Chapter 4Site Runoff Control: Retention and Detention


4.1 Purpose and scope

4.1.1 This chapter sets the performance standard that every regulated development shall meet for runoff leaving the site. It covers:

  • (a) the order in which runoff-control measures are to be applied (Clause 4.3);
  • (b) retention of frequent rainfall, and how retained volume is credited against detention (Clause 4.4);
  • (c) release-rate criteria for standard and flood-sensitive catchments (Clause 4.5);
  • (d) the procedure for sizing detention storage and outlets (Clauses 4.6 to 4.9);
  • (e) facility types, rainwater harvesting (RWH) accounting, and high-groundwater sites (Clauses 4.10 to 4.12);
  • (f) regional detention and fee-in-lieu (Clause 4.13);
  • (g) simplified methods for small sites: the Tier B tables and the fixed-coefficient route (Clause 4.14); and
  • (h) public safety (Clause 4.15).

4.1.2 This chapter applies to land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, as set in Chapter 1. Single dwellings below that threshold, and road resurfacing that adds no impervious area, are exempt. The existing RWH mandate of the building rules (rainwater storage under bye-law 6.5 of the Bye-laws 2011 on every permitted construction with a ground coverage of 125 m² or more, except in waterlogged areas, of at least 2.0 m³ for a coverage of up to 250 m², 3.5 m³ up to 400 m² and a further 0.5 m³ for each further 50 m² or part, reduced to one-third where groundwater recharge is provided on a plot of more than 400 m², and confirmed on the plan before approval; the rules are discussed in the Commentary to Clause 4.11) continues to apply to every building it covers, whether or not this chapter applies.

4.1.3 Rainfall inputs come from Chapter 2. Hydrologic methods come from Chapter 3. Tailwater, downstream analysis and the outfall-closed check come from Chapter 5. Water quality volume (WQv) treatment comes from Chapter 8. Where this chapter and those chapters overlap, the more stringent requirement governs.

Commentary. No Indian national rule or Uttarakhand rule found during research for this Manual limits the rate of discharge from a site, and none requires on-site detention or "zero run-off". The building rules are the Uttarakhand Building Construction and Development Bye-laws/Regulations 2011 (Amendment 2015), made by the Housing Department under section 57 of the Uttar Pradesh Urban Planning and Development Act 1973, as applicable to and amended in Uttarakhand, and adopted by the board of each development authority, which may propose local amendments to the Government (notification of 10 January 2024, para 4). They have been amended piecemeal since: of the amendments read, those of 27 September 2022 (setbacks of single residences), 13 March 2023 (mobile towers), 10 January 2024 (No. 180884) and 13 June 2024 (housing for the economically weaker sections), only that of 10 January 2024 touches water, keeping a filling station at least 50 m from rivers, waterbodies, springs and the flood plain and 5 m from a nala (cl. 7.14(III)(1)(i)). A comprehensive "Amendment 2017", hosted by MDDA, is a draft that invited suggestions until 24 February 2018; it was not seen notified, later notifications still amend the 2011 (Amendment 2015) text, and it is not cited in this Manual as in force. The text read is the Housing Department's compilation of 2015–2019; the 2015 notification and the amendments of 2016, 2019, 2021 and 7 January 2022 were not read [TBC]. The drainage provisions that can be found protect the building, the slope and the watercourse, not the catchment. Bye-law 4.4(III) fixes plot boundaries back from water: at least 30 m from a river bank and 10 m from an underground water source (the bye-law's term for a spring), both left for dense plantation with no construction of any kind; at least 5 m from the bank of a nala, or the required setback if more; and 30 m from the bank or boundary of every lake in the State, including the Nainital lake special area, or from the maximum fixed level of a natural reservoir, whichever is more. The distances are printed "30.0–30.0" and "10.0–10.0" metres; this Manual reads them as single distances of 30 m and 10 m, and the printing is to be confirmed with the Housing Department [TBC]. Bye-law 4.4(IV) requires a contour plan at 2 m intervals with sections, and bars building where landslides are likely to be severe and continuous or where the local slope exceeds 30°, or 26.5° in the Nainital municipal area, with public utilities on steeper ground approved only at Government level on a geologist's certificate; the draft of 2017 would also bar building within 250 m of a place prone to landslides. Bye-law 4.4(V) requires the site plan in the hills to show nearby landslide-prone areas and, on a sloping site, "proposals to divert the natural flow of water coming from uphill away from the foundation" (4.4(V)(b)). That is the only clause of the bye-laws on site runoff. Appendix 1, for Nainital, adds that "the drainage condition should be improved such that no water accumulates and saturates the grounds close to the footing level" (cl. 14). The plinth shall be at least 0.45 m above ground, with no maximum (2.41); premises of more than 1,000 m² need a sewer-capacity no-objection or their own treatment plant before approval (6.4(III)); and rainwater storage is required under 6.5 (Commentary to Clause 4.11). None of these sets a design storm, a release rate, a storage volume or an overflow path. The Unified Zoning Regulations 2025 (No. 568, 20 November 2025) put the rivers, lakes, ponds, nalas and streams of the revenue record into a Conservation Use Zone of the master plans, with a green buffer under the bye-laws and no new construction within 30 m of the banks of rivers and lakes. The Uttarakhand Flood Plain Zoning Act 2012 (Act 07 of 2013) lets the Irrigation Department, through the Flood Zoning Authority, prohibit building on land within the 25-year flood line and restrict it within the 100-year line, river by river, marked on shajra maps and by pillars; these lines are final for 614.6 km of the Bhagirathi, the Ganga, the Bhilangana, the Alaknanda and the Mandakini, and for the Rispana (5 May 2025), the Asan was approved by the cabinet in June 2025 (as reported), and the Gaula, the Kosi, the Suswa, the Song, the Baldi and the Solani have been studied but not notified (Irrigation Department, status report in NGT OA 417/2022). The amendment of 2024, seen only as quoted, extends the time for a final notification to 24 months and allows a notified line to be amended where "riverbank development" can protect the land; Rules were approved by the cabinet on 12 October 2026, but no text was found [TBC]. The only flood-level building rule found is in the declaration of intent for the Ganga's right bank at Rishikesh, which allows reconstruction in the restricted zone with the plinth at least 1.00 m above the high flood level (No. 1875/II(2)-2020-06(18)/2020, 7 October 2020). On the Ganga in the hills, the Housing Department's order of 29 November 2017, revised on 1 June 2023, prohibits building within 100 m of the middle of the river or the 25-year flood area, whichever is wider, and regulates the next 200 m, while the NGT designated "100 meters from the edge of the river" as a no-development zone from Haridwar to Unnao until the floodplain is demarcated (OA 200/2014, 13 July 2017); the two are measured from different lines, and both are cited as written (Chapter 7). The Uttarakhand Ground Water Act 2016 was repealed in 2017 (Act 11 of 2017), so the State has no groundwater law in force. The Nagar Nigams are governed by the Uttar Pradesh Municipal Corporation Act 1959 as adapted by the Adaptation and Modification Order 2002, and the Nagar Palika Parishads and Nagar Panchayats by the Uttar Pradesh Municipalities Act 1916 as amended in 2002 (CAG, performance audit of the 74th Amendment, 2022); their chapters on drains were not read in their Uttarakhand form [TBC]. The Doon Valley notification of 1989 and the Bhagirathi eco-sensitive zone of 2012 regulate development in their areas, but their drainage clauses were not read [TBC]. No drainage design standard of the Housing or Urban Development Department, any development authority or any Nagar Nigam stating a return period was found. The only stated design basis is in a funded project: the national consultants of the ADB's Uttarakhand Integrated and Resilient Urban Development Project designed the roadside drains of Dehradun for a storm of "once in 2 years" and the primary and secondary channels for "once in 5 years", with a minimum drain of 250 × 250 mm, velocities of 0.6–3.0 m/s and the outfall invert "above 'high flood level' (HFL) of the receiving water body", and the ADB's climate risk assessment notes that they "do not include an allowance for climate change", recommends drains "to convey 10-20% more flow", and observes that "the drains may remove around half the floodwater in larger events" (ADB, UIRUDP climate risk assessment, October 2021). That basis records practice; it is superseded for design under this Manual by the design storms of Chapter 2 and the levels of service of Chapter 6. The Irrigation Department's drainage master plans for Haldwani and other Kumaon towns state no design storm (as reported), and the Smart City's drainage project in Dehradun made no provision for storm-water reuse (CAG, performance audit of Smart Cities, 2025). Basements are regulated for the hills, not for flooding. In the hill area, "keeping in view the geological sensitivity", a single basement is allowed only on a plot with a frontage of at least 18 m and an area of at least 2,000 m², while the plains allow up to three on plots of 2,000 m² or more (5.6(iii)); the basement ceiling shall be at least 0.9 m above the surrounding ground (5.6(viii)), and a structural and soil certificate shall cover the effect of the excavation on nearby stability and on the water table (5.6(xi)); no Uttarakhand rule restricts basements in low-lying or flood-prone land, sets a level for a basement ramp or opening, or keeps surface water out of a basement. This Manual therefore adds its own requirements for every basement: no detention storage in a habitable basement (Clause 4.10.1); the crest of every basement ramp and the sill of every basement opening at least 0.5 m above the 1% AEP flood level, with basement drainage pumped to the surface drain through a non-return valve (Clauses 6.11.1 and 6.11.4); and no basement in Zone 2 (Clause 7.5.2). In the flood-sensitive catchments of Clause 4.5.3.2, in any catchment notified under Clause 4.5.4, on the terai, floodplain and taal-margin land of Clause 4.12.1 and in the restricted zone of a notified floodplain, it recommends that no basement be permitted where the 1% AEP flood level stands above the surrounding ground; and in the hills, a basement cut into a slope shall also carry the geotechnical certificate of the hill infiltration rule of Clause 4.11, with the water behind its walls drained to a lined drain and not to the ground. For a sloping site, this chapter also supplies what bye-law 4.4(V)(b) leaves open: the diversion of uphill runoff shall carry the flow of the catchment above the site in the design storms of Chapter 6, and shall discharge to a lined drain or a stable natural channel, never onto an unprotected slope. These are the Manual's proposals, not rules of the Bye-laws 2011. This chapter is written so that it can supply, as a technical companion to the Bye-laws 2011 and the Municipal Acts, the design storm, release rates and storage volumes that they leave open; it has not been adopted for either purpose. In practice many of the State's urban streams and nalas carry sewage: of the 208 drains that reach the Rispana in Dehradun, 187 have been intercepted and diverted, but the floods of 16–17 September 2025 damaged 83 of the interception structures (Peyjal Nigam, affidavit in NGT OA 417/2022); the CPCB counted 70 of 200 monitored drains in the State as untapped before the monsoon of 2025 (as quoted in a filing of March 2026 in NGT OA 200/2014); and the CAG found 47 of 111 nallas reaching the Ganga tapped in 2017 (Report 39 of 2017) (Clause 8.9). Retention and detention apply in full on every site whatever the drain carries: every litre a site releases at the peak of a storm takes up capacity in a drain that is already part-filled with sewage. The CPHEEO (2019) manual describes limiting outflow to the pre-development peak as typical practice, but it uses no "shall" and names no storm frequencies (CPHEEO Part A §8.5.1). This chapter turns that description into a development-control requirement.


4.2 Definitions

Term Meaning in this Manual
Retention Permanent removal of runoff from the surface drainage system by infiltration, evapotranspiration or reuse, so that the water never reaches the outfall.
Retention depth The 90th percentile wet-day 24-hour rainfall depth for the site's zone (Clause 2.10, Annex 2E).
Required retention volume (RRV) The runoff volume from the retention depth over the post-development site (Clause 4.4.2).
Detention Temporary storage of runoff, released through a controlled outlet at a rate set by Clause 4.5.
Retention credit The reduction in required detention storage that results from retention practices, determined by routing under Clause 4.4.6. It is not the same as the retained volume.
Permissible site discharge (PSD) The maximum rate at which a site may discharge for a stated AEP, in L/s or L/s/ha.
Site storage requirement (SSR) The detention storage required per hectare of site under the simplified method of Clause 4.14.
Multi-stage outlet An outlet structure with separate openings at different levels, each controlling a different AEP (Figure 4.2).
Drawdown time Time from the peak stored volume until the stated fraction of that volume has been released.
Emergency spillway A secondary overflow that passes flows above the primary outlet capacity, or all flow when the primary outlet is blocked, without overtopping the embankment.
Freeboard Vertical distance between the maximum design water level and the embankment crest or other critical level.
Flood-sensitive catchment A catchment listed in Clause 4.5.3 or notified under Clause 4.5.4.
Authority The approving authority under Chapter 1 (the development authority that grants building or layout permission under the Bye-laws 2011 in its development area, such as MDDA, the Haridwar–Roorkee Development Authority (HRDA) or a district development authority constituted under the Uttar Pradesh Urban Planning and Development Act 1973 as applicable in Uttarakhand; UHUDA or the authority of a regulated area; or, where it grants building or layout permission, the Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat concerned [TBC], as applicable).
Tier A / Tier B Adoption tiers defined in Chapter 1. Tier A: the Dehradun Municipal Corporation (DMC), every approving authority within the development area of MDDA, including MDDA itself and the Nagar Palika Parishads and Nagar Panchayats in that area; HRDA in its development area; and every other Nagar Nigam, with the development authority in whose area it lies. Tier B: Nagar Palika Parishads and Nagar Panchayats.

4.3 Order of measures

4.3.1 Every site runoff-control design shall apply measures in the following order, and shall document in the submittal why each earlier step could not do more:

  1. Preserve. Keep existing waterbodies, taals, natural drainage lines, wetlands, and permeable soils and vegetation. Avoid fill in flood storage (Chapter 7).
  2. Retain. Retain the RRV on site by infiltration, reuse or evapotranspiration (Clause 4.4).
  3. Detain. Detain the remaining runoff so that the release-rate criteria of Clause 4.5 are met for every design storm and duration (Clauses 4.6 to 4.9).
  4. Convey. Convey the 1% AEP (100-yr) flow safely through the site to the receiving system on a defined overland path (Chapter 6), and check the receiving system downstream (Chapter 5).

4.3.2 Preservation and retention reduce the detention required (Clauses 4.4.6 and 4.4.7). They do not relieve the site of the release-rate criteria of Clause 4.5 or of the downstream analysis of Chapter 5.

Commentary. This order follows the "layers of stormwater management" adopted in the Kansas City Metro APWA Section 5600 Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet; MARC Supplement, Nov 2025). Maintenance is the fifth layer and is set in Chapter 10. The 2025.01 manual credits retention and natural-area preservation against detention size (MARC Supplement, Nov 2025). Clause 4.4.6 adopts that credit, and defines it so that it cannot be claimed twice.


4.4 Retention

4.4.1 Requirement

The site shall retain the RRV. Retention shall be achieved by one or more of the following:

  • infiltration practices (soakaways, infiltration trenches, permeable pavement with an infiltration base, bioretention);
  • rainwater reuse that is drawn down by a demonstrated non-potable demand;
  • green roofs and landscape areas that do not drain to the outfall in the retention-depth storm.

The limits of Clause 4.4.4 apply.

4.4.2 Computation of the RRV

RRV (m³) = 10 × Q_R × A

where:

  • Q_R (mm) is the runoff depth from the retention depth P_R (Annex 2E). It is computed with the SCS-CN method for the post-development cover of each sub-area, at AMC II, with Ia = 0.2S (Chapter 3); and
  • A (ha) is the area of the site that drains to the outfall.

Q_R shall be computed for each sub-area separately and summed. An area-weighted CN shall not be used where impervious and pervious areas differ by more than 20 CN points.

The volumetric method RRV = 10 × P_R × Rv × A, with Rv = 0.05 + 0.009 × I (I = percent impervious), may be used for sites under 0.5 ha and under the Tier B method.

Commentary. The Rv formula is the one used in the KC water quality volume (MARC BMP Manual 2012). It is simple to review for small sites. The SCS-CN form is required for larger sites so that the retention computation uses the same runoff model as the detention routing. That keeps the credit computation of Clause 4.4.6 consistent.

4.4.3 Verification

Retention by infiltration shall be supported by:

  • (a) site infiltration tests at the location and depth of each practice, at the frequency set in Chapter 8;
  • (b) a design infiltration rate of no more than half of the measured rate; and
  • (c) groundwater evidence showing the seasonal high groundwater table at least 1.0 m below the base of the practice (Chapter 8).

Retention by reuse shall be supported by a demand calculation showing that the RRV is drawn down within 72 hours by a continuous non-potable use, such as toilet flushing, cooling or irrigation.

Commentary. The factor of 2 on measured infiltration rate has no direct precedent; this Manual sets it to allow for clogging and for the difference between a test pit and a full-scale practice. Chapter 8 may set a different factor; if it does, Chapter 8 governs.

4.4.4 Limits on retention

4.4.4.1 Infiltration practices shall not be used:

  • where the seasonal high groundwater table is less than 1.0 m below the base (Chapter 8);
  • on contaminated land;
  • within the setbacks from foundations, wells and septic systems set in Chapter 8; or
  • on fill, unless tested after placement.

4.4.4.2 Where the RRV cannot be fully retained, the shortfall shall be stated in the submittal. The shortfall shall be treated as WQv under Chapter 8 and shall get no retention credit.

4.4.5 Drawdown of retention

Retention storage shall be emptied by infiltration or reuse within 72 hours of the end of the retention-depth storm, verified by the tests of Clause 4.4.3.

4.4.6 Retention credit: definition and computation

4.4.6.1 What the credit is. The retention credit is the reduction in required detention storage that results when the retention practices are included in the post-development routing. It is computed. It is not assumed equal to the RRV.

4.4.6.2 Tier A method (routing). For each design storm and duration of Clause 4.6.3:

  • (a) model each retention practice explicitly as a storage that is empty at the start of the storm, unless Clause 4.11 says otherwise;
  • (b) let the practice fill from the front of the storm, and let it lose water during the storm only at the design infiltration or reuse rate of Clause 4.4.3;
  • (c) once it is full, route its overflow to the detention facility; and
  • (d) size the detention for the residual hydrograph.

The required detention storage is the largest storage over all storms and durations. The credit is the difference between that storage and the storage required with no retention. No further deduction shall be made.

4.4.6.3 Tier B method (simplified). The detention storage required by Clause 4.14 may be reduced by:

V_credit = C_R × RRV_provided

where C_R is the retention credit factor from Annex 4B for the zone, soil group and drawdown rate. Until Annex 4B is published, C_R = 0.

4.4.6.4 Retention that is not verified under Clause 4.4.3 gets no credit.

Commentary. "Credited against detention" (APWA 5600 2025.01) can be read in two ways. One reading subtracts the retained volume from the detention volume, cubic metre for cubic metre. The other routes the storms with retention in place and sees what detention is still needed. The two readings give very different answers in Uttarakhand, because the mandatory 48- and 72-hour storms (Clause 2.5.2) fill any retention practice on the first day, long before the peak arrives on the last day (Clause 2.9.2). Unless the practice keeps infiltrating during the storm, it is full at the peak and does nothing to reduce the peak storage.

The illustrative example in Clause 4.6.7 shows the size of the effect. A 2 ha site with 552 m³ of retention (no infiltration during the storm) needs 138 m³ less detention for the 24-hour storm. That is a credit of about a quarter of the retained volume. For the 48- and 72-hour storms, which govern, the credit is close to zero. Subtracting the retained volume directly would have under-sized the detention by about 545 m³ (about 19%).

This Manual therefore defines the credit as the result of routing. Retention on fast-draining sandy soils, which keeps infiltrating through a multi-day storm, will earn a real credit. Retention that only fills will earn little. Both outcomes are physically correct. Setting C_R = 0 until Annex 4B exists is a safe default for Tier B, not a judgement that retention has no value: retention is still required for water quality and recharge (Chapter 8).

4.4.7 Preservation credit

Areas of the site that are permanently preserved in natural cover may be modelled at their pre-development CN in the post-development condition, provided that:

  • they are protected by a registered covenant or dedication; and
  • their runoff is not concentrated onto impervious surfaces.

This lowers both the RRV and the detention required. No other preservation credit applies.


4.5 Release-rate criteria

4.5.1 General

4.5.1.1 Peak discharge from the site shall be computed by a hydrograph method (Chapter 3) for the pre-development and post-development conditions with identical design storms (Clause 2.11.1). The Rational Method shall not be used for any part of storage sizing.

4.5.1.2 Pre-development is greenfield: open land in good condition for the mapped HSG. Existing impervious cover is not counted (Clause 2.11.5, Chapter 3). This applies to redevelopment as well, subject only to the constrained-redevelopment route of Clause 4.5.6.

4.5.1.3 The criteria apply at each point where runoff leaves the site. Where a site drains to more than one outfall, the criteria apply to each outfall for the area draining to it. Runoff shall not be diverted between catchments.

4.5.2 Standard catchments

For each of the 50%, 10% and 1% AEP (2-, 10- and 100-yr) storms, and for every duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:

Q_post(T, d) ≤ 0.9 × Q_pre(T, d)

4.5.3 Flood-sensitive catchments

4.5.3.1 In the catchments listed below, the mixed-frequency rule of Clause 2.11.3 applies, for every duration in Clause 2.5.2:

Q_post(1% AEP, 100-yr) ≤ Q_pre(10% AEP, 10-yr), and Q_post(50% AEP, 2-yr) ≤ Q_pre(50% AEP, 2-yr).

Each cap is the pre-development peak at the duration that maximises it: the 10-yr peak for the 100-yr check, and the 2-yr peak for the 2-yr check. The cap applies to every post-development duration (Clause 2.11.3).

4.5.3.2 The flood-sensitive catchments are:

  • (a) Dehradun's raos: the catchments of the Rispana, the Bindal, the Song, the Suswa and the Tons (Tamsa) and of their khalas within the development area of MDDA, whose ungauged, boulder-laden flows rise within an hour of a burst on the Mussoorie ridge;
  • (b) Haridwar's low land on the Ganga: the low-lying land of Haridwar, Jwalapur and Kankhal that drains to the Ganga and its channels below the Bhimgoda barrage, whose outfalls are held up when the river at Haridwar is above its CWC warning level;
  • (c) Haldwani on the Gaula: the land of Haldwani–Kathgodam that drains to the Gaula and to the nalas that cross the town, among them the Rakasia and Kalasia nalas;
  • (d) Rudrapur–Kichha terai: the land of Rudrapur, Kichha and Pantnagar that drains to the Kalyani and the Kichha across the terai, where the water table is high and the outfalls are flat;
  • (e) Nainital lake catchment: the whole catchment of Naini lake, including the Sukhatal basin, which drains to a closed lake with a gated outlet, and the land along the Balia Nala below the Tallital sluices;
  • (f) Rishikesh on the Ganga: the land of Rishikesh, Muni-ki-Reti and Dhalwala that drains to the Ganga above the Virbhadra (Pashulok) barrage, or to the Chandrabhaga;
  • (g) Valley-floor towns below debris fans: the land of a town built on a river terrace or valley floor below the fan of a gadhera or nala, such as Srinagar, Rudraprayag and Uttarkashi;
  • (h) Notified floodplain reaches: the land within, or draining directly into, the prohibited (25-year) or restricted (100-year) zone of a reach finally notified under the Uttarakhand Flood Plain Zoning Act 2012, which today are the 614.6 km of the Bhagirathi, the Ganga, the Bhilangana, the Alaknanda and the Mandakini and the Rispana; and
  • (i) any catchment notified under Clause 4.5.4.

The boundaries shall be those mapped in Annex 4A.

4.5.4 Notification of further flood-sensitive catchments

4.5.4.1 The Authority may propose that a catchment be notified as flood-sensitive where one or more of the following is documented:

  • (a) buildings or arterial roads flooded in an event of 1% AEP or more frequent, on at least two occasions in the previous 20 years;
  • (b) receiving drains or channels with capacity below the 10% AEP flow under existing conditions;
  • (c) an outfall that is held up by a river in flood or by a barrage or reservoir pond, such as the Ganga at Haridwar and Rishikesh, the Song at Satyanarayan, the Solani at Roorkee, the Gaula below Kathgodam, the Kosi at Ramnagar or the Sarda at Banbasa, or that discharges to Naini lake, Bhimtal or another taal held at its maximum level, for part of the SW monsoon (Chapter 5);
  • (d) loss of more than a quarter of the mapped tank and taal storage in the catchment since the earliest available survey; or
  • (e) a basin master plan that relies on limiting site discharge.

4.5.4.2 The procedure shall be:

  1. The Authority prepares a technical note with the catchment boundary in GIS form and the evidence for 4.5.4.1.
  2. The State-level technical committee constituted under Chapter 1 reviews the note.
  3. The draft notification and map are published for public comment for at least 60 days.
  4. The Government notifies the catchment and the map is added to Annex 4A.
  5. The rule applies to applications received 6 months or more after notification. Applications received earlier are assessed under Clause 4.5.2.

4.5.4.3 A notified catchment may be de-notified only by the same procedure, and only after a basin study shows that the downstream system meets Chapter 5 with all development under Clause 4.5.2.

Commentary. The 0.9 factor is derived from the Denver (MHFD) analysis. In that analysis, ten basins each releasing 100% of the historic 100-yr peak still produced 106% of the historic peak at the outlet; releasing 90% at each gave 97% (UDFCD Full Spectrum Detention Release Rate Memorandum, 2012). The mixed-frequency rule has no direct precedent; the nearest is the Malaysian DID (2008) checklist, which required post-development 2-, 10-, 50- and 100-yr peaks below the pre-development 2-yr peak. The specific "100-yr post ≤ 10-yr pre" form appears in a New Berlin, Wisconsin planning discussion (not an adopted rule). The Dehradun entry follows the raos. The Rispana and the Bindal rise on the Mussoorie ridge and cross the city to the Suswa and the Song; their catchments are given as 58.09 and 44.40 km² in one study and the Rispana as 53.45 km² in another (as reported), and none of the raos has a CWC site, so their levels are known only from surveyed marks. The record falls of the Doon are among the highest in north India: 487.5 mm at Raipur (Dehradun) on 2 August 1959, 487.0 mm at Dehradun on 25 July 1966 and 440.4 mm at Rajpur (IMD), 98 mm in one hour at Dehradun on 14 June 1970 (CWC zone 7 report), and 264 mm in 24 hours with 54 mm in one hour at Sahastradhara on 15–16 September 2025 (as reported), when 13 bridges and 10 culverts were lost and 83 sewage interception structures on the Rispana were damaged (Peyjal Nigam, affidavit before the NGT). The Smart City's command centre was flooded after the bursts of 25 August 2021 and 8 August 2023 (CAG, performance audit of Smart Cities, 2025). The High Court has acted against encroachment of the river beds and khalas of the Doon (Urmila Thapa, WPPIL 58/2019), the Rispana was the first Doon river finally notified under the Flood Plain Zoning Act (5 May 2025), and before the NGT the State counted 330 structures in the Rispana's 1-in-5-year active floodplain (OA 417/2022; letter of 3 January 2026). The drains of the city under the ADB-funded programme were designed for a 2-yr storm, and its primary and secondary channels for a 5-yr storm, with no allowance for climate change (ADB, UIRUDP climate risk assessment, 2021). The Haridwar entry follows the Ganga: its warning and danger levels at Haridwar are 293.0 m and 294.0 m, its highest level is 296.30 m (dated 19 September 2010 in one CWC record and 17 June 2013 in another), and it stood near 295.7 m in 2013 and 2023 (CWC, as transcribed by SANDRP); Hardwar holds the State's 24-hour record of 495.3 mm, on 18 September 1880 (IMD). The Haldwani entry follows the Gaula, whose barrage at Kathgodam passed 123,000 cusecs in 1993 against a design of 115,000 (Irrigation Department), whose bridge at Haldwani partly collapsed on 19 October 2021 (as reported), and whose level at Kathgodam reached 498.93 m on 20 October 2021 (as reported); the Irrigation Department's drainage master plan for the town, of about ₹1,003 crore, would line the Rakasia (10.25 km) and Kalasia (1.55 km) nalas and add pumping stations in low-lying areas, and states no design storm (as reported). The Rudrapur–Kichha entry follows the terai: Pantnagar recorded 403.9 mm in the 24 hours to 08:30 on 19 October 2021 (IMD), Rudrapur was flooded by the Kalyani then, and flooded again in August 2023, and about 25,000 ha of farmland in Udham Singh Nagar was under water in July 2024 (all as reported). The Nainital entry follows the lake: every drain of the town discharges to Naini lake, which rose to a record 12.2 ft on its gauge and overflowed on 19 October 2021, when Nainital recorded 401 mm (as reported; IMD), and whose outlet through the Balia ravine is limited by rules of 1927 to protect a slope that has slipped repeatedly (NIH, Water Balance of Lake Nainital). The town's British drain network was built after the landslip of 18 September 1880, which followed about 33 inches of rain in three days (as reported), and the High Court has acted on the lake in Ajay Rawat and on the Sukhatal in 2022. The Rishikesh entry follows the Ganga (danger level 340.5 m, highest level 341.72 m on 5 September 1995), which stood above its danger level at 341.3 m in August 2023 (as reported) and whose right-bank floodplain from the Dhalwala drain to Haripur Kalan has been put under a notice of intent under the Act (No. 1875/II(2)-2020-06(18)/2020, 7 October 2020). The valley-floor entry follows the 2013 flood, which set the highest levels of the Alaknanda at Srinagar (537.9 m) and Rudraprayag (634.85 m) on 17 June 2013, 1.9 m and 7.85 m above their danger levels, and the debris flows of Dharali (5 August 2025) and Maldevta (2022), which buried land below the fans of side streams (CWC, as transcribed by SANDRP; as reported). Haldwani's neighbours on the bhabar, Kotdwara, Ramnagar, Kashipur and Tanakpur–Banbasa, and Roorkee on the Solani are candidates for notification under Clause 4.5.4. The notification triggers in 4.5.4.1 have no direct precedent and are set by this Manual. The 6-month lead time follows the update rule of Clause 2.14.2. Clause 4.16 explains why releases below pre-development are needed at all.

4.5.5 Minimum outlet and short-duration 2-yr checks

4.5.5.1 Where the PSD for any AEP and duration is less than the discharge of a 50 mm orifice (Clause 4.8.2) at the corresponding stage, the 50 mm orifice is deemed to comply for that AEP and duration.

4.5.5.2 Where meeting the 2-yr criterion at a duration of 3 hours or less would require a low-flow orifice so small that the drawdown requirement of Clause 4.7 cannot be met, the designer shall:

  • size the low-flow orifice as the smallest opening that meets Clause 4.7; and
  • report the resulting 2-yr exceedance for those durations.

The Authority may accept the design if the exceedance is below the discharge of the 50 mm orifice at the 2-yr stage, or if the downstream analysis of Chapter 5 shows no adverse effect.

Commentary. Under AMC II, a greenfield site produces almost no runoff in a 1- or 2-hour, 2-yr storm, because most of the rain is lost to initial abstraction. A pre-development peak of a few litres per second, compared duration by duration, then forces a very small low-flow orifice. That orifice cannot release the 10-yr volume within 48 hours. Checked as if it were outside a flood-sensitive catchment, the illustrative example of Clause 4.6.7 would need a low-flow orifice of about 75 mm to match the 1-hour, 2-yr pre-development peak. 90% drawdown of the 10-yr volume would then take about 84 hours even with a clean orifice, against the 48-hour limit. The 170 mm orifice that meets drawdown with 50% blockage exceeds the 1-hour, 2-yr pre-development peak by about 11 L/s. Clause 4.5.5.2 resolves that conflict in favour of drawdown, because a basin that is still partly full when the next SW monsoon storm arrives fails in the event that matters more. KC APWA 5600 (2006) used a 75 mm (3 in) minimum orifice with trash racks. This Manual sets a 50 mm minimum (Clause 4.8.2).

4.5.6 Constrained redevelopment sites

4.5.6.1 Eligibility. The relief route of this clause is available only for redevelopment where all of the following hold:

  • (a) the existing site is at least 60% impervious, as surveyed before demolition;
  • (b) the site is 1 ha or less; and
  • (c) the designer shows, in a Constraint Statement submitted with Form 4-1, that the greenfield criteria of Clauses 4.5.2 or 4.5.3 cannot be met on the site. The statement must show that every storage option of Clause 4.10 has been assessed: rooftop and podium storage, tanks under parking or landscape, permeable paving with sub-base storage, and landscape depressions. It must also give the storage each option can provide.

New development on undeveloped land is never eligible.

4.5.6.2 Minimum on-site performance. An eligible site shall provide all of the following on site:

  • (a) the full retention volume (Clause 4.4) and the WQv treatment (Chapter 8), with no relief;
  • (b) post-development peak discharge no more than 50% of the existing-condition peak for the 50%, 10% and 1% AEP storms, at each duration of Clause 2.5.2. The existing condition is modelled under Clause 3.3.4; and
  • (c) no increase in the 1% AEP water level at any building or road downstream (Chapter 5).

4.5.6.3 Shortfall. The shortfall is the detention storage required to meet the greenfield criteria (Clause 4.6) minus the storage provided on site under 4.5.6.2. The applicant shall pay for the shortfall as a fee-in-lieu at the unit rate of Clause 4.13.3. The fee shall be:

  • (a) paid into the ring-fenced account of the basin in which the site lies;
  • (b) spent only on regional detention or on restoring taal or tank flood storage identified in the basin stormwater master plan (Chapter 11); and
  • (c) recorded in the public ledger of Clause 4.13.4, which shall show the volume owed and the volume delivered in each basin.

Where no basin master plan has yet been approved, the fee shall be held for up to 5 years. If no plan is approved in that time, it shall be spent on restoring tank flood storage in the same basin, with Irrigation Department agreement.

4.5.6.4 Flood-sensitive catchments. In the catchments of Clause 4.5.3, the route is available under the same conditions. The Authority may, however, refuse it where the downstream analysis of Chapter 5 shows existing flooding of buildings in the 10% AEP event within the analysis extent.

Commentary. Greenfield is the target for all redevelopment, because a dense city only reduces its runoff as it rebuilds. On small, fully built plots in areas such as Paltan Bazaar and the old city of Dehradun, the lanes of Haridwar behind Har-ki-Pauri, the bazaars of Nainital and Mussoorie on the Mall, or the old bazaar of Haldwani, there is often no space for the full greenfield storage. A rule that cannot be met invites variances and non-compliance, which help no one downstream. This clause follows the approach of the UK Non-statutory Technical Standards for Sustainable Drainage (Defra, 2015, S2–S3). For previously developed sites, those standards require peak runoff "as close as reasonably practicable to the greenfield runoff rate" and never above the pre-redevelopment rate. The fixed 50% minimum reduction has no direct precedent; this Manual sets it to give reviewers a clear number in place of a "reasonably practicable" judgement. The fee-in-lieu turns the shortfall into regional storage in the same basin, so the basin still receives greenfield-equivalent control in total. Retention and water quality get no relief, because they are small volumes that almost every site can hold.


4.6 Detention sizing procedure

4.6.1 Method

Detention shall be sized by hydrograph routing through the stage–storage–discharge relationship of the facility, by level-pool (Modified Puls) or an equivalent numerical method (SWMM, HEC-HMS). Fixed-ratio and Rational-based storage formulae shall not be used. The simplified methods of Clause 4.14 (the Tier B tables and the fixed-coefficient route) are the only exceptions.

4.6.2 Steps

  1. Delineate the site and sub-areas. Map HSG and confirm by testing (Chapter 3).
  2. Extract design rainfall for 50%, 10% and 1% AEP and every duration in Clause 2.5.2, with the climate factor (Chapter 2, Form 2-1).
  3. Build design hyetographs: alternating block for ≤ 24 h; the "peak day last" pattern for 48 and 72 h (Clause 2.9).
  4. Compute pre-development hydrographs (greenfield CN; AMC III for storms of every duration from 1 July to 30 September in sub-areas UK-A, UK-D, UK-E and UK-F and on terai land, at all times in catchments draining to a reservoir or barrage pond, Naini lake or Bhimtal, or a river at or above its CWC warning level, and at other sites and times after a 5-day total of more than 53 mm, AMC II otherwise).
  5. Compute the release caps for each AEP and duration under Clause 4.5.2 or 4.5.3.
  6. Compute post-development hydrographs with the same storms and AMC, including retention practices (Clause 4.4.6).
  7. Choose a trial facility geometry (stage–storage) and a multi-stage outlet (Clause 4.6.5).
  8. Route every storm and duration. Use a time step of no more than 5 minutes, and no more than Tc/3 of the post-development catchment.
  9. Check every release against its cap, and check drawdown (Clause 4.7). Adjust the outlet and storage and repeat.
  10. Check the tailwater condition of Clause 4.6.6 and the downstream analysis of Chapter 5.
  11. Size the emergency spillway and set freeboard (Clause 4.9).
  12. Report the governing storm for storage, for each outlet stage, and for the spillway (Clause 4.17).

4.6.3 Storms to be routed

Every facility shall be routed for the full matrix:

Table 4.1 — Design storms to be routed for detention sizing

AEP Durations (h) AMC
50% (2-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h
10% (10-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h
1% (100-yr) 1, 2, 3, 6, 12, 24, 48, 72 II for ≤ 6 h; III for ≥ 12 h

The 24-, 48- and 72-hour runs are mandatory whatever the critical-duration result (Clause 2.5.2). Where Ia = 0.05S sensitivity is required by Chapter 3, it shall be run for the governing storage case.

4.6.4 Initial conditions

Each run shall start with:

  • detention storage empty, down to the invert of the lowest outlet;
  • any permanent pool full;
  • retention practices empty, except as limited by Clause 4.11; and
  • RWH storage full (Clause 4.11).

The 48- and 72-hour storms already contain their antecedent rain, so no further pre-filling is applied.

4.6.5 Multi-stage outlet design

4.6.5.1 The outlet shall have a separate control for each criterion, normally stacked as in Figure 4.2:

  • Stage 1, at the invert: the low-flow orifice. It releases the WQv over 24–48 h (Chapter 8) and controls the 2-yr release.
  • Stage 2: an orifice or slot set at or near the maximum 2-yr level. It controls the 10-yr release.
  • Stage 3: a weir, riser crest or larger orifice set at or near the maximum 10-yr level. It controls the 100-yr release.
  • Emergency spillway: separate from the primary outlet (Clause 4.9).

Stages may be combined where routing shows that every cap is met.

4.6.5.2 Orifices shall be computed with a discharge coefficient of 0.60 unless a rated device is used. Weirs shall use a coefficient appropriate to their shape. Submerged-outlet and tailwater effects shall be included (Clause 4.6.6).

4.6.5.3 Vortex flow controls and other proprietary devices may be used where the supplier provides a certified head–discharge curve and the minimum clear opening is at least 50 mm.

4.6.6 Tailwater on the outlet

The outlet shall be routed against the tailwater of the receiving system, not free outfall, wherever the receiving water level can rise above the outlet invert. The tailwater shall be:

  • for a receiving drain: its water level in the same storm, from the Chapter 5 analysis or, for Tier B, the drain obvert;
  • for tidal or backwater-affected outfalls: the levels and joint cases of Clause 2.12 and Chapter 5, including the outfall-closed check (Clause 5.10).

Where tailwater governs, a flap gate shall be fitted to the outlet (Clause 5.11). The storage below the tailwater level shall not be counted as available unless the routing includes the gate closure.

4.6.7 Illustrative example

Illustrative — not design values. This example shows the procedure and the sizes it produces. The inputs are invented to be plausible for a colony draining to the Rispana in Dehradun. They are not NIH-DHAARA values and must not be used for design.

Inputs:

  • Site: 2.0 ha, flood-sensitive catchment (Clause 4.5.3).
  • Land cover: pre-development all pervious, CN 70. Post-development as two sub-areas (Clause 3.9.2): 1.57 ha of directly connected impervious surface at CN 98, never converted for AMC, and 0.43 ha of pervious open space at CN 70, on the same soil as pre-development; the area-weighted CN at AMC II is 92. For storms of 12 h and longer the pervious CN only is converted to AMC III: CN_III = 23·CN / (10 + 0.13·CN) = 84.3 (Clause 3.8.4).
  • Time of concentration (Tc): 45 min pre-development, 15 min post-development (used for both sub-areas). SCS triangular unit hydrograph; 5-minute time step.
  • 24-h depths: 110, 200 and 350 mm for 2-, 10- and 100-yr (the same 10- and 100-yr values as Clause 2.11).
  • Shorter durations: P(t) = P24·(t/24)^0.40, an assumed ratio set and not Annex 2B.
  • Longer durations: 48-h and 72-h depths taken as 1.25 and 1.40 × P24, laid out per Clause 2.9.2.
  • Storage: vertical-walled, 2,500 m² plan area.
  • Outlet, sized so that drawdown is met with the low-flow orifice 50% blocked (Clause 4.8.3). Annex 4C shows the trial outlet that failed this check.
    • Stage 1: 170 mm orifice at the invert.
    • Stage 2: 460 mm orifice with its invert 0.53 m above the floor.
    • Stage 3: none needed, because the 100-yr cap is met by Stages 1 and 2.

Results (discharges in L/s; storage in m³):

Table 4.2 — Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)

Duration (h) 2-yr pre 2-yr post, detained 10-yr pre 10-yr post, detained 100-yr post, uncontrolled 100-yr post, detained 100-yr storage used 10-yr drawdown, 50% blocked (h)
1 4 15 51 28 922 42 1,426 31.3
2 14 20 84 34 961 79 1,911 32.1
3 19 22 104 37 981 139 1,999 32.8
6 32 25 150 41 1,010 194 2,154 34.2
12 127 30 302 46 1,074 276 2,512 39.0
24 149 32 327 49 1,081 320 2,766 45.3
48 173 34 349 82 1,087 343 2,913 44.8
72 180 34 356 84 1,089 343 2,911 44.7

How to read it:

  • 100-yr cap. The cap is the largest pre-development 10-yr peak, 356 L/s (72 h). Every 100-yr detained peak is at or below it; the largest is 343 L/s.
  • 2-yr cap. The site is flood-sensitive, so the 2-yr cap is the largest pre-development 2-yr peak, 180 L/s (72 h; Clause 4.5.3.1). The largest 2-yr detained peak is 34 L/s. At 1, 2 and 3 hours the detained 2-yr peak is above the pre-development peak of the same duration (15 against 4 L/s, 20 against 14 L/s, and 22 against 19 L/s). That comparison is not required here. It would be for a site under Clause 4.5.2, and Clause 4.5.5.2 would then apply.
  • Governing storage. Storage is governed by the 48- and 72-hour storms: 2,913 m³, which is 0.146 m³ per m² of site, at a maximum depth of 1.17 m. A design that checked only the critical-duration peak storm (1–3 h here) would have provided about 2,000 m³, roughly two-thirds of what is needed.
  • Drawdown. With the low-flow orifice 50% blocked (Clause 4.8.3), 90% of the 10-yr storage drains in at most 45.3 h (the 24-hour storm), within the 48 hours of Clause 4.7. A 120 mm orifice would drain it in about 42 h when clean but 54 to 75 h when half blocked, so it fails. Annex 4C shows that trial and the routing step by step.
  • Retention credit. With an illustrative retention depth of 40 mm, RRV = 552 m³, computed for each sub-area (Clause 3.9.4). Modelled as filling from the start of the storm with no infiltration during it, the retention reduces the 24-hour storage by 138 m³ and the 48- and 72-hour storage by 7 m³ or less. The credit under Clause 4.4.6 is therefore effectively zero for this site.

The order of magnitude, about 0.15 m³ per m² of site, is consistent with the indication in Clause 2.11.

2026-11-01T10:14:56.974241 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 5 10 15 20 25 30 35 40 Time from start of 24 h design storm (h) 0 200 400 600 800 1000 1200 Discharge (L/s) Release cap = max pre-development 10-yr peak over all durations (356 L/s) Uncontrolled peak 1081 L/s Detained: peak later and flatter, recession prolonged (volume unchanged) Illustrative — not design values. 2 ha site, 24 h storm, AMC III, mixed-frequency rule Post-development 1% AEP (100-yr), uncontrolled Post-development 1% AEP (100-yr), detained Pre-development 10% AEP (10-yr)

Figure 4.1 — Pre-development 10-yr, post-development 100-yr uncontrolled and detained hydrographs for the 24-hour storm of the illustrative example (Clause 4.6.7). Illustrative — not design values. Original drawing for this Manual, adapted from the pre/post-development hydrograph concept in MARC/KC APWA Section 5600 and the Georgia Stormwater Management Manual (2016).

Commentary. Figure 4.1 shows what detention does and does not do. It cuts and delays the peak. It does not reduce the volume: the area under the detained curve equals the area under the uncontrolled curve, more than twice the pre-development 10-yr volume. The extra volume leaves the site over many hours after the storm. That prolonged release can coincide with the peak of the larger catchment downstream (Clause 4.16), and it must still drain when the outfall is tide-locked (Chapter 5).


4.7 Drawdown

4.7.1 Detention. At least 90% of the maximum volume stored in the 10% AEP (10-yr) storm of each duration shall be released within 48 hours of the time of maximum storage, by gravity, with the tailwater of Clause 4.6.6.

4.7.2 Water quality volume. The WQv shall be released over not less than 24 hours and not more than 48 hours (Chapter 8).

4.7.3 Retention. Retention storage shall be emptied within 72 hours by infiltration or reuse (Clause 4.4.5).

4.7.4 Tidal outfalls. Where gravity drawdown is prevented by tide for part of each cycle, the 48-hour limit applies with the tidal tailwater modelled. Where it cannot be met by gravity, pumped drawdown shall be provided under Clause 5.12.

Commentary. KC APWA 5600 (2006) required dry basins to release at least 80% of storage within 24 hours of the inflow peak and to empty within 72 hours. Singapore PUB requires detention to be restored within 4 hours. The 48-hour, 90% rule is longer than PUB's because Uttarakhand storage must hold multi-day volumes. It is still short enough that a basin filled by one SW monsoon depression will have most of its volume back before the next, which in June 2013, when Dehradun recorded 1,094.8 mm in the month and 370.2 mm in the 24 hours of 17 June (IMD) followed within days.


4.8 Outlet structures

4.8.1 General. Primary outlets shall be:

  • unattended, with no moving parts, valves or pumps, except where Clause 5.12 permits pumped drawdown;
  • accessible for inspection and cleaning from the surface without confined-space entry, where practicable; and
  • built of durable materials. In coastal areas these shall be corrosion-resistant (Clause 4.12.5).

4.8.2 Minimum orifice. No control orifice shall be smaller than 50 mm in diameter, or 50 mm in least dimension for a slot.

4.8.3 Trash racks and screens. Every orifice and weir shall be protected by a trash rack or screen. The rack shall:

  • have a clear bar spacing no greater than half the smallest opening it protects, and not less than 25 mm;
  • have a clear open area at least 10 times the area of the opening it protects;
  • be inclined, or set as a cage around the riser, so that debris rises with the water and does not pin against the bars;
  • be removable or hinged for cleaning; and
  • for routing, be assumed 50% blocked at the low-flow orifice when checking drawdown.

4.8.4 Anti-vortex devices. Riser crests and orifices that may run under more than 1.5 times their diameter of head shall have an anti-vortex plate or hood (Figure 4.2).

4.8.5 Outlet barrels. Outlet barrels through embankments shall:

  • be at least 300 mm in diameter (Chapter 6);
  • have watertight joints;
  • have a filter diaphragm or seepage collars over the length within the embankment; and
  • have an energy-dissipating outfall (Chapter 9).

4.8.6 Isolation. Facilities serving more than 1 ha shall have a means of isolating the outlet for maintenance, such as a stop-log slot or penstock. In normal service it shall be left fully open.

Commentary. The 50 mm minimum is smaller than the 75 mm (3 in) of KC APWA 5600 (2006), so the trash-rack requirements are correspondingly stricter. The ratios in 4.8.3 (bar spacing at half the opening, open area 10 times the opening, 50% blockage for the drawdown check) have no direct precedent and are set by this Manual. The blockage factor matches the 50% grate clogging factor for sag inlets in Chapter 6. Indian urban drains carry heavy loads of solid waste, so a low-flow orifice without an effective rack will block within one season.

Figure 4.2 — Detention storage stack and multi-stage outlet (schematic) Schematic cross-section of a detention basin showing stacked storage zones (permanent pool, water quality volume, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and a multi-stage riser outlet with trash rack, anti-vortex plate, outlet barrel and emergency spillway. Not to scale. Storage stack and multi-stage outlet — schematic section, not to scale Embankment crest Max level, spillway flowing (outlet blocked) Emergency spillway crest 1% AEP (100-yr) max water level 10% AEP (10-yr) max water level 50% AEP (2-yr) max water level Top of water quality volume (WQv) Permanent pool (wet basin only) Basin floor / pool bottom Spillway surcharge (Clause 4.9) 100-yr detention zone 10-yr detention zone 2-yr / channel-protection zone WQv — 24–48 h release (Ch 8) Permanent pool / retention Freeboard ≥ 0.3 m Spillway crest (offset in plan) 1 2 3 4 5 6 7 Key 1 Stage 1 low-flow orifice (≥ 50 mm, Clause 4.8.2) — releases WQv over 24–48 h 2 Stage 1 second orifice — with 1, controls 50% AEP (2-yr) release 3 Stage 2 orifice or weir slot — controls 10% AEP (10-yr) release 4 Stage 3 riser crest / overflow grate with anti-vortex plate — controls 1% AEP (100-yr) release 5 Trash rack enclosing all openings (Clause 4.8.3) 6 Seepage collar or filter diaphragm on outlet barrel 7 Outlet barrel, energy dissipation and outfall apron Levels and zone thicknesses are diagrammatic only.

Figure 4.2 — Detention storage stack (permanent pool, WQv, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and multi-stage riser outlet. Schematic, not to scale. Original drawing for this Manual, adapted from the multi-stage outlet and storage-zone concepts in MARC/KC APWA Section 5600 (2006, 2025.01) and the Mile High Flood District Urban Storm Drainage Criteria Manual, Volume 2 (full-spectrum detention).


4.9 Emergency spillway, freeboard and embankment safety

4.9.1 Spillway capacity. Every detention facility formed wholly or partly by an embankment, or whose overflow would reach buildings, shall have an emergency spillway that passes the 1% AEP (100-yr) peak inflow:

  • with the primary outlet assumed fully blocked;
  • with the facility full to the spillway crest at the start of the storm; and
  • with at least 0.3 m freeboard from the maximum water level to the embankment crest.

4.9.2 High-hazard facilities. A facility is high-hazard if its failure or overflow could:

  • endanger life;
  • flood a habitable building or critical facility; or
  • close an arterial road.

High-hazard facilities shall also be checked for the 0.2% AEP (500-yr) peak inflow under the conditions of 4.9.1, with the embankment not overtopped.

4.9.3 Spillway crest. The spillway crest shall be at or above the 1% AEP maximum water level from routing with the primary outlet working. The recommended clearance is 0.15 m.

4.9.4 Spillway location. The spillway shall be:

  • on natural ground or a reinforced section, not on fill, unless protected against erosion for the full design flow;
  • discharging to the 1% AEP overland flow path of Chapter 6; and
  • placed so that its flow does not reach a building.

4.9.5 Underground and enclosed facilities. Tanks, vaults and podium storage shall have an overflow route that operates when the outlet is blocked. The route shall carry the 1% AEP inflow to the overland path without surcharging any building, basement or lift pit.

4.9.6 Embankments.

  • (a) Embankments more than 2 m high (measured from the downstream toe to the crest) shall be designed by a qualified geotechnical engineer. The design shall include stability, seepage and settlement analysis.
  • (b) Side slopes shall be no steeper than 3H:1V on any face that is mown or accessible to the public. Slopes shall be flatter where Clause 4.15 requires.
  • (c) Embankments shall have:
    • a crest width of at least 3 m;
    • compacted, engineered fill with a core or cut-off where required by the seepage analysis; and
    • no trees or large shrubs.
  • (d) An embankment structure that falls within the Dam Safety Act, 2021 is subject to that Act in addition to this Manual.

4.9.7 Excavated facilities. Facilities wholly below the surrounding ground, with no embankment, need not meet 4.9.6. They shall still meet 4.9.1, with the overflow route treated as the spillway.

Commentary. The spillway criterion (1% inflow, outlet blocked, basin full, 0.3 m freeboard; 0.2% for high hazard) follows the KC APWA 5600 (2006) rule: the spillway passes the 1% storm with 1 ft (0.3 m) freeboard to the top of the dam, assuming zero storage and a clogged primary outlet, with the crest at least 0.5 ft (0.15 m) above the 1% maximum water surface. KC designed dams above 10 ft (3 m) to SCS TR-60 Class C. The 2 m embankment trigger, the 3H:1V slope (KC wet ponds), and the 3 m crest width have no direct precedent and are set by this Manual.


4.10 Facility types

4.10.1 General. Any storage that meets Clauses 4.5 to 4.9 may be used. Surface storage that is visible and can be inspected without confined-space entry is preferred. Storage shall not be placed in a habitable basement or in any space whose flooding would endanger life.

4.10.2 Underground tanks and vaults.

  • (a) Gravity outlet is required where the receiving drain allows it. Pumped outlets are permitted only under Clause 5.12, with a registered maintenance declaration (Chapter 10).
  • (b) Access openings shall be provided over the outlet chamber and over every inlet. In tanks over 500 m², they shall be no more than 30 m apart.
  • (c) The floor shall fall at least 1% to a sump at the outlet, with a sediment pocket below the low-flow orifice invert.
  • (d) The tank shall be ventilated.
  • (e) Inlets shall pass through a silt trap or gross pollutant trap (Chapter 8).
  • (f) Flotation and groundwater ingress shall be checked under Clause 4.12.

4.10.3 Rooftop detention.

  • (a) It is permitted on flat roofs designed for the full ponded load with the outlet blocked. The ponding depth shall not exceed 150 mm unless a structural engineer certifies a greater depth.
  • (b) Each roof outlet shall have a flow-control ring or weir with a certified rating, and every roof area shall have at least one overflow scupper, independent of the controlled outlets, that passes the 1% AEP inflow.
  • (c) Roofs used for RWH collection may also provide rooftop detention. The detained volume is released through the control, not into the RWH sump.

4.10.4 Podium and landscape-deck detention.

  • (a) It is permitted above ground level or above a basement car park, provided the structure is designed for full saturation and ponding, and waterproofed.
  • (b) The release, overflow and safety rules for rooftop detention (4.10.3) apply.

4.10.5 Parking-lot detention.

  • (a) It is permitted only on surface parking. Ponding depth shall not exceed:
    • 200 mm in the 10% AEP storm and 300 mm in the 1% AEP storm at any parking bay;
    • zero on accessible routes, ramps and pedestrian crossings; and
    • zero in the 10% AEP storm on fire-tender access routes.
  • (b) Signs shall warn that the area floods.
  • (c) Ponding shall not reach a building wall unless the wall is waterproofed above the 1% level plus freeboard (Chapter 6).

4.10.6 Multi-use detention (parks, playfields, open space reservation).

  • (a) Open space land may be used for detention, provided its primary use remains available in at least the 50% AEP storm.
  • (b) The storage areas shall be graded to drain fully within the times of Clause 4.7.
  • (c) A low-flow channel or underdrain shall carry dry-weather and frequent flows, so that the park is not waterlogged.
  • (d) The depth and slope limits of Clause 4.15 apply.
  • (e) Play equipment and seating shall be placed above the 10% AEP level.

4.10.7 Ponds and wet basins.

  • (a) A permanent pool shall be at least 1.2 m deep over most of its area to discourage weed growth and mosquito breeding, with a vegetated safety bench at the edge (Clause 4.15).
  • (b) Only storage above the permanent pool counts as detention.

Commentary.

  • The rooftop depth (150 mm) and parking depths (200 and 300 mm) have no direct precedent. This Manual sets them so that a blocked outlet is noticed before it becomes dangerous.
  • The 1.2 m pool depth equals the 4 ft minimum permanent pool of KC APWA 5600 (2006). This Manual adopts it mainly for weed and mosquito control.
  • Pumped detention tanks need maintenance declarations in Singapore (PUB Addendum No. 3, April 2025). This Manual adopts the same approach through Chapter 10.
  • Using open space for multi-use detention fits the Bye-laws 2011, under which layouts keep parks and open space and plant 25–125 trees per hectare (the percentage of open space for a layout in the Uttarakhand text was not checked for this Manual [TBC]), and the Unified Zoning Regulations 2025, which allow parks and plantation in the green buffer of a Conservation Use Zone. In the Doon valley, on the bhabar and on the plains of Haridwar, Roorkee and the terai, a detention area graded into the open space below the level of the road keeps it pervious and usable, which is what 4.10.6 requires, and on the Doon Gravels and the bhabar it can also infiltrate under Clause 4.11. On a hill site the position is different. Ground on a natural slope of more than 10°, a terrace held up by a retaining wall, and land within twice the height of a cut or wall downslope of it are not to be used for ponding, because water held there soaks into the slope (hill infiltration rule, Clause 4.11). On such sites, detention is provided in lined tanks, open or closed, with an orifice outlet and an overflow to a lined drain, on rooftops and podiums under 4.10.3 and 4.10.4, or on a level open space only where it stands on rock or on ground that the geotechnical certificate of Clause 4.11 covers; an excavated pond or basin on a slope is not accepted. Four kinds of land are not open space for this purpose. A taal, khal or naula on the land is preserved under step 1 of Clause 4.3.1 and modelled as a water surface (Clause 3.3.2(e)) that starts at its full level (Clause 3.12.5), so only its flood storage above that level can count, and only as Chapter 7 allows. The strips of bye-law 4.4(III), 30 m from a river or lake, 10 m from a spring and 5 m from a nala, are kept for dense plantation with no construction, and the 30 m buffer of the Unified Zoning Regulations 2025 is a Conservation Use Zone; land within the prohibited (25-year) or restricted (100-year) zone of a floodplain notified under the Flood Plain Zoning Act 2012 is flood land already. Land in the hydraulic corridor of a rao, gadhera, nala, taal or river under Chapter 7 is corridor or flood land: water reaches it first, so it is not counted as detention for the development beside it (Chapter 7). And a recharge area kept open on purpose, such as the Sukhatal basin above Naini lake, which the High Court has kept free of construction (2022, as reported) and through which about half of the lake's subsurface recharge is estimated to enter (NIH, as cited by NITI Aayog, 2018), or a mapped spring-recharge area under Clause 4.11, is not graded or paved for detention.

4.11 Rainwater harvesting versus detention accounting

4.11.1 No double counting. RWH storage (sumps, tanks, recharge pits and wells provided under the RWH mandate) shall not be counted as detention.

4.11.2 RWH sumps assumed full. For all routing under this chapter, RWH sumps and tanks shall be assumed full at the start of every storm, in every season. Their overflow shall be routed to the detention facility, or directly to the outfall if it bypasses detention. In the latter case the bypass flow counts against the PSD.

4.11.3 Combined tanks. A single tank may provide both RWH and detention only if:

  • (a) the detention zone lies wholly above the RWH overflow level;
  • (b) the detention zone is drained by its own gravity control orifice set at the RWH overflow level, meeting Clauses 4.7 and 4.8;
  • (c) no pump, valve or user action can hold water in the detention zone; and
  • (d) the two zones and the orifice level are shown on the drawings and in the maintenance declaration.

Only the volume between the RWH overflow level and the detention overflow level counts as detention.

4.11.4 Recharge structures. Recharge pits, trenches, shafts and wells may count as retention (not detention) if they meet Clauses 4.4.3 to 4.4.5. In particular, the seasonal high groundwater table shall be at least 1.0 m below their base. In the routing they are treated under Clause 4.4.6 with the groundwater level for the SW monsoon season.

4.11.5 RWH remains mandatory. Nothing in this chapter reduces the RWH requirement of bye-law 6.5 of the Bye-laws 2011, the guidelines of the Central Ground Water Authority where they apply, any condition of a building or development permission, or any rainwater harvesting rule or direction of an approving authority.

Commentary. RWH in Uttarakhand rests on bye-law 6.5 of the Bye-laws 2011, "rainwater harvesting standards". Except in areas with a waterlogging problem, rainwater harvesting is mandatory for every permitted construction, of any land use, with a ground coverage of 125 m² or more (6.5(I)). The storage required is at least 2.0 m³ for a coverage of up to 250 m², 3.5 m³ for a coverage of up to 400 m², and a further 0.5 m³ for each further 50 m² of coverage or part of it (6.5(II)). On a plot of more than 400 m² where groundwater recharge is provided by a bore well, a recharge pit, a well or hand pump, or a trench, one-third of that storage is required (6.5(III)). The provision is to be confirmed on the building plan before approval, and drainage and storage works are not counted in the ground coverage (6.5(IV)); rainwater storage structures, including underground tanks, are among the works exempt from permission. Over the covered area, the storage of 6.5(II) is about 8–16 mm of rain: 2.0 m³ is 16 mm over 125 m² and 8 mm over 250 m², 3.5 m³ is about 9 mm over 400 m², and each further 0.5 m³ per 50 m² is 10 mm; with recharge on a plot of more than 400 m², the storage falls to about 3–5 mm. The MDDA-hosted draft "Amendment 2017" would apply the rule to plots of more than 100 m² and require recharge on plots of 500 m² or more (§§9.1 and 9.2), but it is a draft only (Commentary to Clause 4.1). The Uttarakhand Ground Water Act 2016, whose section 20 let the State order rainwater harvesting for recharge in notified areas, was repealed by Act 11 of 2017, so no groundwater law requires recharge. MDDA is reported to have ordered rainwater harvesting in residential projects to be improved within a week in June 2024, and to require recharge pits to be built because approved plans often show provisions that are not built (as reported). Bye-law 6.5 sets no drawdown, no infiltration test, no depth to the water table, no rule that a tank be empty before a storm, and no restriction on recharge on slopes, near springs or on wet ground; no rule against soak pits or recharge pits on slopes was found in any Uttarakhand instrument. This Manual credits these structures against its own retention requirement (Clause 4.4) as follows:

  • An RWH storage tank under 6.5(II) is RWH storage. It is not detention (Clause 4.11.1), and it is assumed full at the start of every storm (Clause 4.11.2), because in the monsoon it is full after the first heavy rain. A tank may also provide detention only if it is built as a combined tank under Clause 4.11.3, with a detention zone above its RWH overflow level that drains through its own orifice; only that zone counts.
  • An RWH tank counts toward the retention requirement of Clause 4.4 only to the extent that it is emptied within 72 hours by a continuous non-potable use, such as toilet flushing or washing, demonstrated under Clause 4.4.3; watering a garden is not a continuous use in the monsoon. The tank is then modelled under Clause 4.4.6 like any other retention practice. On hill sites, where infiltration is barred, this storage and reuse is the way retention is provided.
  • The bore wells, recharge pits, wells and trenches of 6.5(III) count as retention only where they meet Clause 4.11.4: they are credited only to the extent that they drain within 72 hours at half the rate measured in a site test (Clauses 4.4.3 and 4.4.5), with their base at least 1.0 m above the seasonal high water table, and the credit is found by routing under Clause 4.4.6, not by deducting their volume. They are also subject to the hill infiltration rule below.
  • Hill infiltration rule. No deliberate infiltration practice (soakaway, soak pit, recharge pit, shaft or well, infiltration trench, or permeable paving with an exfiltrating base) shall be built or credited: on natural ground sloping more than 10°; on a mapped landslide or creep zone, or within the landslide-prone setting of bye-law 4.4(IV)–(V); on colluvium, slide debris or moraine, whatever its slope; or upslope of a cut slope or retaining wall within a distance of twice the height of the cut or wall — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope. On such sites roof runoff goes to the storage tanks of bye-law 6.5, with overflow to a lined drain that discharges through a sediment trap to a stable natural channel (or to the lake through a trap in a lake town), never onto an unprotected slope. On these sites, retention is provided by storage and reuse, and detention by lined tanks, not by ponds or basins on the slope (Commentary to Clause 4.10). The 1.0 m groundwater separation of Clause 4.4.3 does not make an infiltration practice acceptable on a slope: perched water and pore pressure in a slope are the hazard, not the depth to the water table.
  • Recharge first on the Doon Gravels and the bhabar. The State's stage of groundwater extraction was 53.54% in the 2024 assessment, with 16 of 20 assessment units safe and 4 semi-critical (CGWB, Dynamic Ground Water Resources of Uttarakhand 2024); the semi-critical units in the assessments of 2020 and 2022 were Bahadrabad and Bhagwanpur in Haridwar, Haldwani in Nainital and Kashipur in Udham Singh Nagar, all on the bhabar and its fringe, and the names of the four units of 2024 were not found [TBC]. The bhabar recharges the terai aquifers, whose auto-flow zone has receded as the bhabar has been built over (NAQUIM, Udham Singh Nagar, 2016), and the Doon Gravels recharge the aquifers on which Dehradun draws. On the Doon Gravels and the bhabar fans, on ground to which the hill infiltration rule does not apply, retention shall be provided by recharge before reuse or detention wherever site tests allow, through a silt trap, a filter and a first-flush diverter ahead of the recharge structure, and with a hydrogeologist's check of the target zone.
  • No recharge credit on wet ground. On terai land where the seasonal high water table is within 1 m of the surface, wells flow under artesian pressure (auto-flow) or the land is waterlogged, which bye-law 6.5(I) already exempts, on the floodplains and low terraces of the rivers, on the margins of the taals and reservoirs, and wherever the seasonal high water table is within the 1.0 m separation of Clause 4.4.3, no recharge or infiltration practice earns retention credit; storage and reuse, detention and conveyance govern there.
  • Springs and lake recharge areas. Springs supply most of the water in many hill blocks, from about 70% in Chamoli to about 84–87% in some blocks (GBPNIHE, Water at a glance: Uttarakhand, 2019), and the number of working springs round Almora fell from 360 to 60 over 150 years (NITI Aayog, 2018). Within 10 m of a spring the bye-laws allow no construction (4.4(III)(i)), and the Unified Zoning Regulations 2025 place streams ("धाराएँ", a word that can also mean spring spouts) in the Conservation Use Zone. In the recharge area of a naula or dhara, where it has been mapped, and in a lake recharge area such as the Sukhatal basin above Naini lake, only clean roof runoff, passed through a filter, may be infiltrated; road and parking runoff shall not be infiltrated, the area shall not be paved, and no runoff that may be polluted shall be infiltrated upslope of a naula or dhara.
  • Nitrate, arsenic and uranium. Nitrate above 45 mg/l was found in 17.39% of the 207 samples of the 2024 assessment, in Almora, Dehradun, Haridwar, Nainital and Udham Singh Nagar districts, arsenic above 10 ppb in samples from Almora, Haridwar and Udham Singh Nagar, and uranium above 30 ppb in one sample from Haridwar (CGWB, 2024). In these districts the hydrogeologist's check shall report the nitrate, arsenic and uranium of the target aquifer before a recharge bore or shaft is credited, and untreated runoff shall not be put into a bore or shaft there; retention is then provided by surface infiltration through a soil or filter layer, or by storage and reuse (Chapter 8).
  • Everywhere, road and parking runoff shall be recharged only through a surface infiltration practice with a filter, such as a vegetated basin or trench, never directly into a bore or well, and runoff from a rao or nala that carries sewage, as the Rispana and the Bindal do in part, shall not be recharged at all.

In the hills, water put into the ground does not stay where it is put. At the Balia Nala below Nainital, recharge of the perched aquifer from the catchment drains and from buildings raised the pore pressure and reduced the cohesion of the slope (Arabian Journal of Geosciences, 2022); at Joshimath an IIT Roorkee report found internal erosion by subsurface drainage, which "can be minimized by controlling infiltration of water", and the Mishra Committee of 1976 had asked for soak pits to be closed (both as reported); and Nainital's British drain network was built after the landslip of 18 September 1880, which followed about 33 inches of rain in three days (as reported). On the terai a recharge pit sits in the water table in the monsoon, and in any town an RWH tank is full after the first heavy rain. Treating RWH as detention would therefore credit storage that does not exist when it is needed. That is why this Manual assumes RWH tanks are full at the start of every storm. Applying the assumption to every season keeps one simple rule. The combined-tank provision (4.11.3) lets an owner build one structure, as long as the detention part is empty when the storm arrives. The hill infiltration rule, the recharge-first rule for the Doon Gravels and the bhabar, the bar on recharge credit on wet terai land, the spring and lake-recharge rules, the nitrate, arsenic and uranium checks and the pre-treatment and road-runoff rules are set by this Manual. No Uttarakhand source sets a slope or distance threshold for infiltration: the 10° limit is the upper bound of the lowest slope band (up to 10°) used for risk classes in the bye-law text hosted by MDDA, below the 26.5° and 30° limits on building, and the distance of twice the height of a cut or wall is set by this Manual as a precaution, pending guidance from ULMMC or a geotechnical study [TBC].


4.12 High-groundwater and sandy coastal sites

4.12.1 Design groundwater level. Each site in the terai below the spring line in Udham Singh Nagar, Haridwar and the south of Nainital district, where wells flow under artesian pressure and the water table stands 1–7 m below ground, the floodplains and low river terraces of the Ganga, the Solani, the Song, the Gaula, the Kosi, the Kichha, the Kalyani and the Sarda and of the rivers of the inner valleys, the margins of Naini lake, Bhimtal and the other taals, the margins of the Tehri, Dakpathar, Asan, Baur, Haripura and Tumaria reservoirs and barrage ponds, and hill sites with perched water, such as Joshimath, or any area where the groundwater table lies within 3 m of the surface at any time of year shall establish a design groundwater level (DGWL) for the facility. The DGWL is the seasonal high level during or after the SW monsoon, from:

  • (a) site piezometer readings over at least one full June–November season; or
  • (b) where (a) is not available, the higher of the CGWB or Irrigation Department record for the nearest observation well, plus 0.5 m, and the design flood level of any adjacent river, rao, gadhera, nala or taal.

For the flotation check of 4.12.3 at sites in the terai, the river terraces and floodplains, and the taal margins, where (a) is not available, the DGWL shall be taken as existing ground level.

4.12.2 Lined storage. Where the DGWL is less than 1.0 m below the base of a storage facility:

  • (a) the facility shall be watertight (lined or of watertight concrete), and no infiltration credit applies (Clause 4.4.4); or
  • (b) if unlined, the volume below the DGWL shall not be counted as detention, and groundwater inflow shall be added to the routed inflow.

4.12.3 Uplift and flotation. Every below-ground tank, vault, lined pond or chamber shall be checked for flotation:

  • with the facility empty;
  • with groundwater at the DGWL; and
  • for coastal sites, with groundwater also at the major-system tailwater level of Chapter 5, where that is higher.

The factor of safety against uplift, counting only permanent dead loads and ignoring wall friction unless supported by geotechnical design, shall be at least 1.2. Anchoring by ballast, toe extensions or tension piles may be used.

4.12.4 Shallow and above-ground storage preferred. On sites where the DGWL is within 1.5 m of ground, storage should be provided above ground where possible: rooftop, podium, landscape or surface storage. Deep tanks should be avoided.

4.12.5 Durability. Concrete and metal parts in contact with saline or brackish groundwater or tidal water shall be designed for the exposure class appropriate to coastal conditions under IS 456:2000. Outlet fittings, trash racks and gates shall be of stainless steel, HDPE, FRP or another corrosion-resistant material.

4.12.6 Sandy soils with deep groundwater. Where the DGWL is 1.0 m or more below the base, infiltration retention in sandy soils is encouraged. The design infiltration rate of Clause 4.4.3 applies, and the Chapter 8 requirements on pollution of shallow aquifers shall be met.

Commentary. Uttarakhand is landlocked, so the coastal provisions of this clause, the tidal water levels of 4.12.1 and 4.12.3, do not apply in the State, and saline groundwater was not found (no sample above the limit for electrical conductivity in the 2024 assessment; CGWB, Dynamic Ground Water Resources of Uttarakhand 2024), so the exposure provisions of 4.12.5 apply only where a test at the site shows it. Groundwater lies at three kinds of depth. On the Doon Gravels and the bhabar it is deep: 2.29–71 m below ground in the Doon before the monsoon (CGWB, Dehradun brochure, 2011) and 40–75 m in the bhabar, with perched water within 10 m in places (CGWB, Nainital brochure, 2010). On the terai it is shallow: 2.09–7.08 m below ground before the monsoon and 1.73–6.89 m after it, with more than 2,000 artesian wells whose free-flowing heads reach 8.69 m above ground (CGWB, Udham Singh Nagar brochure), and in Haridwar district "flowing wells" are common in the lower piedmont plain (CGWB, Hardwar brochure, 2009). In the hills it occurs as perched bodies in weathered rock and colluvium: of the 225 wells measured in January 2025, 28.44% stood within 5 m of the surface, the shallowest 0.52 m below ground at Joshimath (CGWB, Water Level Bulletin, January 2025). The terai, the floodplains and low terraces of the rivers, the margins of the taals and of the reservoirs and barrage ponds, and hill sites with perched water are the wet cases. There an unlined tank fills with groundwater before the storm, and an empty lined tank can float, especially when a river in flood, a reservoir or barrage pond at its full level or a taal at its maximum level raises the water table beside it. The design groundwater level of 4.12.1(b) therefore takes the design flood level of the adjacent river, rao, gadhera, nala or taal where that is higher than the well record, and on the terai, the floodplains and low terraces and the taal margins it is taken as existing ground level for the flotation check unless piezometers show otherwise. Where an excavation reaches, or comes within 1 m of, the clay that confines an auto-flow aquifer of the terai, the tank shall also be checked for uplift with the groundwater at the artesian head measured in the nearest flowing well, which may stand above ground, and the excavation shall not be carried through the clay. On a hill site, a deep tank is not preferred even where groundwater is deep, because a leaking tank on a slope is an infiltration practice by another name: storage on a slope shall be lined and watertight, and its leakage and overflow taken to a lined drain (hill infiltration rule, Clause 4.11). The June–November monitoring season of 4.12.1(a) is set by this Manual to cover the SW monsoon and the post-monsoon high that the CGWB measures in November: a reading taken in May or June understates the design level. No monsoon water-table depths for individual town sites in Rudrapur, Kashipur, Kichha or Haridwar, and no map of the seasonal high water table of the terai, were obtained [TBC]. The factor of 1.2, the 0.5 m allowance, the "ground level" default for the terai, the floodplains and the taal margins, and the artesian-head check have no direct precedent; this Manual sets them because no published site-scale seasonal groundwater depths for Uttarakhand were found during research.


4.13 Regional detention and fee-in-lieu

4.13.1 Where permitted. In a basin covered by a Basin Stormwater Master Plan approved under Chapter 11, a development may meet all or part of its detention requirement through:

  • (a) a regional detention facility identified in the plan; or
  • (b) a fee-in-lieu paid toward restoration of taal or tank storage identified in the plan.

4.13.2 Conditions. Regional detention or fee-in-lieu shall be accepted only where:

  • (a) the regional facility or restored tank is operational, or is funded and scheduled to be operational within 3 years. Until then, interim on-site detention is required.
  • (b) the conveyance from the site to the facility carries the 1% AEP post-development flow without increasing water levels at buildings or roads between them (Chapter 5);
  • (c) the storage credited at a tank is the flood storage only. This is the volume between full tank level (FTL) and the maximum water level the bund and surplus weir can safely hold, plus any volume below FTL that a notified operating rule commits to empty before the SW monsoon. Storage below FTL that is held for irrigation or supply through June to September shall not be credited.
  • (d) the tank meets Chapter 7: surveyed FTL, a documented operating rule, and a maintained surplus weir;
  • (e) the site still provides retention (Clause 4.4) and WQv treatment (Chapter 8) on site; and
  • (f) in flood-sensitive catchments, the regional facility meets the mixed-frequency rule for its whole contributing area.

4.13.3 Fee. The fee-in-lieu shall be computed as:

Fee = (detention volume required on site under Clause 4.6, m³) × (unit rate, ₹/m³, notified by the Authority)

The unit rate shall include land, construction and 10 years of maintenance. Fees shall be held in a ring-fenced basin account and spent only on the facilities named in the plan.

4.13.4 Ledger. The Authority shall keep a public ledger of:

  • detention volume credited to each regional facility;
  • volume delivered; and
  • fees received and spent.

Commentary. The Malaysian DID (2008) checklist favoured community ponds over on-site detention for sites above 0.1 ha. Studies of on-site detention show that its benefit depends on location and fades with distance downstream (Colorado State University thesis; McEnroe for Kansas City), and that a pond low in the catchment can synchronise with the main-stem peak (Water 2016). Regional storage therefore has to be sited by basin modelling, not simply aggregated.

Uttarakhand has no tank or lake Act, and no taal, lake or reservoir in its towns was found to be operated for flood control under a documented rule. The one taal with an operating rule, Naini lake, is regulated to protect a slope, not to store floods: its five sluice gates at Tallital, installed in 1888, are opened under rules of the Hill Slide Committee of 1927 that limit the opening while the lake is low, to protect the Balia ravine below the outlet, the lake is held up to 12.5 ft on the PWD gauge, and the sluices are sealed on 15 October (NIH, Water Balance of Lake Nainital); the lake rose to a record 12.2 ft and overflowed on 19 October 2021 (as reported). The bye-laws keep construction 30 m back from every lake (4.4(III)(iii)), the Unified Zoning Regulations 2025 place lakes and ponds in the Conservation Use Zone, and the High Court has stopped construction on the Sukhatal lakebed (2022, as reported). The State Wetland Authority, constituted on 16 October 2019, has 192 wetlands on the national atlas, 149 of them ground-truthed by October 2025, but none notified under the Wetlands Rules 2017 (State Wetland Authority, status report of 17 October 2025); the State's only Ramsar site is the Asan Conservation Reserve, 444.4 ha at the confluence of the Asan and the Yamuna above the Asan barrage, designated on 21 July 2020. The State's regional storage is of five kinds: the Kumaon taals, Naini lake, Bhimtal, Naukuchiatal and Sattal; the khals, small rain-fed ponds on the ridges of the hills; the reservoirs and barrages, Tehri and Koteshwar (THDC), the Dakpathar and Asan barrages (UJVN), the Bhimgoda and Virbhadra (Pashulok) barrages on the Ganga, and the Gaula barrage and the Baur, Haripura and Tumaria reservoirs of the Irrigation Department; the Asan wetland; and the river floodplains, which the Flood Plain Zoning Act now protects reach by reach. Four points follow:

  • A taal on the record may not be a working taal, and a taal in the hills is not a detention basin. No inventory of the taals, khals and ponds within the Nagar Nigams and Nagar Palika Parishads, with their beds, bunds and outlets, was found [TBC]. A taal is credited only after a survey shows its bed, bund or rim and outlet, and only for the storage above its full level; Naini lake, held at its maximum level until 15 October with an outflow limited by the 1927 rules, offers none, so every site in its catchment provides its full detention on site. A recharge area such as the Sukhatal is not storage for detention (Commentary to Clause 4.11).
  • The reservoirs and barrages are not spare capacity for a site. They are held for power, irrigation and supply through the monsoon, so their storage below full level is not credited (Clause 4.13.2(c)); their releases are set by their operators for the whole river; and storm water spilled to a reservoir or barrage pond, or to a river below one, can be relied on only with the written agreement of the operator, THDC, UJVN or the Irrigation Department, for a stated flow and level.
  • A pond or check dam in the bed of a rao or gadhera is not regional detention unless it is designed for debris. The streams of the Doon and the hills carry boulders and sediment in every large storm, and a basin in their bed fills with debris in one event; such a facility is credited only for the storage left after the sediment and debris volume of Chapter 6, with a debris rack or trap at its inlet, a geotechnical check of its bund and abutments, its failure path mapped, and a maintenance budget for clearing it after each large storm (Chapters 9 and 10). A regional facility on a hill slope is also subject to the hill infiltration rule of Clause 4.11.
  • No rule dividing natural streams from municipal drains was found [TBC]. Until one is made, this Manual follows the working assignment of Chapter 1: rivers, raos and gadheras with their beds and floodplains, flood-protection works, barrages and canals as the Irrigation Department's; the nalas, khalas, drains and public ponds within the limits of a Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat as that body's; drains built under the ADB programme or by Dehradun Smart City Ltd as UUSDA's or DSCL's until handed over; road drains as PWD's; sewers and interception works as the Peyjal Nigam's and the Jal Sansthan's; Naini lake and its sluices as the custodian's under the Lake Development Authority and the Irrigation Department [TBC]; the hydropower reservoirs and barrages as THDC's and UJVN's; and the Asan wetland as within the remit of the State Wetland Authority and the Forest Department (Commentary to Clause 6.9). This is the Manual's working assignment, not a statutory one.

The first point is the basis of condition 4.13.2(c) in Uttarakhand. A taal gives flood storage only above its full level, unless a notified operating rule commits it to be lowered before the SW monsoon. The 3-year operational limit and the 10-year maintenance allowance have no direct precedent and are set by this Manual.


4.14 Simplified methods for small sites

4.14.1 Applicability. Tier B local bodies may permit the simplified method for sites of 2 ha or less outside flood-sensitive catchments. In flood-sensitive catchments, it may be used for sites of 0.5 ha or less. All other sites shall use Clause 4.6. Until Table 4.3 (Annex 4B) is published, all Tier B sites shall also use Clause 4.6.

4.14.2 Method.

  1. Read the PSD (L/s/ha) and SSR (m³/ha) for the site's zone, HSG and post-development imperviousness from Table 4.3 (Annex 4B).
  2. Required storage: V = SSR × A − V_credit (Clause 4.4.6.3).
  3. Permissible discharges: Q_PSD,T = PSD_T × A for the 2-yr and 100-yr stages.
  4. Select the low-flow orifice and upper control from the standard outlet table in Annex 4B (orifice sizes for the PSD at the stated depths), subject to the 50 mm minimum.
  5. Provide a spillway or overflow under Clause 4.9, the RWH accounting of Clause 4.11, and the safety provisions of Clause 4.15.
  6. Complete Form 4-2 (Tier B site sheet).

Table 4.3 — Tier B permissible site discharge and site storage requirement (template)

Zone (Annex 2A) HSG Imperviousness PSD 2-yr (L/s/ha) PSD 100-yr (L/s/ha), standard PSD 100-yr (L/s/ha), flood-sensitive SSR (m³/ha), standard SSR (m³/ha), flood-sensitive
UK-Z1 Plains and foothills: UK-B Haridwar–Roorkee plains B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
UK-Z1 Plains and foothills: UK-C Bhabar–terai (Haldwani–Kashipur–Rudrapur–Kotdwara) A / B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
UK-Z2 Doon and outer ridge: UK-A Doon valley (Dehradun–Rishikesh) A / B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
UK-Z2 Doon and outer ridge: UK-D Outer-ridge hill stations (Nainital–Mussoorie) C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
UK-Z3 Inner and high mountains: UK-E Inner valleys and middle mountains (Tehri–Srinagar–Almora–Pithoragarh) B / C / D 50% / 70% / 90% [TBC] [TBC] [TBC] [TBC] [TBC]
UK-Z3 Inner and high mountains: UK-F High Himalaya and snow-fed (Joshimath–Kedarnath–Dharchula) — — Not tabulated: Clause 4.6 applies (Clause 2.3.6(i)) — — — —

Worked example (illustrative — not design values).

A 0.4 ha residential layout in a Tier B Municipality, in a flood-sensitive catchment, with about 80% directly connected impervious area (area-weighted post-development CN about 92). Suppose Table 4.3 had been computed and gave the per-hectare equivalent of the Clause 4.6.7 example:

  • PSD 100-yr = 356 / 2.0 = 178 L/s/ha
  • SSR = 2,913 / 2.0 ≈ 1,460 m³/ha
  • PSD 2-yr ≈ 17 L/s/ha

Then:

  • Storage: V = 1,460 × 0.4 = 584 m³. C_R = 0, so there is no retention credit.
  • 100-yr release: 178 × 0.4 = 71 L/s.
  • 2-yr release: 17 × 0.4 = 7 L/s. At about 1 m head this needs a low-flow orifice of about 60 mm, above the 50 mm minimum (Clause 4.8.2).
  • Layout options:
    • a 400 m² underground tank 1.5 m deep; or
    • 250 m² of podium storage at 0.3 m (75 m³) plus a 350 m² tank 1.5 m deep (525 m³).
    • Rooftop storage at 150 mm over 1,200 m² of roof (180 m³) could replace part of the tank.
  • RWH sumps are additional, and are assumed full (Clause 4.11).

Commentary. Australian councils use permissible site discharge and site storage requirement tables in the same way (Sydney Water OSD guide; the Upper Parramatta River Catchment Trust handbook listed SSR of about 455 m³/ha). The illustrative SSR here, about 1,460 m³/ha, is much larger. That is the expected effect of combining a mixed-frequency cap with mandatory 48–72-hour storms at AMC III. MSMA 2 in Malaysia offers a similar simplified OSD method for sites under 5 ha. The MARC policy supplement offers smaller Kansas City municipalities adoptable alternatives within the regional standard; Clause 4.14 follows that model for Tier B.

4.14.3 Fixed-coefficient route. As an alternative to Clauses 4.6 and 4.14.2, the designer of any site of 1 ha or less, under any Approving Authority and in any catchment, may size detention by Clauses 4.14.4 to 4.14.7. The route shall not be used where:

  • (a) the site counts tank or waterbody storage in its design (Chapter 7);
  • (b) any part of the site lies within a waterbody setback (Chapter 7); or
  • (c) the site drains to a tank cascade whose storage is counted in a downstream design.

The route sets the release caps by fixed coefficients and does not need Table 4.3. It may therefore be used before Annex 4B is published. Retention (Clause 4.4), drawdown (Clause 4.7), outlets (Clause 4.8), the spillway (Clause 4.9), the downstream and tailwater checks (Chapter 5) and water quality (Chapter 8) still apply.

4.14.4 Release caps. Two caps apply at each point where runoff leaves the site:

Q_cap,10 = 2.78 × C_10 × i_10 × A and Q_cap,2 = 2.78 × C_2 × i_2 × A

where Q_cap is in L/s; A is the site area (ha); i_10 and i_2 are the 10% AEP (10-yr) and 50% AEP (2-yr) rainfall intensities (mm/h) for a 15-minute duration at the site, from the sources of Chapter 2, with the climate factor of Clause 2.8; and C_10 and C_2 are the fixed coefficients of Table 4.3A for the site's hydrologic soil group (Clause 3.7). For a site with more than one soil group, the coefficients are area-weighted.

Table 4.3A — Fixed release coefficients (provisional)

Hydrologic soil group C_10 C_2
A (sandy, well drained) 0.05 0.02
B 0.08 0.03
C 0.15 0.08
D (clay, poorly drained) 0.25 0.15

Q_cap,10 is the maximum release for every storm up to and including the 1% AEP (100-yr) storm, in every catchment. Q_cap,2 is the maximum release for the 50% AEP (2-yr) storm. Where a cap is smaller than the discharge of a 50 mm orifice at the corresponding stage, the 50 mm orifice is deemed to comply (Clause 4.5.5.1).

4.14.5 Storage. The detention storage V (m³) is the larger of V_100 and V_2, each the largest over the durations d of Clause 2.5.2 (1 to 72 hours):

V_100 = max over d of [ 10 × C_v × P_100(d) × A − 1.8 × Q_cap,10 × d ]

V_2 = max over d of [ 10 × C_v × P_2(d) × A − 1.8 × Q_cap,2 × d ]

where P_100(d) and P_2(d) are the 1% and 50% AEP rainfall depths (mm) for duration d (hours), with the climate factor; and C_v is the post-development volumetric coefficient: the composite C of Table 3.2 (upper half of each range), multiplied by Cf of Table 3.3 for the 1% AEP. For durations of 12 hours or more, C for every pervious surface shall be taken as not less than 0.50. The factor 1.8 assumes an average release of half the cap over the storm (3.6 × 0.5).

4.14.6 Outlet. The outlet shall be a two-stage control: a low-flow orifice that passes Q_cap,2 when the storage holding V_2 is full, and an upper orifice or weir that limits the total release to Q_cap,10 at the top of V. The outlet table of Annex 4B may be used once it is published.

4.14.7 Retention. The retention volume of Clause 4.4 is provided in addition to V. No retention credit (Clause 4.4.6) is taken under this route.

Figure 4.3 — Fixed-coefficient route: release caps, storage by the mass-curve method and two-stage outlet (schematic) Schematic. Left: cumulative inflow volume against storm duration for the 1% and 50% AEP storms, with straight release lines 1.8 x Q_cap x d; the storage is the largest vertical gap. Right: two-stage outlet. Not to scale. Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3–4.14.7) — schematic, not to scale 0 12 24 36 48 60 72 Storm duration d (h) Volume (m³) V_100 = largest gap V_2 = largest gap 1% AEP inflow 10·C_v·P_100(d)·A Release line 1.8·Q_cap,10·d 50% AEP inflow 10·C_v·P_2(d)·A Release line 1.8·Q_cap,2·d Dots: durations of Clause 2.5.2 (1, 2, 3, 6, 12, 24, 48, 72 h). Pervious C ≥ 0.50 for d ≥ 12 h. Two-stage outlet (Clause 4.14.6) Top of V Top of V_2 Overflow / spillway (Clause 4.9) Upper orifice or weir: total release ≤ Q_cap,10 at top of V Low-flow orifice (≥ 50 mm): passes Q_cap,2 at top of V_2 Retention (Clause 4.4) is provided in addition; no retention credit (Clause 4.14.7) Q_cap,10 = 2.78 × C_10 × i_10 × A ; Q_cap,2 = 2.78 × C_2 × i_2 × A ; (L/s; A in ha; i in mm/h) C_10, C_2 from Table 4.3A by soil group; i_10, i_2 for a 15-minute duration with the climate factor (Clause 2.8) V = max(V_100, V_2); V_T = max over d of [ 10 × C_v × P_T(d) × A − 1.8 × Q_cap × d ] (m³) ; 1.8 = 3.6 × 0.5 (average release of half the cap)

Figure 4.3 — Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3 to 4.14.7): the release caps Q_cap,10 and Q_cap,2 from Table 4.3A; the storage V as the largest gap, over the durations of Clause 2.5.2, between the cumulative inflow 10·C_v·P(d)·A and the release line 1.8·Q_cap·d, for the 1% and 50% AEP storms; and the two-stage outlet that passes Q_cap,2 at the top of V_2 and Q_cap,10 at the top of V. Schematic, not to scale. Original drawing for this Manual, adapted from the rainfall mass-curve (inflow minus outflow) storage concept and the single-coefficient peak cap of the PUB Code of Practice on Surface Water Drainage, 7th ed. (cl. 7.1.5).

Commentary. The fixed-coefficient route follows Singapore, which caps the peak runoff from every development of 0.2 ha or more with one runoff coefficient, C = 0.55, applied to the 10-yr storm (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5, Addendum No. 3, 2025). It is quick to apply and quick to check: the cap needs only the site area, the soil group and two intensities. PUB's 0.55 is not used here, because Singapore's baseline is the existing urban drainage system, while this Manual's baseline is greenfield land (Clause 4.5.1.2). The coefficients of Table 4.3A are set by this Manual from the greenfield curve numbers of Clause 3.3 (CN 39, 61, 74 and 80 for soil groups A to D). They are the ratios of runoff to rainfall that those curve numbers give for 1-hour depths typical of the Doon valley, rounded down. They are therefore provisional. The State Stormwater Technical Committee shall confirm or revise them against NIH-DHAARA values for each zone when it issues Annex 4B.

The route is deliberately stricter than the full method, so that simplicity costs the developer storage rather than costing the people downstream. The 100-yr release is held to about the greenfield 10-yr peak everywhere, which is the flood-sensitive rule of Clause 4.5.3; the storage assumes the outlet releases only half the cap on average; pervious ground is assumed wet in long storms; and no retention credit is taken. A designer who wants a smaller tank can use the full method of Clause 4.6. The storage formula is the rainfall-mass (inflow minus outflow) method. Clause 3.4.2 otherwise forbids rainfall-based peak methods for storage, because they ignore the shape of the hydrograph; this route is a stated exception because its conservative assumptions cover that error for small sites, and the 24- to 72-hour durations are always checked.


4.15 Safety, fencing and multi-use

4.15.1 Depth limits for publicly accessible storage. Where the public has access to a storage area (parks, playfields, open space, school grounds):

  • (a) maximum depth in the 10% AEP storm: 0.45 m;
  • (b) maximum depth in the 1% AEP storm: 1.2 m, except in a fenced zone under 4.15.3;
  • (c) side slopes: no steeper than 4H:1V, with at least a quarter of the perimeter at 6H:1V or flatter for escape; and
  • (d) no vertical drop greater than 0.3 m within the storage area or at its edge.

4.15.2 Wet basins. Permanent pools shall have:

  • a safety bench at least 3 m wide, no more than 0.3 m below the normal water level; and
  • an emergent planting fringe that deters entry.

4.15.3 Fencing. A fence at least 1.2 m high, of a non-climbable design with a lockable gate, is required around any part of a storage that:

  • has a vertical wall or headwall drop greater than 0.6 m;
  • exceeds 1.2 m depth in the 1% AEP storm with slopes steeper than 4H:1V; or
  • contains an outlet structure with an opening larger than 300 mm that is not grated.

4.15.4 Outlets. Every inlet and outlet opening larger than 300 mm accessible to the public shall be fitted with a grate or rack. The grate shall be designed so that a person pinned against it can escape: low approach velocity, inclined, with a large open area.

4.15.5 Signs and depth markers. Every publicly accessible storage shall have signs in Hindi and English stating that the area floods during rain, and a depth marker at the deepest point.

4.15.6 Confined spaces. Underground tanks shall have lockable covers. They shall be marked as confined spaces, and the maintenance declaration (Chapter 10) shall state the entry procedure.

4.15.7 Vector control. Dry storage shall drain completely (Clause 4.7) and have no low points that pond for more than 72 hours. Wet basins shall meet Clause 4.10.7.

Commentary. The numeric limits in Clause 4.15 have no single direct precedent. They are drawn from common international practice, for example KC APWA 5600 (2006), which required at least a quarter of a dry-pond perimeter at 5:1 or flatter, a 20 ft (6 m) clearance from property lines and a 15 ft (4.6 m) maintenance strip. They are made somewhat stricter here because multi-use storage on open space land and in schools will be used by children during the monsoon. Standing water in dry basins is a mosquito-breeding risk, so complete drainage (Clause 4.15.7) is a public-health requirement, not an amenity.


4.16 Basis: why peak matching alone fails

Commentary. This section has no requirements. It records why this chapter requires release below pre-development rates, retention, long-duration checks and a downstream analysis, rather than simple peak matching.

  1. Timing. Detention lowers a site's peak but stretches its hydrograph (Figure 4.1). Downstream, the stretched releases from many sites overlap with each other and with the main-stem peak. In Denver's study, ten basins each releasing 100% of the historic 100-yr peak produced 106% of the historic peak at the outlet. Only releasing 90% at each site brought it to 97% (UDFCD memo, 2012). A Colorado State University thesis found that location-blind on-site detention "can actually increase peak flows above post-development peaks". An optimisation study found that a downstream pond performed worse than upstream ponds because its outflow synchronised with the main stem (Water 2016, 8(7):290).
  2. Volume. Detention does not remove volume. In the illustrative example, the post-development 100-yr storm produces about three times the runoff volume of the pre-development 10-yr storm (Clause 2.11). Only retention, or storage that empties to somewhere other than the receiving drain, reduces volume.
  3. Scale. Kansas City modelling (McEnroe, 2005) found that uniform 3 cfs/ac control reduced Q100 by 36% in a 200-ac watershed. With the same control everywhere, Q100 still rose by 40% at 14 sq mi, and the benefit faded beyond about 1–2 sq mi. The KC committee concluded that "'match existing' can harm streams" (MARC Evolution deck). Georgia makes a ten-percent downstream analysis mandatory for the same reason: "Due to peak flow timing and runoff volume effects, some structural practices fail to reduce discharge peaks to pre-development levels downstream" (GSMM 2016).
  4. Design-storm dependence. An Australian study of 20 real on-site detention systems found that designs using even ten temporal patterns "cannot reliably produce an OSD system design that will always be effective" under real rainfall (Water Science and Engineering, 2019). This is why Clause 4.6.3 routes the full duration matrix rather than one critical storm.
  5. Closed outfalls. In Uttarakhand, the governing failure takes two forms. On the plains, in the Doon and in the lake towns, it is volume with no outlet when a river, barrage pond or taal downstream is high. Haridwar drains to the Ganga, whose CWC warning and danger levels at Haridwar are 293.0 m and 294.0 m and which reached 295.75 m on 17 June 2013 and 295.7 m on 14 August 2023 against a highest level of 296.30 m (CWC, as transcribed by SANDRP); Rishikesh drains to the Ganga above the Virbhadra barrage, which stood at 341.3 m on 14 August 2023, above its danger level of 340.5 m; Ramnagar drains to the Kosi, which rose to about 220.95 m at the Ramnagar barrage on 19 October 2021, about 4 m above its previous highest level (as reported; the CWC list gives 220.75 m); and the terai towns drain to the Kalyani, the Kichha and the Sarda, which at Banbasa reached 224.9 m on 19 October 2021, above its maximum water level of 223.3 m (as reported), on the day that Rudrapur was flooded by the Kalyani. Nainital drains wholly to Naini lake, whose outlet is limited by its sluice rules and which rose to a record 12.2 ft and overflowed on 19 October 2021 (as reported): when the lake is at its maximum level, every drain of the town discharges to a water surface that cannot fall. In the hills and on the Doon fans the outfall is closed in a different way: by debris. The raos and gadheras rise fast after a burst and carry boulders and sediment that bury outfalls, block culverts and choke the drains behind them; in the storm of 15–16 September 2025 in Dehradun, 13 bridges and 10 culverts were lost (as reported) and 83 sewage interception structures on the Rispana were damaged (Peyjal Nigam, affidavit before the NGT). No hourly record of how long a river, barrage pond or taal in Uttarakhand stays above a town's outfalls was obtained [TBC], the Rispana, the Bindal, the Suswa and the Tons in Dehradun have no CWC site, and no document was found that sets a design river level for an outfall; Chapter 5 sets the design level and the closure to be assumed, and Chapters 6 and 9 the debris and blockage allowances. A perfectly orificed basin behind a closed outfall simply fills. No release-rate rule can fix that; it is handled by the outfall-closed check of Chapter 5.

The response in this Manual is layered:

  • release below pre-development (Clause 4.5);
  • retain the frequent storms (Clause 4.4);
  • route long SW monsoon storms (Clause 4.6.3);
  • prefer regional storage in the taal system (Clause 4.13); and
  • check downstream and at the outfall (Chapter 5).

Kansas City's own history shows the price. On a test site, peak matching needed 3.0 ac-ft of storage and the 2011 comprehensive criteria needed 4.9 ac-ft (MARC Evolution deck). Over-detention costs more storage. That is the cost of protecting the catchment rather than only the site boundary.


4.17 Submittal requirements

Every site runoff-control submittal shall include a Site Runoff Control Report (Form 4-1) containing:

  1. the Design Rainfall Sheet (Form 2-1) and the hydrology inputs (Chapter 3);
  2. the evidence for the order of measures under Clause 4.3.1;
  3. the RRV computation, infiltration tests, groundwater evidence and drawdown calculation (Clause 4.4);
  4. the retention credit computation (Clause 4.4.6);
  5. the release-rate criterion applied, standard or flood-sensitive, with the Annex 4A map extract (Clause 4.5);
  6. a results table in the format of Clause 4.6.7 for every AEP and duration, with the governing case highlighted;
  7. stage–storage and stage–discharge tables and plots, and inflow/outflow hydrographs for the governing cases;
  8. the drawdown calculation (Clause 4.7);
  9. outlet details, including orifice sizes and levels, trash racks and anti-vortex devices (Clause 4.8);
  10. the spillway or overflow calculation, freeboard and hazard classification, and the geotechnical report where required (Clause 4.9);
  11. the RWH and detention accounting, with tank sections showing zone levels (Clause 4.11);
  12. the design groundwater level and flotation check (Clause 4.12);
  13. the downstream and tailwater report (Chapter 5, Form 5-1); and
  14. the safety provisions (Clause 4.15) and the draft maintenance declaration (Chapter 10).

Tier B sites using Clause 4.14.2 shall submit Form 4-2 in place of items 6 and 7. Sites using the fixed-coefficient route (Clause 4.14.3) shall submit Form 4-3 in place of items 6 and 7.


References (chapter)

Annexes and forms

Annex / Form Content
4A Flood-sensitive catchment boundaries (GIS); shallow-groundwater zone map
4B Tier B tables: PSD and SSR (Table 4.3), retention credit factor C_R, standard outlet sizes; confirmed fixed release coefficients (Table 4.3A)
4C Worked example (Tier A) with full routing tables
Form 4-1 Site Runoff Control Report
Form 4-2 Tier B Site Sheet
Form 4-3 Fixed-coefficient Route Sheet (Clauses 4.14.3 to 4.14.7)