Chapter 7Waterbodies, Johads (Ponds) and Setbacks


7.1 Purpose and scope

7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:

  • (a) identifying and mapping every waterbody that a development or public work affects;
  • (b) the setback zones around waterbodies, and the uses allowed in each zone;
  • (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
  • (d) counting tank (johad) storage, including tank cascades, as design storage;
  • (e) restoring and desilting tanks and ponds;
  • (f) protecting supply channels, surplus courses, inlets and outlets;
  • (g) wetlands, marshes and estuaries, which in Haryana, with no coast and no tidal water, means the two Ramsar sites (Sultanpur National Park and Bhindawas Wildlife Sanctuary), any wetland that the Haryana State Wetland Authority notifies or lists under the 2017 Rules, the wetlands of the national atlas that the State is ground-truthing, the Haryana side of the Najafgarh jheel, lakes and jhils such as Badkhal, Surajkund and Damdama, bandh pondages such as that of the Ghata bandh, the floodplain wetlands and depressions (khadar) of the Yamuna and the Ghaggar, and the johads and talabs recorded in the Revenue records;
  • (h) the interface with encroachment and its removal;
  • (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
  • (j) the safety of tank bunds and other embankments.

7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:

  • (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
  • (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
  • (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.

7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Haryana Pond and Waste Water Management Authority Act, 2018, the Haryana Canal and Drainage Act, 1974 (section 45), the Haryana Municipal Corporation Act, 1994, the Haryana Municipal Act, 1973, the Punjab Village Common Lands (Regulation) Act, 1961, the Punjab Land Preservation Act, 1900, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.

Commentary. Haryana has a pond Act, and its definition of a pond already takes in the catchment. The Haryana Pond and Waste Water Management Authority Act, 2018 (Haryana Act No. 33 of 2018; Gazette of 23 October 2018) defines a "pond" as "a tank or lake or any other inland water body having an area of 0.5 acre or more, whether it contains water or not, and mentioned in revenue records as talab, johar, tank or by any other name", which "includes green belt and the peripheral catchments areas, main feeder inlet and other inlets, bunds, weirs, sluices etc" but not a notified wetland (s. 2(k)). The Act does not apply to a pond of less than 0.5 acre, to one in a notified forest, or to one on private land (s. 1(3)). It forbids anyone, without the Authority's permission, to "construct any structure on pond land, green belt and catchment area", or to "cause any obstruction in the natural or normal course of inflow or outflow of water into or from the pond on the upstream or down-stream", to discharge untreated municipal waste or industrial effluent into a pond, or to breach a bund or alter a waste weir (s. 14); it lets the State notify a protected area around a pond (s. 16); and it requires that the Authority be consulted on "spatial or development plan of any area comprising a pond or protected area", no such plan to be approved or enforced without its prior approval (s. 17(1)). The Authority is chaired by the Chief Minister. By February 2024 it had entered 19,665 ponds, 18,764 of them rural and 901 urban, in its Pond Data Management System, each with a unique ID (Authority's written statement to the National Green Tribunal, 21 February 2024). No protected-area notification under section 16 was found for this Manual. In the Municipal Corporations, the adjacent land, not being private property, "appertaining to any public tank" vests in the Corporation, with the public drains and the drains along the streets (Haryana Municipal Corporation Act, 1994, ss. 161 and 193); in the villages most johads stand on shamlat deh, the common land of the village, which includes land kept "for the benefit of the community including … drinking wells or ponds" (Haryana Municipal Act, 1973, s. 2(22B)(iv), as indexed). The rivers and the I&WRD's drains have their own tool: under section 45 of the Haryana Canal and Drainage Act, 1974, the State may notify limits along a river, stream or drainage channel within which no obstruction may be formed, and the notified reach is then "held to be a drainage-work" (Clause 7.4, Disclosure).

The courts have read the catchment into the protection of a lake. In the Badkhal and Surajkund case the Supreme Court relied on NEERI's finding that "The natural drainage pattern of the surrounding hill areas feed these water bodies during rainy season", and that large-scale construction nearby "may disturb the rain water drains which in turn may badly affect the water level as well as the water quality" of the lakes; it barred construction in the green belt and, with exceptions, within 1 km of the lakes, and made all plans within 1 to 5 km subject to the prior approval of the Central and Haryana Pollution Control Boards (M.C. Mehta (Badkhal and Surajkund Lakes), I.A. 29 in W.P.(C) 4677/1985, order of 11 October 1996). Badkhal is now dry (as reported). The application before the National Green Tribunal in Oberoi (O.A. 325/2015) sought "not to grant development permission over water bodies and their catchment areas in Gurugram and Faridabad districts", and in 2018 the Tribunal directed unique IDs and restoration for at least 123 water bodies in Gurugram and the same exercise across the State. In 2026 the Punjab and Haryana High Court recorded that in Gurugram "the existing natural water bodies have substantially diminished, while the channels that sustained these water bodies remain largely blocked", and that the rain that waterlogs the city "is not being effectively utilized for the purpose of replenishing the depleting groundwater levels" (Sunil Singh v. MoEF, CWP-20032-2008, order of 22 September 2026).

This Manual treats every recorded johad, talab and other pond, with its catchment and the flow paths that feed it, as drainage infrastructure. The Pond Act already says that a pond includes its green belt, its peripheral catchment and its feeder inlets, and forbids building on them or obstructing the inflow without the Authority's permission; it does not say how the catchment is to be found on the ground, which flow paths count, or what a development inside it must do. The catchment and flow-path rules of this chapter (see "Recorded johad" and "Catchment and flow paths" in the definitions after Clause 7.2, the setbacks of Clause 7.4 and Figure 7.3) are offered as a technical method for those questions: the catchment delineated from the terrain under Chapter 3, every flow path that drains 8 ha or more treated as a natural channel with its setback, no flow path blocked except by a crossing that meets Clause 7.10.3, and the runoff not retained on a site returned, after treatment, to the path it used before. They are this Manual's proposal. The Haryana Pond and Waste Water Management Authority has not adopted or endorsed them, and the Act, the Authority's permissions and approvals, and any protected area it notifies govern wherever they say more. The same rules apply, as this Manual's own standard, to the ponds the Act does not reach: those of less than 0.5 acre, those on private land (about 35% of the water bodies inventoried in Gurugram are privately owned, GMDA), and the natural low-lying collection areas that GMDA's inventory says "need to be preserved through appropriate legal mechanisms". No design under this Manual shall assume or rely on the filling of a recorded johad, or on the blocking or diversion of a flow path that feeds it, unless a drainage assessment under Chapters 3 to 5 shows where the storage and the flow go, and the lost storage is replaced under Clause 7.6.4. The Haryana Building Code 2017 sets no setback from water; its nearest provision is the environmental condition for buildings of 5,000 to 20,000 m² built-up area that "The inlet and outlet point of natural drain system should be maintained with adequate size of channel for ensuring unrestricted flow of water" (Code 12.1). This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the revenue, municipal, pond, drainage and wetland procedures that record and protect waterbodies in law, or the directions of the Supreme Court, the High Court and the National Green Tribunal.


7.2 Definitions

Term Meaning in this Manual
Waterbody A river or seasonal stream (such as the Yamuna, the Ghaggar, the Markanda, the Tangri and the Sahibi, and the seasonal hill streams, or choes, of the Shivalik foothills), natural drain or nala, I&WRD drain (such as Outfall Drain No. 8, Drain No. 2 at Panipat and the Gurugram Leg drains), canal, lake or jhil (such as Badkhal, Surajkund and Damdama, and the Najafgarh jheel), pond (johad, johar, talab, pokhar), whether or not it is a "pond" under the Haryana Pond and Waste Water Management Authority Act, 2018, bandh pondage (the water held behind an old earthen bandh, such as the Ghata bandh), marsh or low wet land (dabar), floodplain wetland or depression (khadar), abandoned quarry or mine pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1).
Tank (johad) A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices.
Tank cascade A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3).
Full tank level (FTL) The crest level of the surplus weir (overflow, outlet, waste weir or escape) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling.
Maximum water level (MWL) The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the I&WRD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4).
Top bund level (TBL) The crest level of the tank bund.
Waterspread The area of a tank submerged at FTL.
Foreshore The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage.
Supply channel (feeder inlet, nala or canal) A channel that brings water from a river, anicut or upstream tank into a tank.
Surplus course The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea.
Sluice (sluice, regulator or outlet gate) A controlled outlet through a tank bund, usually to an irrigation channel.
Top of bank For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow.
1% AEP flood extent The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4.
Floodway The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL.
Flood fringe The part of the 1% AEP flood extent outside the floodway.
Zone 1 (waterbody protection zone) The inner setback zone defined in Clause 7.4.3.
Zone 2 (flood fringe setback) The outer setback zone defined in Clause 7.4.4.
Setback Zone 1 and Zone 2 together.
Compensatory storage Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4.
Flood cushion Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8).

Haryana terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):

Term Meaning in this Manual
Johad (जोहड़; talab) A natural or excavated depression, usually with an earthen bund, that stores rainfall runoff from its own catchment: in the Shabdasagara, "कच्चा तालाब", an unlined (earthen) tank (Annex 7E). Johar is the spelling of the Pond Act ("talab, johar, tank", s. 2(k)), and talab the plain Hindi word; both mean the same thing for this chapter. A johad is a tank or pond under Clause 7.2, not a check dam. Most johads have no surplus weir or sluice, only a low point in the rim or bund over which they spill; where a johad has none, its FTL is the level at which it spills to the village nala, a drain or low ground, found by survey. A johad need not hold water to be a johad: one that is dry, or kept full only by sullage, keeps its bed, its bund, its catchment and its flow paths.
Pond (Pond Act) A pond as defined in section 2(k) of the Haryana Pond and Waste Water Management Authority Act, 2018: 0.5 acre or more, recorded as talab, johar, tank or by another name, with its green belt, peripheral catchment, feeder inlets, bunds, weirs and sluices; not a notified wetland, a pond in a notified forest or a pond on private land (s. 1(3)). Every such pond is a recorded johad for this chapter, and the Authority's permission and approval (ss. 14 and 17) are needed in addition to this Manual's requirements.
Recorded johad A johad, talab or other pond shown in the Revenue records, the Pond Data Management System of the Pond Authority, GMDA's inventory of water bodies, a Municipal Corporation's records, a development plan or master drainage drawing, or a survey made under a court's or the Tribunal's directions, whether or not it is a pond under the Pond Act. A recorded johad is part of the drainage system for this Manual. Where it is proposed to be filled or built on, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual; they do not override the Pond Act, a court order or another statute that forbids the filling.
Catchment and flow paths The catchment of a johad is the land that drains to it, and its flow paths are the nalas, channels, feeder inlets and depressions by which that runoff reaches it, recorded or not. For a pond under the Pond Act they are the "peripheral catchments areas, main feeder inlet and other inlets" of section 2(k). The catchment shall be delineated from the terrain under Chapter 3, or taken from the Revenue records or a court-ordered survey where it is recorded, and shown on the Waterbody Sheet (Form 7-1), and in it: (a) every flow path draining 8 ha or more is a natural channel under Clause 7.4.1(b), with its setback, whether or not it is recorded; (b) no flow path shall be blocked, filled, diverted or built across except by a crossing that meets Clause 7.10.3; (c) the runoff of a development that is not retained on site under Chapter 4 shall leave it, after treatment under Chapter 8, by the flow path it used before development, so that the johad keeps its inflow; and (d) the catchment boundary shall be marked on the approved layout plan. This is this Manual's proposed technical method for the catchment that the Pond Act protects; it has not been adopted by the Pond Authority, and the Authority's permissions, approvals and any protected area notified under section 16 govern where they say more.
Monsoon water line The outer edge of a johad's, lake's or wetland's water in the monsoon: the largest of the edge shown by dated imagery of the monsoon and the month after it (July to October) in the years of record, which shall cover at least 20 years so as to include wet years, the edge recorded in the Revenue records, and the spill level (FTL) contour; where none is available, the MWL contour. The boundary of a johad or lake under Clauses 7.3.3 and 7.13.1 is the largest of its Revenue record boundary, its surveyed FTL and its monsoon water line, and setbacks are measured from that boundary. A dry year's edge never sets the boundary. This definition, and the 20 years, are set by this Manual.
Bandh pondage The water held behind an old earthen bandh (embankment) across a nala at the foot of the Aravallis, such as the Ghata bandh at Gurugram, about 1.25 km long and 5 m high, behind which water stood over about 60 ha below 240 m and up to about 100 ha below 245 m above mean sea level (GMDA, report to the Tribunal); the Chakarpur, Jharsa and Wazirabad bandhs are of the same kind (as reported). A bandh pondage is a tank under Clause 7.2, whether or not it now holds water, and its bandh is a tank bund for Clause 7.14.
Jhil (jheel); dabar A jhil is a pool, shallow lake or marsh, such as the Najafgarh jheel; a dabar is low or hollow ground where water collects (Annex 7E). A jhil is a lake or marsh under Clause 7.2 and, where Clause 7.12.1 lists it, a wetland. A dabar is a marsh or low wet land; where it is one of GMDA's "natural low lying water collection areas", it is a recorded johad for this chapter.
Khadar; bangar Khadar is the low land along a river or lake where rainwater stands for long, the floodplains of the Yamuna and the Ghaggar; bangar is the upland that is not flooded (Annex 7E). Land recorded or mapped as khadar is within the 1% AEP extent until a hydraulic study under Clause 7.3.4 shows otherwise.
Nala; nali A nala is a watercourse or drain, natural or cut, such as the Badshahpur nala and the Budhiya nala; a nali is a small street or house drain (Annex 7E). Every nala that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whoever maintains it and whether or not it is lined, piped or covered.
I&WRD drain; section 45 reach An I&WRD drain is a drainage work of the I&WRD under the Haryana Canal and Drainage Act, 1974, such as Outfall Drain No. 8; a section 45 reach is a river, stream or drainage channel within limits notified under section 45, which is then a drainage work, such as the Ghaggar floodplain in Panchkula. Each is a waterbody under Clause 7.3; a section 45 limit governs where it is wider than the setback of Clause 7.4 (Clause 7.4.5).
Sullage-fed johad A johad that receives the sullage (grey water) of a village or colony, by its drains or nalis, in addition to rainfall runoff. It remains a waterbody under this chapter, not a treatment unit for a development; the sullage is intercepted under Clause 8.9.5 ahead of the johad, and its starting level for Clause 7.7.3 is FTL in every season.

7.3 Inventory and mapping of waterbodies

7.3.1 Statewide inventory. The Authority, with the I&WRD and the Revenue and Disaster Management Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:

  • (a) its type (Clause 7.2), name and survey numbers;
  • (b) its custodian (a Municipal Corporation, Council or Committee (in which public drains, and drains in, alongside or under a public street, vest under section 193 of the Haryana Municipal Corporation Act, 1994, with the adjacent land, not being private property, appertaining to a public tank under section 161), GMDA, FMDA or the Panchkula Metropolitan Development Authority (for the master drains and the waterbodies they manage), HSVP (for the sector drains and ponds of its Urban Estates until they are transferred), a licensed colonizer (for the drains within a licensed colony until they are taken over), the I&WRD (for its drains, rivers, embankments, canals and regulators, and the reaches notified under section 45 of the Haryana Canal and Drainage Act, 1974), the Gram Panchayat (for village ponds and other shamlat land), the Haryana Pond and Waste Water Management Authority (as the regulator of every pond of 0.5 acre or more under its Act of 2018), the Haryana State Wetland Authority and the Forests and Wildlife Department (for a notified wetland and the Ramsar sites), HSIIDC (for the drains and ponds of its industrial estates), a private owner, or another body);
  • (c) its boundary as recorded in Revenue records;
  • (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
  • (e) its position in any tank cascade, with the upstream and downstream tanks;
  • (f) the 1% AEP flood extent, where mapped; and
  • (g) known encroachments, with the date recorded.

7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:

  • (a) within the site;
  • (b) within 100 m of the site boundary; and
  • (c) downstream, to the extent of the downstream analysis of Chapter 5.

The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):

  • the Revenue record boundary;
  • the surveyed FTL or top of bank;
  • the MWL contour (tanks) and the 1% AEP flood extent;
  • Zone 1 and Zone 2 (Clause 7.4); and
  • every supply channel, surplus course, sluice and surplus weir.

7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:

  • (a) Revenue records and khasra maps of the Revenue Department, in which johads, talabs and other ponds are entered as talab, johar, tank or by another name (the record on which a "pond" is defined in section 2(k) of the Haryana Pond and Waste Water Management Authority Act, 2018), with village ponds on shamlat deh, nalas, khadar land and land recorded as jhord; the Pond Data Management System of the Haryana Pond and Waste Water Management Authority, in which 19,665 ponds had been entered by February 2024, each with a unique ID; the inventory of 644 water bodies in Gurugram, with unique IDs, made by GMDA under the directions of the National Green Tribunal; the reaches and khasra lists notified under section 45 of the Haryana Canal and Drainage Act, 1974, such as the Ghaggar floodplain in Panchkula (Gazette of 27 October 2023); the public tanks, drains and watercourses vested in a Municipal Corporation under sections 161 and 193 of the Haryana Municipal Corporation Act, 1994; the waterbodies, drains and green belts shown in development plans and in the master storm-water drainage drawings of DTCP, HSVP and GMDA; the green belts of Badkhal and Surajkund lakes under the Supreme Court's order of 1996; the boundaries of the two Ramsar sites and of any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was confirmed for this Manual); and the wetlands of the national atlas that the State is ground-truthing;
  • (b) I&WRD and Gram Panchayat tank registers and records of FTL and MWL;
  • (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
  • (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
  • (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.

7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:

  • (a) any site in a flood-sensitive catchment (Chapter 1);
  • (b) any site of 1 ha or more adjoining a waterbody; and
  • (c) any site where the Authority so requires.

For other sites, the fixed-width setback of Clause 7.4.6 may be used.

7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where I&WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.

Commentary. No 1% AEP flood map of any Haryana city was found, and no design return period was found for any of the State's urban drains: DTCP's master storm-water drainage drawing for Gurugram (No. DTP(G) 2104/2012 of 9 November 2012) gives Leg I 541, Leg II 1,305 and Leg III (the Badshahpur drain) 3,702 cusecs, and HUDA's catchment plan for the Badshahpur drain (Rev. 2 of 24 November 2020) gives reach discharges up to 2,300 cusecs, but neither states the storm they were sized for. The only flood line found that has been notified is the Ghaggar floodplain in Panchkula district, notified by the I&WRD under section 45 of the Haryana Canal and Drainage Act, 1974 (Gazette of 27 October 2023), village by village and khasra by khasra, on a 100-year flood of 2,933.45 m³/s (103,594 cusecs) computed by Gumbel's method from 54 years of data (I&WRD, replies to the National Green Tribunal in O.A. 421/2022); the Tribunal observed in May 2024 that "the requisite procedure for declaration of the Flood Plain Zone of River Ghaggar has not been followed", and the boundary pillars were reported complete in February 2025. The State has told the Tribunal that "All the construction activities are banned on river Flood Plains and no encroachment on any river is allowed as per section 45", but no notification for the Yamuna or any other river in Haryana was found, and this Manual does not read one into that statement. On the Sahibi, the I&WRD found that for about 11 km downstream of the Masani barrage "there is no land, particularly, marked for Sahibi River in Revenue Record" (committee report in O.A. 627/2022, 2024). The records of the ponds are better than those of the rivers: the Pond Authority's Pond Data Management System gives every pond a unique ID, and GMDA's committee checked 826 features in 242 villages and inventoried 644 water bodies of about 1,142 acres in Gurugram, against counts of 641 in the Revenue record of 1956, 487 on the Survey of India maps of 1976 and 557 on imagery of 2011–12 (GMDA, report to the Tribunal in O.A. 325/2015). The counts differ because ponds have been lost and because each source defines a pond differently; Clause 7.3.3 makes the larger extent govern. Every site plan under this Manual shall overlay the khasra map and show each johad, johar, talab and tank, each parcel recorded as jhord, each nala and each khadar parcel, with its pond UID where one exists, on the Waterbody Sheet (Form 7-1); the Haryana Building Code 2017 already requires the site plan to show "any existing physical features such as well, drains" (Code 3.2). Levels shall be stated to one datum (Clause 7.3.5): the levels published for the State's structures and pondages, such as the crest of the Masani barrage (240.00 m) and the Ghata pondage (240 to 245 m above mean sea level), shall be tied to a surveyed datum before use [TBC]. Clause 7.3.4 lets the Authority adopt flood maps once they are issued; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, and a section 45 limit, where one has been notified, is a minimum that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.


7.4 Setbacks

7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:

  • (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
  • (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.

7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:

  • Zone 1 (waterbody protection zone), next to the waterbody; and
  • Zone 2 (flood fringe setback), outside Zone 1.

7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:

  • (a) 15 m, the minimum set by this Manual (no statute, rule or building code read for this Manual sets a distance in metres from a drain, nala, johad, lake or river in Haryana; see the Disclosure below);
  • (b) the outer edge of the floodway (Clause 7.6.1); and
  • (c) for a tank, the MWL contour.

7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.

7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the approval of the I&WRD for a work on or next to one of its drains, rivers, embankments, canals or regulators, or within limits notified under section 45 of the Haryana Canal and Drainage Act, 1974 (such as the Ghaggar floodplain in Panchkula), the prior approval of the Haryana Pond and Waste Water Management Authority for a spatial or development plan of an area comprising a pond or protected area, or its permission for a structure on pond land, green belt or catchment area or in a protected area (Haryana Pond and Waste Water Management Authority Act, 2018, ss. 14 and 17), the permission of the Haryana State Wetland Authority for a regulated activity in a notified wetland, or a direction of the Supreme Court, the Punjab and Haryana High Court or the National Green Tribunal (such as the Badkhal and Surajkund lines listed in the Disclosure to Clause 7.4) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.

7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:

Table 7.1 — Fixed-width setback where no 1% AEP extent is available

Waterbody Total setback (Zone 1 + Zone 2) Of which Zone 1
Channel draining 8 ha to 65 ha 25 m 15 m
Channel draining 65 ha to 20 km² 40 m 15 m
Channel draining more than 20 km², and rivers 50 m 20 m
Tank, lake or pond MWL contour + 25 m to MWL contour, and not less than 15 m from FTL
Marsh, estuary or backwater as notified by the Authority, and not less than 50 m 15 m

This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.

7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).

Commentary. The 15 m minimum is set by this Manual. Haryana has no general statutory distance from water: the Haryana Building Code 2017 sets no setback from a drain, nala, pond, canal or river, and no instruction of the I&WRD barring construction within a stated distance of a drain or canal was found. The lines that exist are tied to a notification, to a pond or to one waterbody: within limits notified under section 45 of the Haryana Canal and Drainage Act, 1974, no obstruction may be formed, and the notified reach becomes a drainage work (used for the Ghaggar floodplain in Panchkula, notified on 27 October 2023 on a 100-year flood of 2,933.45 m³/s); on a pond's land, green belt and catchment area no structure may be built, and no inflow or outflow obstructed, without the permission of the Haryana Pond and Waste Water Management Authority (Haryana Pond and Waste Water Management Authority Act, 2018, s. 14), but the Act sets no distance; around Badkhal and Surajkund lakes there is to be no construction in the green belt or, with exceptions, within 1 km (Supreme Court, 1996); and around a notified wetland no permanent construction is permitted within 50 m of the mean high flood level (Wetlands Rules, 2017, r. 4(2)(vi)). This Manual's 15 m gives every johad, nala and drain a hydraulic corridor where nothing wider binds, and is this Manual's proposal, not a statutory width (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:

  • APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
  • APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
  • APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.

(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Haryana flood maps are mostly coarser than US maps, the Yamuna and Ghaggar alluvial plains, the Rohtak–Jhajjar–Sonipat waterlogged belt and the depressions of the Sahibi and the Najafgarh jheel are very flat (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.

The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.

URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).

Haryana's building code gives no distance in metres from water. The Haryana Building Code 2017 was searched for drain, nala, pond, river, canal and flood, and sets no setback from any of them; its only distances near water concern sewage: a septic tank is not to be "within 60 (sixty) metres from any percolation well, watercourse or stream used or likely to be used for drinking or domestic purposes" (Code 11.4), and a recharge well is to be at least 10 m from any structure handling sewage or industrial waste water (Code 8.1(3)(v)). No instruction of the I&WRD barring construction within a stated distance of a drain or canal was found. The Haryana Municipal Corporation Act, 1994 adds no width: no building, wall, fence or other structure may be erected on a municipal drain without the Commissioner's written permission (s. 206), and the adjacent land appertaining to a public tank, not being private property, vests in the Corporation (s. 161), but no strip is set around either. A municipal bye-law restricting certain acts "within a radius of thirty metres of a tank, pond, well or Baoli" was seen only in a search summary; the bye-law and the acts it restricts were not identified, and this Manual does not rely on it. The lines that exist are tied to a notification, to a pond or to one waterbody: within the limits of a section 45 notification under the Haryana Canal and Drainage Act, 1974, no obstruction may be formed and any obstruction may be ordered removed (ss. 45 and 46; the Ghaggar floodplain in Panchkula, 2023); on a pond's land, green belt and catchment area no structure, and no obstruction of the inflow or outflow, without the Pond Authority's permission, and in a protected area, once notified, no construction without its prior permission (Pond Act, 2018, ss. 14, 16 and 17; no distance is set in the Act, and no protected area was found notified); around Badkhal and Surajkund lakes at Faridabad, no construction in the green belt, none outside it within 1 km of the lakes except on plots sold before 10 May 1996 and owners' houses of up to 2½ storeys, and prior approval of the Central and Haryana Pollution Control Boards for all plans from 1 km to 5 km (Supreme Court, order of 11 October 1996); and around a notified wetland, no permanent construction within 50 m of the mean high flood level (Wetlands Rules, 2017, r. 4(2)(vi)), none of the State's wetlands having been confirmed as notified under the Rules for this Manual. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.

Disclosure. Haryana has no statutory setback in metres from a drain, nala, johad, lake or river: no statute, rule or building code read for this Manual sets one, and the only floodplain notified under the State's drainage law that was found is the Ghaggar floodplain in Panchkula. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor, and so are the catchment and flow-path rules for johads and the reading of the monsoon water line (definitions after Clause 7.2). The Pond Act already protects a pond's green belt and peripheral catchment; this Manual's catchment and flow-path rules are offered as a technical method for applying that protection, but they are this Manual's proposal, not a statutory width or rule, and neither the Haryana Pond and Waste Water Management Authority nor any other government body has adopted or endorsed them. The setback is applied as the larger of the corridor and any statutory or court line, so the Manual is stricter than statute along drains, nalas and johads, and no less strict anywhere. The 1% AEP extent of this Manual, with the climate factor, governs Zone 2 wherever it is wider than a notified or court line. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:

  • Rivers and drains (section 45). Limits notified under section 45 of the Haryana Canal and Drainage Act, 1974, within which no obstruction may be formed and any obstruction may be removed, the notified reach becoming a drainage work: the Ghaggar floodplain in Panchkula district (Gazette of 27 October 2023; 100-year flood of 2,933.45 m³/s). No section 45 notification for the Yamuna or another river was found.
  • Ponds. The pond land, green belt, peripheral catchment and feeder inlets of every pond of 0.5 acre or more recorded as talab, johar or tank, on which no structure may be built, and no inflow or outflow obstructed, without the Pond Authority's permission; any protected area notified around a pond; and the Authority's prior approval of any spatial or development plan of an area comprising a pond (Pond Act, 2018, ss. 2(k), 14, 16 and 17). The Act sets no distance, and no protected area was found notified.
  • Lakes. Around Badkhal and Surajkund lakes, no construction in the green belt, none within 1 km of the lakes except as the Court allowed, and prior approval of the Central and Haryana Pollution Control Boards for all development schemes and plans from 1 km to 5 km (Supreme Court, 1996).
  • Wetlands. No permanent construction within 50 m of the mean high flood level of a notified wetland (Wetlands Rules, 2017, r. 4(2)(vi)); the two Ramsar sites, Sultanpur and Bhindawas, to their designated boundaries; and the directions of the National Green Tribunal on the Najafgarh jheel (Clause 7.12, Commentary).
  • Municipal drains and public tanks. No building on a municipal drain without the Commissioner's permission (Haryana Municipal Corporation Act, 1994, s. 206), and the adjacent land of a public tank vested in the Corporation (s. 161). These protect the waterbody, not a flood corridor; the whole recorded and monsoon extent is a waterbody for this chapter.
  • I&WRD drains, embankments, canals and regulators. Works on or next to them need the I&WRD's approval.

This Manual sets 15 m as the floor because no width exists in Haryana for drains, nalas or johads; because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and desilting machinery that the drains need. The reasons for the corridor and the catchment rules are the record: the High Court found in 2026 that Gurugram's natural water bodies "have substantially diminished, while the channels that sustained these water bodies remain largely blocked"; the HARSAC action plan for Gurugram found 47 ponds of 2 to 8 acres in and around the city "either dried up or filled with municipal waste" (2021); DTCP's master drainage drawing for Gurugram marks reaches of the drains as "Land under stay/litigation/encroachment"; and a reach of the Badshahpur drain is reported to narrow from a capacity of 2,200 cusecs to 700 cusecs (as reported). Until a statute, rule, notification, development plan or the Pond Authority adopts them, the 15 m minimum and the catchment rules are this Manual's recommended standard, and the statutory and court controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.

Waterbody setback zones: cross-section Waterbody setback: Zone 1 and Zone 2, with Haryana's statutory and court limits (section, not to scale) Zone 1 Waterbody protection Zone 2 Flood fringe setback Developable land Waterbody: tank bed, channel, marsh (no development) FTL (crest of surplus weir) / top of bank 1% AEP (100-yr) flood level, with climate factor (or MWL for tanks) Bed (surveyed, original) park, path floor ≥ 1% level + 0.5 m ≥ 15 m (set by this Manual) greater of 15 m and floodway to mapped 1% AEP extent + 10 m margin 1% extent 15 m This Manual: Zone 1 and Zone 2 Statute and courts: Wetlands Rules 2017; Pond Act 2018; Supreme Court (Badkhal and Surajkund, 1996); Canal and Drainage Act 1974, s. 45; HMC Act 1994 50 m from the mean high flood level, notified wetlands only (r. 4(2)(vi)) Pond (0.5 acre or more, recorded): pond land, green belt and the whole peripheral catchment; no structure or obstruction of inflow without the Pond Authority's permission (no distance set) Badkhal and Surajkund: green belt, then no construction within 1 km; plans 1–5 km need prior approval of the Pollution Control Boards (Supreme Court, 11 Oct 1996; off scale) River or drain notified under s. 45: no obstruction within the notified limits (Ghaggar floodplain, Panchkula, 27 Oct 2023, 100-yr flood 2,933.45 m³/s); no Yamuna notification found ? drains, nalas, canals and unrecorded johads: no statutory width. HBC 2017 sets none, no I&WRD distance rule was found, and no building on a municipal drain (HMC Act s. 206). Zone 1: no buildings, fill, paving or dumping. Crossings, utilities, flood works and native vegetation only. Zone 2: no habitable buildings. Parks, unpaved paths, open-sided structures; fill only with 1:1 compensatory storage. Measured from the largest of the Revenue boundary, FTL (or top of bank) and the monsoon water line. The 15 m floor is this Manual's proposal. Wider lines govern: s. 45 limits; pond land, green belt, catchment and protected area (Pond Act); Badkhal and Surajkund green belt and 1 km; notified wetlands 50 m; Ramsar boundaries; I&WRD lines.

Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).


7.5 Uses permitted in each zone

7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:

  • (a) road, rail and utility crossings that meet Clause 7.10.3;
  • (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
  • (c) native vegetation, planting and habitat works;
  • (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
  • (e) waterbody restoration under Clause 7.9.

7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:

  • (a) all uses permitted in Zone 1;
  • (b) parks, playgrounds, open-air sports fields and urban agriculture;
  • (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
  • (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
  • (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
  • (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.

7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.

7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Haryana Building Code 2017, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.

Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Haryana practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.


7.6 Floodway, flood fringe and compensatory storage

7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.

7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.

7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:

  • (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
  • (b) with compensatory storage under Clause 7.6.4.

7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):

  • (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
  • (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
  • (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
  • (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
  • (e) is built before, or at the same time as, the fill is placed; and
  • (f) is secured by a covenant or handover so that it is never filled later.

7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.

7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:

  • (a) redevelopment may be approved without the Zone 2 restriction;
  • (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
  • (c) basements are not permitted;
  • (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
  • (e) Zone 1 continues to apply in full.

Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The Yamuna and Ghaggar alluvial plains, the Rohtak–Jhajjar–Sonipat waterlogged belt and the depressions of the Sahibi and the Najafgarh jheel, where runoff spreads and stands, are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.

In Haryana the lines around waterbodies are measured from a high level, not from the dry-season water line: the Wetlands Rules, 2017 measure their 50 m from the mean high flood level, and the Pond Act defines a pond "whether it contains water or not", with its green belt and peripheral catchment (s. 2(k)). The difference matters because many of the State's johads, jhils and pondages fill only in the monsoon. The Damdama lake near Sohna is reported to shrink from about 80 acres to about 35 acres within a month of the monsoon's end (as reported), and behind the Ghata bandh at Gurugram, where water stood over 60 to 100 ha up to 245 m above mean sea level, GMDA found "no perennial waterbody … except a comparatively small waterbody of about 2 ha" (report to the Tribunal). A line drawn from the edge of the dry months would leave the foreshore that the monsoon floods, and that the johad or pondage needs in order to store it, open to building. This Manual gives the same rule a level for every johad, jhil and pondage: its monsoon water line, read over at least 20 years, and its FTL are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.

The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the colonies and sectors of Gurugram along the Badshahpur drain and in the low ground below the Aravallis that the city's drains flooded in July 2016 and in most monsoons since, the low parts of Ambala flooded when the Ghaggar breached in July 2023, and the waterlogging-prone wards of Rohtak and the other towns of the Rohtak–Jhajjar–Sonipat belt (all as reported) already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.

Compensatory storage by elevation band: section Compensatory storage by elevation band (section, not to scale) A. Fill in the flood fringe B. Compensatory excavation, same reach waterbody waterbody permitted use drains back by gravity 1% AEP flood level Normal water level (or 50% AEP if higher) Band 1 Band 1 Band 2 Band 2 Band 3 Band 3 Band 4 Band 4 Orange: fill below the 1% level = volume lost Blue: excavation below the 1% level = volume gained Grey: cut above the 1% level, no credit Volume per band (m³), Form 7-3 worked example: illustrative, not design values 60 180 Band 1 180 300 Band 2 300 390 Band 3 420 450 Band 4 Volume lost (fill) Volume gained (excavation) Bands of not more than 0.3 m, from the normal water level to the 1% AEP level. Volume gained ≥ volume lost in every band (Clause 7.6.4(b)).

Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.


7.7 Tank cascades as design storage

Haryana has a pond Act but no tank Act, and its storages range from the village johad to the barrages of the I&WRD. The storages that matter for urban drainage are of six kinds. The first is the village and urban johad or talab of 0.5 acre or more, recorded as talab, johar or tank and regulated by the Pond Authority under the Pond Act, 2018, usually with no outlet structure, standing on shamlat land or vested in a Municipal Corporation, and often fed by village sullage as well as by its catchment; 19,665 were on the Authority's register in February 2024. The second is the johad or pond that the Act does not reach because it is smaller than 0.5 acre or on private land, and the natural low-lying collection areas, which in Gurugram are a large share of what remains (GMDA). The third is the bandh pondages at the foot of the Aravallis, such as those of the Ghata, Chakarpur, Jharsa and Wazirabad bandhs, built in the late nineteenth century to hold the runoff of the hill nalas and reported to have been made obsolete by urbanisation (Lok Sabha reply, August 2025, as reported); they are the tanks for which Clauses 7.7 and 7.8 matter most in Gurugram, and no operating rule or level record for any of them was found. The fourth is the lakes, Badkhal and Surajkund at Faridabad, under the Supreme Court's order of 1996, and Damdama near Sohna. The fifth is the I&WRD's barrages and regulators, such as the Hathnikund barrage on the Yamuna, the Masani barrage on the Sahibi, whose weir was left without gates when work stopped in 1986, and the Dhansa regulator at the end of Outfall Drain No. 8; they are not tanks for these clauses, and their releases and levels enter a design as inflow and tailwater (Chapter 5). The sixth is the wetlands, the Najafgarh jheel, which receives the Sahibi and the Gurugram drains, and the Ramsar sites of Sultanpur and Bhindawas, which are wetlands under Clause 7.12. Clauses 7.7 and 7.8 apply to any of these whose storage is counted; any bandh pondage or lake whose storage is to be counted is subject to Clause 7.7.1 in full, with the I&WRD, GMDA, the Municipal Corporation, the Gram Panchayat or other custodian, and the custodian of each bandh and lake shall be confirmed for the inventory (Annex 7A), because it was not established for this Manual.

7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:

  • (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
  • (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
  • (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
  • (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
  • (e) Custodian concurrence. I&WRD, or the other custodian, concurs in writing.

Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).

7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including the catchment of each johad and the flow paths that feed it, the johad with its FTL and its overflow to the village nala or an I&WRD drain, and, where that drain carries the overflow on to a regulated outfall such as the Dhansa regulator of Outfall Drain No. 8 and the Najafgarh drain, the drain and the outfall, with the drain's design water level as the tailwater of the johad's overflow (Chapter 5), as shown in Figure 7.3.

7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.

7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:

  • (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
  • (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than I&WRD's freeboard standard for the tank.

Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.

7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.

7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:

  • (a) routes the cascade under Clause 7.7.2;
  • (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
  • (c) checks the bund under Clause 7.14.

Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.

The FTL starting level follows Clause 3.12.5. Haryana's johads and depressions are fullest, and its water table highest, when its worst storms come. In the waterlogged belt the area with the water table within 3 m of the ground grew from about 2.93 lakh ha in June 2023 to about 3.79 lakh ha in October (Haryana Water Resources Atlas, 2025), so that at the end of the monsoon a johad there can be full, with its bed in the groundwater and the fields around it wet; the State's largest recorded daily falls came in that season, 484.1 mm at Rohtak on 19 September 1933 and 398.8 mm at Palwal on 9 September 1875 (IMD). The I&WRD drains that take the overflow run full at the same time: Outfall Drain No. 8, built for 4,000 cusecs, carried 5,000 cusecs at the Dhansa regulator in the monsoon of 2022 (I&WRD, report to the Tribunal), and Gurugram's Leg drains outfall to the Najafgarh drain, whose level in a wet spell is their tailwater (Chapter 5). Many village johads are also fed by sullage, and the Pond Authority's annual plans give priority to polluted and overflowing ponds (statement to the Tribunal, 2024): a johad fed in this way can stand at or near FTL in every season. No record of how long Haryana's johads and pondages stay at or above FTL in a wet spell was obtained for this Manual. An empty johad at the start of the season is not a design assumption: in a wet spell it fills, and while it is full it stores nothing more below FTL, its feeder nalas discharge against a high level, and its overflow joins a drain that is already running full. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.

A village johad with an I&WRD drain in the waterlogged belt: catchment, sullage interception, overflow, drain to a regulated outfall, shallow saline water table A village johad with an I&WRD drain in the waterlogged belt (schematic, not to scale) A. Plan: the catchment and its flow paths, sullage intercepted, the johad and its overflow, the drain to a regulated outfall johad (water at FTL) village (abadi) interceptor catchment boundary: the Pond Act's peripheral catchment, delineated under Chapter 3 (Form 7-1) flow path ≥ 8 ha: Zone 1 setback on both banks; kept open sullage (nali) dry-weather flow intercepted (Cl. 8.9.5) grey-water treatment storm flow passes on development: runoff not retained, treated, back to its flow path green belt (Pond Act, s. 2(k)) and setback (Zone 1) monsoon water line waste weir at FTL village nala I&WRD drain its design water level is the tailwater of the johad's overflow (Chapter 5) waterlogged belt: water table within 3 m after the monsoon; saline (sub-area HR-D) regulator to a regulated outfall of the Dhansa and Najafgarh drain kind B. Section along the flow path: catchment, green belt, johad with FTL and MWL, bund and waste weir, fields, I&WRD drain MWL (1% AEP routed): foreshore below it is flood storage johad, at FTL FTL bund (bandh) waste weir crest = FTL drain sullage: interceptor (Cl. 8.9.5) to treatment post-monsoon water table, within 3 m of the ground and saline: it meets the johad's bed and the low fields. No recharge or infiltration credit (Clause 8.8.1, class (ii)); storage, detention and drainage govern. drain design water level (I&WRD, with its consent): the tailwater of the overflow low fields: ponding and salt at the surface Zone 1 (≥ 15 m) boundary: largest of Revenue boundary, FTL and monsoon water line catchment boundary flow path, overflow sullage johad at FTL green belt, setback waterlogged belt bund The catchment and flow-path rules, the monsoon water line and the 15 m minimum are this Manual's proposals, offered as a method for the catchment the Pond Act protects; not adopted by the Pond Authority. Its permissions, s. 45 limits and wetland boundaries govern where wider.

Figure 7.3 — A village johad with an I&WRD drain in the waterlogged belt (schematic, not to scale; no particular johad is shown). A: in plan, the johad's catchment drains along its flow paths and feeder inlets to the johad, which is a "pond" with its green belt and peripheral catchment under the Pond Act (s. 2(k)) where it is recorded and of 0.5 acre or more; the village's sullage is intercepted ahead of the johad (Clause 8.9.5) and treated before it reaches the water; the johad spills at its FTL over its waste weir to the village nala, which joins an I&WRD drain that runs to a regulated outfall of the kind of the Dhansa regulator and the Najafgarh drain. The catchment, the flow paths, the johad and its overflow are one waterbody system for this Manual (definitions after Clause 7.2): a development in the catchment keeps its flow paths open, with the setback of Clause 7.4 on every path draining 8 ha or more, and sends the runoff it does not retain on site, after treatment (Chapter 8), down the path it used before. B: in section, the johad holds water up to its FTL and its foreshore up to MWL is its flood storage; its overflow discharges against the design water level of the I&WRD drain, which sets its tailwater (Chapter 5); the post-monsoon water table, within 3 m of the ground and saline, meets the johad's bed and the low fields, so that no recharge or infiltration is credited (Clause 8.8.1, class (ii)) and storage, detention and drainage carry the design. The catchment and flow-path rules, the monsoon water line and the 15 m minimum are this Manual's proposals, offered as a technical method for the catchment that the Pond Act protects and not adopted by the Pond Authority; the Authority's permission and approval, a protected area notified under section 16, a section 45 limit or a notified wetland boundary governs where it says more. Original drawing for this Manual.


7.8 Operating rules and pre-monsoon flood cushion

7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:

  • (a) the levels and dates for filling, holding and drawdown through the year;
  • (b) the sluice and regulator settings at each level;
  • (c) who operates the sluices and regulators, and who may order a release;
  • (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
  • (e) the forecast and warning triggers (IMD district warnings, HSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
  • (f) communication with downstream ULBs and residents before any release; and
  • (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.

7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:

  • (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
  • (b) the operating rule fixes the cushion level and the dates it applies;
  • (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
  • (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
  • (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).

7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.

7.8.4 Coordination. For tanks under I&WRD control, the operating rule shall be I&WRD's rule. This Manual does not authorise any other body to operate a I&WRD tank.

Commentary. No operating rule for a Haryana johad, bandh pondage or lake that keeps a flood cushion was found, and most johads have no controllable outlet, so Clause 7.8.3 applies to them. The controlled flows that matter in the State are those of the I&WRD's barrages and regulators: the releases of the Hathnikund barrage, which passed a record of about 8.28 lakh cusecs on 18 August 2019 (as reported) and take some 35 to 75 hours to reach Delhi (MoJS committee, 2024); the Dhansa regulator at the end of Outfall Drain No. 8, through which the drain passes to the Najafgarh drain; and the Masani barrage on the Sahibi, whose weir was left without gates when work stopped in 1986 and so cannot be operated at all (I&WRD, 2024). No HSDMA plan for urban flooding was found, and no warning protocol tied to a regulator setting or a pondage release was found. Without an agreed rule with dates, levels, release rates and a named operator, storage in a johad or pondage cannot be relied on, and a release made without warning to the colonies and fields downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July or August monsoon burst. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.

Many johads have other users. A village johad on shamlat land is kept for the common purposes of the village, a use the courts have protected (Jagpal Singh v. State of Punjab, Supreme Court, 2011, as reported), and the Pond Authority restores ponds for the water-stressed villages first (statement to the Tribunal, 2024). Drawing a johad down before a storm has a cost to those who use it, which is why Clause 7.8.2(d) requires the custodian to accept it.


7.9 Restoration, desilting and deepening

7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:

  • (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
  • (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
  • (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.

7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.

7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:

  • (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
  • (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
  • (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.

Storage created below the lowest sluice sill shall not be counted as flood storage.

7.9.4 Safe edges. Where the public has access to the waterbody edge:

  • (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
  • (b) no isolated deep pit or vertical cut shall be left in the bed.

7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.

7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Haryana State Pollution Control Board (HSPCB) directs.

7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.

7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 15 June each year (Chapter 10).

Commentary. The State's own deadline for flood-control works and drain cleaning has usually been 30 June, set at the meetings of the Haryana State Drought Relief and Flood Control Board and by the Chief Secretary's orders to the Deputy Commissioners, with one directive of 15 June (all as reported); no order of the Urban Local Bodies Department, GMDA or HSVP fixing a date for the desilting of drains or ponds was found. The date of 15 June in this Manual is set by this Manual: it comes before the monsoon's normal onset in the State, from about 27 June at Sonipat and 28 June at Ambala to about 3 July at Hisar (IMD, new normal dates, 2020), whereas 30 June comes after it in the north and east. Village johads are de-watered and de-silted by the Gram Panchayats from their own funds, under an order of the Development and Panchayats Department of 24 June 2023 (Pond Authority, statement to the Tribunal, 2024), and johads are also renewed under the Amrit Sarovar mission, under which 1,627 were reported completed in Haryana, though an Assembly reply gives smaller numbers (as reported; the figures conflict). No published measure of their effect on storage or recharge was found. Excavation to "increase capacity" is governed by Clause 7.9.3, and in the waterlogged belt deepening that cuts into the groundwater gives no storage at all. The 15 June deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Haryana precedent.


7.10 Supply channels, surplus courses, inlets and outlets

7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.

7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.

7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:

  • (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
  • (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
  • (c) keep the channel bed level and grade; and
  • (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.

7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.

7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.

7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:

  • (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
  • (b) be located and aligned so that it does not cut through or weaken a tank bund;
  • (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
  • (d) not carry sewage or dry-weather flow (Chapter 8).

Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Haryana the drains of the streets vest in the Municipal Corporations, the drainage works and rivers lie with the I&WRD, and the master drains of Gurugram with GMDA, but the split between them has not been written down. The Haryana Municipal Corporation Act, 1994 vests in the Corporation "All public drains, all drains in, along side or under any public street, and all sewage disposal works" (s. 193(1)), puts their maintenance and the construction of new drains on the Commissioner (s. 194(2)), and bars any building, wall, fence or other structure on a municipal drain without the Commissioner's written permission (s. 206). The Haryana Canal and Drainage Act, 1974 covers the I&WRD's drainage works, "escape channels from canals, dams, weirs, embankments, sluices, groins and other works for the protection of lands from flood or from erosion", but not "works for the removal of sewage from towns" (s. 2(7)), and makes any river, stream or drainage channel notified under section 45 a drainage work. The GMDA Act, 2017 gives GMDA the drainage "which connects two or more sectors, municipal colonies or villages", leaving that within a sector, colony or abadi deh to the local body or licensee (as read from the Bill); the sector drains of an HSVP Urban Estate are external development works of HSVP, and the drains within a licensed colony internal development works of the colonizer, until they are handed over (Haryana Development and Regulation of Urban Areas Act, 1975, s. 2, as quoted by DTCP). No rule or order dividing the I&WRD's drains from the drains of the Municipal Corporations, HSVP or GMDA was found for this Manual. This Manual's working assignment, not a statement of law, is: rural and regional drains, Outfall Drain No. 8, the Haryana reach of the Najafgarh drain, rivers and embankments with the I&WRD; the Gurugram master drains (Legs I to IV) and the drains along the master and sector-dividing roads with GMDA; sector drains with HSVP until transfer; drains in licensed colonies with the colonizer until taken over; street and public drains in a Corporation with the Corporation; the drains of industrial estates with HSIIDC; and village ponds with the Gram Panchayat or Municipality as owner and the Pond Authority as regulator. Gurugram shows what is lost when the natural channels are treated as spare land: the High Court found in 2026 that "the channels that sustained these water bodies remain largely blocked"; DTCP's drawing of 2012 marks the Badshahpur drain across Khandsa village as "upgraded for enhanced capacity (work in progress)" and other reaches as "Katcha drain running" on land being made available; and a narrow reach is reported to cut the drain's capacity from 2,200 to 700 cusecs (as reported). The only existing rule on channel width is the Haryana Building Code's condition, for buildings of 5,000 to 20,000 m² built-up area, that the inlet and outlet of the natural drain system be kept "with adequate size of channel for ensuring unrestricted flow of water" (Code 12.1), with no width or design flow; Clauses 7.10.2 and 7.10.3 give it both. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.


7.11 Fee-in-lieu and regional tank storage

7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.

7.11.2 Tank storage funded by fee-in-lieu shall:

  • (a) meet Clause 7.7.1 in full before it is counted;
  • (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
  • (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
  • (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.

7.11.3 Fee-in-lieu does not replace:

  • (a) the retention requirement of Chapter 4, which is always met on site; or
  • (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.

Commentary. Chapter 4 provides for fee-in-lieu toward restored johad or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Haryana no shared form of storage is required by the building code: the rainwater harvesting of the Haryana Building Code 2017 is plot-level (Code 8.1), the large-project conditions ask for recharge bores and unpaved open space (Code 12.1), and the Code has no detention, peak-flow or "zero runoff" rule. The nearest existing forms of shared storage are the johads restored by the Pond Authority and renewed under the Amrit Sarovar mission, the old bandh pondages of Gurugram, the revival of the 18-acre Wazirabad lake at Gurugram in 2022 (as reported), and the proposals of HUDA's catchment plan for the Badshahpur drain for "creation of check dam in Non-urbanizable area" and recharge wells along the drain (2017, revised 2020); the State's sub-regional plan for the NCR asks for "retention of rain water where it is received … by ponding, retardation dams" as policy. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.


7.12 Wetlands, marshes and estuaries

7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:

  • (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Haryana State Wetland Authority;
  • (b) the two Ramsar sites of Haryana (Sultanpur National Park and Bhindawas Wildlife Sanctuary, both designated on 25 May 2021), each to its boundary as designated, any wetland notified under the 2017 Rules, and the wetlands of the national atlas that the State is ground-truthing, until each is found not to be a wetland;
  • (c) the Haryana side of the Najafgarh jheel and the depression of the Sahibi, the bandh pondages such as that of the Ghata bandh, the lakes of Badkhal, Surajkund and Damdama, and the marshy low land (dabar) and depressions of the floodplains (khadar) of the Yamuna and the Ghaggar, within the 1% AEP extent of Clause 7.3.4 or any limit notified under section 45 of the Haryana Canal and Drainage Act, 1974, whichever is larger (the river channel itself is a waterbody under the rest of this chapter); and
  • (d) any other marsh, wetland, jhil or johad that the Authority notifies, that the wetland authority lists, or that a court or the National Green Tribunal directs to be protected.

7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.

7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:

  • (a) meet Clause 7.10.6;
  • (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
  • (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.

7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:

  • (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
  • (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.

7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.

7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:

  • (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
  • (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
  • (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.

7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.

Commentary. Haryana's wetlands are the concern of the Haryana State Wetland Authority (the Wetland Authority of Haryana, reconstituted by the Environment and Climate Change Department on 12 May 2020), chaired by the Chief Minister, with the Secretaries of the Urban Local Bodies and Irrigation Departments among its members and the Director of Environment as Member Secretary. No wetland notified by it under the Wetlands (Conservation and Management) Rules, 2017 was confirmed for this Manual. The State has two Ramsar sites, both designated on 25 May 2021: Sultanpur National Park in Gurugram district, of 143 ha, and Bhindawas Wildlife Sanctuary in Jhajjar district, of 412 ha (Rajya Sabha reply, 13 February 2025; the Ramsar Information Sheets were not read). The Supreme Court, which is overseeing the ground-truthing and demarcation of the wetlands of the national atlas, named Haryana in August 2025 among the States with the least progress (M.K. Balakrishnan v. Union of India, W.P.(C) 230/2001, order of 19 August 2025, as quoted), and in October 2025 the State directed its Deputy Commissioners to verify 1,881 wetlands (as reported); the Union Ministry has said that the wetlands of the national atlas larger than 2.25 ha are protected under rule 4 of the 2017 Rules whether or not they are notified (office memorandum of 8 March 2022, as quoted). The Najafgarh jheel, which lies across the boundary with Delhi and receives the Sahibi and the Gurugram drains, is reported to have been accepted by Haryana as a water body in 2017 but never notified, and in March 2024 the State sought six weeks to designate it a transboundary wetland; most of it is reported to be privately owned (as reported). The National Green Tribunal directed in January 2022 that, until an integrated plan is made, the environment management plans of Haryana and Delhi be enforced and the 2017 Rules "be strictly followed", that the jheel's water be "at least Class 'C'", and that its outlet "should remain free from sewage" (O.A. 153/2014, as quoted by the Wetland Authority). A drain outfall, desilting, diversion or regulator operation in or near a Ramsar site, a notified wetland or the Najafgarh jheel therefore needs the Wetland Authority's permission where the notification or the Rules regulate it, and compliance with the Tribunal's directions, as well as compliance with this chapter; for the johads, jhils and depressions that are not notified, this chapter, the Pond Act and the revenue and municipal law are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Haryana's johads, drains and wetlands through the storm drains (Clause 8.9, Commentary). Gurugram's Legs I to III carried about 138 MLD of untreated sewage to the Najafgarh drain in 2020, of which 51.30 MLD had still to be diverted or treated (GMDA), and a proposed 400 MLD treatment wetland near Najafgarh for Leg III was "not considered being not financially viable" (GMDA, action taken report, 2021); to keep treated water out of the drain, the State raised the capacity of the channel taking Gurugram's treated sewage to Jhajjar for irrigation from 188 to 550 MLD (Wetland Authority, report to the Tribunal, 2022). In the villages, a joint committee of the Tribunal found "discharge of untreated effluent in the water bodies" at Kharkhara in Rewari district (O.A. 573/2023), and the Pond Act forbids the discharge of untreated municipal waste into a pond (s. 14(iii)). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Haryana they apply in full to every new outfall, and every existing outfall to a johad, lake, wetland, river or I&WRD drain that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed.


7.13 Encroachment interfaces

7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.

7.13.2 No reliance on encroached land. No design shall:

  • (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
  • (b) treat the encroached width of a channel as its design width.

7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:

  • (a) it shall be designed for the full waterbody width (Clause 7.13.1);
  • (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
  • (c) the work shall be built so that the full width can be restored later without rebuilding it.

7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:

  • (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
  • (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.

7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.

Commentary. Haryana's main controls on filling and building in johads, drains and their catchments are the Pond Act, the drainage and municipal law and the courts. The Pond Act forbids building on pond land, green belt and catchment area, and obstructing the inflow or outflow, without permission (s. 14), lets the Authority direct the Gram Panchayat or Municipality to remove any building or obstruction within a protected area and pond land (s. 15(2)), and punishes a contravention with a fine of up to ₹25,000 or imprisonment of up to three months, or both (s. 20). Within a section 45 reach, the Divisional Canal Officer may order an obstruction removed, remove it himself and recover the cost as arrears of land revenue (Haryana Canal and Drainage Act, 1974, s. 46), and in a Municipal Corporation the Commissioner may remove a structure built on a municipal drain (Haryana Municipal Corporation Act, 1994, s. 206(2)). Village ponds on shamlat land are commons: the Supreme Court refused to interfere with a High Court order that a village pond be used for the common purposes of the villagers (Jagpal Singh v. State of Punjab, 2011, as reported), and the High Court has ordered filled common ponds in Haryana restored under the Punjab Village Common Lands (Regulation) Act, 1961 (as reported). The National Green Tribunal directed in 2018 that unique IDs be given to, and restoration made of, at least 123 water bodies in Gurugram, and the exercise repeated across the State (O.A. 325/2015, order of 20 July 2018); MCG has pursued litigation over the common land of the Ghata bandh (GMDA, report to the Tribunal). In the Aravalli districts, the Supreme Court held in 2018 that land notified under the Punjab Land Preservation Act, 1900 is "forest" and ordered constructions in Kant Enclave at Faridabad made after 18 August 1992 demolished (M.C. Mehta v. Union of India (Kant Enclave), 11 September 2018, as reported; the judgment was not read). A complaint before the Tribunal in 2025 concerns a pond in Sector 7, Ambala City, "recorded as a Jhord (water-holding area) in the revenue records", said to be being filled (O.A. 351/2025, CPCB reply). This Manual treats a recorded johad, with its catchment and flow paths, as drainage infrastructure (definitions after Clause 7.2), and land recorded as a johad, talab or jhord as a waterbody under Clause 7.3 whatever its present state. The Pond Authority's rules, if any, the Punjab Village Common Lands (Regulation) Act, 1961, the Punjab Land Preservation Act, 1900 and the encroachment provisions of the development authority Acts were not read for this Manual. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.


7.14 Safety of tank bunds and embankments

7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:

  • (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
  • (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.

Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.

7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:

  • High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
  • Low hazard: any other case.

7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:

  • (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
  • (b) a breach analysis shall map the area flooded by a breach at MWL;
  • (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
  • (d) the design shall be certified and independently checked under Clause 10.6.

7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 15 June) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.

7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.

Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The bunds of most johads are low and are not expected to make them specified dams, but each shall be screened under Clause 7.14.1. The old bandhs of Gurugram are higher: the Ghata bandh is about 1.25 km long and about 5 m high (GMDA), and the heights of the Chakarpur, Jharsa and Wazirabad bandhs were not found; each shall be screened. The I&WRD's barrages, such as Hathnikund and Masani, are not tanks under this chapter (Clause 7.7, scope note). Where the storage of a johad, bandh pondage or lake is counted under Clause 7.7, its bund or bandh is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Haryana the embankments that matter to the towns are the I&WRD's river embankments and the bunds of its drains, and the old bandhs of Gurugram that now stand among buildings. In July 2023 the Ghaggar breached its embankments: a major breach at Ambala was plugged with the help of the Army, and the Municipal Corporation pumped the flooded parts of the city (Vidhan Sabha reply, September 2023); in Fatehabad the Chandpura embankment and the Rangoi nullah breached and some 50 to 80 villages were flooded (reports differ), and breaches were also reported in Kaithal and Sirsa districts (as reported). No breach map or emergency action plan for a johad bund, a bandh or a drain embankment was found. A failed or overtopped bund floods the colonies and fields below it, and an unannounced release floods them too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.


7.15 Submittal requirements

Every drainage report for a development or work under Clause 7.1.2 shall include:

  1. the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
  2. the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
  3. the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
  4. for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
  5. for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
  6. for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
  7. for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.

7.16 Review and update

7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.

7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.


References (chapter)

Annexes and forms

Annex / Form Content
7A Statewide waterbody GIS layer and inventory fields
7B Fixed-width setback table (alternative S-3, with Annex 1C)
7C Template tank operating rule, with flood cushion
7D Desilting and restoration specification
7E Glossary of Hindi and Urdu waterbody terms and regional variants
Form 7-1 Waterbody Sheet
Form 7-2 Tank Storage Credit Sheet
Form 7-3 Compensatory Storage Calculation (by elevation band)