Draft v1.0 prepared by NEER. Not adopted by the Government of Haryana or any authority or local body, and has no legal force. About this draft

Haryana · Draft v1.0

Haryana Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Haryana Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Haryana.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Haryana or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Town and Country Planning Department or its Directorate (DTCP), Haryana Shehri Vikas Pradhikaran (HSVP), the Urban Local Bodies Department, the Irrigation and Water Resources Department (I&WRD), the Haryana Pond and Waste Water Management Authority (HPWWMA), the Gurugram Metropolitan Development Authority (GMDA), the Faridabad Metropolitan Development Authority (FMDA), the Panchkula Metropolitan Development Authority (PMDA), any Municipal Corporation, Municipal Council, Municipal Committee or other local body, or any other agency. Where it names a body, such as the Revenue and Disaster Management Department, the Haryana State Disaster Management Authority (HSDMA), the Haryana Water Resources Authority (HWRA), the Haryana State Pollution Control Board (HSPCB), the Wetland Authority of Haryana, the Haryana State Drought Relief and Flood Control Board, the Public Health Engineering Department (PHED), the Development and Panchayats Department, the Haryana State Industrial and Infrastructure Development Corporation (HSIIDC), the Municipal Corporation of Gurugram (MCG), a district administration, or a body outside the State, such as the Irrigation and Flood Control Department of Delhi, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The Haryana Building Code 2017 as applied by each Competent Authority, development plans, licence conditions, drainage schemes, notifications under section 45 of the Haryana Canal and Drainage Act, 1974, orders of courts and tribunals and approval conditions in force continue to apply.

Names. Some places, rivers and drains have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • Gurugram was called Gurgaon until 2016, and IMD's observatory there (42178), the CGWA notification of 2011 and older documents use Gurgaon. In the same way, Hisar is Hissar on the IMD observatory (42131) and in older sources, Sonipat is written Sonepat, Jagadhri Jagadhari, Yamunanagar Yamuna Nagar and Nuh district was called Mewat until 2016. The district map has also changed: before 1995 Ambala district included today's Yamunanagar and Panchkula, Palwal was carved from Faridabad in 2008 and Charkhi Dadri from Bhiwani in 2016. IMD and CWC sources, and the rainfall data in this Manual, use the districts of their time, and a clause that names a district must be checked against the current list;
  • where a shared clause names the State's main city or its municipal corporation, this Manual names Gurugram and the Municipal Corporation of Gurugram (MCG), the State's largest urban drainage system. Gurugram is not the capital. The capital of Haryana is Chandigarh, which is also the capital of Punjab and is itself a Union Territory; this Manual does not cover Chandigarh, but uses its IMD observatory as the reference gauge for Panchkula;
  • Gurugram's three master storm drains are Leg-I, Leg-II and Leg-III, also written Leg 1, 2 and 3. Leg-III is the Badshahpur drain, also called the Badshahpur nala, which carries the runoff of the Aravalli slopes south of the city. All three discharge into the Najafgarh drain, and a fourth, Leg-IV, has been reported under construction. Badshahpur is also the name of a place in Faridabad, where FMDA runs a sewage treatment plant; it has nothing to do with the Gurugram drain;
  • Outfall Drain No. 8 is the I&WRD drain that receives the Sahibi at RD 17.5 km and ends at the Dhansa regulator (RD 42.59 km), from where its water falls into the Najafgarh drain in Delhi. It is not Diversion Drain No. 8 (DD8), a channel reported to carry raw water from Mahra, near Gohana, to the Yamuna at Dahesra in Sonipat district;
  • the Najafgarh drain is in Delhi. It is the continuation of the Sahibi below Dhansa and receives Outfall Drain No. 8 and Gurugram's master drains on its way to the Yamuna. The Najafgarh jheel (jhil) is the seasonal lake and marsh on its course, across the border between Haryana and Delhi. Where this Manual names the drain or the jheel, it names a place that Haryana's drainage depends on, not a place that Haryana manages;
  • Hathnikund is the barrage on the Yamuna in Yamunanagar district, built in 1999 to replace the older weir at Tajewala, and river flows before then are Tajewala figures. Its releases, like most river and drain flows in Haryana's sources, are given in cusecs (cubic feet a second; 1 cusec = 0.0283 m³/s) and lakh cusecs (100,000 cusecs). This Manual quotes them as given and adds the metric value where it matters for design. Levels on the State's Ghaggar gauges are reported in feet on gauges whose zero has not been found tied to mean sea level, and are quoted as reported [TBC];
  • a choe is a seasonal torrent from the Shivalik hills, dry for most of the year, with a wide bed of sand, gravel and boulders, such as the choes of Panchkula, Ambala and Yamunanagar and the Sukhna choe of Chandigarh. A choe rises and falls within hours, and carries debris as well as water; and
  • the Shivalik hills, also written Siwalik, rise in the north-east of the State, above Panchkula, Kalka, Morni and Kalesar; the Aravalli hills run as low, broken ridges through Gurugram, Faridabad, Nuh, Rewari and Mahendragarh in the south. Between them the State is a flat alluvial plain, with khadar (the low floodplain of the Yamuna and the Ghaggar) and bangar (the older upland alluvium above it), sand dunes in the south-west, and a waterlogged, saline belt around Rohtak and Jhajjar. Ahirwal is the region around Rewari and Mahendragarh, and Mewat the region of Nuh. The names describe regions, not administrative units.

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies need a word of explanation:

  • a Municipal Corporation is constituted under the Haryana Municipal Corporation Act, 1994. Under that Act all public drains, and all drains in, alongside or under a public street, vest in the Corporation (s.193), and so does the adjacent land (not private property) that appertains to a public tank (s.161). Municipal Councils and Municipal Committees are constituted under the Haryana Municipal Act, 1973. All three are urban local bodies (ULBs), overseen by the Urban Local Bodies Department;
  • DTCP in this Manual is the Town and Country Planning Department and its Directorate. It issues the Haryana Building Code, grants licences for colonies under the Haryana Development and Regulation of Urban Areas Act, 1975 (HDRUA Act), whose external and internal development works include storm drains, and prepares development plans under the Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Act, 1963. HSVP is Haryana Shehri Vikas Pradhikaran, formerly the Haryana Urban Development Authority (HUDA), constituted under the HUDA Act, 1977. It develops the sectors of the State's Urban Estates and executes their external development works; it was renamed in 2017, as reported (the amending Act was not read), and documents issued before then are cited under the name HUDA;
  • GMDA is the Gurugram Metropolitan Development Authority (Act 34 of 2017), whose notified area covers MCG, the Municipal Committees of Farukhnagar, Sohna and Pataudi and 41 Gram Panchayats, and which runs the master drains of Gurugram; under its Act a drain that connects two or more sectors, colonies or villages is "infrastructure development work". FMDA is the Faridabad Metropolitan Development Authority (Act of 2018) and PMDA the Panchkula Metropolitan Development Authority (Act 23 of 2021);
  • I&WRD is the Irrigation and Water Resources Department, which builds and runs the State's canals, rural and regional drains, embankments and barrages. Its "drainage works" under the Haryana Canal and Drainage Act, 1974 exclude "works for the removal of sewage from towns" (s.2(7)). Under s.45 of that Act the State may notify limits along a river, stream or drainage channel within which obstruction is prohibited; the notified reach then becomes a drainage work. Flood-control schemes are approved by the Haryana State Drought Relief and Flood Control Board, chaired by the Chief Minister;
  • HPWWMA is the Haryana Pond and Waste Water Management Authority, constituted under the Haryana Pond and Waste Water Management Authority Act, 2018 (Act 33 of 2018), called the Pond Authority in this Manual. HWRA is the Haryana Water Resources (Conservation, Regulation and Management) Authority, constituted under the Act of 2020 of that name, which issues groundwater permissions in the State and is named in this Manual as the State groundwater agency;
  • a johad (जोहड़; in the dictionary, kachcha talab, an earthen tank) is the village pond of Haryana, natural or dug, that stores rainwater runoff; the State's pond law spells it johar ("talab, johar, tank"). In Rajasthan the same word also names the earthen check-bunds of village watershed works; in this Manual it means a pond, not a check dam. Talab (तालाब) is the standard Hindi equivalent; and
  • a tehsil is the revenue subdivision of a district, under a Tehsildar.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
  • MC is written out in this Manual, because in Haryana it can mean a Municipal Corporation, a Municipal Council or a Municipal Committee. MCG is the Municipal Corporation of Gurugram and MCF the Municipal Corporation of Faridabad;
  • HFL is the highest flood level recorded at a gauge, as CWC uses it. It is not a design level, and sources sometimes give different values for the same gauge. The floodplain notified under s.45 is called a flood plain zone (FPZ) in this Manual; this Manual proposes how a design flood line is drawn (Chapter 7);
  • RD (reduced distance) is the chainage along a canal or drain, from its head; and
  • SWD is a storm water drain.

The sense is clear from the context. Hindi and Haryanvi terms used in the text, such as johad, talab (तालाब, a pond or tank), jhil or jheel (झील, a large, shallow, often seasonal lake or marsh), dabar (डाबर, low ground where rainwater collects), bandh or bund (बाँध, an earthen embankment, such as the old flood-holding bunds of Gurugram at Ghata and Wazirabad), khadar and bangar, choe, nala (natural drain or large storm drain) and nali (small street drain), are explained where they first appear.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Haryana's cities flood for three reasons. Gurugram showed the first on 28 July 2016, when about 50 mm of rain, as reported, jammed the national highway through the city for more than 18 hours; the Yamuna and the Ghaggar showed the second in July 2023, when the Yamuna rose higher at Delhi than ever recorded and the Ghaggar broke its banks from Ambala to Sirsa; and Rohtak and Jhajjar show the third every monsoon, where the water table stands within 3 m of the ground over almost half of each district while the aquifers of most of the State are drawn down year after year.

  1. Short, intense storms on fast-growing cities whose channels were built for 25 mm an hour. The National Capital Region Planning Board (NCRPB) reported in 2016 that "The intensity of rainfall adopted is 25mm per hour and run off coefficient is 1/8 for designing of storm water drainage channels in Haryana urban area". Storms in Gurugram and Faridabad, which share Delhi's climate, are far larger. On 28 July 2016 ("Gurujam") 46 mm in three hours was reported by the State's Chief Secretary, and other reports give 52 or 54 mm for the day; the highway was jammed between Rajiv Chowk and Hero Honda Chowk for more than 18 hours, and prohibitory orders were imposed. On 19 August 2020, "within half an hour of rain, the entire city was waterlogged", as reported. On 31 July 2024 three people were electrocuted near the IFFCO Chowk metro station when a live cable fell into ponded water, as reported. On 9–10 July 2025 133 mm was reported in 12 hours, 103 mm of it in 90 minutes, and on 1 September 2025 more than 100 mm in four hours; in September 2026 the Punjab and Haryana High Court recorded that "Gurugram is facing severe waterlogging during the monsoon season". Days far larger than these are on record: Gurgaon recorded 282.2 mm on 14 July 1968 and 261.2 mm on 30 June 1981, when Rohtak recorded 297.9 mm, and on 9 September 1875 Palwal recorded 398.8 mm and Ballabgarh 299.7 mm. In the north, on 9 July 2023, Chandigarh recorded 302.2 mm in a day and Ambala 224.1 mm, both new July records, and Ambala flooded. Roofs, roads, basements and underpasses now send more water to the drains, and faster.
  2. Drains and rivers that back up. The ground falls about 78 m from the Aravallis above Gurugram to the Najafgarh drain in Delhi, as reported, and the city cannot drain faster than that drain and the bottlenecks on the way to it allow. The capacity of the Badshahpur drain, Leg-III, is given as 3,702 cusecs on DTCP's master drainage drawing of 2012 and from 500 to 3,800 cusecs in reports, and in 2021 its flow was reported as 2,300 cusecs, falling to 800 cusecs at the Khandsa bottleneck. Outfall Drain No. 8, which carries the Sahibi and the drainage of the Rohtak–Jhajjar belt to the Najafgarh drain, has a capacity of 4,000 cusecs, and 5,000 cusecs was observed at the Dhansa regulator in the monsoon of 2022. In the east, the Yamuna stands above the outfalls of the riverside towns when it floods: Hathnikund barrage passed 8.28 lakh cusecs on 18 August 2019, the highest since it was commissioned, as reported, and 3,59,760 cusecs on 11 July 2023, two days before the river reached 208.66 m at Delhi's Old Railway Bridge, its highest recorded level. In the north-west the Ghaggar, fed by choes from the Shivalik hills, has no flood gauge of the Central Water Commission (CWC) anywhere in its basin. In July 2023 a major breach at Ambala was plugged with the help of the Army; 82,400 cusecs was reported at Kaithal on 12 July, breaches were reported there and in Fatehabad and Sirsa districts, and by 14 July 1,385 villages of the State were reported affected.
  3. A State with both too little and too much groundwater. In 2024 Haryana drew 135.96% of its extractable groundwater, and 88 of its 143 assessment units were over-exploited. In June 2023 the water lay deeper than 30 m under 97.2% of Kurukshetra district and 51.1% of Gurugram district. Yet every block of Rohtak and Jhajjar is "safe", because their water table is near the surface: within 3 m over 49.9% of Rohtak and 42.6% of Jhajjar, where the land is waterlogged and the soils saline and sodic. The State's waterlogged or waterlogging-prone land, within 3 m, grew from about 2.93 lakh ha in June 2023 to about 3.79 lakh ha in October, as the monsoon raised the water table. Recharge that is right for Gurugram is wrong for Rohtak, and the High Court has recorded both halves of the problem in one city: in Gurugram, rainwater "is not being effectively utilized for the purpose of replenishing the depleting groundwater levels" while the city waterlogs.

Behind all three lies lost storage. Gurugram's water bodies were counted at 641 in the revenue record of 1956, 487 in a Survey of India report of 1976 and 557 in satellite imagery of 2011–12, with only 123 common to all three counts; the bunds built in the late nineteenth century at Ghata, Chakarpur, Jharsa and Wazirabad, which once held back the runoff from the ridge, were reported in 2025 to have been made obsolete by urbanisation. The Haryana Pond and Waste Water Management Authority Act, 2018 protects every public pond of 0.5 acre or more recorded as a talab, johar or tank, with its green belt, catchment and feeder inlets, and bars construction on them, and the obstruction of their inflow and outflow, without the Authority's permission (s.14); 19,665 ponds were on its register in February 2024. In 1996 the Supreme Court barred construction in the green belt and within 1 km of the Badkhal and Surajkund lakes in Faridabad, and made all plans within 1 to 5 km subject to the prior approval of the pollution control boards. Two Ramsar sites lie in the State, Sultanpur (143 ha) and Bhindawas (412 ha), both designated on 25 May 2021; no wetland notified under the Wetlands Rules, 2017 was confirmed, and the Najafgarh jheel had not been notified as of March 2024.

Design for Haryana therefore has to cover a monsoon that is short and late, on foothill gravels, alluvium, saline clays, rock and sand, in cities that drain to a drain in another State, to rivers raised by barrage releases and to a water table that in some places is already at the surface. The monsoon normally reaches Sonipat by 27 June, Ambala and Chandigarh by 28 June, Bhiwani by 30 June and Hisar by 3 July, and withdraws between 21 September at Hisar and 25 September at Sonipat. Annual normals run from 325.3 mm in Sirsa district and 396.5 mm in Hisar to 577.8 mm in Gurgaon, 695.8 mm in Karnal and 988.0 mm in Ambala, and 1,073.6 mm at Chandigarh. Large days fall outside the season too: the storm of 30 June 1981, which gave Rohtak 297.9 mm and Gurgaon 261.2 mm, came within days of the normal onset, and 141.6 mm fell at Ambala on 5 October 1973, 130.3 mm at Karnal on 9 October 1956 and 128.3 mm at Hissar on 17 October 1998.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the receiving drain, the Najafgarh drain or the river is high, when a regulator or barrage is being operated, or when the flap gate on its outfall is shut.

The Manual also sets how public drains, roads, nalas, johads, lakes and other water bodies, gated and pumped outfalls and basin-wide master plans are designed, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Haryana's south-west monsoon from late June to September and the short, intense bursts and rare multi-day storms that come with it; the Yamuna, the Ghaggar and its Shivalik tributaries, the Sahibi and the I&WRD drains that carry their water, the barrages and regulators that control them, and the Najafgarh drain beyond the border; the gravels and choes of the Shivalik foothills, the alluvium of the Yamuna and Ghaggar plains, the saline and sodic soils of the centre, the rock of the Aravallis and the dunes of the south-west, over aquifers drawn down across most of the State and brimming in a few places; the johads, talabs and old bunds; and cities whose new sectors, basements and underpasses lie across the natural lines of drainage.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Report for subzone 1(e) Upper Indo-Ganga Plains, which covers almost the entire State, as the interim source, with floors for short storms where its ratios understate them; in Gurugram, Faridabad and the rest of the NCR south, the floors that the Delhi edition of this Manual sets from Delhi's observed bursts. The report for zone 7 (Western Himalayas) is used as a check on catchments that rise in the Shivalik hills. IMD's rainfall intensity curve for Hissar (Das et al., 2022) repeats a curve printed for many other cities and is not used; no station analysis of short-duration rainfall was found for any Haryana station; and frequency analysis of gridded rainfall by the National Institute of Hydrology (NIH), Roorkee, is used for comparison only.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Haryana Building Code 2017; the Haryana Development and Regulation of Urban Areas Act, 1975 and the HUDA Act, 1977; the Haryana Municipal Corporation Act, 1994 and the Haryana Municipal Act, 1973; the Acts of GMDA, FMDA and PMDA; the Haryana Canal and Drainage Act, 1974; the Haryana Pond and Waste Water Management Authority Act, 2018; the Haryana Water Resources (Conservation, Regulation and Management) Authority Act, 2020; the Punjab Land Preservation Act, 1900 in the Aravallis; the Wetlands (Conservation and Management) Rules, 2017; and the orders of the Supreme Court, the Punjab and Haryana High Court and the NGT on lakes, ponds, the Aravallis, drains, wetlands, floodplains and sewage. This Manual follows them or, where disclosed, makes them stricter. The Building Code was not made by notification in the Gazette: it was circulated by a memo of the Town and Country Planning Department of 7 March 2017, applies to the whole State from 6 January 2017, and is applied by each Competent Authority under its own Act; it is cited from an archived copy of the Department's text and a later copy hosted by HSVP. Its amendments, also issued by memo, of 27 May 2020 and 19 January 2022 were read; amendments of 8 December 2025 and 5 June 2026 and a proposal of November 2026 have been reported but were not read, and none of those read or reported concerns rainwater harvesting, plinths or basements. The GMDA Act is cited from the text of its Bill, the HDRUA Act as DTCP quotes it, and the Haryana Municipal Act from its section headings; the HUDA Act, the FMDA Act and the Punjab Land Preservation Act were not read. Every rule cited must be checked against the current text.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain in Haryana can cite 1, 2, 5 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has one panel for the State, Hissar, and it repeats the curve printed for many other cities: it implies a 2-year day of about 170 mm, against a district normal of 396.5 mm a year. The CWC report for subzone 1(e), which covers almost the entire State, dates from 1984; it takes the 1-hour rain as 0.34 of the 24-hour rain and assumes a loss of 3.0 mm/h. Its maps are exceeded at most of the State's long-record stations: Hissar recorded 346.7 mm on 16 August 1926 against a 100-year day of about 200–240 mm on the map, and a raingauge at Rohtak 484.1 mm on 19 September 1933 against about 200–220 mm. The reanalysis grids of NIH-DHAARA split the State the other way round: they read 139 mm for a 50-year day at Hisar, against about 200–220 mm on the map, but 320 mm at Panchkula, against about 262 mm.

Haryana has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of DTCP, HSVP, the Urban Local Bodies Department, I&WRD, GMDA, FMDA or any Municipal Corporation that fixes a return period or a design rainfall for city storm drains. What exists is practice, reported second-hand, and capacities without a design basis: urban channels sized for 25 mm/h with a runoff coefficient of 1/8, and rural drains by the Boston Society formula Q = 200√A (cusecs, square miles) cut by factors of 1/12 to 1/4 (NCRPB, 2016); rural drains sized for "three days rainfall of five years frequency to be drained in three days", and urban drains to CPHEEO, in the Town and Country Planning Department's Sub-Regional Plan for the Haryana Sub-Region of the NCR; and Gurugram's master drains, given as 541 cusecs for Leg-I, 1,305 for Leg-II and 3,702 for Leg-III on DTCP's drainage drawing of 2012, and up to 2,300 cusecs in HUDA's plan for the catchment of the Badshahpur drain (2017, revised 2020), neither of which states a return period. This Manual is offered as a technical companion to the Building Code, the Municipal Corporation Act, the Canal and Drainage Act, the Pond Authority Act and the development plans: it supplies the design storm, detention, water-level and buffer values that they leave open. It has not been adopted by DTCP or any other body. In particular:

  • The building rules require rainwater harvesting, but not detention. The Building Code requires roof rainwater harvesting "in the areas specified by the Competent Authority, through a notification" where the rooftop is 100 m² or more, and groundwater recharge for all types of buildings on plots of more than 500 m², with the recharge well at least 10 m from any structure handling sewage; no occupation certificate is issued until an architect or engineer certifies that the system works, and the rule is to be "strictly implemented" in ten named towns, from Panchkula to Gurgaon (Code 8.1). Its predecessor was HUDA's notification of 31 October 2001, and a direction of the Chief Minister of 30 June 2026 to extend it to urban plots of more than 250 square yards was reported, but no notification was seen. For 5,000 to 20,000 m² of built-up area the Code requires that "The inlet and outlet point of natural drain system should be maintained with adequate size of channel", that at least 20% of the recreational open space be unpaved, and one recharge bore per 5,000 m² (Code 12.1). No rule requires on-site detention, limits peak runoff or sets "zero runoff"; the Code's "zero waste water discharge" (Code 11.7) concerns sewage, not rain;
  • There is no setback from water. The Building Code sets no distance from any drain, nala, river, pond or lake, and no I&WRD rule barring construction within a set distance of a drain or canal was found. The Municipal Corporation Act bars building on a municipal drain without the Commissioner's written permission (s.206). Plinths must be 450 mm to 1.5 m high, "so located … that proper drainage of the site is assured" (Code 7.3), but "The responsibility of draining a basement storey and for protecting it from rain shall be that of the owner" (Code 7.16), and no rule keeps surface water out of a basement;
  • The pond law protects ponds, but gives no method. The Pond Authority Act takes in a pond's green belt and catchment, lets the State notify a protected area around it (s.16), and requires the Authority's prior approval of any spatial or development plan that covers a pond (s.17). It sets no distance, no design flood and no storage to be kept, no protected area was found notified, and it does not apply to ponds of less than 0.5 acre or on private land, which include many of the depressions that hold a city's runoff;
  • A floodplain is notified on one river only. Under s.45 of the Canal and Drainage Act the State notified a flood plain zone of the Ghaggar in Panchkula district on 27 October 2023, drawn for a 100-year flood of 2,933.45 cumecs computed by Gumbel's method from 54 years of data; in May 2024 the NGT found that "the requisite procedure for declaration of the Flood Plain Zone of River Ghaggar has not been followed". The State has told the NGT that all construction on river floodplains is banned under s.45, but no notification was found for the Yamuna, the Markanda, the Tangri, the Sahibi or any other river or drain. Apart from that 100-year flood and the five-year rural criterion, no design return period was found for any drain or river corridor in the State. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7); it does not replace any line that the State notifies or a court draws, and where such a line binds and is wider, it governs; and
  • No document sets the drain or river level for which an outfall is designed. Gurugram's drains end in the Najafgarh drain in Delhi, whose level Haryana does not control; Outfall Drain No. 8 ran a quarter over its capacity in 2022; the CWC gauges on the Yamuna at Karnal and Mawi give danger levels and highest flood levels, which are flood-warning levels and records, not design levels; and on the Ghaggar there are no CWC gauges at all.

So each agency and each local body interprets the central manual its own way. MCG and the other Municipal Corporations, the Municipal Councils and Committees, HSVP, GMDA, FMDA and PMDA, licensed colonisers, I&WRD, PHED, HSIIDC, road agencies, their consultants and funding agencies fill the gaps differently. Two drains on the same road, built by different agencies, can be sized for different storms from different rainfall sources. In Gurugram a drain inside a licensed colony is built by its coloniser, the sector drain outside it by HSVP, and the master drain it joins is run by GMDA, which empties into a drain in Delhi run by another government; none of them states the storm it was built for. The master drains also carry sewage: in 2020 GMDA reported about 139 MLD of untreated sewage entering Legs I to III, of which 51.30 MLD still had to be diverted, against the condition that water reaching the Najafgarh drain have a BOD of not more than 30 mg/l. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall across the State, in three rainfall zones, with a checked station analysis to govern where one exists, and floors where the CWC ratios understate short storms, set in Gurugram and Faridabad from Delhi's observed bursts (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls to drains, regulators and rivers, gated, flap-gated or pumped, against a design drain or river level, with coordination with Delhi where an outfall depends on the Najafgarh drain (Chapter 5);
  • a design flood line, and corridors and setbacks along drains and nalas and around johads and lakes, which no rule now sizes, proposed by this Manual for use with the s.45 floodplain and the lines the courts have drawn (Chapter 7);
  • recharge first where the water table is deep, no recharge credit where it lies within 3 m of the ground, as across much of the Rohtak–Jhajjar belt and the floodplains, and treatment where drains carry sewage (Chapter 8); and
  • basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, a metropolitan development authority or DTCP can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Government of Haryana, Town and Country Planning Department, The Haryana Building Code, 2017, circulated vide PSTCP Memo No. Misc-138-A-Loose/7/5/2006-2TCP dated 7 March 2017 (archived copy of the Department's text and a copy hosted by HSVP), Codes 1.1, 1.2, 3.2, 3.4, 7.3, 7.16, 8.1, 11.7, 11.11 and 12.1; amendment memos No. Misc-2339-(ULB)-VOL-II/7/5/2006-2TCP of 27 May 2020 and No. Misc-2339-ULB-VOL-II-A/7/5/2006-2TCP of 19 January 2022; amendments of 8 December 2025 and 5 June 2026 and the proposal of November 2026 (as reported; not read); HUDA notification of 31 October 2001 (as quoted by I&WRD to the NGT); direction of the Chief Minister of 30 June 2026 (as reported); Haryana Municipal Corporation Act, 1994 (Act 16 of 1994), ss.161, 193–198, 202 and 206; Haryana Municipal Act, 1973 (Act 24 of 1973; section headings only); Haryana Development and Regulation of Urban Areas Act, 1975, ss.2(g), 2(i) and 3 (as quoted by DTCP to the NGT, report of 28 March 2022); Gurugram Metropolitan Development Authority Bill, 2017 (Bill No. 36-HLA of 2017; Act 34 of 2017); Panchkula Metropolitan Development Authority Act, 2021 (Act 23 of 2021); Haryana Canal and Drainage Act, 1974 (Act 29 of 1974), ss.2(7), 45–48; Haryana Pond and Waste Water Management Authority Act, 2018 (Act 33 of 2018), ss.1(3), 2(k), 14–17 and 20, and the Authority's written statement of 21 February 2024 in NGT O.A. 573/2023; Haryana Water Resources (Conservation, Regulation and Management) Authority Act, 2020 (Act 29 of 2020, as amended), s.21; Wetlands (Conservation and Management) Rules, 2017, and the notification reconstituting the Wetland Authority of Haryana (12 May 2020); I&WRD replies in NGT O.A. 421/2022 (Ghaggar flood plain zone) and the Tribunal's order of 22 May 2024 (as quoted); I&WRD committee report of 7 February 2024 in NGT O.A. 627/2022 (Sahibi and Outfall Drain No. 8); State of Haryana report in E.A. 35/2023 in NGT O.A. 673/2018; GMDA status report of 2 October 2020 in NGT O.A. 454/2018, and GMDA reports in O.A. 325/2015 and O.A. 523/2019, including DTCP drawing No. DTP(G) 2104/2012 of 9 November 2012 and HUDA's management plan for the catchment of the Badshahpur drain (Rev. 2, 24 November 2020); Supreme Court of India, M.C. Mehta v. Union of India (Badkhal and Surajkund Lakes), I.A. 29 in W.P.(C) 4677/1985, order of 11 October 1996; Punjab and Haryana High Court, Sunil Singh v. MoEF, CWP-20032-2008 and connected cases, order of 22 September 2026; Haryana Vidhan Sabha, starred questions No. 1397 (2022) and No. 16 (September 2023); Lok Sabha reply of 8 August 2025 (as reported); Rajya Sabha reply of 13 February 2025 and PIB (August 2021) on the Ramsar sites; NCRPB, Functional Plan on Drainage for NCR (2016), §5.2.2 and Table 5.2; Town and Country Planning Department, Sub-Regional Plan for Haryana Sub-Region of NCR-2021, Chapter 9; CWC, Flood Estimation Report for Upper Indo-Ganga Plains Subzone 1(e) (approved July 1984; report number not on the copy read [TBC]), Plates 9 and 10 (read by eye), and the report for zone 7 (Western Himalayas); IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD, Climate of Haryana and Union Territories of Delhi and Chandigarh (1991); IMD, Monthly Climate Summary, July 2023; IMD, Pai et al. (2020), new normal dates of onset and withdrawal of the south-west monsoon, Table 2; Das et al. (2022), MAUSAM 73(4), Fig. 4(viii); NIH-DHAARA (accessed 7 November 2026); CGWB and the State, Dynamic Ground Water Resources of Haryana, 2024; HWRA, Haryana Water Resources Atlas 2025; Ministry of Jal Shakti committee, interim report on the joint flood management study of the Yamuna between Hathnikund and Okhla barrages (January 2024); CWC list of flood forecasting sites (as copied by SANDRP); reports of the floods at Gurugram (2016, 2020, 2024, 2025), on the Ghaggar (2023) and the Yamuna (2019), of the Hathnikund peak of 2019, and of the capacities of Gurugram's master drains (press and secondary sources).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Johads (Ponds) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Haryana
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Haryana locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies
7E.2Channels, embankments and riverine land
7E.3Statutory and court terms
7E.4Terms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3A village johad with an I&WRD drain in the waterlogged belt: the catchment, sullage interception, the johad with its FTL and overflow, the drain to a regulated outfall, and the shallow saline water table
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
AWS Automatic weather station
BOD Biochemical oxygen demand
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CGWA Central Ground Water Authority
CGWB Central Ground Water Board
CN Curve number (SCS/NRCS method)
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CSSRI Central Soil Salinity Research Institute, Karnal
CWC Central Water Commission
DD8 Diversion Drain No. 8 (not Outfall Drain No. 8)
DPR Detailed project report
DTCP Town and Country Planning Department, Haryana, and its Directorate
DWF Dry-weather flow
EIA Environmental impact assessment
ESC Erosion and sediment control
FAR Floor area ratio
FER Flood Estimation Report (CWC)
FMDA Faridabad Metropolitan Development Authority
FPZ Flood plain zone (notified under s.45 of the Haryana Canal and Drainage Act, 1974)
FTL / MWL Full tank level / maximum water level
GMDA Gurugram Metropolitan Development Authority
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Haryana)
HBC 2017 The Haryana Building Code 2017, as amended, applied by each Competent Authority
HDRUA Act Haryana Development and Regulation of Urban Areas Act, 1975
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HPWWMA Haryana Pond and Waste Water Management Authority (the Pond Authority)
HSDMA Haryana State Disaster Management Authority
HSG Hydrologic soil group
HSIIDC Haryana State Industrial and Infrastructure Development Corporation
HSPCB Haryana State Pollution Control Board
HSVP Haryana Shehri Vikas Pradhikaran (formerly HUDA)
HUDA Haryana Urban Development Authority (now HSVP)
HWRA Haryana Water Resources (Conservation, Regulation and Management) Authority
I&FC Irrigation and Flood Control Department, Government of the National Capital Territory of Delhi
I&WRD Irrigation and Water Resources Department, Haryana
IDF Intensity–duration–frequency
IMD India Meteorological Department
IRC Indian Roads Congress
MCF Municipal Corporation of Faridabad
MCG Municipal Corporation of Gurugram
MLD Million litres a day
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
NCR National Capital Region
NCRPB National Capital Region Planning Board
NDMA National Disaster Management Authority
NGT National Green Tribunal
NIH National Institute of Hydrology, Roorkee
NOC No-objection certificate
ORB Old Railway Bridge, the reference gauge on the Yamuna in Delhi
PHED Public Health Engineering Department, Haryana
PMDA Panchkula Metropolitan Development Authority
PSD Permissible site discharge
RD Reduced distance (chainage along a canal or drain)
RRV Required retention volume
RWH Rainwater harvesting
SANDRP South Asia Network on Dams, Rivers and People
SLA Sea-level allowance (coastal term; not applicable in Haryana)
SoI Survey of India
SRP Sub-Regional Plan for the Haryana Sub-Region of the NCR
SRRG Self-recording rain gauge
STP Sewage treatment plant
SUH Synthetic unit hydrograph (CWC)
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
ULB Urban local body (a Municipal Corporation, Municipal Council or Municipal Committee)
UTM Universal Transverse Mercator
WQv Water quality volume
WSUD Water-sensitive urban design