservation and Management) Rules, 2017, r.4(2)(vi); Bihar State Wetland Authority, list of Ramsar sites and draft wetland notifications; Ramsar Information Sheet, Kabartal Wetland (site 2436); Patna High Court, CWJC No. 15027 of 2018 and connected cases, order of 18 October 2019; supplementary affidavit of the District Magistrate, Patna, of 19 August 2025 in NGT O.A. 188/2024/EZ (Saurav Narayan v. Bihar State Pollution Control Board), quoting the Tribunal's order of 5 March 2025; NGT O.A. 155/2022/EZ (Talab Bachao Abhiyan v. Government of Bihar), order of 23 March 2023 as recorded in later filings, and the petitioners' objection of 23 November 2024 in M.A. 18/2024; Talab Bachao Abhiyan's application to the NGT (EZ) of 2025 on the Darbhanga storm water drainage project; CAG, Audit Report (Performance and Compliance Audit) for the year ended March 2020, Government of Bihar, Chapter III, para 3.1, Development of Sewerage Infrastructure in Patna under Namami Gange Programme (report number and date of tabling not confirmed [TBC]); Government of Bihar, Jal-Jeevan-Hariyali Abhiyan, State portal (progress table, accessed 6 November 2026); CWC, Flood Estimation Reports for Subzones 1(f) (GP/10/1984), 1(d) (S/15/1987) and 1(g) (LG-1(g)/R-1/23/94), including the 1(f) worked example for Bridge No. 152 on the Muzaffarpur–Sagauli section; IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD, Climate of Bihar (Climatological Summaries of States Series No. 18, 2011), Tables V and VII; IMD, Pai et al. (2020), new normal dates of onset and withdrawal of the south-west monsoon, Table 2; Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (accessed 6 November 2026); CWC Lower Ganga Division-2, Patna, daily water level bulletin of 31 October 2026, and WRD/FMISC Daily Flood Information Bulletin of 31 October 2026 (levels in metres as printed; datum to be confirmed [TBC]); Rajya Sabha question No. 266 of 27 November 2024, on drainage pumping stations (as quoted; not read); reports of the Patna waterlogging of September 2019 and the State's inquiry, the Patna flood of August 1975, the Kosi breach of August 2008, the north Bihar floods of August 2017, the Ganga at Gandhi Ghat in September 2026 and the closing of Patna's sluices, PMC's counter-affidavit of 20 May 2025 (as quoted; not read), the loss and recovery of ponds, the Mokama tals, the 2026 State budget for storm water drainage, BUIDCO's Patna storm water drainage project and the status of the Draft Byelaws 2026 (press and secondary sources).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Pokhars (Ponds) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Bihar
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Bihar locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies and land
7E.2Channels, embankments and parts of the system
7E.3Floods and statutory terms
7E.4Terms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3River-locked outfall of the Patna type: colony drains, a nala and pokhar, a sluice through the river bank and a sump house (drainage pumping station)
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
AWS Automatic weather station
BBL 2014 Bihar Building Byelaws 2014 (Bihar Building Bye-Laws, 2014)
BIADA Bihar Industrial Area Development Authority
BSDMA Bihar State Disaster Management Authority
BSMP Basin Stormwater Master Plan
BSPCB Bihar State Pollution Control Board
BUIDCO Bihar Urban Infrastructure Development Corporation Limited
CAG Comptroller and Auditor General of India
CGWA Central Ground Water Authority
CGWB Central Ground Water Board
CMO Chief Municipal Officer (Bihar Municipal Act, 2007)
CN Curve number (SCS/NRCS method)
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CWC Central Water Commission
DPR Detailed project report
DPS Drainage pumping station (a sump house)
DWF Dry-weather flow
EIA Environmental impact assessment
ESC Erosion and sediment control
FAR Floor area ratio
FER Flood Estimation Report (CWC)
FMISC Flood Management Improvement Support Centre, WRD
FTL / MWL Full tank level / maximum water level
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Bihar)
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HSG Hydrologic soil group
IDF Intensity–duration–frequency
IMD India Meteorological Department
IRC Indian Roads Congress
MLD Million litres a day
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
NDMA National Disaster Management Authority
NDRF National Disaster Response Force
NGT National Green Tribunal (EZ: its Eastern Zone bench)
NIH National Institute of Hydrology, Roorkee
NMCG National Mission for Clean Ganga
NOC No-objection certificate
PMAA Patna Metropolitan Area Authority
PMC Patna Municipal Corporation (Nagar Nigam Patna)
PSD Permissible site discharge
RRV Required retention volume
RWH Rainwater harvesting
SLA Sea-level allowance (coastal term; not applicable in Bihar)
SoI Survey of India
SRRG Self-recording rain gauge
STP Sewage treatment plant
SUH Synthetic unit hydrograph (CWC)
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
UDHD Urban Development and Housing Department, Government of Bihar (also UD&HD)
ULB Urban local body (a Nagar Nigam, Nagar Parishad or Nagar Panchayat)
UTM Universal Transverse Mercator
WQv Water quality volume
WRD Water Resources Department, Government of Bihar
WSUD Water-sensitive urban design