Chapter 7Waterbodies, Pokhars (Ponds) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (pokhar) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Bihar, with no coast and no tidal water, means the six Ramsar sites, such as Kabartal in Begusarai, the wetlands notified under the 2017 Rules, the chaurs and mauns (oxbow lakes) of the north Bihar plain, the tals of the south bank of the Ganga, such as the Mokama group of tals, and the pokhars, talabs and ahars recorded in the Revenue records;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Bihar Municipal Act, 2007 (sections 177, 183 and 252), the Bihar Public Land Encroachment Act, 1956, the Bihar Urban Planning and Development Act, 2012 and BBL 2014, the Bihar Irrigation Act, 1997, WRD Order No. 143 of 6 March 2025, the River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river (such as the Ganga, the Sone, the Punpun, the Gandak, the Burhi Gandak, the Bagmati, the Kosi and the Mahananda), natural drain or nala, canal, lake, tal or jheel, pokhar or pond (pokhar, pokhra, talab), ahar (the rain- and flood-water reservoir of south Bihar) and its pyne, chaur or maun (seasonal floodplain depression or oxbow lake), marsh or low wet land, floodplain wetland or depression (in the diara or behind an embankment), abandoned quarry or borrow pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (pokhar) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (overflow, outlet or spillway) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the WRD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (pyne, feeder channel, nala or canal) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, regulator or flap gate) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Bihar terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Pokhar (पोखर; pokhra, talab) | A natural or excavated depression that stores rainfall runoff: "A pond, pool, tank, lake" in Platts (Annex 7E). Talab is a synonym. A pokhar is a tank or pond under Clause 7.2. Most pokhars have no surplus weir or sluice; where a pokhar has none, its FTL is the level at which it spills to a nali, a nala or low ground, found by survey. A public pokhar in a municipal area is a public tank vested in the Municipality (Bihar Municipal Act, 2007, s. 177). |
| Recorded pokhar | A pokhar, talab or ahar shown in the Revenue records, the Municipality's records, a Development Plan or drainage plan, or the lists of the Jal-Jeevan-Hariyali Abhiyan. A recorded pokhar is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, including under an order under section 184 or 251(e) of the Bihar Municipal Act, 2007, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual. |
| Monsoon water line | The outer edge of a pokhar's, ahar's or chaur's water in the monsoon: the larger of the edge shown by dated imagery or survey of the monsoon (July to September) in recent years and the edge recorded in the Revenue records, and where neither is available, the MWL contour. The boundary of a pokhar, ahar or chaur under Clauses 7.3.3 and 7.13.1 is the largest of its Revenue record boundary, its surveyed FTL and its monsoon water line, and setbacks are measured from that boundary. The "highest water mark of a tank" of bye-law 30(B) of BBL 2014 is taken to be no lower than the monsoon water line. This definition is set by this Manual. |
| Ahar; pyne | An ahar is a reservoir that collects rain or flood water for irrigation; a pyne (pain, payeen) is the channel that feeds an ahar from a river or leads water from it to the fields (Annex 7E). They form the ahar-pyne systems of south Bihar, especially around Gaya, for which this Manual takes the Minor Water Resources Department as the working custodian (its mandate for them was not read for this Manual). An ahar is a tank under Clause 7.2, and a pyne a supply channel or surplus course under Clause 7.10. No Act and no published engineering description of ahar geometry was found for this Manual. |
| Chaur; maun; tal | A chaur is a low tract in which rainwater stands for a long time (Annex 7E), the seasonal floodplain depression of north Bihar, such as Haldia Chaur in Saran; a maun is an oxbow lake, as the Bagras maun of the Kabartal complex (Annex 7E; the term is not yet verified in a dictionary); a tal is a large shallow lake or seasonally flooded low land, as Kabartal and the Mokama group of tals. Each is a lake or a wetland for this chapter, and Clause 7.12 applies to it. |
| Diara | Riverine land of alluvium, an island or the land exposed when a river shifts (Annex 7E). Diara land is floodplain for this chapter, and where it lies within the Flood Plain Zone of an embanked river, WRD Order No. 143 of 6 March 2025 also applies. |
| Nala; nali | A nala is a watercourse or drain, natural or cut (Annex 7E), such as the Saidpur, Bakarganj or Kurji nalas of Patna; a nali is a small street or house drain. Every nala that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whoever maintains it and whether or not it is lined or covered. |
| Flood Plain Zone (WRD Order 143) | For a river embanked on both banks, the land between the embankments; for a river embanked on one bank, the land from the embankment across the river to 500 m beyond the other bank (WRD Order No. 143 of 6 March 2025). It is kept within a Prohibited Zone, where permanent construction is not permitted and fully temporary or movable structures only beyond 250 m from the current river bank. It is a wider statutory line under Clause 7.4.5 for the uses the Order restricts in it. It is not the design extent: the 1% AEP extent of Clause 7.3.4, with the climate factor, sets Zone 2 wherever it is wider. |
| River-locked outfall; sump house | A drain or nala outfall through a river bank or embankment that cannot discharge by gravity while the river is high, such as the outfalls of Patna to the Ganga and the Punpun, whose sluices are closed at high river stage (Figure 7.3). A sump house, or drainage pumping station, is the sump and pumps that lift the drain's flow to the river while the sluice is shut. The sluice is a controllable outlet under Clause 7.8 only where it is operated to a written rule; the tailwater of the outfall is the river stage (Chapter 5). |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the WRD and the Revenue and Land Reforms Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the Nagar Nigam, Nagar Parishad or Nagar Panchayat (in which public tanks vest under section 177 of the Bihar Municipal Act, 2007), BUIDCO (for the storm water drains and drainage pumping stations it has built or took over from the Bihar Rajya Jal Parshad), the PMAA or another planning authority under the Bihar Urban Planning and Development Act, 2012, the WRD (for its rivers, embankments, canals and drains), the Minor Water Resources Department (for ahars, pynes and minor irrigation tanks), the Gram Panchayat, the Revenue and Land Reforms Department (through the Collector and the Circle Officer), the Bihar State Wetland Authority (for a notified wetland), BIADA (for its industrial areas), a private owner, or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue records and village maps of the Revenue and Land Reforms Department, in which pokhars, talabs, ahars, pynes, nalas and land covered by water are recorded, and in which public land, including land over which the community has a right of irrigation, is protected under the Bihar Public Land Encroachment Act, 1956; the public tanks and their adjacent land vested in the Municipality under section 177 of the Bihar Municipal Act, 2007; the natural waterways and drains shown in a Development Plan or drainage plan, on which BBL 2014 bars building (bye-law 29(A)), and the Water Bodies Use Zone of the Patna Master Plan 2031 and other plans; the Flood Plain Zone of the embanked rivers under WRD Order No. 143 of 6 March 2025 (the land between the embankments, or from the embankment to 500 m beyond the far bank); the boundary of every wetland notified under the Wetlands (Conservation and Management) Rules, 2017 and of the six Ramsar sites; and the lists of public ponds, ahars and pynes identified, restored or freed of encroachment under the Jal-Jeevan-Hariyali Abhiyan;
- (b) Minor Water Resources Department and Gram Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where Minor Water Resources Department records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. No 1% AEP flood map of any Bihar city was found, and no design return period for urban drainage has been published for any Bihar city. Along the rivers, Bihar has begun statutory floodplain zoning, in two phases. In the first, WRD Order No. 143 of 6 March 2025 zones the embanked rivers by embankment geometry, not by a return period: where both banks are embanked, the land between the embankments is the Flood Plain Zone, and where only one bank is embanked, the land from the embankment across the river to 500 m beyond the other bank; the zone is a Prohibited Zone, monitored by the district administration. The Order records that about 68.80 lakh ha of the State's 94.16 lakh ha (about 73%) is flood-prone, and that about 3,800.41 km of embankments protect 39.96 lakh ha. The Kosi is embanked on both banks, so the whole of its inter-embankment land is a Prohibited Zone under the Order. In the second phase, for the un-embanked rivers, the National Institute of Hydrology, Roorkee is to delineate zones on the 5-, 25- and 100-year floods for the Ganga from Chausa to Manihari, under a memorandum of 3 August 2025 for a one-year study (WRD, as filed by the Chief Secretary in NGT O.A. 200/2014); the result was not available for this Manual. For mapping, the Survey of India supplied a 10 m digital elevation model of the State (2 January 2025), and the WRD has asked again for 1 m contours (6 January 2026). The River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016 defines the floodplain of the Ganga and its tributaries by "a flood of frequency once in hundred years" (cl. 3(l)). The building rules ask for flood information but supply none: under BBL 2014 no permission is granted where, in "areas which get flooded, the Structural Plans are not prepared taking this into account" (bye-law 29(G)), and basements "shall not be allowed in flood prone areas" (bye-law 47(1)), but "flood prone" is not mapped; the Draft Bihar Building Byelaws 2026 would require site plans to show "the approximate location and size of water body, normal flood-affected areas" and 0.5 m contours where the slope is steeper than 1 in 20 (cl. 6; a draft, not notified). Clause 7.3.4 lets the Authority adopt flood maps once they are issued; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, and the Flood Plain Zone of an embanked river, and the NIH lines on the Ganga once issued, are minimums that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual (no Bihar statute, rule or bye-law read for this Manual sets a setback in metres from nalas, pynes or chaurs: BBL 2014 sets 9 m only from the highest water mark of a tank (bye-law 30(B)), WRD Order No. 143 of 6 March 2025 applies only to embanked rivers, and the 50 m of the Wetlands Rules, 2017 applies only around notified wetlands; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the approval of the WRD for a work on or next to one of its rivers, embankments, canals or drains (including the Prohibited Zone of an embanked river under WRD Order No. 143 of 6 March 2025), the permission of the Bihar State Wetland Authority for a regulated activity in a notified wetland, or a direction of the Patna High Court or the National Green Tribunal sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual. Bihar's only statutory distance from a pond is the 9 m of BBL 2014, under which no permission is granted for a building "within nine (9) meters of the highest water mark of a tank" unless the owner satisfies the Authority that the building's domestic drainage will not pass into the tank (bye-law 30(B)); the Draft Bihar Building Byelaws 2026, which would repeal BBL 2014 if notified, prohibit "All permanent construction within the water body boundary" but carry no distance (Table 5; a draft, not notified as of September 2026). Along embanked rivers, WRD Order No. 143 of 6 March 2025 makes the land between the embankments, or from an embankment to 500 m beyond the far bank, a Prohibited Zone, and around a wetland notified under the Wetlands (Conservation and Management) Rules, 2017 no permanent construction is permitted within 50 m of the mean high flood level (rule 4(2)(vi)). No distance from a nala, pyne or chaur was found. This Manual's 15 m, wider than the 9 m tank line, gives every pokhar, nala, pyne and chaur a hydraulic corridor, and is this Manual's proposal, not a statutory width (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Bihar flood maps are mostly coarser than US maps, the plains of Bihar are very flat and low (the worked example of the CWC Flood Estimation Report for subzone 1(f), on a north Bihar bridge catchment, has a channel slope of 0.048 m/km) (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Bihar's rules protect waterways and drains of record, and give one distance in metres from tanks, but none from nalas, pynes or chaurs. BBL 2014 grants no permission for a building "within nine (9) meters of the highest water mark of a tank, unless the owner satisfies the Authority that he will take such measures as will prevent any risk of the domestic drainage of the building passing into the tank", and lets the Authority require the lowest floor to be "raised above the normal maximum flood level of the adjoining ground" (bye-law 30(B)); it bars building "In areas of natural waterways or drains, as detailed in the Development Plan, and drainage plan" (bye-law 29(A)) and "over or under a municipal drain" (bye-law 29(D)), keeps the foundation of an external wall at least 1 m from the edge of the street or road margin "including the drain" (bye-law 29(E)), and bars basements in flood-prone and low-lying areas (bye-law 47(1)). The 9 m is measured from a tank's highest water mark and protects the tank from domestic drainage; it is not a flood corridor, and it applies to tanks only. The Draft Bihar Building Byelaws 2026 would replace it with a prohibition of "All permanent construction within the water body boundary" in the Water Body zone (Table 5, item 8), with no distance beyond the boundary; the draft was posted on 5 June 2026 and had not been notified as of September 2026, and whether the 9 m rule will be restored after objections is not known. Along embanked rivers, WRD Order No. 143 of 6 March 2025 makes the Flood Plain Zone (between the embankments, or from the embankment to 500 m beyond the far bank) a Prohibited Zone in which permanent construction, any increase in the floor area or height of an existing structure, and "construction that obstructs the natural course of the river channel" are prohibited, and fully temporary or movable structures are allowed only beyond 250 m from the current river bank. The un-embanked Ganga awaits the NIH study (Clause 7.3, Commentary). Around a notified wetland, no permanent construction is permitted within 50 m of the mean high flood level (Wetlands Rules, 2017, r. 4(2)(vi)). The Bihar Ease of Doing Business Act, 2026 lists, as "Not required" for enterprises, the "Storm Water Drains NOC", the "Revenue Department NOC for land near water bodies or nalas", the "District Collector NOC for development on wet land" and the "Irrigation Department NOC for sites near canals" (Schedule V); the setbacks of this chapter are therefore to be checked within building-plan sanction, not through a separate NOC. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.
Disclosure. Bihar has no statutory setback in metres from nalas, pynes or chaurs in the Acts, rules and bye-laws read for this Manual, and its one distance from ponds is narrow and may lapse. BBL 2014 sets 9 m from the highest water mark of a tank (bye-law 30(B)); the Draft Bihar Building Byelaws 2026, a draft not yet notified, would drop it and protect only the land within the water body boundary. WRD Order No. 143 of 6 March 2025 applies only to embanked rivers, and the Wetlands Rules, 2017 set 50 m only around notified wetlands. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor, to give every nala, pyne, pokhar and chaur a protected width. It is this Manual's proposal, not a statutory width, and no government has adopted it. Along embanked rivers, the Flood Plain Zone of Order 143 is a statutory line, not the design extent: the 1% AEP extent of this Manual, with the climate factor, governs Zone 2 wherever it is wider. Away from the embanked rivers, Bihar has no statutory flood lines yet, and the 1% AEP extent, where it has been mapped (Clause 7.3.4), is the only flood-based line. The setback is applied as the larger of the corridor and any statutory line, so the Manual is stricter than statute along nalas, pynes, chaurs and pokhars, and no less strict anywhere. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- Embanked rivers. The Prohibited Zone of WRD Order No. 143 of 6 March 2025: the land between the embankments, or from the embankment to 500 m beyond the far bank, with no permanent construction, and temporary or movable structures only beyond 250 m from the current river bank.
- The Ganga. The floodplain of "a flood of frequency once in hundred years" under the Ganga Order of 2016 (cl. 3(l)), and the 5-, 25- and 100-year zones of the NIH study from Chausa to Manihari once issued.
- Wetlands. No permanent construction within 50 m of the mean high flood level of a notified wetland (Wetlands Rules, 2017, r. 4(2)(vi)); only draft notifications of Bihar wetlands were seen for this Manual.
- Tanks. No building within 9 m of the highest water mark of a tank without measures to keep domestic drainage out (BBL 2014, bye-law 30(B)). This is narrower than Zone 1 and never governs alone.
- Waterways and drains of record. No building in natural waterways or drains shown in a Development Plan or drainage plan (bye-law 29(A)) or over or under a municipal drain (bye-law 29(D)); public tanks and their adjacent land vest in the Municipality (Bihar Municipal Act, 2007, s. 177); and public land, including land with a community right of irrigation, is protected from encroachment (Bihar Public Land Encroachment Act, 1956). These protect the waterbody, not a strip around it; the whole recorded and monsoon extent is a waterbody for this chapter.
- WRD embankments and canals. Works on or next to them need the WRD's approval, and the Bihar Irrigation Act, 1997 makes a new embankment without the Collector's permission, and the obstruction of or encroachment on an irrigation work, offences (as extracted).
This Manual sets 15 m as the floor because no width at all exists for nalas, pynes and chaurs; because it is wider than the 9 m tank line, which was written to keep domestic drainage out of a tank, not to pass a flood; because it is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and desilting machinery that Bihar's nalas need. The reasons for the corridor are the record: Patna's drainage system "was laid about 200 years ago and is in bad condition" (CAG, year ended March 2020); the State is reported to have lost more than 100,000 ponds in three decades (as reported); and construction by BUIDCO in the buffer of two protected ponds of Darbhanga, Harahi and Digghi, is before the National Green Tribunal (M.A. 18/2024 in O.A. 155/2022/EZ, as listed). Until a statute, rule, notification or Master Plan adopts it, the 15 m minimum is this Manual's recommended standard and the statutory controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Bihar Building Byelaws 2014, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Bihar practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The plains of Bihar are flat, and the rivers meander in wide and shallow channels (CWC, Flood Estimation Report for subzone 1(f), 1985); about 73% of the State's area is flood-prone (WRD Order No. 143 of 6 March 2025), so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Bihar the only statutory line around a pond is measured from its wet-season edge: BBL 2014 measures its 9 m from "the highest water mark of a tank", not from the dry-season water line (bye-law 30(B)). The Ramsar Information Sheet for Kabartal takes the wetland's boundary as its maximum inundation in the post-monsoon season, and records that the whole complex "gets inundated with the monsoon to a maximum depth of 1.5 m". This Manual gives the same rule a level for every pokhar, ahar and chaur: its monsoon water line (definitions after Clause 7.2) is part of its boundary, and the foreshore up to MWL is its flood storage. The Draft Bihar Building Byelaws 2026 would prohibit permanent construction "within the water body boundary" (Table 5, item 8; a draft, not notified), which on this definition includes the foreshore. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Patna (which the Sone and Ganga flood of August 1975 entered over the Patna canal, and whose low wards, such as Rajendra Nagar and Kankarbagh, have faced waterlogging in every monsoon since the 1970s, as reported) and the riverside wards of the north Bihar towns on embanked rivers, such as Muzaffarpur on the Burhi Gandak and Darbhanga on the Bagmati already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Bihar has no tank Act, and few of its pokhars have the full set of an earthen bund, a surplus weir and irrigation sluices. The storages that matter for urban drainage are of five kinds. The first is the urban and village pokhar or talab, usually with no outlet structure, recorded in the Revenue records and, inside a municipal area, vested in the Municipality as a public tank (Bihar Municipal Act, 2007, s. 177); the Jal-Jeevan-Hariyali Abhiyan reports 26,381 ponds restored (State portal, as reported). The second is the ahar and its pynes in south Bihar, especially around Gaya, which store rain and flood water for irrigation; the campaign reports 78,090 ahars and pynes restored (as reported), but no Act and no engineering description of ahar bunds, outlets or depths was found for this Manual. The third is the large floodplain wetland: the chaurs and mauns of north Bihar, such as Kabartal, a complex of 18 interconnected wetlands that drains through the Bagras maun to the Burhi Gandak (Ramsar Information Sheet), and the tals of the south bank, such as the Mokama group of seven connected tals (Fatuha, Bakhtiarpur, Barh, More, Mokama, Barahiya and Singhaul), about 1,062 km² of low land in Patna, Nalanda and Munger waterlogged by excessive rainfall, which drain slowly to the Ganga (NIH and Lok Sabha, both as reported). The fourth is the pumped city, such as Patna, ringed by the Ganga, the Sone and the Punpun, which drains by gravity when the rivers are low and must store in its nalas, pokhars and low ground, or pump through its sump houses, when they are high, as a polder does (Figure 7.3). The fifth is the WRD's system of embankments, canals and drainage channels, including the Flood Plain Zone of the embanked rivers (WRD Order No. 143 of 6 March 2025). Clauses 7.7 and 7.8 apply to any of these whose storage is counted; any ahar or tal whose storage is to be counted is subject to Clause 7.7.1 in full, with the Minor Water Resources Department or other custodian. The river embankments and barrages are not tanks for these clauses: river stages and releases enter a design as inflow and tailwater (Chapter 5).
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. Minor Water Resources Department, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, in a city whose outfalls are shut by river stage, such as Patna between the Ganga and the Punpun, every colony drain, nala, pokhar, sluice through the river bank or embankment and drainage pumping station (sump house) by which the flow reaches the river, with the river stage as tailwater, as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than Minor Water Resources Department's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. Bihar's worst urban floods have come when the rivers were already high. In August 1975 the combined waters of the Sone and the Ganga crossed the Patna canal and entered Patna, and ground floors stayed under water for 5 to 7 days (Lok Sabha record of 16 January 1976, as reported); the highest levels at Dighaghat on the Ganga (52.52 m, 1975) and at Sripalpur on the Punpun (53.91 m, 1976) date from that period. In August 2016 the Ganga at Gandhi Ghat, Patna, set its highest recorded level of 50.52 m against a danger level of 48.60 m, and on 5 and 6 September 2026 it was reported at 50.53 m to 50.57 m, above that level, while the CWC bulletin of 31 October 2026 still lists 50.52 m (2016) (the two conflict; CWC confirmation is awaited). At the CWC gauges of Patna, Muzaffarpur, Darbhanga, Purnia and Bhagalpur the highest flood level is 1.2 to 3.3 m above the danger level, and on the Punpun at Sripalpur, which receives the drains of south Patna, it is 3.31 m above (CWC bulletin of 31 October 2026). When the rivers rise, Patna's sluices on the Ganga and the Punpun are closed (as reported), so an outfall set below the highest flood level can stay shut for days; no hydrograph showing how long Bihar's rivers stay above outfall levels was obtained for this Manual. While the river is high, the city's nalas, pokhars and low ground hold whatever rain falls, and storage downstream that is already full gives no relief. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A river-locked outfall of the Patna type (schematic, not to scale). A: with the river low, the colony drains (nali) feed a pokhar used as detention, which spills to the nala; the nala flows by gravity through the open sluice in the river bank or embankment, and the pumps of the sump house are off. B: with the river high, the sluice is closed; the nala, the pokhar and the low wards store the runoff, and the sump house (drainage pumping station) lifts the nala's flow over the bank until the river falls. The river stage is therefore the tailwater of the whole chain (Chapter 5), and the drains, the pokhar, the nala, the sluice and the pumps are modelled together (Clause 7.7.2); the pokhar's monsoon water line is part of its boundary (definitions after Clause 7.2). C: warning and danger levels and highest flood levels at the three CWC gauges at Patna, from the CWC Lower Ganga Division-2 bulletin of 31 October 2026 (datum to be confirmed); they are not levels at any outfall. The Ganga at Gandhi Ghat was reported at 50.53 m to 50.57 m on 5 and 6 September 2026, above the listed highest level (as reported). Patna's outfalls are pumped (56 permanent and 28 temporary drainage pumping stations, in a Rajya Sabha reply of 27 November 2024 whose scope is unclear), but no sill level, sluice operating rule, pump capacity or design river level for any Bihar outfall was published. Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, BSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under Minor Water Resources Department control, the operating rule shall be Minor Water Resources Department's rule. This Manual does not authorise any other body to operate a Minor Water Resources Department tank.
Commentary. No operating rule for a Bihar pokhar or ahar that keeps a flood cushion was found, and most pokhars have no controllable outlet, so Clause 7.8.3 applies to them. The controlled flows that matter in the cities are at the river outfalls: the sluices through the river banks and embankments, closed when the Ganga and the Punpun rise (as reported), and the sump houses behind them. Patna's sump houses passed from the Bihar Rajya Jal Parshad to BUIDCO with its other assets under the Bihar State Water and Sewage Board (Repeal) Act, 2017; in the waterlogging of September 2019 about 38 of the 39 were reported not to be working, and the State's inquiry found that pumps were not started on time and drains not cleaned (as reported). BUIDCO now monitors nine major sump houses from the Patna Smart City control centre and posted night-shift staff at seven drainage pumping stations in July 2026 (as reported). The WRD's daily flood bulletin runs from 15 June to 15 October. Without an agreed rule with dates, levels and a named operator, storage behind a sluice cannot be relied on. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July to September monsoon depression. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
Many pokhars and ahars have other users. Ahars and pynes store water for irrigation, and the Jal-Jeevan-Hariyali Abhiyan restores them for that purpose; and fisheries are a use permissible on application in the Water Bodies Use Zone of BBL 2014. Drawing an ahar or a pokhar down before a storm has a cost to those who use it, which is why Clause 7.8.2(d) requires the custodian to accept it.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Bihar State Pollution Control Board (BSPCB) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).
Commentary. No statewide order of the UDHD for the pre-monsoon desilting of nalas or pokhars was found. In Patna, PMC set 31 May for desilting its drains in 2026 and then ran a citywide cleaning campaign to 15 June after complaints (as reported); the WRD's anti-erosion works are reported to be due by 15 May (as reported). This Manual keeps 31 May as the general deadline, and Chapter 10 brings it forward to 15 May in the Mithila and Kosi plain (BR-B) and Seemanchal (BR-C), where May is already wet and the monsoon arrives first (Purnea's onset normal is 13 June); both dates are set by this Manual. The Jal-Jeevan-Hariyali Abhiyan reports 26,381 ponds and 78,090 ahars and pynes restored (State portal, as reported), but no specification for that work was found. Excavation to "increase capacity" is governed by Clause 7.9.3. The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Bihar precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Bihar the nalas are split among owners, and the split has not been written down. The Bihar Municipal Act, 2007 vests "all public drains" in the Municipality (s. 195) and lets it make a drain over to another authority with the State's approval (s. 196); the Bihar State Water and Sewage Board (Repeal) Act, 2017 merged the assets and projects of the Bihar Rajya Jal Parshad, which had run Patna's sump houses, into BUIDCO; and a counter-affidavit of PMC's Chief Municipal Engineer of 20 May 2025 is reported to say that the "drainage system is not directly under the Patna Municipal Corporation" (as extracted; not read for this Manual). No order under section 196, and no UDHD order dividing Patna's drains and sump houses between PMC and BUIDCO, was found for this Manual, so the exact split is unconfirmed. In practice rivers, embankments, canals and flood-control drainage channels lie with the WRD; trunk drains, sump houses and the new storm water drainage schemes with BUIDCO; road-side and lane drains, and their cleaning, with the Nagar Nigam; and ahars and pynes with the Minor Water Resources Department. This Manual uses that division as its working assignment, not as a statement of law. The CAG found that "The drainage system of Patna town was laid about 200 years ago and is in bad condition", a "hierarchy of natural and man-made drains that ultimately discharge surface run off and sewage to River Ganga and Punpun" (year ended March 2020); PMC's records are reported to list 535 drains connected to 38 or 39 sump houses (as reported); and BUIDCO's new Patna scheme of 103 drain lines and about 185 km is being built catchment by catchment (as reported). In Darbhanga, an old storm water canal is being lined with concrete, which a petitioner has challenged before the National Green Tribunal (Talab Bachao Abhiyan, 2025, an allegation). BBL 2014 bars building in natural waterways or drains shown in a Development Plan or drainage plan (bye-law 29(A)) and over or under a municipal drain (bye-law 29(D)), and the Draft Bihar Building Byelaws 2026 define a watercourse as "a natural channel or an artificial channel formed by draining or diversion of a natural channel meant for carrying storm and wastewater" (definition 151; a draft). None of these keeps a nala at its recorded width once it has been narrowed or covered, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored pokhar or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Bihar no shared form of storage is required by the building rules: the recharge pits of BBL 2014 are plot-level (bye-law 51), and neither BBL 2014 nor the Draft Bihar Building Byelaws 2026 has a detention, peak-flow or "zero runoff" rule. The public ponds, ahars and pynes restored under the Jal-Jeevan-Hariyali Abhiyan, and the storm water drainage schemes of BUIDCO (38 schemes in the State budget of 2026, as reported), are the nearest existing forms of shared storage and conveyance. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Bihar State Wetland Authority;
- (b) the six Ramsar sites of Bihar listed by the Bihar State Wetland Authority (Kabartal in Begusarai, designated on 21 July 2020 over 2,620 ha, with the interconnected maun, chaur and tal wetlands of its complex; the Nagi and Nakti bird sanctuaries in Jamui; Gokul Jalashay in Buxar; Udaipur Jheel in West Champaran; and Gogabil in Katihar), each to its boundary at maximum post-monsoon inundation, and the wetlands for which draft notifications under the 2017 Rules have been issued, such as Haldia Chaur, Devkhal Chaur and Badka Tal;
- (c) the chaurs and mauns (oxbow lakes) of the north Bihar plain, the tals of the south bank of the Ganga, such as the Mokama group of tals, and the marshy low land and depressions of the diara, within the Flood Plain Zone of an embanked river under WRD Order No. 143 of 6 March 2025 or the 1% AEP extent of Clause 7.3.4, whichever is larger (the river channel itself is a waterbody under the rest of this chapter); and
- (d) any other marsh, wetland, chaur, maun or tal that the Authority notifies, that the wetland authority lists, or that a court or the National Green Tribunal directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Bihar's wetlands are regulated by the Bihar State Wetland Authority, constituted under the 2017 Rules in the Environment, Forest and Climate Change Department. The Authority lists six Ramsar sites: Kabartal in Begusarai, the Nagi and Nakti bird sanctuaries in Jamui, Gokul Jalashay in Buxar, Udaipur Jheel in West Champaran and Gogabil in Katihar. Kabartal, designated on 21 July 2020 over 2,620 ha, is "part of an extensive floodplain wetland complex formed in the lower reaches of Gandak – Kosi interfan", "the largest of a complex of 18 interconnected wetlands", "Locally known as maun, chaur, and taal", inundated in the monsoon to a maximum depth of 1.5 m, and drains through the Bagras maun to the Burhi Gandak (Ramsar Information Sheet); its boundary is its maximum post-monsoon inundation. Under the 2017 Rules only draft notifications were seen for this Manual, inviting objections for, among others, Gokul Jalashay, Haldia Chaur (Saran), Bagharbeel (Katihar) and Devkhal Chaur (Samastipur) (7 June 2024), Chauki and Dargahpur (Begusarai, 2025), and Durgapur Jola (Purnia), Motijheel and Sarottar Jheel (Motihari) and Badka Tal (Bhojpur) (10 February 2026); no final notification under rule 7 was seen, and the Authority is reported to have approved the notification of 36 wetlands in September 2024 (as reported). The National Wetland Atlas counts 21,998 wetlands in Bihar over 4,03,209 ha, 4,416 of them larger than 2.25 ha (as cited by the Authority). The Mokama group of tals, about 1,062 km² of seasonally waterlogged land on the south bank of the Ganga (as reported), was not researched for this Manual and its status is unknown. Under the Bihar Ease of Doing Business Act, 2026, the "District Collector NOC for development on wet land" is listed as "Not required" for enterprises (Schedule V). A drain outfall, desilting, diversion or pumping station in or near a notified wetland or Ramsar site therefore needs the Wetland Authority's permission where the notification or the Rules regulate it, as well as compliance with this chapter; for the chaurs and tals that are not notified, this chapter is the only control. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Bihar's rivers, pokhars and wetlands through the nalas (Clause 8.9, Commentary). In Patna, 19 drains were identified as discharging 628.5 MLD to the Ganga and the Punpun (CAG, year ended March 2020); in Darbhanga, a petitioner alleges before the National Green Tribunal that municipal sewage has been linked to the newly built storm water drains (Talab Bachao Abhiyan, 2025, an allegation). WRD Order No. 143 of 6 March 2025 permits, within the Prohibited Zone, only the "discharge of treated domestic wastewater from cities or towns to prescribed standards" (para 7, as translated). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Bihar they apply in full to every new outfall, and every existing outfall to a river, pokhar, chaur, tal or wetland that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Bihar's main controls on filling and building in ponds are the Bihar Public Land Encroachment Act, 1956, municipal law and the courts. The 1956 Act defines public land to include land vested in the State, a local authority or a Gram Panchayat and any land over which the community has "a right of user, such as right of way, burials, cremation, pasturage or irrigation"; it provides for a notice (s. 3), a hearing (s. 5) and a final order (s. 6), and the burden of proof lies on the person who says the land is not public. The Patna High Court treats the procedure as two-stage, a declaration that the land is public (s. 6(1)) followed by a notice to remove (s. 6(2)), and has often sent pond cases back to the Circle Officer or the Collector (as extracted). The Jal-Jeevan-Hariyali Abhiyan reports encroachment removed from 28,685 ponds, ahars, pynes and wells (State portal, as reported), while other counts differ widely, and the State is reported to have lost more than 100,000 ponds in three decades (Down To Earth, as reported); the figures measure different sets. In Darbhanga, the National Green Tribunal (Eastern Zone) stayed construction around the Harahi, Digghi and Ganga Sagar ponds (8 December 2022) and directed removal of encroachment within three months (23 March 2023); the State's compliance affidavit of 30 July 2024 says the Patna High Court stayed demolition around one pond, and the petitioner's objection of 23 November 2024 says no work was done (O.A. 155/2022/EZ, as listed). Against these, sections 184 and 251(e) of the Bihar Municipal Act, 2007 still allow a pond to be ordered filled where piped supply exists or where it is "injurious to health"; this Manual treats a recorded pokhar as drainage infrastructure (definitions after Clause 7.2). The encroachment sections of the Bihar Municipal Act, 2007 beyond those cited, and the Bihar Irrigation Act, 1997 in full, were not read for this Manual. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The banks of most pokhars are low and are not expected to make them specified dams, but each shall be screened under Clause 7.14.1. The ahars of south Bihar have earthen bunds whose heights and lengths were not found for this Manual; each ahar whose storage is counted shall be screened. The WRD's river embankments, about 3,800 km of them (WRD Order No. 143 of 6 March 2025), and the town protection wall of Patna built after the floods of 1975 (as reported) are flood embankments, which the Act excludes. Where the storage of a pokhar, ahar or tal is counted under Clause 7.7, its bank or bund is a tank bund for Clause 7.14.2. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. Bihar's embankment failures have come at the rivers. On 18 August 2008 the Kosi breached its eastern afflux bund at Kusaha in Nepal and shifted its course across north Bihar, leaving about 3 million people homeless; the commission of inquiry under Justice Rajesh Balia is reported to have found that pressure on the spur from 31 July was not tackled, that anti-erosion work was poor and that warnings were ignored (as reported). In August 2017, floods in north Bihar are reported to have killed 514 people in 19 districts (as reported). No breach map or emergency action plan for a Bihar embankment, sluice or ahar was found. A failed embankment or sluice floods the colonies it was meant to protect, which is why Clause 7.14.3 asks for breach mapping of high-hazard embankments. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Urban Development and Housing Department, Government of Bihar. Bihar Building Bye-Laws, 2014 (English text "Dec-2014"; Notification No. 577 (file 11/न०वि०(मा०)-06/2013), Patna, 8 December 2014, as printed in the official Hindi text) (bye-laws 29, 30, 32, 47 and 51, and the Water Bodies Use Zone of the zoning table). https://automap.bihar.gov.in/PATNABPASPORTAL/PlanningPortals/images/Bihar%20Building%20Bylaw%20English%20Dec-2014.pdf
- Urban Development and Housing Department, Government of Bihar. Draft Bihar Building Byelaws 2026, posted on 5 June 2026 (a draft, not notified as of September 2026) (definition 151, cls. 6, 23 and 41, and Table 5). https://betastate.bihar.gov.in/file_2/FileUpload/2026/Jun/05-Jun-2026/19/LatestNews/0424d72a-9e14-4227-8221-8adb08c0c009.pdf
- Government of Bihar. Bihar Municipal Act, 2007 (ss. 177, 183, 184, 193, 195, 196, 198, 251 and 252). https://www.ielrc.org/content/e0715.pdf
- Government of Bihar. Bihar Public Land Encroachment Act, 1956 (as published by the Bihar State Wetland Authority). https://bswa.bihar.gov.in/Downloads/BIHAR%20PUBLIC%20LAND%20ENCROACHMENT%20ACT,%201956.pdf
- Government of Bihar. Bihar State Water and Sewage Board (Repeal) Act, 2017 (Bihar Act 3 of 2018), Bihar Gazette (Extraordinary) No. 311 of 5 April 2018. https://faolex.fao.org/docs/pdf/ind198266.pdf
- Government of Bihar. Bihar Ease of Doing Business Act, 2026 (Act No. 32 of 2026), Bihar Gazette (Extraordinary) No. 1120 of 16 September 2026, Schedule V. https://prsindia.org/files/bills_acts/acts_states/bihar/2026/Act32of2026BR.pdf
- Government of Bihar. Bihar Urban Planning and Development Act, 2012 (Act 20 of 2012). https://prsindia.org/files/bills_acts/acts_states/bihar/2012/2012Bihar20.pdf ; Bihar Irrigation Act, 1997 (offences relating to embankments and irrigation works; read only through legal-database extracts).
- Water Resources Department, Government of Bihar. Order No. 143 of 6 March 2025, Implementation of Flood Plain Zoning for embanked rivers within Bihar State (Hindi), with the Department's correspondence with the Survey of India and NIH, annexed to the supplementary affidavit of the Chief Secretary, Bihar, of 12 January 2026 in NGT O.A. 200/2014, M.C. Mehta v. Union of India. https://www.greentribunal.gov.in/sites/default/files/news_updates/Supplementary%20affidavit%20on%20behalf%20of%20the%20Chief%20Secretary,%20State%20of%20Bihar%20in%20OA%20No.%20200%20of%202014%20(M%20C%20MEHTA%20Vs.%20UNION%20OF%20INDIA%20and%20Ors).pdf
- National Green Tribunal (Eastern Zone). Application by Talab Bachao Abhiyan against the Darbhanga storm water drainage and canal-lining projects (O.A. of 2025), https://www.greentribunal.gov.in/sites/default/files/news_updates/1755167303.pdf ; and objection of 23 November 2024 in M.A. 18/2024 in O.A. 155/2022/EZ, Talab Bachao Abhiyan v. Government of Bihar (Harahi, Digghi and Ganga Sagar ponds), https://www.greentribunal.gov.in/sites/default/files/news_updates/1732521637_pagenumber.pdf
- Comptroller and Auditor General of India. Audit Report (Performance and Compliance Audit) for the year ended March 2020, Government of Bihar, Chapter III, para 3.1, Development of Sewerage Infrastructure in Patna under Namami Gange Programme (report number and date of tabling [TBC]). https://cag.gov.in/uploads/download_audit_report/2020/05-%20Report%20No-5%20-English%20-%20Chapter%20-%203-06244310a0bd463.62428332.pdf
- Government of Bihar. Jal-Jeevan-Hariyali Abhiyan (components and progress). https://betastate.bihar.gov.in/jaljivan.aspx
- Bihar State Wetland Authority. Home page (Ramsar sites, National Wetland Atlas figures) and Acts, Rules and Notifications (draft notifications under the 2017 Rules). https://bswa.bihar.gov.in/ ; https://bswa.bihar.gov.in/ActRulesandNotification.aspx
- Ramsar Convention. Ramsar Information Sheet, Kabartal Wetland, India (site 2436). https://rsis.ramsar.org/RISapp/files/RISrep/IN2436RIS_2010_en.pdf
- Central Water Commission, Lower Ganga Division-2, Patna. Daily water level and flood forecast bulletin of 31 October 2026 (warning, danger and highest flood levels). https://www.fmiscwrdbihar.gov.in/bulletin/CWC_Bulletin.pdf ; Water Resources Department, FMISC, Daily Flood Information Bulletin. https://fmiscwrdbihar.gov.in/
- Central Water Commission (1985). Flood Estimation Report for Middle Ganga Plains, Subzone 1(f), GP/10/1984 (§1.6 and the worked example).
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Reports of floods and floodplains (secondary): Lok Sabha debates of 12 and 16 January 1976 on the Patna flood of 1975 (read only through search extracts), https://eparlib.sansad.in/bitstream/123456789/857276/1/05_XV_16-01-1976_p57_p59_PII.pdf ; ThePrint on the Ganga at Gandhi Ghat (5 September 2026), https://theprint.in/india/ganga-water-level-breaches-highest-flood-mark-at-patnas-gandhi-ghat-amid-heavy-rain/3034353/ ; DT Next (6 September 2026), https://www.dtnext.in/news/national/bihar-downstream-areas-on-alert-as-ganga-water-level-rises-in-patna-19-lakh-affected-by-floods ; Business Standard on the Patna waterlogging inquiry (14 October 2019), https://business-standard.com/article/news-ani/show-cause-notices-served-to-officials-responsible-for-patna-water-logging-says-chief-secretary-119101401451_1.html ; Business Standard / IANS on the Kosi inquiry report (2 August 2014) and PTI on the floods of 2017 (28 August 2017). Rajya Sabha, reply of 27 November 2024 on drainage pumping stations (seen only in a search extract).
- Reports of ponds, drains and pumping (secondary): Down To Earth on the encroachment of Bihar's ponds, https://www.downtoearth.org.in/water/over-20-000-water-bodies-freed-from-encroachment-in-bihar-for-rainwater-harvesting-78741 , https://www.downtoearth.org.in/water/nearly-3-years-since-campaign-only-5-public-ponds-free-of-encroachment-in-bihar-76044 ; Patna Press on drain cleaning and sump houses (2026), https://patnapress.com/patna-special-drain-cleaning-drive-monsoon-2026/ ; NBMCW on the Patna storm water drainage project, https://www.nbmcw.com/news/infra-development/construction-begins-on-stormwater-drainage-project-in-patna-to-prevent-floods.html ; Patna Press on the State budget of 2026, https://patnapress.com/bihar-budget-urban-development-drainage-waste-management-2026/ ; the NIH study of the Mokama tal area, as summarised by India Water Portal, https://www.indiawaterportal.org/articles/waterlogged-area-mapping-and-hydrological-data-analysis-mokama-tal-area-research-report
- Platts, J. T. (1884). A Dictionary of Urdu, Classical Hindi, and English. London: W. H. Allen; and Dasa, Syamasundara (1965–1975). Hindi Shabdasagara. Kashi: Nagari Pracarini Sabha; both online at the Digital South Asia Library, University of Chicago (accessed 6 November 2026). https://dsal.uchicago.edu/dictionaries/platts/ ; https://dsal.uchicago.edu/dictionaries/dasa-hindi/
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Hindi and Urdu waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Bihar has no Act for the protection of tanks or ponds as such. Its pokhars, talabs and ahars are protected instead by municipal law, encroachment law, the building bye-laws, the courts and a State campaign. Inside a municipal area, "all public tanks, reservoirs, … and any adjacent land, not being private property, appertaining to any such water-source" vest in the Municipality (Bihar Municipal Act, 2007, s. 177), and no person may dig or construct a new tank or pond without the permission of the Chief Municipal Officer (ss. 183 and 252). The same Act keeps older sanitary powers that run the other way: where piped supply exists the Municipality may require an owner "to fill up such well, tank or other water area" (s. 184), and the Chief Municipal Officer may "direct the filling up of any well, pool, ditch, tank, pond, pit or undrained ground … which appears to him to be, or likely to become, injurious to health" (s. 251(e)). This Manual treats every recorded pokhar as drainage infrastructure. A pokhar is storage and conveyance in the drainage system, and filling one, under these sections or otherwise, removes that storage; no design under this Manual shall assume or rely on the filling of a recorded pokhar unless a drainage assessment under Chapters 3 to 5 shows where its storage goes, and the lost storage is replaced under Clause 7.6.4 (see "Recorded pokhar" in the definitions after Clause 7.2). A pond that is a health risk is to be treated (desilting, inlet screening and exclusion of sewage, Clauses 7.9 and 8.9), not filled. Outside the municipal areas, land "managed by or vested in" the State, a local authority or a Gram Panchayat, and land over which the public or the community has a right of user "such as right of way, burials, cremation, pasturage or irrigation", is public land under the Bihar Public Land Encroachment Act, 1956, from which encroachment can be removed after notice and hearing; the right of irrigation brings community ahars and pynes within it. BBL 2014 bars permission for building "within nine (9) meters of the highest water mark of a tank" unless domestic drainage is kept out of the tank (bye-law 30(B)), and "In areas of natural waterways or drains, as detailed in the Development Plan, and drainage plan" (bye-law 29(A)), and keeps ponds, lakes, wetlands and "Water logged/marshy area" in a Water Bodies Use Zone. The State's Jal-Jeevan-Hariyali Abhiyan, led by the Rural Development Department with fifteen departments, takes the "Identification and removal of encroachment from public water bodies" and the "Restoration and rejuvenation of public water bodies such as Ponds/Aahars/Payeens" as its first two components; it is an executive campaign, and no statute or notified scheme for it was found. The National Green Tribunal (Eastern Zone) has ordered encroachment around three ponds of Darbhanga removed (O.A. 155/2022/EZ, order of 23 March 2023, as listed). Wetlands notified under the Wetlands (Conservation and Management) Rules, 2017, and the State's six Ramsar sites, are regulated by the Bihar State Wetland Authority, and the embanked rivers by WRD Order No. 143 of 6 March 2025. This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the municipal, revenue, planning, wetland and floodplain procedures that record and protect waterbodies in law, or the directions of the Patna High Court and the National Green Tribunal.