Chapter 5Downstream and Tailwater Analysis
5.1 Purpose and scope
5.1.1 This chapter sets two checks that every regulated development and every public drainage project must pass.
- The downstream analysis (Clauses 5.3 to 5.5) confirms that the project does not make flooding worse below its outfall.
- The tailwater analysis (Clauses 5.6 to 5.13) sets the water level the system discharges into, including tide, storm surge, sea-level rise, river backwater and sand-bar closure. It also requires the system to cope when its outfall is closed.
5.1.2 This chapter applies to:
- (a) every site to which Chapter 4 applies;
- (b) every minor- and major-system drainage project under Chapter 6; and
- (c) every regional detention or tank restoration project under Clause 4.13 and Chapter 7.
5.1.3 Rainfall and joint-occurrence inputs come from Chapter 2, in particular Clauses 2.5.3 and 2.12. Hydrologic methods come from Chapter 3. Site release criteria come from Chapter 4. Hydraulic design of gates, culverts and pumps follows Chapter 9.
5.1.4 No tidal outfalls in Assam. Assam is landlocked: it has no coast, no tide and no Coastal Regulation Zone, and the monsoon reaches it as rainfall and as the floods of the Brahmaputra, the Barak and their tributaries, which are dealt with in Chapter 2 and in Clause 5.8, not as a tidal or surge level. No outfall in the State discharges to the sea, a tidal creek or an estuary, so the provisions of this chapter that depend on tide, storm surge, sea-level rise or a river mouth do not apply in Assam: Clause 5.7 and Annex 5A, cases J1 to J3 of Table 5.2, the tidal lock windows of Clause 5.10.3, the seawater requirement of Clause 5.11.3(a) (gates and seats shall still be of corrosion-resistant materials, and shall resist abrasion by silt and sand and attack by water that carries sewage), and Clause 5.13. They are kept so that the clause numbers of this Manual match its other State editions. In Assam the receiving water is one of six kinds: a river reached through a sluice or flap gate in a WRD embankment or a town dyke, or through a pumping station, which is normally closed in the monsoon because the Brahmaputra or the Barak stands higher than the town behind it; the gated and pumped channels of Guwahati, the Bharalu–Bahini to the Bharalumukh sluice and the Mora Bharalu, Silsako and Noonmati–Bondajan systems; the drain of a dyke-protected or bowl town, such as Dibrugarh's DTP drain to the Sessa or the drains of Silchar behind the Barak embankment; a tributary with a CWC gauge, or a reach of river below a dam, such as the Ranganadi; a beel (a natural floodplain lake or wetland), a pukhuri or a jan (Assamese জান: a stream or natural drainage channel, often the outlet of a beel, as in Bondajan and Khanajan) that stores the town's water while its outlet is closed; or a juri (Assamese জুৰি: a small hill stream) or other hill stream coming down from Meghalaya or the hill districts, laden with silt and debris; and:
- (a) its tailwater is set by Clauses 5.6 and 5.8, including Clause 5.8.5;
- (b) where Clauses 5.10 to 5.12, Form 5-1 or Chapter 6 refer to the J1 tailwater or the J1 tidal curve, the minor-system tailwater of Clause 5.6.2 or 5.8.5 applies, as a time series where the receiving level varies; where they refer to the J2 tailwater or to HAT + surge + SLA, the major-system tailwater applies: the design-AEP river level of Clause 5.8.4(b), or the major-system tailwater of Clause 5.8.5, whichever is higher at the outfall; and
- (c) the outfall-closed check of Clause 5.10 applies where an outfall is closed by a river behind an embankment sluice, a gated or pumped channel, a dyke, a release reach, a full beel, pukhuri or pond, a hill stream or a receiving drain, with the locks and closures of Clause 5.8.5(a) to (f) in place of the tidal lock windows.
5.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Analysis point | A location on the downstream system where pre- and post-project conditions are compared (Clause 5.3.3). |
| Contributing catchment | The whole area draining to an analysis point, on and off site. |
| Major drain | A channel listed as a major drain in the basin plan or Annex 5B, or any river, WRD canal, the Bharalu and the Bahini, the Mora Bharalu, the Basistha, the Kalmani, the Khanajan, the Bondajan and the Lakhimijan in Guwahati, the DTP drain of Dibrugarh to the Sessa, every channel of a WRD drainage scheme and every drain that discharges through a sluice in an embankment, any drain built or held by GMC, GMDA, a Municipal Corporation, a Municipal Board, a Development Authority, PWD or NHAI with an internal width of 1.0 m or more, and every jan, juri or other natural channel that drains 8 ha or more, or a tidal creek. |
| Chart datum (CD) | The datum of the published tide tables and nautical charts, to which tidal heights are referred. |
| Mean sea level (MSL) | Average sea level over a long period at a tide gauge. |
| MHWS | Mean high water springs: the average of high waters at spring tides. |
| HAT | Highest astronomical tide: the highest level predicted under average meteorological conditions over a full tidal cycle (18.6 years). |
| Storm surge | The rise in sea level above the astronomical tide caused by wind and low pressure, mainly during cyclones. |
| Still-water level | Astronomical tide plus surge, excluding individual waves. |
| Sea-level allowance (SLA) | The allowance added to present-day tidal levels for sea-level rise over the design life (Clause 5.7.4). |
| Tailwater | The water level at the downstream end of a drain, outlet or storage. |
| Tide-lock | The condition in which the tailwater is at or above the upstream water level, so a gravity outfall cannot discharge. |
| Lock window | A period during which the outfall-closed check of Clause 5.10 sets gravity discharge to zero. |
| Sand bar | A bar of beach sand that partly or fully closes a river mouth or creek inlet. |
| Project datum | The levelling datum used on the project drawings. It must be tied to a Survey of India benchmark (Clause 5.7.2). |
5.3 Extent of the downstream analysis
5.3.1 The downstream analysis shall start at each site or project outfall. It shall continue downstream to the first of:
- (a) the point at which the project area is 10% or less of the contributing catchment;
- (b) the next tank, pukhuri or other waterbody with a surplus weir or controlled outlet; or
- (c) the next major drain, or the sea.
The end point itself shall be analysed (Figure 5.1).
5.3.2 Where the analysis ends at a tank or pukhuri under 5.3.1(b), it shall report:
- the change in the tank's maximum water level; and
- the change in surplus-weir discharge, for the AEPs and durations of Clause 5.4.3.
If the maximum water level rises, the analysis shall continue below the surplus weir to the next end point.
5.3.3 Analysis points shall be set at least at:
- (a) each site outfall;
- (b) each confluence with a drain or channel whose contributing catchment is at least half that of the receiving drain at that point;
- (c) each culvert, bridge or road crossing;
- (d) each location recorded as flood-prone by the local body, GMC, ASDMA or WRD; and
- (e) each building or road segment lying within the 1% AEP flood extent along the route. Representative points may be used where buildings are closely spaced.
5.3.4 Small sites. For sites of less than 0.5 ha, the Authority may accept a simplified downstream statement (Form 5-2) in place of the full analysis, where all of the following hold:
- the receiving public drain has documented capacity for its minor-system design flow (Chapter 6);
- no flood-prone location is recorded within 500 m downstream; and
- the site does not drain to a tidal or backwater-affected outfall.
Figure 5.1 — Extent of downstream analysis: analysis points A–D, the contributing area at each point, the 10% point, and the next pukhuri or major drain as an alternative end point. Schematic; percentages are illustrative. Original drawing for this Manual, adapted from the ten-percent rule in the Georgia Stormwater Management Manual (2016, Vol. 2 §3.1.9) and KC APWA Section 5600 (2006, 5601.5).
Commentary. The 10% rule has established precedent. KC APWA 5600 (2006) required the downstream system to be analysed "to the point the development's land mass is less than 10% of the total watershed". The Georgia manual makes the ten-percent analysis a mandatory standard (GSMM 2016, Standard #8). The tank or major-drain end point has no direct precedent; this Manual adds it for Assam. In Guwahati, where the Bahini rises in Meghalaya and runs 9.29 km to Jonali, where it becomes the Bharalu, and the Bharalu runs 6.2 km on to the Brahmaputra at Bharalumukh (PCBA action plan for the Bharalu, as quoted), and where the Mora Bharalu, the Basistha and the Kalmani run to Deepor Beel and on by the Khanajan to the Brahmaputra, and in Dibrugarh, whose drain runs 32.053 km past Larua Jamira beel to the Sessa (ADB IEE, 2017), the 10% point can lie many kilometres downstream, across several tanks. A tank with a working surplus weir changes the hydrograph completely, so the analysis is better ended there and the tank level reported. Clause 5.3.2 prevents that end point from hiding a rise in the tank level. The small-site statement (5.3.4) and its 500 m distance have no direct precedent and are set by this Manual.
5.4 What the analysis must check
5.4.1 Scenarios. Each analysis shall compare:
- (a) Existing: the present downstream system and present land use of the whole contributing catchment, with the project site at its pre-project state; and
- (b) With project: the same, with the project and all its controls (Chapter 4) in place.
Where the Authority's basin plan defines future land use, the Authority may also require:
- (c) Future: the catchment fully developed under the plan, all to Chapter 4 standards, with and without the project.
5.4.2 Quantities to be checked at every analysis point:
- (a) Capacity: peak flow against the capacity of every channel, pipe, culvert and crossing, for the minor-system AEP of that element (Chapter 6) and for 1% AEP;
- (b) Flood levels: 1% AEP maximum water level at buildings (at the lowest opening) and on roads (at the crown and at the deepest point);
- (c) Velocities: peak velocity for 50%, 10% and 1% AEP;
- (d) Timing of combined peaks: the hydrograph at each confluence, showing the time to peak of the project outflow and of the receiving drain; and
- (e) Duration of inundation: on roads and at buildings, the time above the Chapter 6 depth limits.
5.4.3 Storms. The analysis shall use:
- 50%, 10% and 1% AEP;
- the duration set of Clause 2.5.2, at least the durations that give the highest level at each analysis point (these will usually be longer than at the site); and
- the 24-, 48- and 72-hour storms in every case.
The AMC rule of Clause 2.11.4 applies. Areal reduction follows Clause 2.7, applied to the contributing catchment at each analysis point and never to the site storage.
5.4.4 Method. The analysis shall:
- use a hydrograph method that combines hydrographs at confluences (SWMM, HEC-HMS, or an equivalent);
- include a hydraulic model with backwater (SWMM dynamic wave, HEC-RAS, or equivalent) wherever tailwater or backwater affects any analysis point; and
- not use the Rational Method at any analysis point, because it cannot represent timing.
Off-site areas shall be modelled at their present land use. Upstream detention shall be included only where it is built, maintained and documented.
5.4.5 Tailwater. The downstream end of the model shall use the tailwater of Clauses 5.6 to 5.9 and the sand-bar condition of Clause 5.13 where applicable.
Commentary. Clause 5.4.2(d) exists because detention changes when the site's water arrives, not only how much arrives (Clause 4.16). A Colorado State University thesis and a Water (2016) optimisation study both found that delayed site releases can coincide with the main-stem peak and raise it. Georgia's manual states the result directly: some structural practices "fail to reduce discharge peaks to pre-development levels downstream" because of "peak flow timing and runoff volume effects" (GSMM 2016). The duration-of-inundation check (5.4.2(e)) matters in the river-locked and embanked towns of Assam, whose outfalls lie behind sluices and embankments and below the high stages of the Brahmaputra and the Barak: at Guwahati the highest flood level at the DC Court gauge, 51.46 m (21 July 2004), stands 1.78 m above the danger level of 49.68 m (CWC levels as reported), which on this Manual's reading the river reaches in most monsoons; Dibrugarh town lies "1.5 m below the bed level of Bramhaputra" behind its dyke (ADB IEE, 2017); and in June 2022 Silchar, a bowl behind the Barak embankment, was under water for about 11 days, up to about 4 m deep in places (as reported; "about a week" in another report). Detention that prolongs releases can lengthen that time even when it lowers the peak.
5.5 Acceptance criteria
5.5.1 The project is acceptable if, at every analysis point and for every AEP and duration of Clause 5.4.3, comparing "with project" to "existing":
- (a) the 1% AEP maximum water level does not rise by more than 10 mm at any habitable building, at any building's lowest opening, or on any road carriageway;
- (b) no building that is not flooded in the existing case is flooded with the project, and no building or road that meets the Chapter 6 freeboard or depth limits in the existing case fails them;
- (c) peak flow does not exceed the existing peak at the minor-system AEP of each element, or at 1% AEP;
- (d) peak velocity in lined channels stays within the permissible velocity for the lining (Chapter 6: 3.0 m/s maximum); and
- (e) in unlined or natural channels, peak velocity for 50% and 10% AEP does not increase by more than 10%, unless protection is provided under Chapter 9.
5.5.2 The duration of inundation under 5.4.2(e) shall be reported. The Authority may refuse a project that increases the duration of road closure on an arterial or emergency route.
5.5.3 Where the criteria are not met, the project shall do one or more of the following:
- (a) reduce release rates or increase storage (Chapter 4);
- (b) build downstream improvements, with the consent of the owner of the downstream system. These shall not transfer the problem further downstream, and shall be re-analysed under this chapter;
- (c) contribute to a regional facility under Clause 4.13; or
- (d) under Clause 5.5.4, change the release strategy.
5.5.4 Timing exception. Where the analysis shows that detention raises downstream levels because of timing, the Authority may vary the site release-rate criteria of Clause 4.5. This applies only where the site discharges within the lower tenth of the contributing catchment, directly to a major drain, tidal creek or the sea, and only on the following conditions:
- (a) the varied strategy meets 5.5.1;
- (b) the retention requirement (Clause 4.4) and WQv treatment (Chapter 8) are met in full; and
- (c) the outfall-closed check (Clause 5.10) is met.
Commentary. The 10 mm tolerance (5.5.1(a)) has no direct precedent. It is meant to be at or below the numerical precision of a typical one-dimensional model, so that "no increase" can be tested without arguing over rounding. The 10% velocity tolerance is likewise set by this Manual. The timing exception in 5.5.4 follows the Georgia manual, where the downstream analysis can show "that peak controls are not needed" and allow them to be waived (GSMM 2016, Standard #8). It is limited here to sites low in the catchment, which is where synchronisation with the main-stem peak is most likely (Water 2016, 8(7):290). It is not available above that, because the evidence on scale (Clause 4.16) shows that early release from many upstream sites raises peaks.
5.6 Tailwater: general and non-tidal outfalls
5.6.1 Every drain, outlet and storage shall be designed against a stated tailwater. A free outfall shall be assumed only where the outlet invert is above the maximum receiving water level for the case being checked.
5.6.2 Minor-system tailwater, non-tidal. The tailwater is the receiving system's water level at the time of the minor-system peak, from the downstream model. Where no model exists, use:
- for a receiving pipe, its obvert; or
- for a receiving open drain, its full-bank level less freeboard (Chapter 6).
5.6.3 Major-system tailwater, non-tidal. The tailwater is the receiving system's 1% AEP water level, unless Clause 5.8 allows a coincident lower level.
5.6.4 Tidal and backwater outfalls. Clauses 5.7 to 5.13 apply in addition.
5.6.5 Storage elements. Detention, tanks and pumped sumps shall be routed with a time-varying tailwater (Clause 4.6.6), not a constant level, wherever the tailwater varies with tide or with the receiving system's hydrograph.
5.7 Tidal tailwater: datums, surge and sea-level allowance
5.7.1 Design tailwater levels. For outfalls to the sea, tidal creeks, estuaries, backwaters and tidal reaches of rivers and canals:
Table 5.1 — Design tailwater levels for tidal outfalls
| Design case | Tailwater |
|---|---|
| Minor-system design (Chapter 6) | MHWS + SLA |
| Major-system design and storage design | HAT + surge + SLA, with the surge term defined in Clause 5.7.3 |
| Joint case (Clause 2.12(b)) | 1% AEP still-water level + SLA |
The SLA is +0.3 m minimum (Clause 5.7.4). The cases to be run are listed in Clause 5.9.
5.7.2 Sources and datums.
- (a) Tidal levels. MHWS, HAT and MSL shall be taken from the current edition of the Indian tide tables published by the National Hydrographic Office (NHO) or by the Survey of India, for the nearest standard or secondary port, or from the port authority's published tidal levels. The edition and port shall be stated.
- (b) Datum conversion. Tide-table heights are referred to chart datum. They shall be converted to the project datum through a documented connection between chart datum, the tide gauge zero and a Survey of India benchmark. The offset and its source shall be stated on Form 5-1.
- (c) Estuaries, creeks and canals. For outfalls inside estuaries, creeks, backwaters or tidal canals (for example the estuaries of the coastal States; there is none in Assam, Clause 5.1.4), tidal levels may differ from the open coast. Open-coast levels shall be used unless measured levels over at least one spring–neap cycle, or a calibrated hydrodynamic model, justify a different value. No reduction below open-coast levels shall be taken without such evidence.
- (d) Interim. Until Annex 5A is published, the designer shall obtain the values directly from the sources in (a) and record them.
5.7.3 Storm surge.
- (a) Major-system and storage design. The surge term in "HAT + surge" is the 10% AEP (10-yr) storm surge for the coastal segment, given in Annex 5A. The 1% AEP surge is used only in the joint case of Clause 2.12(b), with the 10-yr 48-hour storm. That keeps the two cases symmetric, so that a rare rainfall is never paired with a rare surge.
- (b) Joint case. The 1% AEP still-water level for Clause 2.12(b) is taken from Annex 5A.
- (c) Until Annex 5A is published, both values shall be taken from a site-specific study using INCOIS, IMD or NCCR surge hindcasts or return-level analyses. The study shall state its source, method and record length.
- (d) Wave set-up shall be added where the outfall faces the open sea without a protected entrance.
5.7.4 Sea-level allowance. The SLA shall be:
- (a) +0.3 m minimum for every element;
- (b) greater than 0.3 m where the State, GMDA or the Authority adopts a higher projection for the planning area; and
- (c) assessed for the design life of the element. For elements with a design life of more than 50 years, the designer shall report the effect of a sea-level rise of twice the SLA as a sensitivity run.
Figure 5.2 — Tidal outfall: flap gate, property non-return valve, and the design tailwater levels (MHWS + 0.3 m for the minor system; HAT + surge + 0.3 m for the major system), with a seasonal sand bar at the mouth. Schematic, not to scale. Original drawing for this Manual, adapted from the tidal tailwater table in MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, Table 6.2.
Commentary. CPHEEO (2019) Table 6.2 sets the design tailwater for coastal outfalls as:
- MHWN to MHWS for a minor storm (more frequent than 1 in 5 years);
- MHWS to HAT for a major storm; and
- "Effect of climate change: additional 0.3 m".
CPHEEO also says the joint probability of storm, tide and surge "should" be considered, with the state maritime board consulted. This Manual takes the upper end of each CPHEEO range, adds surge for the major system, and makes the joint case explicit (Clause 2.12). CPHEEO does not require surge to be added; this Manual adds it because the surge records of the coastal States showed why it is needed there; Assam has no coast, and the surge term does not arise in the State, whose rivers are held high by the floods of the Brahmaputra and the Barak, not by the sea (Clause 5.8.5).
Indian tide tables have been published by the Survey of India since the nineteenth century (Survey of India, Tidal Predictions). Current Indian tidal predictions also appear in the NHO's tide tables. One port document describes the current edition as covering 95 Indian ports, based on NHO observations and on data from civil ports, NIO and INCOIS (Adani Ports, Dahej tide table 2025, citing NHO INP-12). INCOIS runs coastal tide gauges and issues storm-surge and swell-surge warnings. None of these is used for design in Assam, which has no coast, and Annex 5A is not prepared for the State (Clause 5.1.4).
5.8 Riverine backwater
5.8.1 Where it applies. Outfalls to rivers and canals whose water level in a storm can exceed the outfall invert shall be designed with riverine backwater. This includes:
- the Brahmaputra at every town on either bank, among them Dibrugarh, Neamatighat (Jorhat), Tezpur, Guwahati with North Guwahati and Amingaon, Goalpara and Dhubri, through the sluices and pumping stations in WRD's embankments and the town dykes (Clause 5.8.5(a));
- in Guwahati, the Bharalu and the Bahini to the Bharalumukh sluice, the Mora Bharalu, Deepor Beel and the Khanajan, the Silsako basin, the Bondajan with the Noonmati pump house, and the Basistha, the Kalmani and the Lakhimijan (Clause 5.8.5(b));
- the DTP drain of Dibrugarh past Larua Jamira beel to the Sessa sluice, the Barak at Silchar (Annapurnaghat) and Badarpur (Badarpurghat), the Kushiyara at Karimganj, and the rivers of Hailakandi (Clause 5.8.5(c));
- the tributaries with CWC sites, the Jia Bharali, the Subansiri, the Burhidihing, the Dikhow, the Kopili, the Beki, the Manas, the Puthimari and the Pagladiya, and the Digaru, the Kulsi and the Krishnai (Dudhnai) from Meghalaya (Clause 5.8.5(d));
- the release reaches of the Ranganadi, the Subansiri, the Kopili, the Manas and the Umtru below Byrnihat (Clauses 5.8.3 and 5.8.5(d));
- every beel, pukhuri, jan and retention pond that receives a town's drains, among them Deepor Beel, Silsako, Borsola, Sorusola and Larua Jamira beel (Clause 5.8.5(e));
- the juris and hill streams of the Guwahati fringe from Meghalaya, of the Karbi and Dima Hasao hills and of the north-bank foothills, and the Jinjiram where it comes down from the Garo hills (Clause 5.8.5(f));
- any drain or channel of GMC, GMDA, a Municipal Corporation or Board, a Development Authority, PWD or NHAI, and any drainage channel of a WRD drainage scheme, that receives storm water (Clause 5.8.5(g)); and
- elsewhere: any river or WRD channel listed in Annex 5B.
5.8.2 River levels. River water levels shall be taken from:
- (a) WRD design flood levels or recorded highest flood levels for the reach, where published; or
- (b) a hydraulic model (HEC-RAS or equivalent) of the river reach. The model shall use:
- the river design flood from a hydrograph method (Chapter 3), with continuous simulation where Chapter 3 requires it;
- the tidal boundary of Clause 5.7 at the mouth; and
- the sand-bar condition of Clause 5.13.
5.8.3 Reservoir and tank releases. Where a reservoir or tank upstream can release to the river (for example the Ranganadi project of NEEPCO in Arunachal Pradesh, above North Lakhimpur; the Lower Subansiri project of NHPC on the Subansiri; the Kopili project of NEEPCO at Khandong on the Kopili; the Kurichu dam in Bhutan, in the Manas basin; and the New Umtru dam in Meghalaya on the Umtru above Byrnihat), the river level shall include the release given by the reservoir's operating rule for the storm being checked. Where there is no published rule, it shall include the largest recorded release.
5.8.4 Coincidence of site storm and river flood. Unless a joint-probability study is accepted by the Authority, the more severe of the following governs:
- (a) the site design storm (AEP as required), with the river at its 10% AEP (10-yr) level; and
- (b) the site 10% AEP storm, with the river at its design-AEP level (1% AEP for the major system).
The two storms in each pair shall have the same duration and timing where they are generated by the same rainfall event.
5.8.5 River-locked outfalls through embankment sluices, Guwahati, dyke-protected and bowl towns, tributaries and dam-release reaches, beels and pukhuris, hill streams, and consents and lines.
- (a) River-locked outfalls through embankment sluices. For an outfall to a river directly, through a sluice (pani-duwar) or flap gate in an embankment (mothauri), a town protection dyke or a wall, or through a drainage pumping station, or into a drain, jan or beel that itself discharges in one of those ways, the designer shall identify the body that operates each sluice, gate and pumping station, and obtain the sill of each gate, the crest of the embankment, dyke or wall, the installed pumping capacity and the operating levels, including the river level at which each sluice is closed. Every level shall state its datum and its connection to the gauge datum of the nearest CWC or WRD gauge, with its operator named. Most embankments and sluices in the State are WRD's: the CAG counted 4,474.42 km of embankments and 98 major and 545 minor sluices in March 2017 (CAG Report No. 5 of 2018), the WRD website gives 4,473.82 km and 94 major and 545 minor sluices (as quoted), a Lok Sabha answer of December 2024 gives 122 major and 545 minor sluices (as quoted), and a later ministerial reply cites about 4,800 km of embankments (as reported). These counts conflict and are not used for design; the designer shall take the record of the sluice concerned. WRD's sluice operating rules and closure durations were not found during research [TBC].
- Design river level. The river level of Clause 5.8.2 at the outfall shall be, for the major-system cases (Clause 5.8.4(b)), the 1% AEP river level at the outfall, from a flood-frequency study or a hydraulic model under Clause 5.8.2(b). Assam has no floodplain zoning law, and no 1% AEP level has been published for any reach of any river in the State (Chapter 7) [TBC]. The level shall in no case be less than the highest recorded level at the nearest CWC gauge on the same river, transferred to the outfall. The highest levels found during research (Table 5B.1), all as reported in SANDRP's 2019 transcription of CWC tables, with the datum not stated [TBC], are: the Brahmaputra at Dibrugarh 106.48 m (3 September 1998), Neamatighat 87.37 m (11 July 1991), Tezpur 66.59 m (27 August 1988), Guwahati (DC Court) 51.46 m (21 July 2004), Goalpara 37.43 m (31 July 1954) and Dhubri 30.36 m (28 August 1988); the Barak at Annapurnaghat (Silchar) 21.84 m (1 August 1989) and at Badarpurghat 18.48 m (11 September 2007); and the Kushiyara at Karimganj 16.57 m (10 June 2010). Where two values are reported for the same gauge, the higher applies until CWC confirms the level [TBC]: at Goalpara the HFL is also given as 37.35 m (13 July 2004), so 37.43 m applies; at Dhubri a 2024 CWC bulletin is reported to give 30.37 m (17 July 2019) (as quoted), so 30.37 m applies. Where a later flood has exceeded the listed level, the later level governs. The recorded level shall be transferred along the river with the water-surface slope of the flood that set it, from the CWC and WRD gauge records or from the model; until either is available, the recorded level of the nearest gauge upstream applies unchanged at the outfall, except that where the outfall lies between two gauges on the same river with no tributary joining between them, the level may be interpolated linearly by river distance between the highest recorded levels of the two gauges (set by this Manual). An outfall upstream of every gauge on its reach shall not be designed without a modelled or surveyed profile [TBC].
- 10% AEP level. For the cases with the river at its 10% AEP level (Clause 5.8.4(a)), the level shall be taken from the same model or from a frequency analysis of the gauge record, and shall be not less than the danger level at the nearest gauge, transferred in the same way: 105.70 m at Dibrugarh, 85.04 m at Neamatighat, 65.23 m at Tezpur, 49.68 m at Guwahati (DC Court), 36.27 m at Goalpara, 28.62 m at Dhubri, 19.83 m at Annapurnaghat, 16.85 m at Badarpurghat and 14.94 m at Karimganj (CWC levels as reported) (set by this Manual). The datum of every CWC level is to be confirmed for each gauge [TBC].
- Tailwater. The tailwater at the outfall shall be the higher of that river level beyond the sluice, gate, dyke or embankment, and the maximum level in the drain, jan or beel behind it, computed by routing it as a closed storage for as long as the river stands above the level behind it, with the inflow of the whole catchment that drains to it, including any part of the catchment in Meghalaya or another State, its storage as surveyed in its present condition, net of silt, encroachment, solid waste and weed, and an outflow of no more than the pumping capacity that the operator confirms in writing is available in a storm, and in no case more than the installed capacity of the permanent pumps less the largest pump (set by this Manual), with gravity discharge through the sluice only while the river is lower than the level behind it. A beel, pukhuri, jan or retention pond behind the sluice starts the storm full to its outlet level (item (e)). Pumps shall deliver against the design river level of this item, and every pump, panel and control shall remain operable with the river at that level and with the land behind the embankment ponded (Clause 5.12.5).
- River lock. Portable dewatering pumps brought in for an event, and capacity that has been sanctioned or proposed but not commissioned, shall not be counted. The outfall-closed check of Clause 5.10 applies with a single lock: the gate is closed for the whole of the 72-hour storm of Clause 5.10.2 and for as long after it as the coincident river level of Clause 5.8.4 stays above the gate sill, or above the level at which the sluice is closed if that is lower, taken from the river model or from the stage record of the nearest CWC gauge in the flood that set the highest recorded level or in a comparable flood; where no stage record has been analysed, the lock is not less than 7 days (168 hours) on the Brahmaputra, the Barak and the Kushiyara and not less than 72 hours on a tributary (set by this Manual). The lock covers the whole of the 48- and 72-hour storms, so that storage and pumping handle the full storm volume (Clause 5.9.4). With the gate still closed, the volume stored in the storm shall be pumped down to the level at which the storm started within 48 hours of the end of the storm, the drawdown time of Clause 4.7, so that the storage is ready for the next storm while the river stays high (set by this Manual). A shorter lock may be used only where the outfall invert is above the 1% AEP river level of this item, or where an analysis of the stage record of a CWC or WRD gauge under Clause 5.10.6 shows it and the Authority approves it.
- Gate failure and breach. Floor levels and pumped outfalls behind a sluice, dyke or embankment shall also be checked for the failure of the gate and for a breach of the embankment, with the land and drains behind it filled to the river level beyond it, as the Barak filled Silchar through the cut embankment at Bethukandi in June 2022 (item (c)).
- (b) Guwahati. For an outfall in the Guwahati metropolitan area (the Master Plan 2025 area of 328 km², on both banks), whose six drainage basins are the Bharalu, Dipar, Silsako, Foreshore, North Guwahati and Kalmoni basins (ADB IEE, 2017), and where "the water level of the Brahmaputra River sometimes, is higher than the ground level of the city areas" (ADB IEE, 2017):
- River level. The Brahmaputra level at every outfall is that of item (a) at the Guwahati (DC Court) gauge, danger level 49.68 m and highest flood level 51.46 m (21 July 2004) (CWC levels as reported), transferred to the outfall, on the north bank at North Guwahati and Amingaon as well as on the south bank. On this Manual's reading the river reaches its danger level there in most monsoons, and its highest flood level is 1.78 m higher (NEER reading), so every outfall below the danger level is a river-locked case under item (a).
- The Bharalu–Bahini to the Bharalumukh sluice. The Bahini rises in the Khasi hills of Meghalaya at Umtyrnga and runs 9.29 km to Jonali, where it becomes the Bharalu, which runs 6.2 km to the Brahmaputra at Bharalumukh; its catchment is about 120 km², about half of it hills, with about 10.94 km² draining the city (PCBA action plan for the Bharalu, as quoted; about 11 km² in a press article; the Bahini–Bharalu is given as 30.02 km long in another source, as quoted). The Bahini is "cut off by a sluice at Natun Bazar" (PCBA action plan). At Bharalumukh, "the natural discharge capacity of the Bharalu is 72 Cumecs when its Bharalumukh sluice gates are kept open, while the pumps fitted to its sluice gates can discharge only seven Cumecs" (2008, as reported); the present installed capacity was not found [TBC]. Every outfall in the Bharalu basin is river-locked under item (a) at Bharalumukh: the Bharalu and Bahini are routed as a closed storage with the inflow of their whole catchment, the Meghalaya part included, at the rainfall of the Guwahati catchment rule of Clause 2.3.6(c)(i), and with an outflow of no more than the permanent pumps at Bharalumukh that WRD confirms in writing are working, less the largest pump. The joint capacity of 52 m³/s for the Bharalu and Mora Bharalu "during the flood season" that resectioning was reported to give (as reported), and the automated Bharalumukh pumping station of the ₹1,459 crore project announced in May 2026 (Bharalu component ₹958.10 crore, as reported), shall not be counted until they are built and commissioned. The WRD dewatering pumps reported at the Bharalu, the Mora Bharalu and the Bondajan (as reported) are counted only where WRD confirms in writing that they are permanent and working.
- The Noonmati–Bondajan system. The Noonmati pump house is reported to have four pumps of 1,000 L/s that divert water through the Bondajan to the Brahmaputra, and an older station two pumps of 1,700 L/s (as reported). An outfall to the Bondajan, or to a drain that ends in it, shall route the Bondajan as a closed storage under item (a) with every pumped inflow to it included in its level (Clause 5.12.3).
- The Mora Bharalu–Deepor Beel–Khanajan system. The Mora Bharalu (reported capacity 45 m³/s, as reported) runs to Deepor Beel, which the Basistha and the Kalmani also feed and which drains to the Brahmaputra by the Khanajan. Deepor Beel holds about 10.1 km² of water all year and up to about 40.1 km² in floods (as reported); no stage–storage relation was found [TBC]. An outfall to the Mora Bharalu, the Basistha, the Kalmani, the Khanajan or Deepor Beel shall take as tailwater the beel's level under item (e), starting full, and in the coincident case the higher of that level and the Brahmaputra level of this item transferred to the Khanajan's outfall. No link between the Bharalu and Deepor Beel other than the Mora Bharalu shall be assumed. Deepor Beel is a Ramsar site (No. 1207, 2002, as quoted) and a wildlife sanctuary whose denotification the High Court stayed (order of 5 April 2024): no storage in it shall be credited to a project, and no drain shall be brought to it without the interception and screens of Clause 6.3.6(e) and Clause 8.9.
- Silsako and the ADB Bahini works. The ADB Assam Urban Sector Development Project provides, in the Bahini basin, 4.1 km of flood diversion channels, 4.7 km of drains, an increase in pumping capacity of 7.8 m³/s in three stormwater pumping stations and "a nature-based flood retention pond of 59,000 m3 and a pumping station with capacity of 1.6 m3 per second", with part of the runoff "diverted to a retention basin in the nearby Silsako Basin and gradually pumped out to the Brahmaputra River" (ADB RRP and PAM, 2025). None of these works shall be counted until it is commissioned and GMDA, the project's implementing unit, confirms its capacity in writing; once commissioned, the retention pond and the Silsako retention basin start every design storm full to their outlet levels under item (e), and their pumps are credited under item (a). The project's target of avoiding inundation "from a 1-in-5-year storm or lower return period" and its "design storm of 65.72 mm hour" (ADB PAM, 2025) are not design values under this Manual (Clause 2.3.6(o)).
- Hill streams and the master plan. The Basistha, the Kalmani, the Bahini above Jonali and the streams of the Khanapara–Jorabat fringe, where they come down from the hills, are hill streams under item (f). The comprehensive drainage master plan and DPR for Guwahati that GMDA engaged Haskoning DHV to prepare (Gauhati High Court, PIL/14/2024, order of 23 September 2024) were under revision and not final when research was done (as reported); where they publish a design level for an outfall, the higher of that level and the level of this item governs, until the Authority accepts the plan's levels [TBC]. The storm-water drainage report prepared by Tahal in 2008 was not built (as reported) and gives no level used here.
- (c) Dyke-protected and bowl towns. For an outfall in a town that drains through a dyke or embankment to a river higher than itself:
- Dibrugarh. "To protect the town, the 8.62-km DTP dyke was constructed in 1955. The construction of the DTP dyke closed all the drainage channels", and "At present, Dibrugarh town is 1.5 m below the bed level of Bramhaputra"; the town drains by the DTP drain, which runs 32.053 km past Larua Jamira beel to the Sessa, with capacities of 105.50, 142.97 and 61.11 m³/s by reach and "sewage flows" from a major part of the town; its outfall sluice is to be rebuilt as "two numbers of radial automatic sluice", with backwater "at the sluice with a flood level of 97.50 m", and was designed "keeping in mind that the beel is full and the drain is also flowing full" (ADB IEE for the Dibrugarh DTP drain outfall, 2017). An outfall to the DTP drain, or to a drain that ends in it, shall be river-locked under item (a) at the Sessa sluice, with a tailwater at the sluice not less than 97.50 m (the IEE's flood level; its datum and its tie to the CWC gauge at Dibrugarh are to be confirmed [TBC]), Larua Jamira beel full to its outlet and the drain flowing full at the start of the storm, as the IEE assumes (set by this Manual). No outfall through the DTP dyke to the Brahmaputra shall be designed to discharge by gravity at any river level above its invert, and the Brahmaputra level there is that of item (a) at the Dibrugarh gauge. The radial automatic sluices shall not be counted until they are commissioned.
- Silchar. Silchar is a bowl behind the Barak embankment, and its gauge is the Barak at Annapurnaghat, danger level 19.83 m and highest flood level 21.84 m (1 August 1989) (CWC levels as reported). In June 2022 the river crossed its danger level there on 18 June, rising from 19.62 m to 20.98 m in 24 hours, and peaked at 21.59 m on 21 June between 14:00 and 18:00 (Cachar district flood management report, 2022, as quoted): 1.76 m above the danger level and 0.25 m below the 1989 record (NEER arithmetic). The town flooded through a cut in the embankment at Bethukandi (an FIR was registered for a breach of 23 May and one person was arrested; the Chief Minister called the flood "man-made"; an official said the breach made little difference at that river level; all as reported) and was under water for about 11 days, up to about 4 m deep in places (as reported; "about a week" in another report). It was a breach-and-ponding flood inside the embankment, not a record river stage. Every outfall in Silchar is river-locked under item (a) at Annapurnaghat, and floor levels, pumped outfalls and storage there shall be checked for a breach with the enclosed area filled to the Barak level beyond the embankment (set by this Manual). The town's outfall channels (among them the Ghagra, Singla and Longai channels) and any pumps on them were not researched [TBC]. The Barak valley has about 731 km of embankments (as quoted), of which 450 km are reported to be "extremely vulnerable" (as reported).
- Karimganj, Badarpur, Hailakandi and the other embanked towns. At Karimganj the river level is that of the Kushiyara at the Karimganj gauge, and at Badarpur that of the Barak at Badarpurghat (item (a)). No CWC level for Hailakandi was found; ASDMA listed the Dhaleswari at Gharmura and the Katakhal at Matizuri among the rivers above danger level on 4 July 2024 (ASDMA daily flood report), and their levels are to be obtained [TBC]. Every other town that drains through a WRD embankment, among them Dhubri, Goalpara, Tezpur, North Lakhimpur and the towns of the Jorhat side of Neamatighat, is river-locked under item (a) at its nearest gauge.
- Char and chapori land. No outfall structure, sluice or pumping station shall be built on active char or chapori land or on an eroding bank, which are hazard-first sites under Clause 2.3.6(i); a drain there discharges to the nearest stable outfall, and floor levels govern.
- (d) Tributaries with CWC sites, and dam-release reaches. For an outfall to a tributary of the Brahmaputra or the Barak, or to a drain that ends in one:
- Tributary levels. Item (a) applies, with the lock of item (a) for a tributary. The levels found during research (Table 5B.1), as warning, danger and highest flood levels, are (SANDRP's 2019 transcription of CWC tables, as reported, datum not stated [TBC], except where another source is named): the Jia Bharali at NT Road Crossing 76.00, 77.00 and 78.50 m (26 July 2007); the Subansiri at Badatighat 81.53, 82.53 and 86.21 m (28 July 1972); the Burhidihing at Naharkatia 119.40, 120.40 and 122.69 m (17 June 1973) and at Chenimari (Khowang) 101.11, 102.11 and 104.16 m (2 September 2015); the Dikhow at Sivasagar 91.40, 92.40 and 94.23 m (1 August 2018); the Kopili at Kampur 59.50, 60.50 and 61.79 m (20 July 2004) and at Dharamtul 55.00, 56.00 and 58.09 m (21 July 2004) (CWC daily flood bulletins of 3 and 4 July 2024, as quoted); the Beki at Road Bridge 44.10, 45.10 and 46.20 m (4 August 2000); the Manas at NH Crossing 47.81, 48.42 and 50.08 m (15 September 1984) and at Mathanguri 98.10 and 99.10 m, with a highest flood level given as 100.28 m in one list and 102.28 m in another (30 October 1973), so that 102.28 m applies until CWC confirms it [TBC]; the Puthimari at NH Road Crossing 50.81, 51.81 and 55.08 m (31 August 2008); and the Pagladiya at NT Road Crossing 51.75, 52.75 and 55.45 m (8 July 2004). The level-monitoring sites have a highest level only: the Burhidihing at Margherita 137.51 m (26 August 1988), the Dikhow at Bihubar 104.77 m (24 June 1998), the Kopili at Kheronighat 74.07 m (19 July 2004) and the Manas at Panbari 55.96 m (7 July 1991); there the 10% AEP case uses the design river level until a frequency analysis is accepted (set by this Manual). The Digaru at Sonapur, the Kulsi and the Krishnai (Dudhnai), which come down from Meghalaya, have level-monitoring sites with no published level (as reported) [TBC]: on them, and on any reach with no gauge level, the river level is the higher of a modelled level under Clause 5.8.2(b) and the highest flood level surveyed at the outfall from flood marks and from the records of WRD, the local body or the Deputy Commissioner, with its source stated, and no outfall shall be designed without one of them (set by this Manual). An outfall structure on the Kopili shall be designed for the pH measured in the river at the outfall, because acid drainage from mining in its Meghalaya catchment has been reported (a 2014 petition, as reported).
- Consent and levels of the operator. Storm water shall not be discharged to a reservoir or its release reach without the written consent of its operator. The operator's levels shall be used as it gives them in writing; a level given in feet shall be converted at 1 ft = 0.3048 m exactly, with the conversion and the datum stated on Form 5-1.
- Release reaches. For an outfall to a river below a dam, among them the Ranganadi below the Ranganadi project of NEEPCO in Arunachal Pradesh, the Subansiri below the Lower Subansiri project of NHPC, the Kopili below the Kopili project of NEEPCO at Khandong, the Manas below the Kurichu dam in Bhutan, and the Umtru below Byrnihat, on the reach below the New Umtru dam in Meghalaya, in addition to the cases of Clause 5.8.4, the site design storm (each AEP required) and the 72-hour storm shall be run with the river at the level that results from the largest recorded release of the dams above, routed to the outfall, with the flow of the catchment below them as it occurred, and with the release placed before, during and after the site storm, and the lock of item (a) applies for not less than 72 hours (set by this Manual). The releases are, until the operator states a larger recorded release and its duration: on the Ranganadi, 1,412.57 m³/s, the release of 2017 recorded in an IIT Guwahati report for ASDMA (February 2018, as quoted), when an inflow of about 1,511 m³/s followed rain from 30 June and NEEPCO used 200 m³/s for power (as reported); a release of 605.25 m³/s through one gate is reported for an undated event (as reported); on the Umtru, 3,820 m³/s, the spillway capacity of the New Umtru dam, whose maximum water level is 132.78 m and whose release reach runs 9.80 km to the Byrnihat bridge (MePGCL guideline, as used in the Meghalaya edition of this Manual); and on the Subansiri, the Kopili and the Manas, the operator's spillway design capacity in writing, because no release record, commissioning date for the Lower Subansiri or operating rule was found for any of them [TBC]. An undated report of an expected "discharge around 16000 cumec … from upstream in Subansiri river" (as reported) is not a release record and is not used. No attenuation by the storage of any reservoir shall be credited to the river below, and no dam gate shall be assumed to open earlier or wider than the operator's records show. Catchments that drain to a release reach take the AMC that Chapter 3 sets for them.
- Warnings are not notices. No design shall rely on a notice or a warning of a release, on a reservoir being drawn down before a storm, or on a gate being opened early, late or partly: the release scenarios of this item govern (set by this Manual).
- (e) Beels and pukhuris as receiving storage. For an outfall to a beel, a pukhuri, a jan or a retention or detention pond, directly or through a drain that ends in it, among them Deepor Beel, Silsako, Borsola and Sorusola in Guwahati and Larua Jamira beel on the DTP drain at Dibrugarh:
- Starting level. The waterbody starts every design storm full to its outlet level: the crest of its outlet weir, the sill of its sluice or the invert of the jan that drains it, or, where it has no defined outlet, its highest monsoon water line surveyed and tied to a Survey of India benchmark, and in every case not less than the highest level recorded at it, as the Dibrugarh DPR assumed "that the beel is full and the drain is also flowing full" (ADB IEE, 2017) (set by this Manual).
- Design level. The tailwater for the major-system and storage cases is the level reached when the inflow of the waterbody's whole catchment is routed through its stage–storage relation from that starting level, with its outlet closed for as long as the river or jan beyond it stands above the outlet (item (a)), and with the project's discharge included (Clause 5.12.3). The stage–storage relation shall be surveyed: none was found for Deepor Beel or any other beel or pukhuri in the State [TBC]. The minor-system tailwater is the starting level.
- Closed outfall. Where the outfall invert is below the design level of this item, the outfall is closed for the whole storm (Clause 5.9.4), and where the waterbody itself drains through a river-locked outlet, the lock of item (a) applies to both.
- Storage is the system's. Under the Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024, a waterbody is land "where the rain water accumulates and act as natural or storm water reservoir", with its inflow and outflow channels (s.2(d) of the Bill; the enacted Act's text was not read [TBC]). The storage of a beel or pukhuri is part of the drainage system: it shall not be credited to one project, and no project shall reduce it (Chapter 7). A pukhuri with no outlet is a closed basin, and an outfall to it is closed for the whole storm. Engineered storage is a detention pond, never a pukhuri or a beel. No drain that carries sewage shall discharge to a beel or pukhuri without the interception and screens of Clause 6.3.6(e) and Clause 8.9.
- (f) Hill streams from Meghalaya and the hill districts. For an outfall to a juri or another hill stream, such as the Bahini above Jonali, the Basistha, the Kalmani and the streams of the Khanapara–Jorabat fringe of Guwahati, which rise in the Khasi hills of Meghalaya, the Digaru, the Kulsi, the Krishnai (Dudhnai) and the Jinjiram where they come down from Meghalaya, the streams of Haflong, Diphu and the other towns of the Karbi and Dima Hasao hills, and the foothill streams of the north bank across the bhabar fans, or to a drain that ends in one:
- Design level. These streams have no gauge or published flood level [TBC]. The tailwater for the major-system and storage cases shall be the highest of: (i) the 1% AEP level at the outfall from a study of the stream, made with a hydrograph method of Chapter 3 for the whole catchment above the outfall, including the part in Meghalaya, with the rainfall of its sub-area in Annex 2A and, for the streams of the Guwahati fringe, the Guwahati catchment rule of Clause 2.3.6(c)(i), the bulking factor of Clause 6.3.6(g) on the peak flow, and the crossings downstream blocked as Clause 6.3.6(h) requires, routed through a hydraulic model of the channel as surveyed, net of encroachment, silt and solid waste; (ii) the level at the outfall of any flood study of the stream made by or for WRD, GMDA or the local body [TBC]; and (iii) the highest flood level surveyed at the outfall from flood marks of the storms of 14 June 2022, 31 May 2025 or 20 April 2026 or of a later flood, and from the records of the local body, WRD or the Deputy Commissioner, with its source stated. No outfall to such a stream shall be designed without items (i) and (iii) (set by this Manual). The Meghalaya edition of this Manual governs the reaches in Meghalaya.
- Bed level and siting. The designer shall survey the bed at the outfall and for at least 100 m upstream and downstream and state the range within which it has moved. The outfall invert, and the seat of any flap gate on it, shall stand at least 0.5 m above the highest bed level found within 50 m downstream, the foundation shall be taken below the scour depth of Chapter 9 (Clause 9.6) for the 1% AEP flow with the bulking factor, and the outfall shall be built into the bank and not project into the active channel (set by this Manual). Where a hill stream drops its load on reaching the plain, the silt trap of Clause 6.3.6(m) shall be placed above the outfall. On the bhabar fans, where the streams carry boulders and shift their channels, an outfall in the path of a channel shift is a hazard-first site (Clause 2.3.6(i)).
- Closed outfall. Where the outfall invert is below the design level of this item, the outfall-closed check of Clause 5.10 applies with a single lock that lasts for the design storm plus the stream's recession, computed under item (i) for as long as the stream stays above the invert, and not less than 24 hours; where no hydrograph of the stream has been computed, the lock lasts for the whole storm (set by this Manual). Where the hill stream itself ends at a river-locked sluice, as the Bahini does at Bharalumukh, the lock of item (a) governs.
- (g) Consents and lines. No outfall structure, gate, pumping station or drain shall cut, cross, alter or discharge through an embankment, sluice or drain under the Assam Embankment and Drainage Act, 1953 without the permission of WRD (its Embankment Officer) or the Deputy Commissioner: in a notified area, building on, removing or altering an embankment or drain without that permission is punishable with up to three years and a fine of ₹1,000 (s.16); cutting through an embankment or drain, or opening, shutting or obstructing a sluice, without authority is punishable in the same way (s.15(ii)); the Embankment Officer may remove or alter a work that endangers a town or interferes with drainage (s.4); and PWD and the Public Health Department are to be consulted (s.18). No written procedure or form for this permission was found during research [TBC]. Storm water shall not be discharged to a drain of another body without the written consent of that body: in Guwahati, no person may without permission make or alter a drain leading into a drain vested in GMC (Gauhati Municipal Corporation Act, 1969, s.242), and the Commissioner's power to make municipal drains empty into any place (s.232) is a power, not a duty to provide an outfall; in the area of another Municipal Corporation, the Corporation's duty to "provide a safe and sufficient outfall … for effectual drainage and proper discharge of storm-water and sewage" without flooding the area or "the areas surrounding the outfall" (Assam Municipal Corporation Act, 2022, s.171) and its power to restrict discharges into its drains (s.177) apply; to a road drain or culvert, the consent of PWD or NHAI; to a work of GMDA, that of GMDA; to a drain of the Railways, OIL, the Army or another body, that body's; and in an Autonomous District, that of the District Council or the body it designates (set by this Manual). Where consent is given, the discharge shall not exceed the rate the consent allows; the tailwater is the higher of the channel's design water level as its owner states it in writing and its level in the coincident case of Clause 5.8.4, computed from all the storm water it receives and with its downstream boundary at the level of items (a) to (f); the channel shall be taken in its present condition, net of silt, encroachment, solid waste and weed, and a widening, resectioning or diversion that has been proposed but not completed shall not be counted; and the outfall shall have a flap gate (Clause 5.11) where the design water level or the computed level is above the outfall invert. The designer shall also check the outfall against the lines that bind at the time of design (Chapter 7): the building setbacks from "the edge of natural drainage channels" and water bodies of the Unified Byelaws 2022 (byelaw 26(ix), repeated as 44(ix) [TBC: numbering read from the OCR layout; confirm against a clean copy]); the no-construction buffer round scheduled water bodies that the District Level Committees are to ensure (s.5 of the 2024 Bill), the bar on obstructing the inflow and outflow of a waterbody without permission (s.15 of the Bill), and, in Guwahati, the four schedules of the Guwahati Waterbodies (Preservation and Conservation) Act, 2008, which the 2024 Bill repeals (s.22; the enacted text is to be confirmed) [TBC]; the bar on altering an ecological site, which includes "a drainage system, feeding channel", in a Designated Area under the Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 (s.3), no designated-area notification of which was found [TBC]; the 15 m no-construction strip from the Brahmaputra bank on the riverfront stretch of the Master Plan for Guwahati 2025 between Sonaram High School and the Kamakhya foothills; and the plinth of byelaw 45(c), "0.3 m higher than the highest recorded flood level as fixed by the local authority" (0.6 m for lifeline buildings), for which no local authority's level was found for any town [TBC], so that the 1% AEP level of this clause and the floor levels of Clause 6.11 govern. Assam has no floodplain zoning law; a proposed Assam Flood Plain Zoning Bill was reported in November 2026 (single report, as reported) and is not applied by this clause.
No pump, sluice, gate or dam operation that helps drainage, such as pumping a drain, jan or beel down before a storm, closing a sluice late, opening a sluice while the river is higher than the land behind it, or opening dam gates early, shall be assumed unless the operator's written records show it. Where the outfall invert is below the tailwater of this clause, the outfall shall have its own flap gate (Clause 5.11) and, where the outfall-closed check requires it, pumping (Clause 5.12), with the pumped volume included in the routing of the drain, the jan, the beel or the river (Clause 5.12.3). Pumping shall not be used to move water into a beel, a pukhuri or another catchment without the consent of its custodian.
Commentary. In large continental river basins, a site storm and a river flood are usually treated as roughly independent. That is the basis of tables of coincident frequencies such as FHWA HEC-22 Table 7.3. Assam's rivers and towns break that assumption, because the same monsoon spell fills the rivers and falls on the towns behind them. In June 2022 rainfall over Assam and Meghalaya, 858.1 mm, "was highest since 1901" (IMD, June 2022 monthly summary); Guwahati flooded on 14–15 June, the Barak at Annapurnaghat crossed its danger level on 18 June, Cachar recorded 251.20 mm on 19 June (Cachar district report, as quoted), and the river peaked at 21.59 m on 21 June while Silchar lay flooded behind its embankment (as quoted). On 4 July 2024 the Brahmaputra was above its danger level at Neamatighat, Tezpur, Guwahati, Goalpara and Dhubri, with the Kopili, the Barak, the Kushiyara and other rivers (ASDMA daily flood report). Several of the State's 24-hour rainfall records are May storms, before the south-west monsoon (IMD Extremes), so the coincident case is not confined to June–September. The two cannot be treated as independent, and a local storm can fall before, during or after the river peak. Clause 5.8.4 therefore pairs a design event on one side with a 10-yr event on the other, in the same way as Clause 2.12(b). This pairing has no direct precedent. It is more severe than an independence assumption would give.
Clause 5.8.3 reflects the dams upstream of Assam's north-bank and hill-fringe towns, none of which is operated by a body of the State. The Ranganadi project of NEEPCO, in Arunachal Pradesh, is reported to divert 160 m³/s to the Pare basin (as reported); in 2017, after rain from 30 June, its inflow was about 1,511 m³/s, of which NEEPCO said 200 m³/s was used for power and the rest could not be absorbed (as reported), and an IIT Guwahati report for ASDMA (February 2018) records a release of 1,412.57 m³/s (as quoted); the guide dam or ring dyke was reported breached (as reported), a release of 605.25 m³/s through one gate is reported for an undated event (as reported), and releases were also reported after Cyclone Remal in May 2024 (as reported). For the Lower Subansiri project of NHPC, the commissioning date and release rules were not found [TBC], and the only figure found is an undated report of an expected "discharge around 16000 cumec … from upstream in Subansiri river" when both projects opened their gates (as reported), which is not a release record. No level or release record was obtained for the Kopili project of NEEPCO at Khandong or for the Kurichu dam in Bhutan, in the Manas basin [TBC]. On the Umtru, the New Umtru dam in Meghalaya, with a maximum water level of 132.78 m and a spillway of 3,820 m³/s, releases through 9.80 km of ravine to the Byrnihat bridge, below which the river runs into Assam; its operator's guideline says that, because the reservoir is very small and its gates are opened often, "issuing the notification for release of water is not practicable", and that warnings may be given by siren, telephone or SMS (MePGCL guideline, as used in the Meghalaya edition of this Manual). No operating rule that bounds a release, and no release record other than the Ranganadi's, was obtained for any of these dams [TBC]. Until they are available, Clause 5.8.5(d) uses the largest recorded release or the spillway design capacity, with the flow of the catchment below the dam as it occurred in the same event. The river levels used in this Manual come from SANDRP's transcription of CWC tables and, for the Kopili at Dharamtul, from CWC's daily flood bulletins; their datum and gauge zero are to be confirmed with CWC [TBC].
Clause 5.8.5 is set by this Manual. In Assam the tailwater at a town outfall is set not by the tide but by a river held above the town behind an embankment, by a gated channel whose pumps are a tenth of its gravity capacity, by a beel that is already full, by the release of a dam, or by a hill stream in spate, and no document found during research gives a design level or a closure duration for any of them. No design standard for any town drain in the State was found either: the town drainage master plans of DoHUA "were prepared before 2015 as per previous FPS system" and await revision to the CPHEEO guideline of 2015 (DoHUA status sheet); Dibrugarh's DTP drain was designed by a "rainfall based approach … rational method" with no return period stated (ADB IEE, 2017); and the only return period found in an official document is the ADB project's 1-in-5-year target for the Bahini basin (ADB PAM, 2025). The State has no floodplain zoning law and no published 1% AEP level for any reach (Chapter 7).
The first case is the river-locked outfall. Item (a) follows the river-locked form of the plains editions of this series: the operator, the sills, crests, pumps and closing levels, every level tied to a gauge, and a design level never below the highest level recorded at the nearest CWC gauge. All the CWC levels used come from SANDRP's transcription of CWC tables, with no datum stated, so each is "as reported" and the datum is to be confirmed. Where the sources give two highest levels for one gauge (Goalpara, Dhubri, the Manas at Mathanguri), the higher governs until CWC confirms one, because a tailwater set too low floods the town, while one set too high only costs storage. The lock is the heart of the clause. The brief rule, that the gate is shut for the whole 72-hour storm and for as long after it as the river stays above the sill, comes from the case it describes: WRD itself names "back flow and congestion near outfalls" from the high stages of the Brahmaputra and Barak as a cause of "prolonged inundation" (as quoted by the CAG, 2018). Where no stage record has been analysed, the minimum on the main rivers is 7 days, because on this Manual's reading the Brahmaputra at Guwahati reaches its danger level in most monsoons and its highest level is 1.78 m higher, and because Silchar was under water for about 11 days in 2022 (as reported; "about a week" in another report); 7 days is the shorter of the two Silchar figures, and the same minimum lock that another plains edition of this series sets for its river-locked cities. On a tributary, which rises and falls faster, the minimum is 72 hours, the length of the longest design storm, as the hill editions of this series set for their rivers. The receiving beel or pond starts full because the Dibrugarh DPR, the only design of a town outfall found in the State, assumed exactly that, and because a beel that has filled in the first storm of a spell is full for the next. The pump-down of 48 hours with the gate still shut is the drawdown time of Clause 4.7: storage that is still full when the next storm of the same high stage arrives fails in the event that matters more. Pumps are credited only as permanent, working and confirmed, less the largest unit, because the city's own record shows how far they fall short: 7 m³/s of pumps against 72 m³/s by gravity at Bharalumukh (2008, as reported). A designer with an analysed CWC stage record can justify a different lock under Clause 5.10.6.
The second and third cases are Guwahati and the dyke-protected towns. Item (b) names the city's systems because the State's capital drains through them, because their gates and pumps belong to WRD while the channels above them belong to GMC and GMDA, and because the projects that will change them, the ADB Bahini works and the ₹1,459 crore Bharalu and Bahini project, were not commissioned when research was done; the clause counts them only once they are. Deepor Beel is the western city's storage, but it is also a Ramsar site and a sanctuary, so item (b) lets no project take credit for its volume. Item (c) takes the Dibrugarh DPR's own design flood level and its full-beel assumption, and treats Silchar as a breach case: the 2022 flood came through a cut embankment at a river level 0.25 m below the 1989 record, so a design that checks only the river level and not a breach misses the flood that happened. A cut such as that at Bethukandi is what s.15(ii) of the Embankment and Drainage Act, 1953 punishes; the Manual's breach check does not depend on whether a cut is lawful.
The fourth case is the tributary and the release reach. Item (d) applies the river rule of item (a) to the tributaries and the reservoir and release-reach rule of the hill editions of this series to the dams upstream of the north bank and the hill fringe: the largest recorded release, or the spillway capacity until the operator gives one, placed before, during and after the site storm, with no credit for warnings, drawdown or attenuation. The Ranganadi's release of 2017 is the only release record found for a dam above an Assam town. The Kopili at Dharamtul is given as 58.09 m (21 July 2004), the value printed in CWC's daily flood bulletins of July 2024; the Meghalaya edition uses the same value for the river where it leaves that State.
The fifth case is the beel and the pukhuri. Item (e) treats them as storage that belongs to the drainage system and starts every storm full to its outlet. The law already treats them so: the 2008 Guwahati Waterbodies Act and the 2024 Bill both define a waterbody as land "where the rain water accumulates and act as natural or storm water reservoir" (Chapter 7). No stage–storage relation was found for any beel, so the clause asks for a survey rather than a figure.
The sixth and seventh cases are the hill streams and the consents. Item (f) follows the hill-stream rule of the hill and mountain editions of this series for the streams that come down to Guwahati from the Khasi hills and for the hill districts: a study with the bulking factor, surveyed flood marks, an invert at least 0.5 m above the highest bed level and a lock of at least 24 hours, because these streams fall within hours of the rain stopping. Item (g) asks for WRD's permission and the owner's consent because a design that discharges through an embankment or into another body's drain cannot be checked without them, and because no rule divides the drains of the State's towns (Chapter 6). The lines of item (g) decide where an outfall can be built, not its level: the byelaw setbacks, the water-bodies law, the Hill Land Act and the Master Plan's riverfront strip bind where they apply, and the floor levels follow Clause 6.11 because no local authority has fixed the "highest recorded flood level" that byelaw 45(c) refers to.
5.9 Joint-probability cases
5.9.1 Every element draining to a tidal or backwater-affected outfall shall be checked for the cases below. The most severe governs each design quantity: storage, water level, pipe size and pump capacity.
Table 5.2 — Joint-probability cases for tidal and riverine outfalls
| Case | Rainfall | Tailwater | Applies to | Basis |
|---|---|---|---|---|
| J1 | Minor-system design AEP, Tc to 24 h | MHWS + SLA (tidal curve) | Minor system | Clause 2.12(a); Clause 5.7.1 |
| J2 | 1% AEP, all durations of Clause 2.5.2 | HAT + surge + SLA | Major system, detention, tanks, pumped systems | Clause 5.7.1 |
| J3 | 10% AEP, 48 h | 1% AEP still-water level + SLA | Major system, detention, tanks, pumped systems | Clause 2.12(b) |
| J4 | Design AEP, 48 h (72 h reported) | Tidal curve per J1 with two 6 h lock windows (Clause 5.10) | All storage and every gated or tide-affected outfall | Clause 5.10 |
| R1 | Site design AEP | River at 10% AEP level | Riverine outfalls | Clause 5.8.4(a) |
| R2 | Site 10% AEP | River at design-AEP level | Riverine outfalls | Clause 5.8.4(b) |
5.9.2 For storage elements, the 48- and 72-hour storms shall be run with the J2 and J3 tailwaters (Clause 2.5.3).
5.9.3 For tidally influenced riverine outfalls, R1 and R2 shall be run with the river model's downstream boundary at the J1 tidal curve. The Authority may also require them at J2.
5.9.4 Where tailwater is constant at a level above the outfall invert for the whole storm, the case is treated as a fully closed outfall. Storage and pumps shall then handle the full storm volume.
Commentary. Clause 2.12 sets two joint cases. Case (a) is design rainfall with MHWS plus the sea-level allowance. Case (b) is the 10-yr, 48-hour storm with the 1% still-water level. This Manual adds HAT plus surge for major-system design (Clause 5.7.1). Case J2 combines these. J4 is the outfall-closed check, which tests the timing of tide against the storm rather than a single level. Rainfall and surge share a cyclone cause, so they cannot be treated as independent (Clause 2.12 commentary). These cases are simple surrogates, to be replaced when a statistical joint analysis of IMD rainfall and tide-gauge records is adopted.
5.10 Outfall-closed (tide-locked) storage check
5.10.1 Where it applies. The check applies to:
- every storage facility;
- every minor- and major-system element; and
- every pumped system
whose outfall invert is below HAT + surge + SLA, or which drains to a reach subject to tide-lock or sand-bar closure (Clause 5.13).
5.10.2 Storm. Use the 48-hour design storm built per Clause 2.9.2 (peak day last), at:
- the AEP of the element: 1% AEP for detention, tanks and the major system; the minor-system AEP for minor drains; and
- AMC III.
The 72-hour storm shall also be run and reported.
5.10.3 Lock windows. Unless a site study under 5.10.6 gives otherwise:
- (a) the outfall is closed for two consecutive lock windows of 6 hours each, centred on two consecutive high tides of the local tidal curve. For a semi-diurnal tide, the window starts are therefore about 12.4 hours apart.
- (b) During each lock window, gravity discharge is zero.
- (c) Between lock windows, gravity discharge is computed against the J1 tidal curve, including the head loss of the flap gate and any non-return valve.
- (d) The first lock window shall be placed so that it is centred on the peak 1-hour block of the final 24 hours of the storm. A second run with the first window starting at that peak block shall also be made. The more severe governs.
5.10.4 Requirement. Storage plus pumping (where provided) shall hold the inflow so that, throughout the check:
- (a) the maximum stage in any detention facility stays below its emergency spillway crest, so the spillway does not operate. Where the outfall-closed stage is higher than the 1% AEP maximum water level of the free-outfall design, it becomes the facility's 1% AEP maximum water level for Clause 4.9.3, and the spillway crest, freeboard and wall height are set from it;
- (b) the maximum stage in the minor and major systems meets the Chapter 6 limits: building floor levels, and street depths of no more than 150 mm at the crown and no more than 350 mm at the deepest point; and
- (c) no property connection surcharges above the lowest opening it serves, or a non-return valve is fitted under Clause 5.11.
In volume terms, over each lock window and the full storm:
V_inflow ≤ V_storage available + V_pumped + V_gravity (between locks)
This shall be demonstrated by routing, not by a single volume balance. The release from each facility after a lock window ends may exceed the release caps of Chapter 4, because the facility is emptying into a drain that has just reopened. That release shall be included in the downstream analysis (Clauses 5.4 and 5.9).
5.10.5 Drawdown after the storm. After the second lock window, the storage shall drain under the J1 tidal curve. The drawdown requirement of Clause 4.7 shall be met, with pumping where gravity cannot meet it (Clause 5.12).
5.10.6 Site study. A longer or shorter lock may be used where a site study gives a time series of still-water level for the design case. The study may use a calibrated hydrodynamic model, gauge records of past events, or a surge hindcast. Locks shorter than the default require the Authority's approval. A longer lock shall be used where:
- sand-bar closure (Clause 5.13) or river backwater (Clause 5.8) keeps the outfall closed for longer; or
- the gauge record shows tailwater above the outfall invert for more than 6 hours per tide in comparable past events.
Figure 5.3 — Outfall-closed check: 48-hour storm with the peak day last (Clause 2.9.2), tailwater of astronomical tide plus surge, two 6-hour design lock windows, and the resulting stage upstream of the flap gate. Illustrative — not design values. Original drawing for this Manual, adapted from the tidal tailwater and joint-probability concepts of MoHUA/CPHEEO Manual on Storm Water Drainage Systems (2019), Part A, §6.3.6.
Commentary. The outfall-closed check is the distinctive Assam requirement in this Manual. In Assam it applies where an outfall is shut not by the tide but by a river held above the town for days or weeks behind an embankment sluice, by a gated channel whose pumps are far smaller than its gravity capacity, by a beel or pond that is already full, by the release of a dam upstream, or by a hill stream in spate. At Guwahati the Brahmaputra reaches its danger level of 49.68 m at the DC Court gauge in most monsoons on this Manual's reading, with its highest flood level of 51.46 m 1.78 m higher (CWC levels as reported), so the city's outfalls are designed for gates closed for days to weeks; and the Bharalu then drains through pumps reported at 7 m³/s against 72 m³/s by gravity (2008, as reported); at Dibrugarh the DTP drain's outfall sluice was designed with "the beel … full and the drain … also flowing full" (ADB IEE, 2017); and Silchar stayed under water for about 11 days in June 2022 (as reported; "about a week" in another report). That is why Clause 5.8.5 replaces the two 6-hour windows described below with a gate closed for the whole 72-hour storm and for as long as the river stays above the sill, not less than 7 days on the Brahmaputra, the Barak and the Kushiyara and not less than 72 hours on a tributary or a release reach where no stage record has been analysed; a beel or pond full to its outlet at the start; a pump-down within 48 hours with the gate still shut; and a lock of at least 24 hours at a hill-stream outfall. A rate rule cannot help when there is no outlet: an orificed basin behind a closed gate simply fills.
The default of two consecutive 6-hour locks has no direct precedent. It represents gravity outfalls failing to discharge for about half of each tidal cycle around the two high tides nearest the storm peak. Figure 5.3 shows why both windows matter. The first lock catches the storm peak. The second arrives before the storage has drained, so the stage rises again.
Placing the first window on the rainfall peak is deliberately unfavourable. Cyclone rainfall and surge share a cause, and Clause 2.12 already treats them as dependent. The check replaces neither the J2 and J3 level checks nor the downstream analysis; it adds a test of timing and volume.
5.11 Flap gates, tide gates and non-return valves
5.11.1 Where required. A flap gate, tide gate or equivalent non-return device is required on every outfall whose invert is below the 1% AEP still-water level (Clause 5.7.3). It is also required on outfalls into irrigation channels under Clause 5.8.5.
5.11.2 Hydraulics. The design shall include:
- the gate's head loss and opening head, from the manufacturer's certified head–discharge curve; and
- the reduction in effective outfall capacity when the gate is partly open.
Gates shall not be assumed to seal perfectly in the outfall-closed check unless they are tested.
5.11.3 Construction.
- (a) Gates, hinges and seats shall be of corrosion-resistant materials suitable for seawater (Clause 4.12.5).
- (b) The gate shall be set so that sand, silt or debris on the downstream side cannot hold it shut or open. Where the bed is mobile, the gate invert shall be raised above the bed, or the approach shall be protected.
- (c) A trash screen shall be provided upstream where the gate could be jammed by debris.
- (d) A stop-log slot or penstock shall be provided upstream for maintenance isolation on outfalls larger than 600 mm.
- (e) The gate chamber shall be accessible at all tides, with its access above HAT + surge + SLA.
5.11.4 Non-return valves on property connections. A non-return valve, or a backwater valve with an accessible cleaning eye, is required on every property drainage connection where the lowest opening served is below:
- the major-system tailwater (J2) at the point of connection; or
- the maximum stage in the outfall-closed check (Clause 5.10).
Basement drainage shall in addition be pumped to a level above both, with its own non-return valve.
5.11.5 Inspection. Gates and valves shall be inspected and operated:
- before 31 March each year;
- after every event in which they closed against a storm flow; and
- as set in the maintenance plan (Chapter 10).
Commentary. The requirement for gates below the 1% still-water level is set by this Manual. The construction details follow common coastal-drainage practice. A gate that is jammed open by debris lets the tide into the drain. A gate held shut by a sand bank turns a gravity outfall into a dead end. In Assam the outfalls do not cross a beach, but most town outfalls pass through a sluice in a WRD embankment or a town dyke, and the gates, flap gates and pumps on them are the towns' defence against the rivers. When the Brahmaputra is high the Bharalumukh sluice gates are closed and the Bharalu drains only by its pumps: "the natural discharge capacity of the Bharalu is 72 Cumecs when its Bharalumukh sluice gates are kept open, while the pumps fitted to its sluice gates can discharge only seven Cumecs" (2008, as reported; the present capacity was not found [TBC]). In May 2022 the Barak embankment at Bethukandi, upstream of Silchar, was cut, and in June the river entered the town through the cut (as reported); cutting through an embankment, or opening, shutting or obstructing a sluice, without authority is punishable under s.15(ii) of the Assam Embankment and Drainage Act, 1953. The embankments and sluices are WRD's, while the drains behind them are GMC's, a Municipal Corporation's or Board's, PWD's or GMDA's, and WRD's sluice operating rules and closure durations were not found during research [TBC], so a gate and the drains behind it can belong to different bodies. The 31 March inspection date is set ahead of the monsoon.
5.12 Pumped outfalls
5.12.1 When required. Pumping shall be provided where gravity discharge cannot meet:
- the outfall-closed check of Clause 5.10;
- the drawdown requirement of Clause 4.7; or
- the J2 and J3 cases.
Pumping shall not be used where a gravity solution meets these requirements.
5.12.2 Capacity.
- (a) The duty pumps together, with the storage provided, shall pass every case of Clause 5.9 (including J4), demonstrated by routing.
- (b) Standby capacity at least equal to the largest duty pump shall be installed (duty + 1 standby as a minimum).
- (c) Pump capacity shall be stated at the static head for the J2 tailwater, not at mean tide.
5.12.3 Effect on the receiving water. Pumped discharge to a river, canal or creek shall be included in the river or creek level analysis of Clause 5.8. Pumping that raises the receiving water level above the acceptance criteria of Clause 5.5 elsewhere is not permitted.
5.12.4 Power supply. Pumping stations shall have either:
- two independent power supplies; or
- standby generation for 100% of the duty capacity, with on-site fuel for at least 72 hours of duty operation.
Changeover shall be automatic.
5.12.5 Flood immunity. Electrical panels, control equipment, generators and fuel storage shall be set above the higher of:
- the 1% AEP flood level + 0.5 m; and
- HAT + surge + SLA + 0.5 m.
Access to the station shall remain usable in the 1% AEP event.
5.12.6 Discharge arrangement. Rising mains shall discharge:
- over a level above the J2 tailwater; or
- through a non-return valve and a flap gate.
The arrangement shall prevent back-siphoning.
5.12.7 Controls and monitoring. Each station shall have:
- automatic level control;
- remote alarms for high level, pump failure and power failure, sent to the operator; and
- a level and run-time log kept for at least 5 years.
Wet wells shall be sized to keep pump starts within the manufacturer's limits.
5.12.8 Screens. Inlet screens shall be provided with a cleaning method that works during a storm (a mechanical rake, or duplicate screens).
5.12.9 Testing. Every pumped outfall shall be test-run at full duty, including on standby power, before 31 March each year. Private pumped systems shall be covered by a registered maintenance declaration (Chapter 10).
Commentary. Duty + standby, 72 hours of fuel and flood-immune electrics have no single direct precedent and are set by this Manual. The 72-hour fuel figure matches the longest mandatory design storm (Clause 2.5.2). A pump station that depends only on grid power can stop exactly when it is needed, because supply to flooded areas is often switched off for safety. Singapore's April 2025 amendments added annual maintenance declarations for pumped detention tanks (PUB Addendum No. 3). Clause 5.12.9 and Chapter 10 adopt the same approach. Clause 5.12.3 prevents pumping that simply moves water from one tide-locked drain into a tide-locked river.
5.13 Sand-bar closure of river mouths
5.13.1 Where it applies. This clause applies to outfalls into any river or creek whose mouth is subject to seasonal sand-bar closure. That includes the mouths of the coastal States (there is none in Assam: Clause 5.1.4), and any other mouth listed in Annex 5B.
5.13.2 Assumption at the start of the monsoon. The mouth shall be assumed closed by a bar at the start of the April–October season, at the crest level of the most recent pre-monsoon survey. This applies unless the Water Resources Department certifies that:
- a mouth-maintenance programme (dredging, bar cutting or training walls) has kept the mouth open at the start of each of the previous three monsoon seasons; and
- the programme is funded for the current season.
5.13.3 Tailwater with a closed mouth. With the mouth closed, the tailwater at the outfall shall be the higher of:
- (a) the tidal tailwater of Clause 5.7; and
- (b) the level in the river reach behind the bar, computed with the bar as a weir at its surveyed crest level. That level shall include the river flow of Clause 5.8 and the head needed to pass the flow over or through the bar.
5.13.4 No credit for emergency cutting. Bar cutting or breaching during the storm shall not be assumed in design, unless the Water Resources Department has a documented operating procedure, with equipment stationed for it. Where it does, the bar may be assumed lowered to the procedure's target level only after the time the procedure states.
5.13.5 Outfall-closed check. Where the closed-mouth level of 5.13.3(b) exceeds the outfall invert for longer than the default lock windows, the lock duration of Clause 5.10 shall be extended to that period.
Commentary. Assam has no coast and no river mouth, so Clause 5.13 does not apply in the State (Clause 5.1.4). Its nearest inland counterparts are the silt that the Brahmaputra and the hill streams leave at an outfall or a gate, and the chars that the river builds and moves. In Guwahati "Most of the drains directly or indirectly fall into Bharalu River … due to siltation, the bed level of the river has considerably risen", and "indiscriminate cutting and quarrying of hill slopes for filling up of low lying areas results in sheet wash and blockage of channels" (ADB IEE, 2017); GMC spent ₹32.57 crore on desilting from 2013–14 to 2017–18 (CAG Report No. 4 of 2019); and the char and chapori lands of the river cover about 3,60,927 ha in 2,251 villages (Socio-Economic Survey 2002–03, as quoted). A flap gate held open or shut by silt, sand or waste, an outlet buried by a rising bed, or a sluice that cannot be moved turns a designed outfall into a dead end or a back-flow path. No WRD rule linking the operation of any sluice to the levels of the drains behind it was found during research [TBC]. Clause 5.8.5 deals with this by setting hill-stream outfalls above the range of bed movement, keeping outfall works off active char land, and giving no credit for a gate operation, a pump or a storage that the operator's records do not show. Clause 5.13.2 has no direct precedent. It puts the burden of proof on showing that the mouth is open rather than assuming it.
5.14 Documentation
Every project subject to this chapter shall submit a Downstream and Tailwater Report (Form 5-1). It shall contain:
- a plan of the analysis extent showing:
- the site;
- each analysis point with its contributing catchment area and the site's percentage of it; and
- the end point and the reason it was chosen (Clause 5.3);
- the model description:
- software and version;
- the network schematic, with survey sources for the drains and crossings;
- land use and CN for off-site areas;
- any upstream detention included; and
- calibration or validation evidence where available;
- for each analysis point, AEP and duration, the existing and with-project:
- peak flow;
- time to peak;
- maximum water level and velocity; and
- duration of inundation (Clause 5.4);
- the comparison against Clause 5.5, with each failure identified and the remedy adopted;
- the tailwater derivation:
- tide-table edition and port;
- MHWS, HAT and MSL relative to chart datum;
- the datum connection to the Survey of India benchmark and the project datum;
- surge source and value;
- SLA; and
- river levels and their sources (Clauses 5.6 to 5.8);
- the joint-case table of Clause 5.9 with results;
- the outfall-closed check (Clause 5.10):
- storm and lock alignment;
- stage hydrographs; and
- the volume balance for each lock window;
- a schedule of flap gates, tide gates and non-return valves, with certified head–discharge data (Clause 5.11);
- pumped outfall design, power supply, flood immunity and controls, where provided (Clause 5.12);
- the sand-bar assumption and supporting WRD certification, where relevant (Clause 5.13); and
- inspection and maintenance requirements for Chapter 10.
Small sites under Clause 5.3.4 shall submit Form 5-2 (Simplified Downstream Statement) instead.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A, §6.3.6 and Table 6.2 (coastal tailwater; +0.3 m climate allowance). https://web.archive.org/web/2024/https://mohua.gov.in/upload/uploadfiles/files/VolumeI-Part%20A-Engineering-Design.pdf
- MoHUA / CPHEEO (2013). Manual on Sewerage and Sewage Treatment Systems (pumping stations).
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.5, ten-percent downstream analysis). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01.
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Vol. 1 (Standard #8) and Vol. 2 §3.1.9. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- MARC. The Evolution of Regional Stormwater Design Standards. https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- SANDRP (2019). Overview of CWC's flood forecasting sites 2019: North East India (warning, danger and highest flood levels of the CWC sites in Assam), https://sandrp.in/2019/10/02/overview-of-cwcs-flood-forecasting-sites-2019-north-east-india/ . These are transcriptions of CWC tables; the datum and gauge zero of each gauge are to be confirmed with CWC.
- Central Water Commission. Daily flood bulletins of 3 and 4 July 2024 (the Kopili at Dharamtul: warning 55.00 m, danger 56.00 m, highest flood level 58.09 m on 21 July 2004), https://cwc.gov.in/sites/default/files/cfcrcwcdfb-03.07.2024.pdf and https://cwc.gov.in/sites/default/files/cfcrcwcdfb-04.07.2024.pdf (as quoted); and a CWC bulletin of June 2024 (Dhubri, 30.37 m on 17 July 2019, as quoted).
- Comptroller and Auditor General of India. Report No. 5 of 2018, Government of Assam, para 2.2, "Flood Control in Assam" (embankments, sluices, drainage congestion), https://www.cag.gov.in/uploads/download_audit_report/2018/Executive_summary_of_Report_No_5_of_2018_-_Social_General_and_Economic_Non-PSUs_Sectors_Government_of_Assam.pdf ; and Report No. 4 of 2019, Government of Assam, para 1.2 (storm-water drainage and desilting in the ULBs), https://www.cag.gov.in/uploads/download_audit_report/2019/Chapter_1_Social_Sector_of_Report_no_4_of_2019_Social_General_and_Economic_(Non-PSUs)_Sectors_Government_of_Assam.pdf
- Asian Development Bank (2017). Initial Environmental Examinations, Assam Urban Infrastructure Investment Program, Tranche 2 (42265-025): Guwahati subprojects (the six drainage basins; causes of waterlogging; the Brahmaputra above the city), https://ewsdata.rightsindevelopment.org/files/documents/25/ADB-42265-025_QMl9sl8.pdf , and the Dibrugarh DTP drain outfall (the dyke of 1955; the drain to the Sessa; the 97.50 m flood level; the radial automatic sluices), https://ewsdata.rightsindevelopment.org/files/documents/25/ADB-42265-025_D6ieyPo.pdf
- Asian Development Bank (2025). Report and Recommendation of the President, and Project Administration Manual (July 2025), Assam Urban Sector Development Project (57262-001) (the Bahini basin works; the retention pond and pumping stations; the 1-in-5-year target and the 65.72 mm/h design storm), https://www.adb.org/sites/default/files/project-documents/57262/57262-001-rrp-en.pdf and https://www.adb.org/sites/default/files/project-documents/57262/57262-001-pam-en.pdf
- Pollution Control Board, Assam. Action Plan for the Bharalu River (Priority I) (the Bahini and Bharalu; the Natun Bazar sluice; the catchment), https://www.pcbassam.org/RRC%20Action%20Plan%20Final/Priority%20I/Action%20plan_Bharalu.pdf
- The Assam Embankment and Drainage Act, 1953 (Assam Act I of 1954), ss.2, 4, 15, 16 and 18, https://www.ielrc.org/content/e5303.pdf
- The Gauhati Municipal Corporation Act, 1969 (Assam Act I of 1973), Chapter XXI, ss.231–252 (Legislative Department scan); and the Assam Municipal Corporation Act, 2022 (Assam Act VIII of 2022), ss.171 and 177, https://prsindia.org/files/bills_acts/acts_states/assam/2022/ActNo.8of2022Assam.pdf
- The Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024, ss.2(d), 5, 15 and 22 (Bill as introduced), https://prsindia.org/files/bills_acts/bills_states/assam/2024/Assam_Urban_Water_Bodies_Bill_2024.pdf ; the enacted Act (Act XXV of 2024) was not read.
- Gauhati High Court. PIL/14/2024, North East Eco Development Society v. State of Assam, order of 23 September 2024 (the comprehensive drainage master plan for Guwahati), https://livelaw.in/pdf_upload/gau-hc-water-logging-562406.pdf ; and PIL 18/2023, Pramod Kalita & 2 Ors, I.A.(C) 924/2024, order of 5 April 2024 (Deepor Beel), https://www.livelaw.in/pdf_upload/gau-hc-deepor-beel-denotification-532923.pdf
- ASDMA. Daily flood report, 4 July 2024 (rivers above danger level). Cachar district administration, Flood Management 2022 (the Barak at Annapurnaghat; Cachar rainfall of 19 June 2022), https://cachar.assam.gov.in/sites/default/files/public_utility/Flood%20Management%202022_0.pdf (as quoted).
- IIT Guwahati for ASDMA (February 2018). Final report with annexures (the Ranganadi release of 2017), https://www.asdma.gov.in/download/Final%20Report%20with%20Annexures_ASDMA_IITG_AKS.pdf (as quoted).
- India Meteorological Department. Monthly Climate Summary, June 2022 (rainfall over Assam and Meghalaya), https://imdpune.gov.in/cmpg/Product/Monthly_Climate_Summary/Monthly_Clim_Summary_6_2022.pdf
- Press reports on the Bharalumukh sluice and pumps (2008), the Noonmati pump house, the Bethukandi cut and the Silchar flood of June 2022, the ₹1,459 crore Guwahati project (May 2026), the Ranganadi and Subansiri releases, Deepor Beel's water spread and acid drainage to the Kopili.
- Survey of India. Tidal Predictions: Geodetic and Research Branch. https://www.geographyandyou.com/survey-of-india/tidal-predictions-geodetic-and-research-branch-survey-of-india
- GLOSS. India national report (tide-gauge network and datums). https://gloss-sealevel.org/gloss/gloss/sites/gloss/files/publications/documents/india_ge9.pdf
- Adani Ports (2025). Tide Table 2025, Dahej (notes on NHO INP-12 coverage and data sources). https://www.adaniports.com/-/media/Project/Ports/PortsAndTerminals/Dahej-Port/Marine-Documents/Tide-Table-2025-Dahej.pdf
- INCOIS. Storm-surge and swell-surge warning services. https://incois.gov.in/
- FHWA. HEC-22 Urban Drainage Design Manual (current edition), Table 7.3 (coincident frequencies).
- Purdue University JTRP (2023). Development of a Multiple Water Course Joint Probability Analysis Procedure for Indiana Watersheds, FHWA/IN/JTRP-2023/09. https://docs.lib.purdue.edu/jtrp/1820
- PUB Singapore (2025). Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3. https://info.corenet.gov.sg/docs/default-source/pub-circulars/pub-circular_cop-7th-ed-addendum-no-3_16-apr-2025.pdf?sfvrsn=5a2c1e1a_2
Annexes and forms
| Annex / Form | Content |
|---|---|
| 5A | Tidal datums (MSL, MHWS, HAT vs CD and Survey of India datum), surge allowances and 1% still-water levels by coastal segment |
| 5B | Major drains, riverine outfall reaches, and river mouths subject to sand-bar closure; map |
| 5C | Worked example: outfall-closed check for a site on the hill fringe of south Guwahati draining to the Bahini |
| Form 5-1 | Downstream and Tailwater Report |
| Form 5-2 | Simplified Downstream Statement (small sites) |
Commentary. Assam's towns drain into rivers that are often higher than themselves. "High stages of river Brahmaputra and Barak obstruct free discharge of tributaries causing back flow and congestion near outfalls. Inadequate countryside drainages through sluices in embankment system … cause prolonged inundation" (WRD, as quoted by the CAG in Report No. 5 of 2018); at Guwahati "the water level of the Brahmaputra River sometimes, is higher than the ground level of the city areas" (ADB IEE, 2017); and "Dibrugarh town is 1.5 m below the bed level of Bramhaputra" (ADB IEE, 2017). So the closed outfall is the design case, not the exception. At Bharalumukh the Bharalu discharges 72 m³/s by gravity when the sluice gates are open, against seven by its pumps when they are shut (2008, as reported); the Brahmaputra at the DC Court gauge reaches its danger level of 49.68 m in most monsoons on this Manual's reading, and its highest flood level of 51.46 m (21 July 2004) is 1.78 m higher (CWC levels as reported; NEER arithmetic); and Silchar, a bowl behind the Barak embankment, was under water for about 11 days in June 2022 after the river came in through a cut embankment at Bethukandi (as reported). The outfalls also belong to one body while the drains above them belong to others: the embankments and sluices are WRD's, the municipal drains GMC's or another local body's, the road drains PWD's or NHAI's, the new drainage works and scheduled water bodies of Guwahati GMDA's, and no notification assigns the Bharalu, the Mora Bharalu or the Bahini to one owner (Chapter 6, Clause 6.9). The ADB names "fragmented institutional responsibilities involving multiple institutions" as the problem (ADB RRP, 2025). No document found during research sets a design level for any outfall in the State, and WRD's sluice operating rules and closure durations were not found [TBC]. A detention basin that meets every release rate in Chapter 4 still fails if the sluice it drains to is shut for a week, if the beel below it is already full, or if the hill stream it drains to has buried its outlet in silt. This chapter makes these failure modes part of the design. Assam has no tidal outfall, so Clause 5.1.4 says which of the chapter's coastal provisions fall away and what takes their place.