Draft v1.0 prepared by NEER. Not adopted by the Government of Uttar Pradesh or any authority or local body, and has no legal force. About this draft

Annexes to Chapter 3Hydrologic Methods

These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.


Annex 3A — Uttar Pradesh soil series to HSG lookup; seasonal high water table map

Supports Clauses 3.7 and 3.10 of Chapter 3.

To be prepared. This annex will contain (a) a lookup from each soil series mapped in Uttar Pradesh to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the south-west monsoon (June–September). It needs NBSS&LUP and Uttar Pradesh Department of Agriculture (soil survey) [TBC] series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the UP Ground Water Department, supplemented by piezometers in the khadar floodplains of the Ganga, the Yamuna, the Gomti, the Ghaghra, the Rapti and the Hindon, the north-east terai, where wells flow under artesian pressure, the waterlogged canal commands such as that of the Sharda Sahayak, and the low-lying land behind the embankments of the Gomti at Lucknow and the Rapti at Gorakhpur. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).

Table 3A.1 — Soil series to HSG lookup (layout)

Soil series District(s) Taxonomic class Surface texture Saturated hydraulic conductivity (mm/h) Depth to impermeable layer (m) HSG, drained HSG, undrained Source map and scale
                 
                 
                 

Table 3A.2 — Seasonal high water table, by mapping unit (layout)

Mapping unit or grid cell Observation wells used Years of June–September record Highest June–September level below ground (m) Within 0.6 m of ground (Clause 3.10.1)? Data source
           
           

Annex 3B — Uttar Pradesh CN calibration and supplementary land covers (khadar farmland, usar land, ravines, terai forest and grassland, Bundelkhand scrub and rock, tal beds)

Supports Clauses 3.8 and 3.15 of Chapter 3.

To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Uttar Pradesh catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the cultivated and grazed land of the river floodplains (khadar), which the rivers cover when they are high; the barren or sparsely grassed sodic (usar) land of the central and eastern plain; the ravines of the Yamuna and the Chambal in Agra and Etawah, bare or under scrub; the forest and grassland of the terai and bhabar below the foothills; the scrub on thin soils over granite-gneiss in Bundelkhand and its bare rock outcrop; and the beds of tals that are dry or cultivated at the start of a storm. It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from I&WRD gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).

Table 3B.1 — Supplementary land covers, AMC II (layout)

Cover type HSG A HSG B HSG C HSG D Ia ratio Basis (catchments, events, years)
Floodplain (khadar) farmland and grazing land, above the river level at the start of the storm            
Usar (sodic) land, barren or with sparse grass            
Ravines of the Yamuna and the Chambal, bare or under scrub            
Forest and grassland of the terai and bhabar            
Scrub on thin soil over granite-gneiss, Bundelkhand            
Bare or nearly bare rock outcrop, Bundelkhand            
Tal bed, dry or cultivated at the start of the storm            
Other (state)            

Table 3B.2 — CN calibration catchments (layout)

Catchment District Area (km²) Dominant HSG and cover Events used Table 3.5 CN Calibrated CN Calibrated ÷ Table 3.5
               
               

Annex 3C — Benchmark test problems for software acceptance

Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.

Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.

Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.

Problem 3C-1 — Rational Method peak (Clause 3.5)

Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.

Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.

Table 3C.1 — Problem 3C-1 solution

Step Calculation Result
Composite C (Clause 3.5.4) (1.2 × 0.90 + 0.8 × 0.15) / 2.0 0.60
Frequency factor (Table 3.3) 1% AEP Cf = 1.25
C · Cf (≤ 1.0) 0.60 × 1.25 0.75
Peak flow (Clause 3.5.1) 0.75 × 120 × 2.0 / 360 Q = 0.500 m³/s
Part (b): C · Cf 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) 1.00
Part (b): peak flow 1.00 × 150 × 0.5 / 360 Q = 0.208 m³/s

Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)

Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).

Table 3C.2 — Problem 3C-2 solution

Segment Calculation Travel time
Sheet flow (Clause 3.6.2(a)) 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h 12.83 min
Shallow concentrated (Clause 3.6.2(c)) V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h 6.78 min
Channel (Clause 3.6.2(d)) 400 / (3,600 × 1.0) = 0.1111 h 6.67 min
Tc (Clause 3.6.1; ≥ 10 min) 12.83 + 6.78 + 6.67 26.27 min
Lag (Clause 3.6.5) 0.6 × 26.27 15.76 min

Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)

Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.

Table 3C.3 — Problem 3C-3 solution

Case S (mm) Ia (mm) Runoff Q (mm), P = 100 mm Runoff Q (mm), P = 25 mm
(a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 89.24 17.85 39.38 0.53
(b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 38.80 7.76 64.93 —
(c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 143.31 7.17 36.49 1.97

Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.

Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)

Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.

Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.

Table 3C.4 — Problem 3C-4 solution

Step Calculation Result
(a) Impervious half (Clause 3.9.2) S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) 19.70 mm
(a) Pervious half S = 162.39 mm, Ia = 32.48 mm > P 0 mm
(a) Area-weighted runoff, separate sub-areas 0.5 × 19.70 + 0.5 × 0 9.85 mm
(a) Composite CN (Clause 3.9.4) 61 + 0.50 × (98 − 61) 79.5
(a) Runoff with composite CN S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) 1.83 mm
(b) Interval check (Clause 3.11.3(a)) 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h satisfied
(b) Lag and time to peak (Clause 3.11.2) tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 tp = 0.65 h
(b) Unit hydrograph peak, Q = 1 mm 0.208 × 2.5 × 1 / 0.65 qp = 0.800 m³/s per mm

Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).

Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)

Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.

Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship

Stage (m) Storage S (m³) Outflow O (m³/s)
0.0 0 0.00
0.5 250 0.05
1.0 500 0.10
1.5 750 0.15
2.0 1,000 0.20
2.5 1,250 0.25

Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.

Table 3C.6 — Problem 3C-5 routed outflow

Time (min) Inflow I (m³/s) Outflow O (m³/s) Storage (m³) Stage (m)
0 0.0000 0.0000 0.0 0.000
10 0.1667 0.0094 47.2 0.094
20 0.3333 0.0367 183.3 0.367
30 0.5000 0.0797 398.4 0.797
40 0.4167 0.1226 612.8 1.226
50 0.3333 0.1511 755.7 1.511
60 0.2500 0.1670 835.2 1.670
70 0.1667 0.1717 858.6 1.717
80 0.0833 0.1664 832.1 1.664
90 0.0000 0.1523 761.5 1.523
120 0.0000 0.1062 531.1 1.062
180 0.0000 0.0517 258.3 0.517

Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.

Table 3C.7 — Benchmark results to be reported by the applicant

Problem Result Benchmark Software result Difference (%) Within ±5%?
3C-1 Q, main case (m³/s) 0.500      
3C-1 Q, part (b) (m³/s) 0.208      
3C-2 Tc (min) 26.27      
3C-3 Q, case (a), P = 100 mm (mm) 39.38      
3C-3 Q, case (b), P = 100 mm (mm) 64.93      
3C-3 Q, case (c), P = 100 mm (mm) 36.49      
3C-3 Q, case (c), P = 25 mm (mm) 1.97      
3C-4 Runoff, separate sub-areas (mm) 9.85      
3C-4 Runoff, composite CN (mm) 1.83      
3C-4 qp (m³/s per mm) 0.800      
3C-5 Peak outflow (m³/s) 0.172      
3C-5 Peak storage (m³) 859      

Annex 3D — Peak rate factor study for flat coastal land

Supports Clauses 3.11.5 and 3.15 of Chapter 3.

Not required in Uttar Pradesh. Uttar Pradesh is landlocked and has no flat coastal plain, so no land in the State meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). The khadar floodplains, the terai and the tals are flat but are not coastal plain; their slow response is represented by storage and backwater (Clauses 3.10.4 and 3.12.4), not by a lower peak rate factor. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.

Table 3D.1 — Calibrated peak rate factors (layout)

Catchment Area (km²) Mean slope (m/m) Drainage condition Events used Calibrated PRF (US customary) PRF′ (SI) Range of applicability
               
               

Annex 3E — CWC SUH parameters for subzones 1(e), 1(f), 1(c) and 1(b), with worked example

Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.

To be prepared. This annex will tabulate, for CWC subzones 1(e) (Upper Indo-Ganga Plains), 1(f) (Middle Ganga Plains), 1(c) (Betwa) and 1(b) (Chambal), the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs the four CWC Flood Estimation Reports that cover Uttar Pradesh: the Upper Indo-Ganga Plains subzone 1(e), approved at the 40th meeting of the Planning and Co-ordination Committee on 23–24 July 1984, whose design-office report number is not on the scanned copy read for this Manual [TBC], and which covers the west of the State, including Saharanpur, Meerut, Ghaziabad, Noida, Aligarh, Mathura, Agra, Moradabad and Bareilly; the Middle Ganga Plains subzone 1(f) (GP/10/1984, October 1985), which covers the eastern half of the State, including Lucknow, Kanpur, Prayagraj north of the Ganga, Varanasi and Gorakhpur; the Betwa subzone 1(c) (B/17/1989), which covers Bundelkhand, including Jhansi, Lalitpur, Orai, Banda and Chitrakoot; and the Chambal subzone 1(b) (C/16/1988), which covers only the last 46 km of the Chambal in the State, in the ravines of Agra and Etawah (see the References of Chapter 3); with the report for the Sone subzone 1(d), which covers Sonbhadra, the south of Mirzapur and Chandauli and the trans-Yamuna part of Prayagraj, still to be obtained [TBC], and the subzone boundaries within Uttar Pradesh, including the 1(e)/1(f) boundary near Lucknow, Kanpur and Lakhimpur, to be confirmed on the reports' index maps [TBC], transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).

Table 3E.1 — SUH relationships by subzone (layout)

Parameter Symbol Unit Subzone 1(e) relationship Subzone 1(f) relationship Subzone 1(c) relationship Subzone 1(b) relationship
Peak discharge per unit area qp m³/s per km² qp = 2.030 (L/√S)^−0.649 qp = 0.409 (L/√S)^−0.456 qp = 1.331 (L/S)^−0.492, as printed; L/√S [TBC] qp = 1.251 tp^−0.610 (relationship table; the step-by-step text prints 1.215 [TBC])
Time from centre of unit rainfall to peak tp h tp = 1.858 qp^−1.038 tp = 1.217 qp^−1.034 tp = 2.195 qp^−0.944 tp = 0.339 (L/√S)^0.826
Width of UH at 50% of peak W50 h W50 = 2.217 qp^−0.990 W50 = 1.743 qp^−1.104 W50 = 2.04 qp^−1.026 W50 = 2.215 qp^−1.034
Width of UH at 75% of peak W75 h W75 = 1.477 qp^−0.876 W75 = 0.902 qp^−1.108 W75 = 1.25 qp^−0.864 W75 = 1.191 qp^−1.057
Width of rising limb at 50% of peak WR50 h WR50 = 0.812 qp^−0.907 WR50 = 0.736 qp^−0.928 WR50 = 0.739 qp^−0.968 WR50 = 0.834 qp^−1.077
Width of rising limb at 75% of peak WR75 h WR75 = 0.606 qp^−0.791 WR75 = 0.478 qp^−0.902 WR75 = 0.500 qp^−0.813 WR75 = 0.502 qp^−1.065
Base width of UH TB h TB = 7.744 tp^0.779 TB = 16.432 tp^0.646 TB = 3.917 tp^0.990 TB = 6.662 tp^0.613
Unit duration tr h 2 6 1 1
Design storm duration TD h TD = 1.1 tp, limited to 24 h TD = 1.1 tp, limited to 24 h; by tp: 3–5 h, 6 h; 6–11 h, 12 h; 12–17 h, 18 h; 18–72 h, 24 h TD = 1.1 tp, rounded to the nearest hour TD = 1.1 tp, rounded to the nearest hour (the report also prints TD = 0.539 (L/√S)^0.724, read by optical character recognition only [TBC])
Design loss rate — mm/h 3.0 3.0 (printed as the "modal value … 3.0 mm per hour") 2.3 (printed "0.23 cm/hr"; modal value of about 102 events on 11 catchments) 1.7 (printed "0.17 cm/hr"; modal value)
Design base flow — m³/s per km² 0.05 0.05 (87 of 158 events in the range 0.01–0.09) 0.018 (30 of 102 events in the range 0.009–0.027) qb = 0.207 A^−0.290, read by optical character recognition only [TBC]
Ratio of t-hour to 24-hour rainfall — — 50-yr: 1 h 0.340; 2 h 0.475; 3 h 0.560; 4 h 0.607; 5 h 0.647; 6 h 0.680; 9 h 0.770; 12 h 0.840; 15 h 0.890; 18 h 0.930; 24 h 1.000 50-yr: 1 h 0.31; 3 h 0.50; 6 h 0.65; 9 h 0.75; 12 h 0.82; 15 h 0.89; 18 h 0.94; 24 h 1.00 (2, 4 and 5 h from the table of Fig. 10, read by optical character recognition only: 0.425, 0.555 and 0.605 [TBC]) 1 h 0.32; 3 h 0.50; 6 h 0.65; 9 h 0.72; 12 h 0.79; 15 h 0.84; 18 h 0.90; 24 h 1.00 (independent of return period from 5 years) 1 h 0.35; 3 h 0.53; 6 h 0.67; 9 h 0.74; 12 h 0.80; 15 h 0.85; 18 h 0.90; 24 h 1.00 (independent of return period from 5 years)
Time distribution of 24-hour rainfall — cumulative fraction Average curves of Fig. 12; not transcribed [TBC] Average curves of Fig. 12 for storms of 2–3, 4–6, 7–12, 13–18 and 19–24 hours, from about 3,240 storms; not transcribed [TBC] [TBC] [TBC]
Conversion of 1-day to 24-hour rainfall — factor 1.15 1.15 1.15 1.15
Areal reduction factor ARF — Table 6 of the report [TBC] Table 6 and Figs 11(a) and 11(b), 50–4,500 km², from six bridge catchments; the worked example uses 0.91 for 24 hours at 300 km²; the table not checked against the page images [TBC] ARF table of the report, for areas up to 2,500 km², read by optical character recognition only [TBC] [TBC]
50-yr 24-hour point rainfall at Uttar Pradesh towns — mm Plate 9: Ghaziabad and Noida about 220–240; Agra and Mathura about 200–240; Aligarh about 240; Meerut about 280; Moradabad about 280–320; Bareilly about 280 Plate 8: Lucknow about 240–280; Kanpur about 220–240; Prayagraj about 280–320; Varanasi and Gorakhpur about 240–280; Gonda about 320; Lakhimpur above 320 Plate 10: Jhansi and Banda about 240–280; Orai and Kalpi about 220–240; Karwi about 280; Lalitpur above 320 Not read [TBC]
Catchment area for which the relationships apply A km² 25–2,500, for "reasonably free catchments"; a "suitable increase" for steep foothill catchments Derived from 25 of 45 catchments of 30–4,479 km²; the stated range of application not read [TBC] 25–2,500; up to 5,000 "judiciously" 25–2,500; up to 5,000 "based on sound judgement"
Report reference — — §3.9 (p. 42), §3.11 and §3.12 (p. 57), text table (p. 61) Relationship table (p. 32), pp. 11–12, 34 and 43 Relationship table (p. 20), pp. 22–23 Relationship table (p. 20), pp. 21–23, §5.3

Note: relationships as printed in the four CWC reports that cover Uttar Pradesh (References of Chapter 3), read from scanned copies and checked against the page images except where marked as read by optical character recognition only. L is the length of the main stream in km, S its equivalent slope in m/km and A the catchment area in km². Three entries are to be resolved before use. In subzone 1(b) the relationship table gives qp = 1.251 tp^−0.610, but the step-by-step procedure in the text prints 1.215 (p. 21); the two differ by about 3% in qp, and this Manual uses the table [TBC]. In subzone 1(c) the peak equation is printed with "(L/S)", without the root sign that the other subzones use, and the text also speaks of "qp vs L/S"; whether L/√S was meant is to be checked against the axis of Fig. 3 of the report [TBC]. The 1(e) report number is not on the copy read [TBC]. The 1(f) report's worked example reproduces from these relationships: for a catchment of 299.53 km² with L = 27.03 km and S = 0.048 m/km (L/√S = 123.37), they give qp = 0.0455 m³/s per km² against the report's 0.046, and tp = 29.4 h from the report's qp; the report adopts tp = 27 h, Tm = 30 h and TD = 24 h, and with a 50-yr 24-hour point rainfall of 34.0 cm, an ARF of 0.91 and a base flow of 14.98 m³/s it gives a 50-yr peak of 338.77 m³/s (optical character recognition, checked by recomputation). The design loss rates are φ-indices fitted to the floods of whole rural catchments; they are not soil infiltration capacities and are not used to assign HSG (Clause 3.7) or to size infiltration practices (Chapter 4). The reports were derived from gauged rural catchments at railway and road bridges (1(e) 23 catchments, 137 bridge-years of 1961–1982; 1(f) 25 catchments; 1(c) 11; 1(b) 19 of 26.18–5,729 km²), none of them urban. In Uttar Pradesh they apply to the rural nalas and streams that enter city limits, such as the Kukrail at Lucknow and the Varuna at Varanasi, which appear in the stream list of the 1(f) report (optical character recognition [TBC]); they are not a model of city catchments. Where a city catchment lies within 25–5,000 km², the SUH is computed only as the benchmark of its natural condition (Clause 3.11.4), and the catchment itself is designed by the methods of Clause 3.4 with the design rainfall of Chapter 2. The 6-hour unit graph of 1(f) and its design storm of at least 6 hours make it unsuitable below about 100 km². The rivers through the large cities, the Gomti (25,270 km² within 1(f)), the Ghaghra, the Rapti, the Ganga and the Yamuna, are far larger than the catchments of any report and are outside Clause 3.11.4 (Clause 3.4.5). The ratios understate the short storms of Uttar Pradesh: with the 1(f) ratios, the 50-yr 1-hour depth at Lucknow is about 74–87 mm, against 106.0 mm from the station analysis of Kathuria, Kaur and Mehra (1987), so the ratios are not to be used to derive intensities for durations shorter than the TD of the SUH (Chapter 2). Subzone boundaries: the 1(e)/1(f) boundary of Plate 8 of the 1(f) report runs from just west of Lakhimpur south-west to the Yamuna near 79.9° E, so Lucknow, Kanpur and the land east of them are in 1(f), and the upper Gomti and Sai are in 1(e); Prayagraj north of the Ganga is in 1(f), the land between the Ganga and the Yamuna is on the 1(f)/1(c) boundary, and the land south of the Yamuna is in subzone 1(d); and the southern ravines of Agra and Etawah are in 1(b). The report for the Sone subzone 1(d), which covers Sonbhadra, the south of Mirzapur and Chandauli and the trans-Yamuna part of Prayagraj, was not found during research for this Manual [TBC]; until it is obtained, no SUH benchmark is given here for that subzone.

Table 3E.2 — Worked example outline (layout)

Step Content Clause
1 Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM 3.11.4(a)
2 SUH parameters from Table 3E.1 and the plotted unit hydrograph 3.11.4(a)
3 Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution 3.11.4(a), (b)
4 Effective rainfall after the design loss rate; convolution with the SUH; base flow added 3.11.4(a)
5 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition 3.11.4(c), (d)

Form 3-1 — Hydrologic Calculation Summary

Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.

Draft form — Uttar Pradesh Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.

A. Project

Table 3F.1 — Form 3-1: project

Field Entry
A1. Project name and applicant  
A2. Location (village or ward, survey numbers, district)  
A3. Site area (ha) and number of points of comparison (POCs)  
A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3)  
A5. Design Rainfall Sheet reference (Form 2-1)  

B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)

Table 3F.2 — Form 3-1: method and software

Field Entry
B1. Purpose of each calculation (conveyance, storage, comparison, catchment study)  
B2. Contributing area for each purpose (ha or km²)  
B3. Method used and the row of Table 3.1 that permits it  
B4. Reason for the choice of method  
B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2)  
B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2  
B7. Runoff transform (Clause 3.11.1)  
B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a))  
B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2)  
B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4  
B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference  
B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5)  
B13. Calibration required (Clause 3.15.1)? Calibration report reference  

C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)

Table 3F.3 — Form 3-1: soils and groundwater

Field Entry
C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2)  
C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3)  
C3. Seasonal high water table: depth below ground and source (Clause 3.10.2)  
C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1)  
C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b))  

D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)

Table 3F.4 — Form 3-1: parameters by sub-area and condition

Sub-area Condition (pre / post) Area (ha) Impervious: roofs / paved / roads (ha) DCIA (ha) Disconnected (ha) HSG CN, AMC II CN, AMC III (pervious part) C and Cf (if Rational) Tc (min)
                     
                     
                     

E. Time of concentration worksheet (Clause 3.6)

One worksheet per sub-area and condition.

Table 3F.5 — Form 3-1: time of concentration worksheet

Segment Flow type Surface and n (Table 3.4) L (m) S (m/m) P2 (mm) V (m/s) Tt (min)
1 Sheet         —  
2 Shallow concentrated       —    
3 Channel or pipe       —    
Tc (not less than 10 min)  

E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______

F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)

Table 3F.6 — Form 3-1: rainfall, losses and starting levels

Field Entry
F1. AEPs and durations run; climate factor applied (Chapter 2)  
F2. AMC used for each duration (Clause 3.8.4)  
F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5)  
F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5)  
F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5)  
F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5)  
F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3)  

G. Departures

Table 3F.7 — Form 3-1: departures from Chapter 3

No. Clause departed from Value used in place of the Chapter 3 value Justification
1      
2      

H. Attachments (Clause 3.17)

Table 3F.8 — Form 3-1: attachments

Item Attached (yes / no / not applicable) Reference
H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on    
H2. HSG map, water-table data and infiltration test results    
H3. Parameter tables (Section D) and Tc worksheets (Section E)    
H4. Design Rainfall Sheet (Form 2-1) and hyetographs    
H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels    
H6. Form 3-2 for each POC    
H7. Calibration report (Clause 3.15)    
H8. Native model input and output files (Clause 3.16.4)    

I. Statement by the responsible engineer (Clause 3.17 item 10)

I state that the methods and parameters of Chapter 3 of the Uttar Pradesh Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.

Table 3F.9 — Form 3-1: statement by the responsible engineer

Field Entry
Name  
Qualification and registration number  
Organisation  
Signature  
Date  

Draft form — Uttar Pradesh Stormwater Design Manual, Draft v1.0.


Form 3-2 — Pre- vs Post-Development Comparison

Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.

Draft form — Uttar Pradesh Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.

A. Point of comparison (Clause 3.14.2)

Table 3F.10 — Form 3-2: point of comparison

Field Entry
A1. POC identifier and location  
A2. Area draining to the POC: site (ha) and off-site run-on (ha)  
A3. Off-site run-on passes through site storage? (Clause 3.14.2(c))  
A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3)  
A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c))  
A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7)  
A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3)  

B. Peak flows (Clauses 3.14.7–3.14.10)

Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).

Table 3F.11 — Form 3-2: peak flows by AEP and duration

AEP Duration (h) AMC Q_pre Q_post, uncontrolled Q_post, routed Limit Met?
50% (2-yr) 1 II          
50% (2-yr) 2 II          
50% (2-yr) 3 II          
50% (2-yr) 6 II          
50% (2-yr) 12 III          
50% (2-yr) 24 III          
50% (2-yr) 48 III          
50% (2-yr) 72 III          
10% (10-yr) 1 II          
10% (10-yr) 2 II          
10% (10-yr) 3 II          
10% (10-yr) 6 II          
10% (10-yr) 12 III          
10% (10-yr) 24 III          
10% (10-yr) 48 III          
10% (10-yr) 72 III          
1% (100-yr) 1 II          
1% (100-yr) 2 II          
1% (100-yr) 3 II          
1% (100-yr) 6 II          
1% (100-yr) 12 III          
1% (100-yr) 24 III          
1% (100-yr) 48 III          
1% (100-yr) 72 III          

C. Volumes and storage (Clauses 3.14.8–3.14.10)

Table 3F.12 — Form 3-2: volumes and storage

AEP Governing duration (h) Runoff volume, pre Runoff volume, post uncontrolled Retention volume Detention storage required Peak water level in storage (m)
50% (2-yr)            
10% (10-yr)            
1% (100-yr)            

C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______

D. Sensitivity runs (Clauses 3.8.5, 3.14.11)

Table 3F.13 — Form 3-2: sensitivity runs

Run Governing storm (AEP, duration) Change in Q_post, routed (%) Change in required storage (%) Retention volume or WQv governing (Clause 3.8.5(c))
Ia = 0.05S        
Standard peak rate factor (only where a lower factor is used)       —

E. Associated checks (Clause 3.14.12)

Table 3F.14 — Form 3-2: associated checks

Check Result Reference in submittal
Drawdown times (Chapter 4)    
Minimum orifice and trash screen (Chapter 4)    
Emergency spillway (Chapter 4)    
Outfall-closed storage check (Chapter 5)    
Downstream analysis (Chapter 5)    

F. Statement by the responsible engineer

I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).

Table 3F.15 — Form 3-2: statement by the responsible engineer

Field Entry
Name  
Qualification and registration number  
Signature  
Date  

Draft form — Uttar Pradesh Stormwater Design Manual, Draft v1.0.