Chapter 4Site Runoff Control: Retention and Detention
4.1 Purpose and scope
4.1.1 This chapter sets the performance standard that every regulated development shall meet for runoff leaving the site. It covers:
- (a) the order in which runoff-control measures are to be applied (Clause 4.3);
- (b) retention of frequent rainfall, and how retained volume is credited against detention (Clause 4.4);
- (c) release-rate criteria for standard and flood-sensitive catchments (Clause 4.5);
- (d) the procedure for sizing detention storage and outlets (Clauses 4.6 to 4.9);
- (e) facility types, rainwater harvesting (RWH) accounting, and high-groundwater sites (Clauses 4.10 to 4.12);
- (f) regional detention and fee-in-lieu (Clause 4.13);
- (g) simplified methods for small sites: the Tier B tables and the fixed-coefficient route (Clause 4.14); and
- (h) public safety (Clause 4.15).
4.1.2 This chapter applies to land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, as set in Chapter 1. Single dwellings below that threshold, and road resurfacing that adds no impervious area, are exempt. The existing RWH mandate of the building rules (rainwater harvesting "through storing of water runoff including rainwater in all existing and new buildings on plots of 100 square metre and above", with the storm-water drainage and the points of collection of rain water "in surface reservoirs or in recharge wells" shown on the plans, under bye-law 66 of the Model as each local body has brought it into force, with its soft cover, the grey-water recycling of bye-law 67 and the fee rebate of bye-law 68; none sets a volume, and all are discussed in the Commentary to Clause 4.11) continues to apply to every building it covers, whether or not this chapter applies.
4.1.3 Rainfall inputs come from Chapter 2. Hydrologic methods come from Chapter 3. Tailwater, downstream analysis and the outfall-closed check come from Chapter 5. Water quality volume (WQv) treatment comes from Chapter 8. Where this chapter and those chapters overlap, the more stringent requirement governs.
4.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Retention | Permanent removal of runoff from the surface drainage system by infiltration, evapotranspiration or reuse, so that the water never reaches the outfall. |
| Retention depth | The 90th percentile wet-day 24-hour rainfall depth for the site's zone (Clause 2.10, Annex 2E). |
| Required retention volume (RRV) | The runoff volume from the retention depth over the post-development site (Clause 4.4.2). |
| Detention | Temporary storage of runoff, released through a controlled outlet at a rate set by Clause 4.5. |
| Retention credit | The reduction in required detention storage that results from retention practices, determined by routing under Clause 4.4.6. It is not the same as the retained volume. |
| Permissible site discharge (PSD) | The maximum rate at which a site may discharge for a stated AEP, in L/s or L/s/ha. |
| Site storage requirement (SSR) | The detention storage required per hectare of site under the simplified method of Clause 4.14. |
| Multi-stage outlet | An outlet structure with separate openings at different levels, each controlling a different AEP (Figure 4.2). |
| Drawdown time | Time from the peak stored volume until the stated fraction of that volume has been released. |
| Emergency spillway | A secondary overflow that passes flows above the primary outlet capacity, or all flow when the primary outlet is blocked, without overtopping the embankment. |
| Freeboard | Vertical distance between the maximum design water level and the embankment crest or other critical level. |
| Flood-sensitive catchment | A catchment listed in Clause 4.5.3 or notified under Clause 4.5.4. |
| Authority | The approving authority under Chapter 1 (the urban local body, that is IMC, a Municipal Council or a Nagar Panchayat, for the building permit and its own drains, under the bye-laws it has brought into force on the Model and the Manipur Municipalities Act, 1994; PDA Manipur in a Master Plan or notified planning area outside municipal limits, under the Manipur Town and Country Planning Act, 1975; and, in the hill areas, where no building-control authority exists, the department that executes a public work, for that work, as applicable). |
| Tier A / Tier B | Adoption tiers defined in Chapter 1. Tier A: the Imphal Municipal Corporation (IMC), PDA Manipur and every other approving authority within the Greater Imphal planning area (151.38 km², the area of the Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification)), whichever has jurisdiction over a site (which body issues building permission in the planning area outside IMC's limits is to be confirmed [TBC]). Tier B: Municipal Councils, Nagar Panchayats and planning authorities. |
4.3 Order of measures
4.3.1 Every site runoff-control design shall apply measures in the following order, and shall document in the submittal why each earlier step could not do more:
- Preserve. Keep existing waterbodies, pukhris, natural drainage lines, wetlands, and permeable soils and vegetation. Avoid fill in flood storage (Chapter 7).
- Retain. Retain the RRV on site by infiltration, reuse or evapotranspiration (Clause 4.4).
- Detain. Detain the remaining runoff so that the release-rate criteria of Clause 4.5 are met for every design storm and duration (Clauses 4.6 to 4.9).
- Convey. Convey the 1% AEP (100-yr) flow safely through the site to the receiving system on a defined overland path (Chapter 6), and check the receiving system downstream (Chapter 5).
4.3.2 Preservation and retention reduce the detention required (Clauses 4.4.6 and 4.4.7). They do not relieve the site of the release-rate criteria of Clause 4.5 or of the downstream analysis of Chapter 5.
Commentary. This order follows the "layers of stormwater management" adopted in the Kansas City Metro APWA Section 5600 Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet; MARC Supplement, Nov 2025). Maintenance is the fifth layer and is set in Chapter 10. The 2025.01 manual credits retention and natural-area preservation against detention size (MARC Supplement, Nov 2025). Clause 4.4.6 adopts that credit, and defines it so that it cannot be claimed twice.
4.4 Retention
4.4.1 Requirement
The site shall retain the RRV. Retention shall be achieved by one or more of the following:
- infiltration practices (soakaways, infiltration trenches, permeable pavement with an infiltration base, bioretention);
- rainwater reuse that is drawn down by a demonstrated non-potable demand;
- green roofs and landscape areas that do not drain to the outfall in the retention-depth storm.
The limits of Clause 4.4.4 apply.
4.4.2 Computation of the RRV
RRV (m³) = 10 × Q_R × A
where:
- Q_R (mm) is the runoff depth from the retention depth P_R (Annex 2E). It is computed with the SCS-CN method for the post-development cover of each sub-area, at AMC II, with Ia = 0.2S (Chapter 3); and
- A (ha) is the area of the site that drains to the outfall.
Q_R shall be computed for each sub-area separately and summed. An area-weighted CN shall not be used where impervious and pervious areas differ by more than 20 CN points.
The volumetric method RRV = 10 × P_R × Rv × A, with Rv = 0.05 + 0.009 × I (I = percent impervious), may be used for sites under 0.5 ha and under the Tier B method.
Commentary. The Rv formula is the one used in the KC water quality volume (MARC BMP Manual 2012). It is simple to review for small sites. The SCS-CN form is required for larger sites so that the retention computation uses the same runoff model as the detention routing. That keeps the credit computation of Clause 4.4.6 consistent.
4.4.3 Verification
Retention by infiltration shall be supported by:
- (a) site infiltration tests at the location and depth of each practice, at the frequency set in Chapter 8;
- (b) a design infiltration rate of no more than half of the measured rate; and
- (c) groundwater evidence showing the seasonal high groundwater table at least 1.0 m below the base of the practice (Chapter 8).
Retention by reuse shall be supported by a demand calculation showing that the RRV is drawn down within 72 hours by a continuous non-potable use, such as toilet flushing, cooling or irrigation.
Commentary. The factor of 2 on measured infiltration rate has no direct precedent; this Manual sets it to allow for clogging and for the difference between a test pit and a full-scale practice. Chapter 8 may set a different factor; if it does, Chapter 8 governs.
4.4.4 Limits on retention
4.4.4.1 Infiltration practices shall not be used:
- where the seasonal high groundwater table is less than 1.0 m below the base (Chapter 8);
- on contaminated land;
- within the setbacks from foundations, wells and septic systems set in Chapter 8; or
- on fill, unless tested after placement.
4.4.4.2 Where the RRV cannot be fully retained, the shortfall shall be stated in the submittal. The shortfall shall be treated as WQv under Chapter 8 and shall get no retention credit.
4.4.5 Drawdown of retention
Retention storage shall be emptied by infiltration or reuse within 72 hours of the end of the retention-depth storm, verified by the tests of Clause 4.4.3.
4.4.6 Retention credit: definition and computation
4.4.6.1 What the credit is. The retention credit is the reduction in required detention storage that results when the retention practices are included in the post-development routing. It is computed. It is not assumed equal to the RRV.
4.4.6.2 Tier A method (routing). For each design storm and duration of Clause 4.6.3:
- (a) model each retention practice explicitly as a storage that is empty at the start of the storm, unless Clause 4.11 says otherwise;
- (b) let the practice fill from the front of the storm, and let it lose water during the storm only at the design infiltration or reuse rate of Clause 4.4.3;
- (c) once it is full, route its overflow to the detention facility; and
- (d) size the detention for the residual hydrograph.
The required detention storage is the largest storage over all storms and durations. The credit is the difference between that storage and the storage required with no retention. No further deduction shall be made.
4.4.6.3 Tier B method (simplified). The detention storage required by Clause 4.14 may be reduced by:
V_credit = C_R × RRV_provided
where C_R is the retention credit factor from Annex 4B for the zone, soil group and drawdown rate. Until Annex 4B is published, C_R = 0.
4.4.6.4 Retention that is not verified under Clause 4.4.3 gets no credit.
Commentary. "Credited against detention" (APWA 5600 2025.01) can be read in two ways. One reading subtracts the retained volume from the detention volume, cubic metre for cubic metre. The other routes the storms with retention in place and sees what detention is still needed. The two readings give very different answers in Manipur, because the mandatory 48- and 72-hour storms (Clause 2.5.2) fill any retention practice on the first day, long before the peak arrives on the last day (Clause 2.9.2). Unless the practice keeps infiltrating during the storm, it is full at the peak and does nothing to reduce the peak storage.
The illustrative example in Clause 4.6.7 shows the size of the effect. A 2 ha site with 552 m³ of retention (no infiltration during the storm) needs 138 m³ less detention for the 24-hour storm. That is a credit of about a quarter of the retained volume. For the 48- and 72-hour storms, which govern, the credit is close to zero. Subtracting the retained volume directly would have under-sized the detention by about 545 m³ (about 19%).
This Manual therefore defines the credit as the result of routing. Retention on fast-draining sandy soils, which keeps infiltrating through a multi-day storm, will earn a real credit. Retention that only fills will earn little. Both outcomes are physically correct. Setting C_R = 0 until Annex 4B exists is a safe default for Tier B, not a judgement that retention has no value: retention is still required for water quality and recharge (Chapter 8).
4.4.7 Preservation credit
Areas of the site that are permanently preserved in natural cover may be modelled at their pre-development CN in the post-development condition, provided that:
- they are protected by a registered covenant or dedication; and
- their runoff is not concentrated onto impervious surfaces.
This lowers both the RRV and the detention required. No other preservation credit applies.
4.5 Release-rate criteria
4.5.1 General
4.5.1.1 Peak discharge from the site shall be computed by a hydrograph method (Chapter 3) for the pre-development and post-development conditions with identical design storms (Clause 2.11.1). The Rational Method shall not be used for any part of storage sizing.
4.5.1.2 Pre-development is greenfield: open land in good condition for the mapped HSG. Existing impervious cover is not counted (Clause 2.11.5, Chapter 3). This applies to redevelopment as well, subject only to the constrained-redevelopment route of Clause 4.5.6.
4.5.1.3 The criteria apply at each point where runoff leaves the site. Where a site drains to more than one outfall, the criteria apply to each outfall for the area draining to it. Runoff shall not be diverted between catchments.
4.5.2 Standard catchments
For each of the 50%, 10% and 1% AEP (2-, 10- and 100-yr) storms, and for every duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:
Q_post(T, d) ≤ 0.9 × Q_pre(T, d)
4.5.3 Flood-sensitive catchments
4.5.3.1 In the catchments listed below, the mixed-frequency rule of Clause 2.11.3 applies, for every duration in Clause 2.5.2:
Q_post(1% AEP, 100-yr) ≤ Q_pre(10% AEP, 10-yr), and Q_post(50% AEP, 2-yr) ≤ Q_pre(50% AEP, 2-yr).
Each cap is the pre-development peak at the duration that maximises it: the 10-yr peak for the 100-yr check, and the 2-yr peak for the 2-yr check. The cap applies to every post-development duration (Clause 2.11.3).
4.5.3.2 The flood-sensitive catchments are:
- (a) the Nambul through Greater Imphal: the catchment of the Nambul within the Greater Imphal planning area, with the Naga Nullah and Waisel Maril channels and the 72 drains that fall into the river, down to its outfall from the planning area;
- (b) the Imphal river through Imphal: the land of Imphal that drains to the Imphal river through its bunds, from Minuthong in the city downstream, including the localities at the points where the bunds breached in 2024 and 2025 (Clause 2.3.6(i));
- (c) the Lamphelpat basin: the land that drains to Lamphelpat and through its pumped outlet, the Shamushang nallah, to the Nambul;
- (d) the Kongba and Iril corridors of Imphal East: the land of Imphal East that drains to the Kongba and to the Iril, behind their bunds;
- (e) Thoubal on the Thoubal river: the land of Thoubal that drains to the Thoubal river, on the release reach below the Mapithel dam;
- (f) the Loktak margin: the land of Moirang, Ningthoukhong and Thanga, and of Ithai, Sugnu and Wangoo with the backwater of the Chakpi, that drains to Loktak, its fringing pats or the Manipur river between Ithai and Sugnu (sub-area MN-A1);
- (g) Nambol and Bishnupur on the Nambol and Nambul rivers: the land of the two towns that drains to the Nambol and the Nambul;
- (h) Kakching and Wangjing on the Sekmai and Wangjing rivers: the land of the two towns that drains to the Sekmai and the Wangjing;
- (i) Jiribam on the Barak and the Jiri: the land of Jiribam that drains to the Barak and the Jiri, on their flood plain (sub-area MN-C1);
- (j) the hill towns on landslide ground: the land of Noney, with Tupul, of Tamenglong, of Chandel and of Kangpokpi, with the landslide ground round them; and
- (k) any catchment notified under Clause 4.5.4.
The boundaries shall be those mapped in Annex 4A.
4.5.4 Notification of further flood-sensitive catchments
4.5.4.1 The Authority may propose that a catchment be notified as flood-sensitive where one or more of the following is documented:
- (a) buildings or arterial roads flooded in an event of 1% AEP or more frequent, on at least two occasions in the previous 20 years;
- (b) receiving drains or channels with capacity below the 10% AEP flow under existing conditions;
- (c) an outfall that is closed by a gate or flap gate in a river bund when the Imphal, the Nambul, the Iril, the Kongba, the Thoubal or another valley river stands at or above its WRD flood level, or that depends on pumping, such as the pumped outlet of Lamphelpat to the Nambul through the Shamushang nallah, or that discharges to Loktak or a pat held up above its invert by the Ithai barrage and the Sugnu hump, to the Barak or the Jiri at Jiribam in flood, or to a reach below the Mapithel or another dam that releases water, or that is blocked by phumdi, garbage or the debris of a hill stream, for part of the monsoon season (Chapter 5);
- (d) loss of more than a quarter of the mapped tank and pukhri storage in the catchment since the earliest available survey; or
- (e) a basin master plan that relies on limiting site discharge.
4.5.4.2 The procedure shall be:
- The Authority prepares a technical note with the catchment boundary in GIS form and the evidence for 4.5.4.1.
- The State-level technical committee constituted under Chapter 1 reviews the note.
- The draft notification and map are published for public comment for at least 60 days.
- The Government notifies the catchment and the map is added to Annex 4A.
- The rule applies to applications received 6 months or more after notification. Applications received earlier are assessed under Clause 4.5.2.
4.5.4.3 A notified catchment may be de-notified only by the same procedure, and only after a basin study shows that the downstream system meets Chapter 5 with all development under Clause 4.5.2.
Commentary. The 0.9 factor is derived from the Denver (MHFD) analysis. In that analysis, ten basins each releasing 100% of the historic 100-yr peak still produced 106% of the historic peak at the outlet; releasing 90% at each gave 97% (UDFCD Full Spectrum Detention Release Rate Memorandum, 2012). The mixed-frequency rule has no direct precedent; the nearest is the Malaysian DID (2008) checklist, which required post-development 2-, 10-, 50- and 100-yr peaks below the pre-development 2-yr peak. The specific "100-yr post ≤ 10-yr pre" form appears in a New Berlin, Wisconsin planning discussion (not an adopted rule). The list follows the valley's rivers, its lake and its hill towns, because in Manipur flooding comes less from rain on a town than from rivers and a lake that stand higher than its drains. "The town is below the high flood level of Imphal river" (Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification)); 35% of Imphal is "prone to floods", and "the failure of river dikes causes waterlogging in the low-lying areas for several weeks" (AIIB, Approval Project Document, 2024). The Nambul entry follows "the main urban river" (AIIB): the State's reports to the NGT record the "Interception & Diversion (I & D) of all drains (72 Nos.) falling into the Nambul River", with a drain BOD of 42.45–52.34 mg/L (State report in NGT OA 606/2018, December 2025); the river breached its bunds at four places in 2025 (as reported); the clogged Naga Nullah flooded Nagaram, Laipham Khunou and Lairikyengbam Leikai in July 2024 (as reported); and the market waste "dumped in the Naga Nullah on the backside of the market … creates a stagnant pool all along the year" (master plan). At Thong Nambonbi (Hump Bridge) the Nambul has a highest flood level of 783.695 m, which it exceeded on 29 May 2024 (WRD figures, as reported). The Imphal river entry follows the river at Minuthong, whose flood level of 786.900 m and highest flood level of 788.400 m lie within a metre or two of the city's ground (about 790 m, AIIB; NEER's reading), and which overflowed "above the highest flood level" on 29 May 2024 (as reported); its bunds breached at Singjamei, Heingang, Bashikhong and New Checkon in 2025 and at Keirang, Khabam and Lairikyengbam Leikai in 2024–2025 (as reported). In Cyclone Remal, 28–31 May 2024, 18 embankments were reported breached and 17 sealed, with 1,88,143 people and 24,265 houses affected by the Minister's count of 30 May and 1,26,950 people, 255 localities and 16,364 houses by the Relief and Disaster Management Department's report of 31 May (as reported: the counts conflict). The Lamphelpat entry follows the pat being developed as flood storage, which "remains waterlogged for many days every year" because of "reduction in detention capacity" (NDB, project summary) and which is pumped to the Nambul through the Shamushang nallah in high flood (WRD site report in HC PIL No. 8 of 2025). The Kongba and Iril entry follows the bunded rivers of Imphal East, where the Iril breached at Kshetri Awang Leikai in September 2025, when it stood at 788.850 m at Irilbung, above its flood level of 787.700 m (as reported); Imphal East was the worst hit in 2025 (as reported). The Thoubal entry follows the release reach of the Mapithel dam: the Thoubal carried 391.636 m³/s at the Thoubal bridge on 30 August 1999 (MASTEC), the river has 14 vulnerable embankment points (MASTEC), and the reservoir stood at 876 m, "nearly 2 m above the spillways", on 1 August 2015 (as reported). The Loktak margin entry follows the lake: the Ithai barrage holds Loktak at a full reservoir level of 768.5 m (NHPC, as quoted), the Manipur river at Ithai stood at 770.05 m on 15 September 2025, above its printed highest flood level of 769.320 m (as reported), and the Chakpi "meets the Manipur River at a reverse direction, thereby checking the current … making inundation of the surrounding area of Sugnu extending upto Wangoo" (MASTEC). The Nambol and Bishnupur entry follows the Nambol, which overtopped its highest flood level at Nambol Thongkhong (774.700 m or 774.400 m; the reports differ) on 29 May 2024 (as reported), and the Nambul below the city, on peat and clay with the piezometric head 2.50–4.30 m below ground (CGWB, Bishnupur). The Kakching and Wangjing entry follows the Sekmai and the Wangjing, both on the CPCB's list of polluted stretches (Priority V, CPCB, 2025) and both in the buffer table of bye-law 93; the Wangjing breached at two places in September 1997 (MASTEC). The Jiribam entry follows the Barak and the Jiri: the CWC site at Chotebekra recorded its highest level, 32.1 m, on 31 July 1989 (CWC, as transcribed by SANDRP), and on the Barak plain downstream, which the adjoining edition of this series governs, river-locked outfalls are treated as closed for at least 7 days. The hill-town entry follows the landslides: at Tupul, Noney, on 29 or 30 June 2022, a slope at the Jiribam–Imphal railway site failed after "poorly designed or implemented slope excavation coupled with heavy rainfall" (Baruah et al., 2023, via a search summary of the AGU Landslide Blog, as reported), killing 56, 58 or 61 people by different counts (as reported; NRSC reported 42 dead and 20 missing on 5 July); at Joumol, Chandel, on 1 August 2015, 20 or 21 died, or 24 by ActionAid's count (as reported); and the Khoupum valley was inundated after 225 mm fell at Khoupum in one night on 15 July 2025 (IMD Imphal officials, as reported; duration and gauge not stated). Kangpokpi is listed because its hills feed the valley's floods: WRD's rule of thumb, as reported, is that 135 mm in three days there floods the valley, and 175 mm fell in 72 hours on 30–31 May 2025 (as reported). Ukhrul, Senapati, Churachandpur and Moreh are candidates for notification under Clause 4.5.4. The official final tolls of the Relief and Disaster Management Department and MSDMA were not obtained [TBC]. The notification triggers in 4.5.4.1 have no direct precedent and are set by this Manual. The 6-month lead time follows the update rule of Clause 2.14.2. Clause 4.16 explains why releases below pre-development are needed at all.
4.5.5 Minimum outlet and short-duration 2-yr checks
4.5.5.1 Where the PSD for any AEP and duration is less than the discharge of a 50 mm orifice (Clause 4.8.2) at the corresponding stage, the 50 mm orifice is deemed to comply for that AEP and duration.
4.5.5.2 Where meeting the 2-yr criterion at a duration of 3 hours or less would require a low-flow orifice so small that the drawdown requirement of Clause 4.7 cannot be met, the designer shall:
- size the low-flow orifice as the smallest opening that meets Clause 4.7; and
- report the resulting 2-yr exceedance for those durations.
The Authority may accept the design if the exceedance is below the discharge of the 50 mm orifice at the 2-yr stage, or if the downstream analysis of Chapter 5 shows no adverse effect.
Commentary. Under AMC II, a greenfield site produces almost no runoff in a 1- or 2-hour, 2-yr storm, because most of the rain is lost to initial abstraction. A pre-development peak of a few litres per second, compared duration by duration, then forces a very small low-flow orifice. That orifice cannot release the 10-yr volume within 48 hours. Checked as if it were outside a flood-sensitive catchment, the illustrative example of Clause 4.6.7 would need a low-flow orifice of about 75 mm to match the 1-hour, 2-yr pre-development peak. 90% drawdown of the 10-yr volume would then take about 84 hours even with a clean orifice, against the 48-hour limit. The 170 mm orifice that meets drawdown with 50% blockage exceeds the 1-hour, 2-yr pre-development peak by about 11 L/s. Clause 4.5.5.2 resolves that conflict in favour of drawdown, because a basin that is still partly full when the next monsoon storm arrives fails in the event that matters more. KC APWA 5600 (2006) used a 75 mm (3 in) minimum orifice with trash racks. This Manual sets a 50 mm minimum (Clause 4.8.2).
4.5.6 Constrained redevelopment sites
4.5.6.1 Eligibility. The relief route of this clause is available only for redevelopment where all of the following hold:
- (a) the existing site is at least 60% impervious, as surveyed before demolition;
- (b) the site is 1 ha or less; and
- (c) the designer shows, in a Constraint Statement submitted with Form 4-1, that the greenfield criteria of Clauses 4.5.2 or 4.5.3 cannot be met on the site. The statement must show that every storage option of Clause 4.10 has been assessed: rooftop and podium storage, tanks under parking or landscape, permeable paving with sub-base storage, and landscape depressions. It must also give the storage each option can provide.
New development on undeveloped land is never eligible.
4.5.6.2 Minimum on-site performance. An eligible site shall provide all of the following on site:
- (a) the full retention volume (Clause 4.4) and the WQv treatment (Chapter 8), with no relief;
- (b) post-development peak discharge no more than 50% of the existing-condition peak for the 50%, 10% and 1% AEP storms, at each duration of Clause 2.5.2. The existing condition is modelled under Clause 3.3.4; and
- (c) no increase in the 1% AEP water level at any building or road downstream (Chapter 5).
4.5.6.3 Shortfall. The shortfall is the detention storage required to meet the greenfield criteria (Clause 4.6) minus the storage provided on site under 4.5.6.2. The applicant shall pay for the shortfall as a fee-in-lieu at the unit rate of Clause 4.13.3. The fee shall be:
- (a) paid into the ring-fenced account of the basin in which the site lies;
- (b) spent only on regional detention or on restoring pukhri or tank flood storage identified in the basin stormwater master plan (Chapter 11); and
- (c) recorded in the public ledger of Clause 4.13.4, which shall show the volume owed and the volume delivered in each basin.
Where no basin master plan has yet been approved, the fee shall be held for up to 5 years. If no plan is approved in that time, it shall be spent on restoring tank flood storage in the same basin, with WRD agreement.
4.5.6.4 Flood-sensitive catchments. In the catchments of Clause 4.5.3, the route is available under the same conditions. The Authority may, however, refuse it where the downstream analysis of Chapter 5 shows existing flooding of buildings in the 10% AEP event within the analysis extent.
Commentary. Greenfield is the target for all redevelopment, because a dense city only reduces its runoff as it rebuilds. On small, fully built plots in areas such as Thangal and Paona Bazar in central Imphal (as reported), the localities that the clogged Naga Nullah flooded in July 2024, Nagaram, Laipham Khunou and Lairikyengbam Leikai (as reported), or the old centres of Thoubal and Kakching [TBC], there is often no space for the full greenfield storage. A rule that cannot be met invites variances and non-compliance, which help no one downstream. This clause follows the approach of the UK Non-statutory Technical Standards for Sustainable Drainage (Defra, 2015, S2–S3). For previously developed sites, those standards require peak runoff "as close as reasonably practicable to the greenfield runoff rate" and never above the pre-redevelopment rate. The fixed 50% minimum reduction has no direct precedent; this Manual sets it to give reviewers a clear number in place of a "reasonably practicable" judgement. The fee-in-lieu turns the shortfall into regional storage in the same basin, so the basin still receives greenfield-equivalent control in total. Retention and water quality get no relief, because they are small volumes that almost every site can hold.
4.6 Detention sizing procedure
4.6.1 Method
Detention shall be sized by hydrograph routing through the stage–storage–discharge relationship of the facility, by level-pool (Modified Puls) or an equivalent numerical method (SWMM, HEC-HMS). Fixed-ratio and Rational-based storage formulae shall not be used. The simplified methods of Clause 4.14 (the Tier B tables and the fixed-coefficient route) are the only exceptions.
4.6.2 Steps
- Delineate the site and sub-areas. Map HSG and confirm by testing (Chapter 3).
- Extract design rainfall for 50%, 10% and 1% AEP and every duration in Clause 2.5.2, with the climate factor (Chapter 2, Form 2-1).
- Build design hyetographs: alternating block for ≤ 24 h; the "peak day last" pattern for 48 and 72 h (Clause 2.9).
- Compute pre-development hydrographs (greenfield CN; AMC III for storms of every duration from 1 June to 15 October in sub-areas MN-A and MN-B, from 1 May to 31 October in MN-C and MN-C1, and from 1 April to 31 October on land below the 1% AEP level of a river, a stream or Loktak, on peat, on pat and pukhri margins and on land behind river bunds, at all times in sub-area MN-A1 and in catchments draining to a reservoir, its backwater or a release reach below a dam, and at other sites and times after a 5-day total of more than 53 mm, AMC II otherwise).
- Compute the release caps for each AEP and duration under Clause 4.5.2 or 4.5.3.
- Compute post-development hydrographs with the same storms and AMC, including retention practices (Clause 4.4.6).
- Choose a trial facility geometry (stage–storage) and a multi-stage outlet (Clause 4.6.5).
- Route every storm and duration. Use a time step of no more than 5 minutes, and no more than Tc/3 of the post-development catchment.
- Check every release against its cap, and check drawdown (Clause 4.7). Adjust the outlet and storage and repeat.
- Check the tailwater condition of Clause 4.6.6 and the downstream analysis of Chapter 5.
- Size the emergency spillway and set freeboard (Clause 4.9).
- Report the governing storm for storage, for each outlet stage, and for the spillway (Clause 4.17).
4.6.3 Storms to be routed
Every facility shall be routed for the full matrix:
Table 4.1 — Design storms to be routed for detention sizing
| AEP | Durations (h) | AMC |
|---|---|---|
| 50% (2-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
| 10% (10-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
| 1% (100-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
The 24-, 48- and 72-hour runs are mandatory whatever the critical-duration result (Clause 2.5.2). Where Ia = 0.05S sensitivity is required by Chapter 3, it shall be run for the governing storage case.
4.6.4 Initial conditions
Each run shall start with:
- detention storage empty, down to the invert of the lowest outlet;
- any permanent pool full;
- retention practices empty, except as limited by Clause 4.11; and
- RWH storage full (Clause 4.11).
The 48- and 72-hour storms already contain their antecedent rain, so no further pre-filling is applied.
4.6.5 Multi-stage outlet design
4.6.5.1 The outlet shall have a separate control for each criterion, normally stacked as in Figure 4.2:
- Stage 1, at the invert: the low-flow orifice. It releases the WQv over 24–48 h (Chapter 8) and controls the 2-yr release.
- Stage 2: an orifice or slot set at or near the maximum 2-yr level. It controls the 10-yr release.
- Stage 3: a weir, riser crest or larger orifice set at or near the maximum 10-yr level. It controls the 100-yr release.
- Emergency spillway: separate from the primary outlet (Clause 4.9).
Stages may be combined where routing shows that every cap is met.
4.6.5.2 Orifices shall be computed with a discharge coefficient of 0.60 unless a rated device is used. Weirs shall use a coefficient appropriate to their shape. Submerged-outlet and tailwater effects shall be included (Clause 4.6.6).
4.6.5.3 Vortex flow controls and other proprietary devices may be used where the supplier provides a certified head–discharge curve and the minimum clear opening is at least 50 mm.
4.6.6 Tailwater on the outlet
The outlet shall be routed against the tailwater of the receiving system, not free outfall, wherever the receiving water level can rise above the outlet invert. The tailwater shall be:
- for a receiving drain: its water level in the same storm, from the Chapter 5 analysis or, for Tier B, the drain obvert;
- for tidal or backwater-affected outfalls: the levels and joint cases of Clause 2.12 and Chapter 5, including the outfall-closed check (Clause 5.10).
Where tailwater governs, a flap gate shall be fitted to the outlet (Clause 5.11). The storage below the tailwater level shall not be counted as available unless the routing includes the gate closure.
4.6.7 Illustrative example
Illustrative — not design values. This example shows the procedure and the sizes it produces. The inputs are invented to be plausible for a hill-fringe colony in Jiribam town draining to a stream of the Jiri. They are not NIH-DHAARA values and must not be used for design.
Inputs:
- Site: 2.0 ha, flood-sensitive catchment (Clause 4.5.3).
- Land cover: pre-development all pervious, CN 70. Post-development as two sub-areas (Clause 3.9.2): 1.57 ha of directly connected impervious surface at CN 98, never converted for AMC, and 0.43 ha of pervious open space at CN 70, on the same soil as pre-development; the area-weighted CN at AMC II is 92. For storms of 12 h and longer the pervious CN only is converted to AMC III: CN_III = 23·CN / (10 + 0.13·CN) = 84.3 (Clause 3.8.4).
- Time of concentration (Tc): 45 min pre-development, 15 min post-development (used for both sub-areas). SCS triangular unit hydrograph; 5-minute time step.
- 24-h depths: 110, 200 and 350 mm for 2-, 10- and 100-yr (the same 10- and 100-yr values as Clause 2.11).
- Shorter durations: P(t) = P24·(t/24)^0.40, an assumed ratio set and not Annex 2B.
- Longer durations: 48-h and 72-h depths taken as 1.25 and 1.40 × P24, laid out per Clause 2.9.2.
- Storage: vertical-walled, 2,500 m² plan area.
- Outlet, sized so that drawdown is met with the low-flow orifice 50% blocked (Clause 4.8.3). Annex 4C shows the trial outlet that failed this check.
- Stage 1: 170 mm orifice at the invert.
- Stage 2: 460 mm orifice with its invert 0.53 m above the floor.
- Stage 3: none needed, because the 100-yr cap is met by Stages 1 and 2.
Results (discharges in L/s; storage in m³):
Table 4.2 — Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
| Duration (h) | 2-yr pre | 2-yr post, detained | 10-yr pre | 10-yr post, detained | 100-yr post, uncontrolled | 100-yr post, detained | 100-yr storage used | 10-yr drawdown, 50% blocked (h) |
|---|---|---|---|---|---|---|---|---|
| 1 | 4 | 15 | 51 | 28 | 922 | 42 | 1,426 | 31.3 |
| 2 | 14 | 20 | 84 | 34 | 961 | 79 | 1,911 | 32.1 |
| 3 | 19 | 22 | 104 | 37 | 981 | 139 | 1,999 | 32.8 |
| 6 | 32 | 25 | 150 | 41 | 1,010 | 194 | 2,154 | 34.2 |
| 12 | 127 | 30 | 302 | 46 | 1,074 | 276 | 2,512 | 39.0 |
| 24 | 149 | 32 | 327 | 49 | 1,081 | 320 | 2,766 | 45.3 |
| 48 | 173 | 34 | 349 | 82 | 1,087 | 343 | 2,913 | 44.8 |
| 72 | 180 | 34 | 356 | 84 | 1,089 | 343 | 2,911 | 44.7 |
How to read it:
- 100-yr cap. The cap is the largest pre-development 10-yr peak, 356 L/s (72 h). Every 100-yr detained peak is at or below it; the largest is 343 L/s.
- 2-yr cap. The site is flood-sensitive, so the 2-yr cap is the largest pre-development 2-yr peak, 180 L/s (72 h; Clause 4.5.3.1). The largest 2-yr detained peak is 34 L/s. At 1, 2 and 3 hours the detained 2-yr peak is above the pre-development peak of the same duration (15 against 4 L/s, 20 against 14 L/s, and 22 against 19 L/s). That comparison is not required here. It would be for a site under Clause 4.5.2, and Clause 4.5.5.2 would then apply.
- Governing storage. Storage is governed by the 48- and 72-hour storms: 2,913 m³, which is 0.146 m³ per m² of site, at a maximum depth of 1.17 m. A design that checked only the critical-duration peak storm (1–3 h here) would have provided about 2,000 m³, roughly two-thirds of what is needed.
- Drawdown. With the low-flow orifice 50% blocked (Clause 4.8.3), 90% of the 10-yr storage drains in at most 45.3 h (the 24-hour storm), within the 48 hours of Clause 4.7. A 120 mm orifice would drain it in about 42 h when clean but 54 to 75 h when half blocked, so it fails. Annex 4C shows that trial and the routing step by step.
- Retention credit. With an illustrative retention depth of 40 mm, RRV = 552 m³, computed for each sub-area (Clause 3.9.4). Modelled as filling from the start of the storm with no infiltration during it, the retention reduces the 24-hour storage by 138 m³ and the 48- and 72-hour storage by 7 m³ or less. The credit under Clause 4.4.6 is therefore effectively zero for this site.
The order of magnitude, about 0.15 m³ per m² of site, is consistent with the indication in Clause 2.11.
Figure 4.1 — Pre-development 10-yr, post-development 100-yr uncontrolled and detained hydrographs for the 24-hour storm of the illustrative example (Clause 4.6.7). Illustrative — not design values. Original drawing for this Manual, adapted from the pre/post-development hydrograph concept in MARC/KC APWA Section 5600 and the Georgia Stormwater Management Manual (2016).
Commentary. Figure 4.1 shows what detention does and does not do. It cuts and delays the peak. It does not reduce the volume: the area under the detained curve equals the area under the uncontrolled curve, more than twice the pre-development 10-yr volume. The extra volume leaves the site over many hours after the storm. That prolonged release can coincide with the peak of the larger catchment downstream (Clause 4.16), and it must still drain when the outfall is tide-locked (Chapter 5).
4.7 Drawdown
4.7.1 Detention. At least 90% of the maximum volume stored in the 10% AEP (10-yr) storm of each duration shall be released within 48 hours of the time of maximum storage, by gravity, with the tailwater of Clause 4.6.6.
4.7.2 Water quality volume. The WQv shall be released over not less than 24 hours and not more than 48 hours (Chapter 8).
4.7.3 Retention. Retention storage shall be emptied within 72 hours by infiltration or reuse (Clause 4.4.5).
4.7.4 Tidal outfalls. Where gravity drawdown is prevented by tide for part of each cycle, the 48-hour limit applies with the tidal tailwater modelled. Where it cannot be met by gravity, pumped drawdown shall be provided under Clause 5.12.
Commentary. KC APWA 5600 (2006) required dry basins to release at least 80% of storage within 24 hours of the inflow peak and to empty within 72 hours. Singapore PUB requires detention to be restored within 4 hours. The 48-hour, 90% rule is longer than PUB's because Manipur storage must hold multi-day volumes. It is still short enough that a basin filled by one monsoon depression will have most of its volume back before the next, which in late August and early September 1999, when the Thoubal peaked at 391.636 m³/s at the Thoubal bridge on 30 August and again at 330.906 m³/s on 2 September, within one spell of rain from 24 August to 3 September (MASTEC) followed within days.
4.8 Outlet structures
4.8.1 General. Primary outlets shall be:
- unattended, with no moving parts, valves or pumps, except where Clause 5.12 permits pumped drawdown;
- accessible for inspection and cleaning from the surface without confined-space entry, where practicable; and
- built of durable materials. In coastal areas these shall be corrosion-resistant (Clause 4.12.5).
4.8.2 Minimum orifice. No control orifice shall be smaller than 50 mm in diameter, or 50 mm in least dimension for a slot.
4.8.3 Trash racks and screens. Every orifice and weir shall be protected by a trash rack or screen. The rack shall:
- have a clear bar spacing no greater than half the smallest opening it protects, and not less than 25 mm;
- have a clear open area at least 10 times the area of the opening it protects;
- be inclined, or set as a cage around the riser, so that debris rises with the water and does not pin against the bars;
- be removable or hinged for cleaning; and
- for routing, be assumed 50% blocked at the low-flow orifice when checking drawdown.
4.8.4 Anti-vortex devices. Riser crests and orifices that may run under more than 1.5 times their diameter of head shall have an anti-vortex plate or hood (Figure 4.2).
4.8.5 Outlet barrels. Outlet barrels through embankments shall:
- be at least 300 mm in diameter (Chapter 6);
- have watertight joints;
- have a filter diaphragm or seepage collars over the length within the embankment; and
- have an energy-dissipating outfall (Chapter 9).
4.8.6 Isolation. Facilities serving more than 1 ha shall have a means of isolating the outlet for maintenance, such as a stop-log slot or penstock. In normal service it shall be left fully open.
Commentary. The 50 mm minimum is smaller than the 75 mm (3 in) of KC APWA 5600 (2006), so the trash-rack requirements are correspondingly stricter. The ratios in 4.8.3 (bar spacing at half the opening, open area 10 times the opening, 50% blockage for the drawdown check) have no direct precedent and are set by this Manual. The blockage factor matches the 50% grate clogging factor for sag inlets in Chapter 6. Indian urban drains carry heavy loads of solid waste, so a low-flow orifice without an effective rack will block within one season.
Figure 4.2 — Detention storage stack (permanent pool, WQv, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and multi-stage riser outlet. Schematic, not to scale. Original drawing for this Manual, adapted from the multi-stage outlet and storage-zone concepts in MARC/KC APWA Section 5600 (2006, 2025.01) and the Mile High Flood District Urban Storm Drainage Criteria Manual, Volume 2 (full-spectrum detention).
4.9 Emergency spillway, freeboard and embankment safety
4.9.1 Spillway capacity. Every detention facility formed wholly or partly by an embankment, or whose overflow would reach buildings, shall have an emergency spillway that passes the 1% AEP (100-yr) peak inflow:
- with the primary outlet assumed fully blocked;
- with the facility full to the spillway crest at the start of the storm; and
- with at least 0.3 m freeboard from the maximum water level to the embankment crest.
4.9.2 High-hazard facilities. A facility is high-hazard if its failure or overflow could:
- endanger life;
- flood a habitable building or critical facility; or
- close an arterial road.
High-hazard facilities shall also be checked for the 0.2% AEP (500-yr) peak inflow under the conditions of 4.9.1, with the embankment not overtopped.
4.9.3 Spillway crest. The spillway crest shall be at or above the 1% AEP maximum water level from routing with the primary outlet working. The recommended clearance is 0.15 m.
4.9.4 Spillway location. The spillway shall be:
- on natural ground or a reinforced section, not on fill, unless protected against erosion for the full design flow;
- discharging to the 1% AEP overland flow path of Chapter 6; and
- placed so that its flow does not reach a building.
4.9.5 Underground and enclosed facilities. Tanks, vaults and podium storage shall have an overflow route that operates when the outlet is blocked. The route shall carry the 1% AEP inflow to the overland path without surcharging any building, basement or lift pit.
4.9.6 Embankments.
- (a) Embankments more than 2 m high (measured from the downstream toe to the crest) shall be designed by a qualified geotechnical engineer. The design shall include stability, seepage and settlement analysis.
- (b) Side slopes shall be no steeper than 3H:1V on any face that is mown or accessible to the public. Slopes shall be flatter where Clause 4.15 requires.
- (c) Embankments shall have:
- a crest width of at least 3 m;
- compacted, engineered fill with a core or cut-off where required by the seepage analysis; and
- no trees or large shrubs.
- (d) An embankment structure that falls within the Dam Safety Act, 2021 is subject to that Act in addition to this Manual.
4.9.7 Excavated facilities. Facilities wholly below the surrounding ground, with no embankment, need not meet 4.9.6. They shall still meet 4.9.1, with the overflow route treated as the spillway.
Commentary. The spillway criterion (1% inflow, outlet blocked, basin full, 0.3 m freeboard; 0.2% for high hazard) follows the KC APWA 5600 (2006) rule: the spillway passes the 1% storm with 1 ft (0.3 m) freeboard to the top of the dam, assuming zero storage and a clogged primary outlet, with the crest at least 0.5 ft (0.15 m) above the 1% maximum water surface. KC designed dams above 10 ft (3 m) to SCS TR-60 Class C. The 2 m embankment trigger, the 3H:1V slope (KC wet ponds), and the 3 m crest width have no direct precedent and are set by this Manual.
4.10 Facility types
4.10.1 General. Any storage that meets Clauses 4.5 to 4.9 may be used. Surface storage that is visible and can be inspected without confined-space entry is preferred. Storage shall not be placed in a habitable basement or in any space whose flooding would endanger life.
4.10.2 Underground tanks and vaults.
- (a) Gravity outlet is required where the receiving drain allows it. Pumped outlets are permitted only under Clause 5.12, with a registered maintenance declaration (Chapter 10).
- (b) Access openings shall be provided over the outlet chamber and over every inlet. In tanks over 500 m², they shall be no more than 30 m apart.
- (c) The floor shall fall at least 1% to a sump at the outlet, with a sediment pocket below the low-flow orifice invert.
- (d) The tank shall be ventilated.
- (e) Inlets shall pass through a silt trap or gross pollutant trap (Chapter 8).
- (f) Flotation and groundwater ingress shall be checked under Clause 4.12.
4.10.3 Rooftop detention.
- (a) It is permitted on flat roofs designed for the full ponded load with the outlet blocked. The ponding depth shall not exceed 150 mm unless a structural engineer certifies a greater depth.
- (b) Each roof outlet shall have a flow-control ring or weir with a certified rating, and every roof area shall have at least one overflow scupper, independent of the controlled outlets, that passes the 1% AEP inflow.
- (c) Roofs used for RWH collection may also provide rooftop detention. The detained volume is released through the control, not into the RWH sump.
4.10.4 Podium and landscape-deck detention.
- (a) It is permitted above ground level or above a basement car park, provided the structure is designed for full saturation and ponding, and waterproofed.
- (b) The release, overflow and safety rules for rooftop detention (4.10.3) apply.
4.10.5 Parking-lot detention.
- (a) It is permitted only on surface parking. Ponding depth shall not exceed:
- 200 mm in the 10% AEP storm and 300 mm in the 1% AEP storm at any parking bay;
- zero on accessible routes, ramps and pedestrian crossings; and
- zero in the 10% AEP storm on fire-tender access routes.
- (b) Signs shall warn that the area floods.
- (c) Ponding shall not reach a building wall unless the wall is waterproofed above the 1% level plus freeboard (Chapter 6).
4.10.6 Multi-use detention (parks, playfields, open space reservation).
- (a) Open space land may be used for detention, provided its primary use remains available in at least the 50% AEP storm.
- (b) The storage areas shall be graded to drain fully within the times of Clause 4.7.
- (c) A low-flow channel or underdrain shall carry dry-weather and frequent flows, so that the park is not waterlogged.
- (d) The depth and slope limits of Clause 4.15 apply.
- (e) Play equipment and seating shall be placed above the 10% AEP level.
4.10.7 Ponds and wet basins.
- (a) A permanent pool shall be at least 1.2 m deep over most of its area to discourage weed growth and mosquito breeding, with a vegetated safety bench at the edge (Clause 4.15).
- (b) Only storage above the permanent pool counts as detention.
Commentary.
- The rooftop depth (150 mm) and parking depths (200 and 300 mm) have no direct precedent. This Manual sets them so that a blocked outlet is noticed before it becomes dangerous.
- The 1.2 m pool depth equals the 4 ft minimum permanent pool of KC APWA 5600 (2006). This Manual adopts it mainly for weed and mosquito control.
- Pumped detention tanks need maintenance declarations in Singapore (PUB Addendum No. 3, April 2025). This Manual adopts the same approach through Chapter 10.
- Using open space for multi-use detention fits the soft-cover rule of bye-law 66(b) of the Model, under which a building with a covered area of at least 500 m² keeps soft cover on at least 15% of the plot and any other building on at least 10%, and the green-building criterion that seeks to "Minimize storm water run-off from site by reducing hard paving on site"; the Model also allows no open drain, "except for rain water", in the open spaces it requires. Where the ground is outside the valley-floor and hill rules of Clause 4.11, a detention area graded into the soft cover below the level of the road keeps it pervious and usable, which is what 4.10.6 requires. On land to which the valley-floor rule applies, most of the Imphal valley floor, the same surface storage is the preferred form (Clause 4.12.4), but it earns no infiltration credit, its floor is set above the design groundwater level of Clause 4.12.1 or it is lined, and any permeable paving there is laid on a non-exfiltrating base with an underdrain. On hill-rule ground, slopes of more than 10°, Disang shale at any slope, colluvium, fill, slide debris and land within twice the height of a cut or wall downslope of it are not used for ponding, and detention is provided in lined tanks, on rooftops and podiums under 4.10.3 and 4.10.4, or on a level open space only where the hill rule's geotechnical certificate covers it. Four kinds of land are not open space for this purpose. A pukhri or pat on the land is preserved under step 1 of Clause 4.3.1 and modelled as a water surface (Clause 3.3.2(e)) that starts at its outlet level (Clause 3.12.5), so only its flood storage above that level can count, and only as Chapter 7 allows; a pat and its margins are never turned into a detention pond, and engineered storage is called a detention pond, never a pukhri or a pat. The buffers of bye-law 93 of the Model on the named rivers and the Manual's corridor of Chapter 7 are flood land already: water reaches them first, so they are not counted as detention for the development beside them. The land within the 236.21 km² of the Loktak Lake (Protection) Act, 2006 is not graded or excavated for a development's detention, because the Act bans in its Buffer Zone "Land reclamation, bunding or disturbing the natural course of drainages" (s.19) and makes its Core Zone a "No-Development Zone" (s.3). And paddy land and wetland are the valley's flood storage already: they are not open space for a development's detention, and where they are converted and built on, the storage lost is replaced under Clause 7.6.4 (Chapter 7).
- Signs and depth markers under Clause 4.15.5, and the flood-warning signs of 4.10.5(b), are in Manipuri, written in Meetei Mayek, and English; in the hill areas they are in English and the language in local use of the village or town, with Manipuri where the Authority so directs (set by this Manual). The rule follows the Manipur Official Language (Amendment) Act, 2021 (Act 7 of 2021), which defines "Manipuri Language" as "Meeteilon written in Meetei Mayek" and allows the "concurrent use of Bengali Script and Meetei Mayek … in addition to English language, for a period upto 10(ten) years"; how section 7 of the Manipur Official Language Act, 1979 treats the hill areas was not read cleanly [TBC], and a sign must be readable by the people it warns.
4.11 Rainwater harvesting versus detention accounting
4.11.1 No double counting. RWH storage (sumps, tanks, recharge pits and wells provided under the RWH mandate) shall not be counted as detention.
4.11.2 RWH sumps assumed full. For all routing under this chapter, RWH sumps and tanks shall be assumed full at the start of every storm, in every season. Their overflow shall be routed to the detention facility, or directly to the outfall if it bypasses detention. In the latter case the bypass flow counts against the PSD.
4.11.3 Combined tanks. A single tank may provide both RWH and detention only if:
- (a) the detention zone lies wholly above the RWH overflow level;
- (b) the detention zone is drained by its own gravity control orifice set at the RWH overflow level, meeting Clauses 4.7 and 4.8;
- (c) no pump, valve or user action can hold water in the detention zone; and
- (d) the two zones and the orifice level are shown on the drawings and in the maintenance declaration.
Only the volume between the RWH overflow level and the detention overflow level counts as detention.
4.11.4 Recharge structures. Recharge pits, trenches, shafts and wells may count as retention (not detention) if they meet Clauses 4.4.3 to 4.4.5. In particular, the seasonal high groundwater table shall be at least 1.0 m below their base. In the routing they are treated under Clause 4.4.6 with the groundwater level for the monsoon season.
4.11.5 RWH remains mandatory. Nothing in this chapter reduces the RWH requirement of bye-laws 6(1)(C)(j), 66 and 67 of the Model Manipur Unified Building Bye-Laws 2024 as each local body has brought them into force, the completion certificate that certifies the "water harvesting as well as waste water re-cycling systems", any condition of a building permission, the guidelines of the Central Ground Water Authority where they apply, the Manipur Ground Water (Control & Regulation) Policy, 2023 (as listed by DoECC; text not read [TBC]), or any rainwater harvesting rule or direction of an approving authority.
Commentary. Rainwater harvesting in Manipur is required by the bye-laws, which do not size it. Bye-law 66 of the Model Manipur Unified Building Bye-Laws, 2024 [TBC: confirm the number and text in the bye-laws the local body has notified] reads: "a) Water Harvesting: Water harvesting through storing of water runoff including rainwater in all existing and new buildings on plots of 100 square metre and above will be mandatory. The plans submitted shall indicate the system of storm water drainage along with points of collection of rain water in surface reservoirs or in recharge wells", and "b) Soft Cover: … For any building having a minimum covered area of 500 square metre, the applicant should provide soft cover of at least 15% of the plot area. … For any other building, having lesser covered area, the soft cover should be at least 10% of the plot area." Bye-law 67 requires grey-water recycling for a covered area of 500 m² or more or a flow of 10,000 L/day or more, and "The excess waste water not reused for toilet flushing shall be suitably connected to the rain water recharge structures for ground water recharge"; bye-law 68 gives a "rebate of 10 % on building permission fees" to owners "who undertake both recycling of waste water and rain water harvesting structures"; the plans show the "detail provisions made for conservation and harvesting of rain water" (6(1)(C)(j)); and the completion certificate certifies the "water harvesting as well as waste water re-cycling systems". None gives a storage volume, a release rate, a design storm, a drawdown or an infiltration test (NEER's reading). In the hill areas no rainwater harvesting rule was found. Groundwater is not short: every assessment unit is Safe, and the stage of groundwater extraction was 7.99% in GWRA 2023 and 8.00% in GWRA 2024 (CGWB, as quoted). Rainwater harvesting in Manipur is therefore storage and reuse for the dry season, when the towns draw on rivers that run low ("About 90% of the drinking water supply in Imphal is from the three major rivers namely Imphal River, Nambul River and Iril River", master plan), and, on the valley floor, storage in place of the ground. This Manual therefore sets three infiltration rules and one sizing rule for credit (all set by this Manual), and credits the bye-law structures as follows:
- An RWH tank or surface reservoir is RWH storage. It is not detention (Clause 4.11.1), and it is assumed full at the start of every storm (Clause 4.11.2), because in the monsoon season it is full after the first heavy rain. A tank may also provide detention only if it is built as a combined tank under Clause 4.11.3, with a detention zone above its RWH overflow level that drains through its own orifice; only that zone counts.
- RWH credit rule. Because bye-law 66 sets no volume, RWH storage shall hold at least 25 L per m² of roof area (about 25 mm of rain over the roof) to earn credit under this Manual. The value is the North-East value of this series; the 20 L per m² of the mountain editions is the precedent. It counts toward the retention requirement of Clause 4.4 only to the extent that it is emptied within 72 hours by a continuous non-potable use, such as toilet flushing or washing, demonstrated under Clause 4.4.3, and is then modelled under Clause 4.4.6 like any other retention practice; it is assumed full at the start of every monsoon design storm and never counted as detention. The rule makes the bye-law's requirement measurable; it does not replace it, and a larger tank is always allowed. On the valley floor and on hill-rule ground, storage and reuse is the way retention is provided, and the 25 L per m² is the first part of it.
- Recharge pits, trenches, shafts and wells count as retention only where they meet Clause 4.11.4 and the recharge rule below: they are credited only to the extent that they drain within 72 hours at half the rate measured in a site test (Clauses 4.4.3 and 4.4.5), with their base at least 1.0 m above the seasonal high water table, and the credit is found by routing under Clause 4.4.6, not by deducting their volume.
- Valley-floor rule. No deliberate infiltration practice (soakaway, soak or percolation pit, recharge pit, shaft or well, infiltration trench, or permeable paving with an exfiltrating base) shall be built or credited: on the lacustrine clay, silt or peat of the Imphal valley floor (sub-areas MN-A and MN-A1), which includes paddy land and former pats; on land below the 1% AEP flood level of a river, a stream or Loktak; inside a river-bunded area that ponds when its outfalls close; on the margins of a pat or pukhri (its Zone 1 and Zone 2 under Chapter 7); within the 236.21 km² of the Loktak Lake (Protection) Act, 2006; on the Barak and Jiri flood plain of sub-area MN-C1 below its 1% AEP level; or wherever the seasonal high water table, the highest level from April to November, is less than 2.0 m below ground. Only on a foothill fan of sand and gravel at the valley edge, or on a sand lens shown by test pits, outside every one of these areas, may the recharge rule apply. On such land roof runoff goes to storage under the RWH credit rule above, detention is provided in lined, watertight storage (Clause 4.12.2), checked for flotation with the design groundwater level at ground level (Clause 4.12.1), and every sump or tank founded on peat carries a geotechnical check of bearing and settlement. The evidence is the clay itself: "approximately 30 to 50 m of clayey formation, construction of shallow tube wells is problematic", a "clayey deposit down to depth range of 30 to 65 m bgl", and water "2 to 5 m bgl" in major parts of Imphal West (CGWB, Imphal West district booklet, 2013); "peaty soils have high acidity" round the lakes (CGWB, Bishnupur district booklet, 2013); and the valley is "made up of alluvium of fluvio lacustrine origin" of clay, silt and sand (MASTEC). No subsidence record of the peat was found, and the CGWB records "emanation of gas while constructing deep tube wells in some places" [TBC]. The rule is the series' valley-floor rule, with the floodplain conditions of the adjoining edition, and it reaches most of the valley's town land.
- Bye-law 66: no conflict. Bye-law 66 asks for the points of collection of rain water "in surface reservoirs or in recharge wells". On land under the valley-floor rule the Manual chooses surface reservoirs, which the bye-law allows, so the two agree.
- Bye-law 67: a conflict, stated. Bye-law 67 connects the excess grey water "to the rain water recharge structures for ground water recharge". On the valley floor that structure is a soak pit in clay or in saturated ground, which the valley-floor rule forbids, and the water it would take is waste water. This Manual does not override the bye-law. It states the conflict plainly: on such a site the Manual requires the excess grey water to go to storage for reuse or to a sewer connection in place of the recharge structure, and the applicant seeks the local body's relaxation of the recharge requirement, citing this rule. Until the local body relaxes it, the bye-law requirement stands, and a recharge structure that the bye-law forces on such a site earns no credit under this Manual.
- Hill rule. In sub-areas MN-B and MN-C, on the hill parts of sub-area MN-C1, on the valley-rim slopes and the hillocks of sub-area MN-A, and on any natural slope of more than 10° elsewhere, no deliberate infiltration practice shall be built or credited: on natural ground sloping more than 10°; on Disang shale, at any slope; on colluvium, fill or slide debris, whatever its slope; in a mapped landslide zone or landslide locality, among them Tupul in Noney district, Joumol in Chandel district and the cut slopes of NH-37 and NH-2; or upslope of a cut slope or retaining wall within twice the height of the cut or wall — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope. On such sites roof runoff goes to rainwater storage of at least 25 L per m² of roof, with overflow to a lined drain that discharges through a silt trap and an energy dissipator to a stable natural channel, never onto an unprotected slope. The Disang shale "occupies almost 85 p.c. of the hilly region, have less infiltration and more run off" (MASTEC), and it fails when it is cut and wet: at Tupul on 29 or 30 June 2022 a slope at the Jiribam–Imphal railway site failed after "poorly designed or implemented slope excavation coupled with heavy rainfall" (Baruah et al., 2023, via a search summary of the AGU Landslide Blog, as reported), and at Joumol on 1 August 2015 a landslide killed 20 or 21 people, or 24 by another count (as reported). The hooks are the IMC Building Bye-Laws (3rd Amendment), 2024, whose bye-laws 92.1 and 92.2 permit no construction and no cutting on slopes of more than 30° and at most two floors or 7 m on slopes of 21–30° (a draft, final status not confirmed [TBC]), read with bye-law 92 of the Model as printed (Commentary to Clause 4.1); IS 14458, "Guidelines for retaining wall for hill area", which the Model references; and the green-building criterion of "erosion and sedimentation control". In the hill areas no bye-law applies, and the rule reaches public works and any body that adopts the Manual. On these sites, retention is provided by storage and reuse, and detention by lined tanks, not by ponds or basins on the slope (Commentary to Clause 4.10). The 1.0 m groundwater separation of Clause 4.4.3 does not make an infiltration practice acceptable on a slope: perched water and pore pressure in a slope are the hazard, not the depth to the water table.
- Recharge rule. Recharge is allowed only on tested ground outside the valley-floor and hill rules: the foothill fans of sand, gravel and boulders at the valley edge, HSG B or C by texture; the Barail sandstone cappings of the hills and hillocks, on slopes of 10° or less and away from scarps; and sand lenses on the valley floor shown by test pits, outside every area of the valley-floor rule. There it needs a silt trap, a filter and a first-flush diverter ahead of the structure, a field infiltration test, a seasonal high water table at least 2.0 m below ground, and the separation of Clauses 4.11.4 and 4.12. Recharge is not a design objective in Manipur, where the stage of extraction is 8.00% (GWRA 2024, as quoted); everywhere else rainwater harvesting is storage and reuse for the dry season, and on the valley floor storage for the storm.
- Polluted runoff. Runoff from fuel stations, workshops, industrial premises and the like, and from any drain that carries sewage, as most of the drains of Greater Imphal do (Commentary to Clause 4.1), shall not be recharged; road and parking runoff shall be recharged, where the recharge rule allows it at all, only through a surface practice with a filter, such as a vegetated basin or trench, never directly into a pit, bore or well (Chapter 8).
On the valley floor, water put into the ground has nowhere to go in the monsoon, and on the hills it goes into the slope. In the monsoon season an RWH tank is full after the first heavy rain, and on the clay a pit sits in or near the water table. Treating RWH as detention would therefore credit storage that does not exist when it is needed. That is why this Manual assumes RWH tanks are full at the start of every storm. Applying the assumption to every season keeps one simple rule. The combined-tank provision (4.11.3) lets an owner build one structure, as long as the detention part is empty when the storm arrives. The 25 L per m² credit rule, the valley-floor rule, the hill rule, the recharge rule, the treatment of the bye-law 67 conflict, the check on peat and the polluted-runoff rule are set by this Manual. The 2.0 m water-table screen of the valley-floor rule is set by this Manual from the CGWB depths above, because where the water table rises above it a practice whose base must stand 1.0 m above the water (Clause 4.11.4) has less than a metre of depth to work in. No Manipur source sets a slope threshold for infiltration below the 21° of the IMC draft, which is a limit on building: the 10° limit and the Disang condition are set by this Manual, as in the mountain editions of this series, because a slope that can carry a building can still be destabilised by water put into it, and the distance of twice the height of a cut or wall is set by this Manual as a precaution, pending guidance from a geotechnical study for the State [TBC].
4.12 High-groundwater and sandy coastal sites
4.12.1 Design groundwater level. Each site in the Imphal valley floor, on its lacustrine clay, silt and peat, in and around Imphal, Thoubal, Kakching, Bishnupur, Nambol and Mayang Imphal, where water stands 2–5 m below ground over most of Imphal West and the piezometric head 2.50–4.30 m below ground in Bishnupur, the Loktak margin and the land within the 236.21 km² of the Loktak Act, the paddy land and former pats, the margins of Lamphelpat and the other pats and pukhris, the land behind the river bunds, the Barak and Jiri flood plain of the Jiribam plain, and hill sites with perched water or springs, or any area where the groundwater table lies within 3 m of the surface at any time of year shall establish a design groundwater level (DGWL) for the facility. The DGWL is the seasonal high level during or after the monsoon, from:
- (a) site piezometer readings over at least one full April–November season; or
- (b) where (a) is not available, the higher of the CGWB or WRD record for the nearest observation well, plus 0.5 m, and the design flood level of any adjacent river, stream, pat, pukhri or Loktak, or of the water ponded behind any river bund that encloses the site.
For the flotation check of 4.12.3 at sites in the Imphal valley floor, with its lacustrine clays, peat and paddy land, the margins of Loktak and the other pats and pukhris, the land behind river bunds, and the Barak and Jiri flood plain of the Jiribam plain, where (a) is not available, the DGWL shall be taken as existing ground level.
4.12.2 Lined storage. Where the DGWL is less than 1.0 m below the base of a storage facility:
- (a) the facility shall be watertight (lined or of watertight concrete), and no infiltration credit applies (Clause 4.4.4); or
- (b) if unlined, the volume below the DGWL shall not be counted as detention, and groundwater inflow shall be added to the routed inflow.
4.12.3 Uplift and flotation. Every below-ground tank, vault, lined pond or chamber shall be checked for flotation:
- with the facility empty;
- with groundwater at the DGWL; and
- for coastal sites, with groundwater also at the major-system tailwater level of Chapter 5, where that is higher.
The factor of safety against uplift, counting only permanent dead loads and ignoring wall friction unless supported by geotechnical design, shall be at least 1.2. Anchoring by ballast, toe extensions or tension piles may be used.
4.12.4 Shallow and above-ground storage preferred. On sites where the DGWL is within 1.5 m of ground, storage should be provided above ground where possible: rooftop, podium, landscape or surface storage. Deep tanks should be avoided.
4.12.5 Durability. Concrete and metal parts in contact with saline or brackish groundwater or tidal water shall be designed for the exposure class appropriate to coastal conditions under IS 456:2000. Outlet fittings, trash racks and gates shall be of stainless steel, HDPE, FRP or another corrosion-resistant material.
4.12.6 Sandy soils with deep groundwater. Where the DGWL is 1.0 m or more below the base, infiltration retention in sandy soils is encouraged. The design infiltration rate of Clause 4.4.3 applies, and the Chapter 8 requirements on pollution of shallow aquifers shall be met.
Commentary. Manipur is landlocked, so the coastal provisions of this clause, the tidal water levels of 4.12.1 and 4.12.3 and the saline exposure of 4.12.5, do not apply in the State, and no saline groundwater was reported in the sources read for this Manual [TBC]. The peat round the lakes has "high acidity" (CGWB, Bishnupur district booklet, 2013), and gas emanates "while constructing deep tube wells in some places" in Imphal West (CGWB, Imphal West district booklet, 2013); on peat, and wherever a site test shows acid groundwater, the exposure provisions of 4.12.5 apply to concrete and metal parts as if the groundwater were aggressive, with the exposure class set from the test, and every sump, tank or chamber founded on peat carries a geotechnical check of its bearing and of settlement (set by this Manual; no subsidence or peat-thickness data were found [TBC]). The wet cases are most of the valley floor. Water stands 2–5 m below ground over most of Imphal West and 5–7 m near the hills, under 30–65 m of clay (CGWB, Imphal West), and the piezometric head 2.50–4.30 m below ground in Bishnupur, where the level rises in April and May and is lowest at the end of March (CGWB, Bishnupur). On the paddy land, the former pats, the margins of Loktak and the other pats and pukhris and the land behind the river bunds the ground is flooded or saturated when the rivers are high, for "several weeks" after a breach (AIIB). There an unlined tank fills with groundwater before the storm, and an empty lined tank can float, especially when a river in flood, a pat at its outlet level, Loktak at its design level or water ponded behind a bund raises the water table beside it. The design groundwater level of 4.12.1(b) therefore takes the design flood level of the adjacent river, stream, pat, pukhri or Loktak, or of the water ponded behind a river bund that encloses the site, where that is higher than the well record; and on the Imphal valley floor, the Loktak margin, the pat and pukhri margins, the land behind river bunds and the Barak and Jiri flood plain of the Jiribam plain it is taken as existing ground level for the flotation check unless piezometers show otherwise. Storage there is preferably above ground, on roofs, podiums and landscape (4.12.4), and storage below ground is lined, anchored and checked for flotation empty. On a hill site a deep tank is not preferred even where groundwater is deep, because a leaking tank on a slope is an infiltration practice by another name: storage on a slope shall be lined and watertight, and its leakage and overflow taken to a lined drain (Clause 4.11, hill rule). The April–November monitoring season of 4.12.1(a) is set by this Manual to cover the Manual's monsoon season of 1 April to 31 October and the high water after the withdrawal in mid-October; because the water table in the valley is lowest at the end of March (CGWB, Bishnupur), a reading taken in March understates the design level. The State's observation wells are those of the CGWB, North Eastern Region: no State observation-well network was found, and the CGWB's dug-well monitoring in Imphal West stopped "since 1991 due to disturbed law and order" (CGWB, Imphal West), so the WRD record that 4.12.1(b) refers to does not yet exist [TBC]; no water-table depths for individual town sites were obtained [TBC]. The factor of 1.2, the 0.5 m allowance, the "ground level" default for the valley floor, the waterbody margins, the bunded land and the Jiribam flood plain, the exposure rule for acid groundwater and the check on peat have no direct precedent; this Manual sets them because no published site-scale seasonal groundwater depths for Manipur were found during research.
4.13 Regional detention and fee-in-lieu
4.13.1 Where permitted. In a basin covered by a Basin Stormwater Master Plan approved under Chapter 11, a development may meet all or part of its detention requirement through:
- (a) a regional detention facility identified in the plan; or
- (b) a fee-in-lieu paid toward restoration of pukhri or tank storage identified in the plan.
4.13.2 Conditions. Regional detention or fee-in-lieu shall be accepted only where:
- (a) the regional facility or restored tank is operational, or is funded and scheduled to be operational within 3 years. Until then, interim on-site detention is required.
- (b) the conveyance from the site to the facility carries the 1% AEP post-development flow without increasing water levels at buildings or roads between them (Chapter 5);
- (c) the storage credited at a tank is the flood storage only. This is the volume between full tank level (FTL) and the maximum water level the bund and surplus weir can safely hold, plus any volume below FTL that a notified operating rule commits to empty before the monsoon. Storage below FTL that is held for irrigation or supply through April to October shall not be credited.
- (d) the tank meets Chapter 7: surveyed FTL, a documented operating rule, and a maintained surplus weir;
- (e) the site still provides retention (Clause 4.4) and WQv treatment (Chapter 8) on site; and
- (f) in flood-sensitive catchments, the regional facility meets the mixed-frequency rule for its whole contributing area.
4.13.3 Fee. The fee-in-lieu shall be computed as:
Fee = (detention volume required on site under Clause 4.6, m³) × (unit rate, ₹/m³, notified by the Authority)
The unit rate shall include land, construction and 10 years of maintenance. Fees shall be held in a ring-fenced basin account and spent only on the facilities named in the plan.
4.13.4 Ledger. The Authority shall keep a public ledger of:
- detention volume credited to each regional facility;
- volume delivered; and
- fees received and spent.
Commentary. The Malaysian DID (2008) checklist favoured community ponds over on-site detention for sites above 0.1 ha. Studies of on-site detention show that its benefit depends on location and fades with distance downstream (Colorado State University thesis; McEnroe for Kansas City), and that a pond low in the catchment can synchronise with the main-stem peak (Water 2016). Regional storage therefore has to be sited by basin modelling, not simply aggregated.
Manipur has no tank Act, and no pat or pukhri in its towns was found to be operated for flood control under a documented rule. The valley's regional storage is of five kinds: Loktak, held up by NHPC's Ithai barrage and protected over 236.21 km² by the Loktak Lake (Protection) Act, 2006, with its Core Zone of 70.30 km² a "No-Development Zone or Totally Protected Zone" (s.3); the other pats and marshes, "about 134 swampy and waterlogged marshy wetlands" in the master plan's count, of which the Manipur State Wetlands Authority has listed seven as Phase-1 priority wetlands and published draft notifications of three, Yaral Pat, Utra Pat and Waithou–Phumnom Pat, none yet final (DoECC, Administrative Report 2025-26); Lamphelpat, a pat being developed as flood storage with a pumped outlet (NDB; WRD site report in HC PIL No. 8 of 2025); the pukhris of the towns, the "public ponds" of the AMRUT 2.0 water-body projects, 20 approved and 19 in progress (TPD, Annual Administrative Report 2025-26); and the paddy land of the valley floor, which the Manipur Conservation of Paddy Land and Wetland Act, 2014 protects from conversion and which the master plan shrinks from 5,616.53 ha of agricultural land in 2020 to 2,604.70 ha in 2043, with wetlands falling from 374.48 ha to 232.21 ha while water bodies grow from 563.54 ha to 643.42 ha (Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification)). Four points follow:
- A pat on the record may not be a working pat, and a pat is not a detention pond. About 4,000 water bodies were inventoried after NGT M.A. 26/2019, but "Ground truthing, engineering surveys, and quality monitoring … are pending" (DoECC, 2025-26). A pat or pukhri is credited only after a survey shows its bed, rim and outlet, and only for the storage above its outlet level; a natural pat is never turned into a detention pond, and engineered storage is called a detention pond, never a pukhri or a pat.
- Lamphelpat is regional storage for the city, not spare capacity for a site. It is being dredged over about 300 acres to "increase its water detention capacity, restore stormwater drainage system and channels / streams in the catchment area", with a "real time flood management system with a command center" (NDB, project summary), but no stage–storage relation, design storm or pump rating was found [TBC], it is also proposed as a source of drinking water (NDB), and in high flood it can empty only by pumping to the Nambul. Its storage is credited to a development only under a Basin Stormwater Master Plan (Chapter 11), with WRD's written agreement and after the interception of dry-weather flow ahead of it (Clause 6.3.6(e); Chapter 8).
- Loktak is not spare capacity either. It is held for power by the Ithai barrage, its level is the tailwater of the Loktak margin (Clause 5.8.5(c)), its storage below the full reservoir level is not credited (Clause 4.13.2(c)), and the Loktak Act bans in its Buffer Zone the "Discharge of untreated wastes and effluents from industries, cities or towns" and "Land reclamation, bunding or disturbing the natural course of drainages" (s.19(iv) and (vi)); the High Court's special bench is reported to have barred development in or around Loktak "without the Court's leave" (orders of 17 July 2019 and 25 February 2022, as reported; case number not found [TBC]). Storm water spilled to Loktak can be relied on only with the written agreement of LDA and NHPC for a stated volume and level (set by this Manual).
- Paddy land and wetland are flood storage that is being lost. Where they are converted and built on, the storage lost below the 1% AEP level, or below the ponding level behind the bund in the outfall-closed case of Clause 5.8.5, is replaced under Clause 7.6.4 in the same sub-catchment (Chapter 7); the replacement does not legalise a conversion, which still needs the committees' approval under the 2014 Act, and s.12 of that Act bars any licence for construction on land converted in contravention of it. The Manipur Conservation of Paddy Land and Wetland (Third Amendment) Bill, 2026 would exempt land that conforms to a notified Master Plan and allow "Deemed Conversion" on self-declaration; it is a Bill, and its enactment was not confirmed [TBC].
No rule dividing natural streams and city channels from municipal drains was found: no notification assigns the Naga Nullah, the Waisel Maril or the Shamushang nallah to one owner (NEER's reading). Until one is made, this Manual follows the working assignment of Chapter 1: municipal drains as IMC's and the other urban local bodies' (bye-law 16 of the Model speaks of a "municipal drain"; the drainage sections of the Manipur Municipalities Act, 1994 were not read [TBC]); roadside drains as PWD's, including the "547 km of both side stormwater covered drains" of the AIIB project in Greater Imphal, and national-highway drains as the national-highway agencies'; river bunds, flood channels, Lamphelpat and the Shamushang pumping as WRD's; the interception and diversion of the 72 drains that fall into the Nambul, with its plant, as DoECC's; sewers as PHED's; and Loktak, with the cleaning of the Waisel Maril that it was reported to lead, as LDA's. Each town keeps a drain register giving every reach its owner, the river it reaches, the bund it crosses (gate or flap gate), whether it lies in a bye-law 93 buffer, its land status and its outfall. This is the Manual's working assignment, not a statutory one; where land is private patta land, a drainage corridor or easement is reserved in the master plan or secured by agreement, not taken, and in the hill areas the drains of public works are the executing department's.
The first point is the basis of condition 4.13.2(c) in Manipur. A pat or pukhri gives flood storage only above its outlet level, unless a notified operating rule commits it to be lowered before the monsoon season. The 3-year operational limit and the 10-year maintenance allowance have no direct precedent and are set by this Manual.
4.14 Simplified methods for small sites
4.14.1 Applicability. Tier B local bodies may permit the simplified method for sites of 2 ha or less outside flood-sensitive catchments. In flood-sensitive catchments, it may be used for sites of 0.5 ha or less. All other sites shall use Clause 4.6. Until Table 4.3 (Annex 4B) is published, all Tier B sites shall also use Clause 4.6.
4.14.2 Method.
- Read the PSD (L/s/ha) and SSR (m³/ha) for the site's zone, HSG and post-development imperviousness from Table 4.3 (Annex 4B).
- Required storage: V = SSR × A − V_credit (Clause 4.4.6.3).
- Permissible discharges: Q_PSD,T = PSD_T × A for the 2-yr and 100-yr stages.
- Select the low-flow orifice and upper control from the standard outlet table in Annex 4B (orifice sizes for the PSD at the stated depths), subject to the 50 mm minimum.
- Provide a spillway or overflow under Clause 4.9, the RWH accounting of Clause 4.11, and the safety provisions of Clause 4.15.
- Complete Form 4-2 (Tier B site sheet).
Table 4.3 — Tier B permissible site discharge and site storage requirement (template)
| Zone (Annex 2A) | HSG | Imperviousness | PSD 2-yr (L/s/ha) | PSD 100-yr (L/s/ha), standard | PSD 100-yr (L/s/ha), flood-sensitive | SSR (m³/ha), standard | SSR (m³/ha), flood-sensitive |
|---|---|---|---|---|---|---|---|
| MN-Z1 Imphal valley: MN-A Imphal valley floor (Imphal–Thoubal–Kakching–Bishnupur–Nambol–Mayang Imphal) | B / C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| MN-Z1 Imphal valley: MN-A1 Loktak margin (Moirang–Ningthoukhong–Thanga–Ithai–Sugnu–Wangoo) | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| MN-Z2 Northern, eastern and southern hills: MN-B Northern, eastern and southern hills (Senapati–Kangpokpi–Ukhrul–Kamjong–Chandel–Tengnoupal–Moreh–Churachandpur) | — | — | Not tabulated: Clause 4.6 applies (Clause 2.3.6(c)(iii)) | — | — | — | — |
| MN-Z3 Western hills and the Jiribam plain: MN-C Western hills (Tamenglong–Noney–Khoupum–Tupul–Tousem–Pherzawl) | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| MN-Z3 Western hills and the Jiribam plain: MN-C1 Jiribam plain (Jiribam) | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
Worked example (illustrative — not design values).
A 0.4 ha residential layout in a Tier B Municipality, in a flood-sensitive catchment, with about 80% directly connected impervious area (area-weighted post-development CN about 92). Suppose Table 4.3 had been computed and gave the per-hectare equivalent of the Clause 4.6.7 example:
- PSD 100-yr = 356 / 2.0 = 178 L/s/ha
- SSR = 2,913 / 2.0 ≈ 1,460 m³/ha
- PSD 2-yr ≈ 17 L/s/ha
Then:
- Storage: V = 1,460 × 0.4 = 584 m³. C_R = 0, so there is no retention credit.
- 100-yr release: 178 × 0.4 = 71 L/s.
- 2-yr release: 17 × 0.4 = 7 L/s. At about 1 m head this needs a low-flow orifice of about 60 mm, above the 50 mm minimum (Clause 4.8.2).
- Layout options:
- a 400 m² underground tank 1.5 m deep; or
- 250 m² of podium storage at 0.3 m (75 m³) plus a 350 m² tank 1.5 m deep (525 m³).
- Rooftop storage at 150 mm over 1,200 m² of roof (180 m³) could replace part of the tank.
- RWH sumps are additional, and are assumed full (Clause 4.11).
Commentary. Australian councils use permissible site discharge and site storage requirement tables in the same way (Sydney Water OSD guide; the Upper Parramatta River Catchment Trust handbook listed SSR of about 455 m³/ha). The illustrative SSR here, about 1,460 m³/ha, is much larger. That is the expected effect of combining a mixed-frequency cap with mandatory 48–72-hour storms at AMC III. MSMA 2 in Malaysia offers a similar simplified OSD method for sites under 5 ha. The MARC policy supplement offers smaller Kansas City municipalities adoptable alternatives within the regional standard; Clause 4.14 follows that model for Tier B.
4.14.3 Fixed-coefficient route. As an alternative to Clauses 4.6 and 4.14.2, the designer of any site of 1 ha or less, under any Approving Authority and in any catchment, may size detention by Clauses 4.14.4 to 4.14.7. The route shall not be used where:
- (a) the site counts tank or waterbody storage in its design (Chapter 7);
- (b) any part of the site lies within a waterbody setback (Chapter 7); or
- (c) the site drains to a tank cascade whose storage is counted in a downstream design.
The route sets the release caps by fixed coefficients and does not need Table 4.3. It may therefore be used before Annex 4B is published. Retention (Clause 4.4), drawdown (Clause 4.7), outlets (Clause 4.8), the spillway (Clause 4.9), the downstream and tailwater checks (Chapter 5) and water quality (Chapter 8) still apply.
4.14.4 Release caps. Two caps apply at each point where runoff leaves the site:
Q_cap,10 = 2.78 × C_10 × i_10 × A and Q_cap,2 = 2.78 × C_2 × i_2 × A
where Q_cap is in L/s; A is the site area (ha); i_10 and i_2 are the 10% AEP (10-yr) and 50% AEP (2-yr) rainfall intensities (mm/h) for a 15-minute duration at the site, from the sources of Chapter 2, with the climate factor of Clause 2.8; and C_10 and C_2 are the fixed coefficients of Table 4.3A for the site's hydrologic soil group (Clause 3.7). For a site with more than one soil group, the coefficients are area-weighted.
Table 4.3A — Fixed release coefficients (provisional)
| Hydrologic soil group | C_10 | C_2 |
|---|---|---|
| A (sandy, well drained) | 0.05 | 0.02 |
| B | 0.08 | 0.03 |
| C | 0.15 | 0.08 |
| D (clay, poorly drained) | 0.25 | 0.15 |
Q_cap,10 is the maximum release for every storm up to and including the 1% AEP (100-yr) storm, in every catchment. Q_cap,2 is the maximum release for the 50% AEP (2-yr) storm. Where a cap is smaller than the discharge of a 50 mm orifice at the corresponding stage, the 50 mm orifice is deemed to comply (Clause 4.5.5.1).
4.14.5 Storage. The detention storage V (m³) is the larger of V_100 and V_2, each the largest over the durations d of Clause 2.5.2 (1 to 72 hours):
V_100 = max over d of [ 10 × C_v × P_100(d) × A − 1.8 × Q_cap,10 × d ]
V_2 = max over d of [ 10 × C_v × P_2(d) × A − 1.8 × Q_cap,2 × d ]
where P_100(d) and P_2(d) are the 1% and 50% AEP rainfall depths (mm) for duration d (hours), with the climate factor; and C_v is the post-development volumetric coefficient: the composite C of Table 3.2 (upper half of each range), multiplied by Cf of Table 3.3 for the 1% AEP. For durations of 12 hours or more, C for every pervious surface shall be taken as not less than 0.50. The factor 1.8 assumes an average release of half the cap over the storm (3.6 × 0.5).
4.14.6 Outlet. The outlet shall be a two-stage control: a low-flow orifice that passes Q_cap,2 when the storage holding V_2 is full, and an upper orifice or weir that limits the total release to Q_cap,10 at the top of V. The outlet table of Annex 4B may be used once it is published.
4.14.7 Retention. The retention volume of Clause 4.4 is provided in addition to V. No retention credit (Clause 4.4.6) is taken under this route.
Figure 4.3 — Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3 to 4.14.7): the release caps Q_cap,10 and Q_cap,2 from Table 4.3A; the storage V as the largest gap, over the durations of Clause 2.5.2, between the cumulative inflow 10·C_v·P(d)·A and the release line 1.8·Q_cap·d, for the 1% and 50% AEP storms; and the two-stage outlet that passes Q_cap,2 at the top of V_2 and Q_cap,10 at the top of V. Schematic, not to scale. Original drawing for this Manual, adapted from the rainfall mass-curve (inflow minus outflow) storage concept and the single-coefficient peak cap of the PUB Code of Practice on Surface Water Drainage, 7th ed. (cl. 7.1.5).
Commentary. The fixed-coefficient route follows Singapore, which caps the peak runoff from every development of 0.2 ha or more with one runoff coefficient, C = 0.55, applied to the 10-yr storm (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5, Addendum No. 3, 2025). It is quick to apply and quick to check: the cap needs only the site area, the soil group and two intensities. PUB's 0.55 is not used here, because Singapore's baseline is the existing urban drainage system, while this Manual's baseline is greenfield land (Clause 4.5.1.2). The coefficients of Table 4.3A are set by this Manual from the greenfield curve numbers of Clause 3.3 (CN 39, 61, 74 and 80 for soil groups A to D). They are the ratios of runoff to rainfall that those curve numbers give for 1-hour depths typical of the Imphal valley floor, rounded down. They are therefore provisional. The State Stormwater Technical Committee shall confirm or revise them against NIH-DHAARA values for each zone when it issues Annex 4B.
The route is deliberately stricter than the full method, so that simplicity costs the developer storage rather than costing the people downstream. The 100-yr release is held to about the greenfield 10-yr peak everywhere, which is the flood-sensitive rule of Clause 4.5.3; the storage assumes the outlet releases only half the cap on average; pervious ground is assumed wet in long storms; and no retention credit is taken. A designer who wants a smaller tank can use the full method of Clause 4.6. The storage formula is the rainfall-mass (inflow minus outflow) method. Clause 3.4.2 otherwise forbids rainfall-based peak methods for storage, because they ignore the shape of the hydrograph; this route is a stated exception because its conservative assumptions cover that error for small sites, and the 24- to 72-hour durations are always checked.
4.15 Safety, fencing and multi-use
4.15.1 Depth limits for publicly accessible storage. Where the public has access to a storage area (parks, playfields, open space, school grounds):
- (a) maximum depth in the 10% AEP storm: 0.45 m;
- (b) maximum depth in the 1% AEP storm: 1.2 m, except in a fenced zone under 4.15.3;
- (c) side slopes: no steeper than 4H:1V, with at least a quarter of the perimeter at 6H:1V or flatter for escape; and
- (d) no vertical drop greater than 0.3 m within the storage area or at its edge.
4.15.2 Wet basins. Permanent pools shall have:
- a safety bench at least 3 m wide, no more than 0.3 m below the normal water level; and
- an emergent planting fringe that deters entry.
4.15.3 Fencing. A fence at least 1.2 m high, of a non-climbable design with a lockable gate, is required around any part of a storage that:
- has a vertical wall or headwall drop greater than 0.6 m;
- exceeds 1.2 m depth in the 1% AEP storm with slopes steeper than 4H:1V; or
- contains an outlet structure with an opening larger than 300 mm that is not grated.
4.15.4 Outlets. Every inlet and outlet opening larger than 300 mm accessible to the public shall be fitted with a grate or rack. The grate shall be designed so that a person pinned against it can escape: low approach velocity, inclined, with a large open area.
4.15.5 Signs and depth markers. Every publicly accessible storage shall have signs in Manipuri and English stating that the area floods during rain, and a depth marker at the deepest point.
4.15.6 Confined spaces. Underground tanks shall have lockable covers. They shall be marked as confined spaces, and the maintenance declaration (Chapter 10) shall state the entry procedure.
4.15.7 Vector control. Dry storage shall drain completely (Clause 4.7) and have no low points that pond for more than 72 hours. Wet basins shall meet Clause 4.10.7.
Commentary. The numeric limits in Clause 4.15 have no single direct precedent. They are drawn from common international practice, for example KC APWA 5600 (2006), which required at least a quarter of a dry-pond perimeter at 5:1 or flatter, a 20 ft (6 m) clearance from property lines and a 15 ft (4.6 m) maintenance strip. They are made somewhat stricter here because multi-use storage on open space land and in schools will be used by children during the monsoon. Standing water in dry basins is a mosquito-breeding risk, so complete drainage (Clause 4.15.7) is a public-health requirement, not an amenity.
4.16 Basis: why peak matching alone fails
Commentary. This section has no requirements. It records why this chapter requires release below pre-development rates, retention, long-duration checks and a downstream analysis, rather than simple peak matching.
- Timing. Detention lowers a site's peak but stretches its hydrograph (Figure 4.1). Downstream, the stretched releases from many sites overlap with each other and with the main-stem peak. In Denver's study, ten basins each releasing 100% of the historic 100-yr peak produced 106% of the historic peak at the outlet. Only releasing 90% at each site brought it to 97% (UDFCD memo, 2012). A Colorado State University thesis found that location-blind on-site detention "can actually increase peak flows above post-development peaks". An optimisation study found that a downstream pond performed worse than upstream ponds because its outflow synchronised with the main stem (Water 2016, 8(7):290).
- Volume. Detention does not remove volume. In the illustrative example, the post-development 100-yr storm produces about three times the runoff volume of the pre-development 10-yr storm (Clause 2.11). Only retention, or storage that empties to somewhere other than the receiving drain, reduces volume.
- Scale. Kansas City modelling (McEnroe, 2005) found that uniform 3 cfs/ac control reduced Q100 by 36% in a 200-ac watershed. With the same control everywhere, Q100 still rose by 40% at 14 sq mi, and the benefit faded beyond about 1–2 sq mi. The KC committee concluded that "'match existing' can harm streams" (MARC Evolution deck). Georgia makes a ten-percent downstream analysis mandatory for the same reason: "Due to peak flow timing and runoff volume effects, some structural practices fail to reduce discharge peaks to pre-development levels downstream" (GSMM 2016).
- Design-storm dependence. An Australian study of 20 real on-site detention systems found that designs using even ten temporal patterns "cannot reliably produce an OSD system design that will always be effective" under real rainfall (Water Science and Engineering, 2019). This is why Clause 4.6.3 routes the full duration matrix rather than one critical storm.
- Closed outfalls. In Manipur the closed outfall is not the exception but the normal monsoon case on the valley floor. "The town is below the high flood level of Imphal river and hence there are embankment roads on both sides of the river to protect the settlement from seasonal floods" (Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification)); the Imphal at Minuthong has a highest flood level of 788.400 m, within a metre or two of the city's ground (AIIB; NEER's reading), and it overflowed above that level on 29 May 2024 (as reported). When the rivers are high their gated and flap-gated outfalls shut, and "During the rainy season, the rapid flows of water directed to the main urban river Nambul from its tributaries cannot be contained. As a result, the failure of river dikes causes waterlogging in the low-lying areas for several weeks" (AIIB, Approval Project Document, 2024). The valley as a whole has one outlet, the Manipur river past the Ithai barrage and the Sugnu hump, which carries "of the order of 400 cumecs" while "river down below the barrage does not have the capacity to cope up with such flow, as a result, water is piled up upstream" (MASTEC), so Loktak and the pats rise for weeks and the outfalls on the Loktak margin discharge to a lake that stands above them. Lamphelpat, in the city, drains only by pumping in high flood, through the Shamushang nallah to the Nambul (WRD site report in HC PIL No. 8 of 2025), and "Coping measures undertaken in the form of pumping … are not adequate and the area remains waterlogged for many days every year" (NDB, project summary). In the hills the outfall can be closed by debris and garbage, and in the reservoirs' release reaches by the release itself. What fills behind the closed gate is storm water mixed with sewage, because the drains carry it (Commentary to Clause 4.1). No inventory of the gates, flap gates and pumping stations through the bunds, no record of how long any of them stays shut and no operating rule were found [TBC]; Chapter 5 sets the river and lake levels and the closure to be assumed (Clause 5.8.5(a) to (c)). A perfectly orificed basin behind a closed outfall simply fills. No release-rate rule can fix that; it is handled by the outfall-closed check of Chapter 5.
The response in this Manual is layered:
- release below pre-development (Clause 4.5);
- retain the frequent storms (Clause 4.4);
- route long monsoon storms (Clause 4.6.3);
- prefer regional storage in the pukhri system (Clause 4.13); and
- check downstream and at the outfall (Chapter 5).
Kansas City's own history shows the price. On a test site, peak matching needed 3.0 ac-ft of storage and the 2011 comprehensive criteria needed 4.9 ac-ft (MARC Evolution deck). Over-detention costs more storage. That is the cost of protecting the catchment rather than only the site boundary.
4.17 Submittal requirements
Every site runoff-control submittal shall include a Site Runoff Control Report (Form 4-1) containing:
- the Design Rainfall Sheet (Form 2-1) and the hydrology inputs (Chapter 3);
- the evidence for the order of measures under Clause 4.3.1;
- the RRV computation, infiltration tests, groundwater evidence and drawdown calculation (Clause 4.4);
- the retention credit computation (Clause 4.4.6);
- the release-rate criterion applied, standard or flood-sensitive, with the Annex 4A map extract (Clause 4.5);
- a results table in the format of Clause 4.6.7 for every AEP and duration, with the governing case highlighted;
- stage–storage and stage–discharge tables and plots, and inflow/outflow hydrographs for the governing cases;
- the drawdown calculation (Clause 4.7);
- outlet details, including orifice sizes and levels, trash racks and anti-vortex devices (Clause 4.8);
- the spillway or overflow calculation, freeboard and hazard classification, and the geotechnical report where required (Clause 4.9);
- the RWH and detention accounting, with tank sections showing zone levels (Clause 4.11);
- the design groundwater level and flotation check (Clause 4.12);
- the downstream and tailwater report (Chapter 5, Form 5-1); and
- the safety provisions (Clause 4.15) and the draft maintenance declaration (Chapter 10).
Tier B sites using Clause 4.14.2 shall submit Form 4-2 in place of items 6 and 7. Sites using the fixed-coefficient route (Clause 4.14.3) shall submit Form 4-3 in place of items 6 and 7.
References (chapter)
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01 (approved 10 Dec 2025). https://kcmetro.apwa.org/wp-content/uploads/sites/23/2026/01/APWA-Section-5600_Storm-Drainage-Systems-Facilities.pdf
- Mid-America Regional Council (2025). APWA 5600 Stormwater Standards Policy Supplement (7 Nov 2025); APWA 5600 Manual factsheet. https://www.marc.org/document/apwa-stormwater-standards-supplement ; https://www.marc.org/document/apwa-5600-manual-factsheet
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.8, 5608.4). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- MARC / APWA (2012). Manual of Best Management Practices for Stormwater Quality. https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
- MARC. The Evolution of Regional Stormwater Design Standards (presentation; McEnroe 2005 results). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Volume 1. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- Urban Drainage and Flood Control District (now MHFD) (2012). Full Spectrum Detention Release Rate Memorandum. https://mhfd.specialdistrict.org/files/23cb85ce8/UDFCD_Full_Spectrum_Detention_Release_Rate_Memorandum.pdf
- Mile High Flood District. Urban Storm Drainage Criteria Manual, Volume 2 (Storage).
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd ed.
- PUB Singapore (2024). On-site Detention Tank Technical Guide, Rev. 3; Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3 (16 Apr 2025). https://www.pub.gov.sg/-/media/PUB/PDF/detentionTank.pdf
- Sydney Water (2020). On-site Stormwater Detention Guide (SW201). https://www.sydneywater.com.au/content/dam/sydneywater/documents/on-site-stormwater-detention-guide.pdf
- Upper Parramatta River Catchment Trust (2005). On-site Stormwater Detention Handbook, 4th ed.
- "On-site stormwater detention for Australian development projects: does it meet frequent flow management objectives?" Water Science and Engineering (2019). https://www.sciencedirect.com/science/article/pii/S1674237019300213
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- Manipur Loktak Lake (Protection) Act, 2006 (Manipur Act 3 of 2006; notification No. 2/14/2006-Leg/L of 5 April 2006, Manipur Gazette Extraordinary No. 13(E)), as amended by Acts 5 of 2007 and 8 of 2019: ss. 1(3), 2, 3, 4, 17, 19, 20, 35(2) and 36. https://prsindia.org/files/bills_acts/acts_states/manipur/2006/Manipur%20Act%203%20of%202006.pdf
- Manipur Conservation of Paddy Land and Wetland Act, 2014 (Manipur Act 10 of 2014; Manipur Gazette Extraordinary No. 150, 2 September 2014): ss. 2(c), 2(h), 2(t), 3, 4, 12 and 18; and the (Third Amendment) Bill, 2026 (Bill No. 6 of 2026, as introduced; enactment not confirmed [TBC]). https://faolex.fao.org/docs/pdf/ind194970.pdf ; https://prsindia.org/files/bills_acts/bills_states/manipur/2026/Bill6of2026MN.pdf
- Directorate of Environment and Climate Change, Government of Manipur. Administrative Report 2025-26 (the Manipur State Wetlands Authority, set up on 31 January 2018; the Phase-1 priority wetlands; the draft notifications of Yaral, Utra and Waithou–Phumnom Pat; the inventory of about 4,000 water bodies after NGT M.A. 26/2019). https://assembly.mn.gov.in/user/pages/files/administrative-reports/A%20Report%202025-26%20(DoECC).pdf
- Town Planning Department, Government of Manipur. Annual Administrative Report 2025-26 (AMRUT 2.0 water-body rejuvenation of public ponds). https://www.tpmanipur.mn.gov.in/media/filer_public/1a/48/1a484b87-afaa-41de-8d64-f6d2f27c49c7/admn_report2025-26.pdf
- New Development Bank (2021). Proposed Project Summary, Lamphelpat Waterbody Rejuvenation Project. https://www.ndb.int/wp-content/uploads/2021/11/Project-Summary-Lamphelpat.pdf ; and the WRD site inspection report in HC PIL No. 8 of 2025 (order of 16.06.2025). https://rawlaw.in/wp-content/uploads/2025/06/Meeyam-Amata-Oina-Punsinba-Lup.pdf
- Reports on the levels of Loktak and the Ithai barrage (NHPC and CEA, as quoted; ORF, as reported), on the High Court's orders on Loktak of 17 July 2019 and 25 February 2022 (SabrangIndia, 2 March 2022, as reported) and on the cost and funding of the Lamphelpat project (as reported; the accounts conflict).
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A (§8.5).
- Municipal Administration, Housing and Urban Development Department (MAHUD). The Model Manipur Unified Building Bye-Laws, 2024, Notification No. BBL-101/1/2024-MAHUD-MAHUD-Part(1) of 4 December 2024 (Manipur Gazette Extraordinary No. 253 of 5 December 2024), under section 213 of the Manipur Municipalities Act, 1994 (Act 43 of 1994) and section 26(1) of the Manipur Town and Country Planning Act, 1975 (Manipur Act 11 of 1975), "for adoption by the Urban Local Bodies and Planning & Development Authority, Manipur": bye-laws 1(2), 2(2), 2(11), 6(1)(A), 6(1)(C)(j), 6(1)(D), 16, 26, 27, 28, 66, 67, 68, 92, 93 and 94, the open-space clause and the green-building criteria. https://www.tpmanipur.mn.gov.in/media/filer_public/5b/3d/5b3d9440-3e85-4cf5-bd26-d113882dfb9a/model_manipur_ubbl_final_gazette.pdf ; the bye-laws that the urban local bodies have brought into force on it, among them the Kumbi, Moirang and Jiribam Municipal Councils' Building Bye-laws, 2025 (final gazette 16 January 2025) and the "Building Bye-laws for ULBs of Manipur – Final Gazette Notification" of 15 December 2025 (both as listed on the TPD site; not read [TBC]).
- Imphal Municipal Corporation Building Bye-Laws (3rd Amendment), 2024, draft published for objections (bye-laws 92, 92.1, 92.2, 93.1 and 93.2; final status not confirmed [TBC]). https://www.tpmanipur.mn.gov.in/media/filer_public/22/ef/22ef77df-5b8c-4a80-9fa0-553d8a60a170/amendment_of_imc_building_bye_laws_2024.pdf
- MAHUD. Unified Zoning/Use Regulation Bye-laws for the Master Plan Areas of Manipur, 2026, Notification No. BBL-101/1/2024-MAHUD-MAHUD of 22 July 2026 (Gazette Extraordinary No. 157, 23 July 2026): the use zones "Agriculture" and "Pond, Drain, Rivers and Canals". https://www.tpmanipur.mn.gov.in/media/filer_public/44/2b/442b7923-b910-494a-83d5-767f50c0c87c/unified_zoning_final_gazette.pdf
- MAHUD. Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification), No. SCS-401/3/2021-MAHUD-MAHUD-Part(3) of 4 December 2024 (Section 10, Physical Infrastructure; land use 2020–2043). Internet Archive capture 20250810073559 of https://tpmanipur.mn.gov.in/media/filer_public/81/1c/811cef92-cba3-43cb-9e7f-caeef3738b68/revised_imphal_master_plan_report-1st_modification.pdf
- Manipur Town and Country Planning Act, 1975 (Manipur Act 11 of 1975), ss. 1(2), 2, 13, 22 and 26. https://prsindia.org/files/bills_acts/acts_states/manipur/1975/Act11of1975Manipur.pdf ; Manipur Municipalities Act, 1994 (Act 43 of 1994), s. 213 and its extent (as quoted; drainage sections not read [TBC]).
- Manipur Flood Plain Zoning Act, 1978 (Manipur Act 10 of 1978; Manipur Gazette Extraordinary No. 185, 1 September 1978), ss. 1–7, read from the optical character recognition of a truncated copy. https://www.indiacode.nic.in/bitstream/123456789/13383/1/the_manipur_flood_plain_zoning_act%2C_1978.pdf
- Manipur (Hill Areas) District Councils Act, 1971, as amended (State compilation of subsequent amendments; ss. 29, 29(1A), 44A and 52). https://manipur.gov.in/wp-content/uploads/2026/05/The-Manipur-Hill-Areas-District-Councils-Act-1971-subsequent-Amendments.pdf
- Manipur Official Language Act, 1979 (Act 14 of 1979), with the (Amendment) Act, 2021 (Act 7 of 2021; Gazette Extraordinary No. 427, 10 March 2021). https://prsindia.org/files/bills_acts/acts_states/manipur/1979/Manipur%20Act%2014%20of%201979.pdf
- Government of Manipur. Reports in NGT OA 606/2018 ("Updated Fresh Report", July 2025; sixth six-monthly progress report, as on December 2025): sewage generation and treatment, the interception and diversion of the 72 drains falling into the Nambul and their BOD, and the hill areas. https://www.greentribunal.gov.in/sites/default/files/news_updates/6TH%20SIX%20MONTHLY%20PROGRESS%20REPORT%20BY%20GOVT.%20OF%20MANIPUR%20IN%20OA%20NO.%20606%20of%202018%20(COMPLIANCE%20OF%20MSW%20MGT%20RULES,%202016%20AND%20OTHER%20ENVIRONMENTAL%20ISSUES).pdf
- Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality (the 18 Manipur stretches, all Priority V). https://dste.py.gov.in/ppcc/pdf/Laboratory/PRS-2025.pdf
- Central Ground Water Board, North Eastern Region. Ground Water Information Booklets for Imphal West (Technical Report Series D No. 28/2013-14) and Bishnupur (2013); GWRA 2023 and 2024 (as quoted).
- Asian Infrastructure Investment Bank. Approval Project Document (October 2024) and Project Summary Information (29 November 2024), Manipur Urban Road, Drainage and Asset Management Improvement Project (P000723). https://www.aiib.org/en/projects/details/2024/_download/India/AIIB-PSI-P000723-India-Manipur-Urban-Road-Drainage-and-Asset-Management-Improvement-Project_clean_20241129.pdf
- Manipur Science & Technology Council (MASTEC). Flood Hazard Zonation in Manipur Valley, final report to DST-NRDMS (data to 2001).
- Reports on the floods of May 2024, May–June 2025 and September 2025 in the Imphal valley, the Naga Nullah, and the landslides at Tupul (2022) and Joumol (2015) (The Sangai Express; India Today NE; Eastern Mirror; the AGU Landslide Blog via a search summary; as reported).
- Bureau of Indian Standards. IS 456:2000 Plain and Reinforced Concrete — Code of Practice.
- Government of India. Dam Safety Act, 2021.
- Chow, V.T., Maidment, D.R. and Mays, L.W. (1988). Applied Hydrology. McGraw-Hill (AMC conversion).
Annexes and forms
| Annex / Form | Content |
|---|---|
| 4A | Flood-sensitive catchment boundaries (GIS); shallow-groundwater zone map |
| 4B | Tier B tables: PSD and SSR (Table 4.3), retention credit factor C_R, standard outlet sizes; confirmed fixed release coefficients (Table 4.3A) |
| 4C | Worked example (Tier A) with full routing tables |
| Form 4-1 | Site Runoff Control Report |
| Form 4-2 | Tier B Site Sheet |
| Form 4-3 | Fixed-coefficient Route Sheet (Clauses 4.14.3 to 4.14.7) |
Commentary. No Indian national rule or Manipur rule found during research for this Manual limits the rate of discharge from a site, and none requires on-site detention or a storage volume sized to a storm. No Manipur document found sets a design storm, a return period, a runoff coefficient or a time of concentration for any town drain: the largest current drainage programme, the AIIB project for "547 km of both side stormwater covered drains" along the roads of Greater Imphal, states its purpose but no return period, rainfall intensity or runoff coefficient (AIIB, Approval Project Document, October 2024), the Lamphelpat project states no design storm (NDB, project summary), and the Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification) has no storm-water drainage section, its chapter on physical infrastructure covering water supply, sewerage, electricity and solid waste only. The building rules are the Model Manipur Unified Building Bye-Laws, 2024, published by MAHUD Notification No. BBL-101/1/2024-MAHUD-MAHUD-Part(1) of 4 December 2024 (Manipur Gazette Extraordinary No. 253 of 5 December 2024) under section 213 of the Manipur Municipalities Act, 1994 (Act 43 of 1994) and section 26(1) of the Manipur Town and Country Planning Act, 1975 (Manipur Act 11 of 1975), "for adoption by the Urban Local Bodies and Planning & Development Authority, Manipur". The Model "shall extend to the Master Plan areas or notified Planning areas and area under the jurisdiction of all the Urban Local Bodies of Manipur" (bye-law 1(2)), but a permit is given under the bye-laws that the urban local body or the Planning and Development Authority, Manipur (PDA Manipur) has brought into force on it, such as the Kumbi, Moirang and Jiribam Municipal Councils' bye-laws of 2025 (final gazette 16 January 2025, as listed on the TPD site) and the "Building Bye-laws for ULBs of Manipur – Final Gazette Notification" of 15 December 2025 (as listed; not read); IMC's own Building Bye-Laws of 2025 are reported notified on the same date (as reported), and the older IMC Building Bye-laws of 2013, as amended in 2019 and 2022, are the Imphal lineage, with a third amendment published in draft in 2024. The provision numbers cited here are the Model's [TBC: confirm the number and text in the bye-laws the local body has notified]; where a local body's notified text differs, the local body's text governs. The bye-laws apply in the urban local bodies and the notified planning areas of the valley; the Manipur Municipalities Act, 1994 "extends to the whole of the State of Manipur except the Hill Areas" (as quoted). The bye-laws carry several drainage hooks, but every one of them protects the building, the plot or the watercourse; none sizes anything to a storm. For an outlet from a soak pit to a municipal drain "an intermediate treatment chamber should be installed" (bye-law 6(1)(A)); the plans show the "detail provisions made for conservation and harvesting of rain water" (6(1)(C)(j)) and, for multi-storeyed, lifeline and special buildings, a "Detailed drainage plan for both internal and external required to be constructed up to the available permanent/pucca drain of municipal/other authority" (6(1)(D)); no building or structure shall be built "over any municipal drain or land" (16); a rain-water pipe shall be "at least 75 mm" in diameter, shall discharge "into or over an inlet to a surface drain … but in no case shall it discharge directly into any closed drain", shall discharge into a gully "if a street drains within 30 m", and "shall not discharge into or connect with any soil pipe" (28); and "No open drain, except for rain water, shall be constructed in any open space required by these" bye-laws. Rainwater harvesting is required on plots of 100 m² and above (66), with grey-water recycling (67) and a fee rebate (68) (Commentary to Clause 4.11). Bye-law 92 reads, as printed, "No construction shall be permitted on land above 600 m from the mean sea level and with an average slope of 30 degrees", which would bar the whole of Greater Imphal, all of it above 600 m (NEER's reading); the IMC Building Bye-Laws (3rd Amendment), 2024 give the intended rule, "no construction will be permitted in the areas which have a slope of more than 30 degrees. Permission of development only upto two floors or 7m height in areas which have a slope of 21-30 degrees" (92.1) and "no cutting of slopes will be permitted in the areas which have a slope of more than 30 degrees" (92.2), but they were a draft published for objections, to "come into force on such date as the State Government may … appoint", and their final status was not confirmed [TBC]. Bye-law 93 prohibits "any new construction within the designated buffer zone to minimize human exposure to flood risk", with a table of buffers on the named rivers of the valley measured from mid-stream (Chapter 7), and routes any activity in a "prohibited area or restricted area" through "the previous permission of the Flood Zoning Authority constituted under the Flood Plain Zoning Act, 1978"; no Flood Zoning Authority has been found constituted and no zone notified under that Act, whose zones were reported in June 2026 to be "yet to be done" (as reported). Bye-law 94 sets the plinth "above 1m above the highest flood level of the surrounding areas" in "high Flood Risk Areas identified in the Master Plan of the towns", but the risk-informed master plans for Imphal and Moirang, where those areas would be shown, were not read [TBC], and no local authority's highest flood level was found for any town [TBC]: the WRD highest flood levels printed in the press were exceeded at Lilong and Ithai in September 2025 (as reported). This Manual supplies the method (gauge, model or surveyed flood marks, with the return period stated), and its 1% AEP level plus 0.5 m governs where it is higher (Chapters 5 and 7). The green-building criteria of the Model ask to "Minimize storm water run-off from site by reducing hard paving on site" and for "erosion and sedimentation control", and the bye-laws defer to the National Building Code 2016 for services. None of these sets a design storm, a release rate, a detention volume or an overflow path. Bye-law 6(1)(D) is the one hook for this chapter: its "Detailed drainage plan … up to the available permanent/pucca drain" needs a design storm, a release rate and a storage volume, which this chapter supplies. No duty to hold storm water on a plot, such as a dry sump, exists in the Manipur bye-laws; the only storage they name is the "surface reservoirs" of bye-law 66. The Unified Zoning/Use Regulation Bye-laws for the Master Plan Areas of Manipur, 2026 add a use zone for "Pond, Drain, Rivers and Canals" and list "Rain Water Harvesting System" as a use, but set no drainage rule. Three statutes protect the land that stores the valley's floods, and none sizes anything: the Manipur Conservation of Paddy Land and Wetland Act, 2014 forbids conversion of paddy land and wetland except through its Local, District and State Level Committees, counts "drainage channels, ponds, canals, bunds and ridges" as part of paddy land (s.2(c)), and bars any licence for construction on land converted in contravention of it (s.12); the Manipur Loktak Lake (Protection) Act, 2006 bans in the lake's Buffer Zone the "Discharge of untreated wastes and effluents from industries, cities or towns" and "Land reclamation, bunding or disturbing the natural course of drainages" (s.19); and the Manipur Flood Plain Zoning Act, 1978 provides for zones that have never been notified. Where valley paddy land or wetland is converted and built on, the flood storage lost below the 1% AEP level is replaced in the same basin under Clause 7.6.4 (Chapter 7; set by this Manual). The drainage sections of the Manipur Municipalities Act, 1994 were not read [TBC]. In the hill areas no building or drainage rule was found: the Manipur (Hill Areas) District Councils Act, 1971 gives the District Councils functions that include "water supply and sanitation schemes", "the construction, repair and maintenance of embankments" and the allotment of land for "residential or other non-agricultural purposes" (s.29(1)), but no building control, and the Councils have been run by the Deputy Commissioners of six hill districts as administrators since June 2025 (as reported); there this chapter reaches public works and any body that adopts the Manual, and for a household it is guidance. Basements are not limited for flooding. The Model defines a basement as "the lower storey of a building which is minimum 2/3rd of the floor height below the finished ground level" (bye-law 2(11)) and allows basements within the setback lines for fire safety, but no rule found excludes them from low-lying or flood-prone land or sets a level for a basement ramp or opening. This Manual therefore adds its own requirements for every basement: no detention storage in a habitable basement (Clause 4.10.1); the crest of every basement ramp and the sill of every basement opening at least 0.5 m above the 1% AEP flood level, with basement drainage pumped to the surface drain through a non-return valve (Clauses 6.11.1 and 6.11.4); and no basement in Zone 2 (Clause 7.5.2). On the Imphal valley floor, the Loktak margin and the Jiribam flood plain, where the design groundwater level is ground level (Clause 4.12.1), a basement is allowed only where it meets the rules of this chapter for flood-sensitive catchments, is watertight, and is checked for flotation with groundwater at ground level; on peat it also carries the geotechnical check of the Commentary to Clause 4.12; and in the flood-sensitive catchments of Clause 4.5.3.2 and any catchment notified under Clause 4.5.4 it recommends that no basement be permitted where the 1% AEP flood level stands above the surrounding ground. Wherever a basement or lower floor is cut into a slope, it shall carry the geotechnical certificate of the hill rule of Clause 4.11, with the water behind its walls drained to a lined drain and not to the ground. For a sloping site, this chapter also supplies what the bye-laws leave open: runoff from the catchment above the site shall be intercepted and carried round the building in the design storms of Chapter 6, and every flow from the site shall discharge to a lined drain or a stable natural channel through an energy dissipator, never onto an unprotected slope or into fill. These are the Manual's proposals, not rules of the bye-laws. This chapter is written so that it can supply, as a technical companion to the bye-laws on the Model, the master plans and the Municipalities Act, the design storm, release rates and storage volumes that they leave open; a competent authority could adopt it for that purpose, but none has. In practice the storm drains of Imphal are its sewers: the first phase of the Imphal sewerage project, commissioned in June 2020, covers 11 of IMC's 27 wards (master plan); "Sewage generation in urban areas is 70 MLD and existing treatment facilities are 44 MLD", with 8,600–8,700 household connections of 51,754 targeted (State report in NGT OA 606/2018, July 2025); the 72 drains that fall into the Nambul carried a BOD of 42.45–52.34 mg/L before their interception and diversion (State report, December 2025), against 3–6 mg/L in the river; and the CPCB lists 18 polluted stretches in the State, all Priority V, among them the Nambul from the Singda dam to Bishnupur (CPCB, 2025) (Clause 8.9). Retention and detention apply in full on every site whatever the drain carries: every litre a site releases at the peak of a storm takes up capacity in a drain that is already part-filled with sewage and that, when the river is high, cannot empty at all. The CPHEEO (2019) manual describes limiting outflow to the pre-development peak as typical practice, but it uses no "shall" and names no storm frequencies (CPHEEO Part A §8.5.1). This chapter turns that description into a development-control requirement.