Draft v1.0 prepared by NEER. Not adopted by the Government of Bihar or any authority or local body, and has no legal force. About this draft

Annexes to Chapter 10Submittals, Review, Operation & Maintenance and Enforcement

These annexes support Chapter 10. They give the specification and user-guide outline of the compliance calculator, the GIS data specification, the maintenance access dimensions that the Manual sets, model O&M plans for each facility type, model empanelment criteria, and the eight forms that Chapter 10 requires. The Design Rainfall Sheet (Form 2-1) is in the annexes to Chapter 2. The forms are draft forms. The model texts are for consideration by a competent authority and are not in force.


Annex 10A — Compliance calculator and user guide

Supports Clauses 10.4.1(g), 10.5 and 10.9.1(b) of Chapter 10.

Status. The compliance calculator does not exist yet. Clause 10.5.1 requires the State Stormwater Technical Committee to issue and maintain it. This annex is the specification the calculator shall meet and the outline of its user guide. Until the calculator is issued, the designer completes Form 10-2 by hand from the calculations of Chapters 4, 5 and 8, enters "not issued" as the calculator version, and attaches the calculations.

10A.1 General requirements

The calculator shall:

  • (a) be a spreadsheet or web tool, published free of charge with its user guide and the source of every table in it (Clause 10.5.4);
  • (b) print its version number and release date on every output page and every exported file (Clause 10.5.3);
  • (c) keep a public version log. A new version applies to new submittals 6 months after release; a submittal keeps one version from Stage 1 to Stage 4 unless the Applicant elects a later one (Clause 10.5.3);
  • (d) work for one site at a time, with one or more drainage areas, each draining to its own outfall (Clause 4.5.1.3);
  • (e) never apply a value that the Manual has not published. Where a table it needs has not been issued (for example Table 4.3 of Annex 4B, or the S-2 discharge tables of Annex 1C), the calculator shall show that route as "not available" rather than estimate the value; and
  • (f) export its inputs and results as a machine-readable file (CSV or JSON) as well as Form 10-2, so that the Authority can load them into the facility register (Clause 10.17.1(b)).

10A.2 Inputs

Table 10A.1 — Calculator inputs

No. Input Unit Source
I1 Authority, tier (A or B) and file number — Clause 1.6
I2 Site area; land disturbance area ha Clause 1.5.2
I3 New impervious area; replaced impervious area; existing impervious area before demolition m² Clauses 1.5.2, 1.5.6, 4.5.6.1
I4 Development type: new, redevelopment, linear public work, single dwelling — Clauses 1.5.6–1.5.8
I5 Flood-sensitive catchment (yes / no), and basin with an approved BSMP (yes / no) — Clauses 4.5.3, 4.13, 11.12
I6 Rainfall zone — Annex 2A
I7 Retention depth P_R; 3-month ARI 24-hour depth P_3m mm Annexes 2E, 8A
I8 Design rainfall depths by duration (1–72 h) and AEP, with the climate factor, as recorded on Form 2-1 mm Clauses 2.5, 2.8, 2.13
I9 15-minute intensities i_10 and i_2, with the climate factor (fixed-coefficient route only) mm/h Clause 4.14.4
I10 Drainage areas: for each, area, land cover, impervious percentage, HSG and curve number, pre- and post-development ha, %, — Clauses 3.3, 3.7, 3.9
I11 Areas preserved under a registered covenant ha Clause 4.4.7
I12 Seasonal high groundwater depth below the base of each retention practice m Clauses 4.4.3(c), 8.8
I13 Measured infiltration rate at each practice mm/h Clause 4.4.3
I14 Retention volume provided, by practice; reuse demand where retention is by reuse m³, m³/d Clauses 4.4.3, 4.4.5
I15 Route: full hydrograph method (Clause 4.6); design-aid S-1 (Clause 4.14.2); PSD S-2 (Clause 1.7); fixed-coefficient (Clause 4.14.3); constrained redevelopment (Clause 4.5.6) — Clauses 1.7, 4.5.6, 4.6, 4.14
I16 For the full method: model results for each AEP and duration — pre- and post-development peaks, storage used, retention credit found by routing m³/s, m³ Clauses 4.4.6.2, 4.6
I17 Outlet: low-flow orifice diameter or least slot dimension; drawdown times from routing mm, h Clauses 4.7, 4.8.2
I18 Outfall: tidal or non-tidal; outfall-closed check result — Chapter 5
I19 Fee-in-lieu unit rate notified for the basin, where the route applies ₹/m³ Clause 4.13.3
I20 Stage of submittal (1, 2 or 4) and, at Stage 4, the as-built values of I14, I16 and I17 — Clauses 10.5.2, 10.9.1(b)

10A.3 Calculations, by clause

Table 10A.2 — Calculations the calculator shall perform

Step Calculation Clause
C1 Applicability. Chapters 4 and 5 apply where land disturbance ≥ 0.1 ha or new plus replaced impervious area ≥ 500 m², over the common plan of development. Report exemptions. Flag that the universal provisions apply at every size, and that RWH applies to plots of all sizes, with recharge pits or trenches of at least 6 m³ per 100 m² of roof (BBL 2014, bye-law 51; the Draft Bihar Building Byelaws 2026 would require a rainwater harvesting proposal on plots of 100 m² and more), and in urban areas notified under the Bihar Ground Water Act 2006 to premises of 1,000 m² and more (s.18), except that roof water is stored rather than recharged in diara, chaur and tal land and wherever the seasonal high water table is shallow, and is not injected untreated into recharge wells in the arsenic belt. 1.5.2–1.5.8
C2 Process flags. Stage 0 mandatory (≥ 2 ha, flood-sensitive, variance or regional route, tidal outfall or waterbody); Stages 1 and 2 may be combined (< 1 ha, not flood-sensitive); empanelled signatory required; independent check required. 10.3.2, 10.3.3, 10.6.1, 10.6.4
C3 Route eligibility. Tier B simplified method: ≤ 2 ha, or ≤ 0.5 ha in a flood-sensitive catchment, and only once Table 4.3 is published. Fixed-coefficient route: ≤ 1 ha and none of the exclusions of Clause 4.14.3. Constrained redevelopment: existing ≥ 60% impervious and ≤ 1 ha. Regional detention or fee-in-lieu: only in a basin with an approved BSMP. 4.5.6.1, 4.13.1, 4.14.1, 4.14.3, 11.12.1(b)
C4 Retention volume. RRV = 10 × Q_R × A, with Q_R the SCS-CN runoff from P_R for each sub-area at AMC II, summed over sub-areas. The larger of the Ia = 0.2S and Ia = 0.05S results governs. The Rv form (RRV = 10 × P_R × Rv × A, Rv = 0.05 + 0.009 × I) is offered only for sites < 0.5 ha and the Tier B method. No climate factor. 4.4.2, 3.8.5(c), 2.8.3
C5 Preservation credit. Preserved areas are modelled at their pre-development CN in the post-development condition. 4.4.7
C6 Retention checks. Design infiltration rate ≤ half the measured rate; groundwater ≥ 1.0 m below the base; drawdown of the retained volume within 72 h at the design rate (or by the stated reuse demand). A practice that fails any check gets no credit; any shortfall is reported and treated as WQv. 4.4.3–4.4.5, 4.4.6.4
C7 Water quality volume. P_wq = max(P_ret, P_3m); WQv = 10 × Q_wq × A by SCS-CN, or (P_wq / 1000) × Rv × A (A in m²) for sites < 0.5 ha and the Tier B method. The retained volume counts toward the WQv in full. No climate factor. 8.4.1–8.4.4, 3.8.5(c)
C8 Retention credit. Tier A: the credit found by routing is entered (I16); the calculator does not compute it. Tier B: V_credit = C_R × RRV provided, with C_R = 0 until Annex 4B is published. 4.4.6
C9 Design-aid route (S-1). V = SSR × A − V_credit; Q_PSD,T = PSD_T × A for the 2-yr and 100-yr stages, from Table 4.3. Shown as "not available" until Table 4.3 is published. 1.7.2, 4.14.2
C10 Permissible site discharge (S-2). Q = PSD (m³/s/ha) × A for each AEP, from the S-2 tables. Shown as "not available" until they are issued. 1.7.2, 1.7.3(e)
C11 Fixed-coefficient route. Q_cap,10 = 2.78 × C_10 × i_10 × A and Q_cap,2 = 2.78 × C_2 × i_2 × A (L/s); V_100 and V_2 = max over d of [10 × C_v × P(d) × A − 1.8 × Q_cap × d] for d = 1 to 72 h, with pervious C ≥ 0.50 for d ≥ 12 h; V = max(V_100, V_2); retention added without credit. Coefficients from Table 4.3A (provisional). 4.14.4–4.14.7
C12 Release-rate screen (full method). For each AEP and duration: Q_post ≤ 0.9 × Q_pre (standard), or the two mixed-frequency caps (flood-sensitive). Report the governing duration and margin. 4.5.2, 4.5.3
C13 Constrained redevelopment. Q_post ≤ 0.5 × Q_existing for 2-, 10- and 100-yr at each duration; shortfall volume = greenfield storage − storage provided; fee = shortfall × unit rate. 4.5.6.2, 4.5.6.3
C14 Minimum orifice. Flag any orifice < 50 mm. Where a cap is below the discharge of a 50 mm orifice at the corresponding stage, report "50 mm orifice deemed to comply". 4.5.5.1, 4.8.2
C15 Drawdown. Report the detention drawdown (90% of the 10-yr stored volume within 48 h), the WQv release time (24–48 h) and the retention emptying time (≤ 72 h). 4.7
C16 Fee-in-lieu. Fee = detention volume required on site × notified unit rate. 4.13.3
C17 Model screen. Where the full method is used, compare the model results (I16) with the calculator's screen values (C9 to C11, where available) and flag a difference above the tolerance stated in the user guide. 10.5.2(c)
C18 As-built re-run. At Stage 4, repeat C4 to C17 with the as-built values and report each change from Stage 2. 10.9.1(b), 10.9.2

10A.4 Outputs

The calculator produces:

  • (a) Form 10-2, filled in, with the calculator version and release date on every page;
  • (b) a machine-readable export of every input and result of Tables 10A.1 and 10A.2; and
  • (c) a list of the flags raised (C1 to C3, C6, C14, C17), each with the clause on which it is based (Clause 10.7.7).

10A.5 Testing before release

Before each release the State Stormwater Technical Committee shall check that the calculator reproduces, within rounding, the worked examples of the Manual that use the same method, including the illustrative examples of Clauses 4.6.7 and 4.14, and the benchmark problems of Annex 3C where they apply. The test results shall be published with the version log.

10A.6 Outline of the user guide

The user guide shall contain at least:

  1. Purpose, status and limits of the calculator: a summary and screening check outside the design-aid route (Clause 10.5.2(c)).
  2. How to obtain the current version, and the version rule of Clause 10.5.3.
  3. Each input of Table 10A.1, with where to find it in the Manual and its annexes.
  4. Each calculation of Table 10A.2, with its equation and clause.
  5. The tolerance used in step C17, and what the drainage report must explain where it is exceeded (Clause 10.5.2(c)).
  6. How to read and sign Form 10-2, and what to attach.
  7. At least one worked example for each route, labelled "Illustrative — not design values".
  8. The sources of every table in the calculator (Clause 10.5.4), and the version log.

Annex 10B — GIS data specification and attribute schema

Supports Clauses 10.4.4, 10.14.1(d), 10.14.3 and 10.17 of Chapter 10.

10B.1 Format and reference systems

  • (a) Format. One OGC GeoPackage (.gpkg) per submittal is preferred. Shapefiles are accepted, one per layer, zipped with all component files. Field names shall be as in Tables 10B.2 to 10B.6; shapefile names are limited to 10 characters, and the names below meet that limit.
  • (b) Horizontal reference. WGS 84 geographic (EPSG:4326), or WGS 84 / UTM zone 45N (EPSG:32645), statewide, including for Kaimur, most of Buxar, the west of Rohtas and the Valmikinagar tip of West Champaran, which lie in zone 44N, whichever contains the site (Clause 10.4.4(c)). One system shall be used for all layers.
  • (c) Vertical reference. All levels shall be in metres relative to a named vertical datum, stated in the metadata. The metadata shall also state the relationship between that datum and the river datums of the CWC and WRD (FMISC) gauges on the receiving rivers and of WRD's embankment, sluice and drain levels used in Chapter 5 (Clause 10.4.4(d)).
  • (d) Accuracy. Positions shall come from the site survey or the approved drawings. At Stage 4 and at handover, positions and levels shall come from the as-built survey (Clause 10.9.1(a)).
  • (e) File name. <Authority file number>_<stage>_<yyyymmdd>.gpkg, for example PMC-BP-2026-0123_S2_20261015.gpkg.
  • (f) Identifiers. Every feature has an identifier unique within the submittal (FAC_ID, OUT_ID, CAT_ID, FLP_ID). The Authority replaces them with register identifiers on acceptance and returns the mapping to the Applicant.

10B.2 Layers

Table 10B.1 — Layers

Layer Geometry Content Required at
SW_SITE Polygon Site boundary Stages 1, 2, 4
SW_CATCH Polygon Catchment boundaries draining to and through the site, pre- and post-development (Clause 10.4.1(b)) Stages 1, 2, 4
SW_FAC Polygon (point for buried items smaller than 5 m across) Every stormwater facility: retention, detention, water quality, pumping, gate, conveyance element designed under this Manual Stages 2, 4; handover
SW_OUTF Point Every outfall from the site, and every public outfall Stages 1, 2, 4; handover
SW_FLOW Line Major-system flow paths through and from the site, and natural drainage paths (Clause 10.15.1(g)) Stages 1, 2, 4
SW_CONV Line Drains and pipes designed under Chapter 6 Stage 4 for public works; handover
SW_META Table (no geometry) Metadata of Table 10B.6 Every stage

10B.3 Attribute schema

Types: T = text, I = integer, R = real, D = date (ISO 8601, yyyy-mm-dd). "Req." marks fields that shall not be empty; other fields are filled where they apply.

Table 10B.2 — Attributes of SW_FAC (facilities)

Field Type Unit Req. Content Source
FAC_ID T — Yes Facility identifier 10B.1(f)
FAC_TYPE T — Yes Code from Table 10B.7 Clause 4.10, Table 10.3
FAC_NAME T — Name on the drawings —
OWNER_TYP T — Yes PRIVATE / ASSOC / DEVELOPER / ULB / DEPT Clauses 10.10, 10.14
OWNER_NM T — Yes Name of a corporate owner or association only; for an individual, "private individual" (Clause 10.17.3) Clause 10.17.3
CTRL_AREA R ha Yes Area draining to the facility Clause 4.5.1.3
V_RET R m³ Retention volume provided Clause 4.4
V_WQ R m³ Water quality volume provided Clause 8.4
V_DET R m³ Detention volume at the top design level Clause 4.6
Q_2 R L/s Release at the 50% AEP (2-yr) design level Clause 4.5
Q_10 R L/s Release at the 10% AEP (10-yr) design level Clause 4.5
Q_100 R L/s Release at the 1% AEP (100-yr) design level Clause 4.5
ORIF_MM R mm Low-flow orifice diameter or least slot dimension Clause 4.8.2
INV_OUT R m Outlet invert level Clause 10.9.1(a)
TWL_DES R m Top design water level Clause 10.9.2(a)
SPILL_LV R m Spillway or overflow crest level Clause 4.9
PUMPED T — Yes Y / N Clause 10.10.3
REGIONAL T — Yes Y / N Clause 4.13
EMPANEL T — Yes Y / N: facility under Clause 10.6.1(c) or (d) Clause 10.6.1
STATUS T — Yes Code from Table 10B.8 Clause 10.17.1(a)
APPR_DATE D — Date of Stage 2 approval Clause 10.3
ASB_DATE D — Date the as-built certificate was accepted Clause 10.9
DECL_REF T — Registration reference of the Maintenance Declaration (Form 10-6) Clause 10.10.1(e)
HAND_DATE D — Date of the Asset Handover Certificate (Form 10-8) Clause 10.14
LAST_INSP D — Date of the latest inspection Clause 10.12
INSP_RES T — Code from Table 10B.9 Clause 10.17.1(a)
OUT_ID T — Yes Outfall to which the facility discharges —

Table 10B.3 — Attributes of SW_OUTF (outfalls)

Field Type Unit Req. Content Source
OUT_ID T — Yes Outfall identifier 10B.1(f)
RECEIVER T — Yes Receiving drain, channel, waterbody or sea, by name Clause 4.5.1.3
RECV_TYPE T — Yes PUBLIC_DRAIN / CANAL / RIVER / TANK / SEA / OTHER Chapter 5
INV_LEVEL R m Yes Outfall invert level Clause 10.9.1(a)
SIZE_MM R mm Yes Diameter, or width × height written in the drawing Chapter 6
TIDAL T — Yes Y / N Chapter 5
GATE_TYPE T — NONE / FLAP / TIDE / DUCKBILL / PENSTOCK / NRV Clauses 5.11, 9.10
GATE_REQ T — Yes Y / N: invert below the 1% AEP still-water level Clause 5.11.1
GPT T — Y / N: gross pollutant trap fitted Clause 8.10.1
Q_100 R L/s Design 1% AEP discharge Chapter 5

Table 10B.4 — Attributes of SW_CATCH (catchments)

Field Type Unit Req. Content Source
CAT_ID T — Yes Catchment identifier 10B.1(f)
CONDITION T — Yes PRE / POST / EXTERNAL (land outside the site draining through it) Clause 10.4.1(b)
AREA_HA R ha Yes Area —
IMPERV_PC R % Yes Impervious percentage Clause 3.9
HSG T — Yes A / B / C / D, or mixed with area shares in NOTES Clause 3.7
CN R — Curve number, AMC II Chapter 3
OUT_ID T — Yes Outfall to which it drains Clause 4.5.1.3
FLOODSENS T — Yes Y / N Clause 4.5.3
NOTES T — Free text —

Table 10B.5 — Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)

Field Type Unit Req. Content Source
FLP_ID T — Yes Line identifier 10B.1(f)
LINE_TYPE T — Yes OVERLAND / NATURAL / OPEN_DRAIN / COVERED_DRAIN / PIPE / CULVERT Chapter 6
US_LEVEL R m Upstream invert or ground level Chapter 6
DS_LEVEL R m Downstream invert or ground level Chapter 6
SIZE_MM R mm Pipe diameter, or drain width (depth in NOTES) Clause 6.7.6
Q_DES R L/s Design discharge Chapter 6
AEP_DES T — Design AEP, for example "10%" or "1%" Clause 6.4
RESERVE_M R m Drainage reserve width, where one applies Clause 6.9.7
NOTES T — Free text —

Table 10B.6 — Metadata (SW_META)

Field Content
FILE_NO Authority file number
STAGE 1, 2, 4 or HANDOVER
H_CRS EPSG code of the horizontal reference system
V_DATUM Name of the vertical datum
TIDE_REL Relationship of the vertical datum to the Chapter 5 river datums of the CWC and WRD (FMISC) gauges on the receiving rivers and of WRD's embankment, sluice and drain levels (for example, MSL = x.xx m on the site datum)
SURVEYOR Name and licence number of the surveyor
SURV_DATE Date of the survey
PREP_BY Name and registration number of the certifying professional
CALC_VER Compliance calculator version (Annex 10A), or "not issued"
DATE Date the file was prepared

10B.4 Code lists

Table 10B.7 — Facility type codes (FAC_TYPE)

Code Facility Inspection row of Table 10.3
RET_SOAK Soakaway, recharge pit or shaft Retention / infiltration
RET_TRENCH Infiltration trench or basin Retention / infiltration
RET_BIO Bioretention or rain garden Retention / infiltration
RET_PERM Permeable pavement Retention / infiltration
RET_REUSE Retention by reuse (tank with demand) Underground or podium detention tank, gravity outlet
DET_BASIN Surface detention basin Surface detention basin or multi-use open space area
DET_OSR Multi-use detention in open space, park or playfield Surface detention basin or multi-use open space area
DET_ROOF Rooftop detention Underground or podium detention tank, gravity outlet
DET_PODIUM Podium or landscape-deck detention Underground or podium detention tank, gravity outlet
DET_PARK Parking-lot detention Surface detention basin or multi-use open space area
DET_TANK Underground tank or vault, gravity outlet Underground or podium detention tank, gravity outlet
DET_PUMP Pumped detention or pump station Pumped detention, pumps and controls
WQ_POND Wet pond or constructed wetland Surface detention basin or multi-use open space area
WQ_SWALE Swale or filter strip Private drains and inlets
WQ_GPT Gross pollutant trap, first-flush device or oil-grit separator Gross pollutant trap / first-flush device
GATE Flap or tide gate, non-return valve Flap / tide gate, non-return valve
CONV Private drain, inlet or culvert Private drains and inlets

Table 10B.8 — Status codes (STATUS)

Code Meaning
PROPOSED In a Stage 1 or Stage 2 submittal
APPROVED Stage 2 approved; not yet built
ASBUILT As-built certificate accepted (Clause 10.9)
HANDEDOVER Accepted by the ULB (Clause 10.14)
ALTERED Changed with the Authority's approval (Clause 10.3.5)
REMOVED Removed with the Authority's approval

Table 10B.9 — Inspection result codes (INSP_RES)

Code Meaning
OK Working as designed; no defect
MINOR Defect found and corrected; date in the inspection record
MAJOR Defect affecting storage, outlet or safety; notice issued (Clause 10.15.2, step 1)
NOACCESS Inspection could not be made
NOTFOUND Facility missing, filled, covered or changed in use (Clause 10.15.1(c))

10B.5 Facility register extract

The public facility register of Clause 10.17.1(a) is an extract of SW_FAC: FAC_ID, FAC_TYPE, location (centroid), V_DET (and V_RET, V_WQ), Q_100 (and Q_2, Q_10), OWNER_NM, ASB_DATE, LAST_INSP and INSP_RES. It is published as CSV and GeoPackage under the licence of Clause 10.17.4. Personal data are not published (Clause 10.17.3).


Annex 10C — Maintenance access dimensions

Supports Clause 10.13 of Chapter 10.

Clause 10.13 sets access by function. This annex collects the access dimensions that the Manual already sets in other chapters, and lists the dimensions that it does not set. Where a dimension is not set by the Manual, the designer shall state it on the drawings, show that it suits the plant and equipment named in the O&M plan (Clause 10.11.1(h)), and mark it "to be confirmed in design".

Table 10C.1 — Access dimensions set by the Manual

Element Requirement Clause
Open drains with a top width of 2 m or more Maintenance access strip at least 3.5 m wide along one bank, connected to a public road at intervals of not more than 500 m 6.9.4
Drainage reserves Width not less than Table 6.9, based on the required drain size; where the access strip of Clause 6.9.4 is wider, the wider governs 6.9.7
Covered drains, minimum section 0.6 m × 0.6 m clear 6.7.6
Covered drains, removable covers Panels at not more than 10 m centres, each at least 0.6 m long and spanning the full clear width, liftable by two workers or a hand-operated device 6.13.2(a)
Covered drains, access chambers Clear opening at least 0.6 m × 0.6 m at every junction, bend and change of section, and at not more than 30 m centres on straight runs 6.13.2(b)
Manholes and access chambers on public drains Clear access opening at least 600 mm 9.12.3
Inlet chambers on public roads Silt sump at least 300 mm deep below the outlet pipe invert, cleanable from the surface 6.6.7
Underground tanks and vaults Access openings over the outlet chamber and over every inlet; in tanks over 500 m², not more than 30 m apart; floor falling at least 1% to a sump at the outlet 4.10.2(b), (c)
Detention outlets serving more than 1 ha A means of isolating the outlet (stop-log slot or penstock) 4.8.6
Outfall gates Stop-log slot or penstock upstream on outfalls larger than 600 mm (Chapter 5) and on outfalls of 900 mm or more or serving a pumped or storage system (Chapter 9); the gate chamber accessible at all tides, with its access above HAT + surge + sea-level allowance 5.11.3(d), (e); 9.10.3
Pump stations Maintenance vehicle access usable in the 1% AEP event; hard standing and a quick-coupling connection for mobile pumps; clear space between adjacent pumps or motors of 0.6 m (small and medium units) or 1.0 m (large units) 9.9.6, 9.9.10, 9.9.12
Pretreatment devices Cleanable without entering or disturbing the main BMP 8.5.4
Screens at outfalls, culvert inlets and pump sumps Cleanable from a safe platform, with vehicle access 8.10.3(d)
Infiltration trenches Observation well to the base of each trench 8.7.6(c)
Publicly accessible storage Side slopes no steeper than 4H:1V, with at least a quarter of the perimeter at 6H:1V or flatter 4.15.1(c)
Wet basins Safety bench at least 3 m wide, no more than 0.3 m below normal water level 4.15.2
Fencing At least 1.2 m high, non-climbable, with a lockable gate, where Clause 4.15.3 requires it 4.15.3

Table 10C.2 — Access dimensions not set by the Manual (to be confirmed in design)

Element What the designer shall state Clause setting the function
Vehicle access route to the inlet, outlet and base of a basin, pond or open channel Width, gradient, turning space and design load for the plant in the O&M plan 10.13.2
Maintenance strip beside a basin or pond Width along at least one side 10.13.2
Ramp into a basin Width, gradient and surface for the sediment-removal plant 10.13.2
Access openings of private tanks Clear size of each opening over the inlet, outlet and each chamber 10.13.3(a)
Ladders and steps Type and spacing; ventilation for confined-space entry 10.13.3(b)
Headroom in underground tanks Clear height for manual cleaning 10.13.3(d)
Reach to orifices and screens How the outlet is cleaned without entering a full facility 10.13.4

Commentary. APWA 5600 (2006, §5608) required a maintenance access strip of 15 ft (about 4.5 m) for detention facilities. The Manual did not adopt a fixed width for private sites, because plot sizes in Bihar cities vary widely (Clause 10.13, Commentary). The State Stormwater Technical Committee may add standard values to Table 10C.2 when it issues the standard drawings of Annexes 6C and 9B.


Annex 10D — Model O&M plans by facility type

Supports Clauses 10.11, 10.12 and 10.13 of Chapter 10.

The model plans below are starting points. The designer adapts them to each facility and completes the items marked "______". Inspection frequencies are the minimum frequencies of Table 10.3; a plan may set more frequent inspection, never less. Where this annex leaves a value to the designer, the Manual does not set it.

10D.1 Contents of every O&M plan

Every plan shall contain the items of Clause 10.11.1:

Table 10D.1 — Contents of an O&M plan

Item Content Clause
1 Inventory and plan drawing of each facility, with design levels, volumes and outlet details (from SW_FAC, Annex 10B) 10.11.1(a)
2 Routine tasks and their frequency (Tables 10D.2 to 10D.8) 10.11.1(b)
3 Trigger for sediment removal, as a depth (mm) or a percentage of design volume: ______ 10.11.1(c)
4 Inspection checklist matching Form 10-7 10.11.1(d)
5 For pumps, gates and valves: operating rules, test schedule, standby power, and actions on a cyclone or heavy-rainfall warning 10.11.1(e)
6 Actions against standing water and mosquito breeding, consistent with the drawdown times of Clause 4.7 10.11.1(f)
7 Safety: confined spaces, deep water, public access 10.11.1(g)
8 Access routes and equipment (Annex 10C) 10.11.1(h)
9 Annual cost estimate (₹ ______ per year) and who pays it 10.11.1(i)
10 Records to be kept, and for how long: ______ years (pump records at least 5 years, Clause 9.9.8(c)) 10.11.1(j)

10D.2 Model plans

Table 10D.2 — Retention and infiltration (soakaways, trenches, bioretention, permeable paving)

Task Frequency Standard or trigger Clause
Inspect surface, inlets, pretreatment and overflow Every 6 months; before 31 May; after each heavy-rainfall day No blockage; overflow clear Table 10.3
Check drawdown at the observation well or surface At each inspection after rain Empties within 72 h of the end of rain; if not, investigate clogging 4.4.5, 8.7.6(c)
Clean pretreatment (forebay, filter strip, silt trap) When the sediment trigger (item 3) is reached Pretreatment cleaned without disturbing the main BMP 8.5.3, 8.5.4
Bioretention: mulch, plants, ponding Every 6 months Ponding drains within 48 h; dead plants replaced; mulch 50–75 mm 8.7.2
Permeable paving: surface Every 6 months Sweep or vacuum; no resurfacing with impermeable material 8.7.5(e)
Keep the contributing area stable Each inspection Bare soil stabilised; no sediment washing in 10.8.3(b)
Keep the facility in place and in use Each inspection Not filled, covered, paved or built over without approval 10.10.1(d)

Table 10D.3 — Surface detention basin or multi-use open space area

Task Frequency Standard or trigger Clause
Inspect inlets, outlet, orifice, trash rack and spillway Every 6 months; before 31 May; after each heavy-rainfall day Orifice and rack clear; spillway unobstructed Table 10.3, 4.8, 4.9
Remove debris and sediment When the sediment trigger is reached, and after events Design volume restored 10.11.1(c)
Check that the basin drains After rain No low point ponds for more than 72 h 4.15.7
Vegetation As set in the plan Grass cut; no woody growth on embankments or in the outlet zone 10.11.1(b)
Safety features Every 6 months Signs in Hindi and English and a depth marker in place; fences and gates sound where required 4.15.3, 4.15.5
Embankment (if any) Every 6 months and after events No cracks, slips, seepage or animal burrows 4.9.6

Table 10D.4 — Underground or podium detention tank, gravity outlet

Task Frequency Standard or trigger Clause
Inspect from the access openings: inlets, outlet, orifice, screen, sump, vents Every 6 months; before 31 May; after each heavy-rainfall day Clear; vents open Table 10.3, 4.10.2
Clean the sump and floor When the sediment trigger is reached Floor falls freely to the sump 4.10.2(c)
Inlet silt trap or GPT Every 3 months (Table 10.3 row for GPTs) Cleaned 4.10.2(e)
Overflow route Each inspection Operates when the outlet is blocked; route to the overland path unobstructed 4.9.5
Confined-space entry Each entry Entry procedure stated in the maintenance declaration followed; covers locked after 4.15.6
Use of the space Each inspection Not used for parking or storage; volume not reduced 10.10.1(d)

Table 10D.5 — Pumped detention, pumps and controls

Task Frequency Standard or trigger Clause
Test run of each pump, duty and standby Monthly Each pump starts on level control; roles alternate Table 10.3, 9.9.4(c)
Full duty test Before 31 May Station meets its design duty point Table 10.3, 10.9.3
Standby power Monthly with the test run; full test before 31 May Automatic changeover works; fuel for at least 72 h of all duty pumps on site 9.9.9
Level sensors, float back-up, alarms, telemetry Monthly High-level and fault alarms reach the control room 9.9.8
Screens and silt trap Every 3 months and after events Clean 9.9.7
Records Continuous Sump levels, run hours and power status logged; kept at least 5 years 9.9.8(c)
Warning actions On an IMD heavy-rainfall or cyclone warning Actions written in the plan: ______ (for example staff on site, fuel topped up, mobile pump connection checked) 10.11.1(e), 9.9.12

Table 10D.6 — Flap or tide gate, non-return valve

Task Frequency Standard or trigger Clause
Inspect and operate Every 3 months; after each heavy-rainfall day Opens at a small head; no debris, sand or growth holding it Table 10.3, 9.10.4
Seal test Before 31 May Seals against the receiving water Table 10.3, 10.9.3
Beach, estuary and creek outfalls After every high-tide or surge event in the monsoon season Sand and debris cleared 9.10.5(b)
Isolation Before 31 May Stop-log slot or penstock operable 9.10.3
Hinges, pins and fixings Before 31 May No corrosion that would stop the gate working 9.10.6
Property non-return valves Every 3 months Cleaning eye accessible; valve seals 5.11.4

Table 10D.7 — Gross pollutant trap or first-flush device

Task Frequency Standard or trigger Clause
Inspect and empty Every 3 months; before 31 May; after each heavy-rainfall day Emptied before the capture chamber is full; bypass clear Table 10.3, 8.4.6
Screens Each inspection Clean; overflow path clear 8.10.3(b)
Disposal Each cleaning Material taken to an authorised solid-waste facility —

Table 10D.8 — Private drains and inlets

Task Frequency Standard or trigger Clause
Inspect and clean drains, inlets and silt sumps Every 6 months; before 31 May Free of silt and debris Table 10.3
Check for sewage connections Each inspection None; any cross-connection removed 1.5.4, 8.9
Overland flow paths Each inspection Not obstructed by walls, fill or stored material 6.9.2, 10.15.1(g)

Annex 10E — Empanelment criteria for Stormwater Design Professionals and reviewers

Supports Clauses 10.6, 10.7.4 and 11.4.3 of Chapter 10.

Model text for consideration by a competent authority. Not in force. Clause 10.6.2 assigns the issue of empanelment criteria to UDHD. The text below is a model. Values shown as "[ ]" are for the competent authority to set; the Manual does not set them.

10E.1 Model criteria

  1. Lists. The competent authority shall keep three public lists:
    • (a) Stormwater Design Professionals, who may sign designs under Clause 10.6.1 and act as independent checkers under Clause 10.6.4;
    • (b) Empanelled Reviewers, who may review submittals for an Authority under Clause 10.7.4; and
    • (c) a basin modelling endorsement, held by a Stormwater Design Professional who may prepare or direct a BSMP under Clause 11.4.3.
  2. Eligibility for list (a). An applicant shall:
    • (a) hold a degree in civil engineering, or an equivalent qualification recognised by the competent authority (Clause 10.6.2);
    • (b) be registered as a professional under the Bihar Building Byelaws 2014 (Clause 1.4);
    • (c) have at least [ ] years of experience in drainage design after graduation, shown by a list of at least [ ] projects with the applicant's role in each (Clause 10.6.2); and
    • (d) have completed a training course on this Manual, with an assessment, within the [ ] years before application (Clause 10.6.2).
  3. Eligibility for list (b). As for list (a), with at least [ ] years of experience, of which at least [ ] years in the design or review of drainage under this Manual or an equivalent standard.
  4. Basin modelling endorsement (c). A Stormwater Design Professional who shows experience in basin-scale 1D–2D modelling, including calibration, on at least [ ] studies (Clause 11.4.3).
  5. Independence of a checker. A checker under Clause 10.6.4 shall not be employed by, or a partner of, the designer's firm or the Applicant, and shall not have worked on the design.
  6. Conflict of interest of a reviewer. An Empanelled Reviewer shall not review a site on which the reviewer, or the reviewer's firm, has worked in any capacity (Clause 10.7.4), and shall declare any other interest before accepting a review. The Authority remains the decision-maker (Clause 10.7.4).
  7. Application. The application shall include proof of degree and registration, the project list with references, the training certificate, and a signed declaration that the information is true.
  8. Term and renewal. Empanelment is valid for [ ] years. Renewal requires evidence of continuing practice and of any refresher training issued after a revision of the Manual (Clause 1.12).
  9. Suspension and removal. The competent authority may suspend or remove an empanelled person after a false or negligent certificate (Clause 10.6.5), on a report under step 6 of Table 10.4, or on loss of registration. The person shall be given notice and an opportunity to be heard. Every suspension and removal shall be published on the list.
  10. Publication. The lists shall be published and kept current, with each person's name, registration number, list, endorsement and validity date.

Form 10-1 — Drainage Report Checklist

Supports Clauses 10.4.1 to 10.4.4 and 10.7.1 of Chapter 10.

Draft form — Bihar Stormwater Design Manual, Draft v1.0. Lodge with every Stage 1 and Stage 2 submittal. For each item give the page or sheet where it is addressed, or the reason it does not apply. The Authority does not start technical review without a completed Form 10-1 (Clause 10.4.3).

Table 10F.1 — Form 10-1, Section A: Submittal

No. Field Entry
A1 Authority and file number ______
A2 Site name and address; survey numbers ______
A3 Stage: 1 / 2 / combined 1 and 2 (Clause 10.3.3) / public work DPR or tender (Clause 10.3.4) ______
A4 Applicant ______
A5 Certifying professional (name, registration and empanelment number) ______

Table 10F.2 — Form 10-1, Section B: Stage 1 contents (Clause 10.4.1)

No. Item Clause Page / sheet Not applicable: reason
B1 Form 1-1; Form 1-2 where a variance or waiver is sought 10.4.1(a) ______ ______
B2 Site plan: existing and proposed levels, impervious areas, catchment boundaries to and through the site 10.4.1(b) ______ ______
B3 Soils (HSG), seasonal high groundwater, infiltration tests or test plan 10.4.1(c) ______ ______
B4 Design Rainfall Sheet (Form 2-1) 10.4.1(d) ______ ______
B5 Pre-development condition and hydrologic method 10.4.1(e) ______ ______
B6 Order of measures: areas preserved, retention method, detention concept, conveyance 10.4.1(f) ______ ______
B7 Preliminary retention, WQ and detention volumes and release rates, with Form 10-2 10.4.1(g) ______ ______
B8 Downstream extent and tailwater case 10.4.1(h) ______ ______
B9 Waterbodies, setbacks and the 1% AEP level 10.4.1(i) ______ ______
B10 Land reserved for facilities and maintenance access 10.4.1(j) ______ ______
B11 Professional Design Certificate (Form 10-3) 10.4.5 ______ ______

Table 10F.3 — Form 10-1, Section C: Stage 2 contents (Clause 10.4.2)

No. Item Clause Page / sheet Not applicable: reason
C1 Updated Stage 1 contents (Section B) 10.4.2 ______ ______
C2 Final calculations for every storage duration and AEP, with the outfall-closed check 10.4.2(a) ______ ______
C3 Stage–storage–discharge tables; emergency spillway design 10.4.2(b) ______ ______
C4 Hydraulic design of conveyance, inlets and structures 10.4.2(c) ______ ______
C5 Water quality design; first-flush device or GPT where required 10.4.2(d) ______ ______
C6 Construction drawings, details and specifications of every facility 10.4.2(e) ______ ______
C7 Construction sequence, with protection of retention and infiltration areas 10.4.2(f) ______ ______
C8 Hold-point schedule (Form 10-4, Section A) 10.4.2(g) ______ ______
C9 Draft O&M plan and draft Maintenance Declaration (Form 10-6) 10.4.2(h) ______ ______
C10 Model input files and GIS data 10.4.2(i) ______ ______
C11 Certificates (Form 10-3, signed by designer and, where required, checker) 10.4.2(j) ______ ______

Table 10F.4 — Form 10-1, Section D: Digital submittal (Clause 10.4.4)

No. Item Clause Provided (yes / no) Detail
D1 Reports and drawings as searchable PDF 10.4.4(a) ______ ______
D2 Models in native, runnable format; software name and version 10.4.4(b) ______ ______
D3 GIS data to Annex 10B; horizontal reference system (EPSG code) 10.4.4(c) ______ ______
D4 Vertical datum named; relationship to the Chapter 5 river datums of the CWC and WRD (FMISC) gauges on the receiving rivers and of WRD's embankment, sluice and drain levels 10.4.4(d) ______ ______

Table 10F.5 — Form 10-1, Section E: Declaration and completeness check

Field Entry
I confirm that this checklist is complete and correct. Certifying professional: name, signature, date ______
For the Authority: date received ______
Date of completeness check (within 5 working days, Clause 10.7.1) ______
Result: accepted for review / returned ______
Missing items, if returned ______
Officer: name, designation, signature ______

Form 10-2 — Compliance Calculator Summary

Supports Clauses 10.4.1(g), 10.5 and 10.9.1(b) of Chapter 10.

Draft form — Bihar Stormwater Design Manual, Draft v1.0. Produced by the compliance calculator (Annex 10A) with Stage 1, 2 and 4 submittals. Until the calculator is issued, complete it by hand and enter "not issued" in A3. One column per drainage area where the site has more than one outfall.

Table 10F.6 — Form 10-2, Section A: Site and route

No. Field Entry Clause
A1 Authority, file number, stage (1 / 2 / 4) ______ 10.5.2(a)
A2 Site area, ha; land disturbance, ha; new + replaced impervious area, m² ______ 1.5.2
A3 Calculator version and release date ______ 10.5.3
A4 Tier (A / B); flood-sensitive (yes / no); approved BSMP for the basin (yes / no) ______ 1.6, 4.5.3, 11.12
A5 Route: full method / S-1 / S-2 / fixed-coefficient / constrained redevelopment / regional or fee-in-lieu ______ 1.7, 4.5.6, 4.13, 4.14
A6 Flags raised by the calculator (list) ______ Annex 10A.4

Table 10F.7 — Form 10-2, Section B: Rainfall and soils

No. Field Entry Clause
B1 Rainfall zone; Form 2-1 reference ______ 2.13
B2 Retention depth P_R, mm; 3-month ARI depth P_3m, mm ______ 2.10, 8.4.1
B3 Climate factor applied (≤ 6 h; > 6–72 h) ______ 2.8
B4 HSG by sub-area; seasonal high groundwater, m below base ______ 3.7, 4.4.3
B5 Measured and design infiltration rates, mm/h ______ 4.4.3

Table 10F.8 — Form 10-2, Section C: Volumes

No. Quantity Required (m³) Provided (m³) Clause
C1 Retention volume (RRV) ______ ______ 4.4.2
C2 Water quality volume (WQv) ______ ______ 8.4.2
C3 Retention credit against detention ______ — 4.4.6
C4 Detention volume ______ ______ 4.6, 4.14
C5 Fee-in-lieu or regional volume, and fee (₹) ______ ______ 4.5.6.3, 4.13.3

Table 10F.9 — Form 10-2, Section D: Release rates (each outfall)

AEP Q_pre or cap (L/s) Q_post (L/s) Governing duration (h) Meets criterion (yes / no) Clause
50% (2-yr) ______ ______ ______ ______ 4.5
10% (10-yr) ______ ______ ______ ______ 4.5
1% (100-yr) ______ ______ ______ ______ 4.5

Table 10F.10 — Form 10-2, Section E: Outlets, drawdown and stage comparison

No. Field Entry Clause
E1 Low-flow orifice, mm (minimum 50 mm) ______ 4.8.2
E2 Detention: time to release 90% of the 10-yr stored volume, h (≤ 48 h) ______ 4.7.1
E3 WQv release time, h (24–48 h) ______ 4.7.2
E4 Retention emptying time, h (≤ 72 h) ______ 4.7.3
E5 Model result differs from the calculator screen by more than the guide tolerance? If yes, report section that explains it ______ 10.5.2(c)
E6 Stage 4 only: changes from the Stage 2 values (list), and whether every criterion is still met ______ 10.9.2
E7 Prepared by (name, registration number), signature, date ______ 10.6.3(b)

Form 10-3 — Professional Design Certificate

Supports Clauses 10.6.1 to 10.6.5 of Chapter 10.

Draft form — Bihar Stormwater Design Manual, Draft v1.0. Signed by the designer with every Stage 1 and Stage 2 submittal, and by an independent checker for facilities under Clause 10.6.1(c) and (d).

Table 10F.11 — Form 10-3, Section A: Project and signatory

No. Field Entry Clause
A1 Authority, file number, stage ______ —
A2 Site and facilities covered by this certificate ______ —
A3 Designer: name, qualification, BBL 2014 registration number ______ 10.6.1
A4 Empanelment number, where required, and the reason: Tier A ≥ 1 ha / flood-sensitive / embankment or high-hazard basin / pumped, tide gate or regional facility ______ 10.6.1(a)–(d)
A5 Variances or waivers approved (Form 1-2 references), or "none" ______ 10.6.3(a)

Table 10F.12 — Form 10-3, Section B: Certificate of the designer

No. I certify that: Initials
B1 the design complies with the Bihar Stormwater Design Manual, except for the variances listed at A5, which have been approved ______
B2 the rainfall, soils and tailwater inputs are as recorded on Form 2-1 and Form 10-2 ______
B3 the models submitted reproduce the results reported ______
B4 I understand that a false or negligent certificate is a contravention under Clause 10.15 ______

Table 10F.13 — Form 10-3, Section C: Certificate of the independent checker (Clause 10.6.4)

No. Field or statement Entry
C1 Checker: name, registration and empanelment number ______
C2 I am independent of the designer and the Applicant and have not worked on this design ______
C3 I have checked the facilities listed: ______, and agree with the certificate in Section B ______
C4 Matters on which I do not agree, if any ______

Table 10F.14 — Form 10-3, Section D: Signatures

Role Name Signature Date
Designer ______ ______ ______
Independent checker (where required) ______ ______ ______

Form 10-4 — Hold-Point Inspection Record

Supports Clauses 10.4.2(g), 10.8 and 10.9.3 of Chapter 10.

Draft form — Bihar Stormwater Design Manual, Draft v1.0. Section A is the hold-point schedule, approved at Stage 2. Section B is completed at each hold point, with dated, geotagged photographs (Clause 10.8.2). Work shall not proceed past a hold point until Section B is signed. See Figure 10.2.

Table 10F.15 — Form 10-4, Section A: Hold-point schedule

Hold point Facility (FAC_ID) Stage of work Planned date Notice to Authority sent (date)* Authority attended (yes / no)
(a) Excavated base, before media, liner or structure ______ ______ ______ ______ ______
(b) Outlet structure, orifice and trash screen, before backfill or first filling ______ ______ ______ ______ ______
(c) Infiltration and verification tests (Clause 10.9.3) ______ ______ ______ — ______
(d) Outfall, flap or tide gate and non-return valve, before downstream connection ______ ______ ______ — ______
(e) Pumps and controls, at commissioning ______ ______ ______ — ______
Other hold points added by the Authority ______ ______ ______ ______ ______

* For sites under Clause 10.6.1, at least 3 working days' notice of hold points (a) and (b) (Clause 10.8.2).

Table 10F.16 — Form 10-4, Section B: Inspection record (one per hold point)

No. Field Entry
B1 Hold point and facility ______
B2 Date and time of inspection; weather ______
B3 Inspected by (certifying professional); others present ______
B4 Approved drawing and revision checked against ______
B5 Levels, dimensions and materials found, against approved values ______
B6 For (a): retention and infiltration areas protected from traffic and stockpiles (Clause 10.8.3(a)) ______
B7 For (b): orifice size and invert; screen in place ______
B8 For (c): infiltration test result and emptying time (≤ 72 h); pump duty point; gate opening and sealing ______
B9 For (d) and (e): gate type, seating and test; pump commissioning record ______
B10 Photograph references (dated, geotagged) ______
B11 Result: released / not released; corrective work required ______
B12 Corrective work checked (date, by) ______
B13 Signature of the certifying professional, date ______

Form 10-5 — As-built Certificate

Supports Clauses 10.9 and 10.3.5 of Chapter 10.

Draft form — Bihar Stormwater Design Manual, Draft v1.0. Lodged before the completion certificate. The Authority shall not issue the completion certificate until this form is accepted (Clause 10.9.4).

Table 10F.17 — Form 10-5, Section A: Project and survey

No. Field Entry Clause
A1 Authority, file number; Stage 2 approval reference and date ______ —
A2 Licensed surveyor: name, licence number, date of survey ______ 10.9.1(a)
A3 Vertical datum ______ 10.4.4(d)
A4 GIS data to Annex 10B, as built (file name) ______ 10.4.4(c)

Table 10F.18 — Form 10-5, Section B: Approved against as built (one block per facility)

Item Approved As built Accepted (yes / no) Clause
Storage volume at each design level, m³ ______ ______ ______ 10.9.2(a)
Outlet dimensions (orifice, weir), mm ______ ______ ______ 10.9.2(b)
Outlet and outfall inverts, m ______ ______ ______ 10.9.2(b)
Spillway or overflow level, m ______ ______ ______ 4.9
Retention volume, m³ ______ ______ ______ 4.4

Table 10F.19 — Form 10-5, Section C: Re-run and tests

No. Field Entry Clause
C1 Compliance calculator re-run with as-built values: version, and Form 10-2 (Stage 4) attached ______ 10.9.1(b)
C2 Model re-run with as-built values (where a model was used): file name ______ 10.9.1(b)
C3 Every criterion of Chapters 4 and 5 met on re-run (yes / no; list any not met) ______ 10.9.2(c)
C4 Infiltration retention: measured emptying time, h (≤ 72 h) ______ 10.9.3
C5 Pumps: duty point achieved (flow at head) ______ 10.9.3
C6 Tide gates and non-return valves: shown to open and seal ______ 10.9.3
C7 Deviations, and how corrected or re-certified under Clause 10.3.5 ______ 10.9.2

Table 10F.20 — Form 10-5, Section D: Attachments and certificate

No. Field Entry
D1 Completed hold-point records (Form 10-4) ______
D2 Final O&M plan ______
D3 Executed Maintenance Declaration (Form 10-6) or handover documents (Form 10-8) ______
D4 I certify that the facilities listed were built as approved, except as stated at C7, and perform as designed. Certifying professional: name, registration number, signature, date ______
D5 For the Authority: accepted / returned; officer, date ______

Form 10-6 — Maintenance Declaration

Supports Clauses 10.10.1, 10.10.2, 10.10.4 and 10.13.1 of Chapter 10.

Draft form — Bihar Stormwater Design Manual, Draft v1.0. Model text for consideration by a competent authority. Not in force. Executed by the owner of every private stormwater facility before the completion certificate is issued, and registered so that it runs with the land.

Drafting note D10A.1. The instrument under which this declaration is registered, and the Act that gives the Authority its right of entry and its power to carry out works in default, are to be confirmed by the competent authority. This form does not cite statute sections.

Table 10F.21 — Form 10-6, Section A: Parties and land

No. Field Entry
A1 Owner (the declarant): name and address; for a company or association, its registration number ______
A2 Authority ______
A3 Land: survey numbers, village, anchal (circle), district; extent ______
A4 Approval reference (file number, Stage 2 approval date) ______
A5 For multi-owner developments: the association or body that takes over after the developer (Clause 10.10.2) ______

Table 10F.22 — Form 10-6, Section B: Schedule of facilities

Facility (FAC_ID) Type Location on the attached plan Design volume (m³) Outlet O&M plan reference
______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______

Model declaration. I/We, the owner named in Section A, declare and undertake, for myself/ourselves and for every successor in title to the land:

  1. to operate, inspect and maintain each facility in Section B under the approved O&M plan, and to make the inspections of Clause 10.12 (Clause 10.10.1(b));
  2. to give the Authority, its officers and its contractors a right of entry to inspect each facility and the access route shown on the plan, and to carry out works in default under Clause 10.15, with the cost recoverable from the owner (Clause 10.10.1(c));
  3. not to remove, fill, cover, reduce or change the use of any facility, or obstruct its access route, without the Authority's written approval (Clauses 10.10.1(d), 10.13.5);
  4. where Clause 10.10.3 applies, to lodge an Annual Maintenance Declaration and Inspection Report (Form 10-7) by 31 May each year;
  5. for underground tanks, to follow the confined-space entry procedure stated here: ______ (Clause 4.15.6);
  6. on sale or transfer of the land or any part of it, to disclose this declaration and the latest Form 10-7 to the purchaser, who takes on these obligations from the date of transfer (Clause 10.10.4); and
  7. for a multi-owner development, that the developer remains responsible until the body named at A5 is legally constituted and has accepted this declaration in writing (Clause 10.10.2).

Table 10F.23 — Form 10-6, Section C: Execution and registration

Field Entry
Owner: signature, name, date ______
Witness 1: signature, name, address ______
Witness 2: signature, name, address ______
Acceptance by the association or body at A5 (when constituted): signature, date ______
Registration: office, document number, date ______
For the Authority: received and recorded in the facility register; officer, date ______

Form 10-7 — Annual Maintenance Declaration and Inspection Report

Supports Clauses 10.10.3, 10.11.1(d) and 10.12 of Chapter 10.

Draft form — Bihar Stormwater Design Manual, Draft v1.0. Due by 31 May each year from every owner of a facility in a Tier A area, and from every owner of a pumped facility, tide gate or regional facility anywhere (Clause 10.10.3). See Figure 10.3.

Table 10F.24 — Form 10-7, Section A: Owner and facilities

No. Field Entry
A1 Reporting year (1 June to 31 May) ______
A2 Owner or association; Maintenance Declaration registration reference ______
A3 Facilities covered (FAC_ID and type) ______
A4 Any facility under Clause 10.6.1(c) or (d) (yes / no). If yes, Section E is required ______

Table 10F.25 — Form 10-7, Section B: Inspections made during the year (Table 10.3)

Facility Routine inspections (dates) Pre-monsoon inspection (date) After heavy-rainfall events (dates) Monthly pump test runs (number)
______ ______ ______ ______ ______
______ ______ ______ ______ ______

Table 10F.26 — Form 10-7, Section C: Pre-monsoon checklist (one per facility)

No. Item Condition (OK / defect) Defect and date corrected
C1 Inlets, pretreatment and silt traps clear ______ ______
C2 Orifice, trash screen and outlet clear; orifice size unchanged ______ ______
C3 Sediment below the trigger in the O&M plan ______ ______
C4 Storage volume not reduced; no filling, covering or change of use ______ ______
C5 Overflow and spillway route clear ______ ______
C6 Retention drains within 72 h (observation well or surface) ______ ______
C7 Pumps: full duty test; standby pump and standby power tested; fuel for 72 h on site ______ ______
C8 Alarms and telemetry tested ______ ______
C9 Flap or tide gates and non-return valves: operated and seal tested ______ ______
C10 Safety: covers locked, fences, signs and depth markers in place ______ ______
C11 Access routes clear and not used for parking ______ ______

Table 10F.27 — Form 10-7, Section D: Declaration of the owner

Field Entry
I/We declare that the pre-monsoon inspection of Clause 10.12 has been made, that the defects found have been corrected as listed in Section C, and that the facilities are maintained under the approved O&M plan. Owner: name, signature, date ______

Table 10F.28 — Form 10-7, Section E: Empanelled professional (facilities under Clause 10.6.1(c) and (d))

Field Entry
I have inspected the facilities listed and confirm Section C. Name, empanelment number, signature, date ______

Table 10F.29 — Form 10-7, Section F: For the Authority

Field Entry
Date received; on time (by 31 May) yes / no ______
Entered in the facility register (Clause 10.17), date ______
Follow-up action, if any (Clause 10.15) ______

Form 10-8 — Asset Handover Certificate

Supports Clause 10.14 of Chapter 10.

Draft form — Bihar Stormwater Design Manual, Draft v1.0. Signed by the developer and the ULB when drains, open space facilities, regional facilities or other stormwater assets built by a developer are handed over.

Table 10F.30 — Form 10-8, Section A: Asset and parties

No. Field Entry
A1 Developer: name and address ______
A2 ULB ______
A3 Layout or project, approval reference ______
A4 Assets handed over (FAC_ID, type, length or volume), with a plan ______

Table 10F.31 — Form 10-8, Section B: Conditions of handover (Clause 10.14.1)

No. Condition Met (yes / no) Reference or date
B1 As-built certificate (Form 10-5) accepted ______ ______
B2 Facility cleaned; pipes and culverts inspected internally (CCTV or manual entry), record handed over ______ ______
B3 Land, or an easement over it, transferred to the ULB ______ ______
B4 O&M plan, drawings, GIS data (Annex 10B) and warranties handed over ______ ______

Table 10F.32 — Form 10-8, Section C: Defects liability and register

No. Field Entry Clause
C1 Defects liability period: from ______ to ______ (includes at least one full monsoon season, from 15 June to 15 October, after handover) ______ 10.14.2
C2 Developer responsible during the period for defects and routine maintenance ______ 10.14.2
C3 Security deposit held by the ULB, ₹, and release date ______ 10.14.2
C4 Entered in the ULB GIS drainage asset register and the facility register: date ______ 10.14.3

Table 10F.33 — Form 10-8, Section D: Signatures

Party Name and designation Signature Date
Developer ______ ______ ______
Certifying professional ______ ______ ______
ULB ______ ______ ______