Chapter 1Policy, Applicability and Adoption
1.1 Purpose and objectives
1.1.1 This Manual sets the minimum standards for the planning, design, construction, operation and maintenance of stormwater systems in Uttarakhand. It applies to private development and to public works, as set out in Clause 1.5.
1.1.2 The Manual has the following objectives:
- (a) to make stormwater management a condition of development approval, so that new development and redevelopment do not increase flood peaks or runoff volumes downstream;
- (b) to retain frequent rainfall on site, so that groundwater recharge is sustained and pollutant loads are reduced;
- (c) to size storage for the long-duration south-west monsoon storms of July–September, brought by depressions and lows from the Bay of Bengal and forced up against the outer Himalaya, at times with a western disturbance, as in September 1880 and October 2021, which fall on thin hill soils, springs and terai water tables already raised by weeks of rain, on reservoirs and taals at their full levels and on rivers and raos already in flood, as well as for short-duration intensities;
- (d) to design outfalls for the stage of the rivers and raos into which the towns drain, the Ganga at Rishikesh and Haridwar, the Rispana, the Bindal, the Song and the Suswa in the Doon, the Solani at Roorkee, the Gaula at Haldwani, the Kosi at Ramnagar, the Kalyani at Rudrapur, the Sarda at Banbasa and the Alaknanda and the Bhagirathi at the valley towns, which rise within hours and carry boulders and debris; the levels of the reservoirs and barrage ponds of Tehri, Koteshwar, Dakpathar, Asan, Pashulok, Bhimgoda and the Gaula barrage; and the levels of Naini lake and the other taals, held by their sluices, including the case where the outfall is closed;
- (e) to protect tanks (taals), marshes, rivers, supply channels and surplus courses as part of the drainage system;
- (f) to give every element of the drainage network a safe overland path for the 1% AEP (100-yr) storm;
- (g) to make design inputs, approvals and facility records public, so that designs can be checked and repeated; and
- (h) to make sure that facilities, once built, are maintained and remain effective.
1.1.3 This Manual does not replace the rainwater harvesting (RWH) mandate, the building bye-laws made by the Government under section 57 of the Uttar Pradesh Urban Planning and Development Act, 1973, as applicable to and amended in Uttarakhand, and adopted by the board of each development authority (the Uttarakhand Building Construction and Development Bye-laws 2011), or the statutes on waterbodies. It adds runoff control requirements to them (Clause 1.8).
1.2 Stormwater management hierarchy
1.2.1 Every development to which Chapter 4 applies shall consider stormwater measures in the following order. A designer shall not use a lower measure in place of a higher one that is practicable on the site.
- Preserve — keep or restore natural drainage features, tanks, wetlands, permeable soils, trees and overland flow paths (Chapter 7).
- Retain — hold the runoff from the retention depth of Annex 2E on site, by infiltration, reuse or evapotranspiration (Chapters 4 and 8).
- Detain — store larger storms temporarily and release them at or below the rates in Chapter 4, checked against downstream and tailwater conditions (Chapters 4 and 5).
- Convey — carry the remaining flow safely in the minor system, and the 1% AEP flow in the major system (Chapters 6 and 9).
1.2.2 Maintenance underlies all four measures. A measure that cannot be maintained by its owner under Chapter 10 shall not be credited.
1.2.3 Credits from higher measures reduce the requirements of lower ones. Preserved areas and retained volume reduce detention storage as set out in Chapter 4.
Figure 1.1 — Stormwater management hierarchy: preserve, retain, detain, convey, with maintenance underlying each measure. Original drawing for this Manual, adapted from Mid-America Regional Council / Kansas City Metro Chapter APWA, "Layers of Stormwater Management", APWA 5600 Manual Factsheet, 2025 (concept).
Commentary. The order follows the "layers" of Kansas City Metro APWA Section 5600, Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet, 2025). The same logic is behind Georgia's runoff-reduction standard and CSE's "attenuate and infiltrate first" principle (CSE, 2023). For Uttarakhand, the top two layers have a particular meaning. Much of the State's natural storage and recharge lies in its taals (Naini lake, Bhimtal, Naukuchiatal and Sattal), in the recharge areas that feed them, in its springs (naula, a covered spring tank, and dhara, a spring spout), in the khals (small rain-fed ponds) of the hill saddles, in the beds and floodplains of its raos and gadheras, in the bouldery bhabar along the foot of the hills, where the water table lies 40–75 m down and the rivers lose water to the gravels, and in the Asan wetland, the State's only Ramsar site (444.4 ha, designated on 21 July 2020) (CGWB; State Wetland Authority). About half of the subsurface recharge of Naini lake is estimated to enter through the Sukhatal, a basin of about 2 ha (NIH, as cited by NITI Aayog), springs supply 70–87% of the water in some hill blocks, and the working springs of Almora are reported to have fallen from 360 to 60 over 150 years (NITI Aayog, 2018). The law protects some of this. The Bye-laws 2011 bar construction within 30 m of a river bank, 10 m of an underground water source (a spring), 5 m of a nala and 30 m of every lake (bye-law 4.4(III)); the Unified Zoning Regulations of 2025 put rivers, lakes, ponds, nalas and streams in a Conservation Use Zone with no new construction within 30 m of river and lake banks; the Flood Plain Zoning Act protects the notified reaches of the rivers; river beds outside municipal limits are forest land (High Court, Urmila Thapa, 2022); and the High Court has stopped construction on the bed of the Sukhatal (2022, as reported). In the hills the second layer changes. Retention on a slope is storage and reuse, not infiltration: water put into colluvium, slide debris or moraine raises the pressure in the slope, as the Balia Nala slides below Naini lake and the subsidence of Joshimath show, so this Manual bars deliberate infiltration on natural slopes of more than 10°, on mapped landslide or creep zones, on colluvium, slide debris or moraine and close upslope of a cut or retaining wall, unless a geotechnical certificate allows it (Clause 4.11, hill infiltration rule, set by this Manual). Infiltration remains the first choice on the Doon Gravels and the bhabar, which are the recharge zones of the State, and is not credited on terai land where the seasonal water table is within about 1 m. Losing that storage and those springs cannot be offset by pipes, and in the hills drains that put water into a slope can make it fail.
1.3 Legal basis and status
1.3.1 Notification. This Manual shall be given statutory effect by the Government of Uttarakhand through:
- (a) an amendment to the Uttarakhand Building Construction and Development Bye-laws 2011 that makes compliance with this Manual a condition of planning permission, building permit, layout approval and completion certificate, for development to which Clause 1.5 applies; and
- (b) bye-laws or standing orders of each urban local body (ULB), adopting the Manual for works executed or approved by that ULB, including the ULB's own drains and roads.
1.3.2 Higher State standards. The design return periods and performance criteria of this Manual exceed the national advisory minimums of the CPHEEO Manual on Storm Water Drainage Systems (2019). The State shall constitute, by notification, a high-powered committee (the State Stormwater Technical Committee, Clause 1.9) to adopt these higher standards. This is the route that CPHEEO (2019) provides for higher return periods.
1.3.3 Precedence. Within its scope, this Manual governs where it is stricter than CPHEEO (2019), IRC:SP:42-2014, IRC:SP:50-2013 or any departmental standard. Where a statute or statutory rule sets a stricter requirement (for example a waterbody setback), the statute governs.
1.3.4 Design-practice standard for public works. Departments and ULBs that procure drainage, road or waterbody works shall require compliance with this Manual in detailed project reports (DPRs) and contracts, from the dates in Clause 1.11.
Commentary. In Uttarakhand the building rules are the Uttarakhand Building Construction and Development Bye-laws/Regulations 2011 (Amendment 2015), made by the Housing Department (Awas Vibhag) under section 57 of the Uttar Pradesh Urban Planning and Development Act, 1973, as applicable to and amended in Uttarakhand, and amended piecemeal since by notifications under the same section; each development authority adopts each amendment through its board and may propose local modifications to the Government (notification of 10 January 2024). The amendments read for this Manual, of 27 September 2022 (setbacks for single residences), 13 March 2023 (mobile towers), 10 January 2024 (filling stations) and 13 June 2024 (housing for the economically weaker sections), touch water only in the third, which keeps filling stations 50 m from rivers, waterbodies, springs and the floodplain and 5 m from a nala. A comprehensive "Amendment 2017" hosted by MDDA, which invited suggestions until February 2018, exists only as a draft, and later notifications still amend the 2011 (Amendment 2015) text; this Manual cites a compilation of the amendments of 2015–2019, whose agreement with the gazetted text is to be confirmed [TBC]. The bye-laws bar construction within 30 m of a river bank, 10 m of an underground water source and 30 m of every lake, and beyond at least 5 m from a nala (4.4(III), printed as "30.0–30.0 m" and "10.0–10.0 m", read here as single distances pending confirmation [TBC]); bar building on natural slopes of more than 30°, more than 26.5° in the Nainital municipal area, and at sites of severe and continuous landslides, and require a contour plan at 2 m intervals (4.4(IV)); require the site plan on a slope to show the landslide-prone areas near it and to divert the natural flow of water coming from uphill away from the foundations (4.4(V)(b)); set a plinth of at least 0.45 m above ground (2.41); allow only one basement in the hills, on plots of at least 2,000 m² with a frontage of at least 18 m (5.6); and require a sewer no-objection certificate or a treatment plant for premises of more than 1,000 m² (6.4(III)). Bye-law 4.4(V)(b) is the only clause on site runoff. The bye-laws set no design storm, return period, release rate or detention volume, and no "zero runoff" rule. The route of Clause 1.3.1(a) therefore runs through a Housing Department notification under section 57, adopted by the board of each development authority. This Manual is a draft; neither the Government nor any authority has adopted it. MoHUA told Parliament in July 2026 that urban flooding "falls under the purview of the State Governments and the ULBs" and listed the CPHEEO manual among "advisory guidelines" (Lok Sabha AU1847). The State therefore needs no central approval to adopt higher standards. CPHEEO's Note 2 to Table 4.1 (§4.4.1.4) allows "a high powered committee constituted by State/UT Government through a notification" to adopt higher return periods. Clause 1.3.2 uses that route so that higher standards are on record for centrally funded schemes.
1.4 Definitions
1.4.1 The following terms apply throughout this Manual. Chapter-specific terms are defined in each chapter (for example Clause 2.2).
| Term | Meaning in this Manual |
|---|---|
| Approving Authority (the Authority) | The body that grants planning permission, building permit or layout approval for a development, or that sanctions a public work: the Mussoorie Dehradun Development Authority (MDDA), the Haridwar Roorkee Development Authority (HRDA) or a district development authority constituted under the Uttar Pradesh Urban Planning and Development Act, 1973, as applicable to and amended in Uttarakhand, in its development area; the Uttarakhand Housing and Urban Development Authority (UHUDA), or the authority to which a regulated area has been transferred, in that area; or, where it grants building permission, the Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat concerned (the division of these powers, and the bodies that grant permission outside development areas, are to be confirmed [TBC]), or a department for its own works. |
| Applicant | The owner, developer or department that seeks approval, and its successors in title. |
| Development | Any building, layout, sub-division, road, paving or land-use change that requires approval under the Uttarakhand Building Construction and Development Bye-laws 2011 or that is executed as a public work. |
| Redevelopment | Development on a site where impervious cover already exists. |
| Land disturbance | Clearing, grading, excavation, filling or paving of land, measured in plan area over the whole of a common plan of development (Clause 1.5.5). |
| Impervious area | Roofs, paving, compacted gravel, decks and other surfaces that prevent infiltration. Permeable paving designed to Chapter 8 is counted as pervious only for the area it treats. |
| New or replaced impervious area | Impervious area created, or removed and rebuilt down to the subgrade, by the development. Resurfacing that leaves the base in place is not "replaced". |
| Retention | Permanent removal of runoff from the drainage system on site, by infiltration, reuse or evapotranspiration (Chapter 4). |
| Detention | Temporary storage of runoff with a controlled outlet, emptied after the storm (Chapter 4). |
| Rainwater harvesting (RWH) | Collection of rainfall for supply or recharge under the RWH mandate. RWH storage is not detention unless Chapter 4 allows it. |
| Minor system | Drains, pipes and inlets designed for the minor-system AEP of Chapter 6. |
| Major system | The overland and floodway path that carries the 1% AEP (100-yr) flow (Chapter 6). |
| Pre-development condition | Greenfield: open land in good condition for the mapped hydrologic soil group. Existing impervious cover is not counted (Chapter 3). |
| Flood-sensitive catchment | The catchments of the Rispana, the Bindal, the Song, the Suswa and the Tons (Tamsa) and of their khalas within the development area of MDDA; the low-lying land of Haridwar, Jwalapur and Kankhal that drains to the Ganga below the Bhimgoda barrage; the land of Haldwani–Kathgodam that drains to the Gaula and to the Rakasia and Kalasia nalas; the land of Rudrapur, Kichha and Pantnagar that drains to the Kalyani and the Kichha across the terai; the whole catchment of Naini lake, with the Sukhatal basin and the land along the Balia Nala below the Tallital sluices; the land of Rishikesh, Muni-ki-Reti and Dhalwala that drains to the Ganga above the Virbhadra (Pashulok) barrage or to the Chandrabhaga; valley-floor towns on river terraces below the fans of gadheras, such as Srinagar, Rudraprayag and Uttarkashi; and the land within, or draining directly into, the prohibited or restricted zone of a river reach finally notified under the Uttarakhand Flood Plain Zoning Act 2012, and any catchment the Authority notifies (Chapter 4; Annex 1B). |
| Waterbody | A river, stream, canal, tank (taal), lake, pond, marsh, supply channel or surplus course, whether perennial or seasonal (Chapter 7). |
| Regional facility | A detention, retention or tank storage facility serving more than one development, built or restored under a basin plan (Chapter 4). |
| Tier A / Tier B authority | An Approving Authority classed under Clause 1.6. |
| Policy supplement | The set of adoptable alternative clauses in Clause 1.7 and Annex 1C. |
| Drainage report | The preliminary or final report required by Chapter 10. |
| Registered professional | A person registered under the Uttarakhand Building Construction and Development Bye-laws 2011 to prepare and sign the relevant plans, with any further qualification required by Clause 10.6. |
| Compliance calculator | The State-issued tool for computing and reporting compliance (Clause 10.5). |
| Maintenance declaration | The registered undertaking by an owner to maintain a stormwater facility (Clause 10.10). |
| Variance | Approval to depart from a numeric requirement, with equivalent performance shown (Clause 1.10). |
| Waiver | Approval that a requirement does not apply to a site, on the grounds in Clause 1.10. |
| Notified | Published by the Government or the State Stormwater Technical Committee in the Uttarakhand Gazette. |
Commentary. "Replaced" impervious area is defined to the subgrade so that redevelopment of a fully paved site is captured, while routine resurfacing is not. This follows the approach of the APWA 5600 (2025.01) redevelopment triggers (MARC Supplement, 2025).
1.5 Applicability
1.5.1 Who is covered. This Manual applies to:
- (a) all development requiring planning permission, building permit or layout approval under the Uttarakhand Building Construction and Development Bye-laws 2011;
- (b) all drainage, road, bridge, culvert, waterbody and flood-mitigation works executed by a ULB, a State department, a board, or a State undertaking; and
- (c) works executed by Central agencies or their contractors within Uttarakhand, to the extent that the Authority's approval or no-objection is required.
1.5.2 Retention and detention threshold. Chapters 4 and 5 (retention, detention, downstream and tailwater analysis) apply to any development that, over the common plan of development, involves:
- (a) land disturbance of 0.1 ha or more; or
- (b) new or replaced impervious area of 500 m² or more.
1.5.3 RWH. The existing RWH mandate continues to apply under bye-law 6.5 of the Bye-laws 2011 to every permitted construction, of any land use, with a ground coverage of 125 m² or more, except in areas with a waterlogging problem, as storage of at least 2.0 m³ for a coverage of up to 250 m², 3.5 m³ up to 400 m² and 0.5 m³ more for every further 50 m² or part, reduced to one-third on plots of more than 400 m² where groundwater recharge is provided by bore well, recharge pit, well or trench, and confirmed on the building plan before approval (the Uttarakhand Ground Water (Regulation and Control of Development and Management) Act, 2016, whose section 20 provided for rainwater harvesting, was repealed in 2017 and gives no mandate), as now. This Manual does not change it.
1.5.4 Provisions that apply at every size. The following apply to all development under Clause 1.5.1, whatever its size, unless exempted by Clause 1.5.8:
- (a) no sewage connection to a storm drain (Chapter 8);
- (b) lowest habitable floor and openings at or above the 1% AEP level plus 0.5 m, where a 1% AEP level is mapped or determinable (Chapter 6);
- (c) waterbody setbacks and the no-fill zone (Chapter 7); and
- (d) no obstruction of a natural drainage path or major-system flow path (Chapter 6).
1.5.5 Common plan of development. The thresholds of Clause 1.5.2 apply to the total area of a development, including all phases, plots and sub-divisions under one layout approval or one ownership at the date of application. A development shall not be divided to avoid the thresholds.
1.5.6 Redevelopment. For redevelopment, the thresholds apply to new plus replaced impervious area. Retention and detention apply to the whole of the new and replaced impervious area, and the pre-development condition is greenfield (Clause 1.4). Where greenfield control cannot be achieved on a constrained redevelopment site, the relief route of Clause 4.5.6 applies: a minimum on-site cut of 50% from existing peaks, with the shortfall paid as fee-in-lieu into basin storage.
1.5.7 Linear public works. For roads, widening and other linear works, the impervious area threshold applies to the added impervious area within each drainage catchment crossed. Retention and detention shall be provided within the right of way, or in a regional facility under Chapter 4, where the right of way cannot hold them.
1.5.8 Exemptions. The following are exempt from Chapters 4 and 5:
- (a) a single dwelling on its own plot, where the thresholds of Clause 1.5.2 are not met; and
- (b) linear road resurfacing that adds no impervious area.
Exempt development remains subject to the RWH mandate and to Clause 1.5.4.
1.5.9 Applicability determination. The Applicant shall record the applicability decision on Form 1-1 (Applicability Determination) with the first submittal under Chapter 10. The Authority may confirm or correct it at the pre-application stage.
Figure 1.2 — Applicability decision flowchart for Clause 1.5. Original drawing for this Manual.
Commentary. The thresholds have no single direct precedent; they are set by this Manual. Precedents span a wide range:
- Singapore controls peak runoff from developments of 0.2 ha or more (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5).
- Malaysia's 2008 DID checklist used on-site detention for sites up to 0.1 ha and community ponds above that.
- The APWA 5600 (2025.01) Policy Supplement offers alternative triggers of ¼ acre (about 0.1 ha) disturbed, or 1 acre (about 0.4 ha) with 10,000 sq ft (about 930 m²) impervious, and warns agencies not to exceed a 1-acre trigger.
- MBBL 2016 makes recharge mandatory for buildings over 500 m².
The 0.1 ha / 500 m² trigger sits at the strict end of these, because typical Uttarakhand plots are small and the cumulative effect of many small plots is what fills Dehradun's drains. For small buildings in Uttarakhand, bye-law 6.5 of the Bye-laws 2011 requires rainwater storage only where the ground coverage is 125 m² or more, and not in waterlogged areas: 2.0 m³ up to 250 m² of coverage, 3.5 m³ up to 400 m² and 0.5 m³ for each further 50 m², reduced to one-third on plots of more than 400 m² that provide recharge. That is about 8–16 mm of rain over the covered area, and 10 mm at the margin; it is a supply measure, and none of it limits what leaves the plot. A plot below 125 m² of coverage has no rule at all. On a slope the only runoff clause, bye-law 4.4(V)(b), diverts the water coming from uphill away from the foundations, which protects the building but sends the water on to the next plot or the road. The plinth of at least 0.45 m (bye-law 2.41) is measured from the ground, not from any flood level, although the plinth inspection that the bye-laws already require is the natural point to check it. Clause 1.5.4(b) applies to every building whatever its size for this reason. A small building on a hill slope is also where a soak pit or recharge pit can do most harm; the Bye-laws 2011 do not forbid one, and an Authority may make the hill infiltration rule of Clause 4.11 a condition of every building permit in its hill area, whatever the size of the site (a recommendation of this Manual, not a requirement of Clause 1.5.4).
Clause 1.5.4(b) has no direct precedent; this Manual sets it because floor levels are the cheapest protection a building can have, and it would be perverse to protect only large developments. Where no 1% AEP level is mapped, Chapter 6 gives the method for small sites.
1.6 Tiered adoption
1.6.1 Tier A authorities. The following are Tier A:
- (a) Dehradun Municipal Corporation (DMC);
- (b) every Approving Authority within the development area of MDDA, the Mussoorie Dehradun Development Authority, under the Uttar Pradesh Urban Planning and Development Act, 1973, as applicable to and amended in Uttarakhand, as that area is notified from time to time, including Dehradun, Mussoorie and Rishikesh, which was merged into it in 2019, and including MDDA itself and the Nagar Nigams, Nagar Palika Parishads and Nagar Panchayats in that area; and
- (c) every other Nagar Nigam constituted under the Uttar Pradesh Municipal Corporation Act, 1959, as adapted in Uttarakhand, as constituted from time to time, among them Haridwar, Roorkee, Kotdwar, Srinagar, Haldwani, Rudrapur, Kashipur, Almora and Pithoragarh, and HRDA, UHUDA and every district development authority where it grants permission within the planning area of a Nagar Nigam.
1.6.2 Tier B authorities. All other Nagar Palika Parishads and Nagar Panchayats are Tier B.
1.6.3 What differs between tiers. All criteria of this Manual apply in both tiers. The tiers differ only in method and review:
Table 1.1 — Differences between Tier A and Tier B authorities
| Item | Tier A | Tier B |
|---|---|---|
| Performance criteria (Chapters 2–9) | Apply in full | Apply in full |
| Hydrologic method for storage | Hydrograph method (Chapter 3) | Hydrograph method, or the design-aid route of Clause 1.7 where eligible |
| Compliance calculator (Clause 10.5) | Required as a summary | Required; may be the sole calculation on the design-aid route |
| Policy supplement alternatives (Clause 1.7) | Only with State Stormwater Technical Committee concurrence | May be adopted by council resolution |
| Technical review | By the Authority | By the Authority, with T&CP regional support or an empanelled reviewer (Clause 10.7) |
| Flood-sensitive catchment rule | Applies | Applies |
1.6.4 Moving between tiers. A Tier B authority may opt into Tier A by council resolution. The Government may notify a Tier B authority as Tier A when it becomes a Corporation, joins the development area of MDDA, HRDA or a district development authority constituted under the Uttar Pradesh Urban Planning and Development Act, 1973, as applicable to and amended in Uttarakhand, or is found by a post-event review (Clause 10.16) to need the full methods.
1.6.5 Flood-sensitive catchments override tier. In a flood-sensitive catchment, whatever the tier, the alternatives of Clause 1.7 are available only as Table 1.2 allows: S-1 (the design-aid route) for sites of 0.5 ha or less (Clause 4.14.1), and S-5 fee-in-lieu where a basin plan has been notified (Clause 1.10.3(d)). S-2, S-3 and S-4 are not available.
Commentary. Dehradun Municipal Corporation, with its engineering wing and a city whose drains and khalas discharge to the Rispana, the Bindal and the other raos of the Doon, 208 of them to the Rispana alone (Peyjal Nigam, affidavit before the NGT, 2025), and a small hill Nagar Panchayat with one assistant engineer cannot be asked to review the same hydrograph models. The Kansas City solution was to keep one regional standard and publish adoptable alternatives for the most contested criteria, so that smaller agencies can "opt down" without leaving the standard (MARC Supplement, Nov 2025). The tiers here keep the performance criteria the same in both tiers and vary only the method, so that a building in a Tier B town is protected to the same level as one in Dehradun.
1.7 Policy supplement: adoptable alternatives
1.7.1 The Government shall publish, with this Manual, a Policy Supplement (Annex 1C) of alternative clauses. An Approving Authority may adopt one or more alternatives under the conditions in Clause 1.7.3.
1.7.2 The alternatives are:
Table 1.2 — Policy supplement: adoptable alternatives S-1 to S-5
| No. | Main-text requirement | Adoptable alternative | Eligibility |
|---|---|---|---|
| S-1 | Storage sized by hydrograph method (Chapter 3) | Design-aid route: retention and detention volumes taken from the unit-storage tables (m³ per ha, by rainfall zone, soil group and impervious fraction) in Annex 4 and the compliance calculator | Sites ≤ 2 ha outside flood-sensitive catchments; ≤ 0.5 ha within them (as Clause 4.14.1) |
| S-2 | Release rate Q_post(T) ≤ 0.9 × Q_pre(T), computed for the site | Permissible site discharge (PSD): a tabulated unit-area release rate (m³/s/ha) by zone and AEP, derived from the 0.9 × Q_pre rule | Any site outside flood-sensitive catchments |
| S-3 | Waterbody setback extended to the mapped 1% AEP flood extent plus margin (Chapter 7) | Fixed-width setback table by waterbody class, where no 1% AEP extent is mapped. Never less than the Zone 1 minimum of Clause 7.4.7 | Waterbodies with no mapped 1% AEP extent |
| S-4 | Downstream analysis by hydraulic model (Chapter 5) | Screening checklist of downstream capacity and known flooding, with a model only where the screen fails | Sites < 1 ha, outside flood-sensitive catchments, not discharging to a tidal outfall |
| S-5 | On-site detention | Fee-in-lieu toward a regional facility or restored tank storage in a master-planned basin (Chapter 4) | Where a basin plan has been notified |
1.7.3 Conditions on adoption.
- (a) An alternative shall not lower any criterion below the values of this Manual. S-1 and S-2 are simplified methods for meeting the same criterion. They are not lower criteria.
- (b) A Tier B authority adopts an alternative by council resolution, sent to the State Stormwater Technical Committee within 30 days. A Tier A authority needs the Committee's concurrence before adoption.
- (c) The adopted alternatives shall be published on the Authority's website and in the register of Clause 10.17.
- (d) Retention (Annex 2E depth) cannot be replaced by any alternative, except where fee-in-lieu under S-5 funds equivalent retention in the same basin.
- (e) The tables for S-1, S-2 and S-3 shall be issued by the State Stormwater Technical Committee, and reviewed with Chapter 2 (Clause 2.14).
Commentary. The supplement follows the model of the APWA 5600 (2025.01) Policy Supplement, which gives alternatives for the four most contested criteria (applicability, Rational Method limits, stream setback trigger, and Zone 2 setback width). Two of those map onto S-3 and onto the applicability threshold of Clause 1.5.2. Alternative S-3 copies the APWA answer to the same problem: the 1% AEP extent is not mapped for small drainage areas, so a fixed-width table is offered. S-2 follows the Kansas City 2011 shift from "match existing" to fixed unit-area release rates. Local agencies preferred a set rate because existing conditions were hard to determine consistently (MARC Evolution deck). It also reflects the Sydney Water permissible site discharge (PSD) method. The 2 ha / 0.5 ha limits for S-1 (matching Clause 4.14.1) and the 1 ha limit for S-4 have no direct precedent; they are set by this Manual.
1.8 Relationship with other instruments
1.8.1 This Manual shall be applied together with the instruments below. Where they overlap, Clause 1.3.3 governs.
Table 1.3 — Relationship with other instruments
| Instrument | Relationship |
|---|---|
| Uttarakhand Building Construction and Development Bye-laws/Regulations 2011 (Amendment 2015), made by the Housing Department under section 57 of the Uttar Pradesh Urban Planning and Development Act, 1973, as applicable to and amended in Uttarakhand, and adopted by the board of each development authority; amendments read: 27 September 2022, 13 March 2023, 10 January 2024 (No. 180884) and 13 June 2024; a compilation of 2015–2019 read, its gazetted text to be confirmed [TBC]; the "Amendment 2017" exists only as a draft | Continue. Bye-law 4.4(III) bars construction within 30 m of a river bank and 10 m of an underground water source (a spring), both printed as ranges ("30.0–30.0" and "10.0–10.0" m) and read here as single distances [TBC], within at least 5 m of a nala, and within 30 m of the bank of every lake, including the Nainital lake special area, or of the maximum fixed level of a natural reservoir, whichever is more; bye-law 4.4(IV) bars building on natural slopes of more than 30° (26.5° in the Nainital municipal area) and at sites of severe and continuous landslides, and requires a contour plan at 2 m intervals; bye-law 4.4(V) requires the site plan in the hills to show nearby landslide-prone areas and, on a slope, to divert the natural flow of water from uphill away from the foundations; bye-law 2.41 sets a plinth of at least 0.45 m above ground; bye-law 5.6 allows a single basement in the hills, on plots of at least 2,000 m² with a frontage of at least 18 m, and requires a certificate on the effect of excavation on stability and the water table; bye-law 6.4(III) requires a sewer no-objection certificate or a treatment plant above 1,000 m²; and Appendix 1 (Nainital) asks that drainage be improved so that no water accumulates and saturates the ground near the footings. The amendment of 10 January 2024 keeps filling stations 50 m from rivers, waterbodies, springs and the floodplain and 5 m from a nala. The bye-laws set no design storm, release rate, detention volume or "zero runoff" rule, and no rule on infiltration on slopes. The design criteria of Chapters 2–6, the hill rules of Chapters 4, 6 and 8 and the hydraulic corridor and setbacks of Chapter 7, whose Zone 1 is at least 15 m, are this Manual's proposals; they are not statutory values, and no authority has adopted them. Where the bye-laws, a master plan or a statute are stricter, they govern (Clause 1.3.3). |
| Rainwater harvesting: Bye-laws 2011, bye-law 6.5; Uttarakhand Ground Water (Regulation and Control of Development and Management) Act, 2016 (Act 12 of 2016), repealed by Act 11 of 2017 | Continue unchanged. Bye-law 6.5 requires rainwater storage on every permitted construction with a ground coverage of 125 m² or more, except in waterlogged areas: 2.0 m³ up to 250 m², 3.5 m³ up to 400 m² and 0.5 m³ for each further 50 m² or part, reduced to one-third on plots of more than 400 m² where recharge is provided; the provision is confirmed on the plan before approval, and drainage and storage structures do not count as ground coverage. The storage is about 8–16 mm of rain over the covered area. The Ground Water Act of 2016, whose section 20 provided for rainwater harvesting, was repealed in 2017 "at once", so no groundwater statute is in force in the State. This Manual counts bye-law storage against its retention requirement only as reuse or verified infiltration (Clauses 4.4.3 and 4.11), and in the hills only as storage, under the hill infiltration rule of Clause 4.11. |
| Uttar Pradesh Urban Planning and Development Act, 1973, as applicable to and amended in Uttarakhand (2013); Uttarakhand Unified Zoning Regulations, Housing Department notification No. 568/E.No. 92710 of 20 November 2025, under section 8(2) | Continue. MDDA (Dehradun, Mussoorie and, since 2019, Rishikesh), HRDA and the district development authorities constituted in 2016–17 prepare master plans and grant permission in their development areas, and UHUDA holds the former regulated areas. The Unified Zoning Regulations, to be part of every master plan prepared in the State, put rivers recorded in the revenue records and all existing waterbodies, "including ponds, lakes, nalas and streams", in a Conservation Use Zone with a green buffer under the prevailing bye-law, in which no construction is allowed, and allow no new construction within 30 m of river and lake banks (chapter 11, E-1). Master plans would show the flood-sensitive catchments, drainage reserves and regional facility sites of this Manual (Chapter 11). |
| Uttaranchal (Uttar Pradesh Municipal Corporation Act, 1959) Adaptation and Modification Order, 2002, and the Uttar Pradesh Municipalities Act, 1916 (Uttaranchal Amendment), 2002, as amended; Uttarakhand Special Provisions for Urban Local Bodies and Authorities Act, 2018 | Continue. The Nagar Nigams run on the adapted Act of 1959 and the Nagar Palika Parishads and Nagar Panchayats on the adapted Act of 1916 (CAG, 2022); in the Uttar Pradesh text the Municipal Commissioner maintains and repairs all Corporation drains, but the drainage chapters of the adapted texts and of the amendments of 2007–2025 were not read for this Manual [TBC]. The Act of 2018 bars the eviction of settlements that existed before 11 March 2016, a cut-off extended by an amendment of 2025 (as cited by the High Court); the High Court has held that moving families from the dry bed of the Rispana, where a flash flood endangers them, is rehabilitation and not eviction (Rajeshwari Yadav Gupta, WPMS 739/2026, 1 April 2026). |
| Uttarakhand Flood Plain Zoning Act, 2012 (Uttarakhand Act No. 07 of 2013), as amended in 2024; final notifications under it; Uttarakhand Floodplain Zoning Rules, 2026 (approved by the cabinet on 12 October 2026; text not found [TBC]) | Continue, and govern where a reach is notified. The Collector or another authority is the Flood Zoning Authority (s.3), the Irrigation Department maps the 25-year (prohibited) and 100-year (restricted) zones with HEC-RAS, marks them on the revenue (shajra) maps and sets pillars, and no activity is allowed in either zone without the Authority's permission, deemed granted after 90 days (s.12(3)). Final notifications cover 614.6 km of the Bhagirathi, the Ganga, the Bhilangana, the Alaknanda and the Mandakini (Irrigation Department, 2024) and the Rispana (5 May 2025, as cited by the NGT); the cabinet approved the Asan's in June 2025 (as reported); the Gaula, the Kosi, the Suswa, the Song, the Baldi and the Solani have been studied but not notified. In the restricted zone of the Ganga at Rishikesh the notice of intent of 7 October 2020 (No. 1875/II(2)-2020-06(18)/2020) allows rebuilding only with a plinth at least 1.00 m above the high flood level. The amendment of 2024, seen only as quoted, extends the period for notification to 24 months and lets a final notification be amended where "riverbank development" can protect land and buildings, which would shrink notified floodplain storage [TBC]. Where no line is notified, the hydraulic corridor of Chapter 7, with a Zone 1 of at least 15 m, and the bye-law lines of 30 m and 5 m apply, whichever is wider, as this Manual's proposal. |
| Housing Department G.O. No. 1995/V-2-2017-58(आ0)/2014 of 29 November 2017 on the banks of the Ganga in the hills, and letter of 1 June 2023; NGT, M.C. Mehta, OA 200/2014, judgment of 13 July 2017; High Court, Lalit Miglani, WPPIL 140/2015, 2 December 2016 | Apply where they bind. Upstream from Rishikesh the G.O. makes the prohibited zone 100 m from the middle of the river or the area of floods up to the 25-year frequency, whichever is more, and the next 200 m a regulatory zone; since 2023 the Irrigation Department's floodplain notifications govern where they exist. Downstream, from Haridwar to Unnao, the NGT designated 100 m "from the edge of the river" as a no-development zone until the floodplain is demarcated. The State's order reads the Tribunal as measuring from the middle of the river and the judgment measures from the edge; this Manual cites each for its reach and does not merge them [TBC]. |
| Doon Valley notification, S.O. 102(E) of 1 February 1989 under the Environment (Protection) Act, 1986, amended by S.O. 94(E) of 6 January 2020; Bhagirathi Eco-Sensitive Zone, notified on 18 December 2012 (S.O. 2930(E) in MoEF's documents), with its Zonal Master Plan of 2020 | Apply where they bind. The Doon Valley notification regulates industry, mining and changes of land use in the valley, and the High Court has relied on it for the khalas and storm-water drains of Rajpur (Urmila Thapa); the Bhagirathi zone covers 4,179.59 km² from Gaumukh to Uttarkashi, including Dharali. Their drainage, river-bank and slope clauses were not read for this Manual [TBC]. |
| Nainital: Bye-laws 2011, bye-laws 4.4(III)(iii), 4.4(IV)(iv) and 5.1 and Appendix 1; Lake Development Authority, Nainital; High Court, Ajay Singh Rawat, WPPIL 31/2012, and the Sukhatal orders of 2022 | Apply where they bind. In the Nainital municipal area building is allowed only on slopes of 0–26.5°, only two storeys and 7.5 m, and no construction within 30 m of the lake; the High Court has stopped construction on the Sukhatal lakebed (2022, as reported). Its order of 2016 barring construction within 2 km of the major lakes was stayed by the Supreme Court in 2018 and is not cited as in force. The instruments of the Lake Development Authority were not read [TBC]. |
| Wetlands (Conservation and Management) Rules, 2017; Uttarakhand State Wetland Authority (letter No. 757(1)/X-3-18-09(01)2004 of 16 October 2019); Asan Conservation Reserve (Ramsar site, 21 July 2020) | Continue. The Rules' restrictions apply to wetlands once notified; of the 192 wetlands of the national atlas in the State, 149 had been ground-truthed by October 2025 and none was found notified (State Wetland Authority, 2025). |
| River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016; Namami Gange interception and diversion works; orders of the NGT on the Rispana (Niranjan Bagchi, OA 417/2022) and of the High Court on the river beds of the Doon (Urmila Thapa, WPPIL 58/2019) and the Gaula (Ravi Shankar Joshi, WPPIL 178/2013) | Apply where they bind. The NGT has directed the removal of encroachments from the Rispana's floodplain, subject to NMCG's review under clause 6(3) of the Order; the High Court recorded that river beds outside municipal limits are classified as forest land and made the Municipal Commissioner personally responsible for removing encroachments within them. Sewage in storm drains is dealt with in Chapter 8. |
| Disaster Management Act, 2005; USDMA; the Uttarakhand Landslide Mitigation and Management Centre (ULMMC); the flood control rooms of the Irrigation Department | Continue. No urban flood plan or standard operating procedure of USDMA was read for this Manual [TBC]; the dates by which drains are to be cleaned before the monsoon (15 June) and USDMA's monsoon period (5 June–15 September) were found only in press reports, and the works calendar of Chapter 10 sets this Manual's dates. |
| IRC:SP:48, Hill Road Manual (1998), and the practice of the Public Works Department on hill-road drainage | Apply to the drainage of hill roads, cross-referenced from Chapter 6, where they do not conflict with it; the drainage clauses of IRC:SP:48 were not read for this Manual [TBC]. |
| Design criteria of the ADB-funded Uttarakhand Integrated and Resilient Urban Development Project for the drains of Dehradun (climate risk assessment, 2021) | Superseded for works designed under this Manual. They size roadside drains for a 2-yr storm and primary and secondary channels for a 5-yr storm, with no climate allowance; Table 2.1 and Chapter 6 apply instead. |
| CPHEEO Manual on Storm Water Drainage Systems (2019) | Engineering reference. This Manual sets higher return periods under Clause 1.3.2. |
| NDMA Guidelines on Management of Urban Flooding (2010) and MoHUA SOP (2017) | This Manual puts into effect the NDMA directives on catchment-based design, detention and retention, waterbody protection and climate-adjusted IDF. |
| NDMA Urban Flood Risk Management Programme (UFRMP) and AMRUT 2.0 | Works funded under these programmes shall comply with this Manual. The development controls of Chapters 4–5 protect the capacity those works create. |
| IRC:SP:42-2014 and IRC:SP:50-2013 | Apply to road drainage only where they do not conflict with Chapter 6. |
| MBBL 2016, Chapter 9 | Model for RWH and for the inspection regime in Chapter 10. |
Commentary. RWH in Uttarakhand is framed as a water supply and recharge measure. It works well for that purpose. It cannot, however, be relied on for flood control in the SW monsoon, because RWH sumps are usually full or the ground saturated by the time a July to September monsoon burst or cloudburst against the outer Himalaya, or a late-season storm such as that of October 2021 arrives after weeks of rain. The Manual therefore keeps harvest volume and attenuation volume apart, while letting recharge count as retention where it truly removes water from the system.
Uttarakhand is spending on its town drains. The ADB-funded Uttarakhand Integrated and Resilient Urban Development Project is building at least 117 km of storm drains in Dehradun, with outfalls to the Bindal and the nalas of the city (ADB, 2022); Dehradun Smart City Ltd has an integrated drainage work of about ₹17 crore (CAG, 2025); the Irrigation Department is preparing drainage master plans for Haldwani, of about ₹1,003 crore, and for the other towns of Kumaon, about ₹3,394 crore in all (as reported); and the interception of the drains of the Rispana and the Bindal under Namami Gange was completed in 2021–2025 (Peyjal Nigam, affidavit before the NGT). Only the ADB drains have a stated design storm, 2 and 5 years; the Smart City's drainage DPR left out the storm-water reuse it had provided for (CAG, 2025); and none of the master plans found states a design storm. No development-control condition stops new plots in the same catchments from using up the capacity such works create. Linking Chapters 4–5 to approvals closes that gap.
The State's law already holds many of the tools, more than any plains State of the series. It keeps buildings 30 m from rivers and lakes, 10 m from springs and 5 m from nalas, keeps them off slopes of more than 30° and away from landslides, and asks every hill site plan to divert the water from uphill away from its foundations (Bye-laws 2011, 4.4); it puts rivers, ponds, lakes, nalas and streams in a Conservation Use Zone in every master plan (Unified Zoning Regulations, 2025); it draws 25-year and 100-year flood lines river by river under the Flood Plain Zoning Act, the only working floodplain-zoning law found in the series; it adds the Ganga hill order of 2017; and the High Court and the NGT have acted on the river beds of the Doon, the Rispana, the Gaula and the Sukhatal. What it lacks is a design standard. None of these instruments says how large a drain must be, which storm it must carry, how much water a hill site may put into its slope, how a gadhera's flood level is to be fixed where no line is notified, or how much storage a paved plot removes; and the floodplain lines cover only the reaches notified. This Manual's checks are framed as part of the building permission of the development authorities and the local bodies, and of the permission of the Flood Zoning Authority where a line is notified, not as a separate no-objection certificate. This Manual is offered as a technical companion to these instruments, to the orders of the High Court and the NGT, and to the drainage works of the towns: it supplies the design storm, detention, hill-site drainage, infiltration and buffer numbers they do not set, as a proposal for the Government and the authorities to consider. Neither the Housing Department, the Urban Development Department, the Irrigation Department nor any other body has adopted it.
1.9 Roles and responsibilities
1.9.1 The responsibilities below apply under this Manual. They do not change any agency's statutory powers.
Table 1.4 — Roles and responsibilities under this Manual
| Agency | Role under this Manual |
|---|---|
| Housing Department (Awas Vibhag) | Makes the Bye-laws 2011 and their amendments under section 57 of the 1973 Act, and the Unified Zoning Regulations under section 8(2); oversees UHUDA, MDDA, HRDA and the district development authorities. Would prepare the amendment of Clause 1.3.1(a) and ask each development authority's board to adopt it. |
| Urban Development Department and Directorate | Administers the Nagar Nigams, Nagar Palika Parishads and Nagar Panchayats and oversees UUSDA and Dehradun Smart City Ltd (CAG, 2022). Would issue the model ULB bye-law of Clause 1.3.1(b), apply this Manual to the drainage works it funds, and, with T&CP, give regional support to Tier B authorities (Table 1.1) and maintain the empanelled reviewer list (Clause 10.7). |
| State Stormwater Technical Committee (Clause 1.3.2) | Would adopt higher standards, issue Annexes, tables and the compliance calculator, concur with Tier A alternatives, decide variances referred to it and review the Manual (Clause 1.12). |
| Town and Country Planning Department (T&CP) | Prepared the Unified Zoning Regulations of 2025 and advises on master plans. Would show flood-sensitive catchments, drainage reserves and regional facility sites in master plans (Chapter 11). |
| Uttarakhand Housing and Urban Development Authority (UHUDA) | The State-level development authority, holding the former regulated areas. Would apply this Manual to the areas and schemes it controls. |
| MDDA (Mussoorie Dehradun Development Authority), the Haridwar Roorkee Development Authority (HRDA) and the district development authorities | Prepare master plans and grant building and layout permission in their development areas under the Bye-laws 2011, which their boards adopt; MDDA has removed encroachments from the Rispana's floodplain under the NGT's orders. Would require the drainage report of Chapter 10 with each application, check the hill rules at the plinth inspection, and hand over drains and storage to the local body under Clause 10.14. |
| Dehradun Municipal Corporation (DMC) and the other Nagar Nigams (Haridwar, Roorkee, Rishikesh, Kotdwar, Srinagar, Haldwani, Rudrapur, Kashipur, Almora and Pithoragarh, as reported [TBC]); Nagar Palika Parishads and Nagar Panchayats | Hold, clean and maintain the public drains, nalas and khalas of their areas under the Municipal Acts as adapted (texts not read [TBC]); keep the river beds within municipal limits free of encroachment (High Court, Urmila Thapa). Would apply this Manual to their works, receive handed-over assets (Clause 10.14), and inspect and enforce (Clauses 10.12–10.15). |
| Uttarakhand Urban Sector Development Agency (UUSDA) and Dehradun Smart City Ltd (DSCL) | Build drains under the ADB-funded programme and the Smart Cities Mission for the Urban Development Department and hand them to the local body. Would design them to this Manual from the dates of Clause 1.11. |
| Irrigation Department | The nodal agency for floodplain zoning: maps the 25- and 100-year zones and proposes their notification; builds and maintains flood-protection works, barrages and canals; runs the flood control rooms; and is preparing the drainage master plans of Haldwani and the Kumaon towns. Would supply river and barrage levels for Chapter 5, approve the site-specific hydrology of Clause 2.3.6(i), and apply this Manual to its drainage master plans. |
| Public Works Department (PWD) | Builds and maintains State roads and hill roads with their side drains, catch-water drains, scuppers and cross-drainage, and some road drains in Dehradun's Smart City area (CAG, 2025). Would apply Chapter 6 and the hill-road rules to them; national highways are for NHAI, NHIDCL or MoRTH, and border roads for BRO. |
| Uttarakhand Peyjal Nigam and Uttarakhand Jal Sansthan | The Peyjal Nigam builds sewers, treatment plants and the interception and diversion of drains (187 of the 208 drains of the Rispana intercepted), and gives the sewerage no-objection certificate in restricted floodplain zones; the Jal Sansthan operates water supply and sewerage. Would design interceptors and their storm bypasses to Chapter 8 and protect them against floods. |
| Uttarakhand State Disaster Management Authority (USDMA) and the Uttarakhand Landslide Mitigation and Management Centre (ULMMC) | Prepare for and respond to floods, cloudbursts and landslides; run early warning. Would supply the hazard and landslide maps used in the screening of Clause 2.3.6(i) and the hill rules, and lead post-event reviews with the Authority (Clause 10.16). |
| Uttarakhand Environment Protection and Pollution Control Board (UEPPCB) | Monitors drains and rivers and reports to the NGT. Would receive the records of sewage found in storm drains under Chapter 8. |
| Uttarakhand State Wetland Authority, with the Forest Department | Inventories and protects wetlands, including the Asan Conservation Reserve; the Forest Department holds river beds outside municipal limits. Their consent is needed before a wetland or forest river bed is used for storage or an outfall (Chapter 7). |
| Spring and River Rejuvenation Authority (SARRA) | Reported constituted in 2025 to revive springs and rivers (constitution order not found [TBC]). Would be consulted on spring-shed and recharge areas protected under Chapters 7 and 8. |
| Lake Development Authority, Nainital | Acts against unauthorised construction around the lakes of Nainital (as reported). Would be consulted on every development in the catchment of Naini lake and on the custody of its sluices with the Irrigation Department [TBC]. |
| Revenue Department and the District Magistrates | The District Magistrate is the Flood Zoning Authority under the Flood Plain Zoning Act, and the revenue records show the rivers, nalas and ponds that the Unified Zoning Regulations protect. Would record drainage reserves in the land records. |
| THDC India Ltd and UJVN Ltd | Operate Tehri and Koteshwar (THDC) and the Dakpathar, Asan and other barrages (UJVN). Would supply reservoir and pond levels and release rules for Chapter 5. |
| Central Water Commission (CWC), a body of the Union | Publishes the Flood Estimation Reports for zone 7 and subzone 1(e) used in Chapters 2 and 3, the river levels at its sites and its monitoring of glacial lakes. Would supply river stage records and forecasts for Chapter 5. |
| Central Ground Water Board (CGWB), a body of the Union | Assesses the groundwater of the State (53.54% stage of extraction in 2024, four units semi-critical). Would supply groundwater levels and quality with the Irrigation Department. |
| National Institute of Hydrology (NIH), Roorkee | Runs NIH-DHAARA (Chapter 2) and has studied the water balance of Naini lake. |
| IMD (Meteorological Centre Dehradun), and road and rail owners (PWD, NHAI, NHIDCL, BRO, Indian Railways) | IMD's stations supply the rainfall records of Chapter 2. Road and rail owners would apply this Manual to road drainage (Chapter 6), culverts and linear works (Clause 1.5.7). |
Commentary. Stormwater in Uttarakhand is split between the Housing Department, the development authorities and UHUDA, through the Bye-laws 2011, the Unified Zoning Regulations, master plans and building permission; the Urban Development Department and the Nagar Nigams and other local bodies, through the drains vested in them; UUSDA and Dehradun Smart City Ltd, which build drains for them; the Irrigation Department, through the rivers, raos, barrages, canals and floodplain zoning, and now the drainage master plans of the Kumaon towns; the PWD, through the drains of the roads, which in the hills are the minor drainage system; the Peyjal Nigam and the Jal Sansthan, through the interception of drains for sewage; the Forest Department, which holds the river beds outside the towns; and the High Court and the NGT, which have set lines and ordered removals along the raos. Dehradun shows why the split matters. Its raos, the Rispana, the Bindal, the Song, the Suswa and the Tons, work as trunk storm drains and, until they were intercepted, as sewers; their beds are forest or revenue land, their flood zones are the Irrigation Department's, their interceptors are the Peyjal Nigam's, and the drains and khalas that feed them are the Nagar Nigam's or MDDA's. The Uttar Pradesh Municipal Corporation Act of 1959, as adapted, is understood to vest public drains in the Nagar Nigam, as the Uttar Pradesh text does (adapted text not read [TBC]), but no rule or order found divides the raos and gadheras from the municipal drains, or the road drains of the hill towns from the town drains, between the bodies concerned [TBC]. Until such a rule is made, this Manual assigns the drainage elements as in Table 1.5, as Chapter 6 does for the drains themselves, and recommends that each town keep a register of its drains and raos with an owner for each reach. The assignment is this Manual's working split for applying its clauses; it does not change any agency's powers.
Table 1.5 — Working assignment of drainage elements under this Manual
| Element | Assigned to |
|---|---|
| Rivers, raos and gadheras with their beds, banks and floodplains (such as the Rispana, the Bindal, the Song, the Suswa, the Tons and the Asan in the Doon, the Gaula, the Kosi and the Ganga), flood-protection works, the demarcation of floodplains under the Flood Plain Zoning Act, and the barrages and canals of the Irrigation Department | The Irrigation Department; river-bed land outside municipal limits is forest land, held by the Forest Department (High Court, Urmila Thapa), and within municipal limits the local body keeps the bed free of encroachment |
| Natural nalas, khalas and public drains within the limits of a local body, other than those assigned to the Irrigation Department | The Nagar Nigam, Nagar Palika Parishad or Nagar Panchayat (in Dehradun, DMC) |
| Drains built under the ADB-funded programmes or by Dehradun Smart City Ltd, until handed over in writing | UUSDA or DSCL, and the local body after handover |
| Drains and storage within a scheme of MDDA, HRDA, a district development authority, UHUDA or a colony developer, until handed over in writing | The body that built the scheme |
| Road drains, catch-water drains above cuts, scuppers and cross-drainage of State roads and hill roads | The PWD; on national highways, NHAI, NHIDCL or MoRTH; on border roads, BRO |
| Sewers, interceptors, the interception and diversion of nalas and raos, and sewage treatment plants | The Peyjal Nigam, which builds them, and the Jal Sansthan, which operates them |
| Naini lake, its sluices at Tallital and the Balia Nala below them | The Lake Development Authority with the Irrigation Department, whose custody of the sluices is to be confirmed [TBC]; the drains of Nainital to the Nagar Palika Parishad, Nainital [TBC] |
| Reservoirs and barrages of the hydropower projects | THDC India Ltd (Tehri, Koteshwar); UJVN Ltd (the Dakpathar and Asan barrages and others) |
| Springs (naula, dhara) used for supply, and their rejuvenation | The Jal Sansthan, the local body or the panchayat that uses them; rejuvenation by SARRA (constitution order not found [TBC]) |
| Wetlands and Ramsar sites, including the Asan Conservation Reserve | The Uttarakhand State Wetland Authority, with the Forest Department |
This Manual names departments and authorities as the statutes, orders and records name them. A manual that names one owner for each task does not fix institutions by itself, but it removes ambiguity about who signs what.
1.10 Variances and waivers
1.10.1 Variance. The Authority may grant a variance from a numeric requirement where the Applicant shows, through a report certified under Clause 10.6, that:
- (a) compliance is impracticable because of site conditions such as a high groundwater table, contaminated soil, rock, or a site area too small for the required facility; and
- (b) the proposed alternative gives equal or better performance at the downstream point of Chapter 5, or the shortfall is made up by fee-in-lieu or off-site works in the same catchment.
1.10.2 Waiver. The Authority may waive Chapter 4 detention requirements (not retention) where a hydraulic analysis certified under Clause 10.6 shows that the site discharges directly to the sea, or to a tidal reach with no flood-prone property downstream, and that undetained flow does not worsen the outfall-closed condition of Chapter 5. Uttarakhand has no coast and no tidal reach, so no site in the State qualifies for this waiver. A site that drains to a river or rao in flood, to a reservoir or barrage pond such as Tehri, Dakpathar or Asan, or to Naini lake or another taal held by its sluices, is in the outfall-closed condition of Chapter 5 whenever the receiving water is high, and detention is not waived for it; nor is it waived for a site because it drains to a steep gadhera or down a hill slope.
1.10.3 No variance or waiver. No variance or waiver shall be granted for:
- (a) a sewage connection to a storm drain;
- (b) the lowest habitable floor level of Chapter 6;
- (c) any reduction of a waterbody setback below the Zone 1 minimum of Clause 7.4.7, or any fill or construction in the no-fill zone of Chapter 7; or
- (d) the retention requirement in a flood-sensitive catchment, except by fee-in-lieu under Clause 1.7.
1.10.4 Procedure.
- (a) The request shall be made on Form 1-2 (Variance / Waiver Request) with the preliminary drainage report.
- (b) A Tier B authority shall refer any variance on a site of 1 ha or more to the State Stormwater Technical Committee.
- (c) A decision shall state its reasons and any conditions, and shall be entered in the public register of Clause 10.17.
- (d) A variance runs with the approval. It lapses if the approval lapses.
Commentary. The 2006 APWA 5600 included a waivers section (5601.6), and Georgia allows waivers where downstream analysis shows a peak control is unnecessary. The waiver of Clause 1.10.2 is narrow: on a tidal coast, undetained flow can help by passing through before the tide closes the outfall, but only an analysis can show that. This Manual requires every decision to be published because publication deters case-by-case erosion of the standard; in Uttarakhand the High Court has had to order the removal of encroachments from the river beds and khalas of the Doon, where a survey found 37.93 ha of river bed encroached in Dehradun tehsil and 57.4 ha in Vikasnagar (Urmila Thapa, WPPIL 58/2019, 2022), the NGT has had to direct the removal of encroachments from the floodplain of the Rispana, in whose 1-in-5-year flood zone the State has counted 330 structures (OA 417/2022), and the High Court has had to stop construction on the bed of the Sukhatal, which feeds Naini lake (2022, as reported).
1.11 Transition provisions
1.11.1 Effective date. This Manual takes effect for new applications 6 months after notification (the effective date).
1.11.2 Applications in process. An application filed complete before the effective date may be decided under the rules in force when it was filed, if a decision is issued within 12 months of the effective date. Otherwise, this Manual applies.
1.11.3 Phased start for Tier B. In Tier B authorities, Chapters 4 and 5 apply from 24 months after notification, except in flood-sensitive catchments, where they apply from the effective date.
1.11.4 Public works. DPRs sanctioned before the effective date may proceed as sanctioned. Any DPR revised or re-tendered after the effective date shall comply. Departments shall report non-compliant works in progress to the State Stormwater Technical Committee within 12 months.
1.11.5 Before the annexes are issued. Until an annex referred to in this Manual is issued, the Applicant shall use the method stated in the clause, with values agreed with the Authority and recorded in the drainage report.
Commentary. The 6-month lead time matches the lead time for NIH-DHAARA updates in Clause 2.14.2. Singapore gave a similar interval for its 2025 detention addendum (issued 16 Apr 2025, applied from 1 Oct 2025). The 12- and 24-month periods are set by this Manual to let Tier B authorities train staff and to let the State issue the design-aid tables (Clause 1.7).
1.12 Review and amendment
1.12.1 The State Stormwater Technical Committee shall review this Manual every 10 years, and after any event that exceeds the 1% AEP design depth as set out in Clause 2.14.1.
1.12.2 Amendments shall be notified in the Gazette, published with a change log, and take effect 6 months after notification unless the notification states otherwise.
1.12.3 Any person may propose an amendment to the Committee. Proposals and the Committee's decisions shall be published.
References (chapter)
- Government of Uttarakhand, Housing Department. Uttarakhand Building Construction and Development Bye-laws/Regulations 2011 (Amendment 2015), compiled with the amendments of 2015–2019 (भवन निर्माण एवं विकास उपविधि/विनियम-2011 (संशोधन 2015-2019), Part I, hosted by MDDA as "Draft Compiled ByeLaws"; bye-laws 2.3, 2.41, 4.4, 5.1, 5.6, 6.4, 6.5 and Appendix 1 read; agreement with the gazetted text to be confirmed [TBC]). https://mddaonline.in/wp-content/uploads/2026/03/Compiled_byelaws_I.pdf
- Government of Uttarakhand, Housing Department. Amendment notifications under section 57 of the 1973 Act of 27 September 2022 (e-file 33107), 13 March 2023 (HOUS2-MS/1/61/2022-V-2), 10 January 2024 (No. 180884, e-file 61321) and 13 June 2024 (e-file 64586) (UHUDA document list). https://uhuda.uk.gov.in/documents/
- Mussoorie Dehradun Development Authority. The Uttarakhand Building Construction and Development Bye Laws/Regulations, 2011 (Amendment 2017), draft (not seen notified). https://mddaonline.in/wp-content/uploads/2026/03/DRAFT.pdf
- Government of Uttarakhand, Housing Department. Uttarakhand Unified Zoning Regulations (उत्तराखण्ड एकीकृत परिक्षेत्रीय विनियमन), notification No. 568/E.No. 92710 of 20 November 2025 (cover, contents and chapter 11 read). https://uhuda.uk.gov.in/documents/
- Government of Uttarakhand. Uttarakhand Flood Plain Zoning Act, 2012 (Uttarakhand Act No. 07 of 2013) (FAOLEX copy). https://faolex.fao.org/docs/pdf/ind213361.pdf
- Government of Uttarakhand, Irrigation Department. Notification No. 1875/II(2)-2020-06(18)/2020 of 7 October 2020 (declaration of intent, right bank of the Ganga, Rishikesh); notification No. 888/II(2)/2025 of 3 October 2025 (committee under section 11(1)); "Status of Flood Plain Zoning Works in Uttarakhand", annexed to the Irrigation Department's compliance report in NGT OA 417/2022 (2024).
- Government of Uttarakhand, Housing Department. G.O. No. 1995/V-2-2017-58(आ0)/2014 of 29 November 2017 (Ganga banks in the hill areas) and letter of 1 June 2023 (e-file 46063). https://uhuda.uk.gov.in/documents/
- Government of Uttarakhand. Uttarakhand Ground Water (Regulation and Control of Development and Management) Act, 2016 (Act 12 of 2016) and (Repeal) Act, 2017 (Act 11 of 2017) (Wayback Machine copies of the High Court's site).
- Comptroller and Auditor General of India. Performance Audit on the Implementation of the 74th Constitutional Amendment Act, Government of Uttarakhand (year ended March 2021), Chapter 1 (2022); Performance Audit of the Smart Cities Mission (Dehradun), Chapters 2 and 5 (2025). https://cag.gov.in/uploads/download_audit_report/2022/5-Chapter-1-064183d7e901145.28935463.pdf
- National Green Tribunal. Niranjan Bagchi v. State of Uttarakhand, OA 417/2022: order of 18 August 2025, and the affidavits of the Irrigation Department (2024), Uttarakhand Peyjal Nigam (December 2025), NMCG (April 2026) and the Nagar Nigam, Dehradun (23 April 2026). https://www.greentribunal.gov.in/
- National Green Tribunal. M.C. Mehta v. Union of India, OA 200/2014, judgment of 13 July 2017 (as annexed and quoted).
- High Court of Uttarakhand. Urmila Thapa v. State of Uttarakhand, WPPIL 58/2019 (August 2022); Ravi Shankar Joshi v. State of Uttarakhand, WPPIL 178/2013 (22 November 2019); Rajeshwari Yadav Gupta v. State of Uttarakhand, WPMS 739/2026 (1 April 2026); Lalit Miglani v. State of Uttarakhand, WPPIL 140/2015 (2 December 2016, as quoted by the CAG); the Sukhatal orders of 2022 and Ajay Singh Rawat v. Union of India, WPPIL 31/2012 (as reported). https://www.livelaw.in/pdf_upload/2026/04/08/unknownvsstateofuttarakhandandotherson1april2026-666509.pdf
- Ministry of Environment and Forests. Doon Valley notification, S.O. 102(E) of 1 February 1989, and amendment S.O. 94(E) of 6 January 2020; Bhagirathi Eco-Sensitive Zone notification of 18 December 2012 and its Zonal Master Plan (2020) (titles and summaries; texts not read [TBC]). https://moef.gov.in/uploads/2021/08/DOON_VALLEY.pdf
- Uttarakhand State Wetland Authority (2025). Current Status Report of Wetlands in Uttarakhand (17 October 2025), and note on the Asan Conservation Reserve.
- NITI Aayog (2018). Inventory and Revival of Springs in the Himalayas for Water Security.
- National Institute of Hydrology. Water Balance of Lake Nainital, Report CS(AR)-6/98-99.
- Indian Roads Congress. IRC:SP:48-1998, Hill Road Manual (drainage clauses not read [TBC]).
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §4.4.1.4 (Table 4.1 and notes).
- Kakkar, R. (CPHEEO) (2023). Understanding Urban Stormwater Management. CSE, Aug 2023.
- National Disaster Management Authority (2010). National Guidelines on Management of Urban Flooding.
- MoHUA (2016). Model Building Bye-Laws, Chapter 9.
- Lok Sabha Unstarred Question 1847, 30 Jul 2026 (MoHUA). https://sansad.in/getFile/lsapps/loksabhaquestions/annex/188/AU1847_x29brZ.pdf
- India Meteorological Department (2011). Climate of Uttarakhand, Climatological Summaries of States Series No. 21 (district tables of the heaviest rainfall in 24 hours, to 2010). https://imdpune.gov.in/library/public/Climate%20of%20Uttarakhand.pdf
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012), stations of Uttarakhand; Meteorological Centre Dehradun, station extremes of Dehradun; press release of 19 October 2021 on the heavy rainfall over Uttarakhand; Monsoon 2025 report of the Meteorological Centre Dehradun. https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- Dobhal, D.P., Gupta, A.K., Mehta, M. & Khandelwal, D.D. (2013). Kedarnath disaster: facts and plausible causes. Current Science 105(2), 171–174.
- Shugar, D.H. et al. (2021). A massive rock and ice avalanche caused the 2021 disaster at Chamoli, Indian Himalaya. Science 373, 300–306. doi:10.1126/science.abh4455
- Central Water Commission. Warning, danger and highest flood levels at its sites in Uttarakhand, as transcribed by SANDRP (2013–2026; no bulletin was read for this Manual, and the datum is to be confirmed [TBC]). https://sandrp.in/2021/10/26/unprecedented-october-2021-rainfall-in-uttarakhand/
- Press reports of the Nainital landslip of 1880, the floods of June 2013, the Kumaon floods of October 2021, the subsidence of Joshimath in 2022–23, the Dharali debris flow of August 2025 and the Dehradun floods of September 2025 (secondary sources). https://www.downtoearth.org.in/
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Mid-America Regional Council (2025). APWA 5600 Manual Factsheet; APWA Stormwater Standards Supplement (7 Nov 2025). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Mid-America Regional Council. The Evolution of Regional Stormwater Design Standards (presentation). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Kansas City Metro Chapter APWA (2006). Section 5600, §5601.6 Waivers.
- PUB Singapore (2018, with Addendum No. 3 of 16 Apr 2025). Code of Practice on Surface Water Drainage, 7th ed.
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management.
- Centre for Science and Environment (2023). Urban Stormwater Management (presentation).
- Asian Development Bank (2021, 2022). Uttarakhand Integrated and Resilient Urban Development Project (Loan 38272-044): Climate Risk and Vulnerability Assessment (October 2021); updated resettlement plans for the storm-water drainage packages in Dehradun (July and October 2022). https://www.adb.org/sites/default/files/linked-documents/38272-044-sd-03.pdf
- Comptroller and Auditor General of India (2025). Performance Audit of the Smart Cities Mission, Chapter 5 (Dehradun Smart City Ltd, integrated drainage work). https://cag.gov.in/uploads/download_audit_report/2025/9-Chapter-5-069b02aa26d27d4.67002903.pdf
- Press reports of the drainage master plans of the Irrigation Department for Haldwani and the Kumaon towns (April and August 2026) and of the master plan for Haridwar–Roorkee (secondary sources). https://www.amarujala.com/uttarakhand/nainital/haldwani-city-drainage-plan-approved-2026-08-05 ; https://uttarakhandmorningpost.com/kumaon-drainage-master-plan-approved-haldwani-meeting/
Annexes and forms
| Annex / Form | Content |
|---|---|
| 1A | List of Tier A authorities, with the boundaries of the Nagar Nigams and of the development areas of the Mussoorie Dehradun Development Authority, the Haridwar Roorkee Development Authority and the district development authorities |
| 1B | Maps of flood-sensitive catchments |
| 1C | Policy Supplement: text of alternatives S-1 to S-5 and model council resolution |
| 1D | Model Bye-laws 2011 amendment and model ULB bye-law |
| Form 1-1 | Applicability Determination |
| Form 1-2 | Variance / Waiver Request |
Commentary. Uttarakhand's floods come from four sources, often together. The first is the heavy storm of the monsoon, or of a western disturbance meeting it, forced up against the outer Himalaya. On 17–18 September 1880 Hardwar recorded 495.3 mm in a day, still the State's highest, and Roorkee 284.7 mm, and the rain of those days, about 33 inches in three days at Nainital, brought down the landslip of 18 September 1880 that buried part of the town (IMD; as reported). The Doon's gauges recorded 440.4 mm at Rajpur in 1954, 487.5 mm at Raipur in 1959 and 487.0 mm at the Dehradun observatory on 25 July 1966, far above the 100-year depths of the CWC plates (IMD). On 17 June 2013 Dehradun recorded 370.2 mm, its highest June day, while 325 mm fell in 24 hours at the Chorabari glacier camp above Kedarnath (IMD; Dobhal et al., 2013). On 18–19 October 2021, after the normal withdrawal of the monsoon, Pantnagar recorded 403.9 mm, Nainital 401 mm and Mukteshwar 340.8 mm, each the highest day at its gauge, and at least 54 people died (IMD; as reported). The second is the rivers and the raos. The Ganga at Haridwar rose to 296.30 m, its highest level, in September 2010 or June 2013 (the CWC records differ), the Alaknanda set its highest levels at Srinagar and Rudraprayag on 17 June 2013, and in October 2021 the Gaula at Kathgodam, the Kosi at Ramnagar and the Sarda at Banbasa set new highest levels and the Gaula bridge at Haldwani partly collapsed (CWC data as transcribed by SANDRP; as reported). The raos of the Doon are ungauged and rise within an hour: on 15–16 September 2025, when Sahastradhara recorded 264 mm in 24 hours with 54 mm in one hour, 13 bridges, 10 culverts and 21 roads were lost around Dehradun, at least 30 people died, and 83 of the structures that intercept sewage from the drains of the Rispana were damaged (as reported; Peyjal Nigam, affidavit before the NGT). The third, found in no plains State of the series, is debris, outbursts and unstable ground. The moraine-dammed Chorabari lake emptied in 5–10 minutes on 17 June 2013 and the Mandakini destroyed much of Kedarnath, with more than 5,700 people presumed dead by the State (Dobhal et al., 2013; as reported); on 7 February 2021 about 27 million m³ of rock and ice from Ronti peak became a debris flow down the Rishiganga and the Dhauliganga, with more than 200 dead or missing and no rain at all (Shugar et al., 2021); in the winter of 2022–23 the ground of Joshimath subsided, and the experts' committee named inadequate drainage and sewerage and blocked natural water paths among the primary causes (as reported); and on 5 August 2025 a debris flow down the Kheer Ganga buried Dharali when the nearest gauge recorded 8 mm (as reported). The fourth is the town drainage that fails in a fall that is not extreme: the command centre of Dehradun Smart City was flooded after bursts on 25 August 2021 and 8 August 2023 (CAG, performance audit of the Smart Cities Mission, 2025), and Rudrapur was flooded by the Kalyani in 2021 and again in August 2023 (as reported).
Missing design makes all four worse. The only design storm found for a town's drains in the State is that of the ADB-funded drainage of Dehradun, a 2-yr storm for roadside drains and a 5-yr storm for main channels, with no allowance for climate change (ADB, 2021); the drainage master plans that the Irrigation Department is preparing for Haldwani and the towns of Kumaon state no design storm (as reported). The Bye-laws 2011 control rainwater storage and the siting of buildings on slopes, not runoff, and they have no rule against soak pits on unstable slopes, although the committee on Joshimath's subsidence asked as long ago as 1976 that soak pits there be closed (as reported). Objectives (b) to (e) address the storage, outfall and building-level failures, which a drain-sizing manual alone cannot fix; the third source is answered by the siting, screening and debris rules of Chapters 2, 6 and 7, because no drain is sized to carry a debris flow.
No national instrument requires on-site detention. CPHEEO (2019) is advisory and describes peak control only as typical practice. NDMA (2010) says detention and retention "will" be included but gives no sizing rule. MBBL 2016 and the Uttarakhand Building Construction and Development Bye-laws 2011 mandate RWH only. Objective (a) is therefore the main new step this Manual takes.