Draft v1.0 prepared by NEER. Not adopted by the Government of Haryana or any authority or local body, and has no legal force. About this draft

Chapter 5Downstream and Tailwater Analysis


5.1 Purpose and scope

5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.

  • The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
  • The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.

5.1.2 This chapter applies to:

  • (a) every site to which Chapter 4 applies;
  • (b) every minor- and major-system drainage project under Chapter 6; and
  • (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.

5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.

5.1.4 No tidal outfalls in Haryana. Haryana is landlocked: it has no coast, no tide and no Coastal Regulation Zone. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Haryana: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Haryana the receiving water is one of three kinds: a drain of I&WRD, such as Outfall Drain No. 8, or a master drain of GMDA, FMDA or a Municipal Corporation that leads to one, many of which end in the Najafgarh drain, which runs on into Delhi; a river, the Yamuna, the Ghaggar and its tributaries and choes, or the Sahibi, reached directly, through a gate in an embankment or bund, or through a pumping station, whose level is often set by the releases of the Hathnikund barrage or of the dams and weirs upstream; or a johad, a bund or a depression, which may have no outlet at all, as in parts of the dry south-west, or may be emptied only by pumping, as in the Rohtak–Jhajjar–Sonipat waterlogged belt, and:

  • (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
  • (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall;
  • (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a river, a receiving drain, a johad or a pumped sump, with the river lock of Clause 5.8.5(b), the drain lock of Clause 5.8.5(a) and the closures of Clause 5.8.5(e) and (f) in place of the tidal lock windows; and
  • (d) where there is no defined outfall, Clause 5.8.5(d) applies: the outfall is treated as closed for the whole storm and after it (Clause 5.9.4), and the downstream analysis ends at the storage or at the depression that receives it.

Commentary. The drains of Haryana's cities fail in places that site design does not see, and in three different ways. The first is the receiving drain. Gurugram's three master drains, Leg-I, Leg-II and Leg-III (the Badshahpur drain), outfall into the Najafgarh drain (GMDA, 2020); Outfall Drain No. 8, which takes the Sahibi and the drains of the Rohtak–Jhajjar belt, ends at the Dhansa regulator and falls into the Najafgarh drain in Delhi, and it carried a peak of 5,000 cusec at Dhansa in the monsoon of 2022 against a capacity of 4,000 cusec (I&WRD, report to the NGT, 2024). The capacity of Leg-III is reported anywhere from 500 to 3,800 cusec (as reported), and no design return period is stated for any of these drains. The second is the river. The Yamuna at the Hathnikund barrage passed a reported 8.28 lakh cusec on 18 August 2019 (as reported), and its releases take 35 to 75 hours to reach Delhi past the towns of the State (MoJS committee, 2024). The Ghaggar, the Markanda and the Tangri come down from the Shivaliks, and in July 2023 the Ghaggar's bunds breached at Ambala, in Kaithal, in Fatehabad and in Sirsa (Haryana Vidhan Sabha, 2023; as reported); CWC has no flood gauge in the Ghaggar basin, so the only levels are those of the State's gauges, read in the press. The third is the land with nowhere to drain to. In the dry south-west a johad or a low patch of ground may be the end of the drainage, and in the Rohtak–Jhajjar–Sonipat belt the water table stands within 3 m of the surface over about half of Rohtak district and 43% of Jhajjar (HWRA, 2025), so the land drains only by pumping to the I&WRD drains. The outfalls also belong to one body while the drains above them belong to others: the rivers, embankments and drainage works are held by I&WRD, the master drains by GMDA or FMDA, the sector drains by HSVP, the street drains by the Municipal Corporations and the ponds by the Gram Panchayats and local bodies, and no rule divides them (Chapter 6, Clause 6.9). A detention basin that meets every release rate in Chapter 4 still fails if the drain below it is already full, if the river it drains to stands above its outfall for days, or if there is nowhere for the water to go. This chapter makes all three failure modes part of the design. Haryana has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.


5.2 Definitions

Term Meaning in this Manual
Analysis point A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3).
Contributing catchment The whole area draining to an analysis point, on and off site.
Major drain A channel listed as a major drain in the basin plan or Annex 5B, or any river, I&WRD canal, Outfall Drain No. 8 and the Najafgarh drain into which it falls at the Dhansa regulator, the Leg-I, Leg-II and Leg-III (Badshahpur) master drains and Leg-IV of Gurugram, the Budhiya (Buria) nala of Faridabad, the Gaunchi drain of Faridabad and Palwal, Drain No. 2 of Panipat, any drain of I&WRD, any drain maintained by GMDA, FMDA, PMDA, HSVP, HSIIDC, a Municipal Corporation, a Municipal Council or a Municipal Committee, or a licensed colonizer, with an internal width of 1.0 m or more, any irrigation canal that receives storm water, or a tidal creek.
Chart datum (CD) The datum of the published tide tables and nautical charts, to which tidal heights are referred.
Mean sea level (MSL) Average sea level over a long period at a tide gauge.
MHWS Mean high water springs: the average of high waters at spring tides.
HAT Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years).
Storm surge The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones.
Still-water level Astronomical tide plus surge, excluding individual waves.
Sea-level allowance (SLA) The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4).
Tailwater The water level at the downstream end of a drain, outlet or storage.
Tide-lock The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge.
Lock window A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero.
Sand bar A bar of beach sand that partly or fully closes a river mouth or creek inlet.
Project datum The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2).

5.3 Extent of the downstream analysis

5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:

  • (a) the point at which the project area is 10% or less of the contributing catchment;
  • (b) the next tank, johad or other waterbody with a surplus weir or controlled outlet; or
  • (c) the next major drain, or the sea.

The end point itself shall be analysed (Figure 5.1).

5.3.2 Where the analysis ends at a tank or johad under 5.3.1(b), it shall report:

  • the change in the tank's maximum water level; and
  • the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.

If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.

5.3.3 Analysis points shall be set at least at:

  • (a) each site outfall;
  • (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
  • (c) each culvert, bridge or road crossing;
  • (d) each location recorded as flood-prone by the local body, MCG, HSDMA or I&WRD; and
  • (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.

5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:

  • the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
  • no flood-prone location is recorded within 500 m downstream; and
  • the site does not drain to a tidal or backwater-affected outfall.

Figure 5.1 — Extent of downstream analysis (10% rule or next tank / major drain) Plan sketch of a catchment showing a development site, downstream analysis points A to D along the receiving drain, the contributing area at each point, the point where the site is 10% of the contributing area, and a tank that ends the analysis if reached first. Not to scale. Extent of downstream analysis — plan, not to scale (Clause 5.3) Major drain / river Tank (surplus weir) Development site A B C D A Site outfall site = 100% of contributing area B Confluence site ≈ 30% → continue C Site ≤ 10% of contributing area → analysis may end here (Clause 5.3.1 a) D Next tank or major drain → ends analysis if reached before C Contributing area at C Contributing area at B Development site At every analysis point (A, B, C …), pre- vs post-development, all storage durations: capacity of channel, pipe and culvert · 1% AEP water level at buildings and roads · velocity · timing of combined peaks · tailwater at the end point (Clause 5.6). Percentages are illustrative.

Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next johad or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).

Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Haryana. In Gurugram, where the city's drains fall about 78 m from the Aravalli ridge to the Najafgarh drain (MoHUA reply in the Lok Sabha, 2025, as reported) through the Leg-I, Leg-II and Leg-III (Badshahpur) master drains, reported as about 12, 16 and 26 km long (as reported), with the Ghata and other bunds across them, and in the Rohtak–Jhajjar belt and the Sahibi basin, where the drains join Outfall Drain No. 8, which runs to the Dhansa regulator at its RD 42.59 km before it falls into the Najafgarh drain in Delhi (I&WRD, 2024), the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.


5.4 What the analysis must check

5.4.1 Scenarios. Each analysis shall compare:

  • (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
  • (b) With project: the same, with the project and all its controls (Chapter 4) in place.

Where the Authority's basin plan defines future land use, the Authority may also require:

  • (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.

5.4.2 Quantities to be checked at every analysis point:

  • (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
  • (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
  • (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
  • (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
  • (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.

5.4.3 Storms. The analysis shall use:

  • 50%, 10% and 1% AEP;
  • the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
  • the 24-, 48- and 72-hour storms in every case.

The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.

5.4.4 Method. The analysis shall:

  • use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
  • include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
  • not use the Rational Method at any analysis point, because it cannot represent timing.

Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.

5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.

Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the river towns and the waterlogged belt of Haryana: in September 2025 the flow at the Hathnikund barrage stayed above 1 lakh cusec for about 129 hours (SANDRP, from CWC data); in July 2023 six breaches of the Ghaggar bund and the Hansi–Butana canal in Kaithal district were still open on 18 July, six days after the river passed 82,400 cusec there (as reported); and in the Rohtak–Jhajjar belt, where the water table stands within 3 m of the surface over about half of Rohtak district and 43% of Jhajjar (HWRA, 2025), the low ground drains only by pumping to the drains of I&WRD. Detention that prolongs releases can lengthen that time even when it lowers the peak.


5.5 Acceptance criteria

5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":

  • (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
  • (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
  • (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
  • (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
  • (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.

5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.

5.5.3 Where the criteria are not met, the project shall do one or more of the following:

  • (a) reduce release rates or increase storage (Chapter 4);
  • (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
  • (c) contribute to a regional facility under Clause 4.13; or
  • (d) under Clause 5.5.4, change the release strategy.

5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:

  • (a) the varied strategy meets 5.5.1;
  • (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
  • (c) the outfall-closed check (Clause 5.10) is met.

Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.


5.6 Tailwater: general and non-tidal outfalls

5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.

5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:

  • for a receiving pipe, its obvert; or
  • for a receiving open drain, its full-bank level less freeboard (Chapter 6).

5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.

5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.

5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.


5.7 Tidal tailwater: datums, surge and sea-level allowance

5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:

Table 5.1 — Design tailwater levels for tidal outfalls

Design case Tailwater
Minor-system design (Chapter 6) MHWS + SLA
Major-system design and storage design HAT + surge + SLA, with the surge term defined in Clause 5.7.3
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA

The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.

5.7.2 Sources and datums.

  • (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
  • (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
  • (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Haryana, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
  • (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.

5.7.3 Storm surge.

  • (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
  • (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
  • (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
  • (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.

5.7.4 Sea-level allowance. The SLA shall be:

  • (a) +0.3 m minimum for every element;
  • (b) greater than 0.3 m where the State, GMDA or the Authority adopts a higher projection for the planning area; and
  • (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.

Figure 5.2 — Tidal outfall section with flap gate and design tailwater levels Schematic section through a drain discharging to a tidal creek or river mouth. It shows the headwall, flap gate and non-return valve, the drain stage, and the design tailwater levels: mean sea level, MHWS, MHWS plus sea-level allowance (minor system), HAT, HAT plus surge, and HAT plus surge plus sea-level allowance (major system), with a seasonal sand bar at the mouth. Not to scale. Tidal outfall — schematic section, not to scale (Clauses 5.6–5.13) Seasonal sand bar (Clause 5.13) Drain stage upstream of gate Open drain / storage (outfall-closed check, Clause 5.10) Flap / tide gate (Clause 5.11) Floor ≥ 1% AEP level + 0.5 m (Ch 6) Property connection with non-return valve Mean sea level MHWS MHWS + 0.3 m: minor-system tailwater HAT HAT + surge HAT + surge + 0.3 m: major-system tailwater +0.3 m sea-level allowance (minimum) +0.3 m Notes Levels are diagrammatic. Datums from the current NHO / Survey of India tide tables, reduced to the project datum (Clause 5.7). Joint case (Clause 2.12 b): 10-yr 48 h storm with the 1% AEP still-water level + 0.3 m. Riverine reaches: see Clause 5.8. Outfall invert below the 1% still-water level → flap or tide gate required; property connections need non-return valves.

Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.

Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:

  • MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
  • MHWS to HAT for a major storm; and
  • "Effect of climate change: additional 0.3 m".

CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Haryana has no coast, and the surge term does not arise in the State.

Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Haryana, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).


5.8 Riverine backwater

5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:

  • the Yamuna from the Hathnikund barrage past Yamunanagar, Karnal, Panipat and Sonipat to the boundary with Delhi, and below Delhi along Faridabad and Palwal, with the releases of Hathnikund, and the drains that lead to it, among them the Budhiya (Buria) nala of Faridabad, the Gaunchi drain of Faridabad and Palwal and Drain No. 2 of Panipat (Clauses 5.8.3 and 5.8.5(b) and (c));
  • the Somb and the Maskara in Yamunanagar district (Clause 5.8.5(b));
  • the Ghaggar at Panchkula, including the floodplain zone notified there under section 45 of the Haryana Canal and Drainage Act 1974, with the Kaushalya dam above it, and on through Ambala, Kaithal, Fatehabad and Sirsa to the Ottu weir, with its tributaries and choes, the Tangri at Ambala and the Markanda at Shahabad, for which no CWC gauge level exists (Clauses 5.8.3 and 5.8.5(b));
  • the Sahibi at the Masani barrage in Rewari and at Dadri in Jhajjar district (Clauses 5.8.3 and 5.8.5(b));
  • Outfall Drain No. 8 to the Dhansa regulator and the Najafgarh drain beyond it, the Leg-I, Leg-II and Leg-III (Badshahpur) master drains of Gurugram, which outfall to the Najafgarh drain, and Leg-IV, and the other drains of I&WRD (Clause 5.8.5(a));
  • the pumped drains of Rohtak, Jhajjar, Bahadurgarh and the other towns of the Rohtak–Jhajjar–Sonipat waterlogged belt, and the johads, bunds and lakes that receive storm water, among them the Ghata bundh in Gurugram, Damdama lake near Sohna, Badkhal and Surajkund at Faridabad, and the Najafgarh jheel (Clause 5.8.5(e) and (f));
  • the Western Yamuna Canal and its branches, the Agra canal, and any other irrigation canal or channel of I&WRD that receives storm water (Clause 5.8.5(g)); and
  • elsewhere: any river or I&WRD channel listed in Annex 5B.

5.8.2 River levels. River water levels shall be taken from:

  • (a) I&WRD design flood levels or recorded highest flood levels for the reach, where published; or
  • (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
    • the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
    • the tidal boundary of Clause 5.7 at the mouth; and
    • the sand-bar condition of Clause 5.13.

5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Hathnikund barrage on the Yamuna, whose releases take about 35–75 hours to pass the State's towns on their way to Delhi, the Kaushalya dam at Pinjore on a tributary of the Ghaggar, the Ottu weir on the Ghaggar in Sirsa, and the ungated Masani barrage on the Sahibi), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.

5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:

  • (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
  • (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).

The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.

5.8.5 I&WRD drains and the Najafgarh drain, river-locked outfalls, the Yamuna below the Hathnikund barrage, catchments with no outfall, pumped outfalls in the waterlogged belt, johads, bunds and lakes, and discharges to I&WRD channels and canals.

  • (a) I&WRD drains and the Najafgarh drain. For an outfall to a drain of I&WRD, such as Outfall Drain No. 8, to a master drain of GMDA, FMDA, PMDA or a Municipal Corporation that leads to one, such as Legs I to IV and the Badshahpur drain of Gurugram or the Budhiya (Buria) nala of Faridabad, or to a drain that ends in any of them:
    • Consent. Storm water shall not be discharged to a drain of I&WRD without the written consent of I&WRD, or to another body's drain without the written consent of that body; the procedure for I&WRD's consent was not found during research [TBC]. The discharge shall not exceed the rate the consent allows.
    • Design water level. The tailwater is the higher of the drain's design water level as I&WRD or the owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives, including the drains of other bodies, with its downstream boundary at the level of the drain, river or regulator it ends in. Until a design water level is published for a drain, the computed level governs [TBC].
    • Present condition and capacity. The drain shall be taken in its present condition, net of silt, encroachment, solid waste and obstruction by crossing services and culverts, and with its narrowest section as surveyed, such as the reaches of the Badshahpur drain at Khandsa and Hero Honda Chowk. Where the owner's records give different capacities for the same reach, the lowest applies until the owner confirms the capacity in writing (set by this Manual): the capacity of Leg-III is reported as 3,702 cusec (DTCP drawing, 2012) and 3,800 cusec (GMDA, as reported), but as 800 cusec at the bottleneck at Khandsa (GMDA, 2021, as reported) and 500 cusec near Hero Honda Chowk (as reported) [TBC]. A widening, lining, remodelling or new drain that has been proposed but not completed, including Leg-IV until it is commissioned and the works of a drainage master plan that are not yet built, shall not be counted.
    • Drain lock. Where the drain is at or above its design water level, or at bank-full, in the coincident case, the outfall-closed check of Clause 5.10 applies with a single lock for as long as the drain stays above the outfall invert, taken from the drain model and not less than 72 hours, covering the whole of the 48- and 72-hour storms of Clause 5.10.2 (set by this Manual). A drain shall not be taken to run below its design water level because its stated capacity has not been reached: Outfall Drain No. 8 carried 5,000 cusec at the Dhansa regulator in 2022 against a capacity of 4,000 cusec (I&WRD, 2024).
    • The Najafgarh drain. For a drain that ends in the Najafgarh drain, directly or through Outfall Drain No. 8 and the Dhansa regulator, the downstream boundary shall be the level of the Najafgarh drain at the junction in the coincident case, computed with the inflow of Outfall Drain No. 8 at the largest recorded flow (5,000 cusec, 2022) or from a hydrograph method for its catchment (Chapter 3), whichever is greater, the Dhansa regulator and any regulator below it as operated in the largest recorded event, and no storage credited in the Najafgarh jheel or any other depression along the drain unless the operator's records show it available at the start of a storm. The level shall be not less than 213.58 m, the highest level recorded at the Dhansa gauge (6 August 1977, CWC site list, as copied by SANDRP; 213.575 m upstream of the Dhansa bund in the records of Delhi's Irrigation and Flood Control Department), transferred to the junction under item (b); at a junction upstream of Dhansa, no outfall shall be designed without a profile (set by this Manual) [TBC]. The Najafgarh drain runs from Dhansa into Delhi, where it is held by the Irrigation and Flood Control Department of the Government of NCT of Delhi (I&FC), and the operator of the Dhansa regulator was not confirmed during research [TBC]. The level at an outfall to it therefore cannot be set by a Haryana body alone: the designer shall obtain it through I&WRD, which shall coordinate it with I&FC, and shall state on Form 5-1 the level used, its source and whether I&FC has confirmed it; until a level is agreed, the computed level of this item, not less than 213.58 m transferred, governs (set by this Manual).
    • Water quality. A drain that reaches the Najafgarh drain is also subject to the condition that the water in it shall not exceed a BOD of 30 mg/l (GMDA, 2020, citing the NGT and CPCB), which is the subject of Clause 8.9, not of this clause.
    • Flap gate. The outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert.
  • (b) River-locked outfalls. For an outfall to a river directly, through a gate or sluice in an embankment or bund, or through a pumping station, or into a drain that itself discharges in one of those ways, the designer shall identify the body that operates each gate, sluice and pumping station, and obtain the sill of each gate, the crest of the embankment or bund, the installed pumping capacity and the operating levels, including the river level at which each gate is closed. Every level shall state its datum and its connection to the gauge datum of the nearest CWC or I&WRD gauge.
    • Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the 1% AEP river level at the outfall: the 100-year level of a flood-frequency study or floodplain delineation that gives a level at the outfall, including the levels I&WRD computed for a floodplain zone notified under section 45 of the Haryana Canal and Drainage Act 1974, or a level from a hydraulic model under Clause 5.8.2(b), with the releases of item (c). In the Ghaggar floodplain zone notified in Panchkula on 27 October 2023, the model shall carry not less than the 100-year flood of 2,933.45 m³/s (103,594 cusec) on which I&WRD based the zone (I&WRD replies to the NGT in OA 421/2022); the levels computed for the zone were not found during research [TBC]. The level shall in no case be less than the highest recorded level at the nearest CWC or I&WRD gauge on the same river, transferred to the outfall. The highest levels found during research (Table 5B.1), from a 2022 copy of the CWC site list and the MoJS committee report of 2024, none read in a CWC site sheet [TBC], are: the Yamuna at Kalanaur 268.66 m (9 September 2010; a gauge on the Uttar Pradesh bank opposite Yamunanagar), at Karnal 250.07 m (17 June 2013; 250.01 m on 19 September 2010 in a CWC document of 2018), at Mawi 232.75 m (18 June 2013; on the Uttar Pradesh bank opposite Panipat), at Palla 212.8 m (8 September 1995; 213.275 m, of 1988, on the gauge's notice board), at Manjhawali 193.96 m (21 August 2019), at Mohna 193.13 m (6 September 1978; now listed by CWC as 192.43 m, 9 September 1995) and at Palwal (Rahimpur) 182.25 m (22 August 2019, since removed from the list); the Somb at Fatehgarh 276.35 m and the Maskara at Ghodopipli 271.25 m (both 18 August 2019); and the Sahibi at Masani 242.58 m (2 September 1978) and at Dadri 214.98 m (26 August 2008). Where two values are reported for the same gauge, or a level has been removed from the list, the higher, or the removed level, applies until CWC confirms the level (set by this Manual). Where a later flood has exceeded the listed level, the later level governs. The recorded level shall be transferred along the river with the water-surface slope of the flood that set it, from the CWC and I&WRD gauge records, or from the model. Until either is available, the recorded level of the nearest gauge upstream applies unchanged at the outfall, except that where the outfall lies between two gauges on the same river, with no tributary joining between them, the level may be interpolated linearly by river distance between the highest recorded levels of the two gauges (set by this Manual).
    • Rivers with no CWC gauge. CWC has no flood gauge in the Ghaggar basin (SANDRP, 2018), so no CWC level exists for the Ghaggar, its choes, the Kaushalya, the Tangri or the Markanda; the gauges at Chandimandir, Guhla, Chandpur, Ottu and the other sites belong to I&WRD or to Punjab, and their levels appear only in the press, in feet on a gauge whose zero was not found, such as a danger mark of 748 ft at Khanauri on the Punjab border, crossed by about 6 ft on 15 July 2023 (as reported). On such a reach, and for an outfall upstream of every gauge on its reach, the river level shall be the higher of the level from a model under Clause 5.8.2(b) and the highest flood level surveyed at the outfall from flood marks, including those of July 2023, and from the records of I&WRD, the local body or the Deputy Commissioner, with its source stated. Where a level is known only as a gauge reading, the designer shall tie the gauge zero to the project datum and a Survey of India benchmark by levelling, with I&WRD's confirmation of the reading. No outfall shall be designed on such a reach without one of these levels (set by this Manual).
    • 10% AEP level. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or a frequency analysis of the gauge record, and not less than the danger level at the nearest gauge, transferred in the same way: 249.5 m at Karnal, 230.85 m at Mawi and 212.44 m at Dhansa (CWC site list, as copied by SANDRP). Where no danger level has been found, as at the other gauges listed above and on the Ghaggar system, the 10% AEP case shall use the design river level of this item until a frequency analysis is accepted (all set by this Manual). The datum of every level is to be confirmed for each gauge [TBC].
    • Tailwater. The tailwater at the outfall shall be the higher of that river level beyond the gate or embankment, and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, sand, encroachment and vegetation, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the gate only while the river is lower than the level behind it. Pumps shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level (Clause 5.12.5).
    • River lock. Portable dewatering pumps brought in for an event, inventory pumps lent for a flood, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the outfall invert, or above the level at which its gate is closed if that is lower, taken from the river model or from the stage record of the nearest CWC or I&WRD gauge in the flood that set the highest recorded level or in a comparable flood, with the releases of item (c), and not less than: 7 days (168 hours) on the Yamuna, on the Sahibi and on the Ghaggar below Guhla (Kaithal, Fatehabad and Sirsa); and 72 hours on the Ghaggar and its choes in Panchkula and Ambala districts, the Tangri, the Markanda, the Somb and the Maskara (set by this Manual). Either lock covers the whole of the 48- and 72-hour storms of Clause 5.10.2, so that storage and pumping handle the full storm volume (Clause 5.9.4) and the drawdown of Clause 5.10.5 is met by pumping until the lock ends. A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where a gauge analysis under Clause 5.10.6, including the releases of the barrage and dams above, shows it and the Authority approves it.
    • Gate failure and breach. Floor levels and pumped outfalls behind a gate, embankment or bund shall also be checked for the failure of the gate and for a breach of the embankment or bund, with the land and drains behind it filled to the river level beyond it.
  • (c) The Yamuna below the Hathnikund barrage, and rivers below dams and weirs. For an outfall to the Yamuna, or to a river below a dam or weir such as the Ghaggar below the Kaushalya dam and the Ottu weir, or the Sahibi below the Masani barrage:
    • in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) shall be run with the river at the level that results from the largest recorded release of the barrage, dam or weir above, routed to the outfall, with the flow of the catchment below it as it occurred in the same event (set by this Manual), until I&WRD publishes an operating rule that bounds the release [TBC]. For the Yamuna the largest reported release at Hathnikund is about 8.28 lakh cusec (about 23,400 m³/s) on 18 August 2019 (as reported, from I&WRD records), above the barrage's design flood of 22,000 m³/s (MoJS committee, 2024); it applies until I&WRD gives the record (set by this Manual);
    • a release, or a release rule, alone shall not be taken to bound the river level: the highest level of the Yamuna at Delhi came on 13 July 2023 from a peak at Hathnikund of 3,59,760 cusec (MoJS committee, 2024), less than half the release of 2019, so the level shall also be checked for the largest recorded event at the nearest gauge, with the local inflows and the downstream conditions as they occurred;
    • the river level shall not be reduced on the ground that the flood comes from rain that falls outside the town or outside the State, or that the site storm is small, and the release shall be placed before, during and after the site storm; the travel time of the release from Hathnikund to the outfall, from the committee's travel times by reach, may be used to place it, but not to lower it; and
    • no barrage, dam or weir gate shall be assumed to open earlier or wider than the operator's records show, and the Western and Eastern Yamuna canals shall be taken as closed in a flood, as reported above 1 lakh cusec at Hathnikund, so that no flood water is credited to them.
  • (d) Catchments with no outfall. Where a site, or the catchment it drains to, has no defined outfall to a river, a drain or a waterbody that carries water away from it, as where the drains of a town or village of the dry south-west (sub-areas HR-E and HR-F of Annex 2A) end in a johad or a depression with no outlet:
    • there is no receiving water and no tailwater. The outfall is treated as closed for the whole storm and after it (Clause 5.9.4): the storage shall hold, below the level of its overflow, the runoff volume of the 1% AEP 72-hour design storm of Clause 2.9.2, with the climate factor of Clause 2.8, from the whole area draining to it, computed by Clause 3.8 for the post-development condition, and shall be emptied only by infiltration at the verified rate of Clause 4.4.3, by evaporation or by reuse, within 7 days of the end of the 10% AEP 72-hour storm, with no gravity or pumped discharge credited to a drain, nala or road (set by this Manual);
    • where the site drains to a public basin, johad or depression that also receives other land, the downstream analysis of Clauses 5.3 to 5.5 shall end at that basin, johad or depression, and shall report its maximum water level in the 1% AEP 72-hour storm, with the whole area that drains to it at its present land use, with and without the project; Clause 5.5.1 applies at every building, road and plot around it. The basin, johad or depression shall start the storm at the level that the 10% AEP 72-hour storm leaves in it 7 days after that storm ends, or higher where its flood marks or the records of the local body, the Gram Panchayat or the Deputy Commissioner show it, and a johad that receives dry-weather flow shall start full (set by this Manual);
    • the overflow path shall be traced to where it ends, with its depth and velocity on every road and plot it crosses, within the limits of Table 6.3; it shall not end on a neighbour's land or in another catchment, and a pump or a pipe that moves the water onto a road, a neighbour's land or another catchment is not an outfall; and
    • where the depression is a pond under the Haryana Pond and Waste Water Management Authority Act 2018 or a wetland, item (f) also applies.
  • (e) Pumped outfalls in the waterlogged belt. In the Rohtak–Jhajjar–Sonipat waterlogged belt (sub-area HR-D of Annex 2A), and elsewhere where the seasonal high water table is within 3 m of the ground and a town's drains reach an I&WRD drain only by pumping, as at Rohtak, Jhajjar and Bahadurgarh:
    • the tailwater of a drain or sump that is pumped to an I&WRD drain shall be its routed level under item (b), with the permanent pumps less the largest one and no portable pumps, with the receiving drain at the level of item (a), and with pumping credited only at the rate that I&WRD's consent allows while the receiving drain is at that level; where the consent provides for pumping to stop when the receiving drain is full, no pumping shall be credited for that period (set by this Manual);
    • mobile pumping from one drain into another shall not be counted, and a project's pumped discharge into another drain shall be included in that drain's level (Clause 5.12.3);
    • no infiltration shall be credited in the routing, and the ground and any storage shall be taken as saturated, with the design groundwater level at the seasonal high level after the monsoon (Clause 4.12.1), because the area of the State with the water table within 3 m grew from about 7.2 lakh acres in June 2023 to about 9.4 lakh acres in October 2023 (HWRA, 2025); and
    • low ground, fields and depressions around the town shall not be credited as storage unless their owner and the local body have agreed in writing to receive the water and the depth and duration of ponding on them are reported.
  • (f) Johads, ponds, bunds and lakes. For an outfall to a johad, talab or other pond, a bund or a lake, directly or through a drain that ends in it, such as the Ghata bundh and the other bunds of Gurugram, Damdama lake, Badkhal and Surajkund lakes, the Najafgarh jheel and the village johads that receive town drains:
    • Consent. Storm water shall not be discharged to a pond without the written consent of its owner, the Gram Panchayat or the local body, and, where the pond is a pond under the Haryana Pond and Waste Water Management Authority Act 2018 (a tank, lake or other inland water body of 0.5 acre or more recorded as talab, johar or tank, including its green belt, peripheral catchment, feeder inlets, bunds, weirs and sluices), any permission that the Authority requires under ss.14, 16 and 17 shall be obtained. Where it is a Ramsar site (Sultanpur or Bhindawas) or a wetland under the Wetlands (Conservation and Management) Rules 2017, any permission that the Wetland Authority of Haryana requires shall be obtained; at Badkhal and Surajkund the Supreme Court's lines apply (Chapter 7). An outfall that carries dry-weather flow is dealt with under Clause 8.9.
    • Design level. The tailwater for the major-system and storage cases shall be the level at which the johad, pond, bund or lake spills to the next drain or onto land, from its overflow sill or, where it has none, the lowest point of its rim, plus the head over that point needed to pass the 1% AEP inflow with the project's discharge included (Clauses 5.3.2 and 5.12.3); for a gated bund or lake with a published full level and no published maximum level, it is the full level plus the design-flood surcharge, and full level + 0.5 m where no surcharge has been computed (set by this Manual) [TBC]. In every case it shall be not less than the highest level recorded at the waterbody, from its flood marks and the records of its owner (set by this Manual). For the Ghata bundh, whose pondage GMDA reports as about 60 ha below 240 m and about 100 ha up to 245 m above MSL (GMDA, report to the NGT in OA 325/2015), the tailwater shall be not less than 245 m until a survey gives the level of its spill (set by this Manual) [TBC].
    • Closed outfall. Where the outfall invert is below the design level of this item, the outfall shall be treated as closed for the whole storm (Clause 5.9.4), with storage and pumping handling the full storm volume. Every johad, pond, bund and lake starts every design storm at its spill level, or at its full level (Clause 7.7.3). No storage shall be credited in the Najafgarh jheel, in a dry lake bed such as Badkhal, or in the shrinking water area of Damdama lake (reported to fall from about 80 to about 35 acres within a month of the monsoon), unless its owner's records show the storage available at the start of comparable storms and the Authority accepts it.
  • (g) I&WRD consent, section 45 and court lines; canals. No outfall structure, gate, pumping station or drain shall be built in the bed, bank or floodplain of a river, or in a drain, embankment or canal of I&WRD, without the consent of I&WRD. Within the limits of a notification under section 45 of the Haryana Canal and Drainage Act 1974, which make the reach a drainage-work in which an obstruction is prohibited and may be removed (ss.45 and 46), an outfall shall not be built without I&WRD's written permission. The State has told the NGT that construction on river floodplains is banned under section 45 (State report in EA 35/2023), but the only notification found is the Ghaggar floodplain zone in Panchkula [TBC]; the designer shall state whether the outfall lies in a notified zone. The designer shall also check the outfall against the lines that courts have set, as they stand at the time of design (Chapter 7): the green belt and the 1 km and 1–5 km zones around Badkhal and Surajkund lakes (Supreme Court, M.C. Mehta, order of 11 October 1996). Whether a drain outfall is permitted within each line is to be confirmed with the authority concerned before design [TBC]. Storm water shall not be discharged to the Western Yamuna Canal, its branches and distributaries, the Agra canal or another irrigation or supply canal without the written consent of I&WRD or the canal's owner; a supply canal is not a drainage outfall (set by this Manual). Where consent is given, the tailwater is the higher of the canal's design water level and its level in the coincident case of Clause 5.8.4, the discharge shall not exceed the rate the consent allows, and the outfall shall have a flap gate (Clause 5.11) where that level is above the outfall invert.

No pump, gate, sluice, regulator, barrage or dam operation that helps drainage, such as pumping a drain down before a storm, lowering a johad or lake before a storm, closing a gate late or opening barrage gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the johad or the river (Clause 5.12.3). Pumping shall not be used to move water out of a catchment with no outfall (item (d)).

Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Haryana's rivers break that assumption, because the monsoon spells that fill them fall on the Shivaliks and on the towns of the plains together. On 9 July 2023 Chandigarh recorded 302.2 mm and Ambala 224.1 mm in 24 hours (IMD), the Ghaggar, the Markanda and the Tangri rose the same week, and the Yamuna peaked at Hathnikund on 11 July (MoJS committee, 2024). On 18 August 2019, the day of the largest reported release at Hathnikund, the Somb at Fatehgarh and the Maskara at Ghodopipli in Yamunanagar district also set their highest recorded levels (CWC site list, as copied by SANDRP). On the Sahibi, the highest level at Masani, 242.58 m, was set on 2 September 1978 (CWC site list), in the same week as the Yamuna's record of 1978 at Delhi. The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.

Clause 5.8.3 reflects the barrage, dams and weirs above the State's towns. The Hathnikund barrage on the Yamuna was built by I&WRD in 1999, with a design flood of 22,000 m³/s (1 in 100 years), a highest flood level of 342.35 m, a pond level of 334.32 m and 18 gates, and its operating rule opens all the gates fully once the inflow reaches 6,094 m³/s (2,15,400 cusec) (MoJS committee, 2024). Its largest reported releases are 8,06,464 cusec on 17 June 2013 and about 8.28 lakh cusec (8,28,072 cusec in I&WRD records, as reported) on 18 August 2019, about 23,400 m³/s, which is above the design flood (SANDRP; as reported); in July 2023 it passed 3,59,760 cusec on 11 July (MoJS committee, 2024), and in September 2025 a reported 3,29,313 cusec on 1 September (SANDRP). The Western and Eastern Yamuna canals are reported to be closed once the inflow passes 1 lakh cusec (SANDRP, citing I&WRD), so the whole flood goes down the river. The releases take about 12–24 hours to reach Karnal, 19–40 hours to reach the Mawi gauge opposite Panipat and 35–75 hours to reach Delhi (summed from the travel times by reach of the MoJS committee, 2024), which gives warning to close gates and move pumps but does not lower the river. On the Ghaggar system, the Kaushalya dam at Pinjore was reported releasing about 4,000 cusec on 9 July 2023 (600 cusec in another report), and its danger level is reported as 478 m (as reported); the Ottu weir in Sirsa is reported to pass about 40,000 cusec (as reported). On the Sahibi, the Masani barrage was left without gates when work stopped in 1986, and its weir storage is held by walls at 242.20 m on a crest of 240.00 m (I&WRD, 2024), so it spills without control. No operating rule or release record for the Kaushalya dam, the Ottu weir or the Dhansa regulator was obtained during research, and no hourly stage record for any gauge in the State was obtained other than those published by the committee and SANDRP [TBC]. Until they are, the largest recorded release applies, with the flow of the catchment below it as it occurred in the same event (Clause 5.8.5(c)).

Clause 5.8.5 is set by this Manual. In Haryana the tailwater at a town outfall is set not by the tide but by a drain of I&WRD or a master drain that may already be full, by a river held high for days by its own flood and the releases above it, or by a johad, a depression or a pumped sump with nowhere else to go. No document found during research gives a design water level for any of them. The Haryana Municipal Corporation Act 1994 requires the drain of new premises to empty into a Corporation drain within thirty metres, or else into a cesspool (s.198(2)), but it does not say against which level; the Haryana Building Code 2017 requires a large project to keep "the inlet and outlet point of natural drain system" with a channel of adequate size (Code 12.1), with no level either.

The first is the receiving drain. Haryana's drains were not designed to carry the peak. Its rural drains were sized by an empirical formula cut by reduction factors of 1/12 to 1/4, and its urban channels for 25 mm/h (NCRPB, 2016; Chapter 6), and the Sub-Regional Plan sizes rural drains for "three days rainfall of five years frequency to be drained in three days" (TCP Department, SRP-NCR 2021). Gurugram's master drains have stated discharges, 541, 1,305 and 3,702 cusec for Legs I to III (DTCP drawing, 2012), but no return period (GMDA, report to the NGT in OA 523/2019), and the capacity of Leg-III is reported as anything from 500 to 3,800 cusec, with a bottleneck of 800 cusec at Khandsa (as reported). Outfall Drain No. 8 carried 5,000 cusec at Dhansa in 2022 against a capacity of 4,000 cusec (I&WRD, 2024). A drain built that way stands at or above its design water level in the storms this Manual designs for, so item (a) computes its level from all the water it receives, takes the lowest reported capacity until the owner confirms one, and adds a drain lock. The 72-hour floor of the drain lock covers the longest design storm, and the SRP's own criterion, a 3-day storm drained in 3 days, is a drain that stands high for about three days. Gurugram's master drains and Outfall Drain No. 8 end in the Najafgarh drain, which runs from Dhansa into Delhi. In 1977 the Sahibi raised the level upstream of the Dhansa bund to 213.575 m against a bund top of 214 m, about 36,000 cusec passed through the bund, and the Jhatikara bund breached (Delhi I&FC); the drain's capacity is now reported as 8,000 cusec from Dhansa to Kakraula (Delhi planning document, seen as an extract). The level of the drain at the boundary is therefore decided as much in Delhi as in Haryana, which is why item (a) makes I&WRD coordinate it with Delhi's I&FC and, until a level is agreed, uses the record at Dhansa as a floor.

The second is the river lock. The Yamuna's levels along the State are measured by CWC at gauges several of which stand on the Uttar Pradesh bank, and the site list has been revised: the Mohna level of 1978 was replaced by a lower one of 1995, and the Palwal level of 2019 was removed (SANDRP, 2022). Item (b) keeps the higher value until CWC explains the change, because a level that the river reached is not made lower by being taken off a list. The danger level is used as the floor of the 10% AEP level because the river has crossed it in recent floods: at Mawi the river reached 232.75 m in 2013, 232.30 m in 2023 and 232.1 m in 2025 against a danger level of 230.85 m, and at Karnal it passed 249.5 m in 2010 and 2013 (CWC; MoJS committee, 2024; SANDRP), so a level reached about once in ten years is unlikely to lie below it; it is to be replaced by a frequency analysis of the CWC record [TBC]. A Yamuna flood lasts. In September 2025 the flow at Hathnikund stayed above 1 lakh cusec for about 129 hours, from 1 September to 5 September (SANDRP, from CWC data), and the flood wave then takes another 35 to 75 hours to pass the reach to Delhi (MoJS committee, 2024), so a town on the river can see it high for a week; the 7-day lock covers that and matches the lock that the Delhi and Uttar Pradesh editions of this Manual set on the same river. The Ghaggar system is different above and below. In the Shivalik foothills its choes, the Tangri and the Markanda rise and fall within hours to days, and the 72-hour lock covers the whole of the longest design storm of Clause 2.5.2. Below Guhla the river spreads, breaches and returns slowly: in July 2023 the flood passed Kaithal district on 12 July, six breaches there were still open on 18 July, and the Ottu weir was still passing about 38,400 cusec on 21 July (as reported), so the lower Ghaggar takes the 7-day lock. The Sahibi takes it as well, because in 1977 the Najafgarh drain below it ran at "about 6000-6500 cusecs for number of days" (Delhi I&FC). Neither lock is a substitute for the stage record of the flood that set the highest level, from which each is to be lengthened. CWC has no flood gauge anywhere in the Ghaggar basin (SANDRP, 2018); the State's gauges are reported in feet, as at Khanauri, where the river was about 6 ft above its danger mark of 748 ft on 15 July 2023, and at Ottu, whose danger mark is reported as 17 ft (as reported), with no gauge zero found. That is why item (b) requires a modelled or surveyed level, and a levelled tie for any gauge reading, before an outfall to those rivers is designed. The Panchkula floodplain zone rests on a 100-year flood computed by Gumbel's method from 54 years of data (I&WRD replies to the NGT in OA 421/2022), the State's own precedent for a 1% AEP river, although the NGT has questioned whether the procedure for the notification was followed (order of 22 May 2024, as quoted). Item (b) counts only the permanent pumps less the largest one, for the same reason that Clause 5.12.2(b) requires a standby pump; the inventory pumps that I&WRD lent at Ambala in July 2023 (Haryana Vidhan Sabha, 2023) are not a design capacity. The breach check follows the Ghaggar breaches of July 2023.

The third is the barrage release. Item (c) runs the design storm with the river at the largest recorded release because the rain that raises the Yamuna at Hathnikund and the rain on the towns below come from the same monsoon spell (see the Commentary to Clause 5.8.4). The largest reported release, about 8.28 lakh cusec in August 2019, is above the barrage's own design flood, so the design flood does not bound the release. The release does not bound the river either: the record level of the Yamuna at Delhi in July 2023 came from less than half the release of 2019, with local rain, the inflows below the barrage and the conditions downstream (MoJS committee, 2024; SANDRP). The Kaushalya dam, the Ottu weir and the Masani barrage have no operating rule that was found, and Masani has no gates at all.

The fourth is the land with no outfall, or with a pumped one. In the dry south-west a town's drains may end in a johad or a low patch of ground; the Sahibi below the Masani barrage "does not exist on ground" for about 11 km and is cultivated (I&WRD, 2024). In such a catchment the governing failure is the volume of a multi-day storm, and the State's largest storms are multi-day September storms such as those of 9 September 1875 and 19 September 1933, which brought 398.8 mm to Palwal and 484.1 mm to Rohtak in a day (IMD, Climate of Haryana). Item (d) therefore applies the 72-hour design volume, treats the outfall as closed for the whole storm and after it, and makes the overflow path end on public land. In the Rohtak–Jhajjar–Sonipat belt the problem is the opposite: the water table is high, not deep. In June 2023 about 2.15 lakh acres of Rohtak district and 1.93 lakh acres of Jhajjar had the water table within 3 m, about half and 43% of the two districts, and the area of the State within 3 m grew by about 30% between June and October (HWRA, Haryana Water Resources Atlas 2025). The land drains only by pumping to the I&WRD drains, and the Haryana Water Resources Authority is required to "discourage and prevent such activities that are likely to lead to potential water logging of land" (HWRA Act 2020, s.21(7)). Item (e) gives no infiltration credit, counts only permanent pumps, and limits the credited pumping to what I&WRD's consent allows when its drain is full, because a pump that discharges into a full drain only moves the flood downstream.

The fifth is the johad and the bund. Haryana has 19,665 ponds on the Pond Authority's data system, 18,764 rural and 901 urban (HPWWMA, written statement to the NGT, 2024), and many of them receive the drains of the villages and towns around them, sewage included: a joint committee found "discharge of untreated effluent in the water bodies" at Kharkhara in Rewari (NGT, OA 573/2023). A johad that receives dry-weather flow is full before the storm, which is why items (d) and (f) start it full. The Pond Authority Act protects a pond's green belt, catchment, inlets and outlets (ss.2, 14 and 17), so an outfall to a pond needs its permission as well as the owner's consent. The bunds of Gurugram, Ghata, Chakarpur, Jharsa and Wazirabad, were built in the late nineteenth century to hold flood water (MoHUA, Lok Sabha reply, 2025, as reported); of the 12,575 ha that drain to the Ghata bundh, 9,075 ha lie in Delhi (GMDA, report to the NGT in OA 325/2015), so its level, like that of the Najafgarh drain, depends on land across the State boundary. No full level, maximum level or surcharge was found for any johad, bund or lake in the State [TBC], which is why item (f) uses the spill level and the head over it, and full level + 0.5 m for a gated bund or lake: 0.5 m is the freeboard that this Manual uses for floor levels (Clause 6.11.1), and it is a floor, not an estimate of the surcharge. The Najafgarh jheel was accepted by the State as a water body in 2017 but had not been notified by March 2024, and most of it is reported to be privately owned (as reported), so no storage is credited in it.

The sixth is the body that owns the receiving water. The rivers, embankments, drainage works and canals are I&WRD's; the master drains are GMDA's or FMDA's; the street drains vest in the Municipal Corporation (HMC Act 1994, s.193); the ponds belong to the Gram Panchayat or the local body, with the Pond Authority as regulator; and no rule dividing the drains of I&WRD from the others was found (Chapter 6, Clause 6.9). Items (a), (f) and (g) ask for the owner's consent and design level because a design that discharges to a channel or a pond cannot be checked without them. The Western Yamuna Canal and its branches carry supply water and are closed when the Yamuna is in flood (as reported), so storm water put into them goes where the operator does not expect it. Section 45 of the Canal and Drainage Act lets the State notify a reach of a river, stream or drainage channel within which obstruction is barred; only the Ghaggar zone in Panchkula has been found, and item (g) asks the designer to state whether the outfall lies in a notified zone. The court lines of item (g) decide where an outfall can be built, not its level; their status is set out in Chapter 7.


5.9 Joint-probability cases

5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.

Table 5.2 — Joint-probability cases for tidal and riverine outfalls

Case Rainfall Tailwater Applies to Basis
J1 Minor-system design AEP, Tc to 24 h MHWS + SLA (tidal curve) Minor system Clause 2.12(a); Clause 5.7.1
J2 1% AEP, all durations of Clause 2.5.2 HAT + surge + SLA Major system, detention, tanks, pumped systems Clause 5.7.1
J3 10% AEP, 48 h 1% AEP still-water level + SLA Major system, detention, tanks, pumped systems Clause 2.12(b)
J4 Design AEP, 48 h (72 h reported) Tidal curve per J1 with two 6 h lock windows (Clause 5.10) All storage and every gated or tide-affected outfall Clause 5.10
R1 Site design AEP River at 10% AEP level Riverine outfalls Clause 5.8.4(a)
R2 Site 10% AEP River at design-AEP level Riverine outfalls Clause 5.8.4(b)

5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).

5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.

5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.

Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.


5.10 Outfall-closed (tide-locked) storage check

5.10.1 Where it applies. The check applies to:

  • every storage facility;
  • every minor- and major-system element; and
  • every pumped system

whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).

5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:

  • the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
  • AMC III.

The 72-hour storm shall also be run and reported.

5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:

  • (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
  • (b) During each lock window, gravity discharge is zero.
  • (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
  • (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.

5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:

  • (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
  • (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
  • (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.

In volume terms, over each lock window and the full storm:

V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)

This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).

5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).

5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:

  • sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
  • the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.

2026-10-31T11:03:55.142804 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 10 20 Rain (mm/h) 24 h design depth in final day (Clause 2.9.2) Illustrative — not design values. 48 h storm, peak day last; semi-diurnal tide −0.5 0.0 0.5 1.0 1.5 Level (m, local datum) Design lock 1 (6 h) Design lock 2 (6 h) MHWS + sea-level allowance (illustrative) Tailwater: astronomical tide + surge Astronomical tide only Drain / storage stage upstream of gate 0 6 12 18 24 30 36 42 48 54 60 Time from storm start (h) Flap gate shut

Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.

Commentary. The outfall-closed check is the distinctive Haryana requirement in this Manual. In Haryana it applies where an outfall is shut not by the tide but by a river that stays high for days, by a receiving drain that is already full, or by a depression with no outlet. In September 2025 the flow at the Hathnikund barrage stayed above 1 lakh cusec for about 129 hours (SANDRP, from CWC data). In July 2023 the Ghaggar passed a reported 82,400 cusec in Kaithal district on 12 July, and six breaches there were still open on 18 July (as reported). Outfall Drain No. 8 carried 5,000 cusec at the Dhansa regulator in 2022, a quarter more than its capacity of 4,000 cusec (I&WRD, 2024), and in the Rohtak–Jhajjar–Sonipat belt the low ground drains only by pumping. A river in flood stays high for as long as the flood lasts, a drain beyond its capacity backs up into every drain that joins it, a depression or johad with no outlet empties only by infiltration and evaporation, and the low ground of the waterlogged belt only by pumping, which is why Clause 5.8.5 replaces the two 6-hour windows described below with a single river lock of at least 72 hours, or 7 days on the Yamuna, the Sahibi and the lower Ghaggar, with a drain lock where the receiving drain is full, and with a closure for the whole storm where there is no outfall. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.

The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.

Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.


5.11 Flap gates, tide gates and non-return valves

5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.

5.11.2 Hydraulics. The design shall include:

  • the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
  • the reduction in effective outfall capacity when the gate is partly open.

Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.

5.11.3 Construction.

  • (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
  • (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
  • (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
  • (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
  • (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.

5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:

  • the major-system tailwater (J2) at the point of connection; or
  • the maximum stage in the outfall-closed check (Clause 5.10).

Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.

5.11.5 Inspection. Gates and valves shall be inspected and operated:

  • before 25 June each year;
  • after every event in which they closed against a storm flow; and
  • as set in the maintenance plan (Chapter 10).

Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Haryana the outfalls do not cross a beach, but many of them pass through a gate in an embankment or bund, or end in a drain closed by a regulator, and the bunds breach. In July 2023 the Ghaggar breached its bunds at Ambala, where a major breach was plugged with the help of the Army and the Municipal Corporation ran 19 pump sets with inventory pumps of 962 cusec from I&WRD (Haryana Vidhan Sabha, 2023), and in Kaithal, Fatehabad and Sirsa, where breaches of the Ghaggar bund, the Hansi–Butana canal and the Chandpura siphon bund flooded villages, some 80 of them in Fatehabad district (as reported). In August 1977 the Sahibi rose upstream of the Dhansa bund to 213.575 m against a bund top of 214 m, about 36,000 cusec passed through the bund, and the Jhatikara bund breached and the Najafgarh jheel was submerged (Irrigation and Flood Control Department, Delhi). A gate that is jammed or left open lets the river or the receiving drain back into the drains behind it, and a bund that breaches fills the land behind it to the river level. The embankments, bunds and regulators are held by I&WRD, or, at Dhansa, by an operator not confirmed during research, while the drains that reach them belong to the Municipal Corporations, HSVP, GMDA, FMDA or a colonizer, and no rule linking the operation of any of these gates to the levels of the drains was found during research [TBC], so a gate and the drains behind it can belong to different bodies. The 25 June inspection date is set ahead of the SW monsoon.


5.12 Pumped outfalls

5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:

  • the outfall-closed check of Clause 5.10;
  • the drawdown requirement of Clause 4.7; or
  • the J2 and J3 cases.

Pumping shall not be used where a gravity solution meets these requirements.

5.12.2 Capacity.

  • (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
  • (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
  • (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.

5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.

5.12.4 Power supply. Pumping stations shall have either:

  • two independent power supplies; or
  • standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.

Changeover shall be automatic.

5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:

  • the 1% AEP flood level + 0.5 m; and
  • HAT + surge + SLA + 0.5 m.

Access to the station shall remain usable in the 1% AEP event.

5.12.6 Discharge arrangement. Rising mains shall discharge:

  • over a level above the J2 tailwater; or
  • through a non-return valve and a flap gate.

The arrangement shall prevent back-siphoning.

5.12.7 Controls and monitoring. Each station shall have:

  • automatic level control;
  • remote alarms for high level, pump failure and power failure, sent to the operator; and
  • a level and run-time log kept for at least 5 years.

Wet wells shall be sized to keep pump starts within the manufacturer's limits.

5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).

5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 25 June each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).

Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.


5.13 Sand-bar closure of river mouths

5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Haryana: Clause 5.1.4), and any other mouth listed in Annex 5B.

5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless I&WRD certifies that:

  • a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
  • the programme is funded for the current season.

5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:

  • (a) the tidal tailwater of Clause 5.7; and
  • (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.

5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless I&WRD has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.

5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.

Commentary. Haryana has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the silt, sand and boulders that the Yamuna and the Shivalik streams leave at an outfall, and the debris and dumped material that block the drains below them. The Yamuna is heavily silted at Hathnikund, where the canal head regulators are closed once the silt reaches 2,500 ppm (MoJS committee, 2024), the choes of the Ghaggar system carry sand and boulders in flash floods, and construction and demolition waste has been found dumped on the banks of the Ghaggar in Panchkula (NGT, OA 421/2022). A flap gate held open or shut by silt, or a regulator whose gates cannot be moved, turns a designed outfall into a dead end or a back-flow path. No written gate-operation rule for the Dhansa regulator, for the gates on the drains that outfall to the Yamuna or the Ghaggar, or for any johad or bund outlet was found during research [TBC]. Clause 5.8.5 deals with both by giving no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.


5.14 Documentation

Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:

  1. a plan of the analysis extent showing:
    • the site;
    • each analysis point with its contributing catchment area and the site's percentage of it; and
    • the end point and the reason it was chosen (Clause 5.3);
  2. the model description:
    • software and version;
    • the network schematic, with survey sources for the drains and crossings;
    • land use and CN for off-site areas;
    • any upstream detention included; and
    • calibration or validation evidence where available;
  3. for each analysis point, AEP and duration, the existing and with-project:
    • peak flow;
    • time to peak;
    • maximum water level and velocity; and
    • duration of inundation (Clause 5.4);
  4. the comparison against Clause 5.5, with each failure identified and the remedy adopted;
  5. the tailwater derivation:
    • tide-table edition and port;
    • MHWS, HAT and MSL relative to chart datum;
    • the datum connection to the Survey of India benchmark and the project datum;
    • surge source and value;
    • SLA; and
    • river levels and their sources (Clauses 5.6 to 5.8);
  6. the joint-case table of Clause 5.9 with results;
  7. the outfall-closed check (Clause 5.10):
    • storm and lock alignment;
    • stage hydrographs; and
    • the volume balance for each lock window;
  8. a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
  9. pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
  10. the sand-bar assumption and supporting I&WRD certification, where relevant (Clause 5.13); and
  11. inspection and maintenance requirements for Chapter 10.

Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.


References (chapter)

Annexes and forms

Annex / Form Content
5A Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
5B Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map