Draft v1.0 prepared by NEER. Not adopted by the Government of Uttarakhand or any authority or local body, and has no legal force. About this draft

Chapter 3Hydrologic Methods


3.1 Purpose and scope

3.1.1 This chapter sets out how design rainfall from Chapter 2 is turned into runoff peaks, volumes and hydrographs for:

  • (a) drain, inlet and culvert sizing (Chapter 6);
  • (b) retention and detention sizing, and the pre- vs post-development comparison (Chapter 4);
  • (c) downstream and tailwater analysis (Chapter 5); and
  • (d) waterbody, tank (taal) and regional facility studies (Chapter 7).

3.1.2 It specifies:

  • (a) which method may be used for which purpose and catchment size (Clause 3.4);
  • (b) how the pre- and post-development land surfaces are defined (Clause 3.3);
  • (c) the parameters of each method: runoff coefficients, time of concentration, soils, curve numbers, unit hydrographs and routing (Clauses 3.5–3.12);
  • (d) when continuous simulation and model calibration are required (Clauses 3.13 and 3.15);
  • (e) the step-by-step pre- vs post-development comparison (Clause 3.14); and
  • (f) software acceptance and documentation (Clauses 3.16 and 3.17).

3.1.3 Rainfall inputs (depth, duration, areal reduction, climate factor, temporal pattern and antecedent moisture) are governed by Chapter 2 and shall not be varied in this chapter.

Commentary. The CPHEEO (2019) Manual on Storm Water Drainage Systems gives a full Rational Method procedure and names SWMM for hydrograph work, but it is a drain-sizing guide. It does not say how a regulator should define "pre-development" or which method must be used to test a development against it (CPHEEO Part A §4.4, §8.5.1). APWA Section 5600 does both: it limits the Rational Method, names baseline hydrograph methods, and fixes the land-use assumptions for existing and proposed conditions (KC Metro APWA 5600, 2011, §5602.2–5602.3; Version 2025.01, §5603.4). This chapter follows that model.


3.2 Definitions

Term Meaning in this Manual
Pre-development condition The reference land surface defined in Clause 3.3.2, against which post-development runoff is tested. It is not the existing condition.
Post-development condition The land surface after the proposed works are complete, as defined in Clause 3.3.3.
Point of comparison (POC) A location where site runoff leaves the site, at which pre- and post-development flows are compared (Clause 3.14).
Time of concentration (Tc) The time for runoff to travel from the hydraulically most distant point of the catchment to the point of interest.
Lag (tL) The time from the centroid of rainfall excess to the peak of the runoff hydrograph.
Hydrologic soil group (HSG) The NRCS classification (A, B, C, D) of a soil by its minimum infiltration rate when wet (USDA NRCS, NEH Part 630, Ch. 7).
Curve number (CN) The NRCS parameter that combines soil group, land cover and antecedent moisture into a single runoff-potential index (USDA NRCS, NEH Part 630, Ch. 9–10).
Antecedent moisture condition (AMC) The soil wetness at the start of a storm: AMC I (dry), II (average), III (wet).
Directly connected impervious area (DCIA) Impervious surface that drains to a drain, pipe or channel without first flowing over a pervious surface.
Disconnected impervious area Impervious surface whose runoff flows as sheet flow over a pervious surface before reaching the drainage system, and meets Clause 3.9.3.
Peak rate factor (PRF) The constant in the unit hydrograph peak equation (484 in US customary units; 0.208 in the SI form of Clause 3.11.2).
Continuous simulation A model run over a long rainfall record (years), with soil moisture, storage and tank levels carried forward between storms.
Tank cascade A chain of tanks (taals) in which the surplus of one tank feeds the next.

3.3 Pre-development and post-development land surface

3.3.1 Same site, same storm. Pre- and post-development runs shall cover the same area draining to each POC, and use the same design storms (Clause 2.11.1). They shall differ only in the land-surface parameters of this clause, the resulting Tc, and the stormwater controls.

3.3.2 Pre-development condition. The pre-development land surface shall be greenfield: open land in good condition for the mapped hydrologic soil group, as follows:

  • (a) All land within the site, including land that is now built on, paved, compacted or cultivated, is treated as open land (grass cover > 75%) in good condition. Existing impervious cover shall not be counted.
  • (b) The curve number is the TR-55 value for "open space, good condition" for the HSG of Clause 3.7: CN 39 (A), 61 (B), 74 (C), 80 (D) at AMC II (Table 3.5).
  • (c) The HSG is the natural HSG of Clause 3.7, including the dual-group rule for high water table (Clause 3.10.1). No HSG improvement for drainage works is allowed.
  • (d) Tc is computed on the pre-development ground surface using unchannelled overland and shallow concentrated flow and natural channels only (Clause 3.6). Existing pipes, lined drains and kerbs are ignored.
  • (e) Existing waterbodies, tank waterspreads up to the full tank level (FTL), natural channels and supply or surplus channels are kept as they are, and modelled as water surfaces or channels, not as open land.

3.3.3 Post-development condition. The post-development land surface shall represent the proposed works at full build-out:

  • (a) Impervious areas shall be measured from the site plan, separately for roofs, paved surfaces, roads and other sealed surfaces, and classified as directly connected or disconnected (Clause 3.9). Lot-size residential rows of TR-55 shall not be used for the site itself.
  • (b) Pervious areas disturbed by construction (graded, filled or trafficked) shall be assigned one HSG lower in infiltration capacity than the natural HSG (A to B, B to C, C to D), unless post-construction infiltration tests (Clause 3.7.3) show otherwise. Soil disturbed by construction shall never be classed as HSG A.
  • (c) Rainwater harvesting (RWH) sumps shall be treated as full at the start of storms of 12 hours or more, and the roof area draining to them as directly connected for those storms (Chapter 4).
  • (d) Retention and detention facilities shall be represented explicitly as storage (Clause 3.12), not by lowering CN.

3.3.4 Redevelopment. The pre-development condition of Clause 3.3.2 applies to redevelopment as well. A site that is already fully paved is tested against greenfield, not against its existing state. For the constrained-redevelopment route of Clause 4.5.6, the existing condition shall also be modelled, with existing impervious areas as surveyed, so that the 50% minimum can be checked.

3.3.5 Off-site areas.

  • (a) For conveyance design (Chapter 6), areas upstream of the site shall be taken at their ultimate land use under the approved master plan or development plan. Where no plan exists, upstream undeveloped land shall be assumed to be at least 35% impervious.
  • (b) For the pre- vs post-development comparison, off-site run-on shall be modelled identically in both runs, at its existing condition (Clause 3.14.2).

Commentary. A greenfield reference stops each redevelopment from being judged against an already degraded baseline. The UK non-statutory standards and KC APWA take the same approach in different forms: APWA caps existing agricultural land at no more than "good condition pasture, grassland or range (C = 0.30, CN = 74)" for HSG C, and forbids disturbed soils from being classed as HSG A or B (KC Metro APWA 5600, 2011, §5602.3A and E). The TR-55 "open space, good condition" values used in (b) are identical to TR-55's "pasture, grassland or range, good" values (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c), so this Manual's pre-development CN equals the APWA cap on HSG C soils. The one-class downgrade for disturbed soils in 3.3.3(b) is set by this Manual as a simpler, less strict version of the APWA rule, suited to the Doon Gravels, the bhabar boulder fans, the terai, the Ganga alluvium, Siwalik rock, and the colluvium, slide debris, moraine and rock of the hills, where an HSG A to C jump would be excessive. The 35% minimum imperviousness for unplanned upstream land in 3.3.5(a) is the APWA value (2011, §5602.3E.2). Using the master-plan land use for conveyance follows CPHEEO, which requires C to reflect "ultimate development of the catchment as per the master plan" (CPHEEO 2019, Part A §4.4.1.5).


3.4 Selection of method

3.4.1 The method shall be selected from Table 3.1 by purpose and catchment size. Figure 3.1 shows the same rules as a flowchart.

Table 3.1 — Permitted hydrologic methods

Purpose Catchment / condition Permitted method Clause
Peak flow for one conveyance element (inlet, pipe reach, drain reach, culvert) ≤ 16 ha contributing, no upstream storage, no backwater Rational Method 3.5
Peak flow for conveyance > 16 ha, or any upstream storage, tank or pond Hydrograph method (SCS-CN with SCS unit hydrograph, SWMM or HEC-HMS) 3.8–3.12
Retention, detention, any storage; pre- vs post-development comparison Any size Hydrograph method; Rational Method not permitted 3.8–3.12, 3.14
Pipe or drain network with backwater, tidal or tank tailwater Any size Hydrograph method with dynamic-wave hydraulic routing 3.12.4; Chapter 5
Catchment-scale flows 25–5,000 km² in CWC subzone 1(e) or zone 7 (Western Himalayas) HEC-HMS or SWMM, benchmarked against the CWC synthetic unit hydrograph (SUH) 3.11.4
Regional facilities Draining > 25 km² Design-storm hydrograph method plus continuous simulation 3.13
Tank (taal) cascades Any size Design-storm hydrograph method plus continuous simulation 3.13
Tier B: small sites under Chapter 1 Within the limits of the design aid Design aids issued under Chapter 4, which are themselves derived by the methods of this chapter 3.4.4
Small sites, any authority ≤ 1 ha, within the limits of Clause 4.14.3 Fixed-coefficient route of Chapter 4 (fixed release coefficients, rainfall-mass storage) 3.4.4; 4.14.3

Figure 3.1 — Selection of hydrologic method Start: state the purpose of the calculation Storage, retention, detention, or a pre- vs post-development comparison? Yes No (conveyance peak) Hydrograph method required (Rational Method not permitted, Clause 3.4) Contributing area ≤ 16 ha, one conveyance element, and no storage upstream? No Yes Rational Method (Clause 3.5) Tc ≥ 10 min; frequency factor Cf; partial-area check (Clause 3.5.6) Catchment area? < 25 km² 25–5,000 km² Event model SCS-CN losses with SCS unit hydrograph, or SWMM / HEC-HMS (Clauses 3.8–3.12) Catchment model HEC-HMS / SWMM, benchmarked against CWC subzone SUH (Clause 3.11.4) Regional facility > 25 km², or a tank cascade in the system? Yes Add continuous simulation (Clause 3.13), in addition to design storms Tidal or backwater outfall: route with a dynamic-wave hydraulic model (Chapter 5).

Figure 3.1 — Selection of hydrologic method. Original drawing for this Manual, adapted from KC Metro APWA, Section 5600 Storm Drainage Systems and Facilities, 2011 (§5602.2) and Version 2025.01 (§5603.4, Policy Supplement, 2025).

3.4.2 Rational Method limits. The Rational Method shall be used only for catchments of 16 ha or less and only to compute the peak flow to a single conveyance element. It shall never be used to size retention, detention or any other storage, nor to derive a hydrograph or runoff volume.

3.4.3 Hydrograph methods. Above 16 ha, and for every storage calculation, a hydrograph method shall be used: SCS-CN losses with the SCS (NRCS) unit hydrograph, EPA SWMM, or HEC-HMS. For 25–5,000 km² the CWC synthetic unit hydrograph shall also be computed as a benchmark (Clause 3.11.4).

3.4.4 Simplified routes. In Tier B areas (Chapter 1), sites within the limits stated on a design aid issued under Chapter 4 may use that design aid in place of a site-specific hydrograph model. In any area, sites of 1 ha or less may use the fixed-coefficient route of Clause 4.14.3; it is the only exception to the rule in 3.4.2 that rainfall-based peak methods shall not be used for storage. The Rational Method remains available for conveyance under 3.4.2.

3.4.5 Catchments above 5,000 km². These are outside the scope of this Manual and require a basin study approved by the Irrigation Department.

Commentary. The 16 ha limit and the single-element rule follow APWA 5600 Version 2025.01, which cut the Rational Method from 200 ac to 40 ac and restricted it to "a single pipe segment". The MARC Policy Supplement adds that it "cannot be used to size runoff reduction practices or determine retention volumes and detention volumes" (MARC, APWA Stormwater Standards Supplement, 2025). CPHEEO (2019, Part A §4.4.1.3) allows the Rational Method up to 8–10 km², which is too large for a method that assumes uniform rainfall intensity over the whole catchment for the whole of Tc and gives no volume. The Rational Method is excluded from storage design because it gives a peak, not a hydrograph, and storage depends on volume and timing.


3.5 Rational Method

3.5.1 Equation. The peak flow shall be computed as:

Q = C · Cf · i · A / 360

where Q is the peak flow (m³/s); C is the runoff coefficient (Table 3.2); Cf is the frequency factor (Table 3.3), with C · Cf ≤ 1.0; i is the rainfall intensity (mm/h) for a duration equal to Tc, from Chapter 2 (with the climate factor of Clause 2.8); and A is the contributing area (ha).

Commentary. This is the CPHEEO equation Qp = 10 C I A, with Qp in m³/h (CPHEEO 2019, Part A §4.4.1.1–4.4.1.3), converted to m³/s.

3.5.2 Runoff coefficients. C shall be taken from Table 3.2. Within a range, the designer shall use the upper half of the range unless site data justify a lower value.

Table 3.2 — Runoff coefficient C (for AEP of 10% or more frequent)

Surface or land use C Source
Commercial 0.70–0.95 CPHEEO 2019, Table 4.2
Industrial 0.60–0.90 CPHEEO 2019, Table 4.2
Institutional 0.70–0.95 CPHEEO 2019, Table 4.2
Residential, high density 0.60–0.75 CPHEEO 2019, Table 4.2
Residential, low density 0.40–0.60 CPHEEO 2019, Table 4.2
Recreational 0.10–0.25 CPHEEO 2019, Table 4.2
Asphalt 0.70–0.95 CPHEEO 2019, Table 4.2
Concrete 0.80–0.95 CPHEEO 2019, Table 4.2
Brick paving 0.70–0.85 CPHEEO 2019, Table 4.2
Roofs: tiles 0.80–0.90 CPHEEO 2019, Table 4.2
Roofs: metal 0.70–0.90 CPHEEO 2019, Table 4.2
Roofs: concrete 0.70–0.90 CPHEEO 2019, Table 4.2
Lawns, sandy soil, flat (≤ 2%) 0.05–0.10 ASCE/WPCF 1969
Lawns, sandy soil, average (2–7%) 0.10–0.15 ASCE/WPCF 1969
Lawns, sandy soil, steep (> 7%) 0.15–0.20 ASCE/WPCF 1969
Lawns, heavy (clay) soil, flat (≤ 2%) 0.13–0.17 ASCE/WPCF 1969
Lawns, heavy soil, average (2–7%) 0.18–0.22 ASCE/WPCF 1969
Lawns, heavy soil, steep (> 7%) 0.25–0.35 ASCE/WPCF 1969
Undeveloped land (maximum for any condition) 0.30 KC APWA 5600 (2011), §5602.3E

3.5.3 Frequency factor. For design AEPs rarer than 10%, C shall be multiplied by Cf from Table 3.3. The product C · Cf shall not exceed 1.0.

Table 3.3 — Frequency factor Cf

Design AEP (return period) Cf
10% (10-yr) and more frequent 1.00
4% (25-yr) 1.10
2% (50-yr) 1.20
1% (100-yr) 1.25

3.5.4 Composite C. Where a catchment contains more than one surface, C shall be the area-weighted value C = Σ(Cj · Aj) / ΣAj, computed from the measured areas of each surface. Cf is applied to the composite C.

3.5.5 Time of concentration and networks.

  • (a) Tc shall be computed by Clause 3.6 and shall not be less than 10 minutes.
  • (b) For each reach of a network within the 16 ha limit, the peak shall be computed with the cumulative Σ(C · A) upstream of that reach and the longest Tc to that reach. Peaks from upstream reaches shall not be added.

3.5.6 Partial-area check. Where a compact, highly impervious part of the catchment has a much shorter Tc than the whole, the peak shall also be computed for that part alone, using its own area, C and Tc. The larger peak governs.

Commentary. The developed-surface coefficients in Table 3.2 are CPHEEO Table 4.2, which CPHEEO adapted from ASCE/WPCF (1969). CPHEEO keeps C constant for all return periods. Table 3.3 instead adopts the APWA antecedent-precipitation factors (KC Metro APWA 5600, 2011, §5602.2A: K = 1.1, 1.2 and 1.25 for 4%, 2% and 1% storms, with C·K ≤ 1.0). These factors matter here because Uttarakhand's rare storms arrive on wet ground (Clause 2.11.4). The 10-minute minimum Tc matches the minimum design duration of Clause 2.5.1. APWA 2011 bounds inlet time between 5 and 15 minutes (§5602.7A). The partial-area check follows CPHEEO's treatment of "partial area effect" (CPHEEO 2019, Part A §4.4.1.7). This Manual requires the upper half of each range in 3.5.2 because Indian urban plots are typically more densely covered than the US land uses behind the ASCE ranges.


3.6 Time of concentration

3.6.1 General. Tc shall be computed separately for the pre- and post-development conditions, along the flow path that gives the longest travel time to the point of interest, as the sum of travel times in each flow segment. Tc shall not be less than 10 minutes for either condition.

3.6.2 NRCS velocity (segment) method. The NRCS segment method is the default for all catchments. Tc = Tt(sheet) + Tt(shallow) + Tt(channel), where:

  • (a) Sheet flow:

    Tt = 0.091 (n · L)^0.8 / (P2^0.5 · S^0.4)

    where Tt is in hours; n is the sheet-flow roughness from Table 3.4; L is the sheet-flow length (m); P2 is the present-day 50% AEP (2-yr) 24-hour rainfall (mm) from Clause 2.3, without the climate factor; and S is the land slope (m/m).

  • (b) Sheet-flow length. In urban areas, and for all post-development conditions, the sheet-flow length shall not exceed 30 m. For pre-development greenfield surfaces, up to 90 m may be used only where survey shows unchannelled planar ground; otherwise 30 m applies.

  • (c) Shallow concentrated flow: Tt = L / (3,600 V), with V = 4.918 S^0.5 (unpaved) or V = 6.196 S^0.5 (paved), V in m/s, L in m and S in m/m.

  • (d) Channel and pipe flow: Tt = L / (3,600 V), with V from Manning's equation at bank-full or pipe-full flow.

Time of concentration: flow segments along the longest flow path (schematic, not to scale) Time of concentration: flow segments along the longest flow path (schematic, not to scale) Ground surface Hydraulically most distant point Point of interest (inlet, reach or POC) Sheet flow thin film over the surface Shallow concentrated flow rills, gutters, swales Channel and pipe flow drains, pipes, natural channels L ≤ 30 m (urban; all post-development) ≤ 90 m only for surveyed planar pre-development ground Sheet flow — Clause 3.6.2(a), (b) Tt = 0.091 (n · L)^0.8 / (P2^0.5 · S^0.4) [h] n from Table 3.4; pre-development n = 0.15 P2: 2-yr 24 h rainfall, no climate factor Shallow concentrated — Clause 3.6.2(c) Tt = L / (3,600 V) V = 4.918 S^0.5 (unpaved) V = 6.196 S^0.5 (paved) Channel and pipe — Clause 3.6.2(d) Tt = L / (3,600 V) V from Manning's equation at bank-full or pipe-full flow Tc = Tt(sheet) + Tt(shallow) + Tt(channel) ≥ 10 min (Clause 3.6.1) Computed separately for pre- and post-development; lag tL = 0.6 Tc (Clause 3.6.5)

Figure 3.2 — Time of concentration by the NRCS segment method: sheet flow, shallow concentrated flow and channel or pipe flow along the longest flow path, with the travel-time equations and limits of Clause 3.6. Schematic, not to scale. Original drawing for this Manual, adapted from USDA SCS TR-55 (1986), Ch. 3, and USDA NRCS, NEH Part 630, Ch. 15 (2010).

Table 3.4 — Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)

Surface n
Smooth surfaces (concrete, asphalt, gravel, bare soil) 0.011
Fallow (no residue) 0.05
Cultivated, residue cover ≤ 20% 0.06
Cultivated, residue cover > 20% 0.17
Grass: short-grass prairie 0.15
Grass: dense grasses 0.24
Range (natural) 0.13
Woods: light underbrush 0.40
Woods: dense underbrush 0.80

3.6.3 Pre-development roughness. For the pre-development greenfield surface of Clause 3.3.2, sheet-flow n shall be 0.15 unless the designer justifies another Table 3.4 value from the natural vegetation of the area.

3.6.4 Kirpich formula. The Kirpich formula may be used only as a cross-check, or for pre-development rural catchments with a defined main channel:

tc = 0.0195 L^0.77 S^−0.385

where tc is in minutes, L is the length of the main flow path (m) and S is its average slope (m/m). It shall not be used for urban or post-development catchments.

3.6.5 Lag. Where a unit hydrograph method requires lag, tL = 0.6 Tc.

3.6.6 Check. Post-development Tc shall normally be shorter than pre-development Tc. Where it is longer, the designer shall explain why in the submittal.

Commentary. The segment method and its equations are from TR-55 (USDA SCS, 1986, Ch. 3) and NEH Part 630, Ch. 15 (USDA NRCS, 2010). The SI constants are direct conversions of the US equations: 0.007 becomes 0.091 with L in m and P2 in mm, and 16.1345 and 20.3282 ft/s become 4.918 and 6.196 m/s. TR-55 (1986) allowed sheet flow up to 300 ft (≈ 90 m). NEH 630 Ch. 15 states that sheet flow typically lasts no more than about 100 ft (≈ 30 m) before becoming shallow concentrated flow (citing Merkel, 2001), and many US agencies now cap it there. This Manual sets the 30 m urban limit in 3.6.2(b) on that basis: in Indian urban plots, flow reaches a drain, kerb or compound-wall weep hole within a few metres. The undisturbed P2 is used in the sheet-flow equation because P2 is a parameter of the travel-time relationship, not a design load. The default n = 0.15 for greenfield is the TR-55 short-grass value; this Manual adopts it to avoid long pre-development Tc values that would make Q_pre artificially low. The Kirpich formula is the SI form given by Chow, Maidment and Mays (1988, Table 15.1.2), from small agricultural catchments in Tennessee (Kirpich, 1940), so it does not suit urban surfaces. The lag ratio 0.6 is the NRCS value, also used by APWA (2011, §5602.7C).


3.7 Soils and hydrologic soil groups

3.7.1 Mapping. HSG shall be assigned from the soil series mapped by the National Bureau of Soil Survey and Land Use Planning (NBSS&LUP) or the Uttarakhand Agriculture Department (soil survey) [TBC], using the soil-series-to-HSG lookup of Annex 3A. The source map and its scale shall be stated.

3.7.2 Assignment rule. Where Annex 3A is not yet available for a series, the HSG shall be assigned from the measured saturated hydraulic conductivity and depth to an impermeable layer or water table using the criteria of NEH Part 630, Ch. 7. Until Annex 3A is published, this Manual sets the following interim groups for Uttarakhand: the Doon Gravels of the Doon valley and the boulder fans of the bhabar, HSG A, and HSG B where a fine-loamy or silty cover lies over the gravels or the ground is compacted urban ground; the terai below the spring line, HSG C, and HSG D for every design storm wherever the seasonal high water table is within about 1 m of the surface, wells flow under artesian pressure (auto-flow) or the land is waterlogged; the Ganga alluvium of southern Haridwar, Laksar and Khanpur, HSG B on sandy floodplain soils and HSG C on silty ones; the regolith of the Siwalik sandstone and conglomerate, HSG C, and HSG D on mudstone or claystone; hill colluvium, slide debris and moraine, HSG D for design, with no infiltration credit on slopes, whatever group the material itself would take; exposed rock (quartzite, phyllite, slate, limestone, schist and the like), HSG D; and urban fill, HSG C, and HSG D where it is clayey or compacted. A field infiltration test is required on every site larger than the limits of the simplified method of Clause 4.14.1, at the depth of the proposed facility; on smaller sites, a soil that has not been tested shall be given the less permeable of the groups listed for it. Whether an infiltration practice may be built at all on a hill site is governed by the hill infiltration rule of Clause 4.11, not by its HSG. Clause 3.10.1 applies to all of these groups.

3.7.3 Site verification. For every site that relies on retention by infiltration (Chapter 4), the mapped HSG shall be verified by site infiltration tests at the location and depth of each infiltration facility. Where the tests show a lower infiltration capacity than the mapped HSG, the test result governs for both the retention design and the post-development CN. Where they show a higher capacity, the pre-development HSG shall not be changed without the approval of the authority.

3.7.4 Disturbed and filled ground. Clause 3.3.3(b) applies.

Commentary. NBSS&LUP soil maps are typically at 1:250,000 to 1:50,000 scale and classify soils by series and taxonomy, not by HSG. A lookup table is therefore needed (Annex 3A). Site tests matter most at the edges of the belts, where one site can span two groups: at the foot of the Doon fans and of the bhabar, where the boulder gravels pass under a fine-loamy cover and then into the terai at the spring line; in the terai, where a sand lens that tests as HSG A or B lies over clay with the water table a metre or two below the surface; on the Siwalik front, where sandstone and mudstone alternate; and on hill sites, where a test pit in colluvium can show a high rate that is in fact water entering a slope that cannot take it (Clause 4.11). No HSG map or table for Uttarakhand, and no measured infiltration rate for any site in the State, was found during research for this Manual [TBC]: a 2024 study ran double-ring tests at three sites in Dehradun, but its values were not seen. About 85% of the State is mountainous and underlain by hard rock, and about 15% by the semi-consolidated and unconsolidated deposits of the bhabar and the terai (CGWB, Dynamic Ground Water Resources of Uttarakhand 2024). The interim groups follow that geology. The Doon Gravels are "boulders and pebbles embedded in sandy and silty matrix", "highly porous", with field permeabilities of 5.86–104 m/day and hydraulic conductivities of 13–583 m/day (CGWB, Dehradun district brochure, 2011); the bhabar is a belt of "coalesced piedmont fans" 4–20 km wide, about 21 km in the Haldwani–Kichha section, with hydraulic conductivities of 25–250 m/day and water 40–75 m below ground (173.71 m at Bhotia Parao, Haldwani) (CGWB, Nainital district brochure, 2010), whose porosity allows the "major part of the precipitation to infiltrate, within a very short span" (CGWB, Udham Singh Nagar brochure). These are aquifer values, not surface infiltration rates, but they support HSG A where the gravel reaches the surface. The terai is 8–25 km wide, of sand, silt and clay in which "clay beds predominate", with water 1–7 m below ground and more than 2,000 artesian wells with heads up to 8.69 m above ground (CGWB, Udham Singh Nagar brochure; NAQUIM, 2016), so it is HSG C, and D wherever it is wet. In the hills, the soils on steep slopes are "skeletal … with low available water capacity" (CGWB, Nainital brochure), and the colluvium and debris that cover them would take water fast as a material; but water put into a slope raises the pore pressure in it. At the Balia Nala below Nainital, water recharging the perched aquifer from the catchment drains and from buildings reduced the cohesion of the soil (Arabian Journal of Geosciences, 2022); at Joshimath, an IIT Roorkee report found internal erosion by subsurface drainage, which "can be minimized by controlling infiltration of water", and the Mishra Committee of 1976 had asked for soak pits to be closed (both as reported). That is why colluvium, slide debris and moraine are designed as HSG D: the group decides the runoff, and on a slope none of the water is to be put back into the ground. A single group D for the whole State would be conservative for peak flows, but it would deny recharge on the Doon Gravels and the bhabar, where four semi-critical groundwater blocks lie (Clause 4.11) and where the bhabar recharges the terai aquifers whose auto-flow zone is retreating (NAQUIM, 2016). The only regional measures of losses are the design loss rates of the CWC reports, 0.5 cm/h (5 mm/h) in zone 7 and 0.30 cm/h (3.0 mm/h) in subzone 1(e) (Annex 3E). They are φ-indices fitted to the floods of whole rural catchments, those of zone 7 to six catchments in Punjab, Himachal Pradesh and the Doon; they shall be used only in rural SUH runs under Clause 3.11.4, not to assign an HSG, not in an urban SCS-CN or SWMM model, and not to size an infiltration practice. The interim groups of Clause 3.7.2, the 1 m water-table threshold for the terai, the treatment of colluvium, slide debris and moraine and the rule for untested soil on small sites are set by this Manual pending a soil-series lookup for Uttarakhand. Steep ground matters as much as soil in the hills and on the Siwalik and outer-ridge slopes, where runoff from rock and skeletal soil reaches a channel within minutes; the following rules are set by this Manual. (a) On hill streets and khalas with slopes of 10–60%, Kirpich and similar formulae give times of concentration of 1–5 minutes; Tc shall be found by the segment method of Clause 3.6.2 and shall not be taken below the 10-minute minimum of Clause 3.6.1, which matches the shortest design duration of Chapter 2, and the Kirpich formula, derived from small Tennessee farm catchments of moderate slope, shall not be used even as a cross-check where the average slope of the flow path exceeds 10%. (b) The sheet-flow segment over bare rock, scree, a road cut or a paved hill street shall use the smooth-surface n of Table 3.4 and shall not exceed 30 m. (c) A catchment that runs from a hill flank onto a fan or the plain, such as the Rispana and Bindal from the Mussoorie ridge onto the Doon fans, or the Gaula and the bhabar streams from the Siwalik and outer ridge onto the bhabar, shall be split at the break of slope, and the hill sub-area modelled on its own, so that a long, flatter lower reach does not average away the fast response of the hill; channel losses into the gravels of a rao or bhabar bed shall not be credited in design, because the bed is saturated by the time of the design storm. (d) No method of this chapter predicts debris flow; in steep catchments the design flow is bulked for sediment and debris, and inlets and culverts are protected against blockage, under Chapters 6 and 9.


3.8 SCS curve number (SCS-CN) loss method

3.8.1 Runoff equation. Runoff depth shall be computed by:

Q = (P − Ia)² / (P − Ia + S) for P > Ia; Q = 0 otherwise S = 25,400 / CN − 254

where Q is runoff depth (mm), P is the cumulative rainfall depth (mm), S is potential maximum retention (mm) and Ia is initial abstraction (mm). In hydrograph models the equation is applied to the cumulative rainfall at each time step to obtain incremental rainfall excess.

3.8.2 Curve numbers. CN at AMC II shall be taken from Table 3.5, for the HSG of Clause 3.7.

Table 3.5 — Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)

Cover type HSG A HSG B HSG C HSG D
Pre-development reference (Clause 3.3.2): open space, good condition (grass > 75%) 39 61 74 80
Open space, fair condition (grass 50–75%) 49 69 79 84
Open space, poor condition (grass < 50%) 68 79 86 89
Impervious: roofs, paved parking, driveways, paved roads with kerbs and drains 98 98 98 98
Paved roads with open ditches (including right-of-way) 83 89 92 93
Gravel roads (including right-of-way) 76 85 89 91
Dirt roads (including right-of-way) 72 82 87 89
Newly graded areas (pervious, no vegetation) 77 86 91 94
Fallow, bare soil 77 86 91 94
Meadow (continuous grass, protected from grazing) 30 58 71 78
Brush, good condition 30 48 65 73
Woods, good condition 30 55 70 77
Woods, fair condition 36 60 73 79
Woods, poor condition 45 66 77 83
Water surfaces, tank waterspreads, wet detention basins Runoff = rainfall (no losses)

3.8.3 Use of Table 3.5.

  • (a) Post-development CN shall be built up from measured surfaces (Clause 3.9). The TR-55 urban district and residential lot-size rows shall not be used for the site.
  • (b) Pervious areas in the post-development condition shall use "open space" in the condition the landscape plan will achieve. Where no landscape plan is submitted, fair condition applies.
  • (c) Cultivated rows of TR-55 may be used for off-site existing conditions, but never for the pre-development reference of Clause 3.3.2.

3.8.4 Antecedent moisture. AMC shall follow Clause 2.11.4: AMC III for every design storm, whatever its duration, from 1 July to 30 September at a site in sub-area UK-A (Doon valley), UK-D (Outer-ridge hill stations), UK-E (Inner valleys and middle mountains) or UK-F (High Himalaya and snow-fed) of Annex 2A, or on terai land below the spring line in sub-area UK-B or UK-C; AMC III for every design storm at any time of year in a catchment that drains to a reservoir or barrage pond, to Naini lake or Bhimtal, or to a river reach whose CWC site stands at or above its warning level; at any other site or time, AMC III for a design storm that follows, or contains, a 5-day rainfall total of more than 53 mm; and AMC II for every other storm. CN for AMC I and III shall be obtained from AMC II by:

CN(I) = 4.2 CN(II) / (10 − 0.058 CN(II)) CN(III) = 23 CN(II) / (10 + 0.13 CN(II))

The conversion shall be applied to the pervious component only. Impervious surfaces stay at CN 98 for all AMC. Composite CNs shall not be converted directly.

Illustrative — not design values. Pre-development reference CNs at AMC III are: HSG A 59.5; HSG B 78.2; HSG C 86.7; HSG D 90.2.

3.8.5 Initial abstraction.

  • (a) Default: Ia = 0.2S, with the CNs of Table 3.5.

  • (b) Sensitivity run (mandatory): every storage design shall also be run with Ia = 0.05S. For this run, S shall be converted as S0.05 = 1.33 · S0.20^1.15 (S in inches), which in SI is:

    S0.05 = 25.4 × 1.33 × (S0.20 / 25.4)^1.15 (mm)

  • (c) The design shall be based on the default run. The sensitivity results shall be reported on Form 3-2. Where the sensitivity run increases the required retention volume or water quality volume, the larger value governs for that volume.

2026-10-31T09:51:23.520885 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ 0 50 100 150 200 250 300 350 400 Rainfall depth P (mm) 0 50 100 150 200 250 300 350 400 Runoff depth Q (mm) Q = P (dotted) CN 98 (impervious) CN 90 CN 80 (open land, HSG D) CN 74 (open land, HSG C) CN 61 (open land, HSG B) CN 39 (open land, HSG A) CN 74 with Ia = 0.05S (dashed) S converted per Hawkins et al. (2002) Solid lines: Ia = 0.2S (default). Illustrative — not design values.

Figure 3.3 — SCS-CN runoff depth versus rainfall depth for selected curve numbers at Ia = 0.2S, with the Ia = 0.05S sensitivity case for CN 74. Original drawing for this Manual, computed from the runoff equation of USDA NRCS, NEH Part 630, Ch. 10 (2004) and USDA SCS TR-55 (1986), and the S-conversion of Hawkins et al. (2002). Illustrative — not design values.

Commentary. Table 3.5 reproduces standard NRCS TR-55 (1986) values. They were derived from US catchments and have not been calibrated in Uttarakhand. The AMC conversion equations are the standard NEH-4 relationships as given by Chow, Maidment and Mays (1988, §5.5). Converting only the pervious component follows APWA, which states that "direct conversion of composite antecedent moisture conditions is not appropriate" (KC Metro APWA 5600, 2011, §5602.2C). Converting a composite CN would wrongly lower the CN of the impervious part.

Ia = 0.2S is the original NRCS ratio. Analysis of US rainfall–runoff data found that 0.05S fits better on average (Hawkins et al., 2002; Woodward et al., 2003), and gave the conversion of 3.8.5(b). NRCS has not formally replaced 0.2S, so this Manual keeps it as the default. Figure 3.3 shows why the sensitivity run is needed: for CN 74, the 0.05S case gives more runoff for small storms (about 2.0 mm vs 0.5 mm from 25 mm of rain) but less for large storms (about 242 mm vs 262 mm from 350 mm). Illustrative — not design values. The ratio therefore matters most for retention and water quality volumes, and the default 0.2S is the conservative choice for peak and detention design. The rule in 3.8.5(c) that the larger retention or water-quality volume governs has no direct precedent; this Manual sets it because the 0.05S case gives more runoff from the small storms that set those volumes.


3.9 Impervious connectivity

3.9.1 Classification. Every impervious surface in the post-development condition shall be classified as directly connected (DCIA) or disconnected, and shown on the drainage plan.

3.9.2 Preferred representation. In hydrograph models, DCIA and pervious areas shall be modelled as separate sub-areas (or as the separate impervious and pervious fractions of a SWMM subcatchment), each with its own loss parameters. The runoff from disconnected impervious areas shall be routed onto the receiving pervious area.

3.9.3 Disconnection criteria. An impervious area may be classed as disconnected only if all of the following hold:

  • (a) its runoff discharges as sheet flow onto a pervious area, without a pipe, channel or kerb;
  • (b) the pervious flow path is at least as long as the impervious flow path draining to it;
  • (c) the pervious area is not compacted, not HSG D, and is protected from paving by the approved plan; and
  • (d) for storms of 12 hours or more, it does not drain to an RWH sump or tank (Clause 3.3.3(c)).

3.9.4 Composite CN. Where a single composite CN is used instead of 3.9.2, it shall be computed as:

  • for directly connected impervious area: CNc = CNp + (Pimp / 100)(98 − CNp);
  • where total impervious area is below 30% and part of it is disconnected: CNc = CNp + (Pimp / 100)(98 − CNp)(1 − 0.5 R),

where CNp is the pervious CN, Pimp is the percentage of impervious area and R is the ratio of disconnected to total impervious area. The composite CN shall not be used for retention or water quality volumes.

Commentary. The composite equations are from TR-55 (USDA SCS, 1986, Ch. 2, Figures 2-3 and 2-4). This Manual prefers separate representation in 3.9.2 because a composite CN spreads the impervious response over the whole area, which suppresses runoff from small storms. For a site that is 50% directly connected impervious on HSG B open space (CNp 61), 25 mm of rain gives about 9.9 mm of runoff when the two parts are modelled separately, but only about 1.8 mm with the composite CN 79.5. At 200 mm the two methods agree (139.5 mm vs 138.4 mm). Illustrative — not design values. The error is largest for the frequent storms that set retention and water-quality volumes. The disconnection criteria of 3.9.3 are set by this Manual, drawing on common practice in US runoff-reduction manuals. Criterion (d) follows the rule of Clause 3.3.3(c) that RWH sumps are full at the start of SW monsoon storms.


3.10 Groundwater, high water table and tank backwater

3.10.1 High water table (dual HSG). Where the seasonal high groundwater table is within 0.6 m of the ground surface, the soil shall be assigned HSG D for both the pre- and post-development runs, whatever its texture, unless it is permanently drained by works that are maintained under Chapter 10. This rule applies in every case to storms of 12 hours or more, which are run at AMC III (Clause 2.11.4).

3.10.2 Water-table data. The seasonal high water table shall be taken as the highest level recorded in the SW monsoon season (June–September), from site piezometers or trial pits, or from the nearest Central Ground Water Board (CGWB) or Irrigation Department observation well, adjusted for ground level.

3.10.3 Infiltration-based losses. Where Green–Ampt, Horton or soil-moisture-accounting losses are used instead of SCS-CN, the cumulative infiltration in any storm shall not exceed the storage available in the soil above the seasonal high water table.

3.10.4 Tank and waterbody backwater. Where a site or sub-catchment drains to a tank, taal, marsh or other waterbody:

  • (a) the water level in the receiving waterbody shall be applied as the downstream boundary of the model, per Chapter 5 and Chapter 7;
  • (b) land below the level of the receiving waterbody in the design event (including the tank foreshore below FTL) shall be modelled as water surface or storage, with no losses; and
  • (c) where the outfall is submerged by the waterbody level, the routing shall use the dynamic-wave method of Clause 3.12.4.

Commentary. The dual-group rule follows NEH Part 630, Ch. 7 (USDA NRCS, 2009), which places wet soils with a water table within 60 cm (24 in) of the surface in group D in their undrained state, with a dual group (A/D, B/D, C/D) where drainage is feasible. This Manual applies the undrained group to long storms because two belts of Uttarakhand are wet in the monsoon, while the rest of the State is not. The terai, below the spring line that separates it from the bhabar, has water 2.09–7.08 m below ground before the monsoon and 1.73–6.89 m after it, with more than 2,000 artesian wells in the Kashipur, Bazpur, Gadarpur, Rudrapur and Sitarganj blocks whose free-flowing heads reach 8.69 m above ground (CGWB, Udham Singh Nagar brochure); the whole of Bazpur and almost 80% of the Kashipur block were artesian in 2016, although the auto-flow zone has receded westward by about 5–7 km in the east as the bhabar has been cleared and shallow tube wells have multiplied (NAQUIM, Udham Singh Nagar, 2016). In Haridwar district the terai lies south of the bhabar of Bhagwanpur and Bahadrabad, with "flowing wells … common" in the lower piedmont plain, a first aquifer at 4–8 m below ground and shallow water levels from about 1.68 m (NAQUIM, Haridwar; CGWB, Hardwar brochure, 2009). The second wet belt is the floodplains and low terraces of the rivers, where the water table follows the river, and the taal margins. The Doon Gravels and the bhabar are the opposite case: water stands 2.29–71 m below ground in the Doon before the monsoon and 2.52 to more than 100 m after it, deepest near the hills (CGWB, Dehradun brochure, 2011), and 40–75 m below ground in the bhabar, with perched water within 10 m in places (CGWB, Nainital brochure, 2010). In the hills groundwater occurs as perched bodies in weathered veneers and colluvium (CGWB, Dehradun brochure), and of the 225 wells measured in January 2025 the shallowest stood 0.52 m below ground at Joshimath and 28.44% stood within 5 m (CGWB, Water Level Bulletin, January 2025). No monsoon water-table depths for individual sites in Rudrapur, Kashipur, Kichha or Haridwar, and no map of the seasonal high water table of the terai, were obtained [TBC]; Annex 3A is to supply them. Clause 3.10.4 reflects the State's receiving waters, which are rivers held up by barrages and reservoirs, ungauged raos, and taals with gated outlets. Haridwar drains to the Ganga, whose CWC warning and danger levels at Haridwar (Dudhia Band) are 293.0 m and 294.0 m, with a highest level of 296.30 m dated 19 September 2010 in one CWC record and 17 June 2013 in another; Rishikesh to the Ganga above the Virbhadra (Pashulok) barrage (warning 339.5 m, danger 340.5 m, highest 341.72 m on 5 September 1995); the east of Dehradun and Doiwala to the Song at Satyanarayan (337.2 m, 338.2 m and 338.49 m on 28 June 2019); and Roorkee to the Solani (warning 260.5 m, danger 261.5 m, highest 260.58 m on 14 October 2021, below its danger level) (all CWC, as transcribed by SANDRP). The Rispana, the Bindal, the Suswa and the Tons in Dehradun have no CWC site. Nainital drains wholly to Naini lake, a closed basin of 4.7 km² whose outlet is five sluice gates at Tallital (NIH, Water Balance of Lake Nainital); a site there drains to a water surface, not to a channel, and Clause 3.10.4(b) applies to the land below the lake's maximum level.


3.11 Unit hydrographs and runoff transformation

3.11.1 Permitted transforms.

  • (a) SCS (NRCS) dimensionless unit hydrograph, curvilinear or triangular, for catchments below 25 km² and for any sub-area of a larger model;
  • (b) the SWMM non-linear reservoir with kinematic overland flow;
  • (c) Clark or ModClark unit hydrograph in HEC-HMS, where parameters are calibrated under Clause 3.15; and
  • (d) the CWC synthetic unit hydrograph, for 25–5,000 km² (Clause 3.11.4).

3.11.2 SCS unit hydrograph. The peak and time to peak of the unit hydrograph shall be:

qp = PRF′ · A · Q / tp, with PRF′ = 0.208 (SI form of the standard peak rate factor 484) tp = Δt / 2 + tL, tL = 0.6 Tc

where qp is the peak flow (m³/s); A is the area (km²); Q is the runoff depth (mm), equal to 1 mm for the unit hydrograph; tp is the time to peak (h); and Δt is the computation interval (h).

3.11.3 Computation interval and sub-areas.

  • (a) Δt shall not exceed 0.133 Tc of the smallest sub-area, nor the hyetograph time step of Clause 2.9.1.
  • (b) Sub-areas shall be reasonably uniform in HSG, land cover and slope. Pervious and directly connected impervious areas shall be separate sub-areas, per Clause 3.9.2.

3.11.4 CWC synthetic unit hydrograph. For catchments of 25–5,000 km² in CWC subzone 1(e) (Upper Indo-Ganga Plains), below the Siwalik front (Haridwar–Roorkee and the bhabar–terai), or zone 7 (Western Himalayas), in the Doon and the hills, other than their snow-fed catchments:

  • (a) the SUH parameters, design storm duration, loss rate, base flow, areal reduction and time distribution shall be taken from the applicable CWC Flood Estimation Report, using the catchment's physiographic parameters measured from survey or a DEM;
  • (b) the 24-hour design rainfall shall follow Clause 2.3.3(b) and Clause 2.7.3, and the climate factor of Clause 2.8 shall be applied;
  • (c) the SUH result shall be reported alongside the HEC-HMS or SWMM result for the existing natural condition; and
  • (d) where the hydrograph model gives a lower 1% AEP peak than the CWC SUH, the designer shall either justify the model by calibration under Clause 3.15 or adopt the CWC SUH peak.

3.11.5 Peak rate factor for flat coastal land. The standard factor (484; PRF′ = 0.208) is the default. A lower factor may be used only:

  • (a) for unchannelled, flat coastal-plain land without piped or lined drainage;
  • (b) in the same way in both the pre- and post-development runs for any land that stays unchannelled; and
  • (c) after the authority adopts calibrated values in Annex 3D.

Land drained by pipes, lined drains or kerbs in the post-development condition shall use the standard factor.

Commentary. The SCS unit hydrograph, the 0.6 lag ratio and the 0.133 Tc interval are from NEH Part 630, Ch. 16 (USDA NRCS, 2007). The interval follows from the unit hydrograph geometry: with tp = Δt/2 + 0.6 Tc and Tc + Δt = 1.7 tp, Δt = 0.133 Tc. The SI constant 0.208 is the direct conversion of 484 (cfs, mi², in, h). APWA uses the SCS dimensionless unit hydrograph as its basis (2011, §5602.5). The CWC Flood Estimation Reports give regression equations for SUH parameters, a design storm duration, a constant loss rate and ARF and time-distribution curves for each subzone (CWC 1984 and 1994; see Chapter 2). They were derived from natural, mostly rural catchments with data that predate the reports of 1984 and 1994 (the only Uttarakhand catchment behind the zone 7 relationships, the Suswa at railway bridge 139 on the Laksar–Dehradun line, was gauged in 1966–67), so they represent pre-development conditions, not urbanised ones. That is why the SUH is used as a benchmark rather than as the post-development model. Clause 3.11.4(d) mirrors the floor principle of Clause 2.3.3. HEC-HMS has been calibrated against CWC subzone SUH responses in Indian studies, which shows the two can be linked.

The lower-factor option of 3.11.5 is based on the NRCS Delmarva unit hydrograph, which uses a peak rate factor of 284 (PRF′ ≈ 0.122) for flat, poorly channelled coastal-plain catchments on the Delmarva Peninsula (Welle et al., 1980, as adopted by NRCS; New Jersey Department of Agriculture, Delmarva bulletin, which uses 285). A lower factor gives a lower, later peak. Used only in the pre-development run, it would lower Q_pre and make the release cap stricter; used in a piped post-development run, it would understate Q_post. Clause 3.11.5(b) prevents both biases.


3.12 Routing

3.12.1 Storage routing. Routing through detention and retention facilities, tanks, ponds and any storage behind embankments shall use level-pool (modified Puls, storage-indication) routing with:

  • (a) a stage–storage relationship from the design grading or survey;
  • (b) a stage–discharge relationship for every outlet (orifices, weirs, surplus weirs, pumps), including the minimum orifice and trash screen of Chapter 4; and
  • (c) the tailwater boundary of Chapter 5, where the tailwater affects the outlet rating.

3.12.2 Channel routing. Routing through channels and drains shall use the Muskingum–Cunge method, or the Muskingum method with parameters K and X that are derived from channel geometry or calibration. For the Muskingum method, the routing interval Δt shall satisfy 2KX ≤ Δt ≤ 2K(1 − X).

3.12.3 Incidental storage. Storage behind road embankments, culverts or boundary walls that is not part of an approved facility shall not be counted in the design unless the authority is satisfied that it will be maintained for the design life.

3.12.4 Dynamic-wave routing. Dynamic-wave (full Saint-Venant) routing, in SWMM or HEC-RAS unsteady flow, shall be used where:

  • (a) the outfall is under tidal, river or tank backwater (Chapter 5, Clause 3.10.4);
  • (b) flow can reverse, or the network has loops or overflow links; or
  • (c) the network surcharges in the design event and the hydraulic grade line sets the design.

3.12.5 Tank cascades. Tanks in a cascade shall each be routed by Clause 3.12.1, with the surplus weir and sluice ratings and the documented operating rule of Chapter 7. The starting water level in each tank shall be FTL unless continuous simulation (Clause 3.13) supports a lower level.

Commentary. Modified Puls routing for storage and Muskingum–Cunge for channels are the APWA requirements (KC Metro APWA 5600, 2011, §5602.8). APWA also excludes "incidental detention" behind embankments unless it will be maintained, which 3.12.3 adopts. CPHEEO's detention procedure uses the same three inputs as 3.12.1: an inflow hydrograph, a stage–storage curve and a stage–discharge curve (CPHEEO 2019, Part A §8.5.3). The Muskingum stability limits are standard (Chow, Maidment and Mays, 1988, §8.4). This Manual starts taals, reservoirs and barrage ponds at their full or maximum level in 3.12.5 because Uttarakhand's heaviest rain falls in the middle and late monsoon and in October, on waterbodies that have taken the earlier rains and are held up for supply, power or safety, not drawn down for drainage. About 78% of the State's annual rain falls in June to September (IMD, Climate of Uttarakhand), and its largest storms have come in every month from June to October: 370.2 mm at Dehradun on 17 June 2013, 487.0 mm at Dehradun on 25 July 1966, 487.5 mm at Raipur (Dehradun) on 2 August 1959, 495.3 mm at Hardwar on 18 September 1880, and 403.9 mm at Pantnagar and 401 mm at Nainital in the 24 hours to 08:30 on 19 October 2021 (IMD). The starting levels are as follows.

  • Naini lake. The lake is regulated through five sluice gates at Tallital, installed in 1888, under rules of the Hill Slide Committee of 1927 that limit the opening to 6 inches while the gauge is below 9 ft and to 12 inches while it is below 9.5 ft, to protect the Balia ravine below the outlet; the maximum lake level is 12.5 ft on the PWD gauge at Tallital, and the sluices are finally sealed on 15 October (NIH, Water Balance of Lake Nainital). The press usually gives the maximum as 12 ft, and the lake reached a record 12.2 ft and overflowed on 19 October 2021 (as reported). Operation of the gates is reported to have passed from the PWD to the Irrigation Department in 2018 (as reported), and the custodian of the rules today, the Lake Development Authority or the Irrigation Department, is to be confirmed [TBC]. The lake shall be started at its maximum gauge level of 12.5 ft on the PWD gauge, converted to metres above mean sea level, whose datum has not been found [TBC], for every design storm from 1 July to 15 October, with the sluices modelled under the 1927 rules, and at the same level with the sluices sealed after 15 October.
  • Bhimtal and the other Kumaon taals. Bhimtal (47.8 ha, catchment 17.12 km²) and Naukuchiatal have no published operating rule or level record (as reported) [TBC]; they shall be started at their spill or outlet crest level.
  • Reservoirs and barrage ponds. These are started at their maximum water level, or, where none is published, at the full or maximum pond level plus 0.5 m, as for a gated reservoir in Chapter 5: the Tehri reservoir at its maximum water level of 835 m (full reservoir level 830 m, first reached on 24 September 2021; THDC); the Dakpathar barrage on the Yamuna at its maximum pond level of 456.40 m, or 456.50 m in its 200-year flood (UJVN O&M manual, 2021); the Asan barrage at 401.50 m (UJVN O&M manual, 2021); the Gaula barrage at Kathgodam at its high pond level of 513.250 m; and the Baur and Haripura reservoirs at their full reservoir level of 242.32 m (795 ft) plus 0.5 m (Irrigation Department salient-feature sheets).
  • Khals and village tanks. The small rain-fed ponds of the hill ridges and the talabs of the plains are started full from July.

A gated reservoir or barrage is modelled with its gate rule from its operator (THDC, UJVN or the Irrigation Department), and a waterbody is modelled below these levels only where a continuous simulation under Clause 3.13 or a notified operating rule supports it. The window of 1 July to 15 October in Clause 3.13.5(a) is set by this Manual. It starts after the monsoon has covered the State, which it reaches at Dehradun by 20 June and at Roorkee by 28 June (IMD, Pai et al., 2020), so that a late onset or a dry June does not lower the starting level. It ends on 15 October, after the normal withdrawal of about 25–27 September (IMD, Pai et al., 2020) and the complete withdrawal by 1 October (IMD, Climate of Uttarakhand), because October storms are the main late-season threat: on 9 October 1956 Nainital recorded 300.7 mm and Roorkee 231.7 mm (IMD), and the storm of 17–19 October 2021 set the October records of Kumaon. The date also matches the sealing of the Naini lake sluices. Pumps, gates and debris screens stay on standby until 31 October (Chapter 10).


3.13 Continuous simulation

3.13.1 When required. Continuous simulation shall be carried out, in addition to the design-storm analysis, for:

  • (a) regional facilities draining more than 25 km²; and
  • (b) any system that includes a tank cascade whose storage is counted in the design (Chapter 7).

The authority may also require it for any facility where the starting storage level governs the design.

3.13.2 Rainfall input.

  • (a) The longest available hourly record from IMD or another approved recording gauge representative of the catchment shall be used.
  • (b) Where hourly data are shorter than 30 years, the record shall be extended with the IMD 0.25° gridded daily data. The full gridded record (1901 to present) should be used; at least the most recent 30 years shall be. The daily data shall be disaggregated to hourly by a method stated in the submittal and checked against the hourly gauge for the overlapping years. Grid values shall be converted to point values under Clause 2.7.1 where applicable.
  • (c) A future-climate run shall scale the record by the climate factors of Clause 2.8.

3.13.3 Model content. The model shall include soil-moisture accounting with evaporation (IMD pan evaporation or equivalent), groundwater or base flow, tank storage with operating rules and irrigation withdrawals, and the tailwater series of Chapter 5 (predicted tides plus a surge allowance for coastal outfalls).

3.13.4 Use of results. Annual maxima of water level, storage and volume, and the duration of outfall closure, shall be extracted and fitted by frequency analysis. Results shall be compared with the design-storm results. The more severe result at each AEP governs. Peak flows in drains and channels with a response time of less than one day shall be taken from the design-storm analysis where the continuous record was disaggregated from daily data, because the disaggregated hourly peaks are synthetic.

3.13.5 Two-step approach. The continuous simulation need not use the full hydraulic model. It may use a simplified hydrologic and storage model, at a daily or hourly step, that represents the soil moisture, groundwater, tank storage, operating rules and tailwater of 3.13.3. Its results shall then be passed to the design-storm runs of the full hydraulic model as:

  • (a) the starting level of each tank, taken as the level exceeded on 10% of the days from 1 July to 15 October over the record; and
  • (b) the antecedent soil-moisture condition, taken from the same days and compared with the AMC rule of Clause 3.8.

The designer shall show that the simplified model reproduces the water balance of the full model for at least one recorded event.

Two-step continuous simulation: setting the starting tank level (schematic, not to scale) Two-step continuous simulation: setting the starting tank level (schematic, not to scale) Step 1 — Long continuous run with a simplified hydrologic and storage model (daily or hourly step) Rainfall record: hourly gauge, extended with IMD 0.25° gridded daily data (at least 30 years; full record preferred) Tank level Year 1 Year 2 Year 3 Year 4 Year 5 Year n Monsoon season FTL (surplus weir crest) 0 10 50 100 % of days level is exceeded Tank levels on all monsoon-season days, ranked L10 L10 = level exceeded on 10% of the monsoon-season days over the record Pass to the design-storm runs (Clause 3.13.5): (a) starting level of each tank = L10; (b) antecedent soil moisture from the same days, compared with the AMC rule Step 2 — Design-storm run of the full hydraulic model, starting from L10 Design storm hyetograph (Chapter 2) Tank level 0 12 24 36 48 60 72 Time from start of design storm (h) FTL (surplus weir crest) Tank level, start at L10 Default without continuous simulation: start at FTL (Clause 3.12.5) Peak design level Check: the simplified model reproduces the water balance of the full model for at least one recorded event.

Figure 3.4 — Two-step approach of Clause 3.13.5. Step 1: a long continuous run with a simplified hydrologic and storage model gives the tank level exceeded on 10% of the days from 1 July to 15 October (L10). Step 2: the design storms are run in the full hydraulic model from that starting level, in place of the default start at FTL of Clause 3.12.5. Schematic, not real data. Original drawing for this Manual, illustrating the two-step approach set by this Manual in Clause 3.13.5.

Commentary. Design storms assume one starting condition, but in a tank cascade the governing variable is how full the tanks are when the storm arrives, which depends on the weeks of rain before it. An Australian study of 20 real on-site detention systems found that designs based on one temporal pattern, or even an ensemble of ten, "cannot reliably produce an OSD system design that will always be effective" under real rainfall, and continuous simulation showed frequent-event peaks exceeding pre-development levels (Water Science and Engineering, 2019). The 30-year minimum in 3.13.2(b) matches the station IDF rule of Clause 2.3.2; a longer record is better, and the IMD gridded daily record, which starts in 1901, is the practical long series for Uttarakhand. The record length matters less than what the simulation is for. Its main purpose here is to find how full the tanks and soils usually are when a south-west monsoon storm arrives, and how often heavy rain coincides with a closed outfall. A design storm cannot answer either question, because it starts from one assumed condition. It is not intended to replace design storms for the peak flow in urban drains. Clause 3.13.5 therefore allows the long run to be made with a simple storage model, which takes minutes, and passes the starting tank levels to the detailed hydraulic model, which is then run only for the design storms. Running a detailed 1D–2D city model continuously for decades is rarely practical and is not required. The 10% exceedance level in 3.13.5(a) is set by this Manual: it represents a wet but not exceptional monsoon, so that the design storm arrives on tanks that are already well filled, as they were in September 2021, when the Tehri reservoir reached its full reservoir level of 830 m for the first time, on 24 September (THDC), and October 2021, when Naini lake rose to a record 12.2 ft on its gauge and overflowed on 19 October (as reported).


3.14 Pre- vs post-development comparison procedure

3.14.1 The comparison required by Clause 2.11 and Chapter 4 shall be carried out by the following steps. The results shall be recorded on Form 3-2.

2026-10-31T09:51:23.621054 image/svg+xml Matplotlib v3.9.4, https://matplotlib.org/ Time (same design storm for both scenarios) Discharge 0.9 × Q_pre (standard-catchment cap, Clause 2.11.2) Q_pre Q_post (uncontrolled): higher and earlier peak Storage volume Routed peak ≤ cap; volume released over a longer time (drawdown, Ch 4) Schematic. Illustrative — not design values. Pre-development (greenfield, Clause 3.3.2) Post-development, no control Post-development, routed through storage

Figure 3.5 — Pre-development, uncontrolled post-development and routed post-development hydrographs for the same design storm. Original drawing for this Manual, adapted from the pre- vs post-development detention concept in CPHEEO, Manual on Storm Water Drainage Systems, Part A §8.5, 2019, and KC Metro APWA Section 5600, 2025.01. Schematic. Illustrative — not design values.

3.14.2 Step 1 — Define the site, catchments and points of comparison.

  • (a) Delineate the site and every area that drains to it, from survey.
  • (b) Identify each POC where runoff leaves the site. Each POC shall be tested separately. Runoff shall not be diverted from one natural catchment to another to meet the criterion.
  • (c) Model off-site run-on identically in both runs, at its existing condition (Clause 3.3.5(b)). Where it passes through the site's storage, the criterion applies to the total outflow at the POC.

3.14.3 Step 2 — Soils. Map HSG (Clause 3.7), apply the high-water-table rule (Clause 3.10.1) and record the infiltration tests.

3.14.4 Step 3 — Pre-development model. Build the pre-development model per Clause 3.3.2: greenfield CN (Table 3.5), Tc (Clause 3.6, with n = 0.15), and existing waterbodies and channels. Compute CN at AMC II and AMC III.

3.14.5 Step 4 — Post-development model. Build the post-development model per Clause 3.3.3: measured impervious areas, connectivity (Clause 3.9), disturbed-soil HSG, CN, Tc, and the proposed retention, detention and outlets as storage (Clause 3.12.1).

3.14.6 Step 5 — Design storms. From Chapter 2, prepare for each required AEP (50%, 10% and 1%; 2-, 10- and 100-yr) and each duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:

  • the depth with the climate factor (Clause 2.8), ARF = 1.0 for the site (Clause 2.7.4);
  • the hyetograph (Clause 2.9); and
  • the AMC (Clause 2.11.4).

The same storms shall be used in both runs (Clause 2.11.1).

3.14.7 Step 6 — Run the pre-development model for every storm and tabulate Q_pre(T, d). For flood-sensitive catchments, identify the largest 10% AEP pre-development peak over all durations; that value is the cap of Clause 2.11.3.

3.14.8 Step 7 — Run the post-development model without controls and tabulate Q_post(T, d) and runoff volumes. This shows the size of the problem and is reported, not tested.

3.14.9 Step 8 — Add retention and detention.

  • (a) Represent the retention volume of Chapter 4 as storage that is lost to infiltration or reuse (not released to the POC) within the period verified under Chapter 4.
  • (b) Route the remaining hydrograph through the detention storage and outlets (Clause 3.12.1).
  • (c) Apply the tailwater of Chapter 5, including the joint cases of Clause 2.12, where the outfall is tidal or under backwater.
  • (d) Adjust storage and outlets until Step 9 is met.

3.14.10 Step 9 — Test the criterion at each POC, for every AEP and every duration:

  • (a) standard catchments: Q_post(T) ≤ 0.9 × Q_pre(T) for the 50%, 10% and 1% AEP (Clause 2.11.2);
  • (b) flood-sensitive catchments: Q_post(1% AEP) ≤ Q_pre(10% AEP), and Q_post(50% AEP) ≤ Q_pre(50% AEP) (Clause 2.11.3).

The governing duration for storage is the one that needs the largest storage or gives the highest water level; the 24, 48 and 72 h runs are always reported (Clause 2.5.2).

3.14.11 Step 10 — Sensitivity runs. Repeat Steps 6–9 for the governing storms with Ia = 0.05S (Clause 3.8.5) and, where a lower peak rate factor is used, with the standard factor (Clause 3.11.5). Report the change in peaks and required storage.

3.14.12 Step 11 — Associated checks. Using the final routed model, check the drawdown times, minimum orifice and emergency spillway of Chapter 4, the outfall-closed storage check of Chapter 5, and the downstream analysis of Chapter 5.

3.14.13 Step 12 — Document the results on Forms 3-1 and 3-2 (Clause 3.17).

Commentary. The step sequence follows the standard event-based workflow: delineate; set pre-development CN and Tc; set post-development CN and shorter Tc; run identical storms through a unit hydrograph or kinematic model; compare peaks and volumes; and size storage by modified Puls routing. It adds the Uttarakhand elements: the 48–72 h storms, AMC III, and tailwater. Figure 3.5 shows why the long-duration runs matter: the routed peak can meet the cap while the storage holds the volume difference between the post- and pre-development hydrographs, which must then drain within the Chapter 4 limits. The ban on diverting runoff between catchments in 3.14.2(b) stops a site meeting the rule at one POC by moving flow to a neighbour's drain.


3.15 Model calibration and validation

3.15.1 When required. Calibration and validation are required for:

  • (a) catchment models of 25 km² or more;
  • (b) regional facilities and continuous simulation under Clause 3.13;
  • (c) city or basin drainage master plans; and
  • (d) any model whose parameters differ from the defaults of this chapter (for example a Clark transform or a lower peak rate factor).

3.15.2 Data. Calibration shall use observed rainfall (gauges, and radar where available) and observed flows or water levels (Irrigation Department gauging sites, DMC or USDMA level sensors, tank gauges, or surveyed flood marks).

3.15.3 Events. At least three independent events shall be used for calibration and at least one further event for validation. At least one event shall be a long-duration SW monsoon or cyclone event (for example the Dehradun storm of 16–17 June 2013 (370.2 mm in 24 hours at Dehradun on 17 June, IMD), the Kumaon storm of 17–19 October 2021 (403.9 mm at Pantnagar and 401 mm at Nainital in the 24 hours to 08:30 on 19 October, IMD), the Dehradun storm of 13–14 August 2023 (175.1 mm at Dehradun on 14 August, IMD), or the Doon storm of 15–16 September 2025 (264 mm in 24 hours and 54 mm in one hour at Sahastradhara, as reported), where data exist).

3.15.4 Performance. The submittal shall report, for each event, the observed and modelled peak, volume and time to peak, and for continuous models the Nash–Sutcliffe efficiency (NSE) and percent bias. As a guide, a calibrated model should reproduce event peaks and volumes within ±25%, and a continuous model should achieve NSE ≥ 0.5 and percent bias within ±25%.

3.15.5 Limits on calibration. Calibration shall not be used to justify design flows lower than those given by the default methods of this chapter, unless site-specific factors are thoroughly examined and documented and the authority agrees.

3.15.6 Reasonableness check. Design peak flows shall be plotted as discharge per unit area against catchment area and compared with the CWC SUH results, regional gauged estimates and known historical floods.

Commentary. Clauses 3.15.5 and 3.15.6 follow APWA, which states that "model calibration shall not be used to justify discharge estimates that are lower than those provided by the baseline unit hydrograph method" and requires unit discharges to be plotted against tributary area and compared with regression, gauge and historical values (KC Metro APWA 5600, 2011, §5602.9). The event-count and performance values in 3.15.3 and 3.15.4 are set by this Manual. The NSE ≥ 0.5 and ±25% bias thresholds are the "satisfactory" streamflow ratings of Moriasi et al. (2007), which were developed for monthly continuous simulation; their use for event peaks and volumes here is an extension.


3.16 Software acceptance

3.16.1 Accepted software. The following are accepted without further demonstration, in a version current at the time of submittal:

  • (a) EPA Storm Water Management Model (SWMM 5.x);
  • (b) USACE HEC-HMS and HEC-RAS;
  • (c) USDA NRCS WinTR-55 and WinTR-20; and
  • (d) spreadsheets for the Rational Method and single-area SCS-CN calculations, where every formula and input is shown.

3.16.2 Other software. Commercial packages built on the SWMM or HEC engines are accepted if the engine and version are stated. Any other method or software is accepted only if the designer reports, for every sub-area, the peak flow, lag, runoff volume and equivalent CN from both that method and a baseline method of 3.16.1, identifies every difference greater than 5%, and justifies every difference that gives a less conservative result.

3.16.3 Benchmark problems. The authority shall publish benchmark test problems (Annex 3C). Software not listed in 3.16.1 shall reproduce them within the stated tolerance.

3.16.4 Model files. Native model input and output files shall be submitted with every hydrograph-based design.

Commentary. The 5% equivalence test is the APWA rule for alternative methods (KC Metro APWA 5600, 2011, §5602.2D). APWA names TR-55, TR-20, HEC-1 and HEC-HMS as baseline methods (§5602.2B). CPHEEO names SWMM for hydrograph and continuous modelling (CPHEEO 2019, Part A §4.4.2). Submitting native model files lets the authority rerun the model and is the main safeguard against unreviewable black-box results.


3.17 Documentation

Every hydrologic submittal shall include:

  1. Form 3-1, Hydrologic Calculation Summary, stating the method used and why (Table 3.1), the software and version, and the computation interval.
  2. Catchment maps for the pre- and post-development conditions, showing sub-areas, flow paths used for Tc, POCs, and off-site run-on.
  3. Soils: the HSG map and its source and scale (Clause 3.7), water-table data (Clause 3.10), and infiltration test results.
  4. Parameter tables for each sub-area and condition: area, impervious area by type and connectivity, HSG, CN at AMC II and III (or C and Cf), Tc worksheets, and n values.
  5. Rainfall: the Design Rainfall Sheet (Form 2-1) and the hyetographs used.
  6. Results: hydrograph tables and plots for each storm; stage–storage and stage–discharge tables; routed outflows; and peak water levels.
  7. Form 3-2, Pre- vs Post-Development Comparison, with Q_pre, Q_post (uncontrolled and routed) and the criterion for each POC, AEP and duration, and the sensitivity runs of Clause 3.14.11.
  8. Calibration report, where Clause 3.15 applies.
  9. Model files (Clause 3.16.4).
  10. A statement by the responsible engineer that the methods and parameters of this chapter have been used, with any departures listed and justified.

References (chapter)

  • MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Volume I, Part A: Engineering Design. Ministry of Housing and Urban Affairs, New Delhi. §4.4 (Rational Method, Table 4.2 runoff coefficients, time of concentration, partial area effect), §8.5 (detention).
  • Kansas City Metro Chapter APWA (2011). Section 5600 Storm Drainage Systems and Facilities (Feb 16, 2011), §5602.2–5602.9.
  • Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01, §5603.4. https://kcmetro.apwa.org/wp-content/uploads/sites/23/2026/01/APWA-Section-5600_Storm-Drainage-Systems-Facilities.pdf
  • Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Policy Supplement). https://www.marc.org/document/apwa-stormwater-standards-supplement
  • USDA Soil Conservation Service (1986). Urban Hydrology for Small Watersheds, Technical Release 55 (TR-55), 2nd ed. Tables 2-2a, 2-2c, 3-1; Figures 2-3, 2-4, 3-1.
  • USDA NRCS. National Engineering Handbook, Part 630 Hydrology: Ch. 7 Hydrologic Soil Groups (2009); Ch. 9 Hydrologic Soil-Cover Complexes; Ch. 10 Estimation of Direct Runoff from Storm Rainfall (2004); Ch. 15 Time of Concentration (2010); Ch. 16 Hydrographs (2007). https://directives.nrcs.usda.gov/
  • Hawkins, R.H., Jiang, R., Woodward, D.E., Hjelmfelt, A.T. and Van Mullem, J.A. (2002). Runoff curve number method: examination of the initial abstraction ratio. Proc. Second Federal Interagency Hydrologic Modeling Conference, Las Vegas.
  • Woodward, D.E., Hawkins, R.H., Jiang, R., Hjelmfelt, A.T., Van Mullem, J.A. and Quan, Q.D. (2003). Runoff curve number method: examination of the initial abstraction ratio. World Water & Environmental Resources Congress, ASCE.
  • Welle, P.I., Woodward, D.E. and Moody, H.F. (1980). A dimensionless unit hydrograph for the Delmarva Peninsula. American Society of Agricultural Engineers paper. See also New Jersey Department of Agriculture, Delmarva Unit Hydrograph bulletin. https://nj.gov/agriculture/divisions/anr/pdf/DelmarvaBulletin.pdf
  • Chow, V.T., Maidment, D.R. and Mays, L.W. (1988). Applied Hydrology. McGraw-Hill. §5.5 (SCS method, AMC), §8.4 (Muskingum), Table 15.1.2 (Kirpich).
  • Kirpich, Z.P. (1940). Time of concentration of small agricultural watersheds. Civil Engineering 10(6), 362.
  • Merkel, W.H. (2001), as cited in USDA NRCS NEH Part 630, Ch. 15 (2010), on the length of sheet flow.
  • ASCE and WPCF (1969). Design and Construction of Sanitary and Storm Sewers. ASCE Manual of Practice No. 37.
  • Texas Department of Transportation. Hydraulic Design Manual, Ch. 4, §12 Runoff Coefficients. https://www.txdot.gov/manuals/des/hyd/chapter-4--hydrology/section-12--rational-method/runoff-coefficients.html
  • Central Water Commission (1984). Flood Estimation Report for Upper Indo-Ganga Plains Subzone 1(e). Approved at the 40th meeting of the Planning and Co-ordination Committee, RDSO, Lucknow, 23–24 July 1984; the design-office report number is not on the scanned copy read for this Manual [TBC]. Read from the Internet Archive copy of 17 April 2016 (78 pages): §§3.9–3.12, §§6.1–6.3 and Plates 9 and 10, re-read by eye over Haridwar–Roorkee, Kotdwara, Kathgodam, Rudrapur and Khatima. http://web.archive.org/web/20160417155336/http://www.cwc.gov.in:80/main/downloads/Upper%20Indo-Ganga%20Plains%20subzone%201(e).Pdf
  • Central Water Commission (1994). Flood Estimation Report for Western Himalayas – Zone 7. Design Office Report No. WH/22/1994, November 1994, CWC, RDSO, IMD and the Ministry of Surface Transport. Read from the Internet Archive copy of 12 April 2016 (87 pages, scanned): the cover, §2.1, the river table, §§3.3–3.6, Annexes 3.1 and 3.2, the ratio table of §4.4.2, Annexes 4.1 to 4.4 and the worked example (pp. 24–26) checked against the page images; Plates 8, 9 and 10 read by eye over Uttarakhand. https://web.archive.org/web/20160412153218id_/http://www.cwc.gov.in:80/main/downloads/Western%20Himalayas%20zone%207.pdf
  • Moriasi, D.N. et al. (2007). Model evaluation guidelines for systematic quantification of accuracy in watershed simulations. Trans. ASABE 50(3), 885–900.
  • "OSD for Australian development projects: does it meet frequent flow management objectives?" Water Science and Engineering (2019). https://www.sciencedirect.com/science/article/pii/S1674237019300213
  • India Meteorological Department (c. 2011). Climate of Uttarakhand. Climatological Summaries of States Series No. 21 (normals; heaviest rainfall in 24 hours by district, data to 2010). https://imdpune.gov.in/library/public/Climate%20of%20Uttarakhand.pdf
  • India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012) (Uttarakhand stations). https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
  • India Meteorological Department (2020). New normal dates of onset/progress and withdrawal of the southwest monsoon (Pai et al.), press release of 15 May 2020, Table 2. https://internal.imd.gov.in/press_release/20200515_pr_804.pdf
  • India Meteorological Department. Press release of 19 October 2021 (record 24-hour rainfall at Pantnagar, Nainital and Mukteshwar); Meteorological Centre Dehradun, extreme-rainfall tables for Dehradun. https://mausam.imd.gov.in/dehradun/mcdata/DEHRADUN_EXTREME.pdf
  • Central Ground Water Board (2024). Dynamic Ground Water Resources and Ground Water Quality of Uttarakhand, 2024 (GWRA-2024 brochure, December 2024); Ground Water Level Bulletin, Uttarakhand, January 2025.
  • Central Ground Water Board. District ground water brochures for Dehradun (2011), Nainital (2010), Udham Singh Nagar (data to 2006–08) and Hardwar (2009); Aquifer Mapping (NAQUIM) reports for Udham Singh Nagar (parts) (October 2016) and Haridwar district (draft).
  • National Institute of Hydrology (c. 1999). Water Balance of Lake Nainital, Kumaun Himalayas, U.P. Report CS(AR)-6/98-99 (Bhishm Kumar and Rm. P. Nachiappan) (scanned; read by optical character recognition).
  • THDC India Ltd (2025). Tehri project progress report, February 2025 (full reservoir level reached on 24 September 2021); project page (full and maximum reservoir levels).
  • Uttarakhand Jal Vidyut Nigam Ltd (2021). Operation and maintenance manuals of the Dakpathar barrage (April 2021) and the Asan barrage (March 2021).
  • Irrigation Department, Uttarakhand. Salient-feature sheets of the Gaula barrage and of the Baur, Haripura and Tumaria dams (23 May 2016). https://uttarakhandirrigation.com/document/gola-barrage-23_05_2016.pdf
  • Vishwakarma et al. (2024). Assessing the performance of various infiltration models to improve water management practices. Paddy and Water Environment, doi 10.1007/s10333-024-01000-9 (three Dehradun sites; abstract only, values not seen).
  • Studies of the Balia Nala landslide, Nainital (Arabian Journal of Geosciences, 2022, doi 10.1007/s12517-022-09742-8; Gupta et al., Natural Hazards 80, 2016) (seen in search extracts).
  • Reports on Joshimath (IIT Roorkee findings and the Mishra Committee of 1976, as reported by Down To Earth, ORF and Mongabay), on Naini lake in October 2021, on the storm of 15–16 September 2025 at Sahastradhara (Down To Earth) and on the river levels of Uttarakhand (SANDRP, "2022 CWC flood monitoring sites in North India", 5 August 2022, and event posts of 2013, 2021 and 2023).
  • US EPA. Storm Water Management Model (SWMM 5). US Army Corps of Engineers, Hydrologic Engineering Center. HEC-HMS and HEC-RAS.

Annexes and forms

Annex / Form Content
3A Uttarakhand soil series to HSG lookup; seasonal high water table map
3B Uttarakhand CN calibration and supplementary land covers (terraced fields, oak and chir pine forest, slide scars and debris fans, bare rock and scree, boulder-bed raos, terai paddy, taal and reservoir beds)
3C Benchmark test problems for software acceptance
3D Peak rate factor study for flat coastal land
3E CWC SUH parameters for subzone 1(e) and zone 7, with worked example
Form 3-1 Hydrologic Calculation Summary
Form 3-2 Pre- vs Post-Development Comparison