Draft v1.0 prepared by NEER. Not adopted by the Government of Bihar or any authority or local body, and has no legal force. About this draft

Annexes to Chapter 8Water Quality and Recharge

These annexes support Chapter 8. They give the layout of the water quality rainfall tables, the Level of Service and Value Rating method in detail, the layout of the BMP calibration programme, design sheets for each BMP, standard details for construction erosion and sediment control, and the two forms that Clause 8.14 requires. Annexes 8A and 8C need data that are not yet available; they say so and give the rule to use in the meantime. The forms are draft forms.


Annex 8A — 3-month ARI 24-hour depth and IDF by zone

Supports Clauses 8.2, 8.4.1 and 8.4.5 of Chapter 8.

To be prepared. This annex will contain, for each rainfall zone of Chapter 2, the 24-hour 3-month ARI depth P_3m and the 3-month ARI intensity–duration relationship used for Q_wq. It needs long-term daily and sub-daily rainfall records (IMD station and gridded data, with NIH as the Chapter 2 primary source), analysed as a partial-duration series. Until it is published, the designer shall compute P_3m from the longest available daily record for the site's zone, as the 24-hour depth equalled or exceeded on average four times a year (Clause 8.2), state the record, its length and the method on the Water Quality Sheet (Form 8-1), and use P_wq = max (P_ret, P_3m) (Clause 8.4.1). The climate factor is not applied (Clause 8.4.3).

8A.1 Method to be used in preparing the annex

  • (a) Use daily records of at least 30 years where available (as for station IDF in Chapter 2).
  • (b) Form the partial-duration series of 24-hour depths, with independent events separated by at least one dry day.
  • (c) Choose the threshold so that the number of events above it averages four per year; P_3m is that threshold.
  • (d) Derive the 3-month ARI intensities for durations from 10 minutes to 24 hours from sub-daily records, or by the Chapter 2 method of scaling from the daily value, stating which.
  • (e) Do not apply the climate factor (Clause 8.4.3).

Table 8A.1 — Water quality rainfall depths by zone (layout)

Zone (Chapter 2) Representative stations or grid Record (years) P_ret, Annex 2E (mm) P_3m (mm) P_wq = max (mm)
______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______

Table 8A.2 — 3-month ARI intensity by duration (layout)

Zone 10 min (mm/h) 15 min (mm/h) 30 min (mm/h) 1 h (mm/h) 2 h (mm/h) 6 h (mm/h) 24 h (mm/h)
______ ______ ______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______ ______ ______

Annex 8B — Redevelopment LoS table and treatment-train composite VR

Supports Clauses 8.6.2 to 8.6.5 of Chapter 8.

8B.1 Required Level of Service for redevelopment

To be prepared. This part will give the required Level of Service for redevelopment sites (existing impervious cover of 20% or more of the site, Clause 8.6.2). The MARC/APWA BMP Manual (2012, Table 4.3) sets the redevelopment LoS from the percentage of impervious cover within the disturbed area; the Bihar values need to be set by the State Stormwater Technical Committee and checked against local redevelopment cases. Until it is published, the required LoS for a redevelopment site is 6 for the disturbed area. Where Table 8.2, applied to the change in CN from the existing condition to post-development, gives a higher LoS, that higher LoS applies. This interim value is set by this Manual. A redevelopment site that retains its whole WQv on site under Chapter 4 needs no further treatment for that area, apart from pretreatment, hotspot controls and the outfall requirements (Clause 8.4.4).

Table 8B.1 — Required LoS for redevelopment (layout)

Existing impervious cover within the disturbed area (%) Change in impervious cover Required LoS
______ ______ ______
______ ______ ______
______ ______ ______

8B.2 Composite Value Rating: area-weighted method

The composite VR of a site is the area-weighted average of the VRs of the BMPs serving each part of the site (Clause 8.6.3):

VR_site = Σ (A_i × VR_i) / Σ A_i + VR_signage

where:

  • A_i = the area of part i of the site, ha;
  • VR_i = the Value Rating (Table 8.3) of the BMP serving part i, which counts only if the BMP meets Clause 8.6.4 for the whole of A_i;
  • Σ A_i = the whole site area: every part of the site is assigned to one BMP, or to preserved native vegetation; a part served by no BMP is entered with VR_i = 0; and
  • VR_signage = 0.25 where public education signage is provided (Table 8.3), otherwise 0.

The site complies where VR_site ≥ required LoS (Clause 8.6.3).

Illustrative — not design values. A 1.0 ha site that is not redevelopment, with ΔCN = 18. Required LoS = 8 (Table 8.2).

Table 8B.2 — Worked example: composite VR (illustrative)

Part Area A_i (ha) BMP VR_i (Table 8.3) A_i × VR_i
Roofs and paving draining to bioretention 0.60 Bioretention 8.5 5.100
Car park 0.25 Permeable pavement 7.5 1.875
Preserved strip along boundary 0.15 Native vegetation (preserved) 9.25 1.388
Total 1.00 8.363
  • Area-weighted VR = 8.363 / 1.00 = 8.36
  • Signage provided: + 0.25
  • VR_site = 8.61 ≥ 8. The site complies.

Without the permeable pavement (car park draining untreated, VR = 0): (5.100 + 0 + 1.388) / 1.00 + 0.25 = 6.74 < 8. The site would not comply.

8B.3 Treatment trains

To be prepared. This part will give the composite VR of BMPs in series (a treatment train), following the approach of the MARC/APWA BMP Manual (2012, Table 4.6), with values to be confirmed for Bihar by the calibration programme of Clause 8.13.4 (Annex 8C). Until it is published, each part of the site is credited with the VR of one BMP in the train that meets Clause 8.6.4 for that part, normally the last BMP before discharge, and no extra credit is given for BMPs in series. Pretreatment devices, silt traps and oil-grit separators upstream of the credited BMP earn no VR of their own (Clauses 8.6.4(c), 8.7.11(c) and 8.7.12(c)).

Table 8B.3 — Composite VR of treatment trains (layout)

First BMP Second BMP Composite VR Conditions
______ ______ ______ ______
______ ______ ______ ______

Annex 8C — Bihar BMP performance calibration

Supports Clauses 8.6.3, 8.13 and 8.15.1 of Chapter 8.

To be prepared. This annex will report the BMP performance calibration programme of the State Stormwater Technical Committee (Clause 8.13.4): measured inflow and outflow concentrations and volumes for BMPs built in Bihar, and the revised Value Ratings that follow from them. It needs wet-weather monitoring of BMPs over several SW monsoon seasons, with laboratory analysis to the CPCB methods, and the outfall monitoring of Clause 8.13.1 published under Clause 10.17. Until it is published, the Value Ratings of Table 8.3 (MARC/APWA 2012) apply, and a proprietary device earns a VR only from verified test data (Table 8.3).

The layouts below set the minimum records the programme shall keep, so that results from different authorities can be pooled.

Table 8C.1 — Monitoring site register (layout)

Site ID BMP type (Table 8.3) Location and authority Catchment area (ha) Impervious (%) Soil and groundwater setting Date commissioned Pretreatment
______ ______ ______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______ ______ ______

Table 8C.2 — Event record (layout; parameters of Clause 8.13.2)

Site ID Event date Rainfall (mm) Inflow volume (m³) Outflow volume (m³) TSS in / out (mg/L) BOD in / out (mg/L) COD in / out (mg/L) Faecal coliform in / out (MPN/100 mL) TN in / out (mg/L) TP in / out (mg/L) Oil and grease in / out (mg/L) Heavy metals (industrial catchments)
______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______

Table 8C.3 — Performance summary and proposed VR (layout)

BMP type Sites Events Volume reduction (%) Median effluent TSS (mg/L) Other findings VR in Table 8.3 Proposed VR
______ ______ ______ ______ ______ ______ ______ ______

Annex 8D — BMP design sheets, media specification, plant lists

Supports Clauses 8.5, 8.7, 8.8 and 8.11 of Chapter 8.

Each design sheet collects the requirements of Chapter 8 for one BMP. Values marked "recommended starting value" in Clause 8.7.1 may be departed from with justification. Values that the Manual does not set are marked "to be confirmed in design"; the designer shall state and justify them. Every BMP also needs: sizing for the WQv or Q_wq (Clause 8.6.4(a)), pretreatment (Clause 8.5.3), a safe bypass for flows above Q_wq (Clause 8.4.6) and maintenance access (Chapter 10).

8D.1 Design sheets

Table 8D.1 — Pretreatment (all BMPs)

Item Requirement Clause
Where needed Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland, at each concentrated inflow 8.5.3
Types Sediment forebay, grass filter strip, silt trap or proprietary device 8.5.3
Size Holds at least 10% of the WQv of its contributing area; or sized for Q_wq (flow-through devices) 8.5.3
Access Cleanable without entering or disturbing the main BMP 8.5.4
Silt traps and catch pits At every inlet receiving runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody; sump at least 300 mm below the outlet invert; earn no VR 8.7.12

Table 8D.2 — Bioretention and rain gardens (Figure 8.2)

Item Requirement Clause
Ponding depth ≤ 300 mm above the mulch, with an overflow at maximum ponding level 8.7.2(a)
Ponding drawdown Within 48 h 8.7.2(b)
Filter media 600–900 mm engineered sandy loam, low fines, low phosphorus (Table 8D.12) 8.7.2(c)
Mulch 50–75 mm 8.7.2(c)
Transition (choker) and gravel drainage layers Required; thickness and grading to be confirmed in design 8.7.2(d)
Underdrain Perforated; required where the design infiltration rate cannot meet the 48 h drawdown, or where lined; diameter to be confirmed in design 8.7.2(e)
Lining Required where Clause 8.8 cannot be met, and at hotspots 8.7.2(f)
Plants Native or naturalised, tolerant of waterlogging and long dry spells (Tables 8D.13 and 8D.14) 8.7.2(g)
VR 8.5 (rain garden / infiltration 9.0) Table 8.3

Table 8D.3 — Vegetated swales

Item Requirement Clause
Section Trapezoidal or parabolic; side slopes no steeper than 1V:3H 8.7.3(a)
Longitudinal slope 0.5% to 4%; check dams where steeper 8.7.3(b)
Flow at Q_wq Depth not more than grass height; velocity ≤ 0.3 m/s 8.7.3(c)
1% AEP or bypass flow No erosion (Chapter 9 permissible velocities) 8.7.3(d)
Underdrained ("dry") swale Where slope < 1% or subsoil is poorly drained; filter media as Table 8D.12 8.7.3(e)
VR 4.0 (native vegetation swale) Table 8.3

Table 8D.4 — Vegetated filter strips

Item Requirement Clause
Inflow Sheet flow only; level spreader where flow arrives concentrated 8.7.4(a)
Length in flow direction ≥ 5 m 8.7.4(b)
Slope 1% to 8% 8.7.4(b)
Use Mainly pretreatment for bioretention, infiltration and swales 8.7.4(c)
VR 5.0 Table 8.3

Table 8D.5 — Permeable pavement

Item Requirement Clause
Run-on Impervious run-on area ≤ 2 × permeable area; none from unpaved or eroding areas 8.7.5(a)
Base reservoir Clean open-graded aggregate holding its share of the WQv in its voids; void ratio confirmed by test 8.7.5(b)
Open (infiltrating) base Only where Clause 8.8 is met; otherwise lined with underdrain and counted as filtration only 8.7.5(c)
Structure Designed for traffic loading to the road authority's standards 8.7.5(d)
Exclusions Not at hotspots; not where it will be resurfaced with impermeable material 8.7.5(e)
VR 7.5 Table 8.3

Table 8D.6 — Infiltration trenches and basins (Figure 8.3)

Item Requirement Clause
Pretreatment Always (Table 8D.1) 8.7.6(a)
Fill Clean washed aggregate, void ratio confirmed by test; geotextile on sides and top; sand base 8.7.6(b)
Observation well To the base of each trench 8.7.6(c)
Storage WQv (or Chapter 4 retention volume, if greater) held in the voids 8.7.6(d)
Drawdown Empty within 72 h at the design infiltration rate 8.7.6(d), 8.8.7
Overflow At grade, to the minor or major system 8.7.6(e)
Commissioning Not in service until the contributing area is stabilised 8.7.6(f)
Criteria All of Clause 8.8 (Table 8D.11) 8.8

Table 8D.7 — Wet ponds (extended wet detention)

Item Requirement Clause
Permanent pool ≥ WQv 8.7.7(a)
Extended detention WQv above the pool, released over 24–48 h 8.7.7(a), 8.4.7
Forebay At each inlet 8.7.7(b)
Flow path Length-to-width ≥ 3:1; no short-circuiting 8.7.7(c)
Pool depth 1.0–2.5 m, with safety bench (Clause 7.9.4) 8.7.7(d)
Water balance Monthly balance with IMD rainfall and pan evaporation: ≥ 50% of pool volume kept through the driest year in 10; no top-up with groundwater, potable water or sewage 8.7.8
Flood detention Chapter 4 detention may sit above the extended detention level 8.7.7(f)
VR 5.0 Table 8.3

Table 8D.8 — Constructed wetlands

Item Requirement Clause
Layout Inlet sedimentation pond (forebay), then shallow macrophyte zone 8.7.9(a)
Extended detention WQv above normal water level, released over 24–48 h; depth ≤ 0.5 m 8.7.9(b)
Flow path Length-to-width ≥ 3:1; deep zones across the flow path 8.7.9(c)
Bypass High-flow bypass so that floods do not scour the macrophyte zone 8.7.9(d)
At a tank inlet Within the tank's setback, outside its waterspread; not counted as tank storage 8.7.9(e)
Water balance As wet ponds (minimum wetland depth kept) 8.7.8
VR 7.0 (extended detention wetland) Table 8.3

Table 8D.9 — Gross pollutant traps and outfall screens

Item Requirement Clause
Treatment flow Q_wq; all flows up to 1% AEP pass without washing out captured material 8.7.10(a)
Capture size Down to about 5 mm 8.7.10(b)
Head loss In the drain HGL (Chapter 9), screen 50% blocked 8.7.10(c), 8.10.3(a)
Storage For the O&M cleaning interval; not less than 3-monthly cleaning 8.7.10(d)
Access Vehicle access for suction or grab cleaning; safe cleaning platform 8.7.10(e), 8.10.3(d)
Blocked screen Overflow or bypass path so that a fully blocked screen does not flood property 8.10.3(b)
Bar spacing Chosen for the hazard: closer for litter capture, wider where blockage would cause flooding; to be confirmed in design 8.10.3(c)

Table 8D.10 — Oil-grit separators

Item Requirement Clause
Where Fuel stations; vehicle workshops and washing bays; bus and truck depots; parking areas of more than 50 spaces 8.7.11(a)
Sizing Q_wq, with high-flow bypass 8.7.11(b)
Not alone Followed by a filtering BMP where the site needs a VR above 5; lined filtering BMP before any infiltration at hotspots 8.7.11(c), 8.8.8

Table 8D.11 — Infiltration and recharge criteria (all infiltrating BMPs)

Item Requirement Clause
Groundwater separation Seasonal high groundwater ≥ 1.0 m below base (roof-only runoff in notified coastal sand: ≥ 0.5 m with mounding check, mound ≥ 0.3 m below base) 8.8.1, 8.8.9(d)
Bedrock or impermeable layer Base ≥ 1.0 m above, unless designed for rock-aquifer recharge under Clause 8.8.10 8.8.2
Tests Double-ring (ASTM D3385) for basins, bioretention, permeable pavement; falling-head borehole or trial-pit soakage (e.g. BRE Digest 365) for trenches, soakaways, pits, wells; ≥ 2 per facility and ≥ 1 per 100 m² of base or per 50 m of trench; Form 8-2 8.8.3
Design rate Measured rate ÷ 2.0 (tests meet 8.8.3(c) and vary by no more than a factor of 2), otherwise ÷ 3.0 8.8.4
Minimum rates ≥ 13 mm/h full infiltration; 3–13 mm/h partial, with underdrain, credit only for volume infiltrated within 72 h; < 3 mm/h no credit 8.8.5
Setbacks (runoff from paved surfaces) Foundations 3 m, basements 5 m; property boundary 1.5 m; drinking-water well or borewell 30 m; septic tank or soak pit 15 m; crest of slope steeper than 1V:3H 6 m 8.8.6
Expansive soils Foundation setback doubled 8.8.11(b)
Drawdown Empty within 72 h at design rate; tested after construction 8.8.7
Hotspots No infiltration without treatment; none at all for waste sites and contaminated land 8.8.8
Road runoff Never led directly into a well, borewell or recharge shaft 8.11.3(b)

8D.2 Bioretention drawdown check

The 48-hour ponding drawdown (Clause 8.7.2(b)) and the minimum rates of Clause 8.8.5 together decide whether a cell needs an underdrain.

  • Rate needed to drain the maximum ponding depth in 48 h = 300 mm / 48 h = 6.25 mm/h.
  • Design rate ≥ 13 mm/h: full infiltration, no underdrain, provided Clause 8.8 is met.
  • Design rate from 6.25 mm/h to 13 mm/h: the ponding drains in time, but Clause 8.8.5(b) applies, so an underdrain is required.
  • Design rate below 6.25 mm/h: the ponding cannot drain in 48 h by infiltration; an underdrain is required (Clause 8.7.2(e)), and below 3 mm/h no infiltration credit is given.

Illustrative — not design values. Two tests at the base of a proposed cell give 30 mm/h and 22 mm/h. The two results differ by a factor of 30 / 22 = 1.36, which is not more than 2, and the number of tests meets Clause 8.8.3(c), so the safety factor is 2.0. Taking the lower result, the design rate = 22 / 2.0 = 11 mm/h. This is above 6.25 mm/h, so the ponding drains in 300 / 11 = 27 h, within 48 h. It is below 13 mm/h, so the cell is a partial-infiltration design with an underdrain (Clause 8.8.5(b)).

8D.3 Filter media specification

Table 8D.12 — Bioretention filter media and layers

Layer Requirement from Chapter 8 Values to be confirmed in design
Mulch 50–75 mm (Clause 8.7.2(c)); shredded hardwood or similar organic mulch that does not float away at the ponding depth Material and source
Filter media 600–900 mm engineered sandy loam with low fines and low phosphorus content (Clause 8.7.2(c)) Particle size grading; fines (silt + clay) limit; organic matter content; phosphorus limit; saturated hydraulic conductivity of the compacted media; source and test certificate for each batch
Transition (choker) layer Between media and gravel, to stop media washing into the gravel (Clause 8.7.2(d)) Thickness and grading, matched to the media and gravel
Gravel drainage layer Below the transition layer, surrounding the underdrain (Clause 8.7.2(d)) Thickness, grading, washed
Underdrain Perforated pipe where Clause 8.7.2(e) applies, with cleanouts Diameter, slope, perforation, outlet level
Liner Where Clause 8.7.2(f) applies (cannot meet Clause 8.8; hotspots) Liner type and protection

Media shall be tested before placing, and placed in lifts without heavy compaction. The State Stormwater Technical Committee should set numeric limits for grading, fines, organic matter and phosphorus, with local sources of sand and compost, when it reviews this annex.

8D.4 Plant lists

The lists below are indicative. They name species that are native or long naturalised in the Ganga plain and known to tolerate both wet and dry periods; no Bihar source on planting for stormwater was researched for this Manual. Hindi or Urdu names are given only where J. T. Platts, A Dictionary of Urdu, Classical Hindi, and English (1884, as served by the Digital South Asia Library), gives the name for the species or plant named, with its page; a dash means none was confirmed. Platts often uses older botanical names, which are given in the notes. Final selection shall be confirmed with a horticulturist or the State Forest Department for the site's soil and water table. Diara and Kosi-plain sites need species tolerant of long waterlogging in sand and silt; sites on the plateau fringe of the south species tolerant of dry, thin soils over rock; chaur, tal and clay sites species tolerant of standing water.

Table 8D.13 — Indicative plants for bioretention, swales and filter strips

Use Botanical name Hindi / Urdu name Notes
Swales, filter strips, bioretention edges Chrysopogon zizanioides (vetiver) ख़स / خس (ḵẖas) Deep-rooted clump grass; tolerates flooding and drought; binds soil on side slopes and pokhar banks. Platts: "A fragrant grass, Andropogon muricatum (from the roots of which taṭṭīs are made)" (p. 489), an older name of this species
Swales and filter strips (turf) Cynodon dactylon (Bermuda grass) दूब / دوب (dūb) Low turf; tolerates drought, traffic and short flooding. Platts: "Bent grass, panic grass, Panicum dactylon, or Cynodon dactylon" (p. 531)
Swales and banks on floodplain sites Saccharum spontaneum कास / کاس (kās) Native tall grass of river sands; binds banks; cut back where it would obstruct a channel. Platts: "A species of grass, of which ropes, &c. are made, Saccharum spontaneum" (p. 801)
Trees beside bioretention and swales Syzygium cumini जामुन, जामन / جامن (jāmun, jāman) Native; tolerates wet ground. Platts: "The tree Eugenia jambelana, or Syzygium jambolanum, and its fruit" (p. 372)
Trees beside bioretention and swales Millettia pinnata (syn. Pongamia pinnata) करंज / کرنج (karanj) Native; tolerates waterlogging and drought. Platts names Galedupa arborea, an older name of this species, but also the fever-nut Caesalpinia bonducella under the same word (p. 828); confirm the species with the supplier. Keep roots clear of underdrains
Trees beside bioretention, swales and channels Terminalia arjuna अर्जुन / ارجن (arjun) Native riverbank tree; tolerates seasonal flooding. Platts: "a certain tree, Terminalia alata glabra" (p. 39); that the name refers to this species was not confirmed in Platts
Trees beside channels and on floodplain sites Dalbergia sissoo शीशम / شيشم (śīśam) Native riverine tree. Platts: "The tree Dalbergia sisu, and its wood" (p. 740)
Trees beside wet ponds and channels Ficus racemosa (syn. F. glomerata) गूलर / گولر (gūlar) Native fig of stream banks. Platts: "The wild fig, Ficus glomerata" (p. 926). Keep roots clear of underdrains, pipes and walls
Bioretention (flowering, wet zones) Canna indica — Naturalised; tolerates waterlogging; widely used in constructed wetlands in India

Table 8D.14 — Indicative plants for constructed wetlands and wet ponds

Zone Botanical name Hindi / Urdu name Notes
Shallow macrophyte zone Typha spp. (e.g. T. domingensis, syn. T. angustata) — Native; spreads quickly and needs periodic harvesting. No Hindi name was confirmed in Platts: पटेर (paṭer), sometimes used for it, is glossed by Platts as Cyperus (p. 229)
Shallow macrophyte zone Phragmites karka नल / نل (nal); नरसल / نرسل (narsal) Native reed; vigorous; keep out of nalas and channels where it would obstruct flow. Platts: "A species of reed, Amphidonax karka, or Arundo karka" (p. 1152) and "A large species of reed, Arundo karka" (p. 1132)
Shallow macrophyte zone Canna indica — As Table 8D.13
Open water and deep zones Nelumbo nucifera (lotus) कमल / کمل (kamal) Native; for permanent pools only. Platts: "The lotus, Nelumbium speciosum" (p. 849)
Open water and deep zones Nymphaea nouchali (blue water lily) नीलोफ़र / نيلوفر (nīlofar) Native; for permanent pools only. Platts: "the blue water-lily, Nymphæa cyanea" (p. 1168), an older name of this species

Table 8D.15 — Species not to be planted

Botanical name Hindi / Urdu name Reason
Eichhornia crassipes (water hyacinth) — Invasive; chokes pokhars, chaurs, tals, nalas and screens
Prosopis juliflora — Invasive on pond beds, embankments and drain banks
Ipomoea carnea — Invasive in ponds and channels; obstructs flow

Annex 8E — Erosion and sediment control standard details

Supports Clause 8.12 of Chapter 8.

The details below show the arrangement of each measure. Dimensions set by the Manual are given. Dimensions the Manual does not set are labelled "to be confirmed in design" and shall be shown on the ESC plan (Clause 8.12.1). Temporary measures are designed with the rainfall of Chapter 2 and a climate factor of 1.0 (Clause 8.12.4).

Table 8E.1 — Selection of measures (Clause 8.12.3)

Situation Measure Detail
Sheet flow leaving a disturbed area, along its downslope edge Silt fence Figure 8E.1
Concentrated flow from a disturbed area of up to 2 ha Sediment trap Figure 8E.2
Disturbed area of more than 2 ha Sediment basin with surface dewatering outlet Figure 8E.2
Existing drain inlet receiving site runoff Inlet protection Figure 8E.4
Vehicle exit to a public road Stabilised construction exit, with wheel washing Figure 8E.3
Stockpiles Outside Zone 1 of any waterbody setback; ≥ 10 m from any drain; covered in the SW monsoon Notes to Figure 8E.1
Dewatering Through a sediment basin, settling tank or filter bag; never pumped directly to a drain or waterbody Notes to Figure 8E.2
Concrete washout Lined pit; never into a drain Notes to Figure 8E.3

8E.1 Silt fence

Silt fence (section and plan, not to scale) Silt fence (section and plan, not to scale) Section Plan sheet flow disturbed area geotextile on the upslope side post bottom edge buried in an anchor trench, backfilled and compacted trapped sediment: clean out at half the fence height Fence height, post spacing, trench width and depth: to be confirmed in design contours disturbed area fence on the contour ends turned upslope stockpile, outside Zone 1, covered in the monsoon drain ≥ 10 m Inspect weekly and within 24 h after heavy rain; repair within 48 h (Clause 8.12.5). Drainage area per fence: Annex 8E (to be prepared).

Figure 8E.1 — Silt fence: section showing geotextile on posts with the bottom edge buried in an anchor trench on the upslope side, and plan showing the fence on the contour with returns at the ends. Dimensions not set by the Manual are to be confirmed in design. Original drawing for this Manual, adapted from US EPA, NPDES Construction General Permit (2022), and CIRIA, The SuDS Manual (C753), 2015.

To be prepared. Clause 8.12.3(a) refers to this annex for the limit on the area draining to each silt fence. That limit, and the maximum slope length above a fence, need to be set by the State Stormwater Technical Committee for Bihar rainfall. Until they are published, the following interim limits apply, taken from common US practice (US EPA, Stormwater Best Management Practice fact sheet: Silt Fence):

  • drainage area: not more than 0.1 ha per 30 m of fence;
  • slope length above the fence: not more than 30 m on slopes under 2%, 23 m at 2–5%, 15 m at 5–10%, 8 m at 10–20% and 5 m steeper than 20%;
  • wherever flow arrives concentrated, or a limit cannot be met, a sediment trap (Figure 8E.2) is used instead.

The designer shall show the drainage area and slope length served by each fence on the ESC plan.

Notes:

  1. Place along the contour at the downslope edge of the disturbed area, never across a concentrated flow path.
  2. Turn the ends upslope so that water cannot run round them.
  3. Inspect weekly and within 24 hours after every heavy-rainfall event; repair within 48 hours; remove sediment when the deposit reaches half the fence height (Clause 8.12.5).
  4. Remove only after the area draining to it is stabilised (Clause 8.12.6).
  5. Stockpiles: outside Zone 1, at least 10 m from any drain, and covered during the SW monsoon (Clause 8.12.3(f)).

8E.2 Sediment trap and sediment basin

Sediment basin with surface dewatering outlet (section, not to scale) Sediment basin with surface dewatering outlet (section, not to scale) clean out when half full of sediment settled sediment inflow from disturbed area storage below the outlet ≥ the greater of the 2-yr 24-h runoff and 250 m³ per ha drained surface (skimmer) outlet draws water from the top of the pool outlet pipe through the embankment emergency spillway: level and capacity to be confirmed in design embankment stabilised outlet Sediment trap: disturbed area up to 2 ha. Sediment basin: more than 2 ha (Clause 8.12.3(b), (c)). Design rainfall from Chapter 2 with climate factor 1.0 (Clause 8.12.4). Dewatering of excavations passes through the basin, a settling tank or a filter bag.

Figure 8E.2 — Sediment trap or basin in section: inflow, storage volume below the outlet, surface dewatering outlet (skimmer) drawing water from the top of the pool, emergency spillway, and sediment cleanout level at half the storage. Original drawing for this Manual, adapted from US EPA, NPDES Construction General Permit (2022).

Notes:

  1. Sediment trap: for concentrated flow from disturbed areas of up to 2 ha (Clause 8.12.3(b)). Storage volume, depth and outlet: to be confirmed in design.
  2. Sediment basin: for disturbed areas of more than 2 ha. Storage below the outlet ≥ the greater of (a) the runoff from the 50% AEP (2-yr) 24-hour storm and (b) 250 m³ per hectare of drainage area (Clause 8.12.3(c)).
  3. The dewatering outlet draws water from the surface (Clause 8.12.3(c)).
  4. An emergency spillway and its capacity: to be confirmed in design. Where the basin is also a permanent detention facility, the Chapter 4 spillway rules apply.
  5. Clean out when half full of sediment (Clause 8.12.5). Remove sediment from any permanent facility before its as-built survey (Clause 8.12.6).
  6. Dewatering of excavations shall pass through a sediment basin, settling tank or filter bag (Clause 8.12.3(g)).

Illustrative — not design values. A sediment basin serves 3.0 ha of disturbed land. Assume a 2-yr 24-hour rainfall of 100 mm (climate factor 1.0, Clause 8.12.4) and a curve number of 86 for bare compacted ground under the antecedent moisture condition of Chapter 2.

  • S = 25,400 / 86 − 254 = 41.35 mm; Ia = 0.2S = 8.27 mm
  • Q = (P − Ia)² / (P − Ia + S) = (100 − 8.27)² / (100 − 8.27 + 41.35) = 8,414 / 133.08 = 63.2 mm
  • (a) Runoff volume = 10 × Q × A = 10 × 63.2 × 3.0 = 1,896 m³
  • (b) 250 m³/ha × 3.0 ha = 750 m³
  • Required storage below the outlet = max (1,896, 750) = 1,896 m³. Here the 2-yr runoff governs.

8E.3 Stabilised construction exit and concrete washout

Stabilised construction exit and concrete washout (plan and section, not to scale) Stabilised construction exit and concrete washout (plan and section, not to scale) Plan construction site public road vehicles leave site coarse aggregate pad on geotextile length, width, thickness: to be confirmed in design wheel-wash bay wash water to sediment trap sediment trap concrete washout: lined pit, never into a drain drain inlet protected (Figure 8E.4) A A Section A–A aggregate geotextile subgrade Clause 8.12.3(e) and (h). Sweep sediment tracked onto the public road at the end of each working day.

Figure 8E.3 — Stabilised construction exit: plan and section showing a coarse aggregate pad on geotextile between the site and the public road, a wheel-wash bay draining to a sediment trap, and a lined concrete washout pit. Dimensions not set by the Manual are to be confirmed in design. Original drawing for this Manual, adapted from US EPA, NPDES Construction General Permit (2022).

Notes:

  1. Provide at every point where vehicles leave the site onto a public road, with wheel washing (Clause 8.12.3(e)).
  2. Pad length, width, thickness and aggregate size: to be confirmed in design.
  3. Wash water drains to a sediment trap or basin, never to a drain.
  4. Concrete washout in a lined pit, never into a drain (Clause 8.12.3(h)).
  5. Sweep any sediment tracked onto the public road at the end of each working day.

8E.4 Inlet protection

Drain inlet protection (section and plan, not to scale) Drain inlet protection (section and plan, not to scale) Section Plan existing drain site runoff with sediment overflow into the inlet when ponding rises ponded water settles sediment filter barrier: type and height to be confirmed in design grate road kerb road barrier round the grate overflow path along the street, not onto property Clause 8.12.3(d). Remove sediment after each heavy-rainfall event (Clause 8.12.5). The protection must not block the inlet.

Figure 8E.4 — Inlet protection at an existing drain inlet: a filter barrier around a grate or kerb inlet, with an overflow path so that ponding does not flood the road or property. Original drawing for this Manual, adapted from US EPA, NPDES Construction General Permit (2022), and CIRIA, The SuDS Manual (C753), 2015.

Notes:

  1. At every existing drain inlet that receives runoff from the site (Clause 8.12.3(d)).
  2. The protection must not block the inlet: water ponding behind it must be able to overflow into the inlet or along the street.
  3. Barrier type and height: to be confirmed in design.
  4. Remove sediment after each heavy-rainfall event (Clause 8.12.5).

8E.5 Timing and inspection

Table 8E.2 — ESC timing and inspection (Clauses 8.12.2 and 8.12.5)

Item Requirement
Completed earthworks Stabilised by vegetation, mulch, matting or paving by 31 May
Area cleared between 15 June and 15 October Sediment controls in place before clearing
Area exposed in the SW monsoon As small as practicable
Inspection Weekly, and within 24 h after every heavy-rainfall event (Chapter 10)
Repair Within 48 h
Cleaning When half full of sediment
Removal Only after the area draining to the measure is stabilised

Form 8-1 — Water Quality Sheet

Supports Clauses 8.4, 8.6 and 8.14 of Chapter 8.

Draft form — Bihar Stormwater Design Manual, Draft v1.0.

Table 8F.1 — Form 8-1, Section A: Site and rainfall

No. Field Entry Clause
A1 Project name and Authority file number ______ —
A2 Tier (A / B) and site area, ha ______ 8.6.1
A3 Rainfall zone (Chapter 2) ______ 8.4.1
A4 P_ret, mm (Annex 2E) ______ 8.4.1
A5 P_3m, mm (Annex 8A, or the interim calculation: record, years, method) ______ 8.4.1
A6 P_wq = max (P_ret, P_3m), mm (no climate factor) ______ 8.4.1, 8.4.3
A7 WQv method: SCS-CN, or Rv (sites < 0.5 ha and Tier B simplified method only) ______ 8.4.2
A8 Redevelopment (existing impervious ≥ 20%)? ______ 8.6.2

Table 8F.2 — Form 8-1, Section B: Water quality volume and flow by drainage area

Area ID Area (ha) Impervious I (%) Q_wq runoff depth (mm) or Rv WQv (m³) Q_wq (m³/s) Volume retained, Chapter 4 (m³) WQv not retained (m³) BMP serving the area Pretreatment
______ ______ ______ ______ ______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______ ______ ______ ______ ______
______ ______ ______ ______ ______ ______ ______ ______ ______ ______
Total ______ ______ ______ ______

Table 8F.3 — Form 8-1, Section C: Level of Service and Value Rating (Tier A)

No. Field Entry Clause
C1 CN pre-development; CN post-development; ΔCN ______ 8.6.2
C2 Required LoS (Table 8.2, or Annex 8B for redevelopment) ______ 8.6.2
C3 Composite VR (Annex 8B calculation attached) ______ 8.6.3
C4 Composite VR ≥ required LoS? ______ 8.6.3
C5 Tier B: route used under Clause 8.6.5 (a) retained on site / (b) bioretention, rain garden or infiltration ______ 8.6.5

Table 8F.4 — Form 8-1, Section D: Other submittals (Clause 8.14)

No. Item Attached (yes / no / not applicable) Clause
D1 BMP designs to Clause 8.7 and Annex 8D, with pretreatment ______ 8.14(3)
D2 Infiltration Test Record (Form 8-2), seasonal high groundwater level and source, design rate, drawdown time, setbacks ______ 8.14(4)
D3 Sewage and sullage connection plan; dye or smoke test record ______ 8.9.2, 8.14(5)
D4 GPT and first-flush design for any outfall to a waterbody ______ 8.10, 8.14(6)
D5 RWH layout separating harvesting, recharge and detention ______ 8.11, 8.14(7)
D6 ESC plan ______ 8.12, 8.14(8)
D7 Hotspot controls, where Clause 8.8.8 applies ______ 8.8.8

Table 8F.5 — Form 8-1, Section E: Prepared by

Field Entry
Name, registration and empanelment number (Clause 10.6) ______
Signature and date ______

Form 8-2 — Infiltration Test Record

Supports Clauses 8.8.1 to 8.8.7 and 8.11.4 of Chapter 8.

Draft form — Bihar Stormwater Design Manual, Draft v1.0. One record per facility. Attach a plan showing the test locations, and the readings for each test.

Table 8F.6 — Form 8-2, Section A: Facility

No. Field Entry Clause
A1 Project and facility ID; facility type ______ 8.8.3
A2 Infiltration base area (m²) or trench length (m) ______ 8.8.3(c)
A3 Proposed base level of the facility, m (datum) ______ 8.8.3
A4 Runoff source: roof only / paved surfaces / mixed; hotspot (yes / no) ______ 8.8.6, 8.8.8
A5 Ground setting: sandy coastal / laterite or hard rock / delta clay or black cotton / other ______ 8.8.9–8.8.11

Table 8F.7 — Form 8-2, Section B: Tests

Test no. Location (grid ref.) Date Method: double-ring (ASTM D3385) / falling-head borehole or trial-pit soakage (e.g. BRE Digest 365) Test level, m Groundwater level at time of test, m Measured rate (mm/h)
1 ______ ______ ______ ______ ______ ______
2 ______ ______ ______ ______ ______ ______
3 ______ ______ ______ ______ ______ ______

Minimum number of tests: 2 per facility, and 1 per 100 m² of base area or per 50 m of trench (Clause 8.8.3(c)).

Table 8F.8 — Form 8-2, Section C: Design rate and drawdown

No. Item Entry Clause
C1 Number of tests made; number required ______ 8.8.3(c)
C2 Highest and lowest measured rates; ratio (highest ÷ lowest) ______ 8.8.4
C3 Safety factor: 2.0 (tests meet 8.8.3(c) and ratio ≤ 2) or 3.0 ______ 8.8.4
C4 Design rate = measured rate used ÷ safety factor, mm/h (state which measured rate was used) ______ 8.8.4
C5 Category: ≥ 13 mm/h full infiltration / 3–13 mm/h partial with underdrain / < 3 mm/h no credit ______ 8.8.5
C6 Depth of water to infiltrate, mm; drawdown time = depth ÷ design rate, h (≤ 72 h) ______ 8.8.7

Table 8F.9 — Form 8-2, Section D: Separation and setbacks

No. Item Entry Clause
D1 Seasonal high groundwater level, m, and its source (Clause 3.10.2) ______ 8.8.1
D2 Separation from facility base to seasonal high groundwater, m (≥ 1.0; ≥ 0.5 for roof-only runoff in notified coastal sand with mounding check) ______ 8.8.1, 8.8.9(d)
D3 Depth to bedrock or impermeable layer below base, m (≥ 1.0 unless Clause 8.8.10) ______ 8.8.2
D4 Distances to: foundations / basement / property boundary / drinking-water well or borewell / septic tank or soak pit / crest of slope steeper than 1V:3H, m ______ 8.8.6
D5 Expansive soils: foundation setback doubled? ______ 8.8.11(b)

Table 8F.10 — Form 8-2, Section E: Declaration

Field Entry
Tester: name, qualification in geotechnical testing, organisation ______
I certify that the tests were made at the stated locations and levels, by the stated methods, and that the readings attached are complete. Signature and date ______
Designer (Clause 10.6): name and signature ______