Draft v1.0 prepared by NEER. Not adopted by the Government of Himachal Pradesh or any authority or local body, and has no legal force. About this draft

Himachal Pradesh · Draft v1.0

Himachal Pradesh Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Himachal Pradesh Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Himachal Pradesh.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Himachal Pradesh or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Town and Country Planning Department (TCP), the Urban Development Department (UDD), Jal Shakti Vibhag, the Shimla Municipal Corporation (SMC) or any other Municipal Corporation, Nagar Parishad, Nagar Panchayat or other local body, any Special Area Development Authority (SADA), the Baddi Barotiwala Nalagarh Development Authority (BBNDA), the Himachal Pradesh Housing and Urban Development Authority (HIMUDA), or any other agency. Where it names a body, such as the Revenue Department, the Public Works Department (PWD), Shimla Jal Prabandhan Nigam Limited (SJPNL), the Himachal Pradesh State Industrial Development Corporation (HPSIDC), the Himachal Pradesh State Pollution Control Board (HPSPCB), the Himachal Pradesh Council for Science, Technology and Environment (HIMCOSTE), the Himachal Pradesh State Wetlands Authority (HPSWA), the State Centre on Climate Change, the Himachal Pradesh Ground Water Authority, the Himachal Pradesh State Disaster Management Authority (HPSDMA), a Deputy Commissioner or a district administration, a dam operator such as the Bhakra Beas Management Board (BBMB), NTPC, SJVN, NHPC or the Himachal Pradesh State Electricity Board Limited (HPSEBL), a Smart City company, or a body of the Union, such as the Central Water Commission (CWC), the Central Ground Water Board (CGWB), the India Meteorological Department (IMD), the National Highways Authority of India (NHAI) or the Central Pollution Control Board (CPCB), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The Himachal Pradesh Town and Country Planning Act, 1977 and the Himachal Pradesh Town and Country Planning Rules, 2014 as amended, the Interim Development Plans and Development Plans and their regulations, including the Shimla Development Plan, the Himachal Pradesh Ground Water Act, 2005, the Himachal Pradesh Minor Canals Act, 1976, the Municipal Acts, drainage schemes, orders of courts and tribunals and approval conditions in force continue to apply.

Names. Some places, rivers and gauges have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • Himachal Pradesh reached its present extent in 1966, when Kangra, Kullu, Lahaul and Spiti, the Shimla hill areas and the areas of Una and Nalagarh were transferred to it from Punjab, and became a State in 1971. Older records of those areas may be filed under Punjab. The district map has also changed: Kangra district included today's Hamirpur and Una until 1972, and the CWC flood estimation report for zone 7 (1994) still lists a district of Mahasu, whose area is now in Shimla and Kinnaur districts. IMD and CWC sources, and the rainfall data in this Manual, use the districts of their time, and a clause that names a district must be checked against the current list;
  • Shimla is Simla in older sources; Dharamshala is written Dharmsala, Dharmshala or Dharamsala on IMD's stations and in many sources, and IMD's airport station near it, at Gaggal, is Kangra Aero; Keylong is also written Kyelang; Kullu is Kulu, Lahaul Lahul, Sirmaur Sirmur or Sirmour, Nalagarh Nallagarh, Indora Indaura and Renuka Renukaji, and the CWC report prints Renuka's gauge as Rainka. The Sutlej is also the Satluj; the Swan of Una is also the Soan; the Ashwani Khad of Shimla is also the Ashwini Khad; the reservoir of the Bhakra dam on the Sutlej is Gobind Sagar, written Govind Sagar in the High Court's orders; and the reservoir of the Pong dam on the Beas is Pong Dam Lake, its name as a Ramsar site, also called Maharana Pratap Sagar and the Pong reservoir;
  • Rampur in this Manual is Rampur Bushahr, the town on the Sutlej in Shimla district, with a CWC gauge; Una Rampur is the IMD automatic weather station at Rampur in Una district, which recorded 228.5 mm on 9 July 2023, and is a different place. Dharampur is the self-recording raingauge in Solan district on the road below Kasauli, which recorded 100 mm in one hour on 9 August 1985; it is not the town of that name in Mandi district. Barauli is a raingauge of Shimla district, not of the town; and Samej, where a flash flood came down the Samej Khad on 31 July 2024, lies near Rampur. This Manual names the station each figure comes from;
  • CWC's zone 7 ("Western Himalayas", report No. WH/22/1994) is the hydrometeorological region of the CWC flood estimation reports that covers the whole State. Its boundary with subzone 1(e) ("Upper Indo-Ganga Plains", 1984) runs along the Siwalik front just outside the State: Una, Nalagarh, Baddi, Parwanoo, Nahan and Paonta Sahib all lie on the zone 7 side, about 5–15 km inside it, and no town of the State is in 1(e). Three of the six gauged catchments on which the zone 7 report rests drain the State: the Neogal Khad and the Banu Khad in Kangra, and the Chakki Khad, which drains the Kangra and Chamba hills and is gauged at Pathankot in Punjab; the Sewa catchment, another of the six, is in Jammu & Kashmir. Zone 7 is not one of the three rainfall zones (HP-Z1 to HP-Z3) and five hydrologic sub-areas (HP-A, HP-B, HP-B1, HP-B2 and HP-C) that this Manual sets in Annex 2A, nor Zones 1 and 2 of a waterbody setback in Chapter 7, nor the sinking and sliding zones of the development plans;
  • where a shared clause names the State's main city or its municipal corporation, this Manual names Shimla, the State capital, and the Shimla Municipal Corporation (SMC), written MC Shimla in many sources. The State has no metropolitan development authority: the Shimla Planning Area, and every other planning area, is planned by TCP. SADAs are Special Area Development Authorities under the Town and Country Planning Act; BBNDA is the Baddi Barotiwala Nalagarh Development Authority for the industrial belt of Solan district; and HIMUDA builds and approves housing colonies;
  • the State has five belts, broadly from south-west to north-east. The Siwalik foothills and outer valleys, low hills of sandstone, shale and conglomerate, with the valleys of Una (the Swan), Nalagarh (the Sirsa) and Paonta–Kala Amb, whose deep fills of boulder, gravel and sand are the State's main aquifers and recharge zones; the mid-hills of the Lesser Himalaya, of schist, phyllite and slate under a thick debris cover, on which Shimla, Solan, Mandi and Chamba are built, with the Balh valley near Mandi, a flat valley of alluvium where the water table lies within 0.3–7 m of the ground; the Dhauladhar front above Dharamshala, Kangra and Palampur, the wettest part of the State, where the monsoon meets the first high range; the Kullu–Manali inner valley of the Beas; and the high and trans-Himalaya of Kinnaur, Lahaul and Spiti, of crystalline rock, moraine and alpine soils, fed by snow and glaciers. The names describe regions, not administrative units, except where a district bears the same name;
  • the hills have their own names for water, from the Pahari dialects and Hindi. A tal (ताल) is a pond, lake or tank, and this Manual uses it as its general term for lakes and ponds; the word also means rhythm. A khad (खड्ड) is a seasonal hill torrent or ravine stream, written khud in the TCP Rules; in Hindi dictionaries the word means a pit or hollow, and the stream sense is recorded only in the Pahari dictionary, so this Manual always glosses it. A nallah (नाला; also nala, written nullah in the TCP Rules) is a natural drainage channel or a large storm drain, and a nali (नाली) a small street drain; in the Pahari dictionary nala can also mean a spring or a waterfall. A kuhl (कूहल; also kuhal) is a gravity irrigation channel led along the contour from a khad, especially in Kangra, and kuhls are "canals" under the Minor Canals Act. A baoli (बावड़ी; also bauri, bawdi and bawri, as in Shiv Bawri at Shimla) is in the hills a small stone-built tank fed by a spring, not the stepwell of the plains; a naun (नौण) is a spring-fed stone tank or water source; and a panihar (पनिहार) is the water place of a village, though in Hindi the word means a water carrier. A dhar (धार) is a ridge or crest, though Hindi readers take it as a stream; a chashma (चश्मा) is a spring; a choe is a seasonal torrent of the Siwalik, as the streams south of Pong are locally called; and a gharat (घराट) is a water mill on a khad. The TCP Rules' forms ask a site plan to show "Existing water bodies like Bauri, Well, Nallah, khud"; and
  • many levels and flows in the sources are not in metric or not on a stated datum. BBMB publishes the levels of its reservoirs in feet (1 ft = 0.3048 m): the full reservoir level of Pong is 1,390 ft (about 423.67 m), and its maximum level is given as 1,400 ft, 1,410 ft and 1,421 ft in different sources; that of Bhakra is 1,680 ft (about 512.06 m). Flows at dams are given in cusecs (cubic feet a second; 1 cusec = 0.0283 m³/s), often in lakh (100,000): the inflow to Pong on 14 August 2023 was reported as 7.3 lakh cusecs (about 20,670 m³/s) and as 5.13 lakh cusecs. CWC's levels for its sites in the State were read only in transcriptions by SANDRP, which give two highest flood levels for the Sutlej at Pandoa, 740.6 m (2005) and 689.6 m (2022), and say the first is incorrect. No source read states the datum of these levels, and they are quoted as reported [TBC].

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:

  • the Himachal Pradesh Town and Country Planning Act, 1977 is the State's planning law, and the Himachal Pradesh Town and Country Planning Rules, 2014 (the TCP Rules 2014), made under it, are its building rules. The Rules were read in TCP's consolidation to 2022, which includes the amendments of 2016 to 2022, and in the live text of Appendix-1 as it stood in June 2025; the later amendments, including a Twelfth Amendment (2024) and a draft Sixteenth Amendment (2025) published for objections, are known only from the press and were not read [TBC]. Appendix-1 of the Rules is the general regulation only for areas where land use is frozen and no Interim Development Plan or Development Plan has been prepared; in a planning area with such a plan, the plan's own regulations govern. Shimla was planned for 44 years under an Interim Development Plan of 1979; its Development Plan was published on 20 June 2023, the date the Supreme Court gives, and reported as notified on 23 June 2023, and its text was read only as the Supreme Court quotes it [TBC]. The Act operates in the 54 urban local bodies and about 102 other notified areas, covering 21.70% of the State's people but less than 10% of its area, as the post-disaster needs assessment of 2023 records; outside them, building in villages was to follow model bye-laws for rural construction that the Cabinet approved in September 2025, as reported, whose text was not found;
  • a Municipal Corporation is constituted under the Himachal Pradesh Municipal Corporation Act, 1994, and a Nagar Parishad (Municipal Council) or Nagar Panchayat under the Himachal Pradesh Municipal Act, 1994. Their chapters on drains were not read for this Manual [TBC]. All three are urban local bodies (ULBs) under UDD. The CAG counted 54 ULBs in March 2020; the Municipal Corporations are taken to include Shimla, Dharamshala, Mandi, Solan and Palampur, and the current list was not confirmed [TBC]. In the sources "MC" stands for a Municipal Corporation (MC Shimla) and also for a Municipal Council (MC Parwanoo); this Manual writes the names in full;
  • Jal Shakti Vibhag, formerly the Irrigation and Public Health (IPH) Department, renamed in the Ground Water Act by an amendment of 2022, supplies water, runs the sewers and treatment plants of the towns other than Shimla and Solan, builds flood protection and the channelisation of rivers, such as that of the Swan in Una, and is named in this Manual as the State groundwater agency, under the Ground Water Act, 2005. SJPNL supplies water to Shimla and runs its sewers; the CAG found in 2022 that SMC has "limited control" over it. The PWD keeps the State's roads and their roadside and hill-road drains and culverts, and NHAI the national highways, whose four-laning has dumped muck into khads, as the High Court has recorded. HPSIDC plans the State's industrial areas;
  • HPSDMA is the State's disaster management authority, and published the reports of the technical committees on the events of 2023. HIMCOSTE coordinated the State technical committee on the landslides of Shimla in 2023, and is the secretariat of HPSWA, the State Wetlands Authority, constituted by notification of 7 November 2017; the State Centre on Climate Change keeps the inventories of glacial lakes and landslides. No wetland notified under Rule 4 of the Wetlands (Conservation and Management) Rules, 2017 was found;
  • BBMB operates the Bhakra dam on the Sutlej, the Pong dam on the Beas and the Pandoh dam, which diverts the Beas to the Sutlej. Other dams are operated by NTPC (Kol, on the Sutlej), SJVN (Nathpa Jhakri), NHPC (Chamera on the Ravi; Parbati), HPSEBL (Larji, on the Beas) and private companies (Karcham Wangtoo); the needs assessment of 2023 counts 135 dams in the State;
  • the Himachal Pradesh Minor Canals Act, 1976 makes the kuhls of the Government and the larger private kuhls statutory canals, and lets the Government regulate the flow in any "line of natural drainage" and remove obstructions; it is the only law of the State found that names lines of natural drainage;
  • the National Green Tribunal (NGT) gave 29 directions for Shimla on 16 November 2017, including a slope limit and a direction that runoff from concretised areas be kept from the overburden and the slopes; the Supreme Court set all of them aside on 11 January 2024. This Manual cites them, and the findings of the NGT's Expert Committee, as expert guidance only, never as binding; and
  • a tehsil is the revenue subdivision of a district, under a Tahsildar. A district is headed by a Deputy Commissioner (DC), who is also the Collector.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
  • SMC is the Shimla Municipal Corporation. DC is the Deputy Commissioner; DP is a Development Plan and IDP an Interim Development Plan under the Town and Country Planning Act; disaster management is written in full;
  • TCP is the Town and Country Planning Department; its Act and Rules are written "the Town and Country Planning Act" and "the TCP Rules 2014";
  • HFL is the highest flood level recorded at a gauge, as CWC uses it. It is not a design level, and sources sometimes give different values for the same gauge. The TCP Rules use the same words for the line from which a development plan measures distances along rivers, khads and nallahs. WL and DL are CWC's warning and danger levels, which only one site in the State, the Yamuna at Paonta, has;
  • FRL (full reservoir level) and MWL (maximum water level) are used for reservoirs, and BBMB gives them in feet; and
  • SWD is a storm water drain.

The sense is clear from the context. Hindi and Pahari terms used in the text, such as tal, khad, nallah, nali, kuhl, baoli, naun, panihar, dhar, chashma, choe and gharat, are explained where they first appear.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Himachal Pradesh's towns flood, and fail, for three reasons. The monsoon of 2023 showed the first, when more than 500 people died, over 5,400 landslides were recorded and the State's recovery needs were put at about ₹9,043 crore; Shimla showed the second on 14 August 2023, when a slope of saturated debris slid about 230 m from Summer Hill onto the Shiv Bawri temple, and the State's technical committee named open drainage among its causes; and the khads of Shimla showed the third in January 2016, when sewage reached the Ashwani Khad, from which the town drew water, and an outbreak of hepatitis E followed.

  1. Monsoon bursts and western disturbances on steep, debris-covered slopes, where drains fail by debris and blockage before they fail by capacity. The monsoon reaches the State after crossing the plains, and where its currents meet a western disturbance over the first ranges the rain is among the heaviest in north India. From 7 to 11 July 2023 such a meeting brought the State 223 mm in four days, 436% above normal, as reported; Una's automatic weather station recorded 228.5 mm on 9 July, Pachhad 220.3 mm on 10 July and Nahan 250.0 mm on 11 July; and on 14 August Kangra Aero recorded 273.4 mm and Dharmsala 250.2 mm. The post-disaster needs assessment (PDNA) of 2023 counts more than 500 deaths, over 5,400 landslides, 45 cloudbursts and 83 flash floods (HPSDMA's count, through IMD, is 52 cloudbursts), damage and losses of ₹8,304.21 crore and recovery needs of ₹8,667.66 crore, with ₹375 crore more for disaster risk reduction; over 8,040 km of road, 21% of the State's road length, were damaged, and the State's recovery plan rebuilds box culverts only after a "Drainage Analysis". The records exceed the national maps: Dharamshala recorded 600 mm in a day on 18 July 1967, where the CWC map for zone 7 gives a 50-year day of about 320–400 mm; and short bursts are severe: Dharampur in Solan district recorded 100 mm in one hour on 9 August 1985. On slopes of 45–60° a street drain fills in minutes, and it fills with stones, gravel, felled wood and road spoil as well as water: in 2023 the streams at Thunag were choked with wood and road debris, and the Malana II reservoir was "filled with debris and silts causing its overspill", as reported. The worst floods of recent years were not measured at all: no raingauge recorded the storms that sent flash floods down the Samej Khad on 31 July 2024, killing 56 people, as reported, or through Seraj and Thunag in Mandi district on 30 June and 1 July 2025, and the State's counts of cloudbursts are counts of damage, not of rain. Like the Parechu lake burst that raised the Sutlej by 12–15 m on 26 June 2005, such events set where towns may build, not how their drains are sized.
  2. Towns on slopes where water put into the ground moves the ground. About 90% of Shimla is built on slopes of 45–60°, on schist, phyllite and slate under a debris cover up to 10–12 m thick, as the NGT's Expert Committee found in 2017; the development plans name sinking and sliding zones, and that committee named two in Shimla, around Lakkar Bazar and down to Dhobighat, and around Ladakhi Mohalla and Krishna Nagar. After a wet spell from April to August 2023 the slopes failed: the State technical committee led by HIMCOSTE found that the Summer Hill slide followed "the weak plane of the depression which seems to be old buried channel of a dry stream", and named among seven causes "Deposition of thick debris cover on the fragile slopes", "Open Drainage systems leading to poor disposal of surface water" and structural depressions that act as "conduits for the infiltration of subsurface water"; at Navbahar Chowk, it found, "Input of rainwater from the road also accelerated the process". The TCP Rules require a geologist's report before building in a sinking or sliding zone, and their rainwater rule asks for storage, not recharge; the draft Ground Water Rules of 2006 exempt the sinking zones from rainwater harvesting directions where the structures "would be detrimental to the safety of the building structures". But no rule restricts soak pits or recharge on slopes: the site plan must show a soak pit, and a new sub-division must keep 5% of its area for soak pits. The plains habit of recharging everywhere must therefore be reversed on the slopes. It holds in the Siwalik valleys, whose fills transmit 150–2,600 m² a day at Una and 211–3,336 m² a day at Paonta–Kala Amb and whose water tables lie as deep as 43.20 m: these are the State's recharge zones, and the State's most used aquifers, Una at 63.72% of its extractable groundwater and Solan (Nalagarh) at 57.89% in 2024, though all ten assessed valley units are safe. It does not hold in the Balh valley, where the water table is within 0.3–7 m of the ground. The hills' springs, about 500 of them inventoried in a standard format, feed many of their water supplies; Palampur pays a forest committee to protect the recharge area of the Bohal spring that supplies the town.
  3. Khads and rivers narrowed by building, muck and channelisation, laden with sewage, without a floodplain law, a gauge or a design storm. The PDNA found that "most of the destruction that occurred along the Beas river in Kullu district was mainly due to overflow of the water along the palaeo channels following the old river course along which the developmental activities have taken place", and that "The lack of well-defined river boundaries in floodplains is a prominent issue in Himachal Pradesh"; it warned that channelisation by concrete "is not advisable in Himalayan Ecology", and the State told the NGT in 2024 that it had recommended dropping the channelisation of river stretches. The muck of the Kiratpur–Nerchowk four-lane highway was dumped into Gobind Sagar and the khads that feed it, and the High Court ordered penal action and clearance on 31 May 2024. In Shimla the khads are storm drains, sewers and water sources at once: the hepatitis E outbreak that began in January 2016 was traced to the Ashwani Khad, whose water was "contaminated with sewage effluent from Malyana and Dhalli STP", and the intake was shut; case counts differ between the medical study and the press. In 2022 CPCB put four stretches of the State in Priority I of its list of polluted river stretches: the Ashwani Khad, the Bald along Baddi, the Sirsa along Nalagarh and the Sukhna along Parwanoo. In August 2025 Shimla's three treatment plants used 18.1 MLD of their installed 35.88 MLD, and 50.8 km of its sewers were still to be connected, by 2039. The State has no floodplain zoning law; only one CWC site in the State, the Yamuna at Paonta, has a warning and danger level, and the Beas at Manali, Kullu, Mandi and Pandoh, the Sutlej at Bilaspur and the Ravi at Chamba have no CWC site at all. Of the drains themselves, no State or municipal standard states a design storm, and the NGT's Expert Committee found in 2017 that Shimla's drains covered 30% of the city and were "not able to carry the peak flow".

Behind all three lie the State's reservoirs, lakes, springs and kuhls, which set the level at the outfall. Gobind Sagar, behind the Bhakra dam (full reservoir level 1,680 ft, about 512.06 m), reaches Bilaspur, and Pong Dam Lake (1,390 ft, about 423.67 m) the towns of Dehra and Indora; in 2023 Pong rose to 1,399.65 ft by 15 August and in 2025 to 1,394.71 ft, as reported, and the Pandoh and Larji dams govern the Beas below Kullu, where 14 students died during a release from Larji in 2014. The reservoirs fill with sediment: the storage of Bhakra fell from 9,868 to 7,769 million m³ between 1958 and 2012, as reported, and the Nathpa Jhakri plant stops when the Sutlej carries too much silt. Above them, the State Centre on Climate Change counted 562 glacial lakes in the Sutlej basin, 242 in the Chenab, 93 in the Beas and 37 or 38 in the Ravi in 2019. Pong Dam Lake (15,662 ha), Chandertal (49 ha) and Renuka (20 ha) are Ramsar sites, and Rewalsar, where leaking sewage drains around the lake cause eutrophication, and Khajjiar are wetlands of national importance, but no wetland in the State has been notified under the Wetlands Rules, and no statute protects a baoli, a naun or a spring. The kuhls of Kangra and the other valleys carry runoff as well as irrigation water, and the Minor Canals Act makes it an offence to obstruct or foul them.

Design for Himachal Pradesh therefore has to cover a monsoon that reaches the State about 25 June and withdraws about 25 September under IMD's new normals, but whose withdrawal came later than normal in eight of the nine years from 2018 to 2026, as late as 11 October in 2019; western disturbances that bring storms after it has gone, such as those of 4 October 1955 (285 mm at Batheri), 10–12 October 1956 (268 mm at Nichar and 246 mm at Renuka) and 5–7 October 2025; and winter snow above about 1,500 m. The State's normal rainfall for June to September is 734.4 mm, but the gauges range from an annual normal of 3,099 mm at Dharamshala, on the Dhauladhar front, to 984 mm at Kullu and 622 mm at Keylong in the rain shadow. Underground, the State draws about a third of its extractable groundwater (35.48% in 2024), and all its ten assessed valley units are safe, but seven of its twelve districts, Kullu, Shimla, Bilaspur, Hamirpur, Chamba, Kinnaur and Lahaul and Spiti, have no assessed unit at all.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site, in the ground where the ground can take it and in tanks where a slope cannot;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the receiving nallah, khad, river, tal or reservoir is high, when a dam upstream is releasing, or when a drain is choked with debris.

The Manual also sets how public drains, hill roads and their drains, nallahs, khads, rivers, tals, reservoirs, springs and kuhls, outfalls and basin-wide master plans are designed, and how drains in steep catchments are protected against debris and sediment, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Himachal Pradesh's south-west monsoon from late June to late September, with its storms against the Dhauladhar and the outer ranges, its western disturbances and its storms in October; to the Sutlej under the Karcham Wangtoo, Nathpa Jhakri, Kol and Bhakra dams; to the Beas under the Larji, Pandoh and Pong dams; to the Ravi under the Chamera dams; to the Chandra and the Bhaga in Lahaul; to the Yamuna at Paonta with the Giri, the Pabbar and the Bata; to the Swan, the Sirsa and the Markanda of the Siwalik valleys; to the khads and nallahs of the hill towns; to the boulder fills of the Siwalik valleys, the alluvium of the Balh valley, the schist, phyllite and slate with their debris cover in the mid-hills, and the moraine and alpine soils of the high valleys; to the tals, Ramsar sites, baolis, nauns and kuhls; and to towns whose roads and stepped houses lie across the natural lines of drainage on the slopes.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes, including IRC:SP:42-2014 on hill roads, and the NDMA urban flood guidelines are also used. The drainage chapter of the IRC's hill road manual, IRC:SP:48, was not read for this Manual.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The CWC Flood Estimation Report for zone 7, Western Himalayas (1994), as the interim source for the whole State. It rests on only six gauged catchments, of which three drain the State and its worked example is the Banu Khad in Kangra; it warns against using its relations without checking them, and does not apply them to snow-fed catchments, which this Manual leaves to site-specific study with a screening for glacial lake outbursts, landslide lakes and debris flows. Its ratio of the 1-hour to the 24-hour rain, 0.425, fits the bursts recorded at Dharampur and Nahan and is used in the Siwalik foothills, the mid-hills and the Kullu–Manali valley; but on the Dhauladhar front it gives about twice the largest hour recorded at Dharamshala, 73 mm, so there this Manual sets a lower ratio, not below 0.34; and at Shimla, which lies in a relative low on the maps, it keeps the map's day but sets the hour no lower than Shimla's own recorded hour of 50 mm, scaled to the design frequency. It checks the design day against the largest reliable days recorded nearby once their gauges' records are confirmed (Dharamshala's 600 mm of 1967 is the first to confirm), and does not rely on the falls of 610 mm at Kilba and 559 mm at Sangla in December 1958, which are doubtful. IMD's national set of rainfall intensity curves (Das et al., 2022) has no panel for any station in the State; an equation for the northern region gives a 50-year day of about 129 mm, less than half Dharamshala's recorded 270 mm, and is not used; and the gridded rainfall of NIH-DHAARA was not consulted for the State.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Himachal Pradesh Town and Country Planning Act, 1977 and the TCP Rules 2014 as amended, with the regulations of the Interim Development Plans and Development Plans, including the Shimla Development Plan published on 20 June 2023 and the Chopal Planning Area Development Plan 2041; the Himachal Pradesh Ground Water (Regulation and Control of Development and Management) Act, 2005 as amended in 2022 and 2023; the Himachal Pradesh Minor Canals Act, 1976; the Himachal Pradesh Municipal Corporation Act, 1994 and the Himachal Pradesh Municipal Act, 1994; the Wetlands (Conservation and Management) Rules, 2017 and the State's notification of 7 November 2017 constituting HPSWA; the State's stone crusher policy of 29 June 2021; and the orders of the High Court of Himachal Pradesh and the NGT on muck dumping, polluted river stretches and the disasters of 2023, and the judgment of the Supreme Court of 11 January 2024. This Manual follows them or, where disclosed, makes them stricter. The TCP Rules were read in their consolidation to 2022 and the live text of Appendix-1 of June 2025, not in the amendments of 2024 and 2025; the setbacks reported in the press in 2025, 5 m from drains and 7 m from rivers and ravines, no government building within 150 m of rivers, nullahs and other water bodies, and no building on the banks of rivers and streams under the rural bye-laws, were not found in any gazetted text and are not applied as rules. The Shimla Development Plan was read only as the Supreme Court quotes it, the Municipal Acts were not read, the final Ground Water Rules were not seen, and the orders in the Supreme Court's own case on the State's ecology (WP(C) No. 758 of 2025) and the first report of its Central Empowered Committee (October 2026) were read only as reported. Every rule cited must be checked against the current text.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 5–25 years for road drains and 10–50 years for culverts, by class of road and size of culvert. An engineer designing a drain in Himachal Pradesh can cite 1, 2, 5, 10 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period. The State's Action Plan on Climate Change (version 2, 2021–2030) expects heavy rainfall and floods to increase, but finds the observed trend of the heaviest day falling, with low confidence, and gives no factor for design.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has no panel for any station in the State, and its nearest panels, Jammu, Amritsar and Dehradun, repeat the curve printed for many other cities. The one CWC report that covers the State dates from 1994 (zone 7); it takes the 1-hour rain as 0.425 of the 24-hour rain, which gives a 50-year hour of about 68–85 mm at Shimla, where the largest hour on the self-recording gauge was 50 mm, and more than 136 mm at Dharamshala, where it was 73 mm, while at Dharampur the gauge recorded 100 mm. At the other end its maps are exceeded at gauges: Dharamshala recorded 600 mm in a day where the map gives a 50-year day of about 320–400 mm. At Kullu the map gives a 50-year day of about 280–320 mm, above the 236 mm of 1888, the largest day recorded there, while Kullu district reported 26 cloudbursts in July 2023, counted from their damage, not from any gauge. An equation for the northern region by Ram Babu and others gives a 50-year day of about 129 mm, below the map at Shimla and less than half the 270 mm recorded in 24 hours at Dharamshala.

Himachal Pradesh has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of TCP, UDD, Jal Shakti Vibhag, SJPNL, the PWD, SMC or any other Municipal Corporation that fixes a return period, a runoff coefficient or a design rainfall for town storm drains. The NGT's Expert Committee found in 2017 that storm drainage covered 30% of Shimla, that the "Carrying capacity of these drains is not sufficient", that their "Catchments" were "improperly selected" and that drains were "constructed for longer distances with much lesser gradients than actually required", so that they were "not able to carry the peak flow". The sources do not agree on what Shimla has: 13 major nallahs and about 67 storm drains with a network of about 42.33 km in a plan of SMC with the United Nations Development Programme (2015), against 191 drains and nallahs, 55.43 km, built under AMRUT. After the slides of 2023 SMC asked SJPNL for a study and a detailed project report on the town's drains, as reported, which was not found; Jal Shakti Vibhag has proposed storm water drainage for Una town at ₹19.66 crore; and Dharamshala's drainage is reported inadequate despite the spending of its Smart City company. These are projects, not a State standard. This Manual is offered as a technical companion to the Town and Country Planning Act and the TCP Rules 2014, the development plans, the Ground Water Act, the Minor Canals Act and the Municipal Acts: it supplies the design storm, detention, slope, water-level and buffer values that they leave open. It has not been adopted by TCP, UDD or any other body. In particular:

  • The TCP Rules require rainwater storage, but not detention. Appendix 6 makes the collection of rain from roofs compulsory for all buildings, existing and new, where the Town and Country Planning Act operates, with storage of at least 20 litres per m² of roof, about 20 mm of rain on the roof; no water connection is given until it is installed, and existing buildings were to comply within eighteen months. It is a storage rule, not an infiltration rule. The Ground Water Act, 2005 adds a power, which the Authority "may" use, to direct rainwater harvesting on premises with a plinth of 100 m² or more. No rule requires on-site detention, limits peak runoff, sets "zero runoff" or deals with permeable paving; the NGT's direction of 2017 that "All the storm water available as surface run off in all the concretised areas like roads, lanes, platforms and market places should be diverted in such a manner to ensure that such run off does not go in to over burden or flow along hills and depressions" was set aside with the rest of its judgment in 2024;
  • The slope rules stop building, not infiltration. Appendix-1 of the TCP Rules sets 45° as the maximum slope for development (30° for IT parks), allows a hill cut of at most 3.50 m, and Rule 21(1) requires a geologist's soil investigation report before building in a sinking or sliding zone; the NGT's Expert Committee would have kept building off slopes of more than 35° where soil covers the rock, but its direction was set aside. No rule restricts soak pits, recharge pits or infiltration trenches on slopes, on debris cover or above a cut or retaining wall: the site plan must show a soak pit, and a new sub-division must keep 5% of its area for soak pits;
  • The setbacks are small, and their reference line is not defined. Appendix-1 allows building 3.00 m from a nullah and 5.00 m from a khad, but only in areas without a development plan, and does not say whether the distance is measured from the bank, the centre line or a flood level; in planning areas the distance from the highest flood level along rivers, khads and nallahs "shall be as delineated in the Interim Development Plans / Development Plans", and elsewhere "no construction shall be allowed in parcel of land prone to floods". In 2025 the press reported setbacks of 5 m from drains and 7 m from rivers and ravines, no government building within 150 m of rivers, nullahs and other water bodies, and no building on the banks of rivers and streams under model bye-laws for villages; no gazetted text of any of them was found. No rule sizes a buffer along a khad or a nallah by the flood it carries;
  • The State has no floodplain law. The PDNA of 2023 found that "It becomes challenging to establish setback distances and zoning regulations that account for floodplains" and that "there is a pressing need for comprehensive river boundary mapping and the establishment of floodplain management guidelines", and costed them at ₹10 crore; no flood line has been notified on any river. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7); it does not replace any line that the State notifies, a development plan draws or a court orders, and where such a line binds and is wider, it governs; and
  • No document sets the river, khad or reservoir level for which an outfall is designed. CWC's warning level (383.5 m), danger level (384.5 m) and highest flood level (384.6 m, 5 September 1995) for the Yamuna at Paonta were found only in transcriptions, and its 29 other sites in the State record only a highest flood level, such as 933 m for the Sutlej at Rampur in the Parechu flood of 2005 and 367 m for the Swan at Ghaluwal; the khads and nallahs of the towns are ungauged; and BBMB gives its reservoir levels in feet, with three values for the maximum level of Pong. Danger levels and highest flood levels are flood-warning levels and records, not design levels.

So each agency and each local body interprets the central manual its own way. SMC and the other Municipal Corporations, the Nagar Parishads and Nagar Panchayats, TCP and the SADAs, BBNDA, HIMUDA, HPSIDC, Jal Shakti Vibhag, SJPNL, the PWD, NHAI, the Smart City companies, the dam operators, their consultants and funding agencies fill the gaps differently. The CAG found in 2022 that HIMUDA approves colony plans without the ULBs, that HPSIDC plans the industrial areas, and that Jal Shakti Vibhag runs the sewers of every town but Shimla and Solan. No rule divides the khads and nallahs from municipal drains: in Shimla a nallah may be SMC's storm drain, carry sewage that SJPNL is to intercept, drain a road of the PWD or NHAI, and run on Revenue or Forest land; and in most of the State, outside the areas of the Town and Country Planning Act, no building rule applies at all, as the PDNA noted among the causes of the disaster of 2023. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall across the State, in three rainfall zones and five hydrologic sub-areas, with a checked station analysis to govern where one exists, the zone 7 ratios where the records support them and a lower ratio on the Dhauladhar front, a check of the design day against the largest reliable days recorded nearby, once their gauges' records are confirmed; and, in the snow-fed catchments of the high and trans-Himalaya, site-specific hydrology with a screening for glacial lake outbursts, landslide lakes and debris flows (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls to nallahs, khads, rivers, tals and reservoirs, against a design river or lake level: CWC's levels where they exist, the reservoir levels of BBMB and the other operators, converted from feet, the releases of the dams upstream, and, on the ungauged khads and nallahs, surveyed flood marks and a 1% AEP study that allows for debris (Chapter 5);
  • a design flood line, and corridors and setbacks along khads, nallahs and rivers and around tals, baolis, nauns and springs, proposed by this Manual for use where nothing wider binds, with the TCP Rules' 3 m and 5 m lines and the development plans' flood lines wherever those are wider, and old river courses kept free of building (Chapter 7);
  • recharge first on the fills of the Siwalik valleys, none in the Balh valley where the water table rises within 1 m of the ground, and no deliberate infiltration on slopes steeper than 10°, in sinking or sliding zones, on debris cover, colluvium or moraine, or above a cut slope or retaining wall, unless a geotechnical certificate allows it; roof runoff to the storage tanks the TCP Rules already require, with their overflow to lined drains; protection of the recharge areas of springs and of the kuhls; and treatment where drains carry sewage (Chapter 8);
  • debris racks and traps, allowances for sediment and blockage, energy dissipation in steep drains, and hill-road drainage that never discharges onto an unprotected slope (Chapters 6 and 9), with debris cleared before the monsoon and again by 31 October in the hill towns, standby kept to 31 October for the late storms, and inlets kept clear of snow and ice in winter (Chapter 10); and
  • basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, TCP in a development plan, or UDD can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 cl. 7.1.4 and 8.5.1; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Himachal Pradesh Town and Country Planning Rules, 2014, consolidated to 2022 (TCP Department), Rule 21(1), Appendix-1 cl. 3, 8, 11, 16 and 20, Appendix-3 cl. 15, Appendix-6 and Appendix-7, and the live Appendix-1 page (June 2025); Chopal Planning Area Development Plan 2041; Himachal Pradesh Ground Water (Regulation and Control of Development and Management) Act, 2005 (Act 31 of 2005, as amended by Acts 14 of 2022 and 9 of 2023) and draft Rules, 2006, r.28–29; Himachal Pradesh Minor Canals Act, 1976 (Act No. 42 of 1976), s.2, 3, 43–48 and 65; Department of Environment, Science and Technology notification No. STE-E(3)-10/2017-Pt-I of 7 November 2017 (HPSWA) and No. STE-F(2)-10/2009 of 15 June 2017; HPSWA, Major Wetlands of Himachal Pradesh; MoEFCC, list of Ramsar sites of India (31 January 2024); NGT, Yogindra Mohan Sengupta v. Union of India, O.A. 121/2014, judgment of 16 November 2017, and the report of its Expert Committee (May 2017); Supreme Court, State of Himachal Pradesh v. Yogendera Mohan Sengupta, 2024 INSC 30 (11 January 2024); High Court of Himachal Pradesh, CWP 5243/2022 (26 June 2023) and CWPIL 31/2023 (31 May 2024); NGT O.A. 726/2023 (HPSPCB reply of 20 February 2024), O.A. 673/2018 and O.A. 735/2023 (affidavits of the Chief Secretary of 2024 and 1 February 2026; CPCB interim report of 6 May 2024); CAG Report No. 1 of 2022 (74th Constitutional Amendment Act, Himachal Pradesh); Government of Himachal Pradesh, Post Disaster Needs Assessment, Monsoon 2023, and Monsoon 2023 Recovery and Reconstruction Plan; HIMCOSTE-led technical committee, preliminary report on the landslides and land subsidence in and around Shimla, July–August 2023 (HPSDMA); SMC and GoI–UNDP, Action Plan for Mainstreaming DRR and CCA (2015); SMC, AMRUT status (2022); NITI Aayog DMEO, Swan River best-practice note (2020); Bhagra et al. (2017), Int J Community Med Public Health 4(6); CWC, Flood Estimation Report for Western Himalayas – Zone 7 (WH/22/1994), Annexes 3.1, 4.3 and 4.4 and Plates 8–10, read by eye, and Flood Estimation Report for Upper Indo-Ganga Plains subzone 1(e) (1984), plates; CWC levels as transcribed by SANDRP (2022 and 2023); IMD Meteorological Centre Shimla, Monsoon Reports 2023–2026; IMD press releases of 10 July and 7 August 2023 and Disastrous Weather Events report (July 2024); Das et al. (2022), MAUSAM 73(4); Ram Babu et al., ISCO-14; Government of Himachal Pradesh, State Action Plan on Climate Change, version 2 (2021–2030); CGWB, Dynamic Ground Water Resources of Himachal Pradesh 2022 and 2024, and NAQUIM reports for Una, Nalagarh, Paonta–Kala Amb and Balh; NITI Aayog, IWMI and SDC, Resource Book on Springshed Management in the Indian Himalayan Region (2021); IHA case study of Nathpa Jhakri; reports of the floods of 2005, 2023, 2024 and 2025, of BBMB's reservoir levels and of the setbacks and rural bye-laws announced in 2025 (press and secondary sources).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Tals (Lakes and Ponds) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Himachal Pradesh
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Himachal Pradesh locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies
7E.2Springs, streams and channels
7E.3Land and structures
7E.4Terms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3A mid-hill town: its nallahs, spring, kuhl and tal. A town on a ridge and its slopes, nallahs falling to a khad, a naun or baoli at the spring line kept clear of drains, a kuhl along the contour to terraced fields, a small spring-fed tal with silt retention chambers, lined drains with sediment traps, and no soakaways on the slopes or in the sinking zone
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
AWS Automatic weather station
BBMB Bhakra Beas Management Board (operator of the Bhakra, Pong and Pandoh dams)
BBN Baddi–Barotiwala–Nalagarh
BBNDA Baddi Barotiwala Nalagarh Development Authority
BSMP Basin Stormwater Master Plan
CAG Comptroller and Auditor General of India
CEC Central Empowered Committee (of the Supreme Court)
CGWA Central Ground Water Authority
CGWB Central Ground Water Board
CN Curve number (SCS/NRCS method)
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CWC Central Water Commission
DC Deputy Commissioner (the Collector)
DL / WL Danger level / warning level (CWC)
DP / IDP Development Plan / Interim Development Plan (under the Town and Country Planning Act, 1977)
DPR Detailed project report
DWF Dry-weather flow
EIA Environmental impact assessment
ESC Erosion and sediment control
FAR Floor area ratio
FER Flood Estimation Report (CWC)
FRL / MWL Full reservoir level / maximum water level
GLOF Glacial lake outburst flood
GWRA Ground water resource assessment (CGWB)
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Himachal Pradesh)
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HIMCOSTE Himachal Pradesh Council for Science, Technology and Environment
HIMUDA Himachal Pradesh Housing and Urban Development Authority
HPSDMA Himachal Pradesh State Disaster Management Authority
HPSEBL Himachal Pradesh State Electricity Board Limited
HPSIDC Himachal Pradesh State Industrial Development Corporation
HPSPCB Himachal Pradesh State Pollution Control Board
HPSWA Himachal Pradesh State Wetlands Authority
HSG Hydrologic soil group
IDF Intensity–duration–frequency
IMD India Meteorological Department
IPH Irrigation and Public Health Department (now Jal Shakti Vibhag)
IRC Indian Roads Congress
MLD Million litres a day
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
NDMA National Disaster Management Authority
NGT National Green Tribunal
NHAI National Highways Authority of India
NIH National Institute of Hydrology, Roorkee
NOC No-objection certificate
PDNA Post-disaster needs assessment (Himachal Pradesh, monsoon 2023)
PSD Permissible site discharge
PWD Public Works Department, Himachal Pradesh
RRV Required retention volume
RWH Rainwater harvesting
SADA Special Area Development Authority (under the Town and Country Planning Act, 1977)
SANDRP South Asia Network on Dams, Rivers and People
SAPCC State Action Plan on Climate Change
SJPNL Shimla Jal Prabandhan Nigam Limited
SLA Sea-level allowance (coastal term; not applicable in Himachal Pradesh)
SMC Shimla Municipal Corporation
SoI Survey of India
SRRG Self-recording rain gauge
STP Sewage treatment plant
SUH Synthetic unit hydrograph (CWC)
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
TCP Town and Country Planning Department, Himachal Pradesh
TCP Rules 2014 The Himachal Pradesh Town and Country Planning Rules, 2014, as amended
UDD Urban Development Department, Himachal Pradesh
ULB Urban local body (a Municipal Corporation, Nagar Parishad or Nagar Panchayat)
UTM Universal Transverse Mercator
WQv Water quality volume
WSUD Water-sensitive urban design