Annexes to Chapter 2Design Rainfall and Design Storms
These annexes support Chapter 2. Annexes 2A to 2E will hold the statewide rainfall tables that Chapter 2 refers to: the benchmark checks and zone map, sub-daily ratios, grid-to-point factors, temporal patterns and retention depths. Each needs analysis of NIH-DHAARA and IMD records that has not yet been done for this Manual, so each is marked "To be prepared" and gives its intended layout and the rule to use until it is published (Clause 1.11.5). Form 2-1 is a draft form for the Design Rainfall Sheet that every hydrologic submittal must include (Clause 2.13). The Manual is a draft; it is not adopted by any government or agency.
Annex 2A — NIH-DHAARA vs IMD station and IMD gridded checks at benchmark points; zone map
Supports Clauses 2.3.1 to 2.3.5 of Chapter 2.
To be prepared. This annex will compare, at benchmark points across the State, the NIH-DHAARA design depths with frequency analyses of long IMD daily station records and of IMD gridded daily data (converted to point values with Annex 2C), for 24 hours and longer and for the AEPs of Table 2.1. It will also contain the map of rainfall zones used by Annexes 2B, 2C and 2E and by the Tier B tables of Chapter 4. It needs NIH-DHAARA values at the benchmark coordinates (NIH), IMD daily and recording-gauge station records and IMD gridded rainfall (IMD), State rain-gauge records (the rain gauges and river gauges of DoWR, the block rainfall reports of the Special Relief Commissioner, and the automatic weather stations and rain gauges of OSDMA), and district and basin boundaries (Survey of India, DoWR). Until it is published, design depths are taken from NIH-DHAARA under Clause 2.3.1, the cross-checks of Clause 2.3.3 are reported on Form 2-1, and the zone of a site is the one agreed with the Authority and recorded on Form 2-1.
Table 2A.1 — Benchmark comparison of design depths (layout)
| Benchmark point | IMD station ID | Latitude, longitude | Years of record | Duration (h) | AEP | NIH-DHAARA (mm) | IMD station analysis (mm) | IMD gridded, point value (mm) | NIH-DHAARA / IMD station | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|
| 24 | ||||||||||
| 48 | ||||||||||
| 72 |
2A.1 The zone names below are the working names used in the Tier B table template of Chapter 4 (Clause 4.14.2). Their boundaries, and whether further zones are needed, are to be set by the analysis of this annex.
Table 2A.2 — Rainfall zones (layout)
| Zone (working name) | Extent (districts, basins) | Representative stations | Notes |
|---|---|---|---|
| OD-Z1 North coast (Budhabalanga–Baitarani delta) | Balasore and Bhadrak districts and coastal Mayurbhanj: Balasore, Jaleswar, Soro, Bhadrak, Basudevpur, Chandbali, Dhamra, Baripada. CWC subzone 1(g) (Balasore, Baripada) and 3(d) (Bhadrak, Chandbali); Balasore on the 1(g)/3(d) boundary (Clause 2.3.6(a)). Boundary [TBC] | [TBC] (candidates: Balasore 42895, Chandbali 42973, Baripada 42894) | Annual about 1,490–1,750 mm (Balasore 1,748, the highest of any district; Bhadrak 1,493; IMD 2020). IMD 24-h records Baripada 467.4 mm and Chandbali 437.1 mm (12 Oct 1973), Balasore 398.8 mm (18 Jul 1987); May record Balasore 258.5 mm (27 May 1989). October 1999: 400–955 mm in four days over the Baitarani, Salandi and Budhabalanga, with flooding worst around Balasore (Kalsi, 2006). Recording gauges at Akhuapada and Bangriposhi 100 mm in 1 h (FER 1(g)). FER 50-yr 24-h about 320–360 mm at Balasore and Chandbali, 280–320 mm at Baripada (1(g) Plate 9; 3(d) Plate 9); 1-h ratio 0.350 (1(g)) or 0.390 (3(d)). Surge of 2–4 m in Yaas (2021) on a full-moon tide and 1–2 m in Dana (2024); saline coastal tract (about 1,300 km² of Bhadrak) and free-flowing wells near Chandbali; flood-prone alluvium |
| OD-Z2 Mahanadi–Brahmani delta and central coast | Cuttack, Jagatsinghpur, Kendrapara, Jajpur and Puri districts and the north of Khordha district: Bhubaneswar, Cuttack, Puri, Konark, Paradip, Jagatsinghpur, Kendrapara, Jajpur. CWC subzone 3(d); Bhubaneswar on the 3(d)/4(a) boundary (Clause 2.3.6(a)). Boundary [TBC] | [TBC] (candidates: Bhubaneshwar (A) 42971, Cuttack 42970, Puri 43053, Paradip Port 42976) | Annual about 1,455–1,610 mm (Cuttack 1,594; Puri 1,536; Khurda 1,455; Jajpur 1,611; IMD 2020). IMD 24-h records Bhubaneswar 426.4 mm (30 Oct 1999), Puri 362.3 mm (13 Jun 2001), Cuttack 330.2 mm (5 Aug 2007), Paradip Port 263.8 mm (25 May 2009); Paradip 53.0 cm on 30 Oct 1999 by Kalsi (2006), not in IMD's Paradip Port record; Bhubaneswar 252.5 mm and Cuttack 236.0 mm on 11 May 1995. Recording gauges: Bhubaneswar 83 mm in 1 h (23 Jun 1979), 110 mm in 3 h, 127 mm in 6 h; Naraj 83 mm in 1 h and 158 mm in 3 h (1 Aug 1976); Paradip 219 mm in 6 h (29 Aug 1976) (FER 3(d)). FER 50-yr 24-h about 360–400 mm at Cuttack, 320–360 mm at Bhubaneswar and Puri, 400 mm or more on the Paradip–Jagatsinghpur coast (3(d) Plate 9); 1-h ratio 0.390. River-locked outfalls at Cuttack (Mahanadi at Mundali 25,000–45,000 m³/s in large floods); Gangua–Daya–Chilika outfalls at Bhubaneswar; 1999 surge 5.9–7.95 m near Erasama; 100-yr extreme sea level 2.62 m above mean sea level at Paradip (INCOIS, 2025); laterite upland at Bhubaneswar, deltaic alluvium at Cuttack; saline marsh belt 3–15 km wide behind dune chains; water table 0.1–1 m below ground in places after the monsoon |
| OD-Z3 South coast and Chilika | Ganjam district, the south of Khordha district and the Chilika side of Puri district: Berhampur, Gopalpur, Chhatrapur, Aska, Bhanjanagar, Balugaon, Satapada. CWC subzone 4(a). Boundary [TBC] | [TBC] (candidate: Gopalpur 43049) | Annual about 1,300–1,400 mm (Ganjam 1,306, of which only 891 mm in June–September; IMD 2020); about a third of the year's rain falls outside June–September. IMD 24-h record Gopalpur 510.8 mm (24 Oct 1954), the highest of the 19 Odisha stations in IMD's extremes; Berhampur 30 cm in 24 h in Fani (3 May 2019). FER 50-yr 24-h about 280–320 mm at Berhampur, with a cell above 360 mm just inland, and about 280 mm on the Gopalpur coast (4(a) Plate 9.4(a)); 1-h ratio 0.42 (the report's 0.35 for catchments near the coast is not used; Clause 2.3.6(d)); design loss rate 7.5 mm/h (4(a), probably high for Odisha). Surge of 2–2.5 m in Phailin (2013) in Ganjam; Chilika receives Bhubaneswar's storm water through the Daya; red loamy and red sandy soils, laterite on the hill slopes, coastal sands |
| OD-Z4 Central Mahanadi basin | Sambalpur, Bargarh, Jharsuguda, Sonepur, Bolangir, Boudh, Angul and Dhenkanal districts: Sambalpur, Burla, Hirakud, Jharsuguda, Bargarh, Bolangir, Titlagarh, Angul, Talcher, Dhenkanal. CWC subzone 3(d). Boundary [TBC] | [TBC] (candidates: Sambalpur 42883, Jharsuguda (A) 42886, Hirakud 31362, Bolangir 42963, Angul 42969) | Annual about 1,280–1,480 mm (Sambalpur 1,478; IMD 2020); 85–92% in June–October at representative stations (FER 3(d)). IMD 24-h records Sambalpur 581.9 mm (19 Aug 1982), Bolangir 401.6 mm (30 Aug 1982), Titlagarh 350.5 mm (13 Jun 2001), Hirakud 281.9 mm (4 Sep 1955), Jharsuguda 257.8 mm (20 Aug 1975); recording gauge at Jharsuguda 68 mm in 1 h and 213 mm in 24 h (FER 3(d)). FER 3(d) contour labels near Hirakud, Sambalpur and Jharsuguda illegible on the available scan [TBC]; 1-h ratio 0.390. Hirakud reservoir (a Ramsar site since 2021) and its releases; floods of the Tel and the middle Mahanadi (2008); red and yellow and red sandy soils |
| OD-Z5 Northern plateau | Sundargarh and Keonjhar districts and inland Mayurbhanj: Rourkela, Sundargarh, Keonjhar, Joda, Rairangpur. CWC subzone 3(d) (Brahmani and Baitarani headwaters) and 1(g) (Subarnarekha). Boundary [TBC] | [TBC] (candidates: Keonjhargarh 42891, Jharsuguda (A) 42886 for Rourkela) | Annual about 1,365–1,570 mm (Sundargarh 1,366; Keonjhar 1,439; Mayurbhanj 1,571; IMD 2020). IMD 24-h record Keonjhargarh 206.6 mm (4 Aug 1989); recording gauge at Telkoi 245 mm in 24 h (1–2 Sep 1978; less than 5 years of record) (FER 3(d)). FER 50-yr 24-h more than 440 mm in a cell over the Keonjhar–Mayurbhanj hills (3(d) Plate 9); values near Rourkela illegible [TBC]; 1-h ratio 0.390 (3(d)) or 0.350 (1(g)). Brahmani at Rourkela; mining terrain; red sandy and red loamy soils, light and porous |
| OD-Z6 Eastern Ghats and southern highlands | Koraput, Nabarangpur, Malkangiri, Rayagada, Gajapati, Kandhamal, Kalahandi and Nuapada districts: Koraput, Jeypore, Sunabeda, Nabarangpur, Malkangiri, Rayagada, Gunupur, Paralakhemundi, Phulbani, Bhawanipatna. CWC subzones 3(g), 3(f), 4(a) and 3(d). Boundary [TBC] | [TBC] (candidates: Koraput 43097, Phulbani 42966, Bhawanipatna 43042) | Annual about 1,140–1,615 mm (Nowrangapur 1,613; Kalahandi 1,571, of which 1,381 mm in June–September, the most of any district; Nuapada 1,141; IMD 2020). Records: Potangi 54.6 cm in a day (14 Oct 1931; FER 3(g)), Phulbani 484.0 mm (30 Aug 1982), Koraput 246.6 mm (27 Jun 2007) (IMD); cyclone rain on the eastern slopes, 35 cm at G. Udayagiri in Titli (2018) and 20–24 cm a day at Mohana in each of Phailin, Hudhud and Titli and 26 cm at R. Udaigiri in Hudhud (IMD). FER 50-yr 24-h about 240–280 mm at Nabarangpur and 280–360 mm towards Jeypore and Koraput (3(g) Plate 10), about 200–220 mm at Gunupur (4(a)); 3(f) plates missing [TBC]; 1-h ratio 0.320 (3(g), 3(f)). Heavy rainfall rising in Koraput and Malkangiri (Mohanty et al., 2026); landslides and debris; laterite capping; red, red-and-yellow and red-and-black soils |
Annex 2B — Sub-daily ratios P(t)/P(24h) by zone: NIH-DHAARA (hourly-based) vs the one-third rule
Supports Clauses 2.6.1 to 2.6.4 of Chapter 2.
To be prepared. This annex will tabulate, for each zone of Annex 2A, the ratios of the t-hour to the 24-hour design depth from NIH-DHAARA, which are derived from hourly records, against the ratios implied by IMD Das et al. (2022) and by the one-third rule. It needs NIH-DHAARA depths for each duration at representative points in each zone (NIH), IMD recording-gauge data and the IDF values of Das et al. (2022) (IMD). Until it is published, sub-daily depths are read directly from NIH-DHAARA or an approved station IDF (Clause 2.6.1). Where only daily depths are available, the ratios used are those agreed with the Authority, not lower than the CWC Flood Estimation Report ratios for the subzone in Table 2B.1 (Clause 2.6.2), and are recorded on Form 2-1. The one-third rule is not used (Clause 2.6.4).
2B.1 The first row of Table 2B.1 gives the ratios of the one-third rule P(t) = P(24)·(t/24)^(1/3), for comparison only. The 1, 3, 6 and 12 h values are those stated in the commentary to Clause 2.6; the 2 h value is computed from the same formula. The rule shall not be used for design unless this annex confirms it for the zone concerned (Clause 2.6.4).
Table 2B.1 — Ratios P(t)/P(24h) by zone (layout)
| Zone | Source | 1 h | 2 h | 3 h | 6 h | 12 h | 24 h |
|---|---|---|---|---|---|---|---|
| All (reference only, not for design) | One-third rule | 0.35 | 0.44 | 0.50 | 0.63 | 0.79 | 1.00 |
| OD-Z1 North coast (Budhabalanga–Baitarani delta) | CWC FER 1(g), 10-yr (interim design ratios, Clause 2.3.6(d)) | 0.350 | 0.515 | 0.640 | 0.800 | 1.00 | |
| OD-Z1 North coast (Budhabalanga–Baitarani delta), 3(d) area | CWC FER 3(d), 10-yr (interim design ratios, Clause 2.3.6(d)) | 0.390 | 0.610 | 0.760 | 0.860 | 1.00 | |
| OD-Z1 North coast (Budhabalanga–Baitarani delta) | NIH-DHAARA | 1.00 | |||||
| OD-Z2 Mahanadi–Brahmani delta and central coast | CWC FER 3(d), 10-yr (interim design ratios, Clause 2.3.6(d)) | 0.390 | 0.610 | 0.760 | 0.860 | 1.00 | |
| OD-Z2 Mahanadi–Brahmani delta and central coast, Bhubaneswar (4(a) side) | CWC FER 4(a,b,c), 50-yr (interim design ratios, Clause 2.3.6(d)) | 0.42 | 0.525 | 0.58 | 0.69 | 0.84 | 1.00 |
| OD-Z2 Mahanadi–Brahmani delta and central coast | NIH-DHAARA | 1.00 | |||||
| OD-Z3 South coast and Chilika | CWC FER 4(a,b,c), 50-yr (interim design ratios, Clause 2.3.6(d); the report's 0.35 at 1 h near the coast not used) | 0.42 | 0.525 | 0.58 | 0.69 | 0.84 | 1.00 |
| OD-Z3 South coast and Chilika | NIH-DHAARA | 1.00 | |||||
| OD-Z4 Central Mahanadi basin | CWC FER 3(d), 10-yr (interim design ratios, Clause 2.3.6(d)) | 0.390 | 0.610 | 0.760 | 0.860 | 1.00 | |
| OD-Z4 Central Mahanadi basin | NIH-DHAARA | 1.00 | |||||
| OD-Z5 Northern plateau | CWC FER 3(d), 10-yr (interim design ratios, Clause 2.3.6(d)) | 0.390 | 0.610 | 0.760 | 0.860 | 1.00 | |
| OD-Z5 Northern plateau, Subarnarekha (1(g)) area | CWC FER 1(g), 10-yr (interim design ratios, Clause 2.3.6(d)) | 0.350 | 0.515 | 0.640 | 0.800 | 1.00 | |
| OD-Z5 Northern plateau | NIH-DHAARA | 1.00 | |||||
| OD-Z6 Eastern Ghats and southern highlands, 3(g) area | CWC FER 3(g), 10-yr (interim design ratios, Clause 2.3.6(d)) | 0.320 | 0.500 | 0.635 | 0.800 | 1.00 | |
| OD-Z6 Eastern Ghats and southern highlands, 3(f) area | CWC FER 3(f), 10-yr (interim design ratios, Clause 2.3.6(d)) | 0.320 | 0.520 | 0.650 | 0.790 | 1.00 | |
| OD-Z6 Eastern Ghats and southern highlands, 4(a) area | CWC FER 4(a,b,c), 50-yr (interim design ratios, Clause 2.3.6(d)) | 0.42 | 0.525 | 0.58 | 0.69 | 0.84 | 1.00 |
| OD-Z6 Eastern Ghats and southern highlands, 3(d) area | CWC FER 3(d), 10-yr (interim design ratios, Clause 2.3.6(d)) | 0.390 | 0.610 | 0.760 | 0.860 | 1.00 | |
| OD-Z6 Eastern Ghats and southern highlands | NIH-DHAARA | 1.00 |
2B.2 Depths from fixed observation windows are converted to true-interval depths with the factors of Clause 2.6.3, repeated in Table 2B.2. They are the standard WMO (Hershfield) values and are not provisional.
Table 2B.2 — Fixed-interval adjustment factors (Clause 2.6.3)
| Number of fixed observation intervals in the duration | Factor |
|---|---|
| 1 | 1.13 |
| 2 | 1.04 |
| 3–4 | 1.02 |
Annex 2C — Grid-to-point factors
Supports Clauses 2.7.1 and 2.7.4 of Chapter 2.
To be prepared. This annex will give the factors that convert grid-average design depths (for example from 0.25° cells) to point depths, by zone, duration and AEP. It needs paired frequency analyses of IMD gridded rainfall and of the IMD and State gauges inside each cell (IMD, DoWR), the benchmark points of Annex 2A, and a stated method for deriving the factors. Until it is published, design depths are taken as point values from NIH-DHAARA or an approved station IDF (Clauses 2.3.1 and 2.3.2). Grid-average values are not used as design depths unless a conversion agreed with the Authority is recorded on Form 2-1 (Clause 1.11.5).
2C.1 The commentary to Clause 2.7 shows why the factors matter, and in Odisha the error runs both ways. At Gopalpur the IMDAA cell of NIH-DHAARA (about 12 km) gives a 100-year 24-hour depth of about 461 mm, below the 510.8 mm the Gopalpur gauge recorded on 24 October 1954; reanalysis cells smooth the peaks of cyclone rain of this kind. Elsewhere on the coast the cells give more than the plates or any gauge: about 457 mm for the 50-year 24-hour depth at Puri, against about 320–360 mm on the plates and a highest recorded day of 362.3 mm, and about 406 mm at Berhampur, against about 280–320 mm (NIH-DHAARA, queried 6 Nov 2026; IMD; CWC). Values of this kind are grid-average values and need these factors before any use as point depths; under Clause 2.3.6 they are not used as design depths in Odisha until this annex and Annex 2A are published.
Table 2C.1 — Grid-to-point factors (layout)
| Zone | Grid product and cell size | Duration (h) | AEP | Factor (point / grid) | Stations used | Years of record |
|---|---|---|---|---|---|---|
| 24 | ||||||
| 48 | ||||||
| 72 |
Annex 2D — Odisha temporal patterns (Huff curves)
Supports Clauses 2.9.3 and 2.9.4 of Chapter 2, and Clause 11.7.3 of Chapter 11.
To be prepared. This annex will give dimensionless time-distribution (mass) curves of Odisha storms, in the form introduced by Huff (1967), by zone, storm-duration class and quartile, at stated probability levels. It needs storm hyetographs from recording gauges and automatic weather stations (IMD, DoWR and OSDMA), separated into independent storms by a stated rule, and the Mahanadi basin storms of August 1982, the storms of 11–15 May 1995 over Bhubaneswar, Cuttack and Puri, the rain of the super cyclone of 29 October–1 November 1999, of Phailin (12 October 2013), Titli (11 October 2018), Fani (3 May 2019), Yaas (26 May 2021) and Dana (25 October 2024), and the Bhubaneswar storm of 1 August 2023 among them. Until it is published, design storms use the alternating-block pattern of Clause 2.9.1 and the 48- and 72-hour pattern of Clause 2.9.2; for catchments of 25–5,000 km², the CWC Flood Estimation Report curves may be used with a sensitivity run under Clause 2.9.1 (Clause 2.9.4). SCS Type distributions are not used (Clause 2.9.3). For the disaggregation of daily records in continuous simulation (Clause 11.7.3), the method is agreed with the Authority and recorded (Clause 1.11.5).
Table 2D.1 — Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
| Fraction of storm time | 0 | 0.1 | 0.2 | 0.3 | 0.4 | 0.5 | 0.6 | 0.7 | 0.8 | 0.9 | 1.0 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 10% probability curve | 0 | 1.0 | |||||||||
| 50% probability curve | 0 | 1.0 | |||||||||
| 90% probability curve | 0 | 1.0 |
2D.1 Each table shall state the zone, the duration class, the quartile (the quarter of the storm in which most rain fell), the number of storms analysed and the period of record.
Reference: Huff, F.A. (1967). Time distribution of rainfall in heavy storms. Water Resources Research 3(4), 1007–1019.
Annex 2E — Retention percentile depths by zone
Supports Clauses 2.8.3 and 2.10.1 to 2.10.2 of Chapter 2, Clause 4.4 of Chapter 4 and Chapter 8.
To be prepared. This annex will give, for each zone of Annex 2A, the retention design depth P_R: the 24-hour rainfall depth not exceeded on 90% of days with rain (≥ 2.5 mm) in the long-term record (Clause 2.10.1). It needs long daily records at stations in each zone (IMD, DoWR) and IMD gridded data with the factors of Annex 2C where stations are sparse. Until it is published, P_R is computed by the definition of Clause 2.10.1 from the long-term daily record of a station agreed with the Authority, by the steps in 2E.1, and recorded on Form 2-1 (Clause 1.11.5).
2E.1 Computing P_R from a daily record.
- Take the daily (24-hour) rainfall series of the station for its full record.
- Keep only the days with rain of 2.5 mm or more (wet days).
- Rank the wet-day depths and take the depth not exceeded on 90% of them (the 90th percentile).
- Do not apply the climate factor (Clause 2.8.3) or the fixed-interval factor; P_R is a statistic of everyday rainfall, not an AEP design depth.
- Record the station, the period of record, the number of wet days and P_R on Form 2-1.
Table 2E.1 — Retention depth P_R by zone (layout)
| Zone | Stations or grid cells used | Period of record | Number of wet days (≥ 2.5 mm) | P_R, 90th percentile (mm) | Issued on |
|---|---|---|---|---|---|
| OD-Z1 North coast (Budhabalanga–Baitarani delta) | |||||
| OD-Z2 Mahanadi–Brahmani delta and central coast | |||||
| OD-Z3 South coast and Chilika | |||||
| OD-Z4 Central Mahanadi basin | |||||
| OD-Z5 Northern plateau | |||||
| OD-Z6 Eastern Ghats and southern highlands |
Form 2-1 — Design Rainfall Sheet
Supports Clauses 2.3 to 2.13 of Chapter 2, and Clause 10.4.1(d) of Chapter 10.
Draft form — Odisha Stormwater Design Manual, Draft v1.0. One sheet for each hydrologic submittal. The steps follow Figure 2.3 of Chapter 2.
Table 2F.1 — Form 2-1: site, source and storms
| No. | Item (clause) | Entry |
|---|---|---|
| A. Site (Clause 2.13, item 1) | ||
| A1 | Project and site | ______ |
| A2 | Site coordinates (latitude, longitude, decimal degrees) | ______ |
| A3 | Rainfall zone (Annex 2A, or as agreed with the Authority) | ______ |
| A4 | Contributing catchment area (km²) (Clause 2.7) | ______ |
| A5 | Design life: more than 25 years / temporary works, 5 years or less (Clause 2.8.2) | ______ |
| A6 | Outfall under tidal or river backwater influence: Yes / No (Clauses 2.5.3, 2.12) | ______ |
| B. Source (Clauses 2.3, 2.3.5; item 2) | ||
| B1 | NIH-DHAARA: version or access date | ______ |
| B2 | Coordinates queried | ______ |
| B3 | Screenshot or export of the values extracted attached: reference | ______ |
| B4 | Station IDF used (Clause 2.3.2): No / Yes — station, ID, distance from site (km) | ______ |
| B5 | Station IDF: years of recording-gauge data (30 or more); published or approved by | ______ |
| B6 | Station IDF: change of terrain or coastal exposure between gauge and site: None / describe | ______ |
| C. AEPs and durations (Clauses 2.4, 2.5) | ||
| C1 | Elements designed and their AEPs (Table 2.1) | ______ |
| C2 | Conveyance: Tc and design duration (not less than 10 min) (Clause 2.5.1) | ______ |
| C3 | Storage: durations checked from {1, 2, 3, 6, 12, 24, 48, 72 h}; 24, 48 and 72 h included (Clause 2.5.2) | ______ |
| C4 | Critical duration found for each storage element | ______ |
| D. Conversions | ||
| D1 | Sub-daily depths: read directly / from Annex 2B ratios / from ratios agreed with the Authority (Clauses 2.6.1, 2.6.2) | ______ |
| D2 | Fixed-interval factor applied: none (true-interval source) / 1.13 / 1.04 / 1.02 (Clause 2.6.3) | ______ |
| D3 | Grid-to-point factor: not needed (point source) / Annex 2C / agreed value (Clause 2.7.1) | ______ |
| D4 | ARF: 1.0 (10 km² or less; single-site storage) / CWC curve / interpolated (Clauses 2.7.2–2.7.4) | ______ |
| D5 | Climate factor: 1.20 (≤ 6 h) and 1.10 (> 6–72 h) / 1.0 temporary works / projected depths under Clause 2.8.4 | ______ |
| E. Cross-checks (Clause 2.3.3; item 4) | ||
| E1 | IMD Das et al. (2022) values for 1–24 h: reported in Table 2F.2 | ______ |
| E2 | CWC subzone 1(g) / 3(d) / 3(f) / 3(g) / 4(a) 24-hour point value, catchments of 25–5,000 km²: subzone used | ______ |
| E3 | CWC floor governs for any AEP: No / Yes — AEPs | ______ |
| F. Retention depth (Clause 2.10) | ||
| F1 | P_R (mm) and source: Annex 2E zone value / computed under Annex 2E, 2E.1 — station and period | ______ |
| F2 | No climate factor applied to P_R (Clause 2.8.3): confirmed | ______ |
| G. Design storms (Clauses 2.9, 2.11, 2.12; items 5 and 6) | ||
| G1 | Storms up to 24 h: alternating block, peak at 50%; time step (≤ Tc/3 and ≤ 15 min) | ______ |
| G2 | 48 and 72 h storms: built under Clause 2.9.2 (Table 2F.3) | ______ |
| G3 | Other pattern used: none / Annex 2D / CWC FER with sensitivity run (Clauses 2.9.3, 2.9.4) | ______ |
| G4 | Hyetographs attached as a table and a plot for each design storm: reference | ______ |
| G5 | AMC: III for every design storm of July–October in OD-Z1, OD-Z2 and OD-Z3 and of August–September in OD-Z4 and OD-Z5, whatever its duration, for every design storm that represents a named cyclone, in any zone and month, and in OD-Z6 for a design storm that follows, or contains, a 3-day total of more than 100 mm; II otherwise (Clause 2.11.4) | ______ |
| G6 | Pre-development condition: greenfield, open land in good condition for the mapped HSG (Clause 2.11.5) | ______ |
| G7 | Release criterion: standard, Q_post ≤ 0.9 × Q_pre (Clause 2.11.2) / flood-sensitive, mixed-frequency rule (Clause 2.11.3) | ______ |
| G8 | Tailwater joint cases run (Clause 2.12): case (a) MHWS + sea-level allowance; case (b) 10% AEP 48 h storm with 1% AEP still-water level + sea-level allowance; governing case | ______ |
| H. Prepared by | ||
| H1 | I confirm that the values above are those extracted and used in the submittal. Name, registration number, signature, date | ______ |
Design depth = source depth × fixed-interval factor × grid-to-point factor × ARF × climate factor. Where the design depth is lower than the CWC floor for the same AEP, the floor is adopted (Clause 2.3.3).
Table 2F.2 — Form 2-1: depth table (Clause 2.13, item 3)
| AEP (T-yr) | Duration | Source depth (mm) | Fixed-interval factor | Grid-to-point factor | ARF | Climate factor | Design depth (mm) | IMD Das et al. (2022) (mm) | CWC floor (mm) | Adopted depth (mm) |
|---|---|---|---|---|---|---|---|---|---|---|
Table 2F.3 — Form 2-1: 48- and 72-hour storm construction (Clause 2.9.2)
| AEP (T-yr) | Duration (h) | Total design depth (mm) | 24 h design depth, final 24 h (mm) | Remainder (mm) | Hours before the final 24 h | Uniform intensity before the final 24 h (mm/h) |
|---|---|---|---|---|---|---|
| 48 | 24 | |||||
| 72 | 48 |