Draft v1.0 prepared by NEER. Not adopted by the Government of Manipur, any District Council, authority or local body, and has no legal force. About this draft

Chapter 7Waterbodies, Pats and Pukhris (Lakes and Ponds) and Setbacks


7.1 Purpose and scope

7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:

  • (a) identifying and mapping every waterbody that a development or public work affects;
  • (b) the setback zones around waterbodies, and the uses allowed in each zone;
  • (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
  • (d) counting tank (pukhri) storage, including tank cascades, as design storage;
  • (e) restoring and desilting tanks and ponds;
  • (f) protecting supply channels, surplus courses, inlets and outlets;
  • (g) wetlands, marshes and estuaries, which in Manipur, a landlocked State, means Loktak, a Ramsar site (as reported), with its phumdi, within the 236.21 km² of the Manipur Loktak Lake (Protection) Act, 2006, the other pats of the valley, among them Lamphelpat, Utra Pat, Yaral Pat, Waithou–Phumnom Pat, Pumlen–Khoidum Pat and Ikop–Kharung Pat, and the wetland of Khonghampat, the marshes, swamps and waterlogged land of the valley floor, the wetlands of the Manipur Conservation of Paddy Land and Wetland Act, 2014, the land ponded behind river bunds when their sluices close, the hill wetlands among the Manipur State Wetlands Authority's priority wetlands, Jaimeng in Kangpokpi district and Kachouphung (Achau Maki) in Kamjong district, and any wetland notified under the 2017 Rules (the drafts published for the Yaral, Utra and Waithou–Phumnom pats are not final);
  • (h) the interface with encroachment and its removal;
  • (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
  • (j) the safety of tank bunds and other embankments.

7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:

  • (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
  • (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
  • (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.

7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Manipur Municipalities Act, 1994 and the Manipur Town and Country Planning Act, 1975, the building bye-laws that each urban local body and PDA Manipur bring into force on the Model Manipur Unified Building Bye-Laws, 2024, the Unified Zoning/Use Regulation Bye-laws for the Master Plan Areas of Manipur, 2026 and the master plans, the Manipur Loktak Lake (Protection) Act, 2006, the Manipur Conservation of Paddy Land and Wetland Act, 2014, the Manipur Flood Plain Zoning Act, 1978, the Manipur (Hill Areas) District Councils Act, 1971, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.

Commentary. Manipur protects its waterbodies through its building bye-laws, a lake Act, a paddy-land and wetland Act, its master plans and the wetland rules, with the courts behind them; it has had a floodplain zoning Act since 1978, but no zone has been drawn under it. The Model Manipur Unified Building Bye-Laws, 2024, published by MAHUD Notification No. BBL-101/1/2024-MAHUD-MAHUD-Part(1) of 4 December 2024 (Manipur Gazette Extraordinary No. 253 of 5 December 2024) under section 213 of the Manipur Municipalities Act, 1994 (Act 43 of 1994) and section 26(1) of the Manipur Town and Country Planning Act, 1975 (Manipur Act 11 of 1975), "for adoption by the Urban Local Bodies and Planning & Development Authority, Manipur", extend to "the Master Plan areas or notified Planning areas and area under the jurisdiction of all the Urban Local Bodies of Manipur" (bye-law 1(2)); a permit is given under the bye-laws that the urban local body or PDA Manipur has brought into force on the Model, such as the Kumbi, Moirang and Jiribam Municipal Councils' bye-laws of 2025 (final gazette of 16 January 2025, as listed on the Town Planning Department's site) and the "Building Bye-laws for ULBs of Manipur – Final Gazette Notification" of 15 December 2025 (as listed; not read). The provision numbers in this chapter are the Model's [TBC: confirm the number and text in the bye-laws the local body has notified], and where a local body's notified text differs, its text governs. Bye-law 93 of the Model prohibits "any new construction within the designated buffer zone" along ten named rivers, measured from mid-stream, and routes any activity "within the prohibited area or restricted area" to "the previous permission of the Flood Zoning Authority constituted under the Flood Plain Zoning Act, 1978"; bye-law 94 sets the plinth "above 1m above the highest flood level of the surrounding areas" in "high Flood Risk Areas identified in the Master Plan of the towns"; and bye-law 16 bars building "over any municipal drain or land" (Clause 7.4, Disclosure). The draft IMC Building Bye-Laws (3rd Amendment), 2024 repeat the river table (93.1) and tie the plinth rule to the Risk-Informed GIS-Based Master Plan for Greater Imphal (93.2); the draft was published for objections, and its final status was not confirmed [TBC]. The Unified Zoning/Use Regulation Bye-laws for the Master Plan Areas of Manipur, 2026 (MAHUD, 22 July 2026; Gazette Extraordinary No. 157 of 23 July 2026) have a use zone "Pond, Drain, Rivers and Canals" in every master-plan area. The Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification) (No. SCS-401/3/2021-MAHUD-MAHUD-Part(3) of 4 December 2024; 151.38 km²) has no storm-water drainage section, records that "The town is below the high flood level of Imphal river and hence there are embankment roads on both sides of the river", and plans for wetlands to shrink from 374.48 ha to 232.21 ha and agricultural land from 5,616.53 ha to 2,604.70 ha by 2043, while water bodies grow from 563.54 ha to 643.42 ha, because the wetlands "are now earmarked by the government for the construction of water bodies for an area of approximately 500 hectares". The Manipur Loktak Lake (Protection) Act, 2006 (Manipur Act 3 of 2006, as amended by Acts 5 of 2007 and 8 of 2019) applies to "the whole of 236.21 Sq. km" of the lake, except the Keibul Lamjao National Park (40 km²) and the Takmu Fishery Farm (5 km²) (s.1(3)), makes its Core Zone of 70.30 km² "the No-Development Zone or Totally Protected Zone" (s.3), forbids any part of the lake to be sold, leased, transferred "or converted in any form whatsoever" (s.4), and gives the Loktak Development Authority the duty "to administer the affairs of the Loktak Lake and to protect and improve the natural environment of lake" (s.17). The Manipur Conservation of Paddy Land and Wetland Act, 2014 (Manipur Act 10 of 2014) allows paddy land, with "its allied constructions like drainage channels, ponds, canals, bunds and ridges" (s.2(c)), and wetland to be converted only through its Local, District and State Level Committees, and bars any licence "for carrying out any activity or construction in a paddy land, converted or reclaimed in contravention" of it (s.12); it extends to the areas of the Manipur Land Revenue and Land Reforms Act, 1960, and so not to the hill areas (NEER reading); a (Third Amendment) Bill, 2026 that would exempt land conforming to a master plan was introduced, and is not law [TBC: enactment not confirmed]. The Manipur Flood Plain Zoning Act, 1978 (Manipur Act 10 of 1978) provides for flood zones by "relative risk", but no zone has been demarcated ("yet to be done", as reported in June 2026) and no Flood Zoning Authority was found constituted (Clause 7.3, Commentary). Wetlands are the concern of the Manipur State Wetlands Authority (Clause 7.12, Commentary). In the hill areas none of the building bye-laws, the Municipalities Act or the paddy-land Act applies, and the Manipur (Hill Areas) District Councils Act, 1971 gives the District Councils water supply and sanitation schemes, embankments and land allotment but no building control (s.29(1)); who is the competent authority for the area there is set out in Chapter 1. In this chapter WRD means the Water Resources Department, formerly the Irrigation and Flood Control Department, which holds the river bunds, flood channels and sluices of the valley, is developing Lamphelpat as flood storage with the Shamushang pumping to the Nambul, and publishes the levels of the valley's river gauges. A pat or pukhri has no gate of its own unless it drains through WRD's works, so WRD is the custodian this chapter names where a clause speaks of levels, a datum, freeboard or an operating rule; the level of Loktak is held by NHPC's Ithai barrage and the lake is the Loktak Development Authority's, and these and the other custodians are recorded one by one in the inventory (Annex 7A).

This Manual treats every recorded waterbody as drainage infrastructure. Six features set Manipur apart. The first is the closed valley with one outlet: every river of the Imphal valley, the Imphal, the Iril, the Thoubal, the Nambul, the Kongba, the Sekmai, the Khuga and the rest, runs to Loktak and leaves the valley as the Manipur river past the Ithai barrage and a rock sill below it, the "Sugnu hump", where the bed rises from 756.7 m to 763.7 m in about 800 m (MASTEC). The rivers are held in by river bunds (pan, the Manipuri word for a bund or embankment), and Imphal drains through sluices (ithong, a sluice gate or floodgate) that close when the river is high, so the outfall is normally shut in the monsoon (Chapter 5). The second is Loktak, 236.21 km² under its Act, with its Core Zone and Buffer Zone and its phumdi, the floating mats that the Act defines as a "heterogeneous mixture of vegetation, organic debris and soil in floating condition"; it is a Ramsar site, designated on 23 March 1990 and placed on the Montreux Record on 16 June 1993 (both as reported). The third is the pats (pat, the Manipuri word for a lake or wetland, as in Lamphelpat), the valley's natural storage: "there were nearly 500 lakes in Manipur Valley", among them Lamphelpat, Porompat, Takyelpat, Sangaipat, Kharungpat and Ikop pat, many degraded or gone (MASTEC), and the valley "was once full of swamps and marshy land represented by the places having the word PAT meaning lake" (CGWB, 2013); Lamphelpat is now a pat being developed as flood storage, with a pumped outlet to the Nambul. The fourth is the pukhris (pukhri, the Manipuri word for a pond; plural pukhris), the ponds of the towns and villages, among them the public ponds of the 20 water-body rejuvenation projects of AMRUT 2.0 (TPD, 2025-26), which this Manual keeps apart from the pats. The fifth is paddy land, which on the valley floor is flood storage: the flood of 1989 lay on 97,500 ha of paddy (MASTEC), and the land behind the bunds stores the town's runoff while the sluices are shut. The sixth is the hill streams (khong, a stream), which leave the hills that make up 70% of the valley's catchment (MASTEC) and "flow down with steep slope for a short distance before meeting the Loktak Lake … load carrying capacity is high which causes siltation of the lake" (MASTEC). Manipur has no irrigation tank cascades; the tank clauses of this chapter apply to pukhris, to pats that drain through a channel or a sluice, to the reservoirs, and to Loktak as held by the barrage, and storage built under this Manual is a "detention pond", never a pukhri or a pat. Because the storm drains are also the sewers (Clause 8.9, Commentary), most pats and pukhris in the towns receive sewage. This chapter gives the design rules that protect the storage and conveyance of these waterbodies. It does not replace the bye-laws, the Loktak Act, the paddy-land and wetland Act, the master plans and the wetland procedures that record and protect them, or the directions of the High Court of Manipur, the National Green Tribunal and the Supreme Court.


7.2 Definitions

Term Meaning in this Manual
Waterbody A river (turel, a river), such as the Imphal, the Iril, the Thoubal, the Nambul, the Kongba, the Sekmai, the Wangjing, the Nambol, the Khuga and the Chakpi, which run to Loktak or to the Manipur river, by which the valley drains past the Ithai barrage, and, in the west, the Barak, the Jiri, the Makru, the Irang, the Leimatak and the Tuivai; hill stream (khong, a stream), which brings water, silt and debris from the hills that ring the valley; city channel, such as the Naga Nullah, the Waisel Maril and the Shamushang nallah in Imphal; pat (a natural lake or wetland), such as Loktak, Lamphelpat, Utra Pat, Yaral Pat, Waithou–Phumnom Pat, Pumlen–Khoidum Pat and Ikop–Kharung Pat, and the wetland of Khonghampat; pukhri (a pond), dug or small standing water, such as the public ponds of the towns; the floating mats of vegetation (phumdi) of Loktak and the pats; paddy land, with its drainage channels, ponds, bunds and ridges; the land ponded behind a river bund (pan) when its sluice (ithong) is closed; reservoir, such as the Thoubal (Mapithel) and Khuga reservoirs, with its drawdown zone; spring; retention pond or basin built for flood storage; supply channel or surplus course, perennial or seasonal (as in Chapter 1).
Tank (pukhri) A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices.
Tank cascade A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3).
Full tank level (FTL) The crest level of the surplus weir (overflow, outlet or spillway, or the control at the head of the channel or sluice (ithong) by which a pat drains) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling.
Maximum water level (MWL) The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the Water Resources Department and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4).
Top bund level (TBL) The crest level of the tank bund.
Waterspread The area of a tank submerged at FTL.
Foreshore The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage.
Supply channel (feeder stream (khong), channel or drain) A channel that brings water from a river, anicut or upstream tank into a tank.
Surplus course The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea.
Sluice (sluice (ithong), regulator or flap gate, including a sluice through a river bund (pan)) A controlled outlet through a tank bund, usually to an irrigation channel.
Top of bank For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow.
1% AEP flood extent The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4.
Floodway The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL.
Flood fringe The part of the 1% AEP flood extent outside the floodway.
Zone 1 (waterbody protection zone) The inner setback zone defined in Clause 7.4.3.
Zone 2 (flood fringe setback) The outer setback zone defined in Clause 7.4.4.
Setback Zone 1 and Zone 2 together.
Compensatory storage Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4.
Flood cushion Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8).

Manipur terms. The following terms are used in this chapter in addition to those above (see also Annex 7E). Manipuri terms are given in Latin transliteration; their forms in Meetei Mayek belong to the Manipuri edition of this Manual.

Term Meaning in this Manual
Pat A natural lake or wetland: pāt, "n. lake" (Sharma, Learners' Manipuri-English Dictionary, 2006, p. 114), the word in the names of Lamphelpat, Utra Pat, Yaral Pat and the other pats of the valley. First used in this Manual as "pat (Manipuri: a lake or wetland, as in Lamphelpat)". A pat that drains through a channel, a sluice or a pumped outlet is a tank under Clause 7.2: its FTL is the crest or sill of that outlet, found by survey, and its MWL is set under Clause 7.2 with the outfall closed where Clause 5.8.5 so requires. A pat with no outlet is a wetland under Clause 7.12. Lamphelpat is a pat being developed as flood storage, not a detention pond. A natural lake or wetland is never called a pukhri, and storage built under this Manual is never called a pat.
Pukhri A pond: pukhri, "n. pond" (Sharma, 2006, p. 117, checked on the printed page), with no other sense; it names dug or small standing water. First used in this Manual as "pukhri (Manipuri: a pond; plural pukhris)". Meeteilon marks the plural with suffixes, so the English plural "pukhris" is a convention of this Manual. A pukhri with an outlet pipe, sluice or overflow is a tank under Clause 7.2, and its FTL is the crest of that outlet or overflow, found by survey; a pukhri with no outlet has its FTL at the level at which it would spill to the ground around it, found by survey. Engineered storage built under this Manual is a "detention pond", never a pukhri.
Turel; khong; city channel A turel is a river (turen, "n. a river … Variant: turel", Sharma, 2006, p. 81), as in "Imphal Turel"; a khong is a stream (Sharma, 2006, p. 54, where the same word also means "mine"), and in this Manual always a hill stream or a natural stream of the valley; a city channel is a natural or former stream of a town, lined, narrowed or built along, such as the Naga Nullah, the Waisel Maril and the Shamushang nallah in Imphal. Every river, khong or city channel that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whatever its name and whether it is lined, piped or covered. A hill stream carries silt and debris in flood: its inlets and culverts take the racks, bulking and blockage of Clause 6.3.6(f) to (h), and where it reaches the valley floor it passes a silt trap (Clause 6.3.6(m)). These readings are set by this Manual.
River bund (pan); sluice (ithong) A river bund is a flood embankment along a river, pan, "a bund; embankment" (Sharma, 2006, p. 111), such as the bunds that hold the Imphal, the Nambul and the Iril through Imphal and carry its embankment roads. A sluice is a gated outlet through a bund, ithong, "floodgate; sluice gate" (Sharma, 2006, p. 20), with or without a flap gate. No Manipur statute on embankments was found (NEER reading): WRD holds the bunds and sluices as owner, and no one other than WRD, or a body acting under its written consent, opens, shuts or alters a sluice or cuts a bund under this Manual.
Phumdi; athaphum Phumdi are the floating mats of Loktak and the pats: "'Phumdis' means heterogeneous mixture of vegetation, organic debris and soil in floating condition", and "'Athaphum' mean long strip of Phumdis in circular shape in floating condition, planted or cultured artificially for catching fish" (Manipur Loktak Lake (Protection) Act, 2006, s.2). Phumdi block outlets, screens and channels (Chapter 9); no outfall, screen or channel is designed on the assumption that they are absent, and no phumdi or athaphum is removed, planted or moved under this Manual within the lake except as the Act and the Loktak Development Authority allow.
Ponded area behind a river bund The land inside a river-bunded area that is flooded when its sluices are closed, up to the level reached in the outfall-closed case of Clause 5.8.5(a) for the 1% AEP storm. It is recorded in the inventory (Annex 7A), and that level is part of the 1% AEP flood extent of Clause 7.3.4; Zone 1 applies to the pats, pukhris and channels within it, not to the ponded area as a whole. This definition is set by this Manual.
Valley paddy land and wetland as flood storage On the Imphal valley floor (sub-areas MN-A and MN-A1 of Annex 2A), paddy land and wetland as section 2 of the Manipur Conservation of Paddy Land and Wetland Act, 2014 defines them, with their "drainage channels, ponds, canals, bunds and ridges" (s.2(c)), and every former pat, are flood storage for this Manual. Where such land is filled or built on, the storage lost below the 1% AEP flood level, or below the level of the ponded area behind a river bund in the outfall-closed case of Clause 5.8.5(a) where that is higher, is replaced as compensatory storage under Clause 7.6.4: volume for volume in each band of not more than 0.3 m, in the same sub-catchment and draining to the same river, pat or pumped outfall, built before or with the fill, and secured by covenant. Where the land drains to a pumped outfall, the replacement drains by gravity to the ponded area that the pumps serve, and the "no pumping" of Clause 7.6.4(d) applies between the replacement and that area. The replacement is not counted as detention (Clause 7.6.5), and it does not make a conversion lawful: the approval of the committees under the 2014 Act is still needed, and no local authority may licence construction on land converted in contravention of it (s.12). This rule is set by this Manual.
Loktak zones The Core Zone, of 70.30 km², is "the No-Development Zone or Totally Protected Zone", and the Buffer Zone is "the remaining area of the lake excluding Core Zone area" (Manipur Loktak Lake (Protection) Act, 2006, s.3), within the 236.21 km² of section 1(3). Their boundaries are recorded in the inventory (Annex 7A) as the Act and its Rules draw them (the Rules were not read [TBC]); the Act does not reach the rivers and land upstream of that area (NEER reading).
Recorded waterbody A pat, pukhri, river, khong, city channel, marsh, reservoir or ponded area shown in any source of Clause 7.3.3(a): a land record, the inventory of about 4,000 water bodies made after the National Green Tribunal's order in M.A. 26/2019, the Wetland Atlas (2021), a delineation or draft notification of the Manipur State Wetlands Authority, a master-plan map, the Loktak Act, WRD's records or a town's drain register. A recorded waterbody is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual.
Boundary of a pat or pukhri For this Manual, the boundary of a pat or pukhri under Clauses 7.3.3 and 7.13.1 is the largest of its boundary in the land records, inventory or notification, its surveyed FTL, and the outer edge of its water in the season of 1 April to 31 October shown by dated imagery or survey of recent years. For Loktak it is the larger of the 236.21 km² of the Act and that edge. This reading is set by this Manual.
Reference lines for setbacks Four lines are used, and the setback that reaches furthest from the water governs: (a) the mid-stream line of a river in the table of bye-law 93 of the Model, with that bye-law's distance; (b) the outer (landward) toe of the bund on such a river, with the bye-law's 6 m, where the table applies it; (c) the top of bank of a channel or the boundary of a pat or pukhri, with Zone 1 of Clause 7.4.3, except that on a bunded reach Zone 1 is measured from the landward toe of the bund; and (d) the 1% AEP flood extent of Clause 7.3.4, found with the outfall closed where Clause 5.8.5 so requires, with the 10 m of Clause 7.4.4. The landward toe is used on a bunded reach because there the bund, not the natural bank, is the edge of the flood channel, with the river standing against it at flood level; because bye-law 93 already measures from the outer toe of the bund, so that both lines start from one surveyed line; because the strip at the landward toe is where seepage, piping and breaches show and are repaired, as the breaches of 2024 and 2025 were (as reported); and because many bunds carry the embankment roads, on which a line from the river-side bank would fall. This rule is set by this Manual.
Patta land and landholding On the valley floor most land is patta land, held under the land records of the Revenue Department; some is government land, and State khas land in a master-plan area vests in PDA Manipur. Zone 1 land that is private patta land is reserved in the master plan, for which the use zone "Pond, Drain, Rivers and Canals" of the Unified Zoning/Use Regulation Bye-laws, 2026 is the hook, or secured by a written agreement with the owner, and is not taken. In the hill areas, where land is allotted under section 29 of the Manipur (Hill Areas) District Councils Act, 1971 and held under customary tenure, it is secured through the District Council's land allotment powers (not researched [TBC]). This rule is set by this Manual.

7.3 Inventory and mapping of waterbodies

7.3.1 Statewide inventory. The Authority, with the Water Resources Department and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:

  • (a) its type (Clause 7.2), name and survey numbers;
  • (b) its custodian (IMC or another urban local body (for the municipal drains within its limits, and for the public ponds of the AMRUT 2.0 water-body rejuvenation projects, which the municipal councils carry out), PDA Manipur (for State khas land, which vests in it within a master-plan area under the Manipur Town and Country Planning Act, 1975), WRD (for the river bunds, flood channels and sluices it holds, for Lamphelpat, which it is developing as flood storage, and for the Shamushang pumping to the Nambul), the Loktak Development Authority (for Loktak within the 236.21 km² of the Manipur Loktak Lake (Protection) Act, 2006), NHPC (for the Ithai barrage, which holds the lake's level; the Act does not apply to the Power Department acting under its agreements with NHPC, s.36), PWD and the national-highway agencies (for the drains and culverts of their roads), PHED (for sewers and water-supply intakes), the Directorate of Environment and Climate Change (for the interception and diversion works of the Nambul), the Forest, Environment and Climate Change Department (for forest land), the Revenue Department and the Deputy Commissioner (for government land recorded as water), the Gram Panchayat, a private owner (for a pukhri or pat on patta land), the District Council or a Village Authority in the hill areas (not researched [TBC]), the Manipur State Wetlands Authority (for a notified wetland; none is final), or another body);
  • (c) its boundary as recorded in Revenue records;
  • (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
  • (e) its position in any tank cascade, with the upstream and downstream tanks;
  • (f) the 1% AEP flood extent, where mapped; and
  • (g) known encroachments, with the date recorded.

7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:

  • (a) within the site;
  • (b) within 100 m of the site boundary; and
  • (c) downstream, to the extent of the downstream analysis of Chapter 5.

The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):

  • the Revenue record boundary;
  • the surveyed FTL or top of bank;
  • the MWL contour (tanks) and the 1% AEP flood extent;
  • Zone 1 and Zone 2 (Clause 7.4); and
  • every supply channel, surplus course, sluice and surplus weir.

7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:

  • (a) land records of the Revenue Department under the Manipur Land Revenue and Land Reforms Act, 1960 in the valley, kept by district, sub-division, revenue village and patta, including government land recorded as water; in the hill areas, where land is allotted under section 29 of the Manipur (Hill Areas) District Councils Act, 1971 and held under customary tenure, the records of the District Councils and Village Authorities (not researched [TBC]); the inventory of about 4,000 water bodies prepared after the National Green Tribunal's order of 22 May 2020 in M.A. 26/2019, for which "Ground truthing, engineering surveys, and quality monitoring … are pending" (DoECC, 2025-26); the Space Applications Centre's Wetland Atlas (2021), with 132 wetlands larger than 2.25 ha; the 71 wetlands delineated and 3 demarcated by the Manipur State Wetlands Authority in 2025-26, and its draft notifications of the Yaral, Utra and Waithou–Phumnom pats; the land-use maps of the Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification), with its water bodies and ponds (about 502.95 ha), river bed (about 76.85 ha) and wetlands, and of the GIS master plans of the other towns; the 236.21 km² of Loktak and its Core Zone of 70.30 km² under the Manipur Loktak Lake (Protection) Act, 2006; WRD's records of its river bunds, sluices and pumping stations, and its river gauges; and each town's drain register (Chapter 6);
  • (b) WRD and Gram Panchayat or, in the hill areas, Village Authority tank registers and records of FTL and MWL;
  • (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
  • (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
  • (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.

7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:

  • (a) any site in a flood-sensitive catchment (Chapter 1);
  • (b) any site of 1 ha or more adjoining a waterbody; and
  • (c) any site where the Authority so requires.

For other sites, the fixed-width setback of Clause 7.4.6 may be used.

7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.

Commentary. Manipur has a floodplain law but no flood line. The Manipur Flood Plain Zoning Act, 1978 (Manipur Act 10 of 1978; assent 26 August 1978; Manipur Gazette Extraordinary No. 185 of 1 September 1978; read from the OCR of a truncated copy, sections 1 to 7 only) lets the State declare that flood plain zoning "shall be made", direct a survey of a river by the Deputy Commissioner "or such other authority", and have the Flood Zoning Authority "delineate the areas which are subject to [flooding] … with reference to relative risk"; it defines a flood zone as "the area which is required to carry the [flow] of the maximum probable [flood]" (OCR damaged), and its provisions other than section 1 come into force on dates to be appointed. No Flood Zoning Authority was found constituted and no zone notified: demarcation "is yet to be done" (as reported, June 2026), although an eviction order along the channels of the Imphal river in April 2025 cited "Section 24" of the Act (as reported; section 24 was not read [TBC]). Bye-law 94 of the Model ties the plinth to "high Flood Risk Areas identified in the Master Plan of the towns"; the Risk Informed GIS Based Master Plans for Imphal and Moirang, where those areas would be shown, are listed as finally notified on 17 January 2025, while the Town Planning Department's report for 2025-26 says their draft report "has been submitted" (the two conflict), and neither plan was read [TBC], so this Manual cannot say where bye-law 94 applies. The AIIB found 35% of Imphal "prone to floods" (APD, 2024), but no flood map was found. The levels that exist are WRD's river gauges, as printed in the press (datum not stated [TBC]): at Minuthong on the Imphal river a highest flood level of 788.400 m, exceeded on 29 May 2024; at Lilong 782.850 m, exceeded at 783.250 m on 15 September 2025; at the Ithai barrage 769.320 m, exceeded at 770.05 m on the same day; and at Thong Nambonbi (Hump Bridge) on the Nambul 783.695 m (all as reported; Chapter 5). CWC has one site in the State, on the Barak at Chotebekra, with a highest flood level of 32.1 m on 31 July 1989 (as reported). No "highest flood level" fixed by a local authority was found for any town [TBC], and the readings of September 2025 rose above two of the printed ones. Clause 7.3.4 lets the Authority adopt 1% AEP maps; a map prepared under this Manual is offered as an input to any future zoning under the 1978 Act and to the risk-informed master plans, not as a zone or a notification under either. Until maps are adopted, the Applicant produces the 1% AEP extent for larger and flood-sensitive sites with the outfall closed as Clause 5.8.5 requires, because behind a river bund the flood extent is set by the ponding behind a shut sluice, and by the paths of bund breaches, as often as by the river; and a highest flood level stated in a permission is a minimum that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Levels shall be stated to one datum (Clause 7.3.5) and tied to the WRD or CWC gauge. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.


7.4 Setbacks

7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:

  • (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
  • (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.

7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:

  • Zone 1 (waterbody protection zone), next to the waterbody; and
  • Zone 2 (flood fringe setback), outside Zone 1.

7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:

  • (a) 15 m, the minimum set by this Manual along every natural channel draining 8 ha or more and round every pat and pukhri, measured on a bunded reach from the landward toe of the bund (definitions after Clause 7.2) (wider lines govern under Clause 7.4.5 where they bind: bye-law 93 of the Model Manipur Unified Building Bye-Laws, 2024, where a local body has brought it into force, bars new construction within 55 to 62 m of mid-stream on the Imphal river, 50 m on the Iril, 48 m on the Thoubal, 35 m on the Sekmai and the Kongba, 31 m on the Wangjing, 30 m on the Nambul within Greater Imphal and on the Arong, 25 m on the Nambol and 22.5 to 28 m on the Merakhong, on most of these rivers "or 6 m from outer toe of bund, whichever is further from mid-stream"; it sets no line for any other river or stream, for any pat or pukhri, or in the hill areas; the Core Zone of Loktak is a no-development zone under the Manipur Loktak Lake (Protection) Act, 2006; and no flood zone has been notified under the Manipur Flood Plain Zoning Act, 1978; see the Disclosure below);
  • (b) the outer edge of the floodway (Clause 7.6.1); and
  • (c) for a tank, the MWL contour.

7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.

7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the prior permission of the Loktak Development Authority within the 236.21 km² of the Manipur Loktak Lake (Protection) Act, 2006, whose Core Zone is a "No-Development Zone or Totally Protected Zone" (s.3) and in whose Buffer Zone "Land reclamation, bunding or disturbing the natural course of drainages" is barred (s.19(vi)); the leave of the High Court of Manipur for development in or around Loktak under its special bench orders of 17 July 2019 and 25 February 2022 (as reported; the case number was not found [TBC]); a condition of WRD for a work on, through or next to a river bund, flood channel, sluice or pumped outfall that it holds (as owner; no Manipur embankment statute was found); the permission of a Flood Zoning Authority under the Manipur Flood Plain Zoning Act, 1978 in a prohibited or restricted area (bye-law 93 of the Model; no Authority has been constituted and no area notified); a decision of the Local, District or State Level Committee under the Manipur Conservation of Paddy Land and Wetland Act, 2014; the views or permission of the Manipur State Wetlands Authority for a wetland notified under the 2017 Rules (none is final); a line of the Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification) or another master plan, such as land in the use zone "Pond, Drain, Rivers and Canals" of the Unified Zoning/Use Regulation Bye-laws for the Master Plan Areas of Manipur, 2026; or a direction of the High Court of Manipur, the National Green Tribunal or the Supreme Court sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.

7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:

Table 7.1 — Fixed-width setback where no 1% AEP extent is available

Waterbody Total setback (Zone 1 + Zone 2) Of which Zone 1
Channel draining 8 ha to 65 ha 25 m 15 m
Channel draining 65 ha to 20 km² 40 m 15 m
Channel draining more than 20 km², and rivers 50 m 20 m
Tank, lake or pond MWL contour + 25 m to MWL contour, and not less than 15 m from FTL
Marsh, estuary or backwater as notified by the Authority, and not less than 50 m 15 m

This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.

7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).

Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor where no wider line binds. Manipur's distances from water are in its building rules: bye-law 93 of the Model Manipur Unified Building Bye-Laws, 2024 (MAHUD Notification No. BBL-101/1/2024-MAHUD-MAHUD-Part(1) of 4 December 2024; Manipur Gazette Extraordinary No. 253 of 5 December 2024), which binds only where an urban local body or PDA Manipur has brought it into force in its own bye-laws, prohibits "any new construction within the designated buffer zone" along ten named rivers, reach by reach, measured from mid-stream: 55, 60 and 62 m on three reaches of the Imphal river, 50 m on the Iril, 48 m on the Thoubal, 35 m on the Sekmai, 31 m on the Wangjing, and 30 m on the Nambul within Greater Imphal and on the Arong, each "or 6 m from outer toe of bund, whichever is further from mid-stream", and, from mid-stream only, 35 m on the Kongba, 25 m on the Nambol and 22.5, 24.2 and 28 m on three reaches of the Merakhong. It names no other river or stream and no pat or pukhri, and because it is measured from mid-stream, a 30 m buffer on a reach 40 m wide leaves 10 m beyond the bank (NEER reading). The 15 m floor is measured from the top of bank, or on a bunded reach from the landward toe of the bund, so it is stricter than the bye-law's 6 m wherever the bund stands well back from the river and on narrow reaches, and it reaches every channel, pat and pukhri that the table omits; on the wide bunded reaches the bye-law's distances usually reach further and govern (NEER reading). It applies to new development and redevelopment approved under this Manual, not to existing buildings; and where Zone 1 land is private patta land, it is reserved in the master plan or secured by agreement with the owner, not taken (in the hill areas, through the District Council's land allotment powers [TBC]). It is this Manual's proposal, not a statutory width, and it never reduces a wider line (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:

  • APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
  • APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
  • APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.

(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Manipur flood maps are mostly coarser than US maps, the Imphal valley is "virtually a flat alluvium filled valley … with a very low southerly gradient" (MASTEC), and Imphal's ground, at about 790 m (AIIB, 2024), lies within a metre or two of the high flood level of the Imphal river at Minuthong, 788.400 m (WRD, as reported; NEER reading) (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.

The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.

URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).

Manipur's setbacks from water are in its building bye-laws and its lake Act. Bye-law 93 of the Model Manipur Unified Building Bye-Laws, 2024, "Flood risk prone areas", reads: "Prohibit any new construction within the designated buffer zone to minimize human exposure to flood risk and preserve the natural integrity of natural ecosystems", and gives a table, the same for the left and right banks: the Imphal river from Koirengei to Lilong, 55 m; from Lilong to Sekmaijin, 60 m; from Sekmaijin to Ithai, 62 m; the Wangjing from the Heirok bridge to Kharungpat, 31 m; the Nambul within Greater Imphal, 30 m; the Iril from Sawombung to Lilong, 50 m; the Thoubal from Yairipok to Irong Ichil, 48 m; the Sekmai from the Pallel bridge to its confluence with the Imphal river at Sekmaijin, 35 m; and the Arong from Charangpat to Ikop pat, 30 m, each "from mid-stream or 6 m from outer toe of bund, whichever is further from mid-stream"; and, from mid-stream only, the Merakhong 22.5 m (Yurembam to the Tiddim Road crossing), 24.2 m (to Langpok) and 28 m (Langpok to Chingphu), the Kongba 35 m (Chairenthong to Kiyamgei) and the Nambol 25 m (Maklang to Heikrujam and Heikrujam to Yangoi). It ends: "No person shall undertake any activity within the prohibited area or restricted area except with the previous permission of the Flood Zoning Authority constituted under the Flood Plain Zoning Act, 1978". The draft IMC Building Bye-Laws (3rd Amendment), 2024 repeat the table as bye-law 93.1 (draft; final status not confirmed [TBC]). The Model binds only where an urban local body or PDA Manipur has brought it into force in its own bye-laws (Chapter 1), and its numbering may differ there [TBC per body]. Bye-law 16 adds that a masonry building "shall not be constructed or extended, over any municipal drain or land", and bye-law 94 sets the plinth "above 1m above the highest flood level of the surrounding areas" in "high Flood Risk Areas identified in the Master Plan of the towns" (Clause 7.3, Commentary). Round Loktak the Manipur Loktak Lake (Protection) Act, 2006 makes the Core Zone of 70.30 km² "the No-Development Zone or Totally Protected Zone" (s.3), bars in the Buffer Zone, among eight items, "Land reclamation, bunding or disturbing the natural course of drainages" and "Construction activities in ecologically sensitive areas as specified in the notification" (s.19(vi) and (vii)), and, in the Core Zone, bars anyone from building "any hut or house on phumdis inside the lake" without the Authority's prior permission (s.20(iv)); the High Court of Manipur's special bench ordered on 17 July 2019, and reaffirmed on 25 February 2022, that no development or construction take place in or around Loktak "without the Court's leave" (as reported; the case number was not found [TBC]). The rules leave gaps for drainage: bye-law 93 measures from mid-stream, so that a 30 m buffer on a reach 40 m wide leaves 10 m beyond the bank (NEER reading); its 6 m from the outer toe of the bund is narrow for a bund that must be patrolled and repaired; it names ten rivers and none of their tributaries, hill streams, city channels such as the Naga Nullah and the Waisel Maril, the Khuga or the Chakpi; no setback from any pat or pukhri was found in the bye-laws (NEER reading), and none from a wetland outside Loktak, because no wetland has yet been notified under the 2017 Rules; no Flood Zoning Authority has been constituted and no "prohibited area or restricted area" notified, so the bye-law's last sentence has nothing yet to work on (NEER reading); and in the hill areas no building rule applies at all. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere the Manual applies.

Disclosure. Manipur has a named-river buffer in its building bye-laws, but it is measured from mid-stream, it names ten rivers and none of the pats, pukhris, hill streams or city channels, and it binds only where a local body has adopted the Model: bye-law 93 of the Model Manipur Unified Building Bye-Laws, 2024 bars new construction within 55 to 62 m of mid-stream on the Imphal river, 50 m on the Iril, 48 m on the Thoubal, 35 m on the Sekmai, 31 m on the Wangjing and 30 m on the Nambul within Greater Imphal and on the Arong, "or 6 m from outer toe of bund, whichever is further from mid-stream", and 35 m on the Kongba, 25 m on the Nambol and 22.5 to 28 m on the Merakhong from mid-stream only; it is in force only where an urban local body or PDA Manipur has brought the Model into force in its bye-laws [TBC per body]; no Flood Zoning Authority has been constituted and no flood zone or "prohibited" or "restricted" area notified under the Manipur Flood Plain Zoning Act, 1978 (none found); no pat or pukhri buffer exists in the bye-laws; and the three wetlands that the Manipur State Wetlands Authority has published in draft, the Yaral, Utra and Waithou–Phumnom pats, are not yet notified, so no prohibition under rule 4 of the Wetlands (Conservation and Management) Rules, 2017 applies to them (NEER reading). The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor where nothing wider binds: along every natural channel draining 8 ha or more, river, khong or city channel, whether or not the bye-law names it, round every pat and pukhri, and, on a bunded reach, measured from the landward toe of the bund. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's four reference lines, its reading of the boundary of a pat or pukhri, of the ponded area behind a river bund and of valley paddy land as flood storage, and its compensatory storage for converted paddy land and wetland (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body, Authority, committee, District Council or Village Authority has adopted or endorsed them. The comparison runs both ways. On the wide bunded reaches of the rivers in the table, the bye-law's 30 to 62 m from mid-stream, or its 6 m from the outer toe of the bund, usually reach further than Zone 1 and govern (NEER reading); the Manual's 15 m from the landward toe of the bund is stricter than the bye-law's 6 m wherever the bund stands well back from the river, and on narrow reaches, where the mid-stream distance falls on the bund or inside it; and on every river, stream, channel, pat and pukhri that the table omits, among them the Khuga, the Chakpi, the hill streams, the Naga Nullah and the Waisel Maril, the pats and the pukhris, the Manual's 15 m governs alone. It applies to new development and redevelopment approved under this Manual, not to existing buildings; Clause 7.4.7 allows no variance below it; and where Zone 1 land is private patta land, it is reserved in the master plan or secured by agreement with the owner, not taken (in the hill areas, through the District Council's land allotment powers [TBC]). The setback is applied as whichever of the four reference lines and its setback reaches furthest (definitions after Clause 7.2), so the Manual is stricter than statute along the pats, pukhris, hill streams and city channels and at bunds that stand back from the river, and no less strict anywhere. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:

  • The building bye-laws on the Model. The distances of bye-law 93 above, which the Applicant states on Form 7-1, measured from mid-stream; bye-law 16, no building over a municipal drain; and bye-law 94, the plinth more than 1 m above "the highest flood level of the surrounding areas" in the "high Flood Risk Areas identified in the Master Plan of the towns", which were not read [TBC]; this Manual's floor of the 1% AEP level plus 0.5 m (Clause 7.6.6(b); Chapter 6) governs where it is higher. The Model defines a basement (bye-law 2(11)) but no rule keeps basements off low-lying or flood-prone land (NEER reading); on the valley floor this Manual allows a basement only under its flood-sensitive rules and with a flotation check at ground level (Chapter 4).
  • Loktak. The Core Zone of 70.30 km², a "No-Development Zone or Totally Protected Zone" (s.3), and the bans of the Buffer Zone, among them "Land reclamation, bunding or disturbing the natural course of drainages" (s.19(vi)), under the Manipur Loktak Lake (Protection) Act, 2006, with the prior permission of the Loktak Development Authority (s.20); and the High Court's special bench orders of 17 July 2019 and 25 February 2022 against development in or around Loktak "without the Court's leave" (as reported; case number not found [TBC]).
  • Paddy land and wetland. Conversion only through the Local, District and State Level Committees under the Manipur Conservation of Paddy Land and Wetland Act, 2014, with no licence for construction on land converted in contravention (s.12) and imprisonment of three to five years and a fine of ₹50,000 to ₹2 lakh (s.18); the (Third Amendment) Bill, 2026 is a Bill, not law [TBC].
  • Master plans and zoning. The use zone "Pond, Drain, Rivers and Canals" of the Unified Zoning/Use Regulation Bye-laws for the Master Plan Areas of Manipur, 2026, and the lines of the Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification) and the other GIS master plans; the risk-informed master plans for Imphal and Moirang were not read [TBC].
  • Wetlands, courts and custodians. Any wetland notified under the 2017 Rules (none is final); the orders of the High Court of Manipur, the National Green Tribunal and the Supreme Court as they stand; and WRD's lines at its bunds and sluices.

This Manual sets 15 m as the floor because the bye-law's line, measured from mid-stream, can leave only a few metres beyond the bank or the bund; because the pats, pukhris, hill streams and city channels, which carry and store most of the towns' water, have no line at all; because a bund needs a strip at its landward toe for patrol, seepage control and breach repair, which the breaches of the Imphal, Nambul and Iril bunds in 2024 and 2025 needed (as reported); and because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled. The reasons for the corridor are the record: "The town is below the high flood level of Imphal river" (master plan); "the failure of river dikes causes waterlogging in the low-lying areas for several weeks" (AIIB, APD, 2024); 18 embankment breaches were reported in the Remal floods of 28 to 31 May 2024, 17 of them sealed (as reported); the market waste dumped in the Naga Nullah "creates a stagnant pool all along the year" (master plan); and the clogging of the Naga Nullah flooded Nagaram, Laipham Khunou and Lairikyengbam Leikai in July 2024 (as reported). Until a bye-law amendment, a master plan, a notification under the 1978 Act or the Wetlands Rules, or a court adopts it, the 15 m minimum is this Manual's recommended standard, and the bye-laws, the Loktak Act, the paddy-land Act, the master plans and the orders above remain the only legal minimum. Approving authorities should state in each approval which was applied.

Waterbody setback zones: section through a bunded valley river, with bye-law 93 of the Model measured from mid-stream or the outer toe of the bund, and the Manual's Zone 1 from the landward toe of the bund and Zone 2 to the 1% AEP extent plus 10 m, whichever is wider; and a pat with no statutory buffer Waterbody setback: Zone 1 and Zone 2 on a bunded valley river, with Manipur's lines Section, one bank shown (both banks alike). Distances drawn to one scale (1 m = 5 px) for a reach 40 m wide; levels schematic. River (turel) and its bund (pan): no development Zone 1 protection Zone 2 Flood fringe setback (ponding behind the bund) Developable land river at flood level bund (pan) embankment road on crest sluice (ithong), flap gate 1% AEP level behind the bund, outfall closed (Clause 5.8.5) mid-stream landward toe of bund 1% extent bank patrol paddy, park, path floor ≥ 1% level + 0.5 m (bye-law 94: plinth > 1 m above HFL in master-plan risk areas [TBC]) This Manual (set by this Manual): Zone 1 ≥ 15 m from landward toe to mapped 1% AEP extent + 10 m On an unbunded reach Zone 1 is measured from top of bank; round a pat or pukhri, from its boundary at seasonal high. Bye-law 93 of the Model (where a local body has adopted it [TBC]): "from mid-stream or 6 m from outer toe of bund, whichever is further from mid-stream" 30 m from mid-stream (Nambul; Arong): ends on the bund, 10 m beyond the bank 6 m from the outer toe: further from mid-stream here, so it governs over the 30 m 62 m from mid-stream (Imphal river, Sekmaijin–Ithai; 55–60 m upstream): reaches beyond the Manual's Zone 1 here, but not the 1% AEP extent + 10 m Other rows: Iril 50 m, Thoubal 48 m, Sekmai 35 m, Wangjing 31 m (same rule); Kongba 35 m, Nambol 25 m, Merakhong 22.5–28 m (from mid-stream only). No other river, stream, city channel, pat or pukhri is in the table. No Flood Zoning Authority and no flood zone has been constituted or notified under the Manipur Flood Plain Zoning Act, 1978. A pat (lake or wetland) or a pukhri (pond), in plan pat No statutory buffer in the bye-laws: the Manual's corridor governs: Zone 1 ≥ 15 m from the boundary at seasonal high; Zone 2 to the 1% AEP extent + 10 m (drafts of 3 pats not final). Loktak Core Zone: no development (2006 Act) Manipur Loktak Lake (Protection) Act, 2006: Core Zone, 70.30 km², "No-Development Zone or Totally Protected Zone" (s.3); Buffer Zone bans, among others, "bunding or disturbing the natural course of drainages" (s.19(vi)); within 236.21 km². High Court leave in or around Loktak (as reported). Zone 1: no buildings, fill, paving or dumping; crossings, utilities, flood works, bund patrol and native vegetation only. Zone 2: no habitable buildings; fill only with 1:1 compensatory storage, also for converted paddy land and wetland. Whichever is wider governs: bye-law 93's line, Zone 1 from the landward toe (or top of bank or boundary), or the 1% AEP extent + 10 m. New development and redevelopment only; patta land reserved in the master plan or secured by agreement, not taken.

Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).


7.5 Uses permitted in each zone

7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:

  • (a) road, rail and utility crossings that meet Clause 7.10.3;
  • (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
  • (c) native vegetation, planting and habitat works;
  • (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
  • (e) waterbody restoration under Clause 7.9.

7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:

  • (a) all uses permitted in Zone 1;
  • (b) parks, playgrounds, open-air sports fields and urban agriculture;
  • (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
  • (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
  • (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
  • (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.

7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.

7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Model Manipur Unified Building Bye-Laws 2024, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.

Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to Imphal valley practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.


7.6 Floodway, flood fringe and compensatory storage

7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.

7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.

7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:

  • (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
  • (b) with compensatory storage under Clause 7.6.4.

7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):

  • (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
  • (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
  • (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
  • (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
  • (e) is built before, or at the same time as, the fill is placed; and
  • (f) is secured by a covenant or handover so that it is never filled later.

7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.

7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:

  • (a) redevelopment may be approved without the Zone 2 restriction;
  • (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
  • (c) basements are not permitted;
  • (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
  • (e) Zone 1 continues to apply in full.

Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The Imphal valley floor is flat, its towns lie at or below the high flood level of the rivers behind their bunds, and the Loktak margin is held at the lake's level by the Ithai barrage and the rock sill below it, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.

In Manipur the land records fix a pat or pukhri by its recorded plot, and the Loktak Act fixes the lake by its area of 236.21 km², but nothing gives a line for the edge of a pat whose water spreads and shrinks through the year, or for the paddy land round it that floods with it. The difference matters because the valley's storage is being lost. "There were nearly 500 lakes in Manipur Valley", and Lamphelpat, Porompat, Takyelpat, Sangaipat, Kharungpat and Ikop pat are among those MASTEC lists as degraded or disappearing; Loktak, with its swamps 246.72 km² in MASTEC's figure against the Act's 236.21 km² (and "250 km²" in other sources, as reported; the figures conflict), is "becoming shallower" and its "water holding capacity" is "reducing" (MASTEC). The master plan for Greater Imphal plans for wetlands to fall from 374.48 ha to 232.21 ha and agricultural land from 5,616.53 ha to 2,604.70 ha between 2020 and 2043, and notes that "new areas need to be unlocked as the paddy fields cannot be used for construction" under the 2014 Act; a (Third Amendment) Bill, 2026 would exempt land that conforms to a master plan and allow "Deemed Conversion" on self-declaration (as introduced; not law [TBC]). Paddy land is flood storage in this valley: the flood of July and August 1989 lay on 97,500 ha of paddy, and that of August 2002 on 20,000 ha (MASTEC). A line drawn from the edge of the water in the dry months would leave a pat's own flood storage open to building, one drawn from today's edge would give up its lost area for good, and a conversion of paddy land approved without replacing its storage moves the flood onto the next field or street. This Manual therefore gives every pat and pukhri a boundary measured from a high level, not from the water's edge on the day of survey (definitions after Clause 7.2), treats the foreshore up to MWL as its flood storage, and requires the storage of valley paddy land and wetland that is filled or built on to be replaced under Clause 7.6.4 (definitions after Clause 7.2). Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.

The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Imphal, which "is below the high flood level of Imphal river" behind embankment roads on both banks (Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification)) and of which 35% is "prone to floods" (AIIB, 2024) — Singjamei, Heingang, Bashikhong, New Checkon, Keirang, Khabam and Lairikyengbam Leikai, on the breach paths of the Imphal river in 2024 and 2025, and Nagaram and Laipham Khunou, flooded when the Naga Nullah clogged in July 2024 (all as reported) — already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.

Compensatory storage by elevation band: section Compensatory storage by elevation band (section, not to scale) A. Fill in the flood fringe B. Compensatory excavation, same reach waterbody waterbody permitted use drains back by gravity 1% AEP flood level Normal water level (or 50% AEP if higher) Band 1 Band 1 Band 2 Band 2 Band 3 Band 3 Band 4 Band 4 Orange: fill below the 1% level = volume lost Blue: excavation below the 1% level = volume gained Grey: cut above the 1% level, no credit Volume per band (m³), Form 7-3 worked example: illustrative, not design values 60 180 Band 1 180 300 Band 2 300 390 Band 3 420 450 Band 4 Volume lost (fill) Volume gained (excavation) Bands of not more than 0.3 m, from the normal water level to the 1% AEP level. Volume gained ≥ volume lost in every band (Clause 7.6.4(b)).

Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.


7.7 Tank cascades as design storage

Manipur has no tank Act and no irrigation tank cascades; its valley pats lie in a chain that drains to Loktak, and the outlet of the whole valley is the Manipur river at the Ithai barrage. The storages that matter for urban drainage are of six kinds. The first is Loktak, the valley's terminal storage, held up by NHPC's Ithai barrage (Loktak hydroelectric project, 105 MW; commissioned in 1983 by most accounts, with 1979 and 1986 also printed, as reported; the dates conflict) at a full reservoir level of 768.5 m and a minimum drawdown level of 766.2 m (NHPC, as quoted; the CEA gives 766.01 m, and an ORF article gives 769.63 m and calls 768.50 m the "flood level", as reported; the figures conflict), and by the rock sill of the "Sugnu hump" below it (MASTEC); "At Ithai, flow of the Manipur river during monsoon is of the order of 400 cumecs and river down below the barrage does not have the capacity to cope up with such flow, as a result, water is piled up upstream" (MASTEC). The second is Lamphelpat, a pat being developed as flood storage with a pumped outlet: WRD is dredging a waterbody of "around 300 acres" under a work order of 9 November 2023, with "provision for pumping of flood water from the Lamphel pat water body to the Nambul River through Shamushang Nalla during high flood season" (WRD's site report in High Court PIL No. 8 of 2025), and the NDB's summary describes a project to "increase its water detention capacity, restore stormwater drainage system" with a "real time flood management system with a command center" (USD 87.84 million, loan USD 70.27 million; concept approval 17 November 2021); its cost, area and funders in the press conflict (as reported); no stage–storage relation or design storm was found [TBC]. The third is the other pats of the valley, among them the Manipur State Wetlands Authority's priority wetlands, Utra Pat, Yaral Pat, Waithou–Phumnom Pat, Pumlen–Khoidum Pat and Ikop–Kharung Pat, and the wetland of Khonghampat; no levels, areas or outlet records were found for any of them [TBC]. The fourth is the reservoirs of the hills that feed the valley, the Thoubal (Mapithel) reservoir, with a full reservoir level of 880.7 m (WRD, September 2025, as reported) and a spillway designed for 2,240 cumec (as reported), and the Khuga reservoir, for which no levels were found [TBC]. The fifth is the pukhris, the ponds of the towns and villages, among them the public ponds of the 20 water-body rejuvenation projects of AMRUT 2.0 (₹4.11 crore; work in progress at 19, TPD, 2025-26); no levels or outlet records were found for them [TBC], so their storage is modelled as an existing feature and not counted unless Clause 7.7.1 is met. The sixth is the ponded area behind a river bund and the paddy land round the pats, which store the town's runoff while the sluices are shut (definitions after Clause 7.2); they are modelled as existing features where they intercept runoff but never counted as design storage, because they are not surveyed, have no controlled outlet and are full by the time of the peak storm. The inventory of about 4,000 water bodies made after the National Green Tribunal's order in M.A. 26/2019 still awaits "Ground truthing, engineering surveys, and quality monitoring" (DoECC, 2025-26). These are the waterbodies for which Figure 7.3 and Clause 7.8 matter: on the valley floor every drain ends in a channel, a pat or a river, every river behind a bund in a sluice that the river closes, and the whole valley in Loktak. Any pat, pukhri or reservoir whose storage is to be counted is subject to Clause 7.7.1 in full, with WRD where the outlet is its sluice or pump, with NHPC and the Loktak Development Authority for Loktak, and with the other custodian where it is neither, and the custodian of each shall be confirmed for the inventory (Annex 7A) [TBC].

7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:

  • (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
  • (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
  • (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
  • (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
  • (e) Custodian concurrence. WRD, or the other custodian, concurs in writing.

Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).

7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, for a valley-floor town behind river bunds (pan), every pat and pukhri that stores its runoff, the paddy land that floods behind the bunds, the channels that join them, the outfall sluice (ithong), flap gate and pumps through the bund, and the river stage that closes the sluice, and, on the Loktak margin, the lake level held up by the Ithai barrage and the rock sill below it (Clause 5.8.5), as shown in Figure 7.3.

7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.

7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:

  • (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
  • (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than WRD's freeboard standard for the tank.

Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.

7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.

7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:

  • (a) routes the cascade under Clause 7.7.2;
  • (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
  • (c) checks the bund under Clause 7.14.

Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.

The FTL starting level follows Clause 3.12.5. In Manipur the starting level of a pat is its outlet level because the outlet is shut when the river is high, and the starting level of Loktak is the lake's level as the barrage and the sill hold it. Lamphelpat "remains waterlogged for many days every year" despite pumping (NDB), and the rivers stand above their outfalls for days: the Imphal river at Minuthong rose above its printed highest flood level of 788.400 m on 29 May 2024, and on 15 September 2025 the Imphal river at Lilong stood at 783.250 m and the Manipur river at the Ithai barrage at 770.05 m, above the printed highest flood levels of 782.850 m and 769.320 m (WRD, as reported); "the failure of river dikes causes waterlogging in the low-lying areas for several weeks" (AIIB, APD, 2024). Loktak reached 768.5 m in August 2002 (as reported), and the CEA's readings of August 2026, about 767.46 to 767.73 m (as quoted), show its ordinary monsoon level. This Manual therefore takes the case that the adjoining edition of this series takes from a design report for its floodplain lakes behind sluices, in which the lake is full and the drain is also flowing full, as the rule for every pat or pond that drains through a sluice or a gated pumped outfall: it starts full to its outlet level (Clause 5.8.5(a) and (e)), and on the Loktak margin the lake starts at the design lake level of Clause 5.8.5(c), never below its full reservoir level from June to September. The Manual's season begins on 1 April because large falls come before the south-west monsoon as well as during it (Imphal (Tulihal) 105.9 mm on 16 April 2004 and 122.4 mm on 27 May 1956, IMD), and the floods of 28 to 31 May 2024 and 30 May to June 2025 came before its normal onset on 5 June (as reported), so a pat or pukhri may be full at any time from April to October. No record of how long any pat stays at or above its outlet level in a wet spell, or of how long any sluice stays closed, was found [TBC]. While a pat is full and its sluice shut, it stores nothing more below FTL, and the drains and channels that flow into it discharge against its level. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.

A valley-floor town behind river bunds, its pats and pukhris, and the lake margin: roadside drains and a city channel to a gated outfall with a flap gate through the bund and a pump station, the river below and above its flood level, a pat as regional flood storage with a pumped outlet, a pukhri, paddy land as flood storage, dry-weather sewage intercepted and screened before the pat, no infiltration credit on the valley floor, a silt trap where a hill stream reaches the valley floor, and a lake held up by a barrage and a rock sill with floating vegetation at an outlet screen and the design lake level on a town outfall (schematic) A valley-floor town behind river bunds, its pats and pukhris, and the lake margin (schematic, not to scale; no particular place is shown) A. Plan: drains to a city channel and a gated outfall through the bund (pan); a pat as regional flood storage, pumped to the river hills (Disang shale) where the hills meet the valley floor paddy land: flood storage (compensatory storage if converted) town on the valley floor pukhri (pond) khong (hill stream) silt trap city channel lined roadside drain DWF interceptor + screen before the pat (Clause 8.9) to sewer pat regional flood storage, starts full to its outlet Zone 1 ≥ 15 m round the pat and along the channel pumped outlet no infiltration credit on the valley floor (clay, peat) river (turel) pan pan pump station sluice (ithong) + flap gate Outfall through the bund at two river stages (section) River below its flood level: gate open, the town drains by gravity town (valley floor) river pan River at its flood level or above: gate shut, storage behind the bund fills, pumps run ponding behind the bund river high flap gate shut pump station B. Section: the lake margin, a lake held up by a barrage and a rock sill downstream design lake level (Clause 5.8.5(c)) lake phumdi barrage rock sill controls the outlet whatever the gates do town outfall: invert below the design lake level, so the outfall is closed June–September; the storm is stored and pumped screen at the outlet, phumdi gathered (Chapter 9) town on the lake margin Zone 1 at least 15 m from the landward toe of the bund, the top of bank of the channel and stream, and the boundary of the pat and pukhri; Zone 2 to the 1% AEP extent + 10 m (Clause 7.4). The pat starts full to its outlet and is pumped to the river; the pukhri is an existing feature. DWF interceptor and screen before every outfall to a pat, a pukhri, the lake or a listed river stretch (Clause 8.9); silt trap where the khong reaches the valley floor (Clause 6.3.6(m)). The 15 m minimum, the starting levels, the interception and the infiltration rule are this Manual's proposals; the bye-laws on the Model, the Loktak Act, the paddy-land Act and the courts' orders govern where they say more.

Figure 7.3 — A valley-floor town behind river bunds, its pats and pukhris, and the lake margin (schematic, not to scale; no particular town, pat, lake, barrage or landmark is shown). A: in plan, a town stands on the valley floor behind river bunds (pan). Its roadside drains fall to a city channel, which runs to a gated outfall through the bund, a sluice (ithong) with a flap gate on the river side and a pump station beside it (Clause 5.8.5(a); Chapter 9). When the river is below its flood level the gate is open and the town drains by gravity; when the river is at its flood level or above, the gate is shut, the storage behind the bund fills and the pumps run, and the outfall is designed for the river stage and the outfall-closed duration of Clause 5.8.5, not for the storm alone. Part of the town drains to a pat, the natural lake or wetland that serves as regional flood storage, through a dry-weather-flow interceptor and a screen, because the drains carry sewage (Clause 8.9); the pat starts full to its outlet level and is pumped to the river over the bund (Clauses 5.8.5(e) and 7.7.3). A pukhri, a pond, stands in the town; it is modelled as an existing feature and counted as storage only under Clause 7.7.1. The paddy land round the pat floods when the sluices are shut and is flood storage: if it is converted and built on, its storage is replaced under Clause 7.6.4 (definitions after Clause 7.2). No infiltration is credited on the clay and peat of the valley floor (Clause 4.11, valley-floor rule). A hill stream (khong) from the hills passes a silt trap where it reaches the valley floor (Clauses 6.3.6(m) and 8.12). Zone 1 is at least 15 m from the landward toe of the bund, from the top of bank of the channel and stream, and from the boundary of the pat and the pukhri, and Zone 2 runs to the 1% AEP extent plus 10 m (Clause 7.4). B: in section through the lake margin, the lake is held up by a barrage downstream and by a rock sill below it; floating vegetation (phumdi) gathers at the screen of a town outlet (Chapter 9); and the design lake level of Clause 5.8.5(c) is marked on a town outfall, which is treated as closed from June to September where its invert lies below that level, so that the town's storm is stored and pumped. The 15 m minimum, the landward-toe line, the interception rule, the starting levels, the compensatory storage for paddy land and the infiltration rule are this Manual's proposals; the building bye-laws on the Model, the Manipur Loktak Lake (Protection) Act, 2006, the Manipur Conservation of Paddy Land and Wetland Act, 2014 and the courts' orders govern where they say more. Original drawing for this Manual.


7.8 Operating rules and pre-monsoon flood cushion

7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:

  • (a) the levels and dates for filling, holding and drawdown through the year;
  • (b) the sluice and regulator settings at each level;
  • (c) who operates the sluices and regulators, and who may order a release;
  • (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
  • (e) the forecast and warning triggers (IMD district warnings, MSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
  • (f) communication with downstream ULBs and residents before any release; and
  • (g) the records to be kept: daily levels in the monsoon, releases, and gate settings.

7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the monsoon), and the cushion counted under Clause 7.7.3, only where:

  • (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
  • (b) the operating rule fixes the cushion level and the dates it applies;
  • (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
  • (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
  • (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).

7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.

7.8.4 Coordination. For tanks under WRD control, the operating rule shall be WRD's rule. This Manual does not authorise any other body to operate a WRD tank.

Commentary. No pat or pukhri in Manipur was found with a written operating rule, and most have no gates to operate. Where a pat drains through a river bund, its only controllable outlet is a sluice that WRD holds, and WRD's sluice operating rules and closure periods were not found [TBC]; the sluices close because the river rises, not because a forecast is issued. Pumps are the only means of drawing a pat down while the river is high, and the one pumped pat on the record, Lamphelpat, with "provision for pumping of flood water … to the Nambul River through Shamushang Nalla during high flood season" (WRD), still "remains waterlogged for many days every year" because the pumping is "not adequate" (NDB); its pump capacity was not found [TBC]. Loktak's level is set by NHPC's operation of the Ithai barrage for the Loktak hydroelectric project, to which the Loktak Act does not apply (s.36), and the barrage's operating rule was not found [TBC]; the barrage "permanently raised the average water level of Loktak Lake by about a metre" (as reported), and below it the rock sill of the "Sugnu hump" restricts the outflow whatever the gates do (MASTEC). The reservoirs of the hills release into the valley's rivers: the Mapithel reservoir on the Thoubal stood at 876 m on 1 August 2015, "nearly 2 m above the spillways" (as reported), against a full reservoir level of 880.7 m given by WRD in September 2025 (as reported; the two do not reconcile). Without an agreed rule with dates, levels, pumping rates and a named operator, storage in a pat or a reservoir cannot be relied on, and a release made without warning to the land downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is refilled by the April and May storms gives no protection when a July to September monsoon storm, such as those of late July 1989 and late July 2015, arrives after weeks of rain. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.

For a pat or pukhri with no controllable outlet, Clause 7.8.3 is the governing condition: no cushion is assumed, a design that relies on it routes the storm through it from its outlet level, and the outflow is limited by the channel below it and, at the bund, by the sluice and the river stage. A cushion made by pumping is counted only where the pumps, their standby power and their operator are in the rule and were certified ready by 31 March (Chapter 10). Many pats are fisheries, and many pukhris belong to private owners, which is why Clause 7.8.2(d) requires the custodian to accept any drawdown and any loss to the fishery, and why no detention pond built under this Manual is called a pukhri or a pat. No drawdown of Loktak, and no work on the barrage or its gates, is proposed under this Manual.


7.9 Restoration, desilting and deepening

7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:

  • (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
  • (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
  • (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.

7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.

7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:

  • (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
  • (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
  • (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.

Storage created below the lowest sluice sill shall not be counted as flood storage.

7.9.4 Safe edges. Where the public has access to the waterbody edge:

  • (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
  • (b) no isolated deep pit or vertical cut shall be left in the bed.

7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.

7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Manipur Pollution Control Board (MPCB) directs.

7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.

7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 March each year (Chapter 10).

Commentary. No State or municipal order fixing a date for the pre-monsoon cleaning of drains, channels or pats was found. The cleaning that is done is large and reactive: a meeting in April 2025 ordered the removal of encroachments along the Waisel Maril, the Naga Nallah and the eastern bank of the Nambul, with WRD to provide machinery, the Loktak Development Authority was named to lead the cleaning of the Waisel Maril, and dredged spoil was piled on Dingku Road (all as reported); the market waste dumped in the Naga Nullah "creates a stagnant pool all along the year" (master plan); and at Lamphelpat a cutter-suction dredger is at work under a work order of 9 November 2023 for two years, with its spoil taken to dykes on institutional campuses (WRD's site report in High Court PIL No. 8 of 2025, which the Court disposed of on 16 June 2025, finding "no substance" in the petition against the dumping of spoil). Silt comes from the hills: the hill streams' "load carrying capacity is high which causes siltation of the lake", and degraded land covers 1,545 km², 24% of the catchment and 35% of the hills (MASTEC); earlier audits found the "failure of canals … due to siltation of beds" in the Loktak lift irrigation project (CAG audits of 2002 and 2008, as cited). The date of 31 March in this Manual is set by this Manual, before its season begins on 1 April, because Imphal's April and May storms come before the south-west monsoon (105.9 mm on 16 April 2004 and 122.4 mm on 27 May 1956, IMD); because the floods of 28 to 31 May 2024 and from 30 May 2025 struck in the last days of May (as reported), the inlets, screens and silt traps are cleared again by 15 May, not by 31 May as in the other North-East editions, and after the season by 15 November (Chapter 10). WRD's works on the river bunds keep WRD's own calendar. Excavation to "increase capacity" is governed by Clause 7.9.3. The bed of a pat is clay and peat, and the silt of a town pat is laden with sewage: every desilting of a pat or pukhri that receives town drains tests the silt under Clause 7.9.1(c) and disposes of it as the MPCB directs, and no desilting, dredging or deposit of spoil within the 236.21 km² of Loktak is begun without the prior permission of the Loktak Development Authority and the leave of the High Court where its orders require it (Clause 7.12). The 31 March deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Manipur precedent.


7.10 Supply channels, surplus courses, inlets and outlets

7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.

7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.

7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:

  • (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
  • (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
  • (c) keep the channel bed level and grade; and
  • (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.

7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.

7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.

7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:

  • (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
  • (b) be located and aligned so that it does not cut through or weaken a tank bund;
  • (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
  • (d) not carry sewage or dry-weather flow (Chapter 8).

Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Manipur no notification assigns the Naga Nullah, the Waisel Maril or the Shamushang nallah to one owner (NEER reading). The municipal drains are the urban local bodies' (bye-law 16 of the Model speaks of a "municipal drain"; the drainage sections of the Manipur Municipalities Act, 1994 were not read [TBC]); the roadside drains of Greater Imphal are PWD's, which is to build "547 km of both side stormwater covered drains" under the AIIB-financed road project; the river bunds, flood channels, Lamphelpat and the Shamushang pumping are WRD's; the interception and diversion of the 72 drains that fall into the Nambul, with its 16 or 17 MLD plant, is the Directorate of Environment and Climate Change's; the sewers are PHED's; and the Loktak Development Authority was named to lead the cleaning of the Waisel Maril (as reported); Chapter 6 gives this Manual's working split and each town's drain register. The record shows a network that is partial, disconnected and built over: "The existing drainage in the Greater Imphal area is also not in good condition and is not properly connected to the primary drain. Drainage system links are missing … the drains are clogged … Imphal lacks decentralized stormwater management along streets" (AIIB, APD, 2024); the market waste of Imphal is "dumped in the Naga Nullah on the backside of the market, which creates a stagnant pool all along the year" (master plan); the clogging of the Naga Nullah flooded Nagaram, Laipham Khunou and Lairikyengbam Leikai in July 2024 (as reported); and an eviction drive along the channels of the Imphal river, the Waisel Maril, the Naga Nallah and the eastern bank of the Nambul was ordered in April 2025 (as reported). The law reaches some of these channels: the paddy-land Act counts the "drainage channels", meaning "the inlets or outlets for the flow of water to or from a paddy land", as part of paddy land (s.2(c) and (h) of the 2014 Act); the Loktak Act bars "disturbing the natural course of drainages" in the lake's Buffer Zone (s.19(vi)); and the petition in High Court PIL No. 8 of 2025 recorded that "the entire rain water are required to be discharged through the water canal from Lamphelpat through Samushang and discharged to the Nambul River". None of these keeps a city channel, a hill stream or the outlet channel of a pat at its recorded width once it has been lined, covered, built over or narrowed by a culvert, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.


7.11 Fee-in-lieu and regional tank storage

7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.

7.11.2 Tank storage funded by fee-in-lieu shall:

  • (a) meet Clause 7.7.1 in full before it is counted;
  • (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
  • (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
  • (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.

7.11.3 Fee-in-lieu does not replace:

  • (a) the retention requirement of Chapter 4, which is always met on site; or
  • (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.

Commentary. Chapter 4 provides for fee-in-lieu toward restored pukhri or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Manipur no shared form of storage is required by the building rules: bye-law 66 of the Model asks for rainwater harvesting with "points of collection of rain water in surface reservoirs or in recharge wells", and bye-law 6(1)(D) for a "Detailed drainage plan for both internal and external required to be constructed up to the available permanent/pucca drain of municipal/other authority" for multi-storeyed, lifeline and special buildings, but the Model has no detention, release-rate or design-storm rule (Chapter 4). The first public storage being built for flood control is Lamphelpat, a pat being developed as flood storage, whose project is to "increase its water detention capacity" (NDB), and the master plan for Greater Imphal earmarks about 500 ha of its wetlands "for the construction of water bodies". The 20 pond projects of AMRUT 2.0 rejuvenate public ponds but are not counted as flood storage (TPD, 2025-26). The GIS master plans that the Town Planning Department is preparing for the towns and for 14 district headquarters "both valley and hills" (horizon 2042), and the Lamphelpat project, are the natural home for basin storage targets (Chapter 11). None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.


7.12 Wetlands, marshes and estuaries

7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:

  • (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Manipur State Wetlands Authority;
  • (b) Loktak, within the 236.21 km² of the Manipur Loktak Lake (Protection) Act, 2006, with its Core Zone and Buffer Zone, its phumdi and athaphum, and its Ramsar boundary (designated 23 March 1990, as reported; the boundary was not obtained [TBC]), and the Keibul Lamjao National Park and the Takmu Fishery Farm, which the Act excludes;
  • (c) every pat of the valley, among them Lamphelpat, Utra Pat, Yaral Pat, Waithou–Phumnom Pat, Pumlen–Khoidum Pat and Ikop–Kharung Pat, the wetland of Khonghampat, the hill wetlands of Jaimeng and Kachouphung (Achau Maki), and every marsh, swamp and waterlogged area of the valley floor within the 1% AEP extent of Clause 7.3.4, including the wetlands of section 2(t) of the Manipur Conservation of Paddy Land and Wetland Act, 2014, "land lying between terrestrial and aquatic system where the water table is usually at or near the surface or which is covered by shallow water"; paddy land is flood storage under the definitions after Clause 7.2, not a wetland under this Clause; and
  • (d) any other pat, marsh or wetland that the Authority notifies, that the Manipur State Wetlands Authority lists, delineates or notifies (its drafts for the Yaral, Utra and Waithou–Phumnom pats are not final), or that the High Court of Manipur, the National Green Tribunal or the Supreme Court directs to be protected.

7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.

7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:

  • (a) meet Clause 7.10.6;
  • (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
  • (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.

7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:

  • (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
  • (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.

7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.

7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:

  • (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
  • (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
  • (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.

7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.

Commentary. Manipur's wetlands are the concern of the Manipur State Wetlands Authority, "set up on 31st January 2018, along with its Technical and Grievance committees", with 22 members, the Minister for Forest, Environment and Climate Change as Chairperson, the Chief Secretary as Vice-Chairperson and the Director of Environment and Climate Change as Member Secretary (DoECC, 2025-26). Its Phase-1 priority wetlands are Jaimeng (Kangpokpi), Kachouphung or Achau Maki (Kamjong), Utra Pat (Bishnupur), Yaral Pat (Imphal East), Waithou–Phumnom Pat (Imphal East and Thoubal), Pumlen–Khoidum Pat (Kakching) and Ikop–Kharung Pat (Thoubal and Kakching); in 2025-26 it delineated 71 wetlands, demarcated 3, and "Published the draft notification" of the Yaral, Utra and Waithou–Phumnom pats in the e-Gazette (DoECC, 2025-26). No wetland notified under rule 4 of the 2017 Rules was found, so until the drafts are final their prohibitions do not apply (NEER reading). The Space Applications Centre's Wetland Atlas (2021) counts 132 wetlands larger than 2.25 ha, about 3% of the State, and the master plan for Greater Imphal counts "about 134 swampy and waterlogged marshy wetlands" and 69 waterlogged areas in the Imphal valley, 40 in Thoubal and 21 in Bishnupur district. Loktak is a Ramsar site, designated on 23 March 1990, and was placed on the Montreux Record on 16 June 1993 (both as reported); its Ramsar area was not confirmed [TBC], and its statutory extent is 236.21 km² (Clause 7.1, Commentary). The Act gives the lake to the Loktak Development Authority, with the Forest and Environment Department as nodal department (s.35(2)), and the High Court's special bench has barred development in or around the lake without its leave and directed that the missing "Brief Document" of its Integrated Management Plan be fixed under the Wetlands Rules (order of 25 February 2022, as reported). The Keibul Lamjao National Park, about 40 km² and outside the Act, is mostly phumdi (as reported). Lamphelpat, where WRD is dredging and building flood storage, is not among the priority wetlands, and the dumping of its dredged spoil was the subject of PIL No. 8 of 2025, which the High Court disposed of. A drain outfall, desilting, diversion or gate operation in or next to Loktak therefore needs the prior permission of the Loktak Development Authority and, where its orders reach, the leave of the High Court; one in or next to a notified wetland needs the views or permission of the Manipur State Wetlands Authority; and for the pats and marshes they do not reach, this chapter, the paddy-land and wetland Act and the bye-laws where they apply are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Manipur's pats, rivers and Loktak through the drains (Clause 8.9, Commentary). The 72 drains that fall into the Nambul had a BOD of 42.45 to 52.34 mg/L (State report of December 2025 to the National Green Tribunal), the CPCB lists the Nambul from the Singda Dam to Bishnupur among the State's 18 polluted stretches (2025), and the Loktak Act counts "sludge from open drains" as sewage effluent (s.2) and bars "Discharge of untreated wastes and effluents from industries, cities or towns and other human settlements" in the lake's Buffer Zone (s.19(iv)). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by most existing outfalls in Greater Imphal. In Manipur they apply in full to every new outfall, and every existing outfall to a pat, a pukhri, Loktak or a listed river stretch is taken to carry dry-weather flow and comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed. Every drain or hill stream that enters a pat or Loktak from the hills also passes a silt trap where it reaches the valley floor (Figure 7.3; Clause 6.3.6(m)), because the hill streams' "load carrying capacity is high which causes siltation of the lake" (MASTEC), and the pat or the lake is the end of the slope's drainage and loses its storage to that silt.


7.13 Encroachment interfaces

7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.

7.13.2 No reliance on encroached land. No design shall:

  • (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
  • (b) treat the encroached width of a channel as its design width.

7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:

  • (a) it shall be designed for the full waterbody width (Clause 7.13.1);
  • (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
  • (c) the work shall be built so that the full width can be restored later without rebuilding it.

7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:

  • (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
  • (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.

7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.

Commentary. Manipur's controls on building and filling in its waterbodies have come from its statutes and, round Loktak, from the courts. The Loktak Act forbids any part of the lake to be sold, leased, transferred "or converted in any form whatsoever" (s.4); its core-zone rule has been used to clear floating huts (phumshangs) from the lake, and critics say that fishers were treated as encroachers (as reported). The High Court's special bench ordered on 17 July 2019, and reaffirmed on 25 February 2022, that no development or construction take place in or around Loktak "without the Court's leave" (as reported; case number not found [TBC]); a suo motu public interest litigation of 2019 on the Thoubal river barred stone quarrying, sand mining and pollution of the river except under licence or lease (as reported). In the valley the paddy-land and wetland Act punishes conversion in contravention of it with imprisonment of three to five years and a fine of ₹50,000 to ₹2 lakh (s.18), and bars any licence for construction on land so converted (s.12). Along the city channels, a meeting in April 2025 ordered the removal of encroachments along the Waisel Maril, the Naga Nallah and the eastern bank of the Nambul from Keishampat to Keishamthong and Elangbam Leikai, and an eviction order along the channels of the Imphal river cited "Section 24" of the Manipur Flood Plain Zoning Act, 1978 (both as reported; section 24 was not read [TBC]). At Lamphelpat the High Court found "no substance" in a petition against the dumping of dredged spoil and disposed of it (PIL No. 8 of 2025, order of 16 June 2025). The National Green Tribunal's order of 22 May 2020 in M.A. 26/2019 led to the inventory of about 4,000 water bodies, whose ground truthing is pending (DoECC, 2025-26), and the State reports to the Tribunal in O.A. 606/2018 and O.A. 673/2018 on its polluted rivers. The CAG found that "The overall flood fighting and control activities remained inadequate" (Report No. 2 of 2017, as cited); no audit of drainage in Imphal, of the Smart City or of the Loktak Development Authority was found. The master plan's own figures show the storage being given up: wetlands from 374.48 ha to 232.21 ha by 2043 (Clause 7.6, Commentary). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.


7.14 Safety of tank bunds and embankments

7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:

  • (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
  • (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.

Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.

7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:

  • High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
  • Low hazard: any other case.

7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:

  • (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
  • (b) a breach analysis shall map the area flooded by a breach at MWL;
  • (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
  • (d) the design shall be certified and independently checked under Clause 10.6.

7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the monsoon (by 31 March) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.

7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.

Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. Manipur's river bunds along the Imphal, the Nambul, the Iril, the Thoubal and the other valley rivers are flood embankments, which the Act excludes; their lengths and heights were not found [TBC], and MASTEC counted 11 vulnerable points on the Imphal river, 14 on the Thoubal and 5 on the Iril. The Thoubal (Mapithel) dam, an earth dam reported as 66 m high and 1,074 m long, is a dam across a river under the Act, and so, on the Act's definition, is the Ithai barrage (NEER reading; its height was not obtained [TBC]); the Khuga and Singda dams were named in the sources without their dimensions [TBC]. No pat or pukhri in Manipur was found to be held by a bund high enough to be a specified dam, though no bund or outlet was surveyed for this Manual [TBC]; each shall be screened under Clause 7.14.1. Where the storage of a pat or pukhri is counted under Clause 7.7, the bund that holds it, with its sluice, is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Manipur the bund hazard is the breach. In the Remal floods of 28 to 31 May 2024 there were 18 embankment breaches, 17 of them sealed (as reported); in the floods of 2024 and of 30 May to June 2025 the Imphal river breached at Singjamei, Heingang, Bashikhong and New Checkon and at Keirang, Khabam and Lairikyengbam Leikai, and the Nambul at four places; and in September 2025 the Iril breached at Kshetri Awang Leikai (all as reported). The record is old: the flood of 1966 breached the bunds at 60 places, that of 1989 at 40 and that of 2002 at 59 (MASTEC). A failed bund floods the land behind it, and a breach closes no sluice: "the failure of river dikes causes waterlogging in the low-lying areas for several weeks" (AIIB, APD, 2024). Releases from the dams upstream are the other hazard: the Mapithel reservoir stood at 876 m on 1 August 2015, "nearly 2 m above the spillways" (as reported), and its spillway is designed for 2,240 cumec (as reported). No breach map or emergency action plan for any bund, dam, pat or pukhri was read for this Manual. That is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments counted under this Manual, why Clause 2.3.6(i) treats the breach paths of the river bunds as hazard-first sites, and why Chapter 5 treats bund-locked towns and release reaches as flood-sensitive outfalls. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.


7.15 Submittal requirements

Every drainage report for a development or work under Clause 7.1.2 shall include:

  1. the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
  2. the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
  3. the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
  4. for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
  5. for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
  6. for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
  7. for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.

7.16 Review and update

7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.

7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.


References (chapter)

Annexes and forms

Annex / Form Content
7A Statewide waterbody GIS layer and inventory fields
7B Fixed-width setback table (alternative S-3, with Annex 1C)
7C Template tank operating rule, with flood cushion
7D Desilting and restoration specification
7E Glossary of Manipuri waterbody terms and regional variants
Form 7-1 Waterbody Sheet
Form 7-2 Tank Storage Credit Sheet
Form 7-3 Compensatory Storage Calculation (by elevation band)