About this draft
Status. This is Draft v1.0 of the Manipur Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Manipur.
Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Manipur, by its Governor, its Council of Ministers or its Legislative Assembly, or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Municipal Administration, Housing and Urban Development Department (MAHUD), the Town Planning Department (TPD), the Planning and Development Authority, Manipur (PDA Manipur), the Imphal Municipal Corporation (IMC) or any Municipal Council or Nagar Panchayat, or Imphal Smart City Ltd. Nor has it been adopted, notified or endorsed by the Hill Areas Committee of the Legislative Assembly, by any Autonomous District Council or its administrator, by any Village Authority or other body of the hill areas, by any Local, District or State Level Committee under the Manipur Conservation of Paddy Land and Wetland Act, 2014, or by any Flood Zoning Authority under the Manipur Flood Plain Zoning Act, 1978. Where it names a body, such as the Water Resources Department (WRD), the Public Health Engineering Department (PHED), the Public Works Department (PWD), the Directorate of Environment and Climate Change (DoECC) or the Forest, Environment and Climate Change Department, the Manipur Pollution Control Board (MPCB), the Loktak Development Authority (LDA), the Manipur State Wetlands Authority (MSWA), the Manipur State Disaster Management Authority (MSDMA), the Relief and Disaster Management Department, the Revenue Department or a Deputy Commissioner, the High Court of Manipur, the National Green Tribunal (NGT) or the Supreme Court, or a body of the Union or another public body, such as the Central Water Commission (CWC), the India Meteorological Department (IMD), the Central Ground Water Board (CGWB), the Central Pollution Control Board (CPCB), the National Institute of Hydrology (NIH), NHPC, the Central Electricity Authority (CEA), the National Disaster Management Authority (NDMA) or the Ministry of Environment, Forest and Climate Change (MoEF&CC), or a research body, lender or consultant, such as the Manipur Science and Technology Council (MASTEC), the Asian Infrastructure Investment Bank (AIIB), the New Development Bank (NDB) or WAPCOS, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role. Citing a body's document does not make this Manual that body's document.
No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. Until then, the Model Manipur Unified Building Bye-Laws 2024 (the Unified Bye-Laws 2024) and the building bye-laws that each urban local body and PDA Manipur have brought into force on it; the Unified Zoning/Use Regulation Bye-laws for the Master Plan Areas of Manipur, 2026; the Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification) and the master plans of the other towns; the Manipur Town and Country Planning Act, 1975 (the MTCP Act) and the Manipur Municipalities Act, 1994; the Manipur Loktak Lake (Protection) Act, 2006 (the Loktak Act); the Manipur Conservation of Paddy Land and Wetland Act, 2014 (the paddy-land Act); the Manipur Flood Plain Zoning Act, 1978; the Manipur (Hill Areas) District Councils Act, 1971 (the District Councils Act); orders of courts and tribunals; and approval conditions in force continue to apply.
Manipur and its hill areas. The State has two legal geographies, and this Manual reaches them differently. The hill areas are the areas specified in the First Schedule to the Manipur Legislative Assembly (Hill Areas Committee) Order, 1972, as the District Councils Act has defined them since its amendment of 2008; Article 371C of the Constitution provides for a Hill Areas Committee of the Legislative Assembly, of the members elected from the hill areas, as summarised in a secondary source. The Manipur Municipalities Act, 1994 "extends to the whole of the State of Manipur except the Hill Areas", as quoted in a secondary copy, the Act itself not having been read in full; the Unified Bye-Laws 2024 extend to the Master Plan areas, the notified planning areas and the areas of the urban local bodies; and the paddy-land Act, which extends to the areas under the Manipur Land Revenue and Land Reforms Act, 1960, does not reach the hill areas, as this Manual reads it. The MTCP Act and the Flood Plain Zoning Act, 1978 extend to the whole State. In the hill areas the District Councils have functions that touch drainage: section 29(1) of the District Councils Act lists, among others, "water supply and sanitation schemes", "the construction, repair and maintenance of embankments", the conservation of soil, the allotment of land for "residential or other non-agricultural purposes", and "village planning or any other matter" that the Governor may entrust to a Council "in consultation with the Hill Areas Committee" (the item numbers were read from page images and are to be checked [TBC]). None of these is building control, and no building or drainage rule for the hill areas was found. Section 29(1A), inserted in 2006, would let a District Council "notify any part of the area of the Autonomous District as urban area for the purpose of formulation of development plan", but it comes into force on a date to be notified, and no such notification was found [TBC]. The Councils' terms expired on 30 November 2022, and since June 2025 the Deputy Commissioners of six hill districts have acted as their administrators, as reported; the number of Councils is given as six and as ten, and the sources conflict [TBC]. Village Authorities act under the Manipur Village Authorities in Hill Areas Act, 1956, which was not read [TBC]. In the hill areas, then, this Manual can reach the public works that the State's departments and agencies execute there (roads, bridges, culverts, drains, water supply, embankments and flood works, Clause 1.5.1(b)) and any body that adopts it; in future it could also reach a notified planning area under the master plans that TPD is preparing for the district headquarters "both valley and hills", where the Unified Bye-Laws 2024 would then extend. For a household or a village in the hill areas the Manual is guidance only. A District Council could take it up as a matter that the Governor entrusts to it under section 29, or through a development plan under section 29(1A) once that section is in force. In the valley, MAHUD could amend the Unified Bye-Laws 2024 under the same two sections under which it published them, and each urban local body and PDA Manipur could adopt the amendment in its own bye-laws; TPD and PDA Manipur could carry drainage reserves, pat buffers and flood areas into the master plans and the land-use check of building plans; WRD could set outfall, gate and pumping conditions at the river bunds and advise any Flood Zoning Authority; and LDA and the MSWA could apply it in the Loktak catchment and in notified wetlands. None has done so. Land in the valley is mostly patta land with revenue records; in the hill areas land is allotted under the District Councils Act and held under customary tenure, which was not researched for this Manual [TBC]. This Manual reserves drainage corridors and easements in a master plan or secures them by agreement; it does not assume that land can be taken.
Names. Some places, rivers, gauges and instruments have more than one name or spelling in statutes, sources and on IMD and CWC stations:
- Imphal (Tulihal) (A) (index 42623, rainfall data 1953–2012) is IMD's station at Imphal airport, the only Manipur station in IMD's tables of extremes. This Manual writes "Tulihal" only in the station's name. MASTEC's annual-maximum series headed "Imphal" is the same gauge for most values, as this Manual reads it;
- the Imphal river (Imphal Turel) runs south through Imphal and the valley; the river at the Ithai barrage and below it, which leaves the State for Myanmar, is the Manipur river. The sources draw the change of name at different points: the Loktak Act names "the confluence of Manipur river and Khuga", and CPCB lists a stretch of the Manipur river from Thoubal to the Ithai bridge. Ithai is also spelt Ethai;
- the Nambul is the river that runs through Imphal; the Nambol is a different river, and a town, in Bishnupur district;
- the Mapithel dam is the dam of the Thoubal Multipurpose Project, and the press uses both names;
- Chotebekra, also spelt Chotobekra, is CWC's only site in the State, on the Barak near Jiribam; it is printed under Imphal East district in a transcription of CWC's tables and lies in Jiribam district today, as this Manual reads it;
- Lamphelpat is also spelt Lamphelphet; the Shamushang nallah, its outlet to the Nambul, is Samushang in the High Court's order and Samusang in CPCB's list; and the Naga Nullah is also the Naga Nallah;
- the "Sugnu hump" is MASTEC's name for the rock sill on the Manipur river below Ithai, where the bed rises from 756.7 m to 763.7 m in about 800 m. It controls the outlet of the whole valley, whatever the barrage gates do;
- the Water Resources Department (WRD) was formerly the Irrigation and Flood Control Department (IFCD), and older audits and reports use the old name;
- CWC's flood estimation reports place the whole State in subzone 2(c), "Barak and others", whose rivers the subzone list of the report for subzone 2(b) gives as "Barak, Kalden and Manipur rivers"; "Kalden" is the Kaladan, as this Manual reads it. CWC never published a report for subzone 2(c). A strip in the north of Senapati district may touch subzone 2(b), South Brahmaputra, on that report's plate, as this Manual reads it, with low confidence [TBC]. These subzones are not the three rainfall zones (MN-Z1 to MN-Z3) and five hydrologic sub-areas (MN-A, MN-A1, MN-B, MN-C and MN-C1) that this Manual sets in Annex 2A, nor Zones 1 and 2 of a waterbody setback in Chapter 7, nor a "flood zone" under the Flood Plain Zoning Act, 1978, nor the Core Zone and Buffer Zone of Loktak under the Loktak Act;
- the Unified Bye-Laws 2024 are a model, and the bye-laws that grant a permit are those that each urban local body and PDA Manipur bring into force on it; the gazette spells the word "Bye-Laws", and this Manual writes "bye-law 93" for a provision. "MBBL 2016", in Chapters 1 and 10, is the national Model Building Bye-Laws of 2016, not the State's bye-laws;
- the Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification) is the master plan of Greater Imphal; an "Imphal Master Plan 2043" is this plan, not a separate document. The Risk Informed GIS Based Master Plans for Imphal and for Moirang (RIMP) are separate plans, which were not read;
- PDA Manipur is the Planning and Development Authority constituted under section 13 of the MTCP Act, and this Manual uses no other short form for it; no separate Act constitutes it;
- WRD's river levels, which this Manual has only as the press printed them, are in metres, and no source read states their datum [TBC]: for example, the Imphal river at Minuthong has a warning level of 785.900 m, a flood level of 786.900 m and a highest flood level of 788.400 m. This Manual names the gauge, the unit and the datum with every level; and
- in this Manual "the monsoon" and "the monsoon season" mean the wet season of 1 April to 31 October. That is not IMD's usage: IMD counts April and May as pre-monsoon months, and the south-west monsoon's normal onset at Imphal is 5 June (1 June before IMD's normals of 2020) and its normal withdrawal 15 October, as quoted from IMD's release. The Manual's season begins on 1 April because Imphal's April and May storms are among its largest, and two of the recent damaging valley floods came before the onset (Chapter 2).
This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:
- the Unified Bye-Laws 2024 are the Model Manipur Unified Building Bye-Laws, 2024, published by MAHUD Notification No. BBL-101/1/2024-MAHUD-MAHUD-Part(1) of 4 December 2024 (Manipur Gazette Extraordinary No. 253 of 5 December 2024) under section 213 of the Manipur Municipalities Act, 1994 (Act 43 of 1994) and section 26(1) of the Manipur Town and Country Planning Act, 1975 (Manipur Act 11 of 1975), "for adoption by the Urban Local Bodies and Planning & Development Authority, Manipur". They "shall extend to the Master Plan areas or notified Planning areas and area under the jurisdiction of all the Urban Local Bodies of Manipur" (bye-law 1(2)). Their recitals record that the bye-laws of eight urban local bodies were "based on Model Building Bye-laws of 1998" and that 18 had none. The Kumbi, Moirang and Jiribam Municipal Councils' bye-laws of 2025 were finally notified on 16 January 2025, as listed on TPD's site; a "Building Bye-laws for ULBs of Manipur – Final Gazette Notification" of 15 December 2025 is listed there but was not read [TBC]; and IMC's Building Bye-Laws, 2025 are reported to have been notified on the same date. Before them IMC had the IMC Building Bye-laws, 2013, amended in 2019 and 2022, and a draft third amendment of 2024 was published for objections, to "come into force on such date as the State Government may … appoint"; its final status was not confirmed [TBC]. This Manual cites the Model's provision numbers; where the bye-laws that a local body has notified differ, the local body's text governs. Bye-law 92 of the Model, as printed, forbids construction "on land above 600 m from the mean sea level and with an average slope of 30 degrees", which would bar all of Greater Imphal; this Manual reads it with the draft IMC text of 2024, which forbids building and cutting on slopes above 30° and allows at most two floors or 7 m on slopes of 21–30°;
- MAHUD makes the bye-laws and the zoning bye-laws and notifies the master plans. TPD, a department under MAHUD set up in 1965-66, prepares the master plans, including GIS master plans for 14 district headquarters "both valley and hills" with a horizon of 2042, checks building plans for land-use compatibility on the Online Building Permission System (OBPS), and is the nodal department for AMRUT. PDA Manipur was constituted under section 13 of the MTCP Act, in 1975 or 1976, as reported differently [TBC]; on its constitution the State's khas land within a master plan area vests in it. The Unified Zoning/Use Regulation Bye-laws for the Master Plan Areas of Manipur, 2026 (MAHUD Notification No. BBL-101/1/2024-MAHUD-MAHUD of 22 July 2026; Gazette Extraordinary No. 157 of 23 July 2026), made under section 91(1)(iv) read with section 24(e) of the MTCP Act, set the use zones of every Master Plan area, among them "Agriculture" and "Pond, Drain, Rivers and Canals";
- the Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification) was notified by No. SCS-401/3/2021-MAHUD-MAHUD-Part(3) of 4 December 2024 and covers 151.38 km² of Imphal East and Imphal West. It has no section on storm-water drainage. The Risk Informed GIS Based Master Plans for Imphal and Moirang are listed as finally notified on 17 January 2025, while TPD's annual report for 2025-26 says that their draft report "has been submitted"; the two statements conflict, and the plans, with any flood-risk areas they map, were not read [TBC];
- IMC is the municipal corporation of Imphal under the Manipur Municipalities Act, 1994, with 27 wards; it became a corporation in 2014 or 2016, as reported differently [TBC]. The State has 27 urban local bodies in all. The Greater Imphal planning area is wider than IMC's area, and PWD (roadside drains), WRD (rivers, bunds, flood channels, Lamphelpat and its pumping), PHED (sewers), DoECC (the interception of the drains that fall into the Nambul) and LDA hold drains or channels in it;
- the Loktak Act (Manipur Act 3 of 2006, Gazette Extraordinary No. 13(E), as amended by Acts 5 of 2007 and 8 of 2019) applies to "the whole of 236.21 Sq. km" of the lake, but not to the Keibul Lamjao National Park (40 km²) or the Takmu Fishery Farm (5 km²). Its Core Zone, of 70.30 km², is "the No-Development Zone or Totally Protected Zone"; the rest of the lake is the Buffer Zone, in which section 19 bans, among other things, the "Discharge of untreated wastes and effluents from industries, cities or towns and other human settlements" and "Land reclamation, bunding or disturbing the natural course of drainages". LDA administers it, with the Forest and Environment Department as nodal department. The Act does not reach the land upstream of the lake. The lake's area is also given as 246.72 km² with its swamps (MASTEC) and as 250 km² (as reported), and the three figures differ in what they count. Loktak was designated a Ramsar site on 23 March 1990 and placed on the Montreux Record on 16 June 1993, as reported;
- the Manipur Flood Plain Zoning Act, 1978 (Manipur Act 10 of 1978; Gazette Extraordinary No. 185 of 1 September 1978) provides for a Flood Zoning Authority, surveys of river plains, and zones delineated "with reference to relative risk". Only sections 1 to 7 were read, from the damaged text layer of a truncated copy [TBC]. No constitution of a Flood Zoning Authority and no zone notification was found, and the demarcation of flood zones in the State "is yet to be done", as reported in June 2026; this Manual treats no zone as notified;
- the paddy-land Act (Manipur Act 10 of 2014; Gazette Extraordinary No. 150 of 2 September 2014) allows paddy land and wetland to be converted only through the Local Level Monitoring Committees (led by the Sub-Divisional Officer), the District Level Committees and the State Level Committee, and counts "drainage channels, ponds, canals, bunds and ridges" as part of paddy land (section 2(c)). A Bill of 2026 to amend it, which would exempt land that conforms to a notified Master Plan, was introduced; its enactment was not confirmed, and this Manual does not cite it as law;
- the MSWA was set up on 31 January 2018. It has published draft notifications of three wetlands, Yaral Pat, Utra Pat and Waithou–Phumnom Pat; no final notification under Rule 4 of the Wetlands (Conservation and Management) Rules, 2017 was found;
- WRD holds the rivers, the river bunds and flood channels, Lamphelpat and the Shamushang pumping, and is named in this Manual as the State groundwater agency, although no State network of observation wells was found; the only network found is CGWB's, in its North Eastern Region. PHED builds and runs the Imphal sewerage project. PWD keeps the State's roads and their drains, including the 547 km of roads in Greater Imphal that the AIIB-assisted project is to rehabilitate. DoECC, under the Forest, Environment and Climate Change Department, runs the rejuvenation of the Nambul and acts as the secretariat of the MSWA. MPCB grants pollution consents;
- MSDMA is the State's disaster management authority; it was not researched for this Manual [TBC], and the flood situation reports quoted here are those of the Relief and Disaster Management Department, as reported. The District Disaster Management Authorities are written in full;
- the High Court of Manipur and the NGT have taken up the State's waters: the High Court's order of 16 June 2025 in PIL No. 8 of 2025 records WRD's inspection of the Lamphelpat works, and its special bench is reported to have barred development in or around Loktak without its leave (orders of 17 July 2019 and 25 February 2022, as reported; case number not found [TBC]); the State's reports in the NGT's case on solid waste and other environmental issues (OA 606 of 2018) record the sewage in Imphal's drains. This Manual cites court and tribunal orders with their status; and
- where a shared clause names a revenue subdivision, this Manual uses the sub-division. A district is headed by a Deputy Commissioner (DC). In the valley land records are kept under the Manipur Land Revenue and Land Reforms Act, 1960.
Where a shared clause calls for the local language on a sign, a form field or a basin name, this Manual writes "Manipuri". The Manipur Official Language Act, 1979 (Act 14 of 1979), as amended by the Manipur Official Language (Amendment) Act, 2021 (Act 7 of 2021; Gazette Extraordinary No. 427 of 10 March 2021), defines "Manipuri Language" as "Meeteilon written in Meetei Mayek", with "concurrent use of Bengali Script and Meetei Mayek … in addition to English language, for a period upto 10(ten) years from the date of commencement". English is the language of this Manual. So, as set by this Manual, signs and flood-depth markers are in Manipuri, written in Meetei Mayek, and English; in the hill areas, in English and the language in local use of the village or town, with Manipuri where the Authority so directs. The 1979 Act's provision on the hill areas was not read cleanly [TBC], and a sign must be readable by the people it warns. In Annex 7A the field WB_NAME_MNI holds a water body's name in Meetei Mayek; MNI is the code of this Manual for Manipuri, after its ISO 639 code, mni.
Some local words are used in the text, and are explained again where they first appear. This English edition writes them in Latin letters only; their Meetei Mayek forms are left to the Manipuri edition of this Manual.
- a pukhri (Manipuri: a pond; plural pukhris) is this Manual's word for a dug pond or a small body of standing water, such as the public ponds of the towns. Sharma's Learners' Manipuri-English Dictionary (2006, p. 117) gives "n. pond", with no other sense. Meeteilon marks the plural with suffixes, not with an ending of this kind, so the English plural "pukhris" is a convention of this Manual;
- a pat (Manipuri: a lake or wetland, as in Lamphelpat) is a natural lake, marsh or wetland of the valley, as in Lamphelpat, Utra Pat and Yaral Pat; the dictionary gives "n. lake" (p. 114), and CGWB notes "the places having the word PAT meaning lake". This Manual never calls a pat a pukhri, and calls engineered storage a detention pond, never a pukhri or a pat; Lamphelpat is a pat being developed as flood storage;
- a turel (also turen) is a river (p. 81), as in Imphal Turel, and a khong a stream (p. 54); the same word khong also means "a mine";
- a khongban (also khongbal) is "a ditch; a drainage" (p. 55). The word nala means both "a drain" and "a sewer" (p. 103), so this Manual writes "drain" and does not use nala alone;
- an ithong is a "floodgate; sluice gate" (p. 20), and a pan "a bund; embankment" (p. 111). The text keeps the English "sluice", "flap gate" and "bund"; and
- a phumdi is a floating mat of vegetation, organic debris and soil (p. 125, under phum), the "Phumdis" of the Loktak Act, which defines them as a "heterogeneous mixture of vegetation, organic debris and soil in floating condition". Phumdis can drift onto screens and outlets.
The pages given are those of the dictionary's online edition; only p. 117 was checked on the printed page, and the others are to be checked [TBC]. Words of the hill languages for streams, ponds and drains were not researched for this Manual [TBC].
Some abbreviations have more than one meaning:
- AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
- IMC is the Imphal Municipal Corporation. In other editions of this series and in some sources the same letters stand for other bodies; in this Manual IMC means only this one;
- DC is a Deputy Commissioner. The District Councils of the hill areas are written in full, and so is the Hill Areas Committee of the Legislative Assembly;
- "Unified Bye-Laws 2024" is the Model Manipur Unified Building Bye-Laws 2024, with the bye-laws that each local body has brought into force on it, and "MBBL 2016" the national Model Building Bye-Laws 2016. Neither is the building rule of any other State;
- HFL is the highest flood level recorded at a gauge, and WL and FL are the warning and flood levels that WRD sets at its river gauges. None is a design level. Bye-law 94 sets the plinth in "high Flood Risk Areas identified in the Master Plan of the towns" at "1m above the highest flood level of the surrounding areas"; no such level was found for any town, and in September 2025 the river stood above the printed HFL at Lilong and at Ithai, as reported. Chapters 5 and 7 say how this Manual finds a design level;
- FRL (full reservoir level) and MDDL (minimum draw-down level) are used for Loktak behind the Ithai barrage and for the reservoirs of the hills; for Loktak the sources give an FRL of 768.5 m and of 769.63 m, and an MDDL of 766.2 m and of 766.01 m, and the conflicts are stated where they matter; and
- I&D is the interception and diversion of drains to a treatment plant.
The sense is clear from the context.
Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.
Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.
Comments. Comments and corrections are welcome at info@neer.ai.
Preface
Manipur's towns flood, and fail, for three reasons. The Imphal valley showed the first on 28–31 May 2024, when the rains of Cyclone Remal breached the river bunds at 18 places and flooded Imphal from the Imphal river and the Nambul, as reported, and again from 30 May 2025, when the Nambul breached at four places and the Imphal river at Keirang, Khabam and Lairikyengbam Leikai, as reported; the hills show the second, because no CWC report covers any part of the State and no IDF relationship exists for any Manipur station, while 225 mm fell at Khoupum, in the western hills, in one night in July 2025, as reported; and Imphal shows the third every day, because its storm drains carry its sewage: the State told the NGT in December 2025 that the 72 drains that fall into the Nambul carry water with a biochemical oxygen demand (BOD) of 42.45–52.34 mg/L.
- A capital that drains into rivers and a lake higher than its drains, through bunds that fail. "The town is below the high flood level of Imphal river and hence there are embankment roads on both sides of the river to protect the settlement from seasonal floods", the master plan for Greater Imphal records. The Imphal river's highest flood level at Minuthong, 788.400 m as the press printed WRD's figure, lies within a metre or two of the city's ground, at about 790 m, as this Manual reads the two. The valley is a closed basin with one outlet: the Imphal, the Nambul, the Iril, the Kongba, the Thoubal and the other valley rivers run to Loktak and the pats round it, and leave the valley only past the Ithai barrage and the rock sill below it, the "Sugnu hump". The rivers entering the valley carry a few hundred cumec each in flood, while the outlet at Ithai carries "of the order of 400 cumecs", and the "river down below the barrage does not have the capacity to cope up with such flow, as a result, water is piled up upstream", as MASTEC found. So the valley floods from its bunds and from drains that cannot discharge: in July and August 1989, after Imphal's record day of 158.6 mm on 30 July, the rivers breached in 40 places, and floods reached 361 localities, 7 lakh people and 97,500 ha of paddy; in August 2002 there were 59 breaches; and on 15 September 2025 the Imphal river at Lilong and the Manipur river at Ithai stood at 783.250 m and 770.05 m, above their printed highest flood levels of 782.850 m and 769.320 m, as reported. Counts of those affected by the floods of May 2024 differ, at 1,88,143 people and 24,265 houses (the Minister, 30 May) and 1,26,950 people, 255 localities and 16,364 houses (the Relief and Disaster Management Department, 31 May), as reported. "The failure of river dikes causes waterlogging in the low-lying areas for several weeks", the AIIB found, and the Lamphelpat area "remains waterlogged for many days every year", as the NDB's summary records. No operating rule, closing level or pump capacity for any sluice or pumping station on the valley's bunds was found.
- Rainfall that no CWC report covers: modest in the valley, heavy in the western hills. The whole State is in CWC's subzone 2(c), for which no flood estimation report was ever published, so there is no CWC plate, ratio or synthetic unit hydrograph for any part of it. IMD's record at Imphal (Tulihal) is modest: 158.6 mm in 24 hours on 30 July 1989, in data from 1953 to 2012. MASTEC published Imphal's annual maximum daily falls for 1974 to 2000, and this Manual's own Gumbel fit of them gives about 157 mm in a day at 50 years; IMD's daily series for the station has not been fitted [TBC]. The reanalysis grids of NIH-DHAARA give Imphal a 50-year day of 231 mm, about 1.45 times the IMD record, and the western hills, which face the Barak, 306 mm at Noney, 431 mm at Tamenglong and 491 mm at Jiribam. IMD's national set of rainfall intensity curves (Das et al., 2022) has a panel for Imphal, but it repeats a curve printed for many other cities. No hourly maximum for any Manipur gauge was found, and the 225 mm of Khoupum came with no stated duration or gauge. The valley's floods are made by rain on the hills, which are 70% of its catchment, as MASTEC found, and WRD's rule of thumb, as reported, is that 135 mm in three days at Kangpokpi floods the valley.
- Storm drains that are the sewers. The first phase of the Imphal sewerage project, commissioned in June 2020, covers 11 of IMC's 27 wards; the State told the NGT in July 2025 that "Sewage generation in urban areas is 70 MLD and existing treatment facilities are 44 MLD", that 8,600–8,700 households were connected out of 51,754 targeted, and that the treated effluent's "Final mode of disposal" is "Agriculture canals". The rest of Greater Imphal, and every other town, uses septic tanks and soak pits whose overflow, with all the sullage, goes to the open drains, as this Manual reads the State's reports. The State's answer is the "Interception & Diversion (I & D) of all drains (72 Nos.) falling into the Nambul River", reported as completed in December 2025, with a drain BOD of 42.45–52.34 mg/L and a chemical oxygen demand (COD) of 78.56–97.23 mg/L, against 3–6 mg/L of BOD at the river stations: CPCB lists 18 polluted river stretches in Manipur, all in Priority V, among them the Nambul from Singda Dam to Bishnupur. The Naga Nullah, behind the main market, receives the market's solid waste, which "creates a stagnant pool all along the year", as the master plan records. In the hill areas "The existing reliance on septic tanks and twin soak pits … is appropriate", the State reported, and there is "minimal presence of underground drainage infrastructure".
Over all three lie four more. Pats and paddy lost to building: "there were nearly 500 lakes in Manipur Valley", MASTEC records, and the pats it names as degraded and disappearing include Lamphelpat, Porompat, Takyelpat, Sangaipat, Kharungpat and Ikop pat; "This valley was once full of swamps and marshy land represented by the places having the word PAT meaning lake", CGWB notes; and the master plan for Greater Imphal reduces its wetlands from 374.48 ha to 232.21 ha and its agricultural land from 5,616.53 ha to 2,604.70 ha by 2043, while its water bodies grow from 563.54 ha to 643.42 ha, and says that "new areas need to be unlocked as the paddy fields cannot be used for construction" under the paddy-land Act. Hill slopes of shale that slide when cut: the Disang shale "occupies almost 85 p.c. of the hilly region, have less infiltration and more run off", as MASTEC found; the landslide at Tupul, in Noney district, on 29 or 30 June 2022, at a construction site of the Jiribam–Imphal railway, killed 56, 58 or 61 people, as reported differently, and a published study attributes it to "poorly designed or implemented slope excavation coupled with heavy rainfall", as quoted in a summary of that study (Baruah et al., 2023); and the landslide at Joumol, in Chandel district, on 1 August 2015, killed 20 or 21 people, or 24 by ActionAid's count, as reported. A clay valley floor that will not take water: CGWB found "approximately 30 to 50 m of clayey formation" in Imphal West, with the water 2–5 m below the ground, and peaty organic soils round the lakes of Bishnupur. And bye-laws with a river-buffer table and a plinth rule but no design storm: bye-law 93 of the Unified Bye-Laws 2024 forbids new construction within a buffer of each named valley river, from 22.5 m to 62 m measured from mid-stream, and bye-law 94 sets the plinth 1 m above "the highest flood level of the surrounding areas" in the high flood risk areas of the master plans; bye-law 66 makes rainwater harvesting mandatory on plots of 100 m² and more; but no rule says what storm a drain or a store is designed for, what flood level a plinth is set above, or how fast a site may release its runoff.
Behind all of this lie Loktak, the pats and the pukhris, which set the level at the outfall and hold the water while the gates are shut. Loktak's statutory extent is 236.21 km², of which the Core Zone of 70.30 km² is closed to development; its level is held by the Ithai barrage, commissioned in 1983 by most accounts and in 1979 or 1986 by others, as reported, and the sources give its full level as 768.5 m (NHPC, as quoted) and as 769.63 m (as reported). Phumdis, the floating mats of the lake, can drift onto screens and outlets. The wetland atlas of the Space Applications Centre (2021) counts 132 wetlands larger than 2.25 ha in the State, and about 4,000 water bodies were listed after an order of the NGT, though their "Ground truthing, engineering surveys, and quality monitoring … are pending", as DoECC reported. Lamphelpat is being dredged over about 300 acres as flood storage, with "provision for pumping of flood water from the Lamphel pat water body to the Nambul River through Shamushang Nalla during high flood season", as WRD reported to the High Court; it is also proposed as a source of drinking water. About 90% of Imphal's drinking water comes from the Imphal, the Nambul and the Iril, as the master plan records, the same rivers that take its drains.
Design for Manipur therefore has to cover a wet season that begins with the storms of April and May, before the south-west monsoon reaches Imphal in about the first week of June, and that runs past its withdrawal in mid-October to storms such as that of 5 October 1980 at Imphal (119.4 mm) and the flood of October 1992; it is this Manual's monsoon season, 1 April to 31 October. Imphal's April and May records exceed 100 mm in a day, at 105.9 mm (16 April 2004) and 122.4 mm (27 May 1956), and the floods of 28–31 May 2024 and from 30 May 2025 struck before the onset. Large falls come outside the season too, as on 1 November 1991 (80.3 mm), 13 December 1966 (89.6 mm), 18 February 1993 (79.8 mm) and 24 March 1998 (72.9 mm) at Imphal, so design statistics use the annual maxima of every month. MASTEC gives Imphal a mean annual rainfall of 1,416.9 mm (1975–2000), and CGWB gives Imphal West 1,632.40 mm. There is no snow. Underground, every assessed unit of the State is safe, and the State draws 8.00% of its extractable groundwater (2024), as quoted; rainwater is worth storing for use, but on the clay of the valley floor it cannot be put into the ground.
National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:
- hold frequent rainfall on site, in tanks for use in the dry season, and in the ground only where the ground can safely take it;
- release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
- show that its outfall still works when the receiving river, pat, pukhri or Loktak is high, when the sluice in the river bund is shut and the town drains only by its pumps, when a dam upstream is releasing, or when a drain is choked with silt from the hills, phumdis or garbage.
The Manual also sets how public drains, roads and their drains, hill roads, streams, rivers and their bunds, sluices and pumped outfalls, pats and pukhris, and basin-wide master plans are designed, and how drains below the hills are protected against debris and silt, so that private sites and public works aim at the same standard.
The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Manipur's wet season of April to October, with its pre-monsoon storms; to a closed valley with one outlet past the Ithai barrage and the Sugnu hump, where the rivers run between bunds above the town and Loktak's level sets the tailwater of the south; to the Imphal, the Nambul, the Iril, the Kongba, the Thoubal and the other rivers of the valley, and to the release reach below the Mapithel dam; to the Barak and the Jiri at Jiribam; to the lacustrine clay and peat of the valley floor, the sand and gravel fans at the foot of the hills, the Disang shale of the hills and the sandstone cappings of the Barail ranges; to Loktak, the pats and the pukhris, and to the paddy land that stores the valley's floods; and to storm drains that carry sewage.
- National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes, including IRC:SP:42-2014 on hill roads, and the NDMA urban flood guidelines are also used.
- Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
- Design rainfall. No CWC report covers any part of the State, so every design rainfall value in Manipur is set by this Manual, by sub-area. In the Imphal valley the design day comes from a table that this Manual fits to MASTEC's annual-maximum series at Imphal, 1974–2000, until IMD's daily series is obtained and fitted. In the northern, eastern and southern hills it is the higher of NIH-DHAARA's value for the site and the valley table: the one sub-area where NIH-DHAARA is a design value. In the western hills and on the Jiribam plain it is not less than 320 mm at 2% AEP and 351 mm at 1% AEP, the floors of the Barak-valley rule of the adjoining edition of this series, so that one storm reads alike on both sides of the State's border. Shorter durations use interim ratios for Manipur that are never lower than those of the CWC report for subzone 2(a), and, on the Jiribam plain, the ratios of the report for subzone 2(b), as on the Barak plain downstream. The design day is checked against the largest reliable days recorded within 25 km, but only within the same domain, so that a valley gauge never sets a hill depth or the reverse. NIH-DHAARA is reported beside the design value elsewhere, for comparison only, and IMD's Imphal panel is not used.
- Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
- Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
- Local rules. The Unified Bye-Laws 2024, with the draft third amendment of IMC's bye-laws of 2024; the Unified Zoning/Use Regulation Bye-laws, 2026; the MTCP Act; the Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification); the Loktak Act and its amendments; the Flood Plain Zoning Act, 1978; the paddy-land Act and the amending Bill of 2026; the District Councils Act and its amendments of 2006 and 2008; the Manipur Official Language Act, 1979 and its amendment of 2021; the Wetlands (Conservation and Management) Rules, 2017; the High Court's order in PIL No. 8 of 2025; and the State's reports to the NGT in OA 606 of 2018. This Manual follows them or, where disclosed, makes them stricter. The bye-laws that the urban local bodies notified on 15 December 2025, the Risk Informed GIS Based Master Plans, sections 8 onward of the Flood Plain Zoning Act, the drainage sections of the Manipur Municipalities Act, 1994, the Manipur Village Authorities in Hill Areas Act, 1956, the State Action Plan on Climate Change and the CAG's report on flood control (Report No. 2 of 2017) were not read. Every rule cited must be checked against the current text.
Why this Manual is needed
India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.
The national documents leave key values open, or give different answers.
- Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 5–25 years for road drains and 10–50 years for culverts, by class of road and size of culvert. An engineer designing a drain in Manipur can cite 1, 2, 5, 10 or 25 years, depending on the code chosen.
- Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
- Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period. The State Action Plan on Climate Change was not read, and the figures for a future increase in rainfall that officials have given in the press differ from one another, so this Manual uses none of them. A study of Manipur's rainfall from 1991 to 2024 (Singh, 2025) found "a statistically significant downward trend in Total Annual Rainfall", while the valley floods of 2015, 2024 and 2025 are among the largest recorded, as reported; no trend in extreme rainfall was found.
- Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. Manipur lies wholly in a CWC subzone for which no report was ever published; IMD's 2022 national set of rainfall intensity curves has a panel for Imphal, but it repeats a curve printed for many other cities; and the reanalysis grids of NIH-DHAARA give depths in the valley about 1.3 to 1.5 times what Imphal's own series supports.
Manipur has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of MAHUD, TPD, PDA Manipur, IMC or any other urban local body, PWD, WRD or PHED that fixes a return period, a runoff coefficient or a design rainfall for town storm drains, and no IDF relationship with published constants for any station in the State; the Unified Bye-Laws 2024 defer to the National Building Code 2016 for services. The master plan for Greater Imphal has no section on storm-water drainage. The two live drainage projects state no design storm: the AIIB-assisted Manipur Urban Road, Drainage and Asset Management Improvement Project, which will build "547 km of both side stormwater covered drains" along the roads of Greater Imphal and records that "35% of the area" is "prone to floods", gives no return period, rainfall intensity or runoff coefficient in its project document of October 2024; and the NDB's summary of the Lamphelpat project of 2021, to "increase its water detention capacity, restore stormwater drainage system and channels / streams in the catchment area", gives none either. These are projects, not a State standard. This Manual is offered as a technical companion to the Unified Bye-Laws 2024 and the bye-laws of the local bodies, the zoning bye-laws and the master plans, the MTCP Act and the Municipalities Act, the Loktak Act, the paddy-land Act and the Flood Plain Zoning Act, 1978: it supplies the design storm, detention, water-level, tailwater and buffer values that they leave open. It has not been adopted by MAHUD, TPD, PDA Manipur, IMC, WRD, any District Council or any other body. In particular:
- The building rules require rainwater harvesting, but size nothing. Bye-law 66 makes "storing of water runoff including rainwater in all existing and new buildings on plots of 100 square metre and above" mandatory, asks plans to show "the system of storm water drainage along with points of collection of rain water in surface reservoirs or in recharge wells", and sets soft cover of 15% of the plot where the covered area is 500 m² or more and 10% otherwise; bye-law 68 rebates 10% of the permission fee for recycling with rainwater harvesting; and bye-law 6(1)(D) asks multi-storeyed, lifeline and special buildings for a "Detailed drainage plan for both internal and external required to be constructed up to the available permanent/pucca drain of municipal/other authority". None gives a storage volume, a release rate or a design storm; the only mention of runoff is a green-building criterion to "Minimize storm water run-off from site by reducing hard paving on site";
- The rules send grey water into clay. Bye-law 67 connects the excess grey water of larger buildings "to the rain water recharge structures for ground water recharge". On the valley floor, with 30–50 m of clay and the water 2–5 m below the ground, such a structure is a soak pit in clay. This Manual states the conflict and asks for storage or a sewer connection in its place; it does not override the bye-law;
- The river buffers are measured from mid-stream, and stop at the named rivers. Bye-law 93 forbids new construction within a buffer of each named reach: 55 m, 60 m and 62 m on the Imphal river, 50 m on the Iril, 48 m on the Thoubal, 35 m on the Sekmai and the Kongba, 31 m on the Wangjing, 30 m on the Nambul within Greater Imphal and on the Arong, 25 m on the Nambol and 22.5–28 m on the Merakhong, measured from mid-stream, or, on most reaches, 6 m from the outer toe of the bund where that is further. A 30 m buffer on a reach 40 m wide leaves 10 m from the bank, as this Manual reads it. Activity in a "prohibited" or "restricted" area needs the permission of a Flood Zoning Authority that was not found to have been constituted. The table leaves out the pats, the pukhris, the hill streams and the city's channels, and no setback from a pat or a pukhri was found; only Loktak has statutory zones;
- The floodplain law has no zones. The Flood Plain Zoning Act, 1978 defines a "flood zone" by the flow of "the maximum probable" flood, as far as the damaged copy shows, without a return period, and no zone has been demarcated. An eviction order along the river channels of Imphal in April 2025 cited "Section 24" of the Act, as reported; that section was not read. Bye-law 94 sets the plinth 1 m above "the highest flood level of the surrounding areas" only in the "high Flood Risk Areas identified in the Master Plan of the towns", which are in the risk-informed master plans that were not read, so this Manual cannot say where it applies. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7) as an input to any future zoning; it does not replace any zone that is notified, a line that a master plan draws or a court orders, and where such a line binds and is wider, it governs;
- The slope rules stop building, not water. Bye-law 92 of the Model, as printed, would bar all of Greater Imphal, and the draft IMC text of 2024 that gives its intended rule, no building or cutting above 30° and at most two floors or 7 m on slopes of 21–30°, was published for objections and its final status was not confirmed. No rule restricts soak pits, recharge pits or infiltration trenches on slopes or on shale, and in the hill areas no building rule applies at all; and
- No document sets the river or lake level for which an outfall is designed. CWC has one site in the State, on the Barak at Chotebekra, whose highest flood level of 32.1 m (31 July 1989) was found only in a transcription. WRD's warning, flood and highest flood levels on the valley rivers were found only as the press printed them, on no stated datum, and two of them conflict between years; Loktak's full level is given as 768.5 m and as 769.63 m. No inventory of the sluices, flap gates and pumping stations on the valley's bunds, and no rule for operating them, was found. Highest flood levels are records, not design levels.
So each agency and each local body interprets the central manual its own way. IMC and the other urban local bodies, PDA Manipur and TPD, PWD and the national-highway agencies, WRD, PHED, DoECC, LDA, Imphal Smart City Ltd, their consultants and funding agencies fill the gaps differently. No notification assigns the Naga Nullah, the Waisel Maril or the Shamushang nallah to one owner. A drain in Imphal may be IMC's municipal drain for part of its length and a PWD roadside drain for another, carry sewage that DoECC intercepts before the Nambul, pass through a gate in a WRD bund, and end in a pat being rebuilt as flood storage or in Loktak, under LDA. In the hill areas no building rule applies at all. And a reviewer has no common basis against which to check a design.
What this Manual does about it. It turns those open choices into one State standard:
- one source and method for design rainfall across the State, in three rainfall zones and five hydrologic sub-areas, with a checked station analysis to govern where one exists; the valley table from Imphal's own series in the Imphal valley and on the Loktak margin; NIH-DHAARA, never below the valley table, in the northern, eastern and southern hills; the Barak-valley floors in the western hills and on the Jiribam plain, where subzone 2(c) has no report; 72-hour depths for the valley's multi-day floods; and a check of the design day against the largest reliable days recorded nearby that never crosses the valley rim or a ridge (Chapter 2);
- named return periods for every drainage element (Chapters 2 and 6);
- a required pre- versus post-development rule for private sites, with the rainwater stores of bye-law 66 sized and credited (Chapter 4);
- a required tailwater check for every outfall against a design river or lake level, which treats a gate shut against a high river as the normal monsoon case in the valley: the gate closed for the whole of the 72-hour design storm and for as long after it as the river stays above the sill, and for not less than 7 days on the valley's main rivers and on the Barak where no stage record has been analysed; an outfall on the Loktak margin below the design lake level treated as closed from 1 June to 30 September; the receiving pat or pukhri full to its outlet level at the start; and the stored water pumped down within 48 hours (Chapter 5);
- a design flood line, and corridors and setbacks along rivers, streams and the city's channels and around pats and pukhris, proposed by this Manual for use where nothing wider binds, with a corridor at least 15 m from the top of bank, or from the landward toe of the bund on a bunded reach, on every natural channel draining 8 ha or more, and the buffers of bye-law 93, the zones of the Loktak Act and any notified flood zone wherever those are wider; and the flood storage lost when paddy land or wetland is converted replaced in the same basin (Chapter 7);
- no deliberate infiltration on the clay, silt and peat of the valley floor, below the 1% AEP flood level, inside a bunded area that ponds when its outfalls close, at the margins of pats and pukhris, within the extent of the Loktak Act or where the water table rises within 2 m of the surface; none on slopes steeper than 10° or on Disang shale at any slope without a geotechnical certificate; recharge only on tested ground at the foot of the hills; roof runoff to storage for the dry season, as bye-law 66 already requires, with its overflow to lined drains; and the interception and screening of dry-weather flow before every outfall to a pat, Loktak or a polluted river stretch, where drains carry sewage (Chapter 8);
- debris racks, silt traps where hill streams reach the valley floor, allowances for sediment and blockage, screens against phumdis and garbage, and sluices, flap gates and pumps designed for the river's high stage (Chapters 6 and 9), with drains, inlets, screens, gates and pumps cleared, tested and certified ready by 31 March, before the April storms, cleared again by 15 May, before the late-May storms that flooded the valley in 2024 and 2025, and by 15 November after the season, and standby kept from 1 April to 31 October (Chapter 10); and
- basin-wide master plans, so that the agencies that share a basin, from the hills to the valley floor and Loktak, plan together (Chapter 11).
It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). An urban local body in its bye-laws, MAHUD in the Model, TPD and PDA Manipur in a master plan, or a District Council in a matter entrusted to it can still adopt a stricter standard (Chapter 1).
Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 cl. 7.1.4 and 8.5.1; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Model Manipur Unified Building Bye-Laws, 2024, MAHUD Notification No. BBL-101/1/2024-MAHUD-MAHUD-Part(1) of 4 December 2024 (Manipur Gazette Extraordinary No. 253, 5 December 2024), bye-laws 1(2), 2(2), 6(1)(D), 16, 28, 66–68 and 92–94; Imphal Municipal Corporation Building Bye-Laws (3rd Amendment), 2024, draft text; Unified Zoning/Use Regulation Bye-laws for the Master Plan Areas of Manipur, 2026, MAHUD Notification No. BBL-101/1/2024-MAHUD-MAHUD of 22 July 2026 (Gazette Extraordinary No. 157, 23 July 2026); Manipur Town and Country Planning Act, 1975 (Manipur Act 11 of 1975), ss. 1, 2, 13, 22 and 26; Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification), No. SCS-401/3/2021-MAHUD-MAHUD-Part(3) of 4 December 2024; Manipur Loktak Lake (Protection) Act, 2006 (Manipur Act 3 of 2006), ss. 1–4, 19, 20 and 35, as amended by Acts 5 of 2007 and 8 of 2019; Manipur Flood Plain Zoning Act, 1978 (Manipur Act 10 of 1978), ss. 1–7; Manipur Conservation of Paddy Land and Wetland Act, 2014 (Manipur Act 10 of 2014), ss. 2, 3, 4, 12 and 18, and Bill No. 6 of 2026; Manipur (Hill Areas) District Councils Act, 1971, ss. 29, 44A and 52, with the (Second Amendment) Act, 2006 (Manipur Act 10 of 2006) and the (Third Amendment) Act, 2008 (Manipur Act 7 of 2008); Manipur Official Language Act, 1979 (Act 14 of 1979) and the (Amendment) Act, 2021 (Act 7 of 2021); High Court of Manipur, PIL No. 8 of 2025, order of 16 June 2025, with WRD's inspection report; NGT, OA 606/2018, Government of Manipur, updated report (July 2025) and sixth six-monthly report (December 2025); CPCB, Polluted River Stretches for Restoration of Water Quality (2025); DoECC, Administrative Report 2025-26; Town Planning Department, Annual Administrative Report 2025-26; AIIB, Approval Project Document (October 2024) and Project Summary Information (29 November 2024), Manipur Urban Road, Drainage and Asset Management Improvement Project (P000723); NDB, Project Summary, Lamphelpat Waterbody Rejuvenation Project (2021); MASTEC, Flood Hazard Zonation in Manipur Valley, final report (data to 2001); CGWB, Ground Water Information Booklets, Imphal West and Bishnupur districts (2013); CWC, Flood Estimation Report for South Brahmaputra subzone 2(b) (Revised), No. SB-2(b)/R-4/44/99 (March 2000), Annexure 1.1, Table 4.1 and Plate 9, and Flood Estimation Report for North Brahmaputra subzone 2(a) (NB/18/1991); IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (queried 14 November 2026); H. Surmangol Sharma, Learners' Manipuri-English Dictionary (2006); M. Singh (2025), NEHU Journal; CWC levels as transcribed by SANDRP (2018); reports of the floods of 1989, 2002, 2015, 2024 and 2025, of the landslides at Joumol and Tupul, of the WRD river levels, of the District Councils, of the Flood Plain Zoning Act and of Loktak (press and secondary sources).
How to use this Manual
Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.
Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.
Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.
Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.
Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.
Where to start.
| If you are… | Read first |
|---|---|
| A developer or architect | Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit) |
| A design engineer | Chapters 2–6, then 8 and 9 |
| A local body or approving authority | Chapters 1, 10 and 11 |
| A planner or waterbody manager | Chapters 7 and 11 |
Contents
List of tables
List of figures
Abbreviations
| Abbreviation | Meaning |
|---|---|
| ABC Waters | Active, Beautiful, Clean Waters (PUB Singapore's design guidelines) |
| AEP | Annual exceedance probability |
| AGU | American Geophysical Union |
| AIDR | Australian Institute for Disaster Resilience |
| AIIB | Asian Infrastructure Investment Bank |
| AMC | Antecedent moisture condition |
| AMRUT | Atal Mission for Rejuvenation and Urban Transformation |
| APD | Approval project document (AIIB) |
| APWA | American Public Works Association |
| ARF | Areal reduction factor |
| ASABE | American Society of Agricultural and Biological Engineers |
| ASTM | ASTM International (standards) |
| AWS | Automatic weather station |
| BMP | Best management practice |
| BOD | Biochemical oxygen demand |
| BRE | Building Research Establishment (UK) |
| BSMP | Basin Stormwater Master Plan |
| CAG | Comptroller and Auditor General of India |
| CEA | Central Electricity Authority |
| CGP | Construction General Permit (US EPA) |
| CGWB | Central Ground Water Board |
| CIP | Capital Improvement Programme |
| CN | Curve number (SCS/NRCS method) |
| COD | Chemical oxygen demand |
| CPCB | Central Pollution Control Board |
| CPHEEO | Central Public Health and Environmental Engineering Organisation |
| CSE | Centre for Science and Environment |
| CWC | Central Water Commission |
| DC | Deputy Commissioner |
| DEM | Digital elevation model |
| DoECC | Directorate of Environment and Climate Change, Manipur |
| DPR | Detailed project report |
| DSAL | Digital South Asia Library (the online edition of the Manipuri dictionary cited) |
| DST-NRDMS | Natural Resources Data Management System of the Department of Science and Technology |
| DWF | Dry-weather flow |
| EN | European Standard (Norme Européenne) |
| EPD | Environmental Protection Division (Georgia, United States) |
| ESC | Erosion and sediment control |
| EV1 | Extreme value type I (Gumbel) distribution |
| FER | Flood Estimation Report (CWC) |
| FL / WL | Flood level / warning level (at WRD's river gauges) |
| FRL / MWL / MDDL | Full reservoir level / maximum water level / minimum draw-down level |
| FRP | Fibre-reinforced plastic |
| GIS | Geographic information system |
| GWRA | Ground water resource assessment (CGWB) |
| HAT / MHWS | Highest astronomical tide / mean high water springs (coastal terms; not applicable in Manipur) |
| HC | High Court of Manipur |
| HFL | High flood level (the highest level recorded at a gauge) |
| HGL | Hydraulic grade line |
| HSG | Hydrologic soil group |
| HY-8 | FHWA's culvert hydraulic analysis program |
| I&D | Interception and diversion (of drains to a treatment plant) |
| IDF | Intensity–duration–frequency |
| IEE | Initial environmental examination |
| IFCD | Irrigation and Flood Control Department (the former name of WRD) |
| IIT | Indian Institute of Technology |
| IMC | Imphal Municipal Corporation |
| IMD | India Meteorological Department |
| IMDAA | Indian Monsoon Data Assimilation and Analysis (a regional reanalysis) |
| IRC | Indian Roads Congress |
| IS | Indian Standard (Bureau of Indian Standards) |
| ISO | International Organization for Standardization |
| IST | Indian Standard Time |
| JICA | Japan International Cooperation Agency |
| KC | Kansas City (Kansas City Metro APWA Section 5600) |
| LDA | Loktak Development Authority |
| LiDAR | Light detection and ranging (laser survey) |
| MAHUD | Municipal Administration, Housing and Urban Development Department, Manipur |
| MASTEC | Manipur Science and Technology Council |
| MBBL 2016 | Model Building Bye-Laws 2016 (MoHUA; not the State's bye-laws) |
| MLD | Million litres a day |
| MoEF&CC | Ministry of Environment, Forest and Climate Change |
| MoHUA | Ministry of Housing and Urban Affairs |
| MPCB | Manipur Pollution Control Board |
| MSDMA | Manipur State Disaster Management Authority |
| MSWA | Manipur State Wetlands Authority |
| MTCP Act | The Manipur Town and Country Planning Act, 1975 |
| MW | Megawatt |
| NDB | New Development Bank |
| NDMA | National Disaster Management Authority |
| NGT | National Green Tribunal |
| NH | National Highway |
| NHPC | NHPC Ltd (operator of the Loktak hydroelectric project and the Ithai barrage) |
| NIH | National Institute of Hydrology, Roorkee |
| NIT | National Institute of Technology |
| NOC | No-objection certificate |
| NPDES | National Pollutant Discharge Elimination System (United States) |
| NRSC | National Remote Sensing Centre |
| NWIA | National Wetland Inventory and Assessment (ISRO) |
| OA | Original Application (NGT) |
| OBPS | Online Building Permission System |
| OCR | Optical character recognition (the text layer of a scanned document) |
| OGC | Open Geospatial Consortium |
| ORF | Observer Research Foundation |
| PDA Manipur | Planning and Development Authority, Manipur (section 13 of the MTCP Act) |
| PHED | Public Health Engineering Department |
| PIL | Public interest litigation |
| PSD | Permissible site discharge |
| PWD | Public Works Department, Manipur |
| RDSO | Research Designs and Standards Organisation (Railways) |
| RIMP | Risk Informed GIS Based Master Plan (for Imphal and for Moirang) |
| RMSE | Root-mean-square error |
| RRV | Required retention volume |
| RWH | Rainwater harvesting |
| SAC | Space Applications Centre, Indian Space Research Organisation |
| SANDRP | South Asia Network on Dams, Rivers and People |
| SH | State highway |
| SLA | Sea-level allowance (coastal term; not applicable in Manipur) |
| SRRG | Self-recording rain gauge |
| STP | Sewage treatment plant |
| SUH | Synthetic unit hydrograph (CWC) |
| TBC | To be confirmed: a fact or value not yet found in a source |
| TCPO | Town and Country Planning Organisation (MoHUA) |
| TPD | Town Planning Department, Manipur (under MAHUD) |
| TR-55 | Technical Release 55 (USDA SCS/NRCS) |
| UH | Unit hydrograph |
| ULB | Urban local body (in Manipur, IMC, a Municipal Council or a Nagar Panchayat) |
| Unified Bye-Laws 2024 | The Model Manipur Unified Building Bye-Laws 2024, with the bye-laws that each ULB and PDA Manipur bring into force on it |
| USACE | US Army Corps of Engineers |
| USD | United States dollar |
| UT | Union Territory |
| UTM | Universal Transverse Mercator |
| VR | Value rating (of a BMP treating the WQv) |
| WAPCOS | WAPCOS Ltd (the monitoring consultant for the Lamphelpat works) |
| WQv | Water quality volume |
| WRD | Water Resources Department, Manipur |
| WSUD | Water-sensitive urban design |