Annexes to Chapter 5Downstream and Tailwater Analysis

These annexes support Chapter 5. Annex 5C is a worked example of the outfall-closed check of Clause 5.10, for the illustrative facility of Annex 4C. Annexes 5A and 5B need tidal, surge, survey and river data that this draft does not yet contain; each lists what the chapter already sets, gives the intended layout and states the interim rule of Chapter 5 that applies until it is published. Forms 5-1 and 5-2 are the submittal forms required by Clause 5.14. They are draft forms and have no statutory status.


Annex 5A — Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment

Supports Clauses 5.7, 5.9, 5.10, 5.11 and 5.12 of Chapter 5.

5A.1 Table 5A.1 shows how the values of this annex enter the design tailwater levels of Table 5.1. The sea-level allowance is set by Clause 5.7.4 and does not depend on this annex.

Table 5A.1 — Use of the Annex 5A values in the design tailwater (Table 5.1)

Design case Tailwater Annex 5A values used Chapter value
Minor-system design MHWS + SLA MHWS SLA ≥ +0.3 m (Clause 5.7.4)
Major-system and storage design HAT + surge + SLA HAT; 10% AEP surge (Clause 5.7.3(a)) SLA ≥ +0.3 m
Joint case (Clause 2.12(b)) 1% AEP still-water level + SLA 1% AEP still-water level (Clause 5.7.3(b)) SLA ≥ +0.3 m
Datum conversion Chart datum to project datum Offset from chart datum to the Survey of India datum (Clause 5.7.2(b)) —

To be prepared. This annex will give, for each coastal segment of Odisha (the north coast of Balasore and Bhadrak; the Dhamra estuary and the Bhitarkanika coast of Kendrapara; the Mahanadi mouth, False Point and Paradip in Jagatsinghpur; the Puri coast and Chilika's sea mouth in Puri and Khordha; and the Ganjam coast, with Gopalpur) and for the tidal outfall channels (the tidal reaches of the Mahanadi's branches near Paradip, the Dhamra estuary, and the creeks behind the coastal embankments): the reference port or gauge; MSL, MHWS and HAT relative to chart datum; the connection from chart datum to the Survey of India datum and to any port or municipal datum; the 10% AEP storm surge; the 1% AEP still-water level; where an outfall faces the open sea, the wave set-up; and, for Chilika, the lagoon level in the largest recorded event. It needs the current Indian tide tables of the National Hydrographic Office or the Survey of India and the tidal levels of the Paradip Port Authority and of the ports at Dhamra and Gopalpur, tide-gauge records and benchmark connections (Survey of India, INCOIS, the ports), DoWR river gauges with tidal records, surge return-level analyses or hindcasts (INCOIS, IMD, NCCR) reconciled with the surges observed since 1999, and the lagoon level records of the Chilika Development Authority, with the coastal segments agreed with OSDMA and the ports. Values found during research, for reference only: at Paradip the INCOIS (2025) modelled tidal maximum is 1.21 m and the surge and wave set-up 1.37 m above mean sea level, and the 100-year extreme sea level 2.62 m above mean sea level at present, 3.12 m (SSP2-4.5) or 3.34 m (SSP5-8.5) by 2100, a value that INCOIS itself says probably underestimates the northern Bay of Bengal; Paradip Port's MHWS is given as 2.58 m and MHWN as 2.02 m in a secondary source that does not name the datum; the PSMSL record for Paradip (station 1161, 1966–2024) is tied to a GTS benchmark 5.04 m above chart datum; the surge of the 1999 super cyclone near Paradip is estimated at 5.9 m above the tide (IIT Delhi model, the value Kalsi judges closest to the official estimates) and up to 7.95 m in total sea level (NCDM), and earlier probable maximum storm surges for Paradip of 4.5 m and 5.5 m have been published (Kalsi, 2006); the surge was 2–2.5 m above the astronomical tide in Ganjam in Cyclone Phailin (2013), about 1.5 m at Puri in Cyclone Fani (2019), 2–4 m in Balasore and Bhadrak and 1–2 m in Kendrapara and Jagatsinghpur in Cyclone Yaas (2021), on a day when IMD described the astronomical tide on the Bhadrak and Balasore coast as 3 to 5 m, and 1–2 m in Kendrapara, Bhadrak and Balasore in Cyclone Dana (2024) (IMD); a straight-line fit made for this Manual to the annual PSMSL record at Paradip gives about 2.95 mm/yr for 1967–2024, with no correction for land movement, as a screening figure only; and MHWS and HAT relative to chart datum for Paradip, False Point, Dhamra, Gopalpur and Puri are [TBC]. The INCOIS tidal maximum is a model value and is not a substitute for the tide-table HAT. Until the annex is published: the designer obtains MHWS, HAT and MSL directly from the current tide tables or port authority levels and records the edition and port (Clause 5.7.2(d)); takes the 10% AEP surge and the 1% AEP still-water level from a site-specific study using INCOIS, IMD or NCCR hindcasts or return-level analyses, stating its source, method and record length and comparing its values with the observed surges (Clauses 5.7.3(c) and 5.8.5(f)); uses the tide-table levels of the nearest port (Clause 5.7.2(a)) and, for an outfall between two ports or up a river, creek or lagoon, the higher of the two ports' levels unless measurements or a calibrated model justify a lower value (Clause 5.7.2(c)); states every level with its datum (chart datum, GTS (mean sea level) or a port or municipal datum) and the conversion used; and applies an SLA of at least +0.3 m (Clause 5.7.4).

Table 5A.2 — Tidal datums, surge and still-water levels by coastal segment (layout)

Coastal segment Reference port and tide-table edition MSL (m CD) MHWS (m CD) HAT (m CD) CD to Survey of India datum (m) 10% AEP surge (m) 1% AEP still-water level (m CD) Wave set-up (m), open-sea outfalls Sources
                   
                   
                   

Annex 5B — Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map

Supports Clauses 5.2, 5.3, 5.8 and 5.13 of Chapter 5.

5B.1 Table 5B.1 lists the water bodies that Chapter 5 already names. It is not complete: the annex will add the extents of each reach, the other rivers, canals and mouths of the State, and a map.

Table 5B.1 — Water bodies named in Chapter 5

Water body Region Listed as Clause
Mahanadi and Kathajodi at Cuttack, with the sluices at the ends of MSWC-I (Matagajpur) and MSWC-II (Gulguli), on the Petta nala and at Khannagar and Matrubhawan Cuttack Riverine outfall reaches; river-locked sluice outfalls; Hirakud releases and uncontrolled flow included 5.8.1, 5.8.3, 5.8.5
Main storm water channels MSWC-I and MSWC-II, and the Petta nala Cuttack Major drains; river-locked outfalls; single lock of at least 24 h 5.2, 5.8.5
Gangua nala, from Budhi nala near Rajadhani Engineering College to the Daya near Kanti Bhubaneswar; Khordha Major drain; DoWR drainage channel; DoWR consent, design water level [TBC] and flap gate; Daya backwater 5.2, 5.8.1, 5.8.5
The ten natural drains of the Comprehensive Development Plan (Drains I to X) Bhubaneswar Major drains 5.2
Daya West Canal Bhubaneswar; Khordha Major drain; DoWR channel; DoWR consent and flap gate 5.2, 5.8.5
Kuakhai and Daya Bhubaneswar; Khordha; Puri Riverine outfall reaches; levels set by the Mahanadi flood; the Daya ends in Chilika 5.8.1, 5.8.5
Taladanda canal Cuttack; Jagatsinghpur Major drain; DoWR canal; no diversion assumed without operating records 5.2, 5.8.5
Mahanadi below Hirakud Sambalpur; Mahanadi delta Riverine outfall reach; releases and uncontrolled flow combined 5.8.1, 5.8.3, 5.8.5
Brahmani at Rourkela and below Rengali Sundargarh; Angul; Brahmani delta Riverine outfall reaches; Rengali releases included [TBC] 5.8.1, 5.8.3, 5.8.5
Budhabalanga, Baitarani and Salandi Baripada, Balasore, Bhadrak Riverine outfall reaches 5.8.1
Hirakud and Rengali Mahanadi; Brahmani Releases to be included in river levels 5.8.3
Chilika lagoon and the lower Daya Puri, Khordha, Ganjam Lagoon outfalls; Ramsar site; recorded lagoon level or tide at the mouth; no storage credit; Clause 8.9 5.8.5, 5.13.1
Tidal reaches near Paradip; Dhamra estuary; creeks of Bhitarkanika Jagatsinghpur, Kendrapara, Bhadrak Riverine outfall reaches; tidal 5.7.2, 5.8.1
Tidal rivers and creeks behind sluices in saline and river embankments Coastal districts Gated outfalls; land behind routed as closed storage; breach check 5.8.1, 5.8.5
DoWR drainage channels and irrigation canals receiving storm water Statewide Major drains; DoWR consent, design water level and flap gate 5.2, 5.8.5
River, creek and lagoon mouths, including Chilika's sea mouth and the Kushabhadra and Nuanai near Puri Coastal districts Mouth status to be confirmed by pre-monsoon survey 5.13.1

To be prepared. This annex will list and map (a) the major drains of each basin plan, (b) the riverine outfall reaches where backwater shall be modelled, with their upstream and downstream limits and the source of their design flood levels, and (c) the river mouths and creek inlets subject to seasonal sand-bar closure, with the most recent pre-monsoon bar crest levels and any DoWR mouth-maintenance programme. It needs DoWR river and canal records, design and recorded flood levels, reservoir operating rules, mouth-condition, dredging and bar-cutting records and pre-monsoon bar surveys (DoWR), the drain inventories of BMC and other local bodies, basin stormwater master plans (Chapter 11), and base mapping from the Survey of India and NRSC. Until it is published: every river, DoWR canal, the Gangua nala and the ten natural drains of Bhubaneswar, the Daya West Canal, the main storm water channels (MSWC-I and MSWC-II) and the Petta nala of Cuttack, the Taladanda canal, any drainage channel maintained by DoWR or a local body, any irrigation canal that receives storm water and every tidal creek is a major drain (Clause 5.2); the water bodies of Table 5B.1 are riverine outfall reaches (Clause 5.8.1); and the mouths of any river, creek or lagoon on the Odisha coast that a pre-monsoon survey shows closed or restricted by sand, including, where it does, Chilika and the Kushabhadra and Nuanai near Puri are assumed closed at the start of the SW monsoon unless DoWR certifies otherwise (Clause 5.13.2).

Table 5B.2 — Attributes of the Annex 5B layers (layout)

Field Content Unit or format
feature_id Unique identifier text
name Name of the drain, river, canal, creek or mouth text
category Major drain; riverine outfall reach; mouth subject to sand-bar closure text
clause Clause of Chapter 5 under which it is listed text
reach_limits Upstream and downstream limits of the reach text
design_flood_level_source DoWR design or highest recorded flood level, or hydraulic model (Clause 5.8.2) text
reservoir_release Upstream reservoir or tank and its operating rule, where any (Clause 5.8.3) text
bar_crest_level Most recent pre-monsoon bar crest level, for mouths m (Survey of India datum)
mouth_programme DoWR mouth-maintenance programme and certification (Clause 5.13.2) text
source Source agency and date text
geometry Line (drains and reaches) or point (mouths) line / point

Annex 5C — Worked example: outfall-closed check for a site in the Mahanadi delta near Cuttack

Supports Clauses 5.9, 5.10, 5.11 and 5.12 of Chapter 5 and Clause 4.6.6 of Chapter 4.

Illustrative — not design values. This example applies the outfall-closed check of Clause 5.10 to the revised detention facility of Annex 4C. The site, its levels and its receiving drain are invented to show the method. No tidal level is used: the tide enters only through the illustrative statements in Table 5C.1 about whether the receiving drain is above or below the site outlet.

Inputs

5C.1 The site is the 2.0 ha flood-sensitive site of Annex 4C, on low-lying land in the Mahanadi delta near Cuttack. It discharges through its own outlet chamber to a public storm drain, which outfalls through a flap gate to a channel that reaches the Kathajodi through a sluice in the river embankment, so Clause 5.10.1 applies to the facility. To show the method, this example uses the two 6-hour lock windows of Clause 5.10.3, as the coastal editions of this Manual do. A river-locked outfall in Cuttack has a single lock of at least 24 hours under Clause 5.8.5(a), which needs more storage than this example shows; the routing, the volume balance of Clause 5.10.4 and the assessment are the same.

Table 5C.1 — Inputs (Illustrative — not design values)

Item Value Basis
Facility Revised facility of Annex 4C: 2,500 m² plan area, vertical walls; 170 mm orifice at the floor; 460 mm orifice, invert 0.53 m Annex 4C, Table 4C.14
Storm 1% AEP, 48 h, peak day last, AMC III; 72 h also run Clause 5.10.2
Inflow Post-development 1% AEP hydrographs of Annex 4C (48 h: 8,420 m³; 72 h: 9,468 m³) Annex 4C
Receiving drain levels at the connection, J1, J2 and J3 Below the site outlet invert (from the drain owner's model) Illustrative input
Receiving drain during each lock window Backs up above the site outlet invert, so the site cannot discharge Illustrative input; Clause 5.10.3(b)
Flap gate on the site outlet Set 0.15 m below the orifice inverts in the outlet chamber, so that outside the lock windows its opening head and head loss do not affect the orifice control Illustrative input; to be confirmed from the certified curve (Clause 5.11.2)
Lock windows Two of 6 h each, starts 12.4 h apart (semi-diurnal tide) Clause 5.10.3(a)
Pumps None —

5C.2 Cases of Table 5.2. Because the receiving drain stays below the site outlet in J1, J2 and J3 (Table 5C.1), those cases give the free-outfall results of Annex 4C: in J2 the 1% AEP maximum water level is 1.17 m (2,913 m³), and in J3 (10% AEP, 48 h) it is 0.77 m. R1 and R2 do not apply, because the site does not drain to a river. J4, the outfall-closed check, is worked below.

Lock windows (Clause 5.10.3)

5C.3 The peak 1-hour block of the final 24 hours of the 48-hour storm is 35:35–36:35 h, with 98.2 mm (the 1-hour depth of Table 4C.2). Two runs are made:

  • Run A: the first window is centred on that block: 33:05–39:05 h; the second starts 12.4 h later: 45:29–51:29 h.
  • Run B: the first window starts at that block: 35:35–41:35 h; the second: 47:59–53:59 h.

For the 72-hour storm, every time is 24 h later.

5C.4 Gravity discharge is zero inside each window. Outside the windows the outlet discharges through the orifices of Table 4C.10. The routing is the same level-pool routing as in Annex 4C.

Results

Table 5C.2 — Outfall-closed check results (Illustrative — not design values)

Storm Run Lock windows (h:min) Maximum stage (m) Maximum storage (m³) Time of maximum (h:min) Largest release after a window (L/s)
1% AEP, 48 h A 33:05–39:05; 45:29–51:29 2.01 5,019 39:05 566
1% AEP, 48 h B 35:35–41:35; 47:59–53:59 2.10 5,238 41:35 584
1% AEP, 72 h A 57:05–63:05; 69:29–75:29 2.00 5,012 63:05 565
1% AEP, 72 h B 59:35–65:35; 71:59–77:59 2.09 5,233 65:35 584

Run B of the 48-hour storm governs. The first window closes the outlet just as the storm peak arrives, so the whole peak is stored. The second window arrives when the facility has drained to about 0.7 m, below the Stage 2 orifice, and adds little.

5C.5 Volume balance (Clause 5.10.4). Table 5C.3 gives the balance for Run B. The outflow in each period is found by continuity: outflow = storage at start + inflow − storage at end.

Table 5C.3 — Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)

Period (h:min) Inflow (m³) Gravity outflow (m³) Pumped (m³) Storage at start (m³) Storage at end (m³)
0:00–35:35, before window 1 3,817 2,213 0 0 1,604
35:35–41:35, window 1 3,634 0 0 1,604 5,238
41:35–47:59, between windows 941 4,423 0 5,238 1,756
47:59–53:59, window 2 28 0 0 1,756 1,784
After 53:59 0 1,784 0 1,784 0
Total 8,420 8,420 0 — —

Check for window 1: V_inflow = 3,634 m³ ≤ V_storage available + V_pumped + V_gravity = (5,238 − 1,604) + 0 + 0 = 3,634 m³. The facility therefore needs 5,238 m³ of storage, which the routing confirms.

Table 5C.4 — Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)

Time (h) Inflow (L/s) Outlet Outflow (L/s) Stage (m) Storage (m³)
24 20 Open 18 0.18 445
28 39 Open 24 0.25 621
32 59 Open 32 0.36 906
34 85 Open 37 0.47 1,166
36 286 Closed 0 0.78 1,944
38 106 Closed 0 1.73 4,321
40 66 Closed 0 1.96 4,904
42 51 Open 529 1.79 4,472
44 42 Open 204 0.87 2,181
46 37 Open 49 0.74 1,854
48 33 Open 47 0.70 1,756
50 0 Closed 0 0.71 1,784
54 0 Closed 0 0.71 1,784
56 0 Open 43 0.58 1,459
60 0 Open 32 0.37 921
66 0 Open 16 0.16 397
72 0 Open 7 0.06 162

Assessment

5C.6 Clause 5.10.4(a). The facility of Annex 4C reaches 1.17 m in J2, and its spillway crest is at 1.35 m (Annex 4C). In the outfall-closed check the stage reaches 2.10 m, so the spillway would operate. The facility of Annex 4C fails the check.

5C.7 Remedy. Pumping (Clause 5.12) does not help here: during the lock windows the receiving drain is itself closed, and pumping into it would raise its level, which Clause 5.12.3 does not permit. The remedy is more storage. Keeping the plan area of 2,500 m² and the outlets of Annex 4C:

  • the facility must hold 5,238 m³, to a stage of 2.10 m;
  • the spillway crest is set above that stage, with the 0.15 m clearance recommended in Clause 4.9.3: 2.25 m;
  • with the 4.0 m spillway of Annex 4C (head 0.30 m), the maximum level with the spillway flowing is 2.55 m, and with 0.3 m freeboard the top of the walls is at least 2.85 m above the floor.

The outfall-closed check therefore governs the storage: 5,238 m³ against 2,913 m³ from the release-rate checks, about 80% more. A larger plan area would make the facility shallower; the outlet, caps and drawdown would then have to be re-checked, because the stage–discharge relationship changes.

5C.8 Release after the lock. When the first window ends, the stored water is released under a head of about 2 m, at up to 584 L/s. This is above the 100-yr cap of 356 L/s. Clause 5.10.4 allows this, because the release reaches a drain that has itself just reopened, and requires it to be included in the J4 run of the downstream analysis (Clauses 5.4 and 5.9) and reported on Form 5-1, Section H.

5C.9 Drawdown after the storm (Clause 5.10.5). The J1 tidal curve stays below the site outlet (Table 5C.1), so the drawdown of Annex 4C applies: 45.3 h for 90% of the 10-yr storage with the low-flow orifice 50% blocked, within the 48-hour limit of Clause 4.7. In Run B, 90% of the maximum J4 storage is released 22.6 h after the maximum.

5C.10 Other requirements.

  • The flap gate on the site outlet is inspected and operated before 15 April each year and after every event in which it closed against a storm flow (Clause 5.11.5).
  • The deeper facility is checked for flotation with groundwater at the design groundwater level; in the deltaic and coastal sand zone without piezometer readings that level is existing ground level (Clauses 4.12.1 and 4.12.3).
  • The fence and signs of Annex 4C apply to the deeper facility (Clause 4.15).

Table 5C.5 — Summary (Illustrative — not design values)

Item Value
Governing case J4, 1% AEP 48-hour storm, Run B (first window starting at the peak 1-hour block)
Storage required 5,238 m³ (Annex 4C release-rate design: 2,913 m³)
Maximum stage 2.10 m, with 2,500 m² plan area
Spillway crest 2.25 m
Top of walls ≥ 2.85 m above the floor
Largest release after a lock window 584 L/s, to be included in the downstream J4 run
Drawdown Annex 4C result applies: 45.3 h with the low-flow orifice 50% blocked

Form 5-1 — Downstream and Tailwater Report

Supports Clauses 5.3 to 5.14 of Chapter 5.

Draft form — Odisha Stormwater Design Manual, Draft v1.0. One report for each project. Sites of less than 0.5 ha that meet Clause 5.3.4 may submit Form 5-2 instead, where the Authority accepts it. Attach the plans, model files and hydrographs referred to.

A. Project

Table 5F.1 — Form 5-1: project

Field Entry
A1. Project name, applicant and location  
A2. Project type: site under Chapter 4; drainage project under Chapter 6; regional detention or tank restoration (Clause 5.1.2)  
A3. Site or project area (ha) and outfalls  
A4. Site Runoff Control Report reference (Form 4-1), where applicable  

B. Extent of the analysis (Clause 5.3; Clause 5.14, item 1)

Table 5F.2 — Form 5-1: analysis points

Point Location Type (Clause 5.3.3 (a) to (e)) Contributing catchment (ha) Project area as % of it
         
         
         

Table 5F.3 — Form 5-1: end point

Field Entry
B1. End point and reason: 10% point, tank or pokhari, or major drain or the sea (Clause 5.3.1 (a) to (c))  
B2. Where the end point is a tank or pokhari: change in maximum water level (m) and in surplus-weir discharge (m³/s); continuation below the weir if the level rises (Clause 5.3.2)  
B3. Plan of the analysis extent, showing the site, each point with its contributing area and percentage, and the end point (attach)  

C. Model (Clause 5.4.4; Clause 5.14, item 2)

Table 5F.4 — Form 5-1: model

Field Entry
C1. Software and version; hydrologic and hydraulic methods (Clause 5.4.4)  
C2. Network schematic, with the survey sources for drains and crossings (attach)  
C3. Land use and CN of off-site areas (present land use)  
C4. Upstream detention included, with evidence that it is built, maintained and documented  
C5. Calibration or validation evidence, where available  
C6. Scenarios run: existing, with project, and future where the Authority requires it (Clause 5.4.1)  
C7. Storms run: AEPs and durations, AMC and areal reduction (Clause 5.4.3)  

D. Results at each analysis point (Clause 5.4.2; Clause 5.14, item 3)

Complete one row for each analysis point, AEP and duration. E = existing; P = with project.

Table 5F.5 — Form 5-1: results by analysis point

Point AEP Duration (h) Peak flow E / P (m³/s) Time to peak E / P (h) Maximum water level E / P (m) Peak velocity E / P (m/s) Duration of inundation E / P (h)
               
               
               

E. Acceptance (Clause 5.5; Clause 5.14, item 4)

Table 5F.6 — Form 5-1: acceptance criteria

Criterion Met at every point? Where not met, the remedy adopted (Clause 5.5.3)
E1. 1% AEP water level rise ≤ 10 mm at buildings, lowest openings and carriageways (Clause 5.5.1(a))    
E2. No building newly flooded; no building or road newly failing the Chapter 6 limits (Clause 5.5.1(b))    
E3. Peak flow not above existing at the minor-system AEP of each element or at 1% AEP (Clause 5.5.1(c))    
E4. Velocity in lined channels within the lining limit, 3.0 m/s maximum (Clause 5.5.1(d))    
E5. Velocity in unlined channels, 50% and 10% AEP, not increased by more than 10% (Clause 5.5.1(e))    
E6. Change in duration of road closure on arterial or emergency routes (Clause 5.5.2)    
E7. Timing exception requested (Clause 5.5.4)? Give the conditions met    

F. Tailwater derivation (Clauses 5.6 to 5.8; Clause 5.14, item 5)

Table 5F.7 — Form 5-1: tailwater derivation

Field Entry
F1. Tide-table edition and port, or port authority source (Clause 5.7.2(a))  
F2. MHWS, HAT and MSL (m above chart datum)  
F3. Connection from chart datum to the Survey of India benchmark and the project datum: offset (m) and source (Clause 5.7.2(b))  
F4. Estuary, creek or canal outfall: levels used and any evidence for a departure from open-coast levels (Clause 5.7.2(c))  
F5. 10% AEP surge and 1% AEP still-water level: values, source, method and record length (Clause 5.7.3)  
F6. Wave set-up, for outfalls facing the open sea (Clause 5.7.3(d))  
F7. SLA (m), at least +0.3 m; design life; sensitivity run at twice the SLA for design lives over 50 years (Clause 5.7.4)  
F8. Non-tidal tailwater: receiving-system level and source (Clauses 5.6.2, 5.6.3)  
F9. River levels and sources; reservoir or tank releases included (Clauses 5.8.2, 5.8.3)  
F10. River-locked outfalls, dam-release and backwater reaches, DoWR drainage channels and the Gangua nala, Chilika and lagoon-mouth outfalls, saline embankment sluices, and coastal surge levels: operator of each sluice, gate and pumping station identified, gate sills, embankment crest, installed capacity and operating levels obtained; channel behind the sluice routed with its whole catchment and present storage, pumping confirmed available (permanent pumps only, not more than installed capacity less the largest pump); single river lock of not less than 24 h and its source; embankment-breach check; releases of Hirakud or Rengali and the flow of the uncontrolled catchment combined as in the largest recorded event; downstream boundary at the tidal boundary or recorded level, or shown not to matter; not below the highest recorded flood level for the major system; DoWR consent, permitted rate, design water level or computed channel level to the Daya, and flap gate; Chilika level used, no storage credit in the lagoon, Clause 8.9 met; surge study compared with the observed surges, INCOIS Paradip level not adopted without that comparison (Clause 5.8.5)  

G. Joint cases (Clause 5.9; Clause 5.14, item 6)

Table 5F.8 — Form 5-1: joint-case results

Case Rainfall Tailwater used (m, project datum) Applies? Governing result (storage, level, pipe size or pump capacity)
J1        
J2        
J3        
J4        
R1        
R2        

H. Outfall-closed check (Clause 5.10; Clause 5.14, item 7)

Table 5F.9 — Form 5-1: outfall-closed check

Field Entry
H1. Reason the check applies (Clause 5.10.1)  
H2. Storm: AEP, 48 h and 72 h, AMC III (Clause 5.10.2)  
H3. Lock duration and basis: default of two 6-hour windows, or site study (Clause 5.10.6); extension for sand-bar closure (Clause 5.13.5)  
H4. Lock windows of the two runs (start and end times) (Clause 5.10.3(d))  
H5. Maximum stage in each facility, against its 1% AEP maximum water level (Clause 5.10.4(a))  
H6. Maximum stage in the minor and major systems, against the Chapter 6 limits (Clause 5.10.4(b))  
H7. Property connections: surcharge level, or non-return valves fitted (Clause 5.10.4(c))  
H8. Stage hydrographs (attach)  
H9. Drawdown after the storm under the J1 tidal curve, and pumping where needed (Clause 5.10.5)  

Table 5F.10 — Form 5-1: volume balance for each lock window (Clause 5.10.4)

Period Inflow (m³) Gravity outflow (m³) Pumped (m³) Storage at start (m³) Storage at end (m³)
Before window 1          
Window 1          
Between windows          
Window 2          
After window 2          

I. Gates and valves (Clause 5.11; Clause 5.14, item 8)

Table 5F.11 — Form 5-1: schedule of flap gates, tide gates and non-return valves

Location Type Size (mm) Invert (m, project datum) Certified head–discharge data (reference) Stop-log or penstock (outfalls > 600 mm)
           
           

J. Pumped outfalls (Clause 5.12; Clause 5.14, item 9)

Table 5F.12 — Form 5-1: pumped outfalls

Field Entry
J1. Reason pumping is needed (Clause 5.12.1)  
J2. Duty capacity (m³/s) at the static head for the J2 tailwater; standby capacity (Clause 5.12.2)  
J3. Effect on the receiving water level (Clause 5.12.3)  
J4. Power supply: two independent supplies, or standby generation with 72 h of fuel; automatic changeover (Clause 5.12.4)  
J5. Level of electrical panels, controls, generators and fuel, against the higher of the 1% AEP flood level + 0.5 m and HAT + surge + SLA + 0.5 m (Clause 5.12.5)  
J6. Discharge arrangement (Clause 5.12.6); controls, alarms and logging (Clause 5.12.7); screens (Clause 5.12.8)  

K. Sand bar (Clause 5.13; Clause 5.14, item 10)

Table 5F.13 — Form 5-1: sand-bar assumption

Field Entry
K1. River mouth or creek inlet concerned  
K2. Mouth assumed closed, or open with DoWR certification attached (Clause 5.13.2)  
K3. Bar crest level from the most recent pre-monsoon survey (m) and the closed-mouth tailwater (Clause 5.13.3)  
K4. Extension of the lock duration, where required (Clause 5.13.5)  

L. Inspection and maintenance (Clause 5.14, item 11)

Table 5F.14 — Form 5-1: inspection and maintenance

Field Entry
L1. Gate and valve inspection before 15 April and after closure events (Clause 5.11.5)  
L2. Pump test runs before 15 April (Clause 5.12.9)  
L3. Other requirements for the maintenance plan (Chapter 10)  

M. Statement by the registered professional (Clause 10.6)

I state that this report has been prepared under Chapter 5 of the Odisha Stormwater Design Manual (Draft v1.0), that the results reported are reproduced by the models submitted, and that every departure from Chapter 5 is listed with its reason. The Professional Design Certificate (Form 10-3) is attached.

Table 5F.15 — Form 5-1: statement by the registered professional

Field Entry
Name  
Qualification and registration number  
Empanelment number, where Clause 10.6.1 requires it  
Organisation  
Signature  
Date  

Draft form — Odisha Stormwater Design Manual, Draft v1.0.


Form 5-2 — Simplified Downstream Statement (small sites)

Supports Clause 5.3.4 of Chapter 5.

Draft form — Odisha Stormwater Design Manual, Draft v1.0. For sites of less than 0.5 ha. The Authority may accept this statement in place of the full analysis only where every answer in Section B is "Yes". Otherwise submit Form 5-1.

A. Site

Table 5F.16 — Form 5-2: site

Field Entry
A1. Project name, applicant and location  
A2. Site area (ha), less than 0.5 ha  
A3. Receiving public drain: name or reference, type and size  
A4. Site Runoff Control Report reference (Form 4-1)  

B. Conditions (Clause 5.3.4)

Table 5F.17 — Form 5-2: conditions

Condition Yes / No Evidence
B1. The receiving public drain has documented capacity for its minor-system design flow (Chapter 6)    
B2. No flood-prone location is recorded within 500 m downstream of the site outfall. Records checked: local body, BMC, OSDMA, DoWR (Clause 5.3.3(d))    
B3. The site does not drain to a tidal or backwater-affected outfall    

C. Route plan

Table 5F.18 — Form 5-2: attachments

Attachment Attached?
C1. Plan of the drainage route from the site outfall for 500 m downstream, with the receiving drain and any recorded flood-prone locations  
C2. Copy or reference of the drain capacity record  

D. Statement

I state that the site meets the conditions of Clause 5.3.4 as shown above, and that the records listed have been checked.

Table 5F.19 — Form 5-2: statement

Field Entry
Name  
Qualification and registration number  
Signature  
Date  

Draft form — Odisha Stormwater Design Manual, Draft v1.0.