Chapter 7Waterbodies, Tanks (Pokharis) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (pokhari) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, including Chilika lagoon and its mouths to the sea, the mangroves and tidal creeks of Bhitarkanika and of the Mahanadi and Brahmani–Baitarani deltas, Ansupa and Tampara lakes, the margins of the Hirakud reservoir, the estuaries of the coastal rivers, and the pokharis and temple tanks of Bhubaneswar, Cuttack, Puri and other towns;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Orissa Public Premises (Eviction of Unauthorized Occupants) Act, 1972, the Odisha Prevention of Land Encroachment Act, 1972, the Orissa Irrigation Act, 1959, the Odisha Municipal Corporation Act, 2003, the Odisha Development Authorities Act, 1982 and the Odisha Town Planning and Improvement Trust Act, 1956 with the rules made under them, the Coastal Regulation Zone Notification as applied through the approved CZMP, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river or tidal river (nadi), stream (jora), nala or natural drain, canal, lake or large tank (dighi, sarobara), tank or pond (pokhari, bandha), coastal lagoon (such as Chilika), marsh or swamp, embanked prawn or fish pond (gherry), tidal creek or estuary (muhana), mudflat or mangrove, reservoir margin, abandoned quarry or borrow pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (pokhari) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (overflow, outlet or spillway) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the DoWR and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (feeder channel, nala or jora) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice gate or outlet, including a sluice or flap gate through a river, canal or coastal embankment (bandha)) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Odisha terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Jalasaya land | Land recorded in the record of rights in the Jalasaya kisam (land class), as in the plots "recorded as Jalasaya-ii" of the Baula Bandha case (NGT, OA 114/2022/EZ). One filing before the Tribunal reads the class as including "tank, pokhari, water reservoir, bandh, kata, bandhi, chira etc." (a party's argument, not a finding). For this Manual, Jalasaya land is a waterbody under Clause 7.3.3(a), whether or not it holds water at the time of survey, and its recorded extent governs where it is larger than the surveyed water edge (Clause 7.13.1). |
| Pokhari | A tank or pond (Annex 7E), in a town usually without a surplus weir or sluice; it includes temple tanks (kunda) such as Bindusagar. A pokhari is a tank or pond under Clause 7.2. Where it has no surplus weir, its FTL is the level at which it spills to a street drain, a nala or the next pond, found by survey. |
| Bandha | An embankment, dam or dyke; in names such as Baula Bandha, and in western Odisha as bandh, an embanked tank (Annex 7E). An embanked tank is a tank under Clause 7.2, and its embankment is a tank bund (Clause 7.14). A river or canal embankment of the DoWR is a flood embankment, not a tank bund. |
| Natural drain; nala | A channel shown as a natural drain in a Comprehensive Development Plan or Master Plan, such as Drains I to X of the Bhubaneswar CDP and the main storm water channels MSWC-I and MSWC-II of the Cuttack CDP (CAG, Appendix III), or any nala, natural or cut, such as the Gangua nala and the Petta nala. A natural drain or nala draining 8 ha or more is a natural channel under Clause 7.4.1(b), and its width in the CDP or Master Plan, or in the record of rights, is its recorded width for Clause 7.13.1. |
| Water Bodies Use Zone | The land-use zone (W) of the OTPIT (Planning and Building Standards) Rules, 2021 covering "Rivers, canals; Streams, water spring; Ponds, lakes, Reservoir; Wetland, Water logged/marshy area, aquaculture pond". Land in this zone is a waterbody for this chapter. |
| Natural hazard prone area | In the OTPIT Rules, flood-prone areas in river plains shown in the Flood Atlas of India of the Central Water Commission, and other areas flooded by "heavy intensity rains, inundation in depressions, back flow in drains, inadequate drainage, etc. as identified through local surveys in the Master Plan". Where such an area has been mapped in a Master Plan, it is a source for the 1% AEP extent under Clause 7.3.3, but it does not replace the hydraulic study of Clause 7.3.4. |
| River-locked outfall | A drain outfall through a river embankment that cannot discharge by gravity while the river is high, such as the outfalls of Cuttack to the Mahanadi and the Kathajodi (Figure 7.3). Its sluice or flap gate is a controllable outlet under Clause 7.8 only where it is operated to a written rule; its tailwater is the river stage (Chapter 5). |
| Gherry | An embanked prawn or fish pond, as on the margins of Chilika and in the Bhitarkanika area, where the Orissa High Court has supervised the removal of gherries within the High Tide Line (W.P.(C) 7469/2017). It is a tank or pond under Clause 7.2 and, within a wetland of Clause 7.12.1, part of that wetland; its storage is not counted as detention for any development (Clause 7.12.5). |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the DoWR and the Revenue and Disaster Management Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the DoWR (through its drainage or irrigation division), BMC, CMC or another Municipal Corporation, a Municipality or Notified Area Council, BDA, CDA or another development or planning authority, the Chilika Development Authority, the Gram Panchayat, the Revenue and Disaster Management Department (through the Collector and the Tahasildar), the Forest, Environment and Climate Change Department, a temple or its trust, the private owner of a pond, or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) the record of rights and mouza maps of the Revenue and Disaster Management Department, including land recorded in the Jalasaya kisam (tanks, pokharis, bandhas and other water-holding land) and land recorded as nala; the water-body lists of BMC, CMC and the other ULBs (628 in the five Municipal Corporations in November 2022, CAG); land shown as a water body, in the Water Bodies Use Zone or as a natural drain in a Master Plan, Comprehensive Development Plan or drainage plan of BDA, CDA or another development or planning authority; and, in the seven coastal districts, the High Tide Line, mangroves and CRZ lines of the CZMP approved on 1 June 2021;
- (b) DoWR and Gram Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where DoWR records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. No 1% AEP flood map of any Odisha city was found, Odisha has no system of statutory flood lines, and no flood plain zoning Act was found. The OTPIT Rules define natural hazard prone areas by reference to the Central Water Commission's Flood Atlas and to areas "identified through local surveys in the Master Plan", but no such mapped area was found for a city. The CAG found that no Municipal Corporation kept a GIS inventory of its storm drains as the NDMA guidelines require, that only Berhampur had a drainage master plan (2017), and that ₹66.66 crore had been released to 30 ULBs to prepare drainage master plans (CAG, Report No. 8 of 2024, paras 3.2.2 and 3.2.2.2). Bhubaneswar's comprehensive stormwater management plan, under a memorandum signed by BMC and IIT Roorkee in February 2025 with a horizon of 2050, includes a drone and DGPS survey and hydraulic modelling of the Gangua nala with backwater from the Daya; it was reported in October 2025 to be nearing completion, and no flood map or design figure from it has been published (as reported). Funds were released for a drainage master plan for Cuttack in September 2025 (as reported). On the coast, the CZMP approved on 1 June 2021 maps the High Tide Line and the CRZ for the seven coastal districts, but the shoreline management plan with erosion maps was still "under process" in May 2025 (State reply to the National Green Tribunal, as reported). In Chilika and Bhitarkanika, the Orissa High Court directed in June 2022 that the High Tide Line be marked "by embedding concrete pillars in the water", with the Chilika Development Authority helping the Collectors to identify it (W.P.(C) 7469/2017). The State was reported to have begun demarcating about 13,000 wetlands (as reported). Clause 7.3.4 lets the Authority adopt flood maps once they are issued. Until then, the Applicant must produce the extent for larger and flood-sensitive sites, and because Odisha has no flood lines, that extent governs wherever it has been mapped. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual (no Odisha statute or building rule read for this Manual sets a setback in metres from nalas, pokharis or wetlands; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the DoWR's clearance for a work on one of its rivers, embankments, drainage channels or canals, a direction of the Orissa High Court or the National Green Tribunal, or a CRZ clearance under the Coastal Zone Management Plan (CZMP) approved under the CRZ Notification, 2019 sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual, because the OTPIT (Planning and Building Standards) Rules, 2021 and the Odisha Acts that protect waterbodies, as read for this Manual, set no setback in metres from nalas, pokharis or wetlands, and the text of the ODA (Planning and Building Standards) Rules 2020 could not be read. The NDMA Urban Flooding Guidelines (2010) keep building activity 12 m from major canals and streams and 2 m from nallahs and storm drains, but the CAG found that none of the five Municipal Corporations applied them (CAG, Report No. 8 of 2024); this Manual's 15 m is wider than both (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Odisha flood maps are mostly coarser than US maps, the Mahanadi–Brahmani–Baitarani delta around Cuttack, Kendrapara and Jagatsinghpur and the coastal plain behind the dunes are very flat and low (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Odisha's rules bar building in waterways but set no distance from them. Rule 25 of the OTPIT (Planning and Building Standards) Rules, 2021 refuses permission for a building "in areas of natural waterways or drains, as detailed in the Master Plan, and drainage plan", over or under a municipal drain or sewer, or with the foundation of an external wall less than 0.5 m from the edge of the street or road margin "including the drain" (rule 25(i), (iii) and (iv)); its table of environmentally sensitive zones lists "Development between river, stream, canal and the embankment with clearance of Water Resource Department or any other competent authority" (the DoWR; the table is garbled in the text read). No setback in metres from a nala, pokhari or wetland was found in the OTPIT Rules. The ODA (Planning and Building Standards) Rules 2020 could not be read for this Manual; they are understood to carry equivalent provisions [TBC]. BDA's regulations were reported in 2022 to have been amended to control development near notified wetlands, lakes, reservoirs, low-lying areas and water bodies (as reported; the amendment, Notification No. 7453 of 24 February 2022, was not read), and a 2019 BDA notice refused permission over land proposed for roads, water bodies and drains in the CDP (as reported). The NDMA Urban Flooding Guidelines (2010, para 6.6.2(ii)) say that no building activity other than recreational use shall be carried out within 12 m of the boundaries of major canals and streams and 2 m of the boundaries of nallahs and storm drains; the CAG found that none of the five Municipal Corporations applied this: BMC said the buffer "would be defined after land acquisition", Berhampur said it had declared buffer zones but gave no details, and Berhampur and Rourkela said no land was available (CAG, Report No. 8 of 2024, para 3.2.8). The DoWR's Khordha Drainage Division asked BMC and BDA to "demarcate the buffer zone for the Gangua Nallah, on both sides", without a width in the record read. The only distances found beside water were in the Orissa High Court's supervision of Chilika and Bhitarkanika, where land within 200 m of the High Tide Line was being identified and gherries "coming under 100 meters considered as no development zone" were to be demolished (W.P.(C) 7469/2017, order of 30 June 2022). Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.
Disclosure. Odisha has no general statutory setback from nalas, pokharis or wetlands in the rules and Acts read for this Manual. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor. It is not found in the OTPIT (Planning and Building Standards) Rules, 2021 or in any Odisha Act read for this Manual, and the ODA (Planning and Building Standards) Rules 2020 were not read [TBC]. Because Odisha has no statutory flood lines, the 1% AEP extent of this Manual, where it has been mapped (Clause 7.3.4), is the only flood-based line, and it governs Zone 2. The setback is applied as the larger of the corridor and any statutory line, so the Manual is stricter than statute almost everywhere. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- The bar on building in natural waterways and drains. Rule 25(i) and (iii) of the OTPIT Rules refuse permission in areas of natural waterways or drains shown in the Master Plan and drainage plan, and over or under a municipal drain. The ODA Rules are understood to carry an equivalent provision [TBC]. Where the Master Plan shows a drain or waterway wider than Zone 1, its width governs.
- The NDMA buffers. The NDMA Urban Flooding Guidelines (2010) ask for 12 m from major canals and streams and 2 m from nallahs and storm drains. They are guidelines, not statute, and the CAG found them applied by no Municipal Corporation (CAG, Report No. 8 of 2024). Zone 1, not less than 15 m, is wider than both.
- The High Tide Line of Chilika and Bhitarkanika. Under the Orissa High Court's directions in W.P.(C) 7469/2017, land within 200 m of the High Tide Line is being identified and gherries within 100 m are treated as within a no-development zone (order of 30 June 2022). These lines govern wherever they lie outside Zone 1.
- CRZ Notification, through the approved CZMP. The CZMP under the CRZ Notification, 2019 was approved on 1 June 2021 for Balasore, Bhadrak, Kendrapara, Jagatsinghpur, Puri, Khordha and Ganjam districts (MoEF&CC); its approval was reported to be under challenge before the National Green Tribunal, and the shoreline management plan with erosion maps is pending. Its widths along tidal rivers and creeks were not read for this Manual; the Applicant shall obtain the CRZ lines for the site, and they govern wherever they lie outside Zone 1.
- Jalasaya land and Master Plan water bodies. Land recorded in the Jalasaya kisam, and land in the Water Bodies Use Zone of a Master Plan, is protected against filling and building through eviction law and the courts. That protects the waterbody, not a strip around it; the whole recorded extent is a waterbody for this chapter.
- DoWR embankments. Development between a river, stream or canal and its embankment needs the clearance of the DoWR or another competent authority (OTPIT Rules, table of environmentally sensitive zones).
This Manual sets 15 m as the floor because it is wider than the 12 m that the NDMA guidelines ask for along major canals and streams; because it is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and desilting machinery that the nalas need, on drains that a technical team proposed in 2015 to widen (the Gangua bed from 18 m to 21 m) and whose CDP widths BMC has not been able to restore for want of land (CAG). The reasons for the corridor are the CAG's findings that no Municipal Corporation applied any buffer, that only 68.152 km of the 193.324 km of natural drains in the five Municipal Corporations had seen any development work, and that drains and water bodies had been encroached (CAG, Report No. 8 of 2024); the damage to 291 km of urban drains in Cyclone Fani (as reported); and the 259.2 mm that fell on Bhubaneswar in a day in August 2023 (as reported). Until a statute, rule, notification or Master Plan adopts it, the 15 m minimum is this Manual's recommended standard and the statutory controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the ODA (Planning and Building Standards) Rules 2020, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Odisha practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The Mahanadi–Brahmani–Baitarani delta and the coastal plain are flat and low, and Cuttack lies on the holms between the Mahanadi and the Kathajodi (JICA, 2007), so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
No Odisha rule protecting the land between a pond's full level and its flood level was found. The Jalasaya kisam protects the land recorded as water-holding, which may be larger or smaller than the land that floods, and the Water Bodies Use Zone of the OTPIT Rules includes "Water logged/marshy area", but neither is tied to a flood level. The land around Bhubaneswar's drains that used to hold flood water is being lost: the agricultural catchment of the Daya West Canal fell from 2,417 ha to 1,255 ha by November 2022 (CAG, Report No. 8 of 2024). Odisha's urban pokharis are part of the flood path. Most have no surplus weir and spill to the street drains, so the land around them that floods in a storm stores water that would otherwise stand in the streets or reach the nalas. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Cuttack, which lies between the Mahanadi and the Kathajodi and where 470 ha was inundated in 2005 (JICA, 2007), the low-lying land of Bhubaneswar along the Gangua nala and the Daya West Canal, on which 1,195 houses encroach (CAG, 2024), and the towns of the Mahanadi–Brahmani–Baitarani delta already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Odisha has no tank Act, and few tanks in its towns have the full set of an earthen bund, a surplus weir and irrigation sluices. The storages that matter for urban drainage are of five kinds. The first is the urban pokhari, including the temple tanks of Bhubaneswar's Old Town, Puri and other temple towns, on Jalasaya land and usually with no outlet structure: the CAG counted 628 water bodies in the five Municipal Corporations (CAG, Report No. 8 of 2024). The second is the bandha, an embanked tank, sometimes still fed or drained by irrigation channels: Baula Bandha in Berhampur "was a tank which was used for channeling water for irrigation by the Irrigation Department" (NGT, OA 114/2022/EZ). The third is the receiving chain of Bhubaneswar: eight of the city's ten CDP natural drains outfall to the Gangua nala, which the DoWR's Khordha Drainage Division manages, and the Gangua joins the Daya, which flows to Chilika (CAG); this chain, not any single pond, is the cascade for Clause 7.7.2. The fourth is the embanked city of Cuttack, on the holms between the Mahanadi and the Kathajodi, which drains through sluices in its embankments when the rivers are low and must store or pump when they are high, as a polder does (this Manual's reading; Figure 7.3). The fifth is the lagoon and the coastal wetland: Chilika, the mangrove creeks of Bhitarkanika and the deltas, and their gherries (Clause 7.12). Clauses 7.7 and 7.8 apply to any of these whose storage is counted. The Hirakud and Rengali reservoirs are not tanks for these clauses: their releases enter a design as inflow and tailwater (Chapter 5).
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. DoWR, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, in Cuttack, every drain, sluice or flap gate through the Mahanadi or Kathajodi embankment and pumping station by which the city's flow reaches the river, with the river stage as tailwater, as shown in Figure 7.3, and, in Bhubaneswar, the natural drains, the Gangua nala and the Daya, which flows to Chilika.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than DoWR's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. Odisha's largest floods have come late in the south-west monsoon or with the October cyclones, when ponds, nalas and rivers are already high and the soils wet. The Mahanadi's peak at Mundali reached 44,873 m³/s in late August and early September 1982 and 44,775 m³/s in September 2008 (Parhi et al., 2012), and Bhubaneswar received 426.4 mm in a day on 30 October 1999, in the super cyclone (IMD). In Cuttack, the city's outfalls cannot discharge by gravity while the Mahanadi and the Kathajodi are high, and in Cyclone Titli (October 2018) pumps were reported submerged while the sluices at Khannagar and Matrubhawan were opened (as reported): storage downstream that is already full gives no relief. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — Cuttack's river-locked outfalls (schematic, not to scale). A: with the Mahanadi or the Kathajodi low, the city's storm drain or nala flows by gravity through a gated sluice barrel in the river embankment and out through a flap gate, and the pumps are off. B: with the river in flood above the outfall, the river holds the flap gate shut and the sluice gate is closed against backflow; the city's runoff is held in its drains, pokharis, detention storage and low ground and is pumped over the embankment until the river falls, so the river stage is the tailwater of the whole chain (Chapter 5) and the drains, sluices, pumps and storage are modelled together (Clause 7.7.2). C: the city on the doab between the Mahanadi and the Kathajodi, embanked on both rivers, with its outfalls as named in the CDP and by the CAG: main storm water channel MSWC-II to the Mahanadi at Gulguli; MSWC-I to the Kathajodi at Matagajpur, with its link drain at Khannagar; and the Petta nala through "six vented sluices" in the left embankment of the Kathajodi. The sluices at Khannagar and Matrubhawan, the pumping station at Khannagar and the use of portable pumps are as reported in the press; the Mahanadi peaks at Mundali (25,000–45,000 m³/s) and the capacity of the delta embankments (about 24,660 m³/s) are from Parhi et al. (2012). The levels and positions are drawn schematically: no sill level, gate operating rule or design river stage for any Cuttack outfall was published. Original drawing for this Manual; concept from the CAG's account of Cuttack's natural drains (Report No. 8 of 2024, Appendix III and para 5.2.3), the JICA ex-ante evaluation of the Orissa Integrated Sanitation Improvement Project (2007), which includes pumping stations and the rehabilitation of sluice gates, and Parhi et al. (2012).
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, OSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under DoWR control, the operating rule shall be DoWR's rule. This Manual does not authorise any other body to operate a DoWR tank.
Commentary. No operating rule for an Odisha pokhari or bandha that keeps a flood cushion was found, and most urban pokharis have no controllable outlet, so Clause 7.8.3 applies to them. The controlled flows that matter are elsewhere. Cuttack drains through sluices and pumps in its river embankments (Figure 7.3): in Cyclone Titli (October 2018) the sluices at Khannagar and Matrubhawan were opened to the Kathajodi and to the Taladanda canal, and the city has used 140 to 220 dewatering pumps in a single event (as reported); JICA's sanitation project for the city includes new pumping stations and the rehabilitation of sluice gates (JICA, 2007). Upstream, the Mahanadi's floods are only partly regulated: Hirakud intercepts 58.9% of the basin, and of the delta floods from 1969 to 2011, 69% came from the uncontrolled catchment, 23% jointly and 8% from Hirakud releases alone (Parhi et al., 2012). In September 2011 Hirakud opened 55 sluice gates and 4 crest gates, and the CAG was reported to have found that the dam's operation did not follow the State Water Policy, the Flood Management Manual or the IMD and CWC forecasts (as reported; the CAG report was not read). Without an agreed rule with dates, levels and a named operator, storage behind a gate cannot be relied on. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July to September monsoon depression or an October or May cyclone. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
Some bandhas still serve irrigation: Baula Bandha in Berhampur was a tank "used for channeling water for irrigation by the Irrigation Department" (NGT, OA 114/2022/EZ), and temple tanks such as Bindusagar are heritage sites, the Sahasralinga tank being covered by draft heritage by-laws of the National Monuments Authority (as reported). Drawing such a tank down before a storm has a cost to those who use or keep it, which is why Clause 7.8.2(d) requires the custodian to accept it.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Odisha State Pollution Control Board directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 30 April each year (Chapter 10).
Commentary. The CAG found that the Municipal Corporations had not followed the NDMA guidelines on pre-monsoon desilting, any more than on a GIS inventory or a master plan, and BMC's drainage wing cited a "shortage of manpower" (CAG, Report No. 8 of 2024, para 3.1.1). The H&UD Department's urban-flooding SOP for the 2026 monsoon made desilting compulsory and called for the verification of every drain and manhole, but set no completion date (as reported). The NGT's order in the Baula Bandha case directed that solid and liquid waste and drains be kept out of the restored tank "by providing appropriate drainage system away from the Baula Bandha", with six-monthly water sampling by the Odisha State Pollution Control Board (NGT, OA 114/2022/EZ). No published deadline for desilting by any Odisha ULB was found. The 30 April deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Odisha precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. Bhubaneswar's ten natural drains in the CDP, 62.602 km long and 4.9 to 14.83 m wide, belong to BMC; eight of them outfall to the Gangua nala, Drain II to the Mancheswar railway bridge and Drain VIII to Pokhariput, and only 11 km of them had been widened by 2015 (CAG, Appendix III). BMC surveyed 11.888 acres of private land to restore the CDP widths of nine nallahs, but none had been acquired by September 2022. The Gangua, 31 km long, is managed by the DoWR's Khordha Drainage Division and joins the Daya near Kanti; a technical team recommended in February 2015 that its bed be widened from 18 m to 21 m, utility pipes obstruct it at the Palasuni bridge, and a ₹432.75 crore proposal for its improvement, with four bridges and 52.85 acres of land, had been pending with the Government for more than three years in November 2022. The Daya West Canal, 34.86 km long and 16.10 km of it within BMC, is encroached by 1,195 houses (CAG, paras 3.2.8.1 and 5.2.3.1). In Cuttack, the capital embankment cut the Petta nala off from the Mahanadi, and it now outfalls to the Kathajodi through six vented sluices. Across the five Municipal Corporations, 120.249 km (63.83%) of the 193.324 km of natural drains had seen no development work in 2017–22, and satellite images showed the Petta (Cuttack) and Dhobijore (Sambalpur) nallahs narrowed by encroachment (CAG, paras 3.1.4 and 3.1.4.1). The CAG recommended that the Corporations maintain the "prescribed length and width of natural drains". Rule 25(i) of the OTPIT Rules bars building in the natural waterways and drains shown in the Master Plan and drainage plan, and the Orissa Irrigation Act, 1959 lets the State order the removal of an obstruction of a drainage work in a notified area (section 7, as reported), but none of these keeps a drain at its recorded width once it has been narrowed, which is the failure Clause 7.10.3 is written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored pokhari or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Odisha the nearest existing forms of shared storage are the detention and retention ponds that the OTPIT Rules ask developers to show on the landscape plan of a layout (as read; the ODA Rules are understood to be similar [TBC]), the CAG's recommendation that storm drains be linked to water bodies (none of the five Corporations had done so), CMC's identification of 17 water bodies for linking to its drains, and the NGT's direction to create a replacement water body of Ac. 2.421 for the encroached part of Baula Bandha (CAG, Report No. 8 of 2024; NGT, OA 114/2022/EZ). None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Odisha State Wetland Authority;
- (b) the Ramsar sites of Odisha: Chilika Lake (listed as Chilka Lake, designated on 1 October 1981, 116,500 ha), Bhitarkanika Mangroves (19 August 2002, 65,000 ha), and Satkosia Gorge (98,197 ha), Hirakud Reservoir (65,400 ha), Tampara Lake (300 ha) and Ansupa Lake (231 ha), all designated on 12 October 2021;
- (c) Chilika lagoon, with its mouths to the sea and the lower reaches of the rivers that enter it;
- (d) the tidal creeks, rivers, mudflats and mangroves of Bhitarkanika, of the Mahanadi, Brahmani–Baitarani and Budhabalanga deltas and estuaries, and of the rest of the coast of the seven coastal districts;
- (e) the lakes, marshes and water-logged land of the Water Bodies Use Zone of a Master Plan; and
- (f) any other marsh, wetland or creek that the Authority notifies, that the wetland authority lists, or that a court or the National Green Tribunal directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Odisha has six Ramsar sites: Chilika Lake (116,500 ha, designated on 1 October 1981), Bhitarkanika Mangroves (65,000 ha, 19 August 2002), and four designated on 12 October 2021: Satkosia Gorge (98,197 ha), Hirakud Reservoir (65,400 ha), Tampara Lake (300 ha) and Ansupa Lake (231 ha) (MoEF&CC, 2024). Chilika was the first Ramsar site of India; its water-spread varies from about 1,165 km² in the monsoon to 900 km² in summer, and it supports more than 0.15 million fisherfolk. The Chilika Development Authority was created in 1991 under the Forest, Environment and Climate Change Department; its objectives include the "control of silt load in to the lagoon through catchments management" and the "preservation and management of other wetlands of the State", and its Governing Body, chaired by the Chief Minister, includes the Secretary of the Department of Water Resources and the Collectors of Puri, Khurda and Ganjam (Chilika Development Authority). Chilika is also the end of Bhubaneswar's drainage: the Gangua nala carries the city's flow to the Daya, which flows into the lagoon (CAG). In its suo motu case on Chilika and Bhitarkanika, the Orissa High Court recorded in June 2022 that 59 illegal prawn gherries inside the High Tide Line had been identified in Kendrapara district by superimposing satellite images on cadastral maps and 26 demolished, directed the Chilika Development Authority to help the Collectors of Puri, Ganjam, Kendrapara and Khurda identify the High Tide Line and mark it with concrete pillars in the water, and directed the Odisha State Pollution Control Board to test the water of Chilika and the Bhitarkanika lagoons (W.P.(C) 7469/2017, order of 30 June 2022). A State Wetland Authority under the Wetlands (Conservation and Management) Rules, 2017 was reported to have begun demarcating about 13,000 wetlands (as reported). On the coast, erosion has driven the resettlement of 571 families from Satabhaya in Kendrapara and of the village of Podampeta in Ganjam (as reported). A drain outfall, nala widening, sluice or pumping station in a mangrove belt, on a tidal creek or on the shore of Chilika therefore needs CRZ clearance under the approved CZMP as well as compliance with this chapter, and any work within a Ramsar site or notified wetland is subject to the restrictions of the Wetlands (Conservation and Management) Rules, 2017. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. In Odisha the law already requires a separate system, but sewage still reaches the nalas, the rivers and Chilika. Section 307 of the Odisha Municipal Corporation Act, 2003 provides that "there shall be one drain for sullage and polluted water and another distinct drain for rainwater" (as quoted by the CAG), and IRC:SP:50-2013 bars sewage from storm drains. In practice, BMC's drains discharge sewage and sullage into the Daya West Canal at 11 points, and the Gangua nala carries "household waste water/industrial effluent of Bhubaneswar city, through 10 natural drains" to the Daya and Chilika, with a BOD of 6.1 to 10.1 mg/l, dissolved oxygen of 0.8 to 3.1 mg/l and faecal coliforms of 1.0 to 1.4 lakh MPN/100 ml. In the CDA area of Cuttack, 83 of 1,294 sewer manholes were found "directly connected to drainage manholes", and only 10,495 of 35,000 targeted houses had sewer connections by March 2022 (CAG, Report No. 8 of 2024, paras 3.2.8.1 and 5.2.3). Of Bhubaneswar's six sewerage districts, four were run by WATCO, one by OWSSB, and one had not been started in April 2022 (Orissa High Court, W.P.(C) 2746/2016). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Odisha they apply in full to every new outfall, and every existing outfall to the Gangua, the Daya West Canal, the Petta nala, the Kathajodi, the Mahanadi, a pokhari or Chilika that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sewer connections are complete. No combined-sewer provision is needed in Odisha, because section 307 already requires the separate drain that Clause 8.9.1 assumes.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Odisha's main controls on filling and building in waterbodies are the land records, the eviction Acts and the orders of the Orissa High Court and the National Green Tribunal. A case at Berhampur shows how they are used. Plots "recorded as Jalasaya-ii" at Kalapuri mouza, Ac. 5.809 in all, made up Baula Bandha, a tank once used for irrigation; the Collector accepted that Ac. 2.421 had been encroached, and 82 cases were pending under the Orissa Public Premises (Eviction of Unauthorized Occupants) Act, 1972. Relying on Hinch Lal Tiwari v. Kamala Devi (2001) 6 SCC 496, the Tribunal directed the State to create a water body of Ac. 2.421 at or near Baula Bandha, to keep waste and drains out of it, and to report compliance by 31 December 2023 (NGT, OA 114/2022/EZ, judgment of 22 March 2023). In Bhubaneswar, the Tribunal called for a report on the alleged encroachment of Nayapali Haza and of natural drain No. 10 (Srikanta Kumar Pakal v. State of Odisha, order of 9 September 2022, as reported). The CAG recorded the encroachment surveys of 2017–22: BMC identified 283 encroachments and cleared 225, BDA identified 487 and cleared 120, the Berhampur and Rourkela development authorities identified 6 and 55 and cleared none, and CDA and the Sambalpur authority made no survey (CAG, Report No. 8 of 2024, para 3.2.8.1); it cites section 407 of the Odisha Municipal Corporation Act, 2003 for the removal of encroachments over roads and drains. The Odisha Prevention of Land Encroachment Act, 1972 also applies to Government land; whether it or the Orissa Government Land Settlement Act, 1962 bars the settlement of Jalasaya land was not established. The counts of encroached water bodies are in the Commentary to Clause 7.1. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 30 April) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The banks of most pokharis and the bunds of most bandhas are low and are not expected to make them specified dams, but each shall be screened under Clause 7.14.1. The river embankments of the DoWR in the Mahanadi, Brahmani and Baitarani deltas, and the ring embankments of Cuttack, are flood embankments, which the Act excludes. The Hirakud and Rengali dams enter this Manual only as sources of inflow and tailwater (Chapter 5). Where the storage of a pokhari, bandha or other pond is counted under Clause 7.7, its bank or bund is a tank bund for Clause 7.14.2. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. Dam releases and embankment failures have flooded Odisha's deltas. In September 2011 Hirakud opened 55 sluice gates and 4 crest gates on 9 September, and about 13.66 lakh cusec (about 38,700 m³/s) was reported passing Mundali (as reported). The largest delta flood of recent decades, 44,775 m³/s at Mundali in September 2008, came almost entirely from the uncontrolled catchment below Hirakud (Parhi et al., 2012), so dam operation alone does not bound the flood. In the super cyclone of October 1999, 400 to 955 mm of rain in four days caused 20,005 breaches in flood embankments (Kalsi, 2006). No release protocol for Hirakud or Rengali, and no emergency action plan for an embankment, was read for this Manual. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Housing and Urban Development Department, Government of Odisha. Odisha Town Planning and Improvement Trust (Planning and Building Standards) Rules, 2021, S.R.O. No. 374/2021, notification of 26 October 2021, Odisha Gazette Extraordinary No. 1747 of 27 October 2021 (definitions, land-use zones, rules 25, 38, 52 and the layout plan requirements; read from a third-party copy of the Gazette): https://nackuchinda.in/wp-content/uploads/2024/12/OTPIT-Planning-Building-Standard-rules-2021.pdf
- Housing and Urban Development Department, Government of Odisha. Odisha Development Authorities (Planning and Building Standards) Rules, 2020, S.R.O. No. 180/2020, with amendments to 2025 (listed at https://urban.odisha.gov.in/Notifications/rules ; the text could not be reached and was not read).
- Comptroller and Auditor General of India (2024). Report No. 8 of 2024, Government of Odisha: Performance Audit on Storm Water Drainage and Sewerage Management Systems in Municipal Corporations for the year ended March 2022 (tabled 7 December 2024), paras 1.7, 3.1, 3.2, 5.2.3, Table 3.1 and Appendix III. https://d1jmc0u14z2tmp.cloudfront.net/uploads/download_audit_report/2024/English_PA_SWD-&-SMS-06754649d967c42.35261715.pdf
- National Green Tribunal (Eastern Zone). OA 114/2022/EZ, Sirin Tammana v. State of Odisha (Baula Bandha, Berhampur), judgment of 22 March 2023. https://www.greentribunal.gov.in/sites/default/files/news_updates/1752557493.pdf ; Srikanta Kumar Pakal v. State of Odisha, order of 9 September 2022 (as reported by the India Environment Portal); filings in OA 17/2023/EZ (Jalasaya and the Orissa Irrigation Act, as reported).
- Orissa High Court. Tapan Kumar Das v. Commissioner, Cuttack Municipal Corporation, 2012 (II) OLR 1040, judgment of 11 October 2012 (as reported: https://vlex.in/vid/1-tapan-kumar-das-546068810 ); W.P.(C) No. 7469 of 2017, Registrar (Judicial), Orissa High Court v. Union of India, order No. 69 of 30 June 2022, https://www.orissahighcourt.nic.in/uploads/pil_orders/WPC_7469_2017_2022_06_30.pdf ; W.P.(C) No. 2746 of 2016, order No. 22 of 8 April 2022, https://www.orissahighcourt.nic.in/uploads/pil_orders/WPC_2746_2016_2022_04_08.pdf
- Government of Odisha. The Orissa Public Premises (Eviction of Unauthorized Occupants) Act, 1972; the Odisha Prevention of Land Encroachment Act, 1972 (https://www.lbsnaa.gov.in/storage/uploads/pdf_data/1742472625_The%20Odisha%20Prevention%20of%20Land%20Encroachment%20Act,%201972.pdf , not read); the Orissa Irrigation Act, 1959, sections 7, 8 and 39–42 (read only through database extracts); the Odisha Municipal Corporation Act, 2003, sections 24, 307 and 407 (as quoted by the CAG; the Act was not read).
- Supreme Court of India. Hinch Lal Tiwari v. Kamala Devi (2001) 6 SCC 496 (as quoted by the National Green Tribunal).
- Ministry of Environment, Forest and Climate Change. Reply affidavit in NGT (WZ) OA 106/2022, Vanashakti v. Union of India (status of the Coastal Zone Management Plans; Odisha CZMP approved on 1 June 2021). https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20by%20R-1%20in%20OA%20No.106-2022%20(page%20nos.1026-1248).pdf
- MoEF&CC (2024). Ramsar sites of India (as on 24 January 2024). https://moef.gov.in/uploads/2024/03/80-Ramsar-sites-of-India-31-01-2024.pdf
- Chilika Development Authority. About the Authority and its Governing Body; Chilika at a glance. https://www.chilika.com/chilika-dev-authority.php ; https://www.chilika.com/chilika-at-a-glance.php
- National Disaster Management Authority (2010). National Disaster Management Guidelines: Management of Urban Flooding (para 6.6.2(ii)), as cited by the CAG.
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Japan International Cooperation Agency (2007). Ex-ante evaluation, Orissa Integrated Sanitation Improvement Project (loan agreement of 30 March 2007). https://www2.jica.go.jp/en/evaluation/pdf/2006_ID-P187_1_f.pdf
- Parhi, P. K., Mishra, S. K., Singh, R., Tripathi, V. K. (2012). Floods in Mahanadi River Basin, Orissa (India): a critical review. India Water Week 2012. https://indiawaterweek.thewaternetwork.com/storage2/cI8LFxgpNKMwcmGI5Ej5kuLiamRdhQP1lTu2gLbxRFSWxoCN1IK1Jdj7APer_-bZxxf_Sy5RMEg7qp-1cNsOfT1qlhtvDmRGCXvS0VUfSWE
- Kalsi, S. R. (2006). Orissa super cyclone – A synopsis. MAUSAM 57(1), 1–20. https://mausamjournal.imd.gov.in/index.php/MAUSAM/article/download/449/450/1763 ; IMD. Extremes of Temperature and Rainfall for Indian Stations (up to 2012). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- Reports of Bhubaneswar's drainage and tanks (secondary): Ommcom News on the IIT Roorkee drainage master plan (22 August 2025), https://ommcomnews.com/odisha-news/bhubaneswar-gears-up-for-2050-with-new-drainage-master-plan/ ; OdishaTV on the August 2023 rainfall record, https://odishatv.in/news/odisha/bhubaneswar-breaks-24-year-old-record-receives-259mm-rainfall-in-24-hrs-211067 ; Prothi Khanna (2019), US/ICOMOS proceedings paper on the Ekamra Kshetra and Bindusagar, https://openarchive.icomos.org/id/eprint/2297/1/Prothi-Khanna-2019-US-ICOMOS-Proceedings-.pdf ; OdishaBytes on the Bindusagar renovation (2021) and on the demarcation of 13,000 wetlands, https://odishabytes.com/odisha-govt-launches-process-for-demarcation-of-13000-wetlands/amp/ ; OrissaPOST on the BDA regulations, https://www.orissapost.com/state-govt-to-clip-wings-of-real-estate-developers ; OrissaPOST on Cyclone Fani damage, https://www.orissapost.com/cyclonic-storm-fani-housing-and-urban-department-estimates-rs-524-cr-infrastructure-damage/
- Reports of Cuttack's drainage, the Mahanadi and the coast (secondary): The Telegraph on Cyclone Titli in Cuttack, https://obeta.ttef.in/odisha/flooded-pumps-lie-choked/cid/1671699 ; Ommcom News on the Cuttack drainage master plan (September 2025), https://ommcomnews.com/odisha-news/rs-4-cr-released-for-cuttack-drainage-master-plan-dprs-submitted/ ; OdishaBytes on the 2011 Hirakud releases, https://odishabytes.com/2011-odisha-flood-what-happened-then-why-cag-pulled-up-hirakud-officials ; Down To Earth on Satabhaya, https://www.downtoearth.org.in/amp/story/natural-disasters/going-under-coastal-odisha-under-existential-threat-83499 ; Village Square on Podampeta, https://villagesquare.in/coastal-erosion-turns-podampetta-into-odishas-ghost-village/ ; ThePrint (PTI) on the H&UD urban-flooding SOP (6 May 2026), https://theprint.in/india/odisha-govt-issues-sop-to-combat-urban-flooding-for-coming-monsoon/2923539/
- Praharaj, G. C. (1931–1940). Pūrṇṇachandra Oḍiā Bhāshākosha: a lexicon of the Oriya language. Cuttack: Utkal Sahitya Press; online at Digital South Asia Library, University of Chicago (accessed 6 November 2026). https://dsal.uchicago.edu/dictionaries/praharaj/
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Odia waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. No Odisha Act for the protection of tanks or water bodies as such was found during research for this Manual. In Tapan Kumar Das v. Commissioner, Cuttack Municipal Corporation (11 October 2012, 2012 (II) OLR 1040) the Orissa High Court directed the State to frame a law to protect water bodies within two years, holding that the "protection of natural water bodies and ponds is akin to honouring the most basic of fundamental rights" (as reported); no such law was found. Ponds and tanks are protected instead through land records, eviction law and the courts. Water-holding land is recorded in the record of rights in the Jalasaya kisam (land class), and a Revenue Department circular transferred water bodies and tanks (Jalasaya) in urban areas to the administrative control of the Urban Local Bodies (as reported; its number and date were not seen). Encroachment on such land is removed under the Orissa Public Premises (Eviction of Unauthorized Occupants) Act, 1972 and the Odisha Prevention of Land Encroachment Act, 1972, and on irrigation tanks and drainage works under the Orissa Irrigation Act, 1959 (sections 7 and 39, as reported); the National Green Tribunal and the High Court apply Hinch Lal Tiwari v. Kamala Devi (2001) 6 SCC 496. In the building rules, rule 25(i) of the OTPIT (Planning and Building Standards) Rules, 2021 bars any building permission "in areas of natural waterways or drains, as detailed in the Master Plan, and drainage plan", the Rules place rivers, canals, streams, ponds, lakes, reservoirs, wetlands, water-logged and marshy land and aquaculture ponds in a Water Bodies Use Zone, and rule 52 lets an Authority make regulations for development near notified wetlands, lakes, reservoirs and low-lying areas "and to encourage sustainable drainage and low impact development"; no regulation made under rule 52 was found. The ODA (Planning and Building Standards) Rules 2020 are understood to carry equivalent provisions [TBC]. The CAG counted 628 water bodies in the five Municipal Corporations in November 2022 (BMC 107, CMC 220, Berhampur 22, Sambalpur 272, Rourkela 7), of which 460 were Government water bodies and only 35 had been developed, and found 18 Government water bodies (1.977 acres) in BMC and CMC disused and encroached by buildings (CAG, Report No. 8 of 2024, Table 3.1). Cuttack was reported in 2012 to have had "more than 1,400 tanks and water bodies" and to be "hardly left with 200" (as reported; the count is not verified). Bhubaneswar's Old Town keeps its temple tanks: Bindusagar, about 450 m by 175 m and aligned with the Lingaraj temple, was taken up for renovation in January 2021 under the Ekamra Kshetra plan, and Sahasralinga, Papanasini Kunda, Godabari, Kotitirtha and Ganga-Jamuna Kunda were named for revival (as reported). On the coast, the Coastal Zone Management Plan (CZMP) under the CRZ Notification, 2019 was approved for all seven coastal districts on 1 June 2021 (MoEF&CC). This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the land-record, eviction, irrigation, planning, wetland and coastal procedures that record and protect waterbodies in law, or the directions of the Orissa High Court and the National Green Tribunal.