Chapter 7Waterbodies, Tals (Lakes and Ponds) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (tal) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Himachal Pradesh, with no coast and no tidal water, means the State's three Ramsar sites, Pong Dam Lake, Chandertal and Renuka, the two lakes covered by the national wetland conservation programme, Rewalsar and Khajjiar, any wetland notified under the 2017 Rules (none was found notified), the wetlands of the national atlas larger than 2.25 ha, the drawdown zone of the Pong reservoir, and the spring-fed tals and marshy glades of the hills;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Himachal Pradesh Town and Country Planning Act, 1977, the TCP Rules 2014 and the Interim Development Plans and Development Plans made under it, the Himachal Pradesh Minor Canals Act, 1976, the Himachal Pradesh Ground Water (Regulation and Control of Development and Management) Act, 2005, the Municipal Acts, the Wildlife (Protection) Act, 1972 (for the sanctuaries at Pong, Renuka and Chandertal), the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river (such as the Beas, the Sutlej, the Ravi, the Chandra-Bhaga, the Yamuna, the Giri, the Pabbar and the Swan), khad (a hill torrent or ravine stream, perennial or seasonal, such as the Ashwani Khad below Shimla, the Neogal and the Banu Khad in Kangra, the Chakki Khad, and the Balad and the Sirsa in the Nalagarh valley), nallah (a natural drain or storm channel), nali (a street, roadside or house drain), cho (a seasonal Siwalik torrent, such as the streamlets that feed the Pong reservoir from the south), kuhl (a gravity irrigation channel), canal, lake or tal (such as Renuka, Rewalsar, Khajjiar, Prashar and Dal), reservoir or barrage pond (such as the Pong reservoir, Gobind Sagar behind Bhakra, Pandoh, Larji, Kol and Chamera), spring (naun, baoli or chashma) with its recharge area, khatri (a rock-cut seepage tank), wetland (such as the Ramsar sites of Pong Dam Lake, Chandertal and Renuka), glacial or moraine-dammed lake, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (tal) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (spillway, overflow or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the Jal Shakti Vibhag and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (kuhl, nallah, cho or feeder channel) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, sluice gate or regulator) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Himachal Pradesh terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Tal (ताल) | A lake, pond or tank: "A pond, a lake or tank" in Joshi's dictionary of the Pahari dialects, and "pond, pool, tank, lake (= tālāb)" in Platts (Annex 7E). In Himachal Pradesh the word, and its forms sar and sarovar in names such as Rewalsar, names the small natural lakes of the hills, such as Rewalsar, Renuka, Khajjiar, Prashar and Dal, most of them fed by springs or streamlets in a small catchment; it is used here for any lake, tank or pond. A tal with a controlled outlet is a tank under Clause 7.2: its outlet gate or regulator is its sluice, and its FTL is the level at which it spills over its outlet with any gate closed, found by survey. A tal with an uncontrolled outlet has its FTL at the crest of that outlet. |
| Recorded tal | A tal, pond, lake, reservoir, spring or wetland shown in the Revenue records or village maps, on a site plan submitted under the TCP Rules 2014 ("Bauri, Well, Nallah, khud"), in the land use map of an Interim Development Plan or Development Plan, in the records of a Municipal Corporation, Nagar Parishad, Nagar Panchayat or Gram Panchayat, in the national wetland atlas or a list of the Himachal Pradesh State Wetlands Authority, or in a list filed before the High Court of Himachal Pradesh or the National Green Tribunal. A recorded tal is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual. |
| Boundary of a tal or reservoir | No Himachal Pradesh rule measures a distance from a lake or reservoir. For this Manual, the boundary of a tal under Clauses 7.3.3 and 7.13.1 is the largest of its Revenue record boundary, its surveyed FTL and the outer edge of its water in the monsoon (July to September) shown by dated imagery or survey of recent years; and the boundary of a reservoir is the higher of its full reservoir level and the highest level its operator states, converted from feet at 1 ft = 0.3048 m and stated to the datum of Clause 7.3.5 (for Pong the operator's maximum is reported as 1,400, 1,410 or 1,421 ft, and the highest governs until BBMB confirms the level). The drawdown land of a reservoir below that level, such as the land between 1,280 and 1,390 ft at Pong, is part of the reservoir. This reading is set by this Manual. |
| Khad; nallah; nali; cho | A khad (खड्ड; "Khud" in the TCP Rules) is a hill torrent or ravine stream, perennial or seasonal: "A small river" in Joshi, where Hindi dictionaries give only a pit. A nallah (नाला; "Nullah" in the TCP Rules) is a natural drain or storm channel, a nali (नाली) a street, roadside or house drain, and a cho a seasonal Siwalik torrent, as the streamlets that feed the Pong reservoir from the south are "locally called choes" (HP State Wetlands Authority) (Annex 7E). Every khad, nallah or cho that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whatever its name, whether it is dry for most of the year, and whether it is lined, piped or covered. A khad or nallah carries boulders, debris and muck in flood: its inlets and culverts take the debris racks, bulking and blockage of Clause 6.3.6, and its top of bank is the edge of its active boulder bed where that is wider than the edge of the 50% AEP flow. This definition is set by this Manual. |
| Spring (naun, baoli, chashma); khatri; spring recharge area | A spring is a place where groundwater comes out at the surface. A naun (नौण) is a spring-fed tank or water place ("A place for water" in Joshi; a brick-built tank or well in CDIAL), a baoli or bauri (बावड़ी) in the hills a small spring-fed pool or stone tank rather than the stepped well of the plains, and chashma (चश्मा) a spring (Annex 7E). A khatri is a chamber cut by hand into hard rock to collect the water that seeps through it, found in Hamirpur and the neighbouring parts of Mandi and Kangra (as reported; no dictionary source was found). A spring, naun, baoli or khatri is a waterbody for Clause 7.3, and its Zone 1 under Clause 7.4 is measured from its outlet or the edge of its tank or chamber. Its recharge area is the area upslope from which it is fed, as a hydrogeologist maps it; within that area Clause 8.8.1 limits infiltration, no road runoff, sewage or septic effluent is led into the ground, and no drain is cut that would intercept the flow to the spring. No storm drain or sewer is laid within Zone 1 of a spring except a lined drain below its outlet that carries its overflow away. This definition and these rules are set by this Manual. |
| Kuhl; line of natural drainage | A kuhl (कूहल) is a gravity irrigation channel that takes water from a khad or stream and carries it along the contour to terraced fields; a kuhl in Schedule I or II of the Himachal Pradesh Minor Canals Act, 1976 is a canal under that Act. A kuhl intercepts and carries hill runoff, so it is part of the drainage system: a kuhl that drains 8 ha or more is a natural channel under Clause 7.4.1(b), and no design under this Manual discharges to a kuhl, or crosses it, unless its capacity and its outlet to a stable channel are shown and the managing body and, for a scheduled kuhl, the Collector have consented (ss. 46 and 65). A line of natural drainage, in the words of section 43 of the Act, is for this Manual every khad, nallah, cho and natural channel, recorded or not; the Act's power to regulate its flow and remove obstructions is the statutory hook for recording every khad, nallah and kuhl of a town, with its owner, in the inventory of Clause 7.3.1. |
| Sinking and sliding zones | The zones so defined in an Interim Development Plan or Development Plan, in which a geologist's soil investigation report is required before building (TCP Rule 21(1); Shimla Development Plan, §17.2.2.9), and any other mapped landslide or creep zone. No tal, pond, retention basin or infiltration facility is placed in them (Clause 8.8.1). |
| Glacial or moraine-dammed lake | A lake held by a glacier, moraine or landslide dam, of which the State Centre on Climate Change counted 562 in the Sutlej basin, 242 in the Chenab, 93 in the Beas and 37 in the Ravi in 2019 (as reported), and such as the landslide lake on the Parechu in Tibet whose burst raised the Sutlej by 12 to 15 m on 26 June 2005 (as reported). It is a waterbody for Clause 7.3 and a hazard to be mapped under Chapter 5; it is never a design outfall or design storage, and no drain under this Manual discharges to it. This rule is set by this Manual. |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the Jal Shakti Vibhag and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the Municipal Corporation, Nagar Parishad or Nagar Panchayat (for the drains and nallahs within a town, under the Himachal Pradesh Municipal Corporation Act, 1994 and the Himachal Pradesh Municipal Act, 1994, whose drain sections were not read [TBC]), SJPNL (for Shimla's water sources, intakes and sewers), JSV (for flood works and channelised reaches of the rivers and khads, such as the Swan in Una, for water-supply sources and intakes outside Shimla, and for sewerage outside Shimla and Solan), HPPWD or NHAI (for the drains, catch-water drains and culverts of their roads), the Government, a local authority or the beneficiaries, with the Collector (for a kuhl in Schedule I or II of the Himachal Pradesh Minor Canals Act, 1976), BBMB (for the Pong, Bhakra and Pandoh reservoirs), NTPC, SJVN, NHPC, HPSEBL or another dam operator (for its reservoir and the reach below its dam), the Forest Department (for forest land and the wildlife sanctuaries at Pong, Renuka and Chandertal), the State Government through the Deputy Commissioner and the Tehsildar (for land recorded as water in the Revenue records), the Gram Panchayat (for the nauns, baolis, kuhls and tals of a village), HIMUDA, HPSIDC, BBNDA or a colony developer (for the drains of a scheme until they are handed over), the Himachal Pradesh State Wetlands Authority (for a notified wetland), a private owner, or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue records and village maps of the Revenue Department, in which rivers, khads, nallahs, kuhls, tals, baolis and land covered by water are recorded; the existing water bodies, "like Bauri, Well, Nallah, khud", that the site plan forms of the TCP Rules 2014 require on every application for planning permission; the land use maps, sinking and sliding zones, non-developable land and distances from the highest flood level along rivers, khads and nullahs of each Interim Development Plan or Development Plan, such as the Shimla Development Plan (published on 20 June 2023); the drains and nallahs in the records of a Municipal Corporation, Nagar Parishad or Nagar Panchayat, and SJPNL's records of Shimla's sources and sewers; the kuhls listed by district and tehsil in Schedules I and II of the Himachal Pradesh Minor Canals Act, 1976; the boundaries of the Ramsar sites at Pong, Chandertal and Renuka and of any wetland notified under the Wetlands (Conservation and Management) Rules, 2017, and the wetlands of the national atlas; BBMB's and the other dam operators' records of reservoir levels and acquired land; the spring inventories (about 500 springs inventoried in a standard format, NITI Aayog, 2021); and the lists of encroachment and muck dumping filed before the High Court of Himachal Pradesh and the National Green Tribunal;
- (b) JSV and Gram Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where JSV records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. Himachal Pradesh maps no flood lines in law. It has no floodplain zoning Act, and no notified flood line, flood hazard map or 1% AEP map of any town's khads or nallahs was found. The post-disaster needs assessment of 2023 found that "the absence of defined river boundaries hampers effective land-use planning" and that "It becomes challenging to establish setback distances and zoning regulations that account for floodplains and their dynamics", and proposed ₹10 crore for floodplain guidelines; whether any mapping followed was not found. The planning law points to the plans: the distance from the highest flood level along rivers, khads and nullahs is "as delineated in the Interim Development Plans / Development Plans" (TCP Rules 2014, Appendices 3 and 7), and the Chopal Development Plan 2041 treats "flood plains and areas adjacent to major drainage lines" as non-developable; the flood lines of the Shimla Development Plan and the other plans were not read for this Manual. The site plan forms ask for contours and for the "Existing water bodies like Bauri, Well, Nallah, khud", but not for a flood line. The rivers are poorly gauged for this purpose. Of the 30 CWC flood sites listed for the State, only the Yamuna at Paonta has a warning level (383.5 m) and a danger level (384.5 m), with a highest flood level of 384.6 m (5 September 1995); the others record a highest flood level only, such as 933 m for the Sutlej at Rampur, set in the Parechu flood of 26 June 2005 (a reading of 924.5 m in 2023 is also reported), and new highest levels were set in July 2023 at Ropa, Gulling, Meenus and Ganguwala; and there is no CWC site on the Beas at Manali, Kullu, Mandi or Pandoh, on the Sutlej at Bilaspur or on the Ravi at Chamba (all as reported by SANDRP; Chapter 5). The levels of the Pong and Bhakra reservoirs are published by BBMB in feet. No source read for this Manual states the datum of the CWC levels, of the reservoir levels or of the levels on any plan. The best evidence of flood extent in the towns is therefore on the ground: the flood marks and debris lines of July and August 2023 and of 2025, and the old river courses along which, in Kullu, "most of the destruction" followed (needs assessment, 2023). Clause 7.3.4 lets the Authority adopt flood maps once they exist; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, with the bulking of Clause 6.3.6 on khads and nallahs and the surveyed flood marks of Clause 5.8.5(b), and a highest flood level delineated in a plan is a minimum that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Levels shall be stated to one datum (Clause 7.3.5), and reservoir levels converted from feet at 1 ft = 0.3048 m. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual (wider lines govern under Clause 7.4.5 where they bind: in a planning area the distance from the highest flood level along rivers, khads and nullahs is as the Interim Development Plan or Development Plan delineates; where no plan has been prepared, Appendix-1, clause 16, of the TCP Rules 2014 allows construction at 3.00 m from a nullah and 5.00 m from a khud, which is narrower than this floor and never governs alone; Himachal Pradesh has no floodplain zoning law; this Manual's 15 m applies to every river, khad, nallah, cho, kuhl, spring and tal where nothing wider binds; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the approval of JSV for a work on or next to one of its flood works, channelised reaches (such as the Swan), intakes or water-supply sources, the consent of SJPNL for a work in the catchment of one of Shimla's water sources, the permission of the managing body and the Collector for a work that crosses, obstructs or discharges to a kuhl in Schedule I or II of the Himachal Pradesh Minor Canals Act, 1976 (ss. 46 and 65), any notification under section 43 of that Act regulating a line of natural drainage, the views or permission of the Himachal Pradesh State Wetlands Authority or the Forest Department for a work in or next to a Ramsar site, a notified wetland or a wildlife sanctuary, the consent of BBMB, NTPC, SJVN, NHPC, HPSEBL or another dam operator for a work that drains to, or lies next to, one of its reservoirs or the reach below its dam, the distance from the highest flood level along rivers, khads and nullahs delineated in an Interim Development Plan or Development Plan, or a direction of the High Court of Himachal Pradesh, the National Green Tribunal or the Supreme Court (such as the High Court's orders against dumping muck in Gobind Sagar and its feeding khads, listed in the Disclosure to Clause 7.4) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor where no wider line binds. Himachal Pradesh has distances from water in its planning rules, but they are the narrowest in this series. Where no Interim Development Plan or Development Plan has been prepared, Appendix-1, clause 16, of the TCP Rules 2014 provides that "The construction shall be allowed at distance of 3.00 Metre and 5.00 Metre from Nullah and Khud respectively", without saying from which line the distance is measured; in a planning area the distance from the highest flood level along rivers, khads and nullahs "shall be as delineated" in the plan (Appendices 3 and 7); and the State has no floodplain zoning law and no notified flood line. Wider distances announced in 2025, 5 m from drains and 7 m from rivers and ravines, no government building within 150 m of rivers and nullahs, and a ban on building along the banks of rivers and streams in rural model bye-laws, were seen only in the press, with no gazetted text. The 15 m floor matters along every nallah and khad, where the rule gives 3 m or 5 m and a hill torrent needs room for the boulders and debris it carries and for the machinery that clears them, and along the kuhls, chos, springs and tals that the rules do not name. It is this Manual's proposal, not a statutory width, and it never reduces a wider line (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Himachal Pradesh flood maps are mostly coarser than US maps, the only level land in a Himachal Pradesh town is usually a river terrace, an old river course, a valley floor such as the Balh valley or the Una and Nalagarh valleys, or the margin of a tal or reservoir (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Himachal Pradesh's building rules are the Himachal Pradesh Town and Country Planning Rules, 2014, made under the Himachal Pradesh Town and Country Planning Act, 1977. This Manual read them in the Town and Country Planning Department's consolidation to 2022, with the Appendix-1 title of the Fifth Amendment of 2020; the Twelfth to Fifteenth Amendments (2024–2025) and the draft Sixteenth Amendment published for objections in 2025 were not read, though clause 16 of Appendix-1 still stood on the Department's web page in June 2025. Appendix-1 is the general regulation only "in areas where land use is frozen and Interim Development Plan or Development Plan has not been prepared"; in a planning area the plan's own regulations govern. In Appendix-1, development is limited to slopes of 45° (clause 3), a hill cut to 3.50 m with at least 1.00 m between the building and the toe wall (clause 11), and "The construction shall be allowed at distance of 3.00 Metre and 5.00 Metre from Nullah and Khud respectively" (clause 16); no building may stand within 5.00 m of a forest boundary (clause 18); and a new sub-division keeps 5% of its area for soak pits, orients its plots for the "natural flow of surface drainage" and grades its layout at not less than 1 in 15 (clause 20). Appendices 3 and 7 add that "Distance from the Highest Flood Level (HFL) along Rivers, Khuds and Nullahs shall be as delineated in the Interim Development Plans / Development Plans. In other areas, no construction shall be allowed in parcel of land prone to floods." The 5 m line of the Shimla Interim Development Plan of 1979, as amended in 2000, is kept from the boundary of a green belt, not from a nullah. A stone-crusher policy of 29 June 2021 keeps new crushers 100 m from springs and perennial rivulets and 500 m from lakes, wetlands and reservoirs, and prohibits dumping of waste material in a river water source (as quoted by the HPSPCB before the National Green Tribunal). In 2025 the press reported that buildings must now keep "a minimum distance of 5 metres from drains, and 7 metres from rivers and ravines", where the earlier distances had been 3 and 5 metres (26 July 2025), that no government building would be allowed within 150 m of rivers, nullahs and other water bodies (the Chief Minister, 30 July 2025), and that model bye-laws for rural construction banned building along the banks of rivers and streams (16 September 2025); no notification or gazetted text of any of these was found, and they are reported here, not applied. The rules leave gaps. Clause 16 does not say whether its 3 m and 5 m are measured from the water's edge, the top of the bank or the highest flood level; it does not apply in a planning area, where the plan's line governs; kuhls, chos, springs, baolis, nauns and tals are not named; and no line is tied to a flood level except where a plan delineates the highest flood level. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.
Disclosure. Himachal Pradesh has statutory distances from water, but they are narrow and partial: where no Interim Development Plan or Development Plan has been prepared, Appendix-1, clause 16, of the TCP Rules 2014 allows construction at 3.00 m from a nullah and 5.00 m from a khud, from an unstated line; in a planning area the distance from the highest flood level along rivers, khads and nullahs is as the plan delineates; and the State has no floodplain zoning law and no notified flood line. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor where nothing wider binds: along nallahs, where the rule keeps 3 m; along khads, where it keeps 5 m; and along the kuhls, chos, springs, nauns, baolis and tals that it does not name. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's reading of the boundary of a tal or reservoir, and the rules on springs, kuhls, sinking zones and glacial lakes (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body has adopted or endorsed them. The setback is applied as the larger of the corridor and any statutory, plan, court or Tribunal line, so the Manual is stricter than statute along nallahs, khads, kuhls, springs and tals, and no less strict anywhere. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- Appendix-1, clause 16, of the TCP Rules 2014 (consolidation to 2022). Construction at 3.00 m from a nullah and 5.00 m from a khud, in areas without an Interim Development Plan or Development Plan. Both are narrower than Zone 1's floor and never govern alone; the Applicant states them on Form 7-1.
- Interim Development Plans and Development Plans (TCP Rules 2014, Appendices 3 and 7). The distance from the highest flood level along rivers, khads and nullahs as the plan delineates; elsewhere, no construction in a parcel of land prone to floods; and the plan's non-developable land, such as the "flood plains and areas adjacent to major drainage lines" of the Chopal Development Plan 2041. Where a plan's line is wider than Zone 1 it governs as Zone 1; the lines of the Shimla Development Plan (published on 20 June 2023 according to the Supreme Court; 23 June 2023 in the press) were not read [TBC].
- The announcements of 2025 (reported, not applied). 5 m from drains and 7 m from rivers and ravines (TCP, as reported on 26 July 2025); no government building within 150 m of rivers, nullahs and other water bodies (the Chief Minister, as reported on 30 July 2025); and a ban on building along the banks of rivers and streams in model bye-laws for rural construction (the Cabinet, as reported on 16 September 2025). No gazetted text was found, and the reports conflict on the distances. Where any of them is notified it governs as a statutory line under Clause 7.4.5; until then this Manual's 15 m is wider than the first and the others are not applied.
- Wetlands, Ramsar sites and sanctuaries. The Ramsar sites of Pong Dam Lake (15,662 ha), Chandertal (49 ha) and Renuka (20 ha), to their boundaries; the wildlife sanctuaries around them; and any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was found notified) (Clause 7.12).
- Kuhls and lines of natural drainage. The Himachal Pradesh Minor Canals Act, 1976: no obstruction or fouling of a scheduled kuhl (s. 65), crossing works by the beneficiaries (s. 46), and any notification under section 43 regulating a river, creek, natural channel or line of natural drainage.
- Courts and custodians. The High Court's orders against dumping muck in Gobind Sagar and its feeding khads and nallahs (Madan Lal, CWPIL 31/2023, orders of 22 May 2023 and 31 May 2024); the lines of BBMB and the other dam operators at their reservoirs; JSV's lines at its flood works. The directions of the National Green Tribunal on Shimla of 16 November 2017 were set aside by the Supreme Court on 11 January 2024 and are cited in this Manual as expert guidance only, never as binding.
This Manual sets 15 m as the floor because the rule gives the nallahs, which carry most of the towns' storm water, only 3 m and the khads only 5 m, measured from an unstated line, and gives the kuhls, chos and springs nothing; because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because a khad or nallah needs room for the boulders, debris and muck it carries in flood and for the machinery that clears them. The reasons for the corridor are the record: the needs assessment of 2023 found that "Water channels, which should act as natural outlets, are often encroached upon" and that in Kullu the destruction along the Beas followed the old river courses on which building had taken place; the expert committee before the National Green Tribunal found in 2017 that the debris from Shimla's slopes "is dumped in the valley or near water channels, obstructing the natural drainage"; and the HPSPCB levied environmental compensation for illegal dumping of muck and debris in eight of its regions (reply of 20 February 2024 in NGT O.A. 726/2023). Until a statute, rule, notification, development plan or court adopts it, the 15 m minimum is this Manual's recommended standard, and the statutory, plan, court and Tribunal lines above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Himachal Pradesh Town and Country Planning Rules 2014, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to hill-town practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The valley floors of Una, Nalagarh, Paonta and the Balh valley, the terraces of the Beas at Kullu and Mandi, and the old river courses on which the post-disaster needs assessment of 2023 found building in Kullu, are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Himachal Pradesh no building rule measures a distance from a lake or reservoir at all, so the line from which a setback is measured must come from this Manual. The difference matters most at the reservoirs, whose levels swing widely through the year: the water spread of the Pong reservoir is about 125 km² at its minimum level of 1,280 ft and about 220 km² at its maximum of 1,390 ft, so that about 80 km² is a drawdown zone exposed in the dry months (HP State Wetlands Authority), and a line drawn from the edge of the water in May would leave the reservoir's own bed open to building. The natural tals shrink in another way: at Khajjiar, heavy siltation and the deposition of peat have made the water body too shallow, and vegetation has reclaimed some of the old open water (HP State Wetlands Authority), so a line drawn from today's edge would give up the lake's lost area for good. This Manual gives every tal and reservoir a boundary measured from a high level, not from the water's edge on the day of survey: the monsoon edge of a tal and the operator's highest level of a reservoir are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the Beas valley in Kullu and Manali, where the post-disaster needs assessment of 2023 found that most of the destruction along the river followed old river courses on which building had taken place, of Mandi along the Beas, of Una along the Swan, of Baddi and Nalagarh along the Balad and the Sirsa, and of Rampur Bushahr along the Sutlej already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Himachal Pradesh has no tank Act, and its storages range from nauns a few metres across to the Pong reservoir, whose water spread grows from about 125 km² at 1,280 ft to about 220 km² at 1,390 ft (HP State Wetlands Authority). The storages that matter for urban drainage are of five kinds. The first is the natural tal: Rewalsar in Mandi district, at about 1,360 m, covers 2.6 ha in a catchment of 173 ha, with a shoreline of about 735 m, and its main source of water is its own springs; Renuka in Sirmaur, of about 20 ha and "the largest natural lake in Himachal", is fed by 21 seasonal streams; and Khajjiar in Chamba district is a water body of about 4,500 m² in a catchment of 6 km², fed by streamlets carrying rain and snowmelt (all HP State Wetlands Authority); Prashar and Dal are smaller lakes for which no data were read. Their outlets are uncontrolled or unrecorded [TBC], so their storage is modelled as an existing feature and not counted unless Clause 7.7.1 is met. The second is the reservoirs and barrage ponds, which are the State's largest waterbodies: the Pong reservoir (full reservoir level 1,390 ft, about 423.67 m) and Gobind Sagar behind Bhakra (full reservoir level 1,680 ft, about 512.06 m), both held by BBMB with their levels in feet, BBMB's Pandoh, NTPC's Kol, NHPC's Chamera and HPSEBL's Larji (as reported); their releases enter a design as inflow and tailwater (Clauses 5.8.3 and 5.8.5(c)), and they are not tanks for these clauses unless their storage is counted. The third is the kuhls and the small village ponds, which are modelled as existing features where they intercept runoff but are never counted as storage, because they are not surveyed, have no controlled outlet and are usually full by the time of the peak storm. The fourth is the springs, nauns, baolis and khatris, which are protected for their water and never counted as storage. The fifth is the glacial and moraine-dammed lakes of the high mountains, which are hazards (definitions after Clause 7.2). These are the waterbodies for which Figure 7.3 and Clause 7.8 matter: in a hill town every nallah ends in a khad and every khad in a river or reservoir, and a spring-fed tal receives the drains of the slopes around it. Any tal or reservoir whose storage is to be counted is subject to Clause 7.7.1 in full, with BBMB, JSV or other custodian, and the custodian of each tal shall be confirmed for the inventory (Annex 7A) [TBC].
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. JSV, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, for a hill town, every nallah that falls from the ridge and its slopes to the khad below, every kuhl that the town's drains cross or reach, any spring-fed tal with its inlets and outlet, and the khad itself down to its confluence with the river, whose level sets the tailwater of the nallahs (Clause 5.8.5(b)), as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than JSV's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. Himachal Pradesh's reservoirs have been at or near their full levels in the worst storms. In August 2023 the Pong reservoir rose from 1,374.20 ft to 1,399.65 ft (about 426.61 m) between 11 and 15 August, above its full reservoir level of 1,390 ft, and the outflow, about 18,000 cusecs until 14 August, was then raised to 1.40 to 1.50 lakh cusecs (about 3,960 to 4,250 m³/s); in 2025 Pong peaked at 1,394.71 ft (about 425.11 m) on 5 September and Gobind Sagar at 1,679 ft (about 511.76 m) on 4 September; and on 30 June 2025 all five gates of the Pandoh barrage were reported opened, releasing nearly 44,000 cusecs (all as reported). The natural tals are spring-fed and full through the monsoon, and no record of how long Rewalsar, Renuka or Khajjiar stay at or above their outlet level in a wet spell was obtained for this Manual. The monsoon has also withdrawn later than its normal date of 25 September in eight of the nine years from 2018 to 2026, and storms of western disturbances follow it, as on 5 to 7 October 2025 (IMD), so a late storm finds the reservoirs high. While a tal or reservoir is full, it stores nothing more below FTL, the khads and nallahs that flow into it discharge against its level, and its release adds to the flow in the river below it. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A mid-hill town: its nallahs, spring, kuhl and tal (schematic, not to scale; no particular town, lake or landmark is shown). A: in plan, the town stands on a ridge, the catchment divide, and on the slopes below it, so every drain of the town ends in a nallah and every nallah in the khad at the foot of the slope, which runs to the river and whose level is the nallahs' tailwater (Clause 5.8.5(b)). The nallahs are lined where they pass through the built-up area and each passes a sediment trap before it reaches the khad, because a hill drain carries more silt, gravel and muck than any other load (Clauses 6.3.6 and 8.12). A naun or baoli takes water at the spring line; its Zone 1 (15 m) is kept clear of drains and sewers, and its recharge area upslope, as a hydrogeologist maps it, receives only filtered roof water, with no road runoff, soak pits or septic tanks (Clause 8.8.1). A kuhl leaves the khad upstream and runs along the contour to the terraced fields; the nallahs pass under it in crossing works, and no storm drain discharges into it (definitions after Clause 7.2; Himachal Pradesh Minor Canals Act, 1976, ss. 46 and 65). A small spring-fed tal on a bench receives drains from the slope above only through silt retention chambers, and spills over its outlet crest to the khad. A sinking zone of the Development Plan takes no soakaway and no pond, and no soakaway is placed anywhere on the slopes. Zone 1 along the khad is 15 m from the top of its bank, wider than the 5 m from a khud and 3 m from a nullah of the TCP Rules. B: in section, roof water goes to the storage tank of Appendix 6 of the TCP Rules 2014 (20 L per m² of roof), and its overflow and the road runoff go by a lined drain through a trap to the khad, because water put into the debris cover raises its pore pressure; the spring comes out where perched water in the debris cover meets the rock; the kuhl runs on a terrace; and the khad's 1% AEP level, found with bulking, sets the flood edge from which Zone 2 is measured. The 15 m minimum and the spring, kuhl and no-soakaway rules are this Manual's proposals; the TCP Rules, the highest flood level lines of the development plans, the Minor Canals Act and the courts' orders govern where they say more. Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, HPSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under JSV control, the operating rule shall be JSV's rule. This Manual does not authorise any other body to operate a JSV tank.
Commentary. No tal in Himachal Pradesh was found with a written operating rule, and the natural tals have no gates to operate. The reservoirs are run by their operators to their own rules, which were not read for this Manual. BBMB's full reservoir level for Pong is 1,390 ft (about 423.67 m), but its maximum level is reported as 1,400 ft (about 426.72 m), 1,410 ft (about 429.77 m) and, as a "technical" limit, 1,421 ft (about 433.12 m), and Gobind Sagar's full reservoir level is 1,680 ft (about 512.06 m), with an earlier technical limit of 1,690 ft (about 515.11 m) (all as reported, converted at 1 ft = 0.3048 m). In August 2023 BBMB's Chief Engineer was reported as saying that releases from Pong had never exceeded 1.49 lakh cusecs and that the Beas below could carry 2 lakh cusecs, while a civil-society review alleged that the reservoir had been filled early and released late (an allegation, not a finding); in 2014 a release from the Larji project on the Beas was followed by the deaths of 14 students downstream (as reported); and the needs assessment of 2023 proposed ₹20 crore for a forecast-based dam management system. Without an agreed rule with dates, levels, release rates and a named operator, storage in a tal or reservoir cannot be relied on, and a release made without warning to the towns downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July or August monsoon burst or cloudburst, often with a western disturbance, as in July and August 2023. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
For a natural tal, Clause 7.8.3 is the governing condition: with no controllable outlet, no cushion is assumed, a design that relies on the tal routes the storm through it from its outlet level, and the outflow over the outlet is limited by the khad or nallah below it, which shall be shown to carry it with the debris of Clause 6.3.6. For a reservoir, a design takes the operator's level and release for the storm being checked (Clause 5.8.3), not a drawdown the operator has not agreed to in writing. Most tals have other users: they are sacred places and the centres of their towns' trade, which is why Clause 7.8.2(d) requires the custodian to accept any drawdown.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Himachal Pradesh State Pollution Control Board (HPSPCB) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).
Commentary. No statewide order fixing a date for the pre-monsoon cleaning of drains, nallahs or tals was found; the State's recurring pre-monsoon directions call for "pre-monsoon de-siltation, clearing of water channels, removal of blockages and encroachments from drainage systems and flood plains" without a date (as reported). In the hills the material to be removed is less silt than boulders, debris and muck: Gobind Sagar's storage fell from 9,868 MCM in 1958 to 7,769 MCM in the survey of 2012, with the loss of gross capacity put at 38% by one study and 47% by BBMB (as reported); the State's tals are silting from their catchments, and the works at Rewalsar and Renuka include silt retention chambers, check dams and the cleaning of drains (HP State Wetlands Authority); and the needs assessment of 2023 asked for all natural drains and streams "blocked with dumped spoil" to be cleared. The date of 31 May in this Manual is set by this Manual, before the monsoon's normal onset of 25 June and ahead of the earliest recorded onset, on 9 June 2000 (IMD); because the monsoon now withdraws in October in most years and storms of western disturbances follow it, hill towns also clear debris a second time by 31 October (Chapter 10). Excavation to "increase capacity" is governed by Clause 7.9.3. In a spring-fed tal, such as Rewalsar, whose main source of water is its own springs, deepening can cut the springs off or the silt and clay that hold the water, and this Manual allows no spring-fed tal to be deepened below its original bed or its bed to be lined or cemented. The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Himachal Pradesh precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Himachal Pradesh the drains and nallahs of a town are understood to vest in its Municipal Corporation, Nagar Parishad or Nagar Panchayat, under Municipal Acts whose drain sections were not read for this Manual [TBC], while the khads and rivers lie with JSV for flood works, the road drains with HPPWD and NHAI, and the kuhls with their managing bodies under the Minor Canals Act. No rule or order dividing natural khads and nallahs from municipal drains, or the local bodies' drains from the road drains, was found; Chapter 6 gives this Manual's working assignment. The building rules know the nallah and the khad, but give them only 3 m and 5 m (TCP Rules 2014, Appendix-1, clause 16), and the kuhl and the cho not at all. The record of Shimla shows a network that is old, partial and undersized, and is being concentrated: a municipal and UNDP plan of 2015 counted 13 major nallahs and about 67 drains of 42.33 km, while 191 drains and nallahs of 55.43 km are reported built under AMRUT (the counts conflict); the expert committee before the National Green Tribunal found in 2017 that storm drainage covered about 30% of the city, that the "Carrying capacity of these drains is not sufficient", that their catchments were "improperly selected" and that "drains are constructed for longer distances with much lesser gradients than actually required", so that they were "not able to carry the peak flow"; and the committee on the slides of August 2023 named "Open Drainage systems leading to poor disposal of surface water" among their causes. Elsewhere the response to floods has been to confine the rivers and khads: the Swan in Una was channelised with 16.67 km of embankments in its first phase (NITI Aayog, 2020), and a channelisation of the Beas was prepared in 2021, which the needs assessment of 2023 said "predominantly require[s] concretisation, which is not advisable in Himalayan Ecology", and which the State later told the National Green Tribunal it had recommended dropping "as the channelization may affect the cross drainage and hamper the natural drainage system". The Minor Canals Act gives the Government power to order the removal of an obstruction in any line of natural drainage (s. 43); the TCP rule keeps a building off the first 3 m of a nallah; neither keeps a nallah, khad or kuhl at its recorded width once it has been lined, piped, covered or filled with muck, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored tal or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Himachal Pradesh no shared form of storage is required by the building rules: the rainwater harvesting of Appendix 6 of the TCP Rules 2014 is plot-level storage of 20 litres per m² of roof, to be built underground in the parks and open spaces of colonies and IT parks, and the rules have no detention, peak-flow or "zero runoff" rule; the 5% of a new sub-division kept for soak pits (Appendix-1, clause 20(4)) is for wastewater, not storm storage. The plans for Shimla's drains are for conveyance: the draft City Development Plan 2041 of the Municipal Corporation proposes new drains and the rejuvenation of nallahs, with no storage standard (as read), and the storm-water drainage proposed for Una is a drainage work (JSV, ₹19.66 crore). In the hill towns there is little flat land on which a regional pond could be built, and none may be built on a slope where Clause 8.8.1 bars infiltration; a regional facility there is a lined tank or a lined detention structure, not a pond. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Himachal Pradesh State Wetlands Authority;
- (b) the State's three Ramsar sites, Pong Dam Lake in Kangra district (Site No. 1211; 15,662 ha; designated on 19 August 2002), Chandertal in Lahaul and Spiti (Site No. 1569; 49 ha; 8 November 2005) and Renuka in Sirmaur (Site No. 1571; 20 ha; 8 November 2005), to their Ramsar boundaries, with the wildlife sanctuaries around them, and any wetland notified under the 2017 Rules;
- (c) Rewalsar and Khajjiar, covered by the national wetland conservation programme, the wetlands of the national atlas larger than 2.25 ha, the drawdown zone of the Pong reservoir between its minimum and maximum levels, and the spring-fed tals, marshy glades and seeps of the hills, within the 1% AEP extent of Clause 7.3.4 (a river or reservoir itself is a waterbody under the rest of this chapter); and
- (d) any other tal, marsh or wetland that the Authority notifies, that the wetland authority lists, or that the High Court of Himachal Pradesh, the National Green Tribunal or the Supreme Court directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Himachal Pradesh's wetlands are the concern of the Himachal Pradesh State Wetlands Authority, constituted under rule 5(1) of the Wetlands (Conservation and Management) Rules, 2017 by notification No. STE-E(3)-10/2017-Pt-I of 7 November 2017 of the Department of Environment, Science and Technology, chaired by the Minister in charge of that Department, with the Chief Secretary as Vice-Chair, the Secretaries of Urban Development and of Irrigation and Public Health (now JSV) among its members, an expert in hydrology among its non-official members, and HIMCOSTE as Member Secretary, nodal department and secretariat; a State Level Steering Committee on Wetlands under the Chief Secretary, continued in 2017, approves the action plans for the Ramsar sites and for Rewalsar and Khajjiar. The State has three Ramsar sites: Pong Dam Lake in Kangra district (Site No. 1211; 15,662 ha; designated on 19 August 2002), Chandertal in Lahaul and Spiti (Site No. 1569; 49 ha; 8 November 2005) and Renuka in Sirmaur (Site No. 1571; 20 ha; 8 November 2005) (Ministry of Environment, Forest and Climate Change, list of 31 January 2024; Ramsar Sites Information Service); the Authority's booklet gives larger areas, which are those of the sanctuaries and the reservoir, and this Manual uses the Ramsar figures. Rewalsar in Mandi and Khajjiar in Chamba are covered by the national wetland conservation programme. No wetland notified under rule 4 of the 2017 Rules was found, and no count of the State's wetlands in the national atlas was obtained; the Union Ministry has said that the wetlands of the national atlas larger than 2.25 ha are protected under rule 4 whether or not they are notified (office memorandum of 8 March 2022, as quoted). The wetlands that matter to drainage are the small tals in town catchments, which are silting and receiving sewage (Clause 8.9, Commentary): Rewalsar, whose "Sewage drains constructed around the lake are not functioning properly and leaking at many points which are causing eutrophication", and Khajjiar, where "Heavy siltation and deposition of peat has made the water-body too shallow" (HP State Wetlands Authority); and the drawdown zone of the Pong reservoir, whose southern streamlets, the choes, are checked by check dams and walls in the catchment "to reduce the silt load". A drain outfall, desilting, diversion or gate operation in or near a Ramsar site, a notified wetland or a wildlife sanctuary therefore needs the views or permission of the Wetlands Authority or the Forest Department where the Rules or the Wildlife (Protection) Act, 1972 reach it, as well as compliance with this chapter; for the tals, springs and marshy glades they do not reach, this chapter and the planning rules are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Himachal Pradesh's tals, khads and rivers through the drains (Clause 8.9, Commentary). The CPCB placed the Ashwani Khad, the Bald, the Sirsa and the Sukhna in Priority I in 2022; it found in 2024 that the treatment plants in the catchment of the Ashwani Khad were discharging "into Nalla leading to Ashwani Khad" without a valid consent, and that BBMB's treatment plant at Pandoh was not operating (interim report of 6 May 2024 in NGT O.A. 735/2023); and the leaking sewers round Rewalsar are eutrophying the lake (HP State Wetlands Authority). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Himachal Pradesh they apply in full to every new outfall, and every existing outfall to a tal, khad, wetland, reservoir or river that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed. In a tal catchment, every drain that enters the tal also passes a silt retention chamber or sediment trap first (Figure 7.3), as the works at Rewalsar and Renuka already provide, because the tal is the end of the slope's drainage and has no other way to lose the silt.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Himachal Pradesh's main controls on building and dumping in its khads, rivers and reservoirs are the planning rules and the courts, and the courts have done most of the work on dumping. In Madan Lal v. State of Himachal Pradesh (CWPIL 31/2023) the High Court barred, on 22 May 2023, the dumping of muck "in Govind Sagar Lake and its feeding khuds/nallahas", asked the State on 20 July 2023 what it was doing to stop people dumping muck "on the banks of river or in the valleys", and on 31 May 2024 directed penal action against those who had dumped muck in the lake "or its tributaries/rivulets/khuds or on other forest or public lands" and steps "to clear the muck from the shores of Govind Sagar Lake, its tributaries, forest and all public lands", recording that the figures given for the four-laning of the national highway (6,41,256 m³ of muck, of which 4,08,010 m³ were said to be used and 2,34,080 m³ dumped on private land) were contradicted by the record. In Fourlane Visthapit and Prabhavit Samiti v. State (CWP 5243/2022, order of 26 June 2023) the High Court, faced with a payment of ₹8,45,700 for muck dumped in a forest, remarked that it was made "as if the payment of the said money will automatically dissolve the muck and make it disappear in thin air", and asked the Union Ministry how NHAI would stop muck dumping "near water bodies". The HPSPCB has levied environmental compensation for illegal dumping of muck and debris in eight regions, from ₹1,00,000 in Chamba to ₹77,90,000 in Shimla (reply of 20 February 2024 in NGT O.A. 726/2023). On building in flood land, the needs assessment of 2023 found construction "on unstable slopes or floodplains", channels "often encroached upon" and, in Kullu, building along the old river courses of the Beas, and asked for no-building zones along riverbanks. The National Green Tribunal's directions on Shimla of 16 November 2017, which barred new construction in the core and green areas, were set aside by the Supreme Court on 11 January 2024 (State of Himachal Pradesh v. Yogendera Mohan Sengupta, 2024 INSC 30), which let the State implement the Shimla Development Plan "subject to what has been observed" and gave the plan no "imprimatur"; and the Supreme Court has since taken up the ecology of the State on its own motion (W.P.(C) 758/2025), referring Shimla's green belts and construction to its Central Empowered Committee, whose first report was reported in October 2026 (all as reported; the orders were not read). A petition on hill cutting and haphazard construction was reported pending before the High Court (CWPIL 13/2021). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The natural tals of Himachal Pradesh are not held by bunds, and village ponds and kuhls are too low to be specified dams, but each outlet work or bund shall be screened under Clause 7.14.1. The dams of the State's reservoirs are specified dams under the Act: among them Kol, 153 m high above the river bed and 167 m above its foundation, Pandoh, 76 m, Karcham Wangtoo, 98 m, and Chamera I, 226 m, as well as Bhakra and Pong (as reported); the needs assessment of 2023 counts 135 dams in the State, and a list of dams that the Chief Secretary was reported to have found in breach of dam-safety norms was not obtained. Where the storage of a tal or reservoir is counted under Clause 7.7, its bund, outlet works or dam is a tank bund for Clause 7.14.2 unless the Act applies. A glacial or moraine-dammed lake is never counted as storage, but where it lies upstream of a town, its breach path is mapped as a hazard (definitions after Clause 7.2; Chapter 5). Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Himachal Pradesh the embankments and lakes that matter to the towns are the dams of the hydroelectric and storage projects and the natural dams of the high mountains. On 26 June 2005 a landslide lake on the Parechu in Tibet burst and the Sutlej rose by 12 to 15 m, with a flow of about 2,000 m³/s, and about 5,000 people were evacuated along the river; on 1 August 2000 a flash flood on the Sutlej in Kinnaur and Rampur carried away more than 100 people and over 25 bridges (both as reported; no official account was found). After a cloudburst on 24 July 2023 the reservoir of the Malana II project was reported "filled with debris and silts causing its overspill", with its gates jammed, and the "Bursting of Malana Dam" was listed by IMD among the events of 31 July 2024; releases from Pandoh were blamed by residents for flooding downstream in July 2023, and a civil-society review listed faulty operations at Larji and other projects that year (all as reported). No breach map or emergency action plan for a tal, barrage or reservoir was read for this Manual, and no State plan for urban floods was read. A failed or overtopped bund floods the town below it, a burst lake sends a flood and debris down a khad faster than any warning, and an unannounced release floods the town too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Government of Himachal Pradesh, Town and Country Planning Department. Himachal Pradesh Town and Country Planning Rules, 2014, made under the Himachal Pradesh Town and Country Planning Act, 1977, consolidated to 2022 (Rule 21(1); Appendix-1, clauses 3, 8, 11, 15, 16, 18 and 20, with the title of the Fifth Amendment, 2020; Appendices 3, 6 and 7; site plan forms). The Twelfth to Fifteenth Amendments (2024–2025) and the draft Sixteenth Amendment (2025) were not read. https://tcp.hp.gov.in/Application/uploadDocuments/rule/Rule20221126_160623.pdf ; Appendix-1 web page (as of June 2025), https://tcp.hp.gov.in/content/appendix-1
- Town and Country Planning Department. Chopal Planning Area Development Plan 2041 (non-developable land). https://tcp.hp.gov.in/Application/uploadDocuments/devlopmentPlan/PlanDoc020240108_160640.pdf ; the Shimla Development Plan (published on 20 June 2023 according to the Supreme Court; 23 June 2023 in the press), not read.
- Government of Himachal Pradesh. Himachal Pradesh Minor Canals Act, 1976 (Act No. 42 of 1976), ss. 2, 3, 43–48, 65, 66 and 68, with its Schedules and Rules (PRS Legislative Research copy).
- Government of Himachal Pradesh, Department of Environment, Science and Technology. Notification No. STE-E(3)-10/2017-Pt-I of 7 November 2017 constituting the Himachal Pradesh State Wetlands Authority; notification No. STE-F(2)-10/2009 of 15 June 2017 (State Level Steering Committee on Wetlands); and the Authority's booklet Major Wetlands of Himachal Pradesh (Rewalsar, Khajjiar, Renuka, Chandertal and Pong).
- Ministry of Environment, Forest and Climate Change. 80 Ramsar sites of India (31 January 2024), https://moef.gov.in/uploads/2024/03/80-Ramsar-sites-of-India-31-01-2024.pdf ; Ramsar Sites Information Service, Site No. 1211 (Pong Dam Lake), No. 1569 (Chandertal Wetland), https://rsis.ramsar.org/ris/1569 , and No. 1571 (Renuka Wetland), https://rsis.ramsar.org/ris/1571 ; Ministry office memorandum of 8 March 2022 on wetlands larger than 2.25 ha (seen only as quoted).
- Government of Himachal Pradesh (2023). Himachal Pradesh Post Disaster Needs Assessment: Monsoon 2023 (with NDMA support), pp. 27–29, 40, 65, 69, 182–189; and Himachal Pradesh Monsoon 2023 Recovery and Reconstruction Plan (NDMF proposals).
- National Green Tribunal. O.A. 121/2014 with O.A. 505(THC)/2015, Yogindra Mohan Sengupta v. Union of India, judgment of 16 November 2017, with the report of its expert committee (paras 53, 61, 62 and 112); set aside by the Supreme Court in State of Himachal Pradesh v. Yogendera Mohan Sengupta, C.A. 5348-5349/2019, 2024 INSC 30, judgment of 11 January 2024 (paras 69–70, 84–85, 99, 124 and 126).
- High Court of Himachal Pradesh. Madan Lal v. State of Himachal Pradesh, CWPIL 31/2023, orders of 22 May 2023, 20 July 2023 and 31 May 2024; Fourlane Visthapit and Prabhavit Samiti v. State of Himachal Pradesh, CWP 5243/2022, order of 26 June 2023.
- Himachal Pradesh State Pollution Control Board. Reply of 20 February 2024 in NGT O.A. 726/2023 (environmental compensation for muck dumping; stone-crusher policy of 29 June 2021).
- National Green Tribunal. O.A. 735/2023 (Ashwani Khad, suo motu): CPCB interim report of 6 May 2024; affidavits of the Chief Secretary of 22 February 2024, 2024 and 1 February 2026 (Chapter 8 references).
- NITI Aayog, Development Monitoring and Evaluation Office (2020). Best-practice note, Swan River Flood Management Project, Una.
- SANDRP. "2022 CWC flood monitoring sites in North India" (5 August 2022) and "Rivers breaching highest flood levels in July 2023" (secondary; CWC levels and sites as transcribed). https://sandrp.in/
- India Meteorological Department, Meteorological Centre Shimla. Onset and withdrawal dates of the monsoon in Himachal Pradesh (2024–2026 tables); monsoon reports for 2023 and 2025.
- Bhakra Beas Management Board. Reservoir levels of Pong and Bhakra (in feet), as reported in the press and by SANDRP, 2023 and 2025 (secondary).
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Reports of the setbacks and bye-laws of 2025 (secondary; no gazetted text found): The News Himachal, "Himachal Makes Geological and Structural Design Report Mandatory for Urban Building Construction" (26 July 2025), https://thenewshimachal.com/?p=62926 ; The Tribune, "No govt institution to be built within 150 metres of rivers: CM" (30 July 2025), https://www.tribuneindia.com/news/himachal/no-govt-institution-to-be-built-within-150-metres-of-rivers-cm ; The News Himachal on the model bye-laws for rural construction (16 September 2025), https://thenewshimachal.com/?p=63321
- Reports of the Supreme Court's suo motu case on the ecology of Himachal Pradesh, W.P.(C) 758/2025, and of the first report of its Central Empowered Committee (2025–2026; secondary; the orders were not read).
- Reports of reservoir operation and floods (secondary): Pong and Bhakra levels and releases in August 2023 and September 2025; Pandoh releases (30 June 2025); the Larji release of 2014; the Malana II reservoir (2023–2024); the Parechu flood of 26 June 2005 and the Sutlej flood of 1 August 2000; the glacial lake inventory of the State Centre on Climate Change (2019), as reported by The Tribune.
- Rajan, Rajendra. "Water under lock and key." The Tribune (Spectrum), 18 September 2011 (khatris of Bamsan, Hamirpur). https://www.tribuneindia.com/2011/20110918/spectrum/main3.htm
- Baker, J. Mark (2005). The Kuhls of Kangra: Community-Managed Irrigation in the Western Himalaya. Seattle: University of Washington Press (kuhl and kohli).
- Joshi, Tika Ram (1911). "A Dictionary of the Pahari Dialects as Spoken in the Punjab Himalayas", ed. H. A. Rose. Journal and Proceedings of the Asiatic Society of Bengal, New Series, Vol. VII, No. 5, art. 22, pp. 119–275 (BioStor 317660).
- Platts, J. T. (1884). A Dictionary of Urdu, Classical Hindi, and English. London: W. H. Allen; Dasa, Syamasundara (1965–1975). Hindi Shabdasagara. Kashi: Nagari Pracarini Sabha; and Turner, R. L. (1962–1966, Addenda 1985). A Comparative Dictionary of the Indo-Aryan Languages. London: Oxford University Press; all online at the Digital South Asia Library, University of Chicago (accessed 10 November 2026). https://dsal.uchicago.edu/dictionaries/platts/ ; https://dsal.uchicago.edu/dictionaries/dasa-hindi/ ; https://dsal.uchicago.edu/dictionaries/soas/
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Hindi and Pahari waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Himachal Pradesh has no Act for the protection of lakes, tanks, ponds or springs as such, and no floodplain zoning law. Its waterbodies are protected instead by its planning law, by a canal Act that reaches its kuhls and its lines of natural drainage, by its groundwater Act, by the wetland rules and by the courts. The Himachal Pradesh Town and Country Planning Act, 1977 is applied through the TCP Rules 2014 and through the Interim Development Plans and Development Plans made under it. Where no plan has been prepared, Appendix-1 of the Rules limits development to slopes of 45° (clause 3), limits a hill cut to 3.50 m (clause 11) and allows construction at 3.00 m from a nullah and 5.00 m from a khud (clause 16); in a planning area the distance from the highest flood level along rivers, khads and nullahs is as the plan delineates, and elsewhere "no construction shall be allowed in parcel of land prone to floods" (Appendices 3 and 7); every application for planning permission shows the "Existing water bodies like Bauri, Well, Nallah, khud" on its site plan; and a geologist's soil investigation report is required before building in the sinking and sliding zones of a plan (Rule 21(1)) (Clause 7.4, Disclosure). The Act reaches only the 54 urban local bodies and about 102 notified areas, with 21.70% of the population and less than 10% of the area of the State (post-disaster needs assessment, 2023); building in the villages is to come under model bye-laws approved by the Cabinet in September 2025, reported to ban building along the banks of rivers and streams, whose text was not found. The Himachal Pradesh Minor Canals Act, 1976 (Act No. 42 of 1976) makes the kuhls owned or managed by the Government or a local authority (Schedule I) and the listed private kuhls serving more than one beneficiary and at least twenty acres (Schedule II) statutory canals; it lets the Government regulate the flow of water in "any river, creek, natural channel or line of natural drainage" and order an obstruction to be removed (s. 43), requires the beneficiaries to provide works for the passage of a kuhl across a road or a drainage channel (s. 46), and makes it an offence to obstruct a canal or to foul its water (s. 65). It is the only Himachal Pradesh statute found that names a line of natural drainage. The Himachal Pradesh Ground Water Act, 2005 (Act 31 of 2005, as amended) gives the Ground Water Authority an enabling power over rainwater harvesting and bars the release of effluent that contaminates the groundwater (Chapter 8). The wetlands are the concern of the Himachal Pradesh State Wetlands Authority, constituted on 7 November 2017 with HIMCOSTE as its secretariat (Clause 7.12, Commentary). On flood land the State's own post-disaster needs assessment of 2023 records that "The lack of well-defined river boundaries in floodplains is a prominent issue in Himachal Pradesh" and asks for "comprehensive river boundary mapping and the establishment of floodplain management guidelines"; no floodplain zoning Act and no notified flood line were found. In the towns, drains and nallahs are understood to vest in the local body under the Himachal Pradesh Municipal Corporation Act, 1994 and the Himachal Pradesh Municipal Act, 1994, whose drain sections were not read for this Manual [TBC]. In this chapter JSV means the Jal Shakti Vibhag, the former Irrigation and Public Health Department, which holds the State's flood works, such as the channelised Swan in Una, and its water-supply sources and intakes, and runs sewerage outside Shimla and Solan; the State's large reservoirs are held by BBMB and the other dam operators, not by JSV.
This Manual treats every recorded waterbody as drainage infrastructure. Four features set Himachal Pradesh apart. The first is the khad and the nallah: the hill torrents and storm channels into which every town on a ridge or slope drains, which carry boulders, debris and muck in flood, which in places carry sewage (Clause 8.9, Commentary), and which in places are a town's water source, as the Ashwani Khad was for Shimla until 2016. The second is the reservoir: the State's largest waterbodies are the Pong reservoir and Gobind Sagar behind Bhakra, whose levels are set by BBMB in feet, on whose shores towns such as Bilaspur stand, and into whose feeding khads muck from road works has been dumped (Clause 7.13, Commentary). The third is the spring: the naun, the baoli and the chashma, of which about 500 have been inventoried in a standard format (NITI Aayog, 2021), with no rule that keeps building or drains away from them. The fourth is the kuhl, the gravity irrigation channel of Kangra and the other valleys, which intercepts and carries hill runoff and is a canal in law. The few natural tals, Renuka, Rewalsar, Khajjiar, Prashar and Dal among them, are small lakes in small catchments, sacred and visited, fed by springs, streamlets and snowmelt, and silting; and the glacial lakes of the high mountains are hazards. This chapter gives the design rules that protect the storage and conveyance of these waterbodies. It does not replace the planning, canal, groundwater, municipal, forest and wetland procedures that record and protect them in law, or the directions of the High Court of Himachal Pradesh, the National Green Tribunal and the Supreme Court.