Draft v1.0 prepared by NEER. Not adopted by the Government of Uttarakhand or any authority or local body, and has no legal force. About this draft

Chapter 7Waterbodies, Taals (Lakes and Ponds) and Setbacks


7.1 Purpose and scope

7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:

  • (a) identifying and mapping every waterbody that a development or public work affects;
  • (b) the setback zones around waterbodies, and the uses allowed in each zone;
  • (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
  • (d) counting tank (taal) storage, including tank cascades, as design storage;
  • (e) restoring and desilting tanks and ponds;
  • (f) protecting supply channels, surplus courses, inlets and outlets;
  • (g) wetlands, marshes and estuaries, which in Uttarakhand, with no coast and no tidal water, means the Asan Conservation Reserve at the confluence of the Asan and the Yamuna, the State's only Ramsar site, any wetland notified under the 2017 Rules (none was found notified), the 192 wetlands of the national atlas that the Uttarakhand State Wetland Authority is ground-truthing, the taals of the Nainital lake region and their recharge flats, such as Sukhatal, the simar marshes and seeps of the hill slopes, and the floodplain wetlands and depressions of the rivers in Haridwar and Udham Singh Nagar;
  • (h) the interface with encroachment and its removal;
  • (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
  • (j) the safety of tank bunds and other embankments.

7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:

  • (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
  • (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
  • (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.

7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Uttarakhand Flood Plain Zoning Act, 2012 (Act 07 of 2013), the Bye-laws 2011 (bye-law 4.4), the Unified Zoning Regulations 2025, the Uttar Pradesh Urban Planning and Development Act, 1973 as applicable in Uttarakhand, the Municipal Acts as adapted in Uttarakhand, the Wildlife (Protection) Act, 1972 (for the Asan Conservation Reserve), the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.

Commentary. Uttarakhand has no Act for the protection of lakes, tanks, ponds or springs as such. Its waterbodies are protected instead by the building bye-laws, the zoning regulations, a floodplain zoning law, orders on the banks of the Ganga, the wetland rules and the courts. Bye-law 4.4(III) of the Bye-laws 2011, made by the Housing Department under s. 57 of the Uttar Pradesh Urban Planning and Development Act, 1973 as applicable in Uttarakhand and adopted by each development authority's board, fixes plot boundaries beyond set distances from rivers, springs, nalas and lakes, with no construction within them (Clause 7.4, Disclosure); bye-law 4.4(IV) forbids building where the local slope exceeds 30° (26.5° in the Nainital municipal area) or where landslides are likely to be severe and continuous; and bye-law 4.4(V)(b) requires the site plan of a sloping site to divert the natural flow of water from uphill away from the foundation, the bye-laws' only site-runoff clause. The Unified Zoning Regulations 2025 (Housing Department notification No. 568 of 20 November 2025) place the rivers and waterbodies in the Revenue records, "including ponds, lakes, nalas and streams", in a Conservation Use Zone of every master plan, with a green buffer and no new construction within 30 m of river and lake banks. The Uttarakhand Flood Plain Zoning Act, 2012 (Act 07 of 2013) is applied river by river: the Irrigation Department, the nodal agency, models the 25-year and 100-year floods, the Collector or other authority appointed as Flood Zoning Authority declares the intent to demarcate the flood plain (s. 8), hears objections for sixty days (s. 10) and issues a final notification (s. 11), the lines are marked on the shajra (village) maps and by pillars, and no activity is then allowed within the 25-year line (prohibited area) or the 100-year line (restricted area) without the Authority's permission, deemed to be granted if not refused within ninety days (s. 12(3)). Final notifications cover 614.6 km of the Bhagirathi, the Ganga, the Bhilangana, the Alaknanda and the Mandakini (Irrigation Department, status table filed before the National Green Tribunal, 2024), and the Rispana's was issued on 5 May 2025 (NGT order of 18 August 2025); the Asan's was approved by the cabinet in June 2025 (as reported); the Gaula, the Kosi, the Suswa, the Song, the Baldi and the Solani have been studied but not notified (2024). An amendment of 2024, seen only as quoted, extends the time for the prohibition notification from eighteen to twenty-four months and lets a final notification be amended where "riverbank development" can protect land and buildings, and Rules under the Act are reported to have been approved by the cabinet on 12 October 2026, their text not found. On the Ganga in the hills a Housing Department order of 2017, revised in 2023, adds a prohibited zone and a 200 m regulatory zone, and the National Green Tribunal has set its own line below Haridwar (Clause 7.4, Disclosure). In the towns, drains and watercourses are understood to vest in the local body under the Uttar Pradesh Municipal Corporation Act, 1959 and the Uttar Pradesh Municipalities Act, 1916 as adapted in Uttarakhand, whose drain chapters were not read for this Manual [TBC]; outside municipal limits the High Court has held river-bed land to be forest land (Urmila Thapa, 2022). In this chapter UKID means the Uttarakhand Irrigation Department, the Irrigation Department of Chapter 1, which holds the State's barrages, dams, reservoirs and canals, operates the sluice gates of Naini lake (since 2018, as reported) and is the floodplain zoning agency.

This Manual treats every recorded waterbody as drainage infrastructure, as the Conservation Use Zone already does in the master plans. Three features set Uttarakhand apart. The first is the taal of the Kumaon lake region: Naini lake, Bhimtal, Naukuchiatal and Sattal are natural lakes in hill bowls, with a town or settlement on the slopes around them, so every drain of the town ends in the lake, and the lake empties through a controlled outlet into a steep and unstable gadhera; Naini lake also depends on a small recharge flat, Sukhatal, through which about half of its subsurface recharge was estimated by the National Institute of Hydrology to enter (as cited by NITI Aayog, 2018), and on which the High Court stopped construction in 2022 (as reported). The second is the spring: the naulas and dharas that supply much of the hill population's water (Clause 7.12, Commentary), whose recharge areas lie on the slopes being built over; the bye-law keeps 10 m from a spring, the zoning regulations protect "streams" (धाराएँ, a word that can also mean spring spouts) without naming springs as such, and a Spring and River Rejuvenation Authority (SARRA) was reported to be constituted in 2025, with no constitution order found. The third is the rao and gadhera, the seasonal boulder-laden torrents of the Doon and the hill towns, such as the Rispana and the Bindal, which are rivers in the floodplain law, trunk drains in the towns and, in places, sewers (Clause 8.9, Commentary). Small rain-fed ponds on the ridges and saddles, the khals and chals, and the hill irrigation channels, the guls, belong to the same system and are revived by village programmes (as reported). This chapter gives the design rules that protect the storage and conveyance of these waterbodies. It does not replace the floodplain zoning, building, zoning, municipal, forest and wetland procedures that record and protect them in law, or the directions of the High Court of Uttarakhand, the National Green Tribunal and the Supreme Court.


7.2 Definitions

Term Meaning in this Manual
Waterbody A river (such as the Ganga, the Alaknanda, the Bhagirathi, the Mandakini, the Yamuna, the Kali (Sarda), the Ramganga, the Kosi and the Gaula), rao, gad or gadhera (a seasonal hill stream or torrent, such as the Rispana, the Bindal, the Song, the Suswa and the Tons in the Doon, and the Balia Nala below Naini lake), natural drain, khala or nala, gul (a hill irrigation channel), canal, lake or taal (such as Naini lake, Bhimtal, Naukuchiatal and Sattal), recharge flat (such as Sukhatal), khal or chal (a small rain-fed hill pond), talab or pond of the plains, reservoir or barrage pond (such as Tehri, Koteshwar, Dakpathar, the Asan barrage, the Gaula barrage at Kathgodam, and the Baur, Haripura and Tumaria reservoirs of the terai), spring (naula or dhara) with its recharge area, simar (a seep or marshy tract), wetland (such as the Asan Conservation Reserve), glacial or moraine-dammed lake, supply channel or surplus course, perennial or seasonal (as in Chapter 1).
Tank (taal) A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices.
Tank cascade A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3).
Full tank level (FTL) The crest level of the surplus weir (spillway, overflow or outlet) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling.
Maximum water level (MWL) The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the Irrigation Department and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4).
Top bund level (TBL) The crest level of the tank bund.
Waterspread The area of a tank submerged at FTL.
Foreshore The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage.
Supply channel (gadhera, nala, gul or feeder channel) A channel that brings water from a river, anicut or upstream tank into a tank.
Surplus course The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea.
Sluice (sluice, sluice gate or regulator) A controlled outlet through a tank bund, usually to an irrigation channel.
Top of bank For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow.
1% AEP flood extent The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4.
Floodway The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL.
Flood fringe The part of the 1% AEP flood extent outside the floodway.
Zone 1 (waterbody protection zone) The inner setback zone defined in Clause 7.4.3.
Zone 2 (flood fringe setback) The outer setback zone defined in Clause 7.4.4.
Setback Zone 1 and Zone 2 together.
Compensatory storage Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4.
Flood cushion Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8).

Uttarakhand terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):

Term Meaning in this Manual
Taal (ताल) A lake, pond or tank: "Pond, pool, tank, lake (= tālāb)" in Platts, and "वह नीची भूमि या लंबा चौड़ा गड्ढा जिसमें बरसात का पानी जमा रहता है" (low ground or a wide pit in which the rain-water collects) in the Shabdasagara (Annex 7E). In Uttarakhand the word names the natural lakes of the Kumaon lake region, Naini lake, Bhimtal, Naukuchiatal and Sattal, which lie in hill bowls and empty through an outlet; it is used here for any lake, tank or pond, and talab for the ponds of the plains. A taal with a controlled outlet is a tank under Clause 7.2: its outlet sluice, gate or regulator is its sluice, and its FTL is the level at which it spills over its outlet with the gates closed, found by survey.
Recorded taal A taal, talab, khal, lake, reservoir, spring or wetland shown in the Revenue records or shajra maps, in a master plan's Conservation Use Zone under the Unified Zoning Regulations 2025 (which names "ponds, lakes, nalas and streams"), in the records of a Nagar Nigam, Nagar Palika Parishad, Nagar Panchayat or development authority, in the national wetland atlas or a list of the Uttarakhand State Wetland Authority, or in a list filed before the High Court of Uttarakhand or the National Green Tribunal. A recorded taal is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual.
Maximum fixed level; boundary of a lake Bye-law 4.4(III)(iii) of the Bye-laws 2011 measures its 30 m from the bank or boundary of a lake, or from "the maximum fixed level" of a natural reservoir, whichever gives more; the bye-law does not define that level. For this Manual, the maximum fixed level of a taal with a gauged outlet is the highest level its operating rule allows, such as the maximum of 12.5 ft on the PWD gauge at Tallital that the National Institute of Hydrology reports for Naini lake (12 ft in the press), stated to the datum of Clause 7.3.5; for any other taal it is the higher of its FTL and the outer edge of its water in the monsoon (July to September) shown by dated imagery or survey of recent years. The boundary of a taal under Clauses 7.3.3 and 7.13.1 is the largest of its Revenue record boundary, its surveyed FTL and that level, and setbacks are measured from it. This reading is set by this Manual; it is not a statutory interpretation.
Lake recharge flat A flat, a dry lake bed or a depression in the catchment of a taal through which a large share of the taal's subsurface inflow enters the ground, such as Sukhatal for Naini lake, through which about half of the lake's subsurface recharge was estimated to enter (National Institute of Hydrology, as cited by NITI Aayog, 2018). A recharge flat is a waterbody for Clause 7.3 and lies within the taal's setback for this chapter. It is kept open and unpaved; no fill, debris, building, paving, lining or cementing of its bed is placed on it; and only roof water and runoff that has passed a filtering BMP may be led to it (Clause 8.8.1). This definition and rule are set by this Manual.
Spring (naula, dhara); spring recharge area A spring is a place where groundwater comes out at the surface. A naula (नौला) is a covered, stepped tank closed on three sides that collects water from a subterranean spring, and a dhara (धारा) a spring spout (Rawat and Sah, 2009; Annex 7E); the bye-laws call a spring an underground water source (भूगर्भीय जल स्रोत). A spring, naula or dhara is a waterbody for Clause 7.3, and its setback under Clause 7.4 is measured from its outlet or the edge of its tank. Its recharge area is the area upslope from which it is fed, as a hydrogeologist maps it; within that area Clause 8.8.1 limits infiltration, no road runoff, sewage or septic effluent is led into the ground, and no drain is cut that would intercept the flow to the spring. This definition is set by this Manual.
Gadhera; gad; rao; khala A gadhera (गधेरा) is a small seasonal hill stream that flows during the rains, and a gad (गाड़) a hill river or torrent (Annex 7E). Rao is the name of the seasonal torrents of the Doon, such as the Bindal Rao and the Sitla Rao, and khala the name of the seasonal storm channels of Dehradun that feed them, as in the High Court's record in Urmila Thapa. Every gadhera, gad, rao or khala that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whatever its name, whether it is dry for most of the year, and whether it is lined, piped or covered. A rao or gadhera carries boulders and debris in flood: its inlets and culverts take the debris racks, bulking and blockage of Clause 6.3.6, and its top of bank is the edge of its active boulder bed where that is wider than the edge of the 50% AEP flow. This definition is set by this Manual.
Khal; chal A khal (खाल) is a small rain-fed pond on a ridge or in the saddle between two crests, used for irrigation and recharge (Rawat and Sah, 2009); the word also means "skin" and, in place names such as Dwarikhal, a saddle between hills (Annex 7E). Chal is used here only in "khal-chal", the traditional technique of small rain-fed hill ponds revived by village programmes (as reported). A khal is a waterbody for Clause 7.3 and a tank in a cascade for Clause 7.7.2, but its storage is never counted as design storage, because it is not surveyed, has no outlet and is usually full by the time of the peak storm. No new khal or other open pond for retention or recharge is dug on ground where Clause 8.8.1 bars infiltration.
Gul A gul (गूल) is a channel dug along the contour to carry water from a stream to fields (Platts; Rawat and Sah, 2009). A gul intercepts and carries runoff, so it is part of the drainage system; a gul that drains 8 ha or more is a natural channel under Clause 7.4.1(b), and no design under this Manual discharges to a gul unless its capacity and its outlet to a stable channel are shown.
Simar A simar (सिमार) is a swampy or marshy tract fed by groundwater (CDIAL; Rawat and Sah, 2009). A simar is a wetland under Clause 7.12, and no drain under this Manual is designed to dry it.
Prohibited and restricted zones The land within the 25-year flood line (prohibited area) and between that line and the 100-year flood line (restricted area) of a reach notified under the Uttarakhand Flood Plain Zoning Act, 2012, marked on the shajra maps and by pillars. On such a reach Zone 1 is never narrower than the prohibited area, and Zone 2 never ends inside the restricted area; where the 1% AEP extent of this Manual, with the climate factor, is wider, it governs (Clause 7.4.5).
Glacial or moraine-dammed lake A lake held by a glacier, moraine or landslide dam, such as the lake above Kedarnath that emptied on 17 June 2013 (as reported). It is a waterbody for Clause 7.3 and a hazard to be mapped under Chapter 5; it is never a design outfall or design storage, and no drain under this Manual discharges to it. This rule is set by this Manual.

7.3 Inventory and mapping of waterbodies

7.3.1 Statewide inventory. The Authority, with the Irrigation Department and the Revenue Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:

  • (a) its type (Clause 7.2), name and survey numbers;
  • (b) its custodian (the Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat (for the drains and watercourses within a town, under the Uttar Pradesh Municipal Corporation Act, 1959 and the Uttar Pradesh Municipalities Act, 1916 as adapted in Uttarakhand, whose drain chapters were not read [TBC]), the Lake Development Authority, Nainital (for the lakes of the Nainital lake region, whose instruments were not read [TBC]), UKID (for flood works and floodplain zoning on the rivers, for the sluice gates of Naini lake, which it is reported to have operated since 2018, and for its barrages, dams, reservoirs and canals, such as the Gaula barrage and the Baur, Haripura and Tumaria reservoirs), UJVN Ltd (for the Dakpathar and Asan barrages), THDC India Ltd (for Tehri and Koteshwar), the Forest Department (for river beds outside municipal limits, which the High Court has held to be forest land, and for the Asan Conservation Reserve), the State Government through the Collector and the Tehsildar (for land recorded as water in the Revenue records), the Gram Panchayat (for the naulas, dharas, khals and guls of a village), Uttarakhand Jal Sansthan or Uttarakhand Peyjal Nigam (for a spring or stream tapped for a public water supply), a development authority (MDDA, HRDA or a district development authority) or a colony developer (for the drains and ponds of a scheme until they are handed over), the Uttarakhand State Wetland Authority (for a notified wetland), a private owner, or another body);
  • (c) its boundary as recorded in Revenue records;
  • (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
  • (e) its position in any tank cascade, with the upstream and downstream tanks;
  • (f) the 1% AEP flood extent, where mapped; and
  • (g) known encroachments, with the date recorded.

7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:

  • (a) within the site;
  • (b) within 100 m of the site boundary; and
  • (c) downstream, to the extent of the downstream analysis of Chapter 5.

The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):

  • the Revenue record boundary;
  • the surveyed FTL or top of bank;
  • the MWL contour (tanks) and the 1% AEP flood extent;
  • Zone 1 and Zone 2 (Clause 7.4); and
  • every supply channel, surplus course, sluice and surplus weir.

7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:

  • (a) Revenue records and shajra (village) maps of the Revenue Department, in which rivers, nalas, taals, naulas, dharas and land covered by water are recorded, and on which the Irrigation Department marks the 25-year and 100-year flood lines of a reach notified under the Uttarakhand Flood Plain Zoning Act, 2012, with its boundary pillars; the rivers and waterbodies in the Revenue records, "including ponds, lakes, nalas and streams", that the Unified Zoning Regulations 2025 place in the Conservation Use Zone of a master plan; the drains and watercourses in the records of a Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat; the river-bed land outside municipal limits that the High Court has held to be forest land, in the records of the Forest Department; the setbacks from rivers, springs, nalas and lakes and the 2 m contour plans shown on plans approved under bye-law 4.4 of the Bye-laws 2011; the boundary of the Asan Conservation Reserve (Ramsar site) and of any wetland notified under the Wetlands (Conservation and Management) Rules, 2017, and the wetlands of the national atlas that the Uttarakhand State Wetland Authority is ground-truthing; the inventories of springs and water sources of the Jal Sansthan, the Peyjal Nigam and SARRA (as reported); and the lists of encroachments in river beds and floodplains filed before the High Court of Uttarakhand (such as in Urmila Thapa) and the National Green Tribunal (such as for the Rispana);
  • (b) UKID and Gram Panchayat tank registers and records of FTL and MWL;
  • (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
  • (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
  • (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.

7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:

  • (a) any site in a flood-sensitive catchment (Chapter 1);
  • (b) any site of 1 ha or more adjoining a waterbody; and
  • (c) any site where the Authority so requires.

For other sites, the fixed-width setback of Clause 7.4.6 may be used.

7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where UKID records use a local or older datum, the conversion to the project datum shall be surveyed and stated.

Commentary. Uttarakhand is one of the few States that maps flood lines in law, but it does so river by river, and no 1% AEP flood map of any town's drains or raos was found. Under the Uttarakhand Flood Plain Zoning Act, 2012 the Irrigation Department, the nodal agency, analyses the floods, models the 25-year and 100-year lines with HEC-RAS, checks them on the ground, and after an interim and a final notification marks them on the shajra (village) maps and by pillars (compliance report in NGT O.A. 417/2022, 2024). Final notifications cover 614.6 km of the Bhagirathi, the Ganga, the Bhilangana, the Alaknanda and the Mandakini, and the Rispana's was issued on 5 May 2025 (NGT order of 18 August 2025); studies of the Gaula, the Kosi, the Suswa, the Song, the Baldi, the Asan and the Solani were done but not notified in 2024, and 671 km more were under study. The lines are not complete for flood planning: the National Mission for Clean Ganga objected in 2025 that the Rispana reply did not show the extent of the 5-year, 25-year and 100-year floods, and the State later counted 330 structures in the Rispana's 1-in-5-year "active floodplain" (letter of 3 January 2026, recorded by NMCG before the Tribunal). The building process asks for the ground but not the water: a 2 m contour plan and sections for every sloping site (bye-law 4.4(IV)(i)) and the landslide-prone areas near it (4.4(V)(a)), but no flood line; and the ADB-funded drains of Dehradun require only that each outfall invert be above the high flood level of the receiving nala or river, without a source for that level (resettlement plan, 2022). The raos of the Doon and the gadheras of the hill towns are ungauged. The river levels that are known, such as a highest flood level of 296.30 m for the Ganga at Haridwar (dated 2010 in one CWC source and 2013 in another) and of 498.93 m for the Gaula at Kathgodam (2021), are known only through transcriptions (as reported; Chapter 5). Clause 7.3.4 lets the Authority adopt flood maps once they are issued, and a final notification under the Act is such a map for the lines it shows; until then the Applicant must produce the 1% AEP extent for larger and flood-sensitive sites, and a notified 25-year or 100-year line is a minimum that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Levels shall be stated to one datum (Clause 7.3.5), because no source read for this Manual states the datum of the CWC levels, of the Naini lake gauge or of the flood lines on the shajra maps. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.


7.4 Setbacks

7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:

  • (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
  • (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.

7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:

  • Zone 1 (waterbody protection zone), next to the waterbody; and
  • Zone 2 (flood fringe setback), outside Zone 1.

7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:

  • (a) 15 m, the minimum set by this Manual (wider lines bind in Uttarakhand and govern under Clause 7.4.5: bye-law 4.4(III) of the Bye-laws 2011 keeps 30 m from a river bank and from the bank or maximum fixed level of every lake, 10 m from a spring and at least 5 m from a nala free of construction, the Unified Zoning Regulations 2025 bar new construction within 30 m of river and lake banks, and on a reach notified under the Uttarakhand Flood Plain Zoning Act, 2012 the 25-year prohibited zone is never narrower than Zone 1; this Manual's 15 m applies to every nala, gadhera, rao, khal, spring and other waterbody where nothing wider binds; see the Disclosure below);
  • (b) the outer edge of the floodway (Clause 7.6.1); and
  • (c) for a tank, the MWL contour.

7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.

7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the permission of the Flood Zoning Authority for any activity in the prohibited or restricted area of a reach notified under the Uttarakhand Flood Plain Zoning Act, 2012 (s. 12(3)), the approval of the Irrigation Department for a work on or next to one of its rivers, embankments, barrages, reservoirs or canals, the conditions of the Housing Department order of 2017 (revised 2023) for the banks of the Ganga in the hills, the no-objection of the Peyjal Nigam on sewerage that a floodplain notification or that order requires, the views or permission of the Uttarakhand State Wetland Authority or the Forest Department for a work in or next to a notified wetland or the Asan Conservation Reserve, the consent of THDC India Ltd, UJVN Ltd or UKID for a work that drains to, or lies next to, one of their dams, barrages or reservoirs, or a direction of the High Court of Uttarakhand or the National Green Tribunal (such as those on the Sukhatal lakebed and the Rispana floodplain listed in the Disclosure to Clause 7.4) sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.

7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:

Table 7.1 — Fixed-width setback where no 1% AEP extent is available

Waterbody Total setback (Zone 1 + Zone 2) Of which Zone 1
Channel draining 8 ha to 65 ha 25 m 15 m
Channel draining 65 ha to 20 km² 40 m 15 m
Channel draining more than 20 km², and rivers 50 m 20 m
Tank, lake or pond MWL contour + 25 m to MWL contour, and not less than 15 m from FTL
Marsh, estuary or backwater as notified by the Authority, and not less than 50 m 15 m

This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.

7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).

Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor where no wider line binds. Uttarakhand, unlike most States in this series, has statutory distances from water. Bye-law 4.4(III) of the Bye-laws 2011 fixes plot boundaries only beyond "at least" 30 m from a river bank and 10 m from an underground water source (a spring), both kept for dense planting with no construction of any kind (printed "30.0–30.0" and "10.0–10.0" metres, read in this Manual as single distances), beyond at least 5 m from a nala or the required setback, whichever is more, and beyond 30 m from the bank or boundary of every lake, including the Nainital lake special area, or from the maximum fixed level of a natural reservoir, whichever is more; the Unified Zoning Regulations 2025 put rivers and waterbodies in the Conservation Use Zone with no new construction within 30 m of river and lake banks; and the Uttarakhand Flood Plain Zoning Act, 2012 bars or restricts use within the 25-year and 100-year flood lines of the reaches notified under it. The 15 m floor matters where the statutory line is narrower or absent: along nalas (5 m) and springs (10 m), and along the gadheras, raos, khalas and khals that the bye-law does not name as rivers or lakes, where it gives room for the debris that hill streams carry and for the machinery that clears it. It is this Manual's proposal, not a statutory width, and it never reduces a wider line (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:

  • APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
  • APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
  • APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.

(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Uttarakhand flood maps are mostly coarser than US maps, the terai of Udham Singh Nagar and Haridwar, where Rudrapur, Kashipur and Roorkee are growing, slopes at less than 1% (CGWB), and the only level land in a hill town is often a river terrace or a lake margin (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.

The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.

URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).

Uttarakhand's building rules are the Uttarakhand Building Construction and Development Bye-laws/Regulations, 2011 (Amendment 2015), made by the Housing Department under section 57 of the Uttar Pradesh Urban Planning and Development Act, 1973 as applicable in Uttarakhand, amended piecemeal since and adopted by the board of each development authority (notification of 10 January 2024, para 4); this Manual read them in the Housing Department's compilation of the amendments of 2015 to 2019, and a comprehensive "Amendment 2017" is found only as a draft. Unlike most States in this series, Uttarakhand has distances from water in its building rules. Bye-law 4.4(III) fixes the boundary of a plot only beyond: (i) at least 30 m from the bank of a river and 10 m from an underground water source (a spring), both to be left for dense planting with no construction of any kind, printed "30.0–30.0" and "10.0–10.0" metres, which this Manual reads as single distances of 30 m and 10 m until the gazetted text is checked; (ii) at least 5 m from the bank of a nala, or the setback otherwise required, whichever is more; and (iii) 30 m from the bank or boundary of every lake in Uttarakhand, including the Nainital lake special area, or from the maximum fixed level of a natural reservoir, whichever is more, within which no construction or development is allowed, community services and public infrastructure excepted in special circumstances. Bye-law 4.4(IV) bars building where the local slope exceeds 30° (26.5° in the Nainital municipal area) or where landslides are likely to be severe and continuous, and the amendment of 10 January 2024 keeps filling stations 50 m from rivers, waterbodies, springs and the flood plain and 5 m from a nala. The Unified Zoning Regulations 2025 (Housing Department notification No. 568 of 20 November 2025) place the rivers and waterbodies of the Revenue records, "including ponds, lakes, nalas and streams", in a Conservation Use Zone of every master plan, with a green buffer in which no construction is allowed and no new construction within 30 m of river and lake banks. On a reach notified under the Uttarakhand Flood Plain Zoning Act, 2012, no activity may be undertaken within the 25-year line (prohibited area) or the 100-year line (restricted area) without the permission of the Flood Zoning Authority, deemed to be granted if it is not refused within ninety days (s. 12(3)); the Irrigation Department's draft notification for the Ganga at Rishikesh lists the works allowed in each zone and, where building is allowed in the restricted area, a plinth at least 1.00 m above the high flood level (No. 1875/II(2)-2020-06(18)/2020 of 7 October 2020). On the Ganga in the hills, a Housing Department order of 29 November 2017 fixes a prohibited zone of 100 m from the middle of the river or the area of floods up to the 25-year frequency, whichever is more, and a regulatory zone over the next 200 m, and since 1 June 2023 the Irrigation Department's floodplain notifications govern in the five hill districts where they exist; below Haridwar the National Green Tribunal designated 100 m "from the edge of the river" as a no-development zone until the floodplain is demarcated (M.C. Mehta, O.A. 200/2014, 13 July 2017). The rules leave gaps. The bye-law's nala line is 5 m, narrower than the room a rao or gadhera needs for its boulders and for the machinery that clears it; gadheras, khalas, guls and khals are not named; the bye-law does not say from which level a river's 30 m is measured; and none of the lines is tied to a flood level except the notified flood lines. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere.

Disclosure. Uttarakhand has statutory setbacks from water, and they are wider than this Manual's floor along rivers and lakes: bye-law 4.4(III) of the Bye-laws 2011 keeps 30 m from a river bank, 30 m from the bank or maximum fixed level of every lake, 10 m from a spring and at least 5 m from a nala free of construction (the 30 m and 10 m printed "30.0–30.0" and "10.0–10.0" metres, read as single distances [TBC]); the Unified Zoning Regulations 2025 bar new construction within 30 m of river and lake banks; and on the reaches notified under the Uttarakhand Flood Plain Zoning Act, 2012 the 25-year line bounds a prohibited area and the 100-year line a restricted area. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor where nothing wider binds: along nalas, where the bye-law keeps 5 m; along springs, where it keeps 10 m; and along the gadheras, raos, khalas, guls and khals that it does not name. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's reading of the "maximum fixed level", and the rules on recharge flats, spring recharge areas and glacial lakes (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body has adopted or endorsed them. The setback is applied as the larger of the corridor and any statutory, plan, court or Tribunal line, so the Manual is stricter than statute along nalas, springs and unnamed streams, and no less strict anywhere. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:

  • Bye-law 4.4(III) (Bye-laws 2011, compilation of 2015–2019). Rivers 30 m and springs 10 m, for dense planting with no construction of any kind; nalas at least 5 m or the required setback, whichever is more; every lake, including the Nainital lake special area, 30 m from its bank or boundary or from the maximum fixed level of a natural reservoir, whichever is more. Along a river or lake the 30 m is wider than Zone 1's floor and governs as Zone 1; along a spring the 10 m and along a nala the 5 m are narrower and never govern alone.
  • Unified Zoning Regulations 2025 (No. 568, 20 November 2025, chapter 11, E-1). Rivers and waterbodies of the Revenue records, including ponds, lakes, nalas and streams, in the Conservation Use Zone of the master plan, with a green buffer free of construction and no new construction within 30 m of river and lake banks.
  • Uttarakhand Flood Plain Zoning Act, 2012 (Act 07 of 2013). On a reach finally notified (614.6 km of the Bhagirathi, the Ganga, the Bhilangana, the Alaknanda and the Mandakini; the Rispana, 5 May 2025), no activity in the prohibited area (25-year line) or the restricted area (100-year line) without the Flood Zoning Authority's permission (s. 12(3)); the restricted-zone conditions are set in each notification, such as a plinth at least 1.00 m above the high flood level, 35% coverage, FAR 1.5 and 7.5 m height in the draft for the Ganga at Rishikesh (2020). An amendment of 2024, seen only as quoted, lets a final notification be amended where "riverbank development" can protect land and buildings; this Manual does not treat such an amendment as reducing the 1% AEP extent of Zone 2. The Asan's notification was approved by the cabinet in June 2025 and Rules under the Act on 12 October 2026 (both as reported; texts not found).
  • The Ganga in the hills and below Haridwar. The Housing Department order of 29 November 2017 (revised 1 June 2023): a prohibited zone of 100 m from the middle of the river or the 25-year flood area, whichever is more, and a regulatory zone over the next 200 m, superseded by the Irrigation Department's notification where one exists. The National Green Tribunal's 100 m "from the edge of the river" from Haridwar to Unnao (13 July 2017). The two are measured from different lines; both are stated, and the wider governs.
  • Wetlands, Ramsar and forest land. The Asan Conservation Reserve, the State's only Ramsar site (444.4 ha; designated 21 July 2020), to its boundary; any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was found notified); and river beds outside municipal limits, which the High Court has held to be forest land (Urmila Thapa, 2022).
  • Courts and custodians. The High Court's order stopping construction on the Sukhatal lakebed (2022, as reported); the Irrigation Department's, UJVN's and THDC's lines at their works; the Lake Development Authority's controls in the Nainital lake region (instruments not read [TBC]).

This Manual sets 15 m as the floor because the bye-law gives the nalas, which carry most of the towns' storm water, only 5 m and the gadheras and khalas no width at all; because 15 m is above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because a rao or gadhera needs room for the boulders and debris it carries in flood and for the machinery that clears them. The reasons for the corridor are the record: the District Magistrate's survey counted 37.93 ha of encroachment in the river beds of Dehradun tehsil and 57.4 ha in Vikasnagar tehsil (Urmila Thapa, WPPIL 58/2019, 2022); the State counted 330 structures within the Rispana's 1-in-5-year flood zone (letter of 3 January 2026); and the floods of 16 and 17 September 2025 in Dehradun were reported to have carried away 13 bridges, 10 culverts and 21 roads in Dehradun district (as reported) and damaged 83 interception structures on the Rispana and the Bindal (Clause 8.9, Commentary). Until a statute, rule, notification, master plan or court adopts it, the 15 m minimum is this Manual's recommended standard, and the statutory, plan, court and Tribunal lines above remain the only legal minimum. Approving authorities should state in each approval which was applied.

Waterbody setback zones: cross-section Waterbody setback: Zone 1 and Zone 2, with Uttarakhand's statutory lines (section, not to scale) Zone 1 Waterbody protection Zone 2 Flood fringe setback Developable land Waterbody: tank bed, channel, marsh (no development) FTL (crest of surplus weir) / top of bank 1% AEP (100-yr) flood level, with climate factor (or MWL for tanks) Bed (surveyed, original) park, path floor ≥ 1% level + 0.5 m ≥ 15 m (set by this Manual) greater of 15 m and floodway to mapped 1% AEP extent + 10 m margin 1% extent 15 m This Manual: Zone 1 and Zone 2 Statute and orders: Bye-laws 2011, bye-law 4.4(III); Unified Zoning Regulations 2025; Flood Plain Zoning Act 2012; Ganga orders ≥ 5 m from a nala bank, or the required setback if more (4.4(III)(ii)) 10 m from a spring (naula, dhara), dense planting, no construction (4.4(III)(i)) 30 m from a river bank (4.4(III)(i)); 30 m from a lake's bank or maximum fixed level (4.4(III)(iii)); UZR 2025: no new construction within 30 m of river and lake banks (printed "30.0–30.0 m") 25-yr line: prohibited area (FPZ Act) 100-yr line: restricted area notified reaches only (614.6 km of five Ganga-system rivers; Rispana, 2025); FZA permission for any activity Ganga in the hills: prohibited to 100 m from mid-river or the 25-yr flood area, whichever is more, then a 200 m regulatory zone (Housing order, 2017, rev. 2023); below Haridwar, 100 m from the edge (NGT, 2017); off scale ? gadheras, khalas, guls and khals: no width in the bye-law; this Manual's 15 m applies. Zone 1: no buildings, fill, paving or dumping. Crossings, utilities, flood works and native vegetation only. Zone 2: no habitable buildings. Parks, unpaved paths, open-sided structures; fill only with 1:1 compensatory storage. Measured from the largest of the Revenue boundary, FTL (or top of bank) and the maximum fixed level. The 15 m floor is this Manual's proposal. Wider lines govern: bye-law and UZR 30 m along rivers and lakes; FPZ prohibited and restricted areas; Ganga orders; the Asan Ramsar boundary; court lines (Sukhatal); Irrigation, UJVN and THDC lines.

Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).


7.5 Uses permitted in each zone

7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:

  • (a) road, rail and utility crossings that meet Clause 7.10.3;
  • (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
  • (c) native vegetation, planting and habitat works;
  • (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
  • (e) waterbody restoration under Clause 7.9.

7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:

  • (a) all uses permitted in Zone 1;
  • (b) parks, playgrounds, open-air sports fields and urban agriculture;
  • (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
  • (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
  • (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
  • (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.

7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.

7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Uttarakhand Building Construction and Development Bye-laws 2011, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.

Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Uttarakhand practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.


7.6 Floodway, flood fringe and compensatory storage

7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.

7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.

7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:

  • (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
  • (b) with compensatory storage under Clause 7.6.4.

7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):

  • (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
  • (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
  • (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
  • (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
  • (e) is built before, or at the same time as, the fill is placed; and
  • (f) is secured by a covenant or handover so that it is never filled later.

7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.

7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:

  • (a) redevelopment may be approved without the Zone 2 restriction;
  • (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
  • (c) basements are not permitted;
  • (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
  • (e) Zone 1 continues to apply in full.

Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The terai of Udham Singh Nagar and Haridwar, which slopes at less than 1% (CGWB), the Ganga floodplain below Haridwar, and the river terraces and lake margins on which the hill towns have built, are flat, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.

In Uttarakhand the lake line of the building rules is already measured from a high level, not from the water's edge on the day of survey: bye-law 4.4(III)(iii) keeps 30 m from the bank or boundary of a lake or from the maximum fixed level of a natural reservoir, whichever gives more. The difference matters in the hill lakes, whose level swings widely through the year. Naini lake is held up to a maximum of 12.5 ft on the PWD gauge at Tallital (NIH; 12 ft in the press) and was reported at a record 12.2 ft when it overflowed on 19 October 2021, but it is drawn down through the dry months and was reported 18 ft below its normal level in 2017 and at a five-year low of 4.7 ft in 2025 (all as reported), so a line drawn from the shrunken summer edge would leave part of the lake's own bed open to building. On the plains, the floodplain wetlands of Haridwar and Udham Singh Nagar spread far beyond their dry-season pools in the monsoon. This Manual gives the bye-law's level a value for every taal: the maximum fixed level and the monsoon edge are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.

The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Dehradun along the Rispana and the Bindal, where the State counted 330 structures within the 1-in-5-year flood zone of the Rispana alone (letter of 3 January 2026, recorded by NMCG before the National Green Tribunal) and the Kathbangla basti stands on the dry river bed (High Court, 1 April 2026), of the riverside of Rishikesh, where the declaration of intent of October 2020 lists plots, by khasra number, within the 25-year flood limit of the Ganga, and of Rudrapur along the Kalyani, flooded in October 2021 (as reported) already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.

Compensatory storage by elevation band: section Compensatory storage by elevation band (section, not to scale) A. Fill in the flood fringe B. Compensatory excavation, same reach waterbody waterbody permitted use drains back by gravity 1% AEP flood level Normal water level (or 50% AEP if higher) Band 1 Band 1 Band 2 Band 2 Band 3 Band 3 Band 4 Band 4 Orange: fill below the 1% level = volume lost Blue: excavation below the 1% level = volume gained Grey: cut above the 1% level, no credit Volume per band (m³), Form 7-3 worked example: illustrative, not design values 60 180 Band 1 180 300 Band 2 300 390 Band 3 420 450 Band 4 Volume lost (fill) Volume gained (excavation) Bands of not more than 0.3 m, from the normal water level to the 1% AEP level. Volume gained ≥ volume lost in every band (Clause 7.6.4(b)).

Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.


7.7 Tank cascades as design storage

Uttarakhand has no tank Act, and its storages range from khals a few metres across on the ridges to Tehri's reservoir behind a 260.5 m dam. The storages that matter for urban drainage are of five kinds. The first is the natural taal of the Kumaon lake region, in a hill bowl with a town or settlement on its slopes and a controlled outlet to a gadhera. Naini lake is the clearest case: about 1.4 km long and 0.45 km wide, with a surface of 0.46 km², a mean depth of 18.52 m, a volume of 8.58 Mm³ and a basin of 4.7 km² of which 0.75 km² is the Sukhatal sub-basin; it empties through five sluices at Tallital, installed in 1888, into the Balia Nala, which runs to the Gaula (National Institute of Hydrology, CS(AR)-6/98-99). Bhimtal is reported at about 47.8 ha with a catchment of 17.12 km², and Naukuchiatal and Sattal are smaller (as reported; the depths conflict). These are the taals for which Figure 7.3 and Clause 7.8 matter most: every drain of the town ends in the lake, and the lake's release is limited by the stability of the ravine below it. The second is the khals and village ponds of the ridges and the talabs of the plains of Haridwar and Udham Singh Nagar, which hold 41 and 48 of the 192 wetlands of the national atlas (Uttarakhand State Wetland Authority, 2025); they are modelled as existing features but, in the hills, not counted as storage (definitions after Clause 7.2). The third is the reservoirs and barrage ponds: Tehri and Koteshwar (THDC India Ltd), the Dakpathar and Asan barrages (UJVN Ltd), and UKID's Gaula barrage at Kathgodam and the Baur, Haripura and Tumaria reservoirs of the terai; their releases enter a design as inflow and tailwater (Chapter 5), and they are not tanks for these clauses unless their storage is counted. The fourth is the recharge flats and springs, such as Sukhatal and the naulas and dharas of the hill towns, which are protected for their recharge and never counted as storage. The fifth is the glacial and moraine-dammed lakes of the high mountains, which are hazards (definitions after Clause 7.2). Clauses 7.7 and 7.8 apply to any of these whose storage is counted; any taal or reservoir whose storage is to be counted is subject to Clause 7.7.1 in full, with UKID, the Lake Development Authority, THDC, UJVN or other custodian, and the custodian of each taal shall be confirmed for the inventory (Annex 7A) [TBC].

7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:

  • (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
  • (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
  • (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
  • (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
  • (e) Custodian concurrence. UKID, or the other custodian, concurs in writing.

Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).

7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, for a hill-town lake such as Naini lake, every drain that enters the lake from the slopes of its bowl, the lake itself with its gauge level and the operating rule of its sluice gates (Clause 7.8), the recharge flat that feeds it, such as Sukhatal, and the outlet channel and gadhera below the sluices, such as the Balia Nala to the Gaula, whose stability limits the release, as shown in Figure 7.3.

7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.

7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:

  • (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
  • (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than UKID's freeboard standard for the tank.

Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.

7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.

7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:

  • (a) routes the cascade under Clause 7.7.2;
  • (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
  • (c) checks the bund under Clause 7.14.

Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.

The FTL starting level follows Clause 3.12.5. Uttarakhand's worst town floods have come when the lakes and reservoirs were already full. On 18 and 19 October 2021, after the monsoon had withdrawn, 401 mm fell at Nainital and 403.9 mm at Pantnagar in a day, Naini lake rose to a record 12.2 ft and overflowed, the approach of the Gaula bridge at Haldwani collapsed, and Rudrapur flooded along the Kalyani (all as reported); Tehri had reached its full reservoir level of 830 m on 24 September 2021 (THDC). The sluices of Naini lake are opened in steps through the monsoon and are sealed on 15 October each year (National Institute of Hydrology), so a storm in late October finds the lake at its highest and its outlet closed unless the custodian reopens it. No record of how long Naini lake, Bhimtal or the reservoirs of the terai stay at or above their spill level in a wet spell was obtained for this Manual. While a taal is full, it stores nothing more below FTL, the drains that flow into it discharge against its spill level, and its outflow adds to the flow in the gadhera below it, which itself discharges against the river. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.

A hill-town taal and its springs: a lake in a hill bowl with a town on the slopes, a recharge flat kept open, a naula below the spring line, lined drains with sediment traps entering the lake, an outlet sluice to a gadhera, and no soakaways on the slopes (schematic) A hill-town taal and its springs (schematic, not to scale; no particular lake or town is shown) A. Plan: a lake in a hill bowl; every drain of the town ends in the lake, and the lake empties to a gadhera ridge of the bowl spring recharge area (mapped): roof water only, filtered; no road runoff, no soak pits spring line naula (10 m kept clear, bye-law 4.4(III)) recharge flat kept open no fill, paving, debris or lining taal level held by the sluice rule Zone 1 around the taal (the bye-law's 30 m governs) town on the slopes lined drain sediment trap outlet sluice gadhera to the river: release limited by its stability no soakaways on slopes B. Section along the bowl: water held on the slopes goes to tanks and lined drains; the lake is fed from below by the flat recharge flat subsurface inflow to the lake maximum fixed level (gauge maximum) FTL (spill over the outlet, gates shut) outlet sluice gadhera roof water to a storage tank overflow: lined drain trap perched water in colluvium naula at the spring line no soak pit on the slope: water put into it raises pore pressure (Clause 8.8.1) rock taal recharge flat spring recharge area naula sediment trap outlet sluice colluvium, debris rock lined drain subsurface flow spring line Zone 1 maximum fixed level The recharge-flat, spring-area and no-soakaway rules, the 15 m minimum and the reading of the maximum fixed level are this Manual's proposals; bye-law 4.4(III), the floodplain notifications, the sluice rule and the courts' orders govern where they say more. Original drawing for this Manual.

Figure 7.3 — A hill-town taal and its springs (schematic, not to scale; no particular lake, town or landmark is shown). A: in plan, the taal lies in a hill bowl with the town on the slopes around it, so every drain of the town ends in the lake; each drain is lined, and passes a sediment trap before it enters, because the lake is the end of the town's drainage and keeps every load of silt and debris it receives (Clauses 6.3.6, 7.9.7 and 8.10), and each drain discharges against the lake level (Clause 5.8.5(d)). A recharge flat on the floor of the bowl, of the kind that Sukhatal is for Naini lake, feeds the lake from below and is kept open, with no fill, paving, debris or lining. On the outer slope a naula takes water from the spring line; the bye-law keeps 10 m around it, and its recharge area upslope, as a hydrogeologist maps it, receives only filtered roof water, with no road runoff and no soak pits (Clause 8.8.1). Zone 1 around the taal is set by the bye-law's 30 m from its bank or maximum fixed level, which is wider than this Manual's 15 m floor. The lake empties through an outlet sluice into a gadhera that runs to the river, and the release is limited by the stability of the gadhera's banks, not by the lake's storage (Clause 7.8). No soakaway or recharge pit is placed on the slopes. B: in section, roof water goes to a storage tank whose overflow runs in a lined drain, through a trap, to the lake, because water put into the colluvium raises its pore pressure; the spring comes out where perched water in the colluvium meets the rock; and the lake is held between its FTL (the spill level over the outlet with the gates shut) and its maximum fixed level, from which its setback is measured (definitions after Clause 7.2). The recharge-flat, spring-area and no-soakaway rules, the 15 m minimum and the reading of the maximum fixed level are this Manual's proposals; bye-law 4.4(III), the floodplain notifications, the sluice rule and the courts' orders govern where they say more. Original drawing for this Manual.


7.8 Operating rules and pre-monsoon flood cushion

7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:

  • (a) the levels and dates for filling, holding and drawdown through the year;
  • (b) the sluice and regulator settings at each level;
  • (c) who operates the sluices and regulators, and who may order a release;
  • (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
  • (e) the forecast and warning triggers (IMD district warnings, USDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
  • (f) communication with downstream ULBs and residents before any release; and
  • (g) the records to be kept: daily levels in the SW monsoon, releases, and gate settings.

7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the SW monsoon), and the cushion counted under Clause 7.7.3, only where:

  • (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
  • (b) the operating rule fixes the cushion level and the dates it applies;
  • (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of SW monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
  • (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
  • (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).

7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.

7.8.4 Coordination. For tanks under UKID control, the operating rule shall be UKID's rule. This Manual does not authorise any other body to operate a UKID tank.

Commentary. Uttarakhand has one taal with a written operating rule, and it is old. The five sluices of Naini lake at Tallital, each 2.5 ft wide and 1.25 ft high, were installed in 1888 on the recommendation of one of the committees on the safety of the hill slopes, and the Hill Slide Committee of 1927 set the rule still described for them: below 9 ft on the gauge the sluices are opened no more than 6 inches, and below 9.5 ft no more than 12 inches, "mainly to avoid any damage to the geotechnically sensitive Balia ravine"; once opened they are never fully closed until 15 October, when they are sealed; and the maximum lake level is 12.5 ft on the PWD gauge (National Institute of Hydrology, CS(AR)-6/98-99; the press gives 12 ft). The rule is a cushion in reverse: it limits the release, not the level, because the slopes of the Balia Nala below the lake are unstable, and landslides along it have been linked to the water that reaches them (Clause 8.8.1). Gate operation is reported to have passed from the PWD to the Irrigation Department in 2018, and the role of the Lake Development Authority in it was not found [TBC]. For the reservoirs, Tehri keeps a flood-control zone between its spillway crest at 815 m and its full reservoir level of 830 m, with a surcharge to 835 m (as described by THDC in a workshop paper), and in June 2013 it was reported to have held a peak inflow of about 7,000 m³/s while releasing about 500 m³/s, though how far that was by design is disputed (all as reported); no rule fixing dates, levels and release rates for Bhimtal, the barrages of the Doon or the reservoirs of the terai was found. Without an agreed rule with dates, levels, release rates and a named operator, storage in a taal or reservoir cannot be relied on, and a release made without warning to the colonies downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is usually refilled by the early monsoon rain gives no protection in a July to September monsoon burst or cloudburst against the outer Himalaya, or a late-season storm such as that of October 2021. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.

For Naini lake, Clause 7.8.1(d) is the governing condition: the maximum release is whatever the Balia Nala can take without sliding, and that limit, not the lake's storage, sets how much of a storm the lake can pass. A design that relies on the lake shall route the storm through it with the sluice rule in force and its gates at the opening the rule allows for the level, shall not assume a drawdown below the level the rule holds, and shall take the lake at its maximum fixed level, with the sluices sealed, for a storm after 15 October (Clause 7.7.3). Most taals have other users: the lake is the town's landscape and its trade, and a drawdown before a storm has costs to those who use it, which is why Clause 7.8.2(d) requires the custodian to accept it.


7.9 Restoration, desilting and deepening

7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:

  • (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
  • (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
  • (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.

7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.

7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:

  • (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
  • (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
  • (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.

Storage created below the lowest sluice sill shall not be counted as flood storage.

7.9.4 Safe edges. Where the public has access to the waterbody edge:

  • (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
  • (b) no isolated deep pit or vertical cut shall be left in the bed.

7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.

7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Uttarakhand Environment Protection and Pollution Control Board (UEPPCB) directs.

7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.

7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 May each year (Chapter 10).

Commentary. No statewide order of the Urban Development Department for the pre-monsoon cleaning of drains, raos or taals was found; directives that drains be cleaned before 15 June, and a monsoon period of 5 June to 15 September for the USDMA, were seen only in the press (as reported). In the hills the material to be removed is less silt than gravel, boulders and debris: the Gaula barrage at Kathgodam is reported silted with debris and boulders upstream (as reported), and debris dumped on Sukhatal has reduced the recharge it gives to Naini lake (NITI Aayog, 2018). The date of 31 May in this Manual is set by this Manual, before the monsoon's normal onset (about 20 June at Dehradun and 28 June at Roorkee, IMD new normal dates, 2020); because the State's largest late floods have come in October (1956 and 2021), hill towns also clear debris a second time by 15 October (Chapter 10). Excavation to "increase capacity" is governed by Clause 7.9.3. In a taal it can cut the silt and clay that seal the bed; on a recharge flat it does the opposite of what is needed, and a plan to cement the base of Sukhatal has been dropped (NITI Aayog, 2018), and this Manual allows no recharge flat to be deepened, lined or cemented (definitions after Clause 7.2). The 31 May deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Uttarakhand precedent.


7.10 Supply channels, surplus courses, inlets and outlets

7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.

7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.

7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:

  • (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
  • (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
  • (c) keep the channel bed level and grade; and
  • (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.

7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.

7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.

7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:

  • (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
  • (b) be located and aligned so that it does not cut through or weaken a tank bund;
  • (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
  • (d) not carry sewage or dry-weather flow (Chapter 8).

Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Uttarakhand the drains of a town are understood to vest in its Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat under the Uttar Pradesh Municipal Corporation Act, 1959 and the Uttar Pradesh Municipalities Act, 1916 as adapted in Uttarakhand, whose drain chapters were not read for this Manual [TBC], while the raos and rivers lie with the Irrigation Department for flood works and floodplain zoning, and their beds outside municipal limits are forest land (High Court, Urmila Thapa, 2022). No rule or order dividing natural nalas, khalas and gadheras from municipal drains, or the local bodies' drains from the PWD's road drains, was found; Chapter 6 gives this Manual's working assignment. The building rules know the nala but give it only 5 m (bye-law 4.4(III)(ii)), and the gadhera, the khala and the gul not at all. The record shows the seasonal channels being lost: the petition in Urmila Thapa (WPPIL 58/2019) was about encroachment on the waterbodies and "khalas/storm water drains" of the Rajpur area of the Doon, and asked that the catchments of the khalas of the Rispana and the Bindal be declared no-construction zones; the High Court ordered removal of the encroachments in the river beds but set no width. In Nainital the drains are the town's defence against landslides: a network of drains was built on the slopes after the landslip of 18 September 1880, which killed about 151 people, though the sources disagree on its length and number of drains (as reported). Where drains are being rebuilt, they are being concentrated: the ADB-funded works in Dehradun lead new storm drains to 57 outfalls on the Harrawala, Nakraunda, Kaunwala and Natthanpur nalas (resettlement plan, July 2022); the Irrigation Department's drainage master plan for Haldwani is reported to line 10.25 km of the Rakasia nala and 1.55 km of the Kalasia nala, and those for six other Kumaon towns to aim at "100% connectivity of nalas" (as reported); and in Dehradun's Smart City works the drains of Paltan Bazaar were split between Dehradun Smart City Ltd and the PWD (CAG, 2025). Bye-law 4.4(III) keeps a building off the nala's first 5 m; it does not keep a nala, khala or gadhera at its recorded width once it has been lined, piped or covered, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.


7.11 Fee-in-lieu and regional tank storage

7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.

7.11.2 Tank storage funded by fee-in-lieu shall:

  • (a) meet Clause 7.7.1 in full before it is counted;
  • (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
  • (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
  • (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.

7.11.3 Fee-in-lieu does not replace:

  • (a) the retention requirement of Chapter 4, which is always met on site; or
  • (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.

Commentary. Chapter 4 provides for fee-in-lieu toward restored taal or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Uttarakhand no shared form of storage is required by the building rules: the rainwater harvesting of bye-law 6.5 is plot-level storage of 2.0 m³ and more, and the rules have no detention, peak-flow or "zero runoff" rule. The drainage master plans that the Irrigation Department is preparing for Haldwani and other Kumaon towns are reported to rely on lined nalas and new pumping stations in the low-lying areas, not on storage (as reported), and the integrated drainage works of Dehradun Smart City made no provision for storm-water reuse (CAG, 2025). The khal-chal ponds revived in the villages are for recharge and irrigation, not for urban detention. In the hill towns there is little flat land on which a regional pond could be built, and a regional facility there is more likely to be a tank or a lined detention structure than a pond. None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.


7.12 Wetlands, marshes and estuaries

7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:

  • (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Uttarakhand State Wetland Authority;
  • (b) the Asan Conservation Reserve at the confluence of the Asan and the Yamuna, the State's only Ramsar site (Site No. 2437; 444.4 ha; designated on 21 July 2020; a Conservation Reserve under section 36A of the Wildlife (Protection) Act, 1972 since 2005), to its boundary, and any wetland notified under the 2017 Rules;
  • (c) the 192 wetlands of the national atlas that the Uttarakhand State Wetland Authority is ground-truthing, the taals of the Nainital lake region with their recharge flats, such as Sukhatal, the simar marshes and seeps of the hill slopes, and the marshy low land and depressions of the floodplains of the Ganga in Haridwar district and of the rivers of Udham Singh Nagar, within the 1% AEP extent of Clause 7.3.4 (the river channel itself is a waterbody under the rest of this chapter); and
  • (d) any other marsh, wetland, taal, khal or simar that the Authority notifies, that the wetland authority lists, or that the High Court of Uttarakhand or the National Green Tribunal directs to be protected.

7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.

7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:

  • (a) meet Clause 7.10.6;
  • (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
  • (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.

7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:

  • (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
  • (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.

7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.

7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:

  • (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
  • (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
  • (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.

7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.

Commentary. Uttarakhand's wetlands are the concern of the Uttarakhand State Wetland Authority, constituted by letter No. 757(1)/X-3-18-09(01)2004 of 16 October 2019, with a State Level Technical Committee under the Principal Secretary, Environment, Forest and Climate Change, and a District Level Technical Committee in each district under the District Magistrate, with the Divisional Forest Officer as member secretary. Its status report of 17 October 2025 lists 192 wetlands in the national atlas of 2021 (100 natural, 9 reservoirs and 83 parts of rivers), 89 of them in forest areas, with 48 in Udham Singh Nagar, 41 in Haridwar, 30 in Pauri, 17 each in Chamoli and Nainital and 14 in Dehradun; ground-truthing was done for 149 and boundaries for 26, under the directions of the Supreme Court in W.P. 304/2018, and no wetland notified under rule 4 of the 2017 Rules was mentioned or found. The Asan Conservation Reserve, 444.4 ha at the confluence of the Asan and the Yamuna in Dehradun district, became a Conservation Reserve in 2005 and the State's first and only Ramsar site on 21 July 2020 (Site No. 2437); it is recorded for about 330 bird species and as a spawning ground of the golden mahseer (Wetland Authority note; Ramsar Information Sheet), and the floodplain notification of the Asan was approved in June 2025 (as reported). In the hills the wetlands that matter to drainage are small and not in the atlas: the recharge flats of the lakes, such as Sukhatal, on whose lakebed the High Court stopped construction in 2022 (as reported); and the simar, the marshy tracts fed by groundwater on the hill slopes (Rawat and Sah, 2009). A drain outfall, desilting, diversion or gate operation in or near the Asan Conservation Reserve, a notified wetland or a recharge flat therefore needs the views or permission of the Wetland Authority or the Forest Department where the Rules or the Wildlife (Protection) Act, 1972 reach it, as well as compliance with this chapter; for the taals, simars and floodplain wetlands they do not reach, this chapter, the bye-law setbacks and the Conservation Use Zone are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Uttarakhand's raos, lakes and rivers through the drains (Clause 8.9, Commentary). The CPCB lists the Rispana, the Bindal Rao, the Rambha at Rishikesh and the Kalyani at Rudrapur among "rivers reported as drains", and counted 70 untapped drains in the State before the monsoon of 2025 (as quoted before the National Green Tribunal in March 2026); in Nainital the ADB-funded project is replacing about 9.6 km of trunk and outfall sewers and building a 17.5 MLD treatment plant (ADB, 2023), and the CAG reported in 2025 that 12 of 37 treatment plants it inspected under Namami Gange were discharging untreated sewage (as reported). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by many existing outfalls. In Uttarakhand they apply in full to every new outfall, and every existing outfall to a taal, rao, wetland or river that carries dry-weather flow comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed. In a lake town, every drain that enters the lake also passes a sediment trap first (Figure 7.3), because the lake is the end of the town's drainage and has no other way to lose the silt.


7.13 Encroachment interfaces

7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.

7.13.2 No reliance on encroached land. No design shall:

  • (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
  • (b) treat the encroached width of a channel as its design width.

7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:

  • (a) it shall be designed for the full waterbody width (Clause 7.13.1);
  • (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
  • (c) the work shall be built so that the full width can be restored later without rebuilding it.

7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:

  • (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
  • (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.

7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.

Commentary. Uttarakhand's main controls on building in rivers, raos and lakes are the bye-law setbacks, the floodplain zoning law and the courts, and the courts have done most of the work. In Urmila Thapa v. State of Uttarakhand (WPPIL 58/2019, August 2022) the High Court recorded a survey of encroachment in the river beds of Dehradun district, 37.93 ha in Dehradun tehsil, 57.4 ha in Vikasnagar, 4.89 ha in Rishikesh and 5.62 ha in Doiwala, held that river-bed land outside municipal limits is forest land, ordered removal to begin at once, and made the Municipal Commissioner personally responsible within the city. On the Rispana, the National Green Tribunal recorded in 2025 the encroachments found by each body (89 by the Nagar Nigam, of which 20 dated from before 11 March 2016 and 69 had been removed; 413 by MDDA, of which 347 dated from before 2016 and 66 had been removed), and the State later counted 330 structures within the river's 1-in-5-year flood zone, 324 of them unauthorised (NGT O.A. 417/2022, order of 18 August 2025; NMCG affidavit, 2026). The cut-off date matters because the Uttarakhand Special Provisions for Urban Local Bodies and Authorities Act, 2018, as extended in 2025, defers the eviction of settlements that existed before 11 March 2016 (as recorded by the High Court); the Supreme Court held in abeyance in February 2025 the Tribunal's direction to remove the Rispana encroachments within a month (C.A. 1440/2025, as reported); and on 1 April 2026 the High Court dismissed petitions against the rehabilitation of the Kathbangla basti, whose residents were "living in dry river bed and are in danger if any flash flood … occurs" (Rajeshwari Yadav Gupta, WPMS 739/2026). In the Nainital lake region the High Court stopped construction on the Sukhatal lakebed in 2022, and a ban it laid in 2016 on construction within 2 km of the major lakes was stayed by the Supreme Court in 2018 (both as reported); the Lake Development Authority issues notices against unauthorised structures (as reported). The Gaula at Haldwani has its own record of mining and encroachment before the High Court (Ravi Shankar Joshi, WPPIL 178/2013). Floodplain zoning itself may yield: an amendment of 2024, seen only as quoted, lets a final notification be amended where "riverbank development" can protect land and buildings. This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.


7.14 Safety of tank bunds and embankments

7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:

  • (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
  • (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.

Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.

7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:

  • High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
  • Low hazard: any other case.

7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:

  • (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
  • (b) a breach analysis shall map the area flooded by a breach at MWL;
  • (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
  • (d) the design shall be certified and independently checked under Clause 10.6.

7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the SW monsoon (by 31 May) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.

7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.

Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. Naini lake and the other Kumaon taals are natural lakes whose outlets are controlled by sluices, not by bunds, and khals and village ponds are too low to be specified dams, but each outlet works or bund shall be screened under Clause 7.14.1; the heights of the outlet works of Bhimtal, Naukuchiatal and Sattal were not found for this Manual. Tehri, at 260.5 m, is a specified dam under the Act, and the earth dams of the Baur, Haripura and Tumaria reservoirs in Udham Singh Nagar, of which the Baur dam is 9.5 km long (Irrigation Department salient features), are to be checked against it. Where the storage of a taal, khal or reservoir is counted under Clause 7.7, its bund, outlet works or dam is a tank bund for Clause 7.14.2 unless the Act applies. A glacial or moraine-dammed lake is never counted as storage, but where it lies upstream of a town, its breach path is mapped as a hazard (definitions after Clause 7.2; Chapter 5). Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Uttarakhand the embankments and lakes that matter to the towns are the State's dams and barrages and the natural dams of the high mountains. In June 2013 the moraine-dammed lake above Kedarnath emptied within minutes on the morning of 17 June, in a disaster in which the State presumed more than 5,700 people dead (as reported); on 7 February 2021 a rock and ice avalanche at Raini became a debris flow that destroyed the Rishiganga project and damaged the Tapovan-Vishnugad project (Shugar et al., 2021); and on 5 August 2025 a debris flow buried Dharali in the Bhagirathi valley (as reported). Among the dams, Tehri's spillways were designed for a probable maximum flood of 15,540 m³/s (THDC), the Gaula barrage at Kathgodam was designed for 3,250 m³/s and passed about 123,000 cusec in 1993 (Irrigation Department salient features), and the Dakpathar barrage was given a waterway for the 1-in-50-year flood of 11,620 m³/s (UJVN, O&M manual, 2021). No breach map or emergency action plan for a taal, a barrage or a reservoir of the terai was read for this Manual, and no State disaster management plan for urban floods was read. A failed or overtopped bund floods the colonies below it, a released or burst lake sends a flood and debris down a gadhera faster than any warning, and an unannounced release floods the colonies too, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.


7.15 Submittal requirements

Every drainage report for a development or work under Clause 7.1.2 shall include:

  1. the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
  2. the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
  3. the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
  4. for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
  5. for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
  6. for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
  7. for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.

7.16 Review and update

7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.

7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.


References (chapter)

Annexes and forms

Annex / Form Content
7A Statewide waterbody GIS layer and inventory fields
7B Fixed-width setback table (alternative S-3, with Annex 1C)
7C Template tank operating rule, with flood cushion
7D Desilting and restoration specification
7E Glossary of Hindi, Garhwali and Kumaoni waterbody terms and regional variants
Form 7-1 Waterbody Sheet
Form 7-2 Tank Storage Credit Sheet
Form 7-3 Compensatory Storage Calculation (by elevation band)