Chapter 8Water Quality and Recharge
8.1 Purpose and scope
8.1.1 This chapter sets the requirements for the quality of stormwater leaving a site or a public drainage system, and for groundwater recharge. It covers:
- (a) the water quality volume (WQv) and the water quality design flow;
- (b) the treatment train, and the selection and design of best management practices (BMPs);
- (c) the criteria for infiltration and recharge;
- (d) the exclusion of sewage and dry-weather flow from storm drains;
- (e) gross pollutant traps, first-flush treatment and screens at outfalls to waterbodies;
- (f) how rainwater harvesting (RWH) fits with retention and detention;
- (g) erosion and sediment control during construction; and
- (h) monitoring.
8.1.2 This chapter applies to every development and public work to which Chapter 4 applies (Chapter 1). Clauses 8.9 (sewage) and 8.12 (construction erosion and sediment control) apply to every development that needs a building permit or layout approval, and to every public drainage work, whatever its size.
8.1.3 Retention under Chapter 4 is the first and preferred form of water quality control. Runoff retained on site is treated in full. The rest of this chapter applies to the part of the WQv that is not retained.
8.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Water quality volume (WQv) | The runoff volume that must be retained or treated, from the water quality rainfall depth (Clause 8.4). |
| Water quality rainfall depth (P_wq) | The greater of the retention depth (Annex 2E, Clause 2.10) and the 24-hour 3-month ARI depth (Annex 8A). |
| 3-month ARI depth | The 24-hour rainfall depth equalled or exceeded on average four times a year, from a partial-duration series of the long-term daily record. |
| Water quality design flow (Q_wq) | The peak flow from the 3-month ARI storm, used to size flow-through devices and diversion structures (Clause 8.4.5). |
| Runoff coefficient for WQv (Rv) | The volumetric runoff coefficient for small storms, Rv = 0.05 + 0.009·I. |
| BMP | A best management practice: a structural or non-structural measure that reduces pollutant loads or runoff volume. |
| Treatment train | Two or more BMPs in series, from source to site to regional scale (Clause 8.5). |
| Pretreatment | A BMP that removes coarse sediment, litter and oil before runoff reaches a filter or infiltration BMP. |
| First flush | The early part of a runoff event, which usually carries the highest concentrations of sediment, litter and oil. |
| Gross pollutant trap (GPT) | A device that captures litter, plastics, vegetation and coarse sediment, typically above about 5 mm. |
| Dry-weather flow (DWF) | Flow in a storm drain when it has not rained for at least 72 hours. In a separate storm system, DWF is evidence of sewage, sullage, groundwater infiltration or illicit discharge. |
| Cross-connection | Any pipe, channel or opening that lets sewage or sullage (grey water from kitchens, bathrooms and laundries) enter a storm drain. |
| Infiltration facility | A facility designed to store runoff below the ground surface, or in a depression, and let it soak into the soil: infiltration trenches and basins, unlined bioretention, permeable pavement with an open base, soakaways, recharge pits and recharge wells. |
| Seasonal high groundwater table | As defined in Clause 3.10.2: the highest level in the monsoon season. |
| Hotspot | A land use with a high risk of spills or contaminated runoff (Clause 8.8.8). |
| Level of Service (LoS) / Value Rating (VR) | The scoring system of Clause 8.6, from the MARC/APWA BMP Manual (2012). |
8.3 Objectives and pollutants of concern
8.3.1 Stormwater treatment under this Manual shall aim to:
- (a) remove litter, plastics and other gross pollutants before they reach a waterbody;
- (b) remove suspended sediment, and the metals, nutrients and oil carried on it;
- (c) keep sewage and sullage out of storm drains and waterbodies;
- (d) recharge groundwater where soils and groundwater depth allow, without polluting it; and
- (e) prevent erosion and sediment discharge during construction.
8.3.2 The design shall address the following pollutants for every site, and the hotspot pollutants of Clause 8.8.8 where they apply:
Table 8.1 — Pollutants of concern, sources and primary controls
| Pollutant | Main sources in Manipur towns | Primary control |
|---|---|---|
| Gross pollutants (plastics, litter, vegetation) | Streets, markets, open dumping in drains | Source collection; GPTs and screens (Clause 8.10) |
| Suspended sediment | Construction sites, unpaved roads and verges, road wear, drain silt | Erosion and sediment control (Clause 8.12); pretreatment; filtration |
| Oil, grease and fuel | Roads, parking, fuel stations, workshops, bus depots | Oil-grit separators at hotspots; bioretention |
| Pathogens and organic load (BOD) | Sewage and sullage cross-connections, animal waste | Exclusion and DWF interception (Clause 8.9) |
| Nutrients (N, P) | Sewage, fertiliser, food waste, detergents | Exclusion; bioretention; wetlands |
| Heavy metals | Roads, roofs, industrial yards | Filtration; sedimentation |
Commentary. Gross pollutants and sewage come first in Clause 8.3 because they dominate the pollution of urban waterbodies in Manipur, and because no treatment BMP works for long if they are not removed. CPHEEO (2019) notes that Indian drains carry night soil, urine and food waste (Part A §9.5). In its WSUD procedure it lists TSS, total nitrogen, total phosphorus and gross pollutants as the key pollutants (Part A Ch. 10). AMRUT 2.0 funds the harvesting of rainwater "through storm water drains into water body (which is not receiving sewage/effluent)" (Lok Sabha unstarred question AU1419), which only works if sewage is first kept out of the drains.
8.4 Water quality volume and design flow
8.4.1 Water quality rainfall depth. The water quality rainfall depth is:
P_wq = max (P_ret, P_3m)
where:
- P_ret = the retention depth for the site's zone (Annex 2E, Clause 2.10), mm; and
- P_3m = the 24-hour 3-month ARI depth for the site's zone (Annex 8A), mm.
8.4.2 Water quality volume. The WQv shall be computed as:
WQv = (P_wq / 1000) × Rv × A
where:
- WQv is in m³;
- A = the contributing area, m²;
- Rv = 0.05 + 0.009·I; and
- I = the impervious percentage of the contributing area (0–100), after the connectivity rules of Clause 3.9.
The Rv form above may be used only for sites under 0.5 ha and under the Tier B simplified method (Clause 4.14). This is the same limit as for the retention volume (Clause 4.4.2). For all other sites the WQv shall be computed with the SCS-CN method, as the retention volume is: WQv (m³) = 10 × Q_wq × A, where Q_wq (mm) is the SCS-CN runoff from P_wq for each sub-area and A is in ha.
8.4.3 Climate factor. The climate factor of Clause 2.8 shall not be applied to P_wq. P_ret and P_3m are frequency statistics of ordinary rainfall, not AEP design depths.
8.4.4 WQv met by retention. The volume retained on site under Chapter 4 counts toward the WQv in full. Where the retained volume is equal to or greater than the WQv, no further treatment is required for that area, except:
- (a) pretreatment of inflows to each retention facility (Clause 8.5.3);
- (b) hotspot controls (Clause 8.8.8); and
- (c) the outfall requirements of Clause 8.10, where the site discharges to a waterbody.
8.4.5 Water quality design flow. Flow-through devices (swales, filter strips, oil-grit separators, GPTs) and diversion weirs for off-line BMPs shall be sized for Q_wq. Q_wq shall be computed from the 3-month ARI intensity at the time of concentration of the contributing area:
- (a) by the Rational Method, where Chapter 3 allows it (a single element draining no more than 16 ha); or
- (b) as the peak of a hydrograph method using the 3-month ARI 24-hour depth with the alternating-block pattern of Clause 2.9.1.
8.4.6 Bypass. Flows above Q_wq shall bypass flow-through and off-line treatment devices without washing out the material already captured. The bypass shall be part of the minor or major system (Chapter 6).
8.4.7 Drawdown. Where the WQv is held in an extended-detention BMP (wet pond, constructed wetland or dry extended-detention basin), it shall be released over 24–48 hours (Chapter 4).
Commentary. The WQv depth is the runoff from the 3-month ARI storm or the retention depth, whichever is greater. The 3-month ARI is the Malaysian water quality design storm (MSMA 2, 2012). The Malaysian 2008 checklist gave its depth as about 40 mm and said it captures 90% or more of 24-hour storm runoff volume (DID, 2008). The Manipur value must be computed (Annex 8A). Georgia sets its WQv as the runoff from 1.2 inches (about 30 mm), the depth that covers 85% of storms in an average year, and requires 80% removal of the average annual post-development TSS load (GSMM 2016, Vol 1, Standard #4). Kansas City's water quality storm is the 1.37-inch (about 35 mm) event that produces up to 90% of the runoff from all 24-hour storms in a year (MARC BMP Manual, 2012).
The Rv formula is from the MARC/APWA BMP Manual (2012), which computes WQv = P × Rv with Rv = 0.05 + 0.009·I. Rv is used instead of the SCS curve number because the CN method greatly understates runoff from small storms on pervious ground. Not applying the climate factor (Clause 8.4.3) has no direct precedent; this Manual does so because it treats P_wq like the retention depth, as a statistic of ordinary rainfall. Bypass of larger flows and the 24–48 hour drawdown follow Chapter 4; MARC (2012) required at least 40 hours of extended detention of the WQv.
Illustrative — not design values. For a 1.0 ha site with 80% impervious cover and an assumed P_wq of 50 mm:
- Rv = 0.05 + 0.009 × 80 = 0.77
- WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³
8.5 Treatment train and pretreatment
8.5.1 Treatment train. Water quality control shall be designed as a treatment train, in the order shown in Figure 8.1:
- (a) source controls on the plot: roof runoff to RWH, rain gardens, permeable paving, disconnection of impervious areas, and silt traps at inlets;
- (b) site controls: bioretention, swales, filter strips, infiltration, oil-grit separators at hotspots, wet ponds and extended detention; and
- (c) regional controls, for public drainage: GPTs and DWF interceptors at outfalls, constructed wetlands at tank inlets, and regional ponds.
8.5.2 A development shall meet the WQv on site, through (a) and (b). Regional controls under (c) may count toward a development's WQv only where a regional facility treating the same runoff has been built under a notified basin plan (Clause 7.11).
8.5.3 Pretreatment. Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland shall have pretreatment at each concentrated inflow. Pretreatment shall be a sediment forebay, grass filter strip, silt trap or proprietary device that holds at least 10% of the WQv of its contributing area, or that is sized for Q_wq for flow-through devices.
8.5.4 Pretreatment shall be accessible for cleaning without entering or disturbing the main BMP.
Commentary. The treatment train follows CPHEEO (2019, Part A §10.2.3, SuDS treatment train) and CIRIA C753 The SuDS Manual (2015). It is also the order of priorities of this Manual: preserve, retain, detain, convey (Chapter 1). The 10% forebay volume has no Indian precedent; it is a common sizing rule for forebays in US manuals. In Manipur, unpaved verges, construction sites and drain silt deliver a heavy sediment load. Bioretention and infiltration facilities without pretreatment clog, often within a year or two.
Figure 8.1 — Treatment train: source, site and regional controls before the receiving waterbody, with sewage and dry-weather flow kept out of the system. Original drawing for this Manual, adapted from CIRIA, The SuDS Manual (C753), 2015, and MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012.
8.6 BMP selection: Level of Service and Value Rating
8.6.1 Method. In Tier A areas, the BMPs for each site shall be selected by the Level of Service (LoS) method of this Clause. In Tier B areas, the simplified route of Clause 8.6.5 may be used.
8.6.2 Required Level of Service. For a site that is not redevelopment, the required LoS depends on the change in curve number (ΔCN) from pre- to post-development (Chapter 3):
Table 8.2 — Required Level of Service for sites that are not redevelopment
| ΔCN | Impact | Required LoS |
|---|---|---|
| 17 or more | High | 8 |
| 7 to 16 | Moderate | 7 |
| 4 to 6 | Low | 6 |
| 1 to 3 | Minimal | 5 |
For redevelopment (existing impervious cover of 20% or more of the site), the required LoS shall be taken from Annex 8B.
8.6.3 Value Rating. Each BMP treating the WQv has a Value Rating (VR) from Table 8.3. The site's composite VR is the area-weighted average of the VRs of the BMPs serving each part of the site. Treatment trains get a composite VR under Annex 8B. The composite VR shall be equal to or greater than the required LoS.
8.6.4 Conditions for a Value Rating. A BMP earns its VR only if:
- (a) it is sized for the WQv (or Q_wq for flow-through devices) of the area credited to it;
- (b) it meets the design requirements of Clause 8.7 and, for infiltration, Clause 8.8; and
- (c) it has pretreatment under Clause 8.5.3.
8.6.5 Tier B simplified route. In Tier B areas, the requirement of Clause 8.6.3 is deemed met where the whole WQv of the site is either:
- (a) retained on site under Chapter 4; or
- (b) treated by a bioretention cell, rain garden or infiltration facility designed under Clauses 8.7 and 8.8, with pretreatment.
Table 8.3 — BMP Value Ratings and suitability in Manipur
| BMP | VR (MARC 2012) | Main pollutants removed | Volume reduction / recharge | Foothill fans and tested sand lenses (recharge rule) | Laterite / hard rock | Valley-floor clay and peat, pat and pukhri margins / high water table | Manipur notes |
|---|---|---|---|---|---|---|---|
| Native vegetation (preserved) | 9.25 | All | High | Suited | Suited | Suited | Counts only for preserved, undisturbed area |
| Rain garden / infiltration | 9.0 | Sediment, metals, oil, nutrients | High | Suited if 1.0 m separation met | Conditional (test) | Not suited | Mosquito control: drain within 48 h |
| Bioretention | 8.5 | Sediment, metals, oil, nutrients | Medium–high (unlined); low (lined) | Suited | Suited, with underdrain | Lined, with underdrain | Media source and phosphorus content to be specified |
| Permeable pavement | 7.5 | Sediment, metals, oil | Medium–high | Suited | Conditional | Lined only | Not where run-on carries heavy silt |
| Extended detention wetland | 7.0 | Sediment, nutrients, metals | Low | Conditional (water balance) | Suited | Suited | Good at tank inlets (Clause 7.9.7) |
| Media / sand filter | 6.0 | Sediment, metals | Low | Suited | Suited | Suited (lined) | Needs frequent cleaning |
| Extended wet detention (wet pond) | 5.0 | Sediment, metals, some nutrients | Low | Conditional (water balance) | Suited | Suited | Dry-season water balance (Clause 8.7.8) |
| Vegetated filter strip | 5.0 | Sediment | Low–medium | Suited | Suited | Suited | Mostly as pretreatment |
| Native vegetation swale | 4.0 | Sediment, oil | Low–medium | Suited | Suited | Suited | Not where Q_wq velocity is high |
| Extended dry detention | 4.0 | Coarse sediment | Low | Suited | Suited | Suited | Combine with detention (Chapter 4) |
| Proprietary / hydrodynamic devices | 3.0–5.0 | Coarse sediment, oil, litter | None | Suited | Suited | Suited | VR from verified test data only |
| Signage (public education) | +0.25 | — | — | — | — | — | Added to composite VR |
The VR column is from the MARC/APWA BMP Manual (2012), Table 4.4. The suitability columns and notes have no direct precedent and are set by this Manual.
Commentary. The LoS and VR method is from the MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Tables 4.2 and 4.4. The VRs combine a water quality score, based on effluent TSS concentrations in the International Stormwater BMP Database, with scores for volume reduction, temperature, and oils and floatables. The method suits Manipur for two reasons. It rewards volume reduction and preservation, which also serve recharge. It can also be checked by a reviewer without water quality modelling. Its weakness is that the scores come from US data. Manipur stormwater carries more litter and more sewage than the US runoff behind the scores (CPHEEO 2019, §9.5), so this Manual requires GPTs and DWF exclusion separately (Clauses 8.9 and 8.10) and does not let a VR stand in for them.
8.7 BMP design summaries
8.7.1 General. Each BMP shall be designed to the requirements below and to Annex 8D (BMP design sheets). The dimensions given are recommended starting values where marked; the designer shall justify any departure. Every BMP shall be designed for safe passage of flows above Q_wq (Clause 8.4.6) and shall have access for maintenance (Chapter 10).
8.7.2 Bioretention and rain gardens (Figure 8.2).
- (a) Surface ponding depth not more than 300 mm above the mulch, with an overflow at the maximum ponding level.
- (b) Surface ponding drained within 48 hours.
- (c) Filter media 600–900 mm deep: an engineered sandy loam with low fines and low phosphorus content (Annex 8D), with a 50–75 mm mulch layer.
- (d) A transition (choker) layer and a gravel drainage layer below the media.
- (e) A perforated underdrain where the design infiltration rate of the native soil (Clause 8.8.4) is below the rate needed to meet (b), or where the cell is lined.
- (f) Unlined cells shall meet the infiltration criteria of Clause 8.8. Cells that cannot meet them, and cells at hotspots, shall be lined.
- (g) Plants: native or naturalised species tolerant of both waterlogging and long dry spells.
8.7.3 Vegetated swales.
- (a) Trapezoidal or parabolic section, with side slopes no steeper than 1V:3H.
- (b) Longitudinal slope 0.5% to 4%, with check dams where steeper.
- (c) Flow depth at Q_wq not more than the height of the grass, and velocity at Q_wq not more than 0.3 m/s.
- (d) The 1% AEP flow (or the bypass) shall not erode the swale (Chapter 9 permissible velocities).
- (e) Where longitudinal slopes are below 1% or the subsoil is poorly drained, an underdrained ("dry") swale with filter media.
8.7.4 Vegetated filter strips.
- (a) Receive sheet flow only, with a level spreader where flow arrives concentrated.
- (b) Length in the direction of flow at least 5 m, and slope 1% to 8%.
- (c) Used mainly as pretreatment for bioretention, infiltration and swales.
8.7.5 Permeable pavement.
- (a) Run-on from impervious areas not more than twice the permeable area, and no run-on from unpaved or eroding areas.
- (b) Base reservoir of clean, open-graded aggregate, sized to hold its share of the WQv in its voids.
- (c) An open base (infiltrating) only where Clause 8.8 is met; otherwise lined with an underdrain, and then counted as filtration only.
- (d) Structural design for the traffic loading by the road authority's standards.
- (e) Not at hotspots, and not where the surface will be resurfaced with impermeable material.
8.7.6 Infiltration trenches and basins (Figure 8.3).
- (a) Pretreatment under Clause 8.5.3 in every case.
- (b) Trenches filled with clean washed aggregate, with a void ratio confirmed by test, wrapped in geotextile on the sides and top, on a sand base.
- (c) An observation well to the base of each trench.
- (d) Storage volume = WQv (or the retention volume of Chapter 4, where greater) held in the voids; emptied within 72 hours at the design infiltration rate.
- (e) An overflow to the minor or major system at grade.
- (f) Not brought into service until the contributing area is stabilised (Chapter 10).
8.7.7 Wet ponds (extended wet detention).
- (a) A permanent pool of at least the WQv, plus extended detention of the WQv above the pool, released over 24–48 hours.
- (b) A sediment forebay at each inlet (Clause 8.5.3).
- (c) Length-to-width ratio of the flow path at least 3:1, with no short-circuiting.
- (d) Permanent pool depth 1.0–2.5 m, with a safety bench (Clause 7.9.4).
- (e) A dry-season water balance (Clause 8.7.8).
- (f) The detention storage of Chapter 4 may sit above the extended detention level.
8.7.8 Water balance for permanent pools. Wet ponds and wetlands shall be shown, by a monthly water balance using IMD rainfall and pan evaporation, to keep at least 50% of the permanent pool volume (or the minimum wetland depth) through the driest year in 10. They shall not be topped up with groundwater, potable water or sewage. Where the balance fails, a dry extended-detention basin or a constructed wetland with a smaller permanent pool shall be used instead.
8.7.9 Constructed wetlands.
- (a) An inlet sedimentation pond (forebay) followed by a shallow vegetated macrophyte zone.
- (b) Extended detention of the WQv above the normal water level, released over 24–48 hours, with an extended detention depth not more than 0.5 m.
- (c) A flow path length-to-width ratio of at least 3:1, with deep zones across the flow path to spread the flow.
- (d) A high-flow bypass so that floods do not scour the macrophyte zone.
- (e) Where built at a tank inlet, the wetland shall sit within the tank's setback but outside its waterspread, and its storage shall not be counted as tank storage.
8.7.10 Gross pollutant traps.
- (a) Sized to treat Q_wq, with all flows up to the 1% AEP passing without washing out captured material.
- (b) Capture of gross pollutants down to about 5 mm.
- (c) Head loss included in the hydraulic grade line of the drain (Chapter 9), with the screen assumed 50% blocked.
- (d) Storage for captured material sized for the cleaning interval of the O&M plan, and not less than the 3-monthly cleaning of Chapter 10.
- (e) Vehicle access for cleaning by suction or grab.
8.7.11 Oil-grit separators.
- (a) Required at the hotspots of Clause 8.8.8 that involve fuel or oil: fuel stations, vehicle workshops and washing bays, bus and truck depots, and parking areas of more than 50 spaces.
- (b) Sized for Q_wq, with a high-flow bypass.
- (c) Not to be used as the only treatment: they shall be followed by a filtering BMP where the site needs a VR above 5.
8.7.12 Silt traps and catch pits.
- (a) At every inlet that receives runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody.
- (b) A sump at least 300 mm below the outlet invert.
- (c) Silt traps are pretreatment only and earn no VR.
Commentary. The design summaries draw on the MARC/APWA BMP Manual (2012), the Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) and PUB Singapore's ABC Waters Design Guidelines. The dimensions are typical of those manuals but have not been calibrated in Manipur. Three local issues drive changes from the source manuals:
- Mosquitoes. Dengue is endemic in Manipur. Surface ponding in bioretention and rain gardens must drain within 48 hours (Clause 8.7.2(b)), well inside the time mosquito larvae need to develop. This is consistent with the 24–48 hour WQv drawdown of Clause 8.4.7.
- Dry seasons. Most of Manipur's rain falls in the monsoon season of 1 April to 31 October: at Imphal the "Rainy season … starts from May and extent up to October", July (241.28 mm) and June (236.06 mm) are the wettest months, and the mean annual fall was 1,416.9 mm in 1975–2000 (MASTEC); in Bishnupur "Rainfall starts from the month of April end" and "About 80% rainfall is from South West monsoon" (CGWB, 2013); and IMD's highest January month at Imphal is 49.3 mm and highest December month 94.0 mm, against 459.6 mm in April and 605.0 mm in June (IMD, data 1953–2012). From December to February the pats shrink and pukhris fall, though on the valley floor the water table stays a few metres below the ground (Clause 8.8.1), and in the towns the dry-weather feed of a drain, channel or pat is sewage, because the drains carry it (Clause 8.9, Commentary). A wet pond or constructed wetland whose water balance (Clause 8.7.8) cannot keep its permanent pool from December to March on its own catchment's runoff is not to be used, and none is kept full with dry-weather flow; on the valley floor, where Clause 4.11 bars infiltration, the practical forms are lined bioretention with an underdrain, swales, storage for use and lined extended dry detention. Clause 8.7.8 applies to BMPs, which shall not be topped up with sewage; pats, pukhris, Loktak and other wetlands are waterbodies under Chapter 7 and are not to be used as treatment for a development. Wet ponds that dry out turn into stagnant pools or are used for dumping. Clause 8.7.8 requires a water balance and bans topping up with sewage, which is a common practice for keeping urban ponds "full".
- Litter and silt. GPTs and silt traps are treated as essential, not optional, because Manipur drains carry heavy litter and silt loads. The 50% blockage factor for screens matches the grate clogging factor of Chapter 6.
The 50-space threshold for oil-grit separators, the 5 mm GPT capture size, the 0.3 m/s swale velocity and the other dimensions in this Clause have no direct precedent and are set by this Manual.
Figure 8.2 — Bioretention cell (rain garden) in section: pretreatment, surface ponding, filter media, transition and gravel layers, underdrain, overflow, and the 1.0 m separation to seasonal high groundwater for an unlined cell. Original drawing for this Manual, adapted from MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, and CIRIA, The SuDS Manual (C753), 2015.
8.8 Infiltration and recharge criteria
8.8.1 Groundwater separation. An infiltration facility is permitted only where the seasonal high groundwater table is at least 1.0 m below the base of the facility. There is no exception in Manipur, which has no coastal sand areas (Clause 8.8.9). For this Clause the seasonal high groundwater table is the highest level found from April to November, which covers the season of 1 April to 31 October and the month after it (Clause 3.10.2). Manipur needs the three rules of Clause 4.11 here, and Clause 8.8.1 applies with the following. (i) No infiltration on the valley floor (Clause 4.11, valley-floor rule). No deliberate infiltration practice (soakaway, soak or percolation pit, recharge pit, shaft or well, infiltration trench, or permeable paving with an exfiltrating base) shall be built or credited on the lacustrine clay, silt or peat of the Imphal valley floor (sub-areas MN-A and MN-A1 of Annex 2A), which includes paddy land and former pats; on land below the 1% AEP flood level of a river, a stream or Loktak; inside a river-bunded area that ponds when its outfalls close; on the margins of a pat or pukhri (its Zone 1 and Zone 2 under Chapter 7); within the 236.21 km² of the Manipur Loktak Lake (Protection) Act, 2006; on the Barak and Jiri flood plain of sub-area MN-C1 below its 1% AEP level; or wherever the seasonal high water table is less than 2.0 m below ground. On such land the exception for roof water in Clause 8.11.3(c) does not apply; roof water goes to storage for use, retention is met by storage for use and by surface measures that do not infiltrate below ground, and detention under Chapter 4 is in lined, watertight storage checked for flotation with the groundwater at ground level. The valley floor has "approximately 30 to 50 m of clayey formation, construction of shallow tube wells is problematic", with "clayey deposit down to depth range of 30 to 65 m bgl" and water "2 to 5 m bgl" in major parts of Imphal West (CGWB, 2013); round the lakes of Bishnupur "peaty soils have high acidity" (CGWB, 2013); and the valley's soils are of "fluvio lacustrine origin", of clay, silt and sand (MASTEC). Bye-law 66 of the Model Manipur Unified Building Bye-Laws, 2024 [TBC: confirm the number and text in the bye-laws the local body has notified] offers "surface reservoirs or recharge wells", and this Manual chooses surface reservoirs, which is no conflict; bye-law 67 sends the excess grey water "to the rain water recharge structures for ground water recharge", which on the valley floor is a soak pit in clay: this Manual states the conflict, requires storage or a sewer connection in its place, and leaves the Applicant to seek the local body's relaxation of the bye-law, which this Manual does not override. Gas has been met "while constructing deep tube wells in some places" (CGWB, 2013), and no subsidence record for the peat was found [TBC]: a sump, tank or detention structure on peat has a geotechnical check (set by this Manual). (ii) No infiltration on hill slopes (Clause 4.11, hill rule). In sub-areas MN-B and MN-C, on the hill parts of MN-C1, on the valley-rim slopes and hillocks of MN-A, and on any natural slope steeper than 10° elsewhere, no deliberate infiltration practice shall be built or credited on natural ground sloping more than 10°; on Disang shale at any slope; on colluvium, fill or slide debris; in a mapped landslide zone or landslide locality, such as Tupul in Noney district and Joumol in Chandel district, and the cut slopes of NH-37 and NH-2; or upslope of a cut slope or retaining wall within twice its height — unless a geotechnical certificate shows that the added water will not destabilise the slope. Roof runoff goes to storage of at least 25 L per m² of roof (Clause 4.11), with its overflow, and all other runoff, by a lined drain through a silt trap and an energy dissipator to a stable channel, never onto an unprotected slope. The Disang shale "occupies almost 85 p.c. of the hilly region, have less infiltration and more run off" (MASTEC), and it failed when cut and saturated at Tupul, where a landslide at the Jiribam–Imphal railway site on 29 or 30 June 2022 was attributed to "poorly designed or implemented slope excavation coupled with heavy rainfall" (as reported). The draft IMC Building Bye-Laws (3rd Amendment), 2024 would bar construction on slopes of more than 30° and cutting of them, and allow at most two floors or 7 m on slopes of 21 to 30° (92.1 and 92.2; a draft published for objections, final status not confirmed [TBC]), in place of bye-law 92 of the Model, which as printed bars construction "on land above 600 m from the mean sea level and with an average slope of 30 degrees"; the 10° threshold and the Disang condition are set by this Manual, because no Manipur numeric threshold exists below 21°. In the hill areas no building bye-law applies, and this rule reaches public works and any body that adopts this Manual. (iii) Recharge only on tested ground outside both rules (Clause 4.11, recharge rule). Recharge is allowed, with pretreatment, the field test of Clause 8.8.3 and the separation of this Clause, with the seasonal high water table at least 2.0 m below ground, only on the foothill fans of sand, gravel and boulders at the valley edge, where "sand, gravel, pebbles and boulders are found in the foothill regions" (MASTEC), on Barail sandstone cappings on slopes of 10° or less away from scarps, and on sand lenses in the valley floor that test pits show, outside the areas of item (i). Recharge is a choice, not a duty: every assessment unit is Safe, and the stage of groundwater extraction was 8.00% in the assessment of 2024 and 7.99% in 2023 (CGWB, as quoted); Imphal draws about 90% of its drinking water from the Imphal, Nambul and Iril rivers (master plan). (iv) Quality. No runoff from roads with heavy traffic, fuel stations, workshops, industrial yards or solid-waste sites is led to any recharge structure, and a recharge structure on a foothill fan, a sandstone capping or a sand lens takes only roof water or runoff that has passed a filtering BMP. The 2.0 m limit, the April–November record, the 10° threshold and these conditions are set by this Manual; no Manipur rule on infiltration near the water table or on slopes below 21° was found. The seasonal high groundwater table shall be determined under Clause 3.10.2.
8.8.2 Other separation. The base of an infiltration facility shall also be at least 1.0 m above bedrock or any impermeable layer, unless the facility is designed to recharge a fractured or weathered rock aquifer under Clause 8.8.10.
8.8.3 Infiltration tests. The infiltration rate shall be measured at the proposed base level of the facility:
- (a) by a double-ring infiltrometer test (ASTM D3385) for basins, bioretention and permeable pavement;
- (b) by a falling-head borehole or trial-pit soakage test (for example BRE Digest 365) for trenches, soakaways, recharge pits and recharge wells;
- (c) with at least 2 tests per facility, and at least 1 test per 100 m² of infiltration base area or per 50 m of trench length; and
- (d) by a person competent in geotechnical testing, with the results reported on the Infiltration Test Record (Form 8-2).
Tests made in the dry season shall be reported with the groundwater level at the time of test and the seasonal high level of Clause 8.8.1.
8.8.4 Design infiltration rate. The design infiltration rate is the measured rate divided by a safety factor:
- (a) 2.0 where the tests meet Clause 8.8.3(c) and the results vary by no more than a factor of 2; and
- (b) 3.0 otherwise.
8.8.5 Minimum rates.
- (a) Full infiltration (no underdrain) only where the design rate is at least 13 mm/h.
- (b) Partial infiltration, with an underdrain, where the design rate is 3 mm/h to 13 mm/h. Only the volume that infiltrates within 72 hours is credited as retention.
- (c) No infiltration credit where the design rate is below 3 mm/h.
8.8.6 Setbacks for infiltration facilities. Infiltration facilities receiving runoff from roads, parking or other paved surfaces shall be at least:
- (a) 3 m from building foundations, and 5 m from a basement;
- (b) 1.5 m from a property boundary, unless the neighbour agrees in writing;
- (c) 30 m from a drinking-water well or borewell;
- (d) 15 m from a septic tank or soak pit; and
- (e) 6 m from the crest of a slope steeper than 1V:3H, unless a geotechnical report shows the slope remains stable.
Roof-only runoff to recharge structures is subject to (a) and (b) only, and to Clause 8.11.3.
8.8.7 Drawdown and verification. Every infiltration facility shall empty within 72 hours at the design rate (Chapter 4), and shall be tested after construction (Clause 10.9.3).
8.8.8 Hotspots. Runoff from the following shall not be infiltrated without treatment, and shall not be infiltrated at all where (d) or (e) applies:
- (a) fuel stations;
- (b) vehicle workshops, washing bays, and bus and truck depots;
- (c) industrial yards and loading areas where hazardous materials are handled or stored;
- (d) solid waste transfer stations and landfill areas; and
- (e) land known or suspected to be contaminated.
Treatment for (a) to (c) shall include an oil-grit separator and a lined filtering BMP before any infiltration.
8.8.9 Sandy coastal aquifers. This Clause applies only to coastal sand aquifers. Manipur has none, so the Clause has no effect in the State; it is kept only so that the clause numbers stay unchanged. The sands and gravels of the foothill fans at the edge of the Imphal valley, the sand lenses in its clays and the Barak and Jiri alluvium of the Jiribam plain are not coastal sand areas: Clause 8.8.1 applies there in full, with the valley-floor rule and the recharge rule of Clause 4.11, and the reduced separation of item (d) does not. In coastal sand areas:
- (a) infiltration is the preferred means of meeting retention and the WQv wherever Clause 8.8.1 is met;
- (b) storm drains shall not be designed to lower the groundwater table: inverts below the seasonal high groundwater table shall be watertight, with no weep holes or subsoil drains that discharge groundwater to the outfall, unless a hydrogeological report shows no harm to the freshwater aquifer;
- (c) no long-term pumping of groundwater into storm drains shall be approved (for example basement dewatering); and
- (d) in notified coastal sand areas, roof-only runoff may be infiltrated with a separation of not less than 0.5 m to the seasonal high groundwater table, provided a groundwater mounding check shows that the mound stays at least 0.3 m below the facility base and does not reach adjacent foundations or basements. No other runoff may use this reduced separation;
- (e) where neither the 1.0 m separation nor clause (d) can be met, the site shall use surface retention that does not infiltrate below ground (for example shallow vegetated depressions, disconnection of roofs onto lawns, and reuse), and detention under Chapter 4.
8.8.10 Laterite and hard-rock areas. In laterite and hard-rock terrain (for example the Barail sandstone cappings of the hills and of some hillocks in the valley, the only rock on which this Manual allows recharge, after testing, on slopes of 10° or less away from scarps (Clause 4.11, recharge rule), and the Disang shale, which "occupies almost 85 p.c. of the hilly region, have less infiltration and more run off" (MASTEC) and on which no infiltration is allowed at any slope without a geotechnical certificate (Clause 4.11, hill rule); no laterite was described in the sources read for this Manual; on any slope in these areas the hill rule of Clause 4.11 applies first under Clause 8.8.1):
- (a) tests shall be made at the facility base, below any surface crust or hardpan;
- (b) recharge into weathered or fractured rock is permitted only for roof runoff, or for runoff that has passed through a filtering BMP, because fractures give little treatment; and
- (c) infiltration on or above slopes shall be checked for slope stability.
8.8.11 Delta clays and black cotton soils. In the lacustrine clays, silts and peat of the Imphal valley floor, with its paddy land and former pats, the clay beds of the pats and pukhris, the margins of Loktak, and the Barak and Jiri alluvium of the Jiribam plain below its 1% AEP level, and in expansive black cotton soils:
- (a) infiltration facilities will usually fail Clause 8.8.5 and need not be tested where the soil survey (Chapter 3) shows HSG D; and
- (b) where infiltration is used near buildings on expansive soils, the setback of Clause 8.8.6(a) shall be doubled.
Commentary. The 1.0 m groundwater separation is a core requirement of this Manual. The other values in this Clause (the 1.0 m bedrock separation, test numbers, safety factors, minimum rates and setbacks) are typical of US and UK practice and have no Manipur precedent. The well setback in Clause 8.8.6(c) applies to runoff from paved surfaces, not to roof water. Manipur RWH practice routes roof water into open wells and recharge wells, and Clause 8.11 keeps that practice.
No map of hydrologic soil groups for Manipur, no soil series and no measured infiltration rate anywhere in the State was found [TBC]; every infiltration design needs the tests of Clause 8.8.3. "Manipur Valley is virtually a flat alluvium filled valley … Basically Manipur Valley is made up of alluvium of fluvio lacustrine origin. They are usually dark grey to black in colour. The principal constituents are clay, silt and sand whereas sand, gravel, pebbles and boulders are found in the foothill regions" (MASTEC). Under Imphal West there are "approximately 30 to 50 m of clayey formation, construction of shallow tube wells is problematic", with "clayey deposit down to depth range of 30 to 65 m bgl"; the "Depth to water level in major parts of the district varies from 2 to 5 m bgl", and 5 to 7 m close to the hills; and "emanation of gas while constructing deep tube wells in some places" has been met (CGWB, Imphal West, 2013). Round the lakes of Bishnupur "peaty soils have high acidity", "lacustrine laminated sand and clay overlies the fresh Disang shale", and the water stands 2.50 to 4.30 m below ground, rising in April and May (CGWB, Bishnupur, 2013; a summary table there prints other ranges whose columns could not be aligned [TBC]). In the hills the Disang shale "occupies almost 85 p.c. of the hilly region, have less infiltration and more run off", with Barail sandstone cappings on some hills and hillocks (MASTEC). Groundwater is not short: every assessment unit is Safe, and the stage of extraction was 8.00% in the assessment of 2024 and 7.99% in 2023 (CGWB, as quoted); no State network of observation wells was found, and the CGWB's dug-well monitoring in Imphal West stopped "since 1991 due to disturbed law and order" (CGWB, 2013). A Manipur Ground Water (Control & Regulation) Policy, 2023 was prepared (as listed by DoECC; text not read [TBC]). This Manual's interim soil groups follow from these (Chapter 3): the valley's lacustrine clay and silt D; peat and the margins of phumdi D, saturated and settling; the foothill fans B to C, by test; the Disang shale hills D for runoff; the Barail sandstone cappings C, by test and away from scarps; the Barak and Jiri alluvium of the Jiribam plain C to D, and D below its 1% AEP level in the season; and urban fill C (D if clayey or compacted). The State therefore needs three rules, not one (Clause 4.11). On the valley floor, which holds most of the towns, no water is put into the ground on purpose, under the valley-floor rule, because it would go into clay, peat or saturated ground. On hill slopes, on Disang shale, on colluvium and fill and in landslide zones, no water is put into the ground on purpose, under the hill rule. On the foothill fans, the Barail sandstone cappings and tested sand lenses, recharge is allowed after testing, under the recharge rule, as a choice rather than a duty. Everywhere, runoff from roads and open land goes to surface systems and never directly to a recharge well, borewell or shaft (Clause 8.11.3(b)). Clause 8.8.9 has no effect in Manipur, which has no coast.
Figure 8.3 — Infiltration trench in section: pretreatment sump, aggregate-filled trench in geotextile, observation well, overflow, the 1.0 m minimum separation to the seasonal high groundwater table, and setbacks to wells and foundations. Original drawing for this Manual, adapted from the Georgia Stormwater Management Manual, 2016 (Vol 2), and CIRIA, The SuDS Manual (C753), 2015.
8.9 Sewage cross-connections and dry-weather flow
8.9.1 No sewage in storm drains. No sewage or sullage (grey water from kitchens, bathrooms and laundries), septic tank effluent, or trade effluent shall be connected to, or discharged into, any storm drain, by any pipe, channel or opening.
8.9.2 Condition of approval. Before the completion certificate, the Applicant shall show, by a dye or smoke test witnessed by the Authority or the sewerage agency, that every sewage and sullage outlet on the site discharges to a sewer or to an approved on-site system, and that none discharges to a storm drain. Any existing cross-connection on the site shall be removed as a condition of approval, including on redevelopment and on additions to existing buildings.
8.9.3 Where no sewer exists. Where no sewer is available, sewage and sullage shall go to an approved on-site or decentralised treatment system. The treated effluent of such a system may be discharged to a storm drain only with the written consent of the Manipur Pollution Control Board (MPCB) and the drain owner.
8.9.4 Public drains: DWF survey. Every ULB in a Tier A area shall survey its storm drain outfalls to waterbodies for dry-weather flow at least once a year, before the monsoon, and record:
- (a) the outfalls with DWF;
- (b) the estimated DWF rate; and
- (c) the upstream sources found by tracing, CCTV, dye or smoke testing.
The results shall be published in the register of Clause 10.17.
8.9.5 DWF interception. Until the sources are removed, every outfall to a waterbody that carries DWF shall have a DWF interceptor that:
- (a) diverts the DWF to a sewer or a treatment plant;
- (b) does not reduce the capacity of the storm drain for the minor or major event (Chapter 6), with its weir or diversion head losses included in the hydraulic design (Chapter 9);
- (c) has a screen ahead of the diversion; and
- (d) is not a substitute for removing the source connections.
8.9.6 Sewage overflows. No new sewage overflow, emergency bypass or pumping station overflow shall be designed to discharge into a storm drain or waterbody, except where the sewerage agency shows that no alternative exists, and then only with screening and with the overflow frequency stated.
Commentary. The prohibition of sewage connections and the removal of existing cross-connections as a condition of approval are core requirements of this Manual, and Clause 1.10.3 allows no variance from them. Sewage in storm drains is the single largest water quality problem of urban drainage in Manipur. It defeats every other measure in this chapter: BMPs designed for stormwater are overloaded, GPTs fill with sludge, and the receiving tanks and channels become sewage lagoons. CPHEEO (2019) notes that Indian drains carry night soil and urine (Part A §9.5). DWF interception (Clause 8.9.5) is an interim measure. It protects the waterbody while the sources are traced and removed, but it can become permanent if the source work is not done, which is why the annual survey and publication of Clause 8.9.4 are required. The annual survey frequency is set by this Manual.
In Greater Imphal the storm drains carry sewage, and this Clause is the normal case, not the exception. Sewers are partial. The Imphal Sewerage Project Phase I of PHED, "commissioned in June 2020", covers 11 municipal wards with "one STP of 27 MLD, 5 nos. of Pumping station and 69.44 km of sewer network" for a population of 2.59 lakh by 2031; Phase II is to serve the remaining 16 wards and 4 outgrowths, 3.84 lakh people by 2054, with plants of 6 MLD at Lamphelpat, 27 MLD at Langthabal Kunja and 16 MLD at Uchekon Loukol, 21 pumping stations and 277 km of sewers, at ₹1,200 crore "for construction with a total capacity of 49 MLD"; and the treatment needed by 2043, 104 MLD, exceeds the 76 MLD the two phases would give (Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification)). The State reported to the National Green Tribunal that "Sewage generation in urban areas is 70 MLD and existing treatment facilities are 44 MLD (27 MLD for Imphal Phase I and II and 17 MLD under Nambul rejuvenation)", that the 27 MLD and 16 MLD plants treated 21.59 MLD and 11.50 MLD, that their "Final mode of disposal" is "Agriculture canals", and that 8,600 to 8,700 households were connected out of 51,754 targeted by 2027 (report of July 2025 in O.A. 606/2018). Everywhere else the septic tanks and soak pits of the town overflow, with all the sullage, to the open drains. The drains reach the rivers: the "Interception & Diversion (I & D) of all drains (72 Nos.) falling into the Nambul River" to a plant of 16 or 17 MLD is reported completed, and the drains' BOD was 42.45 to 52.34 mg/L and their COD 78.56 to 97.23 mg/L (State report of December 2025 in O.A. 606/2018), while the CPCB's list of 2025 places 18 stretches of 18 rivers in the State in Priority V, among them the Nambul from the Singda Dam to Bishnupur, with a maximum BOD of 3.3 mg/L at Singda, 4.8 at Samusang, 4.7 at Naoremthong, 5.6 at the Hump Bridge and at Heirangoithong and 3.4 at Bishnupur (CPCB, Polluted River Stretches for Restoration of Water Quality, 2025): the drains carry sewage and the rivers dilute it (NEER reading). The market waste of Imphal is "dumped in the Naga Nullah on the backside of the market, which creates a stagnant pool all along the year" (master plan). In the hill towns, "The existing reliance on septic tanks and twin soak pits in the hilly regions of Manipur is appropriate" and "There is minimal presence of underground drainage infrastructure in these areas" (State report of July 2025), so their drains, too, receive what the pits and tanks release. The law already points the same way. The Model Manipur Unified Building Bye-Laws, 2024 [TBC: confirm the number and text in the bye-laws the local body has notified] require that "For outlet from the soak-pit to municipal drain if provided, an intermediate treatment chamber should be installed" (bye-law 6(1)(A)), make a latrine "a connected latrine if a sewer is within 30 m" of the site (bye-law 27), and forbid a rain-water pipe to "discharge into or connect with any soil pipe" (bye-law 28(v)); the Manipur Loktak Lake (Protection) Act, 2006 counts "sludge from open drains" as sewage effluent (s.2), bars in the lake's Buffer Zone the "Discharge of untreated wastes and effluents from industries, cities or towns and other human settlements" (s.19(iv)), and bars anyone from discharging or emitting "any sewage or domestic waste into the lake" in the Core Zone "except with the prior permission of the authority" (s.20(i)); the Act reaches only the lake's 236.21 km², not the rivers and drains upstream (NEER reading). Lamphelpat, a pat being developed as flood storage for the drains and channels of its catchment, is also to supply drinking water from its stored water (NDB). In Manipur, therefore: (i) every storm-drain outfall to a pat, a pukhri, Loktak, a river stretch on the CPCB's list, or a paddy-field or agriculture canal is taken to carry dry-weather flow until the survey of Clause 8.9.4 shows that it does not, and has a DWF interceptor and a screen under Clause 8.9.5 before it reaches the water, and before any detention or retention pond; the outfalls to Lamphelpat come first, because it is both flood storage and a proposed source of drinking water; (ii) within the 236.21 km² of the Loktak Act, no outfall carrying untreated sewage is designed or approved, sections 19(iv) and 20(i) of the Act are the hooks, and the prior permission of the Loktak Development Authority is obtained for every outfall; and on the rivers and drains that reach the Loktak margin from upstream, where the Act does not reach, this Manual applies the same interception at the outfalls; (iii) no septic tank or soak-pit overflow and no sullage pipe is connected to a storm drain on any site approved under this Manual (Clauses 8.9.1 and 8.9.2): within 30 m of a sewer the site connects to it (bye-law 27); in the wards of Phase I and Phase II the site's sewage and storm water are kept in separate systems, each with its own last inspection chamber at the boundary, so that it connects to the sewer and to a storm drain without rework (Clause 6.3.6(a)); and where no sewer exists, the intermediate treatment chamber of bye-law 6(1)(A) is the least that is provided, and its outlet reaches a municipal drain only with the written consent of the MPCB and the drain owner under Clause 8.9.3; (iv) until sewers connect, a drain that receives sewage is designed as a combined channel under Clause 6.3.6(d): for velocities that keep sludge moving in dry weather as well as for the storm flow, with access for cleaning, and with covers or screens where it passes homes; in the hill towns a drain below a settlement is treated as such a channel until sewers exist; (v) no storm drain, and no interceptor, discharges to a paddy-field or agriculture canal without treatment, and where no sewer or treatment plant exists to receive the intercepted flow, the interceptor delivers it to an interim treatment unit that the MPCB approves, never to a pat, pukhri, canal or pond; and (vi) a pat, pond or basin that stores storm water mixed with sewage, as any pat does that receives the drains of a town, has the dry-weather flow of its inflows intercepted ahead of it; keeps no permanent pool fed by dry-weather flow; is pumped or drained down to its normal level as soon as the river stage allows and within the pumping period of Clause 5.8.5; has its inlets screened against garbage and phumdi and set so that they do not stand exposed as the level falls; is cleared of sludge in the post-season clearance by 15 November, with the sludge tested under Clause 7.9.1(c) and disposed of as the MPCB directs; and leaves no isolated pool standing more than 72 hours after drawdown, because of mosquitoes. Every interceptor is sized from the measured dry-weather flow of its drain and does not reduce the drain's capacity for the minor and major events (Clause 8.9.5(b)); at an outfall that a sluice closes when the river is high, it and its chamber are placed above the 1% AEP level or made watertight, and work with the gate shut. These conditions are set by this Manual.
8.10 Outfalls to waterbodies: first flush, gross pollutant traps and screens
8.10.1 Requirement. Every new storm drain outfall to a waterbody, and every existing outfall on a drain that is rebuilt, widened or extended, shall have:
- (a) a GPT designed under Clause 8.7.10; and
- (b) first-flush treatment: treatment of the WQv (or Q_wq) of the contributing catchment by the BMPs of Clause 8.7, either on the contributing sites or at the outfall.
8.10.2 Where treatment at the outfall is impracticable. Where land is not available at a public outfall, first-flush treatment may be provided by:
- (a) a proprietary first-flush or hydrodynamic device sized for Q_wq; or
- (b) a treatment wetland or forebay within the waterbody setback (Clause 7.5.1(b)), outside the waterspread.
8.10.3 Screens and trash racks. Screens at outfalls, culvert inlets and pump sumps shall:
- (a) be designed with 50% blockage for hydraulic capacity;
- (b) have an overflow or bypass path so that a fully blocked screen does not flood property;
- (c) have bar spacing chosen for the hazard: closer spacing for litter capture, wider spacing where blockage would cause flooding; and
- (d) be cleanable from a safe platform, with vehicle access.
8.10.4 Existing outfalls. Each ULB shall prepare a programme to fit GPTs and DWF interceptors to its existing outfalls to waterbodies, starting with outfalls to tanks used for drinking water supply and to notified wetlands (Clause 7.12), and shall report progress in the register of Clause 10.17.
Commentary. This Manual requires first-flush treatment and gross pollutant traps at outfalls to waterbodies. Gross pollutants are the most visible form of pollution in Manipur waterbodies, and plastics also block drains and culverts, which links water quality to flooding. The 50% screen blockage matches the grate clogging factor of Chapter 6. Clause 8.10.3(c) warns against fine screens on large drains, which block in the first hour of a storm and cause the flooding they were meant to prevent.
8.11 Rainwater harvesting integration
8.11.1 RWH mandate continues. The rainwater harvesting required by the Model Manipur Unified Building Bye-Laws 2024 (bye-law 66(a) of the Model: "Water harvesting through storing of water runoff including rainwater in all existing and new buildings on plots of 100 square metre and above will be mandatory. The plans submitted shall indicate the system of storm water drainage along with points of collection of rain water in surface reservoirs or in recharge wells"; bye-law 66(b), soft cover of at least 15% of the plot for a building with a covered area of 500 m² or more and 10% for any other; bye-law 67, grey-water recycling, with the excess "suitably connected to the rain water recharge structures for ground water recharge"; bye-law 68, a rebate of 10% on the building permission fee where both recycling and rainwater harvesting are provided; and bye-law 6(1)(C)(j), the details of rainwater harvesting on the plans [TBC: confirm the number and text in the bye-laws the local body has notified]) continues to apply, where the local body has brought it into force, subject to the limits of Clause 8.8.1: this Manual chooses the bye-law's "surface reservoirs", which is no conflict; where bye-law 67 sends grey water to a recharge structure on a site where Clause 4.11 bars infiltration, this Manual states the conflict, requires storage or a sewer connection in its place, and leaves the Applicant to seek the local body's relaxation of the bye-law, which this Manual does not override (Chapter 1). This Clause sets how RWH structures are counted under this Manual.
8.11.2 Three different functions. The designer shall keep apart, on the drawings and in the calculations:
- (a) harvesting: storage for use (sumps and tanks);
- (b) recharge: recharge pits, trenches, shafts and wells that put water into the ground; and
- (c) detention: storage with an orifice outlet that is empty at the start of a storm (Chapter 4).
8.11.3 Recharge structures.
- (a) Roof runoff may be led to recharge wells, open wells, recharge pits and shafts after a filter or settling chamber.
- (b) Runoff from roads, parking and other paved areas shall not be led directly into any well, borewell or recharge shaft. It may be recharged only through an infiltration facility that meets Clause 8.8, with pretreatment.
- (c) Recharge structures shall meet the groundwater separation of Clause 8.8.1, measured from the base of the pit or the bottom of the filter media, except recharge wells that receive filtered roof water only.
8.11.4 Credit toward retention and WQv. A recharge structure counts toward the retention volume of Chapter 4 and the WQv only where:
- (a) its infiltration rate has been tested under Clause 8.8.3;
- (b) it empties within 72 hours at the design rate; and
- (c) it has pretreatment.
A harvesting sump counts toward retention only where its contents are used, by a demand stated in the drainage report, within 72 hours (Chapter 4).
8.11.5 No credit as detention. RWH storage does not count as detention unless it is a dedicated volume that is empty when a storm arrives, with an outlet. RWH sumps are assumed full at the start of every monsoon (April–October) design storm (Chapter 4).
8.11.6 Overflow. Every RWH structure shall have an overflow that discharges at grade to the site drainage, never onto a neighbouring plot or into a sewer.
8.11.7 Surface-runoff recharge in public spaces. Recharge trenches, shafts and percolation pits in roads, medians, parks and other public spaces shall meet Clause 8.8 in full, including the hotspot rules for roads with heavy traffic, and shall have a GPT or silt trap at each inlet.
Commentary. The rule that RWH storage does not count as detention is set in Chapter 4. Manipur's building bye-laws make rainwater harvesting compulsory on plots of 100 m² and above, but they set no storm, no volume for use and no detention rule. Bye-law 66(a) of the Model reads: "Water harvesting through storing of water runoff including rainwater in all existing and new buildings on plots of 100 square metre and above will be mandatory. The plans submitted shall indicate the system of storm water drainage along with points of collection of rain water in surface reservoirs or in recharge wells"; bye-law 66(b) asks for soft cover of at least 15% of the plot for a building with a covered area of 500 m² or more and 10% for any other; bye-law 67 asks for grey-water recycling for a covered area of 500 m² or more or a use of 10,000 L a day, and sends "The excess waste water not reused for toilet flushing" to "the rain water recharge structures for ground water recharge"; bye-law 68 gives "rebate of 10 % on building permission fees" to owners "who undertake both recycling of waste water and rain water harvesting structures"; bye-law 6(1)(C)(j) asks the plans for the "detail provisions made for conservation and harvesting of rain water"; the completion certificate certifies "water harvesting as well as waste water re-cycling systems"; and the green-building criteria include "Water recycle, reuse and rainwater harvesting" (Criterion 9). None of these gives a storage volume, a release rate or a design storm (NEER reading). The Unified Zoning/Use Regulation Bye-laws, 2026 list "Rain Water Harvesting System" as a use, and AMRUT 2.0 funds an "Oxygen Park & Rain Water Harvesting Park" (TPD, 2025-26). On the valley floor a recharge well or pit stands in "approximately 30 to 50 m of clayey formation" with the water 2 to 5 m below ground (CGWB, 2013): it is a soakaway in clay, not recharge, and a pit that receives grey water there is a soak pit. In the hills, on Disang shale, it adds water to a slope that slides when wet. Groundwater is not short (stage of extraction 8.00% in 2024, CGWB, as quoted), and Imphal draws about 90% of its drinking water from the Imphal, Nambul and Iril rivers (master plan), so what harvesting can do in Manipur is hold water for the dry months. This Manual therefore treats rainwater harvesting as storage for use for the months from December to March, and as storage on valley-floor and hill sites: where the valley-floor or hill rule of Clause 4.11 bars infiltration, the bye-law's "surface reservoirs" are provided, of at least 25 L per m² of roof (about 25 mm over the roof; Clause 4.11), credited as retention only through reuse, emptied within 72 hours by a continuous non-potable use (Clauses 4.4.3 and 8.11.4), assumed full at the start of every storm (Clause 4.11.2), and never counted as detention (Clause 8.11.5). On the foothill fans, the Barail sandstone cappings and tested sand lenses, recharge may be one function of harvesting where Clause 8.8.1 allows it (Clause 8.11.2(b)); where bye-law 67 sends grey water to a recharge structure on a site where Clause 4.11 bars infiltration, this Manual states the conflict and requires storage or a sewer connection in its place (Clause 8.11.1). RWH serves water supply and recharge. It is usually full, or its soil saturated, by the time a July to September monsoon storm, such as those of late July 1989 and late July 2015, arrives after weeks of rain, which is why it cannot be counted as detention.
Clause 8.11.3(b) has no direct precedent; this Manual sets it because road runoff carries oil, metals and pathogens. A recharge shaft or borewell bypasses the soil that would otherwise filter it and delivers it straight to the aquifer that supplies wells nearby. The CGWB Manual on Artificial Recharge of Ground Water (2007) gives recharge structure types and filter designs; this Manual adds the source-water restrictions.
8.12 Construction-stage erosion and sediment control
8.12.1 ESC plan. Every development with land disturbance of 0.1 ha or more, and every public drainage or road work, shall have an Erosion and Sediment Control (ESC) plan, approved with the drainage report. It shall show:
- (a) the sequence of clearing, earthworks and stabilisation;
- (b) the area exposed at each stage;
- (c) the measures of Clause 8.12.3, with their locations and sizes;
- (d) the protection of infiltration and retention areas (Chapter 10);
- (e) stockpile, concrete washout and fuel storage locations; and
- (f) the inspection and maintenance schedule.
8.12.2 Monsoon timing. Earthworks shall be planned so that:
- (a) the area exposed during the monsoon (April to October) is as small as practicable;
- (b) all completed earthworks are stabilised by vegetation, mulch, matting or paving by 31 March; and
- (c) any area exposed between 1 April and 31 October has sediment controls in place before it is cleared.
8.12.3 Measures.
- (a) Silt fences along the downslope edge of disturbed areas receiving sheet flow, with the area draining to each fence limited as set in Annex 8E.
- (b) Sediment traps for concentrated flow from disturbed areas of up to 2 ha.
- (c) Sediment basins for disturbed areas of more than 2 ha. The storage volume below the outlet shall be at least the greater of the runoff from the 50% AEP (2-yr) 24-hour storm and 250 m³ per hectare of drainage area, with a dewatering outlet that draws water from the surface.
- (d) Inlet protection at every existing drain inlet that receives runoff from the site.
- (e) Stabilised construction exits, with wheel washing where vehicles enter public roads.
- (f) Stockpiles outside Zone 1 of any waterbody setback (Chapter 7), at least 10 m from any drain, and covered during the monsoon.
- (g) Dewatering discharges passed through a sediment basin, settling tank or filter bag, never pumped directly into a drain or waterbody.
- (h) Concrete washout in a lined pit, never into a drain.
8.12.4 Design storm for temporary works. Temporary ESC measures use the rainfall of Chapter 2 with a climate factor of 1.0 (Clause 2.8.2).
8.12.5 Inspection. ESC measures shall be inspected weekly and within 24 hours after every heavy-rainfall event (as defined in Chapter 10), repaired within 48 hours, and cleaned when half full of sediment.
8.12.6 Removal. Temporary measures shall be removed only after the area draining to them is stabilised. Sediment shall be removed from any permanent facility used for sediment control before its as-built survey (Chapter 10).
Commentary. The 0.1 ha threshold is the applicability threshold of Chapter 1. The sediment basin volume of 250 m³/ha is the US EPA Construction General Permit minimum of 3,600 ft³ per acre drained, converted to SI (US EPA, 2022 CGP); the CGP allows the alternative of the 2-year, 24-hour runoff. This Manual requires the greater of the two, because Manipur's 2-year 24-hour depths are high and construction sites are commonly left exposed through the monsoon. The 2 ha division between traps and basins, the 31 March stabilisation date, the 10 m stockpile distance and the inspection frequency have no direct precedent and are set by this Manual. The 31 March date matches the pre-monsoon deadline of Chapter 10. Construction sediment is a direct flood hazard as well as a pollutant: it fills drains, culverts and tanks, and in Manipur it fills the pats and Loktak as well: the hill streams "flow down with steep slope for a short distance before meeting the Loktak Lake … load carrying capacity is high which causes siltation of the lake", degraded land covers 1,545 km², 24% of the valley's catchment and 35% of its hills, and the high and moderate-to-high erosion classes cover 51% of the area studied (MASTEC); Loktak is "becoming shallower" (MASTEC); and the cut slopes of the hill roads and the railway fail when wet, as at Tupul in 2022, where the landslide was attributed to "poorly designed or implemented slope excavation coupled with heavy rainfall" (as reported). The Model Manipur Unified Building Bye-Laws, 2024 [TBC: confirm the number and text in the bye-laws the local body has notified] name "erosion and sedimentation control" among the criteria of their green-building certification (Criterion 1) and ask, in Criterion 2, to "Minimize storm water run-off from site by reducing hard paving on site", and the draft IMC Building Bye-Laws (3rd Amendment), 2024 would bar cutting of slopes of more than 30° (92.2; draft, final status not confirmed [TBC]); they give no size, area, date or inspection, which Clause 8.12 supplies, and in the hill areas no bye-law applies. The stabilisation date of 31 March is set by this Manual, before its season begins on 1 April, because Imphal's April and May storms come before the south-west monsoon (Chapter 2). The reason given above for the larger basin volume, that the 2-year 24-hour depths are high, holds: this Manual's interim 2-year 24-hour depth is 85 mm on the valley floor and 130 mm in the western hills and the Jiribam plain (Clause 2.3.6(c)), on ground of soil group D with AMC III through much of the season (Chapter 3), so the 2-year runoff, not 250 m³/ha, will usually govern (NEER reading); the rule of Clause 8.12.3(c) is kept unchanged everywhere. In Manipur the outlet of a sediment basin or trap under Clause 8.12 discharges to a lined drain or a stable channel and never onto an unprotected slope; no sediment basin or trap is designed to infiltrate where Clause 4.11 bars infiltration, which includes the whole valley floor and every slope steeper than 10°; no spoil, silt or debris from a site is placed in a pat, pukhri, river, khong or city channel, within its Zone 1, on a river bund, or within the 236.21 km² of Loktak; and a site on the hill fringe of the valley keeps its sediment behind a silt trap where its drains or streams reach the valley floor (Clause 6.3.6(m)) before any drain reaches a pat, a river or Loktak.
8.13 Monitoring
8.13.1 Outfall monitoring. Each Tier A authority shall monitor water quality at a representative set of its outfalls to waterbodies, including every outfall to a drinking-water tank or notified wetland. Monitoring shall include:
- (a) dry-weather sampling (Clause 8.9.4), at least once a year before the monsoon; and
- (b) wet-weather sampling of at least three events each monsoon at a set of index outfalls.
8.13.2 Parameters. At minimum: TSS, BOD, COD, faecal coliform, total nitrogen, total phosphorus, oil and grease, and, for industrial catchments, heavy metals. Results shall be compared with the CPCB water quality criteria for the designated best use of the receiving waterbody.
8.13.3 Gross pollutant records. The mass or volume of material removed from each GPT and screen at each cleaning shall be recorded in the O&M records (Chapter 10).
8.13.4 BMP performance monitoring. The State Stormwater Technical Committee shall run a BMP performance calibration programme and shall revise Table 8.3 and Annex 8C from its results.
8.13.5 Publication. Monitoring results shall be published in the register of Clause 10.17.
Commentary. No Manipur programme of stormwater quality monitoring was found during research for this Manual, and CPHEEO (2019) sets no Indian targets. The monitoring in Clause 8.13 is the minimum needed to calibrate Table 8.3 and to show whether DWF interception and source removal are working. The parameter list follows the key pollutants named in CPHEEO's WSUD procedure (TSS, nitrogen, phosphorus and gross pollutants), with BOD and faecal coliform added because of sewage contamination. The monitoring frequencies are set by this Manual.
8.14 Submittal requirements
Every drainage report under this chapter shall include:
- the Water Quality Sheet (Form 8-1): P_ret, P_3m and P_wq; the WQv and Q_wq for each drainage area; the volume retained under Chapter 4; and the BMP serving each area;
- for Tier A: the LoS calculation (ΔCN, required LoS) and the composite VR (Clause 8.6);
- the design of each BMP to Clause 8.7 and Annex 8D, with pretreatment;
- for infiltration and recharge: the Infiltration Test Record (Form 8-2), the seasonal high groundwater level and its source, the design rate, the drawdown time, and the setbacks of Clause 8.8.6;
- the sewage and sullage connection plan and the dye or smoke test record of Clause 8.9.2;
- the GPT and first-flush design for any outfall to a waterbody (Clause 8.10);
- the RWH layout, separating harvesting, recharge and detention (Clause 8.11); and
- the ESC plan (Clause 8.12).
8.15 Review and update
8.15.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). Table 8.3 shall also be reviewed when the calibration programme of Clause 8.13.4 reports, and in any case within 5 years of notification.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A: Engineering Design (§9.5, Ch. 10). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- Mid-America Regional Council and Kansas City Metro Chapter APWA (2012). Manual of Best Management Practices for Stormwater Quality (Tables 4.2–4.6). https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01; MARC factsheet and Supplement. https://www.marc.org/document/apwa-5600-manual-factsheet ; https://www.marc.org/document/apwa-stormwater-standards-supplement
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, 2016 Edition, Vols 1–2. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd Edition. https://did.sarawak.gov.my/web/attachment/show/?docid=clRsMlRycU1lNnFRcnl3eDZnNkJMdz09OjpY0au0UPvQ9zUHVWRMbCKX
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- CIRIA (2015). The SuDS Manual (C753). London: CIRIA.
- PUB, Singapore's National Water Agency. Active, Beautiful, Clean Waters Design Guidelines (current edition).
- Central Ground Water Board (2007). Manual on Artificial Recharge of Ground Water. Ministry of Water Resources, Government of India.
- US Environmental Protection Agency (2022). NPDES Construction General Permit (sediment basin sizing).
- ASTM D3385. Standard Test Method for Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer.
- BRE Digest 365. Soakaway Design. Building Research Establishment, UK.
- Government of Manipur, MAHUD. The Model Manipur Unified Building Bye-Laws, 2024, Manipur Gazette Extraordinary No. 253 of 5 December 2024, bye-laws 6(1)(A), 6(1)(C)(j), 27, 28, 66, 67 and 68, the completion certificate and the green-building criteria [TBC: confirm the number and text in the bye-laws the local body has notified]; and the draft IMC Building Bye-Laws (3rd Amendment), 2024, bye-laws 92.1 and 92.2 (Chapter 7 references).
- Government of Manipur. Manipur Loktak Lake (Protection) Act, 2006, ss. 2, 19 and 20 (Chapter 7 references).
- Government of Manipur. Reports to the National Green Tribunal in O.A. 606/2018 (July 2025 and December 2025) (Chapter 7 references).
- Central Pollution Control Board (2025). Polluted River Stretches for Restoration of Water Quality (copy hosted by the Puducherry Pollution Control Committee), https://dste.py.gov.in/ppcc/pdf/Laboratory/PRS-2025.pdf
- Government of Manipur, MAHUD. Revised GIS Based Master Plan for Greater Imphal – 2043 (1st Modification), Physical Infrastructure (water supply and sewerage) (Chapter 7 references).
- New Development Bank (2021). Proposed Project Summary: Lamphelpat Waterbody Rejuvenation Project (Chapter 7 references).
- Central Ground Water Board, North Eastern Region (2013). Ground Water Information Booklets, Imphal West and Bishnupur (Chapter 7 references); and the ground water resource assessments (GWRA) of 2023 and 2024 (as quoted; not read), https://cgwb.gov.in/cgwbpnm/publication-detail/1535
- Manipur Science and Technology Council (MASTEC). Flood Hazard Zonation in Manipur Valley (Chapter 7 references).
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012), Imphal (Tulihal) (A) (Chapter 2 references).
- Government of Manipur, Directorate of Environment and Climate Change. Administrative Report 2025-26 (the Manipur Ground Water (Control & Regulation) Policy, 2023, as listed) (Chapter 7 references).
- Reports of the landslide at Tupul of June 2022 (secondary; Chapter 2 references).
- Parliament reply AU1419 on AMRUT 2.0 admissible components. https://eparlib.sansad.in/bitstream/123456789/2988692/1/AU1419_tzCIvw.pdf
Annexes and forms
| Annex / Form | Content |
|---|---|
| 8A | 3-month ARI 24-hour depth and IDF by zone |
| 8B | Redevelopment LoS table and treatment-train composite VR |
| 8C | Manipur BMP performance calibration |
| 8D | BMP design sheets, media specification, plant lists |
| 8E | Erosion and sediment control standard details |
| Form 8-1 | Water Quality Sheet |
| Form 8-2 | Infiltration Test Record |
Commentary. CPHEEO (2019) is the only Indian manual that covers stormwater quality in any detail. Its Chapter 9 reproduces US event mean concentrations, but cautions that "in an Indian context the values would be much higher" because drains receive night soil, urine and food waste, and it sets no Indian numeric criteria (CPHEEO 2019, Part A §9.5). Its Chapter 10 describes water-sensitive urban design, LID and SuDS treatment trains (CPHEEO 2019, Part A Ch. 10). This chapter turns that guidance into requirements. It follows the treatment approach of the MARC/APWA BMP Manual (2012), now merged into APWA 5600 (2025.01), with the Malaysian 3-month ARI water quality storm (MSMA 2, 2012) and the Georgia water quality volume (GSMM, 2016) as tropical and US benchmarks.