Chapter 1Policy, Applicability and Adoption
1.1 Purpose and objectives
1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Haryana. It applies to private development and to public works, as set out in Clause 1.5.
1.1.2 The Manual has the following objectives:
- (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
- (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
- (c) to size storage for the long-duration south-west monsoon storms of July–September, which fall on the waterlogged ground of the Rohtak–Jhajjar belt, often on a Yamuna or Ghaggar already in flood from the Shivalik and Himalayan hills, and have put more than 300 mm in a day on Palwal (1875) and Rohtak (1933), as well as for short-duration intensities;
- (d) to design outfalls for the stage of the Yamuna and the Ghaggar and their tributaries, raised by the releases of the Hathnikund barrage and by floods from the Shivalik hills; the levels of the I&WRD drains into which towns discharge, such as Outfall Drain No. 8, which runs from the Rohtak–Jhajjar belt to the Najafgarh drain in Delhi; and the level of the Najafgarh drain itself, which receives the master drains of Gurugram, including the case where the outfall is closed;
- (e) to protect tanks (johads), marshes, rivers, supply channels and surplus courses as part of the drainage system;
- (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
- (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
- (h) to make sure that facilities, once built, are maintained and remain effective.
1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building code issued by the Town and Country Planning Department with memo No. Misc-138-A-Loose/7/5/2006-2TCP of 7 March 2017, and applied by each Competent Authority under its own Act (the Haryana Building Code 2017), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).
1.2 Stormwater management hierarchy
1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.
- Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
- Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
- Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
- Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).
1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.
1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.
Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).
Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Haryana, the top layer has a particular meaning. The storage that matters is in the State's johads and talabs, of which 19,665 ponds, 18,764 rural and 901 urban, are on the Pond Data Management System of the Haryana Pond and Waste Water Management Authority (HPWWMA, 2024); in the old bunds at the foot of the Aravallis around Gurugram, Ghata, Chakarpur, Jharsa and Wazirabad, built in the late nineteenth century and since made obsolete by building (as reported), of which the Ghata bundh alone ponded 60–100 ha from a catchment of about 12,575 ha (GMDA); in the lakes at Badkhal, Surajkund and Damdama; in the Najafgarh jheel, the depression shared with Delhi into which the Sahibi and Gurugram's drains run; in the khadar of the Yamuna and the Ghaggar; and in the two Ramsar sites, Sultanpur (143 ha) and Bhindawas (412 ha), both designated on 25 May 2021. Losing it has a record: Gurugram's water bodies numbered 641 in the revenue record of 1956, 487 on the Survey of India maps of 1976 and 557 on satellite imagery of 2011–12, with only 123 common to all three (GMDA, report to the NGT). The law protects part of it. The Pond Authority Act of 2018 defines a pond of 0.5 acre or more recorded as talab, johar or tank to include its green belt, peripheral catchment and feeder inlets, and bars construction there, or any obstruction of inflow or outflow, without the Authority's permission (ss.2(k) and 14); public tanks and the land appertaining to them vest in a Municipal Corporation (Haryana Municipal Corporation Act, 1994, s.161); and the Supreme Court has barred construction within 1 km of Badkhal and Surajkund (1996). Ponds under 0.5 acre and ponds on private land, which include many urban depressions, are outside the Act. Losing that storage cannot be offset economically by pipes and pumps.
1.3 Legal basis and status
1.3.1 Notification. This Manual shall be given statutory effect by the Government of Haryana through:
- (a) an amendment to the Haryana Building Code 2017 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
- (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.
1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.
1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.
1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.
Commentary. In Haryana the building rules are the Haryana Building Code, 2017 (HBC 2017), one code for the whole State. It is not a Gazette notification made under an Act: the Town and Country Planning Department circulated it with memo No. Misc-138-A-Loose/7/5/2006-2TCP dated 7 March 2017, and it applies to the entire State from 6 January 2017 (Code 1.1(2)); its predecessor, the Haryana Building Code, 2016, replaced the building rules of the separate agencies from 30 June 2016 (Preface). Each Competent Authority applies it under "the respective Act" (Code 1.2(1)(ii)): DTCP, HSVP in its Urban Estates, the Municipal Corporations, Councils and Committees, and HSIIDC in its estates. It is amended by memo in the same way, as on 27 May 2020 and 19 January 2022, each memo forwarded to all departments, boards and corporations "with a request to take necessary action with regard to adoption"; amendments of 8 December 2025 (occupation certificates) and 5 June 2026 (charging points for electric vehicles), and a proposal of November 2026 on purchasable floor area, are reported (as reported; texts not read), and none found touches Code 8.1, 7.3 or 7.16. The Code requires roof rainwater harvesting where the rooftop is 100 m² or more in areas the Competent Authority notifies, and groundwater recharge on all buildings on plots of more than 500 m² (Code 8.1); sets the plinth at 450 mm to 1.5 m, "so located … that proper drainage of the site is assured" (7.3); leaves the drainage of a basement, and its protection from rain, to the owner (7.16(5)(iv)(b)); requires building plans to show "the method of disposal of … storm water" (3.4(2)(vi)); and, for buildings of 5,000–20,000 m² built-up, keeps the inlets and outlets of the natural drainage, at least 20% of the recreational open space unpaved and one recharge bore for each 5,000 m² (12.1). It sets no design storm, return period, release rate or detention volume, no "zero runoff" rule, and no setback from a drain, nala, pond or river. The route of Clause 1.3.1(a) therefore runs through the Town and Country Planning Department, which would issue the amendment by memo as it issues the Code's other amendments, and through each Competent Authority, which would apply it; publication in the Gazette, which Clause 1.3.1 and Annex 1D assume, is this Manual's proposal. This Manual is a draft; neither the Government nor any authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.
1.4 Definitions
1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).
| Term | Meaning in this Manual |
|---|---|
| Approving Authority (the Authority) | The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the Competent Authority that approves the building plan, licence or layout for the site under the Haryana Building Code 2017 and its own Act, which is DTCP for licences under the Haryana Development and Regulation of Urban Areas Act, 1975 and for building plans in the controlled areas, HSVP in its Urban Estates, the Municipal Corporation, Municipal Council or Municipal Committee within its limits, or HSIIDC in its industrial estates, including approval by self-certification where the Code allows it, or a department for its own works. |
| Applicant | The owner, developer or department that seeks approval, and its successors in title. |
| Development | Any building, layout, sub-division, road, paving or land-use change that requires approval under the Haryana Building Code 2017 or that is executed as a public work. |
| Redevelopment | Development on a site where impervious cover already exists. |
| Land disturbance | Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5). |
| Impervious area | Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats. |
| New or replaced impervious area | Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced". |
| Retention | Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4). |
| Detention | Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4). |
| Rainwater harvesting (RWH) | Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it. |
| Minor system | Drains, pipes and inlets designed for the minor-system AEP of Chapter 6. |
| Major system | The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6). |
| Pre-development condition | Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3). |
| Flood-sensitive catchment | The catchments of Gurugram's master drains, Leg-I, Leg-II and Leg-III (the Badshahpur drain), from the Aravalli slopes through the city to their outfalls into the Najafgarh drain, including the reach past Hero Honda Chowk and Khandsa; the catchment of the Budhiya (Buria) nala and of the city drains that join it through Faridabad, down to its outfall towards the Yamuna; the towns of Rohtak, Jhajjar, Bahadurgarh, Beri and Sampla and the land that drains to Outfall Drain No. 8 there, where the water table is within 3 m of the surface over about half of Rohtak and Jhajjar districts; the land of Panchkula and Ambala that drains to the Ghaggar, the Kaushalya and the Tangri, with the floodplain zone of the Ghaggar notified under section 45 of the Haryana Canal and Drainage Act, 1974; and the floodplain (khadar) of the Yamuna and the land that drains to it through gated or pumped outfalls at Karnal, Panipat and Sonipat, and any catchment the Authority notifies (Chapter 4; Annex 1B). |
| Waterbody | A river, stream, canal, tank (johad), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7). |
| Regional facility | A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4). |
| Tier A / Tier B authority | An Approving Authority classed under Clause 1.6. |
| Policy supplement | The set of adoptable alternative clauses in Clause 1.7 and Annex 1C. |
| Drainage report | The preliminary or final report required by Chapter 10. |
| Registered professional | A person registered under the Haryana Building Code 2017 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6. |
| Compliance calculator | The State-issued tool for computing and reporting compliance (Clause 10.5). |
| Maintenance declaration | The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10). |
| Variance | Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10). |
| Waiver | Approval that a requirement does not apply to a site, on the grounds in Clause 1.10. |
| Notified | Published by the Government or the State Stormwater Technical Committee in the Haryana Government Gazette. |
| Competent Authority | The officer or agency authorised under the respective Act to approve building plans and grant occupation certificates under the Haryana Building Code 2017 (Code 1.2(1)(ii) and (xxv)). Where this Manual refers to the Approving Authority for a development, the Competent Authority for the site acts as it. |
Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).
1.5 Applicability
1.5.1 Who is covered. This Manual applies to:
- (a) all development requiring planning permission, building permit or layout approval under the Haryana Building Code 2017;
- (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
- (c) works executed by Central agencies or their contractors within Haryana, to the extent that the Authority's approval or no-objection is required.
1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:
- (a) land disturbance of 0.1 ha or more; or
- (b) new or replaced impervious area of 500 m² or more.
1.5.3 RWH. The existing RWH mandate continues to apply under Code 8.1 of the Haryana Building Code 2017 to buildings whose rooftop is 100 m² or more in the areas the Competent Authority notifies, and, as groundwater recharge, to all buildings on plots of more than 500 m² and to parks, parking and other common open spaces, with the occupation certificate withheld until an architect or engineer certifies that the system works; and, in the Urban Estates of HSVP, under its notification of 31 October 2001 to buildings whose rooftop is 100 m² or more, as now. This Manual does not change it.
1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:
- (a) no sewage connection to a storm drain (Chapter 8);
- (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
- (c) waterbody setbacks and the no-fill zone (Chapter 7); and
- (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).
1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.
1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.
1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.
1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:
- (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
- (b) linear road resurfacing that adds no impervious area.
Exempt development remains subject to the RWH mandate and to Clause 1.5.4.
1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.
Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.
Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:
- Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
- Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
- The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
- MBBL 2016 makes recharge mandatory for buildings over 500 m².
The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Haryana plots are small and the cumulative effect of many small plots is what fills Gurugram's drains. For small buildings in Haryana, Code 8.1 of the HBC 2017 requires roof rainwater harvesting only where the rooftop is 100 m² or more and the Competent Authority has notified the area, and groundwater recharge only on plots of more than 500 m², with the occupation certificate withheld until an architect or engineer certifies that the system works; the Code names ten towns where it is "strictly implemented". None of this is sized to a runoff volume, and none of it limits what leaves the plot. A direction of the Chief Minister of 30 June 2026 to extend harvesting to residential plots of more than 250 sq yd in urban areas is reported, but no notification was found (as reported) [TBC]. The plinth of 450 mm to 1.5 m (Code 7.3) is measured from the street, not from any flood level, and the Code leaves the drainage of a basement to its owner (7.16(5)(iv)(b)), with no entry level for a basement ramp. Clause 1.5.4(b) applies to every building whatever its size for this reason.
Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.
1.6 Tiered adoption
1.6.1 Tier A authorities. The following are Tier A:
- (a) the Municipal Corporation of Gurugram (MCG), and GMDA and every other Approving Authority within the Gurugram Metropolitan Area as notified under the Gurugram Metropolitan Development Authority Act, 2017;
- (b) every other Municipal Corporation constituted under the Haryana Municipal Corporation Act, 1994, as constituted from time to time, among them those of Faridabad and Manesar, with every other Approving Authority within its limits; and
- (c) the Faridabad and Panchkula Metropolitan Development Authorities (FMDA and PMDA), and any metropolitan development authority constituted later by an Act of the State, with every Approving Authority within its notified area; and, wherever they lie, HSVP in its Urban Estates and DTCP for the colonies it licenses under the Haryana Development and Regulation of Urban Areas Act, 1975.
1.6.2 Tier B authorities. All other Municipal Councils and Municipal Committees are Tier B.
1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:
Table 1.1 — Differences between Tier A and Tier B authorities
| Item | Tier A | Tier B |
|---|---|---|
| Performance criteria (Chapters 2–9) | Apply in full | Apply in full |
| Hydrologic method for storage | Hydrograph method (Chapter 3) | Hydrograph method, or the design-aid route of Clause 1.7 where eligible |
| Compliance calculator (Clause 10.5) | Required as a summary | Required; may be the sole calculation on the design-aid route |
| Policy supplement alternatives (Clause 1.7) | Only with State Stormwater Technical Committee concurrence | May be adopted by council resolution |
| Technical review | By the Authority | By the Authority, with DTCP regional support or an empanelled reviewer (Clause 10.7) |
| Flood-sensitive catchment rule | Applies | Applies |
1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the area of a metropolitan development authority (GMDA, FMDA or PMDA) as notified under its Act, or is found by a post-event review (Clause 10.16) to need the full methods.
1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.
Commentary. Municipal Corporation of Gurugram, with its engineering wing and, beside it, GMDA for the master drains, and a small Municipal Committee with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Gurugram.
1.7 Policy supplement: adoptable alternatives
1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.
1.7.2 The alternatives are:
Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5
| No. | Main-text requirement | Adoptable alternative | Eligibility |
|---|---|---|---|
| S-1 | Storage sized by hydrograph method (Chapter 3) | Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator | Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1) |
| S-2 | Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site | Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule | Any site outside flood-sensitive catchments |
| S-3 | Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) | Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 | Waterbodies with no mapped 1% AEP extent |
| S-4 | Downstream analysis by hydraulic model (Chapter 5) | Screening checklist of downstream capacity and known flooding, with a model only where the screen fails | Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall |
| S-5 | On-site detention | Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) | Where a basin plan has been notified |
1.7.3 Conditions on adoption.
- (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
- (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
- (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
- (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
- (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).
Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.
1.8 Relationship with other instruments
1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.
Table 1.3 — Relationship with other instruments
| Instrument | Relationship |
|---|---|
| Haryana Building Code, 2017 (circulated with memo No. Misc-138-A-Loose/7/5/2006-2TCP of 7 March 2017 and applying statewide from 6 January 2017; amended by memo, as on 27 May 2020 and 19 January 2022, with amendments of 8 December 2025 and 5 June 2026 reported) | Continues. It is a departmental code applied by each Competent Authority under its own Act, not a Gazette notification. It requires building plans to show the disposal of storm water (Code 3.4(2)(vi)); sets the plinth at 450 mm to 1.5 m so that the site drains (7.3); leaves the drainage of a basement to its owner (7.16(5)(iv)(b)); and, for buildings of 5,000–20,000 m² built-up, keeps the inlets and outlets of the natural drainage "with adequate size of channel", at least 20% of the recreational open space unpaved and one recharge bore per 5,000 m² (12.1). It sets no design storm, release rate or detention volume, and no setback from a drain, nala, pond or river. The design criteria of Chapters 2–6 and the hydraulic corridor and setbacks of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the Code, a development plan, a statute or a court order is stricter, it governs (Clause 1.3.3). |
| Rainwater harvesting: HBC 2017, Code 8.1; HSVP notification of 31 October 2001 in the Urban Estates; Central Ground Water Authority (CGWA), Public Notice No. 1 of 2011 (13 August 2011), which made the whole of Gurgaon district a notified area | Continue unchanged. Code 8.1 requires roof harvesting where the rooftop is 100 m² or more in areas the Competent Authority notifies, and groundwater recharge on all buildings on plots of more than 500 m² and in parks and other common open spaces; places a recharge well at least 10 m from any structure that handles sewage; and ties the occupation certificate to a certificate that the system works, with the owner to maintain it. Since 2020 the Haryana Water Resources Authority issues the groundwater NOCs that CGWA issued before. None of these gives an outlet rule or a storage that is empty when a storm arrives. RWH storage is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and tanks are assumed full at the start of SW monsoon storms (Chapter 4). The State drew 135.96% of its annual extractable groundwater in 2024, and 88 of its 143 blocks were over-exploited (CGWB); yet every block of Rohtak and Jhajjar is safe because the water table there is within 3 m of the surface over about half of each district (HWRA). Recharge structures may count toward retention where they meet Chapters 4 and 8, which make recharge the first choice, with pre-treatment, where the seasonal high water table is deeper than 10 m, give no recharge credit where it is within 3 m, and ask for a hydrogeologist's check in between. |
| Haryana Development and Regulation of Urban Areas Act, 1975; Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Act, 1963; Haryana Shehri Vikas Pradhikaran Act, 1977 | Continue. Colonies are licensed under section 3 of the 1975 Act, and their external development works, executed by HSVP as nodal agency, and internal development works, executed by the colonizer, include storm drains (s.2(g) and (i), as quoted by DTCP); development plans of the controlled areas are made under section 5 of the 1963 Act; and HSVP develops the Urban Estates. Their texts were not read for this Manual [TBC]. This Manual does not decide zoning; the drain reserves and regional facility sites of Chapters 4 and 7 are meant to be shown in those plans and licences. |
| Haryana Municipal Corporation Act, 1994 (Act 16 of 1994); Haryana Municipal Act, 1973 (Act 24 of 1973) | Continue. Public drains, and drains in or alongside public streets, vest in the Corporation (s.193), with public tanks and the public land appertaining to them (s.161); the Commissioner keeps them in repair and builds new ones (s.194); no premises may be built or occupied without a drain to a Corporation drain within 30 m (s.198); the Commissioner may require distinct drains for sewage and for rain water (s.202), and foul water may not be discharged into a drain for surface water (s.196); and no structure may be built on a municipal drain without the Commissioner's written permission (s.206). Only the section headings of the 1973 Act, which governs the Municipal Councils and Committees, were read [TBC]. This Manual does not change those powers; Chapter 7 treats ponds as drainage assets and Chapter 8 keeps sewage out of storm drains. |
| Gurugram Metropolitan Development Authority Act, 2017 (Act 34 of 2017); Faridabad Metropolitan Development Authority Act, 2018; Panchkula Metropolitan Development Authority Act, 2021 (Act 23 of 2021) | Continue. Their "infrastructure development work" includes drainage that connects two or more sectors, municipal colonies or villages, and GMDA's infrastructure development plan must detail storm water drainage (s.17, as read from the Bill of 2017). The Gurugram Metropolitan Area was notified on 12 August 2018. The texts of the GMDA and FMDA Acts as enacted were not read [TBC]. This Manual's master-drain, regional-facility and basin-plan provisions (Chapters 4, 6 and 11) are meant to be carried out through those plans. |
| Haryana Canal and Drainage Act, 1974 (Act 29 of 1974), ss.2(7) and 45–48 | Continues. Where obstruction of a river, stream or drainage channel may cause injury, the State may by notification bar obstruction within defined limits, and the reach so notified becomes a drainage work (s.45), from which an obstruction can be removed (s.46). I&WRD used the section for the Ghaggar floodplain zone in Panchkula, notified on 27 October 2023 on a 100-year flood of 2,933.45 m³/s computed by Gumbel's method from 54 years of data (I&WRD, replies to the NGT); the NGT questioned whether the procedure had been followed (order of 22 May 2024, as quoted). No section 45 notification was found for the Yamuna or any other river, and no I&WRD rule fixing a distance of no construction from a drain or canal was found. Town sewage works are not drainage works (s.2(7)). Where a section 45 line is wider than the corridor of Chapter 7, it governs (Clause 1.3.3). |
| Haryana Pond and Waste Water Management Authority Act, 2018 (Act 33 of 2018) | Continues. A "pond" is a tank, lake or other inland water body of 0.5 acre or more, recorded as talab, johar, tank or by any other name, whether it holds water or not, and includes its green belt, peripheral catchment, feeder inlets, bunds, weirs and sluices; ponds under 0.5 acre, on private land, in notified forest or notified as wetlands are excluded (ss.1(3) and 2(k)). No one may build on pond land, its green belt or catchment, or obstruct its inflow or outflow, without the Authority's permission (s.14); the State may notify a protected area around a pond (s.16); and no spatial or development plan covering a pond may be approved without the Authority's prior approval (s.17). No protected-area notification was found [TBC]. Chapter 7 uses the statutory green belt and catchment as the least extent of a pond's protection. |
| Haryana Water Resources (Conservation, Regulation and Management) Authority Act, 2020 (Act 29 of 2020, amended in 2022) | Continues. The Authority is to encourage rainwater harvesting and recharge "as per geohydrological conditions", its harvesting conditions recommended for building bye-laws bind the agencies that approve building plans, and it is to "discourage and prevent such activities that are likely to lead to potential water logging of land" (s.21(3), (4) and (7)). The recharge rules of Chapters 4 and 8, which depend on the depth to water, are framed to fit that duty. |
| Punjab Land Preservation Act, 1900, as applied in Haryana; the Aravalli hills | Apply where they bind. The Supreme Court has held that land notified under the Act must be treated as forest (M.C. Mehta v. Union of India (In re Kant Enclave), 11 Sep 2018, as reported; judgment and Act not read [TBC]); its judgment of 20 November 2025 defining the Aravalli hills was stayed on 29 December 2025 (as reported). Earthworks and drainage works on the Aravalli slopes above Gurugram and Faridabad are subject to those orders. |
| Wetlands (Conservation and Management) Rules, 2017; the Haryana State Wetland Authority; the Ramsar sites of Sultanpur and Bhindawas | Continue. The State Wetland Authority was reconstituted on 12 May 2020. Sultanpur National Park (143 ha) and Bhindawas Wildlife Sanctuary (412 ha) were designated Ramsar sites on 25 May 2021. No wetland notified under the Rules in Haryana was confirmed; the Najafgarh jheel was accepted as a water body in 2017 but had not been notified by March 2024, and 1,881 wetlands were to be ground-truthed under the Supreme Court's orders (as reported). The Union's office memorandum of 8 March 2022 treats the wetlands of the National Wetland Inventory larger than 2.25 ha as protected under rule 4 whether notified or not (as quoted). Where a notification or order is wider than the setback of Chapter 7, it governs (Clause 1.3.3). |
| Orders of the Supreme Court, the High Court and the National Green Tribunal on lakes, ponds and drains | Apply where they bind. Badkhal and Surajkund: no construction in the green belt or within 1 km of the lakes, with stated exceptions, and the prior approval of CPCB and HSPCB for all plans within 1–5 km (M.C. Mehta, I.A. 29 in W.P.(C) 4677/1985, order of 11 Oct 1996). Gurugram's water bodies: unique IDs and restoration for at least 123 water bodies (NGT, O.A. 325/2015, 20 Jul 2018). Master drains: no sewage in dry weather and a BOD of not more than 30 mg/l before the Najafgarh drain (NGT, O.A. 454/2018 and O.A. 6/2012, as reported by GMDA); Najafgarh jheel: the Wetlands Rules to be "strictly followed" (NGT, O.A. 153/2014, 21 Jan 2022, as quoted). Waterlogging: the High Court found Gurugram's water bodies diminished and their channels "largely blocked", and summoned the officers of MCG, HSVP and GMDA (Sunil Singh v. MoEF, CWP-20032-2008, order of 22 Sep 2026). The hydraulic corridor and setbacks of Chapter 7, with a Zone 1 of at least 15 m, are this Manual's proposals; where a court's line binds and is wider, it governs. |
| Disaster Management Act, 2005; HSDMA; the district flood-control action plans; the Haryana State Drought Relief and Flood Control Board | Continue. Flood-control works are to be finished before 30 June each year under the directions of the Board and the Chief Secretary, and one direction asks for drains to be cleaned before 15 June (as reported). No urban flood plan of HSDMA was found [TBC]. Chapter 10 links its pre-monsoon checks to these dates. |
| NCR Planning Board, Functional Plan on Drainage for NCR (2016); Sub-Regional Plan for the Haryana Sub-Region of NCR-2021, Chapter 9 (TCP Department) | Superseded for works designed under this Manual. The Functional Plan reports that Haryana's urban storm water channels were designed for 25 mm/h with a runoff coefficient of 1/8, and its rural drains by the Boston Society formula with reduction factors of 1/12 to 1/4; the Sub-Regional Plan asks for rural drains to carry "three days rainfall of five years frequency to be drained in three days" and for urban drains to follow CPHEEO, and sets the policies that rain be retained where it falls and that drains carry only rain water. These are cited as the history of practice and as policy; the return periods of Table 2.1 and the rainfall of Chapter 2 apply instead. |
| CPHEEO Manual on Storm Water Drainage Systems (2019) | Engineering reference. This Manual sets higher return periods under Clause 1.3.2. |
| NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) | This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF. |
| NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 | Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create. |
| IRC:SP:42-2014 and IRC:SP:50-2013 | Apply to road drainage only where they do not conflict with Chapter 6. |
| MBBL 2016, Chapter 9 | Model for RWH and for the inspection regime in Chapter 10. |
Commentary. RWH in Haryana is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a July or August monsoon burst arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.
Haryana is spending on its drains. The Haryana State Drought Relief and Flood Control Board, chaired by the Chief Minister, approves several hundred flood-control schemes a year, 352 schemes worth ₹657.99 crore at its 56th meeting and 388 worth ₹637.25 crore at its 57th (as reported); GMDA desilts the master drains of Gurugram, has begun a fourth, Leg-IV, as an RCC drain whose design is reported to have been checked by IIT Roorkee, and sought a consultant in 2024 for a drainage plan for the city (as reported); and FMDA desilts eight storm drains of Faridabad, among them the Budhiya nala (as reported). None of these works was found with a stated design return period or rainfall. No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.
The State's law already holds many of the tools. Public drains vest in a Municipal Corporation, which may require separate drains for sewage and for rain water and bars building over a municipal drain (Haryana Municipal Corporation Act, 1994, ss.193, 202 and 206); the external and internal development works of a licensed colony include its storm drains (Haryana Development and Regulation of Urban Areas Act, 1975, s.2(g) and (i), as quoted by DTCP); section 45 of the Haryana Canal and Drainage Act, 1974 lets the State notify limits along a river or drainage channel within which obstruction is barred; the Pond Authority Act of 2018 protects a pond's green belt and catchment and requires the Authority's approval of any plan that covers it; the Water Resources Authority Act of 2020 tells that Authority to "discourage and prevent such activities that are likely to lead to potential water logging of land" (s.21(7)); and the Building Code asks for storm-water disposal on every building plan and keeps the natural drainage of large sites. What the law lacks is a design standard. None of these instruments says how large a drain must be, which storm it must carry, how wide a nala's corridor must be, or how much storage a filled johad or a paved plot removes. This Manual's checks are framed as part of the licence, building plan and occupation certificate stages of the Code, not as a separate NOC. It is offered as a technical companion to these instruments, to the orders of the courts and the NGT, and to the drainage works of the cities: it supplies the design storm, detention and buffer numbers they do not set, as a proposal for the Government and the authorities to consider. Neither the Town and Country Planning Department nor any other body has adopted it.
1.9 Roles and responsibilities
1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.
Table 1.4 — Roles and responsibilities under this Manual
| Agency | Role under this Manual |
|---|---|
| Town and Country Planning Department (DTCP) | Issues the HBC 2017 and its amendments by memo; grants licences for colonies under the Haryana Development and Regulation of Urban Areas Act, 1975, whose external and internal development works include storm drains; prepares the development plans of the controlled areas; and drew the master storm water drainage plan of Gurugram (drawing No. DTP(G) 2104/2012). Would issue the amendment of Clause 1.3.1(a), give regional support to Tier B authorities (Table 1.1) and maintain the empanelled reviewer list (Clause 10.7). |
| State Stormwater Technical Committee (Clause 1.3.2) | Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12). |
| Urban Local Bodies Department | Oversees the Municipal Corporations under the Haryana Municipal Corporation Act, 1994 and the Municipal Councils and Committees under the Haryana Municipal Act, 1973; in 2026 it pressed a "zero flood" plan on the cities, with 159 waterlogging hotspots listed in Gurugram (as reported). Would issue the model ULB bye-law of Clause 1.3.1(b) and require this Manual in the drainage works of the local bodies. |
| Municipal Corporation of Gurugram (MCG) and the other Municipal Corporations; Municipal Councils and Municipal Committees | Public drains vest in a Corporation (s.193), and the Commissioner keeps them in repair and builds new ones (s.194), may require a drain before a building is occupied (s.198) and separate drains for sewage and rain water (s.202), and must permit any structure over a municipal drain (s.206). Competent Authorities for building plans within their limits. The High Court summoned the Chief Engineer of MCG in September 2026 over Gurugram's waterlogging (Sunil Singh). Would apply this Manual to their works, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15). |
| Haryana Shehri Vikas Pradhikaran (HSVP, formerly HUDA) | Develops the Urban Estates and their sectors, and is the nodal agency for the external development works, storm drains among them, in those estates (DTCP, report to the NGT, 2022); Competent Authority for building plans in its estates; enforces roof rainwater harvesting there under its notification of 31 October 2001 and a yearly self-declaration (2024), and counted 1,92,700 structures in private plotted buildings by December 2023 (I&WRD, report to the NGT). Would apply this Manual to its sector layouts and drains and hand them over under Clause 10.14. |
| Gurugram Metropolitan Development Authority (GMDA) | Holds the master drains of Gurugram, Leg-I, Leg-II and Leg-III (the Badshahpur drain), which outfall to the Najafgarh drain, with Leg-IV under construction, and the drains that connect sectors and municipal colonies in the Gurugram Metropolitan Area, whose storm water drainage its infrastructure development plan must detail (GMDA Act, s.17, as read from the Bill text). Nodal agency under the NGT's orders for keeping sewage out of the master drains, whose water must meet a BOD of not more than 30 mg/l before it enters the Najafgarh drain (GMDA, report to the NGT, 2020). Would apply this Manual to the master drains and regional facilities, and agree outfall levels to the Najafgarh drain with I&WRD and the Irrigation and Flood Control Department of Delhi. |
| Faridabad and Panchkula Metropolitan Development Authorities (FMDA, PMDA) | Infrastructure development in their metropolitan areas, defined in their Acts as in GMDA's; FMDA desilts eight storm drains of Faridabad, among them the Budhiya nala (as reported). Their drainage functions under their Acts were not read for this Manual [TBC]. Would apply this Manual to their drains and regional facilities. |
| Irrigation and Water Resources Department (I&WRD) and the Haryana State Drought Relief and Flood Control Board | Holds the rivers, embankments and barrages (Hathnikund on the Yamuna, Masani on the Sahibi) and the rural and regional drains, such as Outfall Drain No. 8, Drain No. 2 and the Gaunchi drain; notifies floodplain zones under section 45 of the Haryana Canal and Drainage Act, 1974, as for the Ghaggar in Panchkula (27 October 2023); and prepares the flood-control schemes that the Board, chaired by the Chief Minister, approves. Would provide design river and drain levels, gate and regulator operating rules and release scenarios for Chapter 5, consent to outfalls into its drains, and keep the section 45 lines that Chapter 7 applies. |
| Haryana Pond and Waste Water Management Authority (HPWWMA) | Regulates ponds of 0.5 acre or more recorded as talab, johar or tank, with their green belts and catchments, under the Act of 2018; its prior approval is needed for any spatial or development plan that covers a pond (s.17), and it keeps the Pond Data Management System. Would certify the boundary, green belt and catchment of a pond for Chapter 7, and consent to a stormwater outlet into a pond. |
| Haryana Water Resources Authority | Regulates groundwater under the Act of 2020, issues the NOCs for abstraction that CGWA issued before, and has adopted CGWB's block categories of 31 March 2024 for them; it is told to prevent activities that lead to waterlogging (s.21(7)). Would supply depth-to-water data, with CGWB, for the recharge rules of Chapters 4 and 8. |
| Haryana State Pollution Control Board (HSPCB) | Grants consents, monitors the drains and rivers and the treatment plants that discharge to them; under the Supreme Court's order of 1996, its approval is needed for development plans within 1–5 km of Badkhal and Surajkund. Supports the removal of sewage from storm drains (Chapter 8). |
| HSDMA and the District Disaster Management Authorities | Approve the State and district disaster management plans; no urban flood plan of HSDMA was found [TBC]. Would recommend flood-sensitive catchments, hold the record of flood-prone locations with the Deputy Commissioners, and lead the post-event review (Clause 10.16). |
| Haryana State Wetland Authority | Reconstituted on 12 May 2020 under the Wetlands Rules 2017, with the Chief Minister as chairman; keeps the inventory of wetlands, demarcates them and would notify them. Would permit regulated activities in notified wetlands (Chapter 7). |
| Revenue and Disaster Management Department: the Deputy Commissioners and the tehsil offices | Keep the revenue (khasra) records in which johads, talabs, nalas and khadar land are recorded, run the district flood-control action plans and act against encroachment; the patwaris surveyed the Ghaggar floodplain in Panchkula with I&WRD. Would certify the recorded extent of a nala, pond or johad for Chapter 7. |
| Public Health Engineering Department (PHED) | Sewerage and sewage treatment in many towns; "strong sewage" reaching ponds is in its scope (HPWWMA, report to the NGT, 2024). Would apply Chapter 8 to the interception of sewage that now flows in storm drains. |
| Development and Panchayats Department and the Gram Panchayats | Own most village ponds, which the Gram Panchayats de-water and de-silt from their own funds under an order of 24 June 2023 (HPWWMA, report to the NGT, 2024). Would apply Chapter 7 to village ponds that receive town or highway runoff. |
| Haryana State Industrial and Infrastructure Development Corporation (HSIIDC) | Develops the industrial estates, where it applies the HBC 2017 as Competent Authority. Would apply this Manual in its estates. |
| Central Water Commission (CWC), a body of the Union | Publishes the Flood Estimation Report for subzone 1(e) used in Chapters 2 and 3, and the river levels at its sites on the Yamuna, such as Karnal and Mawi; it has no flood site in the Ghaggar basin. Would supply river stage records and forecasts for Chapter 5. |
| Central Ground Water Board (CGWB), a body of the Union | Assesses the groundwater units of the State and their categories, 88 of 143 over-exploited in 2024. Would supply groundwater levels and quality with the Haryana Water Resources Authority. |
| National Institute of Hydrology (NIH), Roorkee | Runs NIH-DHAARA (Chapter 2). |
| IMD (Meteorological Centre Chandigarh), and road and rail owners (PWD (B&R), NHAI, Indian Railways) | IMD's stations supply the rainfall records of Chapter 2. Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7). |
| Irrigation and Flood Control Department, Government of the National Capital Territory of Delhi | Holds the Najafgarh drain in Delhi, into which Gurugram's master drains and Outfall Drain No. 8 discharge. Would be consulted on the outfall levels of those drains (Chapter 5). |
Commentary. Stormwater in Haryana is split by tier and by place: between DTCP, through the Building Code, the licences and the development plans; HSVP, through the sectors of its Urban Estates; the metropolitan development authorities, through the master drains of Gurugram, Faridabad and Panchkula; the Municipal Corporations, Councils and Committees, through the drains vested in them; I&WRD, through the rivers, embankments and rural drains and the floodplain zones of section 45; the Pond Authority, through the public ponds and their catchments; and the Revenue and Disaster Management Department, through the revenue records, with the courts and the NGT setting the lines around the lakes and the conditions on the drains. Gurugram shows why the split matters. Its runoff runs off the Aravallis through sector drains built by HSVP and colonizers into master drains held by GMDA, parts of which DTCP's drawing of 2012 marks "to be got constructed by Irrigation Department", and on into the Najafgarh drain, which I&WRD and Delhi's Irrigation and Flood Control Department hold on either side of the boundary; and when the city flooded in 2026 the High Court summoned officers of MCG, HSVP and GMDA together (Sunil Singh, 22 Sep 2026). No rule or order found divides the drains of I&WRD from those of the local bodies, HSVP and the metropolitan development authorities [TBC]. Until such a rule is made, this Manual assigns the drainage elements as in Table 1.5. The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers.
Table 1.5 — Working assignment of drainage elements under this Manual
| Element | Assigned to |
|---|---|
| Rivers, their floodplains and embankments, the barrages (Hathnikund, Masani) and the floodplain zones notified under section 45 | I&WRD |
| Rural and regional drains, such as Outfall Drain No. 8, Drain No. 2 and the Gaunchi drain, and the Haryana reach of the Najafgarh drain | I&WRD |
| The master drains of Gurugram (Leg-I to Leg-IV) and the drains that connect sectors, municipal colonies or villages in the Gurugram Metropolitan Area | GMDA |
| Drains that connect sectors in the Faridabad and Panchkula metropolitan areas | FMDA or PMDA [TBC] |
| Sector drains in the Urban Estates, until handed over to the local body | HSVP |
| Drains within a licensed colony, until taken over | The colonizer, as internal development works, under DTCP's licence |
| Street and public drains within the limits of a local body | The Municipal Corporation, Municipal Council or Municipal Committee |
| Public ponds of 0.5 acre or more | The Gram Panchayat or local body that owns them, with HPWWMA as regulator |
| Ponds under 0.5 acre, private ponds and low-lying water collection areas | The local body or the owner, as drainage storage under Chapter 7 |
| Drains within an industrial estate | HSIIDC |
| Sewers, interceptors and sewage treatment plants | PHED, or the local body or GMDA where it executes the work |
| Drains of State and national highways | PWD (B&R) or NHAI |
| Notified wetlands and Ramsar sites | The Haryana State Wetland Authority, with the owner of the land |
This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.
1.10 Variances and waivers
1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:
- (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
- (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.
1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Haryana has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to the Yamuna or the Ghaggar through a flap gate or regulator, to an I&WRD drain whose level is held up, such as Outfall Drain No. 8 above the Dhansa regulator, or only by pumping, as in much of the Rohtak–Jhajjar belt, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it.
1.10.3 No variance or waiver. No variance or waiver shall be granted for:
- (a) a sewage connection to a storm drain;
- (b) the lowest habitable floor level of Chapter 6;
- (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
- (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.
1.10.4 Procedure.
- (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
- (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
- (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
- (d) A variance runs with the approval. It lapses if the approval lapses.
Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Haryana, Gurugram's water bodies numbered 641 in the revenue record of 1956, 487 on the Survey of India maps of 1976 and 557 on satellite imagery of 2011–12, with only 123 common to all three (GMDA, report to the NGT in O.A. 325/2015), and the High Court found in 2026 that the city's natural water bodies "have substantially diminished, while the channels that sustained these water bodies remain largely blocked" (Sunil Singh v. MoEF, 22 Sep 2026).
1.11 Transition provisions
1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).
1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.
1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.
1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.
1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.
Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).
1.12 Review and amendment
1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.
1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.
1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.
References (chapter)
- Town and Country Planning Department, Haryana (2017). The Haryana Building Code, 2017, circulated with memo No. Misc-138-A-Loose/7/5/2006-2TCP, 7 Mar 2017, Codes 1.1, 1.2, 3.2, 3.4, 7.3, 7.16, 8.1, 11.11, 12.1 and 13 (Wayback Machine copy of tcpharyana.gov.in; later copy hosted by HSVP). http://web.archive.org/web/20170714152920id_/https://tcpharyana.gov.in/Notifications_Judgements/The_Haryana_Building_Code_2017.pdf ; https://www.hsvphry.org.in/documents/policies/planning_wing/PLAN_202208311322_637975489655476564.pdf
- Town and Country Planning Department, Haryana. Amendments of the Haryana Building Code 2017: memo No. Misc-2339-(ULB)-VOL-II/7/5/2006-2TCP, 27 May 2020, and memo No. Misc-2339-ULB-VOL-II-A/7/5/2006-2TCP, 19 Jan 2022 (Wayback Machine copies); amendments of 8 Dec 2025 and 5 Jun 2026 and the proposal of Nov 2026 as reported (secondary sources; texts not read). http://web.archive.org/web/20200926052536id_/https://tcpharyana.gov.in/public_notice/Amendment%20in%20Haryana%20Building%20Code-2017.pdf ; http://web.archive.org/web/20220122194243id_/https://tcpharyana.gov.in/public_notice/Amendment%20in%20HBC%20dated%2019.01.2022.pdf
- Haryana Municipal Corporation Act, 1994 (Act 16 of 1994), ss.2, 161 and 193–206 (PRS copy, with amendments). https://prsindia.org/files/bills_acts/acts_states/haryana/1994/1994Haryana16.pdf
- Haryana Canal and Drainage Act, 1974 (Act 29 of 1974), ss.2(7)–(8) and 45–48 (PRS copy). https://prsindia.org/files/bills_acts/acts_states/haryana/1974/1974HR29.pdf
- Haryana Pond and Waste Water Management Authority Act, 2018 (Haryana Act No. 33 of 2018), as enacted (annexed to the Authority's written statement in NGT O.A. 573/2023) and as the Bill (No. 25-HLA of 2018). https://prsindia.org/files/bills_acts/bills_states/haryana/2018/Bill%20No.%2025%20of%202018%20Haryana.pdf
- Haryana Water Resources (Conservation, Regulation and Management) Authority Act, 2020 (Act 29 of 2020, as amended), s.21. https://hwra.org.in/Content/Images/The%20Haryana%20Water%20Resources%20(Conservation,%20Regulation%20and%20Management)%20Authority,%20Act%202020%20as%20Amendment%20Uptodate.pdf
- Gurugram Metropolitan Development Authority Bill, 2017 (Bill No. 36-HLA of 2017), enacted as Haryana Act 34 of 2017; Panchkula Metropolitan Development Authority Act, 2021 (Act 23 of 2021) (PRS copies). https://prsindia.org/files/bills_acts/bills_states/haryana/2017/Haryana%20Bill%20No.%2036%20of%202017.pdf ; https://prsindia.org/files/bills_acts/acts_states/haryana/2021/Act%20No%2023%20of%202021%20Haryana.pdf
- Environment and Climate Change Department, Haryana (2020). Notification reconstituting the Wetland Authority of Haryana, endorsement No. 16/15/2017-3 Env., 12 May 2020. https://indianwetlands.in/wp-content/uploads/2022/02/Haryana.pdf
- Supreme Court of India. M.C. Mehta v. Union of India (Badkhal and Surajkund Lakes), I.A. 29 in W.P.(C) 4677/1985, order of 11 Oct 1996. https://elaw.org/es/system/files/attachments/publicresource/wp4677of1985ddOct11of1996.pdf
- Supreme Court of India. M.C. Mehta v. Union of India (In re Kant Enclave), judgment of 11 Sep 2018 (as reported; not read). https://scroll.in/latest/894122/irreversible-damage-to-aravallis-sc-orders-demolition-of-buildings-in-faridabads-kant-enclave
- High Court of Punjab and Haryana. Sunil Singh v. MoEF, CWP-20032-2008 and connected matters, order of 22 Sep 2026. https://www.livelaw.in/pdf_upload/2026/09/28/38dff5e0-5d01-49ba-ae89-9956448644e5-702906.pdf
- Irrigation and Water Resources Department, Haryana. Replies in NGT O.A. 421/2022 (Ranvir Singh; the Ghaggar floodplain zone) and committee report in NGT O.A. 627/2022 (Prakash Yadav; the Sahibi and Outfall Drain No. 8, filed 7 Feb 2024). https://www.greentribunal.gov.in/sites/default/files/news_updates/REVISED%20REPLY%20BY%20HARYANA%20IRRIGATION%20AND%20WATER%20RESOURCE%20DEPTT.%20IN%20OA%20NO.%20421%20of%202022%20(RANVIR%20SINGH%20VS%20STATE%20OF%20HARYANA).pdf ; https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20IRRIGATION%20AND%20WATER%20RESOURCES%20DEPT,%20HARYANA%20IN%20OA%20627%20of%202022%20(PRAKASH%20YADAV%20VS.%20STATE%20OF%20HARYANA%20&%20ORS.%20).pdf
- Gurugram Metropolitan Development Authority. Status report of 2 Oct 2020 in NGT O.A. 454/2018 (Subhash Gupta), and compliance report in NGT O.A. 325/2015 (Oberoi; water bodies of Gurugram). https://www.greentribunal.gov.in/sites/default/files/news_updates/STATUS%20REPORT%20in%20OA%20454%20Of%202018%20(Subhash%20Gupta%20&%20Ors.%20VS.%20Union%20Of%20India%20&%20Ors.).pdf ; https://www.greentribunal.gov.in/sites/default/files/all_documents/GMDA-Compliance%20Report%20In%20O.A.%20No.%20325%20of%202015.pdf
- Haryana Pond and Waste Water Management Authority (2024). Written statement of 21 Feb 2024 in NGT O.A. 573/2023 (Prakash Yadav). https://www.greentribunal.gov.in/sites/default/files/news_updates/WRITTEN%20STATEMENT%20ON%20BEHALF%20OF%20R-5%20MS,%20HARYANA%20POND%20AND%20WASTE%20WATER%20MANAGEMENT%20AUTHORITY%20IN%20OA%20NO.%20573%20of%202023%20PRAKASH%20YADAV%20VS%20STATE%20OF%20HARYANA.pdf
- State of Haryana (2024). Status report in NGT E.A. 35/2023 in O.A. 673/2018 (drain water quality, 2023; floodplains). https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20STATE%20OF%20HARYANA%20IN%20EA%20NO.%2035%20of%202023%20IN%20OA%20NO.%20673%20of%202018%20News%20item%20published%20in%20the%20Hindu%20authored%20by%20shri%20Jacob%20Koshy%20titled%20more%20river.pdf
- Department of Town and Country Planning, Haryana (2022). Report of 28 Mar 2022 in NGT O.A. 661/2018 (Parveen Kakkar; licences and development works under the Act of 1975). https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20Department%20of%20Town%20and%20Country%20Planning%20Haryana%20IN%20OA%20NO.%20661%20of%202018%20(Parveen%20Kakkar%20Vs%20Ministry%20of%20Environment,%20Forests%20&%20Climate%20Change,%20Government%20of%20India%20and%20others).pdf
- Irrigation and Water Resources Department, Haryana. Report in NGT O.A. 694/2023 (groundwater; HSVP's rainwater harvesting notification of 31 Oct 2001). https://www.greentribunal.gov.in/sites/default/files/news_updates/Report%20by%20Irrigation%20&%20Water%20Resources%20Department,%20Haryana%20in%20OA%20No.%20694%20of%202023(News%20item%20aooearing%20in%20Hindustan%20Times%20dated%2026.10.2023%20titled%20UN%20predicts%20groundwater%20....).pdf
- Haryana Shehri Vikas Pradhikaran (2024). Chief Engineer's memo on rainwater harvesting, with the self-declaration and public notice. https://hsvphry.org.in/documents/policies/engineering_wing/ENGG_202410091520_638640840300954997.pdf
- Central Ground Water Authority (2011). Public Notice No. 1 of 2011, 13 Aug 2011 (Gurgaon district a notified area; seen only through a snippet). https://cgwb.gov.in/old_website/CGWA/documents/Public%20Notice%20No.1%20of%202011.pdf
- Central Ground Water Board (2025). Dynamic Ground Water Resources of Haryana, 2024. https://cgwb.gov.in/cgwbpnm/public/uploads/documents/1742295665450434455file.pdf
- Haryana Water Resources Authority (2025). Haryana Water Resources Atlas 2025 (depth to water, June and October 2023). https://hwra.org.in/Atlas2025/files/basic-html/page61.html
- Haryana Vidhan Sabha. Starred Question *1397 (2022), flows in the Gurugram master drains. https://haryanaassembly.gov.in/wp-content/uploads/2022/04/1397-H-E-PDF.pdf
- Rajya Sabha. Unstarred Question 1007, 13 Feb 2025 (Ramsar sites; seen only through a snippet). https://rsdebate.nic.in/bitstream/123456789/758759/1/PQ_267_13022025_U1007_p169_p175.pdf
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Table 4.1 and notes).
- Kakkar, R. (CPHEEO) (2023). Understanding Urban Stormwater Management. CSE, Aug 2023.
- National Disaster Management Authority (2010). National Guidelines on Management of Urban Flooding.
- MoHUA (2016). Model Building Bye-Laws, Chapter 9.
- Lok Sabha Unstarred Question 1847, 30 Jul 2026 (MoHUA). https://sansad.in/getFile/lsapps/loksabhaquestions/annex/188/AU1847_x29brZ.pdf
- India Meteorological Department. Climate of Haryana and Union Territories of Delhi and Chandigarh (1991; district records of the heaviest rainfall in 24 hours to 1980; scanned copy, Wayback Machine). https://web.archive.org/web/20220129211840id_/https://imdpune.gov.in/library/public/Climate%20of%20Haryana%20and%20Union%20Terri%20of%20Delhi%20and%20Chandigarh.pdf
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012), stations of Haryana. https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- India Meteorological Department (2023). Monthly Climate Summary, July 2023 (24-hour July records at Chandigarh and Ambala; real-time data). https://www.imdpune.gov.in/cmpg/Product/Monthly_Climate_Summary/Monthly_Clim_Summary_7_2023.pdf
- Ministry of Jal Shakti (2024). Interim report of the committee on the Joint Flood Management Study of River Yamuna between Hathnikund and Okhla Barrage, Jan 2024 (copy hosted by SANDRP). https://sandrp.in/wp-content/uploads/2025/04/interim-report-of-the-committee_28012024_final.pdf
- Haryana Vidhan Sabha. Starred Question *16 (2023), the Ghaggar flood at Ambala, July 2023. https://haryanaassembly.gov.in/wp-content/uploads/2023/09/25sq16.pdf
- Press reports of the Gurugram floods of 28 Jul 2016, 19 Aug 2020, 31 Jul 2024, 9–10 Jul 2025 and 1 Sep 2025, the Hathnikund flow of 18 Aug 2019, the Ghaggar breaches of July 2023 and the floods of September 2025 (secondary sources). https://www.millenniumpost.in/ggn-crisis-continues-delhi-records-highest-rainfall-in-10-yrs-156111 ; https://www.tribuneindia.com/news/nation/heavy-rain-throws-life-out-of-gear-in-delhi-ncr-128342 ; https://www.theweek.in/wire-updates/national/2025/09/02/des56-ncr-rain-waterlogging.html ; https://www.tribuneindia.com/news/haryana/monsoon-fury-six-major-breaches-not-yet-plugged-in-kaithal-district-526894 ; https://www.downtoearth.org.in/natural-disasters/a-dead-ghaggar-and-its-tributaries-wrought-havoc-in-haryana-early-july-here-is-how-90671
- Irrigation and Flood Control Department, Government of NCT of Delhi. Flood control mechanism (web page; the Sahibi flood of 6 Aug 1977 at the Dhansa bund, read through a fetch summary). https://ifc.delhi.gov.in/ifc/flood-control-mechanism
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Mid-America Regional Council (2025). APWA 5600 Manual Factsheet; APWA Stormwater Standards Supplement (7 Nov 2025). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Mid-America Regional Council. The Evolution of Regional Stormwater Design Standards (presentation). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Kansas City Metro Chapter APWA (2006). Section 5600, §5601.6 Waivers.
- PUB Singapore (2018, with Addendum No. 3 of 16 Apr 2025). Code of Practice on Surface Water Drainage, 7th ed.
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management.
- Centre for Science and Environment (2023). Urban Stormwater Management (presentation).
- Department of Town and Country Planning, Haryana (2012). Master Storm Water Drainage, G.M.U.C. 2031 A.D., Gurgaon, drawing No. DTP(G) 2104/2012, 9 Nov 2012; and Haryana Urban Development Authority, Rain Water Run off Management Plan for Catchment Area of Badshahpur Drain, issued 3 Nov 2017, Rev. 2 of 24 Nov 2020 (both as reproduced in GMDA's revised report in NGT O.A. 523/2019). https://www.greentribunal.gov.in/sites/default/files/news_updates/REVISED%20REPORT%20BY%20GURUGRAM%20METROPOLITAN%20DEVELOPMENT%20AUTHORITY,%20GURUGRAM%20IN%20OA%20NO.%20523%20of%202019%20(Vaishali%20Rana%20Chandra%20vs%20UOI).pdf
- National Capital Region Planning Board (2016). Functional Plan on Drainage for NCR, June 2016, §5.2.2. https://ncrpb.nic.in/pdf_files/FunctionalPlanondriangeforNCR.pdf
- Town and Country Planning Department, Haryana. Sub-Regional Plan for Haryana Sub-Region of NCR-2021, Chapter 9 (Sewerage, SWM, Drainage and Irrigation) (Wayback Machine copy). http://web.archive.org/web/20140806083003id_/http://tcpharyana.gov.in/ncrpb/FINAL%20SRP%20FOR%20WEB-HOSTING/09_Sewerage,%20SWM,%20Drainage%20&%20Irrigation.pdf
- Press reports of GMDA's master drains, Leg-IV and the drainage plan it sought in 2024, of FMDA's desilting, and of the meetings of the Haryana State Drought Relief and Flood Control Board (secondary sources). https://newswav.com/article/gurugram-metropolitan-development-authority-completes-desilting-of-drains-A2606_tejeiy ; https://www.tribuneindia.com/news/haryana/to-counter-waterlogging-work-on-4th-drain-in-gurugram-begins-544402 ; https://swarajyamag.com/infrastructure/amid-persistent-flooding-gurugram-authority-seeks-consultant-for-its-new-4-step-study-and-drainage-plan-revamp ; https://www.freepressjournal.in/india/haryana-government-nod-for-flood-control-schemes-worth-1205-crore
Annexes and forms
| Annex / Form | Content |
|---|---|
| 1A | List of Tier A authorities, with the boundaries of the Municipal Corporations and of the metropolitan development areas |
| 1B | Maps of flood-sensitive catchments |
| 1C | Policy Supplement: text of alternatives S-1 to S-5 and model council resolution |
| 1D | Model HBC 2017 amendment and model ULB bye-law |
| Form 1-1 | Applicability Determination |
| Form 1-2 | Variance / Waiver Request |
Commentary. Haryana's floods come from three sources, often together. The first is the long, heavy storm on the plains. On 9 September 1875 Palwal recorded 398.8 mm and Ballabgarh 299.7 mm, and on 19 September 1933 the Rohtak rain gauge recorded 484.1 mm, the highest day on record in the State, with 325.1 mm at Jhajjar and 279.4 mm at Beri (IMD, Climate of Haryana); on 30 June 1981 Rohtak recorded 297.9 mm and Gurgaon 261.2 mm (IMD). A single day above the 100-year value of the CWC plates has struck the Rohtak–Gurugram–Faridabad belt at least three times in the record. The second source is the rivers, fed from the Shivalik and Himalayan hills and from the Aravallis. The Sahibi flooded in 1957, 1964 and 1977; on 6 August 1977 about 36,000 cusecs passed the Dhansa bund and the Najafgarh jheel was submerged (I&WRD, 2024; I&FC Delhi). The Hathnikund barrage on the Yamuna passed a record 8,28,072 cusecs on 18 August 2019 (as reported). In July 2023 Chandigarh recorded 302.2 mm and Ambala 224.1 mm on 9 July (IMD), Hathnikund passed 3,59,760 cusecs on 11 July (MoJS committee, 2024), and the Ghaggar breached its embankments in Ambala, Kaithal, Fatehabad and Sirsa; the State reported 1,385 villages affected (as reported). In September 2025 about 3,000 villages were reported affected, in a season 33% above normal over the Haryana, Chandigarh and Delhi sub-division (IMD; as reported). The third source is the city whose drains fail in a fall that is not extreme. On 28 July 2016 the national highway through Gurugram was jammed for more than 18 hours after a fall reported as 46 mm in three hours, the "Gurujam" (as reported); the city flooded again on 19 August 2020, on 31 July 2024, when three people were electrocuted in ponded water near IFFCO Chowk, on 9–10 July 2025, when 103 mm was reported in 90 minutes, and on 1 September 2025, after more than 100 mm in four hours (as reported).
Missing design makes all three worse. The only urban drainage design figure found for the State is second-hand: the NCR Planning Board reports 25 mm/h with a runoff coefficient of 1/8 for the storm water channels of Haryana's urban areas (NCRPB, 2016). Gurugram's master drains carry design discharges on a DTCP drawing of 2012 but no stated return period, and Leg-III, the Badshahpur drain, a storm drain, carried a dry-season flow of 126.53 cusecs in 2021 (Haryana Vidhan Sabha, 2022). In September 2026 the High Court recorded that Gurugram "is facing severe waterlogging during the monsoon season", while the rain that collects is not used to replenish its falling groundwater (Sunil Singh, 22 Sep 2026). Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix.
No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Haryana Building Code 2017 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.