About this draft
Status. This is Draft v1.0 of the Uttar Pradesh Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Uttar Pradesh.
Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Uttar Pradesh or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Housing and Urban Planning Department, the Urban Development Department (UDD), any development authority or industrial development authority, any Nagar Nigam or other local body, UP Jal Nigam (Urban) or UP Jal Nigam (Rural), or the Irrigation and Water Resources Department (I&WRD). Where it names a body, such as the Directorate of Local Bodies, the Town and Country Planning Department (TCPD), the Revenue Department, the UP Ground Water Department, the Uttar Pradesh Pollution Control Board (UPPCB), the State Mission for Clean Ganga, the UP State Wetland Authority, the Uttar Pradesh State Disaster Management Authority (UPSDMA), the Lucknow Municipal Corporation (LMC), the Lucknow Development Authority (LDA), Noida, GNIDA or YEIDA, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.
No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The building byelaws, master plans, drainage guidelines and approval conditions in force continue to apply.
Names. Some places and rivers have more than one name or spelling in statutes, sources and on IMD and CWC stations:
- Prayagraj was formerly Allahabad. The Allahabad High Court, IMD's Allahabad/Bamrauli observatory (also spelt Bamhrauli) and older sources keep the old name. Ayodhya was formerly Faizabad, and IMD's Faizabad station keeps that name;
- the IMD observatories at Lucknow are Lucknow City and Lucknow/Amausi, the observatory at Lucknow airport, called Amausi in this Manual; Varanasi has two, Varanasi (BHU) and Varanasi/Babatpur, the airport observatory;
- Gautam Buddh Nagar is the district that contains Noida and Greater Noida;
- the Gomti is also spelt Gomati; the Ghaghra Ghagra or Gogra, and it is called the Saryu at Ayodhya; the Hindon Hindan; Ghazipur Gazipur; and
- Ramgarh Tal is also written Ramgarh Taal, the form its wetland notification uses.
This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies need a word of explanation:
- a Nagar Nigam is a Municipal Corporation under the Uttar Pradesh Municipal Corporations Act, 1959; Nagar Palika Parishads and Nagar Panchayats are constituted under the Uttar Pradesh Municipalities Act, 1916. All three are urban local bodies (ULBs);
- Jal Kal (Jal Kal Vibhag) is the water supply and sewerage department of a Nagar Nigam. In some cities it took over the work of a Jal Sansthan constituted under the Uttar Pradesh Water Supply and Sewerage Act, 1975;
- UP Jal Nigam was divided on 9 September 2021 into UP Jal Nigam (Urban) and UP Jal Nigam (Rural). Its Construction and Design Services (C&DS) wing, of UP Jal Nigam (Urban), is to prepare the city drainage master plans under UDD's guideline of December 2024;
- an Integrated Urban Storm Water Drainage Master Plan (IUSWDMP) is the city drainage master plan that UDD's guideline requires before a project is funded;
- a development authority is an authority constituted under the Uttar Pradesh Urban Planning and Development Act, 1973, such as LDA. Each development authority issues the Byelaws 2025 in its own name;
- Noida (the New Okhla Industrial Development Authority), the Greater Noida Industrial Development Authority (GNIDA) and the Yamuna Expressway Industrial Development Authority (YEIDA) are industrial development authorities under the Uttar Pradesh Industrial Area Development Act, 1976. They are not development authorities under the 1973 Act, and they keep their own building regulations of 2010. "Noida" also names the city; the sense is clear from the context; and
- I&WRD is the Irrigation and Water Resources Department, which holds the rivers, embankments, canals and flood works and notifies the floodplain zones.
Some abbreviations have more than one meaning:
- AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
- GDA is the Ghaziabad Development Authority; the Gorakhpur Development Authority is written in full;
- HFL is the highest flood level recorded at a gauge, as CWC and I&WRD use it. It is not a design level, and sources sometimes give different values for the same gauge;
- UDD is the Urban Development Department, not a development authority; and
- SWD is a storm water drain.
The sense is clear from the context. Hindi and Urdu terms used in the text, such as tal (ताल; also talab and pokhar, a pond or tank that holds rainwater), nala (natural drain or large storm drain), nali (small street drain), jhil (lake or marsh), bandh (embankment), khadar (the low floodplain of a river), bangar (the older upland alluvium above it), kachhar (moist riverside land), usar (barren sodic or saline land) and jalplavan (waterlogging, the word UDD uses for urban flooding), are explained where they first appear.
Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.
Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.
Comments. Comments and corrections are welcome at info@neer.ai.
Preface
Uttar Pradesh's cities flood for three reasons. Lucknow showed the first in September 2022 and again in September 2023, when a day's rain fell on drains that the State itself says are usually built for a storm of one or two years; Gorakhpur showed the second in August 1998, when the Rapti rose higher than ever recorded against the embankments that protect the city; and UDD described the third in December 2024, when it found that no city in the State had an integrated plan for its urban drainage.
- Short, intense storms beyond what the drains were built for. UDD's guideline of December 2024 records that urban drains in the State are "usually designed for a 1–2 year" return period, and that this is proving inadequate as more rain falls in shorter periods; it cites Lucknow in 2023 among its examples of short-duration floods. IMD recorded 20 cm at two Lucknow gauges and 16 cm at Amausi in the 24 hours to 08:30 on 16 September 2022, and 29 cm at Fatehpur Tehsil in Barabanki; nine people were reported killed when a wall collapsed in Lucknow's Dilkusha area that day. A day earlier Gorakhpur had recorded 20 cm and Jaunpur 23 cm. In the 24 hours to 08:30 on 11 September 2023 Kanpur recorded 15 cm and Lucknow 14 cm, and Gomti Nagar, Ashiana, Jankipuram, Aliganj and Hazratganj were reported waterlogged. The only published station analysis of short-duration rainfall in the State, for Lucknow (Kathuria, Kaur and Mehra, 1987), gives 50.8 mm in one hour at 2 years and 106.0 mm at 50 years, 22–43% more than the ratios of the CWC flood estimation report give for the same hour. The all-time records are larger still: 311.7 mm in a day at Lucknow City (17 July 1947), and 460.6 mm at Baheri in Bareilly district on 8 July 2024. Even modest rain overwhelms drains that are blocked or undersized: on 17 August 2026 Prayagraj was reported to have recorded 73.4 mm, below a two-year day on the CWC maps, yet George Town, Tagore Town and Rambagh were waterlogged, and the Allahabad High Court took up the matter on its own motion. Roofs, roads and paving now send more water to the drains, and faster.
- Rivers lock the outfalls. Most of the State's large cities drain to a river that, in flood, stands above their outfalls for days. In Lucknow the Gomti runs through the city between embankments, and the Jal Kal department of LMC has told the NGT that 33 of the city's 34 drains join it; when the river is high the outfalls are shut and the drains are pumped, and LDA has proposed 12 more pumping stations, as reported. The Gomti reached 110.85 m at Lucknow on 11 September 1971, against a danger level of 109.5 m, as reported. The Ganga and the Yamuna rose to about 88 m at Prayagraj on 8 September 1978, more than 3 m above the danger level, and the Ganga to 73.901 m at Varanasi the next day, 2.64 m above it; in August 2025 the Ganga at Varanasi again stood above its danger level, as reported. On 23 August 1998 the Rapti reached 77.54 m at Birdghat in Gorakhpur, 2.56 m above its danger level, and its embankments were breached in 13 places in the district, as reported. On 26 July 2023 the Hindon at Noida was reported to have reached 197.28 m, 1.81 m above its previous highest level; about 350 cars parked in its floodplain at Ecotech-3 were submerged. UDD's checklist for project reports now asks for drainage pumps that work above the high flood level, and for pumping where an outfall lies below the river's normal level.
- A drain network split among agencies, built to no common standard, and carrying sewage. Within a single city, the river and its embankments, the canals and the drains of canal commands are held by I&WRD; the municipal nalas and road drains by the Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat; the drains of colonies not yet handed over by the development authority or the Housing Board; the sewers, interceptors and the tapping of drains by UP Jal Nigam; highways by PWD or NHAI; and industrial areas by Noida, GNIDA, YEIDA or UPSIDA. No rule was found that divides natural drains held by I&WRD from municipal nalas. UDD found in 2024 that small nalas and nalis are built piecemeal, and its guideline now requires every agency in a city to work to one approved master plan, regulated by the Nagar Nigam. In practice the city nalas also carry sewage, and the State's main remedy is to intercept it where a drain meets the river. Before the Kumbh of 2025, 39 of Prayagraj's 81 drains to the Ganga and Yamuna were reported to be untapped, and 22 of them were treated in geotubes; in Lucknow, 28 of 45 drains to the Gomti were reported to be untapped or partly tapped, carrying about 260 million litres a day (MLD); in Kanpur the Sisamau nala, about 140 MLD, was reported tapped in 2018. In 2011 the Allahabad High Court recorded that the city produced 232 MLD of sewage against 93 MLD of treatment capacity.
Behind all three lies lost storage. The tals, talabs and pokhars that once held rain are protected by their record in the revenue papers rather than by any width of buffer. In Hinch Lal Tiwari v. Kamala Devi (2001) the Supreme Court held that where a pond's area varies in the rainy season, no part of it could be allotted for building, and directed the State to restore the pond; the Allahabad High Court has since used the revenue record of 1 July 1952 to identify ponds for restoration, and in 2025 it issued a statewide order against the encroachment of ponds and public land, as reported. Ramgarh Tal in Gorakhpur, notified as a wetland on 7 December 2020 with a zone of influence of 50 m, received the sewage of six major nalas until they were intercepted in proceedings before the National Green Tribunal (NGT). In Lucknow the Supreme Court agreed in May 2024 that the Akbar Nagar colony stood on the floodplain of the Kukrail, as reported. Drains have lost their fall as well as their storage: LMC records that the Qila Mohammadi drain is blocked at several places because its level is lower than that of the culverts near Bijnore.
Design for Uttar Pradesh therefore has to cover a long monsoon over a wide plain. The monsoon normally reaches the east of the State on 20 June, covers the whole State by 30 June and withdraws by 10 October. Its normal from June to September is 746.2 mm for the State, 799.2 mm in the east and 672.0 mm in the west. June is already wet in the north-east terai (a June normal of 187.8 mm at Gorakhpur) but not in the west (46.4 mm at Agra), and some of the largest days on record fell at or before the onset: 487.2 mm at Gonda on 12 June 1984, and 327.2 mm at Aligarh on 30 June 1981. Heavy rain can also come after the withdrawal: Hardoi recorded 310.0 mm on 13 October 1985. I&WRD's flood control rooms run from 15 June to 15 October, as reported.
National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:
- hold frequent rainfall on site;
- release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
- show that its outfall still works when the river or the receiving nala is high and the flap gate or regulator is shut, or when the pumps that serve it are running at full capacity.
The Manual also sets how public drains, roads, nalas, tals and other water bodies, gated and pumped outfalls and basin-wide master plans are designed, so that private sites and public works aim at the same standard.
The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Uttar Pradesh's south-west monsoon from late June to early October and the short, intense storms that come with it; the Ganga, the Yamuna, the Gomti, the Ghaghra, the Rapti and the Hindon, their embankments and the gated and pumped outfalls of the cities on their banks; the khadar and bangar of the alluvial plain, the usar soils that let little water in, the shallow water table of the terai and the over-drawn aquifers beneath Lucknow and the cities of the National Capital Region, and the hard rock and thin soils of Bundelkhand; the tals; and cities whose dense old cores, new colonies and basements turn ordinary storms into floods.
- National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes and the NDMA urban flood guidelines are also used.
- Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
- Design rainfall. The CWC Flood Estimation Reports for the subzones that cover Uttar Pradesh, 1(e) Upper Indo-Ganga Plains, 1(f) Middle Ganga Plains, 1(c) Betwa and 1(b) Chambal, as the interim source; the report for subzone 1(d) Sone, which covers the south-east of the State, could not be found for this Manual [TBC]. The Lucknow station analysis of Kathuria, Kaur and Mehra (1987), the only published short-duration rainfall-frequency relationship for a station in the State. Frequency analysis of hourly rainfall by the National Institute of Hydrology (NIH), Roorkee, for comparison only.
- Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
- Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
- Local rules. The Uttar Pradesh Urban Planning and Development Act, 1973 and the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025 and Model Zoning Regulations 2025 made under it; for Noida, GNIDA and YEIDA, their own building regulations of 2010 under the Uttar Pradesh Industrial Area Development Act, 1976; the Uttar Pradesh Municipal Corporations Act, 1959 and the Uttar Pradesh Municipalities Act, 1916; the Uttar Pradesh Water Supply and Sewerage Act, 1975; the Uttar Pradesh Ground Water (Management and Regulation) Act, 2019; the Uttar Pradesh Revenue Code, 2006; the River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016 and the floodplain zones notified under it; the Wetlands (Conservation and Management) Rules, 2017; UDD's storm water drainage guideline of December 2024; and the judgments of the Supreme Court, the Allahabad High Court and the NGT on ponds, floodplains and drains. This Manual follows them or, where disclosed, makes them stricter. The drainage chapters of the two municipal Acts were not read for this Manual [TBC], nor were the 2010 building regulations of Noida, GNIDA and YEIDA [TBC]; the Byelaws 2025 were read in their English text.
Why this Manual is needed
India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.
The national documents leave key values open, or give different answers.
- Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 25 years. An engineer designing a drain in Uttar Pradesh can cite 1, 2, 5 or 25 years, depending on the code chosen.
- Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
- Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
- Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has no panel for any station in Uttar Pradesh, and the range it gives for the Gangetic plain puts the largest 3-hour depth below the largest 1-hour depth. The CWC reports for the State's subzones date from 1984 to 1989. At Lucknow their ratios give a 50-year hour of about 74–87 mm, against 106.0 mm in the Lucknow station analysis. The reanalysis grids of NIH-DHAARA read lower still at one hour, 70.7 mm at Lucknow; at 24 hours they read well above the CWC maps in the terai and Rohilkhand (380 mm for a 50-year day at Gorakhpur, against about 240–280 mm and a station record of 284.5 mm) and below the maps or the station records at Prayagraj, Varanasi and Noida. In Uttar Pradesh, as in Delhi and unlike the coastal States, the published ratios understate the short storms.
Uttar Pradesh has no drainage design standard of its own. Research for this Manual found no design standard, rainfall intensity–duration–frequency (IDF) relationship or circular of UDD, UP Jal Nigam, I&WRD, any Nagar Nigam or any development authority that fixes return periods or design rainfall for storm drains. In particular:
- The State's drainage guideline asks for master plans but sets no design storm. UDD's guideline of December 2024, for a scheme with ₹1,000 crore in 2024-25 (₹100 crore of it for master plans), makes an approved IUSWDMP a condition of project funding, with the condition waived for 2024-25. All Nagar Nigams are eligible first. The plans are to be prepared by C&DS, UP Jal Nigam (Urban), "as per" the CPHEEO manual, and approved by a State Level Apex Committee chaired by the Chief Secretary. Its checklist for project reports asks for 25–30 years or more of IMD autographic rainfall with an IDF curve, and for pumps that work above the high flood level. It records that drains are usually built for 1–2 years, but sets no return period, runoff coefficient or detention rule of its own, and no approved IUSWDMP was found. One project report read for this Manual, for a drain in Agra, adopted a 2-year intensity of 28.2 mm/h derived from a daily rainfall series whose values cannot be right. This Manual is offered as a technical companion to the guideline: it supplies the design storm, detention and buffer values that the guideline leaves open. It has not been adopted by UDD or by any other body;
- The building byelaws require recharge but not detention. The Byelaws 2025 require rooftop rainwater harvesting on plots of 300 m² and more where there is no collective recharge network, except in waterlogged areas, where recharge is not to be adopted and rooftop rainwater may be collected instead (clause 13.1.2). Layouts of more than 4 ha must build recharge reservoirs on at least 1% of their area, no more than 2 m deep. Building projects of 20,000 m² of built-up area and more must provide one recharge bore for every 5,000 m² of built-up area, keep at least 20% of their open space pervious, and keep the natural drainage through the site, where check dams, bio-swales and other sustainable drainage systems are allowed (clause 13.3). Green-rated buildings receive 3%, 5% or 7% extra floor area ratio (FAR). No rule requires on-site detention, limits peak runoff or sets "zero runoff". The Chief Minister was reported in October 2025 to have directed that rainwater harvesting be mandatory on buildings of more than 100 m², but no Government Order (G.O.) giving effect to it was found;
- Basements are guarded against surface water, not floods. The Byelaws 2025 require only that surface water be kept out of a basement (clause 3.3.3.2(iv)) and set a minimum plinth of 0.30 m. They do not restrict basements in low-lying or flood-prone areas;
- The groundwater law limits where runoff may be recharged. The Uttar Pradesh Ground Water (Management and Regulation) Act, 2019 makes the State's rooftop rainwater harvesting conditions binding on every agency that sanctions building plans, and requires a combined recharge system for group housing and colonies (s.31(2)). It bars the direct recharge of rain falling on roads, open land and farms into aquifers through recharge wells, bores or shafts; only rooftop water is excepted (s.28). It also requires the authorities to prevent waterlogging (s.33). A recharge well in a road drain or in a basin that receives street runoff therefore conflicts with the Act;
- Floodplains are notified for the 100-year flood, but no rule sets a setback from nalas or tals. The River Ganga Authorities Order, 2016 defines the floodplain by the flood of once in a hundred years. I&WRD notified the floodplain zone of the Ganga from Unnao to Ballia, in 13 districts, by coordinates on 29 January 2025; a notification for the Yamuna in 17 districts followed in January 2025, as reported. The Hindon's floodplain had not yet been demarcated in May 2026; I&WRD gives its 100-year flood level as 205.39 m at km 49 and 205.20 m at km 110. An amendment of the Order in 2026 is reported to divide the floodplain into zones by the 5-, 25- and 100-year floods; its text was not read for this Manual. The Byelaws 2025 permit only repair and renovation within 200 m of the bank of the Ganga, and make building on ponds or drains recorded in plans or revenue records an offence that cannot be compounded. Court orders add lines of their own: in 2011 the Allahabad High Court directed that there be no construction within 500 m of the mid-stream of the Ganga at Prayagraj, and the Prayagraj Development Authority applies a line of the high flood level plus 500 m along the Yamuna; for the Gomti, a line of 100 m set by the High Court's Lucknow bench in 2010 and one of 50 m set by an Irrigation order in 2020 are both reported. The Wetlands Rules bar permanent construction within 50 m of the mean high flood level of a notified wetland. No setback in metres from nalas or tals was found in any rule read for this Manual;
- Tals are protected by title, not by width. The Uttar Pradesh Revenue Code, 2006 vests the beds of rivers, nalas, ponds and tanks in the State (s.54), reserves village tanks of 0.5 acre or less for public use, where "tank" includes talab, pond and pokhar (s.61), bars the accrual of bhumidhari rights in land covered by a pond, tank or lake or forming part of an embankment (s.77(1)(i)), and provides for eviction (s.67). None of these sets a buffer around a tal; and
- No document sets the river level for which an outfall is designed. The warning and danger levels and the highest flood levels published for river gauges are flood-warning levels and records, not design levels, and sources give different values for some gauges.
So each agency and each local body interprets the central manual its own way. The Nagar Nigams, Nagar Palika Parishads and Nagar Panchayats, the development authorities, Noida, GNIDA and YEIDA, I&WRD, UP Jal Nigam, PWD, their consultants and funding agencies fill the gaps differently. Two drains on the same street, built by different agencies, can be sized for different storms from different rainfall sources. A municipal nala can pass through a colony drained by a development authority and end at an I&WRD regulator in an embankment, designed to another standard, with no agreed level at which the river shuts the gate. And a reviewer has no common basis against which to check a design.
What this Manual does about it. It turns those open choices into one State standard:
- one source and method for design rainfall, with a floor for short storms where the published ratios understate them (Chapter 2);
- named return periods for every drainage element (Chapters 2 and 6);
- a required pre- versus post-development rule for private sites (Chapter 4);
- a required tailwater check for outfalls to rivers and nalas, gated, regulated or pumped, against a design river level (Chapter 5);
- corridors and setbacks along nalas and around tals, which no rule now sizes, proposed by this Manual (Chapter 7);
- recharge only where the ground and the groundwater law allow it, and treatment where nalas carry sewage (Chapter 8); and
- basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).
It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Nagar Nigam, a development authority or an industrial development authority can still adopt a stricter standard (Chapter 1).
Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 §6; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); UDD, Government of Uttar Pradesh, Urban Flood/Waterlogging Control and Storm Water Drainage Scheme: Guidelines (Hindi, December 2024), §§1.1, 1.3, 2.1, 2.2, 3.2, 3.3 and 4, and the checklist for detailed project reports, items 2.14 and 2.26 and Annexure 2; Housing and Urban Planning Department, G.O. No. 1323/2025/8-3099/208/2025 (July 2025), and Model Building Construction and Development Byelaws and Model Zoning Regulations for Development Authorities of Uttar Pradesh, 2025 (English text), clauses 1.1, 2.11, 3.3.1.21, 3.3.3.2, 9.3, 13.1.2, 13.3 and 16.3.2; Uttar Pradesh Ground Water (Management and Regulation) Act, 2019 (U.P. Act No. 13 of 2019), ss.28, 31 and 33; Uttar Pradesh Revenue Code, 2006 (as updated to 5 March 2021), ss.54, 61, 67 and 77; UDD action taken report in NGT O.A. 370/2021, on the division of UP Jal Nigam (Gazette notification of 9 September 2021); River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016, cl.3(l), as quoted by I&WRD and NMCG; I&WRD Section-4, G.O. No. 24/2025/107/2025-27-Sin-4-16(Writ)(NGT)/2023 (29 January 2025), annexed to the Irrigation Department's report in NGT O.A. 341/2022 (2 April 2025); Irrigation Department progress report in NGT O.A. 569/2023 (23 May 2026), on the Hindon; Allahabad High Court, PIL No. 4003 of 2006, In re Ganga Pollution, order of 28 March 2011, annexed to the reply of the Prayagraj Development Authority in NGT I.A. 288/2024 in O.A. 526/2023 (17 December 2025); Supreme Court, Hinch Lal Tiwari v. Kamala Devi, AIR 2001 SC 3215 (25 July 2001); Wetlands (Conservation and Management) Rules, 2017, r.4(2)(vi), as quoted by CPCB, and Government of Uttar Pradesh notification No. 1397/LXXXI-4-2020-06-2018 (7 December 2020), Ramgarh Taal wetland, annexed to CPCB's response in NGT O.A. 1057/2024; NGT O.A. 116/2014, Meera Shukla v. MC Gorakhpur, as reported in later filings; LMC, AMRUT detailed project report for Lucknow (2018), §2.1.7; Agra Smart City, Improvements to Taj East Drain, detailed project report, chapter 9; Kathuria, S.N., Kaur, S. and Mehra, A.K. (1987), Rainfall intensity for local drainage design in Lucknow and its neighbouring area, MAUSAM 38(1), 85–88; IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD press releases of 15 and 16 September 2022 and 11 September 2023; IMD Meteorological Centre Lucknow, Southwest Monsoon Reports 2024 and 2025 for Uttar Pradesh and station climatological tables (1991–2020); Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (accessed 6 November 2026); CWC, Flood Estimation Reports for Subzones 1(e) (approved July 1984; report number not on the copy read [TBC]), 1(f) (GP/10/1984), 1(c) (B/17/1989) and 1(b) (C/16/1988); SANDRP, Overview of CWC Flood Forecasting Sites 2018: North India (updated 2019), and Rivers breaching highest flood levels in July 2023, compiled from CWC data (secondary); reports of the Lucknow events of September 2022 and September 2023, the Prayagraj waterlogging of August 2026 and the High Court's suo motu case, the Gorakhpur flood of 1998, the Hindon flood of July 2023, the Ganga at Varanasi in August 2025, the Yamuna floodplain notification (January 2025), the 2026 amendment of the Ganga Order, the Gomti setback orders of 2010 and 2020, the Akbar Nagar judgment (May 2024), the Allahabad High Court's orders on ponds (2007 and 2025), the drain counts and tapping at Prayagraj, Lucknow and Kanpur, LDA's proposed pumping stations, the Chief Minister's direction on rainwater harvesting (October 2025) and I&WRD's flood control rooms (press).
How to use this Manual
Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.
Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.
Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.
Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.
Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.
Where to start.
| If you are… | Read first |
|---|---|
| A developer or architect | Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit) |
| A design engineer | Chapters 2–6, then 8 and 9 |
| A local body or approving authority | Chapters 1, 10 and 11 |
| A planner or waterbody manager | Chapters 7 and 11 |
Contents
List of tables
List of figures
Abbreviations
| Abbreviation | Meaning |
|---|---|
| AEP | Annual exceedance probability |
| AMC | Antecedent moisture condition |
| AMRUT | Atal Mission for Rejuvenation and Urban Transformation |
| APWA | American Public Works Association |
| ARF | Areal reduction factor |
| AWS | Automatic weather station |
| BSMP | Basin Stormwater Master Plan |
| C&DS | Construction and Design Services, UP Jal Nigam (Urban) |
| CAG | Comptroller and Auditor General of India |
| CGWA | Central Ground Water Authority |
| CGWB | Central Ground Water Board |
| CN | Curve number (SCS/NRCS method) |
| CPCB | Central Pollution Control Board |
| CPHEEO | Central Public Health and Environmental Engineering Organisation |
| CSE | Centre for Science and Environment |
| CWC | Central Water Commission |
| DPR | Detailed project report |
| DWF | Dry-weather flow |
| EIA | Environmental impact assessment |
| ESC | Erosion and sediment control |
| FAR | Floor area ratio |
| FER | Flood Estimation Report (CWC) |
| FTL / MWL | Full tank level / maximum water level |
| G.O. | Government Order, Government of Uttar Pradesh |
| GDA | Ghaziabad Development Authority (the Gorakhpur Development Authority is written in full) |
| GNIDA | Greater Noida Industrial Development Authority |
| HAT / MHWS | Highest astronomical tide / mean high water springs (coastal terms; not applicable in Uttar Pradesh) |
| HFL | High flood level (the highest level recorded at a gauge) |
| HGL | Hydraulic grade line |
| HSG | Hydrologic soil group |
| I&WRD | Irrigation and Water Resources Department, Uttar Pradesh |
| IDF | Intensity–duration–frequency |
| IMD | India Meteorological Department |
| IRC | Indian Roads Congress |
| IUSWDMP | Integrated Urban Storm Water Drainage Master Plan (UDD guideline, December 2024) |
| LDA | Lucknow Development Authority |
| LMC | Lucknow Municipal Corporation (Nagar Nigam Lucknow) |
| MLD | Million litres a day |
| MoEF&CC | Ministry of Environment, Forest and Climate Change |
| MoHUA | Ministry of Housing and Urban Affairs |
| NCR | National Capital Region |
| NDMA | National Disaster Management Authority |
| NGT | National Green Tribunal |
| NHAI | National Highways Authority of India |
| NIH | National Institute of Hydrology, Roorkee |
| NMCG | National Mission for Clean Ganga |
| NOC | No-objection certificate |
| Noida | New Okhla Industrial Development Authority (also the city) |
| PSD | Permissible site discharge |
| PWD | Public Works Department, Uttar Pradesh |
| RRV | Required retention volume |
| RWH | Rainwater harvesting |
| SANDRP | South Asia Network on Dams, Rivers and People |
| SLA | Sea-level allowance (coastal term; not applicable in Uttar Pradesh) |
| SoI | Survey of India |
| SRRG | Self-recording rain gauge |
| SUH | Synthetic unit hydrograph (CWC) |
| SW monsoon / JJAS | South-west monsoon, June–September |
| SWD | Storm water drain |
| TCPD | Town and Country Planning Department, Uttar Pradesh |
| UDD | Urban Development Department, Uttar Pradesh |
| ULB | Urban local body (a Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat) |
| UP | Uttar Pradesh (in the names of Acts and bodies) |
| UPPCB | Uttar Pradesh Pollution Control Board |
| UPSDMA | Uttar Pradesh State Disaster Management Authority |
| UPSIDA | Uttar Pradesh State Industrial Development Authority |
| UTM | Universal Transverse Mercator |
| WQv | Water quality volume |
| WSUD | Water-sensitive urban design |
| YEIDA | Yamuna Expressway Industrial Development Authority |