Chapter 3Hydrologic Methods
3.1 Purpose and scope
3.1.1 This chapter sets out how design rainfall from Chapter 2 is turned into runoff peaks, volumes and hydrographs for:
- (a) drain, inlet and culvert sizing (Chapter 6);
- (b) retention and detention sizing, and the pre- vs post-development comparison (Chapter 4);
- (c) downstream and tailwater analysis (Chapter 5); and
- (d) waterbody, tank (pukhuri) and regional facility studies (Chapter 7).
3.1.2 It specifies:
- (a) which method may be used for which purpose and catchment size (Clause 3.4);
- (b) how the pre- and post-development land surfaces are defined (Clause 3.3);
- (c) the parameters of each method: runoff coefficients, time of concentration, soils, curve numbers, unit hydrographs and routing (Clauses 3.5–3.12);
- (d) when continuous simulation and model calibration are required (Clauses 3.13 and 3.15);
- (e) the step-by-step pre- vs post-development comparison (Clause 3.14); and
- (f) software acceptance and documentation (Clauses 3.16 and 3.17).
3.1.3 Rainfall inputs (depth, duration, areal reduction, climate factor, temporal pattern and antecedent moisture) are governed by Chapter 2 and shall not be varied in this chapter.
3.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Pre-development condition | The reference land surface defined in Clause 3.3.2, against which post-development runoff is tested. It is not the existing condition. |
| Post-development condition | The land surface after the proposed works are complete, as defined in Clause 3.3.3. |
| Point of comparison (POC) | A location where site runoff leaves the site, at which pre- and post-development flows are compared (Clause 3.14). |
| Time of concentration (Tc) | The time for runoff to travel from the hydraulically most distant point of the catchment to the point of interest. |
| Lag (tL) | The time from the centroid of rainfall excess to the peak of the runoff hydrograph. |
| Hydrologic soil group (HSG) | The NRCS classification (A, B, C, D) of a soil by its minimum infiltration rate when wet (USDA NRCS, NEH Part 630, Ch. 7). |
| Curve number (CN) | The NRCS parameter that combines soil group, land cover and antecedent moisture into a single runoff-potential index (USDA NRCS, NEH Part 630, Ch. 9–10). |
| Antecedent moisture condition (AMC) | The soil wetness at the start of a storm: AMC I (dry), II (average), III (wet). |
| Directly connected impervious area (DCIA) | Impervious surface that drains to a drain, pipe or channel without first flowing over a pervious surface. |
| Disconnected impervious area | Impervious surface whose runoff flows as sheet flow over a pervious surface before reaching the drainage system, and meets Clause 3.9.3. |
| Peak rate factor (PRF) | The constant in the unit hydrograph peak equation (484 in US customary units; 0.208 in the SI form of Clause 3.11.2). |
| Continuous simulation | A model run over a long rainfall record (years), with soil moisture, storage and tank levels carried forward between storms. |
| Tank cascade | A chain of tanks (pukhuris) in which the surplus of one tank feeds the next. |
3.3 Pre-development and post-development land surface
3.3.1 Same site, same storm. Pre- and post-development runs shall cover the same area draining to each POC, and use the same design storms (Clause 2.11.1). They shall differ only in the land-surface parameters of this clause, the resulting Tc, and the stormwater controls.
3.3.2 Pre-development condition. The pre-development land surface shall be greenfield: open land in good condition for the mapped hydrologic soil group, as follows:
- (a) All land within the site, including land that is now built on, paved, compacted or cultivated, is treated as open land (grass cover > 75%) in good condition. Existing impervious cover shall not be counted.
- (b) The curve number is the TR-55 value for "open space, good condition" for the HSG of Clause 3.7: CN 39 (A), 61 (B), 74 (C), 80 (D) at AMC II (Table 3.5).
- (c) The HSG is the natural HSG of Clause 3.7, including the dual-group rule for high water table (Clause 3.10.1). No HSG improvement for drainage works is allowed.
- (d) Tc is computed on the pre-development ground surface using unchannelled overland and shallow concentrated flow and natural channels only (Clause 3.6). Existing pipes, lined drains and kerbs are ignored.
- (e) Existing waterbodies, tank waterspreads up to the full tank level (FTL), natural channels and supply or surplus channels are kept as they are, and modelled as water surfaces or channels, not as open land.
3.3.3 Post-development condition. The post-development land surface shall represent the proposed works at full build-out:
- (a) Impervious areas shall be measured from the site plan, separately for roofs, paved surfaces, roads and other sealed surfaces, and classified as directly connected or disconnected (Clause 3.9). Lot-size residential rows of TR-55 shall not be used for the site itself.
- (b) Pervious areas disturbed by construction (graded, filled or trafficked) shall be assigned one HSG lower in infiltration capacity than the natural HSG (A to B, B to C, C to D), unless post-construction infiltration tests (Clause 3.7.3) show otherwise. Soil disturbed by construction shall never be classed as HSG A.
- (c) Rainwater harvesting (RWH) sumps shall be treated as full at the start of storms of 12 hours or more, and the roof area draining to them as directly connected for those storms (Chapter 4).
- (d) Retention and detention facilities shall be represented explicitly as storage (Clause 3.12), not by lowering CN.
3.3.4 Redevelopment. The pre-development condition of Clause 3.3.2 applies to redevelopment as well. A site that is already fully paved is tested against greenfield, not against its existing state. For the constrained-redevelopment route of Clause 4.5.6, the existing condition shall also be modelled, with existing impervious areas as surveyed, so that the 50% minimum can be checked.
3.3.5 Off-site areas.
- (a) For conveyance design (Chapter 6), areas upstream of the site shall be taken at their ultimate land use under the approved master plan or development plan. Where no plan exists, upstream undeveloped land shall be assumed to be at least 35% impervious.
- (b) For the pre- vs post-development comparison, off-site run-on shall be modelled identically in both runs, at its existing condition (Clause 3.14.2).
Commentary. A greenfield reference stops each redevelopment from being judged against an already degraded baseline. The UK non-statutory standards and KC APWA take the same approach in different forms: APWA caps existing agricultural land at no more than "good condition pasture, grassland or range (C = 0.30, CN = 74)" for HSG C, and forbids disturbed soils from being classed as HSG A or B (KC Metro APWA 5600, 2011, §5602.3A and E). The TR-55 "open space, good condition" values used in (b) are identical to TR-55's "pasture, grassland or range, good" values (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c), so this Manual's pre-development CN equals the APWA cap on HSG C soils. The one-class downgrade for disturbed soils in 3.3.3(b) is set by this Manual as a simpler, less strict version of the APWA rule, suited to the flood-plain silts and clays of the Brahmaputra and Barak valleys, the char and chapori sands, the bhabar and terai fans of the northern foothills, the thin red loams over the gneiss of the Guwahati hills, and the laterite and red loams of the Karbi and Dima Hasao hills, where an HSG A to C jump would be excessive. The 35% minimum imperviousness for unplanned upstream land in 3.3.5(a) is the APWA value (2011, §5602.3E.2). Using the master-plan land use for conveyance follows CPHEEO, which requires C to reflect "ultimate development of the catchment as per the master plan" (CPHEEO 2019, Part A §4.4.1.5).
3.4 Selection of method
3.4.1 The method shall be selected from Table 3.1 by purpose and catchment size. Figure 3.1 shows the same rules as a flowchart.
Table 3.1 — Permitted hydrologic methods
| Purpose | Catchment / condition | Permitted method | Clause |
|---|---|---|---|
| Peak flow for one conveyance element (inlet, pipe reach, drain reach, culvert) | ≤ 16 ha contributing, no upstream storage, no backwater | Rational Method | 3.5 |
| Peak flow for conveyance | > 16 ha, or any upstream storage, tank or pond | Hydrograph method (SCS-CN with SCS unit hydrograph, SWMM or HEC-HMS) | 3.8–3.12 |
| Retention, detention, any storage; pre- vs post-development comparison | Any size | Hydrograph method; Rational Method not permitted | 3.8–3.12, 3.14 |
| Pipe or drain network with backwater, tidal or tank tailwater | Any size | Hydrograph method with dynamic-wave hydraulic routing | 3.12.4; Chapter 5 |
| Catchment-scale flows | 25–5,000 km² in CWC subzone 2(a) (North Brahmaputra) or 2(b) (South Brahmaputra) | HEC-HMS or SWMM, benchmarked against the CWC synthetic unit hydrograph (SUH) | 3.11.4 |
| Regional facilities | Draining > 25 km² | Design-storm hydrograph method plus continuous simulation | 3.13 |
| Tank (pukhuri) cascades | Any size | Design-storm hydrograph method plus continuous simulation | 3.13 |
| Tier B: small sites under Chapter 1 | Within the limits of the design aid | Design aids issued under Chapter 4, which are themselves derived by the methods of this chapter | 3.4.4 |
| Small sites, any authority | ≤ 1 ha, within the limits of Clause 4.14.3 | Fixed-coefficient route of Chapter 4 (fixed release coefficients, rainfall-mass storage) | 3.4.4; 4.14.3 |
Figure 3.1 — Selection of hydrologic method. Original drawing for this Manual, adapted from KC Metro APWA, Section 5600 Storm Drainage Systems and Facilities, 2011 (§5602.2) and Version 2025.01 (§5603.4, Policy Supplement, 2025).
3.4.2 Rational Method limits. The Rational Method shall be used only for catchments of 16 ha or less and only to compute the peak flow to a single conveyance element. It shall never be used to size retention, detention or any other storage, nor to derive a hydrograph or runoff volume.
3.4.3 Hydrograph methods. Above 16 ha, and for every storage calculation, a hydrograph method shall be used: SCS-CN losses with the SCS (NRCS) unit hydrograph, EPA SWMM, or HEC-HMS. For 25–5,000 km² the CWC synthetic unit hydrograph shall also be computed as a benchmark (Clause 3.11.4).
3.4.4 Simplified routes. In Tier B areas (Chapter 1), sites within the limits stated on a design aid issued under Chapter 4 may use that design aid in place of a site-specific hydrograph model. In any area, sites of 1 ha or less may use the fixed-coefficient route of Clause 4.14.3; it is the only exception to the rule in 3.4.2 that rainfall-based peak methods shall not be used for storage. The Rational Method remains available for conveyance under 3.4.2.
3.4.5 Catchments above 5,000 km². These are outside the scope of this Manual and require a basin study approved by the Water Resources Department.
Commentary. The 16 ha limit and the single-element rule follow APWA 5600 Version 2025.01, which cut the Rational Method from 200 ac to 40 ac and restricted it to "a single pipe segment". The MARC Policy Supplement adds that it "cannot be used to size runoff reduction practices or determine retention volumes and detention volumes" (MARC, APWA Stormwater Standards Supplement, 2025). CPHEEO (2019, Part A §4.4.1.3) allows the Rational Method up to 8–10 km², which is too large for a method that assumes uniform rainfall intensity over the whole catchment for the whole of Tc and gives no volume. The Rational Method is excluded from storage design because it gives a peak, not a hydrograph, and storage depends on volume and timing.
3.5 Rational Method
3.5.1 Equation. The peak flow shall be computed as:
Q = C · Cf · i · A / 360
where Q is the peak flow (m³/s); C is the runoff coefficient (Table 3.2); Cf is the frequency factor (Table 3.3), with C · Cf ≤ 1.0; i is the rainfall intensity (mm/h) for a duration equal to Tc, from Chapter 2 (with the climate factor of Clause 2.8); and A is the contributing area (ha).
Commentary. This is the CPHEEO equation Qp = 10 C I A, with Qp in m³/h (CPHEEO 2019, Part A §4.4.1.1–4.4.1.3), converted to m³/s.
3.5.2 Runoff coefficients. C shall be taken from Table 3.2. Within a range, the designer shall use the upper half of the range unless site data justify a lower value.
Table 3.2 — Runoff coefficient C (for AEP of 10% or more frequent)
| Surface or land use | C | Source |
|---|---|---|
| Commercial | 0.70–0.95 | CPHEEO 2019, Table 4.2 |
| Industrial | 0.60–0.90 | CPHEEO 2019, Table 4.2 |
| Institutional | 0.70–0.95 | CPHEEO 2019, Table 4.2 |
| Residential, high density | 0.60–0.75 | CPHEEO 2019, Table 4.2 |
| Residential, low density | 0.40–0.60 | CPHEEO 2019, Table 4.2 |
| Recreational | 0.10–0.25 | CPHEEO 2019, Table 4.2 |
| Asphalt | 0.70–0.95 | CPHEEO 2019, Table 4.2 |
| Concrete | 0.80–0.95 | CPHEEO 2019, Table 4.2 |
| Brick paving | 0.70–0.85 | CPHEEO 2019, Table 4.2 |
| Roofs: tiles | 0.80–0.90 | CPHEEO 2019, Table 4.2 |
| Roofs: metal | 0.70–0.90 | CPHEEO 2019, Table 4.2 |
| Roofs: concrete | 0.70–0.90 | CPHEEO 2019, Table 4.2 |
| Lawns, sandy soil, flat (≤ 2%) | 0.05–0.10 | ASCE/WPCF 1969 |
| Lawns, sandy soil, average (2–7%) | 0.10–0.15 | ASCE/WPCF 1969 |
| Lawns, sandy soil, steep (> 7%) | 0.15–0.20 | ASCE/WPCF 1969 |
| Lawns, heavy (clay) soil, flat (≤ 2%) | 0.13–0.17 | ASCE/WPCF 1969 |
| Lawns, heavy soil, average (2–7%) | 0.18–0.22 | ASCE/WPCF 1969 |
| Lawns, heavy soil, steep (> 7%) | 0.25–0.35 | ASCE/WPCF 1969 |
| Undeveloped land (maximum for any condition) | 0.30 | KC APWA 5600 (2011), §5602.3E |
3.5.3 Frequency factor. For design AEPs rarer than 10%, C shall be multiplied by Cf from Table 3.3. The product C · Cf shall not exceed 1.0.
Table 3.3 — Frequency factor Cf
| Design AEP (return period) | Cf |
|---|---|
| 10% (10-yr) and more frequent | 1.00 |
| 4% (25-yr) | 1.10 |
| 2% (50-yr) | 1.20 |
| 1% (100-yr) | 1.25 |
3.5.4 Composite C. Where a catchment contains more than one surface, C shall be the area-weighted value C = Σ(Cj · Aj) / ΣAj, computed from the measured areas of each surface. Cf is applied to the composite C.
3.5.5 Time of concentration and networks.
- (a) Tc shall be computed by Clause 3.6 and shall not be less than 10 minutes.
- (b) For each reach of a network within the 16 ha limit, the peak shall be computed with the cumulative Σ(C · A) upstream of that reach and the longest Tc to that reach. Peaks from upstream reaches shall not be added.
3.5.6 Partial-area check. Where a compact, highly impervious part of the catchment has a much shorter Tc than the whole, the peak shall also be computed for that part alone, using its own area, C and Tc. The larger peak governs.
Commentary. The developed-surface coefficients in Table 3.2 are CPHEEO Table 4.2, which CPHEEO adapted from ASCE/WPCF (1969). CPHEEO keeps C constant for all return periods. Table 3.3 instead adopts the APWA antecedent-precipitation factors (KC Metro APWA 5600, 2011, §5602.2A: K = 1.1, 1.2 and 1.25 for 4%, 2% and 1% storms, with C·K ≤ 1.0). These factors matter here because Assam's rare storms arrive on wet ground (Clause 2.11.4). The 10-minute minimum Tc matches the minimum design duration of Clause 2.5.1. APWA 2011 bounds inlet time between 5 and 15 minutes (§5602.7A). The partial-area check follows CPHEEO's treatment of "partial area effect" (CPHEEO 2019, Part A §4.4.1.7). This Manual requires the upper half of each range in 3.5.2 because Indian urban plots are typically more densely covered than the US land uses behind the ASCE ranges.
3.6 Time of concentration
3.6.1 General. Tc shall be computed separately for the pre- and post-development conditions, along the flow path that gives the longest travel time to the point of interest, as the sum of travel times in each flow segment. Tc shall not be less than 10 minutes for either condition.
3.6.2 NRCS velocity (segment) method. The NRCS segment method is the default for all catchments. Tc = Tt(sheet) + Tt(shallow) + Tt(channel), where:
-
(a) Sheet flow:
Tt = 0.091 (n · L)^0.8 / (P2^0.5 · S^0.4)
where Tt is in hours; n is the sheet-flow roughness from Table 3.4; L is the sheet-flow length (m); P2 is the present-day 50% AEP (2-yr) 24-hour rainfall (mm) from Clause 2.3, without the climate factor; and S is the land slope (m/m).
-
(b) Sheet-flow length. In urban areas, and for all post-development conditions, the sheet-flow length shall not exceed 30 m. For pre-development greenfield surfaces, up to 90 m may be used only where survey shows unchannelled planar ground; otherwise 30 m applies.
-
(c) Shallow concentrated flow: Tt = L / (3,600 V), with V = 4.918 S^0.5 (unpaved) or V = 6.196 S^0.5 (paved), V in m/s, L in m and S in m/m.
-
(d) Channel and pipe flow: Tt = L / (3,600 V), with V from Manning's equation at bank-full or pipe-full flow.
Figure 3.2 — Time of concentration by the NRCS segment method: sheet flow, shallow concentrated flow and channel or pipe flow along the longest flow path, with the travel-time equations and limits of Clause 3.6. Schematic, not to scale. Original drawing for this Manual, adapted from USDA SCS TR-55 (1986), Ch. 3, and USDA NRCS, NEH Part 630, Ch. 15 (2010).
Table 3.4 — Manning's n for sheet flow (USDA SCS TR-55, 1986, Table 3-1)
| Surface | n |
|---|---|
| Smooth surfaces (concrete, asphalt, gravel, bare soil) | 0.011 |
| Fallow (no residue) | 0.05 |
| Cultivated, residue cover ≤ 20% | 0.06 |
| Cultivated, residue cover > 20% | 0.17 |
| Grass: short-grass prairie | 0.15 |
| Grass: dense grasses | 0.24 |
| Range (natural) | 0.13 |
| Woods: light underbrush | 0.40 |
| Woods: dense underbrush | 0.80 |
3.6.3 Pre-development roughness. For the pre-development greenfield surface of Clause 3.3.2, sheet-flow n shall be 0.15 unless the designer justifies another Table 3.4 value from the natural vegetation of the area.
3.6.4 Kirpich formula. The Kirpich formula may be used only as a cross-check, or for pre-development rural catchments with a defined main channel:
tc = 0.0195 L^0.77 S^−0.385
where tc is in minutes, L is the length of the main flow path (m) and S is its average slope (m/m). It shall not be used for urban or post-development catchments.
3.6.5 Lag. Where a unit hydrograph method requires lag, tL = 0.6 Tc.
3.6.6 Check. Post-development Tc shall normally be shorter than pre-development Tc. Where it is longer, the designer shall explain why in the submittal.
Commentary. The segment method and its equations are from TR-55 (USDA SCS, 1986, Ch. 3) and NEH Part 630, Ch. 15 (USDA NRCS, 2010). The SI constants are direct conversions of the US equations: 0.007 becomes 0.091 with L in m and P2 in mm, and 16.1345 and 20.3282 ft/s become 4.918 and 6.196 m/s. TR-55 (1986) allowed sheet flow up to 300 ft (≈ 90 m). NEH 630 Ch. 15 states that sheet flow typically lasts no more than about 100 ft (≈ 30 m) before becoming shallow concentrated flow (citing Merkel, 2001), and many US agencies now cap it there. This Manual sets the 30 m urban limit in 3.6.2(b) on that basis: in Indian urban plots, flow reaches a drain, kerb or compound-wall weep hole within a few metres. The undisturbed P2 is used in the sheet-flow equation because P2 is a parameter of the travel-time relationship, not a design load. The default n = 0.15 for greenfield is the TR-55 short-grass value; this Manual adopts it to avoid long pre-development Tc values that would make Q_pre artificially low. The Kirpich formula is the SI form given by Chow, Maidment and Mays (1988, Table 15.1.2), from small agricultural catchments in Tennessee (Kirpich, 1940), so it does not suit urban surfaces. The lag ratio 0.6 is the NRCS value, also used by APWA (2011, §5602.7C).
3.7 Soils and hydrologic soil groups
3.7.1 Mapping. HSG shall be assigned from the soil series mapped by the National Bureau of Soil Survey and Land Use Planning (NBSS&LUP) or the Agriculture Department, Assam (soil survey) [TBC], using the soil-series-to-HSG lookup of Annex 3A. The source map and its scale shall be stated.
3.7.2 Assignment rule. Where Annex 3A is not yet available for a series, the HSG shall be assigned from the measured saturated hydraulic conductivity and depth to an impermeable layer or water table using the criteria of NEH Part 630, Ch. 7. Until Annex 3A is published, this Manual sets the following interim groups for Assam: the recent alluvium of the Brahmaputra and Barak flood plains, mostly silty clay loam, HSG C, and HSG D where it is clayey; the clays of the beel basins, the low terraces and the Silchar bowl, HSG D; the char and chapori sands, HSG A or B by texture, but HSG D, with no infiltration credit, for every design storm from 1 April to 31 October, because the river then rises over or beside them and the water table stands at or near the surface; the boulder and gravel fans of the bhabar belt below the Bhutan and Arunachal foothills, HSG A, where debris and the shifting of channels govern the siting before the soil does (Clause 2.3.6(i)); the terai belt below the bhabar, HSG B or C by texture, and HSG D wherever the seasonal high water table is within 0.6 m of the surface; the granite-gneiss of the Guwahati hills with its thin red loams, HSG C, and HSG D on thin soil over rock, on cut slopes and on fill; the laterite and red loams of the Karbi and Dima Hasao hills, HSG C; and urban fill, HSG C, and HSG D where it is clayey or compacted. A field infiltration test is required on every site in a Tier A area and on every other site larger than the limits of the simplified method of Clause 4.14.1, at the depth of the proposed facility; on smaller sites, a soil that has not been tested shall be given the less permeable of the groups listed for it. Whether an infiltration practice may be built at all is governed by the three infiltration rules of Clause 4.11 (the floodplain rule, the hill rule and the recharge rule), not by its HSG. Clause 3.10.1 applies to all of these groups.
3.7.3 Site verification. For every site that relies on retention by infiltration (Chapter 4), the mapped HSG shall be verified by site infiltration tests at the location and depth of each infiltration facility. Where the tests show a lower infiltration capacity than the mapped HSG, the test result governs for both the retention design and the post-development CN. Where they show a higher capacity, the pre-development HSG shall not be changed without the approval of the authority.
3.7.4 Disturbed and filled ground. Clause 3.3.3(b) applies.
Commentary. NBSS&LUP soil maps are typically at 1:250,000 to 1:50,000 scale and classify soils by series and taxonomy, not by HSG. A lookup table is therefore needed (Annex 3A). Site tests matter most on the char and chapori sands and in the terai belt, where a sand or loam that is HSG A or B by texture behaves as D once the river and the water table rise in the monsoon season (Clause 3.10); at the edges of the beel basins and in the Silchar bowl, where a silty clay loam passes into clay within one site; on the bhabar fans, where a pit can stand in boulder gravel that the next flood buries in debris; and on the Guwahati hill fringe, where a high rate in a pit dug in colluvium or fill can be water entering a slope that cannot take it (Clause 4.11). No soil-series map of Assam from NBSS&LUP, no HSG map or table, no SCS-CN calibration and no measured infiltration rate for any site in the State were obtained during research for this Manual [TBC]. The interim groups follow the soils and geology that the regional sources describe. The CWC subzone 2(b) report records "red loamy soil, red and yellow soil, laterite and alluvial soil of recent origin", and that "The flood plains covering the Dibrugarh, Mariani, Nowgong, Guwahati and Goalpara districts represent alluvial soils of recent origin" (§2.3.2), with about 85% of the subzone under forest (as quoted there from the Irrigation Atlas of 1989); the subzone 2(a) report maps brown hill soil, recent alluvial soil, terai soil and red loamy soil (Plate 6, legend). The CGWB states that "More than 75% of the state is underlain by unconsolidated formations comprising of clay, silt, sand, gravel, pebble and boulders", describes a bhabar belt 11–15 km wide along the northern foothills, with tubewell yields of 27–59 m³/h, a terai zone below it with 80–240 m³/h, and semi-consolidated formations in Cachar with 50–100 m³/h (CGWB, Assam State Profile, 2007). No primary geological source was read for the gneiss hills of Guwahati, the Karbi plateau, the Tertiary rocks of Dima Hasao or the soils of the char and chapori lands and the beel basins [TBC]. The groups for the flood plains are set for the wet season, not for dry ground: over most of the plains the water table stands within a few metres of the surface and rises in the monsoon season (Commentary to Clause 3.10), so a silty clay loam that might test as HSG C in March behaves as D in August, and a char sand that is A by texture is under water or saturated when the design storm comes. Cut slopes and fills are D because "indiscriminate cutting and quarrying of hill slopes for filling up of low lying areas results in sheet wash and blockage of channels" (ADB, IEE for the Guwahati subprojects of AUIIP Tranche 2, 2017). The only regional measures of losses are the design loss rates of the two CWC reports: 0.35 cm/h (3.5 mm/h) in subzone 2(b), the modal value of 100 flood events, kept from the report of 1984, and 0.24 cm/h (2.4 mm/h) in subzone 2(a) (Annex 3E). They are low, consistent with HSG C and D soils at monsoon saturation, and were fitted to floods of rural catchments gauged at bridges. They shall be used only in rural SUH runs under Clause 3.11.4, each within its own subzone, and not to assign an HSG, not in an urban SCS-CN or SWMM model and not to size an infiltration practice. The interim groups of Clause 3.7.2, the design of the char and chapori sands as HSG D through the monsoon season, the design of cut slopes and fill as HSG D and the rule for untested soil on small sites are set by this Manual pending a soil-series lookup for Assam. The method rules matter as much as the soil, because the State's towns are of two kinds that no CWC relationship describes: flat towns on the flood plain that drain through sluices and pumps into a river that is often higher than they are, and the hill fringe of Guwahati, where streams from the hills reach the valley floor within minutes. The following rules are set by this Manual. (a) Tc shall be found by the velocity-based segment method of Clause 3.6.2, segment by segment, and shall not be taken below the 10-minute minimum of Clause 3.6.1, which matches the shortest design duration of Chapter 2; the Kirpich formula, derived from small farm catchments of moderate slope, shall not be used even as a cross-check where the average slope of the flow path exceeds 10%. (b) The sheet-flow segment over bare rock, a cut slope or a paved hill road shall use the smooth-surface n of Table 3.4 and shall not exceed 30 m. (c) A catchment that runs from a hill flank onto a valley floor or a plain, such as the Bahini, the Basistha, the Kalmani and the streams of Khanapara and Jorabat in Guwahati, which rise in the hills of Meghalaya, or the streams of the Karbi and Dima Hasao hills, shall be split at the break of slope and the hill sub-area modelled on its own, with the design rainfall taken over the whole catchment, including the part in Meghalaya (Clause 2.3.6(c)(i)), so that a flatter lower reach does not average away the fast response of the hill. (d) The hill streams of Guwahati, of about 10–120 km², are modelled by a hydrograph method with the segment Tc of (a); the CWC subzone 2(b) unit hydrograph, whose peak depends on area alone and which the report recommends only above 50 km², is a check, not the design model: it is computed as the benchmark of Clause 3.11.4 where the catchment exceeds 25 km², and between 25 and 50 km² it is reported with a note that it lies below the report's range, Clause 3.11.4(d) applying to it as written. (e) The urban catchments of Guwahati, Dibrugarh, Silchar and every other town behind an embankment are designed by the Rational Method under Clause 3.4 for single conveyance elements, and otherwise by SWMM or HEC-HMS with level-pool routing of the storage behind the outfall (the beels, retention ponds, sumps and channels upstream of the sluice) together with the pump ratings and the sluice rule (Clause 3.12.1), the river level at the sluice as the tailwater (Chapter 5) and dynamic-wave routing where the outfall is submerged (Clause 3.12.4); neither CWC unit hydrograph rests on an urban, embanked or pumped catchment, so where such a catchment exceeds 25 km² the SUH is computed only for its natural condition, as the benchmark that Clause 3.11.4 requires, and never as the design model. (f) No CWC unit hydrograph applies in subzone 2(c), the Barak valley (sub-area AS-E) and the south of Dima Hasao: every cross-drainage structure and outfall of more than 1 km² there needs a site-specific hydrology study with the design rainfall of Clause 2.3.6(c)(ii) and the AMC of Clause 3.8.4 (Annex 3E). (g) Catchments that drain to a reservoir or to a reach below a dam, such as the Kopili, the Umtru below Byrnihat, the Ranganadi and the Subansiri, are modelled with storage routing and the operator's release scenarios, not by a peak-flow method alone (Clause 3.12; Chapter 5). (h) No method of this chapter predicts debris flow; on the bhabar fans and in the hill streams the design flow is bulked for sediment and debris, and silt traps at the break between hill and plain, inlets and culverts are designed for blockage under Chapters 6 and 9.
3.8 SCS curve number (SCS-CN) loss method
3.8.1 Runoff equation. Runoff depth shall be computed by:
Q = (P − Ia)² / (P − Ia + S) for P > Ia; Q = 0 otherwise S = 25,400 / CN − 254
where Q is runoff depth (mm), P is the cumulative rainfall depth (mm), S is potential maximum retention (mm) and Ia is initial abstraction (mm). In hydrograph models the equation is applied to the cumulative rainfall at each time step to obtain incremental rainfall excess.
3.8.2 Curve numbers. CN at AMC II shall be taken from Table 3.5, for the HSG of Clause 3.7.
Table 3.5 — Runoff curve numbers, AMC II, Ia = 0.2S (USDA SCS TR-55, 1986, Tables 2-2a and 2-2c)
| Cover type | HSG A | HSG B | HSG C | HSG D |
|---|---|---|---|---|
| Pre-development reference (Clause 3.3.2): open space, good condition (grass > 75%) | 39 | 61 | 74 | 80 |
| Open space, fair condition (grass 50–75%) | 49 | 69 | 79 | 84 |
| Open space, poor condition (grass < 50%) | 68 | 79 | 86 | 89 |
| Impervious: roofs, paved parking, driveways, paved roads with kerbs and drains | 98 | 98 | 98 | 98 |
| Paved roads with open ditches (including right-of-way) | 83 | 89 | 92 | 93 |
| Gravel roads (including right-of-way) | 76 | 85 | 89 | 91 |
| Dirt roads (including right-of-way) | 72 | 82 | 87 | 89 |
| Newly graded areas (pervious, no vegetation) | 77 | 86 | 91 | 94 |
| Fallow, bare soil | 77 | 86 | 91 | 94 |
| Meadow (continuous grass, protected from grazing) | 30 | 58 | 71 | 78 |
| Brush, good condition | 30 | 48 | 65 | 73 |
| Woods, good condition | 30 | 55 | 70 | 77 |
| Woods, fair condition | 36 | 60 | 73 | 79 |
| Woods, poor condition | 45 | 66 | 77 | 83 |
| Water surfaces, tank waterspreads, wet detention basins | Runoff = rainfall (no losses) |
3.8.3 Use of Table 3.5.
- (a) Post-development CN shall be built up from measured surfaces (Clause 3.9). The TR-55 urban district and residential lot-size rows shall not be used for the site.
- (b) Pervious areas in the post-development condition shall use "open space" in the condition the landscape plan will achieve. Where no landscape plan is submitted, fair condition applies.
- (c) Cultivated rows of TR-55 may be used for off-site existing conditions, but never for the pre-development reference of Clause 3.3.2.
3.8.4 Antecedent moisture. AMC shall follow Clause 2.11.4: AMC III for every design storm, whatever its duration, from 1 June to 30 September at a site in sub-area AS-A (Lower north bank and Bhutan foothills), AS-A1 (Central and upper north bank), AS-B (Guwahati metropolitan area), AS-C (Lower and central south bank), AS-C1 (Upper Assam) or AS-D1 (Dima Hasao hills) of Annex 2A, and from 1 May to 31 October at a site in sub-area AS-E (Barak valley); AMC III for every design storm from 1 April to 31 October, in every sub-area, on land below the 1% AEP flood level of a river, on char and chapori land, on the margins of a beel or pukhuri and on land behind an embankment; AMC III for every design storm at any time of year in a catchment that drains to a reservoir or its backwater, or to a reach below a dam into which the dam releases water, such as the Kopili below the Kopili hydroelectric project, the Umtru below Byrnihat, the Ranganadi and the Subansiri; at any other site or time, including every site in sub-area AS-D (Karbi hills) outside the land and catchments above, AMC III for a design storm that follows, or contains, a 5-day rainfall total of more than 53 mm; and AMC II for every other storm. AMC I is not used. CN for AMC I and III shall be obtained from AMC II by:
CN(I) = 4.2 CN(II) / (10 − 0.058 CN(II)) CN(III) = 23 CN(II) / (10 + 0.13 CN(II))
The conversion shall be applied to the pervious component only. Impervious surfaces stay at CN 98 for all AMC. Composite CNs shall not be converted directly.
Illustrative — not design values. Pre-development reference CNs at AMC III are: HSG A 59.5; HSG B 78.2; HSG C 86.7; HSG D 90.2.
3.8.5 Initial abstraction.
-
(a) Default: Ia = 0.2S, with the CNs of Table 3.5.
-
(b) Sensitivity run (mandatory): every storage design shall also be run with Ia = 0.05S. For this run, S shall be converted as S0.05 = 1.33 · S0.20^1.15 (S in inches), which in SI is:
S0.05 = 25.4 × 1.33 × (S0.20 / 25.4)^1.15 (mm)
-
(c) The design shall be based on the default run. The sensitivity results shall be reported on Form 3-2. Where the sensitivity run increases the required retention volume or water quality volume, the larger value governs for that volume.
Figure 3.3 — SCS-CN runoff depth versus rainfall depth for selected curve numbers at Ia = 0.2S, with the Ia = 0.05S sensitivity case for CN 74. Original drawing for this Manual, computed from the runoff equation of USDA NRCS, NEH Part 630, Ch. 10 (2004) and USDA SCS TR-55 (1986), and the S-conversion of Hawkins et al. (2002). Illustrative — not design values.
Commentary. Table 3.5 reproduces standard NRCS TR-55 (1986) values. They were derived from US catchments and have not been calibrated in Assam. The AMC conversion equations are the standard NEH-4 relationships as given by Chow, Maidment and Mays (1988, §5.5). Converting only the pervious component follows APWA, which states that "direct conversion of composite antecedent moisture conditions is not appropriate" (KC Metro APWA 5600, 2011, §5602.2C). Converting a composite CN would wrongly lower the CN of the impervious part.
Ia = 0.2S is the original NRCS ratio. Analysis of US rainfall–runoff data found that 0.05S fits better on average (Hawkins et al., 2002; Woodward et al., 2003), and gave the conversion of 3.8.5(b). NRCS has not formally replaced 0.2S, so this Manual keeps it as the default. Figure 3.3 shows why the sensitivity run is needed: for CN 74, the 0.05S case gives more runoff for small storms (about 2.0 mm vs 0.5 mm from 25 mm of rain) but less for large storms (about 242 mm vs 262 mm from 350 mm). Illustrative — not design values. The ratio therefore matters most for retention and water quality volumes, and the default 0.2S is the conservative choice for peak and detention design. The rule in 3.8.5(c) that the larger retention or water-quality volume governs has no direct precedent; this Manual sets it because the 0.05S case gives more runoff from the small storms that set those volumes.
3.9 Impervious connectivity
3.9.1 Classification. Every impervious surface in the post-development condition shall be classified as directly connected (DCIA) or disconnected, and shown on the drainage plan.
3.9.2 Preferred representation. In hydrograph models, DCIA and pervious areas shall be modelled as separate sub-areas (or as the separate impervious and pervious fractions of a SWMM subcatchment), each with its own loss parameters. The runoff from disconnected impervious areas shall be routed onto the receiving pervious area.
3.9.3 Disconnection criteria. An impervious area may be classed as disconnected only if all of the following hold:
- (a) its runoff discharges as sheet flow onto a pervious area, without a pipe, channel or kerb;
- (b) the pervious flow path is at least as long as the impervious flow path draining to it;
- (c) the pervious area is not compacted, not HSG D, and is protected from paving by the approved plan; and
- (d) for storms of 12 hours or more, it does not drain to an RWH sump or tank (Clause 3.3.3(c)).
3.9.4 Composite CN. Where a single composite CN is used instead of 3.9.2, it shall be computed as:
- for directly connected impervious area: CNc = CNp + (Pimp / 100)(98 − CNp);
- where total impervious area is below 30% and part of it is disconnected: CNc = CNp + (Pimp / 100)(98 − CNp)(1 − 0.5 R),
where CNp is the pervious CN, Pimp is the percentage of impervious area and R is the ratio of disconnected to total impervious area. The composite CN shall not be used for retention or water quality volumes.
Commentary. The composite equations are from TR-55 (USDA SCS, 1986, Ch. 2, Figures 2-3 and 2-4). This Manual prefers separate representation in 3.9.2 because a composite CN spreads the impervious response over the whole area, which suppresses runoff from small storms. For a site that is 50% directly connected impervious on HSG B open space (CNp 61), 25 mm of rain gives about 9.9 mm of runoff when the two parts are modelled separately, but only about 1.8 mm with the composite CN 79.5. At 200 mm the two methods agree (139.5 mm vs 138.4 mm). Illustrative — not design values. The error is largest for the frequent storms that set retention and water-quality volumes. The disconnection criteria of 3.9.3 are set by this Manual, drawing on common practice in US runoff-reduction manuals. Criterion (d) follows the rule of Clause 3.3.3(c) that RWH sumps are full at the start of monsoon storms.
3.10 Groundwater, high water table and tank backwater
3.10.1 High water table (dual HSG). Where the seasonal high groundwater table is within 0.6 m of the ground surface, the soil shall be assigned HSG D for both the pre- and post-development runs, whatever its texture, unless it is permanently drained by works that are maintained under Chapter 10. This rule applies in every case to storms of 12 hours or more, which are run at AMC III (Clause 2.11.4).
3.10.2 Water-table data. The seasonal high water table shall be taken as the highest level recorded in the monsoon season (April–October), from site piezometers or trial pits, or from the nearest Central Ground Water Board (CGWB) or Irrigation Department observation well, adjusted for ground level.
3.10.3 Infiltration-based losses. Where Green–Ampt, Horton or soil-moisture-accounting losses are used instead of SCS-CN, the cumulative infiltration in any storm shall not exceed the storage available in the soil above the seasonal high water table.
3.10.4 Tank and waterbody backwater. Where a site or sub-catchment drains to a tank, pukhuri, marsh or other waterbody:
- (a) the water level in the receiving waterbody shall be applied as the downstream boundary of the model, per Chapter 5 and Chapter 7;
- (b) land below the level of the receiving waterbody in the design event (including the tank foreshore below FTL) shall be modelled as water surface or storage, with no losses; and
- (c) where the outfall is submerged by the waterbody level, the routing shall use the dynamic-wave method of Clause 3.12.4.
Commentary. The dual-group rule follows NEH Part 630, Ch. 7 (USDA NRCS, 2009), which places wet soils with a water table within 60 cm (24 in) of the surface in group D in their undrained state, with a dual group (A/D, B/D, C/D) where drainage is feasible. This Manual applies the undrained group to long storms because over most of Assam the water table stands within a few metres of the surface before the monsoon and close to it after, and whatever infiltration capacity the soil has in the dry season is gone when the design storm arrives. In the CGWB's year book for 2022-23 the water level in Assam in March 2022 was "mostly in the range of 2-5 mbgl (57.43%, 170 Nos.)", with 20.27% of wells at 0–2 m, 17.57% at 5–10 m and 4.05% at 10–20 m, from 0.17 m below ground in Cachar to 22.98 m in East Karbi Anglong; in November 2022 it was "within 5 mbgl (89.13%, 287 Nos.)", with 45.96% of wells at 0–2 m and 43.17% at 2–5 m, and only Dhubri and East and West Karbi Anglong had wells at 10–20 m. In Kamrup (Metro), which holds Guwahati, six wells read 1.39–4.08 m below ground in March 2022, seven read 0.2–2.76 m in August and eight read 1.29–2.64 m in November. Water-logged areas (water within 2 m) and areas prone to it (2–3 m) were found before the monsoon of 2022 in parts of Kamrup (Metro) among other districts, and after it in "almost all the districts of Assam"; the CGWB puts this down to "high rainfall, shallow water level and a poor ground water draft in the vast flood plains" (CGWB, Ground Water Year Book 2022-23, North Eastern Region). Older summaries agree: 2–5 m before the monsoon in Kamrup district (CGWB district booklet, 2013, as quoted), and 1.00–7.85 m before and 0.50–4.64 m after the monsoon in the aquifer-mapping area of Goalpara, Kamrup and Barpeta (as quoted from the CGWB) [TBC]. In Guwahati the ADB's environmental assessment adds a rising water table "with the rising of the Brahmaputra", which "reduces the rate of percolation" (ADB, IEE for the Guwahati subprojects of AUIIP Tranche 2, 2017). On the char and chapori lands, in the beel basins and in the Silchar bowl no well record was obtained, but the land is under water or saturated in a flood [TBC]. No water-table depths for individual town sites, and no map of the seasonal high water table, were obtained [TBC]; Annex 3A is to supply them. Clause 3.10.4 reflects the State's receiving waters, which are rivers held between embankments, beels behind sluices and, below them, the Brahmaputra and the Barak. At the CWC site at Guwahati (DC Court) the warning, danger and highest levels are 48.68 m, 49.68 m and 51.46 m (21 July 2004); at Dibrugarh 104.70 m, 105.70 m and 106.48 m (3 September 1998); and on the Barak at Annapurnaghat, the gauge for Silchar, 18.83 m, 19.83 m and 21.84 m (1 August 1989) (CWC tables, as transcribed by SANDRP in 2019; the datum is not stated and is to be confirmed for each site [TBC]). At Guwahati the danger level is reached in most monsoons and the highest level is 1.78 m above it (NEER's reading of the same tables); "the water level of the Brahmaputra River sometimes, is higher than the ground level of the city areas" (ADB IEE, 2017), and "Dibrugarh town is 1.5 m below the bed level of Bramhaputra" (ADB, IEE for the Dibrugarh DTP drain outfall, 2017). A site there drains to a water surface that stands above it for weeks, and Clause 3.10.4(b) applies to all the land below that level. The town's own storage is its beels: Deepor Beel, which receives the Basistha and Kalmani side of Guwahati and drains to the Brahmaputra by the Khanajan, has a perennial water spread of about 10.1 km² that grows to about 40.1 km² in floods (as reported), and Dibrugarh's DTP drain passes Larua Jamira beel on its way to the Sessa (ADB IEE, 2017). No stage–storage relation for any beel was found [TBC].
3.11 Unit hydrographs and runoff transformation
3.11.1 Permitted transforms.
- (a) SCS (NRCS) dimensionless unit hydrograph, curvilinear or triangular, for catchments below 25 km² and for any sub-area of a larger model;
- (b) the SWMM non-linear reservoir with kinematic overland flow;
- (c) Clark or ModClark unit hydrograph in HEC-HMS, where parameters are calibrated under Clause 3.15; and
- (d) the CWC synthetic unit hydrograph, for 25–5,000 km² (Clause 3.11.4).
3.11.2 SCS unit hydrograph. The peak and time to peak of the unit hydrograph shall be:
qp = PRF′ · A · Q / tp, with PRF′ = 0.208 (SI form of the standard peak rate factor 484) tp = Δt / 2 + tL, tL = 0.6 Tc
where qp is the peak flow (m³/s); A is the area (km²); Q is the runoff depth (mm), equal to 1 mm for the unit hydrograph; tp is the time to peak (h); and Δt is the computation interval (h).
3.11.3 Computation interval and sub-areas.
- (a) Δt shall not exceed 0.133 Tc of the smallest sub-area, nor the hyetograph time step of Clause 2.9.1.
- (b) Sub-areas shall be reasonably uniform in HSG, land cover and slope. Pervious and directly connected impervious areas shall be separate sub-areas, per Clause 3.9.2.
3.11.4 CWC synthetic unit hydrograph. For catchments of 25–5,000 km² in CWC subzone 2(a) (North Brahmaputra), which covers the north bank of the Brahmaputra, including North Guwahati and Amingaon, or 2(b) (South Brahmaputra), which covers the south bank, the rest of Guwahati, the Karbi hills and the north of Dima Hasao, but not the Barak valley and the south of Dima Hasao, which lie in subzone 2(c) (Barak and others), for which CWC has published no Flood Estimation Report:
- (a) the SUH parameters, design storm duration, loss rate, base flow, areal reduction and time distribution shall be taken from the applicable CWC Flood Estimation Report, using the catchment's physiographic parameters measured from survey or a DEM;
- (b) the 24-hour design rainfall shall follow Clause 2.3.3(b) and Clause 2.7.3, and the climate factor of Clause 2.8 shall be applied;
- (c) the SUH result shall be reported alongside the HEC-HMS or SWMM result for the existing natural condition; and
- (d) where the hydrograph model gives a lower 1% AEP peak than the CWC SUH, the designer shall either justify the model by calibration under Clause 3.15 or adopt the CWC SUH peak.
3.11.5 Peak rate factor for flat coastal land. The standard factor (484; PRF′ = 0.208) is the default. A lower factor may be used only:
- (a) for unchannelled, flat coastal-plain land without piped or lined drainage;
- (b) in the same way in both the pre- and post-development runs for any land that stays unchannelled; and
- (c) after the authority adopts calibrated values in Annex 3D.
Land drained by pipes, lined drains or kerbs in the post-development condition shall use the standard factor.
Commentary. The SCS unit hydrograph, the 0.6 lag ratio and the 0.133 Tc interval are from NEH Part 630, Ch. 16 (USDA NRCS, 2007). The interval follows from the unit hydrograph geometry: with tp = Δt/2 + 0.6 Tc and Tc + Δt = 1.7 tp, Δt = 0.133 Tc. The SI constant 0.208 is the direct conversion of 484 (cfs, mi², in, h). APWA uses the SCS dimensionless unit hydrograph as its basis (2011, §5602.5). The CWC Flood Estimation Reports give regression equations for SUH parameters, a design storm duration, a constant loss rate and ARF and time-distribution curves for each subzone (CWC 1991 and 2000; see Chapter 2). They were derived from natural, mostly rural catchments with data that predate the reports of 1991 and 2000 (the 14 catchments of the 2(b) report were gauged at railway bridges from 1961 to 1983 and at national-highway bridges from 1981, and the 21 catchments of the 2(a) report are also bridge sites on rural rivers; none is urban, embanked or pumped), so they represent pre-development conditions, not urbanised ones. That is why the SUH is used as a benchmark rather than as the post-development model. Clause 3.11.4(d) mirrors the floor principle of Clause 2.3.3. HEC-HMS has been calibrated against CWC subzone SUH responses in Indian studies, which shows the two can be linked.
The lower-factor option of 3.11.5 is based on the NRCS Delmarva unit hydrograph, which uses a peak rate factor of 284 (PRF′ ≈ 0.122) for flat, poorly channelled coastal-plain catchments on the Delmarva Peninsula (Welle et al., 1980, as adopted by NRCS; New Jersey Department of Agriculture, Delmarva bulletin, which uses 285). A lower factor gives a lower, later peak. Used only in the pre-development run, it would lower Q_pre and make the release cap stricter; used in a piped post-development run, it would understate Q_post. Clause 3.11.5(b) prevents both biases.
3.12 Routing
3.12.1 Storage routing. Routing through detention and retention facilities, tanks, ponds and any storage behind embankments shall use level-pool (modified Puls, storage-indication) routing with:
- (a) a stage–storage relationship from the design grading or survey;
- (b) a stage–discharge relationship for every outlet (orifices, weirs, surplus weirs, pumps), including the minimum orifice and trash screen of Chapter 4; and
- (c) the tailwater boundary of Chapter 5, where the tailwater affects the outlet rating.
3.12.2 Channel routing. Routing through channels and drains shall use the Muskingum–Cunge method, or the Muskingum method with parameters K and X that are derived from channel geometry or calibration. For the Muskingum method, the routing interval Δt shall satisfy 2KX ≤ Δt ≤ 2K(1 − X).
3.12.3 Incidental storage. Storage behind road embankments, culverts or boundary walls that is not part of an approved facility shall not be counted in the design unless the authority is satisfied that it will be maintained for the design life.
3.12.4 Dynamic-wave routing. Dynamic-wave (full Saint-Venant) routing, in SWMM or HEC-RAS unsteady flow, shall be used where:
- (a) the outfall is under tidal, river or tank backwater (Chapter 5, Clause 3.10.4);
- (b) flow can reverse, or the network has loops or overflow links; or
- (c) the network surcharges in the design event and the hydraulic grade line sets the design.
3.12.5 Tank cascades. Tanks in a cascade shall each be routed by Clause 3.12.1, with the surplus weir and sluice ratings and the documented operating rule of Chapter 7. The starting water level in each tank shall be FTL unless continuous simulation (Clause 3.13) supports a lower level.
Commentary. Modified Puls routing for storage and Muskingum–Cunge for channels are the APWA requirements (KC Metro APWA 5600, 2011, §5602.8). APWA also excludes "incidental detention" behind embankments unless it will be maintained, which 3.12.3 adopts. CPHEEO's detention procedure uses the same three inputs as 3.12.1: an inflow hydrograph, a stage–storage curve and a stage–discharge curve (CPHEEO 2019, Part A §8.5.3). The Muskingum stability limits are standard (Chow, Maidment and Mays, 1988, §8.4). This Manual starts beels, pukhuris and retention ponds at their outlet level in 3.12.5 because in Assam the heavy storm comes when the river is high, the outfall sluice is shut and the beel behind it is filling, not drawn down. The Water Resources Department describes the condition itself: "High stages of river Brahmaputra and Barak obstruct free discharge of tributaries causing back flow and congestion near outfalls. Inadequate countryside drainages through sluices in embankment system … cause prolonged inundation" (as quoted by the CAG, Report No. 5 of 2018). The one design found for a town outfall makes the same assumption: the new sluice of the DTP drain at Dibrugarh, with a flood level of 97.50 m at the sluice, was designed "keeping in mind that the beel is full and the drain is also flowing full" (ADB, IEE for the Dibrugarh DTP drain outfall, 2017). Deepor Beel grows from a perennial water spread of about 10.1 km² to about 40.1 km² in floods (as reported), so its storage is taken up by the monsoon before a late storm arrives. No beel or pukhuri in the State was found to have a documented operating rule, a level record or a stage–storage relation [TBC]. The starting levels are therefore as follows (set by this Manual):
- A beel, pukhuri or retention pond that drains through a gated or pumped outfall shall be started full to the level of its outlet whenever the outfall is closed, and the outfall is taken as closed for the durations of Clause 5.8.5 (Chapter 5; Clause 5.8.5(e)). In Assam this is the normal monsoon case: at Guwahati the Brahmaputra reaches its danger level of 49.68 m in most monsoons, and its highest level is 1.78 m above that (CWC tables, as transcribed by SANDRP; NEER's reading). The ADB retention pond for the Bahini basin (59,000 m³, with a 1.6 m³/s pump station; ADB, RRP 57262-001, 2025) and the retention basin in the Silsako basin to which part of the Bahini's runoff is to be diverted and "gradually pumped out to the Brahmaputra" are started in the same way, full to the level at which the pumps start, unless their operating rule commits them to be pumped down before the storm.
- A beel or pukhuri with a free outlet is started at its surveyed outlet or spill level.
- Reservoirs. Four hydroelectric projects set the level at outfalls downstream of them: the Kopili project of NEEPCO at Khandong, for which no levels were obtained [TBC]; the Ranganadi project of NEEPCO in Arunachal Pradesh, whose release reached 1,412.57 m³/s in 2017 (as quoted from an IIT Guwahati report for ASDMA); the Lower Subansiri project of NHPC, whose release rules were not found [TBC]; and the New Umtru project of MePGCL on the Umtru above Byrnihat, whose maximum water level is 132.78 m (MePGCL, guideline for the New Umtru project, 2025). These are not started here; their release scenarios are the tailwater of Chapter 5 (Clause 5.8.5(d)).
A beel or pukhuri is modelled below these levels only where a continuous simulation under Clause 3.13 or a notified operating rule supports it. The window of 1 April to 31 October in Clause 3.13.5(a) is set by this Manual and is the Manual's monsoon season. It starts on 1 April, not with the south-west monsoon, whose normal onset over the North East is about 5 June (as reported; IMD's revised normals put Guwahati at 2–4 June, as quoted in a press summary of the IMD release), because the storms of April and May are among the State's largest: four of the seventeen Assam station records of 24-hour rainfall are May storms, Dibrugarh (Mohanbari) 231.5 mm on 10 May 1996, Dhubri (Rupsi) 479.3 mm on 28 May 1989, Rangia 217.0 mm on 29 May 1977 and Silchar 290.3 mm on 30 May 1893 (IMD Extremes); Guwahati's April record of 116.5 mm (6 April 2004, IMD) was beaten by 117.4 mm at the airport on 20 April 2026 (as reported); and the CWC subzone 2(b) report finds that "May rainfall is more than the September rainfall. Similarly, April rainfall is more than October rainfall" (§2.4.1). The beels are smallest after the dry winter ("The winter season from December to March is practically dry", the same report), so the April and May days can only lower the 10% level a little, and wherever an outfall is gated the outfall-closed start above governs. The window ends on 31 October because large falls still come in October, such as 237.1 mm at Haflong on 30 October 1959, 220.0 mm at Dhubri (Rupsi) on 4 October 1958 and 160.9 mm at Guwahati on 15 October 1991 (IMD Extremes), while the withdrawal date of the monsoon from Assam was not obtained [TBC]. Pumps, gates and screens are on standby from 1 April to 31 October (Chapter 10).
3.13 Continuous simulation
3.13.1 When required. Continuous simulation shall be carried out, in addition to the design-storm analysis, for:
- (a) regional facilities draining more than 25 km²; and
- (b) any system that includes a tank cascade whose storage is counted in the design (Chapter 7).
The authority may also require it for any facility where the starting storage level governs the design.
3.13.2 Rainfall input.
- (a) The longest available hourly record from IMD or another approved recording gauge representative of the catchment shall be used.
- (b) Where hourly data are shorter than 30 years, the record shall be extended with the IMD 0.25° gridded daily data. The full gridded record (1901 to present) should be used; at least the most recent 30 years shall be. The daily data shall be disaggregated to hourly by a method stated in the submittal and checked against the hourly gauge for the overlapping years. Grid values shall be converted to point values under Clause 2.7.1 where applicable.
- (c) A future-climate run shall scale the record by the climate factors of Clause 2.8.
3.13.3 Model content. The model shall include soil-moisture accounting with evaporation (IMD pan evaporation or equivalent), groundwater or base flow, tank storage with operating rules and irrigation withdrawals, and the tailwater series of Chapter 5 (predicted tides plus a surge allowance for coastal outfalls).
3.13.4 Use of results. Annual maxima of water level, storage and volume, and the duration of outfall closure, shall be extracted and fitted by frequency analysis. Results shall be compared with the design-storm results. The more severe result at each AEP governs. Peak flows in drains and channels with a response time of less than one day shall be taken from the design-storm analysis where the continuous record was disaggregated from daily data, because the disaggregated hourly peaks are synthetic.
3.13.5 Two-step approach. The continuous simulation need not use the full hydraulic model. It may use a simplified hydrologic and storage model, at a daily or hourly step, that represents the soil moisture, groundwater, tank storage, operating rules and tailwater of 3.13.3. Its results shall then be passed to the design-storm runs of the full hydraulic model as:
- (a) the starting level of each tank, taken as the level exceeded on 10% of the days from 1 April to 31 October over the record; and
- (b) the antecedent soil-moisture condition, taken from the same days and compared with the AMC rule of Clause 3.8.
The designer shall show that the simplified model reproduces the water balance of the full model for at least one recorded event.
Figure 3.4 — Two-step approach of Clause 3.13.5. Step 1: a long continuous run with a simplified hydrologic and storage model gives the tank level exceeded on 10% of the days from 1 April to 31 October (L10). Step 2: the design storms are run in the full hydraulic model from that starting level, in place of the default start at FTL of Clause 3.12.5. Schematic, not real data. Original drawing for this Manual, illustrating the two-step approach set by this Manual in Clause 3.13.5.
Commentary. Design storms assume one starting condition, but in a tank cascade the governing variable is how full the tanks are when the storm arrives, which depends on the weeks of rain before it. An Australian study of 20 real on-site detention systems found that designs based on one temporal pattern, or even an ensemble of ten, "cannot reliably produce an OSD system design that will always be effective" under real rainfall, and continuous simulation showed frequent-event peaks exceeding pre-development levels (Water Science and Engineering, 2019). The 30-year minimum in 3.13.2(b) matches the station IDF rule of Clause 2.3.2; a longer record is better, and the IMD gridded daily record, which starts in 1901, is the practical long series for Assam. The record length matters less than what the simulation is for. Its main purpose here is to find how full the tanks and soils usually are when a monsoon season storm arrives, and how often heavy rain coincides with a closed outfall. A design storm cannot answer either question, because it starts from one assumed condition. It is not intended to replace design storms for the peak flow in urban drains. Clause 3.13.5 therefore allows the long run to be made with a simple storage model, which takes minutes, and passes the starting tank levels to the detailed hydraulic model, which is then run only for the design storms. Running a detailed 1D–2D city model continuously for decades is rarely practical and is not required. The 10% exceedance level in 3.13.5(a) is set by this Manual: it represents a wet but not exceptional monsoon, so that the design storm arrives on tanks that are already well filled, as they were in June 2022, when rainfall over the Assam & Meghalaya subdivision, 858.1 mm, was the highest for June since 1901 (IMD, June 2022 summary) and the Barak at Annapurnaghat stood above its danger level from 18 June (as quoted from the Cachar district flood report).
3.14 Pre- vs post-development comparison procedure
3.14.1 The comparison required by Clause 2.11 and Chapter 4 shall be carried out by the following steps. The results shall be recorded on Form 3-2.
Figure 3.5 — Pre-development, uncontrolled post-development and routed post-development hydrographs for the same design storm. Original drawing for this Manual, adapted from the pre- vs post-development detention concept in CPHEEO, Manual on Storm Water Drainage Systems, Part A §8.5, 2019, and KC Metro APWA Section 5600, 2025.01. Schematic. Illustrative — not design values.
3.14.2 Step 1 — Define the site, catchments and points of comparison.
- (a) Delineate the site and every area that drains to it, from survey.
- (b) Identify each POC where runoff leaves the site. Each POC shall be tested separately. Runoff shall not be diverted from one natural catchment to another to meet the criterion.
- (c) Model off-site run-on identically in both runs, at its existing condition (Clause 3.3.5(b)). Where it passes through the site's storage, the criterion applies to the total outflow at the POC.
3.14.3 Step 2 — Soils. Map HSG (Clause 3.7), apply the high-water-table rule (Clause 3.10.1) and record the infiltration tests.
3.14.4 Step 3 — Pre-development model. Build the pre-development model per Clause 3.3.2: greenfield CN (Table 3.5), Tc (Clause 3.6, with n = 0.15), and existing waterbodies and channels. Compute CN at AMC II and AMC III.
3.14.5 Step 4 — Post-development model. Build the post-development model per Clause 3.3.3: measured impervious areas, connectivity (Clause 3.9), disturbed-soil HSG, CN, Tc, and the proposed retention, detention and outlets as storage (Clause 3.12.1).
3.14.6 Step 5 — Design storms. From Chapter 2, prepare for each required AEP (50%, 10% and 1%; 2-, 10- and 100-yr) and each duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:
- the depth with the climate factor (Clause 2.8), ARF = 1.0 for the site (Clause 2.7.4);
- the hyetograph (Clause 2.9); and
- the AMC (Clause 2.11.4).
The same storms shall be used in both runs (Clause 2.11.1).
3.14.7 Step 6 — Run the pre-development model for every storm and tabulate Q_pre(T, d). For flood-sensitive catchments, identify the largest 10% AEP pre-development peak over all durations; that value is the cap of Clause 2.11.3.
3.14.8 Step 7 — Run the post-development model without controls and tabulate Q_post(T, d) and runoff volumes. This shows the size of the problem and is reported, not tested.
3.14.9 Step 8 — Add retention and detention.
- (a) Represent the retention volume of Chapter 4 as storage that is lost to infiltration or reuse (not released to the POC) within the period verified under Chapter 4.
- (b) Route the remaining hydrograph through the detention storage and outlets (Clause 3.12.1).
- (c) Apply the tailwater of Chapter 5, including the joint cases of Clause 2.12, where the outfall is tidal or under backwater.
- (d) Adjust storage and outlets until Step 9 is met.
3.14.10 Step 9 — Test the criterion at each POC, for every AEP and every duration:
- (a) standard catchments: Q_post(T) ≤ 0.9 × Q_pre(T) for the 50%, 10% and 1% AEP (Clause 2.11.2);
- (b) flood-sensitive catchments: Q_post(1% AEP) ≤ Q_pre(10% AEP), and Q_post(50% AEP) ≤ Q_pre(50% AEP) (Clause 2.11.3).
The governing duration for storage is the one that needs the largest storage or gives the highest water level; the 24, 48 and 72 h runs are always reported (Clause 2.5.2).
3.14.11 Step 10 — Sensitivity runs. Repeat Steps 6–9 for the governing storms with Ia = 0.05S (Clause 3.8.5) and, where a lower peak rate factor is used, with the standard factor (Clause 3.11.5). Report the change in peaks and required storage.
3.14.12 Step 11 — Associated checks. Using the final routed model, check the drawdown times, minimum orifice and emergency spillway of Chapter 4, the outfall-closed storage check of Chapter 5, and the downstream analysis of Chapter 5.
3.14.13 Step 12 — Document the results on Forms 3-1 and 3-2 (Clause 3.17).
Commentary. The step sequence follows the standard event-based workflow: delineate; set pre-development CN and Tc; set post-development CN and shorter Tc; run identical storms through a unit hydrograph or kinematic model; compare peaks and volumes; and size storage by modified Puls routing. It adds the Assam elements: the 48–72 h storms, AMC III, and tailwater. Figure 3.5 shows why the long-duration runs matter: the routed peak can meet the cap while the storage holds the volume difference between the post- and pre-development hydrographs, which must then drain within the Chapter 4 limits. The ban on diverting runoff between catchments in 3.14.2(b) stops a site meeting the rule at one POC by moving flow to a neighbour's drain.
3.15 Model calibration and validation
3.15.1 When required. Calibration and validation are required for:
- (a) catchment models of 25 km² or more;
- (b) regional facilities and continuous simulation under Clause 3.13;
- (c) city or basin drainage master plans; and
- (d) any model whose parameters differ from the defaults of this chapter (for example a Clark transform or a lower peak rate factor).
3.15.2 Data. Calibration shall use observed rainfall (gauges, and radar where available) and observed flows or water levels (WRD gauging sites, GMC or ASDMA level sensors, tank gauges, or surveyed flood marks).
3.15.3 Events. At least three independent events shall be used for calibration and at least one further event for validation. At least one event shall be a long-duration monsoon or cyclone event (for example the Silchar flood of June 2022, the Guwahati storms of 14 June 2022 and 31 May 2025, or the overnight storm of 20 April 2026 in Guwahati, where data exist).
3.15.4 Performance. The submittal shall report, for each event, the observed and modelled peak, volume and time to peak, and for continuous models the Nash–Sutcliffe efficiency (NSE) and percent bias. As a guide, a calibrated model should reproduce event peaks and volumes within ±25%, and a continuous model should achieve NSE ≥ 0.5 and percent bias within ±25%.
3.15.5 Limits on calibration. Calibration shall not be used to justify design flows lower than those given by the default methods of this chapter, unless site-specific factors are thoroughly examined and documented and the authority agrees.
3.15.6 Reasonableness check. Design peak flows shall be plotted as discharge per unit area against catchment area and compared with the CWC SUH results, regional gauged estimates and known historical floods.
Commentary. Clauses 3.15.5 and 3.15.6 follow APWA, which states that "model calibration shall not be used to justify discharge estimates that are lower than those provided by the baseline unit hydrograph method" and requires unit discharges to be plotted against tributary area and compared with regression, gauge and historical values (KC Metro APWA 5600, 2011, §5602.9). The event-count and performance values in 3.15.3 and 3.15.4 are set by this Manual. The NSE ≥ 0.5 and ±25% bias thresholds are the "satisfactory" streamflow ratings of Moriasi et al. (2007), which were developed for monthly continuous simulation; their use for event peaks and volumes here is an extension.
3.16 Software acceptance
3.16.1 Accepted software. The following are accepted without further demonstration, in a version current at the time of submittal:
- (a) EPA Storm Water Management Model (SWMM 5.x);
- (b) USACE HEC-HMS and HEC-RAS;
- (c) USDA NRCS WinTR-55 and WinTR-20; and
- (d) spreadsheets for the Rational Method and single-area SCS-CN calculations, where every formula and input is shown.
3.16.2 Other software. Commercial packages built on the SWMM or HEC engines are accepted if the engine and version are stated. Any other method or software is accepted only if the designer reports, for every sub-area, the peak flow, lag, runoff volume and equivalent CN from both that method and a baseline method of 3.16.1, identifies every difference greater than 5%, and justifies every difference that gives a less conservative result.
3.16.3 Benchmark problems. The authority shall publish benchmark test problems (Annex 3C). Software not listed in 3.16.1 shall reproduce them within the stated tolerance.
3.16.4 Model files. Native model input and output files shall be submitted with every hydrograph-based design.
Commentary. The 5% equivalence test is the APWA rule for alternative methods (KC Metro APWA 5600, 2011, §5602.2D). APWA names TR-55, TR-20, HEC-1 and HEC-HMS as baseline methods (§5602.2B). CPHEEO names SWMM for hydrograph and continuous modelling (CPHEEO 2019, Part A §4.4.2). Submitting native model files lets the authority rerun the model and is the main safeguard against unreviewable black-box results.
3.17 Documentation
Every hydrologic submittal shall include:
- Form 3-1, Hydrologic Calculation Summary, stating the method used and why (Table 3.1), the software and version, and the computation interval.
- Catchment maps for the pre- and post-development conditions, showing sub-areas, flow paths used for Tc, POCs, and off-site run-on.
- Soils: the HSG map and its source and scale (Clause 3.7), water-table data (Clause 3.10), and infiltration test results.
- Parameter tables for each sub-area and condition: area, impervious area by type and connectivity, HSG, CN at AMC II and III (or C and Cf), Tc worksheets, and n values.
- Rainfall: the Design Rainfall Sheet (Form 2-1) and the hyetographs used.
- Results: hydrograph tables and plots for each storm; stage–storage and stage–discharge tables; routed outflows; and peak water levels.
- Form 3-2, Pre- vs Post-Development Comparison, with Q_pre, Q_post (uncontrolled and routed) and the criterion for each POC, AEP and duration, and the sensitivity runs of Clause 3.14.11.
- Calibration report, where Clause 3.15 applies.
- Model files (Clause 3.16.4).
- A statement by the responsible engineer that the methods and parameters of this chapter have been used, with any departures listed and justified.
References (chapter)
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Volume I, Part A: Engineering Design. Ministry of Housing and Urban Affairs, New Delhi. §4.4 (Rational Method, Table 4.2 runoff coefficients, time of concentration, partial area effect), §8.5 (detention).
- Kansas City Metro Chapter APWA (2011). Section 5600 Storm Drainage Systems and Facilities (Feb 16, 2011), §5602.2–5602.9.
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01, §5603.4. https://kcmetro.apwa.org/wp-content/uploads/sites/23/2026/01/APWA-Section-5600_Storm-Drainage-Systems-Facilities.pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Policy Supplement). https://www.marc.org/document/apwa-stormwater-standards-supplement
- USDA Soil Conservation Service (1986). Urban Hydrology for Small Watersheds, Technical Release 55 (TR-55), 2nd ed. Tables 2-2a, 2-2c, 3-1; Figures 2-3, 2-4, 3-1.
- USDA NRCS. National Engineering Handbook, Part 630 Hydrology: Ch. 7 Hydrologic Soil Groups (2009); Ch. 9 Hydrologic Soil-Cover Complexes; Ch. 10 Estimation of Direct Runoff from Storm Rainfall (2004); Ch. 15 Time of Concentration (2010); Ch. 16 Hydrographs (2007). https://directives.nrcs.usda.gov/
- Hawkins, R.H., Jiang, R., Woodward, D.E., Hjelmfelt, A.T. and Van Mullem, J.A. (2002). Runoff curve number method: examination of the initial abstraction ratio. Proc. Second Federal Interagency Hydrologic Modeling Conference, Las Vegas.
- Woodward, D.E., Hawkins, R.H., Jiang, R., Hjelmfelt, A.T., Van Mullem, J.A. and Quan, Q.D. (2003). Runoff curve number method: examination of the initial abstraction ratio. World Water & Environmental Resources Congress, ASCE.
- Welle, P.I., Woodward, D.E. and Moody, H.F. (1980). A dimensionless unit hydrograph for the Delmarva Peninsula. American Society of Agricultural Engineers paper. See also New Jersey Department of Agriculture, Delmarva Unit Hydrograph bulletin. https://nj.gov/agriculture/divisions/anr/pdf/DelmarvaBulletin.pdf
- Chow, V.T., Maidment, D.R. and Mays, L.W. (1988). Applied Hydrology. McGraw-Hill. §5.5 (SCS method, AMC), §8.4 (Muskingum), Table 15.1.2 (Kirpich).
- Kirpich, Z.P. (1940). Time of concentration of small agricultural watersheds. Civil Engineering 10(6), 362.
- Merkel, W.H. (2001), as cited in USDA NRCS NEH Part 630, Ch. 15 (2010), on the length of sheet flow.
- ASCE and WPCF (1969). Design and Construction of Sanitary and Storm Sewers. ASCE Manual of Practice No. 37.
- Texas Department of Transportation. Hydraulic Design Manual, Ch. 4, §12 Runoff Coefficients. https://www.txdot.gov/manuals/des/hyd/chapter-4--hydrology/section-12--rational-method/runoff-coefficients.html
- Central Water Commission (2000). Flood Estimation Report for South Brahmaputra Subzone 2(b) (Revised). Design Office Report No. SB-2(b)/R-4/44/99, March 2000, CWC (Hydrology (Regional Studies) Directorate), IMD, RDSO and the Ministry of Surface Transport; approved by the Flood Estimation Planning and Co-ordination Committee at its 55th meeting on 13.3.2000; revises report SB/8/1984. Read from the Internet Archive copy of 12 April 2016 (103 pages, scanned, read by optical character recognition): Table 3.3 (the synthetic unit hydrograph), the simplified formulae (p. 17), Table 4.1 (the ratios of t-hour to 24-hour rainfall, p. 20), the errata page and Plates 8, 9 and 10 checked against the page images; §§2.3.2 and 2.4.1, Annexes 3.1, 3.2, 4.1, 4.2 and 4.3 and the worked example read by optical character recognition only [TBC]. http://web.archive.org/web/20160412151207id_/http://www.cwc.gov.in:80/main/downloads/South%20Brahmaputra%20subzone%202%20(b).Pdf
- Central Water Commission (1991). Flood Estimation Report for North Brahmaputra Subzone 2(a), Design Office Report No. NB/18/1991, placed before the Flood Estimation Planning and Co-ordination Committee at its 49th meeting (24–25 October 1990, Guwahati). Read from the Internet Archive copy of 12 April 2016 (94 pages, scanned, read by optical character recognition): the unit hydrograph relationships, the design loss rate, the ratio table, Table 7 (heaviest daily rainfall) and Plate 9 checked against the page images; Plates 8 and 10 not read [TBC]. http://web.archive.org/web/20160412153137id_/http://www.cwc.gov.in:80/main/downloads/North%20Brahmaputra%20subzone%202%20(a).Pdf
- Central Water Commission. Index of the downloads folder of cwc.gov.in in the Internet Archive (no report for subzone 2(c), Barak and others); and the foreword and back page of the 2(b) report, which list 21 reports covering 24 of the 26 subzones and none for 2(c).
- Moriasi, D.N. et al. (2007). Model evaluation guidelines for systematic quantification of accuracy in watershed simulations. Trans. ASABE 50(3), 885–900.
- "OSD for Australian development projects: does it meet frequent flow management objectives?" Water Science and Engineering (2019). https://www.sciencedirect.com/science/article/pii/S1674237019300213
- Central Ground Water Board, North Eastern Region. Ground Water Year Book 2022-23, North Eastern Region, Technical Series D No. 12/2022-23 (depth to water in March, August and November 2022; Annexures IA and III–V for Kamrup (Metro); water-logged and prone areas). https://cgwb.gov.in/cgwbpnm/public/uploads/documents/17032376731214418851file.pdf (Internet Archive copy of 24 January 2024)
- Central Ground Water Board. Assam State Profile (Internet Archive copy of 31 October 2007): unconsolidated formations; the bhabar, terai and Cachar yields; resources and observation wells. CGWB district booklet for Kamrup (2013) and the aquifer-mapping report for Goalpara, Kamrup and Barpeta (as quoted in search summaries) [TBC].
- India Meteorological Department. Extremes of Temperature and Rainfall for Indian Stations (up to 2012): the Assam stations of pages M23–M31. https://imdpune.gov.in/library/public/EXTREMES%20OF%20TEMPERATURE%20and%20RAINFALL%20upto%202012.pdf
- India Meteorological Department. Monthly Climate Summary, June 2022 (the Assam & Meghalaya subdivision, 858.1 mm). https://imdpune.gov.in/cmpg/Product/Monthly_Clim_Summary/Monthly_Clim_Summary_6_2022.pdf
- Asian Development Bank (2017). Initial Environmental Examinations, Assam Urban Infrastructure Investment Program, Tranche 2 (42265-025): Guwahati subprojects, and the Dibrugarh DTP drain outfall (the DTP dyke, the drain to the Sessa, Larua Jamira beel, the radial sluices and the flood level of 97.50 m). https://ewsdata.rightsindevelopment.org/files/documents/25/ADB-42265-025_QMl9sl8.pdf ; https://ewsdata.rightsindevelopment.org/files/documents/25/ADB-42265-025_D6ieyPo.pdf
- Comptroller and Auditor General of India. Report No. 5 of 2018, Government of Assam, para 2.2, "Flood Control in Assam" (drainage congestion; embankments and sluices to March 2017). https://www.cag.gov.in/uploads/download_audit_report/2018/Executive_summary_of_Report_No_5_of_2018_-_Social_General_and_Economic_Non-PSUs_Sectors_Government_of_Assam.pdf
- SANDRP, "Overview of CWC's flood forecasting sites 2019: North East India" (2 October 2019), transcribing CWC's warning, danger and highest flood levels; datum not stated. https://sandrp.in/2019/10/02/overview-of-cwcs-flood-forecasting-sites-2019-north-east-india/
- Cachar district administration. Flood Management 2022 (the Barak at Annapurnaghat, 18–21 June 2022; Cachar rainfall of 19 June 2022), as quoted in a search summary [TBC]. https://cachar.assam.gov.in/sites/default/files/public_utility/Flood%20Management%202022_0.pdf
- IIT Guwahati, report for ASDMA (February 2018), on the Ranganadi release of 2017, as quoted [TBC]. https://www.asdma.gov.in/download/Final%20Report%20with%20Annexures_ASDMA_IITG_AKS.pdf
- Pollution Control Board, Assam. Action Plan for the Bharalu River (Priority I) (the Bahini–Bharalu catchment and the sluice at Natun Bazar). https://www.pcbassam.org/RRC%20Action%20Plan%20Final/Priority%20I/Action%20plan_Bharalu.pdf
- Reports on Deepor Beel (water spread), the Bharalumukh sluice and pumps (2008), the Guwahati storms of June 2022, 31 May 2025 and 20 April 2026, and the Silchar flood of June 2022 (Assam Tribune; The Sentinel; EastMojo; as reported).
- US EPA. Storm Water Management Model (SWMM 5). US Army Corps of Engineers, Hydrologic Engineering Center. HEC-HMS and HEC-RAS.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 3A | Assam soil series to HSG lookup; seasonal high water table map |
| 3B | Assam CN calibration and supplementary land covers (hill forest, bunded rice fields, char and chapori land, beel beds and margins, bhabar boulder fans, cut hill slopes and fills, hola hollows) |
| 3C | Benchmark test problems for software acceptance |
| 3D | Peak rate factor study for flat coastal land |
| 3E | CWC SUH parameters for subzones 2(a) and 2(b), with worked example |
| Form 3-1 | Hydrologic Calculation Summary |
| Form 3-2 | Pre- vs Post-Development Comparison |
Commentary. The CPHEEO (2019) Manual on Storm Water Drainage Systems gives a full Rational Method procedure and names SWMM for hydrograph work, but it is a drain-sizing guide. It does not say how a regulator should define "pre-development" or which method must be used to test a development against it (CPHEEO Part A §4.4, §8.5.1). APWA Section 5600 does both: it limits the Rational Method, names baseline hydrograph methods, and fixes the land-use assumptions for existing and proposed conditions (KC Metro APWA 5600, 2011, §5602.2–5602.3; Version 2025.01, §5603.4). This chapter follows that model.