About this draft
Status. This is Draft v1.0 of the Assam Stormwater Design Manual. It was prepared by Neer as a proposed stormwater design standard for Assam.
Not adopted. This Manual has not been adopted, notified or endorsed by the Government of Assam, by its Governor, its Council of Ministers or its Legislative Assembly, or by any of its departments, local bodies or agencies. In particular, it has not been adopted, notified or endorsed by the Department of Housing and Urban Affairs (DoHUA), the Directorate of Town and Country Planning (T&CP), the Guwahati Metropolitan Development Authority (GMDA), the Guwahati Municipal Corporation (GMC), the Dibrugarh or Silchar Municipal Corporations, any Municipal Board, Development Authority or Gaon Panchayat, or Guwahati Smart City Ltd. Nor has it been adopted, notified or endorsed by the Bodoland Territorial Council (BTC), the Karbi Anglong Autonomous Council (KAAC) or the North Cachar Hills (Dima Hasao) Autonomous Council (NCHAC), by any District Level Committee or the State Level Committee under the State's water-bodies law, or by any Advisory Committee under the Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006. Where it names a body, such as the Water Resources Department (WRD) or its Embankment Officers, the Irrigation Department or the Assam State Ground Water Authority, the Assam State Disaster Management Authority (ASDMA) or a District Disaster Management Authority, the Revenue and Disaster Management Department, FREMAA, the Public Works Department (PWD), the Pollution Control Board, Assam (PCBA), the Assam State Wetlands Authority (ASWA), the Environment and Forest Department, the Guwahati Jal Board, AUWSSB or GMDW&SB, a Deputy Commissioner or a district administration, the Gauhati High Court, the National Green Tribunal (NGT) or the Supreme Court, or a body of the Union or another public body, such as the Brahmaputra Board, the Central Water Commission (CWC), the India Meteorological Department (IMD), the Central Ground Water Board (CGWB), the Central Pollution Control Board (CPCB), the National Institute of Hydrology (NIH), the National Disaster Management Authority (NDMA), the Ministry of Environment, Forest and Climate Change (MoEF&CC), the North Eastern Electric Power Corporation (NEEPCO) or NHPC, or a lender or consultant, such as the Asian Development Bank (ADB), the Japan International Cooperation Agency (JICA) or Haskoning DHV, it describes the role that body would have if the Manual were adopted. It does not say the body has agreed to that role. Citing a body's document does not make this Manual that body's document.
No legal force. Until a competent authority adopts it, with or without changes, this Manual has no legal force. Until then, the Assam Building Construction (Regulation) Act, 2010 as amended in 2022, and the Assam Unified Building Construction (Regulation) Byelaws, 2022 as amended in 2024 (the Unified Byelaws 2022); the Master Plan for Guwahati 2025 and the master plans of the other towns, with their Zoning Regulations; the Guwahati Metropolitan Development Authority Act, 1985 and the Assam Town and Country Planning Act, 1959 (the T&CP Act); the Gauhati Municipal Corporation Act, 1969, the Assam Municipal Corporation Act, 2022 (the AMC Act) and the Assam Municipal Act, 1956; the Assam Embankment and Drainage Act, 1953; the State's water-bodies law; the Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 (the Hill Land Act); the Assam Ground Water Control and Regulation Act, 2012; orders of courts and tribunals; and approval conditions in force continue to apply.
Assam and the Sixth Schedule. Three areas of the State are Autonomous Districts under the Sixth Schedule to the Constitution: the Bodoland Territorial Region (BTR), under the BTC; Karbi Anglong and West Karbi Anglong, under the KAAC; and Dima Hasao, under the NCHAC. The districts of the BTR are taken to be Kokrajhar, Chirang, Baksa, Udalguri and Tamulpur; this list was not confirmed against a notification [TBC]. Byelaw 1(2) of the Unified Byelaws 2022 extends them "to the master Plan areas or notified Planning areas of whole of Assam except for areas under Autonomous Districts, provided that if any District Council desires that all or any of the provisions of this byelaws shall apply to the Autonomous District concerned, a notification may be issued to that effect", and the Bill of the Assam Urban Water Bodies (Preservation and Conservation) Act, 2024 carries the same opt-in. No building rules of the three Councils and no opt-in notification were found [TBC]. Diphu and Kokrajhar have master plans prepared by T&CP, as listed, but whether the Unified Byelaws 2022 apply there depends on an opt-in that was not found. Outside the notified Master Plan areas the byelaws do not apply anywhere in the State, so this Manual reaches those areas only through public works and through a body that adopts it. This Manual therefore names its "competent authority for the area" by area and by subject, as Chapter 1 sets out. DoHUA could make it part of the Unified Byelaws 2022 by an amendment under section 4 of the building Act; GMDA and the Development Authorities, with T&CP, could write its drainage reserves, water-body buffers and basin storage into the master plans and Zoning Regulations; GMC and the other local bodies could apply it at building permit and occupancy certificate and to their own drains; WRD could set outfall and sluice conditions under the Embankment and Drainage Act; and a District Council could notify under byelaw 1(2) that the byelaws apply in its district, or adopt the Manual in its own rules. None has done so, and the Manual can reach an Autonomous District only through its District Council. Land outside the Councils' areas is mostly patta land, recorded by district, mouza, revenue village and dag number, with government (khas) land; in the Autonomous Districts land is held under the Councils' own land law, which was not researched for this Manual [TBC]. This Manual reserves drainage corridors and easements in a master plan or secures them by agreement; it does not assume that land can be taken. The paragraphs of the Sixth Schedule were not read for this Manual and are not quoted; the division is described by its effect, from the byelaws and the Bill.
Names. Some places, rivers, gauges and instruments have more than one name or spelling in statutes, sources and on IMD and CWC stations:
- Guwahati is the city. The statute that governs its municipal corporation is printed as the Gauhati Municipal Corporation Act, 1969 (Assam Act I of 1973), and this Manual cites it by that title; a GMC notice of 2025 cites a "Guwahati Municipal Corporation Act, 1971", which appears to be a mis-citation, as reported. The High Court keeps the name Gauhati High Court, and the university Gauhati University. Dispur, the State capital, lies within Guwahati, so where a shared clause names the State's main city or its largest local body, this Manual names Guwahati and GMC. The Guwahati metropolitan area, the 328 km² of the Master Plan for Guwahati 2025, is wider than GMC's area, and GMDA, the PWD, WRD, the Railways, Oil India Ltd (OIL), the National Highways Authority of India (NHAI), the Army and others hold drains in it, as reported;
- IMD names its airport stations after the airfield: Guwahati (Borjhar) (A), also spelt Bhorjar (index 42410); Dibrugarh (Mohanbari) (A) (42314); North Lakhimpur (Lilabari) (42309); Silchar (Kumbhigram) (A) (42620), beside the town station Silchar (42619); and Dhubri (Rupsi) (A) (42406), beside the town station Dhubri (42404). This Manual names the station each figure comes from;
- CWC's flood estimation reports and other older sources use the names of their time: Nowgong (Nagaon), Darang (Darrang), Sibsagar (Sivasagar), N.C. Hills (Dima Hasao), Mikir Hills (Karbi Anglong) and Halflong (Haflong). Old Goalpara district is taken to have included today's Dhubri, Kokrajhar, Bongaigaon and Chirang, and old Lakhimpur district Dibrugarh and Tinsukia; this reading is to be confirmed before a clause relies on it [TBC]. The "Lakhipur" of the report for subzone 2(a) is a station in old Goalpara district: it is neither North Lakhimpur nor Lakhipur in Cachar. The districts were reorganised in 2022 and 2023, as reported, and this Manual's list of districts was not confirmed against a notification [TBC]; Karimganj district was renamed Sribhumi, as reported [TBC], and this Manual keeps "Karimganj" for the town and for the CWC and IMD stations that bear the name. A clause that names a district must be checked against the current list;
- CWC's reports divide the State among three subzones: the north bank in subzone 2(a), North Brahmaputra (report No. NB/18/1991); Guwahati, the south bank and the hill districts in subzone 2(b), South Brahmaputra (revised report No. SB-2(b)/R-4/44/99, March 2000); and the Barak valley and the south of Dima Hasao in subzone 2(c), "Barak and others", for which CWC never published a report. These subzones are not the five rainfall zones (AS-Z1 to AS-Z5) and eight hydrologic sub-areas (AS-A, AS-A1, AS-B, AS-C, AS-C1, AS-D, AS-D1 and AS-E) that this Manual sets in Annex 2A, nor Zones 1 and 2 of a waterbody setback in Chapter 7;
- the beels and channels of Guwahati are spelt in several ways: Deepor Beel is Deepar Beel in the Unified Byelaws 2022 and in the State's report to the NGT, and the ADB names its basin "Dipar"; Sarusola is also Sorusola; Borsola is Barsola in the byelaws; Silsako is also Silsaku; and the Kalmani is the ADB's "Kalmoni". The heading of the first schedule of the Guwahati Waterbodies (Preservation and Conservation) Act, 2008 is illegible in the copies read, and this Manual reads it as Sarusola Beel. The Bahini rises in Meghalaya and becomes the Bharalu at Jonali, and the Bharalu joins the Brahmaputra at Bharalumukh. The Mora Bharalu, a channel that the Bharalu abandoned, flows to Deepor Beel; this Manual found no source for any other link between the Bharalu and Deepor Beel;
- the State's building rules spell the word "Byelaws", and this Manual writes "byelaw 74" in the same way when it cites one; the "bye-laws" that a local body makes under its own Act keep their hyphen. "Unified Byelaws 2022" is the State's rules as amended in 2024, and "MBBL 2016", in Chapters 1 and 10, is the national Model Building Bye-Laws of 2016, not the State's rules;
- the Master Plan for Guwahati 2025 is the plan in force: it was published in the Assam Gazette Extraordinary No. 198 of 9 July 2009, for operation from 7 July 2009, and has since been modified. The draft Master Plan 2045 was released in early 2024 and had not been finally notified by November 2026, as reported; this Manual does not cite it as in force;
- CWC's levels in the State were read only in a transcription by the South Asia Network on Dams, Rivers and People (SANDRP), in metres, and no source read states their datum [TBC]: for example, the danger level of 49.68 m and the highest flood level of 51.46 m (21 July 2004) of the Brahmaputra at Guwahati (DC Court). This Manual names the gauge, the unit and the datum with every level; and
- in this Manual "the monsoon" and "the monsoon season" mean the wet season of 1 April to 31 October. That is not IMD's usage: IMD counts April and May as pre-monsoon months, and the south-west monsoon reaches the North East in about the first week of June (about 5 June, as reported; 2–4 June at Guwahati in IMD's revised normals, as quoted in a press summary of IMD's release); the date of its withdrawal from Assam was not obtained [TBC]. The Manual's season begins on 1 April because the April and May storms are among the State's largest (Chapter 2).
This Manual uses the first form and keeps the others where a title, a source or a station uses them. Some names of bodies and laws need a word of explanation:
- the Assam Unified Building Construction (Regulation) Byelaws, 2022 were made by DoHUA in the Governor's name, by notification No. DoHUA/ECF No. 236697/2 (Assam Gazette Extraordinary No. 688, 15 October 2022), under section 4 of the Assam Building Construction (Regulation) Act, 2010 (Assam Act XVI of 2010). That Act was the Guwahati Building Construction (Regulation) Act until Assam Act XXVII of 2022 renamed it and extended it "to the whole of the State of Assam"; the notification that brought the amendment into force was not seen [TBC]. The byelaws were amended by the (Amendment) Byelaws, 2024 (No. DoHUA/ECF No. 420084/34, Gazette No. 667, 20 November 2024). A further amendment approved by the Cabinet in 2025 was reported, but no gazette was found, and this Manual does not cite it. Byelaw 131(1) repeals "The Guwahati Building Construction (Regulation) Byelaws, 2010", although no byelaws of 2010 were found and the earlier rules in Guwahati were the Guwahati Building Construction (Regulation) Byelaws, 2014; this Manual treats the byelaws of 2014 as superseded in practice and states the conflict. Some byelaw numbers, such as 26(ix), 44(ix) and 44(iii), were read from the layout of a scanned copy and are to be confirmed against a clean copy [TBC];
- DoHUA was formed in 2021 by merging the Guwahati Development Department and the Urban Development Department, as cited; it makes the byelaws and oversees GMDA, GMC and the other local bodies. T&CP, a directorate under DoHUA, prepares the master plans of the towns outside the Guwahati metropolitan area for the 24 Development Authorities under the T&CP Act (Assam Act II of 1960), and has begun drainage master plans for the major towns, according to the ADB. GMDA, under the GMDA Act, 1985 (cited in later Acts as Assam Act XX of 1987; its text was not read for this Manual [TBC]), grants planning permits in the Guwahati metropolitan area; in other editions of this series similar letters stand for other bodies, and in this Manual GMDA means only this one;
- in a notified Master Plan area the 2022 amendment of the building Act divides approval between a planning permit, granted by GMDA or a Development Authority, and a building permit, granted by GMC, another Municipal Corporation, a Municipal Board or a Gaon Panchayat. The Gauhati Municipal Corporation Act, 1969 governs GMC's drains (sections 231 to 252); the AMC Act (Assam Act VIII of 2022) governs the Dibrugarh and Silchar Municipal Corporations and requires each to "provide a safe and sufficient outfall … for effectual drainage and proper discharge of storm-water and sewage" (section 171); and the Assam Municipal Act, 1956 governs the Municipal Boards;
- the Assam Embankment and Drainage Act, 1953 (Assam Act I of 1954) applies to the whole State. Its "drain" includes "dongs", culverts, ditches, canals and sluices; cutting through an embankment or drain, or opening, shutting or obstructing a sluice, without authority is punishable with up to three years' imprisonment (section 15(ii)); and in a notified area no one may build on, remove or alter an embankment or drain without permission (section 16). WRD's Embankment Officers act under it;
- the Guwahati Waterbodies (Preservation and Conservation) Act, 2008 (Assam Act XX of 2008) defines "waterbodies" as "the area or areas of land where the rain water accumulates and act as natural or storm water reservoir and shall include wetland", and scheduled four areas of Guwahati by dag number: Sarusola, Borsola and Silsako Beels, and land near Deepor Beel, not the beel itself. Section 22 of the Bill of the Assam Urban Water Bodies (Preservation and Conservation) Act, 2024, passed on 29 August 2024, repeals it; the Bill keeps the definition, adds the inflow and outflow channels and all ponds and tanks "irrespective of its size", with exceptions, and extends to all notified Master Plan areas. The enacted text of the 2024 Act (Assam Act XXV of 2024, as cited) and its Rules of 2025 were not read, so this Manual cites the 2008 Act as the Act that the 2024 Bill repeals, and the Bill's section numbers as the Bill's [TBC]. "The State's water-bodies law" in this Manual means the two together, as in force;
- Deepor Beel is a Ramsar site (No. 1207, designated on 19 August 2002, as cited), the only one in Assam, as reported, and a wildlife sanctuary, whose denotification the Gauhati High Court stayed on 5 April 2024; its eco-sensitive zone has been published only in draft. The ASWA was constituted on 1 November 2018, as cited; no wetland notified under Rule 4 of the Wetlands (Conservation and Management) Rules, 2017 was found;
- the Hill Land Act (Assam Act V of 2007) lets the State declare Designated Areas of hill land and "ecological sites", which include "a drainage system, feeding channel"; in a Designated Area a registered owner needs the Advisory Committee's approval for a guard wall or a house (section 14). No Designated Area notification was found [TBC];
- the Assam Ground Water Control and Regulation Act, 2012 (Assam Act XVI of 2012) is administered through the Irrigation Department, whose Secretary chairs the Assam State Ground Water Authority; its rainwater harvesting directions for premises of 100 m² or more apply only in a notified area (section 19), and no notified area was found. Whether the Authority has been constituted was not confirmed [TBC]. CGWB's North Eastern Region office at Guwahati keeps the observation wells;
- ASDMA, under the Revenue and Disaster Management Department, is the State's disaster management authority; the District Disaster Management Authorities are written in full. FREMAA carries out the ADB-assisted flood and riverbank erosion programme. PCBA prepares the action plans for the State's polluted river stretches; and
- the Revenue and Disaster Management Department keeps the land records by district, mouza, revenue village and dag and patta number. Where a shared clause names a revenue subdivision, this Manual uses the mouza.
Where a shared clause calls for the local language on a sign, a form field or a basin name, this Manual writes "Assamese". Assamese is the official language of the State, and English the language of this Manual. Under the Assam Official Language Act, 1960, as amended, Bengali is in official use in the three Barak valley districts, Cachar, Karimganj and Hailakandi, and Bodo in the Bodoland Territorial Region; the amending Acts and the districts they name were not confirmed for this Manual [TBC]. So, as set by this Manual, signs and flood-depth markers are in Assamese and English; in the Barak valley districts in Bengali and English, to which Assamese may be added; and in the Bodoland Territorial Region in Bodo, Assamese and English. In Annex 7A the field WB_NAME_AS holds a water body's name in the local script of its district: Assamese, or Bengali in the Barak valley, both written in the Eastern Nagari script, which spells the two languages differently in a few letters such as ৰ and ৱ. A Bodo name, written in the Devanagari script, goes in the field WB_NAME with a note.
Some local words are used in the text, and are explained again where they first appear:
- a pukhuri (Assamese পুখুৰী: a dug tank or pond; plural pukhuris) is this Manual's word for a dug pond or tank. The Chandrakanta Abhidhan (2nd ed., 1962, p. 604) gives "a pond; a tank", from a Sanskrit word for a large dug place to hold water, and Bronson's dictionary (1867, p. 351) gives "a tank, a reservoir of water". Assamese marks the plural with -bor or -hot, not with an ending of this kind, so the English plural "pukhuris" is a convention of this Manual. Where a shared clause writes "tank (pukhuri)", it means a pukhuri, or a beel that has a jan outlet or a sluice; Assam has no cascades of irrigation tanks;
- a beel (Assamese বিল: a natural floodplain lake or wetland) is "a lake", a broad body of water without current (Chandrakanta Abhidhan, p. 685; Bronson, p. 410), and the statutory word of the water-bodies law and the byelaws. This Manual never calls a natural wetland a pukhuri, and calls engineered storage a detention pond, never a pukhuri or a beel;
- a jan (Assamese জান: a stream or natural drainage channel, often the outlet of a beel) is "a ravine; a stream", a small river from a channel or beel (Chandrakanta Abhidhan, p. 397), and "a drain, a trench, a channel, a creek" (Bronson, p. 225), as in Bondajan, Lakhimijan and Khanajan. A juri (Assamese জুৰি: a small hill stream) is glossed so in the Chandrakanta Abhidhan (p. 407). A nala (নলা) is a built drain (p. 535);
- a char (চৰ) is land formed by the river from deposited silt (p. 336), and a chapori (চাপৰি) high land of river sand and silt (p. 346), "an island, high table land" in Bronson (p. 196); both flood and move with the river;
- a mothauri (মথাউৰি) is "an embankment along the edge of a river" (Chandrakanta Abhidhan, p. 737), this Manual's word for a river embankment; a pani-duwar (পানী-দুৱাৰ) is "a water-gate; a sluice" (p. 594), though the text keeps the English "sluice"; and ban or banpani (বান, বানপানী) is a flood (p. 666); and
- the Assamese doba is the deepest part of a river or lake, not a pond, and this Manual does not use it. The Embankment and Drainage Act's "dongs" are drains of that Act; this Manual gives the word no other meaning.
Some abbreviations have more than one meaning:
- AMC is the antecedent moisture condition in Chapters 2 and 3; the Assam Municipal Corporation Act, 2022 is always the "AMC Act";
- GMDA is the Guwahati Metropolitan Development Authority and GMC the Guwahati Municipal Corporation. In other editions of this series and in some sources similar letters stand for other bodies; in this Manual they mean only these;
- "Unified Byelaws 2022" is the Assam Unified Building Construction (Regulation) Byelaws, 2022 as amended, and "MBBL 2016" the national Model Building Bye-Laws 2016. Neither is the building rule of any other State;
- HFL is the highest flood level recorded at a gauge, as CWC uses it, and DL and WL are CWC's danger and warning levels. None is a design level. Byelaw 45(c) sets a plinth above "the highest recorded flood level as fixed by the local authority"; no such level was found for any town, and Chapter 7 says how this Manual finds one;
- T&CP is the Directorate of Town and Country Planning, and the "T&CP Act" the Assam Town and Country Planning Act, 1959.
The sense is clear from the context.
Use with care. Clauses and values may change after review. Designers remain responsible for their designs and for checking the data they use. Neer accepts no liability for decisions made on the basis of this draft.
Disclosure. Neer publishes the India Flood Atlas, a national map of modelled 1% AEP flood depth. Clause 6.11.3 names it as one example of a regional map that an Approving Authority may adopt for floor levels. The Manual does not require the Atlas; any map adopted under Clause 7.3.4 may be used.
Comments. Comments and corrections are welcome at info@neer.ai.
Preface
Assam's towns flood, and fail, for three reasons. Silchar showed the first in June 2022, when the Barak entered the town through a cut in its embankment at Bethukandi and the town stayed under water for about eleven days, or "about a week" in other accounts, as reported, although the river at Annapurnaghat peaked 0.25 m below its record of 1989, as the district's report gives the peak; Guwahati showed the second on the night of 20 April 2026, when the gauge at the airport recorded 117.4 mm, an April record, and a gauge at Khanapara, on the city's hill fringe, 215.9 mm, as reported; and the Bharalu shows the third every day, because no town in Assam has a centralised sewerage system, and the river "has no natural flow … only the domestic sewage and commercial sewage are being carried", as the Pollution Control Board, Assam found.
- Towns that drain into rivers higher than themselves, through sluices that close for weeks. Assam's riverside towns sit behind about 4,474 km of embankments and drain through sluices in them. When the Brahmaputra or the Barak is high the gates close, and the town drains only by pumping or not at all: "High stages of river Brahmaputra and Barak obstruct free discharge of tributaries causing back flow and congestion near outfalls", WRD told the CAG, and "Inadequate countryside drainages through sluices in embankment system … cause prolonged inundation". At Guwahati "the water level of the Brahmaputra River sometimes, is higher than the ground level of the city areas", as the ADB's environmental examination of 2017 records; the Brahmaputra reaches its danger level there in most monsoons, as this Manual reads the record, and its highest level, of 21 July 2004, was 1.78 m above it. The Bharalu, the city's main drain, can discharge "72 Cumecs when its Bharalumukh sluice gates are kept open, while the pumps fitted to its sluice gates can discharge only seven Cumecs", as reported in 2008; the capacity installed today was not found. Dibrugarh has drained through a single long channel since the town protection dyke of 1955 "closed all the drainage channels", and "At present, Dibrugarh town is 1.5 m below the bed level of Bramhaputra"; its drain runs 32 km to the Sessa past a beel, and its new outfall sluice was designed "keeping in mind that the beel is full and the drain is also flowing full". Silchar is a bowl behind the Barak embankment. The CAG counted 98 major and 545 minor sluices in 2017, WRD's site gives 94 major, and a reply in the Lok Sabha in December 2024 gives 122; no operating rule or closing time for any of them was found.
- Rainfall that two CWC reports read differently across one river, and that no report covers in the Barak valley. The Brahmaputra divides CWC's subzone 2(a), on the north bank, from subzone 2(b), on the south bank, and the two reports give different ratios of short to 24-hour rain: 0.260 for the hour in 2(a), and 0.48 in 2(b). On the 2(b) plates, read by eye, Guwahati's 50-year day is about 200–240 mm. Neither ratio set holds every fall recorded at the city's own self-recording gauge, 93 mm in one hour on 17 May 1970 and 163 mm in three hours on 18–19 July 1978, which the report itself prints: the 2(b) ratios hold the hour but give only 124–149 mm in three hours, 9–24% short of the 1978 storm, and the 2(a) ratios give 52–62 mm in an hour, short of the 1970 hour by a third or more. Across the river, at North Guwahati, the 2(a) ratio gives an hour about half as deep as on the south bank for the same day, although the hourly falls recorded and modelled on the two banks are alike. Within the city the gauges disagree more than the reports: on 14 June 2022 two gauges of WRD recorded 84.6 mm and 88 mm while the airport recorded about 10 mm, and on 20 April 2026 the gauges ranged from 117.4 mm to 215.9 mm, as reported. The Barak valley, with Silchar, Karimganj and Hailakandi, is in subzone 2(c), for which CWC never published a report, so there is no plate, no ratio and no synthetic unit hydrograph for it at all. Large falls also come before the south-west monsoon: four of the seventeen Assam stations in IMD's tables of extremes recorded their largest day in May, among them Dhubri (Rupsi), with 479.3 mm on 28 May 1989.
- Storm drains that are the sewerage. "No ULB in the state has a centralized sewerage system, including Guwahati … about 90% of households have installed septic tanks or leach pits, no ULB has a systematic mechanism for septage collection", the ADB found in 2025, and the CAG found that "natural drainage systems of the cities carried the sewage". In Guwahati the Bahini, cut off by a sluice at Natun Bazar, "now becomes a sewerage drain", and about 39 outfalls carry some 70,740 m³ of untreated sewage a day into the Bharalu, which CPCB places in Priority I of its polluted river stretches. The Mora Bharalu carries sewage to Deepor Beel. The sewerage project assisted by JICA, whose loan was signed in 2015, had only "begun with the survey" in March 2025, as reported. Dibrugarh's main drain "receives sewage flows" from a major part of the town.
Over all three lie four more. Beels lost to filling: the ADB's examination lists the "encroachment of low-lying land", filled swamps and "construction of buildings and roads over the manmade drains" among the causes of waterlogging in Guwahati; Deepor Beel is reported to have shrunk by about 35% since 1991, though other figures conflict; Urpad Beel in Goalpara shrank from 4.84 km² to 3.38 km² between 2003 and 2023, as reported; and the Gauhati High Court took up the "artificial floods" of Palasbari, where builders blocked channels and filled wetland (PIL 53 of 2023). Hill cutting that silts the drains: "indiscriminate cutting and quarrying of hill slopes for filling up of low lying areas results in sheet wash and blockage of channels", and in May 2025 the High Court recorded that "hill cutting is still going on". A water table near the surface: in Kamrup (Metro) CGWB found the water 1.39–4.08 m below ground in March 2022 and 1.29–2.64 m in November, and water-logged or waterlogging-prone ground after the monsoon in "almost all the districts of Assam". And building rules with drainage hooks but no design storm: the Unified Byelaws 2022 keep buildings 15 m, 10 m or 6 m from rivers and named channels and 15 m, 6 m or 10 m from beels and ponds, require a "dry sump (including design calculation) … capable of holding rain water during peak monsoon" on plots liable to flood and in hilly areas, set the plinth 0.3 m above "the highest recorded flood level as fixed by the local authority", and ask for 5 m³ of rainwater harvesting pits for every 100 m² of roof; but no rule says for what storm the sump is designed, what flood level the local authority fixes, or how fast a site may release its runoff.
Behind all of this lie the State's rivers, beels and pukhuris, which set the level at the outfall and hold the water when the gates are shut. The Rashtriya Barh Ayog found 31.50 lakh ha, 40% of the State, prone to flood, as the CAG quotes it; WRD's site gives 31.05 lakh ha, 39.58%, and the two figures are both in use. The National Wetland Atlas (2011) mapped 764,372 ha of wetland, 9.74% of the State. The State's water-bodies law already defines a water body as land "where the rain water accumulates and act as natural or storm water reservoir", so a beel is storm-water storage in law as well as in fact. The char and chapori lands of the Brahmaputra, about 3,60,927 ha in a survey of 2002–03, as reported, flood and move with the river, and Majuli's area is given from several baselines that conflict.
Design for Assam therefore has to cover a wet season that begins with the storms of April and May, before the south-west monsoon reaches the North East in about the first week of June, and that runs past its withdrawal to storms such as those of 30 October 1959 at Haflong (237.1 mm) and 2 October 2012 at Dhubri (186.2 mm); it is this Manual's monsoon season, 1 April to 31 October. Large falls come outside it too, as on 9 November 1955 at Haflong (234.2 mm) and Silchar (174.2 mm) and on 29 March 1922 at Silchar (245.4 mm), so design statistics use the annual maxima of every month. CWC's report for subzone 2(b) finds that "The rainfall is generally spread over a period of eight months, i.e. from March to October", that "May rainfall is more than the September rainfall" and that "The winter season from December to March is practically dry"; most of the subzone receives 1,250–2,500 mm a year, while Jatinga Valley, in the Dima Hasao hills, has a normal of 4,767 mm. There is no snow. Underground, groundwater is plentiful and close to the surface; rainwater is worth storing for use, but on the flood plains it cannot be put into the ground in the season when it falls.
National guidance sizes public drains but does not control the runoff that new building adds. This Manual makes stormwater a condition of development approval. Every development above a modest size must:
- hold frequent rainfall on site, in tanks for use, and in the ground only where the ground is above the water table and can safely take it;
- release the large storms no faster than the undeveloped land did, or slower where catchments already flood; and
- show that its outfall still works when the receiving jan, beel, pukhuri or river is high, when the sluice at the embankment is shut and the town drains only by its pumps, when a dam upstream is releasing, or when a drain is choked with silt from the hills.
The Manual also sets how public drains, roads and their drains, jans, beels, pukhuris, embankment sluices, pumped outfalls and basin-wide master plans are designed, and how drains below cut hills are protected against silt and debris, so that private sites and public works aim at the same standard.
The Manual draws on leading stormwater standards from India and abroad. Each is adapted to Assam's wet season of April to October, with its pre-monsoon storms; to the Brahmaputra, which divides two CWC subzones, and the Barak, whose valley no CWC report covers; to towns that lie behind embankments and below the river's high stage, and drain through sluices and pumps; to Guwahati's hill streams, which rise in Meghalaya; to the dam-release reaches of the north bank; to the flood-plain silts and clays, the char and chapori sands, the bhabar and terai fans of the northern foothills, the thin red loams over the gneiss of the Guwahati hills and the laterite and red loams of the Karbi and Dima Hasao hills; to a water table that reaches the surface in the monsoon; to the beels and pukhuris; and to storm drains that carry sewage.
- National base. The CPHEEO Manual on Storm Water Drainage Systems (2019). This Manual builds on it and sets higher standards where it allows a State to do so. IRC road-drainage codes, including IRC:SP:42-2014 for the hill roads, and the NDMA urban flood guidelines are also used.
- Overall structure. Kansas City Metro APWA Section 5600 (Version 2025.01), the most recent comprehensive regional standard. It supplies the preserve, retain, detain, convey and maintain sequence and the required retention volume.
- Design rainfall. The CWC Flood Estimation Reports for subzone 2(a), North Brahmaputra (NB/18/1991), and subzone 2(b), South Brahmaputra (revised, March 2000), as the interim source, each read by the coordinates of the site: the 2(a) ratios of short to 24-hour rain on the north bank and in the Dima Hasao hills, and the 2(b) ratios in Guwahati, on the south bank, in the Karbi hills and in the Barak valley. Within 5 km of the Brahmaputra's banks, which divide the two subzones, the higher of the two values governs; for Guwahati's streams the design day is averaged over the whole catchment, including the part that lies in Meghalaya; and in the Barak valley, for which no report exists, the design day comes from IMD's two Silchar stations, with floors of 320 mm at 2% AEP and 351 mm at 1% AEP, so that no design depth there falls below the adjoining 2(b) values. Floors at 1, 3 and 6 hours keep every short design storm above the falls recorded in the valley. All these rules are set by this Manual (Chapter 2). NIH-DHAARA is reported beside the design value for comparison only, and IMD's national rainfall intensity curves (Das et al., 2022) are not used, because their Guwahati and Dibrugarh (Mohanbari) panels repeat a curve printed for many other cities.
- Monsoon practice. The PUB Singapore Code of Practice on Surface Water Drainage (7th ed., 2025), for the fixed-coefficient route for small sites and drainage reserves. Malaysia's MSMA 2 (2012), for monsoon design storms and simplified on-site detention.
- Runoff reduction and treatment. The Georgia Stormwater Management Manual (2016), for runoff reduction and downstream analysis. CIRIA C753 The SuDS Manual (2015), for the treatment train. The Mile High Flood District criteria manual, for outlet and storage design.
- Local rules. The Assam Building Construction (Regulation) Act, 2010 and its amendment of 2022; the Unified Byelaws 2022 and their amendment of 2024, with the Guwahati byelaws of 2014 for comparison; the Master Plan for Guwahati 2025 and its Zoning Regulation, and its schedule of modifications; the T&CP Act; the Gauhati Municipal Corporation Act, 1969 and the AMC Act; the Assam Embankment and Drainage Act, 1953; the Guwahati Waterbodies (Preservation and Conservation) Act, 2008 and the Bill of the Assam Urban Water Bodies (Preservation and Conservation) Act, 2024; the Hill Land Act; the Assam Ground Water Control and Regulation Act, 2012; and the orders of the Gauhati High Court in PIL 14 of 2024, PIL 53 of 2023 and PIL 18 of 2023, and of the NGT in OA 472 of 2018 and OA 673 of 2018. This Manual follows them or, where disclosed, makes them stricter. The enacted text of the Urban Water Bodies Act and its Rules, the GMDA Act, 1985, the modification of the Master Plan of 25 March 2025, the Assam Municipal Act, 1956, the Assam Official Language Act, 1960 and its amendments, any instrument of the three Councils and the Sixth Schedule itself were not read. Every rule cited must be checked against the current text.
Why this Manual is needed
India has no uniform stormwater design standard. The CPHEEO Manual on Storm Water Drainage Systems (2019) is the country's first manual dedicated to storm water drainage, but it is advisory. The Ministry of Housing and Urban Affairs lists it among advisory guidelines and treats urban flooding as a matter for State Governments and urban local bodies. None of the national rules or State building rules reviewed for this Manual makes runoff control a condition of building approval, and neither does the Model Building Bye-Laws 2016.
The national documents leave key values open, or give different answers.
- Return periods. CPHEEO recommends 5 years for drains in Class I cities and 2 years elsewhere, and lets a State committee adopt higher values. A 2023 CPHEEO presentation shows a different table. IRC:SP:50-2013 suggests 1–2 years for urban road drains; IRC:SP:42-2014 suggests 5–25 years for road drains and 10–50 years for culverts, by class of road and size of culvert. An engineer designing a drain in Assam can cite 1, 2, 5, 10 or 25 years, depending on the code chosen.
- Detention. CPHEEO describes limiting peak outflow to pre-development rates as general practice. It uses no "shall" and names no storm frequencies.
- Climate. The NDMA Urban Flooding Guidelines (2010) call for detention and retention facilities and for rainfall curves adjusted for climate change, but give no sizing rule or return period. The State Action Plan on Climate Change is reported to project that "extreme rainfall events will increase by 5–38 per cent", but gives no factor for design that this Manual could find; its text was not read.
- Design rainfall. No national document gives design rainfall that a designer can apply directly to a given town. Each project chooses its own source. CWC's two reports for the Brahmaputra valley read the same storms differently on the two banks, and the Barak valley has no report at all. IMD's 2022 national set of rainfall intensity curves has panels for Guwahati and Dibrugarh (Mohanbari), but both repeat a curve printed for many other cities. The reanalysis grids of NIH-DHAARA give 24-hour depths 1.3 to 2.6 times the CWC values, most of all in lower Assam, where they give Dhubri 789 mm at 50 years against about 280–320 mm on the CWC plate and an IMD record of 368.3 mm.
Assam has no drainage design standard of its own. Research for this Manual found no standard, IDF relationship or circular of DoHUA, T&CP, GMDA, GMC, any other Municipal Corporation or Municipal Board, the PWD or WRD that fixes a return period, a runoff coefficient or a design rainfall for town storm drains, and no IDF relationship with published constants for any station in the State. DoHUA's status sheet records that the town drainage master plans "were prepared before 2015 as per previous FPS system", and no design criteria appear in the documents read. The drain of the Dibrugarh town protection dyke was designed by a "rainfall based approach … rational method", with no return period stated. The first return period found in any official project document is the ADB's target that inundation "from a 1-in-5-year storm or lower return period" be avoided in 434 ha of the Bahini basin of Guwahati, with a "design storm of 65.72 mm hour" whose duration is not stated. GMDA's comprehensive drainage master plan for Guwahati, ordered in August 2024 and followed by the Gauhati High Court in PIL 14 of 2024, was expected by April 2026 and is being revised on the direction of the minister, as reported; it is not final. "Apart from 17 kilometres of drains built between 1973 and 1997, no other extensive and planned drainage network exists in the Guwahati Metropolitan Area", as reported; the ADB found that the storm-water network of the urban local bodies "covers only about 30% of the required areas", and the CAG found coverage of "3 to 37 per cent only". This Manual is offered as a technical companion to the Unified Byelaws 2022, the master plans and their Zoning Regulations, the municipal Acts, the Embankment and Drainage Act, the State's water-bodies law and the Hill Land Act: it supplies the design storm, detention, water-level, tailwater and buffer values that they leave open. It has not been adopted by DoHUA, T&CP, GMDA, GMC, WRD, any District Council or any other body. In particular:
- The building rules ask for a dry sump with a "design calculation", but name no storm. Byelaws 74 and 110(h) require, on sites liable to flood and in hilly areas, a "dry sump (including design calculation) in all individual plots, capable of holding rain water during peak monsoon", without saying what peak or what calculation. Byelaw 114 requires rainwater harvesting pits of at least 5 m³ for every 100 m² of roof, and Appendix VI one percolation pit of 1.2 m × 1.2 m × 1.5 m for every 100 m² of plot, with storage and reuse on plots of 134 m² or more; the two rates are not reconciled, and neither is sized to a storm. The Unified Byelaws 2022 contain no storm-water detention, peak-runoff or release-rate rule; the only mention of runoff is a green-building criterion to "Minimize storm water run-off from site by reducing hard paving on site";
- The rules put rainwater into ground that is already full. Appendix VI routes "All Rain water outlets/drains and waste water drains" to the road drain "through the percolation pit only". On the flood plains, where the water table lies within about 2 m of the surface after the monsoon and the rising Brahmaputra "reduces the rate of percolation", as the ADB's examination records, and where grey water is mixed in, such a pit is a soakaway in saturated ground. This Manual states the conflict and asks for storage in its place; it does not override the byelaw. The groundwater Act's rainwater rule for premises of 100 m² or more applies only in notified areas, and none has been notified;
- The setbacks name Guwahati's channels and stop at 15 m. Byelaw 26(ix) keeps buildings 15 m from a river "as marked in the plan", 10 m from the Bharalu, the Mora Bharalu and the Bondajan, 6 m from other channels, 15 m from Deepor Beel and Silsako, 6 m from other notified water bodies and 10 m from other large ponds, measured from "the edge"; minor drains and small ponds get only the ordinary setbacks of a building. The table names only Guwahati's waters although the byelaws apply statewide. The Master Plan for Guwahati adds a strip of 15 m from the Brahmaputra's bank on one stretch of riverfront. The Water Bodies Bill points its buffer to the Master Plan and the byelaws, which is this table. No setback from an embankment was found;
- The water-body law protects storage, but its schedules are still being drawn. The 2008 Act scheduled four areas of Guwahati by dag number, and the 2024 Bill extends the same protection to every notified Master Plan area through schedules that District Level Committees prepare and the State Level Committee approves; no schedule under the 2024 law was found. Deepor Beel's eco-sensitive zone is still a draft;
- There is no floodplain law and no line for the floodplain. Assam has not enacted the Model Flood Plain Zoning Bill. A State Bill was reported in November 2026 by a single source; this Manual does not treat it as law. The byelaws let the Authority refuse a site "likely to be inundated" where "satisfactory arrangements for proper drainage is not possible", and the amendment of 2024 asks master plans to map natural-hazard areas "where construction is not permitted", but no such map or flood line was found; and
- No document sets the river level for which an outfall is designed. CWC's danger levels and highest flood levels were found only in transcriptions, on no stated datum. WRD's operating rules for its sluices, the time they stay shut, the pumps now installed at Bharalumukh and the storage of Deepor Beel at each stage were not found. Highest flood levels are records, not design levels.
So each agency and each local body interprets the central manual its own way. GMC, GMDA, the PWD, WRD, NHAI, the Railways and others build and keep drains in Guwahati, and the ADB names "fragmented institutional responsibilities involving multiple institutions" as the reason that storm drainage "remains a challenge". No notification assigns the Bharalu, the Mora Bharalu or the Bahini to one owner. A town's drain may be a municipal drain for part of its length, a PWD roadside drain for another, a scheduled water body where it crosses a beel and a drain under the Embankment and Drainage Act where it passes a WRD sluice. In the Autonomous Districts outside a Council's opt-in, the Unified Byelaws 2022 do not apply at all. And a reviewer has no common basis against which to check a design.
What this Manual does about it. It turns those open choices into one State standard:
- one source and method for design rainfall across the State, in five rainfall zones and eight hydrologic sub-areas, with a checked station analysis to govern where one exists; the 2(a) plates and ratios on the north bank; the 2(b) plates and ratios in Guwahati, on the south bank and in the Karbi hills; the higher of the two within 5 km of the Brahmaputra; the whole-catchment rule for Guwahati's streams that rise in Meghalaya; the 2(a) ratios on the Dima Hasao hills; an interim rule from IMD's Silchar stations, with floors, in the Barak valley, where subzone 2(c) has no report; short-storm floors at 1, 3 and 6 hours; and a check of the design day against the largest reliable days recorded nearby (Chapter 2);
- named return periods for every drainage element (Chapters 2 and 6);
- a required pre- versus post-development rule for private sites, with the dry sump of the byelaws designed as detention (Chapter 4);
- a required tailwater check for every outfall against a design river level, which treats the sluice shut against a high river as the normal monsoon case: the gate closed for the whole of the 72-hour design storm and for as long after it as the river stays above the sill, and for not less than 7 days on the Brahmaputra, the Barak and the Kushiyara where no stage record has been analysed; the receiving beel or pond full at the start; and the stored water pumped down within 48 hours (Chapter 5);
- a design flood line, and corridors and setbacks along jans, rivers and juris and around beels and pukhuris, proposed by this Manual for use where nothing wider binds, with a corridor at least 15 m from the top of bank on every natural channel draining 8 ha or more, and the byelaws' setbacks and any notified line wherever those are wider (Chapter 7);
- no deliberate infiltration on char and chapori land, below the 1% AEP flood level, inside an embankment that ponds when its sluices close, at the margins of beels and pukhuris or where the water table rises within 2 m of the surface; none on hill slopes steeper than 10° without a geotechnical certificate; roof runoff to storage, as the byelaws already require, with its overflow to lined drains; and the interception and screening of dry-weather flow before every outfall to a beel, the Bharalu or a scheduled water body, where drains carry sewage (Chapter 8);
- silt traps at the foot of the hills, allowances for sediment and debris, and sluices, flap gates and pumps designed for the river's high stage (Chapters 6 and 9), with drains, jans, inlets, sluices and pumps cleared, tested and certified ready by 31 March, before the April storms, cleared again by 31 May before the south-west monsoon and by 15 November after it, and standby kept from 1 April to 31 October (Chapter 10); and
- basin-wide master plans, so that the agencies that share a basin plan together (Chapter 11).
It uses the route the CPHEEO manual itself provides: a State may adopt standards higher than the national values (CPHEEO 2019, Table 4.1, Note 2). A Municipal Corporation, a Municipal Board, a Development Authority in its master plan, DoHUA in the byelaws, or a District Council in its own rules can still adopt a stricter standard (Chapter 1).
Sources: CPHEEO (2019) Part A §4.4–4.5 and Table 4.1; CPHEEO presentation to CSE (August 2023); IRC:SP:50-2013 §6; IRC:SP:42-2014 cl. 7.1.4 and 8.5.1; NDMA (2010) Urban Flooding Guidelines, para 6.6.2; MoHUA Model Building Bye-Laws (2016); Assam Building Construction (Regulation) Act, 2010 (Assam Act XVI of 2010), as amended by Assam Act XXVII of 2022; Assam Unified Building Construction (Regulation) Byelaws, 2022, No. DoHUA/ECF No. 236697/2 (Assam Gazette Extraordinary No. 688, 15 October 2022), byelaws 1, 26, 44, 45, 74, 110, 114 and 131 and Appendices VI and IX, and the (Amendment) Byelaws, 2024, No. DoHUA/ECF No. 420084/34 (Gazette No. 667, 20 November 2024), byelaw 120; Guwahati Building Construction (Regulation) Byelaws, 2014 (GMDA copy); Master Plan for Guwahati 2025 and Zoning Regulation, Assam Gazette Extraordinary No. 198 (9 July 2009), Report Part II and the Schedule of Modification; Assam Town and Country Planning Act, 1959 (Assam Act II of 1960), as amended; Gauhati Municipal Corporation Act, 1969 (Assam Act I of 1973), ss. 231–252; Assam Municipal Corporation Act, 2022 (Assam Act VIII of 2022), s. 171; Assam Embankment and Drainage Act, 1953 (Assam Act I of 1954), ss. 2, 15 and 16; Guwahati Waterbodies (Preservation and Conservation) Act, 2008 (Assam Act XX of 2008); Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024, ss. 1, 2, 4–7 and 22, and the Assembly's bulletin of 29 August 2024; Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 (Assam Act V of 2007), ss. 2, 4 and 14; Assam Ground Water Control and Regulation Act, 2012 (Assam Act XVI of 2012), ss. 3 and 19; Gauhati High Court, PIL/14/2024 (orders of 23 September 2024 and 26 May 2025), PIL/53/2023 (6 September 2024) and PIL 18/2023, I.A.(C) 924/2024 (5 April 2024); NGT, OA 472/2018 (11 February 2020) and the State's progress report of August 2020 in OA 673/2018; CAG, Report No. 5 of 2018 and Report No. 4 of 2019 (Government of Assam); ADB, Report and Recommendation of the President and Project Administration Manual, Assam Urban Sector Development Project (57262-001, 2025), and Initial Environmental Examinations for the Guwahati and Dibrugarh subprojects of the Assam Urban Infrastructure Investment Program (42265-025, 2017); JICA, ex-ante evaluation of the Guwahati Sewerage Project (2015); PCBA, Action Plan for the Bharalu River (Priority I); DoHUA, status of the town drainage master plans (c. 2016); CWC, Flood Estimation Reports for subzones 2(a) (NB/18/1991) and 2(b) (Revised), No. SB-2(b)/R-4/44/99 (March 2000), Table 4.1, Annexes 4.1 and 4.2 and Plate 9, read by eye; IMD, Extremes of Temperature and Rainfall for Indian Stations (up to 2012); Das et al. (2022), MAUSAM 73(4); NIH-DHAARA (queried 14 November 2026); CGWB, Ground Water Year Book 2022-23, North Eastern Region, and Assam State Profile (2007); SAC/MoEF, National Wetland Atlas (2011); Chandrakanta Abhidhan (2nd ed., 1962); M. Bronson, A Dictionary in Assamese and English (1867); CWC levels as transcribed by SANDRP (2019); reports of the Bharalumukh sluice (2008), of the floods of 2022 and 2026, of the beels of Guwahati and Goalpara, of the Guwahati drainage master plan, of the draft Master Plan 2045 and of the State Action Plan on Climate Change (press and secondary sources).
How to use this Manual
Clauses and commentary. Numbered clauses (for example 4.5.2) are the requirements of this Manual and use "shall". Paragraphs headed Commentary explain the reason for a clause and cite its precedent. They are guidance, not requirements. Where a value has no direct precedent elsewhere, the commentary says so and explains why this Manual sets it.
Return periods. Storms are described both by annual exceedance probability (AEP) and by return period. For example, "1% AEP (100-yr)" means a storm with a 1-in-100 chance of being equalled or exceeded in any year.
Illustrative values. Worked examples and figures marked "Illustrative — not design values" show method and scale only. Design values come from the sources set in Chapter 2.
Annexes and forms. Each chapter lists the annexes and forms it relies on. They follow the chapters, grouped by chapter, and hold the forms to submit, worked examples, templates, model text and standard drawings. Annexes that need data not yet collected are marked To be prepared. They say what they will contain, and the clause that depends on them states the rule that applies in the meantime.
Figures. All figures are original drawings prepared for this Manual. Where a figure follows a published concept, its caption credits the source.
Where to start.
| If you are… | Read first |
|---|---|
| A developer or architect | Chapter 1 (does it apply?), Chapter 4 (what to provide), Chapter 10 (what to submit) |
| A design engineer | Chapters 2–6, then 8 and 9 |
| A local body or approving authority | Chapters 1, 10 and 11 |
| A planner or waterbody manager | Chapters 7 and 11 |
Contents
List of tables
List of figures
Abbreviations
| Abbreviation | Meaning |
|---|---|
| ABC Waters | Active, Beautiful, Clean Waters (PUB Singapore's design guidelines) |
| ADB | Asian Development Bank |
| AEP | Annual exceedance probability |
| AIDR | Australian Institute for Disaster Resilience |
| AMC | Antecedent moisture condition |
| AMC Act | The Assam Municipal Corporation Act, 2022 |
| AMRUT | Atal Mission for Rejuvenation and Urban Transformation |
| APWA | American Public Works Association |
| ARF | Areal reduction factor |
| ARG | Automatic rain gauge |
| ASABE | American Society of Agricultural and Biological Engineers |
| ASDMA | Assam State Disaster Management Authority |
| ASTM | ASTM International (standards) |
| ASWA | Assam State Wetlands Authority |
| AURA | T&CP's mobile application for monitoring urban water bodies (expansion [TBC]) |
| AUWSSB | The State board for urban water supply and sewerage (expansion [TBC]) |
| AWS | Automatic weather station |
| BOD | Biochemical oxygen demand |
| BRE | Building Research Establishment (UK) |
| BSMP | Basin Stormwater Master Plan |
| BSNL | Bharat Sanchar Nigam Ltd |
| BTC | Bodoland Territorial Council |
| BTR | Bodoland Territorial Region |
| CAG | Comptroller and Auditor General of India |
| CGP | Construction General Permit (US EPA) |
| CGWB | Central Ground Water Board |
| CN | Curve number (SCS/NRCS method) |
| COD | Chemical oxygen demand |
| CPCB | Central Pollution Control Board |
| CPHEEO | Central Public Health and Environmental Engineering Organisation |
| CPWD | Central Public Works Department |
| CSE | Centre for Science and Environment |
| CWC | Central Water Commission |
| DL / WL | Danger level / warning level (CWC) |
| DoHUA | Department of Housing and Urban Affairs, Assam |
| DPR | Detailed project report |
| DTP | Dibrugarh's town protection dyke of 1955 and its drain, as the ADB names them ("DTP dyke", "DTP drain"; expansion [TBC]) |
| DWF | Dry-weather flow |
| EN | European Standard (Norme Européenne) |
| EPD | Environmental Protection Division (Georgia, United States) |
| ESC | Erosion and sediment control |
| EV1 | Extreme value type I (Gumbel) distribution |
| FAR | Floor area ratio |
| FER | Flood Estimation Report (CWC) |
| FREMAA | The State agency for the ADB-assisted flood and riverbank erosion risk management programme (expansion [TBC]) |
| FRIMS | ASDMA's flood reporting system (expansion [TBC]) |
| FRP | Fibre-reinforced plastic |
| GMC | Guwahati Municipal Corporation |
| GMDA | Guwahati Metropolitan Development Authority |
| GMDW&SB | The Guwahati board for drinking water and sewerage (expansion [TBC]) |
| GWYB | Ground Water Year Book (CGWB) |
| HAT / MHWS | Highest astronomical tide / mean high water springs (coastal terms; not applicable in Assam) |
| HEP | Hydro-electric project |
| HFL | High flood level (the highest level recorded at a gauge) |
| HGL | Hydraulic grade line |
| HSG | Hydrologic soil group |
| HY-8 | FHWA's culvert hydraulic analysis program |
| IDF | Intensity–duration–frequency |
| IEE | Initial environmental examination (ADB) |
| IIT | Indian Institute of Technology |
| IMD | India Meteorological Department |
| IMDAA | Indian Monsoon Data Assimilation and Analysis (a regional reanalysis) |
| IRC | Indian Roads Congress |
| ISO | International Organization for Standardization |
| IST | Indian Standard Time |
| JICA | Japan International Cooperation Agency |
| KAAC | Karbi Anglong Autonomous Council |
| KC | Kansas City (Kansas City Metro APWA Section 5600) |
| KLD | Kilolitres a day |
| LiDAR | Light detection and ranging (laser survey) |
| MBBL 2016 | Model Building Bye-Laws 2016 (MoHUA; not the State's byelaws) |
| MePGCL | Meghalaya Power Generation Corporation Ltd |
| MLD | Million litres a day |
| MoEF&CC | Ministry of Environment, Forest and Climate Change |
| MoHUA | Ministry of Housing and Urban Affairs |
| NAPCC | National Action Plan on Climate Change |
| NCHAC | North Cachar Hills (Dima Hasao) Autonomous Council |
| NDMA | National Disaster Management Authority |
| NEEPCO | North Eastern Electric Power Corporation |
| NGT | National Green Tribunal |
| NH | National Highway |
| NHAI | National Highways Authority of India |
| NHPC | NHPC Ltd (operator of the Lower Subansiri project) |
| NIH | National Institute of Hydrology, Roorkee |
| NIT | National Institute of Technology |
| NOC | No-objection certificate |
| NPDES | National Pollutant Discharge Elimination System (United States) |
| NRSC | National Remote Sensing Centre |
| NWIA | National Wetland Inventory and Assessment (ISRO) |
| OA | Original Application (NGT) |
| OGC | Open Geospatial Consortium |
| OIL | Oil India Ltd |
| PAM | Project administration manual (ADB) |
| PCBA | Pollution Control Board, Assam |
| PIB | Press Information Bureau |
| PIL | Public interest litigation |
| PSD | Permissible site discharge |
| PWD | Public Works Department, Assam |
| RDSO | Research Designs and Standards Organisation (Railways) |
| RMSE | Root-mean-square error |
| RRP | Report and recommendation of the President (ADB) |
| RRV | Required retention volume |
| RWH | Rainwater harvesting |
| SANDRP | South Asia Network on Dams, Rivers and People |
| SAPCC | State Action Plan on Climate Change |
| SH | State highway |
| SLA | Sea-level allowance (coastal term; not applicable in Assam) |
| SRRG | Self-recording rain gauge |
| SUH | Synthetic unit hydrograph (CWC) |
| T&CP | Directorate of Town and Country Planning, Assam |
| T&CP Act | The Assam Town and Country Planning Act, 1959 |
| TBC | To be confirmed: a fact or value not yet found in a source |
| TCPO | Town and Country Planning Organisation (MoHUA) |
| TR-55 | Technical Release 55 (USDA SCS/NRCS) |
| UH | Unit hydrograph |
| ULB | Urban local body (in Assam, a Municipal Corporation or a Municipal Board) |
| Unified Byelaws 2022 | The Assam Unified Building Construction (Regulation) Byelaws, 2022, as amended |
| USACE | US Army Corps of Engineers |
| UT | Union Territory |
| UTM | Universal Transverse Mercator |
| VR | Value rating (of a BMP treating the WQv) |
| WQv | Water quality volume |
| WRD | Water Resources Department, Assam |
| WSUD | Water-sensitive urban design |