Draft v1.0 prepared by NEER. Not adopted by the Government of Haryana or any authority or local body, and has no legal force. About this draft

Annexes to Chapter 3Hydrologic Methods

These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.


Annex 3A — Haryana soil series to HSG lookup; seasonal high water table map

Supports Clauses 3.7 and 3.10 of Chapter 3.

To be prepared. This annex will contain (a) a lookup from each soil series mapped in Haryana to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the south-west monsoon (June–September). It needs NBSS&LUP and Haryana Space Applications Centre (HARSAC) [TBC] series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the Haryana Water Resources Authority, supplemented by piezometers in the Rohtak–Jhajjar–Sonipat waterlogged belt and the waterlogged parts of Hisar and Jind districts, the floodplains (khadar) of the Yamuna and the Ghaggar, including the Ghaggar floodplain zone notified in Panchkula, the sodic plains of Kurukshetra, Kaithal and Karnal, and the low-lying land along Outfall Drain No. 8 and the Najafgarh jheel. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).

Table 3A.1 — Soil series to HSG lookup (layout)

Soil series District(s) Taxonomic class Surface texture Saturated hydraulic conductivity (mm/h) Depth to impermeable layer (m) HSG, drained HSG, undrained Source map and scale
                 
                 
                 

Table 3A.2 — Seasonal high water table, by mapping unit (layout)

Mapping unit or grid cell Observation wells used Years of June–September record Highest June–September level below ground (m) Within 0.6 m of ground (Clause 3.10.1)? Data source
           
           

Annex 3B — Haryana CN calibration and supplementary land covers (choe beds and Shivalik scrub, Aravalli rock and scree, waterlogged and saline-sodic fields, dune sand, johad and bund beds)

Supports Clauses 3.8 and 3.15 of Chapter 3.

To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Haryana catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the boulder, gravel and sand beds of the Shivalik choes and the scrub forest on the sandstone and clay of the Morni and Kalesar hills; the bare rock, scree and scrub of the Aravalli ridges of Gurugram, Faridabad, Nuh, Rewari and Mahendragarh; the waterlogged and saline-sodic fields of the Rohtak–Jhajjar–Sonipat belt and the sodic fields of Kurukshetra, Kaithal and Karnal, which either stand under water at the start of a storm or shed it from a sealed, crusted surface; the dune and sandy plains of Sirsa, Hisar, Bhiwani, Charkhi Dadri and Mahendragarh, bare or under sparse crops; and the beds of johads and talabs, and the pondage behind old bunds such as the Ghata bundh, that are dry or cultivated at the start of a storm. It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from I&WRD gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).

Table 3B.1 — Supplementary land covers, AMC II (layout)

Cover type HSG A HSG B HSG C HSG D Ia ratio Basis (catchments, events, years)
Boulder, gravel and sand bed of a Shivalik choe, dry at the start of the storm            
Scrub forest on Shivalik sandstone and clay, Morni and Kalesar hills            
Bare or nearly bare rock, scree and scrub, Aravalli ridges            
Waterlogged or saline-sodic field, Rohtak–Jhajjar–Sonipat belt, above standing water at the start of the storm            
Sodic field with a crusted surface, Kurukshetra, Kaithal and Karnal            
Dune or sandy plain, bare or under sparse crops, south-west            
Johad or talab bed, or pondage behind an old bund, dry or cultivated at the start of the storm            
Other (state)            

Table 3B.2 — CN calibration catchments (layout)

Catchment District Area (km²) Dominant HSG and cover Events used Table 3.5 CN Calibrated CN Calibrated ÷ Table 3.5
               
               

Annex 3C — Benchmark test problems for software acceptance

Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.

Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.

Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.

Problem 3C-1 — Rational Method peak (Clause 3.5)

Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.

Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.

Table 3C.1 — Problem 3C-1 solution

Step Calculation Result
Composite C (Clause 3.5.4) (1.2 × 0.90 + 0.8 × 0.15) / 2.0 0.60
Frequency factor (Table 3.3) 1% AEP Cf = 1.25
C · Cf (≤ 1.0) 0.60 × 1.25 0.75
Peak flow (Clause 3.5.1) 0.75 × 120 × 2.0 / 360 Q = 0.500 m³/s
Part (b): C · Cf 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) 1.00
Part (b): peak flow 1.00 × 150 × 0.5 / 360 Q = 0.208 m³/s

Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)

Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).

Table 3C.2 — Problem 3C-2 solution

Segment Calculation Travel time
Sheet flow (Clause 3.6.2(a)) 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h 12.83 min
Shallow concentrated (Clause 3.6.2(c)) V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h 6.78 min
Channel (Clause 3.6.2(d)) 400 / (3,600 × 1.0) = 0.1111 h 6.67 min
Tc (Clause 3.6.1; ≥ 10 min) 12.83 + 6.78 + 6.67 26.27 min
Lag (Clause 3.6.5) 0.6 × 26.27 15.76 min

Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)

Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.

Table 3C.3 — Problem 3C-3 solution

Case S (mm) Ia (mm) Runoff Q (mm), P = 100 mm Runoff Q (mm), P = 25 mm
(a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 89.24 17.85 39.38 0.53
(b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 38.80 7.76 64.93 —
(c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 143.31 7.17 36.49 1.97

Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.

Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)

Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.

Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.

Table 3C.4 — Problem 3C-4 solution

Step Calculation Result
(a) Impervious half (Clause 3.9.2) S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) 19.70 mm
(a) Pervious half S = 162.39 mm, Ia = 32.48 mm > P 0 mm
(a) Area-weighted runoff, separate sub-areas 0.5 × 19.70 + 0.5 × 0 9.85 mm
(a) Composite CN (Clause 3.9.4) 61 + 0.50 × (98 − 61) 79.5
(a) Runoff with composite CN S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) 1.83 mm
(b) Interval check (Clause 3.11.3(a)) 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h satisfied
(b) Lag and time to peak (Clause 3.11.2) tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 tp = 0.65 h
(b) Unit hydrograph peak, Q = 1 mm 0.208 × 2.5 × 1 / 0.65 qp = 0.800 m³/s per mm

Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).

Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)

Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.

Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship

Stage (m) Storage S (m³) Outflow O (m³/s)
0.0 0 0.00
0.5 250 0.05
1.0 500 0.10
1.5 750 0.15
2.0 1,000 0.20
2.5 1,250 0.25

Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.

Table 3C.6 — Problem 3C-5 routed outflow

Time (min) Inflow I (m³/s) Outflow O (m³/s) Storage (m³) Stage (m)
0 0.0000 0.0000 0.0 0.000
10 0.1667 0.0094 47.2 0.094
20 0.3333 0.0367 183.3 0.367
30 0.5000 0.0797 398.4 0.797
40 0.4167 0.1226 612.8 1.226
50 0.3333 0.1511 755.7 1.511
60 0.2500 0.1670 835.2 1.670
70 0.1667 0.1717 858.6 1.717
80 0.0833 0.1664 832.1 1.664
90 0.0000 0.1523 761.5 1.523
120 0.0000 0.1062 531.1 1.062
180 0.0000 0.0517 258.3 0.517

Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.

Table 3C.7 — Benchmark results to be reported by the applicant

Problem Result Benchmark Software result Difference (%) Within ±5%?
3C-1 Q, main case (m³/s) 0.500      
3C-1 Q, part (b) (m³/s) 0.208      
3C-2 Tc (min) 26.27      
3C-3 Q, case (a), P = 100 mm (mm) 39.38      
3C-3 Q, case (b), P = 100 mm (mm) 64.93      
3C-3 Q, case (c), P = 100 mm (mm) 36.49      
3C-3 Q, case (c), P = 25 mm (mm) 1.97      
3C-4 Runoff, separate sub-areas (mm) 9.85      
3C-4 Runoff, composite CN (mm) 1.83      
3C-4 qp (m³/s per mm) 0.800      
3C-5 Peak outflow (m³/s) 0.172      
3C-5 Peak storage (m³) 859      

Annex 3D — Peak rate factor study for flat coastal land

Supports Clauses 3.11.5 and 3.15 of Chapter 3.

Not required in Haryana. Haryana is landlocked and has no flat coastal plain, so no land in the State meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). The Rohtak–Jhajjar–Sonipat waterlogged belt, the floodplains of the Yamuna and the Ghaggar and the Najafgarh jheel depression are flat but are not coastal plain; their slow response is represented by storage and backwater (Clauses 3.10.4 and 3.12.4), not by a lower peak rate factor. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.

Table 3D.1 — Calibrated peak rate factors (layout)

Catchment Area (km²) Mean slope (m/m) Drainage condition Events used Calibrated PRF (US customary) PRF′ (SI) Range of applicability
               
               

Annex 3E — CWC SUH parameters for subzone 1(e), with worked example

Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.

To be prepared. This annex will tabulate, for CWC subzone 1(e) (Upper Indo-Ganga Plains), the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs the CWC Flood Estimation Report for the Upper Indo-Ganga Plains subzone 1(e), approved at the 40th meeting of the Planning and Co-ordination Committee on 23–24 July 1984, which covers the plains of Haryana and whose design-office report number is not on the scanned copy read for this Manual [TBC], with the line of zone 7 (Western Himalayas) across the Kalka–Pinjore upland and the Morni and Kalesar hills, which this Manual has read only by eye from the plates of the 1(e) report, still to be confirmed on the plates of both reports [TBC] (see the References of Chapter 3), transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).

Table 3E.1 — SUH relationships by subzone (layout)

Parameter Symbol Unit Subzone 1(e) relationship Report reference
Peak discharge per unit area qp m³/s per km² qp = 2.030 (L/√S)^−0.649 §3.9 (p. 42)
Time from centre of unit rainfall to peak tp h tp = 1.858 qp^−1.038 §3.9 (p. 42)
Width of UH at 50% of peak W50 h W50 = 2.217 qp^−0.990 §3.9 (p. 42)
Width of UH at 75% of peak W75 h W75 = 1.477 qp^−0.876 §3.9 (p. 42)
Width of rising limb at 50% of peak WR50 h WR50 = 0.812 qp^−0.907 §3.9 (p. 42)
Width of rising limb at 75% of peak WR75 h WR75 = 0.606 qp^−0.791 §3.9 (p. 42)
Base width of UH TB h TB = 7.744 tp^0.779 §3.9 (p. 42)
Unit duration tr h 2 §3.9
Design storm duration TD h TD = 1.1 tp, limited to 24 h §3.11 and §3.12 (p. 57)
Design loss rate — mm/h 3.0 (printed "3.0 mm per hour" and, in the worked example, 0.3 cm/h) §3.11 (p. 57)
Design base flow — m³/s per km² 0.05 (the average of 126 flood events in the range 0.01–0.09) §3.12 (p. 57)
Ratio of t-hour to 24-hour rainfall — — 50-yr: 1 h 0.340; 2 h 0.475; 3 h 0.560; 4 h 0.607; 5 h 0.647; 6 h 0.680; 9 h 0.770; 12 h 0.840; 15 h 0.890; 18 h 0.930; 24 h 1.000 Text table (p. 61) and table of Fig. 10 (p. 69)
Time distribution of 24-hour rainfall — cumulative fraction Average curves of Fig. 12; the worked 12-hour storm puts 58% of the total in the first 2 hours, 74% by 4 hours, 86% by 6 hours, 92% by 8 hours and 95% by 10 hours; the 24-hour fractions were not transcribed [TBC] Fig. 12
Conversion of 1-day to 24-hour rainfall — factor 1.15 §4.2
Areal reduction factor ARF — Table 6 of the report; at 50 km², 1 h 0.88, 3 h 0.92, 6 h 0.95, 12 h 0.96, 24 h 0.98, read by optical character recognition only, and the rows for larger areas incomplete in the reading [TBC] Table 6
50-yr 24-hour point rainfall at Haryana cities — mm Read by eye from Plate 9, within about one contour: Chandigarh and Panchkula about 262 (a printed spot value), Ambala about 250, Yamunanagar–Jagadhri 240–260, Karnal and Panipat 220–240, Kurukshetra and Kaithal 200–240, Sonipat about 220, Gurugram, Faridabad and Palwal 220–240, Rohtak, Jhajjar and Rewari about 200, Hisar and Jind 200–220, Bhiwani and Narnaul 180–200, Sirsa and Fatehabad 160–180; for 100-yr (Plate 10), about 289 at Chandigarh (a printed spot value), about 280 at Yamunanagar, 240–280 at Ambala, Karnal, Gurugram and Faridabad, 200–220 at Rohtak and 180–200 at Sirsa; the contours between Hisar, Rohtak and Rewari are of low confidence [TBC] Plates 9 and 10
Catchment area for which the relationships apply A km² 25–2,500, for "reasonably free catchments" with interception of not more than 20%; for "foothill catchments (steep slopes)" a "suitable increase" is to be given, by an amount the report does not state §6.1 to §6.3 (pp. 75–76)

Note: relationships as printed in the CWC Flood Estimation Report for subzone 1(e), approved on 23–24 July 1984 (report number not on the scanned copy [TBC]), read from a scanned copy by optical character recognition and checked against the page images. L is the length of the main stream in km and S its equivalent slope in m/km. Unlike most subzone reports, 1(e) relates the peak to L/√S, not to L·Lc/√S, and derives tp from qp. The report's own worked example is a Haryana catchment: the Ghaggar at road bridge No. 2 (30°24′ N, 76°44′ E), 1,126 km² of "moderate steep slope" which, by NEER's reading, lies about 7 km west of Ambala City and takes in the Shivalik headwaters above Panchkula, with L = 81.42 km, S = 5.14 m/km and L/√S = 35.91. The relationships give qp = 0.199 m³/s per km² and tp = 9.98 h, against the report's 0.198 and 10 h; TD = 1.1 tp = 11 h, rounded to 12 h; the 50-yr 24-hour point rainfall of 25.0 cm (Plate 9) × 0.84 (12-hour ratio) × 0.765 (areal reduction at 1,126 km²) = 16.06 cm; a loss of 0.3 cm/h and a base flow of 0.05 × 1,126 = 56.3 m³/s; and a 50-yr peak of 2,706 m³/s by the unit hydrograph, or 2,630 m³/s by the simplified formula, Q50 = K·A·R·S^0.324 / L^0.649 (K = 1.70 at 25 km² falling to 1.00 at 2,500 km², R the 50-yr TD-hour point rainfall in cm), both of which reproduce. That is about 2.40 m³/s per km², against about 0.02–0.1 m³/s per km² for the rural drains of the State as they were sized by the Boston Society formula with its reduction factors (NCR Planning Board, 2016; Chapter 4). The report was derived from 23 gauged catchments (137 bridge-years, 1961–1982); those in or on the edge of Haryana include the Ghaggar site and catchments on the Kalka–Ambala, Delhi–Ambala, Ambala–Saharanpur, Jind–Panipat, Narwana–Kurukshetra and Rewari–Phulera railway lines (read by optical character recognition only [TBC]). It applies to the rural nalas and choes that enter city limits, not to the city catchments themselves: the Ghaggar, the Kaushalya, the Tangri and the Markanda above Panchkula and Ambala, the Somb and Pathrala above Yamunanagar–Jagadhri, and the Aravalli nalas above Gurugram and Faridabad where their catchments exceed 25 km². The urban catchments of the Gurugram Legs and the Budhiya nala at Faridabad are drained, built over and controlled at their outfalls, so the SUH there is a benchmark of the natural condition only (Clause 3.11.4). The Sahibi above Outfall Drain No. 8 is larger than 2,500 km² (the report lists the Sahibi and Banganga at 19,381 km²) and is regulated at the Masani barrage and the Dhansa regulator, so it is outside the relationships. The design loss rate of 3.0 mm/h is a φ-index fitted to the monsoon floods of whole rural catchments; it is not the infiltration capacity of any soil and shall not be used to assign an HSG or to size an infiltration practice (Clause 3.7). The 1-hour ratio of 0.34 gives a 50-yr 1-hour depth of only about 75–82 mm at Gurugram and Faridabad and about 85–89 mm at Ambala and Panchkula; the Gurugram storm of 9–10 July 2025 was reported as 103 mm in 90 minutes, and Delhi, in the same rainfall band as Gurugram, recorded 112.5 mm in one hour at Pragati Maidan on 31 July 2024 (as reported): the ratios understate the short storms of this belt, and are not to be used to derive intensities for durations shorter than the TD of the SUH (Chapter 2). The whole of Haryana's plains lies in subzone 1(e). On the report's plates the boundary of zone 7 (Western Himalayas) runs north-east of Chandigarh, with Panchkula city about 11 km inside 1(e), the Kalka–Pinjore upland beyond the line and the Morni and Kalesar hills on it; the line in the west, towards the Luni subzone 1(a), passes about 0.2° of longitude west of the State's western edge, so Sirsa and Ellenabad are in 1(e) (all by NEER's reading of Plate 9 [TBC]). The report for zone 7 names Jammu and Kashmir, Punjab, Himachal Pradesh and Uttar Pradesh, not Haryana. For a Shivalik catchment that drains from Himachal Pradesh into the State, such as the Ghaggar above Panchkula, the Kaushalya or the Markanda, the 1(e) relationships are used with the "suitable increase" for foothill catchments, which the designer shall state and justify, and the zone 7 report is run as a sensitivity check only, the higher 1% AEP peak being adopted.

Table 3E.2 — Worked example outline (layout)

Step Content Clause
1 Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM 3.11.4(a)
2 SUH parameters from Table 3E.1 and the plotted unit hydrograph 3.11.4(a)
3 Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution 3.11.4(a), (b)
4 Effective rainfall after the design loss rate; convolution with the SUH; base flow added 3.11.4(a)
5 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition 3.11.4(c), (d)

Form 3-1 — Hydrologic Calculation Summary

Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.

Draft form — Haryana Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.

A. Project

Table 3F.1 — Form 3-1: project

Field Entry
A1. Project name and applicant  
A2. Location (village or ward, survey numbers, district)  
A3. Site area (ha) and number of points of comparison (POCs)  
A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3)  
A5. Design Rainfall Sheet reference (Form 2-1)  

B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)

Table 3F.2 — Form 3-1: method and software

Field Entry
B1. Purpose of each calculation (conveyance, storage, comparison, catchment study)  
B2. Contributing area for each purpose (ha or km²)  
B3. Method used and the row of Table 3.1 that permits it  
B4. Reason for the choice of method  
B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2)  
B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2  
B7. Runoff transform (Clause 3.11.1)  
B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a))  
B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2)  
B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4  
B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference  
B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5)  
B13. Calibration required (Clause 3.15.1)? Calibration report reference  

C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)

Table 3F.3 — Form 3-1: soils and groundwater

Field Entry
C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2)  
C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3)  
C3. Seasonal high water table: depth below ground and source (Clause 3.10.2)  
C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1)  
C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b))  

D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)

Table 3F.4 — Form 3-1: parameters by sub-area and condition

Sub-area Condition (pre / post) Area (ha) Impervious: roofs / paved / roads (ha) DCIA (ha) Disconnected (ha) HSG CN, AMC II CN, AMC III (pervious part) C and Cf (if Rational) Tc (min)
                     
                     
                     

E. Time of concentration worksheet (Clause 3.6)

One worksheet per sub-area and condition.

Table 3F.5 — Form 3-1: time of concentration worksheet

Segment Flow type Surface and n (Table 3.4) L (m) S (m/m) P2 (mm) V (m/s) Tt (min)
1 Sheet         —  
2 Shallow concentrated       —    
3 Channel or pipe       —    
Tc (not less than 10 min)  

E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______

F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)

Table 3F.6 — Form 3-1: rainfall, losses and starting levels

Field Entry
F1. AEPs and durations run; climate factor applied (Chapter 2)  
F2. AMC used for each duration (Clause 3.8.4)  
F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5)  
F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5)  
F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5)  
F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5)  
F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3)  

G. Departures

Table 3F.7 — Form 3-1: departures from Chapter 3

No. Clause departed from Value used in place of the Chapter 3 value Justification
1      
2      

H. Attachments (Clause 3.17)

Table 3F.8 — Form 3-1: attachments

Item Attached (yes / no / not applicable) Reference
H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on    
H2. HSG map, water-table data and infiltration test results    
H3. Parameter tables (Section D) and Tc worksheets (Section E)    
H4. Design Rainfall Sheet (Form 2-1) and hyetographs    
H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels    
H6. Form 3-2 for each POC    
H7. Calibration report (Clause 3.15)    
H8. Native model input and output files (Clause 3.16.4)    

I. Statement by the responsible engineer (Clause 3.17 item 10)

I state that the methods and parameters of Chapter 3 of the Haryana Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.

Table 3F.9 — Form 3-1: statement by the responsible engineer

Field Entry
Name  
Qualification and registration number  
Organisation  
Signature  
Date  

Draft form — Haryana Stormwater Design Manual, Draft v1.0.


Form 3-2 — Pre- vs Post-Development Comparison

Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.

Draft form — Haryana Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.

A. Point of comparison (Clause 3.14.2)

Table 3F.10 — Form 3-2: point of comparison

Field Entry
A1. POC identifier and location  
A2. Area draining to the POC: site (ha) and off-site run-on (ha)  
A3. Off-site run-on passes through site storage? (Clause 3.14.2(c))  
A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3)  
A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c))  
A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7)  
A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3)  

B. Peak flows (Clauses 3.14.7–3.14.10)

Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).

Table 3F.11 — Form 3-2: peak flows by AEP and duration

AEP Duration (h) AMC Q_pre Q_post, uncontrolled Q_post, routed Limit Met?
50% (2-yr) 1 II          
50% (2-yr) 2 II          
50% (2-yr) 3 II          
50% (2-yr) 6 II          
50% (2-yr) 12 III          
50% (2-yr) 24 III          
50% (2-yr) 48 III          
50% (2-yr) 72 III          
10% (10-yr) 1 II          
10% (10-yr) 2 II          
10% (10-yr) 3 II          
10% (10-yr) 6 II          
10% (10-yr) 12 III          
10% (10-yr) 24 III          
10% (10-yr) 48 III          
10% (10-yr) 72 III          
1% (100-yr) 1 II          
1% (100-yr) 2 II          
1% (100-yr) 3 II          
1% (100-yr) 6 II          
1% (100-yr) 12 III          
1% (100-yr) 24 III          
1% (100-yr) 48 III          
1% (100-yr) 72 III          

C. Volumes and storage (Clauses 3.14.8–3.14.10)

Table 3F.12 — Form 3-2: volumes and storage

AEP Governing duration (h) Runoff volume, pre Runoff volume, post uncontrolled Retention volume Detention storage required Peak water level in storage (m)
50% (2-yr)            
10% (10-yr)            
1% (100-yr)            

C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______

D. Sensitivity runs (Clauses 3.8.5, 3.14.11)

Table 3F.13 — Form 3-2: sensitivity runs

Run Governing storm (AEP, duration) Change in Q_post, routed (%) Change in required storage (%) Retention volume or WQv governing (Clause 3.8.5(c))
Ia = 0.05S        
Standard peak rate factor (only where a lower factor is used)       —

E. Associated checks (Clause 3.14.12)

Table 3F.14 — Form 3-2: associated checks

Check Result Reference in submittal
Drawdown times (Chapter 4)    
Minimum orifice and trash screen (Chapter 4)    
Emergency spillway (Chapter 4)    
Outfall-closed storage check (Chapter 5)    
Downstream analysis (Chapter 5)    

F. Statement by the responsible engineer

I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).

Table 3F.15 — Form 3-2: statement by the responsible engineer

Field Entry
Name  
Qualification and registration number  
Signature  
Date  

Draft form — Haryana Stormwater Design Manual, Draft v1.0.