Chapter 7Waterbodies, Tals (Ponds) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (tal) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Uttar Pradesh, with no coast and no tidal water, means the wetlands notified under the 2017 Rules, such as Ramgarh Tal in Gorakhpur, the large tals and jheels, the marshy low land (kachhar) and depressions of the khadar floodplains of the Ganga, the Yamuna, the Gomti, the Rapti, the Ghaghra and the Hindon, and the tals, talabs and pokhars recorded in the Revenue records;
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the UP Revenue Code, 2006 (sections 54, 61, 67 and 77), the UP Urban Planning and Development Act, 1973 and the Byelaws 2025 made under it, the UP Ground Water (Management and Regulation) Act, 2019, the River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river (such as the Ganga, the Yamuna, the Gomti, the Rapti and the Hindon), natural drain or nala, canal, lake or jheel (jhil), tal or pond (tal, talab, pokhar, johad), Amrit Sarovar or other excavated pond, marsh or low wet land, floodplain wetland or depression (in the khadar or kachhar), recharge reservoir of a layout, abandoned quarry or borrow pit, supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (tal) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (overflow, outlet or spillway) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the I&WRD and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (feeder channel, nala or canal) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice, regulator or flap gate) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Uttar Pradesh terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Tal (ताल; talab, pokhar) | A natural or excavated depression that stores rainfall runoff: in the Hindi Shabdasagara, low ground or a long, wide hollow in which rainwater collects (Annex 7E). Talab and pokhar are synonyms, and all three are a "tank" under section 61 of the UP Revenue Code, 2006. A tal is a tank or pond under Clause 7.2. Most tals have no surplus weir or sluice; where a tal has none, its FTL is the level at which it spills to a nali, a nala or low ground, found by survey. |
| Monsoon water line | The outer edge of a tal's water in the monsoon: the larger of the edge shown by dated imagery or survey of the monsoon (July to September) in recent years and the edge recorded in the Revenue records, and where neither is available, the MWL contour. Because "the area covered by it varies in rainy season" and no part of that area may be allotted for building (Hinch Lal Tiwari v. Kamala Devi, Supreme Court, 2001), the boundary of a tal under Clauses 7.3.3 and 7.13.1 is the largest of its Revenue record boundary, its surveyed FTL and its monsoon water line; setbacks are measured from that boundary. This definition is set by this Manual. |
| Jheel (jhil) | A shallow lake, marsh or swamp (Annex 7E). A jheel is a lake or a wetland for this chapter; where it is a wetland, Clause 7.12 also applies. |
| Amrit Sarovar | A pond excavated or revived under the national Amrit Sarovar mission. It is a tal for this chapter. Its storage is counted only under Clause 7.7. |
| Layout recharge reservoir | The reservoir of at least 1% of the scheme area and not more than 2 m deep that the Byelaws 2025 require in layouts of more than 4 ha, fed only by surface runoff (cl. 13.1.2(b)). It is a waterbody for this chapter once built. Its storage is recharge storage; it counts as detention only under Chapter 4. |
| Nala; nali | A nala is a watercourse or drain, natural or cut (Annex 7E), such as the Qila Mohammadi nala in Lucknow or the Godhoiya nala in Gorakhpur; a nali is a small street or house drain. Every nala that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whoever maintains it. No rule dividing natural drains (I&WRD) from municipal nalas was found; the definition, not the owner or the name, decides which clauses apply. |
| Khadar; bangar | Khadar is the low floodplain land along a river; bangar (written "bhangar" in geography texts) is the older alluvial upland above it, never submerged (Annex 7E). Khadar land is floodplain for this chapter. |
| Notified floodplain | The floodplain of the Ganga or a tributary defined by "a flood of frequency once in hundred years" (River Ganga Authorities Order, 2016, cl. 3(l)) and notified by the I&WRD by coordinates: for the Ganga from Unnao to Ballia in 13 districts (G.O. of 29 January 2025) and for the Yamuna in 17 districts (January 2025, as reported); the Hindon had not been demarcated by May 2026. It is a wider statutory line under Clause 7.4.5 for the uses the Order restricts in it. It is not the design extent: the 1% AEP extent of Clause 7.3.4, with the climate factor, sets Zone 2 wherever it is wider. |
| River-locked outfall | A drain or nala outfall through a river embankment, or to a drain whose own outfall is shut, that cannot discharge by gravity while the river is high, such as the outfalls of Lucknow to the Gomti and of Gorakhpur to the Rapti (Figure 7.3). Its regulator or flap gate is a controllable outlet under Clause 7.8 only where it is operated to a written rule; its tailwater is the river stage (Chapter 5). |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the I&WRD and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (the Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat, a development authority constituted under the UP Urban Planning and Development Act, 1973, the UP Awas Evam Vikas Parishad, an industrial development authority (Noida, GNIDA, YEIDA or UPSIDA), the I&WRD (for its rivers, embankments, canals and drains), the Gram Panchayat or its Bhumi Prabandhak Samiti (for a village tank under sections 59 and 61 of the UP Revenue Code, 2006), the Revenue Department (through the Collector and the Tehsildar), the UP State Wetland Authority (for a notified wetland), a private owner, or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) Revenue records and village maps of the Revenue Department, in which tanks, talabs, ponds and pokhars, nalas, land covered by water and embankments (bandh) are recorded and vest in the State or the Gram Panchayat under the UP Revenue Code, 2006 (sections 54, 59, 61 and 77), read back to the record of 1 July 1952 where the Allahabad High Court's line of pond cases applies; land shown as a pond, reservoir, river, drain or nala in a Master Plan, Zonal Plan or layout plan under the 1973 Act, which the Byelaws 2025 protect (cl. 16.3.2(xi)); the floodplain coordinates notified by the I&WRD on the 1-in-100-year flood, for the Ganga from Unnao to Ballia (G.O. of 29 January 2025) and for the Yamuna (January 2025, as reported); the boundary and zone of influence of every wetland notified under the Wetlands (Conservation and Management) Rules, 2017, such as Ramgarh Tal; and the lists of Amrit Sarovars;
- (b) I&WRD and Gram Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where I&WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. No 1% AEP flood map of any Uttar Pradesh city was found, and the Urban Development Department records that "currently there is no integrated plan for urban drainage" in the State's urban areas (storm water drainage guideline, December 2024); its city drainage master plans are to include an inundation analysis for rainfall above the design storm and hydraulic models of the hotspots. Along the rivers, Uttar Pradesh does have statutory flood lines. The River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016 defines the floodplain by "a flood of frequency once in hundred years" (cl. 3(l), as quoted by the I&WRD and NMCG), and the I&WRD has notified it by coordinates, river by river, under orders of the National Green Tribunal: for the Ganga from Unnao to Ballia in 13 districts "on the basis of the 100-year return period flood" (G.O. of 29 January 2025), with boundary pillars on about 200 of the 250 km at Prayagraj by May 2026; and for the Yamuna in 17 districts (January 2025, as reported). The Hindon in Ghaziabad and Gautam Buddh Nagar had not been demarcated by May 2026: its 100-year flood level, computed by the Log Pearson method, is 205.39 m at km 49 and 205.20 m at km 110, but the Survey of India's 1 m contours proved unusable on parts of the reach (I&WRD, report to the Tribunal of 23 May 2026). An amendment of the Ganga Order in 2026 is reported to divide the floodplain into active, regulatory and warning zones on the 5-, 25- and 100-year floods (as reported); its Gazette text was not read for this Manual. The Byelaws 2025 require layout plans to show "the approximate location and size of any water body, flood affected areas", with contours at 0.3 m where the slope is steeper than 1 in 20 (cl. 2.3.2). Clause 7.3.4 lets the Authority adopt flood maps once they are issued; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, and along a notified river the notified 1-in-100-year line is a minimum that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual (no Uttar Pradesh statute, rule or bye-law read for this Manual sets a setback in metres from nalas or tals: the 50 m of the Wetlands Rules, 2017 applies only around notified wetlands, and the Byelaws 2025 set a distance only along the Ganga; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the approval or NOC of the I&WRD for a work on or next to one of its rivers, embankments, canals or drains (including the Irrigation / Ground Water Department NOC listed in the Byelaws 2025), the permission of the UP State Wetland Authority for a regulated activity in the zone of influence of a notified wetland, or a direction of the Allahabad High Court or the National Green Tribunal sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual. The Byelaws 2025 set no distance from a nala, tal, talab or pokhar: they make construction on ponds, reservoirs, rivers and drains identified in a plan or recorded in the Revenue records non-compoundable (cl. 16.3.2(xi)), and set a distance only along the Ganga, where only repair and renovation are permitted within 200 m of the riverbank (cl. 2.11). The only general distance in metres is the 50 m from the mean high flood level of a wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (rule 4(2)(vi)). This Manual's 15 m gives every nala and tal a hydraulic corridor, and is this Manual's proposal, not a statutory width (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Uttar Pradesh flood maps are mostly coarser than US maps, the Ganga–Yamuna plain and the khadar floodplains of its rivers are very flat and low (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Uttar Pradesh's rules protect ponds and drains by record, and rivers by distance, but give nalas and tals no buffer in metres. The Byelaws 2025 set no distance from a nala, tal, talab or pokhar; they make building on ponds, reservoirs, rivers and drains identified in a plan or recorded in the revenue records non-compoundable (cl. 16.3.2(xi)), require large projects to keep the natural drainage "for ensuring unrestricted flow of water" with "No construction … allowed to obstruct the natural drainage through the site" (cl. 13.3), and permit only repair and renovation within 200 m of the Ganga riverbank, the bank being "the bank mentioned in the records of concerned department (Revenue/Irrigation)"; along other rivers, a city or development authority is to follow any order of the National Green Tribunal or a court (cl. 2.11). The court lines differ by river and city. At Prayagraj the Allahabad High Court directed "no construction within 500 meter from the mid stream of the Ganges" (PIL 4003/2006, order of 28 March 2011), which the District Magistrate reads as no construction within 200 m of the Ganga riverbank and restricted construction within 500 m, and the Prayagraj Development Authority applies "HFL + 500 m" to the Yamuna, saying the order "has not been set aside" by the Ganga Order of 2016 (replies to the Tribunal, December 2025). For the Gomti, the Lucknow bench of the High Court is reported to have halted construction within 100 m of the banks in 2010, while an I&WRD order of 3 September 2020 is reported to set 50 m (both as reported). The Tribunal's orders on the Ganga of 2017 treated 100 m from the edge of the river as a prohibitory zone and 100 m to 300 m as a regulatory zone (as quoted by NMCG). Around a notified wetland, no permanent construction is permitted within 50 m of the mean high flood level (Wetlands Rules, 2017, r. 4(2)(vi)). The Byelaws' table of NOCs lists an Irrigation / Ground Water Department NOC with the words "OR 50 meters", but the row is truncated and what the 50 m is measured from was not established. On the Kukrail in Lucknow, the Supreme Court in May 2024 agreed with the High Court that the Akbar Nagar colony stood on a floodplain, rejecting the plea that the Kukrail is a nala and not a river (as reported). Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.
Disclosure. Uttar Pradesh has no statutory setback in metres from nalas, tals, talabs or pokhars in the Acts, rules and bye-laws read for this Manual. The Byelaws 2025 protect recorded ponds and drains themselves (cl. 16.3.2(xi)) and set a distance only along the Ganga (cl. 2.11); the Wetlands Rules, 2017 set 50 m only around notified wetlands. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor, to give every nala and tal a protected width. It is this Manual's proposal, not a statutory width, and no government has adopted it. Along the notified rivers, the 1-in-100-year floodplain is a statutory line, not the design extent: the 1% AEP extent of this Manual, with the climate factor, governs Zone 2 wherever it is wider. Away from the rivers, Uttar Pradesh has no statutory flood lines, and the 1% AEP extent, where it has been mapped (Clause 7.3.4), is the only flood-based line. The setback is applied as the larger of the corridor and any statutory line, so the Manual is stricter than statute along nalas and tals, and no less strict anywhere. What does exist, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- The notified floodplains. The 1-in-100-year floodplain of the Ganga from Unnao to Ballia (G.O. of 29 January 2025) and of the Yamuna (January 2025, as reported), in which the Ganga Order of 2016 bars new structures in the river, its bank and its active floodplain except as it allows (cl. 6(3), as quoted); the 2026 amendment of the Order (as reported) once its text is read; and, on rivers not yet demarcated, such as the Hindon, the 100-year flood level supplied by the I&WRD.
- The Ganga riverbank. Only repair and renovation within 200 m of the Ganga riverbank in cities on the Ganga (Byelaws 2025, cl. 2.11), and on other rivers the orders of the Tribunal or a court.
- Court lines. At Prayagraj, no construction within 500 m of the mid-stream of the Ganga (Allahabad High Court, 2011) and "HFL + 500 m" for the Yamuna as applied by the Prayagraj Development Authority; on the Gomti, 100 m (High Court, 2010) or 50 m (I&WRD, 2020), as reported.
- Wetlands. No permanent construction within 50 m of the mean high flood level of a notified wetland (Wetlands Rules, 2017, r. 4(2)(vi)); at Ramgarh Tal, a zone of influence of 50 m beyond the notified boundary (notification of 7 December 2020).
- Ponds and drains of record. Construction on ponds, reservoirs, rivers and drains identified in a plan or recorded in the revenue records is non-compoundable (Byelaws 2025, cl. 16.3.2(xi)); land covered by a pond, tank or lake cannot become private (Revenue Code, s. 77(1)(i)); and no part of a pond's rainy-season extent may be allotted for building (Hinch Lal Tiwari, 2001). These protect the waterbody, not a strip around it; the whole recorded and monsoon extent is a waterbody for this chapter.
- I&WRD embankments, canals and drains. Works near them need the I&WRD's approval or NOC.
This Manual sets 15 m as the floor because no width at all exists for nalas and tals; because it is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because it leaves room for the maintenance track and desilting machinery that Uttar Pradesh's nalas need. The reasons for the corridor are the record: the Urban Development Department found that small nalas and nalis are built piecemeal, with no integrated drainage plan in any city (guideline, December 2024); Lucknow's Qila Mohammadi drain was found "blocked at several places as the level of drain is lower than that of culverts" (Lucknow Municipal Corporation, 2018); and ponds continue to be filled and built over, which the Supreme Court and the High Court have repeatedly ordered reversed (Clause 7.13, Commentary). Until a statute, rule, notification or Master Plan adopts it, the 15 m minimum is this Manual's recommended standard and the statutory controls above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Uttar Pradesh practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The Ganga–Yamuna plain and the khadar floodplains of its rivers are flat, and the rivers meander in wide and shallow channels (CWC, Flood Estimation Report for subzone 1(f), 1985), so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Uttar Pradesh the land between a pond's dry-season edge and its rainy-season edge is protected by law as part of the pond: the Supreme Court held that where "the area covered by it varies in rainy season … no part of it could have been allotted to anybody for construction of house building or any allied purposes" (Hinch Lal Tiwari v. Kamala Devi, 2001, para 13). This Manual gives that rule a level: the monsoon water line of a tal (definitions after Clause 7.2) is part of its boundary, and the foreshore up to MWL is its flood storage. The Urban Development Department's guideline asks city drainage master plans to integrate "existing detention ponds, lakes" and to set operating procedures for their pre- and post-monsoon levels (December 2024), which is the use this chapter protects. Around Ramgarh Tal, the notification of 7 December 2020 adds a zone of influence of 50 m beyond the wetland boundary, in which reclamation, filling and construction are prohibited. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of the colonies of Lucknow behind the Gomti embankments, whose drains must be pumped when the river is high (as reported), the low wards of Gorakhpur on the Rapti, such as Mehewa, which flood "after relatively small amounts of rain" (as reported), and the built-up land of Agra, Prayagraj and Varanasi within the Yamuna and Ganga floodplains notified in January 2025 (more than 5,000 buildings in Agra alone, as reported) already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Uttar Pradesh has no tank Act, and few of its tals have the full set of an earthen bund, a surplus weir and irrigation sluices. The storages that matter for urban drainage are of five kinds. The first is the village and urban tal, talab or pokhar, usually with no outlet structure, recorded in the Revenue records and, where it is a village tank, managed by the Gram Panchayat and its Bhumi Prabandhak Samiti (Revenue Code, ss. 59 and 61), together with the Amrit Sarovars. The second is the large tal or jheel, such as Ramgarh Tal in Gorakhpur, a notified wetland of 742.245 ha that receives six named nalas. The third is the recharge reservoir that the Byelaws 2025 require in layouts of more than 4 ha (cl. 13.1.2(b)), fed only by surface runoff and not more than 2 m deep. The fourth is the embanked city, such as Lucknow behind the Gomti embankments and Gorakhpur behind those of the Rapti, which drains by gravity when the river is low and must store in its tals, nalas and low ground, or pump, when it is high, as a polder does (Figure 7.3). The fifth is the canal and reservoir system of the I&WRD, whose canals can receive urban drainage, as in the reported proposal to divert Lucknow's Geetapalli nala to the Haider canal (as reported). Clauses 7.7 and 7.8 apply to any of these whose storage is counted. The bandhs (bandhas) and old tanks of Bundelkhand, some of them of the Chandela period, were not researched for this Manual; any such tank whose storage is to be counted is subject to Clause 7.7.1 in full, with the I&WRD or other custodian. River barrages and regulators, such as the Gomti barrage at Lucknow, are not tanks for these clauses: their releases and pond levels enter a design as inflow and tailwater (Chapter 5).
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. I&WRD, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, in a city on an embanked river such as Lucknow on the Gomti or Gorakhpur on the Rapti, every colony drain, tal, nala, regulator or flap gate through the embankment and pumping station by which the flow reaches the river, with the river stage as tailwater, as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than I&WRD's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. Uttar Pradesh's worst urban floods have come when the rivers were already high. The Rapti at Birdghat, Gorakhpur, reached its highest recorded level of 77.54 m on 23 August 1998, against a danger level of 74.98 m, with 13 embankment breaches in the district and road and rail cut for more than 72 hours; the Gomti at Lucknow reached 110.85 m on 11 September 1971, against a danger level of 109.5 m; and in August 2025 the Ganga at Varanasi stood at about 72.1 m, above its danger level of 71.262 m (all as reported; a lower danger level is also reported for the Gomti at Lucknow). At most city gauges the highest flood level is 1 to 3 m above the danger level, so an outfall set below the highest flood level can stay shut for days; no hydrograph showing how long Uttar Pradesh's rivers stay above outfall levels was obtained for this Manual. While the river is high, the outfalls are shut and the city's tals, nalas and low ground hold whatever rain falls, so storage downstream that is already full gives no relief. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A tal–nala–river chain (schematic, not to scale). A: with the river low, the colony drains (nali) feed a tal used as detention, which spills over its surplus weir to the nala; the nala flows by gravity through the embankment and out through a flap gate, and the pumps are off. B: with the river high, the river holds the flap gate shut; the tal rises from its normal water line toward its monsoon water line and holds the colonies' runoff, and the pumping station lifts the nala's flow over the embankment until the river falls. The river stage is therefore the tailwater of the whole chain (Chapter 5), and the drains, the tal, the nala, the gate and the pumps are modelled together (Clause 7.7.2); the tal's monsoon water line is part of its boundary (definitions after Clause 7.2). C: reported danger levels and highest flood levels at three city gauges, as reported from CWC data in a secondary compilation; they are not levels at any outfall. No sill level, gate operating rule, pump capacity or design river level for any Uttar Pradesh outfall was published; pumping stations are an eligible component of the State's storm water drainage scheme, and its guideline asks that pumps be operable above the highest flood level (Urban Development Department, December 2024). Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, UPSDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under I&WRD control, the operating rule shall be I&WRD's rule. This Manual does not authorise any other body to operate a I&WRD tank.
Commentary. No operating rule for an Uttar Pradesh tal that keeps a flood cushion was found, and most tals have no controllable outlet, so Clause 7.8.3 applies to them. The Urban Development Department's guideline asks each city drainage master plan to set standard operating procedures for its detention ponds, including desilting and their pre- and post-monsoon levels (December 2024); Clause 7.8.1 sets out what such a procedure must contain. The controlled flows that matter in the cities are at the river outfalls: regulators and flap gates in the embankments, and the pumping stations behind them. The I&WRD runs flood control rooms from 15 June to 15 October (as reported); in Lucknow, an inspection is reported to have found "only half the pumps" working at the Kukrail pumping station and all pumps non-functional at Wazirganj (undated, as reported); and Gorakhpur is reported to use a decision-support system and automated pumps in the monsoon (as reported). Without an agreed rule with dates, levels and a named operator, storage behind a gate cannot be relied on. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July to September monsoon depression. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
Many tals have other users. A village tank of more than 0.5 acre may be let out by the Bhumi Prabandhak Samiti with the approval of the Sub-Divisional Officer (Revenue Code, s. 61(b)), and the Code itself recognises land covered by water that is "used for the purpose of growing singhara or other produce" (s. 77(1)(b)). Drawing such a tal down before a storm has a cost to those who use it, which is why Clause 7.8.2(d) requires the custodian to accept it.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Uttar Pradesh Pollution Control Board (UPPCB) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).
Commentary. No deadline for completing the desilting of nalas or tals before the monsoon was found in any order of the Urban Development Department, the Directorate of Local Bodies or a Nagar Nigam; the date of 31 May in this Manual is set by this Manual, two weeks before the I&WRD's reported deadline of 15 June for its flood-protection works (as reported). The Urban Development Department's guideline asks city drainage master plans to set procedures for desilting detention ponds and to rejuvenate the existing storage ponds of the city (December 2024), and many tals have been excavated or revived as Amrit Sarovars. Excavation to "increase capacity" is governed by Clause 7.9.3. The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Uttar Pradesh precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Uttar Pradesh the nalas are split among many owners, and no rule dividing natural drains (I&WRD) from municipal nalas was found for this Manual. In practice rivers, floodplains, embankments, canals and drains in canal commands lie with the I&WRD; nalas and road drains inside a city with the Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat; the internal drains of colonies not yet handed over with the development authority or the UP Awas Evam Vikas Parishad; interceptor sewers and drain tapping with UP Jal Nigam; and the drains of industrial areas with Noida, GNIDA, YEIDA or UPSIDA. This Manual uses that division as its working assignment, not as a statement of law. The Urban Development Department found that small nalas and nalis have been built piecemeal, with no integrated plan, and that they are usually designed for a 1–2-year storm (guideline, December 2024). In Lucknow, "LMC has only one Qila Mohammadi drain to fall back upon", "blocked at several places as the level of drain is lower than that of culverts near Bijnore" (Lucknow Municipal Corporation, AMRUT report, 2018), and remodelling of the nala was put to tender in 2026 (as reported); 33 of the city's 34 drains outfall to the Gomti (as cited). On the Kukrail the Supreme Court rejected the plea that it is a nala and not a river (May 2024, as reported). The Byelaws 2025 require that drains be "an integral part of the road" (cl. 3.1.3.5) and that the natural drain system of a large project be maintained (cl. 13.3). None of these keeps a nala at its recorded width once it has been narrowed or covered, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored tal or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Uttar Pradesh the nearest existing forms of shared storage are the recharge reservoirs of at least 1% of the scheme area that the Byelaws 2025 require in layouts of more than 4 ha (cl. 13.1.2(b)); the Urban Development Department's direction that city drainage master plans integrate existing detention ponds and lakes, rejuvenate storage ponds within the city and create new ones outside it where possible (guideline, December 2024); the Amrit Sarovars; and, in Noida, the requirement that housing schemes of 20 acres or more develop ponds and water bodies on 5% of their area (Noida Building Regulations and Directions, 2006, as reported by CSE, 2017). None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the UP State Wetland Authority;
- (b) Ramgarh Tal, Gorakhpur, notified under the 2017 Rules on 7 December 2020 (742.245 ha), with its zone of influence of 50 m beyond the notified boundary and the six inflow nalas named in the notification;
- (c) the tals, jheels, marshy low land (kachhar) and depressions of the khadar floodplains of the Ganga, the Yamuna, the Gomti, the Rapti, the Ghaghra, the Hindon and the other rivers, within the notified 1-in-100-year floodplain or the 1% AEP extent of Clause 7.3.4, whichever is larger (the river channel itself is a waterbody under the rest of this chapter); and
- (d) any other marsh, wetland, tal or jheel that the Authority notifies, that the wetland authority lists, or that a court or the National Green Tribunal directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Ramgarh Tal in Gorakhpur is the wetland whose notification was read for this Manual. It was notified under the 2017 Rules on 7 December 2020 (No. 1397/LXXXI-4-2020-06-2018), over 742.245 ha, with a zone of influence of 50 m beyond the wetland boundary at every listed coordinate, and covers its six named inflow nalas (Kuda Ghat, Mohaddipur Power House, Rafiq Ahmed Kidwai, Golf Club, Sahabganj Paidleganj and Gordhaiya) and "all other water streams flowing into" it. The notification prohibits reclamation and filling, solid waste, use as a "sink for treated and untreated sewage", and construction other than boat jetties; water withdrawal, diversion or "any other hydrological intervention", and roads proposed under a master plan, are regulated, needing the permission of the UP State Wetland Authority on the recommendation of the District Wetland Committee. The National Green Tribunal had earlier directed that no project be taken up on the tal's submerged or catchment area until the State decided (order of 2016, as listed). Elsewhere in the State, 50 wetlands in nine districts, and later 101 in 26 districts, are reported to have been notified (as reported); the State Wetland Authority's list and the zones of influence it sets were not obtained. Uttar Pradesh has sites on the Ramsar list (as reported), but whether Ramgarh Tal is one was not established, and this Manual does not say so. A drain outfall, desilting, diversion or pumping station in or near a notified wetland therefore needs the Wetland Authority's permission where the notification regulates it, as well as compliance with this chapter. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Uttar Pradesh's tals and wetlands through the nalas (Clause 8.9, Commentary). At Ramgarh Tal, six major drains were intercepted and diverted and seven of 18 minor drains were under work (National Green Tribunal, O.A. 116/2014, as reported); a project of ₹474.42 crore for the Godhoiya nala and the tal, to intercept about 38 MLD, was approved on 7 November 2022, and its first phase, with separate storm and sewer lines, was opened on 1 November 2026 (as reported). The UP Ground Water (Management and Regulation) Act, 2019 directs that no one pollute ponds and rivers (s. 29), and the Ramgarh Tal notification bars the tal's use as a sink for treated or untreated sewage. Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Uttar Pradesh they apply in full to every new outfall, and every existing outfall to a river, tal, jheel or wetland that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Uttar Pradesh's main controls on filling and building in ponds are the UP Revenue Code, 2006 and the courts. The Code lets the Assistant Collector evict a person who damages, misappropriates or wrongfully occupies Gram Panchayat property, with compensation (s. 67), and allows the class of land reserved for a pond or other public use to be changed only "in exceptional cases", with equivalent land reserved for the same purpose nearby (s. 77(2)). The Supreme Court ordered the occupants of a pond to vacate and the State to "restore the pond, develop and maintain the same as a recreational spot" (Hinch Lal Tiwari, 2001); the Allahabad High Court has ordered ponds and water channels identified from the revenue record of 1 July 1952 to be restored (Iqbal Ahmad, 2007, as cited), a school's encroachment on a pond in Agra to be removed (PIL 1474/2019), and, in October 2025, action across the State against encroachment on ponds and Gram Sabha land, with a warning of contempt to the officers who fail to act (as reported); it has also held that a fire station could not be built on pond land by exchange (as reported). The Byelaws 2025 make construction on a pond, reservoir, river or drain identified in a plan or recorded in the revenue records non-compoundable (cl. 16.3.2(xi)). On the floodplains, the CAG reported farmhouse plots allotted by GNIDA in Haibatpur, 130 to 553 m from the Hindon (Report No. 4 of 2023, as reported in the press), which the National Green Tribunal took up of its own motion (O.A. 437/2025); the Noida Authority demolished structures on the Yamuna floodplain under the Ganga Order (2022–2023, as reported); and the Lucknow Development Authority cleared the Akbar Nagar colony on the Kukrail floodplain in 2023–2024 (as reported). The encroachment and drainage sections of the UP Municipal Corporations Act, 1959 and the UP Municipalities Act, 1916 were not read for this Manual. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. The banks of most tals and ponds are low and are not expected to make them specified dams, but each shall be screened under Clause 7.14.1. The embankments along the Gomti at Lucknow and the Rapti at Gorakhpur, and the other river embankments of the I&WRD, are flood embankments, which the Act excludes. The bandhs and old tanks of Bundelkhand were not researched for this Manual; some may be specified dams, and each shall be screened. River barrages, such as the Gomti barrage at Lucknow, enter this Manual only as sources of inflow and tailwater (Chapter 5). Where the storage of a tal or jheel is counted under Clause 7.7, its bank or bund is a tank bund for Clause 7.14.2. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. Uttar Pradesh's embankment failures have come at the rivers. In the flood of August 1998 there were 13 breaches of embankments in Gorakhpur district, and road and rail links were cut for more than 72 hours (as reported). No breach map or emergency action plan for an Uttar Pradesh embankment, regulator or tal was found. The Lucknow Development Authority is reported to propose 12 more pumping stations and an embankment-and-road project of ₹182 crore along the Gomti (as reported). A failed embankment or regulator floods the colonies it was meant to protect, which is why Clause 7.14.3 asks for breach mapping of high-hazard embankments. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Housing and Urban Planning Department, Government of Uttar Pradesh. G.O. No. 1323/2025/8-3099/208/2025 (July 2025) approving the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025 and the Model Zoning Regulations-2025 under ss. 57 and 13(2) of the UP Urban Planning and Development Act, 1973, with the English text (cls. 2.3.2, 2.11, 3.1.3.5, 13.1.2, 13.3 and 16.3.2). https://invest.up.gov.in/wp-content/uploads/2026/08/Model_Building_Byla_250826.pdf
- Government of Uttar Pradesh. Uttar Pradesh Revenue Code, 2006, updated to 5 March 2021 (ss. 54, 59, 61, 67 and 77). https://www.lbsnaa.gov.in/storage/uploads/pdf_data/1742473203_Uttar%20Pradesh%20Revenue%20Code%202006%20updated%20till%2005.03.2021.pdf
- Government of Uttar Pradesh. Uttar Pradesh Ground Water (Management and Regulation) Act, 2019 (U.P. Act No. 13 of 2019) (ss. 29, 33 and 34). https://faolex.fao.org/docs/pdf/IND214528.pdf
- Supreme Court of India. Hinch Lal Tiwari v. Kamala Devi, judgment of 25 July 2001, AIR 2001 SC 3215 (paras 13–15). https://leap.unep.org/sites/default/files/court-case/COU-156224.pdf
- Irrigation and Water Resources Department, Government of Uttar Pradesh. G.O. No. 24/2025/107/2025-27-Sin-4-16(Writ)(NGT)/2023 of 29 January 2025 (Ganga floodplain zone, Unnao to Ballia), annexed to the Department's report of 2 April 2025 in NGT O.A. 341/2022, Deepak Awasthi v. State of U.P. https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20IRRIGATION%20DEPARTMENT,%20UP%20IN%20OA%20NO.%20341%20of%202022%20%20Deepak%20Awasthi%20Vs.%20State%20of%20U.P..pdf
- Irrigation and Water Resources Department, Government of Uttar Pradesh. Progress report of 23 May 2026 in NGT O.A. 569/2023, Alok Kumar v. Union of India (Hindon floodplain). https://www.greentribunal.gov.in/sites/default/files/news_updates/Progress%20Report%20By%20Irrigation%20Department,%20State%20of%20Uttar%20Pradesh%20DATED%2023-05-2026%20in%20OA%20569%20of%202023%20Alok%20Kumar%20Vs%20UOI%20and%20Ors.pdf
- National Green Tribunal. O.A. 515/2023, Ganga Pollution v. State of U.P.: reply of the District Magistrate, Prayagraj, of 18 December 2025; reply of the Irrigation Department, Prayagraj, of 19 May 2026; reply of NMCG (November 2024, quoting the River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016 and the Tribunal's orders of 2017). https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20by%20DM,%20Prayagraj%20in%20IA%20No.%20458%20OF%202024%20IN%20OA%20No.%20515%20OF%202023%20(Ganga%20Pollution%20Vs.%20State%20of%20UP%20&%20Ors.).pdf ; https://www.greentribunal.gov.in/sites/default/files/news_updates/REPLY%20ON%20BEHALF%20OF%20IRRIGATION%20DEPARTMENT,%20PRAYAGRAJ%20IN%20IA%20NO%20824%20OF%202025%20GANGA%20POLLUTION%20VS%20STATE%20OF%20UP%20AND%20ORS.pdf ; https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20of%20NMCG%20in%20OA%20NO%20515%20of%202023%20(Ganga%20Pollution%20Vs.%20State%20of%20UP%20&%20Ors.).pdf
- Prayagraj Development Authority. Reply of 17 December 2025 in NGT I.A. 288/2024 in O.A. 526/2023, annexing the order of the Allahabad High Court of 28 March 2011 in PIL No. 4003 of 2006, In re Ganga Pollution. https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20by%20Prayagraj%20Development%20Authority%20in%20IA%20No.%20288%20of%202024%20IN%20OA%20No.%20526%20OF%202023%20(Ganga%20Sewa%20Abhiyan%20and%20Ors.%20Vs.%20UOI%20and%20Ors.).pdf
- Government of Uttar Pradesh. Notification No. 1397/LXXXI-4-2020-06-2018 of 7 December 2020 (Ramgarh Taal Wetland, district Gorakhpur), as annexed to the response of CPCB in NGT O.A. 1057/2024, Sudhir Kumar Jha v. Gorakhpur Development Authority (also quoting r. 4(2)(vi) of the Wetlands Rules, 2017). https://www.greentribunal.gov.in/sites/default/files/news_updates/RESPONSE%20BY%20R-3%20CPCB%20IN%20OA%20NO.%201057%20of%202024%20Sudhir%20Kumar%20Jha%20Vs%20Gorakhpur%20Development%20Authority%20Through%20ChiefSecretary.pdf
- Urban Development Department, Government of Uttar Pradesh. Urban Flood/Jalplavan Niyantran evam Storm Water Drainage Yojana — Dishanirdesh (Urban Flood/Waterlogging Control and Storm Water Drainage Scheme: Guidelines), Hindi, 24 December 2024. https://urbandevelopment.up.nic.in/assets-new/pdf/Storm%20water/FINAL%20SWD%20GUIDELINE%2024-12-2024%20Designed%20Hindi_R2.pdf
- Lucknow Municipal Corporation (2018). Detailed Project Report, AMRUT (water supply), §2.1.7 (storm drainage). https://lmc.up.nic.in/pdf/amrut/DPRLucknow22052018.pdf
- Central Water Commission (1985). Flood Estimation Report for Middle Ganga Plains, Subzone 1(f), GP/10/1984 (§1.6).
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- National Green Tribunal. Reply of the Irrigation Construction Division, Ghaziabad, of 14 February 2026, and reply of the District Magistrate, Gautam Buddh Nagar, of 13 October 2025, in O.A. 437/2025 (GNIDA farmhouses on the Hindon floodplain). https://www.greentribunal.gov.in/sites/default/files/news_updates/REPLY%20BY%20IRRIGATION%20CONSTRUCTION%20DIVISION,%20GHAZIABAD%20IN%20OA%20NO.%20437%20of%202025%20NEWS%20ITEM%20TITLED%20CAG%20SLAMS%20GREATER%20NOIDA%20FOR%20ALLOWING%20FARMHOUSES%20ON%20HINDON%20FLOODPLAIN.pdf
- Comptroller and Auditor General of India. Report No. 4 of 2023, Land Acquisition and Allotment of Properties in GNIDA (tabled 13 August 2025). https://cag.gov.in/ag2/uttar-pradesh/en/audit-report/details/122410
- Centre for Science and Environment (2017). Mainstreaming Rainwater Harvesting in Noida. https://www.cseindia.org/content/downloadreports/7991
- SANDRP (2018, updated 2019). Overview of CWC Flood Forecasting Sites 2018: North India (danger levels and highest flood levels, compiled from CWC; secondary). https://sandrp.in/2018/08/03/overview-of-cwc-flood-forecasting-sites-north-india/
- Reports of court orders and floodplain cases (secondary): LiveLaw on the Allahabad High Court's order on encroachment of Gram Sabha land (October 2025), https://www.livelaw.in/high-court/allahabad-high-court/allahabad-high-court-crackdown-gram-sabha-land-encroachments-pradhans-lekhpals-tahsildars-inaction-306753 ; LiveLaw on the Supreme Court and Akbar Nagar (May 2024), https://www.livelaw.in/top-stories/supreme-court-lucknow-akbarnagar-demolitions-eviction-upheld-slum-dwellers-alternative-accommodation-257604 ; Down To Earth on the Gomti floodplain orders of 2010 and 2020, https://www.downtoearth.org.in/urbanisation/dte-exclusive-2020-order-on-floodplain-zoning-declaring-gomti-non-perennial-river-draws-flak-90655 ; ThePrint on the Yamuna floodplain notification (4 February 2025), https://theprint.in/india/over-5000-buildings-in-agra-face-risk-of-demolition-after-up-govt-demarcates-yamuna-floodplain/2478998 ; Housing.com on Noida's floodplain demolitions, https://housing.com/news/noida-authority-demolishes-32-illegal-structures-on-yamuna-riverbed
- Reports of floods, ponds and projects (secondary): Down To Earth, "Waters of woe" (Gorakhpur, 1998), https://www.downtoearth.org.in/news/waters-of-woe-22412 ; Business Today on the Ganga floods of August 2025, https://www.businesstoday.in/india/story/flooding-in-13-up-districts-ganga-flows-above-danger-mark-in-varanasi-mirzapur-ghazipur-ballia-487669-2025-08-04 ; Drishti IAS on the Godhoiya drain and Ramgarh Tal project, https://www.drishtiias.com/state-pcs-current-affairs/goddhoia-drain-and-ramgarh-tal ; Drishti IAS and Free Press Journal on Amrit Sarovars, https://www.drishtiias.com/state-pcs-current-affairs/up-ranks-1st-in-amrit-sarovar-construction/print_manually , https://www.freepressjournal.in/uttar-pradesh/yogi-government-completes-nearly-20000-amrit-sarovars-across-uttar-pradesh
- Platts, J. T. (1884). A Dictionary of Urdu, Classical Hindi, and English. London: W. H. Allen; and Dasa, Syamasundara (1965–1975). Hindi Shabdasagara. Kashi: Nagari Pracarini Sabha; both online at the Digital South Asia Library, University of Chicago (accessed 6 November 2026). https://dsal.uchicago.edu/dictionaries/platts/ ; https://dsal.uchicago.edu/dictionaries/dasa-hindi/
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Hindi and Urdu waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Uttar Pradesh has no Act for the protection of tanks or ponds as such. Its tals, talabs and pokhars are protected instead by the land-revenue law, the courts and the planning rules. The UP Revenue Code, 2006 vests "the bed of rivers, streams, nallas, lakes, ponds and tanks" and "all standing and flowing water" in the State (s. 54); lets tanks and ponds be entrusted to the Gram Panchayat (s. 59); reserves every village tank of 0.5 acre or less "for public use by the inhabitants of the village", where "the term 'tank', includes talab, pond, pokhar and other land covered with water" (s. 61); bars any bhumidhari right in "land covered by a pond, tank or lake, or forming part of an embankment, bandh or bhita" (s. 77(1)(i)), whose class may be changed only "in exceptional cases" with equivalent land reserved nearby (s. 77(2)); and provides for eviction and compensation from those who occupy Gram Panchayat land (s. 67). In Hinch Lal Tiwari v. Kamala Devi (2001) the Supreme Court held that where "a pond exists and the area covered by it varies in rainy season … no part of it could have been allotted to anybody for construction", called tanks and ponds "nature's bounty" that "need to be protected", and directed the State to "restore the pond". The Allahabad High Court identifies ponds from the revenue record of 1 July 1952, the date of vesting (Iqbal Ahmad, 2007, as cited), and in October 2025 ordered action across the State against encroachment on ponds and public land, with a warning of contempt to Pradhans, Lekhpals and Tahsildars (as reported). The Byelaws 2025 make construction on "ponds/reservoirs, river, drain, etc" identified in a Master Plan, Zonal Plan or layout plan, or recorded in the revenue records, a non-compoundable offence (cl. 16.3.2(xi)), and for large projects add that "No construction is allowed on wetland and water bodies" (cl. 13.3). The UP Ground Water (Management and Regulation) Act, 2019 bars polluting ponds (s. 29) and directs that ponds be revived (s. 34); the Urban Development Department's storm water drainage guideline (December 2024) asks each city drainage master plan to integrate "existing detention ponds, lakes" and to rejuvenate them; and the State has built more Amrit Sarovars than any other (16,630 completed by March 2025, as reported). Wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 are regulated by the UP State Wetland Authority. This chapter gives the design rules that protect waterbody storage and conveyance. It does not replace the revenue, planning, wetland and floodplain procedures that record and protect waterbodies in law, or the directions of the Allahabad High Court, the National Green Tribunal and the Supreme Court.