Chapter 5Downstream and Tailwater Analysis
5.1 Purpose and scope
5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.
- The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
- The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.
5.1.2 This chapter applies to:
- (a) every site to which Chapter 4 applies;
- (b) every minor- and major-system drainage project under Chapter 6; and
- (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.
5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.
5.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Analysis point | A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3). |
| Contributing catchment | The whole area draining to an analysis point, on and off site. |
| Major drain | A channel listed as a major drain in the basin plan or Annex 5B, or any river, DoWR canal, the Gangua nala and the ten natural drains of Bhubaneswar, the Daya West Canal, the main storm water channels (MSWC-I and MSWC-II) and the Petta nala of Cuttack, the Taladanda canal, any drainage channel maintained by DoWR or a local body, any irrigation canal that receives storm water, or a tidal creek. |
| Chart datum (CD) | The datum of the published tide tables and nautical charts, to which tidal heights are referred. |
| Mean sea level (MSL) | Average sea level over a long period at a tide gauge. |
| MHWS | Mean high water springs: the average of high waters at spring tides. |
| HAT | Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years). |
| Storm surge | The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones. |
| Still-water level | Astronomical tide plus surge, excluding individual waves. |
| Sea-level allowance (SLA) | The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4). |
| Tailwater | The water level at the downstream end of a drain, outlet or storage. |
| Tide-lock | The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge. |
| Lock window | A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero. |
| Sand bar | A bar of beach sand that partly or fully closes a river mouth or creek inlet. |
| Project datum | The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2). |
5.3 Extent of the downstream analysis
5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:
- (a) the point at which the project area is 10% or less of the contributing catchment;
- (b) the next tank, pokhari or other waterbody with a surplus weir or controlled outlet; or
- (c) the next major drain, or the sea.
The end point itself shall be analysed (Figure 5.1).
5.3.2 Where the analysis ends at a tank or pokhari under 5.3.1(b), it shall report:
- the change in the tank's maximum water level; and
- the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.
If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.
5.3.3 Analysis points shall be set at least at:
- (a) each site outfall;
- (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
- (c) each culvert, bridge or road crossing;
- (d) each location recorded as flood-prone by the local body, BMC, OSDMA or DoWR; and
- (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.
5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:
- the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
- no flood-prone location is recorded within 500 m downstream; and
- the site does not drain to a tidal or backwater-affected outfall.
Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next pokhari or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).
Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Odisha. In Bhubaneswar, where eight of the city's ten natural drains end in the Gangua nala, which runs about 31 km past Mancheswar and Palasuni to the Daya, and the Daya on to Chilika (CAG, 2024), and in Cuttack, where the main storm water channels run up to 11.6 km across the city to their sluices on the Kathajodi and the Mahanadi, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.
5.4 What the analysis must check
5.4.1 Scenarios. Each analysis shall compare:
- (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
- (b) With project: the same, with the project and all its controls (Chapter 4) in place.
Where the Authority's basin plan defines future land use, the Authority may also require:
- (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.
5.4.2 Quantities to be checked at every analysis point:
- (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
- (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
- (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
- (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
- (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.
5.4.3 Storms. The analysis shall use:
- 50%, 10% and 1% AEP;
- the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
- the 24-, 48- and 72-hour storms in every case.
The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.
5.4.4 Method. The analysis shall:
- use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
- include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
- not use the Rational Method at any analysis point, because it cannot represent timing.
Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.
5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.
Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in Cuttack, where low-lying parts of the city between the Mahanadi and the Kathajodi were flooded three to five times a year, over up to about 470 ha in 2005 (JICA), and where the drains reach the rivers through sluices in the embankments that cannot discharge while the rivers stand high, so that drainage waits for the river to fall, as it did in Cyclone Titli in October 2018 (press reports). Detention that prolongs releases can lengthen that time even when it lowers the peak.
5.5 Acceptance criteria
5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":
- (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
- (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
- (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
- (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
- (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.
5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.
5.5.3 Where the criteria are not met, the project shall do one or more of the following:
- (a) reduce release rates or increase storage (Chapter 4);
- (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
- (c) contribute to a regional facility under Clause 4.13; or
- (d) under Clause 5.5.4, change the release strategy.
5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:
- (a) the varied strategy meets 5.5.1;
- (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
- (c) the outfall-closed check (Clause 5.10) is met.
Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.
5.6 Tailwater: general and non-tidal outfalls
5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.
5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:
- for a receiving pipe, its obvert; or
- for a receiving open drain, its full-bank level less freeboard (Chapter 6).
5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.
5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.
5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.
5.7 Tidal tailwater: datums, surge and sea-level allowance
5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:
Table 5.1 — Design tailwater levels for tidal outfalls
| Design case | Tailwater |
|---|---|
| Minor-system design (Chapter 6) | MHWS + SLA |
| Major-system design and storage design | HAT + surge + SLA, with the surge term defined in Clause 5.7.3 |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA |
The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.
5.7.2 Sources and datums.
- (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
- (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
- (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the tidal reaches of the Mahanadi's branches near Paradip, the Dhamra estuary of the Brahmani and Baitarani and the creeks of the Bhitarkanika mangroves, the lower Budhabalanga near Balasore, and Chilika and its sea mouth), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
- (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.
5.7.3 Storm surge.
- (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
- (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
- (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
- (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.
5.7.4 Sea-level allowance. The SLA shall be:
- (a) +0.3 m minimum for every element;
- (b) greater than 0.3 m where the State, BDA or the Authority adopts a higher projection for the planning area, for example a projection based on the INCOIS (2025) estimates for Paradip of about 0.44 m (SSP2-4.5) and 0.66 m (SSP5-8.5) of mean-sea-level rise by 2100; and
- (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.
Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.
Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:
- MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
- MHWS to HAT for a major storm; and
- "Effect of climate change: additional 0.3 m".
CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the super cyclone of October 1999, whose surge near Paradip is estimated at 5.9 m above the tide to as much as 7.95 m in total and which caused about 7,000 of its 9,893 deaths, mostly in Erasama block of Jagatsinghpur (Kalsi, 2006), and Cyclone Yaas, whose surge of 2–4 m above the astronomical tide reached the Balasore and Bhadrak coast on a full-moon tide in May 2021 (IMD), showed why it is needed in Odisha.
Indian tide tables have been published by the Survey of India since the nineteenth century; in Odisha, PSMSL holds a tide-gauge record from Paradip from 1966 (station 1161, 81% complete, with a spike in August 2008 flagged as suspect, and not included in PSMSL's table of trends), and no PSMSL record was found for False Point, Dhamra, Gopalpur or Puri (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. Its 2025 technical report gives 100-year extreme sea levels for one Odisha site, Paradip: 2.62 m above mean sea level at present, made up mainly of a modelled tidal maximum of 1.21 m and 1.37 m of surge and wave set-up, and 3.12 m (SSP2-4.5) or 3.34 m (SSP5-8.5) by 2100. The report itself states that its value at Paradip is "much lower than that of Sindhu et al. (2011)", which indicates an underestimation of the extreme sea level in the northern part of the basin, and the value is below every estimate of the 1999 surge (Clause 5.8.5(f)). It gives no value for any other point on the Odisha coast. No surge return-level product for the Odisha coast suitable for design was found during research, and the values of MHWS and HAT relative to chart datum for Paradip, False Point, Dhamra, Gopalpur and Puri were not seen [TBC], which is why Annex 5A is needed. Paradip Port's MHWS is given as 2.58 m in a secondary source that does not name the datum. The sources also mix datums: the INCOIS levels are above mean sea level, the tide tables use chart datum, and the PSMSL record for Paradip is tied to a GTS benchmark 5.04 m above chart datum (PSMSL). Every level used under this chapter shall therefore name its datum. The surges are large and differ along the coast: 5.9 m to 7.95 m near Paradip in 1999 (Kalsi, 2006), 2–2.5 m above the astronomical tide in Ganjam in Cyclone Phailin (2013), about 1.5 m at Puri in Cyclone Fani (2019), 2–4 m in Balasore and Bhadrak and 1–2 m in Kendrapara and Jagatsinghpur in Cyclone Yaas (2021), and 1–2 m in Kendrapara, Bhadrak and Balasore in Cyclone Dana (2024) (IMD). A straight-line fit made for this Manual to the annual PSMSL record at Paradip gives a sea-level trend of about 2.95 mm/yr for 1967–2024; it has no correction for land movement and no stated uncertainty, PSMSL publishes no trend for the station, and it is a screening figure only, not a design value (Clause 5.8.5(f)).
5.8 Riverine backwater
5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:
- in Cuttack: the Mahanadi and the Kathajodi, on either side of the city, below Hirakud (Clause 5.8.3), with the river-locked sluice outfalls of Clause 5.8.5 at the ends of the main storm water channels (MSWC-I to the Kathajodi at Matagajpur and MSWC-II to the Mahanadi at Gulguli), on the Petta nala, and at Khannagar and Matrubhawan;
- in Bhubaneswar: the Gangua nala, which receives most of the city's natural drains, the Daya West Canal, and the Daya and Kuakhai, branches of the Mahanadi system whose levels rise with its floods (Clause 5.8.5);
- in Sambalpur: the Mahanadi below Hirakud, with its releases (Clause 5.8.3);
- on the Brahmani: the river at Rourkela, and the reach below Rengali, with its releases (Clause 5.8.3);
- in the north: the Budhabalanga at Baripada and Balasore, and the Baitarani and Salandi;
- on the coast: the tidal reaches near Paradip, the Dhamra estuary of the Brahmani and Baitarani, Chilika and the lower Daya (Clause 5.8.5), the Kushabhadra and Nuanai near Puri, and every river or creek reach into which a town drain discharges through a sluice in a saline or river embankment (Clause 5.8.5); and
- elsewhere: any river or DoWR channel listed in Annex 5B.
5.8.2 River levels. River water levels shall be taken from:
- (a) DoWR design flood levels or recorded highest flood levels for the reach, where published; or
- (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
- the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
- the tidal boundary of Clause 5.7 at the mouth; and
- the sand-bar condition of Clause 5.13.
5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example Hirakud above the Mahanadi at Sambalpur, Cuttack and the delta, or Rengali above the Brahmani at Talcher and in its delta), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.
5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:
- (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
- (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).
The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.
5.8.5 River-locked outfalls, dam-release and backwater reaches, DoWR drainage channels and the Gangua nala, Chilika and lagoon-mouth outfalls, saline embankment sluices, and surge levels on the Odisha coast.
-
(a) River-locked outfalls. For an outfall through a sluice or gate in a river embankment (for example Cuttack's main storm water channels, MSWC-I to the Kathajodi at Matagajpur and MSWC-II to the Mahanadi at Gulguli, the six-vented sluice of the Petta nala on the left embankment of the Kathajodi, and the sluices at Khannagar and Matrubhawan), or into a drain or channel that itself discharges through one, the designer shall identify the body that operates each sluice, gate and pumping station, and obtain the sill of each gate, the crest of the embankment, the installed pumping capacity and the operating levels. The tailwater at the outfall shall be the higher of:
- the river level of Clause 5.8.2 beyond the sluice, with item (b) where it applies; and
- the maximum level in the drain or channel behind the sluice, computed by routing it as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, encroachment and vegetation, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the sluice only while the river is lower than the level behind it.
Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the outfall invert, taken from the river model of Clause 5.8.2 or from the stage record of the nearest DoWR or CWC gauge in comparable past events, and not less than 24 hours (set by this Manual), centred on the peak 1-hour block of the final 24 hours of the design storm (Clause 5.10.6). Floor levels and pumped outfalls behind a river embankment shall also be checked for a breach of the embankment, with the land behind it filled to the river level beyond it.
-
(b) Dam-release and backwater reaches. For an outfall to a river reach whose level is set by releases from a dam upstream (for example the Mahanadi below Hirakud, at Sambalpur and in the delta, with its branches the Kathajodi, the Kuakhai and the Daya; or the Brahmani below Rengali), the river level of Clause 5.8.2 shall:
- include the releases of Clause 5.8.3 from every dam above the reach and the flow from the uncontrolled catchment below the dams, combined as they occurred in the largest recorded event, unless an operating rule in force staggers the releases; a release, or a release rule, alone shall not be taken to bound the river flow (set by this Manual);
- be computed with the downstream boundary of the river model at the tidal boundary of Clause 5.9.3 where the reach is tidal, or at the recorded level of the receiving river or lagoon in the largest recorded event, unless the model is carried far enough downstream that moving the boundary changes the level at the outfall by less than 10 mm; and
- for the major-system cases, be not less than the highest recorded flood level at the outfall, where DoWR or the local body has recorded one.
-
(c) DoWR drainage channels, the Gangua nala and irrigation canals. Town drainage shall not be discharged to a DoWR drainage channel or irrigation canal (for example the Gangua nala, the Daya West Canal or the Taladanda canal) without the consent of DoWR or of the channel's owner. Where consent is given:
- the discharge shall not exceed the rate the consent allows;
- the tailwater is the higher of the channel's design water level as DoWR states it and its level in the coincident case of Clause 5.8.4, with the channel level computed from all the storm water it receives, including the drains of other areas and towns, and, where the channel ends in a river (the Gangua in the Daya), with its downstream boundary at the river level of Clause 5.8.2 and item (b). Until DoWR publishes a design water level for the Gangua nala, the computed level governs [TBC];
- the channel shall be taken in its present condition, net of silt, encroachment and obstruction by crossing services, and a widening or improvement that has been proposed but not completed, such as the proposed improvement of the Gangua nala, shall not be counted; and
- the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert.
-
(d) Chilika and lagoon-mouth outfalls. For an outfall to Chilika, or to a river or channel whose level near the outfall is set by the lagoon (such as the lower Daya), the downstream boundary shall be the higher of the lagoon level recorded in the largest recorded event and the tidal level of Clause 5.7 at the lagoon's sea mouth, with the mouth treated under Clause 5.13, until a design level for the lagoon is published [TBC]. No storage in the lagoon shall be counted in a project's design. No drain, bund, outfall or pumping station that discharges to Chilika or alters its shore shall be designed under this Manual without the permissions that apply to a Ramsar site and to the lagoon's shore, and the designer shall consult the Chilika Development Authority (set by this Manual); this Manual authorises none of them. A drain that discharges to Chilika, directly or through the Gangua and the Daya, shall also meet Clause 8.9.
-
(e) Saline embankment sluices. For a drain that discharges through a sluice in a saline or tidal embankment to a tidal river, creek or the sea (on the coasts of Balasore, Bhadrak, Kendrapara, Jagatsinghpur, Puri and Ganjam), the sluice shall be treated as a gate under (a), with the lock windows of Clause 5.10 extended for as long as the level outside stands above the level inside (Clause 5.10.6), and the land and drains behind the embankment routed as a closed storage for that period. Floor levels and pumped outfalls behind the embankment shall also be checked for a breach of the embankment, with the land behind it filled to the level beyond it.
-
(f) Surge levels on the Odisha coast. Until Annex 5A gives the 10% AEP surge and the 1% AEP still-water level for a coastal segment, the site-specific study of Clause 5.7.3(c) shall compare its values with the surges observed in the 1999 super cyclone and in Cyclones Phailin, Fani, Yaas and Dana (Annex 5A), and explain any value below them. The INCOIS (2025) 100-year extreme sea level for Paradip, 2.62 m above mean sea level at present, shall not be adopted as the 1% AEP still-water level without that comparison, because INCOIS itself states that it probably underestimates the extreme sea level in the northern part of the Bay of Bengal (set by this Manual). No sea-level trend computed for this Manual from the PSMSL record at Paradip shall be used to reduce the SLA of Clause 5.7.4.
No pump, sluice, gate or release operation that helps drainage, such as pumping a channel down before a storm, opening a sluice early, diverting flow to the Taladanda canal or staggering dam releases, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the channel, the river or the lagoon (Clause 5.12.3).
Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Odisha's rivers break that assumption. The Mahanadi's flood at Cuttack comes largely from rain far upstream, above Hirakud, much of it in Chhattisgarh, and in the Tel and the middle catchment below the dam, yet the same monsoon systems fall on the delta. The flood of 30 August to 6 September 1982 peaked at about 44,900 m³/s at Mundali (Parhi et al., 2012), in a wet spell that gave Sambalpur its record day of 581.9 mm on 19 August and Bolangir and Phulbani theirs on 30 August (IMD). On the coast, one cyclone can flood the rivers and the towns together: in the 1999 super cyclone, 400 to 955 mm fell in four days and brought high floods in the Baitarani, Salandi, Budhabalanga, Kharasua and Brahmani (Kalsi, 2006), while Bhubaneswar recorded its highest day, 426.4 mm, on 30 October (IMD). Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.
Clause 5.8.3 reflects the Mahanadi. Hirakud intercepts only 58.9% of the catchment above the delta, and of the delta floods of 1969–2011, 69% came from the uncontrolled catchment below the dam, 23% from that catchment and Hirakud's releases together, and only 8% from the releases alone (Parhi et al., 2012). The releases still matter: in July 2001 Hirakud released 24,186 m³/s of the 39,904 m³/s recorded at Mundali, while in September 2008 it released 7,030 m³/s of 44,775 m³/s, the rest coming from the uncontrolled catchment, mainly the Tel (same source). In September 2011 Hirakud opened 55 sluice gates and 4 crest gates on 9 September and about 13.66 lakh cusec (about 38,700 m³/s) passed Mundali; the CAG is reported to have found that the dam was not operated in line with the State Water Policy, the Flood Management Manual or the forecasts of IMD and CWC (press report summarising the CAG). The delta embankments are reported to carry only 24,660 m³/s (Parhi et al., 2012). On the Brahmani, the releases of Rengali and the flood records at Jenapur and Akhuapada were not researched [TBC]. No published operating rule or release hydrograph for either dam was found, so until one is published the largest recorded release applies, with the flow of the uncontrolled catchment below the dam as it occurred in the same event (Clause 5.8.5(b)).
Clause 5.8.5 is set by this Manual. In Odisha the tailwater at a town outfall is set less often by the open tide than by a river in flood, a channel that another department owns, a lagoon or an embankment sluice, and on the coast the surge is larger than any published return level.
The first is the river lock. Cuttack's drains end at sluices in the river embankments. The main storm water channel MSWC-I runs 11.58 km to the Kathajodi at Matagajpur and MSWC-II 5.24 km to the Mahanadi at Gulguli, and the Petta nala, which rises in CDA Sector-10, reaches the Kathajodi through six vented sluices in the left embankment because the capital embankment cut it off from the Mahanadi (CAG, 2024). While the rivers are high the sluices stay shut, and each channel becomes a closed reservoir for its catchment. A tide lock opens again within hours; a river lock lasts as long as the flood. Clause 5.8.5(a) therefore takes a single lock of at least 24 hours, or longer where the gauge record or the river model shows it, as Clause 5.10.6 already requires for river backwater. It counts only the permanent pumps less the largest one, for the same reason that Clause 5.12.2(b) requires a standby pump on every new station; the portable pumps brought in for an event are not a design capacity. The Khannagar pumping station is reported at only 100 HP (press reports), and no operating rule, design water level or pumping capacity for any of the Cuttack sluices was found in the public domain. The DPRs for Cuttack's major drains, reported at about ₹335 crore, and a ₹496 crore branch storm water channel project are being re-vetted under the supervision of the Orissa High Court, with experts from IIT Bhubaneswar (press reports); their design basis was not found.
The second is the dam-release reach. Hirakud regulates only part of the Mahanadi's flood, and the largest recent flood at Mundali, in September 2008, came almost entirely from the uncontrolled catchment below the dam (Parhi et al., 2012). A release rule alone therefore does not bound the river level, and Clause 5.8.5(b) adds the uncontrolled flow as it occurred. The Kathajodi, the Kuakhai and the Daya, on which Cuttack and the eastern and southern outfalls of Bhubaneswar depend, carry the same flood. Odisha has no flood lines along its town reaches and no floodplain zoning law was found: the OTPIT (Planning and Building Standards) Rules 2021 define flood-prone areas by reference to the CWC Flood Atlas and to areas identified in the Master Plan, and bar basements in them (rule 38(1)), but no flood-level map for a town reach was found. Clause 5.8.5(b) therefore uses the highest recorded flood level as a floor for the major-system cases.
The third is the channel that another department owns. Bhubaneswar's ten natural drains, 62.6 km in all, belong to BMC, but eight of them end in the Gangua nala, which DoWR's Khordha Drainage Division manages and which runs about 31 km past Mancheswar and Palasuni to the Daya near Kanti (CAG, 2024). A technical team recommended in February 2015 that its bed be widened from 18 m to 21 m; a ₹432.75 crore proposal to improve it had been pending with the Government for more than three years in November 2022; utility pipes obstruct its flow at the Palasuni bridge; and the Daya West Canal, which also receives BMC's drains, is encroached by 1,195 houses (same source). The city's tailwater is thus a DoWR level that DoWR has not published. Clause 5.8.5(c) asks for DoWR's consent and design water level and, until the level is published, computes it from the channel's present condition down to the Daya, without counting improvements that are not built. The drainage master plan that IIT Roorkee is preparing for BMC under an agreement of February 2025, with a horizon of 2050, is reported to model the Gangua with backwater from the Daya and was reported to be nearing completion in October 2025 (press reports); no design figures from it are public.
The fourth is Chilika. The Gangua and the Daya carry Bhubaneswar's storm water, and with it the city's waste water, to Chilika (CAG, 2024). The lagoon has been a Ramsar site of 116,500 ha since 1 October 1981 (MoEF&CC), the Chilika Development Authority has looked after it since 1991, and its water spread varies from about 1,165 km² in the monsoon to about 900 km² in summer (CDA). The Orissa High Court has directed the Authority to help the Collectors of Puri, Ganjam, Khordha and Kendrapara identify the High Tide Line, and has supervised the removal of prawn gherries from the lagoon's margin (Orissa High Court, 2022). Its level in a storm depends on the rivers that enter it and on its sea mouth, and no design level for it was found. Clause 5.8.5(d) takes the higher of its recorded level and the tide at the mouth, gives no storage credit in the lagoon, and leaves every work in it to the authorities that govern it.
The fifth is the embankment on the coast. About 7,000 of the 9,893 deaths in the 1999 super cyclone were caused by the surge, most of them in Erasama block of Jagatsinghpur, and the four days of rain that followed made 20,005 breaches in flood embankments (Kalsi, 2006); Phailin's surge carried saline water about 1 km inland in Ganjam in 2013 (IMD). Behind a sluice in a coastal or tidal embankment, the drainage of a town is a polder problem. Clause 5.8.5(e) treats the sluice as a gate and the embankment as one that can breach.
The sixth is the surge level itself. The only Odisha site in the INCOIS (2025) report is Paradip, with a 100-year extreme sea level of 2.62 m above mean sea level at present, rising to 3.12 m (SSP2-4.5) or 3.34 m (SSP5-8.5) by 2100. INCOIS states that its value at Paradip is "much lower than that of Sindhu et al. (2011)", which indicates an underestimation in the northern part of the basin (INCOIS, 2025), and the value is below every estimate of the 1999 surge (5.9 m above the tide to 7.95 m in total; Kalsi, 2006) and below the 2 to 4 m surge of Cyclone Yaas on a full-moon tide (IMD, 2021). Clause 5.8.5(f) therefore makes the design study answer to the observed surges. A straight-line fit made for this Manual to the annual PSMSL record at Paradip for 1967–2024 gives about 2.95 mm/yr, with no correction for land movement and no uncertainty, and PSMSL publishes no trend for the station; it is a screening figure only. The SLA of Clause 5.7.4 is not reduced on the strength of it, and the INCOIS projection of about 0.44 m (SSP2-4.5) of mean-sea-level rise at Paradip by 2100 is a reason for an Authority to adopt more than the minimum (Clause 5.7.4(b)).
5.9 Joint-probability cases
5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.
Table 5.2 — Joint-probability cases for tidal and riverine outfalls
| Case | Rainfall | Tailwater | Applies to | Basis |
|---|---|---|---|---|
| J1 | Minor-system design AEP, Tc to 24 h | MHWS + SLA (tidal curve) | Minor system | Clause 2.12(a); Clause 5.7.1 |
| J2 | 1% AEP, all durations of Clause 2.5.2 | HAT + surge + SLA | Major system, detention, tanks, pumped systems | Clause 5.7.1 |
| J3 | 10% AEP, 48 h | 1% AEP still-water level + SLA | Major system, detention, tanks, pumped systems | Clause 2.12(b) |
| J4 | Design AEP, 48 h (72 h reported) | Tidal curve per J1 with two 6 h lock windows (Clause 5.10) | All storage and every gated or tide-affected outfall | Clause 5.10 |
| R1 | Site design AEP | River at 10% AEP level | Riverine outfalls | Clause 5.8.4(a) |
| R2 | Site 10% AEP | River at design-AEP level | Riverine outfalls | Clause 5.8.4(b) |
5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).
5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.
5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.
Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.
5.10 Outfall-closed (tide-locked) storage check
5.10.1 Where it applies. The check applies to:
- every storage facility;
- every minor- and major-system element; and
- every pumped system
whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).
5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:
- the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
- AMC III.
The 72-hour storm shall also be run and reported.
5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:
- (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
- (b) During each lock window, gravity discharge is zero.
- (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
- (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.
5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:
- (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
- (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
- (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.
In volume terms, over each lock window and the full storm:
V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)
This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).
5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).
5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:
- sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
- the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.
Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.
Commentary. The outfall-closed check is the distinctive Odisha requirement in this Manual. Cuttack shows why, although its outfalls are locked by rivers rather than by the tide. The city lies between the Mahanadi and the Kathajodi, and its drains reach the rivers only through sluices in the embankments. JICA's sanitation project for the city set out to cut the area flooded from about 470 ha (2005) to 30 ha, and the number of floods from three to five a year to fewer than three, through drainage channels, pumping stations and the rehabilitation of sluice gates (JICA). In Cyclone Titli in October 2018 the sluices at Khannagar and Matrubhawan were opened to the Kathajodi and the Taladanda canal while the city lay waterlogged and pumps were submerged, and 140 to 220 dewatering pumps are reported to be deployed in such events (press reports). A Mahanadi flood lasts for days, not hours (the 1982 flood ran from 30 August to 6 September; Parhi et al., 2012), which is why Clause 5.8.5(a) replaces the two 6-hour windows with a single, longer lock. The coast is locked by the tide and the surge: Cyclone Yaas crossed on the full-moon day in May 2021, and IMD described the astronomical tide that day on the Bhadrak and Balasore coast as 3 to 5 m, with a surge of 2 to 4 m above it (IMD, 2021). A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.
The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.
Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.
5.11 Flap gates, tide gates and non-return valves
5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.
5.11.2 Hydraulics. The design shall include:
- the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
- the reduction in effective outfall capacity when the gate is partly open.
Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.
5.11.3 Construction.
- (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
- (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
- (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
- (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
- (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.
5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:
- the major-system tailwater (J2) at the point of connection; or
- the maximum stage in the outfall-closed check (Clause 5.10).
Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.
5.11.5 Inspection. Gates and valves shall be inspected and operated:
- before 15 April each year;
- after every event in which they closed against a storm flow; and
- as set in the maintenance plan (Chapter 10).
Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. Both failures matter in Odisha. Cuttack's drains reach the Mahanadi and the Kathajodi through sluices in the river embankments, such as the six-vented sluice of the Petta nala on the left embankment of the Kathajodi (CAG, 2024) and the sluices at Khannagar and Matrubhawan, which were opened during Cyclone Titli in October 2018 while the city lay waterlogged and its pumps were submerged (press reports); JICA's Cuttack drainage project included the rehabilitation of sluice gates (JICA). On the coast, the floods that followed the 1999 super cyclone made 20,005 breaches in flood embankments (Kalsi, 2006), and Phailin's surge carried saline water about 1 km inland in Ganjam in 2013 (IMD). A sluice jammed open lets the river or the sea behind the embankment, and one held shut by silt keeps the land behind it flooded after the water outside has fallen. The 15 April inspection date is set ahead of the SW monsoon.
5.12 Pumped outfalls
5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:
- the outfall-closed check of Clause 5.10;
- the drawdown requirement of Clause 4.7; or
- the J2 and J3 cases.
Pumping shall not be used where a gravity solution meets these requirements.
5.12.2 Capacity.
- (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
- (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
- (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.
5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.
5.12.4 Power supply. Pumping stations shall have either:
- two independent power supplies; or
- standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.
Changeover shall be automatic.
5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:
- the 1% AEP flood level + 0.5 m; and
- HAT + surge + SLA + 0.5 m.
Access to the station shall remain usable in the 1% AEP event.
5.12.6 Discharge arrangement. Rising mains shall discharge:
- over a level above the J2 tailwater; or
- through a non-return valve and a flap gate.
The arrangement shall prevent back-siphoning.
5.12.7 Controls and monitoring. Each station shall have:
- automatic level control;
- remote alarms for high level, pump failure and power failure, sent to the operator; and
- a level and run-time log kept for at least 5 years.
Wet wells shall be sized to keep pump starts within the manufacturer's limits.
5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).
5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 15 April each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).
Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.
5.13 Sand-bar closure of river mouths
5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes any river, creek or lagoon mouth on the Odisha coast that a pre-monsoon survey shows closed or restricted by sand, including, where it does, the sea mouth of Chilika and the mouths of the Kushabhadra and Nuanai near Puri, and any other mouth listed in Annex 5B.
5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless DoWR certifies that:
- a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
- the programme is funded for the current season.
5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:
- (a) the tidal tailwater of Clause 5.7; and
- (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.
5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless DoWR has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.
5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.
Commentary. The research for this Manual found no record of the dates or crest levels of sand-bar closure at the mouths of Odisha's rivers, creeks or lagoons, and no DoWR or municipal procedure for clearing them. Puri lies behind a ridge of sand dunes, with the silted Sar and Samang lakes inland (CGWB), so drainage towards the sea has to pass the dune ridge; how the town's outfalls reach the sea or the Kushabhadra and Nuanai was not researched. The Chilika Development Authority lists the control of silt entering the lagoon among its objectives (CDA). So Clause 5.13.4 gives no credit for cutting at present, and the mouths to which Clause 5.13.1 applies are to be confirmed by pre-monsoon survey and listed in Annex 5B. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.
5.14 Documentation
Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:
- a plan of the analysis extent showing:
- the site;
- each analysis point with its contributing catchment area and the site's percentage of it; and
- the end point and the reason it was chosen (Clause 5.3);
- the model description:
- software and version;
- the network schematic, with survey sources for the drains and crossings;
- land use and CN for off-site areas;
- any upstream detention included; and
- calibration or validation evidence where available;
- for each analysis point, AEP and duration, the existing and with-project:
- peak flow;
- time to peak;
- maximum water level and velocity; and
- duration of inundation (Clause 5.4);
- the comparison against Clause 5.5, with each failure identified and the remedy adopted;
- the tailwater derivation:
- tide-table edition and port;
- MHWS, HAT and MSL relative to chart datum;
- the datum connection to the Survey of India benchmark and the project datum;
- surge source and value;
- SLA; and
- river levels and their sources (Clauses 5.6 to 5.8);
- the joint-case table of Clause 5.9 with results;
- the outfall-closed check (Clause 5.10):
- storm and lock alignment;
- stage hydrographs; and
- the volume balance for each lock window;
- a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
- pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
- the sand-bar assumption and supporting DoWR certification, where relevant (Clause 5.13); and
- inspection and maintenance requirements for Chapter 10.
Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §6.3.6 and Table 6.2 (coastal tailwater; +0.3 m climate allowance). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- MoHUA / CPHEEO (2013). Manual on Sewerage and Sewage Treatment Systems (pumping stations).
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.5, ten-percent downstream analysis). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Vol. 1 (Standard #8) and Vol. 2 §3.1.9. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- MARC. The Evolution of Regional Stormwater Design Standards. https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- Comptroller and Auditor General of India (2024). Performance Audit on Storm Water Drainage and Sewerage Management Systems in Municipal Corporations for the year ended March 2022, Government of Odisha, Report No. 8 of 2024 (natural drains of Bhubaneswar and Cuttack, Appendix III; the Gangua nala and the Daya West Canal; the Petta nala sluices). https://d1jmc0u14z2tmp.cloudfront.net/uploads/download_audit_report/2024/English_PA_SWD-&-SMS-06754649d967c42.35261715.pdf
- Japan International Cooperation Agency. Ex-ante Evaluation, Orissa Integrated Sanitation Improvement Project (loan agreement 30 March 2007; drainage of Cuttack; operation and effect indicators). https://www2.jica.go.jp/en/evaluation/pdf/2006_ID-P187_1_f.pdf ; and Phase II (loan agreement 31 March 2016). https://www.jica.go.jp/english/our_work/evaluation/oda_loan/economic_cooperation/c8h0vm000001rdjt-att/india_160331_04.pdf
- Parhi, P.K., Mishra, S.K., Singh, R. and Tripathi, V.K. (2012). Floods in Mahanadi River Basin, Orissa (India): a critical review. India Water Week 2012 (flood peaks at Mundali; Hirakud releases and the uncontrolled catchment; capacity of the delta embankments). https://indiawaterweek.thewaternetwork.com/storage2/cI8LFxgpNKMwcmGI5Ej5kuLiamRdhQP1lTu2gLbxRFSWxoCN1IK1Jdj7APer_-bZxxf_Sy5RMEg7qp-1cNsOfT1qlhtvDmRGCXvS0VUfSWE
- Kalsi, S.R. (2006). Orissa super cyclone – A synopsis. MAUSAM 57(1), 1–20 (surge estimates, deaths, rainfall and embankment breaches). https://mausamjournal.imd.gov.in/index.php/MAUSAM/article/download/449/450/1763
- India Meteorological Department (2013). Extremes of Temperature and Rainfall for Indian Stations (up to 2012) (Bhubaneswar, Sambalpur, Bolangir, Phulbani). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- Ministry of Environment, Forest and Climate Change (2024). 80 Ramsar sites of India (Chilka Lake; Bhitarkanika Mangroves). https://moef.gov.in/uploads/2024/03/80-Ramsar-sites-of-India-31-01-2024.pdf
- Chilika Development Authority. Chilika Development Authority and Chilika at a glance (objectives; water spread), web pages. https://www.chilika.com/chilika-dev-authority.php ; https://www.chilika.com/chilika-at-a-glance.php
- Orissa High Court. W.P.(C) No. 7469 of 2017, Registrar (Judicial), Orissa High Court v. Union of India, order No. 69 dated 30.06.2022 (High Tide Line in Chilika and Bhitarkanika; prawn gherries). https://www.orissahighcourt.nic.in/uploads/pil_orders/WPC_7469_2017_2022_06_30.pdf
- Government of Odisha, Housing and Urban Development Department (2021). Odisha Town Planning and Improvement Trust (Planning and Building Standards) Rules, 2021, S.R.O. No. 374/2021, rule 38(1) and definitions (third-party copy of the Gazette). https://nackuchinda.in/wp-content/uploads/2024/12/OTPIT-Planning-Building-Standard-rules-2021.pdf
- Central Ground Water Board. District groundwater brochure, Puri district (coastal dunes; Sar and Samang lakes), as archived.
- Press reports on Cyclone Titli in Cuttack (The Telegraph, 2018), https://obeta.ttef.in/odisha/flooded-pumps-lie-choked/cid/1671699 ; on the Khannagar pumping station (The Quint); on the Cuttack drainage DPRs (OdishaTV, Projects Today, Ommcom News, 2025), https://odishatv.in/news/odisha/cuttack-drainage-project-orissa-hc-flags-irregularities-in-rs-335-crore-dprs-questions-cmc-270243 ; on the 2011 Hirakud releases and the CAG's findings (Odishabytes, 2022), https://odishabytes.com/2011-odisha-flood-what-happened-then-why-cag-pulled-up-hirakud-officials ; on the Mundali flows of August 2022 (Odishabytes); and on the IIT Roorkee drainage master plan for Bhubaneswar (Careers360, February 2025; Ommcom News, August 2025), https://ommcomnews.com/odisha-news/bhubaneswar-gears-up-for-2050-with-new-drainage-master-plan/
- Survey of India. Tidal Predictions: Geodetic and Research Branch. https://www.geographyandyou.com/survey-of-india/tidal-predictions-geodetic-and-research-branch-survey-of-india
- GLOSS. India national report (tide-gauge network and datums). https://gloss-sealevel.org/gloss/gloss/sites/gloss/files/publications/documents/india_ge9.pdf
- Adani Ports (2025). Tide Table 2025, Dahej (notes on NHO INP-12 coverage and data sources). https://www.adaniports.com/-/media/Project/Ports/PortsAndTerminals/Dahej-Port/Marine-Documents/Tide-Table-2025-Dahej.pdf
- INCOIS. Storm-surge and swell-surge warning services. https://incois.gov.in/
- INCOIS (2025). Technical Report ESSO-INCOIS-OMDA-TR-04(2025) (extreme sea-level components and projections, Paradip). https://incois.gov.in/documents/Reports/TechnicalReports/TR_ESSO-INCOIS-OMDA-TR-04(2025)_20250725114934.pdf
- PSMSL. Station 1161, Paradip (station page and annual RLR data). https://psmsl.org/data/obtaining/stations/1161.php
- India Meteorological Department, RSMC New Delhi. Report on Very Severe Cyclonic Storm Phailin, October 2013. https://rsmcnewdelhi.imd.gov.in/uploads/report/26/26_38a1d4_phailin.pdf
- India Meteorological Department, RSMC New Delhi (2019). Preliminary report on Extremely Severe Cyclonic Storm Fani, as archived. http://web.archive.org/web/20190928150902/http://www.rsmcnewdelhi.imd.gov.in/images/pdf/publications/preliminary-report/fani.pdf
- India Meteorological Department, RSMC New Delhi. Annual report on cyclonic disturbances over the north Indian Ocean during 2021 (Cyclone Yaas). https://rsmcnewdelhi.imd.gov.in/uploads/report/27/27_81bdf0_RSMC%20Report%202021.pdf
- India Meteorological Department (2024). Press release of 25 October 2024 on Severe Cyclonic Storm Dana. https://internal.imd.gov.in/press_release/20241025_pr_3362.pdf
- Paradip Port, tidal levels (MHWS, MHWN; secondary source, datum not stated). https://en.wikipedia.org/wiki/Paradip_Port
- FHWA. HEC-22 Urban Drainage Design Manual (current edition), Table 7.3 (coincident frequencies).
- Purdue University JTRP (2023). Development of a Multiple Water Course Joint Probability Analysis Procedure for Indiana Watersheds, FHWA/IN/JTRP-2023/09. https://docs.lib.purdue.edu/jtrp/1820
- PUB Singapore (2025). Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3. https://info.corenet.gov.sg/docs/default-source/pub-circulars/pub-circular_cop-7th-ed-addendum-no-3_16-apr-2025.pdf?sfvrsn=5a2c1e1a_2
Annexes and forms
| Annex / Form | Content |
|---|---|
| 5A | Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment |
| 5B | Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map |
| 5C | Worked example: outfall-closed check for a site in the Mahanadi delta near Cuttack |
| Form 5-1 | Downstream and Tailwater Report |
| Form 5-2 | Simplified Downstream Statement (small sites) |
Commentary. Odisha's drains fail in two places that site design does not see. Downstream, a river or another department's channel decides. Bhubaneswar's ten natural drains belong to BMC, but eight of them outfall to the Gangua nala, which DoWR's Khordha Drainage Division manages and which runs to the Daya and on to Chilika (CAG, 2024). Cuttack lies "on the holms of Mahanadi River and Kathajodi River" (JICA), and its drains reach the rivers through sluices in the embankments, which cannot discharge while the rivers stand high; the Mahanadi's floods at Mundali, of 25,000 to 45,000 m³/s, set their level (Parhi et al., 2012; press reports). On the coast, cyclones bring surge and rain together: the surge of the 1999 super cyclone near Paradip is estimated at 5.9 m to 7.95 m, and about 7,000 of its 9,893 deaths were caused by it (Kalsi, 2006). None of this enters design today: the CAG found no design discharge in any storm-drain estimate of the five Municipal Corporations it audited for 2017–22 (CAG, 2024). A detention basin that meets every release rate in Chapter 4 still fails if the drain below it is already full, or if its outfall is shut. This chapter makes both failure modes part of the design.