Chapter 5Downstream and Tailwater Analysis
5.1 Purpose and scope
5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.
- The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
- The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.
5.1.2 This chapter applies to:
- (a) every site to which Chapter 4 applies;
- (b) every minor- and major-system drainage project under Chapter 6; and
- (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.
5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.
5.1.4 No tidal outfalls in Uttar Pradesh. Uttar Pradesh is landlocked: it has no coast, no tide and no Coastal Regulation Zone. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Uttar Pradesh: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Uttar Pradesh the receiving water is a river, reached directly, through a gate in an embankment or through a pumping station; a drain or canal of I&WRD; a nala of a Nagar Nigam, a development authority or another drain-owning body; a pumped sump behind a river embankment; or a tal or other water body, and:
- (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
- (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
- (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a river or by a receiving drain, with the river lock of Clause 5.8.5(a) in place of the tidal lock windows.
5.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Analysis point | A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3). |
| Contributing catchment | The whole area draining to an analysis point, on and off site. |
| Major drain | A channel listed as a major drain in the basin plan or Annex 5B, or any river, I&WRD canal, the Kukrail and the other nalas that outfall to the Gomti in Lucknow, including the Qila Mohammadi nala, the nalas that outfall to the Ganga at Kanpur, including the Sisamau nala, the nalas that outfall to the Ganga and the Yamuna at Prayagraj, the Varuna and the Assi at Varanasi, the Taj East Drain and the other nalas that outfall to the Yamuna at Agra and Mathura, the Hindon and the drains that outfall to it or to the Yamuna in Ghaziabad and Noida, the nalas that outfall to the Rapti and the Rohin at Gorakhpur and the six inflow nalas of Ramgarh Tal, any drain of I&WRD, any drain maintained by a Nagar Nigam, a development authority, an industrial development authority or UP Jal Nigam with an internal width of 1.0 m or more, any irrigation canal that receives storm water, or a tidal creek. |
| Chart datum (CD) | The datum of the published tide tables and nautical charts, to which tidal heights are referred. |
| Mean sea level (MSL) | Average sea level over a long period at a tide gauge. |
| MHWS | Mean high water springs: the average of high waters at spring tides. |
| HAT | Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years). |
| Storm surge | The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones. |
| Still-water level | Astronomical tide plus surge, excluding individual waves. |
| Sea-level allowance (SLA) | The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4). |
| Tailwater | The water level at the downstream end of a drain, outlet or storage. |
| Tide-lock | The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge. |
| Lock window | A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero. |
| Sand bar | A bar of beach sand that partly or fully closes a river mouth or creek inlet. |
| Project datum | The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2). |
5.3 Extent of the downstream analysis
5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:
- (a) the point at which the project area is 10% or less of the contributing catchment;
- (b) the next tank, tal or other waterbody with a surplus weir or controlled outlet; or
- (c) the next major drain, or the sea.
The end point itself shall be analysed (Figure 5.1).
5.3.2 Where the analysis ends at a tank or tal under 5.3.1(b), it shall report:
- the change in the tank's maximum water level; and
- the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.
If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.
5.3.3 Analysis points shall be set at least at:
- (a) each site outfall;
- (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
- (c) each culvert, bridge or road crossing;
- (d) each location recorded as flood-prone by the local body, LMC, UPSDMA or I&WRD; and
- (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.
5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:
- the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
- no flood-prone location is recorded within 500 m downstream; and
- the site does not drain to a tidal or backwater-affected outfall.
Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next tal or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).
Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Uttar Pradesh. In Lucknow, where 33 of the city's 34 drains end in the Gomti and the Kukrail alone gathers about 75 drains on its way to the river (as reported), and in Gorakhpur, where six named nalas and the other streams of the city end in Ramgarh Tal (Ramgarh Taal wetland notification, 2020), the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.
5.4 What the analysis must check
5.4.1 Scenarios. Each analysis shall compare:
- (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
- (b) With project: the same, with the project and all its controls (Chapter 4) in place.
Where the Authority's basin plan defines future land use, the Authority may also require:
- (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.
5.4.2 Quantities to be checked at every analysis point:
- (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
- (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
- (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
- (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
- (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.
5.4.3 Storms. The analysis shall use:
- 50%, 10% and 1% AEP;
- the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
- the 24-, 48- and 72-hour storms in every case.
The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.
5.4.4 Method. The analysis shall:
- use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
- include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
- not use the Rational Method at any analysis point, because it cannot represent timing.
Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.
5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.
Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the river-locked cities of Uttar Pradesh, whose outfalls lie behind embankments or below the highest flood levels of the rivers they drain to, and where the rivers stand high for days: the reported highest flood levels are 1–3.3 m above the danger levels (the Gomti at Lucknow 110.85 m against 109.5 m; the Ganga at Phaphamau, Prayagraj, 87.98 m against 84.734 m), roads and railways around Gorakhpur were cut for more than 72 hours in the Rapti flood of August 1998, and the Hindon at Noida rose 1.81 m above its old highest flood level on 26 July 2023 (all as reported). Detention that prolongs releases can lengthen that time even when it lowers the peak.
5.5 Acceptance criteria
5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":
- (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
- (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
- (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
- (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
- (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.
5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.
5.5.3 Where the criteria are not met, the project shall do one or more of the following:
- (a) reduce release rates or increase storage (Chapter 4);
- (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
- (c) contribute to a regional facility under Clause 4.13; or
- (d) under Clause 5.5.4, change the release strategy.
5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:
- (a) the varied strategy meets 5.5.1;
- (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
- (c) the outfall-closed check (Clause 5.10) is met.
Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.
5.6 Tailwater: general and non-tidal outfalls
5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.
5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:
- for a receiving pipe, its obvert; or
- for a receiving open drain, its full-bank level less freeboard (Chapter 6).
5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.
5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.
5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.
5.7 Tidal tailwater: datums, surge and sea-level allowance
5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:
Table 5.1 — Design tailwater levels for tidal outfalls
| Design case | Tailwater |
|---|---|
| Minor-system design (Chapter 6) | MHWS + SLA |
| Major-system design and storage design | HAT + surge + SLA, with the surge term defined in Clause 5.7.3 |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA |
The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.
5.7.2 Sources and datums.
- (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
- (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
- (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Uttar Pradesh, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
- (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.
5.7.3 Storm surge.
- (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
- (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
- (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
- (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.
5.7.4 Sea-level allowance. The SLA shall be:
- (a) +0.3 m minimum for every element;
- (b) greater than 0.3 m where the State, LDA or the Authority adopts a higher projection for the planning area; and
- (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.
Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.
Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:
- MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
- MHWS to HAT for a major storm; and
- "Effect of climate change: additional 0.3 m".
CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Uttar Pradesh has no coast, and the surge term does not arise in the State.
Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Uttar Pradesh, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).
5.8 Riverine backwater
5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:
- the Gomti through Lucknow, between its embankments, with the Gomti barrage, the Kukrail confluence, and the gated and pumped outfalls of the city's drains, including the Kukrail and Wazirganj pumping stations (Clause 5.8.5(a) and (b));
- the Ganga and the Yamuna at Prayagraj, from Phaphamau on the Ganga and Naini on the Yamuna to and below the Sangam, and the outfalls of the drains that discharge to either river there (Clause 5.8.5(c));
- the Ganga at Kanpur, and at Varanasi with the Varuna and the Assi and the outfalls to them, which are under the Ganga's backwater when it is high (Clause 5.8.5(d));
- the Hindon through Ghaziabad and Noida to its confluence with the Yamuna, and the Yamuna along Noida below the Okhla barrage, with the releases of Hathnikund (Clauses 5.8.3 and 5.8.5(e));
- the Yamuna at Agra and Mathura, including the outfall of the Taj East Drain (Clause 5.8.5(a));
- the Rapti and the Rohin at Gorakhpur, with the embanked city behind them, its pumped outfalls and Ramgarh Tal (Clause 5.8.5(f));
- any drain or canal of I&WRD, and any irrigation canal that receives storm water (Clause 5.8.5(g)); and
- elsewhere: any river or I&WRD channel listed in Annex 5B.
5.8.2 River levels. River water levels shall be taken from:
- (a) I&WRD design flood levels or recorded highest flood levels for the reach, where published; or
- (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
- the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
- the tidal boundary of Clause 5.7 at the mouth; and
- the sand-bar condition of Clause 5.13.
5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Hathnikund barrage on the Yamuna in Haryana, whose releases reach Noida through Delhi, the Okhla barrage at the head of the Yamuna's reach past Noida, and the Gomti barrage in Lucknow), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.
5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:
- (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
- (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).
The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.
5.8.5 River-locked outfalls, the Gomti through Lucknow, the Sangam reach at Prayagraj, the Ganga at Kanpur and Varanasi, the Hindon and the Yamuna at Noida and Ghaziabad, the Rapti at Gorakhpur, and discharges to I&WRD drains and irrigation canals.
- (a) River-locked outfalls. For an outfall to a river directly, through a gate or sluice in an embankment or through a pumping station, or into a drain that itself discharges in one of those ways, the designer shall identify the body that operates each gate, sluice and pumping station, and obtain the sill of each gate, the crest of the embankment, the installed pumping capacity and the operating levels. Every level shall state its datum and its connection to the gauge datum of the nearest CWC or I&WRD gauge.
- Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the 1% AEP river level at the outfall: the 1-in-100-year flood level on which I&WRD has notified the floodplain of the reach, where it gives a level at the outfall, or a level from a hydraulic model under Clause 5.8.2(b). It shall in no case be less than the highest recorded level at the nearest CWC or I&WRD gauge on the same river, transferred to the outfall. The reported highest levels (Table 5B.1) are: the Gomti at Lucknow (Hanuman Setu) 110.85 m (11 September 1971); the Ganga at Kanpur 114.08 m (29 September 2010); the Ganga at Phaphamau 87.98 m and the Yamuna at Naini 87.99 m (8 September 1978), at Prayagraj; the Ganga at Varanasi 73.901 m (9 September 1978); the Yamuna at Agra 154.76 m (9 September 1978; 154.87 m is reported for the Poiyaghat gauge at Agra) and at Mathura 169.73 m (8 September 1978); the Rapti at Birdghat, Gorakhpur, 77.54 m (23 August 1998); and the Hindon at Noida 197.28 m (26 July 2023). Where two values are reported for the same gauge, the higher applies until CWC confirms the level [TBC]. The recorded level shall be transferred along the river with the water-surface slope of the flood that set it, from the CWC and I&WRD gauge records, or from the model. Until either is available, the recorded level of the nearest gauge upstream applies unchanged at the outfall, and an outfall upstream of every gauge on its reach shall not be designed without a profile [TBC]. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or a frequency analysis of the gauge record, and not less than the danger level at the nearest gauge, transferred in the same way: 109.5 m on the Gomti at Lucknow, 114.0 m at Kanpur, 84.734 m at Phaphamau and 84.73 m at Naini, 71.262 m at Varanasi, 152.4 m at Agra, 166.0 m at Mathura and 74.98 m at Birdghat (as reported); no danger level was found for the Hindon gauge at Noida [TBC] (all set by this Manual).
- Tailwater. The tailwater at the outfall shall be the higher of that river level beyond the gate or embankment, and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, encroachment and vegetation, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the gate only while the river is lower than the level behind it. Pumps shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level (Clause 5.12.5).
- River lock. Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the outfall invert, taken from the river model or from the stage record of the nearest CWC or I&WRD gauge in the flood that set the highest recorded level (1971 for the Gomti, 1978 for the Ganga below Kanpur and the Yamuna, 2010 for the Ganga at Kanpur, 1998 for the Rapti and 2023 for the Hindon) or in a comparable flood, and not less than 7 days (168 hours), covering the whole of the 48- and 72-hour storms of Clause 5.10.2, so that storage and pumping handle the full storm volume (Clause 5.9.4) and the drawdown of Clause 5.10.5 is met by pumping until the lock ends (set by this Manual). A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where a gauge analysis under Clause 5.10.6 shows it and the Authority approves it. Floor levels and pumped outfalls behind a gate or embankment shall also be checked for the failure of the gate and for a breach of the embankment, with the land and drains behind it filled to the river level beyond it.
- (b) The Gomti through Lucknow. For an outfall to the Gomti in Lucknow, or to a drain that ends in it:
- the outfalls inside the embankments shall be taken as river-locked under item (a), with the pumping stations behind them, such as those at Kukrail and Wazirganj, credited only with the pumps that the operator confirms in writing are working, and the pumping stations proposed by LDA, or any other that is not commissioned, not counted;
- the river level shall take the Gomti barrage's gates as operated in the largest recorded event, and not assume that any gate opens fully or early unless the operator's records show it, until I&WRD publishes an operating rule for the barrage [TBC];
- an outfall to the Kukrail, or to another tributary that joins the Gomti in the city, shall take as tailwater the higher of the tributary's own level and the Gomti level at the confluence, carried up the tributary as a level surface until a model of both gives the profile; and
- the conflict between the reported levels of the Gomti at Lucknow (danger 109.5 m and highest flood level 110.85 m in one compilation of CWC data; warning 108.50 m and a "normal high flood level" of 108.81 m in another report) shall be resolved from CWC records before a design is approved, and until then the higher values govern [TBC].
- (c) The Sangam reach at Prayagraj. For an outfall to the Ganga or the Yamuna at Prayagraj, the river level shall be the higher of the two rivers' levels at the outfall, with both rivers in flood together as they were on 8 September 1978, when the Ganga at Phaphamau and the Yamuna at Naini set their highest recorded levels on the same day, unless a model of the confluence shows a lower coincident level. An outfall above the confluence on either river shall include the backwater of the other. Interception and treatment works at an outfall, such as the geotube units on the drains to the rivers, shall be included in the routing of item (a) as obstructions, at their present condition (Clause 8.9.5).
- (d) The Ganga at Kanpur and Varanasi. For an outfall to the Ganga at Kanpur or Varanasi, the river level shall be that of item (a). An outfall to the Varuna or the Assi at Varanasi, or to another tributary that joins the Ganga in a city, shall take as tailwater the higher of the tributary's own level and the Ganga level at the confluence, carried up the tributary as a level surface until a model of both gives the profile (set by this Manual).
- (e) The Hindon and the Yamuna at Noida and Ghaziabad. For an outfall to the Hindon, to the Yamuna along Noida, or to a drain that ends in either:
- the major-system river level on the Hindon shall be not less than 197.28 m at the Noida gauge (26 July 2023), transferred under item (a), and not less than the 100-year flood level that I&WRD has computed for the reach (196.367–205.390 m between its km 0 and km 49, and 205.20 m at km 110). Those levels were derived from discharge data from 1973, and the floodplain of the Hindon had not been demarcated when research was done, so where they lie below the recorded level, the recorded level governs;
- the Yamuna level along Noida shall include the releases of Clause 5.8.3 from the Hathnikund barrage in Haryana, routed through Delhi, and the flow of the catchment below it, combined as they occurred in the largest recorded event, and the Okhla barrage, which is reported to be operated by I&WRD, shall be taken with its gates as operated in that event, and not assumed to open fully unless the operator's records show it, until an operating rule is published [TBC];
- an outfall to the Hindon near its confluence shall include the backwater of the Yamuna, and an outfall to the Yamuna near the confluence the inflow of the Hindon, as they occurred together in the largest recorded event; and
- drains that enter Uttar Pradesh from Delhi carry flow from beyond the State boundary, which shall be taken as the largest recorded inflow until the owner publishes a design inflow; they were not researched for this Manual [TBC].
- (f) The Rapti at Gorakhpur. Behind the embankments of the Rapti and the Rohin, an outfall to a drain that is pumped or gated to the river shall have as tailwater the routed level of the drain and its sump under item (a), with the permanent pumps less the largest one and no portable pumps. Mobile pumping from one drain into another shall not be counted, and a project's pumped discharge into another drain shall be included in that drain's level (Clause 5.12.3). No storage shall be credited in Ramgarh Tal, or in any other tal or low ground behind the embankments, unless the operator's records show the storage available at the start of a storm; an outflow control for the Tal was not found during research [TBC], and any hydrological intervention in the notified wetland needs the permission of the UP State Wetland Authority (Chapter 7). Floor levels and pumped outfalls behind the embankments shall also be checked for a breach of the embankment under item (a).
- (g) I&WRD drains and irrigation canals. Storm water shall not be discharged to a drain or canal of I&WRD, or to another irrigation canal, without the consent of I&WRD or of the channel's owner. Where consent is given:
- the discharge shall not exceed the rate the consent allows;
- the tailwater is the higher of the channel's design water level as I&WRD or the owner states it and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives, including the nalas of other bodies, and with its downstream boundary at the river level of item (a); until I&WRD publishes a design water level for a channel, the computed level governs [TBC];
- the channel shall be taken in its present condition, net of silt, encroachment and obstruction by crossing services, and a widening, remodelling or diversion that has been proposed but not completed, including the works of an Integrated Urban Storm Water Drainage Master Plan or a scheme DPR that are not yet built, shall not be counted; and
- the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert.
No pump, gate, sluice or barrage operation that helps drainage, such as pumping a drain down before a storm, closing a gate late or opening barrage gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain or the river (Clause 5.12.3).
Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Uttar Pradesh's rivers break that assumption. The Gomti is a plains river whose whole basin lies in the State, so the monsoon systems that flood Lucknow also raise the river through the city: its highest recorded level at Lucknow, 110.85 m, was set on 11 September 1971 in a September flood (as reported), and Lucknow received 20 cm in 24 hours on 15–16 September 2022 and 14 cm on 10–11 September 2023 (IMD). The Ganga and the Yamuna bring water from far upstream, but the same monsoon spells fall on the cities they pass: in September 1978 the two rivers set their highest recorded levels at Mathura and Prayagraj on 8 September and at Agra and Varanasi on 9 September (as reported), and they stay high for days. Gorakhpur received 20 cm in 24 hours on 14–15 September 2022 (IMD), and the Rapti, whose catchment extends into Nepal, rises with the same monsoon systems. The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.
Clause 5.8.3 reflects the barrages above and within the State's cities. The Yamuna reaches Noida below the Hathnikund barrage in Haryana, whose releases are reported to take about 48–50 hours to reach Delhi, and below the Okhla barrage, which is reported to be controlled by Uttar Pradesh (press reports, 2025). In Lucknow the Gomti passes the Gomti barrage and the Lakshman Mela regulator. No published operating rule or release record was found during research for the Gomti barrage, the Lakshman Mela regulator or the Okhla barrage, and the CWC hourly stage records at Lucknow, Kanpur, Prayagraj, Varanasi, Agra, Birdghat and Noida, and the I&WRD flood-control orders, were not obtained [TBC]. Until they are, the largest recorded release applies, with the flow of the catchment below the barrage as it occurred in the same event (Clause 5.8.5(e)), and the danger and highest flood levels used in this Manual are those of a compilation of CWC site data and press reports, to be confirmed from CWC [TBC].
Clause 5.8.5 is set by this Manual. In Uttar Pradesh the tailwater at a city outfall is set not by the tide but by a river that stands high for days, by an embankment and its gates, by a barrage, or by a pump behind an embankment, and no document found during research gives a design river level for any of them. The UDD guideline (Dec 2024) comes closest: its DPR checklist requires pumps that remain operable above the high flood level, and separate pumping arrangements where the outfall invert lies below the normal river level or between the normal river level and the high flood level (UDD, 2024), but it does not say which flood level, at which gauge, or for how long.
The first is the river lock. Clause 5.8.5(a) asks for a 1% AEP level, which is the return period on which I&WRD now notifies floodplains, by coordinates, under the River Ganga Authorities Order 2016: the Ganga from Unnao to Ballia (G.O. of 29 January 2025) and the Yamuna (January 2025, as reported); the Hindon had not been demarcated (I&WRD, 2025 and 2026). Until a level is available at the outfall, the highest recorded level is the floor. The reported levels come from a compilation of CWC site data (SANDRP, 2018), because the CWC pages could not be read during research, and some historical highest flood levels are reported to rest on local recollection rather than gauge records (SANDRP, 2026), so every value is to be confirmed from CWC [TBC]. The floor is not an estimate of the 1% AEP level, which may be higher: the Hindon at Noida set a new record of 197.28 m on 26 July 2023, 1.81 m above its old highest flood level (SANDRP, 2023), which is also why item (e) lets the recorded level override I&WRD's 100-year levels where they are lower. For the Gomti at Lucknow the sources conflict, 109.5 m and 110.85 m for the danger and highest flood levels in the CWC compilation against 108.50 m and 108.81 m in a press report, so the higher values are used until CWC settles it. Carrying a gauge level unchanged downstream is conservative, because the river falls downstream; upstream of the gauge it would not be, so an outfall upstream of every gauge needs a profile. The danger level is used as the floor of the 10% AEP river level because the highest recorded levels stand 1–3.3 m above the danger levels and the rivers have crossed their danger levels in many recent years, the Ganga at Varanasi in August 2022 and August 2025 and the Rapti at Birdghat in 2020, when it reached 77.27 m, 2.3 m above danger (as reported), so a level reached about once in ten years is unlikely to lie below it; it is to be replaced by a frequency analysis of the CWC record [TBC].
A river flood also lasts. No hourly hydrograph for any gauge in the State was obtained during research [TBC]. In the Rapti flood of August 1998, roads and railways around Gorakhpur were cut for more than 72 hours (as reported); upstream of Noida, the Yamuna at Delhi was reported still near its danger level on 24 July 2023, eleven days after its record peak (press reports); and a river that peaks 1–3 m above its danger level must fall all of that before an outfall set at the danger level can open. A tide lock opens again within hours; a river lock lasts as long as the flood. The single lock of at least 7 days is therefore a floor, to be lengthened from the gauge record of the flood that set the highest recorded level on each river. It also covers the whole design storm, so that a site behind an embankment stores or pumps its whole storm, which is what Clause 5.9.4 already requires when the tailwater stays above the outfall. It counts only the permanent pumps less the largest one, for the same reason that Clause 5.12.2(b) requires a standby pump; portable pumps brought in for an event are not a design capacity. The gate-failure and embankment-breach checks follow Gorakhpur in 1998, when the embankments in the district were reported breached in 13 places.
The second is Lucknow. The Gomti runs between embankments through the city, and the outfalls inside them are pumped when it is high; an inspection found only half the pumps at the Kukrail pumping station working and none at Wazirganj (as reported; undated). LDA has proposed 12 more pumping stations between IIM Road and Kisan Path (press reports), which is why item (b) counts only commissioned pumps that the operator confirms. No pumping-station inventory or capacity, and no operating rule for the Gomti barrage or the Lakshman Mela regulator, was found [TBC]. The Kukrail, which the Supreme Court in May 2024 treated as a river with a floodplain rather than as a nala (press reports), joins the Gomti within the city, and its outfalls are under the Gomti's backwater when the river is high.
The third is the confluences. At Prayagraj the Ganga at Phaphamau and the Yamuna at Naini set their highest recorded levels, 87.98 m and 87.99 m, on the same day in 1978 (SANDRP, 2018), so item (c) takes them as coincident. At Varanasi the Varuna and the Assi are expected to outfall under the Ganga's backwater whenever the river is high, although no record of their levels was found [TBC], and item (d) carries the Ganga level up each tributary until a model gives the profile. At Noida the Hindon meets the Yamuna below the Okhla barrage, which is reported to be operated by Uttar Pradesh although it lies in Delhi (press report, July 2025), and the Yamuna brings the releases of Hathnikund in Haryana, which take about 48–50 hours to reach Delhi (press reports).
The fourth is Gorakhpur. The city lies behind the embankments of the Rapti and the Rohin, and Ramgarh Tal, a notified wetland of 742.245 ha with six named inflow nalas (Ramgarh Taal wetland notification, 2020), lies within it. The Rapti at Birdghat reached 77.54 m in 1998 and 77.27 m in 2020 (as reported), and wards such as Mehewa flood "after relatively small amounts of rain" (ISET/CDKN, 2014, as summarised). Item (f) treats the city as a polder, with an embankment that can breach, counts no mobile pump, and gives the Tal no storage credit unless records show it, because no outflow control for it was found.
The fifth is the drain that another body owns. No rule dividing the natural drains of I&WRD from the nalas of the Nagar Nigams was found during research (Chapter 6, Clause 6.9). I&WRD runs the embankments, canals and flood works, while the UDD guideline makes the Nagar Nigam the regulator of the city's drainage master plan (UDD, 2024). In Lucknow, a tender of 2026 was reported for diverting the Geetapalli nala to the Haider canal (as reported), which would make the canal's level the nala's tailwater. No I&WRD design water level was found for any drain or canal, and no Integrated Urban Storm Water Drainage Master Plan had been approved. Item (g) asks for the owner's consent and design water level and, until the level is published, computes it from the channel's present condition, without counting works that are not built.
5.9 Joint-probability cases
5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.
Table 5.2 — Joint-probability cases for tidal and riverine outfalls
| Case | Rainfall | Tailwater | Applies to | Basis |
|---|---|---|---|---|
| J1 | Minor-system design AEP, Tc to 24 h | MHWS + SLA (tidal curve) | Minor system | Clause 2.12(a); Clause 5.7.1 |
| J2 | 1% AEP, all durations of Clause 2.5.2 | HAT + surge + SLA | Major system, detention, tanks, pumped systems | Clause 5.7.1 |
| J3 | 10% AEP, 48 h | 1% AEP still-water level + SLA | Major system, detention, tanks, pumped systems | Clause 2.12(b) |
| J4 | Design AEP, 48 h (72 h reported) | Tidal curve per J1 with two 6 h lock windows (Clause 5.10) | All storage and every gated or tide-affected outfall | Clause 5.10 |
| R1 | Site design AEP | River at 10% AEP level | Riverine outfalls | Clause 5.8.4(a) |
| R2 | Site 10% AEP | River at design-AEP level | Riverine outfalls | Clause 5.8.4(b) |
5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).
5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.
5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.
Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.
5.10 Outfall-closed (tide-locked) storage check
5.10.1 Where it applies. The check applies to:
- every storage facility;
- every minor- and major-system element; and
- every pumped system
whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).
5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:
- the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
- AMC III.
The 72-hour storm shall also be run and reported.
5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:
- (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
- (b) During each lock window, gravity discharge is zero.
- (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
- (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.
5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:
- (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
- (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
- (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.
In volume terms, over each lock window and the full storm:
V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)
This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).
5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).
5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:
- sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
- the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.
Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.
Commentary. The outfall-closed check is the distinctive Uttar Pradesh requirement in this Manual. In Uttar Pradesh it applies where an outfall is shut not by the tide but by a river. The outfalls of Lucknow's drains inside the Gomti embankments are pumped when the river is high, and an inspection is reported to have found only half the pumps at the Kukrail pumping station working and all the pumps at Wazirganj out of order (as reported; undated). Behind the embankments of the Rapti, roads and railways around Gorakhpur were cut for more than 72 hours in August 1998 (as reported). A river flood lasts for days, not hours, which is why Clause 5.8.5(a) replaces the two 6-hour windows described below with a single lock of at least 7 days. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.
The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.
Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.
5.11 Flap gates, tide gates and non-return valves
5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.
5.11.2 Hydraulics. The design shall include:
- the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
- the reduction in effective outfall capacity when the gate is partly open.
Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.
5.11.3 Construction.
- (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
- (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
- (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
- (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
- (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.
5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:
- the major-system tailwater (J2) at the point of connection; or
- the maximum stage in the outfall-closed check (Clause 5.10).
Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.
5.11.5 Inspection. Gates and valves shall be inspected and operated:
- before 15 June each year;
- after every event in which they closed against a storm flow; and
- as set in the maintenance plan (Chapter 10).
Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Uttar Pradesh the outfalls do not cross a beach, but the gates and pumps on the outfalls through the river embankments are the cities' defence against the rivers, and the rivers carry silt in flood. An inspection of Lucknow's pumping stations on the Gomti is reported to have found that "at Kukrail pumping station, only half the pumps … working … in Wazirganj, all pumps were non-functional" (as reported; undated), and in the Rapti flood of August 1998 the embankments in Gorakhpur district were reported breached in 13 places. The outfall gates are usually on I&WRD embankments, while the drains and pumps behind them belong to the Nagar Nigam, a development authority or UP Jal Nigam, so a gate and the pumps behind it can belong to different bodies. The 15 June inspection date is set ahead of the SW monsoon.
5.12 Pumped outfalls
5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:
- the outfall-closed check of Clause 5.10;
- the drawdown requirement of Clause 4.7; or
- the J2 and J3 cases.
Pumping shall not be used where a gravity solution meets these requirements.
5.12.2 Capacity.
- (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
- (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
- (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.
5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.
5.12.4 Power supply. Pumping stations shall have either:
- two independent power supplies; or
- standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.
Changeover shall be automatic.
5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:
- the 1% AEP flood level + 0.5 m; and
- HAT + surge + SLA + 0.5 m.
Access to the station shall remain usable in the 1% AEP event.
5.12.6 Discharge arrangement. Rising mains shall discharge:
- over a level above the J2 tailwater; or
- through a non-return valve and a flap gate.
The arrangement shall prevent back-siphoning.
5.12.7 Controls and monitoring. Each station shall have:
- automatic level control;
- remote alarms for high level, pump failure and power failure, sent to the operator; and
- a level and run-time log kept for at least 5 years.
Wet wells shall be sized to keep pump starts within the manufacturer's limits.
5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).
5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 15 June each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).
Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.
5.13 Sand-bar closure of river mouths
5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Uttar Pradesh: Clause 5.1.4), and any other mouth listed in Annex 5B.
5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless I&WRD certifies that:
- a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
- the programme is funded for the current season.
5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:
- (a) the tidal tailwater of Clause 5.7; and
- (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.
5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless I&WRD has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.
5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.
Commentary. Uttar Pradesh has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are silt and a tal. Silt deposited by a river in flood at a drain's outfall can hold a flap gate shut or open, and a tal whose outlet is uncontrolled or obstructed, such as Ramgarh Tal at Gorakhpur, whose outflow control was not found during research [TBC], limits what can leave the nalas that end in it. Clause 5.8.5 deals with both by giving no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.
5.14 Documentation
Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:
- a plan of the analysis extent showing:
- the site;
- each analysis point with its contributing catchment area and the site's percentage of it; and
- the end point and the reason it was chosen (Clause 5.3);
- the model description:
- software and version;
- the network schematic, with survey sources for the drains and crossings;
- land use and CN for off-site areas;
- any upstream detention included; and
- calibration or validation evidence where available;
- for each analysis point, AEP and duration, the existing and with-project:
- peak flow;
- time to peak;
- maximum water level and velocity; and
- duration of inundation (Clause 5.4);
- the comparison against Clause 5.5, with each failure identified and the remedy adopted;
- the tailwater derivation:
- tide-table edition and port;
- MHWS, HAT and MSL relative to chart datum;
- the datum connection to the Survey of India benchmark and the project datum;
- surge source and value;
- SLA; and
- river levels and their sources (Clauses 5.6 to 5.8);
- the joint-case table of Clause 5.9 with results;
- the outfall-closed check (Clause 5.10):
- storm and lock alignment;
- stage hydrographs; and
- the volume balance for each lock window;
- a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
- pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
- the sand-bar assumption and supporting I&WRD certification, where relevant (Clause 5.13); and
- inspection and maintenance requirements for Chapter 10.
Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §6.3.6 and Table 6.2 (coastal tailwater; +0.3 m climate allowance). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- MoHUA / CPHEEO (2013). Manual on Sewerage and Sewage Treatment Systems (pumping stations).
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.5, ten-percent downstream analysis). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Vol. 1 (Standard #8) and Vol. 2 §3.1.9. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- MARC. The Evolution of Regional Stormwater Design Standards. https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- Urban Development Department, Government of Uttar Pradesh (2024). Urban Flood/Waterlogging Control and Storm Water Drainage Scheme: Guidelines (in Hindi), file dated 24 December 2024 (no integrated urban drainage plan; DPR checklist: pumps operable above the high flood level, separate pumping where the outfall invert is below the normal river level or between it and the high flood level). https://urbandevelopment.up.nic.in/assets-new/pdf/Storm%20water/FINAL%20SWD%20GUIDELINE%2024-12-2024%20Designed%20Hindi_R2.pdf
- Irrigation and Water Resources Department, Government of Uttar Pradesh. G.O. No. 24/2025/107/2025-27-Sin-4-16(Writ)(NGT)/2023, 29 January 2025 (Ganga floodplain zone, Unnao to Ballia, on the 100-year return period flood), annexed to the Department's report of 2 April 2025 in NGT O.A. 341/2022, Deepak Awasthi v. State of U.P. https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20IRRIGATION%20DEPARTMENT,%20UP%20IN%20OA%20NO.%20341%20of%202022%20%20Deepak%20Awasthi%20Vs.%20State%20of%20U.P..pdf
- Irrigation and Water Resources Department, Government of Uttar Pradesh. Progress report of 23 May 2026 in NGT O.A. 569/2023, Alok Kumar v. Union of India (Hindon: discharge data since 1973; 100-year flood levels by chainage; demarcation pending). https://www.greentribunal.gov.in/sites/default/files/news_updates/Progress%20Report%20By%20Irrigation%20Department,%20State%20of%20Uttar%20Pradesh%20DATED%2023-05-2026%20in%20OA%20569%20of%202023%20Alok%20Kumar%20Vs%20UOI%20and%20Ors.pdf
- Government of Uttar Pradesh. Notification No. 1397/LXXXI-4-2020-06-2018, 7 December 2020, Ramgarh Taal Wetland, district Gorakhpur (742.245 ha; inflow nalas; prohibited and regulated activities), as annexed to CPCB's response in NGT O.A. 1057/2024. https://www.greentribunal.gov.in/sites/default/files/news_updates/RESPONSE%20BY%20R-3%20CPCB%20IN%20OA%20NO.%201057%20of%202024%20Sudhir%20Kumar%20Jha%20Vs%20Gorakhpur%20Development%20Authority%20Through%20ChiefSecretary.pdf
- SANDRP (2018, updated 2019). Overview of CWC Flood Forecasting Sites 2018: North India (warning, danger and highest flood levels, compiled from CWC). https://sandrp.in/2018/08/03/overview-of-cwc-flood-forecasting-sites-north-india/
- SANDRP (2023). Rivers breaching highest flood levels in July 2023 (the Hindon at Noida, 197.28 m). https://sandrp.in/2023/08/03/rivers-breaching-highest-flood-levels-in-july-2023/
- India Meteorological Department. Press releases of 15 and 16 September 2022 and 11 September 2023 (24-hour rainfall at Gorakhpur and Lucknow). https://internal.imd.gov.in/press_release/20220915_pr_1821.pdf ; https://internal.imd.gov.in/press_release/20220916_pr_1823.pdf ; https://internal.imd.gov.in/press_release/20230911_pr_2523.pdf
- ISET-International / CDKN (2014). Gorakhpur: Extreme Rainfall, Climate Change, and Flooding (landing-page summary). https://cdkn.org/resource/gorakhpur-extreme-rainfall-technical-report
- Press reports on the Rapti flood of August 1998 at Gorakhpur (Down To Earth, "Waters of woe"), https://www.downtoearth.org.in/news/waters-of-woe-22412 ; on the Hindon flood of July 2023 at Noida (The Tribune), https://www.tribuneindia.com/news/delhi/about-350-cars-at-ola-dump-yard-submerged-by-overflowing-hindon-529226 ; on the Yamuna near its danger level at Delhi on 24 July 2023 (Business Standard/PTI), https://business-standard.com/amp/india-news/yamuna-s-water-level-in-delhi-declines-marginally-old-railway-bridge-shut-123072400776_1.html ; on the Hathnikund travel time (PTI via The Week, 1 September 2025), https://www.theweek.in/wire-updates/national/2025/09/01/des22-dl-yamuna-level.html ; on control of the Okhla barrage (PTI via The Week, 23 July 2025), https://www.theweek.in/wire-updates/national/2025/07/23/des48-dl-ito-barrage.html ; on the Ganga above its danger level at Varanasi and Prayagraj in August 2025 (Business Today), https://www.businesstoday.in/india/story/flooding-in-13-up-districts-ganga-flows-above-danger-mark-in-varanasi-mirzapur-ghazipur-ballia-487669-2025-08-04 ; and on the Akbar Nagar demolitions on the Kukrail floodplain (LiveLaw, May 2024), https://www.livelaw.in/top-stories/supreme-court-lucknow-akbarnagar-demolitions-eviction-upheld-slum-dwellers-alternative-accommodation-257604
- Survey of India. Tidal Predictions: Geodetic and Research Branch. https://www.geographyandyou.com/survey-of-india/tidal-predictions-geodetic-and-research-branch-survey-of-india
- GLOSS. India national report (tide-gauge network and datums). https://gloss-sealevel.org/gloss/gloss/sites/gloss/files/publications/documents/india_ge9.pdf
- Adani Ports (2025). Tide Table 2025, Dahej (notes on NHO INP-12 coverage and data sources). https://www.adaniports.com/-/media/Project/Ports/PortsAndTerminals/Dahej-Port/Marine-Documents/Tide-Table-2025-Dahej.pdf
- INCOIS. Storm-surge and swell-surge warning services. https://incois.gov.in/
- FHWA. HEC-22 Urban Drainage Design Manual (current edition), Table 7.3 (coincident frequencies).
- Purdue University JTRP (2023). Development of a Multiple Water Course Joint Probability Analysis Procedure for Indiana Watersheds, FHWA/IN/JTRP-2023/09. https://docs.lib.purdue.edu/jtrp/1820
- PUB Singapore (2025). Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3. https://info.corenet.gov.sg/docs/default-source/pub-circulars/pub-circular_cop-7th-ed-addendum-no-3_16-apr-2025.pdf?sfvrsn=5a2c1e1a_2
Annexes and forms
| Annex / Form | Content |
|---|---|
| 5A | Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment |
| 5B | Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map |
| 5C | Worked example: outfall-closed check for a site behind the Gomti embankment in Lucknow |
| Form 5-1 | Downstream and Tailwater Report |
| Form 5-2 | Simplified Downstream Statement (small sites) |
Commentary. The drains of Uttar Pradesh's large cities fail in places that site design does not see, because almost every one of those cities stands on a river that decides when its drains can discharge. Lucknow lies on both banks of the Gomti, which runs between embankments through the city: 33 of the city's 34 drains outfall to the river, and the outfalls inside the embankments are pumped when it is high (as reported). Kanpur, Prayagraj and Varanasi stand on the Ganga, and Prayagraj also on the Yamuna at the Sangam; Agra and Mathura stand on the Yamuna, Gorakhpur behind the embankments of the Rapti and the Rohin, and Noida and Ghaziabad on the Hindon and the Yamuna. The reported highest flood levels at the CWC gauges of these cities stand 1–3.3 m above their danger levels, and in July 2023 the Hindon at Noida rose 1.81 m above its old highest flood level (as reported), so an outfall set below the highest flood level is closed by the river for days, not hours. The outfalls also belong to one body while the drains above them belong to others: the embankments are I&WRD's, while the nalas and the pumps behind them are those of the Nagar Nigam, a development authority or UP Jal Nigam. The UDD guideline (Dec 2024) states that "currently there is no integrated plan for urban drainage" in the State's urban areas, and its DPR checklist requires pumps to remain operable above the high flood level and a separate pumping arrangement wherever the outfall invert lies below the normal river level, or between the normal river level and the high flood level (UDD, 2024). No document found during research sets a design river level for any outfall. A detention basin that meets every release rate in Chapter 4 still fails if the drain below it is already full, or if the river it drains to stands above its outfall for days. This chapter makes both failure modes part of the design. Uttar Pradesh has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.