Chapter 11Basin and City Stormwater Master Plans
11.1 Purpose and scope
11.1.1 Chapters 2 to 10 control one project at a time. This chapter sets the requirements for the plan that ties those projects together: the Basin Stormwater Master Plan (BSMP). A BSMP is prepared for each drainage basin of a city or urban area. A city's set of BSMPs makes up its City Stormwater Master Plan.
11.1.2 A BSMP shall:
- (a) map flood hazard for the basin under existing and future conditions;
- (b) set the level of service each part of the drainage system must achieve (Clause 11.6);
- (c) identify the works, storage and land needed to reach that level of service, and rank them (Clauses 11.7 and 11.8);
- (d) reserve land for regional storage, tal and tank restoration, and major flow paths in the statutory land-use plan (Clause 11.9);
- (e) set the basin-specific inputs that site designs under Chapter 4 depend on: regional facilities, the fee-in-lieu unit rate, and any basin release rate stricter than Chapter 4 (Clause 11.8.3); and
- (f) recommend catchments for notification as flood-sensitive (Clause 4.5.4).
11.1.3 Relationship to site design. Site criteria (Chapters 4 to 8) apply whether or not a BSMP exists. A BSMP may make the site criteria stricter for its basin. It shall not relax them, except through the regional detention and fee-in-lieu routes of Clauses 4.13 and 4.5.6.
11.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Basin | The land draining to one outfall to the sea, a river, or a major waterbody, as delineated under Clause 11.3. |
| Basin Stormwater Master Plan (BSMP) | The plan for one basin prepared under this chapter. |
| Lead Authority | The body responsible for preparing a BSMP (Clause 11.4). |
| Level of service (LoS) | The flood performance a part of the drainage system must achieve, expressed as an AEP and an outcome (Clause 11.6). |
| Flood hazard map | A map of flood extent, depth, velocity and hazard class (H1–H6, Chapter 6) for a stated AEP and scenario. |
| Regional facility | A storage, conveyance or outfall work serving more than one development, identified in a BSMP. |
| Capital Improvement Programme (CIP) | The ranked, costed list of works in a BSMP (Clause 11.8.4). |
11.3 Planning unit: the basin, not the ward
11.3.1 BSMPs shall be prepared by hydrological basin, not by ward, zone or local-body boundary. Where a basin crosses local-body boundaries, one BSMP shall cover the whole basin.
11.3.2 Basin boundaries shall be delineated from the digital elevation model of Clause 11.5.2, checked against the drain network, road embankments, canals and tank supply channels. Diversions between basins, whether by canal, drain or surplus course, shall be mapped and represented in the model.
11.3.3 No basin delineation has been published for any Uttar Pradesh city. For the urban areas where the evidence identifies them, the basins are at least the following:
- Lucknow, Gomti: the catchment of each drain that outfalls to the Gomti within the city, 33 of the 34 drains of the Jal Kal department (as reported), each as a basin with the Gomti level at its outfall as the boundary condition and the outfall-closed case of Chapter 5, with the capacity of its pumping station, as a design case; among them the Kukrail nala, with its whole catchment, and the Qila Mohammadi nala, on which the drainage of South City, Ashiana, Alambagh, the LDA Colony on Kanpur Road and Transport Nagar depends (LMC 2018), with the reported diversion of the Geetapalli nala to the Haider canal mapped as a link between basins;
- Gorakhpur, Rapti and Ramgarh Tal: the city inside the embankments of the Rapti and the Rohin, with the Rapti level at Birdghat as the boundary condition; and the catchment of Ramgarh Tal, the notified wetland of 742.245 ha, with the six named nalas that flow into it and the Goddhoiya nala, on which a project of interception, diversion and separate storm and sewer lines was approved in 2022 (Ramgarh Taal notification 2020; as reported);
- Prayagraj, Ganga and Yamuna: the catchments of the drains that outfall to the Ganga and the Yamuna, 81 in all (as reported), with the levels at Phaphamau and Naini, and the backwater at the Sangam, as boundary conditions; and
- Ghaziabad and Noida, Hindon: the catchments that drain to the Hindon across the Ghaziabad Nagar Nigam, the Ghaziabad Development Authority, Noida and Greater Noida, as one set of basins with the Hindon level as the boundary condition; I&WRD's demarcation of the Hindon floodplain, not complete in May 2026, shall be shown in the BSMP when it is.
Other Tier A bodies, including Kanpur, Varanasi, Agra and Meerut, shall define their basins in the first BSMP that covers them. Where I&WRD or CWC has a high flood level, a notified 1-in-100-year floodplain line, an embankment crest level or an operating rule for a river, a barrage, a regulator or a pumping station, the BSMP shall take its boundary conditions from it and show those levels against its own 1% AEP map.
Figure 11.1 — Basin Stormwater Master Plan process and its links to site design. Original drawing for this Manual. The phase structure is adapted from Defra, Surface Water Management Plan Technical Guidance (2010), and Mile High Flood District master planning practice.
Commentary. Water does not follow ward boundaries. A ward-by-ward drain plan can pass the problem to the next ward, and to the next local body. In Uttar Pradesh a single drain can pass through several owners' hands on its way to the river. No rule dividing the natural drains kept by I&WRD from the nalas of the Nagar Nigams was found; drains in colonies not yet handed over stay with the development authority or the Awas Vikas Parishad, trunk sewers and the interceptors that tap the drains are built by UP Jal Nigam, and the drains of the industrial areas belong to Noida, Greater Noida, YEIDA or UPSIDA (as this Manual reads the institutional record). The Urban Development Department's guideline answers this by making the plan catchment-based, extending it beyond the local body's limits where the catchment does, and requiring every agency to carry out drainage works only in conformity with the approved master plan, regulated by the Nagar Nigam (UDD 2024). I&WRD, for its part, has told the National Green Tribunal that enforcement against encroachment in a notified floodplain lies with the development authority (I&WRD 2025). The storm drains also carry sewage across these boundaries: at Kanpur a State filing listed 30 drains, 14 of them untapped (as reported), and the Hindon receives 133 drains between Saharanpur and Ghaziabad (as reported). This clause makes the basin the planning unit, so that one model carries each drain from its head to the river whoever owns each reach, and so that the interception structures are tested against the capacity of the drains they tap (Chapter 8, Clause 8.9.5).
11.4 Who prepares, and when
11.4.1 Lead Authority.
- For the basins of a city with a Nagar Nigam: the Nagar Nigam, which the Urban Development Department's guideline makes responsible for the city's drainage master plan and its regulation (UDD 2024), with C&DS, UP Jal Nigam (Urban), which the guideline names to prepare the plan, as preparer. Where the Nagar Nigam prepares an IUSWDMP under that guideline, its BSMPs may be prepared as the technical content of it. Where a basin extends beyond the Nagar Nigam, the other local bodies and the development authority in the basin are partners, and one BSMP covers the whole basin (Clause 11.3.1).
- No rule dividing natural drains from municipal nalas was found; until one is made, this Manual assigns the reaches within each BSMP as follows, each body being Lead Authority for the reaches it owns and for the parts of the CIP on them: I&WRD for the rivers, their embankments, regulators and floodplains and the drains in canal commands; the Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat, through its Jal Kal or engineering department, for the municipal nalas and road drains; the development authority (or the Awas Vikas Parishad) for the drains of layouts not yet handed over; UP Jal Nigam (Urban or Rural) for trunk sewers, interceptors and drain-tapping works; PWD and NHAI for the drains of their roads; and Noida, Greater Noida, YEIDA and UPSIDA for the drains of their own areas.
- For the Hindon basins of Ghaziabad and Noida: the Ghaziabad Nagar Nigam and the Noida and Greater Noida authorities, each for its part, prepared together so that one model covers the whole basin, with I&WRD (Irrigation Construction Division, Ghaziabad) as Lead Authority for the Hindon and its floodplain.
- In Tier B bodies: the Lead Authority is named by the Directorate of Local Bodies. Basins draining to a common river reach may be grouped into one district-level plan.
The UP State Wetland Authority shall be consulted on every BSMP whose basin drains to a notified wetland, including the Ramgarh Tal basin at Gorakhpur; UPSDMA and the Divisional Administrative Coordination Committee on every BSMP; and the State Mission for Clean Ganga on every BSMP that proposes works on a drain tapped or to be tapped under Namami Gange.
I&WRD shall be a partner in every BSMP that includes a river, canal or tank under its control.
11.4.2 When a BSMP is required.
- (a) Every Tier A body shall approve BSMPs covering its whole area within 3 years of this Manual taking effect.
- (b) A BSMP is required before:
- any regional detention or fee-in-lieu is accepted under Clause 4.13;
- a fee held under Clause 4.5.6.3 is spent; and
- a basin-specific release rate is applied under Clause 11.8.3.
- (c) A Tier B body shall prepare a BSMP where its Lead Authority, or the State Stormwater Technical Committee, finds recurrent flooding of buildings or arterial roads.
11.4.3 Preparation. BSMPs shall be prepared by, or under the direction of, an engineer empanelled as a Stormwater Design Professional (Chapter 10) with experience in basin-scale modelling.
11.5 Data and surveys
11.5.1 Each BSMP shall assemble and publish (Clause 11.10) the data in Table 11.1:
Table 11.1 — Minimum data and surveys for a BSMP
| Data | Minimum requirement |
|---|---|
| Terrain | Digital elevation model from LiDAR or photogrammetry, with vertical accuracy of 0.15 m RMSE or better in urban areas, tied to the Survey of India datum |
| Drain network | Inventory of all public drains, culverts and outfalls with invert levels, sizes, condition and silt depth; private drains above 600 mm |
| Waterbodies | Survey of every tank, tal, pond and marsh under Chapter 7: FTL, MWL, bund level, stage–storage, sluices, surplus weirs, supply channels, encroachment |
| Rivers and canals | Cross-sections at no more than 200 m spacing and at every structure |
| Outfalls and rivers | The datum of every level named; outfall invert levels against the warning, danger and high flood levels of the receiving river at the nearest CWC or I&WRD gauge and its recorded peaks; the 1-in-100-year flood levels and floodplain coordinates notified by I&WRD; the regulators, flap gates, interception (drain-tapping) structures and pumping stations on the outfalls and in the river embankments, with their capacities and operating rules; embankment crest levels; and releases from any barrage or dam upstream |
| Rainfall and levels | All available rain gauges (IMD, including the Lucknow (city and Amausi), Kanpur, Prayagraj (Bamhrauli), Varanasi (Babatpur and BHU), Gorakhpur, Agra, Meerut, Bareilly and Jhansi stations and the automatic weather stations and rain gauges reported by the Meteorological Centre Lucknow, and, for Ghaziabad and Noida, which have no long-record IMD station, Safdarjung and Palam in Delhi; the tehsil rain gauges; the rain and river gauges of CWC and I&WRD; and any gauges kept by the Nagar Nigams and the development and industrial development authorities) and water-level records, including those for the September 1971 (the Gomti at Lucknow), September 1978 (the Ganga and the Yamuna at Agra, Prayagraj and Varanasi), August 1998 (the Rapti at Gorakhpur), September 2022 (Gorakhpur and Lucknow), July 2023 (the Hindon at Ghaziabad and Noida) and September 2023 (Lucknow and Kanpur) events |
| Flood evidence | Surveyed flood marks and mapped flood extents from past events, including public reports |
| Land use | Existing land use and imperviousness; future land use from the statutory master plan |
| Soils and groundwater | HSG map (Annex 3A); seasonal high groundwater; aquifer and recharge zones |
| Sewer interaction | Known sewage cross-connections, dry-weather flow in drains, and solid-waste hotspots |
Commentary. The 0.15 m accuracy has no direct precedent; this Manual sets it because on the khadar floodplains of the Ganga, the Yamuna, the Gomti, the Rapti and the Hindon, behind the river embankments at Lucknow and Gorakhpur, and in the low tal basins of the terai such as that of Ramgarh Tal, a small error in ground level moves the flood edge a long way, and the 1% extent from the BSMP sets floor levels (Chapter 6) and setbacks (Chapter 7). Past flood marks matter as much as models. The September 1971 (the Gomti at Lucknow), September 1978 (the Ganga and the Yamuna at Agra, Prayagraj and Varanasi), August 1998 (the Rapti at Gorakhpur), September 2022 (Gorakhpur and Lucknow), July 2023 (the Hindon at Ghaziabad and Noida) and September 2023 (Lucknow and Kanpur) events are the best calibration data Uttar Pradesh has, and much of the evidence is held in photographs, news reports and residents' records that should be collected before it is lost.
11.6 Levels of service
11.6.1 Each BSMP shall adopt the following minimum levels of service. A BSMP may adopt stricter levels.
Table 11.2 — Minimum levels of service
| Element | Minimum level of service |
|---|---|
| Minor system | The design AEP of Chapter 6 (Table 6.1) |
| Habitable buildings | No flooding above floor level in the 1% AEP (100-yr) event |
| Critical facilities (hospitals, emergency services, substations, water and sewage plants) | No flooding of the facility in the 0.2% AEP (500-yr) event; access road passable in the 1% AEP event |
| Evacuation routes and arterial roads | Passable (hazard class H2 or better, Chapter 6) in the 1% AEP event |
| Ponding drain time | Surface water cleared from roads within 6 hours after rain ends in the 10% AEP (10-yr) event |
| Tank and tal storage | No net loss of flood storage below the MWL in the basin, measured against the earliest available survey |
| Outfalls | Functioning under the joint and outfall-closed cases of Chapter 5 |
Commentary. The building and road levels repeat Chapter 6, so that the basin plan and the site designs aim at the same outcome. The 0.2% AEP for critical facilities, the 6-hour ponding drain time and the no-net-loss rule for tank storage have no direct precedent and are set by this Manual. The drain time reflects what residents notice most after a storm. The no-net-loss rule reflects a loss of storage that has been counted but not measured. In law the ponds of Uttar Pradesh are well protected: the beds of rivers, nalas, lakes, ponds and tanks vest in the State, a village tank of 0.5 acre or less is reserved for public use, "tank" includes talab, pond and pokhar, and no bhumidhari rights accrue in land covered by a pond, tank or lake (UP Revenue Code 2006, ss.54, 61 and 77(1)(i)); the Supreme Court has held that no part of a pond whose area "varies in rainy season" may be allotted, and that the State must restore it (Hinch Lal Tiwari v. Kamala Devi, 2001), which this Manual reads as setting the protected extent at the monsoon water line; and the Allahabad High Court takes the revenue record of 1 July 1952 as the baseline for restoring ponds (as reported). Ramgarh Tal at Gorakhpur is a notified wetland of 742.245 ha with a 50 m zone of influence (Ramgarh Taal notification 2020), and the State has reported 16,630 Amrit Sarovars completed by March 2025 (as reported). No inventory of the tals and ponds inside any Nagar Nigam, and no survey of the storage of any of them, was found.
11.7 Modelling and scenarios
11.7.1 Model. Each BSMP shall use a coupled 1D–2D hydraulic model of:
- the minor system;
- the major (overland) system;
- rivers, canals and tanks; and
- the outfalls.
Methods shall follow Chapter 3. Tidal and river boundaries shall follow Chapter 5.
11.7.2 Design storms. The model shall be run for the design storms of Chapter 2, including the 24-, 48- and 72-hour storms, for at least the 50%, 10%, 1% and 0.2% AEPs. Areal reduction shall be applied under Clause 2.7.3.
11.7.3 Continuous simulation. Basins with tank cascades shall also be run by continuous simulation (Clause 3.13), using the full IMD gridded daily record where available and at least 30 years, disaggregated by the temporal patterns of Annex 2D. This shows how full the tanks are when the design storms arrive, and how often heavy rain coincides with a closed outfall. The two-step approach of Clause 3.13.5 may be used: a simplified storage model is run for the whole record, and the coupled 1D–2D model of Clause 11.7.1 is run only for the design storms, starting from the tank levels the continuous run gives. A continuous run of the full 1D–2D model is not required.
11.7.4 Scenarios. Each BSMP shall model at least:
- (a) Existing: existing land use, network, tanks and outfalls;
- (b) Future, uncontrolled: future land use under the statutory master plan, with no site controls;
- (c) Future, controlled: future land use with the site controls of Chapter 4;
- (d) Future, with plan: scenario (c) plus the works of the CIP; and
- (e) Climate: scenarios (a) and (d), with the climate factors of Clause 2.8; the rise of 2–25% in the 24-hour intensity of severe storms by the 2050s reported for Gorakhpur (ISET-International 2014, as reported) spans those factors, which are used unchanged.
11.7.5 Calibration. The model shall be calibrated and validated under Clause 3.15, using at least two of the September 1971 (the Gomti at Lucknow), September 1978 (the Ganga and the Yamuna at Agra, Prayagraj and Varanasi), August 1998 (the Rapti at Gorakhpur), September 2022 (Gorakhpur and Lucknow), July 2023 (the Hindon at Ghaziabad and Noida) and September 2023 (Lucknow and Kanpur) events where data exist.
Figure 11.2 — Elements of the BSMP model required by Clause 11.7: sub-catchments, the 1D drain and channel network, the 2D surface, tanks and tals with starting levels from continuous simulation, and the tidal or river boundary at the outfall (schematic, not to scale). Original drawing for this Manual, adapted from common coupled 1D–2D urban flood modelling practice.
Commentary. Scenario (b) against scenario (c) shows what the site rules achieve on their own. Scenario (d) shows what the public works add. This comparison is also the evidence base for notifying flood-sensitive catchments (Clause 4.5.4) and for setting a stricter basin release rate (Clause 11.8.3).
11.8 Options, outputs and the Capital Improvement Programme
11.8.1 Options hierarchy. Options shall be considered in the following order, the basin-scale form of the hierarchy in Clause 1.2:
- Protect and restore storage: tals, tanks, marshes and floodplains, including desilting to the original bed and recovering encroached area (Chapter 7);
- Regional retention and detention, sited by modelling so that releases do not coincide with the main-stem peak (Clause 4.13);
- Conveyance upgrades to drains, canals and culverts;
- Outfall works: regulators and flap gates on the outfalls to the rivers, pumping stations and the storage behind them, including those behind the river embankments at Lucknow and Gorakhpur, interception structures that keep the storm capacity of the drain, and the river embankments;
- Property-level protection where works cannot reach the level of service; and
- Non-structural measures: flood warning (for example IMD district rainfall warnings and nowcasts issued by the Meteorological Centre Lucknow, CWC flood forecasts and river stages at its sites on the Ganga, the Yamuna, the Gomti, the Rapti and other rivers against their warning and danger levels, and the flood control rooms that I&WRD runs from 15 June to 15 October), flood-hazard zoning, emergency planning and public information.
11.8.2 Option assessment. Each option shall be assessed for:
- reduction in flood risk (buildings and people flooded; expected annual damage);
- capital and 30-year maintenance cost;
- land required;
- effect on groundwater recharge where the water table is deep, and waterlogging where it is shallow or the soils are usar (Chapter 8);
- effect on downstream basins and the receiving river; and
- who benefits.
11.8.3 Basin release rates. Where scenario (c) does not meet the level of service, the BSMP may set a basin-specific permissible site discharge (m³/s/ha) stricter than Chapter 4, by AEP and sub-catchment. The rate takes effect under the notification procedure of Clause 4.5.4.
11.8.4 Outputs. Each BSMP shall produce:
- (a) flood hazard maps (extent, depth, velocity, hazard class) for the 10%, 1% and 0.2% AEPs, existing and future-with-plan. The 1% AEP future-with-plan map becomes the reference map for floor levels (Chapter 6) and setbacks (Chapter 7);
- (b) recommended flood-sensitive catchments and any basin release rates (Clauses 4.5.4 and 11.8.3);
- (c) regional facility sites, with storage volumes, land needs and the sites they serve;
- (d) the fee-in-lieu unit rate for the basin (Clause 4.13.3);
- (e) the Capital Improvement Programme: works ranked by risk reduction per rupee, with cost, phasing and agency;
- (f) a pre-monsoon maintenance programme: desilting, gate and pump testing, and tank operating rules (Chapter 10); and
- (g) monitoring needs: new rain gauges, level sensors and flood-mark survey points.
Commentary. Restoring storage comes first because the outfalls of Uttar Pradesh's larger cities cannot always take more water. When the Gomti, the Ganga, the Rapti or the Hindon is high, the outfalls below its flood level are closed and the drains behind the embankments reach the river only by pumping, so faster conveyance only fills the drains behind them sooner. The State's own guideline already points the same way: master plans are to integrate the existing detention ponds and lakes, rejuvenate storage ponds in the city and create new ones outside it where possible (UDD 2024), and the Byelaws 2025 require recharge reservoirs on at least 1% of every layout of more than 4 ha. The storms are large for drains designed for 1–2 years: IMD recorded 20 cm in 24 hours at Lucknow and at Gorakhpur in September 2022 (IMD 2022), and the only station IDF for the State puts the 50-year 1-hour fall at Lucknow at 106 mm (Kathuria, Kaur and Mehra 1987). Conveyance upgrades on their own move water faster to an outfall that the river may close, or that is limited by the capacity of its regulator, interception structure or pumping station. Groundwater in Uttar Pradesh sets opposite limits in different parts of the State. Lucknow city is over-exploited, with the pre-monsoon depth to water at 7.65–45.6 m below ground in 2023, 1.4–13.1 m deeper than in 2014 (CGWA, in National Green Tribunal O.A. 594/2024); in the terai the wells flow under artesian pressure, and about 260,000 ha of the Sharda Sahayak command are reported waterlogged (as reported). The law reflects both: the UP Ground Water (Management and Regulation) Act 2019 makes the rainwater harvesting conditions of the building bye-laws binding on the agencies that sanction plans (s.31(2)), bars the direct recharge of runoff from roads, open land and farms through recharge wells, bores and shafts (s.28), and makes the prevention of waterlogging a duty (s.33); and the Byelaws 2025 exempt waterlogged areas from recharge (cl. 13.1.2). This is why recharge and waterlogging are both assessment criteria. This Manual ranks projects by risk reduction per rupee so that limited budgets go first where most people are protected.
11.9 Integration with land-use planning
11.9.1 An approved BSMP shall be incorporated into the statutory land-use plan: the Master Plans and Zonal Development Plans of the development authorities made under the UP Urban Planning and Development Act 1973, the plans of Noida, Greater Noida and YEIDA under the UP Industrial Area Development Act 1976, and the layout plans approved under them. In particular:
- (a) regional facility sites, restored tank flood storage, and major flow paths shall be reserved in the plan;
- (b) the 1% AEP hazard map shall be shown, and Chapter 7 setbacks applied to it;
- (c) land in hazard classes H5–H6 in the 1% AEP event shall not be zoned for new habitable development; and
- (d) the open space of layouts within a basin should be located, where possible, to form part of the major flow paths or regional storage shown in the BSMP.
11.9.2 Where a land-use plan is revised before a BSMP is approved, the planning authority shall use the best available flood mapping and record the BSMP as pending.
Commentary. Uttar Pradesh draws its floodplain lines river by river, on the 1-in-100-year flood. I&WRD notified the Ganga floodplain zone from Unnao to Ballia, in 13 districts, by coordinates on 29 January 2025 (I&WRD 2025); a Yamuna floodplain order covering 17 districts followed in January 2025 (as reported); and the Hindon was still not demarcated in May 2026, its 100-year flood level being 205.39 m at km 49 and 205.20 m at km 110 (I&WRD 2026). A 2026 amendment of the Ganga Order is reported to divide the floodplain into zones on the 5-, 25- and 100-year floods (as reported). Older lines still apply: within 200 m of the bank of the Ganga only repair and renovation is allowed (Byelaws 2025, cl. 2.11); the Allahabad High Court barred construction within 500 m of the mid-stream of the Ganga at Prayagraj in 2011, and the Prayagraj Development Authority applies "HFL + 500 m" to the Yamuna (PDA 2025); and on the Gomti a line of 100 m set by the High Court in 2010 and one of 50 m in an Irrigation order of 2020 are both reported, and neither text was read. Layout maps must show water bodies and flood-affected areas, but no general setback in metres from a nala or a tal exists, and basements need only keep surface water out (Byelaws 2025, cl. 2.3.2 and 3.3.3.2(iv)). These are river-flood lines, not drainage-flood lines. A BSMP gives the land-use plans the 1% AEP drainage-flood map, and the buffer widths of Chapter 7, that they need. Using open space land as storage or flow path has no direct precedent; this Manual adopts it because the Byelaws 2025 already require layouts of more than 4 ha to build recharge reservoirs on at least 1% of the scheme area, no more than 2 m deep and fed only by surface runoff, limit concrete construction in parks to 5% with permeable or semi-permeable blocks for the rest, require at least 20% of the open spaces of larger building projects to be pervious, and allow check dams, bio-swales and other sustainable urban drainage systems to maintain the drainage pattern (cl. 13.1.2 and 13.3); storage placed in a layout's open space builds on these duties, and because that land still serves as open space, the storage must stay usable as one. Placing it on the flow path costs the developer nothing extra and gives the basin storage it would otherwise have to buy.
11.10 Consultation and publication
11.10.1 A draft BSMP shall be published for public comment for at least 60 days, with public meetings in each affected local body.
11.10.2 After approval, the following shall be published as open data:
- the model files;
- the flood hazard maps;
- the data of Clause 11.5.1, except security-sensitive asset details; and
- the CIP.
They shall also be shown on a public map viewer.
Commentary. Publishing the maps lets buyers, lenders, insurers and residents see flood hazard before they build or buy. Publishing the model lets designers use the same boundary conditions as the Authority, so site designs and the basin plan stay consistent. This matches the publication approach of Chapter 10.
11.11 Approval, review and reporting
11.11.1 Approval. BSMPs shall be approved by the State Stormwater Technical Committee (Chapter 1), after review of the model and of the public comments.
11.11.2 Review. Each BSMP shall be reviewed:
- every 10 years;
- within 2 years of an event exceeding the 1% AEP design depth in the basin (Clause 2.14); and
- when the statutory land-use plan is revised.
11.11.3 Annual report. The Lead Authority shall publish an annual implementation report before each SW monsoon (by 31 May). The report shall show:
- CIP progress;
- the fee-in-lieu ledger (Clause 4.13.4);
- maintenance completed; and
- any flooding against the levels of service.
11.12 Interim arrangements
11.12.1 Until a BSMP is approved for a basin:
- (a) all site criteria of Chapters 4 to 8 apply in full;
- (b) regional detention and fee-in-lieu under Clause 4.13 are not available, except the holding of fees under Clause 4.5.6.3;
- (c) floor levels and setbacks use the best available mapping, and the methods of Chapters 6 and 7 where no mapping exists; and
- (d) public drain projects shall include a basin-level check that their outfall and downstream reaches can take the design flow under the Chapter 5 tailwater cases.
References (chapter)
- Urban Development Department, Government of Uttar Pradesh (2024). Urban Flood/Jalplavan Niyantran evam Storm Water Drainage Yojana: Dishanirdesh (guidelines for the urban flood and waterlogging control and storm water drainage scheme), Hindi, file dated 24 December 2024. https://urbandevelopment.up.nic.in/assets-new/pdf/Storm%20water/FINAL%20SWD%20GUIDELINE%2024-12-2024%20Designed%20Hindi_R2.pdf
- Defra (2010). Surface Water Management Plan Technical Guidance. Department for Environment, Food and Rural Affairs, London.
- Mile High Flood District (Denver). Master planning programme and Urban Storm Drainage Criteria Manual.
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement; KC Metro APWA Section 5600, Version 2025.01.
- Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd ed.
- Housing and Urban Planning Department, Government of Uttar Pradesh (2025). G.O. No. 1323/2025/8-3099/208/2025 of July 2025, approving the Uttar Pradesh Development Authority Building Construction and Development Byelaws 2025 and Model Zoning Regulations 2025, with the English text (Version PRF3, 3 July 2025) (clauses 2.3.2, 2.11, 3.3.3.2 and 13.1.2). https://invest.up.gov.in/wp-content/uploads/2026/08/Model_Building_Byla_250826.pdf
- Uttar Pradesh Ground Water (Management and Regulation) Act 2019 (U.P. Act No. 13 of 2019), sections 28, 31 and 33 (FAOLEX copy). https://faolex.fao.org/docs/pdf/IND214528.pdf
- Uttar Pradesh Revenue Code 2006, sections 54, 61 and 77 (LBSNAA copy, updated to 5 March 2021). https://www.lbsnaa.gov.in/storage/uploads/pdf_data/1742473203_Uttar%20Pradesh%20Revenue%20Code%202006%20updated%20till%2005.03.2021.pdf
- Supreme Court of India (2001). Hinch Lal Tiwari v. Kamala Devi, judgment of 25 July 2001, AIR 2001 SC 3215. https://leap.unep.org/sites/default/files/court-case/COU-156224.pdf
- Irrigation and Water Resources Department, Government of Uttar Pradesh (2025). Compliance report of 2 April 2025 in National Green Tribunal O.A. 341/2022, Deepak Awasthi v. State of U.P., annexing G.O. No. 24/2025/107/2025-27-Sin-4-16(Writ)(NGT)/2023 of 29 January 2025 (Ganga floodplain zone, Unnao to Ballia). https://www.greentribunal.gov.in/sites/default/files/news_updates/REPORT%20BY%20IRRIGATION%20DEPARTMENT,%20UP%20IN%20OA%20NO.%20341%20of%202022%20%20Deepak%20Awasthi%20Vs.%20State%20of%20U.P..pdf
- Irrigation and Water Resources Department, Government of Uttar Pradesh (2026). Progress report of 23 May 2026 in National Green Tribunal O.A. 569/2023, Alok Kumar v. Union of India (Hindon floodplain). https://www.greentribunal.gov.in/sites/default/files/news_updates/Progress%20Report%20By%20Irrigation%20Department,%20State%20of%20Uttar%20Pradesh%20DATED%2023-05-2026%20in%20OA%20569%20of%202023%20Alok%20Kumar%20Vs%20UOI%20and%20Ors.pdf
- Prayagraj Development Authority (2025). Reply of 17 December 2025 in National Green Tribunal I.A. 288/2024 in O.A. 526/2023, annexing the Allahabad High Court order in PIL No. 4003 of 2006, In re Ganga Pollution. https://www.greentribunal.gov.in/sites/default/files/news_updates/Reply%20by%20Prayagraj%20Development%20Authority%20in%20IA%20No.%20288%20of%202024%20IN%20OA%20No.%20526%20OF%202023%20(Ganga%20Sewa%20Abhiyan%20and%20Ors.%20Vs.%20UOI%20and%20Ors.).pdf
- Government of Uttar Pradesh (2020). Notification No. 1397/LXXXI-4-2020-06-2018 of 7 December 2020, Ramgarh Taal Wetland, district Gorakhpur (as annexed to CPCB's response in National Green Tribunal O.A. 1057/2024, Sudhir Kumar Jha v. Gorakhpur Development Authority). https://www.greentribunal.gov.in/sites/default/files/news_updates/RESPONSE%20BY%20R-3%20CPCB%20IN%20OA%20NO.%201057%20of%202024%20Sudhir%20Kumar%20Jha%20Vs%20Gorakhpur%20Development%20Authority%20Through%20ChiefSecretary.pdf
- Central Ground Water Authority / Central Ground Water Board, Northern Region. Documents filed in National Green Tribunal O.A. 594/2024 (Lucknow groundwater levels, 2014–2023). https://www.greentribunal.gov.in/sites/default/files/news_updates/Documents%20on%20behalf%20of%20CGWA%20in%20OA%20ON%20594%20of%202024%20(NEWS%20ITEM%20TITLED%20LUCKNOW%20ME%20PAANEE%20CHALA%20RASATAL%2010%20SAAL%20ME%20160%20FOOT%20NEECHE%20CHALA%20GAYA%20JALSTAR%20MEL%20RAHE%20KHATARNAK%20SANKET_0.pdf
- Lucknow Municipal Corporation (2018). AMRUT detailed project report, Lucknow, 22 May 2018, §2.1.7 (storm drainage and the Qila Mohammadi drain). https://lmc.up.nic.in/pdf/amrut/DPRLucknow22052018.pdf
- Kathuria, S.N., Kaur, S. and Mehra, A.K. (1987). Rainfall intensity for local drainage design in Lucknow and its neighbouring area. Mausam 38(1), 85–88. https://mausamjournal.imd.gov.in/index.php/MAUSAM/article/download/2654/2468
- India Meteorological Department (2022). Press releases of 15 and 16 September 2022 (heavy rainfall over Uttar Pradesh). https://internal.imd.gov.in/press_release/20220915_pr_1821.pdf ; https://internal.imd.gov.in/press_release/20220916_pr_1823.pdf
- ISET-International and CDKN (2014). Gorakhpur: Extreme Rainfall, Climate Change, and Flooding, technical report (landing-page summary; secondary source). https://cdkn.org/resource/gorakhpur-extreme-rainfall-technical-report
- Drishti IAS. Goddhoia drain and Ramgarh Tal (project of 7 November 2022; secondary source). https://www.drishtiias.com/state-pcs-current-affairs/goddhoia-drain-and-ramgarh-tal
- The Statesman. UP Jal Nigam adopts geotube technology to treat drains ahead of Maha Kumbh 2025 (Prayagraj drains; secondary source). https://www.thestatesman.com/india/up-jal-nigam-adopts-geotube-technology-to-treat-drains-ahead-of-maha-kumbh-2025-1503376493.html
- Free Press Journal. UP plans 45-drain sewage control network to clean Gomti river in Lucknow under Namami Gange (secondary source). https://www.freepressjournal.in/uttar-pradesh/up-plans-45-drain-sewage-control-network-to-clean-gomti-river-in-lucknow-under-namami-gange
- Down To Earth (2019). Dirty Ganga: funds down the drain in UP (Kanpur drains; secondary source). https://www.downtoearth.org.in/water/dirty-ganga-funds-down-the-drain-in-up-63980
- Down To Earth (17 July 2023). 2020 order on floodplain zoning declaring Gomti non-perennial river draws flak (Gomti 100 m and 50 m lines; secondary source). https://www.downtoearth.org.in/urbanisation/dte-exclusive-2020-order-on-floodplain-zoning-declaring-gomti-non-perennial-river-draws-flak-90655
- ThePrint (4 February 2025). Over 5,000 buildings in Agra face risk of demolition after UP govt demarcates Yamuna floodplain (secondary source). https://theprint.in/india/over-5000-buildings-in-agra-face-risk-of-demolition-after-up-govt-demarcates-yamuna-floodplain/2478998
- Free Press Journal (2026). Centre redefines Ganga floodplain, drops construction-free zone wording (secondary source). https://www.freepressjournal.in/india/centre-redefines-ganga-floodplain-drops-construction-free-zone-wording
- Drishti IAS / Free Press Journal (2025). UP ranks first in Amrit Sarovar construction (secondary sources). https://www.drishtiias.com/state-pcs-current-affairs/up-ranks-1st-in-amrit-sarovar-construction/print_manually
Annexes and forms
| Annex / Form | Content |
|---|---|
| 11A | BSMP terms of reference template |
| 11B | Basin lists and boundaries for Tier A bodies |
| 11C | Depth–damage curves for Uttar Pradesh building types |
| 11D | BSMP data and model publication standard |
| Form 11-1 | Annual implementation report |
Commentary. Uttar Pradesh has a funded State programme for city drainage master plans, but no approved plan or design standard has been published. The Urban Development Department's guideline of December 2024 found that "there is no integrated plan for urban drainage" in the State and that existing drains are usually designed for a 1–2 year return period (UDD 2024). It makes an approved Integrated Urban Storm Water Drainage Master Plan (IUSWDMP) a precondition for projects under its storm water drainage scheme (waived for 2024-25), with ₹1,000 crore provided for 2024-25, of which ₹100 crore was for the plans, and all Nagar Nigams eligible first. Each plan is to be prepared by catchment, and may extend beyond the local body's limits, by the Construction and Design Services (C&DS) of UP Jal Nigam (Urban), to the CPHEEO Manual on Storm Water Drainage Systems (2019); it is to integrate existing detention ponds and lakes, analyse inundation for rainfall above the design, and model hotspots and bottlenecks. It is approved by the local body's standing committee and then by a State Level Apex Committee chaired by the Chief Secretary, after appraisal by the Directorate of Local Bodies, while a Divisional Administrative Coordination Committee under the Divisional Commissioner coordinates the agencies and keeps the drain land free of encroachment (UDD 2024). The guideline sets no return period, level of service or detention standard. A Lok Sabha reply is reported to say that plans are being prepared for 16 municipal corporations and that Gorakhpur began its own plan (as reported; not read). This chapter supplies the design storm, levels of service, storage and buffer criteria that such a plan needs; it has not been adopted by the Urban Development Department or by any other body. A site-level manual cannot fix basin-level problems: lost tank storage, city outfalls to the Gomti, the Ganga, the Yamuna, the Rapti and the Hindon closed when the rivers are high, drains behind river embankments that reach the river only through regulators or by pumping, nalas that carry sewage to interception structures at their outfalls, natural drains and tals narrowed or filled by encroachment, single drains split between a Nagar Nigam, a development authority and I&WRD, and drains that are adequate on their own but overload the next reach. Comparable manuals pair site criteria with basin planning:
This chapter adapts that method to Uttar Pradesh: to city outfalls on the Gomti, the Ganga, the Yamuna, the Rapti and the Hindon that the rivers close in flood, and to drains behind river embankments that reach the river only through regulators or by pumping; to nalas that carry sewage to interception structures at their outfalls; to drains held by Nagar Nigams, development authorities, industrial development authorities and I&WRD without a rule that divides them; to tals and ponds that the law protects but encroachment has reduced; to the State's own programme of drainage master plans under the Urban Development Department's guideline of December 2024, which names who prepares and approves a plan but sets no design return period; and to a south-west monsoon whose short bursts exceed what the CWC ratios assume.