Draft v1.0 prepared by NEER. Not adopted by the Government of Manipur, any District Council, authority or local body, and has no legal force. About this draft

Annexes to Chapter 3Hydrologic Methods

These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.


Annex 3A — Manipur soil series to HSG lookup; seasonal high water table map

Supports Clauses 3.7 and 3.10 of Chapter 3.

To be prepared. This annex will contain (a) a lookup from each soil series mapped in Manipur to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the monsoon season (April–October). It needs NBSS&LUP and State soil survey (agency to be confirmed [TBC]) series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the WRD, supplemented by piezometers in the Imphal valley floor in and around Imphal, Thoubal, Kakching, Bishnupur, Nambol and Mayang Imphal, where water stands 2–5 m below ground over most of Imphal West and the piezometric head 2.50–4.30 m below ground in Bishnupur, the Loktak margin and the land within the 236.21 km² of the Loktak Act, the paddy land and former pats, the margins of Lamphelpat and the other pats and pukhris, the land behind the river bunds, the foothill fans at the valley edge, where water stands 5–7 m below ground near the hills, the Barak and Jiri flood plain at Jiribam, and hill towns with perched water or springs on Disang shale. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).

Table 3A.1 — Soil series to HSG lookup (layout)

Soil series District(s) Taxonomic class Surface texture Saturated hydraulic conductivity (mm/h) Depth to impermeable layer (m) HSG, drained HSG, undrained Source map and scale
                 
                 
                 

Table 3A.2 — Seasonal high water table, by mapping unit (layout)

Mapping unit or grid cell Observation wells used Years of April–October record Highest April–October level below ground (m) Within 0.6 m of ground (Clause 3.10.1)? Data source
           
           

Annex 3B — Manipur CN calibration and supplementary land covers (valley paddy land, pats and phumdi, hill forest and jhum land, landslide scars and hill-road and railway cuts, foothill fans, and the margins of Loktak and the reservoirs)

Supports Clauses 3.8 and 3.15 of Chapter 3.

To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Manipur catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the paddy land of the Imphal valley floor, ponded through the monsoon season behind its bunds and ridges, which the Manipur Conservation of Paddy Land and Wetland Act, 2014 counts, with its drainage channels and ponds, as part of the paddy land (s.2(c)); the pats and marshes of the valley, with their mats of phumdi (floating biomass of vegetation, organic debris and soil, the "Phumdis" of the Loktak Lake (Protection) Act, 2006), wet at the start of every storm; the forest, scrub and degraded land of the hills, of which MASTEC classes 1,545 km² as degraded, 24% of the valley's catchment and 35% of its hills, with the jhum (shifting cultivation) land that the Manipur (Hill Areas) District Councils Act, 1971 lists for regulation; the fresh scars, slide debris and fills of landslides and of hill-road and railway cuts on the Disang shale, such as those of Tupul in June 2022; the sand, gravel and boulder fans where hill streams leave the hills for the valley floor; and the margins of Loktak and of the Thoubal (Mapithel) and Khuga reservoirs, exposed or drawn down at the start of a storm. It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from WRD gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).

Table 3B.1 — Supplementary land covers, AMC II (layout)

Cover type HSG A HSG B HSG C HSG D Ia ratio Basis (catchments, events, years)
Paddy land of the valley floor, ponded behind its bunds and ridges, with the bunds and drainage channels recorded            
Pat or marsh, with the phumdi (floating biomass) cover recorded; wet at the start of the storm            
Hill forest or scrub on Disang shale, with the depth of soil recorded; jhum (shifting cultivation) land, with the year of clearing recorded            
Fresh landslide scar or slide debris; hill-road or railway cut slope or fill            
Foothill fan of sand, gravel and boulders where a hill stream reaches the valley floor            
Margin of Loktak or of a reservoir (Thoubal (Mapithel), Khuga) exposed or drawn down at the start of the storm            
Other (state)            

Table 3B.2 — CN calibration catchments (layout)

Catchment District Area (km²) Dominant HSG and cover Events used Table 3.5 CN Calibrated CN Calibrated ÷ Table 3.5
               
               

Annex 3C — Benchmark test problems for software acceptance

Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.

Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.

Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.

Problem 3C-1 — Rational Method peak (Clause 3.5)

Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.

Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.

Table 3C.1 — Problem 3C-1 solution

Step Calculation Result
Composite C (Clause 3.5.4) (1.2 × 0.90 + 0.8 × 0.15) / 2.0 0.60
Frequency factor (Table 3.3) 1% AEP Cf = 1.25
C · Cf (≤ 1.0) 0.60 × 1.25 0.75
Peak flow (Clause 3.5.1) 0.75 × 120 × 2.0 / 360 Q = 0.500 m³/s
Part (b): C · Cf 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) 1.00
Part (b): peak flow 1.00 × 150 × 0.5 / 360 Q = 0.208 m³/s

Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)

Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).

Table 3C.2 — Problem 3C-2 solution

Segment Calculation Travel time
Sheet flow (Clause 3.6.2(a)) 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h 12.83 min
Shallow concentrated (Clause 3.6.2(c)) V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h 6.78 min
Channel (Clause 3.6.2(d)) 400 / (3,600 × 1.0) = 0.1111 h 6.67 min
Tc (Clause 3.6.1; ≥ 10 min) 12.83 + 6.78 + 6.67 26.27 min
Lag (Clause 3.6.5) 0.6 × 26.27 15.76 min

Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)

Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.

Table 3C.3 — Problem 3C-3 solution

Case S (mm) Ia (mm) Runoff Q (mm), P = 100 mm Runoff Q (mm), P = 25 mm
(a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 89.24 17.85 39.38 0.53
(b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 38.80 7.76 64.93 —
(c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 143.31 7.17 36.49 1.97

Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.

Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)

Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.

Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.

Table 3C.4 — Problem 3C-4 solution

Step Calculation Result
(a) Impervious half (Clause 3.9.2) S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) 19.70 mm
(a) Pervious half S = 162.39 mm, Ia = 32.48 mm > P 0 mm
(a) Area-weighted runoff, separate sub-areas 0.5 × 19.70 + 0.5 × 0 9.85 mm
(a) Composite CN (Clause 3.9.4) 61 + 0.50 × (98 − 61) 79.5
(a) Runoff with composite CN S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) 1.83 mm
(b) Interval check (Clause 3.11.3(a)) 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h satisfied
(b) Lag and time to peak (Clause 3.11.2) tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 tp = 0.65 h
(b) Unit hydrograph peak, Q = 1 mm 0.208 × 2.5 × 1 / 0.65 qp = 0.800 m³/s per mm

Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).

Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)

Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.

Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship

Stage (m) Storage S (m³) Outflow O (m³/s)
0.0 0 0.00
0.5 250 0.05
1.0 500 0.10
1.5 750 0.15
2.0 1,000 0.20
2.5 1,250 0.25

Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.

Table 3C.6 — Problem 3C-5 routed outflow

Time (min) Inflow I (m³/s) Outflow O (m³/s) Storage (m³) Stage (m)
0 0.0000 0.0000 0.0 0.000
10 0.1667 0.0094 47.2 0.094
20 0.3333 0.0367 183.3 0.367
30 0.5000 0.0797 398.4 0.797
40 0.4167 0.1226 612.8 1.226
50 0.3333 0.1511 755.7 1.511
60 0.2500 0.1670 835.2 1.670
70 0.1667 0.1717 858.6 1.717
80 0.0833 0.1664 832.1 1.664
90 0.0000 0.1523 761.5 1.523
120 0.0000 0.1062 531.1 1.062
180 0.0000 0.0517 258.3 0.517

Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.

Table 3C.7 — Benchmark results to be reported by the applicant

Problem Result Benchmark Software result Difference (%) Within ±5%?
3C-1 Q, main case (m³/s) 0.500      
3C-1 Q, part (b) (m³/s) 0.208      
3C-2 Tc (min) 26.27      
3C-3 Q, case (a), P = 100 mm (mm) 39.38      
3C-3 Q, case (b), P = 100 mm (mm) 64.93      
3C-3 Q, case (c), P = 100 mm (mm) 36.49      
3C-3 Q, case (c), P = 25 mm (mm) 1.97      
3C-4 Runoff, separate sub-areas (mm) 9.85      
3C-4 Runoff, composite CN (mm) 1.83      
3C-4 qp (m³/s per mm) 0.800      
3C-5 Peak outflow (m³/s) 0.172      
3C-5 Peak storage (m³) 859      

Annex 3D — Peak rate factor study for flat coastal land

Supports Clauses 3.11.5 and 3.15 of Chapter 3.

Not required in Manipur. Manipur is landlocked, so no land in the State meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). The Imphal valley floor, the Loktak margin and the Jiribam plain are flat and slow to drain, but they are not coastal plain; their slow response is represented by storage, pumping and backwater (Clauses 3.10.4, 3.12.1 and 3.12.4) and by the outfall-closed check of Chapter 5, not by a lower peak rate factor, while the hills of Disang shale respond fast. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.

Table 3D.1 — Calibrated peak rate factors (layout)

Catchment Area (km²) Mean slope (m/m) Drainage condition Events used Calibrated PRF (US customary) PRF′ (SI) Range of applicability
               
               

Annex 3E — CWC SUH parameters for subzone 2(b), applied as a check in subzone 2(c), with worked example

Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.

To be prepared. This annex will tabulate, for CWC subzone 2(b) (South Brahmaputra), whose report this Manual applies in place of the unpublished report for subzone 2(c) (Barak and others), the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs a CWC Flood Estimation Report for subzone 2(c) (Barak and others), which covers the whole of Manipur, the Imphal valley and the northern, eastern and southern hills through the Manipur river and the western hills and the Jiribam plain through the Barak, and which CWC has never published, with written confirmation from CWC that none exists or is in preparation [TBC]; until then, from the South Brahmaputra subzone 2(b) report (Revised; Design Office Report No. SB-2(b)/R-4/44/99, March 2000), in which no part of Manipur is known to lie except, at most, a sliver of northern Senapati district near Mao that a clean copy of its Plate 9 is still to confirm [TBC], the areal reduction curves of its Figs 12(a) and 12(b), whose values were not read on the copy used [TBC], and its unit-hydrograph relationships, which this Manual uses only as a check (see the References of Chapter 3); and the stage–discharge records and flood hydrographs of the WRD gauging sites on the Iril, the Thoubal, the Imphal and the Nambul, of which only the peaks of 1999–2001 printed by MASTEC were read [TBC], transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).

Table 3E.1 — SUH relationships by subzone (layout)

Parameter Symbol Unit Subzone 2(b) (South Brahmaputra) relationship, applied in Manipur as a check only
Peak discharge of the 1-hour unit hydrograph Qp m³/s Qp = 0.905 A^0.758 (Eq. 3.4.3.2); the peak depends on the catchment area alone
Peak discharge per unit area qp m³/s per km² qp = Qp / A
Time from centre of unit rainfall to peak tp h tp = 2.87 qp^−0.839
Width of UH at 50% of peak W50 h W50 = 2.304 qp^−1.035
Width of UH at 75% of peak W75 h W75 = 1.339 qp^−0.978
Width of rising limb at 50% of peak WR50 h WR50 = 0.814 qp^−1.018
Width of rising limb at 75% of peak WR75 h WR75 = 0.494 qp^−0.966
Base width of UH TB h TB = 2.447 tp^1.157
Time to peak from start of rise Tm h Tm = tp + tr/2
Unit duration tr h 1
Design storm duration TD h TD = 1.1 tp
Design loss rate — mm/h 3.5 (printed "0.35 cm/hr", the modal value of 100 flood events, as in the report of 1984); for the 2(b) SUH check run only, never to assign an HSG or in an urban model (Clause 3.7)
Design base flow — m³/s per km² 0.05 (68 of 100 events in the range 0.01–0.09)
Ratio of t-hour to 24-hour rainfall — — 10-yr, partial duration, mean of the six self-recording gauges of the report: 1 h 0.48; 3 h 0.62; 6 h 0.74; 9 h 0.81; 12 h 0.87; 15 h 0.91; 18 h 0.95; 24 h 1.00 (Table 4.1). Used in this Manual only in sub-area MN-C1, the Jiribam plain (Clause 2.3.6(f))
Time distribution of rainfall — cumulative fraction by hour Fig. 11 and Annex 4.4 not read [TBC]
Conversion of 1-day to 24-hour rainfall — factor 1.15 (§4.3.1); the interim table for sub-areas MN-A and MN-A1 uses 1.13 (Clause 2.3.6(c)(i))
Areal reduction factor ARF % of point rainfall Figs 12(a) (1, 3 and 6 h) and 12(b) (12 and 24 h); curve values not read [TBC]. Used in Manipur for catchments of 25–5,000 km² in place of the unpublished 2(c) report (Clause 2.7.3)
50-yr 24-hour point rainfall at Manipur towns — mm None: the plates of the report stop at its southern boundary, which runs from about 25.2°N at 93°E to about 25.5°N at 94°E and then north along about 94.4°E (NEER's reading of Plate 9, within about 0.1°). No Manipur town is on the plates; only the north of Senapati district near Mao may lie north of the line, where the 320-mm contour runs along it [TBC]
Gauged catchments that drain Manipur — — None of the 14 used
Catchment area for which the relationships apply A km² more than 50 to 1,500; up to 5,000 "judiciously"
Report reference — — Annexure 1.1, §§3.4–3.7, Table 3.3, Table 4.1, §4.3, worked example, Plate 9

Note: relationships as printed in the CWC subzone 2(b) report (References of Chapter 3), read from a scanned copy and with Table 3.3 checked against its page images for the earlier North-East editions of this series. A is the catchment area in km². Coverage. The report's subzone list gives subzone 2(c), "Barak and others", as covering the "Barak, Kalden and Manipur rivers" (Annexure 1.1; "Kalden" is the Kaladan, NEER's reading). Both of Manipur's river systems are therefore in subzone 2(c): the Imphal valley and the northern, eastern and southern hills drain through the Manipur river, past Ithai and Sugnu, towards Myanmar, and the western hills and the Jiribam plain drain to the Barak. CWC has published no report for subzone 2(c): the 2(b) report's list of the 21 reports published by 2000 has none, and neither has CWC's download page of 2024. The earlier North-East editions of this series met subzone 2(c) only in part of their land; in Manipur it covers the whole State. Basis. The unit hydrograph rests on 14 catchments gauged at railway and national-highway bridges outside Manipur, 100 bridge-years of record in all; none drains Manipur, and none is urban, embanked, pumped or a closed lake basin. The 50-yr peaks the report reproduces err by "+ 40.72% − 57.84%", and "very small catchments have larger variation". Area only. The 2(b) peak depends on A alone: slope enters nowhere, so the SUH gives the same unit hydrograph to a steep catchment of Disang shale in the western hills and to a flat catchment of the same area on the plains of subzone 2(b), and it knows nothing of the bunds, the pats or the lake that govern the valley. Worked example. The report's example is railway bridge 160, outside Manipur (470 km², L 56.35 km, Lc 31.40 km, S 2.02 m/km): Qp = 96.00 m³/s, qp = 0.20 m³/s per km², tp = 11.07 h, adjusted to 11.50 h, W50 = 12.19 h, W75 = 6.46 h, WR50 = 4.19 h, WR75 = 2.34 h and TB = 41.00 h, with a loss of 0.35 cm/h and a base flow of 0.05 × 470 = 23.50 m³/s. Use in the State. The 2(b) SUH is used in Manipur only as the check of Clause 3.11.4, for the rural rivers of more than 50 km² that enter the valley or the towns, such as the Iril, the Thoubal, the Sekmai, the Khuga and the Chakpi, and the Irang, the Makru and the Jiri of the western hills; the design model is HEC-HMS or SWMM, calibrated under Clause 3.15 to the WRD discharges where they exist (Commentary to Clause 3.7). The largest discharges printed for the valley rivers are 532.488 m³/s on the Iril at Moirang Kampu (stage 11.04 m above the gauge datum, 2 September 2000), 391.636 m³/s on the Thoubal at the Thoubal bridge (9.49 m, 30 August 1999), 202.006 m³/s on the Imphal (7.3 m, 2 September 2000) and 68.495 m³/s on the Nambul (4.7 m, 2 July 2001), and their stage–discharge curves are looped (MASTEC, from WRD data of 1999–2001); no longer record, no catchment area at the gauges and no unit hydrograph derived from them were found [TBC]. Where a calibrated model gives a lower 1% AEP peak than the 2(b) SUH, Clause 3.11.4(d) applies as written. Below the Mapithel, Khuga and Singda dams the flood is set by releases (Clause 5.8.5(d)), and on the valley floor by the bunds, the pumps and the lake (Clause 5.8.5(a) to (c)), not by any unit hydrograph. The urban catchments of Imphal, Thoubal, Kakching, Bishnupur, Churachandpur, Ukhrul, Tamenglong and Jiribam are far smaller than 50 km² and are designed by the Rational Method or SWMM under Clause 3.4. In sub-areas MN-C and MN-C1 every cross-drainage structure and outfall of more than 1 km² needs a site-specific hydrology study with the design rainfall of Clause 2.3.6(c)(ii). The design loss rate of 3.5 mm/h is a φ-index fitted to the floods of rural catchments on the plains and foothills of subzone 2(b); it is not a soil infiltration capacity and is not used to assign HSG (Clause 3.7), in urban SCS-CN or SWMM models, or to size infiltration practices (Chapter 4).

Table 3E.2 — Worked example outline (layout)

Step Content Clause
1 Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM 3.11.4(a)
2 SUH parameters from Table 3E.1 and the plotted unit hydrograph 3.11.4(a)
3 Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution 3.11.4(a), (b)
4 Effective rainfall after the design loss rate; convolution with the SUH; base flow added 3.11.4(a)
5 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition 3.11.4(c), (d)

Form 3-1 — Hydrologic Calculation Summary

Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.

Draft form — Manipur Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.

A. Project

Table 3F.1 — Form 3-1: project

Field Entry
A1. Project name and applicant  
A2. Location (village or ward, survey numbers, district)  
A3. Site area (ha) and number of points of comparison (POCs)  
A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3)  
A5. Design Rainfall Sheet reference (Form 2-1)  

B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)

Table 3F.2 — Form 3-1: method and software

Field Entry
B1. Purpose of each calculation (conveyance, storage, comparison, catchment study)  
B2. Contributing area for each purpose (ha or km²)  
B3. Method used and the row of Table 3.1 that permits it  
B4. Reason for the choice of method  
B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2)  
B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2  
B7. Runoff transform (Clause 3.11.1)  
B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a))  
B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2)  
B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4  
B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference  
B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5)  
B13. Calibration required (Clause 3.15.1)? Calibration report reference  

C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)

Table 3F.3 — Form 3-1: soils and groundwater

Field Entry
C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2)  
C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3)  
C3. Seasonal high water table: depth below ground and source (Clause 3.10.2)  
C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1)  
C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b))  

D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)

Table 3F.4 — Form 3-1: parameters by sub-area and condition

Sub-area Condition (pre / post) Area (ha) Impervious: roofs / paved / roads (ha) DCIA (ha) Disconnected (ha) HSG CN, AMC II CN, AMC III (pervious part) C and Cf (if Rational) Tc (min)
                     
                     
                     

E. Time of concentration worksheet (Clause 3.6)

One worksheet per sub-area and condition.

Table 3F.5 — Form 3-1: time of concentration worksheet

Segment Flow type Surface and n (Table 3.4) L (m) S (m/m) P2 (mm) V (m/s) Tt (min)
1 Sheet         —  
2 Shallow concentrated       —    
3 Channel or pipe       —    
Tc (not less than 10 min)  

E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______

F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)

Table 3F.6 — Form 3-1: rainfall, losses and starting levels

Field Entry
F1. AEPs and durations run; climate factor applied (Chapter 2)  
F2. AMC used for each duration (Clause 3.8.4)  
F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5)  
F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5)  
F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5)  
F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5)  
F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3)  

G. Departures

Table 3F.7 — Form 3-1: departures from Chapter 3

No. Clause departed from Value used in place of the Chapter 3 value Justification
1      
2      

H. Attachments (Clause 3.17)

Table 3F.8 — Form 3-1: attachments

Item Attached (yes / no / not applicable) Reference
H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on    
H2. HSG map, water-table data and infiltration test results    
H3. Parameter tables (Section D) and Tc worksheets (Section E)    
H4. Design Rainfall Sheet (Form 2-1) and hyetographs    
H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels    
H6. Form 3-2 for each POC    
H7. Calibration report (Clause 3.15)    
H8. Native model input and output files (Clause 3.16.4)    

I. Statement by the responsible engineer (Clause 3.17 item 10)

I state that the methods and parameters of Chapter 3 of the Manipur Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.

Table 3F.9 — Form 3-1: statement by the responsible engineer

Field Entry
Name  
Qualification and registration number  
Organisation  
Signature  
Date  

Draft form — Manipur Stormwater Design Manual, Draft v1.0.


Form 3-2 — Pre- vs Post-Development Comparison

Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.

Draft form — Manipur Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.

A. Point of comparison (Clause 3.14.2)

Table 3F.10 — Form 3-2: point of comparison

Field Entry
A1. POC identifier and location  
A2. Area draining to the POC: site (ha) and off-site run-on (ha)  
A3. Off-site run-on passes through site storage? (Clause 3.14.2(c))  
A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3)  
A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c))  
A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7)  
A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3)  

B. Peak flows (Clauses 3.14.7–3.14.10)

Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).

Table 3F.11 — Form 3-2: peak flows by AEP and duration

AEP Duration (h) AMC Q_pre Q_post, uncontrolled Q_post, routed Limit Met?
50% (2-yr) 1 II          
50% (2-yr) 2 II          
50% (2-yr) 3 II          
50% (2-yr) 6 II          
50% (2-yr) 12 III          
50% (2-yr) 24 III          
50% (2-yr) 48 III          
50% (2-yr) 72 III          
10% (10-yr) 1 II          
10% (10-yr) 2 II          
10% (10-yr) 3 II          
10% (10-yr) 6 II          
10% (10-yr) 12 III          
10% (10-yr) 24 III          
10% (10-yr) 48 III          
10% (10-yr) 72 III          
1% (100-yr) 1 II          
1% (100-yr) 2 II          
1% (100-yr) 3 II          
1% (100-yr) 6 II          
1% (100-yr) 12 III          
1% (100-yr) 24 III          
1% (100-yr) 48 III          
1% (100-yr) 72 III          

C. Volumes and storage (Clauses 3.14.8–3.14.10)

Table 3F.12 — Form 3-2: volumes and storage

AEP Governing duration (h) Runoff volume, pre Runoff volume, post uncontrolled Retention volume Detention storage required Peak water level in storage (m)
50% (2-yr)            
10% (10-yr)            
1% (100-yr)            

C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______

D. Sensitivity runs (Clauses 3.8.5, 3.14.11)

Table 3F.13 — Form 3-2: sensitivity runs

Run Governing storm (AEP, duration) Change in Q_post, routed (%) Change in required storage (%) Retention volume or WQv governing (Clause 3.8.5(c))
Ia = 0.05S        
Standard peak rate factor (only where a lower factor is used)       —

E. Associated checks (Clause 3.14.12)

Table 3F.14 — Form 3-2: associated checks

Check Result Reference in submittal
Drawdown times (Chapter 4)    
Minimum orifice and trash screen (Chapter 4)    
Emergency spillway (Chapter 4)    
Outfall-closed storage check (Chapter 5)    
Downstream analysis (Chapter 5)    

F. Statement by the responsible engineer

I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).

Table 3F.15 — Form 3-2: statement by the responsible engineer

Field Entry
Name  
Qualification and registration number  
Signature  
Date  

Draft form — Manipur Stormwater Design Manual, Draft v1.0.