Chapter 4Site Runoff Control: Retention and Detention
4.1 Purpose and scope
4.1.1 This chapter sets the performance standard that every regulated development shall meet for runoff leaving the site. It covers:
- (a) the order in which runoff-control measures are to be applied (Clause 4.3);
- (b) retention of frequent rainfall, and how retained volume is credited against detention (Clause 4.4);
- (c) release-rate criteria for standard and flood-sensitive catchments (Clause 4.5);
- (d) the procedure for sizing detention storage and outlets (Clauses 4.6 to 4.9);
- (e) facility types, rainwater harvesting (RWH) accounting, and high-groundwater sites (Clauses 4.10 to 4.12);
- (f) regional detention and fee-in-lieu (Clause 4.13);
- (g) simplified methods for small sites: the Tier B tables and the fixed-coefficient route (Clause 4.14); and
- (h) public safety (Clause 4.15).
4.1.2 This chapter applies to land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, as set in Chapter 1. Single dwellings below that threshold, and road resurfacing that adds no impervious area, are exempt. The existing RWH mandate of the building rules (rooftop rainwater collection under Appendix 6 of the TCP Rules 2014, compulsory for every building, existing or proposed, wherever the Himachal Pradesh Town and Country Planning Act 1977 is in operation, with a storage of at least 20 litres per m² of roof-top area and no water supply connection until it is in place; the rules are discussed in the Commentary to Clause 4.11) continues to apply to every building it covers, whether or not this chapter applies.
4.1.3 Rainfall inputs come from Chapter 2. Hydrologic methods come from Chapter 3. Tailwater, downstream analysis and the outfall-closed check come from Chapter 5. Water quality volume (WQv) treatment comes from Chapter 8. Where this chapter and those chapters overlap, the more stringent requirement governs.
4.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Retention | Permanent removal of runoff from the surface drainage system by infiltration, evapotranspiration or reuse, so that the water never reaches the outfall. |
| Retention depth | The 90th percentile wet-day 24-hour rainfall depth for the site's zone (Clause 2.10, Annex 2E). |
| Required retention volume (RRV) | The runoff volume from the retention depth over the post-development site (Clause 4.4.2). |
| Detention | Temporary storage of runoff, released through a controlled outlet at a rate set by Clause 4.5. |
| Retention credit | The reduction in required detention storage that results from retention practices, determined by routing under Clause 4.4.6. It is not the same as the retained volume. |
| Permissible site discharge (PSD) | The maximum rate at which a site may discharge for a stated AEP, in L/s or L/s/ha. |
| Site storage requirement (SSR) | The detention storage required per hectare of site under the simplified method of Clause 4.14. |
| Multi-stage outlet | An outlet structure with separate openings at different levels, each controlling a different AEP (Figure 4.2). |
| Drawdown time | Time from the peak stored volume until the stated fraction of that volume has been released. |
| Emergency spillway | A secondary overflow that passes flows above the primary outlet capacity, or all flow when the primary outlet is blocked, without overtopping the embankment. |
| Freeboard | Vertical distance between the maximum design water level and the embankment crest or other critical level. |
| Flood-sensitive catchment | A catchment listed in Clause 4.5.3 or notified under Clause 4.5.4. |
| Authority | The approving authority under Chapter 1 (the Town and Country Planning Department, through the Director and the officers to whom powers are delegated, in the planning areas and special areas of the Himachal Pradesh Town and Country Planning Act 1977; a Special Area Development Authority or the Baddi Barotiwala Nalagarh Development Authority (BBNDA) in its area; the Municipal Corporation, Nagar Parishad or Nagar Panchayat concerned, where it grants building permission; and HIMUDA for its own colonies [TBC], as applicable). |
| Tier A / Tier B | Adoption tiers defined in Chapter 1. Tier A: the Shimla Municipal Corporation (SMC) and every approving authority within the Shimla Planning Area; the Municipal Corporations of Dharamshala, Mandi, Solan and Palampur, with the TCP Department in their planning areas; and BBNDA in the Baddi–Barotiwala–Nalagarh area. Tier B: Nagar Parishads and Nagar Panchayats. |
4.3 Order of measures
4.3.1 Every site runoff-control design shall apply measures in the following order, and shall document in the submittal why each earlier step could not do more:
- Preserve. Keep existing waterbodies, tals, natural drainage lines, wetlands, and permeable soils and vegetation. Avoid fill in flood storage (Chapter 7).
- Retain. Retain the RRV on site by infiltration, reuse or evapotranspiration (Clause 4.4).
- Detain. Detain the remaining runoff so that the release-rate criteria of Clause 4.5 are met for every design storm and duration (Clauses 4.6 to 4.9).
- Convey. Convey the 1% AEP (100-yr) flow safely through the site to the receiving system on a defined overland path (Chapter 6), and check the receiving system downstream (Chapter 5).
4.3.2 Preservation and retention reduce the detention required (Clauses 4.4.6 and 4.4.7). They do not relieve the site of the release-rate criteria of Clause 4.5 or of the downstream analysis of Chapter 5.
Commentary. This order follows the "layers of stormwater management" adopted in the Kansas City Metro APWA Section 5600 Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet; MARC Supplement, Nov 2025). Maintenance is the fifth layer and is set in Chapter 10. The 2025.01 manual credits retention and natural-area preservation against detention size (MARC Supplement, Nov 2025). Clause 4.4.6 adopts that credit, and defines it so that it cannot be claimed twice.
4.4 Retention
4.4.1 Requirement
The site shall retain the RRV. Retention shall be achieved by one or more of the following:
- infiltration practices (soakaways, infiltration trenches, permeable pavement with an infiltration base, bioretention);
- rainwater reuse that is drawn down by a demonstrated non-potable demand;
- green roofs and landscape areas that do not drain to the outfall in the retention-depth storm.
The limits of Clause 4.4.4 apply.
4.4.2 Computation of the RRV
RRV (m³) = 10 × Q_R × A
where:
- Q_R (mm) is the runoff depth from the retention depth P_R (Annex 2E). It is computed with the SCS-CN method for the post-development cover of each sub-area, at AMC II, with Ia = 0.2S (Chapter 3); and
- A (ha) is the area of the site that drains to the outfall.
Q_R shall be computed for each sub-area separately and summed. An area-weighted CN shall not be used where impervious and pervious areas differ by more than 20 CN points.
The volumetric method RRV = 10 × P_R × Rv × A, with Rv = 0.05 + 0.009 × I (I = percent impervious), may be used for sites under 0.5 ha and under the Tier B method.
Commentary. The Rv formula is the one used in the KC water quality volume (MARC BMP Manual 2012). It is simple to review for small sites. The SCS-CN form is required for larger sites so that the retention computation uses the same runoff model as the detention routing. That keeps the credit computation of Clause 4.4.6 consistent.
4.4.3 Verification
Retention by infiltration shall be supported by:
- (a) site infiltration tests at the location and depth of each practice, at the frequency set in Chapter 8;
- (b) a design infiltration rate of no more than half of the measured rate; and
- (c) groundwater evidence showing the seasonal high groundwater table at least 1.0 m below the base of the practice (Chapter 8).
Retention by reuse shall be supported by a demand calculation showing that the RRV is drawn down within 72 hours by a continuous non-potable use, such as toilet flushing, cooling or irrigation.
Commentary. The factor of 2 on measured infiltration rate has no direct precedent; this Manual sets it to allow for clogging and for the difference between a test pit and a full-scale practice. Chapter 8 may set a different factor; if it does, Chapter 8 governs.
4.4.4 Limits on retention
4.4.4.1 Infiltration practices shall not be used:
- where the seasonal high groundwater table is less than 1.0 m below the base (Chapter 8);
- on contaminated land;
- within the setbacks from foundations, wells and septic systems set in Chapter 8; or
- on fill, unless tested after placement.
4.4.4.2 Where the RRV cannot be fully retained, the shortfall shall be stated in the submittal. The shortfall shall be treated as WQv under Chapter 8 and shall get no retention credit.
4.4.5 Drawdown of retention
Retention storage shall be emptied by infiltration or reuse within 72 hours of the end of the retention-depth storm, verified by the tests of Clause 4.4.3.
4.4.6 Retention credit: definition and computation
4.4.6.1 What the credit is. The retention credit is the reduction in required detention storage that results when the retention practices are included in the post-development routing. It is computed. It is not assumed equal to the RRV.
4.4.6.2 Tier A method (routing). For each design storm and duration of Clause 4.6.3:
- (a) model each retention practice explicitly as a storage that is empty at the start of the storm, unless Clause 4.11 says otherwise;
- (b) let the practice fill from the front of the storm, and let it lose water during the storm only at the design infiltration or reuse rate of Clause 4.4.3;
- (c) once it is full, route its overflow to the detention facility; and
- (d) size the detention for the residual hydrograph.
The required detention storage is the largest storage over all storms and durations. The credit is the difference between that storage and the storage required with no retention. No further deduction shall be made.
4.4.6.3 Tier B method (simplified). The detention storage required by Clause 4.14 may be reduced by:
V_credit = C_R × RRV_provided
where C_R is the retention credit factor from Annex 4B for the zone, soil group and drawdown rate. Until Annex 4B is published, C_R = 0.
4.4.6.4 Retention that is not verified under Clause 4.4.3 gets no credit.
Commentary. "Credited against detention" (APWA 5600 2025.01) can be read in two ways. One reading subtracts the retained volume from the detention volume, cubic metre for cubic metre. The other routes the storms with retention in place and sees what detention is still needed. The two readings give very different answers in Himachal Pradesh, because the mandatory 48- and 72-hour storms (Clause 2.5.2) fill any retention practice on the first day, long before the peak arrives on the last day (Clause 2.9.2). Unless the practice keeps infiltrating during the storm, it is full at the peak and does nothing to reduce the peak storage.
The illustrative example in Clause 4.6.7 shows the size of the effect. A 2 ha site with 552 m³ of retention (no infiltration during the storm) needs 138 m³ less detention for the 24-hour storm. That is a credit of about a quarter of the retained volume. For the 48- and 72-hour storms, which govern, the credit is close to zero. Subtracting the retained volume directly would have under-sized the detention by about 545 m³ (about 19%).
This Manual therefore defines the credit as the result of routing. Retention on fast-draining sandy soils, which keeps infiltrating through a multi-day storm, will earn a real credit. Retention that only fills will earn little. Both outcomes are physically correct. Setting C_R = 0 until Annex 4B exists is a safe default for Tier B, not a judgement that retention has no value: retention is still required for water quality and recharge (Chapter 8).
4.4.7 Preservation credit
Areas of the site that are permanently preserved in natural cover may be modelled at their pre-development CN in the post-development condition, provided that:
- they are protected by a registered covenant or dedication; and
- their runoff is not concentrated onto impervious surfaces.
This lowers both the RRV and the detention required. No other preservation credit applies.
4.5 Release-rate criteria
4.5.1 General
4.5.1.1 Peak discharge from the site shall be computed by a hydrograph method (Chapter 3) for the pre-development and post-development conditions with identical design storms (Clause 2.11.1). The Rational Method shall not be used for any part of storage sizing.
4.5.1.2 Pre-development is greenfield: open land in good condition for the mapped HSG. Existing impervious cover is not counted (Clause 2.11.5, Chapter 3). This applies to redevelopment as well, subject only to the constrained-redevelopment route of Clause 4.5.6.
4.5.1.3 The criteria apply at each point where runoff leaves the site. Where a site drains to more than one outfall, the criteria apply to each outfall for the area draining to it. Runoff shall not be diverted between catchments.
4.5.2 Standard catchments
For each of the 50%, 10% and 1% AEP (2-, 10- and 100-yr) storms, and for every duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:
Q_post(T, d) ≤ 0.9 × Q_pre(T, d)
4.5.3 Flood-sensitive catchments
4.5.3.1 In the catchments listed below, the mixed-frequency rule of Clause 2.11.3 applies, for every duration in Clause 2.5.2:
Q_post(1% AEP, 100-yr) ≤ Q_pre(10% AEP, 10-yr), and Q_post(50% AEP, 2-yr) ≤ Q_pre(50% AEP, 2-yr).
Each cap is the pre-development peak at the duration that maximises it: the 10-yr peak for the 100-yr check, and the 2-yr peak for the 2-yr check. The cap applies to every post-development duration (Clause 2.11.3).
4.5.3.2 The flood-sensitive catchments are:
- (a) Shimla's nallahs and sinking zones: the catchments of the nallahs of the Shimla Planning Area that drain north to the Sutlej and south to the Ashwani Khad and the Giri, whose steep, debris-laden flows reach the drains within minutes of a burst, and the land of Shimla's two sinking and sliding zones (Commentary to Clause 4.11);
- (b) Mandi on the Beas and the Suketi: the land of Mandi town that drains to the Beas and to the Suketi at and above their confluence, and the Balh valley of the Suketi round Sundernagar and Ner Chowk, where the water table is high and the outfalls are flat;
- (c) Kullu–Bhuntar–Manali on the Beas: the land of Kullu, Bhuntar and Manali on the valley floor, low terraces and old channels of the Beas and on the fans of its side streams, among them the Sarvari and the Parbati at their confluences;
- (d) Baddi–Barotiwala–Nalagarh on the Sirsa and the Balad: the land of the BBNDA area that drains to the Sirsa, the Balad and their nallahs across the Nalagarh valley;
- (e) Una on the Swan: the land of Una and the towns of the Una valley that drains to the Swan and its tributaries;
- (f) Paonta Sahib on the Yamuna and the Bata: the land of Paonta Sahib that drains to the Yamuna, whose outfalls are held up when the river at Paonta is above its CWC warning level, or to the Bata;
- (g) Dharamshala–Kangra on the Dhauladhar khads: the land of Dharamshala, McLeodganj and Kangra that drains to the Manjhi, the Gaj, the Banner and the Bhagsunag nallah and the other khads of the Dhauladhar front;
- (h) Rampur Bushahr on the Sutlej: the land of Rampur Bushahr that drains to the Sutlej and to the khads that join it at the town;
- (i) Reservoir-backwater towns: the land of Bilaspur that drains to Gobind Sagar, and of Dehra and the other towns on the Pong reservoir that drains to it, below or near the reservoir's starting level of Clause 3.12.5;
- (j) Chamba on the Ravi: the land of Chamba town that drains to the Ravi and to the nallahs that cross the town; and
- (k) any catchment notified under Clause 4.5.4.
The boundaries shall be those mapped in Annex 4A.
4.5.4 Notification of further flood-sensitive catchments
4.5.4.1 The Authority may propose that a catchment be notified as flood-sensitive where one or more of the following is documented:
- (a) buildings or arterial roads flooded in an event of 1% AEP or more frequent, on at least two occasions in the previous 20 years;
- (b) receiving drains or channels with capacity below the 10% AEP flow under existing conditions;
- (c) an outfall that is held up by a river in flood or by a reservoir, such as the Yamuna at Paonta Sahib, the Swan at Una, the Beas at Mandi, Kullu and Bhuntar, the Sutlej at Rampur Bushahr, Gobind Sagar at Bilaspur or the Pong reservoir below Dehra, or that is buried or blocked by the debris of a khad or nallah, for part of the SW monsoon (Chapter 5);
- (d) loss of more than a quarter of the mapped tank and tal storage in the catchment since the earliest available survey; or
- (e) a basin master plan that relies on limiting site discharge.
4.5.4.2 The procedure shall be:
- The Authority prepares a technical note with the catchment boundary in GIS form and the evidence for 4.5.4.1.
- The State-level technical committee constituted under Chapter 1 reviews the note.
- The draft notification and map are published for public comment for at least 60 days.
- The Government notifies the catchment and the map is added to Annex 4A.
- The rule applies to applications received 6 months or more after notification. Applications received earlier are assessed under Clause 4.5.2.
4.5.4.3 A notified catchment may be de-notified only by the same procedure, and only after a basin study shows that the downstream system meets Chapter 5 with all development under Clause 4.5.2.
Commentary. The 0.9 factor is derived from the Denver (MHFD) analysis. In that analysis, ten basins each releasing 100% of the historic 100-yr peak still produced 106% of the historic peak at the outlet; releasing 90% at each gave 97% (UDFCD Full Spectrum Detention Release Rate Memorandum, 2012). The mixed-frequency rule has no direct precedent; the nearest is the Malaysian DID (2008) checklist, which required post-development 2-, 10-, 50- and 100-yr peaks below the pre-development 2-yr peak. The specific "100-yr post ≤ 10-yr pre" form appears in a New Berlin, Wisconsin planning discussion (not an adopted rule). The Shimla entry follows the nallahs and the slopes. The town drains through 13 major nallahs from the Kufri–Dhalli–Sanjauli–Ridge–Tutu watershed, north to the Sutlej and south to the Yamuna system through the Ashwani Khad and the Giri (MC Shimla and UNDP, 2015); its storm drains covered about 30% of the city in 2017 and were found "not able to carry the peak flow" (expert committee before the NGT, as recorded in the judgment of 2017, para 53); and the slide of 14 August 2023 at Summer Hill and Shiv Bawri, about 230 m long, ran along an old buried stream channel and killed about 20 people, with buildings collapsing at Krishna Nagar the next day (HIMCOSTE-led technical committee, 2023; as reported). The Ashwani Khad below the town is a drinking-water source whose contamination by sewage caused the hepatitis E outbreak of 2016 (Bhagra et al., 2017). The Mandi entry follows the Beas and the Suketi: on 9 July 2023 the Panchvaktra temple at their confluence was submerged to its dome (as reported), Kataula and Pandoh in the district recorded 210.2 mm and 178.0 mm on 23 August 2023 (IMD), the town's sewage treatment works were damaged in the Beas floods of 2025 (Chief Secretary's affidavit in NGT O.A. 735/2023, 2026), and Mandi lies in a closed cell of the CWC zone 7 plate (Annex 3E); the Balh valley upstream has water 0.27–7.15 m below ground (NAQUIM, Mandi). The Kullu–Bhuntar–Manali entry follows the Beas: the post-disaster needs assessment found that "most of the destruction that occurred along the Beas river in Kullu district was mainly due to overflow of the water along the palaeo channels following the old river course along which the developmental activities have taken place" (PDNA 2023); Manali recorded 131.3 mm on 9 July 2023, a new 24-hour record (IMD), Kullu district reported 26 cloudbursts in July 2023 (HPSDMA, as cited by IMD), and the recovery plan lists flash-flood protection for Bhuntar (₹31.23 crore) and works on the Beas at Manali (₹243.37 crore) among its proposals; there is no CWC site on the Beas at Manali, Kullu or Bhuntar. The Baddi–Barotiwala–Nalagarh entry follows the Sirsa and the Balad: a pier of the Baddi–Nalagarh bridge on the Balad collapsed on 23 August 2023 and bridges at Madawala and Dabhota were lost or damaged in July 2023 (as reported), and the CPCB placed the Bald along Baddi and the Sirsa along Nalagarh in Priority I among polluted stretches (2022 list); the Sirsa has no gauge. The Una entry follows the Swan, channelised under the Swan River Flood Management Project (₹922.49 crore in a Rajya Sabha answer of 2024, ₹945.49 crore in a NITI Aayog note of 2020: the sources differ), with no design flood stated in either; the Una Rampur AWS recorded 228.5 mm on 9 July 2023 (IMD), and the Swan at Ghaluwal has a highest recorded level of 367 m (CWC, as transcribed by SANDRP). The Paonta Sahib entry follows the Yamuna, the only river in the State with CWC warning and danger levels (383.5 m and 384.5 m), whose highest level of 384.6 m on 5 September 1995 stands only 0.1 m above the danger level, and the Bata, which set a new highest level of 373.52 m at Ganguwala on 22 July 2023 (CWC, as transcribed by SANDRP). The Dharamshala–Kangra entry follows the Dhauladhar front, the wettest part of the State: Dharamshala recorded 600 mm in a day on 18 July 1967 (CWC zone 7 report, Annex 4.3) and 250.2 mm and Kangra Aero 273.4 mm on 14 August 2023 (IMD), and a flash flood swept through Bhagsunag on 12 July 2021 (as reported). The Rampur Bushahr entry follows the Sutlej, whose highest level at Rampur, 933 m, was set on 26 June 2005 by the outburst of the Parechu lake in Tibet (CWC, as transcribed by SANDRP), and whose flood of 1 August 2000 was reported to have carried away more than 100 people (as reported); and the burst of 31 July 2024 at Samej, in the Rampur area, in which 56 people were reported killed, fell where no gauge recorded it (as reported). The reservoir entry follows Gobind Sagar and Pong, whose levels are set by BBMB and stood near or above their full reservoir levels in 2023 and 2025 (Commentary to Clause 3.12); the High Court has barred muck dumping into Gobind Sagar "and its feeding khuds/nallahas" and ordered action against those who dumped it (CWPIL 31/2023, order of 31 May 2024). The Chamba entry follows the Ravi, which has no CWC site at Chamba; Chuari in Chamba district recorded 234.0 mm on 14 August 2023 (IMD). Solan, Nahan, Hamirpur, Palampur, Sundernagar and Kala Amb are candidates for notification under Clause 4.5.4. The notification triggers in 4.5.4.1 have no direct precedent and are set by this Manual. The 6-month lead time follows the update rule of Clause 2.14.2. Clause 4.16 explains why releases below pre-development are needed at all.
4.5.5 Minimum outlet and short-duration 2-yr checks
4.5.5.1 Where the PSD for any AEP and duration is less than the discharge of a 50 mm orifice (Clause 4.8.2) at the corresponding stage, the 50 mm orifice is deemed to comply for that AEP and duration.
4.5.5.2 Where meeting the 2-yr criterion at a duration of 3 hours or less would require a low-flow orifice so small that the drawdown requirement of Clause 4.7 cannot be met, the designer shall:
- size the low-flow orifice as the smallest opening that meets Clause 4.7; and
- report the resulting 2-yr exceedance for those durations.
The Authority may accept the design if the exceedance is below the discharge of the 50 mm orifice at the 2-yr stage, or if the downstream analysis of Chapter 5 shows no adverse effect.
Commentary. Under AMC II, a greenfield site produces almost no runoff in a 1- or 2-hour, 2-yr storm, because most of the rain is lost to initial abstraction. A pre-development peak of a few litres per second, compared duration by duration, then forces a very small low-flow orifice. That orifice cannot release the 10-yr volume within 48 hours. Checked as if it were outside a flood-sensitive catchment, the illustrative example of Clause 4.6.7 would need a low-flow orifice of about 75 mm to match the 1-hour, 2-yr pre-development peak. 90% drawdown of the 10-yr volume would then take about 84 hours even with a clean orifice, against the 48-hour limit. The 170 mm orifice that meets drawdown with 50% blockage exceeds the 1-hour, 2-yr pre-development peak by about 11 L/s. Clause 4.5.5.2 resolves that conflict in favour of drawdown, because a basin that is still partly full when the next SW monsoon storm arrives fails in the event that matters more. KC APWA 5600 (2006) used a 75 mm (3 in) minimum orifice with trash racks. This Manual sets a 50 mm minimum (Clause 4.8.2).
4.5.6 Constrained redevelopment sites
4.5.6.1 Eligibility. The relief route of this clause is available only for redevelopment where all of the following hold:
- (a) the existing site is at least 60% impervious, as surveyed before demolition;
- (b) the site is 1 ha or less; and
- (c) the designer shows, in a Constraint Statement submitted with Form 4-1, that the greenfield criteria of Clauses 4.5.2 or 4.5.3 cannot be met on the site. The statement must show that every storage option of Clause 4.10 has been assessed: rooftop and podium storage, tanks under parking or landscape, permeable paving with sub-base storage, and landscape depressions. It must also give the storage each option can provide.
New development on undeveloped land is never eligible.
4.5.6.2 Minimum on-site performance. An eligible site shall provide all of the following on site:
- (a) the full retention volume (Clause 4.4) and the WQv treatment (Chapter 8), with no relief;
- (b) post-development peak discharge no more than 50% of the existing-condition peak for the 50%, 10% and 1% AEP storms, at each duration of Clause 2.5.2. The existing condition is modelled under Clause 3.3.4; and
- (c) no increase in the 1% AEP water level at any building or road downstream (Chapter 5).
4.5.6.3 Shortfall. The shortfall is the detention storage required to meet the greenfield criteria (Clause 4.6) minus the storage provided on site under 4.5.6.2. The applicant shall pay for the shortfall as a fee-in-lieu at the unit rate of Clause 4.13.3. The fee shall be:
- (a) paid into the ring-fenced account of the basin in which the site lies;
- (b) spent only on regional detention or on restoring tal or tank flood storage identified in the basin stormwater master plan (Chapter 11); and
- (c) recorded in the public ledger of Clause 4.13.4, which shall show the volume owed and the volume delivered in each basin.
Where no basin master plan has yet been approved, the fee shall be held for up to 5 years. If no plan is approved in that time, it shall be spent on restoring tank flood storage in the same basin, with Jal Shakti Vibhag agreement.
4.5.6.4 Flood-sensitive catchments. In the catchments of Clause 4.5.3, the route is available under the same conditions. The Authority may, however, refuse it where the downstream analysis of Chapter 5 shows existing flooding of buildings in the 10% AEP event within the analysis extent.
Commentary. Greenfield is the target for all redevelopment, because a dense city only reduces its runoff as it rebuilds. On small, fully built plots in areas such as the Lower Bazaar, Middle Bazaar and Lakkar Bazaar of Shimla, the old town of Mandi, the bazaars of Solan, Kullu and Chamba, or Kotwali Bazaar in Dharamshala, there is often no space for the full greenfield storage. A rule that cannot be met invites variances and non-compliance, which help no one downstream. This clause follows the approach of the UK Non-statutory Technical Standards for Sustainable Drainage (Defra, 2015, S2–S3). For previously developed sites, those standards require peak runoff "as close as reasonably practicable to the greenfield runoff rate" and never above the pre-redevelopment rate. The fixed 50% minimum reduction has no direct precedent; this Manual sets it to give reviewers a clear number in place of a "reasonably practicable" judgement. The fee-in-lieu turns the shortfall into regional storage in the same basin, so the basin still receives greenfield-equivalent control in total. Retention and water quality get no relief, because they are small volumes that almost every site can hold.
4.6 Detention sizing procedure
4.6.1 Method
Detention shall be sized by hydrograph routing through the stage–storage–discharge relationship of the facility, by level-pool (Modified Puls) or an equivalent numerical method (SWMM, HEC-HMS). Fixed-ratio and Rational-based storage formulae shall not be used. The simplified methods of Clause 4.14 (the Tier B tables and the fixed-coefficient route) are the only exceptions.
4.6.2 Steps
- Delineate the site and sub-areas. Map HSG and confirm by testing (Chapter 3).
- Extract design rainfall for 50%, 10% and 1% AEP and every duration in Clause 2.5.2, with the climate factor (Chapter 2, Form 2-1).
- Build design hyetographs: alternating block for ≤ 24 h; the "peak day last" pattern for 48 and 72 h (Clause 2.9).
- Compute pre-development hydrographs (greenfield CN; AMC III for storms of every duration from 1 July to 30 September in sub-areas HP-B, HP-B1, HP-B2 and HP-C, including the Balh valley, at all times in catchments draining to Gobind Sagar, Pong, Pandoh or another reservoir, barrage pond or backwater, or a river at or above its CWC warning level, and at other sites and times after a 5-day total of more than 53 mm, AMC II otherwise).
- Compute the release caps for each AEP and duration under Clause 4.5.2 or 4.5.3.
- Compute post-development hydrographs with the same storms and AMC, including retention practices (Clause 4.4.6).
- Choose a trial facility geometry (stage–storage) and a multi-stage outlet (Clause 4.6.5).
- Route every storm and duration. Use a time step of no more than 5 minutes, and no more than Tc/3 of the post-development catchment.
- Check every release against its cap, and check drawdown (Clause 4.7). Adjust the outlet and storage and repeat.
- Check the tailwater condition of Clause 4.6.6 and the downstream analysis of Chapter 5.
- Size the emergency spillway and set freeboard (Clause 4.9).
- Report the governing storm for storage, for each outlet stage, and for the spillway (Clause 4.17).
4.6.3 Storms to be routed
Every facility shall be routed for the full matrix:
Table 4.1 — Design storms to be routed for detention sizing
| AEP | Durations (h) | AMC |
|---|---|---|
| 50% (2-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
| 10% (10-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
| 1% (100-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
The 24-, 48- and 72-hour runs are mandatory whatever the critical-duration result (Clause 2.5.2). Where Ia = 0.05S sensitivity is required by Chapter 3, it shall be run for the governing storage case.
4.6.4 Initial conditions
Each run shall start with:
- detention storage empty, down to the invert of the lowest outlet;
- any permanent pool full;
- retention practices empty, except as limited by Clause 4.11; and
- RWH storage full (Clause 4.11).
The 48- and 72-hour storms already contain their antecedent rain, so no further pre-filling is applied.
4.6.5 Multi-stage outlet design
4.6.5.1 The outlet shall have a separate control for each criterion, normally stacked as in Figure 4.2:
- Stage 1, at the invert: the low-flow orifice. It releases the WQv over 24–48 h (Chapter 8) and controls the 2-yr release.
- Stage 2: an orifice or slot set at or near the maximum 2-yr level. It controls the 10-yr release.
- Stage 3: a weir, riser crest or larger orifice set at or near the maximum 10-yr level. It controls the 100-yr release.
- Emergency spillway: separate from the primary outlet (Clause 4.9).
Stages may be combined where routing shows that every cap is met.
4.6.5.2 Orifices shall be computed with a discharge coefficient of 0.60 unless a rated device is used. Weirs shall use a coefficient appropriate to their shape. Submerged-outlet and tailwater effects shall be included (Clause 4.6.6).
4.6.5.3 Vortex flow controls and other proprietary devices may be used where the supplier provides a certified head–discharge curve and the minimum clear opening is at least 50 mm.
4.6.6 Tailwater on the outlet
The outlet shall be routed against the tailwater of the receiving system, not free outfall, wherever the receiving water level can rise above the outlet invert. The tailwater shall be:
- for a receiving drain: its water level in the same storm, from the Chapter 5 analysis or, for Tier B, the drain obvert;
- for tidal or backwater-affected outfalls: the levels and joint cases of Clause 2.12 and Chapter 5, including the outfall-closed check (Clause 5.10).
Where tailwater governs, a flap gate shall be fitted to the outlet (Clause 5.11). The storage below the tailwater level shall not be counted as available unless the routing includes the gate closure.
4.6.7 Illustrative example
Illustrative — not design values. This example shows the procedure and the sizes it produces. The inputs are invented to be plausible for a colony draining to a nallah in Shimla. They are not NIH-DHAARA values and must not be used for design.
Inputs:
- Site: 2.0 ha, flood-sensitive catchment (Clause 4.5.3).
- Land cover: pre-development all pervious, CN 70. Post-development as two sub-areas (Clause 3.9.2): 1.57 ha of directly connected impervious surface at CN 98, never converted for AMC, and 0.43 ha of pervious open space at CN 70, on the same soil as pre-development; the area-weighted CN at AMC II is 92. For storms of 12 h and longer the pervious CN only is converted to AMC III: CN_III = 23·CN / (10 + 0.13·CN) = 84.3 (Clause 3.8.4).
- Time of concentration (Tc): 45 min pre-development, 15 min post-development (used for both sub-areas). SCS triangular unit hydrograph; 5-minute time step.
- 24-h depths: 110, 200 and 350 mm for 2-, 10- and 100-yr (the same 10- and 100-yr values as Clause 2.11).
- Shorter durations: P(t) = P24·(t/24)^0.40, an assumed ratio set and not Annex 2B.
- Longer durations: 48-h and 72-h depths taken as 1.25 and 1.40 × P24, laid out per Clause 2.9.2.
- Storage: vertical-walled, 2,500 m² plan area.
- Outlet, sized so that drawdown is met with the low-flow orifice 50% blocked (Clause 4.8.3). Annex 4C shows the trial outlet that failed this check.
- Stage 1: 170 mm orifice at the invert.
- Stage 2: 460 mm orifice with its invert 0.53 m above the floor.
- Stage 3: none needed, because the 100-yr cap is met by Stages 1 and 2.
Results (discharges in L/s; storage in m³):
Table 4.2 — Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
| Duration (h) | 2-yr pre | 2-yr post, detained | 10-yr pre | 10-yr post, detained | 100-yr post, uncontrolled | 100-yr post, detained | 100-yr storage used | 10-yr drawdown, 50% blocked (h) |
|---|---|---|---|---|---|---|---|---|
| 1 | 4 | 15 | 51 | 28 | 922 | 42 | 1,426 | 31.3 |
| 2 | 14 | 20 | 84 | 34 | 961 | 79 | 1,911 | 32.1 |
| 3 | 19 | 22 | 104 | 37 | 981 | 139 | 1,999 | 32.8 |
| 6 | 32 | 25 | 150 | 41 | 1,010 | 194 | 2,154 | 34.2 |
| 12 | 127 | 30 | 302 | 46 | 1,074 | 276 | 2,512 | 39.0 |
| 24 | 149 | 32 | 327 | 49 | 1,081 | 320 | 2,766 | 45.3 |
| 48 | 173 | 34 | 349 | 82 | 1,087 | 343 | 2,913 | 44.8 |
| 72 | 180 | 34 | 356 | 84 | 1,089 | 343 | 2,911 | 44.7 |
How to read it:
- 100-yr cap. The cap is the largest pre-development 10-yr peak, 356 L/s (72 h). Every 100-yr detained peak is at or below it; the largest is 343 L/s.
- 2-yr cap. The site is flood-sensitive, so the 2-yr cap is the largest pre-development 2-yr peak, 180 L/s (72 h; Clause 4.5.3.1). The largest 2-yr detained peak is 34 L/s. At 1, 2 and 3 hours the detained 2-yr peak is above the pre-development peak of the same duration (15 against 4 L/s, 20 against 14 L/s, and 22 against 19 L/s). That comparison is not required here. It would be for a site under Clause 4.5.2, and Clause 4.5.5.2 would then apply.
- Governing storage. Storage is governed by the 48- and 72-hour storms: 2,913 m³, which is 0.146 m³ per m² of site, at a maximum depth of 1.17 m. A design that checked only the critical-duration peak storm (1–3 h here) would have provided about 2,000 m³, roughly two-thirds of what is needed.
- Drawdown. With the low-flow orifice 50% blocked (Clause 4.8.3), 90% of the 10-yr storage drains in at most 45.3 h (the 24-hour storm), within the 48 hours of Clause 4.7. A 120 mm orifice would drain it in about 42 h when clean but 54 to 75 h when half blocked, so it fails. Annex 4C shows that trial and the routing step by step.
- Retention credit. With an illustrative retention depth of 40 mm, RRV = 552 m³, computed for each sub-area (Clause 3.9.4). Modelled as filling from the start of the storm with no infiltration during it, the retention reduces the 24-hour storage by 138 m³ and the 48- and 72-hour storage by 7 m³ or less. The credit under Clause 4.4.6 is therefore effectively zero for this site.
The order of magnitude, about 0.15 m³ per m² of site, is consistent with the indication in Clause 2.11.
Figure 4.1 — Pre-development 10-yr, post-development 100-yr uncontrolled and detained hydrographs for the 24-hour storm of the illustrative example (Clause 4.6.7). Illustrative — not design values. Original drawing for this Manual, adapted from the pre/post-development hydrograph concept in MARC/KC APWA Section 5600 and the Georgia Stormwater Management Manual (2016).
Commentary. Figure 4.1 shows what detention does and does not do. It cuts and delays the peak. It does not reduce the volume: the area under the detained curve equals the area under the uncontrolled curve, more than twice the pre-development 10-yr volume. The extra volume leaves the site over many hours after the storm. That prolonged release can coincide with the peak of the larger catchment downstream (Clause 4.16), and it must still drain when the outfall is tide-locked (Chapter 5).
4.7 Drawdown
4.7.1 Detention. At least 90% of the maximum volume stored in the 10% AEP (10-yr) storm of each duration shall be released within 48 hours of the time of maximum storage, by gravity, with the tailwater of Clause 4.6.6.
4.7.2 Water quality volume. The WQv shall be released over not less than 24 hours and not more than 48 hours (Chapter 8).
4.7.3 Retention. Retention storage shall be emptied within 72 hours by infiltration or reuse (Clause 4.4.5).
4.7.4 Tidal outfalls. Where gravity drawdown is prevented by tide for part of each cycle, the 48-hour limit applies with the tidal tailwater modelled. Where it cannot be met by gravity, pumped drawdown shall be provided under Clause 5.12.
Commentary. KC APWA 5600 (2006) required dry basins to release at least 80% of storage within 24 hours of the inflow peak and to empty within 72 hours. Singapore PUB requires detention to be restored within 4 hours. The 48-hour, 90% rule is longer than PUB's because Himachal Pradesh storage must hold multi-day volumes. It is still short enough that a basin filled by one SW monsoon depression will have most of its volume back before the next, which in July 2023, when four western disturbances (5–11, 13–18, 20–23 and 28–31 July) met an active monsoon and the State received about 448 mm in the month, 75% above its July normal (IMD) followed within days.
4.8 Outlet structures
4.8.1 General. Primary outlets shall be:
- unattended, with no moving parts, valves or pumps, except where Clause 5.12 permits pumped drawdown;
- accessible for inspection and cleaning from the surface without confined-space entry, where practicable; and
- built of durable materials. In coastal areas these shall be corrosion-resistant (Clause 4.12.5).
4.8.2 Minimum orifice. No control orifice shall be smaller than 50 mm in diameter, or 50 mm in least dimension for a slot.
4.8.3 Trash racks and screens. Every orifice and weir shall be protected by a trash rack or screen. The rack shall:
- have a clear bar spacing no greater than half the smallest opening it protects, and not less than 25 mm;
- have a clear open area at least 10 times the area of the opening it protects;
- be inclined, or set as a cage around the riser, so that debris rises with the water and does not pin against the bars;
- be removable or hinged for cleaning; and
- for routing, be assumed 50% blocked at the low-flow orifice when checking drawdown.
4.8.4 Anti-vortex devices. Riser crests and orifices that may run under more than 1.5 times their diameter of head shall have an anti-vortex plate or hood (Figure 4.2).
4.8.5 Outlet barrels. Outlet barrels through embankments shall:
- be at least 300 mm in diameter (Chapter 6);
- have watertight joints;
- have a filter diaphragm or seepage collars over the length within the embankment; and
- have an energy-dissipating outfall (Chapter 9).
4.8.6 Isolation. Facilities serving more than 1 ha shall have a means of isolating the outlet for maintenance, such as a stop-log slot or penstock. In normal service it shall be left fully open.
Commentary. The 50 mm minimum is smaller than the 75 mm (3 in) of KC APWA 5600 (2006), so the trash-rack requirements are correspondingly stricter. The ratios in 4.8.3 (bar spacing at half the opening, open area 10 times the opening, 50% blockage for the drawdown check) have no direct precedent and are set by this Manual. The blockage factor matches the 50% grate clogging factor for sag inlets in Chapter 6. Indian urban drains carry heavy loads of solid waste, so a low-flow orifice without an effective rack will block within one season.
Figure 4.2 — Detention storage stack (permanent pool, WQv, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and multi-stage riser outlet. Schematic, not to scale. Original drawing for this Manual, adapted from the multi-stage outlet and storage-zone concepts in MARC/KC APWA Section 5600 (2006, 2025.01) and the Mile High Flood District Urban Storm Drainage Criteria Manual, Volume 2 (full-spectrum detention).
4.9 Emergency spillway, freeboard and embankment safety
4.9.1 Spillway capacity. Every detention facility formed wholly or partly by an embankment, or whose overflow would reach buildings, shall have an emergency spillway that passes the 1% AEP (100-yr) peak inflow:
- with the primary outlet assumed fully blocked;
- with the facility full to the spillway crest at the start of the storm; and
- with at least 0.3 m freeboard from the maximum water level to the embankment crest.
4.9.2 High-hazard facilities. A facility is high-hazard if its failure or overflow could:
- endanger life;
- flood a habitable building or critical facility; or
- close an arterial road.
High-hazard facilities shall also be checked for the 0.2% AEP (500-yr) peak inflow under the conditions of 4.9.1, with the embankment not overtopped.
4.9.3 Spillway crest. The spillway crest shall be at or above the 1% AEP maximum water level from routing with the primary outlet working. The recommended clearance is 0.15 m.
4.9.4 Spillway location. The spillway shall be:
- on natural ground or a reinforced section, not on fill, unless protected against erosion for the full design flow;
- discharging to the 1% AEP overland flow path of Chapter 6; and
- placed so that its flow does not reach a building.
4.9.5 Underground and enclosed facilities. Tanks, vaults and podium storage shall have an overflow route that operates when the outlet is blocked. The route shall carry the 1% AEP inflow to the overland path without surcharging any building, basement or lift pit.
4.9.6 Embankments.
- (a) Embankments more than 2 m high (measured from the downstream toe to the crest) shall be designed by a qualified geotechnical engineer. The design shall include stability, seepage and settlement analysis.
- (b) Side slopes shall be no steeper than 3H:1V on any face that is mown or accessible to the public. Slopes shall be flatter where Clause 4.15 requires.
- (c) Embankments shall have:
- a crest width of at least 3 m;
- compacted, engineered fill with a core or cut-off where required by the seepage analysis; and
- no trees or large shrubs.
- (d) An embankment structure that falls within the Dam Safety Act, 2021 is subject to that Act in addition to this Manual.
4.9.7 Excavated facilities. Facilities wholly below the surrounding ground, with no embankment, need not meet 4.9.6. They shall still meet 4.9.1, with the overflow route treated as the spillway.
Commentary. The spillway criterion (1% inflow, outlet blocked, basin full, 0.3 m freeboard; 0.2% for high hazard) follows the KC APWA 5600 (2006) rule: the spillway passes the 1% storm with 1 ft (0.3 m) freeboard to the top of the dam, assuming zero storage and a clogged primary outlet, with the crest at least 0.5 ft (0.15 m) above the 1% maximum water surface. KC designed dams above 10 ft (3 m) to SCS TR-60 Class C. The 2 m embankment trigger, the 3H:1V slope (KC wet ponds), and the 3 m crest width have no direct precedent and are set by this Manual.
4.10 Facility types
4.10.1 General. Any storage that meets Clauses 4.5 to 4.9 may be used. Surface storage that is visible and can be inspected without confined-space entry is preferred. Storage shall not be placed in a habitable basement or in any space whose flooding would endanger life.
4.10.2 Underground tanks and vaults.
- (a) Gravity outlet is required where the receiving drain allows it. Pumped outlets are permitted only under Clause 5.12, with a registered maintenance declaration (Chapter 10).
- (b) Access openings shall be provided over the outlet chamber and over every inlet. In tanks over 500 m², they shall be no more than 30 m apart.
- (c) The floor shall fall at least 1% to a sump at the outlet, with a sediment pocket below the low-flow orifice invert.
- (d) The tank shall be ventilated.
- (e) Inlets shall pass through a silt trap or gross pollutant trap (Chapter 8).
- (f) Flotation and groundwater ingress shall be checked under Clause 4.12.
4.10.3 Rooftop detention.
- (a) It is permitted on flat roofs designed for the full ponded load with the outlet blocked. The ponding depth shall not exceed 150 mm unless a structural engineer certifies a greater depth.
- (b) Each roof outlet shall have a flow-control ring or weir with a certified rating, and every roof area shall have at least one overflow scupper, independent of the controlled outlets, that passes the 1% AEP inflow.
- (c) Roofs used for RWH collection may also provide rooftop detention. The detained volume is released through the control, not into the RWH sump.
4.10.4 Podium and landscape-deck detention.
- (a) It is permitted above ground level or above a basement car park, provided the structure is designed for full saturation and ponding, and waterproofed.
- (b) The release, overflow and safety rules for rooftop detention (4.10.3) apply.
4.10.5 Parking-lot detention.
- (a) It is permitted only on surface parking. Ponding depth shall not exceed:
- 200 mm in the 10% AEP storm and 300 mm in the 1% AEP storm at any parking bay;
- zero on accessible routes, ramps and pedestrian crossings; and
- zero in the 10% AEP storm on fire-tender access routes.
- (b) Signs shall warn that the area floods.
- (c) Ponding shall not reach a building wall unless the wall is waterproofed above the 1% level plus freeboard (Chapter 6).
4.10.6 Multi-use detention (parks, playfields, open space reservation).
- (a) Open space land may be used for detention, provided its primary use remains available in at least the 50% AEP storm.
- (b) The storage areas shall be graded to drain fully within the times of Clause 4.7.
- (c) A low-flow channel or underdrain shall carry dry-weather and frequent flows, so that the park is not waterlogged.
- (d) The depth and slope limits of Clause 4.15 apply.
- (e) Play equipment and seating shall be placed above the 10% AEP level.
4.10.7 Ponds and wet basins.
- (a) A permanent pool shall be at least 1.2 m deep over most of its area to discourage weed growth and mosquito breeding, with a vegetated safety bench at the edge (Clause 4.15).
- (b) Only storage above the permanent pool counts as detention.
Commentary.
- The rooftop depth (150 mm) and parking depths (200 and 300 mm) have no direct precedent. This Manual sets them so that a blocked outlet is noticed before it becomes dangerous.
- The 1.2 m pool depth equals the 4 ft minimum permanent pool of KC APWA 5600 (2006). This Manual adopts it mainly for weed and mosquito control.
- Pumped detention tanks need maintenance declarations in Singapore (PUB Addendum No. 3, April 2025). This Manual adopts the same approach through Chapter 10.
- Using open space for multi-use detention fits the TCP Rules 2014, under which a new sub-division of more than five plots keeps at least 10% of the scheme as open or green space and 5% for soak pits and the like (Appendix-1, cl. 20(iii)–(iv)), an IT park keeps 8–12% of its area in parks and tot lots (Appendix-3), and colonies and IT parks put their rainwater storage of 20 L per m² of roof underground in their parks and open spaces. On the Siwalik valley fills of Una, Nalagarh and Paonta–Kala Amb, a detention area graded into the open space below the level of the road keeps it pervious and usable, which is what 4.10.6 requires, and can also infiltrate under Clause 4.11. On a hill site the position is different. Ground on a natural slope of more than 10°, a terrace held up by a retaining wall, land within twice the height of a cut or wall downslope of it, and land in a sinking or sliding zone are not to be used for ponding, because water held there soaks into the slope (hill infiltration rule, Clause 4.11). On such sites, detention is provided in lined tanks, open or closed, with an orifice outlet and an overflow to a lined drain, on rooftops and podiums under 4.10.3 and 4.10.4, or on a level open space only where it stands on rock or on ground that the geotechnical certificate of Clause 4.11 covers; an excavated pond or basin on a slope is not accepted, and the 5% soak-pit area of a hill sub-division is used for lined storage or for the sediment trap ahead of the outfall, not for soak pits. Four kinds of land are not open space for this purpose. A tal, naun, baoli or kuhl on the land is preserved under step 1 of Clause 4.3.1; a tal is modelled as a water surface (Clause 3.3.2(e)) that starts at its spill level (Clause 3.12.5), so only its flood storage above that level can count, and only as Chapter 7 allows, and a kuhl is a canal under the Himachal Pradesh Minor Canals Act 1976 that may not be obstructed or fouled. The strips of 3 m from a nullah and 5 m from a khud of Appendix-1 (cl. 16), the distance from the highest flood level that a development plan delineates, and land "prone to floods" on which the TCP appendices allow no construction are flood land already. Land in the hydraulic corridor of a khad, nallah, tal or river under Chapter 7 is corridor or flood land: water reaches it first, so it is not counted as detention for the development beside it (Chapter 7). And land kept open on purpose, such as the green belts of Shimla, where the development plan allows only limited building and no felling (as recorded by the Supreme Court in 2024), or a mapped spring-recharge area such as the Bohal catchment above Palampur (Clause 4.11), is not graded or paved for detention.
4.11 Rainwater harvesting versus detention accounting
4.11.1 No double counting. RWH storage (sumps, tanks, recharge pits and wells provided under the RWH mandate) shall not be counted as detention.
4.11.2 RWH sumps assumed full. For all routing under this chapter, RWH sumps and tanks shall be assumed full at the start of every storm, in every season. Their overflow shall be routed to the detention facility, or directly to the outfall if it bypasses detention. In the latter case the bypass flow counts against the PSD.
4.11.3 Combined tanks. A single tank may provide both RWH and detention only if:
- (a) the detention zone lies wholly above the RWH overflow level;
- (b) the detention zone is drained by its own gravity control orifice set at the RWH overflow level, meeting Clauses 4.7 and 4.8;
- (c) no pump, valve or user action can hold water in the detention zone; and
- (d) the two zones and the orifice level are shown on the drawings and in the maintenance declaration.
Only the volume between the RWH overflow level and the detention overflow level counts as detention.
4.11.4 Recharge structures. Recharge pits, trenches, shafts and wells may count as retention (not detention) if they meet Clauses 4.4.3 to 4.4.5. In particular, the seasonal high groundwater table shall be at least 1.0 m below their base. In the routing they are treated under Clause 4.4.6 with the groundwater level for the SW monsoon season.
4.11.5 RWH remains mandatory. Nothing in this chapter reduces the RWH requirement of Appendix 6 of the TCP Rules 2014, any direction under section 15 of the Himachal Pradesh Ground Water (Regulation and Control of Development and Management) Act 2005, the guidelines of the Central Ground Water Authority where they apply, any condition of a planning permission, or any rainwater harvesting rule or direction of an approving authority.
Commentary. RWH in Himachal Pradesh rests on Appendix 6 of the TCP Rules 2014, "Regulations for collection of rain water". The collection of rain water from roof tops is compulsory wherever the Himachal Pradesh Town and Country Planning Act 1977 is in operation, "For all the buildings existing or proposed for construction in future"; the minimum capacity "shall be worked out @ 20 Liters per square Metre of the roof top area" (cl. (vi)); the stored water is to be used regularly for non-drinking uses, "including fire fighting, landscaping, gardening apart from domestic usages" (cl. (iv)); no water supply connection is given until the system is in place and working (cl. (v)), and a violator is liable to disconnection (cl. (vii)); existing buildings were to install it within eighteen months (cl. (viii)); and storage below ground may be built in the setbacks (cl. (i)). Colonies and IT parks provide the same 20 L per m² of roof underground in their parks and open spaces. A storage of 20 L per m² of roof is 20 mm of rain over the roof, and it is a storage rule, not an infiltration rule: Appendix 6 sets no drawdown, no recharge and no infiltration test, and it requires no recharge on any ground, which suits a State whose built-up land is mostly on slopes. The Himachal Pradesh Ground Water (Regulation and Control of Development and Management) Act 2005 (Act 31 of 2005, amended in 2022 and 2023) adds an enabling power: the Ground Water Authority "may" identify recharge areas and issue rainwater harvesting guidelines, and may direct the construction of rainwater harvesting structures in urban "residential, commercial and other premises having plinth area of 100 square meters or above", building them itself at the owner's cost on default (s.15); the whole State is reported to have been notified under the Act from 19 November 2019 (as reported). The draft Rules of 2006 would exempt from such directions premises of less than 100 m² and "the sinking zones, where construction of rain water harvesting structures would be detrimental to the safety of the building structures in the area" (draft rule 29); the final Rules were not seen, and the exemption is cited as a draft [TBC]. The National Green Tribunal's direction of 2017 that rainwater harvesting be mandatory for all building plans (XIV) was set aside with the rest of its Shimla judgment in 2024 (Commentary to Clause 4.1). No Himachal Pradesh rule found sets a slope, a distance or a soil condition for a soak pit or recharge pit, and Appendix-1 still reserves 5% of a new sub-division "for soak pit etc." (cl. 20(iv)). This Manual credits these structures against its own retention requirement (Clause 4.4) as follows:
- An RWH tank under Appendix 6 is RWH storage. It is not detention (Clause 4.11.1), and it is assumed full at the start of every storm (Clause 4.11.2), because in the monsoon it is full after the first heavy rain. A tank may also provide detention only if it is built as a combined tank under Clause 4.11.3, with a detention zone above its RWH overflow level that drains through its own orifice; only that zone counts.
- An RWH tank counts toward the retention requirement of Clause 4.4 only to the extent that it is emptied within 72 hours by a continuous non-potable use, such as toilet flushing or washing, demonstrated under Clause 4.4.3; watering a garden is not a continuous use in the monsoon. The tank is then modelled under Clause 4.4.6 like any other retention practice. On hill sites, where infiltration is barred, this storage and reuse is the way retention is provided, and the 20 mm of Appendix 6 is the first part of it.
- Recharge pits, trenches, shafts and wells count as retention only where they meet Clause 4.11.4: they are credited only to the extent that they drain within 72 hours at half the rate measured in a site test (Clauses 4.4.3 and 4.4.5), with their base at least 1.0 m above the seasonal high water table, and the credit is found by routing under Clause 4.4.6, not by deducting their volume. They are also subject to the hill infiltration rule below.
- Hill infiltration rule. No deliberate infiltration practice (soakaway, soak pit, recharge pit, shaft or well, infiltration trench, or permeable paving with an exfiltrating base) shall be built or credited: on natural ground sloping more than 10°; in a sinking or sliding zone defined in a Development Plan or Interim Development Plan, including Shimla's two sinking and sliding zones, or on any other mapped landslide or creep zone; on debris cover, colluvium, slide debris or moraine, whatever its slope; or upslope of a cut slope or retaining wall within a distance of twice the height of the cut or wall — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope. On such sites roof runoff goes to the rainwater storage of Appendix 6 of the TCP Rules 2014 (20 L per m² of roof), with overflow to a lined drain that discharges through a sediment trap to a stable natural channel, never onto an unprotected slope. Shimla's two zones are the high sinking-prone area of the Ridge, the Grand Hotel, Lakkar Bazaar, the Central School and the Auckland Nursery School, down to Dhobighat below the Idgah electric substation, and the sliding area of Ladakhi Mohalla, Krishna Nagar, the spurs below the office of the Director of Education and the surroundings of Clarkes Hotel, as identified by the expert committee before the NGT (judgment of 2017, paras 53 and 62) and described in the draft Shimla Development Plan of 2022 (as quoted in the press); the zone maps of the plan as published in 2023 were not read [TBC], and wherever they are wider they govern. In a sinking or sliding zone the geologist's soil investigation report of Rule 21(1) shall also state whether the site's drainage, storage and any infiltration add water to the slope. On these sites, retention is provided by storage and reuse, and detention by lined tanks, not by ponds or basins on the slope (Commentary to Clause 4.10). The 1.0 m groundwater separation of Clause 4.4.3 does not make an infiltration practice acceptable on a slope: perched water and pore pressure in a slope are the hazard, not the depth to the water table.
- Recharge only on the Siwalik valley fills. Every one of the ten valley units that the CGWB assesses in the State is safe, with a stage of groundwater extraction of 35.48% for the State in 2024; the highest are Una district (63.72%) and Solan district (57.89%, in the Nalagarh valley), and seven districts, among them Shimla, Kullu and Chamba, have no assessed unit (CGWB, GWRA 2024). Water levels were reported to be falling in the Kangra–Palampur, Indora–Nurpur, Nalagarh, Kullu and Una valleys in August 2025 (as reported). On the valley fills and fans of Una, Paonta–Kala Amb and the upper terraces of Nalagarh, where water stands deep and transmissivities reach 2,600–3,336 m²/day (NAQUIM, Una and Sirmour), and on ground to which the hill infiltration rule does not apply, retention shall be provided by recharge before reuse or detention wherever site tests allow, through a silt trap, a filter and a first-flush diverter ahead of the recharge structure, and with a hydrogeologist's check of the target zone. Recharge is not credited anywhere else in the State unless a hydrogeologist's study approved by the authority shows a deep, stable water table and ground to which the hill infiltration rule does not apply.
- No recharge credit on wet ground. In the Balh valley wherever the seasonal high water table is within 1 m of the surface, which it is over much of the valley floor in the monsoon (water 0.27–7.15 m below ground; NAQUIM, Mandi), on the floors of the Siwalik valleys near their trunk streams, where wells near the Swan flow above ground, on the floodplains and low terraces of the rivers and khads, on the margins of the tals and reservoirs, and wherever the seasonal high water table is within the 1.0 m separation of Clause 4.4.3, no recharge or infiltration practice earns retention credit; storage and reuse, detention and conveyance govern there.
- Springs, nauns and baolis. About 500 springs have been inventoried in the State in a standard format (NITI Aayog, Resource Book on Springshed Management in the Indian Himalayan Region, 2021), and HIMCOSTE is reported to count about 10,512 traditional water sources, of which only 30.41% are recharging properly (as reported). Palampur pays the forest development committee of Bohal to protect the recharge area of the Bohal spring and streams that supply the town (NITI Aayog, 2021); the CGWB advises that a bore well near a spring source in the hills "should be avoided" (NAQUIM, Una and Mandi); and at Krishna Nagar in Shimla the 2023 committee found open drains and springs in the upper catchment feeding water into the slope that failed. The TCP forms require bauris and wells to be shown on the site plan, but no Himachal Pradesh rule found keeps construction back from a spring [TBC]. In the recharge area of a spring, naun or baoli, where it has been mapped, such as the Bohal catchment above Palampur, only clean roof runoff, passed through a filter, may be infiltrated, and only where the hill infiltration rule allows; road and parking runoff shall not be infiltrated, the area shall not be paved, and no runoff that may be polluted shall be infiltrated upslope of a spring, naun or baoli.
- Industrial and polluted runoff. The Ground Water Act bars any person from releasing "any effluent that contaminates the groundwater" (s.5A). Runoff from industrial premises, fuel stations, workshops and the like in Baddi–Barotiwala–Nalagarh, Kala Amb, Paonta Sahib and the industrial areas of Una, where the drains reaching the Sirsa and the Bald carry industrial and sewage loads (Sirsa action plan; CPCB, 2022), shall not be recharged; the hydrogeologist's check of a recharge bore or shaft on the valley fills shall report the nitrate and other contaminants of the target aquifer before it is credited, and untreated runoff shall not be put into a bore or shaft there (Chapter 8).
- Everywhere, road and parking runoff shall be recharged only through a surface infiltration practice with a filter, such as a vegetated basin or trench, never directly into a bore or well, and runoff from a nallah or khad that carries sewage, as the nallahs of Shimla above the Ashwani Khad and the drains of Baddi and Nalagarh do in part, shall not be recharged at all.
In the hills, water put into the ground does not stay where it is put. The technical committee on the Shimla slides of July and August 2023 named "Open Drainage systems leading to poor disposal of surface water" among their seven causes, with "over saturation of the sub surface thick debris cover", and found that the slide of 14 August 2023 at Summer Hill and Shiv Bawri, about 230 m long, ran along "the weak plane of the depression which seems to be old buried channel of a dry stream", such depressions being "the conduits for the infiltration of sub surface water in case of metamorphic terrains"; at Navbahar Chowk it found that "Input of rainwater from the road also accelerated the process" (HIMCOSTE-led technical committee, 2023). The expert committee before the NGT had found in 2017 that slides in Shimla were due to "oversaturation of the slope, either by increased rainfall activity or concentrated household disposal", and had asked for lined drains so that there is "minimum ingress of water into the slope" (as recorded in the judgment, paras 53 and 62); the post-disaster needs assessment of 2023 named "blockage of the natural water drainage" among the root causes of the slides and recommended against "disposing of sewage onto slopes" (PDNA 2023). In the Balh valley a recharge pit sits in the water table in the monsoon, and in any town an RWH tank is full after the first heavy rain. Treating RWH as detention would therefore credit storage that does not exist when it is needed. That is why this Manual assumes RWH tanks are full at the start of every storm. Applying the assumption to every season keeps one simple rule. The combined-tank provision (4.11.3) lets an owner build one structure, as long as the detention part is empty when the storm arrives. The hill infiltration rule, the rule that recharge is credited only on the Siwalik valley fills, the bar on recharge credit on wet ground, the spring rules, the industrial-runoff and pre-treatment rules and the road-runoff rule are set by this Manual. No Himachal Pradesh source sets a slope or distance threshold for infiltration: the slopes in the TCP Rules are limits on building (30° for IT parks and in the definition of a hilly area, 45° for development), and the expert committee before the NGT proposed 35° on soil and 45° on rock, also for building. The 10° limit is set by this Manual well below those slopes, because a slope that can carry a building can still be destabilised by water put into it, and the distance of twice the height of a cut or wall is set by this Manual as a precaution, pending guidance from a geotechnical study for the State [TBC].
4.12 High-groundwater and sandy coastal sites
4.12.1 Design groundwater level. Each site in the Balh valley round Sundernagar and Ner Chowk, where the water table stands 0.27–7.15 m below ground, the floors of the Una, Nalagarh and Paonta–Kala Amb valleys near their trunk streams, where wells near the Swan flow above ground, the floodplains and low terraces of the Beas, the Sutlej, the Ravi, the Yamuna, the Giri and the Swan and of the khads, the margins of Rewalsar, Renuka, Khajjiar and the other tals, the margins and backwaters of Gobind Sagar, the Pong reservoir, the Pandoh reservoir and the other reservoirs and barrage ponds, and hill sites with perched water, such as the sinking and sliding zones of Shimla, or any area where the groundwater table lies within 3 m of the surface at any time of year shall establish a design groundwater level (DGWL) for the facility. The DGWL is the seasonal high level during or after the SW monsoon, from:
- (a) site piezometer readings over at least one full June–November season; or
- (b) where (a) is not available, the higher of the CGWB or Jal Shakti Vibhag record for the nearest observation well, plus 0.5 m, and the design flood level of any adjacent river, khad, nallah, tal or reservoir.
For the flotation check of 4.12.3 at sites in the Balh valley, the river terraces and floodplains, and the tal and reservoir margins, where (a) is not available, the DGWL shall be taken as existing ground level.
4.12.2 Lined storage. Where the DGWL is less than 1.0 m below the base of a storage facility:
- (a) the facility shall be watertight (lined or of watertight concrete), and no infiltration credit applies (Clause 4.4.4); or
- (b) if unlined, the volume below the DGWL shall not be counted as detention, and groundwater inflow shall be added to the routed inflow.
4.12.3 Uplift and flotation. Every below-ground tank, vault, lined pond or chamber shall be checked for flotation:
- with the facility empty;
- with groundwater at the DGWL; and
- for coastal sites, with groundwater also at the major-system tailwater level of Chapter 5, where that is higher.
The factor of safety against uplift, counting only permanent dead loads and ignoring wall friction unless supported by geotechnical design, shall be at least 1.2. Anchoring by ballast, toe extensions or tension piles may be used.
4.12.4 Shallow and above-ground storage preferred. On sites where the DGWL is within 1.5 m of ground, storage should be provided above ground where possible: rooftop, podium, landscape or surface storage. Deep tanks should be avoided.
4.12.5 Durability. Concrete and metal parts in contact with saline or brackish groundwater or tidal water shall be designed for the exposure class appropriate to coastal conditions under IS 456:2000. Outlet fittings, trash racks and gates shall be of stainless steel, HDPE, FRP or another corrosion-resistant material.
4.12.6 Sandy soils with deep groundwater. Where the DGWL is 1.0 m or more below the base, infiltration retention in sandy soils is encouraged. The design infiltration rate of Clause 4.4.3 applies, and the Chapter 8 requirements on pollution of shallow aquifers shall be met.
Commentary. Himachal Pradesh is landlocked, so the coastal provisions of this clause, the tidal water levels of 4.12.1 and 4.12.3, do not apply in the State, and no saline groundwater was reported in the assessments read for this Manual [TBC], so the exposure provisions of 4.12.5 apply only where a test at the site shows it. Groundwater lies at three kinds of depth. On the coarse fans of the Siwalik valleys it is deep: up to 43.20 m below ground at Chalet in the Una valley (NAQUIM, Una), 42 m at Kolar in the Paonta–Kala Amb valley (NAQUIM, Sirmour) and more than 35 m in the south of the Nalagarh valley (NAQUIM, Nalagarh). In the Balh valley and on the valley floors near the trunk streams it is shallow: 0.27–7.15 m below ground in the Balh valley (NAQUIM, Mandi), 0.35 m in Mandi district in May 2021 (CGWB, Ground Water Year Book 2021–22), and above ground in the wells that flow under artesian pressure near the Swan at Rampur in the Una valley, 1.45 m above ground (NAQUIM, Una). In the hills it occurs in fractures, weathered rock and debris cover, and is perched in depressions such as the one at Cambley Bank in Shimla, which the 2023 committee called an "ideal site for the retention of sub surface water" (HIMCOSTE-led technical committee). The Balh valley, the valley floors near the trunk streams, the floodplains and low terraces of the rivers and khads, the margins of the tals and of the reservoirs and their backwaters, and hill sites with perched water are the wet cases. There an unlined tank fills with groundwater before the storm, and an empty lined tank can float, especially when a river or khad in flood, a reservoir at its full level or a tal at its spill level raises the water table beside it. The design groundwater level of 4.12.1(b) therefore takes the design flood level of the adjacent river, khad, nallah, tal or reservoir where that is higher than the well record, and in the Balh valley, on the river terraces and floodplains and on the tal and reservoir margins it is taken as existing ground level for the flotation check unless piezometers show otherwise. Where wells near the site flow under artesian pressure, as near the Swan in the Una valley, the tank shall also be checked for uplift with the groundwater at the artesian head measured in the nearest flowing well, which may stand above ground. On a hill site, a deep tank is not preferred even where groundwater is deep, because a leaking tank on a slope is an infiltration practice by another name: storage on a slope shall be lined and watertight, and its leakage and overflow taken to a lined drain (hill infiltration rule, Clause 4.11). The June–November monitoring season of 4.12.1(a) is set by this Manual to cover the SW monsoon, which now leaves the State in early October in most years, and the post-monsoon high that the CGWB measures in November: a reading taken in May or June understates the design level. No monsoon water-table depths for individual town sites in Sundernagar, Mandi, Kullu, Bhuntar or Una, and no map of the seasonal high water table of the Balh valley, were obtained [TBC]. The factor of 1.2, the 0.5 m allowance, the "ground level" default for the Balh valley, the river terraces and floodplains and the tal and reservoir margins, and the artesian-head check have no direct precedent; this Manual sets them because no published site-scale seasonal groundwater depths for Himachal Pradesh were found during research.
4.13 Regional detention and fee-in-lieu
4.13.1 Where permitted. In a basin covered by a Basin Stormwater Master Plan approved under Chapter 11, a development may meet all or part of its detention requirement through:
- (a) a regional detention facility identified in the plan; or
- (b) a fee-in-lieu paid toward restoration of tal or tank storage identified in the plan.
4.13.2 Conditions. Regional detention or fee-in-lieu shall be accepted only where:
- (a) the regional facility or restored tank is operational, or is funded and scheduled to be operational within 3 years. Until then, interim on-site detention is required.
- (b) the conveyance from the site to the facility carries the 1% AEP post-development flow without increasing water levels at buildings or roads between them (Chapter 5);
- (c) the storage credited at a tank is the flood storage only. This is the volume between full tank level (FTL) and the maximum water level the bund and surplus weir can safely hold, plus any volume below FTL that a notified operating rule commits to empty before the SW monsoon. Storage below FTL that is held for irrigation or supply through June to September shall not be credited.
- (d) the tank meets Chapter 7: surveyed FTL, a documented operating rule, and a maintained surplus weir;
- (e) the site still provides retention (Clause 4.4) and WQv treatment (Chapter 8) on site; and
- (f) in flood-sensitive catchments, the regional facility meets the mixed-frequency rule for its whole contributing area.
4.13.3 Fee. The fee-in-lieu shall be computed as:
Fee = (detention volume required on site under Clause 4.6, m³) × (unit rate, ₹/m³, notified by the Authority)
The unit rate shall include land, construction and 10 years of maintenance. Fees shall be held in a ring-fenced basin account and spent only on the facilities named in the plan.
4.13.4 Ledger. The Authority shall keep a public ledger of:
- detention volume credited to each regional facility;
- volume delivered; and
- fees received and spent.
Commentary. The Malaysian DID (2008) checklist favoured community ponds over on-site detention for sites above 0.1 ha. Studies of on-site detention show that its benefit depends on location and fades with distance downstream (Colorado State University thesis; McEnroe for Kansas City), and that a pond low in the catchment can synchronise with the main-stem peak (Water 2016). Regional storage therefore has to be sited by basin modelling, not simply aggregated.
Himachal Pradesh has no tank or lake Act, and no tal, lake or reservoir in its towns was found to be operated for flood control under a documented rule. The State Wetlands Authority was constituted on 7 November 2017 under the Wetlands (Conservation and Management) Rules 2017, with HIMCOSTE as its member secretary and secretariat (notification No. STE-E(3)-10/2017-Pt-I), but no wetland in the State was found notified under rule 4 of those Rules [TBC]. The State has three Ramsar sites, Pong Dam Lake (15,662 ha, designated on 19 August 2002), Chandertal (49 ha) and Renuka (20 ha) (both 8 November 2005) (MoEFCC, list of Ramsar sites, 31 January 2024), and two wetlands of national importance, Rewalsar and Khajjiar (State Level Steering Committee on Wetlands, 2017). The State's regional storage is of five kinds: the natural tals, Rewalsar (2.6 ha, in a catchment of 173 ha), Renuka (about 20 ha, fed by 21 seasonal streams) and Khajjiar, with Chandertal in the high Himalaya; the reservoirs, Gobind Sagar behind Bhakra and the Pong and Pandoh reservoirs (BBMB), Kol (NTPC), Nathpa Jhakri (SJVN), Chamera (NHPC), Larji (HPSEBL) and the other hydro-electric ponds; the kuhls, the gravity irrigation channels of Kangra, Mandi and Kullu, which are canals under the Himachal Pradesh Minor Canals Act 1976 where they are listed in its schedules; the springs, nauns and baolis; and the river floodplains, which no law protects. Four points follow:
- A tal on the record may not be a working tal, and a tal in the hills is not a detention basin. No inventory of the tals, ponds, nauns and baolis within the Municipal Corporations, Nagar Parishads and Nagar Panchayats, with their beds, rims and outlets, was found [TBC]. A tal is credited only after a survey shows its bed, rim and outlet, and only for the storage above its spill level; Rewalsar, whose leaking sewage drains are reported to cause eutrophication (State Wetlands Authority, Major Wetlands of Himachal Pradesh), offers none, so every site in its catchment provides its full detention on site. A spring-recharge area is not storage for detention (Commentary to Clause 4.11).
- The reservoirs are not spare capacity for a site. They are held for power, irrigation and supply through the monsoon, and their drawdown zones, such as the 80 km² or so of the Pong reservoir between 1,280 and 1,390 ft, fill before the late-monsoon storms; their storage below full level is not credited (Clause 4.13.2(c)); their releases are set by their operators for the whole river; and storm water spilled to a reservoir, or to a river below one, can be relied on only with the written agreement of the operator, BBMB, NTPC, SJVN, NHPC, HPSEBL or the project company, for a stated flow and level.
- A pond or check dam in the bed of a khad or nallah is not regional detention unless it is designed for debris. The streams of the hills and the Siwalik valleys carry boulders, sediment and muck in every large storm, and a basin in their bed fills with debris in one event, as the Malana II pond did in July 2023 (as reported); such a facility is credited only for the storage left after the sediment and debris volume of Chapter 6, with a debris rack or trap at its inlet, a geotechnical check of its bund and abutments, its failure path mapped, and a maintenance budget for clearing it after each large storm (Chapters 9 and 10). A regional facility on a hill slope is also subject to the hill infiltration rule of Clause 4.11. A kuhl is not regional detention either: a storm drain that crosses or discharges to a scheduled kuhl does so only with crossing works under section 46 of the Minor Canals Act and the consent of the body that manages the kuhl, through a screen and a sediment trap, because fouling or obstructing a canal is an offence (s.65).
- No rule dividing natural streams from municipal drains was found [TBC]. Until one is made, this Manual follows the working assignment of Chapter 1: rivers, khads and nallahs outside the limits of a local body, with their beds and banks and the flood-protection and channelisation works on them, such as those on the Swan, as the Jal Shakti Vibhag's; the nallahs, khads and public drains within the limits of a Municipal Corporation, Nagar Parishad or Nagar Panchayat as that body's; drains built under AMRUT or by a Smart City company, or in a scheme of HIMUDA, HPSIDC, BBNDA or a colony developer, as the builder's until handed over in writing; road drains and cross-drainage as the PWD's, and on national highways NHAI's; sewers as SJPNL's in Shimla and the Jal Shakti Vibhag's elsewhere; scheduled kuhls as the managing body's under the Minor Canals Act; the reservoirs as their operators'; and the Ramsar sites and other wetlands as within the remit of the State Wetlands Authority and the Forest Department (Commentary to Clause 6.9). This is the Manual's working assignment, not a statutory one.
The first point is the basis of condition 4.13.2(c) in Himachal Pradesh. A tal gives flood storage only above its spill level, unless a notified operating rule commits it to be lowered before the SW monsoon. The 3-year operational limit and the 10-year maintenance allowance have no direct precedent and are set by this Manual.
4.14 Simplified methods for small sites
4.14.1 Applicability. Tier B local bodies may permit the simplified method for sites of 2 ha or less outside flood-sensitive catchments. In flood-sensitive catchments, it may be used for sites of 0.5 ha or less. All other sites shall use Clause 4.6. Until Table 4.3 (Annex 4B) is published, all Tier B sites shall also use Clause 4.6.
4.14.2 Method.
- Read the PSD (L/s/ha) and SSR (m³/ha) for the site's zone, HSG and post-development imperviousness from Table 4.3 (Annex 4B).
- Required storage: V = SSR × A − V_credit (Clause 4.4.6.3).
- Permissible discharges: Q_PSD,T = PSD_T × A for the 2-yr and 100-yr stages.
- Select the low-flow orifice and upper control from the standard outlet table in Annex 4B (orifice sizes for the PSD at the stated depths), subject to the 50 mm minimum.
- Provide a spillway or overflow under Clause 4.9, the RWH accounting of Clause 4.11, and the safety provisions of Clause 4.15.
- Complete Form 4-2 (Tier B site sheet).
Table 4.3 — Tier B permissible site discharge and site storage requirement (template)
| Zone (Annex 2A) | HSG | Imperviousness | PSD 2-yr (L/s/ha) | PSD 100-yr (L/s/ha), standard | PSD 100-yr (L/s/ha), flood-sensitive | SSR (m³/ha), standard | SSR (m³/ha), flood-sensitive |
|---|---|---|---|---|---|---|---|
| HP-Z1 Siwalik foothills: HP-A Siwalik foothills and outer valleys (Una–Baddi–Nahan–Paonta–Bilaspur–Hamirpur) | A / B / C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| HP-Z2 Mid-hills: HP-B Mid-hills (Shimla–Solan–Mandi–Chamba–Rampur) | B / C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| HP-Z2 Mid-hills: HP-B1 Dhauladhar front (Dharamshala–Kangra–Palampur–Jogindernagar) | B / C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| HP-Z2 Mid-hills: HP-B2 Kullu–Manali inner valley | B / C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| HP-Z3 High and trans-Himalaya: HP-C High and trans-Himalaya (Kinnaur–Lahaul–Spiti; snow-fed) | — | — | Not tabulated: Clause 4.6 applies (Clause 2.3.6(i)) | — | — | — | — |
Worked example (illustrative — not design values).
A 0.4 ha residential layout in a Tier B Municipality, in a flood-sensitive catchment, with about 80% directly connected impervious area (area-weighted post-development CN about 92). Suppose Table 4.3 had been computed and gave the per-hectare equivalent of the Clause 4.6.7 example:
- PSD 100-yr = 356 / 2.0 = 178 L/s/ha
- SSR = 2,913 / 2.0 ≈ 1,460 m³/ha
- PSD 2-yr ≈ 17 L/s/ha
Then:
- Storage: V = 1,460 × 0.4 = 584 m³. C_R = 0, so there is no retention credit.
- 100-yr release: 178 × 0.4 = 71 L/s.
- 2-yr release: 17 × 0.4 = 7 L/s. At about 1 m head this needs a low-flow orifice of about 60 mm, above the 50 mm minimum (Clause 4.8.2).
- Layout options:
- a 400 m² underground tank 1.5 m deep; or
- 250 m² of podium storage at 0.3 m (75 m³) plus a 350 m² tank 1.5 m deep (525 m³).
- Rooftop storage at 150 mm over 1,200 m² of roof (180 m³) could replace part of the tank.
- RWH sumps are additional, and are assumed full (Clause 4.11).
Commentary. Australian councils use permissible site discharge and site storage requirement tables in the same way (Sydney Water OSD guide; the Upper Parramatta River Catchment Trust handbook listed SSR of about 455 m³/ha). The illustrative SSR here, about 1,460 m³/ha, is much larger. That is the expected effect of combining a mixed-frequency cap with mandatory 48–72-hour storms at AMC III. MSMA 2 in Malaysia offers a similar simplified OSD method for sites under 5 ha. The MARC policy supplement offers smaller Kansas City municipalities adoptable alternatives within the regional standard; Clause 4.14 follows that model for Tier B.
4.14.3 Fixed-coefficient route. As an alternative to Clauses 4.6 and 4.14.2, the designer of any site of 1 ha or less, under any Approving Authority and in any catchment, may size detention by Clauses 4.14.4 to 4.14.7. The route shall not be used where:
- (a) the site counts tank or waterbody storage in its design (Chapter 7);
- (b) any part of the site lies within a waterbody setback (Chapter 7); or
- (c) the site drains to a tank cascade whose storage is counted in a downstream design.
The route sets the release caps by fixed coefficients and does not need Table 4.3. It may therefore be used before Annex 4B is published. Retention (Clause 4.4), drawdown (Clause 4.7), outlets (Clause 4.8), the spillway (Clause 4.9), the downstream and tailwater checks (Chapter 5) and water quality (Chapter 8) still apply.
4.14.4 Release caps. Two caps apply at each point where runoff leaves the site:
Q_cap,10 = 2.78 × C_10 × i_10 × A and Q_cap,2 = 2.78 × C_2 × i_2 × A
where Q_cap is in L/s; A is the site area (ha); i_10 and i_2 are the 10% AEP (10-yr) and 50% AEP (2-yr) rainfall intensities (mm/h) for a 15-minute duration at the site, from the sources of Chapter 2, with the climate factor of Clause 2.8; and C_10 and C_2 are the fixed coefficients of Table 4.3A for the site's hydrologic soil group (Clause 3.7). For a site with more than one soil group, the coefficients are area-weighted.
Table 4.3A — Fixed release coefficients (provisional)
| Hydrologic soil group | C_10 | C_2 |
|---|---|---|
| A (sandy, well drained) | 0.05 | 0.02 |
| B | 0.08 | 0.03 |
| C | 0.15 | 0.08 |
| D (clay, poorly drained) | 0.25 | 0.15 |
Q_cap,10 is the maximum release for every storm up to and including the 1% AEP (100-yr) storm, in every catchment. Q_cap,2 is the maximum release for the 50% AEP (2-yr) storm. Where a cap is smaller than the discharge of a 50 mm orifice at the corresponding stage, the 50 mm orifice is deemed to comply (Clause 4.5.5.1).
4.14.5 Storage. The detention storage V (m³) is the larger of V_100 and V_2, each the largest over the durations d of Clause 2.5.2 (1 to 72 hours):
V_100 = max over d of [ 10 × C_v × P_100(d) × A − 1.8 × Q_cap,10 × d ]
V_2 = max over d of [ 10 × C_v × P_2(d) × A − 1.8 × Q_cap,2 × d ]
where P_100(d) and P_2(d) are the 1% and 50% AEP rainfall depths (mm) for duration d (hours), with the climate factor; and C_v is the post-development volumetric coefficient: the composite C of Table 3.2 (upper half of each range), multiplied by Cf of Table 3.3 for the 1% AEP. For durations of 12 hours or more, C for every pervious surface shall be taken as not less than 0.50. The factor 1.8 assumes an average release of half the cap over the storm (3.6 × 0.5).
4.14.6 Outlet. The outlet shall be a two-stage control: a low-flow orifice that passes Q_cap,2 when the storage holding V_2 is full, and an upper orifice or weir that limits the total release to Q_cap,10 at the top of V. The outlet table of Annex 4B may be used once it is published.
4.14.7 Retention. The retention volume of Clause 4.4 is provided in addition to V. No retention credit (Clause 4.4.6) is taken under this route.
Figure 4.3 — Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3 to 4.14.7): the release caps Q_cap,10 and Q_cap,2 from Table 4.3A; the storage V as the largest gap, over the durations of Clause 2.5.2, between the cumulative inflow 10·C_v·P(d)·A and the release line 1.8·Q_cap·d, for the 1% and 50% AEP storms; and the two-stage outlet that passes Q_cap,2 at the top of V_2 and Q_cap,10 at the top of V. Schematic, not to scale. Original drawing for this Manual, adapted from the rainfall mass-curve (inflow minus outflow) storage concept and the single-coefficient peak cap of the PUB Code of Practice on Surface Water Drainage, 7th ed. (cl. 7.1.5).
Commentary. The fixed-coefficient route follows Singapore, which caps the peak runoff from every development of 0.2 ha or more with one runoff coefficient, C = 0.55, applied to the 10-yr storm (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5, Addendum No. 3, 2025). It is quick to apply and quick to check: the cap needs only the site area, the soil group and two intensities. PUB's 0.55 is not used here, because Singapore's baseline is the existing urban drainage system, while this Manual's baseline is greenfield land (Clause 4.5.1.2). The coefficients of Table 4.3A are set by this Manual from the greenfield curve numbers of Clause 3.3 (CN 39, 61, 74 and 80 for soil groups A to D). They are the ratios of runoff to rainfall that those curve numbers give for 1-hour depths typical of the Siwalik valley fills of Una and Nalagarh, rounded down. They are therefore provisional. The State Stormwater Technical Committee shall confirm or revise them against NIH-DHAARA values for each zone when it issues Annex 4B.
The route is deliberately stricter than the full method, so that simplicity costs the developer storage rather than costing the people downstream. The 100-yr release is held to about the greenfield 10-yr peak everywhere, which is the flood-sensitive rule of Clause 4.5.3; the storage assumes the outlet releases only half the cap on average; pervious ground is assumed wet in long storms; and no retention credit is taken. A designer who wants a smaller tank can use the full method of Clause 4.6. The storage formula is the rainfall-mass (inflow minus outflow) method. Clause 3.4.2 otherwise forbids rainfall-based peak methods for storage, because they ignore the shape of the hydrograph; this route is a stated exception because its conservative assumptions cover that error for small sites, and the 24- to 72-hour durations are always checked.
4.15 Safety, fencing and multi-use
4.15.1 Depth limits for publicly accessible storage. Where the public has access to a storage area (parks, playfields, open space, school grounds):
- (a) maximum depth in the 10% AEP storm: 0.45 m;
- (b) maximum depth in the 1% AEP storm: 1.2 m, except in a fenced zone under 4.15.3;
- (c) side slopes: no steeper than 4H:1V, with at least a quarter of the perimeter at 6H:1V or flatter for escape; and
- (d) no vertical drop greater than 0.3 m within the storage area or at its edge.
4.15.2 Wet basins. Permanent pools shall have:
- a safety bench at least 3 m wide, no more than 0.3 m below the normal water level; and
- an emergent planting fringe that deters entry.
4.15.3 Fencing. A fence at least 1.2 m high, of a non-climbable design with a lockable gate, is required around any part of a storage that:
- has a vertical wall or headwall drop greater than 0.6 m;
- exceeds 1.2 m depth in the 1% AEP storm with slopes steeper than 4H:1V; or
- contains an outlet structure with an opening larger than 300 mm that is not grated.
4.15.4 Outlets. Every inlet and outlet opening larger than 300 mm accessible to the public shall be fitted with a grate or rack. The grate shall be designed so that a person pinned against it can escape: low approach velocity, inclined, with a large open area.
4.15.5 Signs and depth markers. Every publicly accessible storage shall have signs in Hindi and English stating that the area floods during rain, and a depth marker at the deepest point.
4.15.6 Confined spaces. Underground tanks shall have lockable covers. They shall be marked as confined spaces, and the maintenance declaration (Chapter 10) shall state the entry procedure.
4.15.7 Vector control. Dry storage shall drain completely (Clause 4.7) and have no low points that pond for more than 72 hours. Wet basins shall meet Clause 4.10.7.
Commentary. The numeric limits in Clause 4.15 have no single direct precedent. They are drawn from common international practice, for example KC APWA 5600 (2006), which required at least a quarter of a dry-pond perimeter at 5:1 or flatter, a 20 ft (6 m) clearance from property lines and a 15 ft (4.6 m) maintenance strip. They are made somewhat stricter here because multi-use storage on open space land and in schools will be used by children during the monsoon. Standing water in dry basins is a mosquito-breeding risk, so complete drainage (Clause 4.15.7) is a public-health requirement, not an amenity.
4.16 Basis: why peak matching alone fails
Commentary. This section has no requirements. It records why this chapter requires release below pre-development rates, retention, long-duration checks and a downstream analysis, rather than simple peak matching.
- Timing. Detention lowers a site's peak but stretches its hydrograph (Figure 4.1). Downstream, the stretched releases from many sites overlap with each other and with the main-stem peak. In Denver's study, ten basins each releasing 100% of the historic 100-yr peak produced 106% of the historic peak at the outlet. Only releasing 90% at each site brought it to 97% (UDFCD memo, 2012). A Colorado State University thesis found that location-blind on-site detention "can actually increase peak flows above post-development peaks". An optimisation study found that a downstream pond performed worse than upstream ponds because its outflow synchronised with the main stem (Water 2016, 8(7):290).
- Volume. Detention does not remove volume. In the illustrative example, the post-development 100-yr storm produces about three times the runoff volume of the pre-development 10-yr storm (Clause 2.11). Only retention, or storage that empties to somewhere other than the receiving drain, reduces volume.
- Scale. Kansas City modelling (McEnroe, 2005) found that uniform 3 cfs/ac control reduced Q100 by 36% in a 200-ac watershed. With the same control everywhere, Q100 still rose by 40% at 14 sq mi, and the benefit faded beyond about 1–2 sq mi. The KC committee concluded that "'match existing' can harm streams" (MARC Evolution deck). Georgia makes a ten-percent downstream analysis mandatory for the same reason: "Due to peak flow timing and runoff volume effects, some structural practices fail to reduce discharge peaks to pre-development levels downstream" (GSMM 2016).
- Design-storm dependence. An Australian study of 20 real on-site detention systems found that designs using even ten temporal patterns "cannot reliably produce an OSD system design that will always be effective" under real rainfall (Water Science and Engineering, 2019). This is why Clause 4.6.3 routes the full duration matrix rather than one critical storm.
- Closed outfalls. In Himachal Pradesh, the governing failure takes two forms. In the valley towns and on the reservoir shores it is volume with no outlet when a river or reservoir downstream is high. Paonta Sahib drains to the Yamuna, whose CWC warning and danger levels at Paonta are 383.5 m and 384.5 m and whose highest level, 384.6 m on 5 September 1995, stands only 0.1 m above the danger level (CWC, as transcribed by SANDRP); Mandi drains to the Beas and the Suketi, which on 9 July 2023 submerged the Panchvaktra temple at their confluence to its dome (as reported), and to the reach above the Pandoh reservoir, all five of whose gates were opened on 30 June 2025 to pass nearly 44,000 cusecs (about 1,250 m³/s) (as reported); Bilaspur drains to Gobind Sagar, which stood at 1,679 ft (about 511.76 m), a foot below its full reservoir level, on 4 September 2025, and Dehra to the Pong reservoir, which rose to 1,399.65 ft (about 426.61 m), above its full reservoir level of 1,390 ft, on 15 August 2023 (as reported): when the reservoir is at that level, every drain below it discharges to a water surface that cannot fall until BBMB releases. In the hills and on the Siwalik fans the outfall is closed in a different way: by debris. The khads and nallahs rise fast after a burst and carry boulders, sediment, wood and muck that bury outfalls, block culverts and choke the drains behind them; in July 2023 the streams at Thunag were choked with "illegally chopped wood and debris from a road project", and the Malana II pond was "filled with debris and silts causing its overspill" (as reported by SANDRP), and the High Court has acted against the dumping of road muck into Gobind Sagar and its feeding khads (CWPIL 31/2023, order of 31 May 2024). No hourly record of how long a river, reservoir or tal in Himachal Pradesh stays above a town's outfalls was obtained [TBC], the Beas has no CWC site at Manali, Kullu, Bhuntar, Mandi or Pandoh and the Sutlej none at Bilaspur, and no document was found that sets a design river level for an outfall; Chapter 5 sets the design level and the closure to be assumed, and Chapters 6 and 9 the debris and blockage allowances. A perfectly orificed basin behind a closed outfall simply fills. No release-rate rule can fix that; it is handled by the outfall-closed check of Chapter 5.
The response in this Manual is layered:
- release below pre-development (Clause 4.5);
- retain the frequent storms (Clause 4.4);
- route long SW monsoon storms (Clause 4.6.3);
- prefer regional storage in the tal system (Clause 4.13); and
- check downstream and at the outfall (Chapter 5).
Kansas City's own history shows the price. On a test site, peak matching needed 3.0 ac-ft of storage and the 2011 comprehensive criteria needed 4.9 ac-ft (MARC Evolution deck). Over-detention costs more storage. That is the cost of protecting the catchment rather than only the site boundary.
4.17 Submittal requirements
Every site runoff-control submittal shall include a Site Runoff Control Report (Form 4-1) containing:
- the Design Rainfall Sheet (Form 2-1) and the hydrology inputs (Chapter 3);
- the evidence for the order of measures under Clause 4.3.1;
- the RRV computation, infiltration tests, groundwater evidence and drawdown calculation (Clause 4.4);
- the retention credit computation (Clause 4.4.6);
- the release-rate criterion applied, standard or flood-sensitive, with the Annex 4A map extract (Clause 4.5);
- a results table in the format of Clause 4.6.7 for every AEP and duration, with the governing case highlighted;
- stage–storage and stage–discharge tables and plots, and inflow/outflow hydrographs for the governing cases;
- the drawdown calculation (Clause 4.7);
- outlet details, including orifice sizes and levels, trash racks and anti-vortex devices (Clause 4.8);
- the spillway or overflow calculation, freeboard and hazard classification, and the geotechnical report where required (Clause 4.9);
- the RWH and detention accounting, with tank sections showing zone levels (Clause 4.11);
- the design groundwater level and flotation check (Clause 4.12);
- the downstream and tailwater report (Chapter 5, Form 5-1); and
- the safety provisions (Clause 4.15) and the draft maintenance declaration (Chapter 10).
Tier B sites using Clause 4.14.2 shall submit Form 4-2 in place of items 6 and 7. Sites using the fixed-coefficient route (Clause 4.14.3) shall submit Form 4-3 in place of items 6 and 7.
References (chapter)
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01 (approved 10 Dec 2025). https://kcmetro.apwa.org/wp-content/uploads/sites/23/2026/01/APWA-Section-5600_Storm-Drainage-Systems-Facilities.pdf
- Mid-America Regional Council (2025). APWA 5600 Stormwater Standards Policy Supplement (7 Nov 2025); APWA 5600 Manual factsheet. https://www.marc.org/document/apwa-stormwater-standards-supplement ; https://www.marc.org/document/apwa-5600-manual-factsheet
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.8, 5608.4). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- MARC / APWA (2012). Manual of Best Management Practices for Stormwater Quality. https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
- MARC. The Evolution of Regional Stormwater Design Standards (presentation; McEnroe 2005 results). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Volume 1. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- Urban Drainage and Flood Control District (now MHFD) (2012). Full Spectrum Detention Release Rate Memorandum. https://mhfd.specialdistrict.org/files/23cb85ce8/UDFCD_Full_Spectrum_Detention_Release_Rate_Memorandum.pdf
- Mile High Flood District. Urban Storm Drainage Criteria Manual, Volume 2 (Storage).
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd ed.
- PUB Singapore (2024). On-site Detention Tank Technical Guide, Rev. 3; Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3 (16 Apr 2025). https://www.pub.gov.sg/-/media/PUB/PDF/detentionTank.pdf
- Sydney Water (2020). On-site Stormwater Detention Guide (SW201). https://www.sydneywater.com.au/content/dam/sydneywater/documents/on-site-stormwater-detention-guide.pdf
- Upper Parramatta River Catchment Trust (2005). On-site Stormwater Detention Handbook, 4th ed.
- "On-site stormwater detention for Australian development projects: does it meet frequent flow management objectives?" Water Science and Engineering (2019). https://www.sciencedirect.com/science/article/pii/S1674237019300213
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- Department of Environment, Science and Technology, Government of Himachal Pradesh. Notification No. STE-E(3)-10/2017-Pt-I of 7 November 2017 (constitution of the Himachal Pradesh State Wetlands Authority), and No. STE-F(2)-10/2009 of 15 June 2017 (State Level Steering Committee on Wetlands).
- Himachal Pradesh State Wetlands Authority. Major Wetlands of Himachal Pradesh (Pong, Renuka, Chandertal, Rewalsar and Khajjiar; the drawdown zone of the Pong reservoir).
- Ministry of Environment, Forest and Climate Change (2024). List of 80 Ramsar sites of India, 31 January 2024. https://moef.gov.in/uploads/2024/03/80-Ramsar-sites-of-India-31-01-2024.pdf
- Himachal Pradesh Minor Canals Act, 1976 (Act No. 42 of 1976), ss. 43, 46 and 65, and its Schedules I and II (PRS copy).
- Reports on the levels of the Pong and Bhakra reservoirs in August 2023 and September 2025, the Pandoh releases of 30 June 2025 and the Malana II pond in July 2023 (SANDRP; The Tribune; The Indian Express).
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A (§8.5).
- Himachal Pradesh Town and Country Planning Act, 1977 (Act No. 12 of 1977).
- Town and Country Planning Department, Government of Himachal Pradesh. Himachal Pradesh Town and Country Planning Rules, 2014, consolidated to 2022 (amendments of 2016, 2018, 2019, 2020 and 2022), rules 13, 14 and 21, Appendix-1 (cls. 3, 8, 11, 16, 20 and 22), Appendices 2, 3, 6, 7 and 8 and the forms; the Twelfth (2024) to the draft Sixteenth (2025) Amendments not read. https://tcp.hp.gov.in/Application/uploadDocuments/rule/Rule20221126_160623.pdf ; Appendix-1 page (June 2025): https://tcp.hp.gov.in/content/appendix-1
- Town and Country Planning Department. Chopal Planning Area Development Plan 2041. https://tcp.hp.gov.in/Application/uploadDocuments/devlopmentPlan/PlanDoc020240108_160640.pdf
- Supreme Court of India. State of Himachal Pradesh v. Yogendera Mohan Sengupta, C.A. 5348–5349 of 2019 with T.C.(C) 2 of 2023, 2024 INSC 30, judgment of 11 January 2024 (the Shimla Development Plan published on 20 June 2023; §17.2.2.9; the NGT's orders set aside).
- National Green Tribunal. O.A. 121/2014 with O.A. 505(THC)/2015, Yogindra Mohan Sengupta v. Union of India, judgment of 16 November 2017, directions XIII, XIV and XV and the Expert Committee's findings (paras 53, 61 and 62); set aside on 11 January 2024 and cited as expert guidance only.
- Himachal Pradesh Ground Water (Regulation and Control of Development and Management) Act, 2005 (Act 31 of 2005), as amended by Acts 14 of 2022 and 9 of 2023, ss. 5A and 15. https://prsindia.org/files/bills_acts/acts_states/himachal-pradesh/2005/Act31of2005HP.pdf ; draft Rules of 2006, rules 28 and 29: https://cdn.cseindia.org/userfiles/HP_groundwater_rules.pdf
- Himachal Pradesh Minor Canals Act, 1976 (Act No. 42 of 1976), ss. 3, 43–48 and 65 (PRS copy).
- Government of Himachal Pradesh (2023). Himachal Pradesh Post Disaster Needs Assessment, Monsoon 2023 (with NDMA), and Monsoon 2023 Recovery and Reconstruction Plan.
- Technical committee coordinated by HIMCOSTE (2023). Preliminary Report on Landslide, Land Subsidence Incidents in and around Shimla during July/August 2023 (HPSDMA document 3578).
- Municipal Corporation Shimla and GoI–UNDP (2015). Action Plan for Mainstreaming Disaster Risk Reduction and Climate Change Adaptation; Municipal Corporation Shimla (2022), AMRUT status of storm-water drains.
- Central Ground Water Board (2024). Dynamic Ground Water Resources of Himachal Pradesh (GWRA 2024) and of India, 2024, §7.9; Aquifer Mapping (NAQUIM) reports for the Una, Nalagarh, Paonta–Kala Amb and Balh valleys; Ground Water Year Book, Himachal Pradesh, 2021–22.
- NITI Aayog, IWMI and SDC (2021). Resource Book on Springshed Management in the Indian Himalayan Region (spring inventories; the Palampur–Bohal payment for ecosystem services).
- NITI Aayog, DMEO (2020). Best-practice note on the Swan River Flood Management Project, Una; Rajya Sabha, answer of 29 July 2024 (project cost).
- National Green Tribunal. O.A. 735/2023 (Ashwani Khad, suo motu), Chief Secretary's affidavits of 22 February 2024 and 1 February 2026, with the CPCB list of polluted river stretches (2022) and the action plans for the Sirsa, the Bald and the Sukhna; and Bhagra, S. et al. (2017), International Journal of Community Medicine and Public Health 4(6): 1966–1971 (hepatitis E in Shimla, 2016).
- High Court of Himachal Pradesh. CWPIL 31/2023, Madan Lal v. State of H.P., order of 31 May 2024 (muck in Gobind Sagar and its khads).
- Comptroller and Auditor General of India (2022). Report No. 1 of 2022, Performance Audit on the Implementation of the 74th Constitutional Amendment Act, Government of Himachal Pradesh.
- Reports on the setbacks and geological reports announced by the TCP Department (thenewshimachal.com, 26 July 2025), on the 150 m limit for government buildings (The Tribune, 30 July 2025), on the model bye-laws for rural construction (thenewshimachal.com, 16 September 2025), on the Supreme Court's suo motu case W.P.(C) 758 of 2025 and the Central Empowered Committee (LiveLaw; ThePrint, 2025–2026), and on the 2023 and 2025 floods (SANDRP; The Tribune). https://thenewshimachal.com/?p=62926 ; https://www.tribuneindia.com/news/himachal/no-govt-institution-to-be-built-within-150-metres-of-rivers-cm ; https://thenewshimachal.com/?p=63321
- Bureau of Indian Standards. IS 456:2000 Plain and Reinforced Concrete — Code of Practice.
- Government of India. Dam Safety Act, 2021.
- Chow, V.T., Maidment, D.R. and Mays, L.W. (1988). Applied Hydrology. McGraw-Hill (AMC conversion).
Annexes and forms
| Annex / Form | Content |
|---|---|
| 4A | Flood-sensitive catchment boundaries (GIS); shallow-groundwater zone map |
| 4B | Tier B tables: PSD and SSR (Table 4.3), retention credit factor C_R, standard outlet sizes; confirmed fixed release coefficients (Table 4.3A) |
| 4C | Worked example (Tier A) with full routing tables |
| Form 4-1 | Site Runoff Control Report |
| Form 4-2 | Tier B Site Sheet |
| Form 4-3 | Fixed-coefficient Route Sheet (Clauses 4.14.3 to 4.14.7) |
Commentary. No Indian national rule or Himachal Pradesh rule found during research for this Manual limits the rate of discharge from a site, and none requires on-site detention or "zero run-off". No Himachal Pradesh document found sets a design storm for any drain. The building rules are the Himachal Pradesh Town and Country Planning Rules 2014, made under the Himachal Pradesh Town and Country Planning Act 1977, which apply statewide wherever the Act is in operation, through Appendix-1 in areas where no Interim Development Plan or Development Plan has been prepared and through the plan's own regulations where one has. The text read is the TCP Department's consolidation to 2022, with the amendments of 2016, 2018 (Second and Third), 2019 (Fourth), 2020 (Fifth) and 2022 (Eighth); the Twelfth Amendment (2024) and the later amendments to the draft Sixteenth Amendment of 2025, published for objections, were not read [TBC], although clause 16 of Appendix-1 still stood on the TCP Department's Appendix-1 page in June 2025. The Act applies in 54 urban local bodies and about 102 notified areas, which hold 21.70% of the State's people but less than 10% of its area (PDNA 2023); most hill settlements lie outside it. The drainage provisions that can be found protect the building, the slope and the watercourse, not the catchment. Appendix-1 sets a maximum slope of 45° for development (cl. 3), defines hilly areas as land above 600 m or with an average slope of 30° (cl. 8), limits a hill cut to 3.50 m with at least 1.00 m between the building and the toe wall (cl. 11), and allows construction "at distance of 3.00 Metre and 5.00 Metre from Nullah and Khud respectively" (cl. 16), without saying whether the distance runs from the bank, the centreline or the flood level. A new sub-division of land shall keep at least 5% of the scheme "for soak pit etc." (cl. 20(iv)), orient its plots to allow the "natural flow of surface drainage to allow un-obstructed rain water discharge" (cl. 20(v)) and grade its roads at least 1 in 15 (cl. 20(vi)). The appendices for IT parks and real estate add that the distance from the highest flood level along rivers, khuds and nullahs "shall be as delineated in the Interim Development Plans / Development Plans" and that "In other areas, no construction shall be allowed in parcel of land prone to floods". Rule 21(1) requires a geologist's soil investigation report before building "in sliding and sinking zones as defined in the respective Interim Development Plans or Development Plans". The forms require the site plan to show "Existing water bodies like Bauri, Well, Nallah, khud", contours, and the "septic tank, soak pit, rain water harvesting tank"; nothing in the rules bars a soak pit on a slope. Rooftop rainwater storage is compulsory under Appendix 6 (Commentary to Clause 4.11). None of these sets a design storm, a release rate, a detention volume or an overflow path. The Shimla Development Plan 2041 was published on 20 June 2023 according to the Supreme Court (notified on 23 June 2023 according to the press); the Court recorded its rule (§17.2.2.9) that a geologist's soil investigation report is required in sinking and sliding zones and that construction there is refused or conditioned on adverse findings, but its storm-water chapter (§7.5 in the draft of February 2022) was not read [TBC]. The Chopal Development Plan 2041 treats slopes above 45°, flood plains and "areas adjacent to major drainage lines" as non-developable. In July 2025 the press reported new setbacks of 5 m from drains and 7 m from rivers and ravines in place of the 3 m and 5 m of clause 16, with geological and structural reports for urban buildings; the Chief Minister announced that no government building would be built within 150 m of rivers, nullahs and other waterbodies; and in September 2025 the Cabinet was reported to have approved model bye-laws for rural construction that ban building along the banks of rivers and streams. No gazette text of any of these was found, and none is applied in this Manual as a rule [TBC]. The State has no floodplain zoning law and no notified flood line; the post-disaster needs assessment of the 2023 monsoon found that "The lack of well-defined river boundaries in floodplains is a prominent issue in Himachal Pradesh" and called for "comprehensive river boundary mapping and the establishment of floodplain management guidelines" (PDNA 2023). The Himachal Pradesh Minor Canals Act 1976 lets the Government regulate "the flow of water in any river, creek, natural channel or line of natural drainage" and remove obstructions to it (s.43), and makes the obstruction or fouling of a canal, which includes a scheduled kuhl, an offence (s.65); it is the only Himachal Pradesh statute found that names a line of natural drainage. The Himachal Pradesh Ground Water Act 2005 is in force (Commentary to Clause 4.11), and its amendment of 2022 bars any person from releasing "any effluent that contaminates the groundwater" (s.5A). The drain sections of the Himachal Pradesh Municipal Corporation Act 1994 and the Himachal Pradesh Municipal Act 1994 were not read [TBC]. The National Green Tribunal's judgment on Shimla of 16 November 2017 (Yogindra Mohan Sengupta, O.A. 121/2014) directed that "All the storm water available as surface run off in all the concretised areas like roads, lanes, platforms and market places should be diverted in such a manner to ensure that such run off does not go in to over burden or flow along hills and depressions, thereby creating over saturation and affecting soil and slope stability" (direction XV), made rainwater harvesting mandatory (XIV) and limited building to slopes of 35° on soil and 45° on rock (XIII); the Supreme Court set the judgment aside on 11 January 2024 (2024 INSC 30), holding that the Tribunal had gone beyond its powers in directing how subordinate legislation should be made, so the directions are cited in this Manual only as expert guidance, not as binding orders. The Supreme Court has since taken up the ecology of the State on its own motion (W.P.(C) 758 of 2025), and the Central Empowered Committee's first report, on hydro-electric projects, roads and tourism construction, was reported in October 2026 (as reported; the orders and the report were not read). The only drainage findings are the Tribunal expert committee's on Shimla: storm drainage covered about 30% of the city, the drains were "not able to carry the peak flow", their "Catchments" were "improperly selected" and they had "much lesser gradients than actually required" (as recorded in the judgment of 2017, para 53). Even the size of Shimla's network is uncertain: a 2015 plan of the Municipal Corporation counts 13 major nallahs and about 67 storm-water drains with about 42.33 km of drains (MC Shimla and UNDP, Action Plan for Mainstreaming DRR and CCA, 2015), while the Corporation reports 191 major storm-water drains and nallahs, 55.43 km, built under AMRUT (AMRUT status, 2022); no design basis is stated in either. The Jal Shakti Vibhag's proposal for storm-water drainage of Una town (₹19.66 crore, in the 2023 recovery and reconstruction plan) states none either. Basements are regulated as storeys, not for flooding. A habitable basement counts as a storey (Appendix-1, cl. 22; Appendix 8), parking may be provided in a basement, and an industry on a plot of more than 1,000 m² may build a basement or cellar for its own use (Appendix-2, cl. 4); no Himachal Pradesh rule found restricts basements in low-lying or flood-prone land, sets a level for a basement ramp or opening, or keeps surface water out of a basement, beyond the geologist's report of Rule 21(1) in sinking and sliding zones. This Manual therefore adds its own requirements for every basement: no detention storage in a habitable basement (Clause 4.10.1); the crest of every basement ramp and the sill of every basement opening at least 0.5 m above the 1% AEP flood level, with basement drainage pumped to the surface drain through a non-return valve (Clauses 6.11.1 and 6.11.4); and no basement in Zone 2 (Clause 7.5.2). In the flood-sensitive catchments of Clause 4.5.3.2, in any catchment notified under Clause 4.5.4, and on the Balh valley, floodplain, tal-margin and reservoir-margin land of Clause 4.12.1, it recommends that no basement be permitted where the 1% AEP flood level stands above the surrounding ground; and in the hills, a basement cut into a slope shall also carry the geotechnical certificate of the hill infiltration rule of Clause 4.11, with the water behind its walls drained to a lined drain and not to the ground. For a sloping site, this chapter also supplies what the TCP Rules leave open and what direction XV described: runoff from the catchment above the site shall be intercepted and carried round the building in the design storms of Chapter 6, and every flow from the site shall discharge to a lined drain or a stable natural channel, never onto an unprotected slope or into the overburden. These are the Manual's proposals, not rules of the TCP Rules 2014. This chapter is written so that it can supply, as a technical companion to the TCP Rules 2014, the development plans and the Municipal Acts, the design storm, release rates and storage volumes that they leave open; it has not been adopted for either purpose. In practice many of the State's urban nallahs and khads carry sewage: in 2017 more than half of Shimla's households had no sewer connection (NGT expert committee, as recorded in the judgment, para 53); sewage effluent from the Malyana and Dhalli treatment plants reached the Ashwani Khad intake and caused the outbreak of hepatitis E that began in Shimla in January 2016, after which the supply from the Ashwani Khad was stopped (Bhagra et al., 2017); the CPCB placed the Ashwani Khad, the Bald along Baddi, the Sirsa along Nalagarh and the Sukhna along Parwanoo in Priority I among polluted river stretches (2022 list); Shimla's three treatment plants had an installed capacity of 35.88 MLD but received 18.1 MLD, with 50.8 km of sewer still to be connected by 2039 (Chief Secretary's affidavit of 1 February 2026 in NGT O.A. 735/2023) (Clause 8.9). Retention and detention apply in full on every site whatever the drain carries: every litre a site releases at the peak of a storm takes up capacity in a drain that is already part-filled with sewage. The CPHEEO (2019) manual describes limiting outflow to the pre-development peak as typical practice, but it uses no "shall" and names no storm frequencies (CPHEEO Part A §8.5.1). This chapter turns that description into a development-control requirement.