Draft v1.0 prepared by NEER. Not adopted by the Government of Odisha, and has no legal force. About this draft

Chapter 1Policy, Applicability and Adoption


1.1 Purpose and objectives

1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Odisha. It applies to private development and to public works, as set out in Clause 1.5.

1.1.2 The Manual has the following objectives:

  • (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
  • (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
  • (c) to size storage for the long-duration multi-day south-west monsoon storms of June–September and the cyclonic storms of May and October, as well as for short-duration intensities;
  • (d) to design outfalls for tidal tailwater at Paradip, Puri, Gopalpur, Chandbali and Dhamra and in the creeks and estuaries of the coast, raised by cyclone surge, and river tailwater in the Mahanadi and the Kathajodi at Cuttack, in the Kuakhai, the Daya and the Gangua nala at Bhubaneswar and in the Brahmani and the Baitarani in the delta, raised by floods from the uncontrolled Mahanadi catchment and by releases from Hirakud, including the case where the outfall is closed;
  • (e) to protect tanks (pokharis), marshes, rivers, supply channels and surplus courses as part of the drainage system;
  • (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
  • (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
  • (h) to make sure that facilities, once built, are maintained and remain effective.

1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the planning and building standards rules for the development-authority areas of the State (the ODA (Planning and Building Standards) Rules 2020), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).

Commentary. Odisha's floods come from four mechanisms, often together. The first is the cyclone on a low, deltaic coast. The super cyclone that crossed the coast near Paradip on 29 October 1999 killed 9,893 people, "about 7,000" of them by the storm surge, most in Erasama block of Jagatsinghpur district; estimates of the surge range from 5.9 m to 7.95 m, and 400–955 mm of rain fell in four days over the Baitarani, Salandi, Budhabalanga, Kharasua and Brahmani basins, where 20,005 breaches were counted in the flood embankments (Kalsi, 2006). Phailin (12 October 2013) brought a surge of 2–2.5 m to Ganjam (IMD, 2013); Fani, which crossed near Puri on 3 May 2019, was a wind disaster for Puri and Bhubaneswar, with damage to urban infrastructure in 53 urban local bodies estimated by H&UD at ₹524 crore, including 291 km of drains (as reported); and Yaas (26 May 2021) and Dana (25 October 2024) brought surges of 2–4 m and 1–2 m to the Balasore–Bhadrak–Kendrapara coast (IMD, 2021; IMD, 2024). The second is the river in flood. Cuttack sits between the Mahanadi and the Kathajodi, and its drains close when the rivers are high: flows in the delta at Mundali reached about 44,900 m³/s in August–September 1982 and 44,800 m³/s in September 2008, most of it from the catchment below Hirakud (Parhi et al., 2012). The third is the long monsoon depression: on 19 August 1982 Sambalpur recorded 581.9 mm in a day (IMD). The fourth is the intense storm on a city whose drains were never designed for one: Bhubaneswar recorded 195 mm on 13 September 2021, when Puri recorded 341 mm, and 259.2 mm on 1 August 2023 (as reported), and in May 1995 Bhubaneswar received 705.0 mm and Cuttack 738.4 mm in the month (IMD).

Lost storage and missing design make all four worse. The CAG's audit of storm drainage in the five Municipal Corporations found "no regulatory framework specifically for storm water management", no drainage master plan except Berhampur's (2017), no detention, retention or infiltration in any drain estimate of 2017–22, and no design discharge in any estimate, although BMC said its drains were sized by an "empirical formula" for "the coming 50 years"; "primary and secondary drains had been constructed without considering the rainfall data, or the required width". Of the 36 natural drains of the five corporations (193.3 km), 63.83% had seen no development work; of their 628 water bodies, 18 were disused and encroached; and the agricultural catchment of the Daya West Canal, which receives Bhubaneswar's drains, had fallen from 2,417 ha to 1,255 ha (CAG, 2024). No city in the State has published a stormwater design storm in research for this Manual. Objectives (b) to (e) address the storage and tailwater failures, which a drain-sizing manual alone cannot fix.

No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the ODA (Planning and Building Standards) Rules 2020 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.


1.2 Stormwater management hierarchy

1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.

  1. Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
  2. Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
  3. Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
  4. Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).

1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.

1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.

Figure 1.1 — Stormwater management hierarchy Four stacked bars, widest at top: Preserve, Retain, Detain, Convey, with a Maintain bar underneath spanning all. A downward arrow shows the order of consideration; an upward arrow shows that credits from higher measures reduce lower ones. Order of consideration Credits reduce lower measures 1 PRESERVE Chapter 7 Keep tanks, wetlands, marshes, permeable soils, trees and flow paths 2 RETAIN Chapters 4, 8 Hold the Annex 2E depth on site: infiltrate, reuse, evaporate 3 DETAIN Chapters 4, 5 Store larger storms; release below pre-development peaks 4 CONVEY Chapters 6, 9 Minor system, plus a 1% AEP overland path MAINTAIN — underlies every measure Chapter 10 A measure that its owner cannot maintain earns no credit (Clause 1.2.2) Use a lower measure only for what the measures above it cannot practicably achieve (Clause 1.2.1).

Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).

Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Odisha, the top layer has a particular meaning: much of the State's flood storage sits in its pokharis and bandhas, many of them on land recorded as "Jalasaya" in the record of rights, in the natural drains (nalas) of its cities, in Chilika (a Ramsar site since 1981, whose water spread varies from about 900 km² in summer to 1,165 km² in the monsoon), in the mangroves of Bhitarkanika (a Ramsar site since 2002), and in the floodplains of the Mahanadi, the Brahmani and the Baitarani. The pokharis are protected by land records and the courts rather than by a statute: encroachment on Jalasaya land is removed under the eviction Acts, the National Green Tribunal ordered a compensatory water body of 2.421 acres for the encroached Baula Bandha in Berhampur (2023), and the Orissa High Court directed the State in 2012 to frame a law to protect water bodies (Tapan Kumar Das v. Commissioner, Cuttack Municipal Corporation, as reported); no such law was found. The natural drains have less: the OTPIT rules bar building in the natural waterways and drains shown in the Master Plan but give them no width, and the CAG found the NDMA buffers applied by none of the five Municipal Corporations (CAG, 2024). Losing that storage cannot be offset economically by pipes and pumps.


1.3.1 Notification. This Manual shall be given statutory effect by the Government of Odisha through:

  • (a) an amendment to the ODA (Planning and Building Standards) Rules 2020 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
  • (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.

1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.

1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.

1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.

Commentary. Odisha has two statewide sets of building standards, one for each kind of planning area. Development-authority areas, such as those of BDA, CDA (Cuttack), BeDA, SDA, RDA and the Puri-Konark Development Authority, are governed by the ODA (Planning and Building Standards) Rules 2020 (S.R.O. No. 180/2020 of H&UD, made under the Odisha Development Authorities Act, 1982, and amended several times between 2021 and 2025, as reported); their text could not be obtained and was not read for this Manual [TBC]. The Master Plan areas of the other Planning Authorities, Special Planning Authorities and Improvement Trusts are governed by the Odisha Town Planning and Improvement Trust (Planning and Building Standards) Rules 2021 (OTPIT PBS Rules; S.R.O. No. 374/2021 of 26 October 2021, made under the Odisha Town Planning and Improvement Trust Act, 1956), which were read. Rule numbers quoted in this Manual are OTPIT rule numbers; the ODA Rules are understood to carry equivalent provisions [TBC]. Whether the BDA (Planning and Building Standards) Regulations 2018 still apply beside the ODA Rules was not confirmed [TBC]. The OTPIT rules set no design storm, return period, runoff coefficient, release rate or detention volume, and no setback in metres from a water body or a nala. They make rainwater harvesting mandatory on plots of more than 115 m² and groundwater recharge on plots of 300 m² and above, size recharge pits or trenches at 6 m³ per 100 m² of roof, and require the system to be inspected before the completion certificate (rule 44); bar basements in low-lying and flood-prone areas (rule 38(1)); bar building in the natural waterways or drains shown in the Master Plan and drainage plan (rule 25(i)); require open parking to be of permeable material (rule 34(5)); ask for bio-swales, rain gardens and detention or retention ponds on the landscape plan of a layout; and let an Authority, with the prior approval of the State Government, make regulations "to encourage sustainable drainage and low impact development" near wetlands, lakes, reservoirs and low-lying areas (rule 52), a power no Authority was found to have used. The rules already ask developers to draw detention ponds without saying how large they must be; this Manual supplies the size. An amendment of both rule sets by H&UD, which makes both, is the natural route for a statewide condition of approval: Clause 1.3.1(a) names the ODA Rules, and Annex 1D gives the same amendment for the OTPIT Rules. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.


1.4 Definitions

1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).

Term Meaning in this Manual
Approving Authority (the Authority) The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the development authority (such as BDA, CDA, BeDA, SDA or RDA) under the ODA (Planning and Building Standards) Rules 2020 in its development area; the Planning Authority, Special Planning Authority or Improvement Trust under the OTPIT (Planning and Building Standards) Rules 2021 in the Master Plan areas those rules cover; or, where it grants building permission, the Municipal Corporation, Municipality or Notified Area Council concerned, or a department for its own works.
Applicant The owner, developer or department that seeks approval, and its successors in title.
Development Any building, layout, sub-division, road, paving or land-use change that requires approval under the ODA (Planning and Building Standards) Rules 2020 or that is executed as a public work.
Redevelopment Development on a site where impervious cover already exists.
Land disturbance Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5).
Impervious area Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats.
New or replaced impervious area Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced".
Retention Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4).
Detention Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4).
Rainwater harvesting (RWH) Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it.
Minor system Drains, pipes and inlets designed for the minor-system AEP of Chapter 6.
Major system The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6).
Pre-development condition Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3).
Flood-sensitive catchment The catchments of the natural drains of Bhubaneswar that outfall to the Gangua nala, the Daya West Canal and the Daya, the city of Cuttack between the Mahanadi and the Kathajodi, whose drains outfall through sluices in the river embankments, the town of Puri behind its dune ridge, Paradip and the tidal tract of the Mahanadi delta, Balasore and the tidal tract of the Budhabalanga–Baitarani delta, and Berhampur and the Gopalpur coast, and any catchment the Authority notifies (Chapter 4; Annex 1B).
Waterbody A river, stream, canal, tank (pokhari), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7).
Regional facility A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4).
Tier A / Tier B authority An Approving Authority classed under Clause 1.6.
Policy supplement The set of adoptable alternative clauses in Clause 1.7 and Annex 1C.
Drainage report The preliminary or final report required by Chapter 10.
Registered professional A person registered under the ODA (Planning and Building Standards) Rules 2020 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6.
Compliance calculator The State-issued tool for computing and reporting compliance (Clause 10.5).
Maintenance declaration The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10).
Variance Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10).
Waiver Approval that a requirement does not apply to a site, on the grounds in Clause 1.10.
Notified Published by the Government or the State Stormwater Technical Committee in the Odisha Gazette.

Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).


1.5 Applicability

1.5.1 Who is covered. This Manual applies to:

  • (a) all development requiring planning permission, building permit or layout approval under the ODA (Planning and Building Standards) Rules 2020;
  • (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
  • (c) works executed by Central agencies or their contractors within Odisha, to the extent that the Authority's approval or no-objection is required.

1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:

  • (a) land disturbance of 0.1 ha or more; or
  • (b) new or replaced impervious area of 500 m² or more.

1.5.3 RWH. The existing RWH mandate continues to apply as set by rule 44 of the OTPIT (Planning and Building Standards) Rules 2021 in the Master Plan areas those rules cover (rainwater harvesting on every plot of more than 115 m², and groundwater recharge on every plot of 300 m² and above and in parks, parking areas, plazas and playgrounds, with recharge pits or trenches of at least 6 m³ for every 100 m² of roof area), and by the ODA (Planning and Building Standards) Rules 2020 in the development-authority areas, which are understood to carry equivalent provisions but were not read for this Manual [TBC], as now. This Manual does not change it.

1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:

  • (a) no sewage connection to a storm drain (Chapter 8);
  • (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
  • (c) waterbody setbacks and the no-fill zone (Chapter 7); and
  • (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).

1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.

1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.

1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.

1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:

  • (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
  • (b) linear road resurfacing that adds no impervious area.

Exempt development remains subject to the RWH mandate and to Clause 1.5.4.

1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.

Figure 1.2 — Applicability decision flowchart Flowchart for Clause 1.5: approval test, exemption test, size threshold test, and flood-sensitive catchment test, leading to the requirements that apply. Development or public work (Clause 1.5.1) Needs building-rules approval, or is it a public work? No Manual not triggered; other rules apply Yes Exempt under Clause 1.5.8? (single dwelling below the threshold, or road resurfacing that adds no impervious area) Yes Exempt from Chapters 4–5. RWH (where mandated) and Clause 1.5.4 still apply No Land disturbance ≥ 0.1 ha, or new or replaced impervious area ≥ 500 m² (Clause 1.5.2)? No Below threshold: RWH (where mandated) and Clause 1.5.4 apply Yes Chapters 4 and 5 apply: retention, detention, downstream and tailwater analysis (+ RWH, 1.5.4) In a flood-sensitive catchment (Annex 1B)? Yes Mixed-frequency rule; full methods only; no Policy Supplement alternatives No Standard rule: Q_post ≤ 0.9 × Q_pre Tier B: design-aid route may be used (Clause 1.7) Decision Chapters 4–5 requirements Chapters 4–5 do not apply

Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.

Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:

  • Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
  • Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
  • The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
  • MBBL 2016 makes recharge mandatory for buildings over 500 m².

The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Odisha plots are small and the cumulative effect of many small plots is what fills Bhubaneswar's drains. For small buildings, the OTPIT (Planning and Building Standards) Rules 2021 leave plots of 115 m² or less outside the rainwater harvesting mandate (rule 44), bar basements in low-lying and flood-prone areas and require every basement to keep out surface drainage (rule 38(1)), and require open parking to be of permeable material with rainwater harvesting and recharge (rule 34(5)). No plinth level above the road or above a flood level was found in the rules read for this Manual.

Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.


1.6 Tiered adoption

1.6.1 Tier A authorities. The following are Tier A:

  • (a) the Bhubaneswar Municipal Corporation (BMC);
  • (b) every Approving Authority within the development area of BDA or of any other development authority constituted under the Odisha Development Authorities Act, 1982, as those areas are notified from time to time, including the Cuttack, Berhampur, Sambalpur and Rourkela Municipal Corporations (CMC, BeMC, SMC and RMC), BDA, CDA (Cuttack), BeDA, SDA, RDA and the Puri-Konark Development Authority where they are the Approving Authority, and the Municipalities and Notified Area Councils in those areas; and
  • (c) every other Municipal Corporation constituted under the Odisha Municipal Corporation Act, 2003, as constituted from time to time.

1.6.2 Tier B authorities. All other Municipalities and Notified Area Councils are Tier B.

1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:

Table 1.1 — Differences between Tier A and Tier B authorities

Item Tier A Tier B
Performance criteria (Chapters 2–9) Apply in full Apply in full
Hydrologic method for storage Hydrograph method (Chapter 3) Hydrograph method, or the design-aid route of Clause 1.7 where eligible
Compliance calculator (Clause 10.5) Required as a summary Required; may be the sole calculation on the design-aid route
Policy supplement alternatives (Clause 1.7) Only with State Stormwater Technical Committee concurrence May be adopted by council resolution
Technical review By the Authority By the Authority, with H&UD regional support or an empanelled reviewer (Clause 10.7)
Flood-sensitive catchment rule Applies Applies

1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the development area of a development authority constituted under the Odisha Development Authorities Act, 1982 (such as BDA, CDA, BeDA, SDA or RDA), or is found by a post-event review (Clause 10.16) to need the full methods.

1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.

Commentary. Bhubaneswar Municipal Corporation, with its own Drainage Division under a Superintending Engineer, and a small Notified Area Council with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Bhubaneswar.


1.7 Policy supplement: adoptable alternatives

1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.

1.7.2 The alternatives are:

Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5

No. Main-text requirement Adoptable alternative Eligibility
S-1 Storage sized by hydrograph method (Chapter 3) Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1)
S-2 Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule Any site outside flood-sensitive catchments
S-3 Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 Waterbodies with no mapped 1% AEP extent
S-4 Downstream analysis by hydraulic model (Chapter 5) Screening checklist of downstream capacity and known flooding, with a model only where the screen fails Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall
S-5 On-site detention Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) Where a basin plan has been notified

1.7.3 Conditions on adoption.

  • (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
  • (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
  • (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
  • (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
  • (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).

Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.


1.8 Relationship with other instruments

1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.

Table 1.3 — Relationship with other instruments

Instrument Relationship
RWH mandates (OTPIT (Planning and Building Standards) Rules 2021, rules 34(5), 44 and 48; ODA (Planning and Building Standards) Rules 2020 [TBC]) Continue unchanged. Rainwater harvesting is mandatory on every plot of more than 115 m², groundwater recharge on every plot of 300 m² and above and in parks, parking areas, plazas and playgrounds, recharge pits or trenches are at least 6 m³ for every 100 m² of roof area, and the system is inspected before the completion certificate (OTPIT rule 44); open parking is of permeable material with rainwater harvesting and recharge (rule 34(5)), and sites above 1,000 m² add a "reduction of hardscape" (rule 48). The ODA Rules are understood to carry equivalent provisions [TBC]; in Bhubaneswar a mandate for plots above 300 m² has been enforced by BDA and BMC (as reported). None gives a storage volume per m² or an outlet rule. RWH storage is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and tanks are assumed full at the start of SW monsoon storms (Chapter 4). Recharge pits may count toward retention where they meet Chapters 4 and 8.
Basements, natural drains, layouts and water-sensitive design (OTPIT rules 25, 38 and 52 and the layout landscape plan; ODA equivalents [TBC]) Continue. No building is permitted in the natural waterways or drains shown in the Master Plan and drainage plan, or over a municipal drain (rule 25(i) and (iii)); the setback and corridor of Chapter 7 also apply, and are wider where the hydraulic corridor or the mapped 1% AEP extent requires. Basements are not permitted in low-lying or flood-prone areas and keep out surface drainage (rule 38(1)); their pumping is not counted as outlet capacity. The detention and retention ponds, bio-swales and rain gardens shown on a layout's landscape plan are sized under Chapter 4. An Authority's power to make regulations for sustainable drainage and low impact development near wetlands and low-lying areas (rule 52) can adopt the technical content of this Manual.
Odisha Municipal Corporation Act, 2003 (ss.24, 302, 307 and 407); Odisha Municipal Act, 1950 Corporations provide and maintain drains and drainage works and the disposal of sewage (s.24). There shall be "one drain for sullage and polluted water and another distinct drain for rainwater" (s.307, as quoted by the CAG): the separate system that this Manual assumes. In practice storm drains carry sewage where sewer connections are incomplete: BMC's drains discharge sewage into the Daya West Canal at 11 points, and in the CDA area of Cuttack 83 of 1,294 sewer manholes were found connected to storm-drain manholes (CAG, 2024). The interception of dry-weather flow under Chapter 8 (Clause 8.9) applies until the connections are removed. Encroachments over roads and drains are removed under s.407, and s.302 is cited for the rainwater harvesting mandate in Bhubaneswar (as reported). The Acts were seen only as quoted by the CAG and the press [TBC]; the drainage sections of the Odisha Municipal Act, 1950, which governs the Municipalities and Notified Area Councils, were not reviewed for this Manual [TBC].
Odisha Development Authorities Act, 1982 and Odisha Town Planning and Improvement Trust Act, 1956 Development authorities, and the Planning Authorities, Special Planning Authorities and Improvement Trusts, prepare development and Master Plans and grant permission in their areas. The OTPIT rules treat as natural-hazard-prone the flood-prone areas of the CWC Flood Atlas and the areas flooded by heavy rain, ponding, backflow in drains or inadequate drainage that the Master Plan identifies. Flood-sensitive catchments, drainage corridors and regional facility sites should be shown in the plans. This Manual does not decide zoning. The Acts were not read for this Manual [TBC].
Orissa Irrigation Act, 1959 (ss.7, 8 and 39–42) In a notified area the State may prohibit, or order the removal of, an obstruction of a river, stream, irrigation work or drainage work, and recover the cost of removal; damaging, altering or obstructing such works is an offence (as read in extracts) [TBC]. Outfalls to the drainage channels and canals of DoWR, such as the Gangua nala, the Daya West Canal and the Taladanda canal, are designed for the channel's own water level, as for a river (Clause 5.8), and need the consent of DoWR; development between a river or canal and its embankment needs DoWR's clearance (OTPIT rules).
Ponds and tanks: "Jalasaya" land, the eviction Acts and the courts Odisha has no water-body protection Act, although the Orissa High Court directed the State in 2012 to frame one (Tapan Kumar Das v. Commissioner, Cuttack Municipal Corporation, as reported). Ponds and tanks are protected through the "Jalasaya" class in the record of rights, a Revenue Department circular placing urban Jalasaya land under the ULBs (number and date not seen [TBC]), eviction under the Orissa Public Premises (Eviction of Unauthorised Occupants) Act, 1972 and the Odisha Prevention of Land Encroachment Act, 1972, and orders of the National Green Tribunal and the High Court, which in the case of Baula Bandha in Berhampur required a compensatory water body and kept drains out of the tank (NGT, 2023). Works under this Manual that drain to a pokhari shall meet the water-quality rules of Chapter 8, and no work shall reduce its area or storage (Chapter 7).
Groundwater Odisha has no groundwater Act: "the State had not enacted any Act for Ground Water Regulation, Control and Management" (CAG, 2024); a Bill of 2011 was placed before the Assembly (as reported). Recharge wells and deep infiltration under Chapters 4 and 8 are subject to the salinity and quality limits of Chapter 8, which matter on the saline coastal tract.
Flood-prone land Odisha has no flood plain zoning law and no flood lines were found in research for this Manual, and the CAG found that the NDMA buffers of 12 m from major canals and streams and 2 m from nallahs and storm drains had been applied by none of the five Municipal Corporations (CAG, 2024). This Manual does not create flood lines. Where the 1% AEP extent of Chapter 7 is mapped, it governs the setback; where a plan zone is wider, the zone governs (Clause 1.3.3).
Wetlands (Conservation and Management) Rules, 2017; Chilika Apply to notified wetlands and the Ramsar sites: Chilika Lake (from 1 October 1981, 116,500 ha), Bhitarkanika Mangroves (19 August 2002, 65,000 ha), and Satkosia Gorge, Hirakud Reservoir, Tampara Lake and Ansupa Lake (all 12 October 2021). Chilika, which receives Bhubaneswar's storm water through the Gangua and the Daya, is managed by the Chilika Development Authority, created in 1991. A State Wetland Authority is reported to be demarcating wetlands; its notification was not read [TBC]. Where their restrictions are wider than the setback of Chapter 7, they govern (Clause 1.3.3).
CRZ Notification 2019, through the Coastal Zone Management Plan in force The Coastal Zone Management Plan under CRZ 2019 for the seven coastal districts (Balasore, Bhadrak, Kendrapara, Jagatsinghpur, Puri, Khordha and Ganjam) was approved by MoEF&CC on 1 June 2021 (MoEF&CC, before the National Green Tribunal); its approval has been challenged over a reclassification near Puri, and a shoreline management plan with erosion maps was still under preparation in 2025 (as reported). CRZ clearance for outfalls, drains, sluices and pumping stations in the CRZ is taken through the Odisha Coastal Zone Management Authority. CRZ categories and lines are taken from the approved maps, and govern where wider than Chapter 7 (Clause 1.3.3).
CPHEEO Manual on Storm Water Drainage Systems (2019) Engineering reference. This Manual sets higher return periods under Clause 1.3.2.
NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF.
NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create.
IRC:SP:42-2014 and IRC:SP:50-2013 Apply to road drainage only where they do not conflict with Chapter 6.
MBBL 2016, Chapter 9 Model for RWH and for the inspection regime in Chapter 10.

Commentary. RWH in Odisha is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a July to September monsoon depression or an October or May cyclone arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.

Odisha is spending on drainage. In Cuttack, the Orissa Integrated Sanitation Improvement Project, financed by JICA in two phases (loan agreements of 2007 and 2016), builds and rehabilitates drainage channels, pumping stations and sluice gates; its stated target is to cut the largest inundated area of the city from 470 ha (2005) to 30 ha, and the number of inundations from three to five a year to fewer than three (JICA). That is an outcome target, not a design storm. Cuttack's drain DPRs have since been under review before the Orissa High Court, with experts from IIT Bhubaneswar (as reported). In Bhubaneswar, a proposal of DoWR to improve the Gangua nala, at ₹432.75 crore, had been pending with the Government for more than three years in November 2022 (CAG, 2024), and a drainage master plan by IIT Roorkee for BMC, under an agreement of February 2025 with a horizon of 2050, was reported to be nearing completion in October 2025; no design figures from it have been published (as reported). In 2021 the State released ₹66.66 crore to 30 ULBs to prepare drainage master plans (CAG, 2024). No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.

Odisha's law already holds many of the tools. It requires a separate drain for rain water (Odisha Municipal Corporation Act, 2003, s.307, as quoted by the CAG), bars building in natural waterways and drains (OTPIT rule 25(i)), lets the State remove obstructions of drainage works (Orissa Irrigation Act, 1959, s.7), and protects ponds through the "Jalasaya" land records, the eviction Acts and the courts. What it lacks is a design standard. The CAG found "no regulatory framework specifically for storm water management", no design discharge in any drain estimate of the five Municipal Corporations, and no detention, retention or infiltration in any of them (CAG, 2024). None of these instruments says how large a drain must be, how high a flood reaches or how much storage a filled pokhari removes; this Manual supplies that technical test.


1.9 Roles and responsibilities

1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.

Table 1.4 — Roles and responsibilities under this Manual

Agency Role under this Manual
Housing and Urban Development Department (H&UD) Would own the Manual. Makes the ODA and OTPIT (Planning and Building Standards) Rules and would issue their amendment (Clause 1.3.1(a)). Controls the State's 114 ULBs; its Director of Municipal Administration oversees storm water drainage in them (CAG, 2024). Would constitute and service the State Stormwater Technical Committee. Oversees the development authorities, whose development plans should show flood-sensitive catchments, drainage corridors and regional facility sites. Funds drainage master plans. Technical support to Tier B authorities. Maintains the empanelled reviewer list (Clause 10.7).
State Stormwater Technical Committee (Clause 1.3.2) Adopts higher standards. Issues Annexes, tables and the compliance calculator. Concurs with Tier A alternatives. Decides variances referred to it. Reviews the Manual (Clause 1.12).
Bhubaneswar Municipal Corporation (BMC) Owns the city's drains, including the ten natural drains of the development plan (62.6 km), eight of which outfall to the Gangua nala (CAG, 2024), and runs them through its Drainage Division. Approving Authority where it grants building permission. Would apply this Manual to its own works and to the drainage master plan prepared for it. Receives handed-over assets (Clause 10.14). Inspects and enforces (Clauses 10.12–10.15).
Cuttack Municipal Corporation (CMC) Owns the drains of Cuttack, including the main storm water channels that outfall through sluices to the Kathajodi and the Mahanadi. Would provide outfall levels and pump operating rules for river tailwater (Chapter 5). Inspects and enforces (Clauses 10.12–10.15).
Berhampur, Sambalpur and Rourkela Municipal Corporations (BeMC, SMC, RMC) Own the drains in their areas. BeMC has the only drainage master plan among the five corporations (2017) (CAG, 2024). Would apply this Manual to their works. Inspect and enforce (Clauses 10.12–10.15).
Development authorities: BDA, CDA (Cuttack Development Authority), BeDA, SDA, RDA, the Puri-Konark Development Authority and the others under the Odisha Development Authorities Act, 1982 Approving Authorities for building plans and layouts in their development areas under the ODA (Planning and Building Standards) Rules 2020. Prepare the development plans, which should reserve drainage corridors and regional facility sites; identify and clear encroachments on drains. Apply this Manual to the drains they build in layouts and schemes.
Municipalities and Notified Area Councils Approving Authorities where they grant building permission. Owners of the public drains in their areas. Inspect and enforce (Clauses 10.12–10.15).
Department of Water Resources (DoWR), including its drainage divisions (Khordha, Cuttack and Berhampur) Rivers, embankments, sluices, irrigation canals and the major drainage channels into which city drains outfall: in Bhubaneswar the Gangua nala, managed by the Khordha Drainage Division, and the Daya West Canal; in Cuttack the river embankments and sluices on the Mahanadi and the Kathajodi. Releases from Hirakud, with the flow of the uncontrolled catchment below it, set the river tailwater in the delta; DoWR would provide release and river-level scenarios for Chapter 5. Provides design water levels and tailwater (Chapters 5 and 7). Consents to outfalls into its channels and canals and to development between a river or canal and its embankment. Holds rain-gauge and river-gauge records (Annex 2A).
Odisha State Disaster Management Authority (OSDMA), the Special Relief Commissioner and the District Disaster Management Authorities Hazard and flood mapping. Notify or recommend flood-sensitive catchments. Cyclone and flood shelters and early warning. Pre-monsoon preparedness. Lead the post-event review (Clause 10.16), using their flood and rainfall records.
Water Corporation of Odisha (WATCO) Operates water supply and sewerage, including Sewerage Districts I–IV of Bhubaneswar, and works around the JICA box drains in Cuttack. Would remove sewage connections from storm drains as sewers are completed, and take part in the interception of dry-weather flow (Chapter 8).
Odisha Water Supply and Sewerage Board (OWSSB) Builds sewerage projects, including Sewerage District VI of Bhubaneswar and the sewerage of Cuttack. Would design its sewers so that no sewage reaches a storm drain (Chapter 8).
Odisha State Pollution Control Board (OSPCB) Consents to establish and operate sewage treatment and drainage works. Tests the quality of Chilika, the Bhitarkanika lagoons and urban water bodies, as the courts have directed. Supports the removal of sewage from storm drains (Chapter 8).
Paradip Port Authority A major port of the Union. Holds the port area and its tide records at Paradip. Would be consulted where an outfall, coastal work or tide gate lies within port limits; its role at urban outfalls was not researched for this Manual [TBC].
Odisha Coastal Zone Management Authority and the Forest, Environment and Climate Change Department Recommend CRZ clearance for outfalls, drains, sluices and pumping stations in the CRZ of the seven coastal districts, under the Coastal Zone Management Plan approved in 2021. The Department also oversees the Chilika Development Authority and the State Wetland Authority.
Chilika Development Authority Conserves Chilika, the receiving water of Bhubaneswar's storm water through the Gangua and the Daya, including the control of silt from its catchment, and helps the Collectors identify the high tide line around the lagoon. Consulted on works that drain to Chilika (Chapters 5, 7 and 8).
Ground water organisation of the State (GWS&I) Advises on groundwater levels, recharge, infiltration and coastal salinity (Chapters 3, 4 and 8). Its rooftop rainwater harvesting scheme built 9,796 systems in 11 ULBs in 2014–19 (CAG, 2024).
Revenue and Disaster Management Department, the Collectors and the Tahasildars Maintain the record of rights, including the land recorded as "Jalasaya" (tanks, ponds and reservoirs) and "nala", which is the starting point for the waterbody inventory of Chapter 7. Evict encroachments on government water bodies under the eviction Acts.

Commentary. Ownership of Odisha's urban drainage is split. In Bhubaneswar the natural drains belong to BMC, but eight of them outfall to the Gangua nala, which the Khordha Drainage Division of DoWR manages, and the Gangua flows to the Daya and on to Chilika: one system with at least three owners (CAG, 2024). The Daya West Canal, also of DoWR, receives sewage from BMC's drains at 11 points and has 1,195 houses on its banks (CAG, 2024). In Cuttack the drains belong to CMC, but the embankments and sluices through which they leave belong to DoWR, and the rivers are set by Hirakud and the uncontrolled Mahanadi catchment above it. The boundary between the drains of the ULBs and the channels of DoWR was not found mapped for any city in research for this Manual [TBC]. Two bodies are abbreviated CDA in Odisha: in this Manual CDA means the Cuttack Development Authority, and the Chilika Development Authority is named in full. This Manual names departments and authorities as the statutes and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.


1.10 Variances and waivers

1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:

  • (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
  • (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.

1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. A site that drains to a tidal creek or estuary through a sluice or flap gate in an embankment, as in the deltas of the Mahanadi, Brahmani and Baitarani, does not discharge to a tidal reach for this clause, because the gate is closed whenever the water outside is higher than the water behind it; nor does a site whose drainage reaches the outfall only by pumping. Cuttack's drains, which reach the Mahanadi and the Kathajodi through sluices in the river embankments, do not discharge to a tidal reach at all.

1.10.3 No variance or waiver. No variance or waiver shall be granted for:

  • (a) a sewage connection to a storm drain;
  • (b) the lowest habitable floor level of Chapter 6;
  • (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
  • (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.

1.10.4 Procedure.

  • (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
  • (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
  • (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
  • (d) A variance runs with the approval. It lapses if the approval lapses.

Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Odisha's five Municipal Corporations the CAG found 18 Government water bodies disused and encroached, and the NDMA buffers of 12 m from major canals and streams and 2 m from nallahs and storm drains applied by none of them (CAG Report No. 8 of 2024).


1.11 Transition provisions

1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).

1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.

1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.

1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.

1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.

Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).


1.12 Review and amendment

1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.

1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.

1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.


References (chapter)

Annexes and forms

Annex / Form Content
1A List of Tier A authorities, with the boundaries of the development areas of the development authorities
1B Maps of flood-sensitive catchments
1C Policy Supplement: text of alternatives S-1 to S-5 and model council resolution
1D Model ODA PBS Rules amendment and model ULB bye-law
Form 1-1 Applicability Determination