Draft v1.0 prepared by NEER. Not adopted by the Government of Uttarakhand or any authority or local body, and has no legal force. About this draft

Uttarakhand · Draft v1.0

Uttarakhand Stormwater Design Manual

About this draft

Status. This is Draft v1.0 of the Uttarakhand Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Uttarakhand.

Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Uttarakhand or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Housing Department (Awas Vibhag) or its Town and Country Planning Department (T&CP), the Urban Development Department or its Directorate (UDD), the Irrigation Department, the Mussoorie Dehradun Development Authority (MDDA), the Haridwar Roorkee Development Authority (HRDA), the Uttarakhand Housing and Urban Development Authority (UHUDA), any district-level development authority, the Dehradun Municipal Corporation (DMC) or any other Municipal Corporation (Nagar Nigam), Nagar Palika Parishad, Nagar Panchayat or other local body, or any other agency. Where it names a body, such as the Revenue Department, the Public Works Department (PWD), Uttarakhand Peyjal Nigam, Uttarakhand Jal Sansthan, the Uttarakhand Urban Sector Development Agency (UUSDA), Dehradun Smart City Limited (DSCL), the Lake Development Authority at Nainital, the Uttarakhand Environment Protection and Pollution Control Board (UKPCB), the Uttarakhand State Wetland Authority, the Spring and River Rejuvenation Authority (SARRA), the Uttarakhand State Disaster Management Authority (USDMA), the Uttarakhand Landslide Mitigation and Management Centre (ULMMC), the State Mission for Clean Ganga, a District Magistrate acting as Flood Zoning Authority, a district administration, a dam or barrage operator such as THDC India Limited (THDC) or Uttarakhand Jal Vidyut Nigam (UJVN), or a body of the Union, such as the Central Water Commission (CWC), the Central Ground Water Board (CGWB), the India Meteorological Department (IMD) or the National Mission for Clean Ganga (NMCG), it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role.

No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. The Uttarakhand Building Construction and Development Bye-laws/Regulations, 2011 (Amendment 2015) as amended, the Unified Zoning Regulations, 2025, the master plans and their approval conditions, notifications under the Uttarakhand Flood Plain Zoning Act, 2012, the Government Orders on the banks of the Ganga, drainage schemes, orders of courts and tribunals and approval conditions in force continue to apply.

Names. Some places, rivers and gauges have more than one name or spelling in statutes, sources and on IMD and CWC stations:

  • Uttarakhand was part of Uttar Pradesh until 9 November 2000, and was called Uttaranchal until 2007; Acts adapted in its first years keep that name. Older sources, including the CWC flood estimation reports for zone 7 (1994) and subzone 1(e) (1984), the National Institute of Hydrology's water balance of Nainital lake (1998–99) and IMD's station lists, name its districts as districts of "Uttar Pradesh" or "U.P.". The district map has also changed: Saharanpur district included Hardwar until 1988; Nainital included today's Udham Singh Nagar until 1995; Garhwal is now Pauri Garhwal; Almora included Bageshwar and Champawat; and Chamoli included part of Rudraprayag. IMD and CWC sources, and the rainfall data in this Manual, use the districts of their time, and a clause that names a district must be checked against the current list;
  • Haridwar is written Hardwar in IMD's tables and many older sources, and IMD's gauge of the 1880 record is Hardwar (Hydro); Dehradun is also Dehra Dun; Joshimath was renamed Jyotirmath in 2023, and its IMD and CWC stations and most sources, including those on its subsidence, keep the old name; Mukteshwar is Mukteswar on IMD's observatory, Lansdowne Landsdown, Kichha Kitchha, Banbasa Bambasa, Ukhimath Okhimath, Devprayag Deoprayag, Kotdwara Kotdwar, Munsiari Munsiyari, the bhabar bhabhar and the terai tarai. The Sarda is also the Sharda and, on the Nepal border, the Mahakali or Kali; the Gaula is also the Gola; and the Kosi in this Manual is the river of Almora and Ramnagar in Kumaon, not the larger river of that name further east;
  • Raipur in this Manual is the IMD raingauge and the area of that name on the eastern edge of Dehradun, towards Maldevta, where 487.5 mm fell on 2 August 1959; it is not Raipur, the capital of Chhattisgarh. Rajpur, the raingauge at the foot of the Mussoorie hills north of the city (440.4 mm on 25 August 1954), is a different station. Dehradun also has an IMD observatory (42111), with records from 1901, and self-recording raingauges whose short-duration maxima are printed in the CWC report for zone 7. This Manual names the station each figure comes from;
  • CWC's zone 7 ("Western Himalayas", report No. WH/22/1994, titled "J & K Kumaon Hills" in CWC's list of subzones) and subzone 1(e) ("Upper Indo-Ganga Plains", 1984) are the two hydrometeorological regions of the CWC flood estimation reports that cover the State. Their boundary runs along the Siwalik front: Dehradun, Doiwala, Rishikesh, Mussoorie and the hills are in zone 7; Haridwar, Roorkee, Kotdwara and the bhabar and terai of Kumaon, with Haldwani, Kashipur and Rudrapur, are in 1(e); Kathgodam is on the line. Neither report names Uttarakhand, which did not exist when they were written. They are not the three rainfall zones (UK-Z1 to UK-Z3) and six hydrologic sub-areas (UK-A to UK-F) that this Manual sets in Annex 2A, nor Zones 1 and 2 of a waterbody setback in Chapter 7, nor the prohibited and restricted areas of the Flood Plain Zoning Act;
  • where a shared clause names the State's main city or its municipal corporation, this Manual names Dehradun, the seat of the State Government, and the Dehradun Municipal Corporation (DMC), Nagar Nigam Dehradun. MDDA is the Mussoorie Dehradun Development Authority, into which Rishikesh was merged in 2019; HRDA is the Haridwar Roorkee Development Authority; and UHUDA, the Uttarakhand Housing and Urban Development Authority, is the State-level authority to which the funds, assets and liabilities of the former regulated areas were transferred. District-level development authorities, such as that of Haldwani–Kathgodam, were constituted in 2016–17;
  • the State has five belts, broadly from south to north. The Ganga alluvium of southern Haridwar district; the terai, 8–25 km wide, where the water that sank into the fans above emerges along a spring line, with water within 1–7 m of the ground and more than 2,000 artesian wells; the bhabar, 4–20 km wide, a belt of coalesced boulder fans at the foot of the hills where the streams sink and the water table lies 40–75 m down, and the State's main recharge zone; the Siwalik hills; and, behind them, the Doon (Dun), the valley between the Siwalik and the Mussoorie ridge, floored by the Doon Gravels, a deep fill of boulders and pebbles in a sandy and silty matrix. North of these rise the Lesser and Great Himalaya, whose outer ridge (Mussoorie, Nainital, Lansdowne) takes the monsoon head-on and whose inner valleys (Tehri, Srinagar, Uttarkashi, Pithoragarh) lie in its rain shadow. Garhwal and Kumaon are the State's two divisions, west and east. The names describe regions, not administrative units, except where a district bears the same name;
  • the hills have their own names for water, from the hill dialects of Garhwali and Kumaoni. A taal (ताल) is a lake or tank that holds rainwater, as in Nainital, Bhimtal, Sattal and Naukuchiatal; this Manual uses it as its general term for lakes and ponds, and talab (तालाब) in the plains. A khal (खाल) is a small rain-fed pond or recharge depression on a hill, often in the saddle between two crests; the word also means a saddle in place names, such as Dwarikhal, and in Dehradun court records khala is a seasonal storm channel, so this Manual always glosses it. A naula (नौला) is a covered, stepped tank that collects water from a spring, and a dhara (धारा) a spring spout; the bye-laws call both "underground water sources", and dhara also means a section of an Act. A gadhera (गधेरा) is a small hill stream that flows in the rains, and a gad (गाड़) a hill river or torrent, as in Kheer Gad. In the Doon a rao (राव; also rau) is a seasonal torrent with a bed of boulders, such as the Bindal Rao, the Sitla Rao and the Rawli Rao; in the hill dictionaries rau is a pool in a stream, and the Doon sense comes from use, not from a dictionary; and
  • many levels and flows in the sources are not in metric or not on a stated datum. The levels of the Naini lake are read in feet on the PWD gauge at Tallital, and must be converted to metres above mean sea level before use; flows at barrages are often given in cusecs (cubic feet a second; 1 cusec = 0.0283 m³/s), as at the Gaula barrage at Kathgodam, designed for 115,000 cusecs (about 3,250 m³/s), which passed 123,000 cusecs in 1993. CWC's levels for its sites in the State were read only in transcriptions by SANDRP, which also give two values for some sites: the highest flood level of the Ganga at Haridwar, 296.30 m, is dated 19 September 2010 in one transcription and 17 June 2013 in another, and that of the Kosi at the Ramnagar barrage in October 2021 is given as 220.75 m and as 220.95 m. No source read states the datum of these levels, and they are quoted as reported [TBC].

This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:

  • the Uttarakhand Building Construction and Development Bye-laws/Regulations, 2011 (the Bye-laws 2011) are Uttarakhand's own building rules, made by the Housing Department under s.57 of the Uttar Pradesh Urban Planning and Development Act, 1973, which the State inherited from Uttar Pradesh in 2000 and amended in 2013; the notifications render the Act's name in three ways. The rules in force are the Bye-laws 2011 (Amendment 2015), amended piecemeal since; the amendments of 27 September 2022, 13 March 2023 and 10 January and 13 June 2024 were read, and only the filling-station rule of 10 January 2024 touches water. A comprehensive "Amendment 2017" exists only as a draft, on which MDDA invited suggestions until February 2018. Each development authority adopts the bye-laws and each amendment through its board. The text read for this Manual is a compilation of the bye-laws with their amendments of 2015 to 2019, which MDDA's website labels a draft; Uttar Pradesh's own building bye-laws do not apply in Uttarakhand;
  • a Municipal Corporation (Nagar Nigam) is constituted under the Uttar Pradesh Municipal Corporation Act, 1959 as adapted by the Uttaranchal (Uttar Pradesh Municipal Corporation Act, 1959) Adaptation and Modification Order, 2002, and a Nagar Palika Parishad or Nagar Panchayat under the Uttar Pradesh Municipalities Act, 1916, with its Uttaranchal Amendment of 2002. Their Uttarakhand texts, and their chapters on drains, were not read for this Manual [TBC]. All three are urban local bodies (ULBs) under UDD. The CAG counted 91 ULBs in 2021, eight of them Municipal Corporations; there are now 11, taken to be Dehradun, Haridwar, Haldwani, Rudrapur, Kashipur, Roorkee, Rishikesh, Kotdwara, Srinagar, Pithoragarh and Almora [TBC]. The Uttarakhand Special Provisions for Urban Local Bodies and Authorities Act, 2018 bars the eviction of settlements that existed before 11 March 2016, and was reported extended by an amendment of 2025;
  • the Housing Department issues the bye-laws and the Unified Zoning Regulations, 2025 (UZR; notification No. 568 of 20 November 2025, under s.8(2) of the 1973 Act), which T&CP prepared, and oversees the development authorities and UHUDA; the development authority, or the ULB outside its area, grants building permission;
  • the Irrigation Department holds the rivers and the flood works and is the nodal agency for floodplain zoning under the Uttarakhand Flood Plain Zoning Act, 2012 (Uttarakhand Act No. 07 of 2013). The Act is applied river by river: the Irrigation Department maps the 25-year and 100-year flood lines, the Flood Zoning Authority, usually the District Magistrate, notifies them, and land inside the 25-year line becomes a prohibited area and land between the two lines a restricted area. The Irrigation Department is also preparing drainage master plans for Haldwani and other towns of Kumaon, as reported, and is named in this Manual as the State groundwater agency, because the Uttarakhand Ground Water (Regulation and Control of Development and Management) Act, 2016 was repealed in 2017 and no groundwater law is in force;
  • the PWD keeps the State's roads and their roadside and hill-road drains; Uttarakhand Peyjal Nigam builds sewers, treatment plants and the interception and diversion (I&D) of drains, and Uttarakhand Jal Sansthan runs them; UUSDA carries out the urban projects funded by the Asian Development Bank (ADB), including the storm drains of Dehradun; and DSCL is the company of the Smart Cities Mission in Dehradun;
  • USDMA is the State's disaster management authority, and ULMMC its centre for landslides; no founding instrument of ULMMC was found. The Uttarakhand State Wetland Authority was constituted by a letter of 16 October 2019; the national atlas lists 192 wetlands in the State, and no wetland notified under the Wetlands (Conservation and Management) Rules, 2017 was found. SARRA, for springs and rivers, was reported constituted in May 2025; no order constituting it was found. The Lake Development Authority at Nainital acts against unauthorised building around the lake; its instruments were not read; and
  • a tehsil is the revenue subdivision of a district, under a Tahsildar. River beds outside municipal limits are recorded as forest land, as the High Court noted in 2022.

Some abbreviations have more than one meaning:

  • AMC is the antecedent moisture condition in Chapters 2 and 3; this Manual does not use it for any municipal body;
  • DMC is the Dehradun Municipal Corporation. DM is the District Magistrate, who is also the Collector and, under the Flood Plain Zoning Act, usually the Flood Zoning Authority; disaster management is written in full;
  • HFL is the highest flood level recorded at a gauge, as CWC uses it. It is not a design level, and sources sometimes give different values for the same gauge. At several CWC sites in the State the transcribed HFL is below the warning level, and such rows are not used without CWC's site sheet. WL and DL are CWC's warning and danger levels;
  • FRL (full reservoir level) and MWL (maximum water level) are used for reservoirs and barrage ponds, such as Tehri (FRL 830 m, MWL 835 m); the "maximum fixed level" of a lake is the bye-laws' term;
  • FPZ is the Flood Plain Zoning Act, 2012, or a zone notified under it; the "25-year line" and the "100-year line" are the limits of its prohibited and restricted areas; and
  • SWD is a storm water drain.

The sense is clear from the context. Hindi, Garhwali and Kumaoni terms used in the text, such as taal, khal, naula, dhara, gadhera, gad and rao, and also gul (गूल, an irrigation channel dug along the contour), simar (सिमार, a marshy tract fed by groundwater), sera (सेरा, irrigated fields on a valley floor), chal-khal (the traditional practice of building small rain-fed ponds on the hills), nala (नाला, a natural drain or large storm drain), nali (नाली, a small street drain) and talab (तालाब, a pond or tank in the plains), are explained where they first appear.

Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.

Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.

Comments. Comments and corrections are welcome at info@neer.ai.

Preface

Uttarakhand's towns flood, and fail, for three reasons. Dehradun showed the first on 25 July 1966, when its observatory recorded 487.0 mm in a day, far more than the 100-year day on the national maps, on a valley whose drains are designed for a 2-year storm where any storm is stated; Joshimath showed the second in the winter of 2022–23, when the town subsided and an expert committee named inadequate drainage and sewerage among the causes, as reported; and the Rispana shows the third, a river of Dehradun whose bed is lined with houses and whose drains carry sewage, and which only in May 2025 had its floodplain notified.

  1. The outer Himalaya meets the monsoon head-on, with days far above the national maps and bursts of an hour on steep catchments, where drains fail by debris and blockage before they fail by capacity. The Bay depressions that bring the monsoon reach the State weakened, about 1,300 km from the coast, but where they and the western disturbances meet the first ridges of the Himalaya the rain is among the heaviest in north India. The days recorded on those ridges exceed the 100-year values that the CWC flood estimation reports map for them: Hardwar (Hydro) recorded 495.3 mm on 18 September 1880, the State's record, against about 280–320 mm on the map; Raipur, on the edge of Dehradun, 487.5 mm on 2 August 1959 and the Dehradun observatory 487.0 mm on 25 July 1966, against about 320–360 mm; and Rajpur 440.4 mm in 1954, all within about 10 km of one another. On 18–19 October 2021, after the monsoon had withdrawn, Pantnagar recorded 403.9 mm, Nainital 401 mm and Mukteshwar 340.8 mm in a day, against previous records of 228, 313.7 and 254.5 mm, as reported; the Gaula bridge at Haldwani partly collapsed and the Naini lake overflowed. Short bursts are as severe: Dehradun's self-recording gauge recorded 98 mm in one hour on 14 June 1970 and 143 mm in three hours, and Uttarkashi 100 mm in one hour in 1979. On 16 September 2025 IMD's centre at Dehradun recorded 26 cm at Sahastradhara in the 24 hours to 08:30, and the press reported 264 mm with 54 mm in one hour; IMD said the storm was not a cloudburst. In Dehradun district 13 bridges, 10 culverts and 21 roads were lost and at least 30 people died, as reported, and 83 of the structures that intercept the drains of the Rispana and the Bindal were damaged. On slopes of 10–60% a street drain fills in minutes, and it fills with stones, gravel and debris as well as water: a drain or culvert that is blocked by boulders or buried by a slip fails long before its capacity is reached. The only design basis found for any drain in the State is that of the drains built in Dehradun with ADB funding: "a storm frequency of once in 2 years" for roadside drains and "once in 5 years" for primary and secondary channels, with no allowance for climate change. In the high valleys the largest disasters were not floods that a drain could carry: the Kedarnath flood of June 2013 followed 325 mm in 24 hours at Chorabari glacier and the breach of the lake below it; the Raini flood of 7 February 2021 was a rock and ice avalanche of about 27 million m³ with no rain; and the debris flow that buried Dharali on 5 August 2025 came when the gauge at Harsil recorded 0.8 cm. Such events set where towns may build, not how their drains are sized.
  2. Hill towns built on colluvium and old slides, where water put into the ground can move the ground. Nainital's slopes are colluvium and old slide debris, and after about 33 inches of rain in three days a landslip on 18 September 1880 killed about 151 people, as reported; the drains built after it still carry the town's runoff to the lake. Below the lake the Balia Nala, its outlet, slides because the perched groundwater in its slopes is recharged by the drains and wastewater of the catchment, which raises the pressure of the water in the soil and lowers its strength. At Joshimath, a town built on moraine, studies quoted after the subsidence of 2022–23 named "internal erosion caused by the subsurface drainage, which may be due to infiltration of rainwater/melting of ice/waste water discharge" and said it "can be minimized by controlling infiltration of water"; a committee had asked in 1976 for its open drains and soak pits to be closed, as reported, and about 1,403 of 2,152 houses were reported affected. The bye-laws forbid building on slopes steeper than 30° (26.5° in Nainital) or within 250 m of a site prone to landslides, and require a site plan on a slope to divert the water that comes from uphill away from the foundations, but no rule restricts soak pits or recharge pits on slopes, and the rainwater harvesting rule rewards a recharge pit on any plot of more than 400 m² by cutting the storage required to one-third. The plains habit of recharging everywhere must therefore be reversed on the slopes. It holds on the Doon Gravels, whose hydraulic conductivity is 13–583 m a day, and on the bhabar, whose water table lies 40–75 m down, as deep as 173.71 m at Bhotia Parao near Haldwani: these are the State's recharge zones, and the bhabar feeds the artesian aquifers of the terai, whose zone of free-flowing wells has receded by about 5–7 km in the east as the bhabar has been cleared and built over. Haldwani, Kashipur and Bahadrabad and Bhagwanpur in Haridwar district are the State's semi-critical blocks. In the hills, the springs that supply 70–87% of the water in some blocks are failing: the working springs of the Almora region are reported to have fallen from 360 to 60 over 150 years, and the National Institute of Hydrology (NIH) estimated that about half the subsurface recharge of the Naini lake enters through the 2 ha bed of the Sukhatal, on which the High Court stopped construction in 2022.
  3. Rivers and raos encroached and laden with sewage, a floodplain law notified on only some reaches, and no design storm. Dehradun's rivers, the Rispana, the Bindal, the Song, the Suswa and the Tons, are seasonal, boulder-laden and ungauged, and they are also the city's trunk storm drains and, until intercepted, its sewers. In 2022 the High Court, in Urmila Thapa, recorded 37.93 ha of encroachment on river beds in Dehradun tehsil and 57.4 ha in Vikasnagar; in 2025 the National Green Tribunal (NGT) recorded 89 encroachments on the Rispana in the Municipal Corporation's area and 413 in MDDA's; and in 2026 NMCG counted 330 structures in the Rispana's 5-year flood zone. Of the 208 drains that reach the Rispana, 187 have been intercepted and diverted to treatment plants, but the floods of September 2025 damaged 83 of the interception structures; statewide, CPCB counted 70 of 200 monitored drains as untapped in 2025, and listed the Rispana, the Bindal Rao, the Rambha at Rishikesh and the Kalyani at Rudrapur as "rivers reported as drains", as quoted. The Flood Plain Zoning Act gives the State a working floodplain law, but it has been finally notified on 614.6 km of five rivers of the Ganga system in the hills and on the Rispana (5 May 2025), and the Asan was reported approved in June 2025; the studies of the Gaula, the Kosi, the Suswa, the Song, the Baldi and the Solani are done but not notified, and an amendment of 2024 allows a notified floodplain to be reduced where "riverbank development" can protect the land behind it. Of the drains themselves, no State or municipal standard states a design storm, and the 2-year and 5-year rule of one project in Dehradun is the only basis in use.

Behind all three lie the State's lakes, springs and reservoirs, which set the level at the outfall. The Naini lake is a closed basin: every drain of Nainital discharges to it, and it discharges through five sluice gates at Tallital, installed in 1888 and worked by rules of the Hill Slide Committee of 1927 that limit their opening to protect the Balia ravine below; the maximum lake level is 12.5 ft on the PWD gauge (12 ft in the press), and the sluices are sealed on 15 October. In October 2021 the lake reached a record of about 12.2 ft and overflowed, as reported. Upstream the Bhagirathi is held by the Tehri dam (FRL 830 m, MWL 835 m), and below the hills the Ganga by the barrages at Pashulok and Bhimgoda, the Yamuna by the Dakpathar barrage and the Asan by its barrage, whose wetland, 444.4 ha, became the State's first Ramsar site on 21 July 2020. The Unified Zoning Regulations of 2025 put every river and waterbody in the revenue records, including ponds, lakes, nalas and streams, in a conservation zone with no new construction within 30 m of river and lake banks, but no wetland in the State has been notified, and no statute protects a spring.

Design for Uttarakhand therefore has to cover a monsoon that reaches Dehradun about 20 June and Roorkee about 28 June and withdraws about 25–27 September, with the State clear by about 1 October under IMD's new normals, but whose largest storms in Kumaon came in October (9 October 1956 and 18–19 October 2021); about 78% of the year's rain falls from June to September and 9% in winter, from western disturbances, which have brought days of 192.0 mm at Mukhim (20 February 1979) and 210.0 mm at Naitwar (10 February 1986), and snow in January. The State's normal is 1,326.1 mm a year, but the gauges range from 2,588.1 mm at Askote, 2,464.5 mm at Nainital and 2,238.3 mm at Dehradun on the outer ridge to 925.5 mm at Joshimath and 494.7 mm at Srinagar in the rain shadow. Underground, the State draws about half of its extractable groundwater (53.54% in 2024), and none of its assessed units is critical, but the hard-rock hills, 85% of its area, are not assessed at all; in the samples of 2024, nitrate exceeded 45 mg/L in 17.39%, and arsenic exceeded 10 ppb in 3.86%, in Almora, Haridwar and Udham Singh Nagar, which limits what may be recharged.

National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:

  • hold frequent rainfall on site, in the ground where the ground can take it and in tanks where a slope cannot;
  • release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
  • show that its outfall still works when the receiving rao, gadhera, river, taal or reservoir is high, when a barrage or dam upstream is releasing, or when a drain is choked with debris.

The Manual also sets how public drains, hill roads and their drains, raos, gadheras, rivers, taals, reservoirs and springs, outfalls and basin-wide master plans are designed, and how drains in steep catchments are protected against debris and sediment, so that private sites and public works aim at the same standard.

The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Uttarakhand's south-west monsoon from late June to the end of September, with its storms against the outer ridge, its late storms in October and its western disturbances in winter; to the Ganga and its headwaters, the Bhagirathi, the Alaknanda and the Mandakini, under the Tehri and Koteshwar dams and the barrages at Pashulok and Bhimgoda; to the Yamuna, the Tons and the Asan under the Dakpathar and Asan barrages; to the raos of the Doon, the Song, the Suswa, the Rispana and the Bindal; to the Gaula, the Kosi, the Ramganga and the Sarda in Kumaon, under the barrages at Kathgodam, Ramnagar and Banbasa; to the Doon Gravels, the boulder fans of the bhabar, the wet terai, the Ganga alluvium, the Siwalik and the colluvium, slide debris and moraine of the hills; to the taals of Kumaon, the naulas and dharas and the khals; and to towns whose roads and stepped houses lie across the natural lines of drainage on the slopes.

  1. National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes, including IRC:SP:42-2014 on hill roads, and the NDMA urban flood guidelines are also used. The drainage chapter of the IRC's hill road manual, IRC:SP:48, was not read for this Manual.
  2. Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
  3. Design rainfall. The two CWC Flood Estimation Reports that divide the State at the Siwalik front, as the interim source: the report for zone 7, Western Himalayas (1994), for the Doon and the hills, and the report for subzone 1(e), Upper Indo-Ganga Plains (1984), for Haridwar–Roorkee and the bhabar and terai of Kumaon and Garhwal. The zone 7 report rests on only six gauged catchments, about 1% of the zone, of which one, the Suswa, is in the State; it warns against using its relations without checking them, and does not apply them to snow-fed catchments, which this Manual leaves to site-specific study with a screening for debris flows and glacial lake outbursts. Its ratio of the 1-hour to the 24-hour rain, 0.425, is the highest in the series: it fits the bursts recorded in the Doon and the inner valleys, where this Manual uses it, but gives more than twice the largest hour recorded at Nainital, so on the outer-ridge hill stations this Manual applies the ratios of the 1(e) report to the zone 7 maps. It does check the design day against the largest reliable days recorded nearby, which exceed the maps in the Doon and at Haridwar. IMD's national set of rainfall intensity curves (Das et al., 2022) has a panel for Dehradun, but it repeats the generic curve printed for many other cities and is not Dehradun data; an equation for the northern region gives Dehradun a 2-year day of about 63 mm, against 152 mm from the station's own record, and is not used; and frequency analysis of gridded rainfall by NIH, Roorkee, is used for comparison only in the plains, since in the high valleys it gives 1-hour falls of a tenth of the day.
  4. Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
  5. Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
  6. Local rules. The Uttar Pradesh Urban Planning and Development Act, 1973 as applicable in Uttarakhand; the Bye-laws 2011 (Amendment 2015) as amended, applied by the development authorities, UHUDA and the ULBs; the Unified Zoning Regulations, 2025; the Uttarakhand Flood Plain Zoning Act, 2012 and the notifications under it; the Housing Department's Government Order of 29 November 2017 on the banks of the Ganga in the hills, as revised on 1 June 2023; the Uttar Pradesh Municipal Corporation Act, 1959 and the Uttar Pradesh Municipalities Act, 1916, as adapted; the Doon Valley notification of 1989 and the Bhagirathi eco-sensitive zone of 2012 under the Environment (Protection) Act, 1986; the Wetlands (Conservation and Management) Rules, 2017; the Ganga Authorities Order of 2016; and the orders of the High Court of Uttarakhand and the NGT on rivers, lakes, encroachment and sewage. This Manual follows them or, where disclosed, makes them stricter. The bye-laws were read in a compilation of their amendments of 2015 to 2019, not in their gazetted text, and the printed setbacks of bye-law 4.4 are read as single distances; four amendments of 2022–2024 were read, others only by title, and none of them adds a rule on detention, drainage design or flood-prone land. The amendment of 2024 to the Flood Plain Zoning Act was seen only as quoted, the Rules approved by the cabinet on 12 October 2026 were not found, and the final notification for the Rispana was not read. The Municipal Acts were not read in their Uttarakhand form, and the Doon Valley and Bhagirathi notifications were not opened. The Ground Water Act of 2016, repealed in 2017, is not relied on. Every rule cited must be checked against the current text.

Why this Manual is needed

India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.

The national documents leave key values open, or give different answers.

  • Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 5–25 years for road drains and 10–50 years for culverts, by class of road and size of culvert. An engineer designing a drain in Uttarakhand can cite 1, 2, 5, 10 or 25 years, depending on the code chosen.
  • Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
  • Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period.
  • Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. IMD's 2022 national set of rainfall intensity curves has one panel for the State, Dehradun, and it repeats the curve printed for many other cities. The two CWC reports that cover the State date from 1984 (subzone 1(e)) and 1994 (zone 7); they take the 1-hour rain as 0.34 (1(e)) and 0.425 (zone 7) of the 24-hour rain, which gives a 50-year hour of about 95 mm at Haridwar, 119–136 mm at Dehradun, 136–150 mm at Haldwani and more than 187 mm at Nainital, where the largest hour on the self-recording gauge was 79 mm; the largest hour on Dehradun's self-recording gauge is 98 mm (1970) and Uttarkashi's 100 mm (1979). At the other end their maps are exceeded at gauges: Dehradun recorded 487.0 mm in a day where the map gives a 100-year day of about 320–360 mm, Hardwar 495.3 mm against about 280–320 mm, and Pantnagar 403.9 mm against a 50-year day of about 280–320 mm. The reanalysis grids of NIH-DHAARA err both ways: they give a 50-year day of about 400 mm at Kashipur and Rudrapur, above the maps' 280–320 mm, and a 50-year hour of 24 mm at Joshimath and 32 mm at Kedarnath, where Uttarkashi has recorded 100 mm.

Uttarakhand has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of UDD, the Housing Department, the Irrigation Department, DMC or any other Municipal Corporation that fixes a return period or a design rainfall for city storm drains. The storm drains built in Dehradun with ADB funding, at least 117 km, were designed for a 2-year storm in roadside drains and a 5-year storm in primary and secondary channels, with a minimum drain of 250 × 250 mm, velocities of 0.6–3.0 m/s and outfall inverts above the highest flood level of the receiving water; their designs "do not include an allowance for climate change", and the project's own climate risk assessment recommends drains that carry "10-20% more flow". The CAG found in 2025 that Dehradun's Smart City drainage work made no provision for storm water reuse, for which the Smart City plan had provided. The Irrigation Department is preparing drainage master plans for Haldwani, at a reported ₹1,003 crore, and for other towns of Kumaon; no design storm for them has been published. These are projects, not a State standard. This Manual is offered as a technical companion to the bye-laws, the Unified Zoning Regulations, the Flood Plain Zoning Act and the Municipal Acts: it supplies the design storm, detention, slope, water-level and buffer values that they leave open. It has not been adopted by UDD, the Housing Department or any other body. In particular:

  • The bye-laws require setbacks and rainwater harvesting, but not detention. Bye-law 6.5 makes rainwater harvesting mandatory where the ground coverage is 125 m² or more, except in waterlogged areas, with storage of 2.0 m³ up to 250 m² of coverage, 3.5 m³ up to 400 m² and 0.5 m³ more for every further 50 m²; on plots of more than 400 m² that provide recharge, one-third of that storage suffices. The storage holds about 8–16 mm of rain on the covered area. Bye-law 4.4(V)(b), which requires a site plan on a slope to divert the water coming from uphill away from the foundations, is the only clause on the runoff of a site. No rule requires on-site detention, limits peak runoff, sets "zero runoff" or deals with permeable paving, and the Ground Water Act of 2016, which let an authority order rainwater harvesting, was repealed in 2017;
  • The slope rules stop building, not infiltration. Bye-law 4.4(IV) forbids building where the local slope exceeds 30° (26.5° in the Nainital municipal area) or landslides are likely to be severe and continuous, and requires a contour plan at 2 m intervals; the hills allow a single basement, only on plots of at least 2,000 m² with 18 m of frontage. No rule restricts soak pits, recharge pits or infiltration trenches on slopes, on slide debris or above a cut or retaining wall, and the storage discount of bye-law 6.5 for recharge applies on any site;
  • The setbacks are fixed distances, and two readings of the Ganga line conflict. Bye-law 4.4(III) leaves 30 m from the bank of a river, 10 m from a spring and 30 m from a lake or the maximum fixed level of a natural reservoir free of any construction, and keeps building at least 5 m from the bank of a nala; the first two are printed "30.0–30.0" and "10.0–10.0" metres and are read as single distances [TBC]. The Unified Zoning Regulations repeat the 30 m. On the Ganga in the hills a Government Order of 2017, revised in 2023, prohibits building within 100 m of the middle of the river or the 25-year flood, whichever is more, and regulates the next 200 m, and yields to the Irrigation Department's floodplain notifications where they exist; for the reach from Haridwar downstream, the NGT's judgment of 2017 made 100 m from the edge of the river a no-construction zone until the floodplain is demarcated. No rule sizes a buffer along a gadhera or a rao by the flood it carries;
  • The floodplain law covers only some reaches. Final notifications under the Flood Plain Zoning Act cover 614.6 km of the Bhagirathi, the Ganga, the Bhilangana, the Alaknanda and the Mandakini, and the Rispana; the Asan was reported approved in 2025, and the Gaula, the Kosi, the Suswa, the Song, the Baldi and the Solani wait on studies already done. The Act's 25-year prohibited and 100-year restricted lines are drawn by the Irrigation Department with HEC-RAS and marked on revenue maps; NMCG asked in 2025 for the 5-year line as well. In a restricted area the draft notification for Rishikesh (2020) required a plinth at least 1.00 m above the highest flood level; elsewhere the bye-laws require a plinth of only 0.45 m above the ground, and no rule bars basements in flood-prone land. This Manual offers a technical method for drawing a design flood line and corridors (Chapter 7); it does not replace any line that the State notifies or a court draws, and where such a line binds and is wider, it governs; and
  • No document sets the river, rao or lake level for which an outfall is designed. CWC's levels for the Ganga at Haridwar (warning 293.0 m, danger 294.0 m, HFL 296.30 m) and Rishikesh and the Song at Satyanarayan were found only in transcriptions, with two dates for Haridwar's highest flood; Dehradun's raos are ungauged; and the level of the Naini lake is read on a gauge in feet whose datum was not found. Danger levels and highest flood levels are flood-warning levels and records, not design levels.

So each agency and each local body interprets the central manual its own way. DMC and the other Municipal Corporations, the Nagar Palika Parishads and Nagar Panchayats, MDDA, HRDA, UHUDA and the district development authorities, the Irrigation Department, the PWD, Peyjal Nigam and Jal Sansthan, UUSDA, DSCL, road agencies, their consultants and funding agencies fill the gaps differently. Two drains on the same road, built by different agencies, can be sized for different storms from different rainfall sources: the CAG found the drains of Dehradun's Paltan Bazaar divided between DSCL and the PWD. No rule divides the raos from municipal drains: in Dehradun a rao's bed is forest or revenue land, its flood zone is the Irrigation Department's, the interception of its drains is Peyjal Nigam's and the drains that reach it are the Municipal Corporation's. And a reviewer has no common basis against which to check a design.

What this Manual does about it. It turns those open choices into one State standard:

  • one source and method for design rainfall across the State, in three rainfall zones and six hydrologic sub-areas, with a checked station analysis to govern where one exists, the ratios of each CWC report where the records support them, and a check of the design day against the largest reliable days recorded nearby, such as Dehradun's 487.0 mm and Raipur's 487.5 mm; and, in the snow-fed catchments of the high Himalaya, site-specific hydrology with a screening for debris flows and glacial lake outbursts (Chapter 2);
  • named return periods for every drainage element (Chapters 2 and 6);
  • a required pre- versus post-development rule for private sites (Chapter 4);
  • a required tailwater check for outfalls to raos, rivers, taals and reservoirs, against a design river or lake level: CWC's levels where they exist, the maximum water level of a reservoir or barrage pond, the sluice rules of the Naini lake, and, on the ungauged raos and gadheras, surveyed flood marks and a 1% AEP study that allows for debris (Chapter 5);
  • a design flood line, and corridors and setbacks along raos, gadheras, nalas and rivers and around taals and springs, proposed by this Manual for use where the Flood Plain Zoning Act has not drawn one, with the bye-laws' 30 m and 5 m lines wherever those are wider (Chapter 7);
  • recharge first on the Doon Gravels and the bhabar, none in the terai where the water table rises within 1 m of the ground, and no deliberate infiltration on slopes steeper than 10°, on landslide or creep zones, on colluvium, slide debris or moraine, or above a cut slope or retaining wall, unless a geotechnical certificate allows it; protection of the recharge areas of springs and of the Sukhatal; and treatment where drains carry sewage (Chapter 8);
  • debris racks and traps, allowances for sediment and blockage, energy dissipation in steep drains, and hill-road drainage that never discharges onto an unprotected slope (Chapters 6 and 9), with debris cleared before the monsoon and again by 15 October in the hill towns, and standby kept to 31 October for the late storms (Chapter 10); and
  • basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).

It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, a development authority, UHUDA or UDD can still adopt a stricter standard (Chapter 1).

Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 cl. 7.1.4 and 8.5.1; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Government of Uttarakhand, Housing Department, Building Construction and Development Bye-laws/Regulations, 2011 (Amendment 2015–2019), compilation hosted by MDDA ("Draft Compiled ByeLaws Part I"), bye-laws 2.3, 2.41, 4.4, 5.1, 5.6, 6.4, 6.5 and Appendix-1; amendment notifications of 27 September 2022 (e-file 33107), 13 March 2023 (e-file 27020), 10 January 2024 (No. 180884) and 13 June 2024 (e-file 64586); draft Bye-laws/Regulations, 2011 (Amendment 2017), hosted by MDDA; Unified Zoning Regulations, notification No. 568/E.No. 92710 of 20 November 2025, chapter 11; Government Order No. 1995/V-2-2017-58(आ0)/2014 of 29 November 2017 and letter of 1 June 2023 (e-file 46063) on the banks of the Ganga; Uttarakhand Flood Plain Zoning Act, 2012 (Uttarakhand Act No. 07 of 2013); Irrigation Department notification No. 1875/II(2)-2020-06(18)/2020 of 7 October 2020 (Ganga at Rishikesh, s.8) and notification No. 888/II(2)/2025 of 3 October 2025; Irrigation Department compliance report, Peyjal Nigam affidavit (December 2025) and NGT order of 18 August 2025 in NGT O.A. 417/2022 (Niranjan Bagchi v. State of Uttarakhand); NMCG and Nagar Nigam Dehradun affidavits (April 2026) in the same case; applicant's submission of 12 March 2026 in NGT O.A. 200/2014 (M.C. Mehta), quoting CPCB; High Court of Uttarakhand, Urmila Thapa v. State, WPPIL 58/2019 (August 2022), Ravi Shankar Joshi v. State, WPPIL 178/2013 (22 November 2019), Rajeshwari Yadav Gupta v. State, WPMS 739/2026 (1 April 2026), and reports of the Sukhatal order (2022); Uttarakhand Ground Water (Regulation and Control of Development and Management) (Repeal) Act, 2017 (Act No. 11 of 2017); Uttarakhand State Wetland Authority, Current Status Report of Wetlands in Uttarakhand (17 October 2025); CAG, Performance Audit on the Implementation of the 74th Constitutional Amendment Act (Uttarakhand, 2022), Chapter 1; CAG, Performance Audit of the Smart Cities Mission (Dehradun, 2025), Chapters 2 and 5; CAG Report No. 39 of 2017, Chapter 8; ADB, Uttarakhand Integrated and Resilient Urban Development Project (38272-044), Climate Risk and Vulnerability Assessment (October 2021) and resettlement plans (July and October 2022); CWC, Flood Estimation Report for Western Himalayas – Zone 7 (WH/22/1994) and Flood Estimation Report for Upper Indo-Ganga Plains subzone 1(e) (1984), plates read by eye; CWC levels as transcribed by SANDRP (2022 and event posts of 2013, 2021 and 2023); IMD, Climate of Uttarakhand (Climatological Summaries of States Series No. 21); IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); IMD, Pai et al. (2020), new normal dates of onset and withdrawal of the south-west monsoon, Table 2; IMD Meteorological Centre Dehradun, Monsoon 2025 report and station extremes; IMD press release of 19 October 2021; Das et al. (2022), MAUSAM 73(4); Ram Babu et al. (2006); NIH-DHAARA (accessed 10 November 2026); NIH, Water Balance of Lake Nainital (CS(AR)-6/98-99); NITI Aayog, Inventory and Revival of Springs in the Himalayas (2018); CGWB, Dynamic Ground Water Resources of Uttarakhand 2024, district brochures for Dehradun, Nainital, Udham Singh Nagar and Hardwar, and Water Level Bulletin (January 2025); UJVN and Irrigation Department salient features of the Dakpathar, Asan and Gaula barrages; THDC, Tehri progress report (February 2025); Dobhal et al. (2013), Current Science 105(2); Shugar et al. (2021), Science 373; reports of the floods of 2013, 2021, 2023 and 2025, of the subsidence of Joshimath (2023), of the Balia Nala and the Nainital landslip of 1880, of the Irrigation Department's drainage master plans for Kumaon (2026) and of the floodplain notifications of the Asan (2025) and the Rules (2026) (press and secondary sources).


How to use this Manual

Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.

Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.

Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.

Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.

Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.

Where to start.

If you are… Read first
A developer or architect Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit)
A design engineer Chapters 2–6, then 8 and 9
A local body or approving authority Chapters 1, 10 and 11
A planner or waterbody manager Chapters 7 and 11

Contents

Ch Title Annexes and forms
1 Policy, Applicability and Adoption Annexes 1
2 Design Rainfall and Design Storms Annexes 2
3 Hydrologic Methods Annexes 3
4 Site Runoff Control: Retention and Detention Annexes 4
5 Downstream and Tailwater Analysis Annexes 5
6 Minor and Major Drainage Systems Annexes 6
7 Waterbodies, Taals (Lakes and Ponds) and Setbacks Annexes 7
8 Water Quality and Recharge Annexes 8
9 Hydraulic Design of Structures Annexes 9
10 Submittals, Review, Operation & Maintenance and Enforcement Annexes 10
11 Basin and City Stormwater Master Plans Annexes 11

List of tables

TableTitle
1.1Differences between Tier A and Tier B authorities
1.2Policy supplement: adoptable alternatives S-1 to S-5
1.3Relationship with other instruments
1.4Roles and responsibilities under this Manual
1.5Working assignment of drainage elements under this Manual
2.1Design return periods (summary)
2.2Interim climate factors
2.3Illustrative scale of the mixed-frequency rule (not design values)
3.1Permitted hydrologic methods
3.2Runoff coefficient C (for AEP of 10% or more frequent)
3.3Frequency factor Cf
3.4Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
3.5Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
4.1Design storms to be routed for detention sizing
4.2Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
4.3Tier B permissible site discharge and site storage requirement (template)
4.3AFixed release coefficients (provisional)
5.1Design tailwater levels for tidal outfalls
5.2Joint-probability cases for tidal and riverine outfalls
6.1Design AEPs for conveyance (matches Clause 2.4)
6.2Street flow limits
6.3Flow hazard limits for streets and overland flow paths
6.4Combined flood hazard vulnerability classes (reproduced for reference)
6.5Inlet clogging factors (share of clean capacity assumed lost)
6.6Manning's n for design (from CPHEEO 2019)
6.7Minimum freeboard in open and covered drains
6.8Maximum spacing of manholes on straight pipe runs
6.9Minimum drainage reserve width (adopted from PUB Singapore)
7.1Fixed-width setback where no 1% AEP extent is available
8.1Pollutants of concern, sources and primary controls
8.2Required Level of Service for sites that are not redevelopment
8.3BMP Value Ratings and suitability in Uttarakhand
9.1Entrance loss coefficients ke (outlet control, full or partly full)
9.2Maximum permissible mean velocities in channels
9.3Riprap classes and apron dimensions (HEC-14)
9.4Minimum internal size of manholes
9.5Minimum IS 456 exposure classes for Uttarakhand locations
10.1Submittal stages and linked approvals
10.2Forms used in submittals
10.3Minimum owner inspection frequencies
10.4Graduated enforcement response
11.1Minimum data and surveys for a BSMP
11.2Minimum levels of service
1A.1Tier A authorities as defined in Clause 1.6.1
1A.2Register of Tier A authorities (layout)
1B.1Flood-sensitive catchments listed in Clause 4.5.3.2
1B.2Attributes of the flood-sensitive catchment layer (layout)
1C.1Alternatives adopted by this resolution
1D.1Schedule: alternatives adopted (layout)
2A.1Benchmark comparison of design depths (layout)
2A.2Rainfall zones (layout)
2B.1Ratios P(t)/P(24h) by zone (layout)
2B.2Fixed-interval adjustment factors (Clause 2.6.3)
2C.1Grid-to-point factors (layout)
2D.1Cumulative fraction of storm depth against cumulative fraction of storm time (layout, one table per zone, duration class and quartile)
2E.1Retention depth P_R by zone (layout)
3A.1Soil series to HSG lookup (layout)
3A.2Seasonal high water table, by mapping unit (layout)
3B.1Supplementary land covers, AMC II (layout)
3B.2CN calibration catchments (layout)
3C.1Problem 3C-1 solution
3C.2Problem 3C-2 solution
3C.3Problem 3C-3 solution
3C.4Problem 3C-4 solution
3C.5Problem 3C-5 stage–storage–discharge relationship
3C.6Problem 3C-5 routed outflow
3C.7Benchmark results to be reported by the applicant
3D.1Calibrated peak rate factors (layout)
3E.1SUH relationships by subzone (layout)
3E.2Worked example outline (layout)
4A.1Attributes of the shallow-groundwater zone layer (layout)
4B.1Contents of Annex 4B and their status
4B.2Tier B PSD and SSR (layout of Table 4.3)
4B.3Retention credit factor C_R (layout)
4B.4Largest orifice diameter (mm) for a permissible discharge at a given head (Cd = 0.60, free discharge)
4B.5Fixed release coefficients C_10 and C_2 (provisional, Table 4.3A)
4C.1Inputs (Illustrative — not design values)
4C.2Design rainfall depths, mm (Illustrative — not design values)
4C.3Curve numbers and abstractions (Illustrative — not design values)
4C.4Storm runoff depth Q, mm (Illustrative — not design values)
4C.5Unit hydrograph parameters (Illustrative — not design values)
4C.6Stage–storage–discharge, trial outlet (Illustrative — not design values)
4C.7Routing of the 100-yr 72-hour storm through the trial outlet, around the peak (Illustrative — not design values)
4C.8Routing of the 100-yr 72-hour storm through the trial outlet, hourly (Illustrative — not design values)
4C.9Results for the trial outlet (120 mm and 470 mm orifices) (Illustrative — not design values)
4C.10Stage–storage–discharge, revised outlet (Illustrative — not design values)
4C.11Results for the revised outlet (170 mm and 460 mm orifices) (Illustrative — not design values)
4C.12Retention credit by routing, revised outlet (Illustrative — not design values)
4C.13Outlet checks, revised outlet (Illustrative — not design values)
4C.14Summary of the revised design (Illustrative — not design values)
5A.1Use of the Annex 5A values in the design tailwater (Table 5.1)
5A.2Tidal datums, surge and still-water levels by coastal segment (layout)
5B.1Water bodies named in Chapter 5
5B.2Attributes of the Annex 5B layers (layout)
5C.1Inputs (Illustrative — not design values)
5C.2Outfall-closed check results (Illustrative — not design values)
5C.3Volume balance, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.4Stage hydrograph, 1% AEP 48-hour storm, Run B (Illustrative — not design values)
5C.5Summary (Illustrative — not design values)
6A.1Interim requirements for inlets until Annex 6A is published (from Chapters 6 and 9)
6A.2Register of standard inlet types (layout)
6A.3Capacity on grade (layout; one table per inlet type)
6A.4Capacity in a sag (layout; one table per inlet type)
6B.1Sediment allowances already set by Chapter 6 (provisional, to be calibrated)
6B.2Sediment yield by land use and drain type (layout)
6B.3Calibration of the sediment allowance (layout)
6C.1Dimensions on the standard drawings and their source clauses
7A.1Attribute fields of the waterbody inventory (WB_POLY)
7A.2Code lists
7A.3Attribute fields of structures (WB_STRUCT)
7B.1Fixed-width setback by waterbody class (alternative S-3)
7B.2Source buffers cited in Clause 7.4.6 (KC APWA 5600, 2006, §5605.3)
7C.1Rule levels by period (to be completed for each tank)
7C.2Outlet settings by level (to be completed for each tank)
7C.3Triggers and actions (to be completed for each tank)
7D.1Hold points for desilting and restoration works
7E.1Waterbodies
7E.2Springs, streams and channels
7E.3Land
7E.4Terms not yet verified
8A.1Water quality rainfall depths by zone (layout)
8A.23-month ARI intensity by duration (layout)
8B.1Required LoS for redevelopment (layout)
8B.2Worked example: composite VR (illustrative)
8B.3Composite VR of treatment trains (layout)
8C.1Monitoring site register (layout)
8C.2Event record (layout; parameters of Clause 8.13.2)
8C.3Performance summary and proposed VR (layout)
8D.1Pretreatment (all BMPs)
8D.2Bioretention and rain gardens (Figure 8.2)
8D.3Vegetated swales
8D.4Vegetated filter strips
8D.5Permeable pavement
8D.6Infiltration trenches and basins (Figure 8.3)
8D.7Wet ponds (extended wet detention)
8D.8Constructed wetlands
8D.9Gross pollutant traps and outfall screens
8D.10Oil-grit separators
8D.11Infiltration and recharge criteria (all infiltrating BMPs)
8D.12Bioretention filter media and layers
8D.13Indicative plants for bioretention, swales and filter strips
8D.14Indicative plants for constructed wetlands and wet ponds
8D.15Species not to be planted
8E.1Selection of measures (Clause 8.12.3)
8E.2ESC timing and inspection (Clauses 8.12.2 and 8.12.5)
9A.1HDS-5 inlet-control coefficients for common inlets
9A.2Inputs for the worked example
9A.3Critical depth and specific head (D = 1.2 m)
9A.4Inlet-control headwater
9A.5Outlet-control headwater
9A.6Governing headwater and checks
9A.7Riprap apron sizing
9A.8Summary of the worked example (Illustrative — not design values)
9B.1Dimensions and rules on the standard drawings and their source clauses
9C.1Pump station design checklist
9C.2Control levels (values to be set in design)
10A.1Calculator inputs
10A.2Calculations the calculator shall perform
10B.1Layers
10B.2Attributes of SW_FAC (facilities)
10B.3Attributes of SW_OUTF (outfalls)
10B.4Attributes of SW_CATCH (catchments)
10B.5Attributes of SW_FLOW and SW_CONV (flow paths and conveyance)
10B.6Metadata (SW_META)
10B.7Facility type codes (FAC_TYPE)
10B.8Status codes (STATUS)
10B.9Inspection result codes (INSP_RES)
10C.1Access dimensions set by the Manual
10C.2Access dimensions not set by the Manual (to be confirmed in design)
10D.1Contents of an O&M plan
10D.2Retention and infiltration (soakaways, trenches, bioretention, permeable paving)
10D.3Surface detention basin or multi-use open space area
10D.4Underground or podium detention tank, gravity outlet
10D.5Pumped detention, pumps and controls
10D.6Flap or tide gate, non-return valve
10D.7Gross pollutant trap or first-flush device
10D.8Private drains and inlets
11A.1Deliverables
11B.1Basins named in Clause 11.3.3 (provisional)
11B.2Attributes of the basin boundary layer (layout)
11C.1Depth–damage curve (layout, one table per building type)
11D.1Items to be published

List of figures

FigureTitle
1.1Stormwater management hierarchy
1.2Applicability decision flowchart
2.1Design rainfall source hierarchy and adjustments
2.2Design hyetographs
2.3From design rainfall source to design storm
3.1Selection of hydrologic method
3.2Time of concentration: flow segments along the longest flow path (schematic)
3.3SCS-CN runoff depth versus rainfall depth
3.4Two-step continuous simulation: starting tank level (schematic)
3.5Pre- and post-development hydrographs
4.1Pre-development 10-yr, post-development 100-yr uncontrolled, and detained hydrographs (illustrative)
4.2Detention storage stack and multi-stage outlet (schematic)
4.3Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic)
5.1Extent of downstream analysis
5.2Tidal outfall section with flap gate and design tailwater levels
5.3Tide-locked outfall timeline (illustrative)
6.1Minor and major drainage in a kerbed street
6.2Gutter spread, inlet interception and clogging
6.3Drain sections: freeboard, sediment allowance and access
6.4Drainage reserve: cross-section (schematic)
6.5Coastal band: floor level stack and extent of the band (schematic)
7.1Waterbody setback zones
7.2Compensatory storage by elevation band (schematic)
7.3A hill-town taal and its springs: a lake in a hill bowl with a town on the slopes, a recharge flat kept open, a naula below the spring line, lined drains with sediment traps entering the lake, an outlet sluice to a gadhera, and no soakaways on the slopes
8.1Treatment train
8.2Bioretention cell
8.3Infiltration trench
9.1Culvert hydraulics: inlet control and outlet control
9.2Riprap apron at a pipe or culvert outlet (schematic)
9.3Stormwater pump station: wet well, screens, levels and outfall
10.1Submittal, review and approval workflow
10.2Construction hold points from approval to handover
10.3Maintenance cycle and responsibility
11.1Basin master plan process
11.2BSMP model schematic
6C.1Covered roadside drain with removable covers
6C.2Access and junction chamber on a covered drain
6C.3Kerb inlet with silt sump
8E.1Silt fence: section and plan (schematic)
8E.2Sediment basin with surface dewatering outlet: section (schematic)
8E.3Stabilised construction exit: plan and section (schematic)
8E.4Drain inlet protection (schematic)
9B.1Culvert headwalls, wingwalls and cut-off walls
9B.2Straight vertical drop structure
9B.3Trash rack at a conduit entrance
9B.4Detention outlet riser and emergency spillway

Abbreviations

Abbreviation Meaning
ADB Asian Development Bank
AEP Annual exceedance probability
AMC Antecedent moisture condition
AMRUT Atal Mission for Rejuvenation and Urban Transformation
APWA American Public Works Association
ARF Areal reduction factor
AWS Automatic weather station
BSMP Basin Stormwater Master Plan
Bye-laws 2011 The Uttarakhand Building Construction and Development Bye-laws/Regulations, 2011 (Amendment 2015), as amended
CAG Comptroller and Auditor General of India
CGWA Central Ground Water Authority
CGWB Central Ground Water Board
CN Curve number (SCS/NRCS method)
CPCB Central Pollution Control Board
CPHEEO Central Public Health and Environmental Engineering Organisation
CSE Centre for Science and Environment
CWC Central Water Commission
DL / WL Danger level / warning level (CWC)
DM District Magistrate (the Collector)
DMC Dehradun Municipal Corporation (Nagar Nigam Dehradun)
DPR Detailed project report
DSCL Dehradun Smart City Limited
DWF Dry-weather flow
EIA Environmental impact assessment
ESC Erosion and sediment control
ESZ Eco-sensitive zone (under the Environment (Protection) Act, 1986)
FAR Floor area ratio
FER Flood Estimation Report (CWC)
FPZ Flood plain zoning (the Uttarakhand Flood Plain Zoning Act, 2012, or a zone notified under it)
FRL / MWL Full reservoir level / maximum water level
FZA Flood Zoning Authority (under the Flood Plain Zoning Act)
GLOF Glacial lake outburst flood
GWRA Ground water resource assessment (CGWB)
HAT / MHWS Highest astronomical tide / mean high water springs (coastal terms; not applicable in Uttarakhand)
HFL High flood level (the highest level recorded at a gauge)
HGL Hydraulic grade line
HRDA Haridwar Roorkee Development Authority
HSG Hydrologic soil group
I&D Interception and diversion (of drains to sewers or treatment plants)
IDF Intensity–duration–frequency
IMD India Meteorological Department
IRC Indian Roads Congress
MDDA Mussoorie Dehradun Development Authority
MLD Million litres a day
MoEF&CC Ministry of Environment, Forest and Climate Change
MoHUA Ministry of Housing and Urban Affairs
NDMA National Disaster Management Authority
NGT National Green Tribunal
NIH National Institute of Hydrology, Roorkee
NMCG National Mission for Clean Ganga
NOC No-objection certificate
PSD Permissible site discharge
PWD Public Works Department, Uttarakhand
RRV Required retention volume
RWH Rainwater harvesting
SANDRP South Asia Network on Dams, Rivers and People
SARRA Spring and River Rejuvenation Authority, Uttarakhand
SLA Sea-level allowance (coastal term; not applicable in Uttarakhand)
SoI Survey of India
SRRG Self-recording rain gauge
STP Sewage treatment plant
SUH Synthetic unit hydrograph (CWC)
SW monsoon / JJAS South-west monsoon, June–September
SWD Storm water drain
T&CP Town and Country Planning Department, Uttarakhand
THDC THDC India Limited (operator of the Tehri and Koteshwar dams)
UDD Urban Development Department (and Directorate), Uttarakhand
UHUDA Uttarakhand Housing and Urban Development Authority
UKID Uttarakhand Irrigation Department (this Manual's shorthand)
UJVN Uttarakhand Jal Vidyut Nigam Limited (operator of the Dakpathar and Asan barrages)
UKPCB Uttarakhand Environment Protection and Pollution Control Board
ULB Urban local body (a Municipal Corporation, Nagar Palika Parishad or Nagar Panchayat)
ULMMC Uttarakhand Landslide Mitigation and Management Centre
USDMA Uttarakhand State Disaster Management Authority
UTM Universal Transverse Mercator
UUSDA Uttarakhand Urban Sector Development Agency
UZR Unified Zoning Regulations, 2025 (Uttarakhand)
WQv Water quality volume
WSUD Water-sensitive urban design