Chapter 5Downstream and Tailwater Analysis
5.1 Purpose and scope
5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.
- The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
- The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.
5.1.2 This chapter applies to:
- (a) every site to which Chapter 4 applies;
- (b) every minor- and major-system drainage project under Chapter 6; and
- (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.
5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.
5.1.4 No tidal outfalls in Uttarakhand. Uttarakhand is landlocked and mountainous: it has no coast, no tide and no Coastal Regulation Zone, and a Bay of Bengal depression reaches it only as rainfall, often meeting a western disturbance over the hills, as in October 2021; that rainfall is dealt with in Chapter 2, not as a tidal or surge level. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Uttarakhand: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials, and shall resist abrasion by gravel and boulders), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Uttarakhand the receiving water is one of five kinds: a river, reached directly, through a gate in a bank, flood wall or embankment or through a pumping station, such as the Ganga at Rishikesh and Haridwar, the Song, the Solani at Roorkee, the Gaula at Haldwani, the Kosi at Ramnagar, the Sarda at Banbasa and the Alaknanda and Bhagirathi at the valley towns, whose level rises and falls within hours in the mountains but is held up by barrages and long monsoon spells below them; a rao, gadhera or khala, such as the Rispana and the Bindal in Dehradun or the Rakasia and Kalasia nalas at Haldwani, ungauged, seasonal and laden with boulders, whose bed rises and falls in a single flood; a reservoir or barrage pond held at its full level, such as Tehri, the Dakpathar and Asan barrages, the Gaula barrage and the reservoirs of the terai; a lake whose only outlet is gated, Naini lake, whose sluices are worked under rules of 1927 and sealed on 15 October, and the other taals of the Nainital region; or a canal, such as the Upper Ganga Canal at Haridwar and Roorkee; and:
- (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
- (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
- (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a river, a rao or gadhera, a reservoir or barrage pond, a taal, a canal or a receiving drain, with the river lock of Clause 5.8.5(a) and the closures of Clause 5.8.5(b) to (e) in place of the tidal lock windows.
5.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Analysis point | A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3). |
| Contributing catchment | The whole area draining to an analysis point, on and off site. |
| Major drain | A channel listed as a major drain in the basin plan or Annex 5B, or any river, Irrigation Department canal, the Rispana, the Bindal, the Suswa, the Song, the Tons (Tamsa) and the Asan and their khalas in the Doon, the nalas of Rishikesh and Haridwar that run to the Ganga, among them the Chandrabhaga at Rishikesh, the Solani at Roorkee, the Rakasia and Kalasia nalas and the gadheras that run to the Gaula at Haldwani, the Kalyani at Rudrapur, the drains that feed Naini lake and the Balia Nala below it, the Upper Ganga Canal, any canal or gul that receives storm water, any drain built or held by a Nagar Nigam, a Nagar Palika Parishad, a Nagar Panchayat, MDDA, HRDA or another development authority, UUSDA, Dehradun Smart City Ltd or PWD with an internal width of 1.0 m or more, and every gadhera, khala or rao that drains 8 ha or more, or a tidal creek. |
| Chart datum (CD) | The datum of the published tide tables and nautical charts, to which tidal heights are referred. |
| Mean sea level (MSL) | Average sea level over a long period at a tide gauge. |
| MHWS | Mean high water springs: the average of high waters at spring tides. |
| HAT | Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years). |
| Storm surge | The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones. |
| Still-water level | Astronomical tide plus surge, excluding individual waves. |
| Sea-level allowance (SLA) | The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4). |
| Tailwater | The water level at the downstream end of a drain, outlet or storage. |
| Tide-lock | The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge. |
| Lock window | A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero. |
| Sand bar | A bar of beach sand that partly or fully closes a river mouth or creek inlet. |
| Project datum | The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2). |
5.3 Extent of the downstream analysis
5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:
- (a) the point at which the project area is 10% or less of the contributing catchment;
- (b) the next tank, taal or other waterbody with a surplus weir or controlled outlet; or
- (c) the next major drain, or the sea.
The end point itself shall be analysed (Figure 5.1).
5.3.2 Where the analysis ends at a tank or taal under 5.3.1(b), it shall report:
- the change in the tank's maximum water level; and
- the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.
If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.
5.3.3 Analysis points shall be set at least at:
- (a) each site outfall;
- (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
- (c) each culvert, bridge or road crossing;
- (d) each location recorded as flood-prone by the local body, DMC, USDMA or Irrigation Department; and
- (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.
5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:
- the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
- no flood-prone location is recorded within 500 m downstream; and
- the site does not drain to a tidal or backwater-affected outfall.
Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next taal or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).
Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Uttarakhand. In the Doon, where a colony's drain runs through a khala to the Rispana or the Bindal, the raos of Dehradun whose combined flow "ultimately meets the River Ganga" (ADB, resettlement plan, 2022), and on the plains of Haridwar and Roorkee, where the drains run to the Ganga at or below the Bhimgoda barrage, to the Solani, or beside and under the Upper Ganga Canal, the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.
5.4 What the analysis must check
5.4.1 Scenarios. Each analysis shall compare:
- (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
- (b) With project: the same, with the project and all its controls (Chapter 4) in place.
Where the Authority's basin plan defines future land use, the Authority may also require:
- (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.
5.4.2 Quantities to be checked at every analysis point:
- (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
- (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
- (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
- (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
- (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.
5.4.3 Storms. The analysis shall use:
- 50%, 10% and 1% AEP;
- the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
- the 24-, 48- and 72-hour storms in every case.
The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.
5.4.4 Method. The analysis shall:
- use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
- include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
- not use the Rational Method at any analysis point, because it cannot represent timing.
Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.
5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.
Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the river and plains towns of Uttarakhand, whose outfalls lie below rivers held up for days by monsoon spells and barrages: in August 2026 the Sarda carried more than one lakh cusec for three days, with about 70,000 cusec at Banbasa (as reported); on 14 August 2023 the Ganga at Rishikesh rose to 341.3 m, above its danger level of 340.5 m, after 419 mm of rain at Rishikesh in two days (CWC data and IMD, as copied by SANDRP); and in July 2024 about 25,000 ha of farmland in the plains of Udham Singh Nagar was submerged (as reported). Detention that prolongs releases can lengthen that time even when it lowers the peak.
5.5 Acceptance criteria
5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":
- (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
- (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
- (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
- (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
- (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.
5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.
5.5.3 Where the criteria are not met, the project shall do one or more of the following:
- (a) reduce release rates or increase storage (Chapter 4);
- (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
- (c) contribute to a regional facility under Clause 4.13; or
- (d) under Clause 5.5.4, change the release strategy.
5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:
- (a) the varied strategy meets 5.5.1;
- (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
- (c) the outfall-closed check (Clause 5.10) is met.
Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.
5.6 Tailwater: general and non-tidal outfalls
5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.
5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:
- for a receiving pipe, its obvert; or
- for a receiving open drain, its full-bank level less freeboard (Chapter 6).
5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.
5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.
5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.
5.7 Tidal tailwater: datums, surge and sea-level allowance
5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:
Table 5.1 — Design tailwater levels for tidal outfalls
| Design case | Tailwater |
|---|---|
| Minor-system design (Chapter 6) | MHWS + SLA |
| Major-system design and storage design | HAT + surge + SLA, with the surge term defined in Clause 5.7.3 |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA |
The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.
5.7.2 Sources and datums.
- (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
- (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
- (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Uttarakhand, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
- (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.
5.7.3 Storm surge.
- (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
- (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
- (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
- (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.
5.7.4 Sea-level allowance. The SLA shall be:
- (a) +0.3 m minimum for every element;
- (b) greater than 0.3 m where the State, MDDA or the Authority adopts a higher projection for the planning area; and
- (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.
Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.
Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:
- MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
- MHWS to HAT for a major storm; and
- "Effect of climate change: additional 0.3 m".
CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Uttarakhand has no coast, and the surge term does not arise in the State, which a Bay of Bengal depression reaches only as rainfall, often meeting a western disturbance over the hills, as in October 2021 (Chapter 2).
Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Uttarakhand, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).
5.8 Riverine backwater
5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:
- the Ganga at Rishikesh, Muni-ki-Reti and Dhalwala past the Rishikesh gauge and the Pashulok (Virbhadra) barrage, and at Haridwar above and below the Bhimgoda barrage and past the Haridwar (Dudhia Band) gauge, to the State border below Laksar, with the nalas of the towns that end in it, among them the Chandrabhaga at Rishikesh (Clauses 5.8.3 and 5.8.5(a) and (c));
- the Song at Satyanarayan below Dehradun and Doiwala, and the Asan at Sabhawala above the Asan barrage (Clauses 5.8.5(a) and (c));
- the Solani at Roorkee, Dosni and Raysi (Clause 5.8.5(a));
- the Gaula at Kathgodam and through Haldwani below the Gaula barrage, with the Rakasia and Kalasia nalas, and the Kosi at Ramnagar below the Ramnagar barrage (Clauses 5.8.3 and 5.8.5(a), (b) and (c));
- the Sarda at Banbasa, Tanakpur and Khatima below the Banbasa barrage (Clauses 5.8.3 and 5.8.5(a) and (c));
- the Alaknanda at Joshimath, Rudraprayag and Srinagar, the Mandakini at Rudraprayag, and the Bhagirathi at Uttarkashi and below the Tehri and Koteshwar dams (Clauses 5.8.3 and 5.8.5(a) and (c));
- the raos and khalas of the Doon, among them the Rispana, the Bindal, the Suswa, the Song above Satyanarayan and the Tons (Tamsa), and the gadheras of the hill and valley towns (Clause 5.8.5(b));
- the Tehri and Koteshwar reservoirs, the ponds of the Dakpathar, Asan, Pashulok, Bhimgoda, Gaula, Ramnagar and Banbasa barrages, the Kalagarh reservoir, and the Baur, Haripura and Tumaria reservoirs and the Dhela and Phika barrages of the terai (Clause 5.8.5(c));
- Naini lake and the Balia Nala below its sluices, Bhimtal, Naukuchiatal and Sattal (Clause 5.8.5(d));
- the Upper Ganga Canal at Haridwar and Roorkee, any canal or gul of the Irrigation Department, and any drain or channel of another body that receives storm water (Clause 5.8.5(e)); and
- elsewhere: any river or Irrigation Department channel listed in Annex 5B.
5.8.2 River levels. River water levels shall be taken from:
- (a) Irrigation Department design flood levels or recorded highest flood levels for the reach, where published; or
- (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
- the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
- the tidal boundary of Clause 5.7 at the mouth; and
- the sand-bar condition of Clause 5.13.
5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Tehri and Koteshwar dams on the Bhagirathi above Rishikesh and Haridwar, the Pashulok (Virbhadra) barrage at Rishikesh and the Bhimgoda barrage at Haridwar on the Ganga, the Dakpathar barrage on the Yamuna and the Asan barrage, the Gaula barrage at Kathgodam above Haldwani, the Ramnagar barrage on the Kosi, the Banbasa barrage on the Sarda, the Kalagarh dam on the Ramganga, and the Baur, Haripura and Tumaria reservoirs and the Dhela and Phika barrages in the terai), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.
5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:
- (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
- (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).
The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.
5.8.5 River-locked outfalls, raos and gadheras, reservoirs, barrage ponds and dam releases, Naini lake and Bhimtal, canals and the drains of other bodies, and Irrigation Department consent.
- (a) River-locked outfalls. For an outfall to a river directly, through a gate in a bank, a flood wall or an embankment, or through a pumping station, or into a drain that itself discharges in one of those ways, the designer shall identify the body that operates each gate and pumping station, and obtain the sill of each gate, the crest of the bank, wall or embankment, the installed pumping capacity and the operating levels, including the river level at which each gate is closed. Every level shall state its datum and its connection to the gauge datum of the nearest CWC or Irrigation Department gauge.
- Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the 1% AEP river level at the outfall: the 100-year level of the Irrigation Department's floodplain study of the reach under the Uttarakhand Flood Plain Zoning Act 2012, where the study gives a level at the outfall, or a level from a hydraulic model under Clause 5.8.2(b), with the dam and barrage releases of item (c). The notifications under the Act mark the 25-year and 100-year lines on revenue (shajra) maps; no published flood level of a notified reach was found during research, and the levels of each study shall be obtained from the Irrigation Department [TBC]. The level shall in no case be less than the highest recorded level at the nearest CWC gauge on the same river, transferred to the outfall, nor less than the 10% AEP level of this item. The highest levels found during research (Table 5B.1), all from SANDRP's copies of CWC tables and posts, with no datum stated and none read in a CWC site sheet [TBC], are: the Ganga at Haridwar (Dudhia Band) 296.30 m, which SANDRP dates 19 September 2010, after the river passed the 296.23 m of September 1978, while the CWC table that SANDRP copied dates it 17 June 2013, a flood whose peak SANDRP gives as 295.75 m; the date is in conflict, the level is not, and 296.30 m governs until CWC confirms the record [TBC]; the Ganga at Rishikesh 341.72 m (5 September 1995; 341.45 m on 17 June 2013 and 341.3 m on 14 August 2023); the Song at Satyanarayan 338.49 m (28 June 2019); the Solani at Roorkee 260.58 m (14 October 2021), at Dosni 244.65 m (29 July 2021) and at Raysi 232.24 m (1 September 2018); the Gaula at Kathgodam 498.93 m (20 October 2021); the Kosi at the Ramnagar barrage, 220.95 m on 19 October 2021 in SANDRP's table of December 2021, 3.97 m above the 216.98 m of 1 June 2019, and 220.75 m for the same flood in the CWC list that SANDRP copied in 2022, a conflict in which the higher governs until CWC confirms the level [TBC]; the Sarda at Banbasa 224.9 m (19 October 2021); the Asan at Sabhawala 450.85 m (30 September 2019); the Alaknanda at Srinagar 537.9 m and at Rudraprayag 634.85 m (both 17 June 2013), and at Joshimath 1,388.65 m (7 February 2021, the Rishiganga flood; 1,385.54 m on 28 June 2013 before it); and the Bhagirathi at Uttarkashi 1,124.13 m (6 August 1978). Where a later flood has exceeded the listed level, the later level governs; four of these levels were set in October 2021. The recorded level shall be transferred along the river with the water-surface slope of the flood that set it, from the CWC and Irrigation Department gauge records, or from the model. Until either is available, the recorded level of the nearest gauge upstream applies unchanged at the outfall, except that where the outfall lies between two gauges on the same river, with no tributary joining between them, the level may be interpolated linearly by river distance between the highest recorded levels of the two gauges; and on a mountain river, whose bed falls several metres in a kilometre, a profile of the flood marks of the same flood, surveyed between the gauge and the outfall and tied to a Survey of India benchmark, may be used in place of the unchanged level (set by this Manual).
- Rivers and reaches with no gauge level. No CWC level was found for the Ganga between Rishikesh and Haridwar other than at the two gauges, the Gaula below Kathgodam through Haldwani, the Kosi below the Ramnagar barrage, the Kalyani at Rudrapur, the Kichha, the Dhela at Kashipur, the Khoh at Kotdwar, the Asan below its barrage or the Mandakini, Alaknanda and Bhagirathi at the towns between the gauges [TBC]. On such a reach, and for an outfall upstream of every gauge on its reach, the river level shall be the higher of the level from a model under Clause 5.8.2(b) and the highest flood level surveyed at the outfall from flood marks, including those of June 2013, October 2021, August 2023 and September 2025, and from the records of the Irrigation Department, the local body or the Collector, with its source stated. Where a level is known only as a gauge reading, the designer shall tie the gauge zero to the project datum and a Survey of India benchmark by levelling. No outfall shall be designed on such a reach without one of these levels (set by this Manual).
- 10% AEP level. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or a frequency analysis of the gauge record, and not less than the danger level at the nearest CWC gauge, transferred in the same way: 294.0 m at Haridwar (warning 293.0 m); 340.5 m at Rishikesh (339.5 m); 338.2 m at Satyanarayan (337.2 m); 261.5 m at Roorkee (260.5 m); 223.3 m at Banbasa (warning 222.3 m in one row of the list and 222.96 m in another); 536.0 m at Srinagar (535.0 m); 627 m at Rudraprayag (626 m); 1,383 m at Joshimath (1,382 m); and 1,123 m at Uttarkashi (1,122 m), all from SANDRP's copy of the CWC list of 2022 [TBC]. At Roorkee the danger level is above the highest recorded level, so there the danger level is also the floor of the design river level; SANDRP warns that 18 of the sites that CWC upgraded to forecasting sites have a recorded highest level below the danger or even the warning level, and at those sites neither level shall be used without the CWC site sheet [TBC]. The gauges at Kathgodam, the Ramnagar barrage and Sabhawala are level-monitoring sites with no danger level; there, the 10% AEP case shall use the design river level of this item until a frequency analysis is accepted (all set by this Manual). The datum of every level is to be confirmed for each gauge [TBC].
- Tailwater. The tailwater at the outfall shall be the higher of that river level beyond the gate, bank, wall or embankment, and the maximum level in the drain behind it, computed by routing the drain as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, its storage as surveyed in its present condition, net of silt, boulders, encroachment, solid waste and weed, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the gate only while the river is lower than the level behind it. Pumps shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level (Clause 5.12.5).
- River lock. Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the river stays above the outfall invert, or above the level at which its gate is closed if that is lower, taken from the river model or from the stage record of the nearest CWC gauge in the flood that set the highest recorded level or in a comparable flood, with the releases of item (c), and not less than 72 hours, or, on a river below a dam or barrage, the time for which the largest recorded release of the dams and barrages above stayed above the flow at which the outfall is closed, from the operator's records, if that is longer (set by this Manual). The lock covers the whole of the 48- and 72-hour storms of Clause 5.10.2, so that storage and pumping handle the full storm volume (Clause 5.9.4) and the drawdown of Clause 5.10.5 is met by pumping until the lock ends. An outfall to the pond of a barrage, such as the Ganga above Bhimgoda at Haridwar or above the Pashulok (Virbhadra) barrage at Rishikesh, whose invert is below the pond level of item (c), is closed for the whole storm. A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where an analysis of the stage record of a CWC gauge under Clause 5.10.6, including the releases of the dams and barrages above, shows it and the Authority approves it.
- Gate failure and breach. Floor levels and pumped outfalls behind a gate, flood wall or embankment shall also be checked for the failure of the gate and for a breach of the wall or embankment, with the land and drains behind it filled to the river level beyond it. Below a dam or barrage they shall also be checked for the release that results from a gate failing open.
- (b) Raos, gadheras, khalas and other ungauged hill streams. For an outfall to a rao, gadhera, khala, gad or other seasonal hill stream, such as the Rispana, the Bindal, the Suswa, the Song above Satyanarayan, the Tons (Tamsa) and the khalas that feed them in the Doon, the Chandrabhaga at Rishikesh, the Rakasia and Kalasia nalas and the gadheras that run to the Gaula at Haldwani, the Balia Nala below Naini lake, and the gadheras that come down to the valley towns of Srinagar, Rudraprayag and Uttarkashi, or into a drain that ends in one:
- No gauge. None of these streams has a CWC gauge at a town, except the Song at Satyanarayan below the town of Dehradun, and none has a published flood level [TBC]. They are seasonal, steep and boulder-laden: they rise within an hour of a burst of rain, carry gravel, boulders and debris, and raise or scour their beds in a single flood.
- Design level. The tailwater for the major-system and storage cases shall be the highest of: (i) the 1% AEP level at the outfall from a study of the stream, made with a hydrograph method of Chapter 3 for the whole catchment above the outfall, with the rainfall of its sub-area in Annex 2A, the AMC of Clause 3.8.4 and the bulking factor of Clause 6.3.6(b) on the peak flow, and routed through a hydraulic model (Clause 5.8.2(b)) of the channel as surveyed, with the crossings downstream blocked as Clause 6.3.6(c) requires; (ii) the 100-year level of the Irrigation Department's floodplain study, where the stream has been notified under the Flood Plain Zoning Act (the Rispana, final notification of 5 May 2025, as reported) or studied (the Suswa, the Song, the Baldi, the Asan and its tributaries, the Gaula and the Kosi) [TBC]; and (iii) the highest flood level surveyed at the outfall from flood marks, such as debris lines, silt and scour marks and the accounts of residents, of the floods of June 2013, October 2021, August 2023 and September 2025 or a later flood, and from the records of the Irrigation Department, the local body or the Collector, with its source stated. No outfall to such a stream shall be designed without items (i) and (iii) (set by this Manual).
- Bed level, scour and aggradation. The designer shall survey the bed of the stream at the outfall and for at least 100 m upstream and downstream, and state the range within which the bed has moved, from past surveys, cross-sections, exposed foundations and pipes, and the records of the Irrigation Department and the local body. The outfall invert, and the seat of any flap gate on it, shall stand at least 0.5 m above the highest bed level found in that range within 50 m downstream of the outfall, and the foundation of the outfall structure and its apron shall be taken below the scour depth computed under Chapter 9 (Clause 9.6) for the 1% AEP flow with the bulking factor (set by this Manual).
- Siting. An outfall shall be built into the bank and shall not project into the bed or the active channel, which for the Rispana the State and NMCG have taken as the land flooded once in 5 years (as reported). It shall discharge in the direction of the stream's flow, with the bank protection that Chapter 9 requires, and no pipe, interceptor or chamber of the drainage system shall be laid along the bed of the stream.
- Closed outfall. Where the outfall invert is below the design level of this item, the outfall-closed check of Clause 5.10 applies with a single lock that lasts for as long as the level of the stream, computed under item (i) for the coincident cases of Clause 5.8.4, stays above the invert, and, where no hydrograph of the stream has been computed, for the whole storm (Clause 5.9.4) (set by this Manual).
- Interceptors. An interception and diversion structure on a rao or its drains (Clause 8.9) shall not raise the design level of this item or reduce the capacity of the drain; it shall stand above that level or be designed to be overtopped without damage.
- (c) Reservoirs, barrage ponds and dam releases. For an outfall to a reservoir or barrage pond, directly or through a drain or stream that ends in it, such as the Tehri and Koteshwar reservoirs on the Bhagirathi, the ponds of the Pashulok (Virbhadra) and Bhimgoda barrages on the Ganga, the Dakpathar barrage on the Yamuna and the Asan barrage, the Gaula barrage at Kathgodam, the Kosi barrage at Ramnagar, the Banbasa barrage on the Sarda, the Kalagarh dam on the Ramganga, and the Baur, Haripura and Tumaria reservoirs and the Dhela and Phika barrages in the terai:
- Consent. Storm water shall not be discharged to a reservoir or barrage pond without the written consent of its custodian: THDC India Ltd for Tehri and Koteshwar; UJVN Ltd for the Dakpathar and Asan barrages; the Irrigation Department for the Gaula barrage and the reservoirs and barrages of the terai; and, for the Bhimgoda, Pashulok, Ramnagar and Banbasa barrages and Kalagarh, the body that operates them, which was not confirmed during research (the canal flows at Bhimgoda are reported to be regulated by the Uttar Pradesh Irrigation Department, unverified) [TBC]. The pond of the Asan barrage lies in the Asan Conservation Reserve, a Ramsar site, where the permission of the State Wetland Authority and the Forest Department is also required (Chapter 7). An outfall that carries dry-weather flow is dealt with under Clause 8.9.
- Design level. The tailwater for the major-system and storage cases shall be the waterbody's maximum water level (MWL) as its custodian publishes it, or, where only the full reservoir level (FRL) or maximum pond level is published, FRL plus the surcharge in its design flood, computed from the rating of its spillway and gates with the gates operated only as the custodian's written rule provides. Where neither the MWL nor the surcharge has been published, or where the published MWL is not above the FRL, the tailwater is FRL + 0.5 m (set by this Manual) [TBC]. For a barrage pond, the tailwater is the higher of that level and the river level of item (a) at the barrage with its gates as operated. In every case it shall be not less than the highest level recorded at the waterbody. The minor-system tailwater is the FRL or maximum pond level, or the level at which the custodian's rule opens the gates if that is higher. The project's discharge shall be included in the level (Clauses 5.3.2 and 5.12.3).
- The named reservoirs and barrages. Until the custodian confirms the MWL or the design-flood level and its datum, the tailwaters are (set by this Manual) [TBC]: Tehri, FRL 830 m, MWL 835 m (THDC), 835.0 m; Dakpathar barrage, maximum pond level 456.40 m and high flood level 456.50 m in the 200-year design flood (UJVN Ltd, operation and maintenance manual, 2021), 456.50 m, to be revised when the upstream flood level for the revised design flood, which the dam-safety review left "yet to be determined", is published; Asan barrage, maximum pond level 401.50 m (UJVN Ltd, 2021), 402.00 m; Gaula barrage, maximum pond level 510.750 m and high pond level 513.250 m (Irrigation Department), 513.25 m; Banbasa barrage, FRL 222.96 m and MWL 223.3 m in the CWC list, but 224.9 m recorded at Banbasa on 19 October 2021, so 224.9 m; Kalagarh dam, FRL 365.3 m and MWL 366.2 m (CWC list), 366.2 m; and the Baur and Haripura reservoirs, FRL 242.32 m (795 ft; Irrigation Department), 242.82 m. No level on a stated datum was found for Koteshwar (whose CWC gauge recorded 546.7 m on 15 August 2013), the Pashulok, Bhimgoda and Ramnagar barrages, the Tumaria reservoir or the Dhela and Phika barrages [TBC]; no outfall to any of them shall be designed without the custodian's FRL or pond level and spillway rating in writing, or, until the custodian gives them, the higher of a survey of the crest tied to a Survey of India benchmark and the river level of item (a) (set by this Manual).
- Closed outfall. Where the outfall invert is below the design level of this item, the outfall shall be treated as closed for the whole storm (Clause 5.9.4), with storage and pumping handling the full storm volume, unless the custodian's stage record shows the waterbody below the invert at the start of comparable storms and the Authority accepts it. Every reservoir and barrage pond starts every design storm at its FRL or maximum pond level (Clause 7.7.3), and no lowering of a reservoir or pond before a storm and no early or additional gate opening shall be assumed unless the custodian's written operating rule and records show it.
- Rivers below dams and barrages. For an outfall to a river below a dam or barrage, such as the Bhagirathi and the Ganga below Tehri and Koteshwar, the Ganga below Pashulok at Rishikesh and below Bhimgoda at Haridwar, the Yamuna below Dakpathar, the Asan below its barrage, the Gaula below the Gaula barrage at Haldwani, the Kosi below Ramnagar, the Sarda below Banbasa, and the rivers of the terai below the Baur, Haripura and Tumaria reservoirs, in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) shall be run with the river at the level that results from the largest recorded release of the dams and barrages above, routed to the outfall, with the flow of the catchment below them as it occurred in the same event, and with the release placed before, during and after the site storm (set by this Manual), until the operator publishes an operating rule that bounds the release [TBC]. The largest recorded releases found are about 375,000 cusec at Bhimgoda in June 2021, 123,000 cusec at the Gaula barrage in 1993 against a design discharge of 115,000 cusec, and 12,742 m³/s at Dakpathar in 1973 (as reported; Irrigation Department; UJVN Ltd); the largest recorded release of each dam and barrage and its duration shall be obtained from its operator and stated [TBC]. A release, or a release rule, alone shall not be taken to bound the river level: the level shall also be checked for the largest recorded event at the nearest gauge, with the local inflows as they occurred. No attenuation by the storage of Tehri or any other reservoir shall be credited to the river below unless the operator's written rule commits that storage to flood control for the event; and no dam or barrage gate shall be assumed to open earlier or wider than the operator's records show. The river level shall not be reduced on the ground that the flood comes from rain that falls outside the town, on snow or glacier melt, or in Nepal on the Kali (Sarda), or that the site storm is small.
- (d) Naini lake and Bhimtal. For an outfall to Naini lake, Bhimtal, Naukuchiatal, Sattal or another taal, directly or through a drain that ends in it:
- Consent. Storm water shall not be discharged to a taal without the written consent of its custodian. The custodian of Naini lake and of its sluices was not confirmed during research [TBC]: the Lake Development Authority, Nainital, holds the lake area, and the operation of the sluice gates at Tallital is reported to have passed from PWD to the Irrigation Department in 2018 (as reported); the drains of the town are held by the Nagar Palika Parishad, Nainital [TBC]. Both the lake custodian and the Irrigation Department shall consent until the State names one custodian. The custodians of Bhimtal, Naukuchiatal and Sattal were not confirmed [TBC].
- Naini lake: design level. The lake drains only through five sluice gates at Tallital, each 2.5 ft wide and 1.25 ft high, installed in 1888 and worked under rules framed by the Hill Slide Committee of 1927, which allow them to be opened no more than 6 inches while the gauge is below 9 ft and, as a rule, no more than 12 inches while it is below 9.5 ft, to protect the Balia ravine below, and which keep them open from their first opening in the monsoon until 15 October, when they are sealed (NIH, 1998–99). The maximum level of the lake is 12.5 ft on the PWD gauge at Tallital (NIH, 1998–99); press reports give 12 ft, and the lake rose to 12.2 ft and overflowed on 19 October 2021 (as reported). Until the custodian confirms a maximum level, the tailwater for the major-system and storage cases is the higher of 12.5 ft on the Tallital gauge and the level to which the lake rose when it overflowed in October 2021, surveyed from flood marks; the minor-system tailwater is the gauge level at which the rules allow the sluices their full opening. The zero of the Tallital gauge has not been tied to mean sea level in any source found [TBC]: the designer shall level it to a Survey of India benchmark, convert every gauge level from feet on the gauge to metres on the project datum, and state the conversion on Form 5-1 (set by this Manual).
- Naini lake: closed outfall. The lake starts every design storm from 1 July to 15 October at the tailwater of the previous item, and every design storm after 15 October with its sluices sealed and its level at the higher of that tailwater and its level on 15 October. An outfall whose invert is below that level shall be treated as closed for the whole storm (Clause 5.9.4). No opening of the sluices beyond the 1927 rules, and no lowering of the lake before a storm, shall be assumed unless the custodian's written rule and records show it. Pumping into the lake raises its level for every other outfall (Clause 5.12.3) and shall not be used without the custodian's consent.
- Drains to the lake. Every drain that discharges to Naini lake or another taal shall pass a debris trap and a sediment trap (Clause 6.3.6(a) and Chapter 8) before it reaches the lake, sized for the bulked flow of Clause 6.3.6(b). No runoff shall be infiltrated on the slopes of the lake catchment except as Clause 4.11 allows, and the Sukhatal basin, which supplies a large part of the lake's subsurface inflow, shall not be built on or paved (Chapter 7).
- The Balia Nala. No new discharge to the Balia Nala or its ravine below the Tallital sluices shall be made except through a lined channel or pipe with energy dissipation, with the consent of the Irrigation Department and a geotechnical certificate that the discharge will not destabilise the ravine (set by this Manual).
- Bhimtal and the other taals. No level on a stated datum was found for Bhimtal, Naukuchiatal or Sattal [TBC]. Until the custodian gives one, the tailwater is the level at which the taal spills, from its outlet or overflow crest surveyed and tied to a Survey of India benchmark, plus the head over that crest needed to pass the 1% AEP inflow, and not less than the highest level recorded at the taal; the taal starts every design storm at its spill level, and an outfall below the tailwater is closed for the whole storm (set by this Manual).
- (e) The Upper Ganga Canal, other canals and the drains of other bodies. Storm water shall not be discharged to the Upper Ganga Canal, which leaves the Ganga at Bhimgoda and runs through Haridwar and Roorkee, or to any other irrigation or power canal or gul, without the written consent of the canal's operator (for the Upper Ganga Canal, reported to be the Uttar Pradesh Irrigation Department, unverified [TBC]; for its own canals, the Irrigation Department), nor to a drain of another body, such as a drain of a Nagar Nigam or other urban local body, a development authority, UUSDA or Dehradun Smart City Ltd, PWD or NHAI, or an industrial estate, without the written consent of that body. A drain that crosses a canal shall cross by a cross-drainage work built with the canal operator's consent, and not discharge into it. Where consent is given:
- the discharge shall not exceed the rate the consent allows;
- the tailwater is the higher of the channel's design water level as its owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives, including the drains of other bodies, and with its downstream boundary at the river, reservoir or taal level of items (a) to (d); until a design water level is published for a channel, the computed level governs [TBC];
- the channel shall be taken in its present condition, net of silt, boulders, encroachment, solid waste, weed and obstruction by crossing services and culverts, and with its narrowest section as surveyed, and with any weir that intercepts its dry-weather flow (Clause 8.9) at its crest level; a widening, lining, remodelling or diversion that has been proposed but not completed, such as the lining of the Rakasia and Kalasia nalas at Haldwani, shall not be counted, and a channel designed for a stated return period shall not be taken to carry more than its surveyed section carries; and
- the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert.
- (f) Irrigation Department consent; floodplain, plan, wetland and court lines. No outfall structure, gate, pumping station or drain shall be built in the bed, bank or floodplain of a river, rao or gadhera, or in a dam, barrage, reservoir, embankment, flood wall or canal of the Irrigation Department, without the consent of the Irrigation Department, or of THDC India Ltd or UJVN Ltd for their structures; the procedure for that consent was not found during research [TBC]. In the prohibited (25-year) or restricted (100-year) area of a reach notified under the Uttarakhand Flood Plain Zoning Act 2012 (614.6 km of the Bhagirathi, the Ganga, the Bhilangana, the Alaknanda and the Mandakini, and the Rispana; Chapter 7), any activity also needs the previous permission of the Flood Zoning Authority (s.12(3)); the lists of permitted works found in the notifications do not name drain outfalls, and whether an outfall is permitted in each area is to be confirmed with the Authority before design [TBC]. The designer shall also check the outfall against the lines that the building rules, the zoning regulations, the wetland rules and the courts have set, as they stand at the time of design (Chapter 7): the 30 m from a river bank, 30 m from the bank or maximum fixed level of a lake, 10 m from a spring and at least 5 m from a nala of bye-law 4.4(III) of the Bye-laws 2011; the 30 m from river and lake banks of the Unified Zoning Regulations 2025; on the Ganga in the hills, the prohibited zone (100 m from the middle of the river or the 25-year flood area, whichever is more) and the 200 m regulatory zone beyond it of the Housing Department's order of 29 November 2017 (revised 1 June 2023), which give way to the Irrigation Department's notified lines where they exist; below Haridwar, the 100 m from the edge of the river that the National Green Tribunal set as a no-development zone on the Ganga from Haridwar to Unnao until the floodplain is demarcated (O.A. 200/2014, judgment of 13 July 2017), which conflicts with the State's reading of 100 m from the middle of the river; the direction of the High Court in Lalit Miglani (2016) that drains opening into the Ganga be sealed, which this Manual reads as applying to sewage and dry-weather flow (Clause 8.9) and not to a storm-water outfall built under this chapter [TBC]; the Asan Conservation Reserve, a Ramsar site; the Sukhatal lakebed, on which the High Court stopped construction in 2022; and the orders on the beds of the Doon's raos and khalas (Urmila Thapa, WPPIL 58/2019; NGT O.A. 417/2022 on the Rispana). Whether a drain outfall is permitted within each line is to be confirmed with the authority concerned before design [TBC].
No pump, gate, sluice, barrage or dam operation that helps drainage, such as pumping a drain down before a storm, lowering a reservoir, barrage pond or taal before a storm, opening the Tallital sluices beyond their rules, closing a gate late or opening dam or barrage gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the waterbody or the river (Clause 5.12.3). Pumping shall not be used to move water into a taal, a reservoir or another catchment without the consent of its custodian, or onto a slope.
Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Uttarakhand's rivers break that assumption, because their catchments are small and steep and the storms that fill them fall on the towns at the same time. On 17 June 2013 Dehradun recorded 370.2 mm in a day (IMD) in the same storm that sent the Alaknanda at Srinagar and Rudraprayag to their highest recorded levels and the Ganga at Haridwar to 295.75 m; on 18–19 October 2021, when Pantnagar recorded 403.9 mm and Nainital 401 mm in 24 hours, the Kosi at Ramnagar, the Gaula at Kathgodam and the Sarda at Banbasa all set new highest levels and Naini lake overflowed; and on 13–14 August 2023, when 419 mm fell at Rishikesh, the Ganga there rose above its danger level (IMD and CWC data, as reported and as copied by SANDRP). The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.
Clause 5.8.3 reflects the dams and barrages above and beside the State's towns. Tehri, on the Bhagirathi, has a full reservoir level of 830 m, a maximum level in the design flood of 835 m and a spillway designed for a probable maximum flood of 15,540 m³/s, and first reached its full level on 24 September 2021 (THDC). In June 2013 it took a peak inflow of about 7,500 m³/s on 17 June while releasing no more than about 500 m³/s, its level rising from 750.00 m to 775.05 m in two days (THDC, as presented at CBIP); an expert panel later called that attenuation "a matter of chance, not design" (as reported): the reservoir stood some 80 m below its full level when the flood came. The Dakpathar barrage on the Yamuna passed 12,742 m³/s in 1973 and is designed for 14,420 m³/s, the 200-year flood, at a high flood level of 456.50 m (UJVN Ltd, 2021); the Asan barrage is designed for 4,500 m³/s (UJVN Ltd, 2021); the Gaula barrage at Kathgodam, designed for 115,000 cusec, passed 123,000 cusec in 1993, and its pond is reported to be silted with boulders (Irrigation Department; as reported); and the Bhimgoda barrage at Haridwar passed about 375,000 cusec in June 2021 (as reported). In August 2026 the Sarda carried more than one lakh cusec for three days, with about 70,000 cusec at Banbasa (as reported). No operating rule or release record for any of these dams and barrages, no rule curve for Tehri after 2013, and no hourly stage record for any gauge in the State was obtained during research [TBC]. Until they are, the largest recorded release applies, with the flow of the catchment below the dam as it occurred in the same event (Clause 5.8.5(c)). The river levels used in this Manual come from SANDRP's copies of CWC data, because the CWC websites refused access during research; their datum and gauge zero are to be confirmed with CWC [TBC].
Clause 5.8.5 is set by this Manual. In Uttarakhand the tailwater at a town outfall is set not by the tide but by a river held high by a monsoon spell or a barrage, by a rao or gadhera whose level no one has recorded and whose bed moves, by a reservoir or barrage pond at its full level, by a lake whose outlet is gated, or by a canal, and no document found during research gives a design level for any of them. The only design basis found for town drains, that of the drains built in Dehradun with ADB's assistance, requires the outfall invert to stand above the high flood level of the receiving water but does not say what that level is (ADB, climate risk assessment, 2021). The State's municipal law was not read in its Uttarakhand form [TBC]. The Uttarakhand Flood Plain Zoning Act 2012 is the State's own instrument for flood lines, and the Irrigation Department has finally notified 614.6 km of five rivers of the Ganga system and the Rispana under it (Irrigation Department, status report filed in NGT O.A. 417/2022; Chapter 7), but the notifications mark lines on revenue maps and publish no levels.
The first is the river. Item (a) follows the interim river rule of the other plains editions of this Manual: the design level is the 1% AEP level, and never below the highest level recorded at the nearest CWC gauge. At Haridwar the record itself is not in doubt, 296.30 m, but its date is: SANDRP's account of the CWC data dates it 19 September 2010 and gives the peak of 17 June 2013 as 295.75 m, while the CWC table that SANDRP copied puts 296.30 m against 17 June 2013. Item (a) uses the level and states the conflict, because the date does not change the floor. At Ramnagar the conflict is in the level, 220.95 m or 220.75 m for the same flood, and the higher is used until CWC confirms it. The danger level is used as the floor of the 10% AEP level because the Ganga has crossed it in recent floods at both Haridwar and Rishikesh, so a level reached about once in ten years is unlikely to lie below it; at Roorkee the danger level stands above the recorded highest level, which SANDRP says is true of 18 of the sites that CWC has upgraded and is a reason to read every level in a CWC site sheet before final design [TBC]. The rivers of the hills rise and fall within hours, which might seem to justify a shorter lock than in the plains. Item (a) keeps 72 hours for three reasons: no hourly stage record for any gauge in the State was obtained during research [TBC]; the storms that raise the rivers last for days, as on 16–18 June 2013 and 17–19 October 2021, and in August 2026 the Sarda carried more than one lakh cusec for three days (as reported); and on the plains the rivers are held up by barrages, the Ganga at Haridwar by Bhimgoda and at Rishikesh by Pashulok, so that an outfall into a barrage pond stays closed for as long as the pond is held, which item (a) treats as the whole storm. The lock covers the whole of the longest design storm of Clause 2.5.2, so that the site does not rely on the river falling during the storm. A designer who has the stage record of a CWC gauge can justify a shorter lock under Clause 5.10.6, and the mountain rivers are where that analysis is most likely to succeed. Item (a) counts only the permanent pumps less the largest one, for the same reason that Clause 5.12.2(b) requires a standby pump: pumping stations are proposed in the low-lying parts of Haldwani (as reported), and a station that loses a pump in the storm must still meet the check.
The second is the rao and the gadhera. Dehradun's raos are ungauged, and the Irrigation Department's floodplain study of the Rispana, modelled for the 25-year and 100-year floods with the CWC subzone unit hydrographs (affidavit of the State in NGT O.A. 417/2022), gives lines but no published level. Item (b) therefore requires the designer to make the study and to survey the flood marks, and takes the higher. A rao's bed is not fixed: it rises with the gravel and boulders of one flood and is scoured by the next, and the floods of September 2025 damaged 83 of the interception structures built in and beside the Rispana (Peyjal Nigam, affidavit in O.A. 417/2022). An outfall set at the present bed level is buried by the first and undermined by the second, so item (b) sets the invert at least 0.5 m above the highest bed level surveyed downstream, a margin set by this Manual for the aggradation that a gravel bed can show in a single flood, and takes the foundation below the computed scour. It keeps outfalls out of the active channel, which NMCG has asked the State to show for the Rispana as the 5-year flood zone (NGT order of 18 August 2025, as recorded).
The third is the reservoir and the barrage pond. A reservoir at its full level does not fall for the rest of the season but passes its inflow over its spillway, and its level rises above FRL by whatever head the flood needs. Item (c) therefore takes the MWL, as published for Tehri, or FRL plus the design-flood surcharge, and treats an outfall below it as closed for the whole storm, which is what Clause 5.9.4 already requires when the tailwater stays above the outfall. Where only a pond or full level is published, FRL + 0.5 m is set as the interim value: it is the freeboard that this Manual uses for floor levels (Clause 6.11.1), and it is a floor, not an estimate of the surcharge, which depends on the spillway and the flood [TBC]. For the Gaula barrage the published high pond level, 513.250 m, is used as its MWL, and for Dakpathar the 200-year high flood level, 456.50 m; at Banbasa the recorded 224.9 m of October 2021 is above the published MWL of 223.3 m, and the recorded level governs. Item (c) also runs the town storm with the river at the largest recorded release because the rain that fills a reservoir and the rain on the town below come from the same monsoon spell (see the Commentary to Clause 5.8.4). It credits no attenuation by Tehri, because the reservoir is held to a rule that THDC has not published and filled to its full level for the first time only in 2021, and because the panel that reviewed the flood of 2013 found its effect then to be "a matter of chance, not design" (as reported).
The fourth is Naini lake. The lake receives every drain of Nainital and leaves only through five sluices of 2.5 ft by 1.25 ft at Tallital, whose opening the rules of 1927 limit to protect the Balia ravine, and which are sealed on 15 October (NIH, 1998–99). A lake with a gated outlet of that size cannot be lowered in a storm, so item (d) starts every storm at the maximum level and treats an outfall below it as closed. The maximum level is 12.5 ft on the PWD gauge in the NIH study and 12 ft in press reports; item (d) uses the higher, with the level of October 2021 as a check, because the lake rose to 12.2 ft and overflowed on 19 October 2021 (as reported), four days after the date on which the sluices are sealed. That flood is also why item (d) starts every storm after 15 October with the sluices sealed. The gauge is read in feet from a zero that no source found ties to mean sea level, so item (d) requires the zero to be levelled before any outfall level is set [TBC]. The custodian of the lake and its sluices was not confirmed: the Lake Development Authority holds the lake area, and the operation of the sluices is reported to have passed from PWD to the Irrigation Department in 2018 [TBC]. Bhimtal and the other taals have no published level, so their spill level is used, as the plains editions of this Manual use the spill level of a talab.
The fifth is the canal and the drain of another body, and the sixth is the line within which an outfall may be built. The Upper Ganga Canal leaves the Ganga at Bhimgoda and runs through Haridwar and Roorkee to Uttar Pradesh; its flows are reported to be regulated by the Uttar Pradesh Irrigation Department (unverified [TBC]), so item (e) asks for the consent of the canal's operator, whoever it is. Items (c), (e) and (f) ask for the owner's consent and design level because a design that discharges to a channel, a reservoir or a lake cannot be checked without them. The lines of item (f) decide where an outfall can be built, not its level. On the Ganga they conflict: the Housing Department's order of 2017 reads the National Green Tribunal's direction as 100 m from the middle of the river, while the Tribunal's judgment of 13 July 2017 for the reach from Haridwar to Unnao says 100 m from the edge (Chapter 7). Item (f) states both and does not choose between them.
5.9 Joint-probability cases
5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.
Table 5.2 — Joint-probability cases for tidal and riverine outfalls
| Case | Rainfall | Tailwater | Applies to | Basis |
|---|---|---|---|---|
| J1 | Minor-system design AEP, Tc to 24 h | MHWS + SLA (tidal curve) | Minor system | Clause 2.12(a); Clause 5.7.1 |
| J2 | 1% AEP, all durations of Clause 2.5.2 | HAT + surge + SLA | Major system, detention, tanks, pumped systems | Clause 5.7.1 |
| J3 | 10% AEP, 48 h | 1% AEP still-water level + SLA | Major system, detention, tanks, pumped systems | Clause 2.12(b) |
| J4 | Design AEP, 48 h (72 h reported) | Tidal curve per J1 with two 6 h lock windows (Clause 5.10) | All storage and every gated or tide-affected outfall | Clause 5.10 |
| R1 | Site design AEP | River at 10% AEP level | Riverine outfalls | Clause 5.8.4(a) |
| R2 | Site 10% AEP | River at design-AEP level | Riverine outfalls | Clause 5.8.4(b) |
5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).
5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.
5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.
Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.
5.10 Outfall-closed (tide-locked) storage check
5.10.1 Where it applies. The check applies to:
- every storage facility;
- every minor- and major-system element; and
- every pumped system
whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).
5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:
- the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
- AMC III.
The 72-hour storm shall also be run and reported.
5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:
- (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
- (b) During each lock window, gravity discharge is zero.
- (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
- (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.
5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:
- (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
- (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
- (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.
In volume terms, over each lock window and the full storm:
V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)
This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).
5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).
5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:
- sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
- the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.
Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.
Commentary. The outfall-closed check is the distinctive Uttarakhand requirement in this Manual. In Uttarakhand it applies where an outfall is shut not by the tide but by a river held high by a monsoon spell or by a barrage, by a rao that has risen over the outlet or buried it in gravel, by a reservoir or barrage pond at its full level, or by Naini lake, whose sluices are sealed on 15 October. In August 2026 the Sarda carried more than one lakh cusec for three days (as reported), and the storms of 16–18 June 2013 and 17–19 October 2021 each lasted for days. A river below a barrage stays high for as long as the barrage passes the flood, a pond or lake at its full level stays there for the rest of the monsoon, and a rao in flood can block an outlet with boulders, which is why Clause 5.8.5 replaces the two 6-hour windows described below with a single river lock of at least 72 hours and a closure for the whole storm at a pond, lake or rao outfall below its design level. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.
The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.
Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.
5.11 Flap gates, tide gates and non-return valves
5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.
5.11.2 Hydraulics. The design shall include:
- the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
- the reduction in effective outfall capacity when the gate is partly open.
Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.
5.11.3 Construction.
- (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
- (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
- (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
- (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
- (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.
5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:
- the major-system tailwater (J2) at the point of connection; or
- the maximum stage in the outfall-closed check (Clause 5.10).
Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.
5.11.5 Inspection. Gates and valves shall be inspected and operated:
- before 15 June each year;
- after every event in which they closed against a storm flow; and
- as set in the maintenance plan (Chapter 10).
Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Uttarakhand the outfalls do not cross a beach, but many of them end in a river whose level is set by a dam or barrage upstream, in a barrage pond, or in a lake whose only outlet is gated. In June 2013 Tehri took a peak inflow of about 7,500 m³/s while releasing about 500 m³/s (THDC, as presented), an attenuation that an expert panel called "a matter of chance, not design" (as reported); the Bhimgoda barrage at Haridwar passed about 375,000 cusec in June 2021 (as reported); and the five sluice gates at the Tallital end of Naini lake, installed in 1888, are worked under rules of 1927 that limit their opening to protect the Balia ravine below them, and are sealed on 15 October (NIH, 1998–99). A gate opened in a hurry raises the river below; a gate held shut raises the pond or the lake and every outfall that drains to it. The dams and barrages are held by THDC India Ltd (Tehri and Koteshwar), UJVN Ltd (Dakpathar and Asan) and the Irrigation Department (the Gaula barrage and the reservoirs of the terai), the canal flows at Bhimgoda are reported to be regulated by the Uttar Pradesh Irrigation Department (unverified [TBC]), the operation of the Tallital sluices is reported to have passed from PWD to the Irrigation Department in 2018 (as reported), and the drains that reach them belong to the Nagar Nigams, the Nagar Palika Parishads, the development authorities and PWD; no rule linking the operation of any of these gates to the levels of the drains was found during research [TBC], so a gate and the drains behind it can belong to different bodies. The 15 June inspection date is set ahead of the SW monsoon.
5.12 Pumped outfalls
5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:
- the outfall-closed check of Clause 5.10;
- the drawdown requirement of Clause 4.7; or
- the J2 and J3 cases.
Pumping shall not be used where a gravity solution meets these requirements.
5.12.2 Capacity.
- (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
- (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
- (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.
5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.
5.12.4 Power supply. Pumping stations shall have either:
- two independent power supplies; or
- standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.
Changeover shall be automatic.
5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:
- the 1% AEP flood level + 0.5 m; and
- HAT + surge + SLA + 0.5 m.
Access to the station shall remain usable in the 1% AEP event.
5.12.6 Discharge arrangement. Rising mains shall discharge:
- over a level above the J2 tailwater; or
- through a non-return valve and a flap gate.
The arrangement shall prevent back-siphoning.
5.12.7 Controls and monitoring. Each station shall have:
- automatic level control;
- remote alarms for high level, pump failure and power failure, sent to the operator; and
- a level and run-time log kept for at least 5 years.
Wet wells shall be sized to keep pump starts within the manufacturer's limits.
5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).
5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 15 June each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).
Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.
5.13 Sand-bar closure of river mouths
5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Uttarakhand: Clause 5.1.4), and any other mouth listed in Annex 5B.
5.13.2 Assumption at the start of the SW monsoon. The mouth shall be assumed closed by a bar at the start of the June–September season, at the crest level of the most recent pre-monsoon survey. This applies unless the Irrigation Department certifies that:
- a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three SW monsoon seasons; and
- the programme is funded for the current season.
5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:
- (a) the tidal tailwater of Clause 5.7; and
- (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.
5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless the Irrigation Department has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.
5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.
Commentary. Uttarakhand has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the gravel, boulders and debris that hill streams leave at an outfall. The pond of the Gaula barrage is reported to be silted with boulders (as reported); in the floods of 15–16 September 2025 the raos of Dehradun damaged 83 of the interception structures on the Rispana (Peyjal Nigam, affidavit in NGT O.A. 417/2022); and the 1927 rules for the Tallital sluices of Naini lake exist to keep the Balia ravine below them from eroding (NIH, 1998–99). A flap gate held open or shut by gravel or debris, an outlet buried by a rising bed or left hanging by scour, or a gate that cannot be moved, turns a designed outfall into a dead end or a back-flow path. Apart from the Tallital rules, no written gate-operation rule for the gates of any barrage or lake outlet in the State was found during research [TBC]. Clause 5.8.5 deals with both by setting outfalls above the range of bed movement and by giving no credit for a gate operation or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.
5.14 Documentation
Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:
- a plan of the analysis extent showing:
- the site;
- each analysis point with its contributing catchment area and the site's percentage of it; and
- the end point and the reason it was chosen (Clause 5.3);
- the model description:
- software and version;
- the network schematic, with survey sources for the drains and crossings;
- land use and CN for off-site areas;
- any upstream detention included; and
- calibration or validation evidence where available;
- for each analysis point, AEP and duration, the existing and with-project:
- peak flow;
- time to peak;
- maximum water level and velocity; and
- duration of inundation (Clause 5.4);
- the comparison against Clause 5.5, with each failure identified and the remedy adopted;
- the tailwater derivation:
- tide-table edition and port;
- MHWS, HAT and MSL relative to chart datum;
- the datum connection to the Survey of India benchmark and the project datum;
- surge source and value;
- SLA; and
- river levels and their sources (Clauses 5.6 to 5.8);
- the joint-case table of Clause 5.9 with results;
- the outfall-closed check (Clause 5.10):
- storm and lock alignment;
- stage hydrographs; and
- the volume balance for each lock window;
- a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
- pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
- the sand-bar assumption and supporting Irrigation Department certification, where relevant (Clause 5.13); and
- inspection and maintenance requirements for Chapter 10.
Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §6.3.6 and Table 6.2 (coastal tailwater; +0.3 m climate allowance). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- MoHUA / CPHEEO (2013). Manual on Sewerage and Sewage Treatment Systems (pumping stations).
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.5, ten-percent downstream analysis). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Vol. 1 (Standard #8) and Vol. 2 §3.1.9. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- MARC. The Evolution of Regional Stormwater Design Standards. https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- SANDRP. 2022 CWC flood monitoring sites in North India (warning, danger and highest flood levels of the CWC sites in Uttarakhand, and the note on upgraded sites whose highest level is below the danger or warning level), https://sandrp.in/2022/08/05/2022-cwc-flood-monitoring-sites-in-north-india/ ; Aug 2023 floods in Alaknanda Ganga rivers (Haridwar 296.3 m of 19 September 2010 and 295.75 m of 17 June 2013; Rishikesh 341.45 m of 2013 and 341.3 m of 14 August 2023; 419 mm at Rishikesh), https://sandrp.in/2023/09/05/aug-2023-floods-in-alaknanda-ganga-rivers/ ; Rivers crossing HFLs in Oct–Nov 2021 (the Kosi at the Ramnagar barrage, 220.95 m), https://sandrp.in/2021/12/12/rivers-crossing-hfls-in-oct-nov-2021/ ; and Unprecedented October 2021 rainfall in Uttarakhand (Pantnagar, Nainital and Mukteshwar, citing IMD), https://sandrp.in/2021/10/26/unprecedented-october-2021-rainfall-in-uttarakhand/ . These are copies of CWC data; the CWC websites refused access during research, and the datum and gauge zero of each gauge are to be confirmed with CWC.
- THDC India Ltd. Tehri progress report, February 2025 (spillway for a PMF of 15,540 m³/s; full reservoir level 830 m first reached on 24 September 2021), https://thdc.co.in/sites/default/files/operational-performance%20/THDC_Tehri_Progress_Report_February2025.pdf ; Tehri project page (FRL 830 m, MWL 835 m), https://www.thdc.co.in/en/node/258 , seen only as an extract; and A.K. Singh (THDC), presentation at the CBIP symposium on reservoir operation, Rishikesh, April 2022 (inflow and release of 16–18 June 2013), seen only as an extract.
- UJVN Ltd (2021). Operation and Maintenance Manual, Dakpatthar Barrage (April 2021: catchment, pond levels, design floods, high flood level of 456.50 m, observed peaks), https://www.ujvnl.com/document/approved-oandm-manual-of-dakpatthar-barrage-ujvnl-20-04-2021.pdf ; and Operation and Maintenance Manual, Asan Barrage (March 2021: maximum pond level 401.50 m; design flood 4,500 m³/s), https://www.ujvnl.com/document/asan-barragre-onm-manual-march2021-17321.pdf
- Irrigation Department, Government of Uttarakhand. Salient features of the Gola (Gaula) barrage (design discharge 115,000 cusec; 123,000 cusec passed in 1993; pond levels), https://uttarakhandirrigation.com/document/gola-barrage-23_05_2016.pdf ; of the Baur and Haripura dams (FRL 795 ft, 242.32 m), https://uttarakhandirrigation.com/document/baur-dam-23_05_2016.pdf and https://uttarakhandirrigation.com/document/haripura-dam-23_05_2016.pdf ; of the Tumaria reservoirs and the Dhela and Phika barrages, https://uttarakhandirrigation.com/document/tumaria-dam-23_05_2016.pdf ; and the Chilla scheme (the Virbhadra barrage near Rishikesh), https://uttarakhandirrigation.com/chilla
- National Institute of Hydrology, Roorkee (1998–99). Water Balance of Lake Nainital, Kumaun Himalayas, U.P., CS(AR)-6/98-99, by Bhishm Kumar and Rm.P. Nachiappan (the Tallital sluices of 1888; the Hill Slide Committee's rules of 1927; maximum level 12.5 ft on the PWD gauge; sluices sealed on 15 October; the Sukhatal sub-basin), https://prod-qt-images.s3.amazonaws.com/indiawaterportal/import/sites/default/files/iwp2/Water_Balance_Of_Lake_Nainital_Kumaun_Himalayas_of_UP.pdf
- Uttarakhand Flood Plain Zoning Act, 2012 (Uttarakhand Act No. 07 of 2013), ss.3, 8, 11 and 12, https://faolex.fao.org/docs/pdf/ind213361.pdf ; Irrigation Department, compliance report in NGT O.A. 417/2022, Niranjan Bagchi v. State of Uttarakhand, with the annexure "Status of Flood Plain Zoning Works in Uttarakhand" (2024); affidavit of the State (Urban Development Department, December 2025) and affidavit of the Uttarakhand Peyjal Nigam (December 2025, annexing the Tribunal's order of 18 August 2025: the Rispana's final notification of 5 May 2025; the 83 interception structures damaged on 16–17 September 2025), https://www.greentribunal.gov.in/sites/default/files/news_updates/AFFIDAVIT%20BY%20R-6%20UTTARAKHAND%20PEY%20JAL%20NIGAM%20IN%20OA%20NO.%20417%20of%202022%20NIRANJAN%20BAGCHI%20VS%20STATE%20OF%20UTTARAKHAND.pdf
- Housing Department, Government of Uttarakhand. Order No. 1995/V-2-2017-58(आ0)/2014 of 29 November 2017 (the banks of the Ganga in the hill areas: prohibited and regulatory zones), and letter of 1 June 2023 (the Irrigation Department's floodplain notifications to govern where they exist), from the UHUDA document list, https://uhuda.uk.gov.in/documents/ ; and National Green Tribunal, O.A. 200/2014, M.C. Mehta v. Union of India, judgment of 13 July 2017 (100 m from the edge of the river, Haridwar to Unnao), seen in an extract.
- High Court of Uttarakhand, Urmila Thapa v. State of Uttarakhand, WPPIL 58/2019 (August 2022), https://hindi.livelaw.in/pdf_upload/uttrakahand-hc-river-beds-433437-433490.pdf ; Lalit Miglani v. State of Uttarakhand, WPPIL 140/2015, 2 December 2016, as quoted in CAG Report 39 of 2017, Chapter 8; and the order of 2022 on the Sukhatal lakebed, as reported (Down To Earth, 2022), https://www.downtoearth.org.in/environment/no-construction-on-sukhatal-lakebed-near-naini-lake-orders-uttarakhand-high-court-86234
- Asian Development Bank (2021). Uttarakhand Integrated and Resilient Urban Development Project (38272-044): Climate Risk and Vulnerability Assessment (design storms of the Dehradun drains; outfall invert above the high flood level), https://www.adb.org/sites/default/files/linked-documents/38272-044-sd-03.pdf
- India Meteorological Department. Dehradun station extremes (370.2 mm on 17 June 2013), https://mausam.imd.gov.in/dehradun/mcdata/DEHRADUN_EXTREME.pdf (archived copy).
- Press reports on Tehri in June 2013 and the expert panel (SANDRP, 28 June 2013; ThePrint), https://theprint.in/science/how-dams-can-help-control-floods-what-experts-said-after-2013-uttarakhand-disaster/601368 ; on the flow at Bhimgoda in June 2021 (Hindustan Times, 20 June 2021) and July 2026 (NewKerala), https://www.newkerala.com/news/a/ganga-water-level-reaches-warning-mark-bhimgoda-barrage-878.htm ; on the regulation of the Upper Ganga Canal (conference paper, as seen in an extract; unverified); on the Sarda in August 2026; on Naini lake in October 2021 and the transfer of its sluices; and on the Haldwani drainage master plan (Amar Ujala, 5 August 2026), https://www.amarujala.com/uttarakhand/nainital/haldwani-city-drainage-plan-approved-2026-08-05
- Survey of India. Tidal Predictions: Geodetic and Research Branch. https://www.geographyandyou.com/survey-of-india/tidal-predictions-geodetic-and-research-branch-survey-of-india
- GLOSS. India national report (tide-gauge network and datums). https://gloss-sealevel.org/gloss/gloss/sites/gloss/files/publications/documents/india_ge9.pdf
- Adani Ports (2025). Tide Table 2025, Dahej (notes on NHO INP-12 coverage and data sources). https://www.adaniports.com/-/media/Project/Ports/PortsAndTerminals/Dahej-Port/Marine-Documents/Tide-Table-2025-Dahej.pdf
- INCOIS. Storm-surge and swell-surge warning services. https://incois.gov.in/
- FHWA. HEC-22 Urban Drainage Design Manual (current edition), Table 7.3 (coincident frequencies).
- Purdue University JTRP (2023). Development of a Multiple Water Course Joint Probability Analysis Procedure for Indiana Watersheds, FHWA/IN/JTRP-2023/09. https://docs.lib.purdue.edu/jtrp/1820
- PUB Singapore (2025). Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3. https://info.corenet.gov.sg/docs/default-source/pub-circulars/pub-circular_cop-7th-ed-addendum-no-3_16-apr-2025.pdf?sfvrsn=5a2c1e1a_2
Annexes and forms
| Annex / Form | Content |
|---|---|
| 5A | Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment |
| 5B | Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map |
| 5C | Worked example: outfall-closed check for a site on a khala draining to the Rispana in Dehradun |
| Form 5-1 | Downstream and Tailwater Report |
| Form 5-2 | Simplified Downstream Statement (small sites) |
Commentary. The drains of Uttarakhand's towns fail in places that site design does not see, and in five different ways. The first is the river. Haridwar and Rishikesh drain to the Ganga, which stood at 295.75 m at Haridwar on 17 June 2013, within 0.6 m of its highest recorded level, and above its danger level at Rishikesh on 14 August 2023 (CWC data, as copied by SANDRP); Roorkee drains to the Solani, Haldwani to the Gaula, Ramnagar to the Kosi and Banbasa to the Sarda, all of which set their highest recorded levels in October 2021, the Solani on 14 October and the others on 19 and 20 October, the Kosi at Ramnagar 3.97 m above its previous highest level (CWC data, as copied by SANDRP); and the valley towns of Srinagar, Rudraprayag and Joshimath stand above rivers that rose to their highest recorded levels in the floods of June 2013 and February 2021. The second is the rao and the gadhera. Dehradun's raos, the Rispana, the Bindal, the Suswa, the Song and the Tons, carry the storm water of the city and, until it is intercepted, its sewage; none of them is gauged at a town; their beds have been built on, so that the High Court and the National Green Tribunal have ordered the encroachments removed (Urmila Thapa, WPPIL 58/2019; O.A. 417/2022); and in the floods of 15–16 September 2025 they carried away bridges and culverts and damaged 83 of the interception structures on the Rispana (Peyjal Nigam, affidavit in O.A. 417/2022). The third is the reservoir and the barrage pond: a pond held at its full level holds every drain that ends in it, and Tehri reached its full reservoir level, 830 m, for the first time on 24 September 2021 (THDC). The fourth is Naini lake, which receives every drain of Nainital and leaves only through five small sluices whose opening is limited to protect the ravine below; it rose to a record 12.2 ft on its gauge and overflowed on 19 October 2021 (as reported). The fifth is the canal: the Upper Ganga Canal runs through Haridwar and Roorkee, and its operation is reported to rest with another State (unverified [TBC]). The outfalls also belong to one body while the drains above them belong to others: the rivers, flood works and floodplain lines are the Irrigation Department's, the dams and barrages THDC's, UJVN Ltd's or the Irrigation Department's, Naini lake the Lake Development Authority's [TBC], and the drains the Nagar Nigams', the development authorities' and PWD's, and no rule divides them (Chapter 6, Clause 6.9). No document found during research sets a design level for any river, rao, reservoir, taal or canal outfall in the State; the only design basis found, for the drains built in Dehradun with ADB's assistance, sets the outfall invert above the high flood level of the receiving water without saying what that level is (ADB, 2021). A detention basin that meets every release rate in Chapter 4 still fails if the river it drains to stands above its outfall, if the rao has buried its outlet in gravel, or if the pond or lake is full. This chapter makes these failure modes part of the design. Uttarakhand has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.