Odisha Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Odisha Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Odisha.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Odisha or by any of its departments, local bodies or agencies, including the Bhubaneswar Municipal Corporation (BMC), the Cuttack, Berhampur, Sambalpur and Rourkela Municipal Corporations, the Bhubaneswar Development Authority (BDA) and the other development authorities, Municipalities and Notified Area Councils of the State. Where it names a body, such as the Housing and Urban Development Department (H&UD), the Department of Water Resources (DoWR), the Revenue and Disaster Management Department, OSDMA, the Odisha State Pollution Control Board, the Forest, Environment and Climate Change Department, the Chilika Development Authority, WATCO, OWSSB, BMC, BDA or a local body, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The development rules, drainage standards and approval conditions in force continue to apply.

Names. The State was renamed from Orissa to Odisha in 2011. Statutes, courts and older sources keep the old name, as in the Orissa Irrigation Act, 1959 and the Orissa High Court; this Manual uses Odisha and keeps Orissa where a title or a source uses it. Some places have more than one spelling in sources and on IMD and CWC stations: Balasore (Baleswar, Baleshwar), Berhampur (Brahmapur), Bhubaneswar (Bhubaneshwar), Khordha (Khurda), Nabarangpur (Nowrangapur), Jagatsinghpur (Jagatsinghapur) and Chilika (Chilka). This Manual uses the first form and keeps the others where a source or a station uses them; the IMD observatory at Paradip is named Paradip Port. Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any Municipal Corporation;
  • BMC is the Bhubaneswar Municipal Corporation, and BeMC the Berhampur Municipal Corporation;
  • CDA is the Cuttack Development Authority; the Chilika Development Authority is always written in full;
  • CD is chart datum; and
  • SWD is a storm water drain.

The sense is clear from the context. Odia terms used in the text, such as pokhari (tank or pond), bandha (embankment; also an embanked tank), nala (drainage channel) and Jalasaya (water body, and the land-record class under which ponds and tanks are recorded), are explained where they first appear.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Odisha's cities and towns flood for three reasons. The super cyclone of October 1999 showed the first, when the sea came ashore at Erasama and four days of rain fell on the delta behind it; Cuttack shows the second whenever the Mahanadi is in flood and its sluices must stay shut; and the Comptroller and Auditor General (CAG) found the third in 2024, in the drains of all five of the State's Municipal Corporations.

  1. Cyclones, surge and rain beyond the old design values. Odisha's coast lies in the path of the Bay of Bengal's strongest cyclones. The super cyclone that crossed near Paradip on 29 October 1999 killed 9,893 people, about 7,000 of them in the storm surge, most in Erasama block of Jagatsinghpur. Estimates of the surge range from 5.9 m, the value that a synopsis of the cyclone in IMD's journal MAUSAM judges closest to the estimates of government agencies, to 7.5–7.95 m. IMD's Bhubaneswar observatory recorded 426.4 mm on 30 October, and the same account reports 53.0 cm at Paradip that day and four-day totals of about 94–96 cm at Paradip and Oupada; IMD's station record for Paradip Port, 263.8 mm on 25 May 2009, does not include the 1999 reading, and the two have not been reconciled. The rain broke flood embankments in 20,005 places. Phailin (October 2013) drove a surge of 2–2.5 m into Ganjam; Fani crossed close to Puri on 3 May 2019 and was reported to have damaged 291 km of drains in 53 towns; Dana (October 2024) raised the sea 1–2 m above the tide in Kendrapara, Bhadrak and Balasore. The rain of these storms exceeds the values on which drains are still designed. The design rainfall maps of the Central Water Commission (CWC), drawn from daily records to the 1980s, put the 100-year day at about 320 mm at Gopalpur and about 360 mm at Bhubaneswar; Gopalpur recorded 510.8 mm on 24 October 1954, and Baripada 467.4 mm and Chandbali 437.1 mm on 12 October 1973. INCOIS puts the 100-year extreme sea level at Paradip at 2.62 m above mean sea level now, rising to 3.12–3.34 m by 2100, but says itself that its estimate for the northern Bay is probably too low: it is below every estimate of the 1999 surge.
  2. Towns locked in by rivers. Cuttack stands on the land between the Mahanadi and the Kathajodi, inside embankments. Its main drains leave the city through sluices in those embankments: the Petta nala through six vented sluices to the Kathajodi, and the two main storm water channels to the Kathajodi at Matagajpur and to the Mahanadi at Gulguli. When the rivers are high the gates must stay shut, and the rain that falls on the city has to be stored or pumped. The Mahanadi delta is regulated only in part: Hirakud is reported to intercept 58.9% of the catchment, and the delta embankments to carry only about 24,700 m³/s, while the major floods at Mundali, at the head of the delta, peaked at 29,000–45,000 m³/s between 1980 and 2011. In September 2008 the peak was about 44,800 m³/s, most of it from the uncontrolled catchment below Hirakud; in September 2011 Hirakud was reported to have opened 55 sluice gates and 4 crest gates, and about 38,700 m³/s (13.66 lakh cusec) to have passed Mundali. A project for Cuttack's drainage under the Japan International Cooperation Agency (JICA) set out in 2007 to cut the area flooded from 470 ha in 2005 to 30 ha, and floods from three to five a year to fewer than three. Bhubaneswar's drains depend on a river too: eight of the city's ten natural drains outfall to the Gangua nala, a channel of DoWR's Khordha Drainage Division, which runs to the Daya and on to Chilika.
  3. Drains built without a design flow, and carrying sewage. The CAG audited storm water drainage in the Municipal Corporations of Bhubaneswar, Cuttack, Berhampur, Sambalpur and Rourkela for 2017–22 (Report No. 8 of 2024, tabled on 7 December 2024). It found no regulatory framework for storm water management in the State and no State groundwater Act; a drainage master plan only in Berhampur (2017); primary and secondary drains built "without considering the rainfall data, or the required width"; and no detention, retention or infiltration in any storm water drain estimate. BMC stated that its drains were designed by "empirical formula" to suffice for the "coming 50 years", but the CAG "did not find any design discharge for runoff calculation of rain water in estimates". The law requires separate drains: the Odisha Municipal Corporation Act, 2003, as the CAG quotes it, provides one drain for sullage and polluted water "and another distinct drain for rainwater" (s.307). In practice the storm drains carry sewage. BMC's drains discharge sewage and sullage into the Daya West Canal at 11 places, and the Gangua carries the city's waste water through its natural drains to the Daya and Chilika; in the Cuttack Development Authority's area, 83 sewer manholes were found connected directly to storm drain manholes. Bhubaneswar recorded 195 mm in a day on 13 September 2021, a 63-year September record, and 259.2 mm on 1 August 2023, its highest August day since 1951, as reported; Puri recorded 341 mm on 13 September 2021. Roofs, roads and paving now send more water to the drains, and faster.

Behind all three lies lost storage. The CAG counted 628 water bodies in the five Municipal Corporations, 18 of them Government tanks disused and encroached by buildings; it found that the agricultural catchment of the Daya West Canal had fallen from 2,417 ha to 1,255 ha, and 1,195 houses encroaching on the canal. The pokharis and bandhas that once held rain are protected through their record as Jalasaya land, eviction proceedings and the courts. In 2012 the Orissa High Court directed the State to frame a law to protect water bodies within two years; no such law was found.

Design for Odisha therefore has to cover more than the monsoon. The State's damaging cyclones cluster in October (1999, twice; Phailin, Hudhud, Titli and Dana) and in May (Fani on 3 May 2019, Amphan and Yaas). In May 1995 Bhubaneswar received 705 mm and Cuttack 738 mm in the month, about twice the State's normal for July, and Bhubaneswar 252.5 mm in a single day.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the river or the tide is high and the sluice is shut, or when the pumps that serve it are running at full capacity.

The Manual also sets how public drains, roads, nalas, pokharis, sluiced and pumped outfalls and basin-wide master plans are designed, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Odisha's south-west monsoon and the May and October cyclones that bracket it, with a State normal of about 1,450 mm a year; the embanked deltas of the Mahanadi, Brahmani, Baitarani and Budhabalanga, whose towns drain through sluices to rivers regulated in part by Hirakud; the laterite upland of Bhubaneswar, the deltaic clays and shallow water table of Cuttack and the coast, the saline marsh and dune sands of the shore, and the red soils and hills of the interior and the Eastern Ghats; the pokharis and bandhas; Chilika, the State's largest receiving water; and a cyclone coast where surge, tide and river flood can arrive together.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Reports for the five subzones that cover Odisha, 3(d) Mahanadi (including the Brahmani and Baitarani), 4(a) Upper Eastern Coast, 1(g) Lower Ganga Plains, 3(g) Indravati and 3(f) Lower Godavari, as the interim source, and frequency analysis of hourly rainfall by the National Institute of Hydrology (NIH), Roorkee, for climate-change ratios.
  4. Tropical and coastal practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites, drainage reserves and coastal platform levels. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Odisha Municipal Corporation Act, 2003 and the Odisha Municipal Act, 1950; the Odisha Development Authorities (Planning and Building Standards) Rules, 2020, which apply in the areas of the development authorities, and the Odisha Town Planning and Improvement Trust (Planning and Building Standards) Rules, 2021, which apply in the Master Plan areas of the other Planning Authorities; the Orissa Irrigation Act, 1959; the record of ponds and tanks as Jalasaya land and the eviction statutes used to protect them; the judgments of the Orissa High Court and the National Green Tribunal on water bodies; and the CRZ Notification 2019 as applied in Odisha through its approved Coastal Zone Management Plan. This Manual follows them or, where disclosed, makes them stricter. The text of the 2020 Rules could not be read for this Manual; where it cites a rule of the 2021 Rules, the 2020 Rules are understood to carry an equivalent provision [TBC].

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain in Odisha can cite 1, 2, 5 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has no curve for any Odisha station. The reanalysis grids of NIH-DHAARA come close to the CWC maps at Cuttack, Balasore and Koraput, but on the south and central coast give 24-hour depths well above them: a 50-year day of 457 mm at Puri against about 320–360 mm, and 406 mm at Berhampur against about 280–320 mm. For one hour they give 50-year depths of 64–103 mm, well below the 125–156 mm that the CWC ratios give for Bhubaneswar and Cuttack, which in turn exceed every one-hour record in the CWC reports' Odisha gauges (83–100 mm).

Odisha has no drainage design standard of its own. Research for this Manual found no Odisha design standard, State rainfall intensity–duration–frequency (IDF) relationship or circular of H&UD or DoWR that fixes return periods or design rainfall for urban drains, and no published IDF relationship for Bhubaneswar, Cuttack or any other city in the State. In particular:

  • the CAG found in 2024 that the State had no regulatory framework for storm water management and no groundwater Act; that only Berhampur had a drainage master plan; that no drain estimate in the five Municipal Corporations stated a design discharge; and that none provided detention, retention or infiltration. The State released ₹66.66 crore in 2021 for drainage master plans in 30 towns;
  • the building rules do not require on-site detention or limit peak runoff. Under the 2021 Rules for Planning Authority areas, rainwater harvesting is mandatory on plots of more than 115 m², groundwater recharge on plots of 300 m² and more, with recharge pits or trenches of at least 6 m³ for every 100 m² of roof, and the system is inspected before the completion certificate (rule 44); basements are not permitted in low-lying or flood-prone areas (rule 38(1)); and no building is permitted on natural waterways or drains shown in the Master Plan (rule 25(i)). A layout's landscape plan is to show bio-swales, rain gardens and "detention/retention ponds", but no rule says how large they must be. The 2020 Rules for the development authorities are understood to carry equivalent provisions [TBC];
  • there are no setbacks in metres from water bodies or nalas in the rules read for this Manual. The CAG found that the buffers of the NDMA guidelines, 12 m from major canals and streams and 2 m from nallahs and storm drains, had been applied by none of the five Municipal Corporations; BMC replied that the buffer "would be defined after land acquisition";
  • pond protection depends on the record of ponds and tanks as Jalasaya land, on eviction under the Orissa Public Premises (Eviction of Unauthorised Occupants) Act, 1972, and on the courts. In Tapan Kumar Das v. Commissioner, Cuttack Municipal Corporation (2012) the Orissa High Court directed the State to frame a law to protect water bodies within two years; none was found. In 2023 the National Green Tribunal ordered a replacement water body of 2.421 acres for an encroached tank at Berhampur, the Baula Bandha;
  • there are no flood lines and no floodplain zoning law. The 2021 Rules treat as flood-prone the areas shown in the CWC's Flood Atlas and those identified in a Master Plan;
  • Bhubaneswar has no drainage master plan in force. BMC engaged IIT Roorkee in February 2025 to prepare one, to a horizon of 2050, and it was reported in October 2025 to be nearing completion, but no design figures have been published. A ₹432.75 crore proposal to improve the Gangua nala, into which the city drains, had been pending with the Government for more than three years in November 2022. In Cuttack, project reports for the main drains have been under review before the Orissa High Court, as reported; and
  • Odisha's Coastal Zone Management Plan under the CRZ Notification 2019 was approved on 1 June 2021 for all seven coastal districts, but the shoreline management plan with its erosion maps was still in preparation in May 2025.

So each region and each local body interprets the central manual its own way. BMC, the other Municipal Corporations, the Municipalities and Notified Area Councils, BDA and the other development authorities, DoWR, WATCO, OWSSB, consultants and funding agencies fill the gaps differently. Two drains on the same street, built by different agencies, can be sized for different storms from different rainfall sources. A BMC drain can discharge into a DoWR channel designed to another standard, with no agreed level at which the channel is full or the river shuts the sluice. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls to rivers and the sea, gated, tidal or pumped (Chapter 5); and
  • basin-wide master plans, so that neighbouring local bodies plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, a Municipality, a Notified Area Council or a development authority can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); CAG, Performance Audit on Storm Water Drainage and Sewerage Management Systems in Municipal Corporations for the year ended March 2022, Government of Odisha, Report No. 8 of 2024, paras 1.7, 3.1.1, 3.1.3.1, 3.2.2.1, 3.2.3, 3.2.3.3, 3.2.8, 3.2.8.1 and 5.2.3, Appendix III (quoting the Odisha Municipal Corporation Act, 2003, s.307); Odisha Town Planning and Improvement Trust (Planning and Building Standards) Rules, 2021, S.R.O. No. 374/2021, rr.25, 38, 44 and 52, definitions and layout-plan requirements; Odisha Development Authorities (Planning and Building Standards) Rules, 2020, S.R.O. No. 180/2020 (text not read); Orissa High Court, Tapan Kumar Das v. Commissioner, Cuttack Municipal Corporation (11 October 2012), as reported; NGT (Eastern Zone), Sirin Tammana v. State of Odisha, OA 114/2022/EZ (22 March 2023); MoEF&CC reply affidavit in NGT OA 106/2022 (WZ), on the approval of Coastal Zone Management Plans; State reply to the NGT on the shoreline management plan (May 2025), as reported; Kalsi, S.R. (2006), Orissa super cyclone – a synopsis, MAUSAM 57(1), 1–20; IMD/RSMC New Delhi, reports on Phailin (2013), on the cyclones of 2014, 2018, 2020, 2021 and 2024, and preliminary report on Fani (2019); IMD press release on Dana (25 October 2024); IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); Guhathakurta, P. et al. (2020), Observed Rainfall Variability and Changes over Odisha State, IMD Met Monograph 44; Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (accessed 6 November 2026); CWC, Flood Estimation Reports for Subzones 3(d) (M-3(d)/R-3/25/1996), 4(a), (b) and (c) (EC(U,L&S)/14/1986), 1(g), 3(g) (I/21/1992) and 3(f); INCOIS (2025), extreme sea levels (TR-04); Parhi, P.K. et al. (2012), Floods in Mahanadi River Basin, Orissa (India): a critical review, India Water Week 2012; JICA, ex-ante evaluation of the Orissa Integrated Sanitation Improvement Project (2007); reports of the 2011 Hirakud releases, of the Fani damage to urban drains (H&UD estimate, 2019), of the September 2021 and August 2023 Bhubaneswar rainfall, of the BMC–IIT Roorkee drainage master plan (2025) and of the Cuttack drain project reports before the Orissa High Court (2025) (press).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Tanks (Pokharis) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Odisha
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Odisha locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies and land
7E.2Channels, drains and parts of the system
7E.3Floods, tides and statutory terms
7E.4Terms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3Cuttack's river-locked outfalls: drain, sluice through the embankment, pumps
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
BDA Bhubaneswar Development Authority
BeMC Berhampur Municipal Corporation
BMC Bhubaneswar Municipal Corporation
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CD Chart datum
CDA Cuttack Development Authority (the Chilika Development Authority is written in full)
CGWB Central Ground Water Board
CMC Cuttack Municipal Corporation
CN Curve number (SCS/NRCS method)
CPHEEO Central Public Health and Environmental Engineering Organisation
CRZ / CZMP Coastal Regulation Zone / Coastal Zone Management Plan
CSE Centre for Science and Environment
CWC Central Water Commission
DDMA District Disaster Management Authority
DoWR Department of Water Resources, Odisha
DWF Dry-weather flow
EIA Environmental impact assessment
ESC Erosion and sediment control
ESL Extreme sea level
FAR Floor area ratio
FE&CC Forest, Environment and Climate Change Department, Odisha
FER Flood Estimation Report (CWC)
FRL Full reservoir level
FTL / MWL Full tank level / maximum water level
GWS&I Ground Water Survey and Investigation, Department of Water Resources, Odisha
H&UD Housing and Urban Development Department, Odisha
HAT / MHWS Highest astronomical tide / mean high water springs
HFL High flood level
HGL Hydraulic grade line
HSG Hydrologic soil group
HTL High tide line
IDF Intensity–duration–frequency
IMD India Meteorological Department
INCOIS Indian National Centre for Ocean Information Services
IRC Indian Roads Congress
JICA Japan International Cooperation Agency
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
MSL Mean sea level
NAC Notified Area Council
NDMA National Disaster Management Authority
NGT National Green Tribunal
NIH National Institute of Hydrology, Roorkee
ODA PBS Rules Odisha Development Authorities (Planning and Building Standards) Rules, 2020
OMC Act Odisha Municipal Corporation Act, 2003
ORSAC Odisha Space Applications Centre
OSDMA Odisha State Disaster Management Authority
OSPCB Odisha State Pollution Control Board
OTPIT PBS Rules Odisha Town Planning and Improvement Trust (Planning and Building Standards) Rules, 2021
OWSSB Odisha Water Supply and Sewerage Board
PSD Permissible site discharge
PSMSL Permanent Service for Mean Sea Level
RMC Rourkela Municipal Corporation
RRV Required retention volume
RWH Rainwater harvesting
SLA Sea-level allowance
SMC Sambalpur Municipal Corporation
SoI Survey of India
SUH Synthetic unit hydrograph (CWC)
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
ULB Urban local body (a Municipal Corporation, a Municipality or a Notified Area Council)
UTM Universal Transverse Mercator
WATCO Water Corporation of Odisha
WQv Water quality volume