Chapter 11Basin and City Stormwater Master Plans


11.1 Purpose and scope

11.1.1 Chapters 2 to 10 control one project at a time. This chapter sets the requirements for the plan that ties those projects together: the Basin Stormwater Master Plan (BSMP). A BSMP is prepared for each drainage basin of a city or urban area. A city's set of BSMPs makes up its City Stormwater Master Plan.

11.1.2 A BSMP shall:

  • (a) map flood hazard for the basin under existing and future conditions;
  • (b) set the level of service each part of the drainage system must achieve (Clause 11.6);
  • (c) identify the works, storage and land needed to reach that level of service, and rank them (Clauses 11.7 and 11.8);
  • (d) reserve land for regional storage, pokhari and tank restoration, and major flow paths in the statutory land-use plan (Clause 11.9);
  • (e) set the basin-specific inputs that site designs under Chapter 4 depend on: regional facilities, the fee-in-lieu unit rate, and any basin release rate stricter than Chapter 4 (Clause 11.8.3); and
  • (f) recommend catchments for notification as flood-sensitive (Clause 4.5.4).

11.1.3 Relationship to site design. Site criteria (Chapters 4 to 8) apply whether or not a BSMP exists. A BSMP may make the site criteria stricter for its basin. It shall not relax them, except through the regional detention and fee-in-lieu routes of Clauses 4.13 and 4.5.6.

Commentary. Odisha's cities have few drainage master plans, and the one that exists is not published. When the CAG audited the five Municipal Corporations, only Berhampur had one, prepared in 2017 at a cost of ₹2.14 crore, with detailed project reports for 5 of its 14 priority drains; BMC's request to H&UD for permission to prepare a master plan for Bhubaneswar, made in September 2021, was still pending a year later; Rourkela's drainage project report of 2012–13 was never sanctioned; and H&UD had released ₹66.66 crore in 2021 to 30 ULBs for drainage master plans (CAG 2024). Since then BMC has engaged IIT Roorkee, under an agreement of 18 February 2025, to prepare a comprehensive stormwater management plan for Bhubaneswar to a 2050 horizon, including a hydraulic model of the Gangua nala with the backwater of the Daya; it was reported to be nearing completion in October 2025, but no design figures have been published (press reports; BMC affidavit before the National Green Tribunal). In Cuttack the JICA-assisted Orissa Integrated Sanitation Improvement Project set targets for the area and frequency of flooding (JICA 2007), ₹4 crore was released for a drainage master plan in 2025, and the detailed project reports for the city's major drains are under review by the Orissa High Court with experts of IIT Bhubaneswar (press reports). Sambalpur's citywide drainage master plan was reported to be awaiting approval in 2025 (press report). No storm water master plan or stated design return period was found, in the sources reviewed for this Manual, for Puri, Paradip, Balasore or any other ULB. A site-level manual cannot fix basin-level problems: lost tank storage, outfalls locked by the Mahanadi and the Kathajodi in flood or by the tide, natural drains narrowed by encroachment, storm drains that carry sewage, and drains that are adequate on their own but overload the next reach. Comparable manuals pair site criteria with basin planning:

  • Denver's Mile High Flood District prepares major drainageway master plans that set regional facilities and release rates.
  • The Kansas City APWA criteria rest on regional watershed studies (MARC).
  • England's Surface Water Management Plans (Defra, Surface Water Management Plan Technical Guidance, 2010) set a phased method of preparation, risk assessment, options and implementation.
  • Malaysia's MSMA requires drainage master plans for urban areas.

This chapter adapts that method to Cuttack, which lies between the Mahanadi and the Kathajodi inside their embankments and drains through sluices and pumping stations that the rivers lock in flood; to Bhubaneswar, whose natural drains belong to BMC but discharge through a drainage channel of DoWR, the Gangua nala, to the Daya and Chilika; to storm drains that carry sewage where sewer connections are incomplete, although the law requires a separate drain for rain water; to the pokharis and other water bodies on Jalasaya land; to the Mahanadi, whose level at Cuttack is set by flows of 25,000–45,000 m³/s from Hirakud and from the uncontrolled catchment below it; to the tide-locked outfalls and saline embankments of the coast from Balasore to Gopalpur; and to a SW monsoon flanked by damaging cyclones in May and in October.


11.2 Definitions

Term Meaning in this Manual
Basin The land draining to one outfall to the sea, a river, or a major waterbody, as delineated under Clause 11.3.
Basin Stormwater Master Plan (BSMP) The plan for one basin prepared under this chapter.
Lead Authority The body responsible for preparing a BSMP (Clause 11.4).
Level of service (LoS) The flood performance a part of the drainage system must achieve, expressed as an AEP and an outcome (Clause 11.6).
Flood hazard map A map of flood extent, depth, velocity and hazard class (H1–H6, Chapter 6) for a stated AEP and scenario.
Regional facility A storage, conveyance or outfall work serving more than one development, identified in a BSMP.
Capital Improvement Programme (CIP) The ranked, costed list of works in a BSMP (Clause 11.8.4).

11.3 Planning unit: the basin, not the ward

11.3.1 BSMPs shall be prepared by hydrological basin, not by ward, zone or local-body boundary. Where a basin crosses local-body boundaries, one BSMP shall cover the whole basin.

11.3.2 Basin boundaries shall be delineated from the digital elevation model of Clause 11.5.2, checked against the drain network, road embankments, canals and tank supply channels. Diversions between basins, whether by canal, drain or surplus course, shall be mapped and represented in the model.

11.3.3 For the main urban areas, and for the river reaches that flood every few years, the basins are at least the following:

  • Bhubaneswar, Gangua–Daya: the Gangua nala from its head near Rajadhani Engineering College through Mancheswar and Palasuni to its outfall to the Daya near Kanti, with the catchments of the eight natural drains of BMC that end at it, the level of the Daya as the boundary condition, and Chilika as the receiving water;
  • Bhubaneswar, western and southern drains: natural Drain VIII, from Baramunda to Pokhariput, and the reach of the Daya West Canal inside BMC, from Kalikhama to Sundarpada, with their whole catchments;
  • Cuttack, Mahanadi–Kathajodi island: the city between the Mahanadi and the Kathajodi inside their embankments, with the catchments of the main storm water channel to the Kathajodi at Matagajpur and its link drain to Khannagar, the main storm water channel to the Mahanadi at Gulguli, the Petta nala to its sluices in the Kathajodi embankment, and the diversion to the Taladanda canal as sub-basins, the river stages for Mahanadi flows of up to about 45,000 m³/s as the boundary condition, and the outfall-closed case of Chapter 5 as a design case;
  • Puri: the town between its coastal sand dunes and the lakes inland of it, with the sea and any river or lake outfall as boundary conditions to be established in the first BSMP;
  • Paradip: the port town at the mouth of the Mahanadi, on a saline marsh tract crossed by tidal streams, with the tide and storm surge as the boundary condition; and
  • Berhampur: the basins of Berhampur Municipal Corporation, starting from the 14 priority drains of its drainage master plan of 2017.

Other Tier A bodies, including Sambalpur, Rourkela and Balasore, shall define their basins in the first BSMP that covers them. Where DoWR has a design flood, a high flood level, an embankment crest level or an operating rule for a river, channel, sluice or dam that a town lies on, the BSMP shall take its river boundary conditions from it, and shall show those levels against its own 1% AEP map.

Basin Stormwater Master Plan (BSMP) — process and links to site design 1. Basin set-up Delineate by basin, not ward (Cl. 11.3) Lead Authority + partners 2. Data DEM, drains, tanks, tides, flood marks (Cl. 11.5) 3. Model 1D–2D, 24–72 h storms, tide, continuous sim. calibrate to past floods 4. Gap vs LoS Scenarios: existing, future ± site controls, climate (Cl. 11.6–11.7) 5. Options Restore tanks first, then regional storage, conveyance, outfalls 6. Outputs (Cl. 11.8.4) — approved by State Stormwater Technical Committee • Flood hazard maps 10% / 1% / 0.2% AEP • Flood-sensitive catchments, basin release rates • Regional facility sites and fee-in-lieu rate • Capital Improvement Programme, ranked • Pre-monsoon maintenance programme • Monitoring network • Open data + public map viewer • Annual report, pre-monsoon Land-use plan Statutory master plan: reserve storage sites, flow paths, hazard zoning (Cl. 11.9) Site design Ch 4 release rates, regional detention and fee-in-lieu (Cl. 4.13, 4.5.6) Floors and setbacks 1% AEP future-with-plan map sets floor levels (Ch 6) and setbacks (Ch 7) Public works CIP funds: ULB, State, Union; O&M and desilting (Ch 10) Review every 10 yr, after a >1% AEP event, or plan revision (Cl. 11.11)

Figure 11.1 — Basin Stormwater Master Plan process and its links to site design. Original drawing for this Manual. The phase structure is adapted from Defra, Surface Water Management Plan Technical Guidance (2010), and Mile High Flood District master planning practice.

Commentary. Water does not follow ward boundaries. A ward-by-ward drain plan can pass the problem to the next ward, and to the next local body. Responsibility in Odisha is divided by body as well as by boundary. BMC owns Bhubaneswar's ten natural drains, 62.6 km in all, but eight of them end at the Gangua nala, which DoWR's Khordha Drainage Division manages; the Gangua runs about 31 km to the Daya near Kanti, and the Daya flows to Chilika (CAG 2024). The same division asked BMC and BDA to demarcate a buffer zone on both banks of the Gangua, and DoWR's proposal to improve the channel had been pending for more than three years in November 2022 (CAG 2024). The Daya West Canal, 34.86 km long with 16.10 km inside BMC, receives BMC's drains at 11 points and is encroached by 1,195 houses (CAG 2024). In Cuttack, CMC's main storm water channels run to the Kathajodi at Matagajpur (11.58 km) and to the Mahanadi at Gulguli (5.24 km), and the Petta nala, which rises in the Cuttack Development Authority's Sector 10, reaches the Kathajodi through sluices in the river embankment (CAG 2024); the rivers and embankments are DoWR's. The exact boundary between the drains of the ULBs and the channels of DoWR was not found. The level of the Mahanadi at Cuttack, and of the Kuakhai and the Daya below it, is set by the river's flood, which comes mostly from the catchment below Hirakud (Parhi et al. 2012), not by local rain. This clause makes the basin the planning unit. It also requires the Gangua nala to be treated as a link, because it carries the storm water, and much of the sewage, of most of Bhubaneswar to one outfall.


11.4 Who prepares, and when

11.4.1 Lead Authority.

  • For a basin wholly within Bhubaneswar: BMC, with BDA as partner.
  • For the Gangua–Daya basin: BMC for the urban basin that drains to the Gangua nala, with BDA as partner, and DoWR (Khordha Drainage Division) for the Gangua nala, the Daya West Canal and the Daya below the Gangua outfall, as Lead Authority for those channels and as partner in the urban basin; the two shall be prepared together, so that one model covers the whole basin (Clause 11.3.1).
  • For Cuttack: CMC, with the Cuttack Development Authority as partner, and DoWR as Lead Authority for the Mahanadi and the Kathajodi, their embankments and the sluices through them.
  • For Berhampur: Berhampur Municipal Corporation (BeMC), with the Berhampur Development Authority (BeDA) as partner. For Sambalpur: Sambalpur Municipal Corporation (SMC), with its development authority as partner. For Rourkela: Rourkela Municipal Corporation (RMC), with the Rourkela Development Authority as partner.
  • For rivers, embankments, irrigation canals and drainage channels under DoWR's control, including the saline embankments of the coast and their sluices: DoWR, as Lead Authority for the river, channel or embankment and as partner in every urban BSMP that discharges to it. Where the river level is set by releases from Hirakud or Rengali, the BSMP shall take its release scenarios from DoWR and record them.
  • For basins that drain directly to Chilika lagoon outside the urban bodies: the Chilika Development Authority, with DoWR and the local bodies in the basin as partners.
  • For other basins that cross local-body boundaries: the Municipal Corporation or Municipality with the largest share of the basin, with the development authority for the area and the other local bodies as partners.
  • In Tier B bodies: the Lead Authority is named by H&UD. Basins draining to a common river reach or drainage channel may be grouped into one district-level plan.

The Odisha Coastal Zone Management Authority shall be consulted on every BSMP that proposes works in the Coastal Regulation Zone, and the Chilika Development Authority on every BSMP whose basin drains to Chilika, including the Gangua–Daya basin. Every BSMP that proposes a discharge to a DoWR river, canal or drainage channel shall record DoWR's consent to it.

DoWR shall be a partner in every BSMP that includes a river, canal or tank under its control.

11.4.2 When a BSMP is required.

  • (a) Every Tier A body shall approve BSMPs covering its whole area within 3 years of this Manual taking effect.
  • (b) A BSMP is required before:
    • any regional detention or fee-in-lieu is accepted under Clause 4.13;
    • a fee held under Clause 4.5.6.3 is spent; and
    • a basin-specific release rate is applied under Clause 11.8.3.
  • (c) A Tier B body shall prepare a BSMP where its Lead Authority, or the State Stormwater Technical Committee, finds recurrent flooding of buildings or arterial roads.

11.4.3 Preparation. BSMPs shall be prepared by, or under the direction of, an engineer empanelled as a Stormwater Design Professional (Chapter 10) with experience in basin-scale modelling.


11.5 Data and surveys

11.5.1 Each BSMP shall assemble and publish (Clause 11.10) the data in Table 11.1:

Table 11.1 — Minimum data and surveys for a BSMP

Data Minimum requirement
Terrain Digital elevation model from LiDAR or photogrammetry, with vertical accuracy of 0.15 m RMSE or better in urban areas, tied to the Survey of India datum
Drain network Inventory of all public drains, culverts and outfalls with invert levels, sizes, condition and silt depth; private drains above 600 mm
Waterbodies Survey of every tank, pokhari, pond and marsh under Chapter 7: FTL, MWL, bund level, stage–storage, sluices, surplus weirs, supply channels, encroachment
Rivers and canals Cross-sections at no more than 200 m spacing and at every structure
Outfalls and coast Tidal datums and surge values (Annex 5A), with the datum of every level named (chart datum, GTS/MSL or a port datum); outfall invert levels against high tide and against river flood levels; sluices, flap gates, tide gates and pumping stations on the outfalls and through the river and saline embankments, with their capacities and operating rules; embankment crest levels and breach history; DoWR's high flood levels and gauge records for the Mahanadi, Kathajodi, Kuakhai, Daya and other rivers; releases from Hirakud, Rengali and any other dam upstream
Rainfall and levels All available rain gauges (IMD, including the Bhubaneswar (Aero), Cuttack, Puri, Gopalpur, Paradip, Balasore, Chandbali, Sambalpur, Jharsuguda and Koraput stations and the Doppler radars at Paradip and Gopalpur; the rain and river gauges of DoWR reported in its daily flood bulletins; the automatic weather stations and rain gauges of OSDMA; and the block rainfall reported daily by the Special Relief Commissioner) and water-level records, including those for the May 1995 (Bhubaneswar and Cuttack), October 1999 (the super cyclone), October 2018 (Cyclone Titli at Cuttack), May 2019 (Cyclone Fani), September 2021 (Bhubaneswar and Puri) and August 2023 (Bhubaneswar) events
Flood evidence Surveyed flood marks and mapped flood extents from past events, including public reports
Land use Existing land use and imperviousness; future land use from the statutory master plan
Soils and groundwater HSG map (Annex 3A); seasonal high groundwater; aquifer and recharge zones
Sewer interaction Known sewage cross-connections, dry-weather flow in drains, and solid-waste hotspots

Commentary. The 0.15 m accuracy has no direct precedent; this Manual sets it because on the Mahanadi delta at Cuttack, Kendrapara and Jagatsinghpur, on the low land along the Gangua and the Daya at Bhubaneswar, and on the coastal plain behind the dunes at Puri and Paradip a small error in ground level moves the flood edge a long way, and the 1% extent from the BSMP sets floor levels (Chapter 6) and setbacks (Chapter 7). Past flood marks matter as much as models. The May 1995 (Bhubaneswar and Cuttack), October 1999 (the super cyclone), October 2018 (Cyclone Titli at Cuttack), May 2019 (Cyclone Fani), September 2021 (Bhubaneswar and Puri) and August 2023 (Bhubaneswar) events are the best calibration data Odisha has, and much of the evidence is held in photographs, news reports and residents' records that should be collected before it is lost.


11.6 Levels of service

11.6.1 Each BSMP shall adopt the following minimum levels of service. A BSMP may adopt stricter levels.

Table 11.2 — Minimum levels of service

Element Minimum level of service
Minor system The design AEP of Chapter 6 (Table 6.1)
Habitable buildings No flooding above floor level in the 1% AEP (100-yr) event
Critical facilities (hospitals, emergency services, substations, water and sewage plants) No flooding of the facility in the 0.2% AEP (500-yr) event; access road passable in the 1% AEP event
Evacuation routes and arterial roads Passable (hazard class H2 or better, Chapter 6) in the 1% AEP event
Ponding drain time Surface water cleared from roads within 6 hours after rain ends in the 10% AEP (10-yr) event
Tank and pokhari storage No net loss of flood storage below the MWL in the basin, measured against the earliest available survey
Outfalls Functioning under the joint and outfall-closed cases of Chapter 5

Commentary. The building and road levels repeat Chapter 6, so that the basin plan and the site designs aim at the same outcome. The 0.2% AEP for critical facilities, the 6-hour ponding drain time and the no-net-loss rule for tank storage have no direct precedent and are set by this Manual. The drain time reflects what residents notice most after a storm. The no-net-loss rule reflects a loss of storage that has been counted but not measured. The CAG counted 628 water bodies in the five Municipal Corporations in November 2022: 107 in Bhubaneswar, 220 in Cuttack, 22 in Berhampur, 272 in Sambalpur and 7 in Rourkela; 18 government water bodies, covering 1.977 acres, were disused and encroached (CAG 2024). Odisha has no water-body Act, although the Orissa High Court directed the State in 2012 to frame one within two years (Tapan Kumar Das v. Commissioner, Cuttack Municipal Corporation, as reported). Ponds are protected through the "Jalasaya" class of the land record and the eviction statutes; at Baula Bandha in Berhampur, Ac. 2.421 of a tank recorded as Jalasaya had been built over, and the National Green Tribunal ordered a compensatory water body of the same area (NGT 2023). No survey of the storage of any city's ponds was found.


11.7 Modelling and scenarios

11.7.1 Model. Each BSMP shall use a coupled 1D–2D hydraulic model of:

  • the minor system;
  • the major (overland) system;
  • rivers, canals and tanks; and
  • the outfalls.

Methods shall follow Chapter 3. Tidal and river boundaries shall follow Chapter 5.

11.7.2 Design storms. The model shall be run for the design storms of Chapter 2, including the 24-, 48- and 72-hour storms, for at least the 50%, 10%, 1% and 0.2% AEPs. Areal reduction shall be applied under Clause 2.7.3.

11.7.3 Continuous simulation. Basins with tank cascades shall also be run by continuous simulation (Clause 3.13), using the full IMD gridded daily record where available and at least 30 years, disaggregated by the temporal patterns of Annex 2D. This shows how full the tanks are when the design storms arrive, and how often heavy rain coincides with a closed outfall. The two-step approach of Clause 3.13.5 may be used: a simplified storage model is run for the whole record, and the coupled 1D–2D model of Clause 11.7.1 is run only for the design storms, starting from the tank levels the continuous run gives. A continuous run of the full 1D–2D model is not required.

11.7.4 Scenarios. Each BSMP shall model at least:

  • (a) Existing: existing land use, network, tanks and outfalls;
  • (b) Future, uncontrolled: future land use under the statutory master plan, with no site controls;
  • (c) Future, controlled: future land use with the site controls of Chapter 4;
  • (d) Future, with plan: scenario (c) plus the works of the CIP; and
  • (e) Climate: scenarios (a) and (d), with the climate factors of Clause 2.8 and, on the coast, the sea-level allowance of Chapter 5 (INCOIS projects a rise in mean sea level at Paradip of 0.44–0.66 m by 2100).

11.7.5 Calibration. The model shall be calibrated and validated under Clause 3.15, using at least two of the May 1995 (Bhubaneswar and Cuttack), October 1999 (the super cyclone), October 2018 (Cyclone Titli at Cuttack), May 2019 (Cyclone Fani), September 2021 (Bhubaneswar and Puri) and August 2023 (Bhubaneswar) events where data exist.

Figure 11.2 — BSMP model schematic Schematic plan of a basin model: design rainfall over sub-catchments; two tanks in cascade with surplus course; a 1D drain network linked to a 2D surface grid; a river or canal reach with an inter-basin link; an outfall with a flap gate and pumps; and a tidal or river level boundary. Numbered notes on the right explain each element. BSMP model: elements required by Clause 11.7 (schematic, not to scale) Sea / receiving water 1 S1 S2 S3 2 Upper tank Lower tank start level start level 3 2D surface 5 4 River / canal (1D) 6 Inter-basin link Gate Pumps 7 8 1 Design rainfall Ch. 2 storms incl. 24, 48, 72 h; 50%, 10%, 1%, 0.2% AEP; areal reduction (Cl. 2.7.3, 11.7.2) 2 Sub-catchments Runoff by Ch. 3 methods; land use for each scenario (a)–(e) of Cl. 11.7.4 3 Tanks and ponds Surveyed FTL, MWL, stage–storage, sluices, surplus weirs (Cl. 11.5.1); start level from continuous run (Cl. 3.13.5, 11.7.3) 4 1D drain network Minor system: drains, pipes, culverts with surveyed inverts and silt (Cl. 11.5.1) 5 2D surface Major (overland) system on the DEM, 0.15 m RMSE or better; exchange with 1D at inlets and manholes 6 Rivers and canals (1D) Sections ≤ 200 m apart and at every structure; diversions between basins mapped (Cl. 11.3.2) 7 Outfall Flap or tide gates and pumps; joint and outfall-closed cases of Ch. 5 8 Downstream boundary Tide (MHWS; HAT + surge + sea-level allowance) or river level, per Ch. 5 Calibrate and validate with at least two major past flood events where data exist (Cl. 11.7.5).

Figure 11.2 — Elements of the BSMP model required by Clause 11.7: sub-catchments, the 1D drain and channel network, the 2D surface, tanks and pokharis with starting levels from continuous simulation, and the tidal or river boundary at the outfall (schematic, not to scale). Original drawing for this Manual, adapted from common coupled 1D–2D urban flood modelling practice.

Commentary. Scenario (b) against scenario (c) shows what the site rules achieve on their own. Scenario (d) shows what the public works add. This comparison is also the evidence base for notifying flood-sensitive catchments (Clause 4.5.4) and for setting a stricter basin release rate (Clause 11.8.3).


11.8 Options, outputs and the Capital Improvement Programme

11.8.1 Options hierarchy. Options shall be considered in the following order, the basin-scale form of the hierarchy in Clause 1.2:

  1. Protect and restore storage: pokharis, tanks, marshes and floodplains, including desilting to the original bed and recovering encroached area (Chapter 7);
  2. Regional retention and detention, sited by modelling so that releases do not coincide with the main-stem peak (Clause 4.13);
  3. Conveyance upgrades to drains, canals and culverts;
  4. Outfall works: sluices and flap gates through the river embankments, pumping stations and the storage behind them, tide gates on coastal outfalls, and the sluices through the saline embankments;
  5. Property-level protection where works cannot reach the level of service; and
  6. Non-structural measures: flood warning (for example IMD district rainfall and cyclone warnings read with the predicted spring tides on the coast, OSDMA's Early Warning Dissemination System, DoWR's daily flood bulletins and river gauges on the Mahanadi, Kathajodi, Kuakhai and Daya, and advance notice of releases from Hirakud and Rengali), flood-hazard zoning, emergency planning and public information.

11.8.2 Option assessment. Each option shall be assessed for:

  • reduction in flood risk (buildings and people flooded; expected annual damage);
  • capital and 30-year maintenance cost;
  • land required;
  • effect on groundwater recharge, saline aquifers on the coast, and fluoride and iron in groundwater (Chapter 8);
  • effect on downstream basins and the Gangua nala; and
  • who benefits.

11.8.3 Basin release rates. Where scenario (c) does not meet the level of service, the BSMP may set a basin-specific permissible site discharge (m³/s/ha) stricter than Chapter 4, by AEP and sub-catchment. The rate takes effect under the notification procedure of Clause 4.5.4.

11.8.4 Outputs. Each BSMP shall produce:

  • (a) flood hazard maps (extent, depth, velocity, hazard class) for the 10%, 1% and 0.2% AEPs, existing and future-with-plan. The 1% AEP future-with-plan map becomes the reference map for floor levels (Chapter 6) and setbacks (Chapter 7);
  • (b) recommended flood-sensitive catchments and any basin release rates (Clauses 4.5.4 and 11.8.3);
  • (c) regional facility sites, with storage volumes, land needs and the sites they serve;
  • (d) the fee-in-lieu unit rate for the basin (Clause 4.13.3);
  • (e) the Capital Improvement Programme: works ranked by risk reduction per rupee, with cost, phasing and agency;
  • (f) a pre-monsoon maintenance programme: desilting, gate and pump testing, and tank operating rules (Chapter 10); and
  • (g) monitoring needs: new rain gauges, level sensors and flood-mark survey points.

Commentary. Restoring storage comes first because Odisha's cities are losing storage while their drains are built without any. The CAG counted 628 water bodies in the five Municipal Corporations, of which only 35 had been developed and 18, on government land, had fallen into disuse and been encroached; it found that the storm drains were not linked to the water bodies, and that no drain estimate provided for detention, retention or infiltration (CAG 2024). Around Bhubaneswar the agricultural catchment of the Daya West Canal fell from 2,417 ha to 1,255 ha by November 2022 (CAG 2024). The storms that the city must survive are large: Bhubaneswar recorded 426.4 mm in a day in the 1999 super cyclone and 252.5 mm on 11 May 1995 (IMD), and 259.2 mm on 1 August 2023 (press report). Against drains built without a design discharge, storage and flow paths have to take what conveyance cannot. Conveyance upgrades on their own move water faster to an outfall that may be locked by the river or the tide, or limited by the capacity of its sluice or pumping station. Groundwater sets narrow limits on recharge in much of Odisha. In the deltas and on the coast the water table after the monsoon was within 0.1–1 m of the surface in parts of Puri, Kendrapara, Jagatsinghpur and Cuttack districts (CGWB, 2011 data), and the groundwater is saline in parts of Balasore, Bhadrak, Ganjam, Jagatsinghpur, Jajpur, Kendrapara and Puri; in Bhadrak about 1,300 km² is affected (CGWB). Recharge wells that carry surface water into the aquifers are not suitable there (Chapter 8). Fluoride above 1.5 mg/l has been found in 15 districts, including Khordha and Cuttack, and iron above 1.0 mg/l in 21 (CGWB). The laterite of Bhubaneswar, about 20 m thick, and the red soils of the uplands are where recharge structures are most likely to work, subject to tests. Odisha has no groundwater Act (CAG 2024); rain water harvesting is mandatory under rule 44 of the OTPIT PBS Rules 2021, but the Directorate of Ground Water Development, which built 9,796 rooftop recharge structures in 11 ULBs between 2014–15 and 2018–19, built none in 2019–22 (CAG 2024). This is why groundwater, saline aquifers and fluoride and iron are assessment criteria. This Manual ranks projects by risk reduction per rupee so that limited budgets go first where most people are protected.


11.9 Integration with land-use planning

11.9.1 An approved BSMP shall be incorporated into the statutory land-use plan: the Comprehensive Development Plans and Master Plans of BDA, the Cuttack Development Authority and the other development authorities under the Odisha Development Authorities Act 1982, the Master Plans of the Planning Authorities and Special Planning Authorities under the Odisha Town Planning and Improvement Trust Act 1956, and, in the seven coastal districts, the Coastal Zone Management Plan under the CRZ Notification 2019 approved on 1 June 2021. In particular:

  • (a) regional facility sites, restored tank flood storage, and major flow paths shall be reserved in the plan;
  • (b) the 1% AEP hazard map shall be shown, and Chapter 7 setbacks applied to it;
  • (c) land in hazard classes H5–H6 in the 1% AEP event shall not be zoned for new habitable development; and
  • (d) the open space of layouts within a basin should be located, where possible, to form part of the major flow paths or regional storage shown in the BSMP.

11.9.2 Where a land-use plan is revised before a BSMP is approved, the planning authority shall use the best available flood mapping and record the BSMP as pending.

Commentary. Odisha has no flood-line system and no floodplain zoning law. The OTPIT PBS Rules 2021 define natural hazard prone areas to include the flood-prone areas of the CWC Flood Atlas and areas flooded by heavy rain, inundation in depressions, back flow in drains or inadequate drainage that the Master Plan identifies; they bar building permission in natural waterways or drains shown in the Master Plan and the drainage plan, and over a municipal drain (rule 25), bar basements in low-lying and flood-prone areas (rule 38(1)), and let an Authority make regulations for development near notified wetlands, lakes, reservoirs and low-lying areas and to encourage sustainable drainage (rule 52). No regulation under rule 52 was found, and no metre setback from a water body or nala; the ODA PBS Rules are understood to carry equivalent provisions [TBC]. The NDMA buffers of 12 m and 2 m were applied by none of the Municipal Corporations, and BMC told the CAG that the buffer "would be defined after land acquisition" (CAG 2024). At Chilika, the Orissa High Court has used 200 m from the high tide line to identify encroachments and treated 100 m as a no-development zone for prawn enclosures (Orissa High Court 2022). On the coast, the Coastal Zone Management Plan under the CRZ Notification 2019 was approved on 1 June 2021 for all seven coastal districts (MoEF&CC), but the Shoreline Management Plan with erosion maps was still in preparation in 2025 (State reply to the National Green Tribunal, as reported). A BSMP gives the land-use plans the 1% AEP drainage-flood map that they need. Using open space land as storage or flow path has no direct precedent; this Manual adopts it because the OTPIT PBS Rules 2021 already make groundwater recharge mandatory in open spaces such as parks, parking areas, plazas and playgrounds (rule 44), require all open parking to be built of permeable material with rain water harvesting and recharge (rule 34(5)), and ask the landscape plan of a layout to show bio-swales, rain gardens, detention and retention ponds and the level of open spaces with respect to road level (the ODA PBS Rules are understood to carry equivalent provisions [TBC]); storage placed in a layout's open space builds on what the developer already has to draw, and because that land still serves as open space, the storage must stay usable as one. Placing it on the flow path costs the developer nothing extra and gives the basin storage it would otherwise have to buy.


11.10 Consultation and publication

11.10.1 A draft BSMP shall be published for public comment for at least 60 days, with public meetings in each affected local body.

11.10.2 After approval, the following shall be published as open data:

  • the model files;
  • the flood hazard maps;
  • the data of Clause 11.5.1, except security-sensitive asset details; and
  • the CIP.

They shall also be shown on a public map viewer.

Commentary. Publishing the maps lets buyers, lenders, insurers and residents see flood hazard before they build or buy. Publishing the model lets designers use the same boundary conditions as the Authority, so site designs and the basin plan stay consistent. This matches the publication approach of Chapter 10.


11.11 Approval, review and reporting

11.11.1 Approval. BSMPs shall be approved by the State Stormwater Technical Committee (Chapter 1), after review of the model and of the public comments.

11.11.2 Review. Each BSMP shall be reviewed:

  • every 10 years;
  • within 2 years of an event exceeding the 1% AEP design depth in the basin (Clause 2.14); and
  • when the statutory land-use plan is revised.

11.11.3 Annual report. The Lead Authority shall publish an annual implementation report before each SW monsoon (by 30 April). The report shall show:

  • CIP progress;
  • the fee-in-lieu ledger (Clause 4.13.4);
  • maintenance completed; and
  • any flooding against the levels of service.

11.12 Interim arrangements

11.12.1 Until a BSMP is approved for a basin:

  • (a) all site criteria of Chapters 4 to 8 apply in full;
  • (b) regional detention and fee-in-lieu under Clause 4.13 are not available, except the holding of fees under Clause 4.5.6.3;
  • (c) floor levels and setbacks use the best available mapping, and the methods of Chapters 6 and 7 where no mapping exists; and
  • (d) public drain projects shall include a basin-level check that their outfall and downstream reaches can take the design flow under the Chapter 5 tailwater cases.

References (chapter)

Annexes and forms

Annex / Form Content
11A BSMP terms of reference template
11B Basin lists and boundaries for Tier A bodies
11C Depth–damage curves for Odisha building types
11D BSMP data and model publication standard
Form 11-1 Annual implementation report