Chapter 2Design Rainfall and Design Storms
2.1 Purpose and scope
2.1.1 This chapter sets the rainfall inputs for every hydrologic calculation in this Manual: drain and inlet sizing (Chapter 6), retention and detention sizing (Chapter 4), downstream and tailwater analysis (Chapter 5), and waterbody and tank works (Chapter 7).
2.1.2 It specifies:
- (a) the approved sources of design rainfall depth and intensity;
- (b) how depths are converted between durations, between point and area, and from present to future climate;
- (c) how design storms (hyetographs) are constructed; and
- (d) the storms that must be applied to pre- and post-development conditions.
2.1.3 This chapter applies throughout Uttar Pradesh. Where a Nagar Nigam, Nagar Palika Parishad, Nagar Panchayat, development authority or industrial development authority has adopted a stricter rainfall standard under Chapter 1, the stricter standard governs.
2.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Annual exceedance probability (AEP) | Probability that a given rainfall depth is equalled or exceeded in any one year. A 1% AEP storm is the "100-year" storm. Both forms are used here: T-year = 1/AEP. |
| IDF / DDF | Intensity–duration–frequency and depth–duration–frequency relationships for a location. |
| Point rainfall | Rainfall at a single location, as measured by a rain gauge. |
| Design storm | A hyetograph (rainfall depth versus time) of stated AEP, duration and temporal pattern. |
| Critical duration | The storm duration that produces the largest peak flow, water level or storage requirement for the element being designed. |
| Areal reduction factor (ARF) | Ratio of catchment-average rainfall to point rainfall for the same AEP and duration. |
| SW monsoon season (JJAS) | June–September, when Uttar Pradesh receives about 82–90% of its annual rainfall at the main stations: normals for 1991–2020 of 693.6 mm a year at Agra, 861.4 mm at Lucknow, 915.4 mm at Prayagraj, 985.9 mm at Varanasi (BHU) and 1,240.9 mm at Gorakhpur, with July and August the wettest months almost everywhere. The June–September normal is 746.2 mm for the State, 799.2 mm for East and 672.0 mm for West Uttar Pradesh (IMD). The normal date of onset is 20 June, when the monsoon first enters the east, and it covers the whole State by 30 June; the normal date of withdrawal is 10 October (in 2025, onset on 18 June and withdrawal on 13 October). June is already wet in the north-east terai, with normals of 187.8 mm at Gorakhpur and 180.8 mm at Bahraich, but not in the west (46.4 mm at Agra, 81.9 mm at Meerut). Very large falls have come at or before onset: 487.2 mm at Gonda on 12 June 1984, 259.0 mm at Gorakhpur on 9 June 1984, and 327.2 mm at Aligarh and 313.2 mm at Mainpuri on 30 June 1981 (IMD). The antecedent moisture rule of Clause 2.11.4 refers to this season; the pre-monsoon deadline of 31 May is set ahead of the earliest onset. |
| Storms outside the season | Rarer but large falls come before and after it: 129.5 mm at Lucknow on 21 April 1909, 111.8 mm at Meerut on 6 April 1918 and 110.2 mm at Gorakhpur on 13 May 1956 before the monsoon; 310.0 mm at Hardoi on 13 October 1985, 199.8 mm at Lucknow (Amausi) on 10 October 1985 and 241.2 mm at Shahjahanpur and at Sultanpur on 6 October 2009 after its normal withdrawal; and 142.8 mm at Jhansi on 9 December 1997 from a western disturbance (IMD). Gorakhpur recorded 193 mm in the 24 hours to 08:30 on 2 October 2021 (as reported). Design statistics use annual maxima from all months, and no works deadline or operating rule shall assume that heavy rain is confined to June–September. |
| Climate factor (CF) | Multiplier applied to present-day design depths to represent the design-life climate. |
| Approved source | A rainfall source listed in Clause 2.3. |
2.3 Approved sources of design rainfall
2.3.1 Primary source. Design rainfall depths and intensities shall be taken from the National Institute of Hydrology, Roorkee NIH-DHAARA platform (Design Hydrology and Advanced Rainfall Analysis, nihdhaara.in). Use its IDF / frequency tools for the site's coordinates, for each duration and AEP required by Clause 2.4. In Uttar Pradesh this clause is suspended until Annex 2A is published: Clause 2.3.6 sets the interim source.
2.3.2 Station IDF. A station-specific IDF relationship may be used in place of 2.3.1 only if all of the following hold:
- (a) it is derived from at least 30 years of recording-gauge (hourly or finer) data;
- (b) it has been published or approved by IMD, the State Hydrology Authority or the approving authority; and
- (c) the gauge is within 10 km of the site, with no major change of terrain or coastal exposure in between.
Where a station IDF is used, the design value shall be the greater of the station value and the NIH-DHAARA value.
2.3.3 Cross-checks (mandatory, not alternatives). The designer shall report, but need not adopt, the following values for comparison:
- (a) the IMD isopluvial / IDF values of Das et al. (2022), MAUSAM 73(4), for durations of 1–24 h;
- (b) for catchments of 25–5,000 km², the 24-hour point rainfall from the CWC Flood Estimation Report for subzone 1(e) (Upper Indo-Ganga Plains), 1(f) (Middle Ganga Plains), 1(c) (Betwa) or 1(b) (Chambal), as applicable.
Where the design value is lower than the CWC 1(e)/1(f)/1(c)/1(b) value for the same AEP, the CWC value shall be adopted as a floor.
2.3.4 Not permitted. None of the following shall be used as a design rainfall source:
- (a) generalised all-India IDF formulae (for example Kothyari & Garde, 1992);
- (b) rainfall values that cite no source, including vendor or web-calculator tables;
- (c) single-event maxima; or
- (d) design intensities carried forward from a previous project without a stated AEP.
Figure 2.1 — Design rainfall source hierarchy and adjustment sequence. Original drawing for this Manual.
2.3.5 Version control. Every submittal shall record the source, its version or access date, the coordinates queried, and the values extracted (Clause 2.13).
2.3.6 Interim source in Uttar Pradesh. Until Annex 2A is published and confirms NIH-DHAARA, or an approved station IDF, for a zone, Clause 2.3.1 does not apply in Uttar Pradesh, and design rainfall shall be taken as follows:
-
(a) Station IDF. Where a station IDF fitted to a checked IMD recording-gauge (SRRG) or automatic weather station record of at least 25 years has been published in Annex 2B, it governs, within 10 km of the station, for the durations and AEPs it covers, in place of (g) and (h); the comparison of Clause 2.3.2 is then made with the 24-hour and longer depths of (d) to (f), and the CWC floor of Clause 2.3.3 still applies. A record is checked when its annual totals and annual maxima have been compared with the IMD normals and station extremes for the station, and every year that disagrees has been explained or removed. An IDF derived from daily data by the one-third rule (Clause 2.6.4) or by any other fixed ratio is not a station IDF. In Uttar Pradesh Clause 2.3.2(a) is read with 25 years in place of 30, the length of record that the UDD guideline asks for in drainage DPRs (UDD, 2024). No IDF has yet been published in Annex 2B.
-
(b) Lucknow. The only published station IDF in the State is the fit of Kathuria, Kaur & Mehra (1987) to about 25 years of hourly SRRG data at Lucknow, which end before 1985. Because the record is old and short, it is used as a floor and not as a cap: at every site in the development area of LDA, the 1-, 3- and 6-hour depths shall be not less than the values below, and a fit under (a) to a longer Lucknow record governs above them but not below them. The values at 2, 5, 50 and 100 years are those of the paper (Gumbel, maximum likelihood); those at 10 and 25 years are interpolated by this Manual on the Gumbel reduced variate between the paper's 2- and 100-year values.
Duration 50% (2) 20% (5) 10% (10) 4% (25) 2% (50) 1% (100) 1 hour (mm) 50.8 68.5 80.2 95.0 106.0 116.9 3 hours (mm) 80.7 110.8 130.7 155.9 174.6 193.1 6 hours (mm) 98.4 141.7 170.4 206.6 233.5 260.1 -
(c) Subzone. The site's CWC subzone is that of the Flood Estimation Report whose area contains it, by the boundaries drawn on the reports' plates: 1(e) (Upper Indo-Ganga Plains, 1984) in the west, including Saharanpur, Muzaffarnagar, Shamli, Baghpat, Meerut, Hapur, Ghaziabad, Gautam Buddh Nagar (Noida and Greater Noida), Bulandshahr, Aligarh, Hathras, Mathura, Agra, Firozabad, Etah, Mainpuri, Etawah, Farrukhabad, Budaun, Bijnor, Moradabad, Rampur, Bareilly, Pilibhit and Shahjahanpur; 1(f) (Middle Ganga Plains, GP/10/1984, 1985) east of the boundary that Plate 8 of that report draws from just west of Lakhimpur south-west to the Yamuna near 79.9° E, including Lucknow and Kanpur, which the report lists, Prayagraj north of the Yamuna, Varanasi, Gorakhpur and the north-east terai; 1(c) (Betwa, B/17/1989) in Bundelkhand, including Jhansi, Lalitpur, Jalaun (Orai and Kalpi), Hamirpur, Mahoba, Banda and Chitrakoot; and 1(b) (Chambal, C/16/1988) along the last 46 km of the Chambal, in the ravines of Agra and Etawah districts. The report for subzone 1(d) (Sone), which covers Sonbhadra, the south of Mirzapur and Chandauli, and Prayagraj south of the Yamuna (Meja, Koraon and Shankargarh), was not found for this Manual [TBC]; there the ratios of 1(c) are used with the higher of the 1(c) and 1(f) plate values, read at the nearest point of each plate where the plate does not reach the site (set by this Manual). Within 5 km of a subzone boundary, the higher of the two plate values is used, and at each duration the higher of the two products under (g); Lakhimpur lies on the 1(e)/1(f) boundary. The district lists are a guide: the plate boundaries govern, and are to be confirmed on the reports' index maps [TBC]. The rainfall zone and sub-area of the site are those of Annex 2A.
-
(d) 24-hour depth, 2% and 1% AEP (50- and 100-yr). The 24-hour point value at the site read from the 50- and 100-year isopluvial plates of the report for its subzone (Plates 9 and 10 of 1(e), Plates 8 and 9 of 1(f), Plates 10 and 11 of 1(c), and the corresponding plates of 1(b)), whatever the catchment area. Where the site lies between two contours, the higher contour value is used; where it lies inside a closed contour with no higher contour within it, the value is that contour plus one contour interval (set by this Manual). For orientation only, read by eye to about one contour, the 50-year plates give about 240–280 mm at Lucknow, Varanasi, Gorakhpur, Jhansi and Banda, 220–240 mm at Kanpur, Ghaziabad and Noida, 200–240 mm at Agra, 280–320 mm at Prayagraj and Moradabad, about 280 mm at Meerut and Bareilly, about 320 mm near Gonda, and more than 320 mm at Lakhimpur and Lalitpur, with a cell of more than 400 mm on the Nepal border north of Maharajganj and Kushinagar; the 100-year values are about one contour (40 mm) higher. Where the Gumbel estimate of (e) for the station of the site is higher for the same AEP, it governs.
-
(e) 24-hour depth, 50%, 20%, 10% and 4% AEP (2-, 5-, 10- and 25-yr). The reports have no plates for these. The depth is the Gumbel (EV1) estimate from the annual maximum daily rainfall series, of all months, of the IMD station agreed with the Authority, checked as in (a), multiplied by the fixed-interval factor of Clause 2.6.3. The station is, for example, the higher of Lucknow City, 42368 (daily record from 1901), and Lucknow/Amausi, 42369 (from 1951), for Lucknow; Kanpur, 42366; Allahabad/Bamhrauli, 42475 (from 1886), for Prayagraj; the higher of Varanasi (BHU), 42483, and Varanasi/Babatpur, 42479, for Varanasi; Gorakhpur, 42379; Agra, 42261; Aligarh, 42262; Meerut, 42139; Moradabad, 42187; Bareilly, 42189; Bahraich, 42273; or Jhansi, 42463. Ghaziabad and Gautam Buddh Nagar have no long-record IMD station; for them the station is New Delhi/Safdarjung, 42182, the nearest, until a station in those districts has 30 or more years of record. Elsewhere it is the nearest IMD station with 30 or more years of record, from the candidates in Annex 2A.
-
(f) 48- and 72-hour depths. The Gumbel estimate from the annual maximum 2-day and 3-day rainfall series of the same station, with the fixed-interval factors of Clause 2.6.3, and not less than the 24-hour depth for the same AEP.
-
(g) Durations of 1 to 24 hours. The 24-hour depth of (d) or (e) multiplied by the 50-year ratios of the report for the site's subzone in Table 2B.1, at every AEP: in 1(f), 0.31 at 1 hour, 0.425 at 2 hours, 0.50 at 3 hours, 0.555 at 4 hours, 0.605 at 5 hours, 0.65 at 6 hours, 0.75 at 9 hours, 0.82 at 12 hours, 0.89 at 15 hours and 0.94 at 18 hours; in 1(e), 0.34, 0.475, 0.56, 0.607, 0.647, 0.68, 0.77, 0.84, 0.89 and 0.93 at the same durations; in 1(c), 0.32 at 1 hour, 0.50 at 3 hours, 0.65 at 6 hours, 0.72 at 9 hours, 0.79 at 12 hours, 0.84 at 15 hours and 0.90 at 18 hours; and in 1(b), 0.35, 0.53, 0.67, 0.74, 0.80, 0.85 and 0.90 at those durations. Between the tabulated durations the ratio is interpolated on logarithmic axes. The 1-, 2- and 3-hour depths are then subject to (h), and, in the development area of LDA, the 1-, 3- and 6-hour depths to (b).
-
(h) Floor for short storms, 10-yr and rarer. The 1-hour and 3-hour depths shall be not less than the greater of (i) 0.35 times (1 hour) and 0.57 times (3 hours) the 24-hour depth of (d) or (e) for the same AEP, and (ii) the following values for the site's zone of Annex 2A, all set by this Manual; the 2-hour depth shall be not less than the value interpolated on logarithmic axes between the 1- and 3-hour values for the same AEP:
Zone Duration 10% (10) 4% (25) 2% (50) 1% (100) UP-Z1 West 1-hour depth not less than (mm) 70 80 90 100 UP-Z1 West 3-hour depth not less than (mm) 110 135 150 165 UP-Z2 Central–east plain and Bundelkhand; UP-Z3 Terai and Rohilkhand 1-hour depth not less than (mm) 80 95 105 115 UP-Z2 Central–east plain and Bundelkhand; UP-Z3 Terai and Rohilkhand 3-hour depth not less than (mm) 130 155 175 195 The reason is that the subzone ratios, derived in 1984–1989 from recording-gauge data averaged over each subzone, understate the short storms of the one station in the State with a published fit. At Lucknow the 1(f) plates and ratios give about 74–87 mm in 1 hour and 120–140 mm in 3 hours for the 50-year storm; the station fit of (b) gives 106.0 mm and 174.6 mm, 22–43% more at 1 hour. The same paper's 2-year ratios of the 1-hour to the 24-hour depth are 0.36 at Lucknow, 0.38 at Kanpur and 0.35 at Bahraich, and of the 3-hour depth 0.58, 0.61 and 0.57, all above the 1(f) ratios of 0.31 and 0.50 and the 1(e) ratios of 0.34 and 0.56 (Kathuria, Kaur & Mehra, 1987); the ratio floor of (i) takes the lowest of the three stations at each duration. The depths of (ii) for UP-Z2 and UP-Z3 are the Lucknow values of (b) at 10, 25, 50 and 100 years, rounded to 5 mm. They are applied across both zones because the 24-hour plate values there, about 220–320 mm in the central and eastern plain and in Bundelkhand and from about 240 mm to more than 400 mm in the terai and Rohilkhand, are mostly equal to or higher than Lucknow's 240–280 mm, and because the Kanpur and Bahraich ratios give no sign that short storms are smaller there. In UP-Z1, where the 1(e) plates give about 200–280 mm and typically about 240 mm, the Lucknow values are scaled by 240/280 and rounded to 5 mm. Where the 24-hour depth is large, as in the terai, the ratio floor of (i) governs. The floors are present-day, true-interval values: the fixed-interval factor of Clause 2.6.3 is not applied to them, and the climate factor of Clause 2.8 is. The paper does not state whether its hourly maxima are for fixed clock hours, in which case the true-interval depths would be higher [TBC]. The floors are interim: the Lucknow fit rests on about 25 years of data that end before 1985, with standard errors of 10–12% at 50 years; no IMD hourly maximum for a recent storm in the State was found in research for this Manual [TBC]; and Annex 2B is to replace the floors with frequency analyses of the IMD recording-gauge and automatic weather station records of the State.
-
(i) Durations below 1 hour. No sub-hourly frequency analysis for any station in the State was found in research for this Manual. Until Annex 2B gives one, the ratio of the depth for a duration below 1 hour to the 1-hour design depth is agreed with the Authority, from a published recording-gauge analysis whose source is stated, and recorded on Form 2-1 [TBC]; the average intensity for a duration below 1 hour shall be not less than the 1-hour design intensity for the same AEP (set by this Manual).
-
(j) Order of depths. For the same AEP, no depth shall be less than the depth for a shorter duration.
-
(k) NIH-DHAARA. Its present-day values at the site are reported on Form 2-1 beside the interim values, for comparison only: in the State they are too high at 24 hours in the terai and Rohilkhand, too low at Prayagraj, Varanasi and Noida, and low at 1 hour everywhere (commentary). Its projected depths are not used under Clause 2.8.4; the ratio of its projected to its present-day depths may be reported as a check on the climate factors of Table 2.2, which apply.
-
(l) IMD Das et al. (2022). The paper has no panel for any station in Uttar Pradesh, and its range for the Gangetic plain gives a 3-hour upper bound (14 cm) below its 1-hour upper bound (16 cm), which cannot hold at one place. The cross-check of Clause 2.3.3(a) is recorded on Form 2-1 as not available, and the paper is not used as a value, a check or a floor.
-
(m) Other clauses. Where Clauses 2.3.2, 2.6.1, 2.7.1 and 2.13, Annexes 2A to 2C and Form 2-1 refer to the NIH-DHAARA value, the value under this clause is meant.
Commentary. NIH-DHAARA is a national, publicly accessible product from a Government of India institution, and it can be queried at any point in the State. That makes it a reproducible default that an approving authority can check. NIH-DHAARA's sub-daily values are derived from hourly records, not disaggregated from daily totals. That makes it the only public source suitable for sizing drains, which depend on short-duration intensity. Its values should still be checked against the long IMD daily record at 24 hours and longer (Annex 2A). In Uttar Pradesh the platform does not yet meet that purpose. Its present-day values there come from IMDAA reanalysis (about 12 km), not from gauges, and they err in both directions. Its 50-year 24-hour depths are far above the CWC plates and the station records in the terai and Rohilkhand: 380 mm at Gorakhpur, where the highest day in more than a century of record is 284.5 mm; 500 mm at Bahraich against a plate value of about 320 mm; 390 mm at Bareilly, against a record of 267.2 mm; and 337 mm at Moradabad. They are below both at Prayagraj (265 mm, against a record of 335.3 mm), Varanasi (254 mm, against 349.5 mm at BHU and 322.0 mm at Babatpur), Noida (204 mm) and Ghaziabad (218 mm). Its 50-year 1-hour depths, 63–109 mm, are only 0.22–0.32 of its 24-hour depths, below every CWC ratio (0.31–0.35) and every station ratio (0.35–0.38); at Lucknow it gives 70.7 mm, against 106.0 mm from the station fit (NIH-DHAARA, queried 6 Nov 2026; IMD; Kathuria, Kaur & Mehra, 1987). A source that errs by these margins cannot be adopted, so Clause 2.3.6 uses the Lucknow station fit, the CWC reports and the long IMD station records until Annex 2A has been done, and uses NIH-DHAARA for comparison and as a check on the climate factors only. Uttar Pradesh differs from the coastal States in one respect. There the CWC sub-daily ratios give 1-hour depths above every hourly fall in the old recording-gauge records; here they give less than the Lucknow station fit, which is why Clause 2.3.6(h) sets floors at 1 and 3 hours. The interim rules for the more frequent AEPs, the 48- and 72-hour depths, the reading of the plates, the 1(d) area, durations below 1 hour, the Lucknow values at 10 and 25 years and the floors of (h) are set by this Manual. Several points are unresolved. The plate values were read by eye on scans, to about one contour, and the 1(e) and 1(b) plates near Meerut, Bareilly, Etawah and Agra need better copies [TBC]. The 1(f) ratios at 2, 4 and 5 hours were read from an OCR of the report's Fig. 10 and not checked against the page image [TBC]. The 1(d) report was not found [TBC]. The Lucknow fit is 40 years old, its record short, and its standard errors 10–12% at 50 years. The one storm-drain DPR read for this Manual, for the Taj East Drain in Agra, adopted a 2-year intensity of 28.20 mm/h from a daily series whose printed values cannot be right, among them annual totals of 22.5–38.6 mm in several years and a 500 mm one-day maximum in a year of 500.5 mm, against an IMD annual normal of 693.6 mm and a station record day of 286.0 mm; that is why (a) asks for a checked record and excludes IDFs built from daily data by a fixed ratio.
2.4 Design return periods (summary)
2.4.1 Design AEPs are set in the chapters for each element. They are summarised here so that the correct rainfall is extracted at the start of design.
Table 2.1 — Design return periods (summary)
| Element | Design AEP (return period) | Check event | Chapter |
|---|---|---|---|
| Minor drains: Lucknow, Kanpur, Varanasi, Prayagraj and Agra core and high-density areas | 10% (10-yr) | 1% (100-yr) overland path | 6 |
| Minor drains: other Class I urban areas | 20% (5-yr) | 1% overland path | 6 |
| Minor drains: other areas | 50% (2-yr) | 1% overland path | 6 |
| Arterial roads and crossings | 2–4% (25–50-yr) | next higher AEP | 6 |
| Collector / local roads | 4% / 10% (25 / 10-yr) | 2% / 4% (50 / 25-yr), plus the 1% overland path | 6 |
| Major (overland) system | 1% (100-yr) | — | 6 |
| Retention volume | Percentile daily rainfall (Clause 2.10) | — | 4 |
| Detention: standard catchments | 50%, 10%, 1% (2, 10, 100-yr) | 1% emergency spillway | 4 |
| Detention: flood-sensitive catchments | Mixed-frequency rule, Clause 2.11 | 1% | 4 |
| Building floor levels | 1% + 0.5 m freeboard | — | 6 |
| Detention emergency spillway | 1% with outlet blocked | 0.2% (500-yr) where high hazard | 4 |
Commentary. These values exceed the CPHEEO (2019) national advisory minimums of 5-yr (Class I cities) and 2-yr (other areas). CPHEEO allows a State to set higher values. The values are set in Chapters 4 and 6, and the table is reproduced here for convenience.
2.5 Design durations
2.5.1 Conveyance elements (pipes, open drains, inlets, culverts) shall be designed with the intensity for a duration equal to the time of concentration (Tc) of the contributing area (Chapter 3). The minimum duration is 10 minutes.
2.5.2 Storage elements (detention, retention, tanks, pumped sumps) shall be checked for every duration in the set {1, 2, 3, 6, 12, 24, 48, 72 h}. The largest required storage or water level governs. The 24-, 48- and 72-hour storms are mandatory checks at every site, whatever the critical-duration result.
2.5.3 Tidally influenced outfalls. For storage draining to a tidally influenced outfall (Chapter 5), the 48- and 72-hour storms shall also be run with the tailwater boundary of Clause 2.12.
Commentary. Uttar Pradesh's worst floods have come when a long wet spell meets a full river. The highest levels on record at most sites on the Yamuna and the Ganga below Agra were set on 8–9 September 1978, at the end of a wet monsoon, those of the Gomti at Lucknow on 11 September 1971, and that of the Rapti at Gorakhpur on 23 August 1998 (CWC levels, as reported). The monthly records show how much rain a single month can bring: 1,116.0 mm at Bahraich in September 1982, 967.5 mm at Gorakhpur in July 1899 and 823.1 mm in June 1984, 914.7 mm at Allahabad in August 1953 and 804.7 mm at Lucknow in September 1915 (IMD). In September 2021 Lucknow received 228.6 mm in about 36 hours (as reported), and in mid-September 2022 Gorakhpur district recorded 20 cm in the 24 hours to 15 September and 22 cm at Chanderdeepghat two days later (IMD, 2022). Behind the embankments of the Gomti at Lucknow and of the Rapti at Gorakhpur, where the drains are closed and pumped when the river is high, storage is filled by the whole wet spell, not by its peak hour. A rule based only on critical duration, applied to a small site, picks a 1–2 hour storm and misses this failure mode. That is why the long-duration checks are mandatory.
2.6 Sub-daily rainfall
2.6.1 Where NIH-DHAARA or an approved station IDF provides values directly for the required duration, those values shall be used.
2.6.2 Where only daily (24-hour) depths are available for a duration below 24 hours, the sub-daily depth shall be derived using the ratio set of Annex 2B. These are duration-to-24-hour ratios calibrated to Uttar Pradesh recording gauges. They shall not be lower than the ratios of the CWC Flood Estimation Report for the subzone (1(e), 1(f), 1(c) or 1(b)). IMD Das et al. (2022) has no Uttar Pradesh station panel and is not used as a floor in Uttar Pradesh.
2.6.3 Fixed-interval adjustment. Depths from fixed observation windows (for example 08:30–08:30 IST daily data, or clock-hour data) shall be converted to sliding-window ("true interval") depths:
- 1.13 for a single fixed observation interval;
- 1.04 for 2 intervals;
- 1.02 for 3–4 intervals.
This adjustment does not apply where the approved source already gives true-interval values.
2.6.4 The empirical relationship P(t) = P(24)·(t/24)^(1/3) shall not be used for design unless Annex 2B confirms it for the zone concerned.
Commentary. The one-third power rule is common in Indian project reports, but no primary IMD source for it was found during research for this Manual. It applies one fixed curve shape everywhere: P(1h)/P(24h) = 0.35, P(3h) = 0.50, P(6h) = 0.63 and P(12h) = 0.79. It cannot represent the difference between a short convective burst and a long SW monsoon soak, and it tends to understate short-duration depths in convective coastal storms. Annex 2B shall tabulate the NIH-DHAARA ratios P(t)/P(24h) against these values by zone. That comparison shows whether the rule is acceptable anywhere in the State and corrects older daily-based analyses. The fixed-interval factors are the standard WMO (Hershfield) values. The IMD 2022 study applies similar clock-hour to any-hour corrections.
2.7 Point, grid and areal rainfall
2.7.1 Design depths are point values. Where an approved source provides grid-average values (for example 0.25° cells), they shall be converted to point values with the grid-to-point factors in Annex 2C before use.
2.7.2 For catchments ≤ 10 km², ARF = 1.0.
2.7.3 For catchments > 10 km², apply ARF as follows:
- for 25–5,000 km² in subzone 1(e), 1(f), 1(c) or 1(b): use the ARF curves of the applicable CWC Flood Estimation Report;
- for 10–25 km²: interpolate linearly between ARF = 1.0 at 10 km² and the CWC value at 25 km².
2.7.4 An ARF shall never be applied to storage design for a single development site.
Commentary. Gridded and district-average return levels are much lower than point values. For example, NIH-DHAARA's IMDAA cell at Prayagraj gives a 50-year 24-hour depth of about 265 mm, while the Allahabad gauge has recorded 335.3 mm (20 August 1953), and its cell at Varanasi about 254 mm, while Varanasi (BHU) has recorded 349.5 mm (26 September 1943) and Babatpur 322.0 mm (2 July 2008) (NIH-DHAARA, queried 6 Nov 2026; IMD). In the terai the same product errs the other way, 380 mm at Gorakhpur against a station record of 284.5 mm in more than a century. Single storms are patchy at a scale that no cell of about 12 km can show: in the 24 hours to 08:30 on 16 September 2022, Fatehpur tehsil in Barabanki recorded 29 cm while Lucknow airport, about 30 km away, recorded 16 cm (IMD, 2022). Neither error can be corrected without the factors of Annex 2C. Using grid values as point values without correction would make site-level design unsafe.
2.8 Climate factor
2.8.1 Until a statewide future-climate rainfall product is adopted, present-day design depths shall be multiplied by the following interim climate factors:
Table 2.2 — Interim climate factors
| Duration | Climate factor (CF) |
|---|---|
| ≤ 6 h | 1.20 |
| > 6 h to 72 h | 1.10 |
2.8.2 The CF applies to all elements with a design life of more than 25 years. For temporary works (design life ≤ 5 years), CF = 1.0.
2.8.3 The climate factor does not apply to the retention depth (Clause 2.10) or to the water quality volume depth (Chapter 8). Those depths are percentile or frequent-event statistics of everyday rainfall, not AEP design values.
2.8.4 Where NIH-DHAARA, or a product adopted on review under Clause 2.14, provides projected future-climate depths, those depths shall replace the interim factors.
Commentary. CPHEEO (2019) considers a fixed climate factor "not feasible" nationally and recommends trend testing instead. That leaves designers without a usable number. The 1.20 short-duration factor matches the UK value cited by CPHEEO itself. It is at or below published projections for India: Ali and Mishra (2018) project 3-hourly 100-year maxima rising by about 20% at 1.5 °C and 25% at 2.0 °C of warming. No design uplift factor has been adopted in Uttar Pradesh; the UDD guideline attributes the rise in short, heavy rain to climate change but gives no factor (UDD, 2024). Seasonal totals and extremes point different ways. IMD found significant decreasing trends in south-west monsoon and annual rainfall over the State for 1989–2018 (as reported in a Rajya Sabha reply of 9 February 2021), and the State action plan on climate change summarises a near-term fall in annual rainfall of about 4–5% (as reported). Recent extremes have not fallen: Baheri in Bareilly district recorded 460.6 mm on 8 July 2024 (IMD, 2024), Najibabad 425.0 mm on 22 July 2010, Varanasi (Babatpur) its record 322.0 mm on 2 July 2008, and Bareilly and Moradabad their records on 17 September 2005 (IMD). For Gorakhpur, a study projects the 24-hour intensity of severe storms to rise by 2–25% by the 2050s (ISET-International, 2014, summary read), a range that brackets the factors of Table 2.2. A study of hourly intensity trends over east and north Uttar Pradesh for 1969–2014 (Shashi Kant, 2018) was not read [TBC]. NIH-DHAARA offers a CMIP6 projection but no historical run of the same model, so no ratio of future to present depths can be formed; under Clause 2.3.6(k) it would serve only as a check. The factors of Table 2.2 are therefore interim values, not Uttar Pradesh estimates.
2.9 Temporal patterns (design hyetographs)
2.9.1 Storms up to 24 hours. Use the nested alternating-block method:
- construct the storm from the same IDF relationship (after the climate factor), at time steps no longer than Tc/3 and no longer than 15 minutes;
- place the peak block at 50% of the storm duration.
2.9.2 48- and 72-hour storms (SW monsoon pattern). Construct as follows:
- (a) The total storm depth equals the design depth for the full duration (48 or 72 h).
- (b) The final 24 hours contain the 24-hour design depth for the same AEP, distributed by the alternating-block method of 2.9.1.
- (c) The remaining depth (total minus the 24-hour depth) is spread uniformly over the preceding 24 or 48 hours.
Figure 2.2 — (a) 24-hour alternating-block design storm; (b) 72-hour SW monsoon design storm with the 24-hour design depth on the final day. Illustrative depths only. Original drawing for this Manual. The alternating-block method follows Chow, Maidment & Mays, Applied Hydrology (1988), §14.4.
2.9.3 Other temporal patterns. Huff-type or mass-curve patterns derived from Uttar Pradesh storms may be used instead of 2.9.1 and 2.9.2 only after they are published in Annex 2D. SCS Type I, IA, II and III distributions shall not be used.
2.9.4 Large catchments. For catchments of 25–5,000 km², the CWC Flood Estimation Report time-distribution curves may be used, and a sensitivity run with 2.9.1 shall be reported.
Commentary. The alternating-block storm embeds every shorter-duration design intensity in one hyetograph. That makes it conservative and consistent across durations. The 72-hour pattern puts the most intense day last. This reproduces the monsoon sequence of Uttar Pradesh: by the time the largest falls arrive in July–September, the water table in the khadar floodplains and the terai is near the surface, with wells in the terai flowing under artesian pressure (CGWB, as reported), the tals and ponds are full, and the Gomti, the Ganga, the Yamuna and the Rapti, fed by rain over their whole catchments, may already be closing the gates on the outfalls through their embankments. SCS distributions are excluded because they come from US convective and Gulf storm data and have no basis in Uttar Pradesh records.
2.10 Retention rainfall depth
2.10.1 The retention design depth is the 24-hour rainfall depth not exceeded on 90% of days with rain (≥ 2.5 mm) in the long-term record, read from the zone value in Annex 2E.
2.10.2 The site must retain on site the runoff from this depth (Chapter 4). Retention earns a detention credit equal to the reduction in required detention storage found by routing with the retention in place (Clause 4.4.6). The credit is not the retained volume subtracted one-for-one.
Commentary. This follows the Kansas City Metro APWA 5600 (2025.01) Required Retention Volume concept and Georgia's 1.0-inch runoff reduction standard. Both are based on percentile storms. A percentile depth is a statistic of everyday rainfall, not an AEP value, so it is computed from the daily record rather than from the frequency curves.
2.11 Design storms for pre- and post-development comparison
2.11.1 Same storm for both scenarios. Pre- and post-development runs shall use the same design storms:
- same AEP, duration, temporal pattern and climate factor;
- same antecedent moisture condition (Clause 2.11.4).
The two runs differ only in land surface parameters and Tc.
2.11.2 Standard catchments. For each of the 50%, 10% and 1% AEP storms and each duration in Clause 2.5.2:
Q_post(T) ≤ 0.9 × Q_pre(T)
2.11.3 Flood-sensitive catchments (as listed in Chapter 4: the catchments of Lucknow behind the Gomti embankments, including the Kukrail, of Gorakhpur behind the Rapti and Rohin embankments, of Prayagraj at the confluence, and of the Hindon at Ghaziabad and Noida, and any catchment notified by the authority). The mixed-frequency rule applies:
Q_post(1% AEP, 100-yr) ≤ Q_pre(10% AEP, 10-yr), and Q_post(50% AEP, 2-yr) ≤ Q_pre(50% AEP, 2-yr),
The post-development peak is checked for each duration in Clause 2.5.2. The caps are taken at the pre-development critical duration. The 10-yr cap is the largest pre-development 10-yr peak over all durations, and the 2-yr cap is the largest pre-development 2-yr peak over all durations. Each cap applies to every post-development duration.
2.11.4 Antecedent moisture. Use AMC III (wet conditions) for every design storm, whatever its duration, from 1 July to 30 September at a site in sub-area UP-C (North-east terai) or UP-D (Rohilkhand and western terai) of Annex 2A, or on floodplain or embanked low-lying land anywhere in the State, and in July and August at a site in sub-area UP-B (Central–east Ganga plain). In sub-areas UP-A (West doab and NCR) and UP-E (Bundelkhand and Vindhyan), use AMC III for a design storm that follows, or contains, a 5-day rainfall total of more than 53 mm. Use AMC II (average conditions) for every other storm, including those of June across the State. AMC I is not used for design.
2.11.5 Pre-development condition. Pre-development is defined in Chapter 3: greenfield, open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted as pre-development.
Commentary. Matching each site's post-development peak to its own pre-development peak does not protect the catchment. Denver's analysis found that 100% matching at every site still produced 106% of historic peak downstream, which led to the 90% rule. The mixed-frequency rule is stricter. It caps the 100-yr post-development release at what the undeveloped site produced in a 10-yr storm. Malaysia (DID 2008: all ARIs ≤ pre-development 2-yr) is a tropical precedent for this kind of cap. AMC III for long storms reflects that SW monsoon extremes arrive after weeks of rain. In Uttar Pradesh the wetness of the ground differs across the State as much as the rainfall does. In the north-east terai and the terai of Rohilkhand (UP-C and UP-D) the water table is shallow, wells in the terai flow under artesian pressure (CGWB, as reported), June is already wet in the north-east, with normals of 180–190 mm at Gorakhpur and Bahraich, and about 260,000 ha of the Sharda Sahayak canal command is reported to be waterlogged (as reported). The khadar floodplains and the land behind the river embankments carry a high water table through the monsoon. In the central–east plain (UP-B) the July and August normals are about 238–283 mm a month at Lucknow, Prayagraj and Varanasi (IMD), while beneath Lucknow city the water table lay 7.65–45.6 m below ground before the 2023 monsoon (CGWB). In the west (UP-A), where the June normal is 46.4 mm at Agra, and on the rock and black soils of Bundelkhand (UP-E), the ground is wet only after a run of heavy days. This Manual therefore uses AMC III from 1 July to 30 September in UP-C and UP-D and on floodplain or embanked low-lying land, in July and August in UP-B, and in UP-A and UP-E only after a 5-day total of more than 53 mm, the NRCS growing-season threshold for AMC III; AMC II otherwise, including June across the State (Clause 2.11.4). These are interim choices set by this Manual; no study in the State has yet validated AMC classes against observed runoff.
Illustrative scale of the mixed-frequency rule. The values below are not design values. They assume a 2 ha site in the Kukrail catchment in north Lucknow with 24-h depths of 200 mm (10-yr) and 350 mm (100-yr), SCS-CN runoff with Ia = 0.2S, and CN 70 pre-development and CN 92 post-development:
Table 2.3 — Illustrative scale of the mixed-frequency rule (not design values)
| Case | Runoff depth | Runoff volume (2 ha) |
|---|---|---|
| Pre-development, 10-yr 24 h | 111 mm | 2,210 m³ |
| Post-development, 100-yr 24 h | 325 mm | 6,500 m³ |
The post-development 100-yr storm generates about three times the runoff volume of the pre-development 10-yr storm. A peak-rate cap at the pre-development 10-yr level means most of the difference must be stored and released slowly, so storage of the order of 0.2 m³ per m² of site may be needed. For this reason the rule applies only in flood-sensitive catchments (Clause 2.11.3); elsewhere the 0.9 × Q_pre rule of Clause 2.11.2 applies.
2.12 Joint occurrence with tailwater
2.12.1 For outfalls under tidal or river backwater influence, the design rainfall of this chapter shall be combined with the tailwater conditions of Chapter 5 as follows. The more severe case governs.
- (a) Design rainfall (AEP as required) with a mean high water springs (MHWS) tailwater plus the sea-level allowance.
- (b) A 10% AEP (10-yr) 48-hour storm with the 1% AEP still-water level (tide plus surge) plus the sea-level allowance.
Uttar Pradesh has no coast, so no outfall in the State is tidal and cases (a) and (b) do not arise. The tailwater is the river into which a city drains, and the nalas and tals that local drains discharge into. For an outfall under river backwater, the site storm is combined with the river level under Clause 5.8.4, which pairs a design event on one side with a 10-yr event on the other in the same way as case (b). The river stage is read at the nearest CWC gauge. As reported from CWC's site data, the danger level and highest flood level (HFL) are 109.5 m and 110.85 m (11 September 1971) for the Gomti at Hanuman Setu in Lucknow, where another source gives a "normal high flood level" of 108.81 m; 74.98 m and 77.54 m (23 August 1998) for the Rapti at Birdghat in Gorakhpur; 114.0 m and 114.08 m (29 September 2010) for the Ganga at Kanpur; 84.734 m and 87.98 m (8 September 1978) for the Ganga at Phaphamau and 84.73 m and 87.99 m for the Yamuna at Naini, in Prayagraj; 71.262 m and 73.901 m (9 September 1978) for the Ganga at Varanasi; and 152.4 m and 154.76 m (9 September 1978) for the Yamuna at Agra. The Hindon at Noida reached 197.28 m on 26 July 2023, 1.81 m above its previous highest level (as reported). Most of these HFLs lie 1–3.3 m above the danger level, so an outfall below the HFL can be shut for days. When the river is high, the gates on the outfalls through the embankments are closed and runoff is stored or pumped, so storage and pumps are checked for the gates-shut condition, with the local storm falling before, during or after the river peak; the UDD guideline already asks for pumps that can operate above the HFL (UDD, 2024). No document found in research for this Manual sets a design river level for the outfalls of any city in the State [TBC], and Chapter 5 sets the interim rule. Every level is stated on a named datum, as Chapter 5 requires; the datum of the CWC gauge levels quoted here is to be confirmed [TBC].
Commentary. Uttar Pradesh has no coast, so no outfall is tidal and there is no storm surge; the coincident load is the stage of the rivers. The coincidence is on record. In September 1978 the Yamuna and the Ganga reached their highest recorded levels at Agra, Prayagraj and Varanasi on 8–9 September, more than 2 m above the danger level at each, at the end of a wet monsoon over their catchments (CWC levels, as reported). In August 2025 the Ganga ran above its danger level in 13 districts, at about 72.1 m at Varanasi against a danger level of 71.262 m (as reported). The rivers stay high for days, and their floods come largely from rain over catchments far upstream, so they give no warning of a local storm that falls while the gates are shut. Behind the embankments of the Gomti at Lucknow and of the Rapti at Gorakhpur, the drains cannot outfall by gravity while the river is high and depend on pumps. The levels of the sources are on different datums, which is why Chapter 5 requires every level to name its datum. Because rainfall and surge share a weather cause (in Uttar Pradesh, which has no coast, the counterpart of surge is the stage of the rivers, raised by the same monsoon systems that bring the heaviest rain to the cities and to the catchments above them: in September 1978 the Yamuna and the Ganga set their highest recorded levels at Agra, Prayagraj and Varanasi on 8–9 September, as reported), they cannot be treated as independent. Case (b) is a simple joint-probability surrogate until a statistical joint analysis is adopted.
2.13 Submittal requirements
Every hydrologic submittal shall include a Design Rainfall Sheet (Form 2-1) stating:
- the site coordinates and zone;
- the source (Clause 2.3), version or access date, and a screenshot or export of the values extracted;
- a depth table for each AEP and duration used, before and after the fixed-interval factor, grid-to-point factor, ARF and climate factor;
- the cross-check values of Clause 2.3.3 and the floor check;
- the hyetographs used, as a table and a plot, for each design storm; and
- the AMC and pre-development definition adopted.
Figure 2.3 shows the steps of this chapter in the order in which the sheet records them.
Figure 2.3 — From design rainfall source to design storm: the steps a designer follows (source, AEPs and durations, point depth, grid-to-point and areal reduction, climate factor, temporal pattern, design storm), the clause that governs each step, what Form 2-1 records, and the separate route for the retention depth. Schematic. Original drawing for this Manual.
2.14 Review and update
2.14.1 The approving authority shall review this chapter every 10 years. It shall also review it within 2 years of any event in which recorded rainfall exceeds the 1% AEP 24-hour or 72-hour design depth at two or more approved gauges in the State.
2.14.2 Updates to NIH-DHAARA take effect for new submittals 6 months after release, unless the authority notifies otherwise.
References (chapter)
- National Institute of Hydrology, Roorkee. NIH-DHAARA: Design Hydrology and Advanced Rainfall Analysis. http://www.nihdhaara.in/
- Das, S.K. et al. (2022). Isopluvial analysis and intensity–duration–frequency curves for different cities in India. MAUSAM 73(4), 887–898. https://metnet.imd.gov.in/docs/mausamdocs/173412_F.pdf
- Central Water Commission (1984). Flood Estimation Report for Upper Indo-Ganga Plains Subzone 1(e), approved at the 40th meeting of the Planning and Co-ordination Committee, 23–24 Jul 1984 (Plates 9 and 10, the short-duration ratio table; read from the Wayback Machine capture of the cwc.gov.in copy; design-office report number not on the scanned pages [TBC]). https://cwc.gov.in/regional-flood-estimation-report
- Central Water Commission (1985). Flood Estimation Report for Middle Ganga Plains Subzone 1(f), Report No. GP/10/1984, Oct 1985, approved at the 41st meeting of the Planning and Co-ordination Committee, 30 Jan 1985 (Plates 8 and 9, the SUH relationships, p. 32, the short-duration ratio table, p. 43, and Fig. 10, whose 2-, 4- and 5-hour ratios were read from an OCR and not checked against the page image [TBC]; Wayback Machine capture of the cwc.gov.in copy). https://cwc.gov.in/regional-flood-estimation-report
- Central Water Commission (1989). Flood Estimation Report for Betwa Subzone 1(c), Report No. B/17/1989, Jun 1989 (Plates 10 and 11, the SUH relationships and the short-duration ratios, and Table T-2 of IMD's daily falls of 300 mm and more; Wayback Machine capture of 12 Apr 2016; the year of approval is illegible on the scan, and the qp relation is printed in terms of L/S, without the root sign that the other reports use [TBC]). https://cwc.gov.in/regional-flood-estimation-report
- Central Water Commission (1988). Flood Estimation Report for Chambal Subzone 1(b), Report No. C/16/1988, Dec 1988 (the SUH relationships and the short-duration ratios; Wayback Machine capture of 12 Apr 2016; the coefficient of the qp relation is printed as 1.251 in the table and 1.215 in the text [TBC]). https://cwc.gov.in/regional-flood-estimation-report
- Central Water Commission. Flood Estimation Report for Sone Subzone 1(d) (not found on the CWC website or in the Wayback Machine index for this Manual [TBC]).
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A.
- Kathuria, S.N., Kaur, S. & Mehra, A.K. (1987). Rainfall intensity for local drainage design in Lucknow and its neighbouring area. MAUSAM 38(1), 85–88 (Tables 2–4). https://mausamjournal.imd.gov.in/index.php/MAUSAM/article/download/2654/2468
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012), stations of Uttar Pradesh. https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- India Meteorological Department (2022, 2023). Press releases of 15, 16 and 17 Sep 2022 and 11 Sep 2023 (heavy rainfall over Uttar Pradesh). https://internal.imd.gov.in/press_release/20220915_pr_1821.pdf ; https://internal.imd.gov.in/press_release/20220916_pr_1823.pdf ; https://internal.imd.gov.in/press_release/20230911_pr_2523.pdf
- India Meteorological Department, Meteorological Centre Lucknow (2024, 2025). Southwest Monsoon Report 2024 for Uttar Pradesh; Southwest Monsoon Report 2025 for Uttar Pradesh. https://mausam.imd.gov.in/lucknow/mcdata/monsoon.pdf ; https://mausam.imd.gov.in/lucknow/mcdata/swreport.pdf
- India Meteorological Department, Meteorological Centre Lucknow. Climatological tables (normals 1991–2020) for Agra, Bahraich, Bareilly, Gorakhpur, Jhansi, Lucknow, Meerut, Prayagraj and Varanasi (BHU). https://mausam.imd.gov.in/lucknow/mcdata/rainfall.pdf
- National Institute of Hydrology, Roorkee. NIH-DHAARA IDF Curve Tool (IMDAA reanalysis), queried at 14 cells in Uttar Pradesh on 6 Nov 2026. http://117.252.14.251:8080/
- Urban Development Department, Government of Uttar Pradesh (2024). Urban Flood/Waterlogging Control and Storm Water Drainage Scheme: Guidelines, Dec 2024, §1.1 and the DPR checklist, items 2.14 and 2.26. https://urbandevelopment.up.nic.in/assets-new/pdf/Storm%20water/FINAL%20SWD%20GUIDELINE%2024-12-2024%20Designed%20Hindi_R2.pdf
- Agra Smart City Ltd. Improvements to Taj East Drain, Detailed Project Report, Chapter 9 (Tables 9 and 10). https://agrasmartcity.in/pdf/wc13581914%20Improvements%20to%20Taj%20East%20Drain.pdf
- Central Ground Water Board, Northern Region (2024). Submission on behalf of CGWA in NGT O.A. 594/2024 (groundwater levels in Lucknow city). https://www.greentribunal.gov.in/sites/default/files/news_updates/Documents%20on%20behalf%20of%20CGWA%20in%20OA%20ON%20594%20of%202024%20(NEWS%20ITEM%20TITLED%20LUCKNOW%20ME%20PAANEE%20CHALA%20RASATAL%2010%20SAAL%20ME%20160%20FOOT%20NEECHE%20CHALA%20GAYA%20JALSTAR%20MEL%20RAHE%20KHATARNAK%20SANKET_0.pdf
- Central Ground Water Board. State profile, Uttar Pradesh (hydrogeological units; seen only through a search summary). https://cgwb.gov.in/old_website/State-Profiles/Uttar%20pradesh.pdf
- Rajya Sabha (2021). Unstarred Question 837, 9 Feb 2021 (rainfall trends by State, 1989–2018; seen only through a search summary). https://rsdebate.nic.in/bitstream/123456789/717555/1/PQ_253_09022021_U837_p153_p164.pdf
- Ministry of Environment, Forest and Climate Change. State Action Plan on Climate Change, Uttar Pradesh (state profile summary). https://napccindia.moef.gov.in/sapcc/state/uttar-pradesh
- ISET-International and CDKN (2014). Gorakhpur: Extreme Rainfall, Climate Change, and Flooding, technical report (landing-page summary read). https://cdkn.org/resource/gorakhpur-extreme-rainfall-technical-report
- Shashi Kant (2018). Trend and variability of hourly intensity of rainfall over eastern and northern part of Uttar Pradesh during 1969–2014. MAUSAM 69(4) (metadata only). https://doi.org/10.54302/mausam.v69i4.422
- Ali, H. & Mishra, V. (2018). Increase in subdaily precipitation extremes in India under 1.5 and 2.0 °C warming worlds. Geophysical Research Letters 45. https://repository.ias.ac.in/142345
- SANDRP (2018, updated 2019). Overview of CWC Flood Forecasting Sites 2018: North India (compiled from CWC site data; secondary source). https://sandrp.in/2018/08/03/overview-of-cwc-flood-forecasting-sites-north-india/
- Press reports of the Lucknow rain of September 2021, the Gorakhpur rain of October 2021, the Ganga floods of August 2025 and the Hindon flood of July 2023 (secondary sources). https://www.pressreader.com/india/hindustan-times-lucknow/20210917/281496459415986 ; https://www.dailypioneer.com/2021/india/gorakhpur-records-highest-october-rainfall-in-100-years.html ; https://www.businesstoday.in/india/story/flooding-in-13-up-districts-ganga-flows-above-danger-mark-in-varanasi-mirzapur-ghazipur-ballia-487669-2025-08-04 ; https://sandrp.in/2023/08/03/rivers-breaching-highest-flood-levels-in-july-2023/
- Chow, V.T., Maidment, D.R. & Mays, L.W. (1988). Applied Hydrology. McGraw-Hill (alternating-block method, §14.4).
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Mile High Flood District (Denver). Urban Storm Drainage Criteria Manual (90% release rationale).
- Department of Irrigation and Drainage Malaysia (2008, 2012). Urban Stormwater Management Manual (MSMA).
Annexes
| Annex | Content |
|---|---|
| 2A | NIH-DHAARA vs IMD station and IMD gridded checks at benchmark points; zone map |
| 2B | Sub-daily ratios P(t)/P(24h) by zone: NIH-DHAARA (hourly-based) vs the one-third rule |
| 2C | Grid-to-point factors |
| 2D | Uttar Pradesh temporal patterns (Huff curves) |
| 2E | Retention percentile depths by zone |
| Form 2-1 | Design Rainfall Sheet |
Commentary. Most past drainage failures in Uttar Pradesh trace to the rainfall input, not the hydraulics. Uttar Pradesh shows how. The State's own guideline records that urban drains are "usually designed for a 1–2 year" return period and that no integrated plan for urban drainage exists (UDD, 2024), and no city has published an approved design storm. The guideline asks each DPR for an IDF curve from 25–30 years of IMD autographic rainfall, but the one storm-drain DPR read for this Manual, for the Taj East Drain in Agra, built its IDF from daily maxima by the one-third rule and adopted a 2-year intensity of 28.20 mm/h, from a series whose printed annual totals include 22.5–38.6 mm in several years and a one-day maximum of 500 mm in a year of 500.5 mm, against an IMD annual normal of 693.6 mm and a station record day of 286.0 mm (IMD). The two published sources that seem to fill the gap do not. IMD Das et al. (2022) has no panel for any station in the State, and NIH-DHAARA's reanalysis-based depths are too high in the terai and too low at Prayagraj, Varanasi and Noida, and low at 1 hour everywhere (Clause 2.3.6). The CWC ratios, the only regional sub-daily source, also understate the short storms of the one station with a published fit, Lucknow, the opposite of their error on the coast. Fixing one transparent source and method for the whole state is the main purpose of this chapter.