Chapter 1Policy, Applicability and Adoption
1.1 Purpose and objectives
1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Himachal Pradesh. It applies to private development and to public works, as set out in Clause 1.5.
1.1.2 The Manual has the following objectives:
- (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
- (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
- (c) to size storage for the long-duration south-west monsoon storms of July–September, forced up against the Dhauladhar and the outer ranges and often joined by a western disturbance, as in July and August 2023, and the western-disturbance storms that follow the withdrawal, as in October 1955 and 1956, which fall on debris-covered slopes, springs and valley water tables already raised by weeks of rain, on reservoirs at their full levels and on rivers and khads already in flood, as well as for short-duration intensities;
- (d) to design outfalls for the stage of the rivers, khads and nallahs into which the towns drain, the Beas at Manali, Kullu and Mandi, the Sutlej at Rampur, the Ravi at Chamba, the Yamuna at Paonta Sahib, the Swan at Una, the Sirsa and the Balad at Baddi–Nalagarh and the Giri and the Ashwani Khad below Shimla, which rise within hours and carry boulders and debris; the levels of the reservoirs of Bhakra (Gobind Sagar), Pong, Pandoh, Kol and Chamera, held and released by their operators; and the levels of tals such as Rewalsar and Renuka at their outlets, including the case where the outfall is closed;
- (e) to protect tanks (tals), marshes, rivers, supply channels and surplus courses as part of the drainage system;
- (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
- (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
- (h) to make sure that facilities, once built, are maintained and remain effective.
1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building rules made by the Government under the Himachal Pradesh Town and Country Planning Act, 1977 (the Himachal Pradesh Town and Country Planning Rules 2014), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).
1.2 Stormwater management hierarchy
1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.
- Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
- Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
- Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
- Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).
1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.
1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.
Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).
Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Himachal Pradesh, the top two layers have a particular meaning. Much of the State's natural storage and recharge lies in its tals (Rewalsar, Renuka and Khajjiar), in its reservoirs, in its springs (naun, a spring-fed stepped tank, and baoli, a small spring-fed pool or tank), in its kuhls (gravity irrigation channels), in the beds and floodplains of its rivers and khads, and in the coarse valley fills of the Siwalik foothills, at Una, Nalagarh and Paonta–Kala Amb, where the water table may lie more than 40 m down and transmissivity reaches thousands of m² per day (CGWB). About 500 springs have been inventoried in the State in a standard format (NITI Aayog, 2021); Palampur pays to protect the recharge area of the Bohal spring that supplies the town; and the State has three Ramsar sites, Pong Dam Lake (15,662 ha, designated on 19 August 2002), Chandertal (49 ha) and Renuka (20 ha), both designated on 8 November 2005 (MoEFCC, list of Ramsar sites). The law protects some of this. The TCP Rules 2014 keep construction 3 m from a nullah and 5 m from a khud where no plan has been prepared (Appendix-1, cl. 16) and leave the distance from the highest flood level to the development plans; the Minor Canals Act of 1976 protects scheduled kuhls and lets the Government regulate any "line of natural drainage" and order obstructions removed (s.43); the Wetlands Rules 2017 apply to notified wetlands through the State Wetlands Authority; and the High Court has barred the dumping of muck into Gobind Sagar and its feeding khads (2023–24). The State has no floodplain zoning law. In the hills the second layer changes. Retention on a slope is storage and reuse, not infiltration: water put into debris cover, colluvium or moraine raises the pressure in the slope, as the technical committee on the Shimla slides of 2023 found, so this Manual bars deliberate infiltration on natural slopes of more than 10°, in the sinking and sliding zones of the development plans, including Shimla's two zones, on debris cover, colluvium or moraine and close upslope of a cut or retaining wall, unless a geotechnical certificate allows it (Clause 4.11, hill infiltration rule, set by this Manual). Infiltration remains a choice on the coarse Siwalik valley fills, which are the State's main recharge zones, and is not credited in the Balh valley, where the seasonal water table is within about 1 m. Losing that storage and those springs cannot be offset by pipes, and in the hills drains that put water into a slope can make it fail.
1.3 Legal basis and status
1.3.1 Notification. This Manual shall be given statutory effect by the Government of Himachal Pradesh through:
- (a) an amendment to the Himachal Pradesh Town and Country Planning Rules 2014 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
- (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.
1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.
1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.
1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.
Commentary. In Himachal Pradesh the building rules are the Himachal Pradesh Town and Country Planning Rules 2014, made under the Himachal Pradesh Town and Country Planning Act, 1977 and amended many times since; this Manual read the text consolidated by the TCP Department to the Eighth Amendment of 2022 and the live page of Appendix-1 as it stood in June 2025, but not the Twelfth to Fifteenth Amendments of 2024–25 or the draft Sixteenth Amendment published for objections in 2025 [TBC]. Within a planning area that has an Interim Development Plan or a Development Plan, the plan's regulations govern; Appendix-1 is the general regulation for areas where land use is frozen and no plan has been prepared. Appendix-1 allows development on slopes of up to 45° (cl. 3), a hill cut of up to 3.50 m with at least 1.00 m between the building and the toe wall (cl. 11), and construction at 3.00 m from a nullah and 5.00 m from a khud (cl. 16), without saying from which line the distance is measured; it asks that new sub-divisions be laid out for the "natural flow of surface drainage" with "un-obstructed rain water discharge" and at grades of at least 1 in 15, and sets aside 5% of the scheme area for soak pits (cl. 20). The appendices for IT parks and real estate leave the distance from the highest flood level along rivers, khuds and nullahs to the development plans and allow "no construction … in parcel of land prone to floods" elsewhere. Appendix 6 makes rooftop rainwater storage of at least 20 litres per m² of roof compulsory for every building, existing or new, where the Act operates, with no water connection until it is in place, and Rule 21(1) requires a geologist's soil investigation report before building in the sliding and sinking zones of a plan. The rules set no design storm, return period, release rate or detention volume, no "zero runoff" rule and no rule on infiltration on slopes; site plans show the "septic tank, soak pit, rain water harvesting tank" without any bar on soak pits on a slope. Setbacks of 5 m from drains and 7 m from rivers and ravines, said in the press in July 2025 to replace the 3 m and 5 m of cl. 16, were not found in a gazetted text and are not applied by this Manual (as reported). The route of Clause 1.3.1(a) therefore runs through an amendment of the TCP Rules 2014 under the 1977 Act, and through the regulations of each development plan. This Manual is a draft; neither the Government nor any authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.
1.4 Definitions
1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).
| Term | Meaning in this Manual |
|---|---|
| Approving Authority (the Authority) | The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the Director of Town and Country Planning (TCP), or an officer to whom the Director's powers are delegated, in a planning area or special area under the Himachal Pradesh Town and Country Planning Act, 1977; a Special Area Development Authority (SADA), or the Baddi Barotiwala Nalagarh Development Authority (BBNDA), in its area; the Himachal Pradesh Housing and Urban Development Authority (HIMUDA) for the colonies it plans; or, where it grants building permission, the Municipal Corporation, Nagar Parishad or Nagar Panchayat concerned (the division of these powers, and the bodies that grant permission outside planning areas, are to be confirmed [TBC]), or a department for its own works. |
| Applicant | The owner, developer or department that seeks approval, and its successors in title. |
| Development | Any building, layout, sub-division, road, paving or land-use change that requires approval under the Himachal Pradesh Town and Country Planning Rules 2014 or that is executed as a public work. |
| Redevelopment | Development on a site where impervious cover already exists. |
| Land disturbance | Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5). |
| Impervious area | Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats. |
| New or replaced impervious area | Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced". |
| Retention | Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4). |
| Detention | Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4). |
| Rainwater harvesting (RWH) | Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it. |
| Minor system | Drains, pipes and inlets designed for the minor-system AEP of Chapter 6. |
| Major system | The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6). |
| Pre-development condition | Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3). |
| Flood-sensitive catchment | The catchments of the nallahs of the Shimla Planning Area that drain north to the Sutlej and south to the Ashwani Khad and the Giri, with Shimla's two sinking and sliding zones; the land of Mandi that drains to the Beas and the Suketi, and the Balh valley round Sundernagar and Ner Chowk; the land of Kullu, Bhuntar and Manali on the valley floor, low terraces and old channels of the Beas and on the fans of its side streams; the land of the Baddi–Barotiwala–Nalagarh area that drains to the Sirsa and the Balad; the land of Una and the Una valley that drains to the Swan; the land of Paonta Sahib that drains to the Yamuna and the Bata; the land of Dharamshala, McLeodganj and Kangra that drains to the khads of the Dhauladhar front; the land of Rampur Bushahr on the Sutlej; the land of Bilaspur that drains to Gobind Sagar, and of Dehra and the other towns on the Pong reservoir; and the land of Chamba on the Ravi, and any catchment the Authority notifies (Chapter 4; Annex 1B). |
| Waterbody | A river, stream, canal, tank (tal), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7). |
| Regional facility | A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4). |
| Tier A / Tier B authority | An Approving Authority classed under Clause 1.6. |
| Policy supplement | The set of adoptable alternative clauses in Clause 1.7 and Annex 1C. |
| Drainage report | The preliminary or final report required by Chapter 10. |
| Registered professional | A person registered under the Himachal Pradesh Town and Country Planning Rules 2014 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6. |
| Compliance calculator | The State-issued tool for computing and reporting compliance (Clause 10.5). |
| Maintenance declaration | The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10). |
| Variance | Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10). |
| Waiver | Approval that a requirement does not apply to a site, on the grounds in Clause 1.10. |
| Notified | Published by the Government or the State Stormwater Technical Committee in the Rajpatra, Himachal Pradesh. |
Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).
1.5 Applicability
1.5.1 Who is covered. This Manual applies to:
- (a) all development requiring planning permission, building permit or layout approval under the Himachal Pradesh Town and Country Planning Rules 2014;
- (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
- (c) works executed by Central agencies or their contractors within Himachal Pradesh, to the extent that the Authority's approval or no-objection is required.
1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:
- (a) land disturbance of 0.1 ha or more; or
- (b) new or replaced impervious area of 500 m² or more.
1.5.3 RWH. The existing RWH mandate continues to apply under Appendix 6 of the Himachal Pradesh Town and Country Planning Rules 2014 to every building, existing or proposed, wherever the Himachal Pradesh Town and Country Planning Act, 1977 is in operation, as rooftop storage of at least 20 litres per m² of roof area (about 20 mm of rain over the roof), with no water supply connection until it is in place and existing buildings to comply within eighteen months; and the Himachal Pradesh Ground Water (Regulation and Control of Development and Management) Act, 2005 (Act 31 of 2005) empowers the Ground Water Authority to direct rainwater harvesting structures on urban premises with a plinth area of 100 m² or more (section 15), a power from which the draft rules of 2006 exempt the sinking zones, as now. This Manual does not change it.
1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:
- (a) no sewage connection to a storm drain (Chapter 8);
- (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
- (c) waterbody setbacks and the no-fill zone (Chapter 7); and
- (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).
1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.
1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.
1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.
1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:
- (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
- (b) linear road resurfacing that adds no impervious area.
Exempt development remains subject to the RWH mandate and to Clause 1.5.4.
1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.
Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.
Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:
- Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
- Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
- The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
- MBBL 2016 makes recharge mandatory for buildings over 500 m².
The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Himachal Pradesh plots are small and the cumulative effect of many small plots is what fills Shimla's drains. For small buildings in Himachal Pradesh, Appendix 6 of the TCP Rules 2014 already reaches every building, whatever its size, where the 1977 Act operates: it requires rooftop storage of at least 20 litres per m² of roof, about 20 mm of rain over the roof, before the building may have a water connection. That is a supply measure, and the tank is full when the monsoon storm arrives, so none of it limits what leaves the plot in a design storm. Outside the areas where the Act operates, which the post-disaster needs assessment of 2023 puts at more than 90% of the State, small buildings follow the rural model bye-laws approved in 2025 (as reported), whose drainage provisions were not read for this Manual [TBC]. Appendix-1 asks that sub-division layouts allow the "natural flow of surface drainage", but no rule asks a single building to carry the water from uphill around its foundations or to discharge its roof water to a stable channel rather than down the slope. Clause 1.5.4(b) applies to every building whatever its size for this reason. A small building on a hill slope is also where a soak pit can do most harm; the TCP Rules 2014 show soak pits on the site plan without forbidding them on a slope, and an Authority may make the hill infiltration rule of Clause 4.11 a condition of every building permit in its hill area, whatever the size of the site (a recommendation of this Manual, not a requirement of Clause 1.5.4).
Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.
1.6 Tiered adoption
1.6.1 Tier A authorities. The following are Tier A:
- (a) Shimla Municipal Corporation (SMC);
- (b) every Approving Authority within the Shimla Planning Area, notified under the Himachal Pradesh Town and Country Planning Act, 1977, as that area is notified from time to time, including the TCP Department and SMC and the other local bodies and special area authorities in that area; and
- (c) every other Municipal Corporation constituted under the Himachal Pradesh Municipal Corporation Act, 1994, as constituted from time to time, among them Dharamshala, Mandi, Solan and Palampur, and the TCP Department, a SADA or HIMUDA where it grants permission within the area of a Municipal Corporation; and the Baddi Barotiwala Nalagarh Development Authority in its area.
1.6.2 Tier B authorities. All other Nagar Parishads and Nagar Panchayats are Tier B.
1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:
Table 1.1 — Differences between Tier A and Tier B authorities
| Item | Tier A | Tier B |
|---|---|---|
| Performance criteria (Chapters 2–9) | Apply in full | Apply in full |
| Hydrologic method for storage | Hydrograph method (Chapter 3) | Hydrograph method, or the design-aid route of Clause 1.7 where eligible |
| Compliance calculator (Clause 10.5) | Required as a summary | Required; may be the sole calculation on the design-aid route |
| Policy supplement alternatives (Clause 1.7) | Only with State Stormwater Technical Committee concurrence | May be adopted by council resolution |
| Technical review | By the Authority | By the Authority, with TCP regional support or an empanelled reviewer (Clause 10.7) |
| Flood-sensitive catchment rule | Applies | Applies |
1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the Shimla Planning Area or another planning area or special area under the Himachal Pradesh Town and Country Planning Act, 1977, or is found by a post-event review (Clause 10.16) to need the full methods.
1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.
Commentary. Shimla Municipal Corporation, with its engineering wing and a city of 13 major nallahs on slopes of 45° to 60°, with about 67 drains and 42.33 km of storm drains counted in 2015 and 55.43 km built under AMRUT (Shimla Municipal Corporation, 2015 and 2022), and a small hill Nagar Panchayat with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Shimla.
1.7 Policy supplement: adoptable alternatives
1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.
1.7.2 The alternatives are:
Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5
| No. | Main-text requirement | Adoptable alternative | Eligibility |
|---|---|---|---|
| S-1 | Storage sized by hydrograph method (Chapter 3) | Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator | Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1) |
| S-2 | Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site | Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule | Any site outside flood-sensitive catchments |
| S-3 | Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) | Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 | Waterbodies with no mapped 1% AEP extent |
| S-4 | Downstream analysis by hydraulic model (Chapter 5) | Screening checklist of downstream capacity and known flooding, with a model only where the screen fails | Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall |
| S-5 | On-site detention | Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) | Where a basin plan has been notified |
1.7.3 Conditions on adoption.
- (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
- (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
- (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
- (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
- (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).
Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.
1.8 Relationship with other instruments
1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.
Table 1.3 — Relationship with other instruments
| Instrument | Relationship |
|---|---|
| Himachal Pradesh Town and Country Planning Rules, 2014, made under the Himachal Pradesh Town and Country Planning Act, 1977, as consolidated by the TCP Department to the Eighth Amendment of 2022 (read), with the live page of Appendix-1 as of June 2025 (read); the Twelfth to Fifteenth Amendments of 2024–25 and the draft Sixteenth Amendment of 2025 (not read [TBC]) | Continue. In areas where no Interim Development Plan or Development Plan has been prepared, Appendix-1 allows development on slopes of up to 45° (cl. 3), a hill cut of up to 3.50 m with at least 1.00 m from the toe wall (cl. 11) and construction at 3.00 m from a nullah and 5.00 m from a khud (cl. 16), with no reference line stated, and asks that sub-divisions be laid out for the "natural flow of surface drainage" at grades of at least 1 in 15, with 5% of the scheme area for soak pits (cl. 20); the appendices for IT parks and real estate leave the distance from the highest flood level along rivers, khuds and nullahs to the development plans and allow no construction on land prone to floods elsewhere; Rule 21(1) requires a geologist's soil investigation report before building in the sliding and sinking zones of a plan; and site plans show the waterbodies ("Bauri, Well, Nallah, khud"), contours and soak pits. The rules set no design storm, release rate, detention volume or "zero runoff" rule, and no rule on infiltration on slopes. The design criteria of Chapters 2–6, the hill rules of Chapters 4, 6 and 8 and the hydraulic corridor and setbacks of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the rules, a development plan or a statute are stricter, they govern (Clause 1.3.3). |
| Rainwater harvesting: TCP Rules 2014, Appendix 6; Himachal Pradesh Ground Water (Regulation and Control of Development and Management) Act, 2005 (Act 31 of 2005), as amended in 2022 and 2023, section 15, and its draft Rules of 2006 | Continue unchanged. Appendix 6 makes rooftop rainwater storage compulsory for every building, existing or proposed, where the 1977 Act operates, at a minimum of 20 litres per m² of roof (cl. (vi)), about 20 mm of rain over the roof, with no water supply connection until it is in place, disconnection for violators and eighteen months for existing buildings to comply; colonies and IT parks provide it underground in parks and open spaces. Section 15 of the Ground Water Act is enabling: the Ground Water Authority "may" issue guidelines and direct rainwater harvesting structures on urban premises with a plinth area of 100 m² or more; the draft Rules of 2006 exempt from such directions premises under 100 m² and "the sinking zones, where construction of rain water harvesting structures would be detrimental to the safety of the building structures" (r.29; final rules not read [TBC]). This Manual counts the Appendix 6 storage against its retention requirement only as reuse (Clause 4.4.3), never as detention, and in the hills only as storage, under the hill infiltration rule of Clause 4.11. |
| Himachal Pradesh Town and Country Planning Act, 1977; the Interim Development Plans and Development Plans of the planning areas, among them the Shimla Development Plan 2041 (published on 20 June 2023 according to the Supreme Court, notified on 23 June 2023 according to the press; its text not read [TBC]) and the Chopal Development Plan 2041; special areas and SADAs | Continue. Development plans are subordinate legislation under the Act and must address water and drainage (Supreme Court, 2024 INSC 30). The Shimla plan requires a geologist's soil investigation report in its sinking and sliding zones and allows construction there only as the geologist's report permits (§17.2.2.9, as recorded by the Supreme Court); the Chopal plan treats slopes of more than 45°, flood plains and "areas adjacent to major drainage lines" as non-developable. The storm-water chapter of the Shimla plan's draft of 2022 was not read [TBC]. Development plans would show the flood-sensitive catchments, drainage reserves and regional facility sites of this Manual (Chapter 11). |
| NGT, Yogindra Mohan Sengupta v. Union of India, OA 121/2014 with OA 505(THC)/2015, judgment of 16 November 2017; Supreme Court, State of Himachal Pradesh v. Yogendera Mohan Sengupta, CA 5348-5349/2019, 2024 INSC 30, judgment of 11 January 2024 | Not binding; cited as expert guidance only. The NGT's directions for Shimla included slope limits of 35° on soil-covered and 45° on rocky slopes (XIII), compulsory rainwater harvesting (XIV) and the diversion of runoff from concretised areas "in such a manner to ensure that such run off does not go in to over burden or flow along hills and depressions" (XV), on the findings of an expert committee that the city's drains could not carry the peak flow. The Supreme Court set aside all the NGT's orders, holding that the Tribunal had "transgressed its limitations" by directing how subordinate legislation should be made, let the State implement the development plan of 20 June 2023 subject to its observations, and said that it gave the plan no "imprimatur". This Manual uses the expert committee's findings and direction XV as technical evidence for its hill rules, not as orders. |
| Supreme Court, In Re: Issues Relating to Ecology and Environmental Conditions Prevailing in the State of Himachal Pradesh, WP(C) No. 758 of 2025 (suo motu), and the reports of the Central Empowered Committee (first report reported in October 2026) | Apply any direction when issued. The case was registered in July 2025, and in July 2026 the Court reportedly referred Shimla's green belts, tree felling and construction to the Central Empowered Committee, whose first report is reported to cover hydropower projects, roads and tourism construction (as reported; orders and reports not read [TBC]). |
| Setback changes of 2025 (as reported): 5 m from drains and 7 m from rivers and ravines for buildings, in place of the 3 m and 5 m of Appendix-1 (July 2025); no government building within 150 m of rivers, nullahs and other waterbodies (announcement, July 2025); model building bye-laws for rural areas banning building on the banks of rivers and streams (cabinet, September 2025) | Not applied as rules. No gazetted text of any of these was found for this Manual [TBC]; they are reported in the press only, and the press reports differ on the distances. Where one is notified, it governs as a statutory setback under Clause 7.4.5 for the uses it restricts. Until then the setbacks of Appendix-1 and of the development plans bind, and the hydraulic corridor of Chapter 7 applies where nothing wider binds. |
| Himachal Pradesh Municipal Corporation Act, 1994 and Himachal Pradesh Municipal Act, 1994 | Continue. The Municipal Corporations run on the first and the Nagar Parishads and Nagar Panchayats on the second; their drainage sections were not read for this Manual [TBC]. The local bodies run few of the functions that bear on drainage alone: sewerage is run by the Jal Shakti Vibhag except in Shimla (SJPNL) and Solan, HIMUDA approves colony plans without them and HPSIDC plans the industrial areas (CAG, Report No. 1 of 2022). |
| Himachal Pradesh Minor Canals Act, 1976 (Act No. 42 of 1976) | Continue, and apply where a kuhl or line of natural drainage is concerned. The Act brings the kuhls of the Government and listed private kuhls under its Schedules, lets the Government "regulate the flow of water in any river, creek, natural channel or line of natural drainage" and prohibit or remove obstructions to it (s.43), requires works where a kuhl crosses a road or drain (s.46) and makes obstructing or fouling a canal an offence (s.65). It is the only statute of the State found that names a "line of natural drainage". A drain that crosses or discharges to a scheduled kuhl needs the consent of the body that manages it (Chapters 5 and 7). |
| Floodplains: no floodplain zoning law | No law of the State zones floodplains or notifies flood lines. The post-disaster needs assessment of 2023 asks for "comprehensive river boundary mapping and the establishment of floodplain management guidelines" and found the damage in Kullu concentrated along the Beas's old channels (PDNA, 2023). Until a law or guideline is made, the hydraulic corridor of Chapter 7, with a Zone 1 of at least 15 m, and the setbacks of Appendix-1 and the development plans apply, whichever is wider, as this Manual's proposal, and old river courses are kept free under Chapter 7. |
| Ground Water Act, 2005, section 5A (2022), and the statewide notification under section 5 (reported from 19 November 2019 [TBC]) | Continue. Section 5A bars any person from releasing "any effluent that contaminates the groundwater"; this Manual applies it to infiltration practices, which shall not receive polluted runoff (Chapter 8). All ten valley units assessed by CGWB were "Safe" in 2024, with Una (63.72%) and Solan (57.89%) the most used. |
| Wetlands (Conservation and Management) Rules, 2017; Himachal Pradesh State Wetlands Authority (notification No. STE-E(3)-10/2017-Pt-I of 7 November 2017); Ramsar sites: Pong Dam Lake (15,662 ha, 19 August 2002), Chandertal (49 ha) and Renuka (20 ha) (8 November 2005) | Continue. The Rules' restrictions apply to wetlands once notified; no wetland of the State was found notified under rule 4. The Ramsar sites and the wetlands of national importance, Rewalsar and Khajjiar, are governed by Chapter 7. |
| High Court of Himachal Pradesh, Fourlane Visthapit and Prabhavit Samiti v. State, CWP 5243/2022 (order of 26 June 2023) and Madan Lal v. State, CWPIL 31/2023 (order of 31 May 2024); NGT, OA 726/2023 (the monsoon disaster of 2023), OA 673/2018 (polluted river stretches) and OA 735/2023 (Ashwani Khad) | Apply where they bind. The High Court barred the dumping of muck into Gobind Sagar and "its feeding khuds/nallahas", and ordered penal action against those who dumped it and the clearance of the muck from the shores, tributaries and public land; HPSPCB has levied environmental compensation for illegal dumping; the NGT oversees the cleaning of the four stretches that CPCB placed in Priority I in 2022, the Ashwani Khad, the Bald along Baddi, the Sirsa along Nalagarh and the Sukhna along Parwanoo. Sewage in storm drains is dealt with in Chapter 8, and muck and debris in Chapters 6 and 9. |
| Disaster Management Act, 2005; HPSDMA and the District Disaster Management Authorities | Continue. No urban flood plan or standard operating procedure of HPSDMA was read for this Manual [TBC]; directions to clean drains "before the onset of monsoon" were found only in press reports, with no fixed date, and the works calendar of Chapter 10 sets this Manual's dates. |
| IRC:SP:48, Hill Road Manual, and the practice of the Public Works Department on hill-road drainage | Apply to the drainage of hill roads, cross-referenced from Chapter 6, where they do not conflict with it; the drainage clauses of IRC:SP:48 were not read for this Manual [TBC]. |
| CPHEEO Manual on Storm Water Drainage Systems (2019) | Engineering reference. This Manual sets higher return periods under Clause 1.3.2. |
| NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) | This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF. |
| NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 | Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create. |
| IRC:SP:42-2014 and IRC:SP:50-2013 | Apply to road drainage only where they do not conflict with Chapter 6. |
| MBBL 2016, Chapter 9 | Model for RWH and for the inspection regime in Chapter 10. |
Commentary. RWH in Himachal Pradesh is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a July or August monsoon burst or cloudburst, often with a western disturbance, as in July and August 2023 arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.
Himachal Pradesh is spending on its town drains, but without a design basis. Shimla built 191 drains and nallahs, 55.43 km, under AMRUT (Shimla Municipal Corporation, 2022), its draft City Development Plan 2041 lists ₹25.47 crore for new drains and ₹179 crore for the rejuvenation of its major nallahs (Shimla Municipal Corporation, 2015), and after the slides of 2023 the Corporation asked SJPNL for a geological, remote-sensing and drone study of its drains and a DPR (as reported); the plan for recovery from the monsoon of 2023 lists proposals for storm-water drainage of Una town (₹19.66 crore) and for flood protection on the Beas at Manali and Bhuntar (Government of Himachal Pradesh, Recovery and Reconstruction Plan); and the Swan river flood management project, covering the main river from Daulatpur to the Gagret bridge and its tributaries, is reported complete (NITI Aayog, 2020; as reported). None of the documents found states a design storm. No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.
The State's law holds some of the tools. It keeps development off slopes of more than 45°, keeps buildings 3 m from nullahs and 5 m from khads where no plan has been made, asks for a geologist's report in sinking and sliding zones and requires rooftop storage of 20 litres per m² of roof on every building (TCP Rules 2014); it lets the Government protect any line of natural drainage (Minor Canals Act 1976, s.43) and bars effluent that contaminates groundwater (Ground Water Act 2005, s.5A); and the High Court has acted against the dumping of muck in Gobind Sagar and its khads. The NGT's directions of 2017 for Shimla, among them that runoff from concretised areas be diverted so that it "does not go in to over burden or flow along hills and depressions", were set aside by the Supreme Court in 2024 and are cited in this Manual as expert guidance only. What the law lacks is a design standard and a floodplain law. None of these instruments says how large a drain must be, which storm it must carry, how much water a hill site may put into its slope, how a khad's flood level is to be fixed, or how much storage a paved plot removes; the setbacks of 2025 reported in the press have not been found in a gazetted text, and the post-disaster needs assessment of 2023 asks for the mapping of river boundaries and for floodplain guidelines that do not yet exist. This Manual's checks are framed as part of the planning and building permission of the TCP Department and the local bodies, not as a separate no-objection certificate. This Manual is offered as a technical companion to these instruments, to the orders of the courts, and to the drainage works of the towns: it supplies the design storm, detention, hill-site drainage, infiltration and buffer numbers they do not set, as a proposal for the Government and the authorities to consider. Neither the TCP Department, the Urban Development Department, the Jal Shakti Vibhag nor any other body has adopted it.
1.9 Roles and responsibilities
1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.
Table 1.4 — Roles and responsibilities under this Manual
| Agency | Role under this Manual |
|---|---|
| Town and Country Planning Department (TCP) | Administers the Himachal Pradesh Town and Country Planning Act, 1977 and the TCP Rules 2014, prepares the Interim Development Plans and Development Plans of the planning areas, among them the Shimla Development Plan, and grants planning permission in the planning and special areas where no other body does. Would prepare the amendment of Clause 1.3.1(a), show flood-sensitive catchments, drainage reserves and regional facility sites in the development plans (Chapter 11), and, with the Urban Development Department, give regional support to Tier B authorities (Table 1.1). |
| Urban Development Department | Administers the Municipal Corporations, Nagar Parishads and Nagar Panchayats, 54 local bodies in March 2020 (CAG, 2022), and the AMRUT and Smart Cities programmes. Would issue the model ULB bye-law of Clause 1.3.1(b), apply this Manual to the drainage works it funds, and maintain the empanelled reviewer list (Clause 10.7). |
| State Stormwater Technical Committee (Clause 1.3.2) | Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12). |
| Shimla Municipal Corporation (SMC) and the other Municipal Corporations (Dharamshala, Mandi, Solan and Palampur, as reported [TBC]); Nagar Parishads and Nagar Panchayats | Hold, clean and maintain the public drains and nallahs of their areas under the Himachal Pradesh Municipal Corporation Act, 1994 and the Himachal Pradesh Municipal Act, 1994 (drainage sections not read [TBC]), and grant building permission where the law gives them that power [TBC]; SMC's engineering wing built the AMRUT drains of Shimla. Would apply this Manual to their works, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15). |
| Special Area Development Authorities (SADAs), the Baddi Barotiwala Nalagarh Development Authority (BBNDA), HIMUDA and HPSIDC | Plan and grant permission in their special areas (SADAs, BBNDA), plan and approve colonies (HIMUDA, without the local bodies, CAG, 2022) and plan industrial areas (HPSIDC). Would require the drainage report of Chapter 10 with each application or scheme, check the hill rules at the plinth inspection, and hand over drains and storage to the local body under Clause 10.14. |
| Smart City companies of Shimla and Dharamshala | Build drains under the Smart Cities Mission and hand them to the Municipal Corporation. Would design them to this Manual from the dates of Clause 1.11. |
| Jal Shakti Vibhag (formerly the Irrigation and Public Health Department) | Builds and maintains flood-protection and channelisation works on the rivers and khads, among them the Swan; runs the water supply of the State and its sewerage outside Shimla; manages the kuhls of the Government under the Minor Canals Act, 1976; and is the State's groundwater agency. Would supply river levels and flood marks for Chapter 5, approve the site-specific hydrology of Clause 2.3.6(i), apply this Manual to its drainage and flood works, and design its sewers and treatment plants so that sewage stays out of the storm drains (Chapter 8). |
| Shimla Jal Prabandhan Nigam Ltd (SJPNL) | Runs the water supply and sewerage of Shimla, including the treatment plants at Lalpani, Malyana and Dhalli (35.88 MLD installed, 18.1 MLD used; Chief Secretary, affidavit before the NGT in OA 735/2023), and was asked by SMC to study the city's drains after the slides of 2023 (as reported). Would keep sewage out of the nallahs that feed the Ashwani Khad and apply Chapter 8 to its works. |
| Public Works Department (PWD) | Builds and maintains State roads and hill roads with their side drains, catch-water drains, scuppers and culverts, which in the hill towns are much of the minor drainage system. Would apply Chapter 6 and the hill-road rules to them; national highways are for NHAI or MoRTH, including the disposal of muck from road works, which the High Court has supervised, and border roads are for BRO. |
| Himachal Pradesh State Disaster Management Authority (HPSDMA) and the District Disaster Management Authorities | Prepare for and respond to floods, cloudbursts and landslides; HPSDMA published the reports of the technical committees on the events of 2023. Would supply the hazard and landslide maps used in the screening of Clause 2.3.6(i) and the hill rules, and lead post-event reviews with the Authority (Clause 10.16). |
| HIMCOSTE, the State Centre on Climate Change and the Himachal Pradesh State Wetlands Authority | HIMCOSTE coordinated the technical committee on the Shimla slides of 2023 and is the secretariat of the State Wetlands Authority (constituted on 7 November 2017); the State Centre on Climate Change inventories glacial lakes and landslides. Would supply those inventories for Clause 2.3.6(i), and the Wetlands Authority's consent is needed before a wetland or Ramsar site is used for storage or an outfall (Chapter 7). |
| Himachal Pradesh State Pollution Control Board (HPSPCB) | Monitors rivers and drains, levies environmental compensation for the illegal dumping of muck and reports to the NGT. Would receive the records of sewage found in storm drains under Chapter 8. |
| Ground Water Authority, under the Ground Water Act, 2005 | May issue guidelines and directions for rainwater harvesting and recharge (s.15) and enforces the bar on effluent that contaminates groundwater (s.5A). Would be consulted where recharge is proposed under Chapters 4 and 8. |
| Revenue Department, the Deputy Commissioners and the Forest Department | The revenue records show the rivers, khads, nallahs and kuhls; the Collector may remove obstructions to scheduled kuhls and lines of natural drainage under the Minor Canals Act, 1976; much land along the khads is forest land. Would record drainage reserves in the land records. |
| Panchayati Raj Department and the gram panchayats | Apply the model building bye-laws for rural areas approved by the cabinet in September 2025 (as reported; text not read [TBC]). Would apply the hill rules of this Manual to rural building where the bye-laws allow. |
| BBMB, NTPC, SJVN, NHPC, HPSEBL, HPPCL and the other dam operators | Operate Bhakra (Gobind Sagar), Pong and Pandoh (BBMB), Kol (NTPC), Nathpa Jhakri (SJVN), Chamera and Parbati (NHPC), Larji and the other dams of the State. Would supply reservoir levels, release rules and release records for Chapter 5. |
| Central Water Commission (CWC), a body of the Union | Publishes the Flood Estimation Report for zone 7 used in Chapters 2 and 3, the river levels at its sites and its monitoring of glacial lakes. Would supply river stage records and forecasts for Chapter 5. |
| Central Ground Water Board (CGWB), a body of the Union | Assesses the groundwater of the State (stage of extraction 35.48% in 2024, all ten assessed valley units "Safe", seven districts unassessed). Would supply groundwater levels and quality with the Jal Shakti Vibhag. |
| IMD (Meteorological Centre Shimla), and road and rail owners (PWD, NHAI, BRO, Indian Railways) | IMD's stations supply the rainfall records of Chapter 2. Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7). |
Commentary. Stormwater in Himachal Pradesh is split between the TCP Department, through the TCP Rules 2014, the development plans and planning permission; the Urban Development Department and the local bodies, through the drains vested in them; the special area authorities, BBNDA, HIMUDA and HPSIDC, through their schemes; the Jal Shakti Vibhag, through the rivers, khads, kuhls and flood works, and through sewerage outside Shimla; SJPNL, through the sewers of Shimla; the PWD and NHAI, through the drains of the roads, which in the hills are the minor drainage system; the dam operators, through the reservoirs that hold the outfalls up; and the courts, which have acted on muck in the khads and on Shimla's planning. Shimla shows why the split matters. Its 13 major nallahs are at once trunk storm drains, carriers of sewage from households without a sewer connection, more than half of them in 2017 (NGT expert committee, as quoted), and the catchments of drinking-water sources: in 2016 effluent from the Malyana and Dhalli treatment plants reached the Ashwani Khad intake and caused an outbreak of hepatitis E (Bhagra et al., 2017). The nallahs are SMC's, the sewers and the treatment plants are SJPNL's, the road drains that feed them are the PWD's, the slopes they cross are governed by the development plan, and the land beside many of them is forest; the Comptroller and Auditor General found that SMC has "limited control" over SJPNL (CAG, 2022). The Municipal Acts of 1994 are understood to vest public drains in the local bodies (drainage sections not read [TBC]), and the Minor Canals Act of 1976 lets the Government regulate any line of natural drainage, but no rule or order found divides the khads and nallahs from the municipal drains, or the road drains of the hill towns from the town drains, between the bodies concerned [TBC]. Until such a rule is made, this Manual assigns the drainage elements as in Table 1.5, as Chapter 6 does for the drains themselves, and recommends that each town keep a register of its drains and nallahs with an owner for each reach. The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers.
Table 1.5 — Working assignment of drainage elements under this Manual
| Element | Assigned to |
|---|---|
| Rivers, khads and nallahs outside the limits of a local body, with their beds, banks and floodplains, and the flood-protection and channelisation works on any river or khad, such as those of the Swan, the Sirsa and the Beas | The Jal Shakti Vibhag; the land remains with its recorded owner (Revenue or Forest), and within the limits of a local body the local body keeps the bed free of encroachment |
| Natural nallahs and khads and public drains within the limits of a local body, other than the works assigned to the Jal Shakti Vibhag | The Municipal Corporation, Nagar Parishad or Nagar Panchayat (in Shimla, SMC) |
| Drains built under AMRUT or by the Smart City companies of Shimla and Dharamshala, until handed over in writing | The body that built them, and the local body after handover |
| Drains and storage within a scheme of a SADA, BBNDA, HIMUDA, HPSIDC or a colony developer, until handed over in writing | The body that built the scheme |
| Road drains, catch-water drains above cuts, scuppers and cross-drainage of State roads and hill roads | The PWD; on national highways, NHAI or MoRTH, which also answer for the muck of their works; on border roads, BRO |
| Sewers, the interception of sewage from nallahs, and sewage treatment plants | SJPNL in Shimla; the Jal Shakti Vibhag elsewhere, or the local body where it runs the sewerage, as at Solan |
| Kuhls (gravity irrigation channels) listed in the Schedules of the Minor Canals Act, 1976 | The Jal Shakti Vibhag or the local authority for the kuhls they manage (Schedule I), and the beneficiaries under the Collector for listed private kuhls (Schedule II) |
| Reservoirs and their gates and releases | BBMB (Bhakra, Pong, Pandoh); NTPC (Kol); SJVN (Nathpa Jhakri); NHPC (Chamera, Parbati); HPSEBL and the other operators of the State's dams |
| Springs (naun, baoli) used for supply | The Jal Shakti Vibhag, SJPNL, the local body or the panchayat that uses them |
| Wetlands and Ramsar sites (Pong Dam Lake, Chandertal, Renuka) and the wetlands of national importance (Rewalsar, Khajjiar) | The Himachal Pradesh State Wetlands Authority, with the Forest Department |
This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.
1.10 Variances and waivers
1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:
- (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
- (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.
1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Himachal Pradesh has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to a river or khad in flood, to a reservoir such as Gobind Sagar, Pong or Pandoh, or to a tal held by its outlet, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it; nor is it waived for a site because it drains to a steep nallah or down a hill slope.
1.10.3 No variance or waiver. No variance or waiver shall be granted for:
- (a) a sewage connection to a storm drain;
- (b) the lowest habitable floor level of Chapter 6;
- (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
- (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.
1.10.4 Procedure.
- (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
- (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
- (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
- (d) A variance runs with the approval. It lapses if the approval lapses.
Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Himachal Pradesh the NGT's expert committee found in 2017 that the debris of Shimla's slopes was "dumped in the valley or near water channels, obstructing the natural drainage", the High Court has had to bar the dumping of muck into Gobind Sagar and its feeding khads and order penal action against those who dumped it (Madan Lal, CWPIL 31/2023, 2024), and the post-disaster needs assessment of 2023 found that the water channels that should act as natural outlets "are often encroached upon".
1.11 Transition provisions
1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).
1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.
1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.
1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.
1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.
Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).
1.12 Review and amendment
1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.
1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.
1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.
References (chapter)
- Government of Himachal Pradesh, Town and Country Planning Department. Himachal Pradesh Town and Country Planning Rules, 2014, consolidated to the Eighth Amendment, 2022 (Appendices 1, 3, 6 and 7 and Rule 21 read; Wayback Machine capture of 14 Jul 2024), and the page of Appendix-1 (capture of 20 Jun 2025); later amendments not read [TBC]. https://tcp.hp.gov.in/Application/uploadDocuments/rule/Rule20221126_160623.pdf
- Government of Himachal Pradesh, Town and Country Planning Department. Chopal Planning Area Development Plan 2041. https://tcp.hp.gov.in/Application/uploadDocuments/devlopmentPlan/PlanDoc020240108_160640.pdf
- Government of Himachal Pradesh. Himachal Pradesh Ground Water (Regulation and Control of Development and Management) Act, 2005 (Act 31 of 2005), with the amendments of 2022 and 2023 (PRS copy); draft Ground Water Rules, 2006. https://prsindia.org/files/bills_acts/acts_states/himachal-pradesh/2005/Act31of2005HP.pdf
- Government of Himachal Pradesh. Himachal Pradesh Minor Canals Act, 1976 (Act No. 42 of 1976), with its Schedules and Rules (PRS copy).
- Government of Himachal Pradesh, Department of Environment, Science and Technology. Notification No. STE-E(3)-10/2017-Pt-I of 7 November 2017 (State Wetlands Authority); Himachal Pradesh State Wetlands Authority, Major Wetlands of Himachal Pradesh.
- Ministry of Environment, Forest and Climate Change (2024). List of 80 Ramsar sites of India, 31 January 2024. https://moef.gov.in/uploads/2024/03/80-Ramsar-sites-of-India-31-01-2024.pdf
- National Green Tribunal. Yogindra Mohan Sengupta v. Union of India, OA 121/2014 with OA 505(THC)/2015, judgment of 16 November 2017 (set aside; cited for the findings of the expert committee only).
- Supreme Court of India. State of Himachal Pradesh & Ors v. Yogendera Mohan Sengupta & Anr, Civil Appeals 5348-5349/2019 with TC (C) 2/2023, 2024 INSC 30, judgment of 11 January 2024.
- Supreme Court of India. In Re: Issues Relating to Ecology and Environmental Conditions Prevailing in the State of Himachal Pradesh, WP(C) No. 758 of 2025, orders of 2025 and 2026 and the reports of the Central Empowered Committee (as reported; not read [TBC]).
- High Court of Himachal Pradesh. Fourlane Visthapit and Prabhavit Samiti v. State of HP, CWP 5243/2022, order of 26 June 2023; Madan Lal v. State of HP, CWPIL 31/2023, order of 31 May 2024.
- National Green Tribunal. OA 726/2023, reply of HPSPCB of 20 February 2024; OA 735/2023 (Ashwani Khad), affidavits of the Chief Secretary (2024; 1 February 2026) and interim report of CPCB (6 May 2024); OA 673/2018 (polluted river stretches).
- Comptroller and Auditor General of India. Report No. 1 of 2022, Performance Audit on the Implementation of the 74th Constitutional Amendment Act, Government of Himachal Pradesh (press brief).
- Himachal Pradesh State Disaster Management Authority (2023). Preliminary Report on Landslide, Land Subsidence Incidents in and around Shimla during July/August 2023, by the technical committee coordinated by HIMCOSTE (HPSDMA document 3578).
- Bhagra, S. et al. (2017). International Journal of Community Medicine and Public Health 4(6), 1966–1971 (the water supply of Shimla and the hepatitis E outbreak of 2016; title not recorded [TBC]).
- NITI Aayog (2021). Resource Book on Springshed Management in the Indian Himalayan Region (with IWMI and SDC).
- Central Ground Water Board. Dynamic Ground Water Resources of India, 2022 and 2024 (Himachal Pradesh).
- Press reports of the setback changes of July 2025, the announcement on government buildings near rivers (Tribune, 30 July 2025), the model rural building bye-laws (September 2025) and the suo motu case in the Supreme Court (secondary sources). https://www.tribuneindia.com/news/himachal/no-govt-institution-to-be-built-within-150-metres-of-rivers-cm
- Indian Roads Congress. IRC:SP:48, Hill Road Manual (drainage clauses not read [TBC]).
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Table 4.1 and notes).
- Kakkar, R. (CPHEEO) (2023). Understanding Urban Stormwater Management. CSE, Aug 2023.
- National Disaster Management Authority (2010). National Guidelines on Management of Urban Flooding.
- MoHUA (2016). Model Building Bye-Laws, Chapter 9.
- Lok Sabha Unstarred Question 1847, 30 Jul 2026 (MoHUA). https://sansad.in/getFile/lsapps/loksabhaquestions/annex/188/AU1847_x29brZ.pdf
- Central Water Commission (1994). Flood Estimation Report for Western Himalayas – Zone 7, Annexes 4.3 and 4.4 (heaviest daily falls and recording-gauge maxima at the stations of Himachal Pradesh).
- India Meteorological Department, Meteorological Centre Shimla. Monsoon Reports 2023, 2024, 2025 and 2026; national press releases of 10 July 2023 and of August 2023 on the rainfall of July 2023; report on disastrous weather events, July 2024. https://mausam.imd.gov.in/shimla/
- Central Water Commission. Highest flood levels at its sites in Himachal Pradesh, as transcribed by SANDRP (2022–2025; no bulletin was read for this Manual, and the datum is to be confirmed [TBC]). https://sandrp.in/
- Press reports of the Sutlej floods of 2000 and 2005, the Bhagsunag flood of 2021, the slides at Batseri and Nigulsari in 2021, the floods of Samej, Bagipul and Rajban in 2024, and the floods of Seraj, Thunag and the Manimahesh route in 2025 (secondary sources). https://www.downtoearth.org.in/
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Mid-America Regional Council (2025). APWA 5600 Manual Factsheet; APWA Stormwater Standards Supplement (7 Nov 2025). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Mid-America Regional Council. The Evolution of Regional Stormwater Design Standards (presentation). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Kansas City Metro Chapter APWA (2006). Section 5600, §5601.6 Waivers.
- PUB Singapore (2018, with Addendum No. 3 of 16 Apr 2025). Code of Practice on Surface Water Drainage, 7th ed.
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management.
- Centre for Science and Environment (2023). Urban Stormwater Management (presentation).
- Shimla Municipal Corporation and Government of India–UNDP (2015). Action Plan for Mainstreaming Disaster Risk Reduction and Climate Change Adaptation, Shimla (drains and nallahs; draft City Development Plan 2041 items).
- Shimla Municipal Corporation (2022). Status of AMRUT projects (storm-water drains).
- Government of Himachal Pradesh (2023). Himachal Pradesh Post Disaster Needs Assessment, Monsoon 2023; and Monsoon 2023 Recovery and Reconstruction Plan.
- NITI Aayog, Development Monitoring and Evaluation Office (2020). Best practice note on the Swan river flood management project, Una.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 1A | List of Tier A authorities, with the boundaries of the Municipal Corporations and of the planning areas and special areas notified under the Himachal Pradesh Town and Country Planning Act, 1977 |
| 1B | Maps of flood-sensitive catchments |
| 1C | Policy Supplement: text of alternatives S-1 to S-5 and model council resolution |
| 1D | Model TCP Rules 2014 amendment and model ULB bye-law |
| Form 1-1 | Applicability Determination |
| Form 1-2 | Variance / Waiver Request |
Commentary. Himachal Pradesh's floods come from four sources, often together. The first is the heavy storm of the monsoon, or of a western disturbance meeting it, forced up against the Dhauladhar and the outer ranges. Dharamshala recorded 600 mm in a day on 18 July 1967, the State's highest day in the CWC zone-7 report (CWC). On 7–11 July 2023, when an active monsoon met a western disturbance, the State received 223 mm in four days, more than five times the normal, the Una Rampur automatic weather station recorded 228.5 mm, Nahan 250.0 mm and Pachhad 220.3 mm in a day, and Manali, Rohru and Keylong set new highest days; on 14 August 2023 Kangra Aero recorded 273.4 mm (IMD). The post-disaster needs assessment of the monsoon of 2023 counted more than 500 deaths and more than 5,400 landslides and put the recovery needs at ₹8,667.66 crore, with ₹375 crore more for disaster risk reduction (PDNA, 2023); the monsoon of 2025 was the wettest in 29 years, 39% above normal, with the losses reported as more than ₹4,881 crore (IMD; as reported). The second is the rivers and the khads. In July 2023 the Beas submerged the Panchvaktra temple at Mandi, and in Kullu "most of the destruction … along the Beas river … was mainly due to overflow of the water along the palaeo channels following the old river course along which the developmental activities have taken place" (PDNA, 2023); the Sutlej rose by a reported 12–15 m on 26 June 2005, when the Parechu lake in Tibet burst, and set its highest level at Rampur (as reported); a flash flood of the Sutlej in Kinnaur and Rampur on 1 August 2000 was reported to have carried away more than 100 people and 25 bridges; and the Yamuna at Paonta Sahib reached 384.6 m, its highest level, on 5 September 1995 (CWC data as transcribed by SANDRP). The third, found in no plains State of the series, is debris, outbursts and unstable ground. On 14 August 2023 a slide about 230 m long ran from Summer Hill to the Shiv Bawri temple in Shimla along "the weak plane of the depression which seems to be old buried channel of a dry stream", killing about 20 people, and buildings collapsed at Krishna Nagar the next day; the technical committee on the slides named "Open Drainage systems leading to poor disposal of surface water" among their causes (HIMCOSTE-led committee, 2023). In Kinnaur, rockfall and slides struck travellers at Batseri on 25 July 2021 and at Nigulsari on 11 August 2021 (as reported); on 31 July 2024 a debris flow down the Samej khad killed 56 people, and floods struck Bagipul and Rajban, where there was no rain gauge (as reported; IMD); on 30 June–1 July 2025 floods and debris flows struck Seraj and Thunag in Mandi district, which recorded 140.7 mm in 24 hours against a normal of 6.9 mm (as reported); and in August 2025 pilgrims on the Manimahesh route in Chamba were stranded by floods and slides, and deaths were reported (as reported). The fourth is the town drainage that fails in a fall that is not extreme: a flash flood swept through Bhagsunag above Dharamshala on 12 July 2021 (as reported); Dharamshala's drainage is reported inadequate despite more than ₹500 crore of Smart City spending (as reported); and in Shimla the nallahs that carry storm water also carried sewage to the Ashwani Khad intake, where it caused the outbreak of hepatitis E that began in January 2016 (Bhagra et al., 2017).
Missing design makes all four worse. No design storm, return period or drain standard was found for the drains of any town in the State: the NGT's expert committee found in 2017 that Shimla's drains were "not able to carry the peak flow" and covered about 30% of the city (NGT, OA 121/2014, as quoted; the judgment was later set aside by the Supreme Court). The TCP Rules 2014 control rainwater storage, slopes and the siting of buildings, not runoff, and they have no rule against soak pits on unstable slopes, although the committee on the Shimla slides of 2023 found that water entering the debris cover through depressions helped them fail. Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix; the third source is answered by the siting, screening and debris rules of Chapters 2, 6 and 7, because no drain is sized to carry a debris flow.
No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Himachal Pradesh Town and Country Planning Rules 2014 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.