Chapter 1Policy, Applicability and Adoption
1.1 Purpose and objectives
1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Uttar Pradesh. It applies to private development and to public works, as set out in Clause 1.5.
1.1.2 The Manual has the following objectives:
- (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
- (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
- (c) to size storage for the long-duration south-west monsoon storms of July–September, brought by monsoon depressions, which fall on ground and water tables raised by weeks of rain and often on rivers already in flood, as well as for short-duration intensities;
- (d) to design outfalls for the stage of the rivers into which the cities drain, the Gomti at Lucknow, the Ganga at Kanpur, Prayagraj and Varanasi, the Yamuna at Agra and Prayagraj, the Rapti at Gorakhpur and the Hindon at Ghaziabad and Noida, which closes the gates on outfalls through the river embankments and leaves the land behind them to be drained by pumping, and the levels of the nalas and tals into which local drains discharge, including the case where the outfall is closed;
- (e) to protect tanks (tals), marshes, rivers, supply channels and surplus courses as part of the drainage system;
- (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
- (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
- (h) to make sure that facilities, once built, are maintained and remain effective.
1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building bye-laws approved by the Government under section 57 of the Uttar Pradesh Urban Planning and Development Act, 1973 and issued by each development authority in its own name (the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).
1.2 Stormwater management hierarchy
1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.
- Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
- Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
- Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
- Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).
1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.
1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.
Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).
Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Uttar Pradesh, the top layer has a particular meaning. Much of the State's flood storage lies in its tals, ponds and jheels, which the law already protects more strongly than any other water feature. Under the Uttar Pradesh Revenue Code, 2006 the beds of nalas, ponds and tanks vest in the State, a village tank of 0.5 acre or less "shall be reserved for public use", and "tank" includes "talab, pond, pokhar and other land covered with water" (ss.54 and 61); no bhumidhari right accrues in land "covered by a pond, tank or lake, or forming part of an embankment, bandh or bhita" (s.77(1)(i)); and the Supreme Court has held that where a pond exists "and the area covered by it varies in rainy season … no part of it could have been allotted", and directed the State to restore it (Hinch Lal Tiwari v. Kamala Devi, 2001). The rest of the storage lies in the khadar floodplains of the Ganga, the Yamuna, the Gomti, the Rapti and the Hindon, which the State now notifies river by river on the line of the 1-in-100-year flood, and in wetlands such as Ramgarh Tal at Gorakhpur, notified in 2020 over 742.245 ha with a zone of influence of 50 m and its six inflow nalas. The Byelaws 2025 make construction on ponds, reservoirs, rivers and drains recorded in a plan or in the revenue records a non-compoundable offence (cl. 16.3.2(xi)), and the UDD guideline asks city drainage master plans to use existing ponds and lakes as detention and to rejuvenate them (UDD, 2024). Losing that storage cannot be offset economically by pipes and pumps.
1.3 Legal basis and status
1.3.1 Notification. This Manual shall be given statutory effect by the Government of Uttar Pradesh through:
- (a) an amendment to the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
- (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.
1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.
1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.
1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.
Commentary. Uttar Pradesh has one set of building rules for the development authorities and a separate set for the industrial authorities. The Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025 and the Model Zoning Regulations 2025 were approved by the Government in the Housing and Urban Planning Department by G.O. No. 1323/2025/8-3099/208/2025 of July 2025, under sections 57 and 13(2) of the Uttar Pradesh Urban Planning and Development Act, 1973, superseding the bye-laws of 2008 and 19 other G.O.s; each development authority issues them in its own name (cl. 1.1), and where the Hindi and English versions differ the English prevails (cl. 1.4). An amendment of 21 November 2025 changed only clauses on township policy and risk-based approval and has no drainage content (as reported). Noida, the Greater Noida Industrial Development Authority (GNIDA) and the Yamuna Expressway Industrial Development Authority (YEIDA), constituted under the Uttar Pradesh Industrial Area Development Act, 1976, were not addressed by the G.O. and keep their own building regulations of 2010, which were not read for this Manual [TBC]. The Byelaws 2025 set no design storm, return period, release rate or detention volume, no "zero runoff" rule, and no setback in metres from a nala or a tal. They make rooftop rainwater harvesting mandatory on plots of 300 m² and more where the scheme has no collective recharge network, "except waterlogged areas" (cl. 13.1.2); require layouts of more than 4 ha to build recharge reservoirs on at least 1% of the scheme area, no more than 2 m deep; set a minimum plinth of 0.30 m above the surrounding ground (cl. 3.3.1.21); require only that surface water does not enter a basement (cl. 3.3.3.2(iv)); permit only repair and renovation within 200 m of the bank of the Ganga (cl. 2.11); make construction on recorded ponds and drains non-compoundable (cl. 16.3.2(xi)); give 3, 5 or 7% extra FAR for green-rated buildings (cl. 9.3); and, for projects of 20,000 m² of built-up area and more, require the natural drainage to be kept and allow "Check dams, bio-swales, landscape, and other sustainable urban drainage systems (SUDS)" (cl. 13.3). In Uttar Pradesh the route of Clause 1.3.1(a) therefore runs through the Housing and Urban Planning Department, which approved the Byelaws 2025 by G.O. and would approve an amendment in the same way for each development authority to issue, and through Noida, GNIDA and YEIDA, which would amend their own regulations. This Manual is a draft; neither the Government nor any authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.
1.4 Definitions
1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).
| Term | Meaning in this Manual |
|---|---|
| Approving Authority (the Authority) | The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the development authority or special area development authority in its development area, under its own edition of the Byelaws 2025; the controlling authority of a regulated area; Noida, the Greater Noida Industrial Development Authority (GNIDA), the Yamuna Expressway Industrial Development Authority (YEIDA) or UPSIDA in its industrial development area, under its own building regulations; or, where it grants building or layout permission, the Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat concerned, or a department for its own works. |
| Applicant | The owner, developer or department that seeks approval, and its successors in title. |
| Development | Any building, layout, sub-division, road, paving or land-use change that requires approval under the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025 or that is executed as a public work. |
| Redevelopment | Development on a site where impervious cover already exists. |
| Land disturbance | Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5). |
| Impervious area | Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats. |
| New or replaced impervious area | Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced". |
| Retention | Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4). |
| Detention | Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4). |
| Rainwater harvesting (RWH) | Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it. |
| Minor system | Drains, pipes and inlets designed for the minor-system AEP of Chapter 6. |
| Major system | The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6). |
| Pre-development condition | Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3). |
| Flood-sensitive catchment | The catchments of the drains of Lucknow that outfall to the Gomti through pumping stations, gates or regulators in its embankments, including the Kukrail; the city of Gorakhpur behind the Rapti and Rohin embankments, including the catchments of Ramgarh Tal and the Goddhoia nala; the catchments of the drains of Prayagraj that outfall to the Ganga and the Yamuna near their confluence; and the low-lying land of Ghaziabad and Gautam Buddh Nagar (Noida) beside the Hindon, and any catchment the Authority notifies (Chapter 4; Annex 1B). |
| Waterbody | A river, stream, canal, tank (tal), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7). |
| Regional facility | A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4). |
| Tier A / Tier B authority | An Approving Authority classed under Clause 1.6. |
| Policy supplement | The set of adoptable alternative clauses in Clause 1.7 and Annex 1C. |
| Drainage report | The preliminary or final report required by Chapter 10. |
| Registered professional | A person registered under the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6. |
| Compliance calculator | The State-issued tool for computing and reporting compliance (Clause 10.5). |
| Maintenance declaration | The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10). |
| Variance | Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10). |
| Waiver | Approval that a requirement does not apply to a site, on the grounds in Clause 1.10. |
| Notified | Published by the Government or the State Stormwater Technical Committee in the Uttar Pradesh Gazette. |
Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).
1.5 Applicability
1.5.1 Who is covered. This Manual applies to:
- (a) all development requiring planning permission, building permit or layout approval under the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025;
- (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
- (c) works executed by Central agencies or their contractors within Uttar Pradesh, to the extent that the Authority's approval or no-objection is required.
1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:
- (a) land disturbance of 0.1 ha or more; or
- (b) new or replaced impervious area of 500 m² or more.
1.5.3 RWH. The existing RWH mandate continues to apply under clause 13.1.2 of the Byelaws 2025 to every plot of 300 m² and more, of all uses including group housing, where the scheme has no collective recharge network, except in waterlogged areas, where roof water may be stored but not recharged; to plots of 100–300 m² in new schemes through the scheme's collective recharge network; and to layouts of more than 4 ha through recharge reservoirs on at least 1% of the scheme area; through the stipulations for rooftop rainwater harvesting that section 31(2) of the Uttar Pradesh Ground Water (Management and Regulation) Act, 2019 makes binding on every agency that sanctions building plans, with a combined recharge system for group housing and colonies; and, in the Noida, Greater Noida and YEIDA areas, under their own building regulations [TBC], as now. This Manual does not change it.
1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:
- (a) no sewage connection to a storm drain (Chapter 8);
- (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
- (c) waterbody setbacks and the no-fill zone (Chapter 7); and
- (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).
1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.
1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.
1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.
1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:
- (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
- (b) linear road resurfacing that adds no impervious area.
Exempt development remains subject to the RWH mandate and to Clause 1.5.4.
1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.
Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.
Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:
- Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
- Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
- The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
- MBBL 2016 makes recharge mandatory for buildings over 500 m².
The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Uttar Pradesh plots are small and the cumulative effect of many small plots is what fills Lucknow's drains. For small buildings in Uttar Pradesh, the Byelaws 2025 require rooftop rainwater harvesting only on plots of 300 m² and more; plots of 100–300 m² in new schemes rely on the scheme's collective recharge network (cl. 13.1.2). A press report says the Chief Minister directed in October 2025 that rainwater harvesting be mandatory on buildings of more than 100 m², but no G.O. giving effect to it was found [TBC], and it is not treated as law here. The Byelaws set a minimum plinth of 0.30 m above the surrounding ground (cl. 3.3.1.21), not above the road or above a flood level; they allow a basement ceiling 0.9–1.2 m above the adjacent road and require only that surface water does not enter it (cl. 3.3.3.2(iv)), and they do not bar basements in low-lying or flood-prone areas. Since November 2025 small residential buildings of up to 100 m² are approved as low-risk on self-certification (as reported). Clause 1.5.4(b) applies to every building whatever its size for this reason.
Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.
1.6 Tiered adoption
1.6.1 Tier A authorities. The following are Tier A:
- (a) the Lucknow Municipal Corporation (LMC);
- (b) every Approving Authority within the development area of LDA or of any other development authority constituted under the Uttar Pradesh Urban Planning and Development Act, 1973, as those areas are notified from time to time, including the development authorities themselves where they are the Approving Authority, and the Nagar Nigams, Nagar Palika Parishads and Nagar Panchayats in those areas; and
- (c) Noida, GNIDA and YEIDA, constituted under the Uttar Pradesh Industrial Area Development Act, 1976, and UPSIDA, in their industrial development areas, and every other Nagar Nigam constituted under the Uttar Pradesh Municipal Corporations Act, 1959, as constituted from time to time.
1.6.2 Tier B authorities. All other Nagar Palika Parishads and Nagar Panchayats are Tier B.
1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:
Table 1.1 — Differences between Tier A and Tier B authorities
| Item | Tier A | Tier B |
|---|---|---|
| Performance criteria (Chapters 2–9) | Apply in full | Apply in full |
| Hydrologic method for storage | Hydrograph method (Chapter 3) | Hydrograph method, or the design-aid route of Clause 1.7 where eligible |
| Compliance calculator (Clause 10.5) | Required as a summary | Required; may be the sole calculation on the design-aid route |
| Policy supplement alternatives (Clause 1.7) | Only with State Stormwater Technical Committee concurrence | May be adopted by council resolution |
| Technical review | By the Authority | By the Authority, with TCPD regional support or an empanelled reviewer (Clause 10.7) |
| Flood-sensitive catchment rule | Applies | Applies |
1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the development area of a development authority constituted under the Uttar Pradesh Urban Planning and Development Act, 1973, or an industrial development area under the Uttar Pradesh Industrial Area Development Act, 1976, or is found by a post-event review (Clause 10.16) to need the full methods.
1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.
Commentary. Lucknow Municipal Corporation (Nagar Nigam Lucknow), with its engineering wing, its Jal Kal Vibhag and a city of 34 drains, 33 of which outfall to the Gomti (as reported to the NGT), and a small Nagar Panchayat with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Lucknow.
1.7 Policy supplement: adoptable alternatives
1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.
1.7.2 The alternatives are:
Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5
| No. | Main-text requirement | Adoptable alternative | Eligibility |
|---|---|---|---|
| S-1 | Storage sized by hydrograph method (Chapter 3) | Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator | Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1) |
| S-2 | Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site | Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule | Any site outside flood-sensitive catchments |
| S-3 | Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) | Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 | Waterbodies with no mapped 1% AEP extent |
| S-4 | Downstream analysis by hydraulic model (Chapter 5) | Screening checklist of downstream capacity and known flooding, with a model only where the screen fails | Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall |
| S-5 | On-site detention | Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) | Where a basin plan has been notified |
1.7.3 Conditions on adoption.
- (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
- (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
- (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
- (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
- (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).
Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.
1.8 Relationship with other instruments
1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.
Table 1.3 — Relationship with other instruments
| Instrument | Relationship |
|---|---|
| Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025 and Model Zoning Regulations 2025, approved by G.O. No. 1323/2025/8-3099/208/2025 of July 2025 under sections 57 and 13(2) of the Uttar Pradesh Urban Planning and Development Act, 1973, issued by each development authority in its own name, and amended on 21 November 2025 | Continue. They supersede the bye-laws of 2008, which are not cited as current. They require site and layout plans to show "any water body, flood affected areas" and nalas, with contours at 0.3 m where the slope is steeper than 1:20 (cl. 2.3.2); drains to be "an integral part of the road" with sufficient slope (cl. 3.1.3.5) and road margins and pathways to be as unpaved or perforated as possible "to ensure maximum groundwater recharge" (cl. 3.1.3.6); parks to have no more than 5% concrete (cl. 13.1.2); a minimum plinth of 0.30 m (cl. 3.3.1.21); basements that keep out surface water (cl. 3.3.3.2(iv)); only repair and renovation within 200 m of the bank of the Ganga, with drainage there "not released directly into the river" (cl. 2.11); and, for projects of 20,000 m² of built-up area and more, the natural drainage kept, no construction on wetlands and water bodies, and SUDS allowed (cl. 13.3). Construction on ponds, reservoirs, rivers and drains identified in a plan or recorded in the revenue records is not compoundable (cl. 16.3.2(xi)). They set no design storm, release rate, detention volume or setback in metres from a nala or a tal. The design criteria of Chapters 2–6 and the hydraulic corridor and setbacks of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the Byelaws 2025 or a Master Plan or Zonal Plan are stricter, they govern (Clause 1.3.3). |
| Rainwater harvesting: Byelaws 2025, cl. 13.1.2 and the environmental conditions for large projects; Uttar Pradesh Ground Water (Management and Regulation) Act, 2019, ss.31(2) and 39(4) | Continue unchanged. Rooftop rainwater harvesting is mandatory on plots of 300 m² and more of all uses, including group housing, where the scheme has no collective recharge network, "except waterlogged areas", where roof water may be stored but "Ground water recharging system should not be adopted"; plots of 100–300 m² in new schemes may rely on the scheme's collective network; layouts of more than 4 ha build recharge reservoirs on at least 1% of the scheme area, no more than 2 m deep, fed only by surface runoff (cl. 13.1.2); and projects of 20,000 m² of built-up area and more provide at least one recharge bore per 5,000 m² of built-up area, keep recharge to the shallow aquifer, and keep at least 20% of the open space pervious. Section 31(2) of the Act makes the rooftop harvesting stipulations that the Municipal Water Management Committee imposes binding on every agency that sanctions building plans, and makes a combined recharge system for group housing and colonies mandatory; s.39(4) penalises an owner who fails to install it. A direction of the Chief Minister of October 2025 to extend harvesting to buildings of more than 100 m² is reported in the press, but no G.O. was found [TBC]. None of these gives an outlet rule or a storage that is empty when a storm arrives. RWH storage is not detention unless it is a dedicated empty-on-arrival volume with an outlet, and tanks are assumed full at the start of SW monsoon storms (Chapter 4). Recharge structures may count toward retention where they meet Chapters 4 and 8. |
| Uttar Pradesh Urban Planning and Development Act, 1973 | The development authorities constituted under section 4 of the Act prepare the Master Plans and Zonal Plans (section 13), approve and enforce development in their development areas under the Byelaws 2025 (section 57), and act on the Government's directions (section 41). This Manual does not decide zoning. |
| Uttar Pradesh Industrial Area Development Act, 1976; the building regulations of Noida, GNIDA and YEIDA (2010) | Noida, GNIDA and YEIDA approve buildings and layouts in their industrial development areas under their own regulations, and UPSIDA in its industrial areas [TBC]. Their drainage, rainwater harvesting and floodplain provisions were not read for this Manual [TBC]. Clause 1.3.1(a) applies to them as to the Byelaws 2025. |
| Uttar Pradesh Municipal Corporations Act, 1959 (Chapter 10, sections 228–249) and Uttar Pradesh Municipalities Act, 1916 (Chapter 7, sections 189–194) | The Nagar Nigams, Nagar Palika Parishads and Nagar Panchayats build and maintain the drains in their areas. The UDD guideline cites these chapters as the basis of urban drainage and directs that all agencies carry out drainage works in conformity with the approved IUSWDMP, regulated by the Nagar Nigam under them (UDD, 2024); their sections were not read for this Manual [TBC]. No rule dividing the natural drains of I&WRD from the municipal nalas was found (Clause 1.9). |
| Uttar Pradesh Water Supply and Sewerage Act, 1975; division of UP Jal Nigam into UP Jal Nigam (Urban) and UP Jal Nigam (Rural) by Gazette notification No. 1770/9-3-21-05lh/2021 of 9 September 2021 | UP Jal Nigam builds sewerage and the interception and diversion of drains ("tapping"); its Construction and Design Services wing prepares the IUSWDMPs; the Jal Kal departments of the Nagar Nigams run the city systems. Most city nalas carry sewage, and the State's main remedy has been to intercept them at the outfall under Namami Gange: before the Kumbh of 2025, 39 of the 81 drains to the Ganga and the Yamuna at Prayagraj were untapped, and 22 of them were treated with geotubes; 28 of 45 drains to the Gomti at Lucknow are untapped or partly tapped; and the Sisamau nala at Kanpur was tapped in 2018 (all as reported). The interception of dry-weather flow under Chapter 8 (Clause 8.9) applies until the connections are removed. |
| Uttar Pradesh Ground Water (Management and Regulation) Act, 2019 (U.P. Act No. 13 of 2019) | Continues. Section 28 bars the direct recharge of rain water, other than from rooftops, "falling on open land, ground, roads (paved/unpaved), agricultural farms" into the aquifers "through recharge well, bore well, recharge shaft, injection well etc."; section 33 makes the prevention of "potential water logging" a duty of the Appropriate Authorities; and section 9 provides for over-exploited and critical blocks and "stressed urban areas" to be notified. Lucknow city is classed as over-exploited, with pre-monsoon water levels of 7.65–45.6 m below ground in 2023 (CGWB). Under Chapters 4 and 8, runoff from roads and open land is sent to surface systems and not to recharge wells or shafts, and infiltration is refused on waterlogged land and where the water table is within the separation of Chapter 8. |
| Uttar Pradesh Revenue Code, 2006, ss.54, 59, 61, 67 and 77; Hinch Lal Tiwari v. Kamala Devi (Supreme Court, 2001) | Continue. The beds of rivers, streams, nalas, lakes, ponds and tanks vest in the State (s.54); a village tank of 0.5 acre or less "shall be reserved for public use", and "tank" includes "talab, pond, pokhar and other land covered with water" (s.61); wrongful occupation is met by eviction and compensation (s.67); and no bhumidhari right accrues in land covered by a pond, tank or lake or forming part of an embankment (s.77(1)(i)). The Supreme Court held that where a pond's area "varies in rainy season … no part of it could have been allotted" and directed the State to "restore the pond" (2001), and the Allahabad High Court has used the revenue record of 1 July 1952 as the baseline for restoring ponds (as reported). No setback in metres around a pond or tal was found; the setbacks of Chapter 7 are this Manual's proposal. Where the Code or a court order is wider, it governs (Clause 1.3.3). |
| River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016, cl. 3(l), 6(3) and 42; floodplain zones notified by I&WRD: the Ganga from Unnao to Ballia (13 districts, G.O. of 29 January 2025) and the Yamuna (17 districts, January 2025, as reported) | Continue. The Order defines the floodplain by "a flood of frequency once in hundred years", bars structures in the active floodplain of the Ganga and its tributaries, and requires the prior approval of NMCG for embankments and channelisation in it (as quoted by I&WRD and NMCG). I&WRD notifies the zones by coordinates. The Hindon in Ghaziabad and Gautam Buddh Nagar is not yet demarcated; its 100-year flood level is 205.39 m at km 49 and 205.20 m at km 110 (I&WRD, 2026). An amendment of the Order in 2026 is reported to define the active floodplain by the 5-year flood, with regulatory and warning zones to the 25- and 100-year floods; its text was not read [TBC]. Court lines also apply: no construction within 500 m of the mid-stream of the Ganga at Prayagraj (Allahabad High Court, 2011), "HFL + 500 m" along the Yamuna as applied by the Prayagraj Development Authority, and along the Gomti at Lucknow 100 m (High Court, Lucknow bench, 2010) or 50 m (Irrigation order, 2020), both as reported. Where the 1% AEP extent of Chapter 7 is mapped and wider, it governs. |
| Wetlands (Conservation and Management) Rules, 2017; UP State Wetland Authority; notification of Ramgarh Tal, Gorakhpur, 7 December 2020 | Continue. The Rules bar construction of a permanent nature, except boat jetties, "within fifty metres from the mean high flood level" of a notified wetland. Ramgarh Tal was notified over 742.245 ha with a zone of influence of 50 m and its six inflow nalas, and may not be used as a "Sink for treated and untreated sewage"; hydrological interventions there need the permission of the UP State Wetland Authority on the recommendation of the District Wetland Committee. Other wetlands are reported to have been notified since [TBC]. Where a notification is wider than the setback of Chapter 7, it governs (Clause 1.3.3). |
| UDD guideline for the Urban Flood/Waterlogging Control and Storm Water Drainage Scheme (December 2024) | Continues. IUSWDMPs and DPRs under the scheme follow the CPHEEO Manual of 2019, which sets national minimum return periods and allows a State committee to adopt higher ones (Clause 1.3.2). This Manual can serve those plans and DPRs as a technical companion: it supplies the design storm (Chapter 2), detention (Chapter 4), tailwater (Chapter 5) and buffer (Chapter 7) values that the guideline does not set, and the master-plan method of Chapter 11. It has not been adopted by UDD. |
| Disaster Management Act, 2005, s.41 (and s.41A, inserted in December 2024, as cited by UDD); flood control rooms of I&WRD; UPSDMA | Continue. I&WRD runs its flood control rooms from 15 June to 15 October and completes flood-protection works by 15 June (as reported). No urban flood plan or SOP of UPSDMA was found [TBC]. Chapter 10 links its pre-monsoon checks to these dates. |
| CPHEEO Manual on Storm Water Drainage Systems (2019) | Engineering reference. This Manual sets higher return periods under Clause 1.3.2. |
| NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) | This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF. |
| NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 | Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create. |
| IRC:SP:42-2014 and IRC:SP:50-2013 | Apply to road drainage only where they do not conflict with Chapter 6. |
| MBBL 2016, Chapter 9 | Model for RWH and for the inspection regime in Chapter 10. |
Commentary. RWH in Uttar Pradesh is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a July to September monsoon depression arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.
Uttar Pradesh is planning to spend on drainage. The UDD's Urban Flood/Waterlogging Control and Storm Water Drainage Scheme had ₹1,000 crore in 2024-25, ₹100 crore of it for master plans. Its guideline of December 2024 makes an approved Integrated Urban Storm Water Drainage Master Plan (IUSWDMP), prepared by catchment by the Construction and Design Services (C&DS) of UP Jal Nigam (Urban) "as per the CPHEEO Manual on Storm Water Drainage System (Aug-2019)" and approved by a State Level Apex Committee chaired by the Chief Secretary, the basis for funding; makes all Nagar Nigams eligible first; and asks each DPR for 25–30 years of IMD autographic rainfall analysed into an IDF curve, and for pumps that can operate above the high flood level (UDD, 2024). It records that existing drains are usually designed for a 1–2-year storm, but it sets no design return period of its own, no detention rule and no buffer. No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.
The State's law already holds many of the tools. It protects ponds and tanks through the Revenue Code and Hinch Lal Tiwari; notifies the floodplains of the Ganga and the Yamuna on the 1-in-100-year flood; makes building on recorded ponds and drains non-compoundable and limits building within 200 m of the Ganga (Byelaws 2025); makes rooftop rainwater harvesting binding on every agency that sanctions building plans, bars the direct recharge of runoff from roads and open land through wells and shafts, and makes the prevention of waterlogging a duty (Uttar Pradesh Ground Water (Management and Regulation) Act, 2019, ss.31(2), 28 and 33). What it lacks is a design standard. None of these instruments says how large a drain must be, which storm it must carry, how wide the reserve along a nala or around a tal should be, or how much storage a filled pond or a paved plot removes. This Manual is offered as a technical companion to the UDD guideline and to these instruments: it supplies the design storm, detention and buffer numbers they do not set, as a proposal for the Government and the authorities to consider. Neither UDD nor any other body has adopted it.
1.9 Roles and responsibilities
1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.
Table 1.4 — Roles and responsibilities under this Manual
| Agency | Role under this Manual |
|---|---|
| Housing and Urban Planning Department, with the TCPD (Town and Country Planning Department, headed by the Chief Town and Country Planner) | Approves the building bye-laws and zoning regulations of the development authorities under the 1973 Act, as it did the Byelaws 2025, and directs the authorities under section 41. Would approve the amendment of Clause 1.3.1(a) for each development authority to issue, and give regional support to Tier B authorities (Table 1.1). Maintains the empanelled reviewer list (Clause 10.7). |
| Urban Development Department (UDD) and the Directorate of Local Bodies | Oversee the Nagar Nigams, Nagar Palika Parishads and Nagar Panchayats, and run the Urban Flood/Waterlogging Control and Storm Water Drainage Scheme: appraisal of IUSWDMPs and DPRs, the project management unit and third-party review (UDD, 2024). Would issue the model ULB bye-law of Clause 1.3.1(b) and require compliance in the drainage works of the local bodies. |
| State Stormwater Technical Committee (Clause 1.3.2) | Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12). How it would relate to the State Level Apex Committee of the UDD scheme, which approves IUSWDMPs, is for the Government to decide. |
| Nagar Nigams, with their Jal Kal departments; Nagar Palika Parishads and Nagar Panchayats | Build and maintain the drains in their areas and grant building permission where they are the Approving Authority. Under the UDD guideline the Nagar Nigam regulates drainage works by all agencies in its city against the approved IUSWDMP. LMC's Jal Kal Vibhag reported 34 drains in Lucknow, 33 of which join the Gomti (as reported to the NGT). Would apply this Manual to their works, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15). |
| Development authorities constituted under the 1973 Act, such as LDA, and the special area development authorities | Approving Authorities in their development areas; prepare the Master Plans and Zonal Plans; build and hold the drains of their schemes until they are handed to the Nagar Nigam. LDA is reported to propose 12 more pumping stations along the embanked Gomti (as reported). Would show flood-sensitive catchments, drain reserves and regional facility sites in their plans. |
| Industrial development authorities: Noida, GNIDA and YEIDA under the 1976 Act, and UPSIDA | Approving Authorities in their industrial development areas under their own regulations; hold the drains of those areas. Would amend their regulations under Clause 1.3.1(a) and apply this Manual to their works. |
| Irrigation and Water Resources Department (I&WRD) | Holds the rivers, embankments, regulators, canals and the drains of the canal commands; computes the 1-in-100-year flood and notifies the floodplain zones by coordinates; runs the flood control rooms from 15 June to 15 October. Its divisions include the Flood Works Division at Prayagraj and the Irrigation Construction Division at Ghaziabad for the Hindon. Would provide design river levels and the regulator and pump operating rules for Chapter 5, and consent to outfalls into its rivers and drains. |
| UP Jal Nigam (Urban) and UP Jal Nigam (Rural) | Sewerage and the interception and diversion of drains; Jal Nigam (Rural) executes Namami Gange projects under the policy of 2021, and the Construction and Design Services of Jal Nigam (Urban) prepare the IUSWDMPs. Would design interception works that keep the storm capacity of the nala (Chapter 8) and apply this Manual in the IUSWDMPs. |
| UP Ground Water Department and the Municipal Water Management Committees | Administer the Uttar Pradesh Ground Water (Management and Regulation) Act, 2019; the Committees impose the rooftop harvesting stipulations under section 31(2). The Department's NOC is among those listed for building permission in the Byelaws 2025. Would supply groundwater levels for the infiltration checks of Chapters 4 and 8. |
| Uttar Pradesh Pollution Control Board (UPPCB) | Monitors the quality of the drains and rivers and consents to sewage treatment works; a respondent in the floodplain and drain cases before the NGT. Supports the removal of sewage from storm drains (Chapter 8). |
| State Mission for Clean Ganga (SMCG) and the National Mission for Clean Ganga (NMCG) | Plan and fund the interception of drains and sewage treatment under Namami Gange; NMCG's prior approval is needed for embankments and channelisation in the Ganga floodplain under the 2016 Order, and a Gomti task force under NMCG includes I&WRD, UPPCB, Jal Nigam, LMC and LDA (as reported). Would be consulted on outfalls in the Ganga basin. |
| UP State Wetland Authority and the District Wetland Committees | Keep the list of wetlands notified under the Wetlands Rules 2017, such as Ramgarh Tal, and permit regulated activities in their zones of influence (Chapter 7). |
| UPSDMA and the District Disaster Management Authorities | Approve the State and district disaster management plans. Would recommend flood-sensitive catchments, hold the record of flood-prone locations with the District Magistrates, and lead the post-event review (Clause 10.16). No urban flood SOP of UPSDMA was found [TBC]. |
| Revenue Department: the District Magistrates, the Sub-Divisional Officers and the tehsil offices | Keep the revenue records and village maps in which ponds, tanks, nalas and embankments are recorded and vest in the State or the Gram Panchayat (Revenue Code, ss.54 and 61); evict encroachments (s.67); lead flood relief. Would certify the recorded extent of a pond or tal for Chapter 7. |
| Central Water Commission (CWC), a body of the Union | Publishes the Flood Estimation Reports for subzones 1(e), 1(f), 1(c) and 1(b) used in Chapters 2 and 3, and the river levels at its flood forecasting sites, such as Hanuman Setu at Lucknow, Birdghat at Gorakhpur, Kanpur, Phaphamau and Naini at Prayagraj, Varanasi and Agra. Would supply river stage records and forecasts for Chapter 5. |
| Central Ground Water Board (CGWB) and the Central Ground Water Authority, bodies of the Union | Assess the groundwater units of the State and their categories, and monitor water levels. Would supply groundwater levels with the UP Ground Water Department. |
| IMD (Meteorological Centre Lucknow), and road and rail owners (PWD, NHAI, Indian Railways) | IMD's stations supply the rainfall records of Chapter 2. Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7). |
Commentary. Stormwater in Uttar Pradesh is split between three departments: Housing and Urban Planning, through the development authorities and their bye-laws; Urban Development, through the Nagar Nigams, the Directorate of Local Bodies and UP Jal Nigam (Urban); and Irrigation and Water Resources, through the rivers, floodplains, embankments and canals. The industrial development authorities are a fourth regime. The UDD guideline of December 2024 is the first document found that names one owner of the drainage plan for each city, the Nagar Nigam, with UP Jal Nigam (Urban) as planner (UDD, 2024). No rule was found that divides the natural drains held by I&WRD from the nalas held by the local bodies, or that sets when the drains of a development authority's scheme pass to the Nagar Nigam [TBC]. The question is not academic: in the Akbar Nagar case in Lucknow the occupants argued that the Kukrail is a nala and not a river, and the Supreme Court agreed with the High Court that the colony stood on its floodplain (as reported). Until such a rule is made, this Manual assigns the drainage elements as in Table 1.5. The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers.
Table 1.5 — Working assignment of drainage elements under this Manual
| Element | Assigned to |
|---|---|
| Rivers, their floodplains and embankments, regulators on the embankments, canals and the drains of canal commands | I&WRD |
| Nalas and road drains within the limits of a local body, including the pumping stations that lift them over a river embankment, unless an order assigns them otherwise | The Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat, through its Jal Kal department or engineering wing |
| Drains within a scheme of a development authority or the UP Awas Evam Vikas Parishad, until they are handed to the local body | The development authority or the Parishad |
| Trunk sewers, interceptors and the interception and diversion (tapping) of nalas | UP Jal Nigam (Urban) or (Rural), as the work is assigned |
| Drains of State and national highways | PWD or NHAI |
| Drains within an industrial development area | Noida, GNIDA, YEIDA or UPSIDA |
This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.
1.10 Variances and waivers
1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:
- (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
- (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.
1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Uttar Pradesh has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to a river through a gate, regulator or flap gate in an embankment, as along the Gomti at Lucknow and the Rapti at Gorakhpur, or only by pumping, is in the outfall-closed condition of Chapter 5 whenever the river is high, and detention is not waived for it.
1.10.3 No variance or waiver. No variance or waiver shall be granted for:
- (a) a sewage connection to a storm drain;
- (b) the lowest habitable floor level of Chapter 6;
- (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
- (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.
1.10.4 Procedure.
- (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
- (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
- (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
- (d) A variance runs with the approval. It lapses if the approval lapses.
Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Uttar Pradesh the Allahabad High Court has had to order that ponds and water channels be identified from the revenue records of 1 July 1952 and restored (Iqbal Ahmad, 2007, as reported), and in October 2025 warned Pradhans, Lekhpals and Tahsildars of contempt for failing to act against the encroachment of ponds and public land (as reported).
1.11 Transition provisions
1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).
1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.
1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.
1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.
1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.
Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).
1.12 Review and amendment
1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.
1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.
1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.
References (chapter)
- Housing and Urban Planning Department, Section-3, Government of Uttar Pradesh (2025). G.O. No. 1323/2025/8-3099/208/2025, July 2025, approving the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025 and Model Zoning Regulations 2025, with the English text (Version PRF3, 3 Jul 2025), cl. 1.1, 1.4, 2.3.2, 2.11, 3.1.2.3, 3.1.3.5, 3.1.3.6, 3.3.1.21, 3.3.3, 9.3, 13.1.2, 13.3 and 16.3.2, and the environmental conditions for building projects (the day of the G.O. is handwritten on the scanned cover [TBC]). https://invest.up.gov.in/wp-content/uploads/2026/08/Model_Building_Byla_250826.pdf
- Housing and Urban Planning Department (2025). Amendment notification No. 57/2025/I/1150135/2025/8-3099/208/2025, 21 Nov 2025 (summary by TeamLease RegTech; secondary source). https://teamleaseregtech.com/updates/article/49758/u-p-govt-issued-amendments-in-the-uttar-pradesh-development-authority-building-construction-and-development-byelaws-2025/
- Uttar Pradesh Urban Planning and Development Act, 1973, ss.4, 13, 41 and 57 (as cited in G.O. No. 1323/2025).
- Uttar Pradesh Industrial Area Development Act, 1976; building regulations of Noida, GNIDA and YEIDA (2010) (not read for this Manual [TBC]).
- Urban Development Department, Government of Uttar Pradesh (2024). अर्बन फ्लड/जलप्लावन नियंत्रण एवं स्टॉर्म वाटर ड्रेनेज योजना — दिशा-निर्देश (Urban Flood/Waterlogging Control and Storm Water Drainage Scheme: Guidelines), Dec 2024 (Hindi, with an English DPR checklist), §§1.1, 1.3, 2.1, 2.2, 3.2, 3.3 and 4. https://urbandevelopment.up.nic.in/assets-new/pdf/Storm%20water/FINAL%20SWD%20GUIDELINE%2024-12-2024%20Designed%20Hindi_R2.pdf
- Uttar Pradesh Ground Water (Management and Regulation) Act, 2019 (U.P. Act No. 13 of 2019), ss.5, 9, 28, 29, 31, 33, 34 and 39 (FAOLEX copy). https://faolex.fao.org/docs/pdf/IND214528.pdf ; https://www.indiacode.nic.in/handle/123456789/17016
- Uttar Pradesh Revenue Code, 2006 (updated to 5 Mar 2021), ss.54, 59, 61, 67 and 77 (LBSNAA copy). https://www.lbsnaa.gov.in/storage/uploads/pdf_data/1742473203_Uttar%20Pradesh%20Revenue%20Code%202006%20updated%20till%2005.03.2021.pdf
- Uttar Pradesh Municipal Corporations Act, 1959, Chapter 10; Uttar Pradesh Municipalities Act, 1916, Chapter 7; Uttar Pradesh Water Supply and Sewerage Act, 1975 (as cited by UDD; not read for this Manual [TBC]).
- Supreme Court of India. Hinch Lal Tiwari v. Kamala Devi, 25 Jul 2001, AIR 2001 SC 3215. https://leap.unep.org/sites/default/files/court-case/COU-156224.pdf
- Irrigation and Water Resources Department, Section-4 (2025). G.O. No. 24/2025/107/2025-27-Sin-4-16(Writ)(NGT)/2023, 29 Jan 2025 (Ganga floodplain zone, Unnao to Ballia), as annexed to the Irrigation Department's report of 2 Apr 2025 in NGT O.A. 341/2022, Deepak Awasthi v. State of U.P. https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20IRRIGATION%20DEPARTMENT,%20UP%20IN%20OA%20NO.%20341%20of%202022%20%20Deepak%20Awasthi%20Vs.%20State%20of%20U.P..pdf
- Irrigation Department, Uttar Pradesh (2026). Progress report of 23 May 2026 in NGT O.A. 569/2023, Alok Kumar v. Union of India (Hindon floodplain). https://www.greentribunal.gov.in/sites/default/files/news_updates/Progress%20Report%20By%20Irrigation%20Department,%20State%20of%20Uttar%20Pradesh%20DATED%2023-05-2026%20in%20OA%20569%20of%202023%20Alok%20Kumar%20Vs%20UOI%20and%20Ors.pdf
- National Mission for Clean Ganga (2024). Reply in NGT O.A. 515/2023, Ganga Pollution v. State of U.P. (quoting the River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016, cl. 3(l), 6(3) and 42). https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20of%20NMCG%20in%20OA%20NO%20515%20of%202023%20(Ganga%20Pollution%20Vs.%20State%20of%20UP%20&%20Ors.).pdf
- Prayagraj Development Authority (2025). Reply of 17 Dec 2025 in NGT I.A. 288/2024 in O.A. 526/2023, annexing the order of the Allahabad High Court of 28 Mar 2011 in PIL No. 4003 of 2006, In re Ganga Pollution; and District Magistrate, Prayagraj, reply of 18 Dec 2025 in I.A. 458/2024 in O.A. 515/2023. https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20by%20Prayagraj%20Development%20Authority%20in%20IA%20No.%20288%20of%202024%20IN%20OA%20No.%20526%20OF%202023%20(Ganga%20Sewa%20Abhiyan%20and%20Ors.%20Vs.%20UOI%20and%20Ors.).pdf ; https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20by%20DM,%20Prayagraj%20in%20IA%20No.%20458%20OF%202024%20IN%20OA%20No.%20515%20OF%202023%20(Ganga%20Pollution%20Vs.%20State%20of%20UP%20&%20Ors.).pdf
- Government of Uttar Pradesh (2020). Notification No. 1397/LXXXI-4-2020-06-2018, 7 Dec 2020 (Ramgarh Taal Wetland, Gorakhpur), as annexed to CPCB's response in NGT O.A. 1057/2024, Sudhir Kumar Jha v. Gorakhpur Development Authority, which also quotes the Wetlands (Conservation and Management) Rules, 2017, r.4(2)(vi). https://www.greentribunal.gov.in/sites/default/files/news_updates/RESPONSE%20BY%20R-3%20CPCB%20IN%20OA%20NO.%201057%20of%202024%20Sudhir%20Kumar%20Jha%20Vs%20Gorakhpur%20Development%20Authority%20Through%20ChiefSecretary.pdf
- Urban Development Department, Uttar Pradesh (2021). Action Taken Report in NGT O.A. 370/2021, Manoj Kumar Rai v. State of U.P. (division of UP Jal Nigam). https://www.greentribunal.gov.in/sites/default/files/news_updates/Action%20Taken%20Report%20by%20Department%20of%20Urban%20Development,%20UP%20in%20OA%20No.%20370%20of%202021%20(Manoj%20Kumar%20Rai%20Versus%20State%20of%20U.%20P.%20&%20Ors).pdf
- Central Ground Water Board, Northern Region (2024). Submission on behalf of CGWA in NGT O.A. 594/2024 (groundwater levels in Lucknow city, 2014–2023). https://www.greentribunal.gov.in/sites/default/files/news_updates/Documents%20on%20behalf%20of%20CGWA%20in%20OA%20ON%20594%20of%202024%20(NEWS%20ITEM%20TITLED%20LUCKNOW%20ME%20PAANEE%20CHALA%20RASATAL%2010%20SAAL%20ME%20160%20FOOT%20NEECHE%20CHALA%20GAYA%20JALSTAR%20MEL%20RAHE%20KHATARNAK%20SANKET_0.pdf
- Press reports of the Yamuna floodplain notification of January 2025, the 2026 amendment of the Ganga Order, the Gomti setbacks of 2010 and 2020, the direction on rainwater harvesting of October 2025, the Akbar Nagar (Kukrail) judgment of 2024 and the High Court's orders on pond encroachment of 2025 (secondary sources). https://theprint.in/india/over-5000-buildings-in-agra-face-risk-of-demolition-after-up-govt-demarcates-yamuna-floodplain/2478998 ; https://www.freepressjournal.in/india/centre-redefines-ganga-floodplain-drops-construction-free-zone-wording ; https://www.downtoearth.org.in/urbanisation/dte-exclusive-2020-order-on-floodplain-zoning-declaring-gomti-non-perennial-river-draws-flak-90655 ; https://www.amarujala.com/lucknow/up-cm-yogi-orders-rainwater-harvesting-to-be-mandatory-in-buildings-larger-than-100-square-meters-potters-ex-2025-10-04 ; https://www.livelaw.in/top-stories/supreme-court-lucknow-akbarnagar-demolitions-eviction-upheld-slum-dwellers-alternative-accommodation-257604 ; https://www.livelaw.in/high-court/allahabad-high-court/allahabad-high-court-crackdown-gram-sabha-land-encroachments-pradhans-lekhpals-tahsildars-inaction-306753
- Press reports of the drains to the Ganga and the Yamuna at Prayagraj, to the Gomti at Lucknow and of the Sisamau nala at Kanpur (secondary sources). https://www.thestatesman.com/india/up-jal-nigam-adopts-geotube-technology-to-treat-drains-ahead-of-maha-kumbh-2025-1503376493.html ; https://www.freepressjournal.in/uttar-pradesh/up-plans-45-drain-sewage-control-network-to-clean-gomti-river-in-lucknow-under-namami-gange ; https://www.downtoearth.org.in/water/dirty-ganga-funds-down-the-drain-in-up-63980
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Table 4.1 and notes).
- Kakkar, R. (CPHEEO) (2023). Understanding Urban Stormwater Management. CSE, Aug 2023.
- National Disaster Management Authority (2010). National Guidelines on Management of Urban Flooding.
- MoHUA (2016). Model Building Bye-Laws, Chapter 9.
- Lok Sabha Unstarred Question 1847, 30 Jul 2026 (MoHUA). https://sansad.in/getFile/lsapps/loksabhaquestions/annex/188/AU1847_x29brZ.pdf
- India Meteorological Department (2022, 2023). Press releases of 15 and 16 Sep 2022 and 11 Sep 2023 (heavy rainfall over Uttar Pradesh). https://internal.imd.gov.in/press_release/20220915_pr_1821.pdf ; https://internal.imd.gov.in/press_release/20220916_pr_1823.pdf ; https://internal.imd.gov.in/press_release/20230911_pr_2523.pdf
- SANDRP (2018, updated 2019). Overview of CWC Flood Forecasting Sites 2018: North India (compiled from CWC site data; secondary source); and Rivers breaching highest flood levels in July 2023 (secondary source). https://sandrp.in/2018/08/03/overview-of-cwc-flood-forecasting-sites-north-india/ ; https://sandrp.in/2023/08/03/rivers-breaching-highest-flood-levels-in-july-2023/
- Press reports of the Rapti flood at Gorakhpur in 1998, the Ganga at Prayagraj in 2013 (Hindustan Times, 2019), the Lucknow rain of September 2022, the Hindon flood of July 2023, the Ganga floods of August 2025, and the waterlogging of Prayagraj and the Allahabad High Court's order of August 2026 (secondary sources). https://www.downtoearth.org.in/news/waters-of-woe-22412 ; https://scroll.in/latest/1032979/scroll_in ; https://www.tribuneindia.com/news/delhi/about-350-cars-at-ola-dump-yard-submerged-by-overflowing-hindon-529226 ; https://www.businesstoday.in/india/story/flooding-in-13-up-districts-ganga-flows-above-danger-mark-in-varanasi-mirzapur-ghazipur-ballia-487669-2025-08-04 ; https://www.livelaw.in/high-court/allahabad-high-court/prayagraj-waterlogging-allahabad-hc-pumps-24-hours-municipal-corporation-546731
- Agra Smart City Ltd. Improvements to Taj East Drain, Detailed Project Report, Chapter 9 (rainfall analysis). https://agrasmartcity.in/pdf/wc13581914%20Improvements%20to%20Taj%20East%20Drain.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Mid-America Regional Council (2025). APWA 5600 Manual Factsheet; APWA Stormwater Standards Supplement (7 Nov 2025). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Mid-America Regional Council. The Evolution of Regional Stormwater Design Standards (presentation). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Kansas City Metro Chapter APWA (2006). Section 5600, §5601.6 Waivers.
- PUB Singapore (2018, with Addendum No. 3 of 16 Apr 2025). Code of Practice on Surface Water Drainage, 7th ed.
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management.
- Centre for Science and Environment (2023). Urban Stormwater Management (presentation).
- Press reports of the drainage proposals of LDA along the Gomti in Lucknow, including 12 additional pumping stations between IIM Road and Kisan Path (secondary source). https://www.downtoearth.org.in/urbanisation/lucknows-floods-are-man-made-encroached-river-space-and-blocked-drains-turn-even-moderate-rain-into-flooding
- Press reports of the Goddhoia nala and Ramgarh Tal project at Gorakhpur (₹474.42 crore, approved 7 Nov 2022) and of drainage allocations for Lucknow, Meerut, Mathura, Ghaziabad and Shahjahanpur (secondary sources). https://www.drishtiias.com/state-pcs-current-affairs/goddhoia-drain-and-ramgarh-tal ; https://www.constructionworld.in/policy-updates-and-economic-news/up-govt-strengthens-urban-drainage-to-tackle-flooding-risks/70124
- Lok Sabha reply on the preparation of IUSWDMPs for 16 municipal corporations in Uttar Pradesh (seen only through a search summary). https://eparlib.sansad.in/bitstream/123456789/3018402/1/AS269_Ws6AF1.pdf
- ISET-International and CDKN (2014). Gorakhpur: Extreme Rainfall, Climate Change, and Flooding, technical report (landing-page summary read). https://cdkn.org/resource/gorakhpur-extreme-rainfall-technical-report
Annexes and forms
| Annex / Form | Content |
|---|---|
| 1A | List of Tier A authorities, with the boundaries of the Nagar Nigams, of the development areas of the development authorities and of the industrial development areas |
| 1B | Maps of flood-sensitive catchments |
| 1C | Policy Supplement: text of alternatives S-1 to S-5 and model council resolution |
| 1D | Model Byelaws 2025 amendment and model ULB bye-law |
| Form 1-1 | Applicability Determination |
| Form 1-2 | Variance / Waiver Request |
Commentary. Uttar Pradesh's floods come from three sources, often together. The first is the rivers. In September 1978 the Yamuna and the Ganga set the highest levels on record at most sites below Agra: 154.76 m at Agra on 9 September, 87.98 m at Phaphamau and 87.99 m at Naini in Prayagraj on 8 September, and 73.901 m at Varanasi on 9 September, against danger levels of 152.4 m, 84.73 m and 71.262 m (CWC levels, as reported). The Gomti at Lucknow reached its highest recorded level, 110.85 m, on 11 September 1971, and the Rapti at Birdghat in Gorakhpur 77.54 m on 23 August 1998, when 13 embankments breached in Gorakhpur district and road and rail links were cut for more than 72 hours (as reported). The Ganga at Prayagraj reached 86.52 m in 2013, its third-highest level, and in August 2025 it ran above the danger level in 13 districts, at about 72.1 m at Varanasi (as reported). On 26 July 2023 the Hindon at Noida reached 197.28 m, 1.81 m above its previous highest level; Karhera in Ghaziabad was evacuated, and about 350 cars parked on the floodplain at Ecotech-3 in Greater Noida were submerged (as reported). The second is the heavy storm on cities whose drains were not designed for it. In the 24 hours to 08:30 on 16 September 2022 Lucknow recorded 20 cm at two stations and 16 cm at the airport, a day after Gorakhpur had recorded 20 cm and Jaunpur 23 cm (IMD, 2022), and nine people died when a wall collapsed at Dilkusha in Lucknow (as reported). In the 24 hours to 08:30 on 11 September 2023, 14 cm fell at Lucknow, 15 cm at Kanpur and 32 cm at Fatehpur tehsil in Barabanki (IMD, 2023), and Gomti Nagar, Ashiana, Jankipuram, Aliganj and Hazratganj were waterlogged (as reported); the State's own guideline names "Lucknow 2023" among India's urban flash floods (UDD, 2024). The third is the city drainage that fails in a fall that is not extreme at all: on 17 August 2026, 73.4 mm in 24 hours at Prayagraj, less than a 2-year day, left George Town, Tagore Town and Rambagh under water, and the Allahabad High Court took up the waterlogging of its own motion and ordered it pumped out within 24 hours (as reported).
Missing design makes all three worse. The Urban Development Department (UDD) records that there is at present no integrated plan for urban drainage in the State's urban areas, that small nalas and nalis are built piecemeal, and that urban drains are "usually designed for a 1–2 year" rainfall return period (UDD, 2024). Most city outfalls discharge to rivers whose highest flood levels lie 1–3.3 m above their danger levels, so an outfall below the river's flood level is shut, or pumped, for days. The one storm-drain DPR read for this Manual, for the Taj East Drain in Agra, adopted a 2-year intensity of 28.20 mm/h derived from a daily rainfall series whose printed values cannot be right (Clause 2.3.6). No published Uttar Pradesh document sets a design storm for a city's drains. Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix.
No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.