Draft v1.0 prepared by NEER. Not adopted by the Government of Himachal Pradesh or any authority or local body, and has no legal force. About this draft

Chapter 8Water Quality and Recharge


8.1 Purpose and scope

8.1.1 This chapter sets the requirements for the quality of stormwater leaving a site or a public drainage system, and for groundwater recharge. It covers:

  • (a) the water quality volume (WQv) and the water quality design flow;
  • (b) the treatment train, and the selection and design of best management practices (BMPs);
  • (c) the criteria for infiltration and recharge;
  • (d) the exclusion of sewage and dry-weather flow from storm drains;
  • (e) gross pollutant traps, first-flush treatment and screens at outfalls to waterbodies;
  • (f) how rainwater harvesting (RWH) fits with retention and detention;
  • (g) erosion and sediment control during construction; and
  • (h) monitoring.

8.1.2 This chapter applies to every development and public work to which Chapter 4 applies (Chapter 1). Clauses 8.9 (sewage) and 8.12 (construction erosion and sediment control) apply to every development that needs a building permit or layout approval, and to every public drainage work, whatever its size.

8.1.3 Retention under Chapter 4 is the first and preferred form of water quality control. Runoff retained on site is treated in full. The rest of this chapter applies to the part of the WQv that is not retained.

Commentary. CPHEEO (2019) is the only Indian manual that covers stormwater quality in any detail. Its Chapter 9 reproduces US event mean concentrations, but cautions that "in an Indian context the values would be much higher" because drains receive night soil, urine and food waste, and it sets no Indian numeric criteria (CPHEEO 2019, Part A §9.5). Its Chapter 10 describes water-sensitive urban design, LID and SuDS treatment trains (CPHEEO 2019, Part A Ch. 10). This chapter turns that guidance into requirements. It follows the treatment approach of the MARC/APWA BMP Manual (2012), now merged into APWA 5600 (2025.01), with the Malaysian 3-month ARI water quality storm (MSMA 2, 2012) and the Georgia water quality volume (GSMM, 2016) as tropical and US benchmarks.


8.2 Definitions

Term Meaning in this Manual
Water quality volume (WQv) The runoff volume that must be retained or treated, from the water quality rainfall depth (Clause 8.4).
Water quality rainfall depth (P_wq) The greater of the retention depth (Annex 2E, Clause 2.10) and the 24-hour 3-month ARI depth (Annex 8A).
3-month ARI depth The 24-hour rainfall depth equalled or exceeded on average four times a year, from a partial-duration series of the long-term daily record.
Water quality design flow (Q_wq) The peak flow from the 3-month ARI storm, used to size flow-through devices and diversion structures (Clause 8.4.5).
Runoff coefficient for WQv (Rv) The volumetric runoff coefficient for small storms, Rv = 0.05 + 0.009·I.
BMP A best management practice: a structural or non-structural measure that reduces pollutant loads or runoff volume.
Treatment train Two or more BMPs in series, from source to site to regional scale (Clause 8.5).
Pretreatment A BMP that removes coarse sediment, litter and oil before runoff reaches a filter or infiltration BMP.
First flush The early part of a runoff event, which usually carries the highest concentrations of sediment, litter and oil.
Gross pollutant trap (GPT) A device that captures litter, plastics, vegetation and coarse sediment, typically above about 5 mm.
Dry-weather flow (DWF) Flow in a storm drain when it has not rained for at least 72 hours. In a separate storm system, DWF is evidence of sewage, sullage, groundwater infiltration or illicit discharge.
Cross-connection Any pipe, channel or opening that lets sewage or sullage (grey water from kitchens, bathrooms and laundries) enter a storm drain.
Infiltration facility A facility designed to store runoff below the ground surface, or in a depression, and let it soak into the soil: infiltration trenches and basins, unlined bioretention, permeable pavement with an open base, soakaways, recharge pits and recharge wells.
Seasonal high groundwater table As defined in Clause 3.10.2: the highest level in the SW monsoon season.
Hotspot A land use with a high risk of spills or contaminated runoff (Clause 8.8.8).
Level of Service (LoS) / Value Rating (VR) The scoring system of Clause 8.6, from the MARC/APWA BMP Manual (2012).

8.3 Objectives and pollutants of concern

8.3.1 Stormwater treatment under this Manual shall aim to:

  • (a) remove litter, plastics and other gross pollutants before they reach a waterbody;
  • (b) remove suspended sediment, and the metals, nutrients and oil carried on it;
  • (c) keep sewage and sullage out of storm drains and waterbodies;
  • (d) recharge groundwater where soils and groundwater depth allow, without polluting it; and
  • (e) prevent erosion and sediment discharge during construction.

8.3.2 The design shall address the following pollutants for every site, and the hotspot pollutants of Clause 8.8.8 where they apply:

Table 8.1 — Pollutants of concern, sources and primary controls

Pollutant Main sources in Himachal Pradesh towns Primary control
Gross pollutants (plastics, litter, vegetation) Streets, markets, open dumping in drains Source collection; GPTs and screens (Clause 8.10)
Suspended sediment Construction sites, unpaved roads and verges, road wear, drain silt Erosion and sediment control (Clause 8.12); pretreatment; filtration
Oil, grease and fuel Roads, parking, fuel stations, workshops, bus depots Oil-grit separators at hotspots; bioretention
Pathogens and organic load (BOD) Sewage and sullage cross-connections, animal waste Exclusion and DWF interception (Clause 8.9)
Nutrients (N, P) Sewage, fertiliser, food waste, detergents Exclusion; bioretention; wetlands
Heavy metals Roads, roofs, industrial yards Filtration; sedimentation

Commentary. Gross pollutants and sewage come first in Clause 8.3 because they dominate the pollution of urban waterbodies in Himachal Pradesh, and because no treatment BMP works for long if they are not removed. CPHEEO (2019) notes that Indian drains carry night soil, urine and food waste (Part A §9.5). In its WSUD procedure it lists TSS, total nitrogen, total phosphorus and gross pollutants as the key pollutants (Part A Ch. 10). AMRUT 2.0 funds the harvesting of rainwater "through storm water drains into water body (which is not receiving sewage/effluent)" (Lok Sabha unstarred question AU1419), which only works if sewage is first kept out of the drains.


8.4 Water quality volume and design flow

8.4.1 Water quality rainfall depth. The water quality rainfall depth is:

P_wq = max (P_ret, P_3m)

where:

  • P_ret = the retention depth for the site's zone (Annex 2E, Clause 2.10), mm; and
  • P_3m = the 24-hour 3-month ARI depth for the site's zone (Annex 8A), mm.

8.4.2 Water quality volume. The WQv shall be computed as:

WQv = (P_wq / 1000) × Rv × A

where:

  • WQv is in m³;
  • A = the contributing area, m²;
  • Rv = 0.05 + 0.009·I; and
  • I = the impervious percentage of the contributing area (0–100), after the connectivity rules of Clause 3.9.

The Rv form above may be used only for sites under 0.5 ha and under the Tier B simplified method (Clause 4.14). This is the same limit as for the retention volume (Clause 4.4.2). For all other sites the WQv shall be computed with the SCS-CN method, as the retention volume is: WQv (m³) = 10 × Q_wq × A, where Q_wq (mm) is the SCS-CN runoff from P_wq for each sub-area and A is in ha.

8.4.3 Climate factor. The climate factor of Clause 2.8 shall not be applied to P_wq. P_ret and P_3m are frequency statistics of ordinary rainfall, not AEP design depths.

8.4.4 WQv met by retention. The volume retained on site under Chapter 4 counts toward the WQv in full. Where the retained volume is equal to or greater than the WQv, no further treatment is required for that area, except:

  • (a) pretreatment of inflows to each retention facility (Clause 8.5.3);
  • (b) hotspot controls (Clause 8.8.8); and
  • (c) the outfall requirements of Clause 8.10, where the site discharges to a waterbody.

8.4.5 Water quality design flow. Flow-through devices (swales, filter strips, oil-grit separators, GPTs) and diversion weirs for off-line BMPs shall be sized for Q_wq. Q_wq shall be computed from the 3-month ARI intensity at the time of concentration of the contributing area:

  • (a) by the Rational Method, where Chapter 3 allows it (a single element draining no more than 16 ha); or
  • (b) as the peak of a hydrograph method using the 3-month ARI 24-hour depth with the alternating-block pattern of Clause 2.9.1.

8.4.6 Bypass. Flows above Q_wq shall bypass flow-through and off-line treatment devices without washing out the material already captured. The bypass shall be part of the minor or major system (Chapter 6).

8.4.7 Drawdown. Where the WQv is held in an extended-detention BMP (wet pond, constructed wetland or dry extended-detention basin), it shall be released over 24–48 hours (Chapter 4).

Commentary. The WQv depth is the runoff from the 3-month ARI storm or the retention depth, whichever is greater. The 3-month ARI is the Malaysian water quality design storm (MSMA 2, 2012). The Malaysian 2008 checklist gave its depth as about 40 mm and said it captures 90% or more of 24-hour storm runoff volume (DID, 2008). The Himachal Pradesh value must be computed (Annex 8A). Georgia sets its WQv as the runoff from 1.2 inches (about 30 mm), the depth that covers 85% of storms in an average year, and requires 80% removal of the average annual post-development TSS load (GSMM 2016, Vol 1, Standard #4). Kansas City's water quality storm is the 1.37-inch (about 35 mm) event that produces up to 90% of the runoff from all 24-hour storms in a year (MARC BMP Manual, 2012).

The Rv formula is from the MARC/APWA BMP Manual (2012), which computes WQv = P × Rv with Rv = 0.05 + 0.009·I. Rv is used instead of the SCS curve number because the CN method greatly understates runoff from small storms on pervious ground. Not applying the climate factor (Clause 8.4.3) has no direct precedent; this Manual does so because it treats P_wq like the retention depth, as a statistic of ordinary rainfall. Bypass of larger flows and the 24–48 hour drawdown follow Chapter 4; MARC (2012) required at least 40 hours of extended detention of the WQv.

Illustrative — not design values. For a 1.0 ha site with 80% impervious cover and an assumed P_wq of 50 mm:

  • Rv = 0.05 + 0.009 × 80 = 0.77
  • WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³

8.5 Treatment train and pretreatment

8.5.1 Treatment train. Water quality control shall be designed as a treatment train, in the order shown in Figure 8.1:

  • (a) source controls on the plot: roof runoff to RWH, rain gardens, permeable paving, disconnection of impervious areas, and silt traps at inlets;
  • (b) site controls: bioretention, swales, filter strips, infiltration, oil-grit separators at hotspots, wet ponds and extended detention; and
  • (c) regional controls, for public drainage: GPTs and DWF interceptors at outfalls, constructed wetlands at tank inlets, and regional ponds.

8.5.2 A development shall meet the WQv on site, through (a) and (b). Regional controls under (c) may count toward a development's WQv only where a regional facility treating the same runoff has been built under a notified basin plan (Clause 7.11).

8.5.3 Pretreatment. Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland shall have pretreatment at each concentrated inflow. Pretreatment shall be a sediment forebay, grass filter strip, silt trap or proprietary device that holds at least 10% of the WQv of its contributing area, or that is sized for Q_wq for flow-through devices.

8.5.4 Pretreatment shall be accessible for cleaning without entering or disturbing the main BMP.

Commentary. The treatment train follows CPHEEO (2019, Part A §10.2.3, SuDS treatment train) and CIRIA C753 The SuDS Manual (2015). It is also the order of priorities of this Manual: preserve, retain, detain, convey (Chapter 1). The 10% forebay volume has no Indian precedent; it is a common sizing rule for forebays in US manuals. In Himachal Pradesh, unpaved verges, construction sites and drain silt deliver a heavy sediment load. Bioretention and infiltration facilities without pretreatment clog, often within a year or two.

Stormwater treatment train: source, site and regional Treatment train: source → site → regional → receiving waterbody Runoff from roofs, roads, parking and open space: first flush carries most sediment, litter and oil 1. Source control on the plot, at the roof or kerb • Rooftop RWH: sump, recharge well • Rain garden, small bioretention • Permeable paving • Disconnect roofs onto lawns • Green roof, soil restoration • Silt trap / catch pit at inlets Retain first (Chapter 4) 2. Site control layout, campus, road corridor • Bioretention, swales, filter strips • Infiltration trench or basin • Oil-grit separator (hotspots) • Wet pond or extended detention • Sediment forebay pretreatment • Treat WQv, then detain Treat WQv (Clause 8.4) 3. Regional control basin or outfall, public land • Gross pollutant trap at outfall • Dry-weather flow interceptor • Constructed wetland at tank inlet (sedimentation zone) • Regional pond / restored tank (fee-in-lieu, Clause 7.11) Required at outfalls (8.10) Receiving waterbody tank, channel, marsh, estuary (Chapter 7) Each stage removes a different fraction. Coarse solids and litter are removed first so that filters and infiltration media do not clog. Flows above the WQ peak bypass treatment to detention (Chapter 4). Sewage and dry-weather flow are not stormwater No sewage or sullage connection to any storm drain (Clause 8.9). Dry-weather flow found at an outfall is intercepted and sent to the sewer or a treatment plant, not to the treatment train or the waterbody.

Figure 8.1 — Treatment train: source, site and regional controls before the receiving waterbody, with sewage and dry-weather flow kept out of the system. Original drawing for this Manual, adapted from CIRIA, The SuDS Manual (C753), 2015, and MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012.


8.6 BMP selection: Level of Service and Value Rating

8.6.1 Method. In Tier A areas, the BMPs for each site shall be selected by the Level of Service (LoS) method of this Clause. In Tier B areas, the simplified route of Clause 8.6.5 may be used.

8.6.2 Required Level of Service. For a site that is not redevelopment, the required LoS depends on the change in curve number (ΔCN) from pre- to post-development (Chapter 3):

Table 8.2 — Required Level of Service for sites that are not redevelopment

ΔCN Impact Required LoS
17 or more High 8
7 to 16 Moderate 7
4 to 6 Low 6
1 to 3 Minimal 5

For redevelopment (existing impervious cover of 20% or more of the site), the required LoS shall be taken from Annex 8B.

8.6.3 Value Rating. Each BMP treating the WQv has a Value Rating (VR) from Table 8.3. The site's composite VR is the area-weighted average of the VRs of the BMPs serving each part of the site. Treatment trains get a composite VR under Annex 8B. The composite VR shall be equal to or greater than the required LoS.

8.6.4 Conditions for a Value Rating. A BMP earns its VR only if:

  • (a) it is sized for the WQv (or Q_wq for flow-through devices) of the area credited to it;
  • (b) it meets the design requirements of Clause 8.7 and, for infiltration, Clause 8.8; and
  • (c) it has pretreatment under Clause 8.5.3.

8.6.5 Tier B simplified route. In Tier B areas, the requirement of Clause 8.6.3 is deemed met where the whole WQv of the site is either:

  • (a) retained on site under Chapter 4; or
  • (b) treated by a bioretention cell, rain garden or infiltration facility designed under Clauses 8.7 and 8.8, with pretreatment.

Table 8.3 — BMP Value Ratings and suitability in Himachal Pradesh

BMP VR (MARC 2012) Main pollutants removed Volume reduction / recharge Siwalik valley fills, fans and river sands Laterite / hard rock Balh valley, Siwalik shale or hill colluvium / high water table Himachal Pradesh notes
Native vegetation (preserved) 9.25 All High Suited Suited Suited Counts only for preserved, undisturbed area
Rain garden / infiltration 9.0 Sediment, metals, oil, nutrients High Suited if 1.0 m separation met Conditional (test) Not suited Mosquito control: drain within 48 h
Bioretention 8.5 Sediment, metals, oil, nutrients Medium–high (unlined); low (lined) Suited Suited, with underdrain Lined, with underdrain Media source and phosphorus content to be specified
Permeable pavement 7.5 Sediment, metals, oil Medium–high Suited Conditional Lined only Not where run-on carries heavy silt
Extended detention wetland 7.0 Sediment, nutrients, metals Low Conditional (water balance) Suited Suited Good at tank inlets (Clause 7.9.7)
Media / sand filter 6.0 Sediment, metals Low Suited Suited Suited (lined) Needs frequent cleaning
Extended wet detention (wet pond) 5.0 Sediment, metals, some nutrients Low Conditional (water balance) Suited Suited Dry-season water balance (Clause 8.7.8)
Vegetated filter strip 5.0 Sediment Low–medium Suited Suited Suited Mostly as pretreatment
Native vegetation swale 4.0 Sediment, oil Low–medium Suited Suited Suited Not where Q_wq velocity is high
Extended dry detention 4.0 Coarse sediment Low Suited Suited Suited Combine with detention (Chapter 4)
Proprietary / hydrodynamic devices 3.0–5.0 Coarse sediment, oil, litter None Suited Suited Suited VR from verified test data only
Signage (public education) +0.25 — — — — — Added to composite VR

The VR column is from the MARC/APWA BMP Manual (2012), Table 4.4. The suitability columns and notes have no direct precedent and are set by this Manual.

Commentary. The LoS and VR method is from the MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Tables 4.2 and 4.4. The VRs combine a water quality score, based on effluent TSS concentrations in the International Stormwater BMP Database, with scores for volume reduction, temperature, and oils and floatables. The method suits Himachal Pradesh for two reasons. It rewards volume reduction and preservation, which also serve recharge. It can also be checked by a reviewer without water quality modelling. Its weakness is that the scores come from US data. Himachal Pradesh stormwater carries more litter and more sewage than the US runoff behind the scores (CPHEEO 2019, §9.5), so this Manual requires GPTs and DWF exclusion separately (Clauses 8.9 and 8.10) and does not let a VR stand in for them.


8.7 BMP design summaries

8.7.1 General. Each BMP shall be designed to the requirements below and to Annex 8D (BMP design sheets). The dimensions given are recommended starting values where marked; the designer shall justify any departure. Every BMP shall be designed for safe passage of flows above Q_wq (Clause 8.4.6) and shall have access for maintenance (Chapter 10).

8.7.2 Bioretention and rain gardens (Figure 8.2).

  • (a) Surface ponding depth not more than 300 mm above the mulch, with an overflow at the maximum ponding level.
  • (b) Surface ponding drained within 48 hours.
  • (c) Filter media 600–900 mm deep: an engineered sandy loam with low fines and low phosphorus content (Annex 8D), with a 50–75 mm mulch layer.
  • (d) A transition (choker) layer and a gravel drainage layer below the media.
  • (e) A perforated underdrain where the design infiltration rate of the native soil (Clause 8.8.4) is below the rate needed to meet (b), or where the cell is lined.
  • (f) Unlined cells shall meet the infiltration criteria of Clause 8.8. Cells that cannot meet them, and cells at hotspots, shall be lined.
  • (g) Plants: native or naturalised species tolerant of both waterlogging and long dry spells.

8.7.3 Vegetated swales.

  • (a) Trapezoidal or parabolic section, with side slopes no steeper than 1V:3H.
  • (b) Longitudinal slope 0.5% to 4%, with check dams where steeper.
  • (c) Flow depth at Q_wq not more than the height of the grass, and velocity at Q_wq not more than 0.3 m/s.
  • (d) The 1% AEP flow (or the bypass) shall not erode the swale (Chapter 9 permissible velocities).
  • (e) Where longitudinal slopes are below 1% or the subsoil is poorly drained, an underdrained ("dry") swale with filter media.

8.7.4 Vegetated filter strips.

  • (a) Receive sheet flow only, with a level spreader where flow arrives concentrated.
  • (b) Length in the direction of flow at least 5 m, and slope 1% to 8%.
  • (c) Used mainly as pretreatment for bioretention, infiltration and swales.

8.7.5 Permeable pavement.

  • (a) Run-on from impervious areas not more than twice the permeable area, and no run-on from unpaved or eroding areas.
  • (b) Base reservoir of clean, open-graded aggregate, sized to hold its share of the WQv in its voids.
  • (c) An open base (infiltrating) only where Clause 8.8 is met; otherwise lined with an underdrain, and then counted as filtration only.
  • (d) Structural design for the traffic loading by the road authority's standards.
  • (e) Not at hotspots, and not where the surface will be resurfaced with impermeable material.

8.7.6 Infiltration trenches and basins (Figure 8.3).

  • (a) Pretreatment under Clause 8.5.3 in every case.
  • (b) Trenches filled with clean washed aggregate, with a void ratio confirmed by test, wrapped in geotextile on the sides and top, on a sand base.
  • (c) An observation well to the base of each trench.
  • (d) Storage volume = WQv (or the retention volume of Chapter 4, where greater) held in the voids; emptied within 72 hours at the design infiltration rate.
  • (e) An overflow to the minor or major system at grade.
  • (f) Not brought into service until the contributing area is stabilised (Chapter 10).

8.7.7 Wet ponds (extended wet detention).

  • (a) A permanent pool of at least the WQv, plus extended detention of the WQv above the pool, released over 24–48 hours.
  • (b) A sediment forebay at each inlet (Clause 8.5.3).
  • (c) Length-to-width ratio of the flow path at least 3:1, with no short-circuiting.
  • (d) Permanent pool depth 1.0–2.5 m, with a safety bench (Clause 7.9.4).
  • (e) A dry-season water balance (Clause 8.7.8).
  • (f) The detention storage of Chapter 4 may sit above the extended detention level.

8.7.8 Water balance for permanent pools. Wet ponds and wetlands shall be shown, by a monthly water balance using IMD rainfall and pan evaporation, to keep at least 50% of the permanent pool volume (or the minimum wetland depth) through the driest year in 10. They shall not be topped up with groundwater, potable water or sewage. Where the balance fails, a dry extended-detention basin or a constructed wetland with a smaller permanent pool shall be used instead.

8.7.9 Constructed wetlands.

  • (a) An inlet sedimentation pond (forebay) followed by a shallow vegetated macrophyte zone.
  • (b) Extended detention of the WQv above the normal water level, released over 24–48 hours, with an extended detention depth not more than 0.5 m.
  • (c) A flow path length-to-width ratio of at least 3:1, with deep zones across the flow path to spread the flow.
  • (d) A high-flow bypass so that floods do not scour the macrophyte zone.
  • (e) Where built at a tank inlet, the wetland shall sit within the tank's setback but outside its waterspread, and its storage shall not be counted as tank storage.

8.7.10 Gross pollutant traps.

  • (a) Sized to treat Q_wq, with all flows up to the 1% AEP passing without washing out captured material.
  • (b) Capture of gross pollutants down to about 5 mm.
  • (c) Head loss included in the hydraulic grade line of the drain (Chapter 9), with the screen assumed 50% blocked.
  • (d) Storage for captured material sized for the cleaning interval of the O&M plan, and not less than the 3-monthly cleaning of Chapter 10.
  • (e) Vehicle access for cleaning by suction or grab.

8.7.11 Oil-grit separators.

  • (a) Required at the hotspots of Clause 8.8.8 that involve fuel or oil: fuel stations, vehicle workshops and washing bays, bus and truck depots, and parking areas of more than 50 spaces.
  • (b) Sized for Q_wq, with a high-flow bypass.
  • (c) Not to be used as the only treatment: they shall be followed by a filtering BMP where the site needs a VR above 5.

8.7.12 Silt traps and catch pits.

  • (a) At every inlet that receives runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody.
  • (b) A sump at least 300 mm below the outlet invert.
  • (c) Silt traps are pretreatment only and earn no VR.

Commentary. The design summaries draw on the MARC/APWA BMP Manual (2012), the Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) and PUB Singapore's ABC Waters Design Guidelines. The dimensions are typical of those manuals but have not been calibrated in Himachal Pradesh. Three local issues drive changes from the source manuals:

  • Mosquitoes. Dengue is endemic in Himachal Pradesh. Surface ponding in bioretention and rain gardens must drain within 48 hours (Clause 8.7.2(b)), well inside the time mosquito larvae need to develop. This is consistent with the 24–48 hour WQv drawdown of Clause 8.4.7.
  • Dry seasons. Most of Himachal Pradesh's rain falls in the south-west monsoon: the State's monsoon normal is 734.4 mm, from June to September, with 255.9 mm in July and 256.8 mm in August, against 240.7 mm in the pre-monsoon months of March to May and 82.9 mm from October to December, and the winter brings rain and snow from western disturbances (IMD, Meteorological Centre Shimla). The monsoon now sets in on about 25 June and withdraws on about 25 September (new normal dates, from 2024), but it withdrew later than that in eight of the nine years from 2018 to 2026, and storms of western disturbances follow it, as on 5 to 7 October 2025; above about 1,500 m snow lies through the winter. From October to the monsoon, tals fall and springs weaken unless they are fed, and the HIMCOSTE is reported to find fewer than a third of the State's traditional water sources recharging properly (as reported). In the towns the feed of a drain or pond in the dry months is often sewage, because the nallahs carry it (Clause 8.9, Commentary). A wet pond or constructed wetland whose water balance (Clause 8.7.8) cannot keep its permanent pool through the dry months on its own catchment's runoff is not to be used; in the hill towns, where Clause 8.8.1 bars infiltration on the slopes and there is little flat land, the practical forms are lined bioretention with an underdrain, swales on gentle ground, storage for use, and lined extended dry detention, and above about 1,500 m every BMP is also checked for frost, snow and ice from December to March. Clause 8.7.8 applies to BMPs, which shall not be topped up with sewage; tals, nauns, baolis, khatris, springs and wetlands are waterbodies under Chapter 7 and are not to be used as treatment for a development. Wet ponds that dry out turn into stagnant pools or are used for dumping. Clause 8.7.8 requires a water balance and bans topping up with sewage, which is a common practice for keeping urban ponds "full".
  • Litter and silt. GPTs and silt traps are treated as essential, not optional, because Himachal Pradesh drains carry heavy litter and silt loads. The 50% blockage factor for screens matches the grate clogging factor of Chapter 6.

The 50-space threshold for oil-grit separators, the 5 mm GPT capture size, the 0.3 m/s swale velocity and the other dimensions in this Clause have no direct precedent and are set by this Manual.

Bioretention cell: cross-section Bioretention cell (rain garden): section, not to scale Paved area Pretreatment: grass strip or forebay to drain ponding ≤ 300 mm filter media 600–900 mm overflow crest = max ponding mulch 50–75 mm engineered sandy-loam media (low fines, low phosphorus) transition (choker) layer gravel drainage layer perforated underdrain (if needed) Seasonal high groundwater table (post-monsoon) ≥ 1.0 m if unlined (infiltrating) Lined version (no infiltration): impermeable liner below the gravel layer. Required at pollution hotspots and wherever the 1.0 m separation to seasonal high groundwater cannot be met. Dimensions as set in Clause 8.7.2.

Figure 8.2 — Bioretention cell (rain garden) in section: pretreatment, surface ponding, filter media, transition and gravel layers, underdrain, overflow, and the 1.0 m separation to seasonal high groundwater for an unlined cell. Original drawing for this Manual, adapted from MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, and CIRIA, The SuDS Manual (C753), 2015.


8.8 Infiltration and recharge criteria

8.8.1 Groundwater separation. An infiltration facility is permitted only where the seasonal high groundwater table is at least 1.0 m below the base of the facility. There is no exception in Himachal Pradesh, which has no coastal sand areas (Clause 8.8.9). For this Clause the seasonal high groundwater table is the highest post-monsoon level (September to November), and on a valley floor or terrace the higher of that level and the level at which springs come out where two terraces meet, as they do in the Nalagarh valley after the monsoon (CGWB). Himachal Pradesh needs opposite rules on its valley fills and on its slopes, and Clause 8.8.1 applies with the following. (i) Recharge on the Siwalik valley fills. On the coarse valley fills and piedmont fans of Una, Paonta–Kala Amb and the upper terraces of the Nalagarh valley, where the water lies deep (up to 43.20 m below ground in Una and 42 m in the Paonta valley) and the transmissivity is high (150 to 2,600 m²/d in Una and 211 to 3,336 m²/d at Paonta–Kala Amb, CGWB aquifer mapping), recharge, with pretreatment and a hydrogeologist's check, is the first means of meeting retention wherever this Clause is met. Una (63.72%) and Solan (57.89%) are the districts that draw the largest share of their groundwater, though all ten assessed valley units are Safe (CGWB, 2024). (ii) No infiltration on hill slopes. The hill infiltration rule of Clause 4.11 applies to every facility under this Chapter: no deliberate infiltration practice (soakaway, soak pit, recharge pit, shaft or well, infiltration trench, unlined bioretention, or permeable paving with an exfiltrating base) shall be built or credited on natural ground sloping more than 10°; in a sinking or sliding zone defined in a Development Plan or Interim Development Plan, including Shimla's two sinking and sliding zones, or on any other mapped landslide or creep zone; on debris cover, colluvium, slide debris or moraine, whatever its slope; or upslope of a cut slope or retaining wall within a distance of twice the height of the cut or wall — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope. On such sites roof runoff goes to the rainwater storage of Appendix 6 of the TCP Rules 2014 (20 L per m² of roof), and its overflow, with all other runoff, is led by a lined drain through a sediment trap to a stable natural channel (or, in a tal catchment, to the tal through a trap), never onto an unprotected slope; the exception for roof water in Clause 8.11.3(c) does not apply, and no infiltration is credited toward retention or the WQv. Water put into a hill slope raises the pore pressure in the debris cover and can carry its fines away: the technical committee on the Shimla slides of August 2023 named "Open Drainage systems leading to poor disposal of surface water" among the causes and found the buried depressions to act as "conduits for the infiltration of sub surface water" (HIMCOSTE-led committee, HPSDMA), the expert committee before the National Green Tribunal asked in 2017 for lined drains on the slopes "so that there is minimum ingress of water into the slope", and the draft Ground Water Rules of 2006 would exempt the sinking zones from rainwater harvesting directions where structures "would be detrimental to the safety of the building structures" (draft; the final rules were not seen). (iii) No infiltration where the water is within 1 m. In the Balh valley, where the water table stands 0.27 to 7.15 m below ground (CGWB aquifer mapping), on the central valley floors near the trunk streams, on the low terraces and floodplains of the rivers, and on the margins of tals and reservoirs, no infiltration facility, recharge pit, recharge well or recharge shaft shall receive runoff of any kind where the seasonal high water table is within 1 m of the ground or the ground is waterlogged; the exception for roof water in Clause 8.11.3(c) does not apply there, no infiltration is credited, and retention is met by storage for use and by detention under Chapter 4. Elsewhere on the valley floors this Clause applies on a test at the site. (iv) Springs, nauns, baolis and khatris. Himachal Pradesh has no rule that keeps building or drains away from a spring. Within the recharge area of a naun, baoli, khatri or other spring used for drinking water, as a hydrogeologist maps it (such as the recharge area of the Bohal spring, which Palampur's municipal body pays a forest committee to protect under an agreement of 2010), only roof water and runoff that has passed a filtering BMP may be infiltrated, where item (ii) allows any infiltration at all; road runoff, sewage and septic effluent never are; no infiltration facility, soak pit or septic tank is placed within Zone 1 of the spring (Clause 7.4); and no bore well is sunk near a spring source in the hills, as the CGWB advises for the Balh and Una valleys. These rules for springs are set by this Manual. (v) Quality. Section 5A of the Himachal Pradesh Ground Water Act, 2005, inserted in 2022, provides that no person shall release any effluent that contaminates the groundwater. No industrial or sewage-laden runoff is led to any recharge structure, and on the valley fills of Baddi–Barotiwala–Nalagarh, Kala Amb, Paonta and Una, where industry stands on the recharge areas, a recharge well or shaft is used only after a check of the groundwater quality at the site and only for roof water or runoff from areas with no industrial use. Where recharge is through a well or shaft into fractured rock or deep gravel, a hydrogeologist's report shall confirm the depth to water, the receiving zone, and that no drinking-water well, spring, naun or baoli within 30 m will be harmed. The 10° trigger, the distance of twice the wall height, the 1 m limit and these conditions are set by this Manual; no Himachal Pradesh rule on infiltration or soak pits on slopes was found, and the TCP site plan forms simply ask for the soak pit to be shown. The seasonal high groundwater table shall be determined under Clause 3.10.2.

8.8.2 Other separation. The base of an infiltration facility shall also be at least 1.0 m above bedrock or any impermeable layer, unless the facility is designed to recharge a fractured or weathered rock aquifer under Clause 8.8.10.

8.8.3 Infiltration tests. The infiltration rate shall be measured at the proposed base level of the facility:

  • (a) by a double-ring infiltrometer test (ASTM D3385) for basins, bioretention and permeable pavement;
  • (b) by a falling-head borehole or trial-pit soakage test (for example BRE Digest 365) for trenches, soakaways, recharge pits and recharge wells;
  • (c) with at least 2 tests per facility, and at least 1 test per 100 m² of infiltration base area or per 50 m of trench length; and
  • (d) by a person competent in geotechnical testing, with the results reported on the Infiltration Test Record (Form 8-2).

Tests made in the dry season shall be reported with the groundwater level at the time of test and the seasonal high level of Clause 8.8.1.

8.8.4 Design infiltration rate. The design infiltration rate is the measured rate divided by a safety factor:

  • (a) 2.0 where the tests meet Clause 8.8.3(c) and the results vary by no more than a factor of 2; and
  • (b) 3.0 otherwise.

8.8.5 Minimum rates.

  • (a) Full infiltration (no underdrain) only where the design rate is at least 13 mm/h.
  • (b) Partial infiltration, with an underdrain, where the design rate is 3 mm/h to 13 mm/h. Only the volume that infiltrates within 72 hours is credited as retention.
  • (c) No infiltration credit where the design rate is below 3 mm/h.

8.8.6 Setbacks for infiltration facilities. Infiltration facilities receiving runoff from roads, parking or other paved surfaces shall be at least:

  • (a) 3 m from building foundations, and 5 m from a basement;
  • (b) 1.5 m from a property boundary, unless the neighbour agrees in writing;
  • (c) 30 m from a drinking-water well or borewell;
  • (d) 15 m from a septic tank or soak pit; and
  • (e) 6 m from the crest of a slope steeper than 1V:3H, unless a geotechnical report shows the slope remains stable.

Roof-only runoff to recharge structures is subject to (a) and (b) only, and to Clause 8.11.3.

8.8.7 Drawdown and verification. Every infiltration facility shall empty within 72 hours at the design rate (Chapter 4), and shall be tested after construction (Clause 10.9.3).

8.8.8 Hotspots. Runoff from the following shall not be infiltrated without treatment, and shall not be infiltrated at all where (d) or (e) applies:

  • (a) fuel stations;
  • (b) vehicle workshops, washing bays, and bus and truck depots;
  • (c) industrial yards and loading areas where hazardous materials are handled or stored;
  • (d) solid waste transfer stations and landfill areas; and
  • (e) land known or suspected to be contaminated.

Treatment for (a) to (c) shall include an oil-grit separator and a lined filtering BMP before any infiltration.

8.8.9 Sandy coastal aquifers. This Clause applies only to coastal sand aquifers. Himachal Pradesh has none, so the Clause has no effect in the State; it is kept only so that the clause numbers stay unchanged. The Siwalik valley fills of Una, Paonta–Kala Amb and Nalagarh and the sands and boulders of the river beds are not coastal sand areas: Clause 8.8.1 applies there in full, and the reduced separation of item (d) does not. In coastal sand areas:

  • (a) infiltration is the preferred means of meeting retention and the WQv wherever Clause 8.8.1 is met;
  • (b) storm drains shall not be designed to lower the groundwater table: inverts below the seasonal high groundwater table shall be watertight, with no weep holes or subsoil drains that discharge groundwater to the outfall, unless a hydrogeological report shows no harm to the freshwater aquifer;
  • (c) no long-term pumping of groundwater into storm drains shall be approved (for example basement dewatering); and
  • (d) in notified coastal sand areas, roof-only runoff may be infiltrated with a separation of not less than 0.5 m to the seasonal high groundwater table, provided a groundwater mounding check shows that the mound stays at least 0.3 m below the facility base and does not reach adjacent foundations or basements. No other runoff may use this reduced separation;
  • (e) where neither the 1.0 m separation nor clause (d) can be met, the site shall use surface retention that does not infiltrate below ground (for example shallow vegetated depressions, disconnection of roofs onto lawns, and reuse), and detention under Chapter 4.

8.8.10 Laterite and hard-rock areas. In laterite and hard-rock terrain (for example the schist, phyllite, slate, quartzite and limestone of the Lesser Himalaya, as around Shimla, Solan, Mandi and Chamba, the granite and gneiss of the Higher Himalaya, as in Kinnaur and upper Kullu, and the Siwalik sandstone and shale of the outer hills, where groundwater is held in the weathered mantle, joints and fractures and comes out at springs (CGWB); on any slope in these areas the hill limits of Clause 8.8.1 apply first):

  • (a) tests shall be made at the facility base, below any surface crust or hardpan;
  • (b) recharge into weathered or fractured rock is permitted only for roof runoff, or for runoff that has passed through a filtering BMP, because fractures give little treatment; and
  • (c) infiltration on or above slopes shall be checked for slope stability.

8.8.11 Delta clays and black cotton soils. In the Balh valley, where the water table stands 0.27 to 7.15 m below ground, the central valley floors of Una and the lower Nalagarh valley near the trunk streams, the silted beds of tals and the margins of reservoirs, the Siwalik shale, and the clayey colluvium and slide debris of the hills, and in expansive black cotton soils:

  • (a) infiltration facilities will usually fail Clause 8.8.5 and need not be tested where the soil survey (Chapter 3) shows HSG D; and
  • (b) where infiltration is used near buildings on expansive soils, the setback of Clause 8.8.6(a) shall be doubled.

Commentary. The 1.0 m groundwater separation is a core requirement of this Manual. The other values in this Clause (the 1.0 m bedrock separation, test numbers, safety factors, minimum rates and setbacks) are typical of US and UK practice and have no Himachal Pradesh precedent. The well setback in Clause 8.8.6(c) applies to runoff from paved surfaces, not to roof water. Himachal Pradesh RWH practice routes roof water into open wells and recharge wells, and Clause 8.11 keeps that practice.

No map of hydrologic soil groups for Himachal Pradesh, and no measured infiltration rate anywhere in the State, was found: "No infiltration tests have been conducted in previous surveys by CGWB and even this data is not available with state agencies" (CGWB aquifer mapping of the Nalagarh, Paonta and Balh valleys), and every infiltration design needs the tests of Clause 8.8.3. The geology and depths below are from the CGWB's assessments and aquifer-mapping reports. "Hilly and mountainous parts with steep slopes mainly constitute the run off areas and have low ground water potential", while in the valleys "unconsolidated / semi-consolidated formations form potential aquifers", and in the hard rocks water is restricted "to weathered mantle, joints/fractures, weak planes, bedding planes and limestone caverns" (CGWB, 2024). The Siwalik valley fills are coarse and deep: in the Una valley, pebble, cobble and boulder beds with sand and clay, with the water from artesian at Rampur to 43.20 m below ground and a transmissivity of 150 to 2,600 m²/d; at Paonta and Kala Amb, channel, valley-fill and fan deposits with the water 2 to 42 m down and 211 to 3,336 m²/d; in the Nalagarh valley, 60 to 100 m of sand, silt, gravel and cobbles, where after the monsoon the water table "intersects the ground surface at the contact between two terraces giving rise to a number of springs". The Balh valley round Sundernagar is alluvium and terrace deposits with the water 0.27 to 7.15 m below ground. Shimla stands on the schist, phyllite and slate of the Jutogh and Shimla Groups under a "thick debris cover", in rocks that "lack primary porosity" and are "permeable along the fractures" (HIMCOSTE-led committee, 2023), and the expert committee before the National Green Tribunal found that "approximately 90% Shimla is built on 45⁰-60⁰ slope" (2017). The State draws 35.48% of its extractable groundwater, and all ten assessed valley units are Safe, Una (63.72%) and Solan (57.89%) drawing the largest shares; Kullu, Shimla, Bilaspur, Hamirpur, Chamba, Kinnaur and Lahaul and Spiti have no assessment unit at all (CGWB, 2024). Older figures that placed Una, Hum or Kala Amb in a critical or over-exploited category are superseded. In the hills the springs are the water supply: about 500 springs have been inventoried in a standard format (NITI Aayog, 2021), the HIMCOSTE is reported to count about 10,512 traditional water sources of which only 30.41% are recharging properly (as reported), Palampur pays a forest committee to protect the recharge area of the Bohal spring that supplies the town (agreement of 2010), and the CGWB advises that a bore well should not be sunk near a spring source in the hills. Water put into a hill slope is a hazard as well as a resource: the committee on the Shimla slides of August 2023 named the "Deposition of thick debris cover on the fragile slopes", "Open Drainage systems leading to poor disposal of surface water" and structural depressions acting as "conduits for the infiltration of subsurface water" among their causes; at Cambley Bank it found the inhabited depression an "ideal site for the retention of sub surface water"; and it did not attribute the failures to sewage. This Manual's interim soil groups follow from these: the Siwalik valley fills and fans A to B, the Balh valley C, and D where the water is within about 1 m, the Siwalik regolith C (D on shale), and the debris cover, colluvium, slide debris and moraine of the hills designed as D with no infiltration credit on slopes (Chapter 3). The State therefore needs opposite rules on its valley fills and its slopes. On the coarse Siwalik valley fills, recharge comes first, with pretreatment and a quality check where industry stands on them. On the hill slopes, in the sinking and sliding zones and on the debris cover, no water is put into the ground on purpose, under the hill infiltration rule of Clause 4.11, which Clause 8.8.1 applies. On the Balh valley and the low terraces, where the water is within 1 m, no infiltration is used, and retention is met by storage for use and detention. Everywhere, runoff from roads and open land goes to surface systems and never directly to a recharge well, borewell or shaft (Clause 8.11.3(b)). Clause 8.8.9 has no effect in Himachal Pradesh, which has no coast.

Infiltration trench: section with groundwater separation Infiltration trench: section, not to scale Seasonal high groundwater table (measured after the monsoon) Drinking-water well Sediment sump (pretreatment) Runoff in Observation well overflow clean washed aggregate (void ratio from test) geotextile on sides and top sand filter base ≥ 1.0 m Building foundation foundation setback well setback Test infiltration at the proposed base level. Design rate = measured rate ÷ safety factor. Empty within 72 h. Setback distances and test methods: Clauses 8.8.3 to 8.8.6. Road and parking runoff is never piped into a well. Sandy coastal soils: high rates, shallow groundwater. Laterite, hard rock: low rates. Delta clay: usually unsuitable.

Figure 8.3 — Infiltration trench in section: pretreatment sump, aggregate-filled trench in geotextile, observation well, overflow, the 1.0 m minimum separation to the seasonal high groundwater table, and setbacks to wells and foundations. Original drawing for this Manual, adapted from the Georgia Stormwater Management Manual, 2016 (Vol 2), and CIRIA, The SuDS Manual (C753), 2015.


8.9 Sewage cross-connections and dry-weather flow

8.9.1 No sewage in storm drains. No sewage or sullage (grey water from kitchens, bathrooms and laundries), septic tank effluent, or trade effluent shall be connected to, or discharged into, any storm drain, by any pipe, channel or opening.

8.9.2 Condition of approval. Before the completion certificate, the Applicant shall show, by a dye or smoke test witnessed by the Authority or the sewerage agency, that every sewage and sullage outlet on the site discharges to a sewer or to an approved on-site system, and that none discharges to a storm drain. Any existing cross-connection on the site shall be removed as a condition of approval, including on redevelopment and on additions to existing buildings.

8.9.3 Where no sewer exists. Where no sewer is available, sewage and sullage shall go to an approved on-site or decentralised treatment system. The treated effluent of such a system may be discharged to a storm drain only with the written consent of the Himachal Pradesh State Pollution Control Board (HPSPCB) and the drain owner.

8.9.4 Public drains: DWF survey. Every ULB in a Tier A area shall survey its storm drain outfalls to waterbodies for dry-weather flow at least once a year, before the SW monsoon, and record:

  • (a) the outfalls with DWF;
  • (b) the estimated DWF rate; and
  • (c) the upstream sources found by tracing, CCTV, dye or smoke testing.

The results shall be published in the register of Clause 10.17.

8.9.5 DWF interception. Until the sources are removed, every outfall to a waterbody that carries DWF shall have a DWF interceptor that:

  • (a) diverts the DWF to a sewer or a treatment plant;
  • (b) does not reduce the capacity of the storm drain for the minor or major event (Chapter 6), with its weir or diversion head losses included in the hydraulic design (Chapter 9);
  • (c) has a screen ahead of the diversion; and
  • (d) is not a substitute for removing the source connections.

8.9.6 Sewage overflows. No new sewage overflow, emergency bypass or pumping station overflow shall be designed to discharge into a storm drain or waterbody, except where the sewerage agency shows that no alternative exists, and then only with screening and with the overflow frequency stated.

Commentary. The prohibition of sewage connections and the removal of existing cross-connections as a condition of approval are core requirements of this Manual, and Clause 1.10.3 allows no variance from them. Sewage in storm drains is the single largest water quality problem of urban drainage in Himachal Pradesh. It defeats every other measure in this chapter: BMPs designed for stormwater are overloaded, GPTs fill with sludge, and the receiving tanks and channels become sewage lagoons. CPHEEO (2019) notes that Indian drains carry night soil and urine (Part A §9.5). DWF interception (Clause 8.9.5) is an interim measure. It protects the waterbody while the sources are traced and removed, but it can become permanent if the source work is not done, which is why the annual survey and publication of Clause 8.9.4 are required. The annual survey frequency is set by this Manual.

In Himachal Pradesh the nallahs of the towns carry sewage, and some of them feed the towns' water. The expert committee before the National Green Tribunal found in 2017 that Shimla had 13,752 sewer connections against 27,318 domestic and 4,900 commercial water connections, so that more than half of its households were not connected, and that 9.65 MLD was being treated in six plants designed for 35.63 MLD (judgment of 16 November 2017, Yogindra Mohan Sengupta, set aside by the Supreme Court on other grounds on 11 January 2024). The Ashwani Khad, which receives the nallahs and treatment plants of Shimla's southern slopes, was also a source of the town's water: its raw water was contaminated with effluent from the Malyana and Dhalli treatment plants, an outbreak of jaundice due to hepatitis E began in January 2016, and the supply from the Ashwani Khad scheme was stopped (Bhagra et al., 2017; the case counts differ between the paper and the press). In 2024 the CPCB found the Lalpani (19.35 MLD), Malyana and Dhalli plants in the Ashwani Khad catchment operating without a valid consent and discharging "into Nalla leading to Ashwani Khad", and every plant it monitored non-complying (interim report of 6 May 2024 in NGT O.A. 735/2023); in August 2025 SJPNL's three plants had an installed capacity of 35.88 MLD of which 18.1 MLD was in use, with 50.8 km of sewer still to be connected by 2039 (annexure to the Chief Secretary's affidavit of 1 February 2026). The CPCB's list of 2022 places four stretches of the State in Priority I: the Ashwani Khad from Matholi to Bhog (BOD 80 mg/L, a figure the State calls an analysis error), the Bald along Baddi (40 mg/L), the Sirsa along Nalagarh (40 mg/L) and the Sukhna along Parwanoo (72 mg/L) (as filed in NGT O.A. 735/2023). In the Sirsa catchment the action plan measures the load of each nallah: the Sandholi Nalla carries 7.34 MLD at a BOD of 56 mg/L, the HPSIDC drain 0.6 MLD at 200 to 230 mg/L, and the outfall of the combined effluent treatment plant 17.5 MLD at 22 mg/L, 385 kg a day (the narrative and the table of the plan disagree on some loads), and the Baddi plant was found discharging without disinfection to a "Drain leading to Sarsa River" (CPCB, 2024); the State holds that the Sirsa's pollution comes mostly from Haryana. No count of tapped and untapped drains for the State was found. In the floods of 2025 the wet wells of the Mandi plant on the Beas were damaged (affidavit of 1 February 2026), and the post-disaster needs assessment of 2023 counted 139.766 km of the State's 610.634 km of sewers damaged and asked that no sewage be disposed of onto slopes. The Municipal Acts were not read for any power to require separate drains for sewage and rain-water [TBC]. Every interceptor on a nallah or khad is a DWF interceptor under Clause 8.9.5, and Clause 8.9.5(b) applies to it in full: it is sized from the measured dry-weather flow of its drain, does not reduce the drain's capacity for the minor and major events or raise the flood level behind it, and passes the storm flow above its capacity on down the drain, never to the treatment plant or back into the town. On a khad, where a flash flood carries boulders and can destroy it, an interceptor and its chamber are also placed above the 1% AEP flood level of the khad found under Clause 5.8.5(b), or otherwise protected against the scour and debris of that flood (Chapter 9), with the bypass shown to pass it; and in the catchment of a drinking-water intake, such as the Ashwani Khad, every outfall comes first in the survey of Clause 8.9.4 and the programme of Clause 8.10.4. These conditions are set by this Manual.


8.10 Outfalls to waterbodies: first flush, gross pollutant traps and screens

8.10.1 Requirement. Every new storm drain outfall to a waterbody, and every existing outfall on a drain that is rebuilt, widened or extended, shall have:

  • (a) a GPT designed under Clause 8.7.10; and
  • (b) first-flush treatment: treatment of the WQv (or Q_wq) of the contributing catchment by the BMPs of Clause 8.7, either on the contributing sites or at the outfall.

8.10.2 Where treatment at the outfall is impracticable. Where land is not available at a public outfall, first-flush treatment may be provided by:

  • (a) a proprietary first-flush or hydrodynamic device sized for Q_wq; or
  • (b) a treatment wetland or forebay within the waterbody setback (Clause 7.5.1(b)), outside the waterspread.

8.10.3 Screens and trash racks. Screens at outfalls, culvert inlets and pump sumps shall:

  • (a) be designed with 50% blockage for hydraulic capacity;
  • (b) have an overflow or bypass path so that a fully blocked screen does not flood property;
  • (c) have bar spacing chosen for the hazard: closer spacing for litter capture, wider spacing where blockage would cause flooding; and
  • (d) be cleanable from a safe platform, with vehicle access.

8.10.4 Existing outfalls. Each ULB shall prepare a programme to fit GPTs and DWF interceptors to its existing outfalls to waterbodies, starting with outfalls to tanks used for drinking water supply and to notified wetlands (Clause 7.12), and shall report progress in the register of Clause 10.17.

Commentary. This Manual requires first-flush treatment and gross pollutant traps at outfalls to waterbodies. Gross pollutants are the most visible form of pollution in Himachal Pradesh waterbodies, and plastics also block drains and culverts, which links water quality to flooding. The 50% screen blockage matches the grate clogging factor of Chapter 6. Clause 8.10.3(c) warns against fine screens on large drains, which block in the first hour of a storm and cause the flooding they were meant to prevent.


8.11 Rainwater harvesting integration

8.11.1 RWH mandate continues. The rainwater harvesting required by the Himachal Pradesh Town and Country Planning Rules 2014 (Appendix 6, which makes the collection of rain water from roof tops compulsory for all buildings, existing and proposed, wherever the Himachal Pradesh Town and Country Planning Act, 1977 is in operation, with a minimum capacity of 20 litres per m² of roof-top area, about 20 mm of rain over the roof, allows the storage below ground in the setbacks, and gives no water supply connection until it is in place; with, in addition, the power of the Ground Water Authority under section 15 of the Himachal Pradesh Ground Water Act, 2005 to direct rainwater harvesting in urban premises with a plinth area of 100 m² or more) continues to apply, subject to the limits of Clause 8.8.1 (Chapter 1). This Clause sets how RWH structures are counted under this Manual.

8.11.2 Three different functions. The designer shall keep apart, on the drawings and in the calculations:

  • (a) harvesting: storage for use (sumps and tanks);
  • (b) recharge: recharge pits, trenches, shafts and wells that put water into the ground; and
  • (c) detention: storage with an orifice outlet that is empty at the start of a storm (Chapter 4).

8.11.3 Recharge structures.

  • (a) Roof runoff may be led to recharge wells, open wells, recharge pits and shafts after a filter or settling chamber.
  • (b) Runoff from roads, parking and other paved areas shall not be led directly into any well, borewell or recharge shaft. It may be recharged only through an infiltration facility that meets Clause 8.8, with pretreatment.
  • (c) Recharge structures shall meet the groundwater separation of Clause 8.8.1, measured from the base of the pit or the bottom of the filter media, except recharge wells that receive filtered roof water only.

8.11.4 Credit toward retention and WQv. A recharge structure counts toward the retention volume of Chapter 4 and the WQv only where:

  • (a) its infiltration rate has been tested under Clause 8.8.3;
  • (b) it empties within 72 hours at the design rate; and
  • (c) it has pretreatment.

A harvesting sump counts toward retention only where its contents are used, by a demand stated in the drainage report, within 72 hours (Chapter 4).

8.11.5 No credit as detention. RWH storage does not count as detention unless it is a dedicated volume that is empty when a storm arrives, with an outlet. RWH sumps are assumed full at the start of every SW monsoon (JJAS) design storm (Chapter 4).

8.11.6 Overflow. Every RWH structure shall have an overflow that discharges at grade to the site drainage, never onto a neighbouring plot or into a sewer.

8.11.7 Surface-runoff recharge in public spaces. Recharge trenches, shafts and percolation pits in roads, medians, parks and other public spaces shall meet Clause 8.8 in full, including the hotspot rules for roads with heavy traffic, and shall have a GPT or silt trap at each inlet.

Commentary. The rule that RWH storage does not count as detention is set in Chapter 4. Himachal Pradesh's building rules make rainwater harvesting compulsory, but none of them sets a detention rule. Appendix 6 of the TCP Rules 2014 makes "The collection of rain water from the roof tops of the buildings … compulsory" wherever the Town and Country Planning Act, 1977 is in operation, "For all the buildings existing or proposed for construction in future", with existing buildings to comply within eighteen months; it fixes "The minimum capacity of Rain Water Harvesting Structure … @ 20 Liters per square Metre of the roof top area", to be built underground in the parks and open spaces of colonies and IT parks; it allows the storage below ground in the setbacks, for uses "including fire fighting, landscaping, gardening apart from domestic usages"; and "No water supply connection shall be given to any building till Rain Water Harvesting System is put in place". The storage is about 20 mm of rain over the roof, more than in most States of this series, and it is a storage rule, not a recharge rule. Section 15 of the Himachal Pradesh Ground Water Act, 2005 adds an enabling power: the Ground Water Authority "may" identify the areas of recharge and issue guidelines, and in urban areas direct rainwater harvesting in premises with a plinth area of 100 m² or more, building it at the owner's cost on default; the draft Rules of 2006 would exempt from such directions premises of less than 100 m² and "the sinking zones, where construction of rain water harvesting structures would be detrimental to the safety of the building structures in the area" (draft; the final rules were not seen). The National Green Tribunal's direction of 2017 that rainwater harvesting be mandatory for all building plans, and fitted to old buildings within three months, was set aside with the rest of its directions by the Supreme Court in 2024. Enforcement is through the water connection; no audit of how many tanks were built, or how they are used, was found. The rules set no test of a recharge pit, no protection of the aquifer from road runoff, no storage to be empty before a storm, and no limit on soak pits on slopes, which the site plan forms simply ask to be shown. On the Siwalik valley fills of Una, Paonta–Kala Amb and the upper Nalagarh terraces, recharge may be the main function of harvesting where Clause 8.8.1 allows it (Clause 8.11.2(b)); on hill slopes, in sinking and sliding zones, on debris cover, colluvium and moraine, and on the Balh valley and the low terraces where the water table is within 1 m, harvesting is for storage and use only, and its overflow goes to a lined drain (Clause 8.8.1). RWH serves water supply and recharge. It is usually full, or its soil saturated, by the time a July or August monsoon burst or cloudburst, often with a western disturbance, as in July and August 2023 arrives after weeks of rain, which is why it cannot be counted as detention.

Clause 8.11.3(b) has no direct precedent; this Manual sets it because road runoff carries oil, metals and pathogens. A recharge shaft or borewell bypasses the soil that would otherwise filter it and delivers it straight to the aquifer that supplies wells nearby. The CGWB Manual on Artificial Recharge of Ground Water (2007) gives recharge structure types and filter designs; this Manual adds the source-water restrictions.


8.12 Construction-stage erosion and sediment control

8.12.1 ESC plan. Every development with land disturbance of 0.1 ha or more, and every public drainage or road work, shall have an Erosion and Sediment Control (ESC) plan, approved with the drainage report. It shall show:

  • (a) the sequence of clearing, earthworks and stabilisation;
  • (b) the area exposed at each stage;
  • (c) the measures of Clause 8.12.3, with their locations and sizes;
  • (d) the protection of infiltration and retention areas (Chapter 10);
  • (e) stockpile, concrete washout and fuel storage locations; and
  • (f) the inspection and maintenance schedule.

8.12.2 Monsoon timing. Earthworks shall be planned so that:

  • (a) the area exposed during the SW monsoon (June to September) is as small as practicable;
  • (b) all completed earthworks are stabilised by vegetation, mulch, matting or paving by 31 May; and
  • (c) any area exposed between 15 June and 31 October has sediment controls in place before it is cleared.

8.12.3 Measures.

  • (a) Silt fences along the downslope edge of disturbed areas receiving sheet flow, with the area draining to each fence limited as set in Annex 8E.
  • (b) Sediment traps for concentrated flow from disturbed areas of up to 2 ha.
  • (c) Sediment basins for disturbed areas of more than 2 ha. The storage volume below the outlet shall be at least the greater of the runoff from the 50% AEP (2-yr) 24-hour storm and 250 m³ per hectare of drainage area, with a dewatering outlet that draws water from the surface.
  • (d) Inlet protection at every existing drain inlet that receives runoff from the site.
  • (e) Stabilised construction exits, with wheel washing where vehicles enter public roads.
  • (f) Stockpiles outside Zone 1 of any waterbody setback (Chapter 7), at least 10 m from any drain, and covered during the SW monsoon.
  • (g) Dewatering discharges passed through a sediment basin, settling tank or filter bag, never pumped directly into a drain or waterbody.
  • (h) Concrete washout in a lined pit, never into a drain.

8.12.4 Design storm for temporary works. Temporary ESC measures use the rainfall of Chapter 2 with a climate factor of 1.0 (Clause 2.8.2).

8.12.5 Inspection. ESC measures shall be inspected weekly and within 24 hours after every heavy-rainfall event (as defined in Chapter 10), repaired within 48 hours, and cleaned when half full of sediment.

8.12.6 Removal. Temporary measures shall be removed only after the area draining to them is stabilised. Sediment shall be removed from any permanent facility used for sediment control before its as-built survey (Chapter 10).

Commentary. The 0.1 ha threshold is the applicability threshold of Chapter 1. The sediment basin volume of 250 m³/ha is the US EPA Construction General Permit minimum of 3,600 ft³ per acre drained, converted to SI (US EPA, 2022 CGP); the CGP allows the alternative of the 2-year, 24-hour runoff. This Manual requires the greater of the two, because Himachal Pradesh's 2-year 24-hour depths are high and construction sites are commonly left exposed through the SW monsoon. The 2 ha division between traps and basins, the 31 May stabilisation date, the 10 m stockpile distance and the inspection frequency have no direct precedent and are set by this Manual. The 31 May date matches the pre-monsoon deadline of Chapter 10. Construction sediment is a direct flood hazard as well as a pollutant: it fills drains, culverts and tanks, and in Himachal Pradesh sediment and muck, not sewage alone, are the dominant pollutants of the hill drains: the slopes are steep and covered with debris, the road and hydroelectric works of the State cut them and leave spoil, and the rivers carry heavy loads (the sediment reaching the Nathpa Jhakri intake on the Sutlej is reported at about 700,000 tonnes a year against a design load of about 430,000, with more than 25,000 ppm in the flood of 2005, and Gobind Sagar is reported to receive about 38 MCM of silt a year, all as reported). Muck from the four-laning of the national highway was dumped in Gobind Sagar and its feeding khads, and the High Court ordered penal action and the clearing of the shores and tributaries (Madan Lal, CWPIL 31/2023, 31 May 2024); the HPSPCB has levied environmental compensation for illegal dumping of muck and debris in eight of its regions (2024); the stone-crusher policy of 2021 prohibits the dumping of waste material in a river water source; and the needs assessment of 2023 asked for every natural drain and stream "blocked with dumped spoil" to be cleared "so that the expected runoff from the watershed can safely be disposed of". In the hills the outlet of a sediment basin or trap under Clause 8.12 discharges to a lined drain or a stable channel and never onto an unprotected slope, no sediment basin or trap is designed to infiltrate where Clause 8.8.1 bars infiltration, and no spoil, muck or debris from a site is placed in a khad, nallah, kuhl or tal or within its Zone 1; in a tal catchment, a construction site also keeps its sediment out of every drain that reaches the tal.


8.13 Monitoring

8.13.1 Outfall monitoring. Each Tier A authority shall monitor water quality at a representative set of its outfalls to waterbodies, including every outfall to a drinking-water tank or notified wetland. Monitoring shall include:

  • (a) dry-weather sampling (Clause 8.9.4), at least once a year before the SW monsoon; and
  • (b) wet-weather sampling of at least three events each SW monsoon at a set of index outfalls.

8.13.2 Parameters. At minimum: TSS, BOD, COD, faecal coliform, total nitrogen, total phosphorus, oil and grease, and, for industrial catchments, heavy metals. Results shall be compared with the CPCB water quality criteria for the designated best use of the receiving waterbody.

8.13.3 Gross pollutant records. The mass or volume of material removed from each GPT and screen at each cleaning shall be recorded in the O&M records (Chapter 10).

8.13.4 BMP performance monitoring. The State Stormwater Technical Committee shall run a BMP performance calibration programme and shall revise Table 8.3 and Annex 8C from its results.

8.13.5 Publication. Monitoring results shall be published in the register of Clause 10.17.

Commentary. No Himachal Pradesh programme of stormwater quality monitoring was found during research for this Manual, and CPHEEO (2019) sets no Indian targets. The monitoring in Clause 8.13 is the minimum needed to calibrate Table 8.3 and to show whether DWF interception and source removal are working. The parameter list follows the key pollutants named in CPHEEO's WSUD procedure (TSS, nitrogen, phosphorus and gross pollutants), with BOD and faecal coliform added because of sewage contamination. The monitoring frequencies are set by this Manual.


8.14 Submittal requirements

Every drainage report under this chapter shall include:

  1. the Water Quality Sheet (Form 8-1): P_ret, P_3m and P_wq; the WQv and Q_wq for each drainage area; the volume retained under Chapter 4; and the BMP serving each area;
  2. for Tier A: the LoS calculation (ΔCN, required LoS) and the composite VR (Clause 8.6);
  3. the design of each BMP to Clause 8.7 and Annex 8D, with pretreatment;
  4. for infiltration and recharge: the Infiltration Test Record (Form 8-2), the seasonal high groundwater level and its source, the design rate, the drawdown time, and the setbacks of Clause 8.8.6;
  5. the sewage and sullage connection plan and the dye or smoke test record of Clause 8.9.2;
  6. the GPT and first-flush design for any outfall to a waterbody (Clause 8.10);
  7. the RWH layout, separating harvesting, recharge and detention (Clause 8.11); and
  8. the ESC plan (Clause 8.12).

8.15 Review and update

8.15.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). Table 8.3 shall also be reviewed when the calibration programme of Clause 8.13.4 reports, and in any case within 5 years of notification.


References (chapter)

  • MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A: Engineering Design (§9.5, Ch. 10). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
  • Mid-America Regional Council and Kansas City Metro Chapter APWA (2012). Manual of Best Management Practices for Stormwater Quality (Tables 4.2–4.6). https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
  • Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01; MARC factsheet and Supplement. https://www.marc.org/document/apwa-5600-manual-factsheet ; https://www.marc.org/document/apwa-stormwater-standards-supplement
  • Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, 2016 Edition, Vols 1–2. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
  • Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd Edition. https://did.sarawak.gov.my/web/attachment/show/?docid=clRsMlRycU1lNnFRcnl3eDZnNkJMdz09OjpY0au0UPvQ9zUHVWRMbCKX
  • Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
  • CIRIA (2015). The SuDS Manual (C753). London: CIRIA.
  • PUB, Singapore's National Water Agency. Active, Beautiful, Clean Waters Design Guidelines (current edition).
  • Central Ground Water Board (2007). Manual on Artificial Recharge of Ground Water. Ministry of Water Resources, Government of India.
  • US Environmental Protection Agency (2022). NPDES Construction General Permit (sediment basin sizing).
  • ASTM D3385. Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer.
  • BRE Digest 365. Soakaway Design. Building Research Establishment, UK.
  • Government of Himachal Pradesh, Town and Country Planning Department. Himachal Pradesh Town and Country Planning Rules, 2014, consolidated to 2022, Appendix 6 (collection of rain water), Appendix-1, clause 20 and the site plan forms (Chapter 7 references).
  • Government of Himachal Pradesh. Himachal Pradesh Ground Water (Regulation and Control of Development and Management) Act, 2005 (Act No. 31 of 2005), as amended by Acts 14 of 2022 and 9 of 2023 (ss. 5, 5A, 7 and 15), https://prsindia.org/files/bills_acts/acts_states/himachal-pradesh/2005/Act31of2005HP.pdf ; draft Rules, 2006 (rr. 28 and 29), https://cdn.cseindia.org/userfiles/HP_groundwater_rules.pdf
  • Central Ground Water Board. Dynamic Ground Water Resources of India, 2024 (Himachal Pradesh, §7.9) and 2022; aquifer mapping (NAQUIM) reports for the Una, Nalagarh, Paonta–Kala Amb (Sirmaur), Balh (Mandi) and Spiti valleys; Ground Water Year Book, Himachal Pradesh, 2021–22.
  • NITI Aayog, IWMI and SDC (2021). Resource Book on Springshed Management in the Indian Himalayan Region (spring inventories; Palampur and the Bohal spring).
  • HIMCOSTE-led State technical committee (2023). Report on the landslides in Shimla of August 2023 (HPSDMA, ID 3578), constituted by order No. Rev (DMC)(F)11-09/2021-LM of 19 August 2023.
  • National Green Tribunal. O.A. 121/2014, judgment of 16 November 2017, with its expert committee's report (directions XIV, XV and XXIV), set aside by the Supreme Court on 11 January 2024 (2024 INSC 30) (Chapter 7 references).
  • Bhagra, S., Singh, D., Sood, A. and Kanga, A. (2017). Bacteriological profile of water samples in and around Shimla hills: a study from the sub Himalayan region. International Journal of Community Medicine and Public Health 4(6): 1966–1971. https://doi.org/10.18203/2394-6040.ijcmph20172158
  • Central Pollution Control Board. Polluted River Stretches for Restoration of Water Quality (November 2022), as extracted in the Chief Secretary's affidavit of 22 February 2024 in NGT O.A. 735/2023; CPCB interim report of 6 May 2024 in O.A. 735/2023; action plans for the Priority I stretches (Sirsa, Annex R-7), under NGT O.A. 673/2018.
  • Chief Secretary, Government of Himachal Pradesh. Affidavit of 1 February 2026 in NGT O.A. 735/2023, with SJPNL's status of sewerage networks (August 2025) and JSV's status of sewer works.
  • Government of Himachal Pradesh (2023). Post Disaster Needs Assessment: Monsoon 2023 (sewerage damage; slopes; drains blocked with spoil) (Chapter 7 references).
  • High Court of Himachal Pradesh. Madan Lal v. State of Himachal Pradesh, CWPIL 31/2023, order of 31 May 2024 (Chapter 7 references).
  • Reports of sediment in the Sutlej and Gobind Sagar (secondary): International Hydropower Association case study of Nathpa Jhakri; reports of the loss of capacity of the Bhakra reservoir (IIT Ropar and BBMB, as reported).
  • India Meteorological Department, Meteorological Centre Shimla. Seasonal rainfall normals for Himachal Pradesh, and onset and withdrawal dates of the monsoon (2024–2026) (Chapter 7 references).
  • Parliament reply AU1419 on AMRUT 2.0 admissible components. https://eparlib.sansad.in/bitstream/123456789/2988692/1/AU1419_tzCIvw.pdf

Annexes and forms

Annex / Form Content
8A 3-month ARI 24-hour depth and IDF by zone
8B Redevelopment LoS table and treatment-train composite VR
8C Himachal Pradesh BMP performance calibration
8D BMP design sheets, media specification, plant lists
8E Erosion and sediment control standard details
Form 8-1 Water Quality Sheet
Form 8-2 Infiltration Test Record