Annexes to Chapter 5Downstream and Tailwater Analysis
These annexes support Chapter 5. Annex 5C is a worked example of the outfall-closed check of Clause 5.10, for the illustrative facility of Annex 4C. Annexes 5A and 5B need tidal, surge, survey and river data that this draft does not yet contain; each lists what the chapter already sets, gives the intended layout and states the interim rule of Chapter 5 that applies until it is published. Forms 5-1 and 5-2 are the submittal forms required by Clause 5.14. They are draft forms and have no statutory status.
Annex 5A — Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment
Supports Clauses 5.7, 5.9, 5.10, 5.11 and 5.12 of Chapter 5.
5A.1 Table 5A.1 shows how the values of this annex enter the design tailwater levels of Table 5.1. The sea-level allowance is set by Clause 5.7.4 and does not depend on this annex.
Table 5A.1 — Use of the Annex 5A values in the design tailwater (Table 5.1)
| Design case | Tailwater | Annex 5A values used | Chapter value |
|---|---|---|---|
| Minor-system design | MHWS + SLA | MHWS | SLA ≥ +0.3 m (Clause 5.7.4) |
| Major-system and storage design | HAT + surge + SLA | HAT; 10% AEP surge (Clause 5.7.3(a)) | SLA ≥ +0.3 m |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA | 1% AEP still-water level (Clause 5.7.3(b)) | SLA ≥ +0.3 m |
| Datum conversion | Chart datum to project datum | Offset from chart datum to the Survey of India datum (Clause 5.7.2(b)) | — |
Not prepared for Himachal Pradesh. Himachal Pradesh has no coast, so no outfall in the State has a tidal tailwater, and this annex has no Himachal Pradesh content (Clause 5.1.4). Its tables are kept, empty, so that the annex and table numbers match the other editions of this Manual. Rows F1 to F7 of Form 5-1 are entered as "not applicable", and the tailwater is derived under rows F8 to F10; for an outfall to a khad or nallah, row F10 records the study, the flood marks and the bed survey of Clause 5.8.5(b), and for an outfall to Gobind Sagar or the Pong reservoir, the conversion of BBMB's levels from feet of Clause 5.8.5(c).
Table 5A.2 — Tidal datums, surge and still-water levels by coastal segment (layout)
| Coastal segment | Reference port and tide-table edition | MSL (m CD) | MHWS (m CD) | HAT (m CD) | CD to Survey of India datum (m) | 10% AEP surge (m) | 1% AEP still-water level (m CD) | Wave set-up (m), open-sea outfalls | Sources |
|---|---|---|---|---|---|---|---|---|---|
Annex 5B — Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map
Supports Clauses 5.2, 5.3, 5.8 and 5.13 of Chapter 5.
5B.1 Table 5B.1 lists the water bodies that Chapter 5 already names. It is not complete: the annex will add the extents of each reach, the other rivers, canals and mouths of the State, and a map.
Table 5B.1 — Water bodies named in Chapter 5
| Water body | Region | Listed as | Clause |
|---|---|---|---|
| Yamuna at Paonta Sahib, past the Paonta gauge; the Bata at Ganguwala and the khads of the Paonta valley | Sirmaur | Riverine outfall reach and major drains; design river level not below the transferred 384.6 m (Paonta, 5 September 1995) and 373.52 m (Ganguwala, 22 July 2023); 10% AEP not below the danger level 384.5 m (warning 383.5 m), the only danger level in the State; datum [TBC] | 5.2, 5.8.1, 5.8.5 |
| Giri at Yaswant Nagar and Dadahu; the Jatton barrage | Sirmaur | Riverine outfall reach; design river level not below the transferred 902.9 m (Yaswant Nagar, 5 September 1995) and 629.02 m (Dadahu, 18 August 2019); barrage pond level and operator not found [TBC] | 5.8.1, 5.8.3, 5.8.5 |
| Sutlej at Rampur Bushahr, Nathpa and Pandoa, below the Karcham Wangtoo and Nathpa Jhakri projects; the Baspa at Sangla | Shimla, Kinnaur | Riverine outfall reach; design river level not below the transferred 933 m (Rampur, 26 June 2005; 924.5 m quoted for 2023: conflict [TBC]), 1,451 m (Nathpa) and 2,515.2 m (Sangla); Pandoa 740.6 m or 689.6 m: conflict, treated as ungauged with the 2023 peak of 688.78 m as a floor [TBC]; releases included; glacial-lake and landslide-lake bursts (Parechu, 2005) not excluded | 5.8.1, 5.8.3, 5.8.5 |
| Nallahs of Shimla draining north to the Sutlej and south to the Ashwani Khad and the Giri; the Ashwani Khad | Shimla | Nallahs and major drains; ungauged; 1% AEP study with bulking and flood marks; outfall at least 0.5 m above the highest surveyed bed level; no outfall in the active channel; the Ashwani Khad a drinking-water source (Clause 8.9) | 5.2, 5.8.1, 5.8.5 |
| Beas at Manali, Kullu and Bhuntar, with the side khads of the Kullu valley and the Parbati | Kullu | Riverine outfall reach and khads; no CWC site with a published level (BBMB stations shown inactive) [TBC]; modelled or surveyed flood level required; palaeo-channels kept free (Chapter 6, Clause 6.9) | 5.2, 5.8.1, 5.8.5 |
| Beas at Mandi and its confluence with the Suketi, below the Larji and Pandoh dams; the Suketi and its khads | Mandi | Riverine outfall reach, khads and major drains; no CWC site with a published level [TBC]; modelled or surveyed flood level required; Larji and Pandoh releases included (44,000 cusec from Pandoh on 30 June 2025) | 5.2, 5.8.1, 5.8.3, 5.8.5 |
| Beas below the Pong dam, in the Mand area of Indora | Kangra | Riverine outfall reach; no CWC site with a published level [TBC]; Pong releases included (1.40–1.50 lakh cusec in August 2023) | 5.8.1, 5.8.3, 5.8.5 |
| Manjhi, Gaj, Banner and Neugal khads; the Bhagsunag nala | Kangra | Khads and major drains below the Dhauladhar; ungauged; 1% AEP study with bulking and flood marks (the flash flood of 12 July 2021 at Bhagsunag) | 5.2, 5.8.1, 5.8.5 |
| Sirsa and Balad, and the Sandholi, Housing Board and other nallahs of Baddi–Barotiwala–Nalagarh | Solan | Khads and major drains; no gauge level found [TBC]; 1% AEP study with bulking and flood marks; industrial and sewage flows dealt with under Clause 8.9 | 5.2, 5.8.1, 5.8.5 |
| Swan at Una and Ghaluwal and its tributary khads | Una | Riverine outfall reach and khads; design river level not below the transferred 367 m (Ghaluwal; dated 3 June 2017, to be confirmed [TBC]); the channelisation's design levels to be obtained from the Jal Shakti Vibhag [TBC]; embankment breach check | 5.2, 5.8.1, 5.8.5 |
| Ravi at Chamba; the Chamera reservoir | Chamba | Riverine outfall reach and reservoir; no CWC site with a published level [TBC]; Chamera tailwater 763.5 m (reported level of 763 m + 0.5 m) [TBC]; NHPC's consent | 5.8.1, 5.8.3, 5.8.5 |
| Gobind Sagar (Bhakra reservoir) at Bilaspur, and its feeding khads and nallahs | Bilaspur | Reservoir outfalls; tailwater 515.11 m (1,690 ft, the reported earlier technical limit; FRL 1,680 ft = 512.06 m) [TBC]; levels in feet converted at 0.3048; BBMB's consent; no muck in the lake or its feeding khads (High Court, CWPIL 31/2023) | 5.8.3, 5.8.5 |
| Pong reservoir (Maharana Pratap Sagar; Pong Dam Lake, a Ramsar site) at Dehra and the Pong shore | Kangra | Reservoir outfalls; tailwater 433.12 m (1,421 ft, the highest of the conflicting maximum levels 1,400, 1,410 and 1,421 ft; FRL 1,390 ft = 423.67 m) [TBC]; BBMB's consent and the State Wetlands Authority's permission; drawdown zone part of the reservoir | 5.8.3, 5.8.5 |
| Pandoh, Larji, Kol, Nathpa Jhakri and Karcham Wangtoo reservoirs | Mandi, Kullu, Bilaspur, Kinnaur | Reservoir outfalls; Kol 642.5 m and Karcham Wangtoo 1,810.5 m (reported levels + 0.5 m) [TBC]; no level found for Pandoh, Larji or Nathpa Jhakri [TBC]; the custodian's consent | 5.8.3, 5.8.5 |
| Rewalsar, Khajjiar and Renuka | Mandi, Chamba, Sirmaur | Tal outfalls; no level found [TBC]; spill level plus head; custodian [TBC]; Renuka a Ramsar site; debris and sediment traps; no sewage | 5.8.5 |
| Kuhls in Schedules I and II of the Minor Canals Act 1976; the Beas–Sutlej Link; canals of the Jal Shakti Vibhag; drains of Municipal Corporations, Nagar Parishads and Nagar Panchayats, HIMUDA, BBNDA, HPSIDC, Smart City companies, PWD and NHAI 1.0 m wide or more | Himachal Pradesh | Major drains; owner's consent (Jal Shakti Vibhag and, for a Schedule II kuhl, the Collector; BBMB for the Link), design water level and flap gate | 5.2, 5.8.5 |
| Bhakra, Pong, Pandoh and Larji dams; the Kol, Nathpa Jhakri, Karcham Wangtoo, Chamera, Malana and Parbati projects; the Jatton barrage | Sutlej, Beas, Ravi, Giri | Releases and gate operation to be included in river levels (operating rules and release records [TBC]) | 5.8.3, 5.8.5 |
| River mouths subject to sand-bar closure | None in Himachal Pradesh | Not applicable (Clause 5.1.4) | 5.13.1 |
To be prepared. This annex will list and map (a) the major drains of each basin plan, (b) the riverine outfall reaches where backwater shall be modelled, with their upstream and downstream limits and the source of their design flood levels, and (c) the river mouths and creek inlets subject to seasonal sand-bar closure, with the most recent pre-monsoon bar crest levels and any Jal Shakti Vibhag mouth-maintenance programme. It needs Jal Shakti Vibhag river and canal records, design and recorded flood levels, reservoir operating rules, mouth-condition, dredging and bar-cutting records and pre-monsoon bar surveys (Jal Shakti Vibhag), the drain inventories of SMC and other local bodies, basin stormwater master plans (Chapter 11), and base mapping from the Survey of India and NRSC. Until it is published: every river, Jal Shakti Vibhag canal, the nallahs of Shimla that run north to the Sutlej and south to the Ashwani Khad and the Giri, the Suketi and its khads at Mandi, the Manjhi, Gaj, Banner and Neugal khads and the Bhagsunag nala below Dharamshala, Kangra and Palampur, the Sirsa, the Balad and the Sandholi and other nallahs of Baddi–Barotiwala–Nalagarh, the Swan and its tributary khads at Una, the Bata at Paonta Sahib, the side khads of the Beas in the Kullu valley, any kuhl in Schedule I or II of the Himachal Pradesh Minor Canals Act 1976 that receives storm water, the Beas–Sutlej Link, any drain built or held by a Municipal Corporation, a Nagar Parishad or Nagar Panchayat, HIMUDA, BBNDA, HPSIDC, a Smart City company or PWD with an internal width of 1.0 m or more, and every khad, nallah or choe that drains 8 ha or more and every tidal creek is a major drain (Clause 5.2); the water bodies of Table 5B.1 are riverine outfall reaches (Clause 5.8.1); and the mouths of the coastal States' rivers (there is none in Himachal Pradesh) are assumed closed at the start of the SW monsoon unless the Jal Shakti Vibhag certifies otherwise (Clause 5.13.2).
Table 5B.2 — Attributes of the Annex 5B layers (layout)
| Field | Content | Unit or format |
|---|---|---|
| feature_id | Unique identifier | text |
| name | Name of the drain, river, canal, creek or mouth | text |
| category | Major drain; riverine outfall reach; mouth subject to sand-bar closure | text |
| clause | Clause of Chapter 5 under which it is listed | text |
| reach_limits | Upstream and downstream limits of the reach | text |
| design_flood_level_source | Jal Shakti Vibhag design or highest recorded flood level, or hydraulic model (Clause 5.8.2) | text |
| reservoir_release | Upstream reservoir or tank and its operating rule, where any (Clause 5.8.3) | text |
| bar_crest_level | Most recent pre-monsoon bar crest level, for mouths | m (Survey of India datum) |
| mouth_programme | Jal Shakti Vibhag mouth-maintenance programme and certification (Clause 5.13.2) | text |
| source | Source agency and date | text |
| geometry | Line (drains and reaches) or point (mouths) | line / point |
Annex 5C — Worked example: outfall-closed check for a site on a nallah draining to the Ashwani Khad in Shimla
Supports Clauses 5.9, 5.10, 5.11 and 5.12 of Chapter 5 and Clause 4.6.6 of Chapter 4.
Illustrative — not design values. This example applies the outfall-closed check of Clause 5.10 to the revised detention facility of Annex 4C. The site, its levels and its receiving drain are invented to show the method. No tidal level is used: the tide enters only through the illustrative statements in Table 5C.1 about whether the receiving drain is above or below the site outlet.
Inputs
5C.1 The site is the 2.0 ha flood-sensitive site of Annex 4C. It discharges through its own outlet chamber and a flap gate to a public storm drain that joins a nallah running to the Ashwani Khad below Shimla, whose level rises when the nallah runs full and when the khad is in flood, as in the storms of July and August 2023, so Clause 5.10.1 applies to the facility. To show the method, this example uses the two 6-hour lock windows of Clause 5.10.3, as the coastal editions of this Manual do. In Himachal Pradesh an outfall to a khad or nallah whose invert is below its design level is closed for as long as the computed level of the stream stays above it, or for the whole storm where no hydrograph of the stream has been computed, a river-locked outfall has a single lock of at least 72 hours, and an outfall below the design level of a reservoir or tal is closed for the whole storm, under Clause 5.8.5, so in each of those cases the facility must store or pump the whole storm volume (Clause 5.9.4); that needs more storage, or pumping, than this example shows. The routing, the volume balance of Clause 5.10.4 and the assessment are the same. The public drain's own outfall to the nallah would also need the debris rack and the bulking factor of Clause 6.3.6 and an invert above the range of bed movement of Clause 5.8.5(b); and on a slope in Shimla the facility itself would be a lined tank, not an infiltrating basin (Clause 4.11).
Table 5C.1 — Inputs (Illustrative — not design values)
| Item | Value | Basis |
|---|---|---|
| Facility | Revised facility of Annex 4C: 2,500 m² plan area, vertical walls; 170 mm orifice at the floor; 460 mm orifice, invert 0.53 m | Annex 4C, Table 4C.14 |
| Storm | 1% AEP, 48 h, peak day last, AMC III; 72 h also run | Clause 5.10.2 |
| Inflow | Post-development 1% AEP hydrographs of Annex 4C (48 h: 8,420 m³; 72 h: 9,468 m³) | Annex 4C |
| Receiving drain levels at the connection, J1, J2 and J3 | Below the site outlet invert (from the drain owner's model) | Illustrative input |
| Receiving drain during each lock window | Backs up above the site outlet invert, so the site cannot discharge | Illustrative input; Clause 5.10.3(b) |
| Flap gate on the site outlet | Set 0.15 m below the orifice inverts in the outlet chamber, so that outside the lock windows its opening head and head loss do not affect the orifice control | Illustrative input; to be confirmed from the certified curve (Clause 5.11.2) |
| Lock windows | Two of 6 h each, starts 12.4 h apart (semi-diurnal tide) | Clause 5.10.3(a) |
| Pumps | None | — |
5C.2 Cases of Table 5.2. Because the receiving drain stays below the site outlet in J1, J2 and J3 (Table 5C.1), those cases give the free-outfall results of Annex 4C: in J2 the 1% AEP maximum water level is 1.17 m (2,913 m³), and in J3 (10% AEP, 48 h) it is 0.77 m. R1 and R2 do not apply, because the site does not drain to a river. J4, the outfall-closed check, is worked below.
Lock windows (Clause 5.10.3)
5C.3 The peak 1-hour block of the final 24 hours of the 48-hour storm is 35:35–36:35 h, with 98.2 mm (the 1-hour depth of Table 4C.2). Two runs are made:
- Run A: the first window is centred on that block: 33:05–39:05 h; the second starts 12.4 h later: 45:29–51:29 h.
- Run B: the first window starts at that block: 35:35–41:35 h; the second: 47:59–53:59 h.
For the 72-hour storm, every time is 24 h later.
5C.4 Gravity discharge is zero inside each window. Outside the windows the outlet discharges through the orifices of Table 4C.10. The routing is the same level-pool routing as in Annex 4C.
Results
Table 5C.2 — Outfall-closed check results (Illustrative — not design values)
| Storm | Run | Lock windows (h:min) | Maximum stage (m) | Maximum storage (m³) | Time of maximum (h:min) | Largest release after a window (L/s) |
|---|---|---|---|---|---|---|
| 1% AEP, 48 h | A | 33:05–39:05; 45:29–51:29 | 2.01 | 5,019 | 39:05 | 566 |
| 1% AEP, 48 h | B | 35:35–41:35; 47:59–53:59 | 2.10 | 5,238 | 41:35 | 584 |
| 1% AEP, 72 h | A | 57:05–63:05; 69:29–75:29 | 2.00 | 5,012 | 63:05 | 565 |
| 1% AEP, 72 h | B | 59:35–65:35; 71:59–77:59 | 2.09 | 5,233 | 65:35 | 584 |
Run B of the 48-hour storm governs. The first window closes the outlet just as the storm peak arrives, so the whole peak is stored. The second window arrives when the facility has drained to about 0.7 m, below the Stage 2 orifice, and adds little.
5C.5 Volume balance (Clause 5.10.4). Table 5C.3 gives the balance for Run B. The outflow in each period is found by continuity: outflow = storage at start + inflow − storage at end.
Table 5C.3 — Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
| Period (h:min) | Inflow (m³) | Gravity outflow (m³) | Pumped (m³) | Storage at start (m³) | Storage at end (m³) |
|---|---|---|---|---|---|
| 0:00–35:35, before window 1 | 3,817 | 2,213 | 0 | 0 | 1,604 |
| 35:35–41:35, window 1 | 3,634 | 0 | 0 | 1,604 | 5,238 |
| 41:35–47:59, between windows | 941 | 4,423 | 0 | 5,238 | 1,756 |
| 47:59–53:59, window 2 | 28 | 0 | 0 | 1,756 | 1,784 |
| After 53:59 | 0 | 1,784 | 0 | 1,784 | 0 |
| Total | 8,420 | 8,420 | 0 | — | — |
Check for window 1: V_inflow = 3,634 m³ ≤ V_storage available + V_pumped + V_gravity = (5,238 − 1,604) + 0 + 0 = 3,634 m³. The facility therefore needs 5,238 m³ of storage, which the routing confirms.
Table 5C.4 — Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
| Time (h) | Inflow (L/s) | Outlet | Outflow (L/s) | Stage (m) | Storage (m³) |
|---|---|---|---|---|---|
| 24 | 20 | Open | 18 | 0.18 | 445 |
| 28 | 39 | Open | 24 | 0.25 | 621 |
| 32 | 59 | Open | 32 | 0.36 | 906 |
| 34 | 85 | Open | 37 | 0.47 | 1,166 |
| 36 | 286 | Closed | 0 | 0.78 | 1,944 |
| 38 | 106 | Closed | 0 | 1.73 | 4,321 |
| 40 | 66 | Closed | 0 | 1.96 | 4,904 |
| 42 | 51 | Open | 529 | 1.79 | 4,472 |
| 44 | 42 | Open | 204 | 0.87 | 2,181 |
| 46 | 37 | Open | 49 | 0.74 | 1,854 |
| 48 | 33 | Open | 47 | 0.70 | 1,756 |
| 50 | 0 | Closed | 0 | 0.71 | 1,784 |
| 54 | 0 | Closed | 0 | 0.71 | 1,784 |
| 56 | 0 | Open | 43 | 0.58 | 1,459 |
| 60 | 0 | Open | 32 | 0.37 | 921 |
| 66 | 0 | Open | 16 | 0.16 | 397 |
| 72 | 0 | Open | 7 | 0.06 | 162 |
Assessment
5C.6 Clause 5.10.4(a). The facility of Annex 4C reaches 1.17 m in J2, and its spillway crest is at 1.35 m (Annex 4C). In the outfall-closed check the stage reaches 2.10 m, so the spillway would operate. The facility of Annex 4C fails the check.
5C.7 Remedy. Pumping (Clause 5.12) does not help here: during the lock windows the receiving drain is itself closed, and pumping into it would raise its level, which Clause 5.12.3 does not permit. The remedy is more storage. Keeping the plan area of 2,500 m² and the outlets of Annex 4C:
- the facility must hold 5,238 m³, to a stage of 2.10 m;
- the spillway crest is set above that stage, with the 0.15 m clearance recommended in Clause 4.9.3: 2.25 m;
- with the 4.0 m spillway of Annex 4C (head 0.30 m), the maximum level with the spillway flowing is 2.55 m, and with 0.3 m freeboard the top of the walls is at least 2.85 m above the floor.
The outfall-closed check therefore governs the storage: 5,238 m³ against 2,913 m³ from the release-rate checks, about 80% more. A larger plan area would make the facility shallower; the outlet, caps and drawdown would then have to be re-checked, because the stage–discharge relationship changes.
5C.8 Release after the lock. When the first window ends, the stored water is released under a head of about 2 m, at up to 584 L/s. This is above the 100-yr cap of 356 L/s. Clause 5.10.4 allows this, because the release reaches a drain that has itself just reopened, and requires it to be included in the J4 run of the downstream analysis (Clauses 5.4 and 5.9) and reported on Form 5-1, Section H.
5C.9 Drawdown after the storm (Clause 5.10.5). The J1 tidal curve stays below the site outlet (Table 5C.1), so the drawdown of Annex 4C applies: 45.3 h for 90% of the 10-yr storage with the low-flow orifice 50% blocked, within the 48-hour limit of Clause 4.7. In Run B, 90% of the maximum J4 storage is released 22.6 h after the maximum.
5C.10 Other requirements.
- The flap gate on the site outlet is inspected and operated before 15 June each year and after every event in which it closed against a storm flow (Clause 5.11.5).
- The deeper facility is checked for flotation with groundwater at the design groundwater level; in the Balh valley, the river terraces and floodplains, and the tal and reservoir margins without piezometer readings that level is existing ground level (Clauses 4.12.1 and 4.12.3).
- The fence and signs of Annex 4C apply to the deeper facility (Clause 4.15).
Table 5C.5 — Summary (Illustrative — not design values)
| Item | Value |
|---|---|
| Governing case | J4, 1% AEP 48-hour storm, Run B (first window starting at the peak 1-hour block) |
| Storage required | 5,238 m³ (Annex 4C release-rate design: 2,913 m³) |
| Maximum stage | 2.10 m, with 2,500 m² plan area |
| Spillway crest | 2.25 m |
| Top of walls | ≥ 2.85 m above the floor |
| Largest release after a lock window | 584 L/s, to be included in the downstream J4 run |
| Drawdown | Annex 4C result applies: 45.3 h with the low-flow orifice 50% blocked |
Form 5-1 — Downstream and Tailwater Report
Supports Clauses 5.3 to 5.14 of Chapter 5.
Draft form — Himachal Pradesh Stormwater Design Manual, Draft v1.0. One report for each project. Sites of less than 0.5 ha that meet Clause 5.3.4 may submit Form 5-2 instead, where the Authority accepts it. Attach the plans, model files and hydrographs referred to.
A. Project
Table 5F.1 — Form 5-1: project
| Field | Entry |
|---|---|
| A1. Project name, applicant and location | |
| A2. Project type: site under Chapter 4; drainage project under Chapter 6; regional detention or tank restoration (Clause 5.1.2) | |
| A3. Site or project area (ha) and outfalls | |
| A4. Site Runoff Control Report reference (Form 4-1), where applicable |
B. Extent of the analysis (Clause 5.3; Clause 5.14, item 1)
Table 5F.2 — Form 5-1: analysis points
| Point | Location | Type (Clause 5.3.3 (a) to (e)) | Contributing catchment (ha) | Project area as % of it |
|---|---|---|---|---|
Table 5F.3 — Form 5-1: end point
| Field | Entry |
|---|---|
| B1. End point and reason: 10% point, tank or tal, or major drain or the sea (Clause 5.3.1 (a) to (c)) | |
| B2. Where the end point is a tank or tal: change in maximum water level (m) and in surplus-weir discharge (m³/s); continuation below the weir if the level rises (Clause 5.3.2) | |
| B3. Plan of the analysis extent, showing the site, each point with its contributing area and percentage, and the end point (attach) |
C. Model (Clause 5.4.4; Clause 5.14, item 2)
Table 5F.4 — Form 5-1: model
| Field | Entry |
|---|---|
| C1. Software and version; hydrologic and hydraulic methods (Clause 5.4.4) | |
| C2. Network schematic, with the survey sources for drains and crossings (attach) | |
| C3. Land use and CN of off-site areas (present land use) | |
| C4. Upstream detention included, with evidence that it is built, maintained and documented | |
| C5. Calibration or validation evidence, where available | |
| C6. Scenarios run: existing, with project, and future where the Authority requires it (Clause 5.4.1) | |
| C7. Storms run: AEPs and durations, AMC and areal reduction (Clause 5.4.3) |
D. Results at each analysis point (Clause 5.4.2; Clause 5.14, item 3)
Complete one row for each analysis point, AEP and duration. E = existing; P = with project.
Table 5F.5 — Form 5-1: results by analysis point
| Point | AEP | Duration (h) | Peak flow E / P (m³/s) | Time to peak E / P (h) | Maximum water level E / P (m) | Peak velocity E / P (m/s) | Duration of inundation E / P (h) |
|---|---|---|---|---|---|---|---|
E. Acceptance (Clause 5.5; Clause 5.14, item 4)
Table 5F.6 — Form 5-1: acceptance criteria
| Criterion | Met at every point? | Where not met, the remedy adopted (Clause 5.5.3) |
|---|---|---|
| E1. 1% AEP water level rise ≤ 10 mm at buildings, lowest openings and carriageways (Clause 5.5.1(a)) | ||
| E2. No building newly flooded; no building or road newly failing the Chapter 6 limits (Clause 5.5.1(b)) | ||
| E3. Peak flow not above existing at the minor-system AEP of each element or at 1% AEP (Clause 5.5.1(c)) | ||
| E4. Velocity in lined channels within the lining limit, 3.0 m/s maximum (Clause 5.5.1(d)) | ||
| E5. Velocity in unlined channels, 50% and 10% AEP, not increased by more than 10% (Clause 5.5.1(e)) | ||
| E6. Change in duration of road closure on arterial or emergency routes (Clause 5.5.2) | ||
| E7. Timing exception requested (Clause 5.5.4)? Give the conditions met |
F. Tailwater derivation (Clauses 5.6 to 5.8; Clause 5.14, item 5)
Table 5F.7 — Form 5-1: tailwater derivation
| Field | Entry |
|---|---|
| F1. Tide-table edition and port, or port authority source (Clause 5.7.2(a)) | |
| F2. MHWS, HAT and MSL (m above chart datum) | |
| F3. Connection from chart datum to the Survey of India benchmark and the project datum: offset (m) and source (Clause 5.7.2(b)) | |
| F4. Estuary, creek or canal outfall: levels used and any evidence for a departure from open-coast levels (Clause 5.7.2(c)) | |
| F5. 10% AEP surge and 1% AEP still-water level: values, source, method and record length (Clause 5.7.3) | |
| F6. Wave set-up, for outfalls facing the open sea (Clause 5.7.3(d)) | |
| F7. SLA (m), at least +0.3 m; design life; sensitivity run at twice the SLA for design lives over 50 years (Clause 5.7.4) | |
| F8. Non-tidal tailwater: receiving-system level and source (Clauses 5.6.2, 5.6.3) | |
| F9. River levels and sources; reservoir or tank releases included (Clauses 5.8.2, 5.8.3) | |
| F10. River-locked outfalls, khads and nallahs, reservoir, barrage-pond and tal outfalls, rivers below dams and barrages, and kuhls, canals or drains of other bodies: operator of each gate and pumping station identified, gate sills, bank, wall or embankment crest, installed capacity, operating levels and gate-closing level obtained, with every level tied to the datum of the nearest CWC gauge or of the named gauge used; 1% AEP river level at the outfall from a model, with the dam releases, and not below the highest recorded level at the nearest CWC gauge transferred to the outfall (384.6 m at Paonta, 373.52 m at Ganguwala, 933 m at Rampur, 367 m at Ghaluwal, and the other levels of Clause 5.8.5(a); Pandoa treated as ungauged until CWC confirms its level), with the profile or flood-mark survey used, or, where no gauge level exists (the Beas at Manali, Kullu, Mandi and Pandoh, the Ravi at Chamba and other reaches), a modelled or surveyed flood level and its source; 10% AEP river level, not below the CWC danger level transferred where one exists (384.5 m at Paonta); drain behind the gate routed with its whole catchment and present storage, pumping confirmed available (permanent pumps only, not more than installed capacity less the largest pump), pumps operable at the design river level; single river lock of not less than 72 hours, or the duration of the largest recorded release below a dam or barrage if longer, and its source, and closure for the whole storm below a reservoir or barrage pond level; gate-failure and breach checks; for a khad or nallah, the 1% AEP study with the bulking and blockage of Clause 6.3.6, the surveyed flood marks and their sources, any Jal Shakti Vibhag flood study, the bed survey and range of bed movement, the invert at least 0.5 m above the highest surveyed bed level and the scour depth of the foundation; for a reservoir or barrage pond, custodian's consent, MWL or FRL plus design-flood surcharge (FRL + 0.5 m where neither is published), every level in feet converted at 1 ft = 0.3048 m with its datum stated (Gobind Sagar 515.11 m; Pong 433.12 m, the highest of the conflicting maximum levels), not below the highest recorded level, outfall below it treated as closed for the whole storm, waterbody starting at FRL or pond level, no gate operation or reservoir attenuation credited without the custodian's written rule; for an outfall below a dam or barrage, the design storm with the largest recorded release, placed before, during and after the storm; for Rewalsar, Khajjiar, Renuka or another tal, the custodian's consent, the surveyed spill level plus head, and the debris and sediment traps before the tal; for a kuhl, the consent of the Jal Shakti Vibhag (and of the Collector for a Schedule II kuhl), its level computed with the runoff it intercepts; for a canal, the operator's consent; Jal Shakti Vibhag consent, and the TCP Rules, development-plan, wetland and court lines checked; owner's consent, permitted rate, design water level or computed channel level, and flap gate (Clause 5.8.5) |
G. Joint cases (Clause 5.9; Clause 5.14, item 6)
Table 5F.8 — Form 5-1: joint-case results
| Case | Rainfall | Tailwater used (m, project datum) | Applies? | Governing result (storage, level, pipe size or pump capacity) |
|---|---|---|---|---|
| J1 | ||||
| J2 | ||||
| J3 | ||||
| J4 | ||||
| R1 | ||||
| R2 |
H. Outfall-closed check (Clause 5.10; Clause 5.14, item 7)
Table 5F.9 — Form 5-1: outfall-closed check
| Field | Entry |
|---|---|
| H1. Reason the check applies (Clause 5.10.1) | |
| H2. Storm: AEP, 48 h and 72 h, AMC III (Clause 5.10.2) | |
| H3. Lock duration and basis: default of two 6-hour windows, or site study (Clause 5.10.6); extension for sand-bar closure (Clause 5.13.5) | |
| H4. Lock windows of the two runs (start and end times) (Clause 5.10.3(d)) | |
| H5. Maximum stage in each facility, against its 1% AEP maximum water level (Clause 5.10.4(a)) | |
| H6. Maximum stage in the minor and major systems, against the Chapter 6 limits (Clause 5.10.4(b)) | |
| H7. Property connections: surcharge level, or non-return valves fitted (Clause 5.10.4(c)) | |
| H8. Stage hydrographs (attach) | |
| H9. Drawdown after the storm under the J1 tidal curve, and pumping where needed (Clause 5.10.5) |
Table 5F.10 — Form 5-1: volume balance for each lock window (Clause 5.10.4)
| Period | Inflow (m³) | Gravity outflow (m³) | Pumped (m³) | Storage at start (m³) | Storage at end (m³) |
|---|---|---|---|---|---|
| Before window 1 | |||||
| Window 1 | |||||
| Between windows | |||||
| Window 2 | |||||
| After window 2 |
I. Gates and valves (Clause 5.11; Clause 5.14, item 8)
Table 5F.11 — Form 5-1: schedule of flap gates, tide gates and non-return valves
| Location | Type | Size (mm) | Invert (m, project datum) | Certified head–discharge data (reference) | Stop-log or penstock (outfalls > 600 mm) |
|---|---|---|---|---|---|
J. Pumped outfalls (Clause 5.12; Clause 5.14, item 9)
Table 5F.12 — Form 5-1: pumped outfalls
| Field | Entry |
|---|---|
| J1. Reason pumping is needed (Clause 5.12.1) | |
| J2. Duty capacity (m³/s) at the static head for the J2 tailwater; standby capacity (Clause 5.12.2) | |
| J3. Effect on the receiving water level (Clause 5.12.3) | |
| J4. Power supply: two independent supplies, or standby generation with 72 h of fuel; automatic changeover (Clause 5.12.4) | |
| J5. Level of electrical panels, controls, generators and fuel, against the higher of the 1% AEP flood level + 0.5 m and HAT + surge + SLA + 0.5 m (Clause 5.12.5) | |
| J6. Discharge arrangement (Clause 5.12.6); controls, alarms and logging (Clause 5.12.7); screens (Clause 5.12.8) |
K. Sand bar (Clause 5.13; Clause 5.14, item 10)
Table 5F.13 — Form 5-1: sand-bar assumption
| Field | Entry |
|---|---|
| K1. River mouth or creek inlet concerned | |
| K2. Mouth assumed closed, or open with Jal Shakti Vibhag certification attached (Clause 5.13.2) | |
| K3. Bar crest level from the most recent pre-monsoon survey (m) and the closed-mouth tailwater (Clause 5.13.3) | |
| K4. Extension of the lock duration, where required (Clause 5.13.5) |
L. Inspection and maintenance (Clause 5.14, item 11)
Table 5F.14 — Form 5-1: inspection and maintenance
| Field | Entry |
|---|---|
| L1. Gate and valve inspection before 15 June and after closure events (Clause 5.11.5) | |
| L2. Pump test runs before 15 June (Clause 5.12.9) | |
| L3. Other requirements for the maintenance plan (Chapter 10) |
M. Statement by the registered professional (Clause 10.6)
I state that this report has been prepared under Chapter 5 of the Himachal Pradesh Stormwater Design Manual (Draft v1.0), that the results reported are reproduced by the models submitted, and that every departure from Chapter 5 is listed with its reason. The Professional Design Certificate (Form 10-3) is attached.
Table 5F.15 — Form 5-1: statement by the registered professional
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Empanelment number, where Clause 10.6.1 requires it | |
| Organisation | |
| Signature | |
| Date |
Draft form — Himachal Pradesh Stormwater Design Manual, Draft v1.0.
Form 5-2 — Simplified Downstream Statement (small sites)
Supports Clause 5.3.4 of Chapter 5.
Draft form — Himachal Pradesh Stormwater Design Manual, Draft v1.0. For sites of less than 0.5 ha. The Authority may accept this statement in place of the full analysis only where every answer in Section B is "Yes". Otherwise submit Form 5-1.
A. Site
Table 5F.16 — Form 5-2: site
| Field | Entry |
|---|---|
| A1. Project name, applicant and location | |
| A2. Site area (ha), less than 0.5 ha | |
| A3. Receiving public drain: name or reference, type and size | |
| A4. Site Runoff Control Report reference (Form 4-1) |
B. Conditions (Clause 5.3.4)
Table 5F.17 — Form 5-2: conditions
| Condition | Yes / No | Evidence |
|---|---|---|
| B1. The receiving public drain has documented capacity for its minor-system design flow (Chapter 6) | ||
| B2. No flood-prone location is recorded within 500 m downstream of the site outfall. Records checked: local body, SMC, HPSDMA, Jal Shakti Vibhag (Clause 5.3.3(d)) | ||
| B3. The site does not drain to a tidal or backwater-affected outfall |
C. Route plan
Table 5F.18 — Form 5-2: attachments
| Attachment | Attached? |
|---|---|
| C1. Plan of the drainage route from the site outfall for 500 m downstream, with the receiving drain and any recorded flood-prone locations | |
| C2. Copy or reference of the drain capacity record |
D. Statement
I state that the site meets the conditions of Clause 5.3.4 as shown above, and that the records listed have been checked.
Table 5F.19 — Form 5-2: statement
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |