Chapter 7Waterbodies, Pukhuris (Ponds) and Setbacks
7.1 Purpose and scope
7.1.1 This chapter treats waterbodies as part of the drainage system. It sets the rules for:
- (a) identifying and mapping every waterbody that a development or public work affects;
- (b) the setback zones around waterbodies, and the uses allowed in each zone;
- (c) fill in flood-prone land, and the compensatory storage needed where fill is allowed;
- (d) counting tank (pukhuri) storage, including tank cascades, as design storage;
- (e) restoring and desilting tanks and ponds;
- (f) protecting supply channels, surplus courses, inlets and outlets;
- (g) wetlands, marshes and estuaries, which in Assam, a landlocked State, means the beels of the Brahmaputra and Barak floodplains, among them Deepor Beel, the State's only Ramsar site, Silsako, Borsola and Sorusola in Guwahati, Larua Jamira on the Dibrugarh drain, Son Beel, Urpad Beel and Chandubi, the marshes and hola land of the floodplains, the land ponded behind embankments when their sluices close, the water bodies scheduled under the water-bodies law, and any wetland notified under the 2017 Rules (none was found notified);
- (h) the interface with encroachment and its removal;
- (i) fee-in-lieu contributions to regional tank storage (with Chapter 4); and
- (j) the safety of tank bunds and other embankments.
7.1.2 This chapter applies to every development and public work to which this Manual applies under Chapter 1 and that:
- (a) adjoins a waterbody or lies wholly or partly within its setback (Clause 7.4);
- (b) discharges to a waterbody, directly or through a drain, within the downstream analysis extent of Chapter 5; or
- (c) alters a waterbody, its bund, sluice, surplus weir, supply channel or surplus course.
7.1.3 Where a statute or statutory rule sets a wider setback or a stricter restriction, the statute governs (Clause 1.3.3). Nothing in this chapter authorises any work that the Assam Building Construction (Regulation) Act, 2010 and the Assam Unified Building Construction (Regulation) Byelaws, 2022 made under it, the Master Plans and Zoning Regulations under the GMDA Act, 1985 and the Assam Town and Country Planning Act, 1959, the Assam Urban Water Bodies (Preservation and Conservation) Act, 2024 and the Guwahati Waterbodies (Preservation and Conservation) Act, 2008, which it repeals, the Assam Embankment and Drainage Act, 1953, the Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006, the Gauhati Municipal Corporation Act, 1969, the Assam Municipal Corporation Act, 2022, the Assam Municipal Act, 1956, the Wetlands (Conservation and Management) Rules, 2017, or any other law, prohibits.
7.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Waterbody | A river, such as the Brahmaputra and the Barak and their tributaries and town rivers (the Bharalu, which the Bahini becomes at Jonali, the Mora Bharalu, the Basistha and the Kalmani in Guwahati, the Sessa at Dibrugarh and the Kushiyara at Karimganj); jan (a stream or natural drainage channel, often the outlet of a beel, as in the Bondajan, the Lakhimijan and the Khanajan); juri (a small hill stream); nala (a built drain) or khal (a ditch or channel); beel (a natural floodplain lake or wetland, such as Deepor Beel, Silsako, Borsola and Sorusola in Guwahati, Larua Jamira on the Dibrugarh drain, Son Beel, Urpad Beel and Chandubi); akhat (a natural pond, not dug); pukhuri (a dug tank or pond); hola (a hollow where water lodges in the rains); marsh or swamp; the land ponded behind an embankment (mothauri) when its sluice (pani-duwar) is closed; retention pond or basin built for flood storage; supply channel or surplus course, perennial or seasonal (as in Chapter 1). |
| Tank (pukhuri) | A waterbody impounded by an earthen bund, fed by its own catchment and/or a supply channel, with a surplus weir and one or more sluices. |
| Tank cascade | A chain of tanks in which the surplus or sluice outflow of one tank feeds the next (as in Chapter 3). |
| Full tank level (FTL) | The crest level of the surplus weir (overflow, outlet or spillway, or the control at the head of the jan or sluice by which a beel drains) of a tank, or the permanent crest of its regulating structure. The tank holds water up to FTL without spilling. |
| Maximum water level (MWL) | The highest water level in a tank when the surplus weir passes the tank's design flood. For this Manual, it is the greater of the level recorded by the Water Resources Department and the level computed for the 1% AEP (100-yr) inflow with the climate factor of Clause 2.8 (Clause 7.7.4). |
| Top bund level (TBL) | The crest level of the tank bund. |
| Waterspread | The area of a tank submerged at FTL. |
| Foreshore | The land around a tank between the FTL contour and the MWL contour. Foreshore land is flooded whenever the tank surpluses, and is part of the tank's flood storage. |
| Supply channel (feeder jan, nala or channel) | A channel that brings water from a river, anicut or upstream tank into a tank. |
| Surplus course | The channel that carries the overflow of a surplus weir to the next tank, a river, a drain or the sea. |
| Sluice (sluice (pani-duwar), regulator or flap gate, including a sluice through a river embankment (mothauri)) | A controlled outlet through a tank bund, usually to an irrigation channel. |
| Top of bank | For a channel, the break in slope at the edge of the channel. Where it cannot be identified, the edge of the water surface at the 50% AEP (2-yr) flow. |
| 1% AEP flood extent | The land flooded by the 1% AEP (100-yr) flood with the climate factor of Clause 2.8, from a hydraulic model that meets Chapter 3 and Chapter 5, or from a map adopted by the Authority under Clause 7.3.4. |
| Floodway | The waterbody and the adjoining land that must be kept free of obstruction to pass the 1% AEP flood without raising the 1% AEP water level by more than 0.1 m at any point (Clause 7.6.1). For a tank, all land below MWL. |
| Flood fringe | The part of the 1% AEP flood extent outside the floodway. |
| Zone 1 (waterbody protection zone) | The inner setback zone defined in Clause 7.4.3. |
| Zone 2 (flood fringe setback) | The outer setback zone defined in Clause 7.4.4. |
| Setback | Zone 1 and Zone 2 together. |
| Compensatory storage | Excavated storage that replaces flood storage lost to fill, under Clause 7.6.4. |
| Flood cushion | Storage below FTL kept empty, under a documented operating rule, to absorb a flood (Clause 7.8). |
Assam terms. The following terms are used in this chapter in addition to those above (see also Annex 7E):
| Term | Meaning in this Manual |
|---|---|
| Pukhuri | A dug tank or pond: পুখুৰী, "a pond; a tank", from Sanskrit পুষ্কৰ, a large dug place to hold water (Chandrakanta Abhidhan, 1962, p. 604); "a tank, a reservoir of water" (Bronson, 1867, p. 351) (Annex 7E). First used in this Manual as "pukhuri (Assamese পুখুৰী: a dug tank or pond; plural pukhuris)". Assamese marks the plural with -bor or -hot, so the English plural "pukhuris" is a convention of this Manual. A pukhuri with an outlet pipe, sluice or overflow is a tank under Clause 7.2, and its FTL is the crest of that outlet or overflow, found by survey; a pukhuri with no outlet has its FTL at the level at which it would spill to the ground around it, found by survey. Historic and temple tanks keep their own names. Engineered storage built under this Manual is a "detention pond", never a pukhuri. |
| Beel | A natural floodplain lake or wetland: বিল, "a lake", a broad body of water without current (Chandrakanta Abhidhan, p. 685); "a lake, a pond" (Bronson, p. 410). First used as "beel (Assamese বিল: a natural floodplain lake or wetland)"; "beel" is also the word of the 2008 Act's schedules and of the byelaws. A beel that drains through a jan or a sluice is a tank under Clause 7.2: its FTL is the crest of the control at the head of its outfall jan, or the sill of its sluice, found by survey, and its MWL is set under Clause 7.2 with the outfall closed where Clause 5.8.5 so requires. A beel with no outlet is a wetland under Clause 7.12. A natural wetland is never called a pukhuri, and storage built under this Manual is never called a beel. |
| Jan; juri; nala | A jan (জান) is a stream or natural drainage channel, "a ravine; a stream", a small river from a channel or beel (Chandrakanta Abhidhan, p. 397), "a drain, a trench, a channel, a creek" (Bronson, p. 225), as in the Bondajan, the Lakhimijan and the Khanajan; a juri (জুৰি) is "a small hill stream" (Chandrakanta Abhidhan, p. 407); a nala (নলা) is a built drain (Chandrakanta Abhidhan, p. 535). Every jan, juri or other channel that drains 8 ha or more is a natural channel under Clause 7.4.1(b), whatever its name and whether it is lined, piped or covered; a built nala that carries a jan's flow along the jan's former line is treated as that jan. A juri carries silt, gravel and debris in flood: its inlets and culverts take the racks, bulking and blockage of Clause 6.3.6(f) to (h), and its top of bank is the edge of its active bed where that is wider than the edge of the 50% AEP flow. These readings are set by this Manual. |
| Embankment (mothauri); sluice (pani-duwar) | An embankment is a river embankment, মথাউৰি (Chandrakanta Abhidhan, p. 737), and, for this chapter, an "embankment" under section 2 of the Assam Embankment and Drainage Act, 1953, which includes walls, dams, spillways, groins, sluices, syphons and appurtenant land but not field ridges (ali) or roads. A sluice is a gated outlet through an embankment, পানী-দুৱাৰ, "a water-gate; a sluice" (Chandrakanta Abhidhan, p. 594). The word "dong" is used in this Manual only as the 1953 Act uses it, among drains. |
| Ponded area behind an embankment | The land inside an embankment-protected area that is flooded when its sluices are closed, up to the level reached in the outfall-closed case of Clause 5.8.5(a) for the 1% AEP storm. It is recorded in the inventory (Annex 7A), and that level is part of the 1% AEP flood extent of Clause 7.3.4; Zone 1 applies to the beels, pukhuris and channels within it, not to the ponded area as a whole. This definition is set by this Manual. |
| Char and chapori land | Char (চৰ) is "high land formed by river by deposit of silt; alluvial land" (Chandrakanta Abhidhan, p. 336); chapori or sapori (চাপৰি) is "high land formed by deposit of river sand and silt; high, open grass land" (Chandrakanta Abhidhan, p. 346; "an island, high table land", Bronson, p. 196). A site on active char or chapori land, or on an eroding bank, is a hazard-first site under Clause 2.3.6(i): it is treated as within the 1% AEP flood extent unless a hydraulic study shows otherwise, no permanent drainage work on it is relied on in a design elsewhere, and no infiltration is credited on it (Clause 4.11, floodplain rule). This reading is set by this Manual. |
| Recorded waterbody | A beel, pukhuri, jan, juri, river, marsh or ponded area shown in any source of Clause 7.3.3(a): a dag-numbered land record, a schedule of the water-bodies law, a Master Plan map, the Fisheries Department's register of beels, WRD's records, the AURA application or a town's drain register. A recorded waterbody is part of the drainage system for this Manual. Where it is proposed to be filled, in whole or part, a drainage assessment under Chapters 3 to 5 shall show the storage and flow paths lost and their effect upstream and downstream, and the lost storage shall be replaced under Clause 7.6.4 before any design relying on the filling is approved. This definition and rule are set by this Manual. |
| Scheduled water body | A water body listed, by district, mouza, revenue village and dag number, in a schedule of the Guwahati Waterbodies (Preservation and Conservation) Act, 2008, so far as the schedules continue under the saving clause of the 2024 law [TBC], or in a schedule approved by the State Level Committee and published in the Gazette under section 6 of the Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024. Since 2024 "No uses shall be permissible in the plots covered under the schedules of the Assam Urban Waterbodies (Preservation and Conservation) Act, 2024 except with permission from the Authority" (Unified Byelaws 2022, land-use table, note (1)). The storage of a scheduled water body is counted in basin and regional models (Clause 7.12.5) and shall not be reduced by any design under this Manual. |
| Boundary of a beel or pukhuri | For this Manual, the boundary of a beel or pukhuri under Clauses 7.3.3 and 7.13.1 is the largest of its boundary in the land records or schedule, its surveyed FTL, and the outer edge of its water in the season of 1 April to 31 October shown by dated imagery or survey of recent years. This reading is set by this Manual. |
| Reference lines for setbacks | Three lines are used, and the setback that reaches furthest from the water governs: (a) the byelaw's line, "the edge of natural drainage channels" or of the water body, with the distance of byelaw 26(ix) / 44(ix) measured from it; (b) the FTL of a beel or pukhuri or the top of bank of a channel, with Zone 1 of Clause 7.4.3 measured from it; and (c) the 1% AEP flood extent of Clause 7.3.4, with the 10 m of Clause 7.4.4 added. Where the byelaw's edge cannot be identified on the ground it is taken as the top of bank. This rule is set by this Manual. |
| Patta land and landholding | Most land in Assam is held as patta land under the land records of the Revenue and Disaster Management Department; some is government land. Zone 1 land that is patta land is reserved in the Master Plan or secured by a written agreement with the owner, and is not taken; in an Autonomous District, it is secured through the District Council (the Councils' land law was not researched [TBC]). This rule is set by this Manual. |
7.3 Inventory and mapping of waterbodies
7.3.1 Statewide inventory. The Authority, with the Water Resources Department and the Revenue and Disaster Management Department, shall maintain a GIS layer of every waterbody in its area (Annex 7A). For each waterbody it shall record:
- (a) its type (Clause 7.2), name and survey numbers;
- (b) its custodian (GMC (for the municipal drains of Guwahati under sections 231 to 252 of the Gauhati Municipal Corporation Act, 1969, and for the desilting of the Bharalu, Mora Bharalu, Basistha, Bahini and Lakhimijan and their feeder drains, as reported), another Municipal Corporation (for the public drains that vest in it under section 173 of the Assam Municipal Corporation Act, 2022), a Municipal Board, GMDA (for the water bodies scheduled in its area under the water-bodies law, for Silsako and for new drainage works) or another Development Authority, WRD (for the rivers, embankments, sluices, drainage channels and pumps it holds, which vest in the State under section 14 of the Assam Embankment and Drainage Act, 1953, among them the Bharalumukh sluice and the dewatering pumps of the Bharalu, Mora Bharalu and Bondajan), PWD or NHAI (for the drains and culverts of their roads), the Fisheries Department (for the beels in its register and the ponds of the Government fish farms), the Environment and Forest Department (for Deepor Beel Wildlife Sanctuary and for water in reserved forests, sanctuaries and national parks), the Revenue and Disaster Management Department (for government land recorded as water), the Gaon Panchayat, a religious institution (for its tank), a private owner (for a beel or pukhuri on patta land), the Railways, OIL, the Army or another body for its own drains, the District Council in an Autonomous District (not researched [TBC]), the Assam State Wetlands Authority (for a notified wetland; none was found), or another body);
- (c) its boundary as recorded in Revenue records;
- (d) for tanks: FTL, MWL, TBL, the surplus weir crest length and type, sluices, the supply channel and the surplus course, each with its datum;
- (e) its position in any tank cascade, with the upstream and downstream tanks;
- (f) the 1% AEP flood extent, where mapped; and
- (g) known encroachments, with the date recorded.
7.3.2 Project mapping. Every drainage report shall include a Waterbody Sheet (Form 7-1) showing all waterbodies:
- (a) within the site;
- (b) within 100 m of the site boundary; and
- (c) downstream, to the extent of the downstream analysis of Chapter 5.
The sheet shall show, on a plan at a scale of 1:1,000 or larger for (a) and (b):
- the Revenue record boundary;
- the surveyed FTL or top of bank;
- the MWL contour (tanks) and the 1% AEP flood extent;
- Zone 1 and Zone 2 (Clause 7.4); and
- every supply channel, surplus course, sluice and surplus weir.
7.3.3 Sources. Waterbodies shall be identified from all of the following. Where they conflict, the larger waterbody extent governs:
- (a) land records of the Revenue and Disaster Management Department, kept by district, mouza, revenue village, dag number and patta, including government land recorded as beel or water; the schedules of water bodies by district, mouza, revenue village and dag number, those of the Guwahati Waterbodies (Preservation and Conservation) Act, 2008 (Sorusola, Borsola, Silsako and land near Deepor Beel) and those that the District Level Committees prepare under section 5 of the Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024 from Bhuvan and the Water Body Census of the Ministry of Jal Shakti; the land-use maps of the Master Plan for Guwahati 2025 and the other Master Plans (the byelaw setbacks apply to rivers and ponds "as marked in the plan"), with their Eco-Sensitive Zone; the Fisheries Department's register of beels (2,072 beels in 2021-22, then 447 registered and 1,625 unregistered, as quoted from the Statistical Handbook); WRD's records of its embankments, sluices and drainage channels; T&CP's AURA application for urban water bodies (as reported); the National Wetland Atlas (2011); in the Autonomous Districts, the land records of the District Councils (not researched [TBC]); and each town's drain register (Chapter 6);
- (b) WRD and Gaon Panchayat tank registers and records of FTL and MWL;
- (c) the Authority's inventory (Clause 7.3.1) and any list published under court directions;
- (d) historical topographic maps and satellite imagery, including the ISRO National Wetland Inventory and Assessment; and
- (e) a site survey by a licensed surveyor, levelled to the datum stated in Clause 7.3.5.
7.3.4 Flood extent maps. The Authority may adopt 1% AEP flood extent or flood depth maps for its area. A depth map adopted under this clause also sets floor levels under Clause 6.11. Where a map has been adopted, it shall be used unless a site hydraulic study under Chapters 3 and 5 shows a larger extent. Where no map has been adopted, the Applicant shall determine the 1% AEP extent by a hydraulic study for:
- (a) any site in a flood-sensitive catchment (Chapter 1);
- (b) any site of 1 ha or more adjoining a waterbody; and
- (c) any site where the Authority so requires.
For other sites, the fixed-width setback of Clause 7.4.6 may be used.
7.3.5 Datum. All levels in this chapter shall be stated to one datum, stated on every drawing. Where WRD records use a local or older datum, the conversion to the project datum shall be surveyed and stated.
Commentary. Assam has no flood line in law. It has not enacted the Model Flood Plain Zoning Bill (PIB, as cited); a proposed Assam Flood Plain Zoning Bill was reported to have been reviewed by the Chief Minister on 5 November 2026 (a single press source, unverified), and it is not law. The two figures for the flood-prone area conflict: 31.50 lakh ha, 40% of the State, identified by the Rashtriya Barh Ayog (CAG Report No. 5 of 2018), and 31.05 lakh ha, 39.58% (WRD's website, as cited); WRD gives "reasonable protection" to 16.50 lakh ha, 52% of the first figure (CAG, 2018). The byelaws provide that "Natural Hazard Prone Areas … shall be notified and updated by the authority based on Hazard Studies viz. … Flood zonation" (byelaw 2), and since 2024 they require every Master Plan to carry a "Map identifying natural hazard prone areas where construction is not permitted" (byelaw 120); no such map or notification was found [TBC], and ASDMA's flood hazard maps were not obtained [TBC]. The levels that exist are CWC's: at Guwahati (DC Court) a danger level of 49.68 m and a highest flood level of 51.46 m (21 July 2004), and at Annapurnaghat on the Barak, the gauge for Silchar, 19.83 m and 21.84 m (1 August 1989), among others (as transcribed by SANDRP from CWC tables; the datum is as published by CWC and was not stated [TBC]; Chapter 5). The plinth rule fixes floors above "the highest recorded flood level as fixed by the local authority" (byelaw 45(c)), but no such level was found fixed for any town [TBC]. The dag-numbered schedules of the water-bodies law and WRD's records of its embankments and sluices are the best record of where water is meant to be. Clause 7.3.4 lets the Authority adopt 1% AEP maps; a map prepared under this Manual is offered as an input to the hazard maps of byelaw 120 and to the schedules of the water-bodies law, not as a notification under either. Until maps are adopted, the Applicant produces the 1% AEP extent for larger and flood-sensitive sites with the outfall closed as Clause 5.8.5 requires, because inside an embankment the flood extent is set by the ponding behind a shut sluice as often as by the river; and a highest flood level stated in a permission is a minimum that the 1% AEP extent of this Manual, with the climate factor, may exceed but never reduce. Levels shall be stated to one datum (Clause 7.3.5) and tied to the CWC or WRD gauge. Clause 7.3.3 makes the larger of the recorded and surveyed extents govern, because the Revenue boundary and the surveyed water edge often differ, and either may have been reduced by encroachment. The 100 m search band in Clause 7.3.2 is set by this Manual.
7.4 Setbacks
7.4.1 Waterbodies to which setbacks apply. Setbacks apply to:
- (a) every waterbody recorded under Clause 7.3.1 or found under Clause 7.3.3, whatever its size; and
- (b) every natural channel, whether recorded or not, that drains 8 ha or more at the site.
7.4.2 Two zones. The setback has two zones, shown in Figure 7.1:
- Zone 1 (waterbody protection zone), next to the waterbody; and
- Zone 2 (flood fringe setback), outside Zone 1.
7.4.3 Zone 1 width. Zone 1 is measured outward from the FTL contour (tanks, lakes and ponds) or from the top of bank (channels). Where both apply, use whichever gives the wider zone. Zone 1 extends to the greatest of:
- (a) 15 m, the minimum set by this Manual along every natural channel draining 8 ha or more and round every beel and pukhuri (wider lines govern under Clause 7.4.5 where they bind: the distances of byelaw 26(ix), repeated as byelaw 44(ix), of the Unified Byelaws 2022 [sub-item numbers read from the OCR layout; TBC: confirm against a clean copy], measured from "the edge of natural drainage channels", are 15 m from a river and from Deepor Beel and Silsako, 10 m from the Bharalu, Mora Bharalu and Bondajan and from large ponds, and 6 m from other channels and other notified water bodies, with only the building setbacks for minor drains and small ponds; the Master Plan for Guwahati 2025 keeps construction 15 m from the Brahmaputra bank on one riverfront stretch; no distance from an embankment was found; and no floodplain zoning law has been enacted; see the Disclosure below);
- (b) the outer edge of the floodway (Clause 7.6.1); and
- (c) for a tank, the MWL contour.
7.4.4 Zone 2 width. Zone 2 extends from the outer edge of Zone 1 to the 1% AEP flood extent plus 10 m. Where the 1% AEP flood extent lies inside Zone 1, Zone 2 is 10 m wide.
7.4.5 Statutory and approval setbacks. Where a statute, a statutory rule, a condition of planning permission or the permission of the Deputy Commissioner or WRD's Embankment Officer under section 16 of the Assam Embankment and Drainage Act, 1953 for any building on, or removal or alteration of, an embankment or drain in a notified area; a condition of the District Level Committee or the State Level Committee for a scheduled water body under the Assam Urban Water Bodies (Preservation and Conservation) Act, 2024 (the Bill as introduced was read, ss.4 to 8 [TBC]); the approval of the Advisory Committee under section 14 of the Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 in a Designated Area; the views or permission of the Assam State Wetlands Authority or the Environment and Forest Department for a work in or next to Deepor Beel, a sanctuary or a notified wetland; a line of the Master Plan for Guwahati 2025 or another Master Plan, such as its 15 m strip from the Brahmaputra bank; or a direction of the Gauhati High Court, the National Green Tribunal or the Supreme Court sets a setback wider than Zone 1 or Zone 2, the wider setback governs for the uses it restricts.
7.4.6 Fixed-width setback where no 1% AEP extent is available. Where Clause 7.3.4 does not require a hydraulic study and no map has been adopted, the setback (Zone 1 plus Zone 2) shall be not less than the following, measured as in Clause 7.4.3:
Table 7.1 — Fixed-width setback where no 1% AEP extent is available
| Waterbody | Total setback (Zone 1 + Zone 2) | Of which Zone 1 |
|---|---|---|
| Channel draining 8 ha to 65 ha | 25 m | 15 m |
| Channel draining 65 ha to 20 km² | 40 m | 15 m |
| Channel draining more than 20 km², and rivers | 50 m | 20 m |
| Tank, lake or pond | MWL contour + 25 m | to MWL contour, and not less than 15 m from FTL |
| Marsh, estuary or backwater | as notified by the Authority, and not less than 50 m | 15 m |
This table is the alternative S-3 of the Policy Supplement (Annex 1C) and may be adopted under Clause 1.7.
7.4.7 Minimum in all cases. No setback under this chapter, and no variance under Clause 1.10, shall reduce Zone 1 below 15 m (Clause 1.10.3(c)).
Commentary. The 15 m minimum is set by this Manual, as the floor of a hydraulic corridor where no wider line binds. Assam's distances from water are in its building rules: byelaw 26(ix), repeated as byelaw 44(ix), of the Assam Unified Building Construction (Regulation) Byelaws, 2022 (Assam Gazette Extraordinary No. 688, 15.10.2022), not amended in this respect in 2024 (NEER reading of the amendment's index [TBC]), sets "The minimum distance of any building from the edge of natural drainage channels" at 15 m from a river "as marked in the plan" and from the notified water bodies Deepar Beel and Silsako, 10 m from the Bharalu, Mora Bharalu and Bondajan and from other large ponds, and 6 m from other channels and other notified water bodies such as Sarusola and Barsola; minor drains and small ponds not marked in the plan take only the building setbacks. The Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024 points its "no construction zone within a buffer around the Water Bodies" to the Master Plan and to these byelaws (s.5). The 15 m floor equals the byelaw for rivers and for Deepor Beel and Silsako; it is half as wide again as the 10 m of the Bharalu, Mora Bharalu and Bondajan and of large ponds, two and a half times the 6 m of other channels and other notified water bodies, and it reaches the minor drains and small ponds that the table leaves to the building setbacks. The byelaw measures from the channel's edge; this Manual measures from top of bank or FTL, or from the 1% AEP extent where that is wider. It applies to new development and redevelopment approved under this Manual, not to existing buildings; and where Zone 1 land is patta land, it is reserved in the Master Plan or secured by agreement with the owner, not taken. It is this Manual's proposal, not a statutory width, and it never reduces a wider line (see the Disclosure below). Extending the setback to the mapped 1% AEP extent plus a margin follows the Kansas City Metro APWA Section 5600 (2025.01) two-zone structure:
- APWA Zone 1 (streamside) is measured from top of bank, and only utility and road crossings are allowed in it.
- APWA Zone 2 is the 1% AEP flood extent plus 10 ft (about 3 m), for streams draining 20–40 acres.
- APWA lowered the trigger for stream setbacks from 40 acres to 20 acres (about 8 ha) in 2025.01.
(MARC, APWA 5600 Policy Supplement, Nov 2025.) Clause 7.4.1(b) adopts the 8 ha trigger. This Manual's 10 m margin is wider than APWA's 10 ft and has no direct precedent. This Manual sets it because Assam flood maps are mostly coarser than US maps, the Brahmaputra and Barak floodplains on which the towns stand are flat and low, and Dibrugarh town is "1.5 m below the bed level" of the Brahmaputra (ADB, 2017) (so a small error in level moves the flood edge a long way), and the margin gives room for maintenance access along the waterbody.
The fixed-width table in Clause 7.4.6 is set by this Manual. Its channel widths are scaled from the 2006 APWA default stream buffers, which were 40 ft, 60 ft, 100 ft and 120 ft (12, 18, 30 and 37 m) for drainage areas of less than 40 acres, 40–160 acres, 160–5,000 acres and more than 5,000 acres (KC APWA 5600, 2006, §5605.3). They are rounded up and floored at the 15 m minimum. APWA offered a fixed-width table for the same reason: communities objected that the 1% extent is often unmapped for small drainage areas (MARC Supplement, 2025). The table should be replaced by mapped extents as soon as the Authority adopts them.
URDPFI (2015) reserves the area flooded at a 10-year frequency for parks and playgrounds, and allows residential use in the 25-year flood zone only on stilts, with minimum plinth levels and no basements. This chapter is stricter. It keeps habitable buildings out of the whole 1% AEP extent plus margin, because the 1% AEP (100-yr) event is the major-system standard of this Manual (Chapter 6).
Assam's setbacks from water are in its building rules. Byelaw 26(ix) of the Unified Byelaws 2022, repeated as byelaw 44(ix) in Part II [sub-item numbers read from the OCR layout; TBC: confirm against a clean copy], reads: "The minimum distance of any building from the edge of natural drainage channels shall be as given below": River (as marked in the plan), 15 m; Bharalu, Mora Bharalu & Bondajan, 10 m; Other channels, 06 m; Minor drains (not marked in the plan), "In accordance with setback requirements for buildings provided in the byelaws"; Notified water bodies (Deepar Beel, Silsako Waterbody), 15 m; Other notified water bodies (Sarusola, Barsola etc.), 06 m; Other large ponds/water bodies (as marked in the plan), 10 m; and Small ponds (not marked in the plan), as for the building setbacks. The same table stood in the Guwahati Building Construction (Regulation) Byelaws, 2014, which also kept "river edge etc." in a "Reserved Forest & Conservation Area" where "No development should normally be allowed"; the 2024 amendment did not change it (NEER reading of the amendment's index [TBC]). The table names only Guwahati's channels and beels although the byelaws now extend to every notified Master Plan area in the State, and "as marked in the plan" ties the river and pond rows to the Master Plan maps (NEER reading). The Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024 makes the District Level Committee "ensure no construction zone within a buffer around the Water Bodies as prescribed in the Notified Master Plan and Assam Unified Building Construction (Regulation) Bye law, 2022" (s.5); that buffer is this table. The Master Plan for Guwahati 2025 adds, on the riverfront strip from Sonaram High School to the foothills of Kamakhya, that "No construction shall be allowed within a distance of 15m from river bank" (schedule of modification), and classes "All notified forest, water bodies, rivers etc." as Eco-Sensitive Zone. Byelaw 44(iii) [TBC: numbering] lets the Authority refuse or modify a proposal "if the site is near a water body or water course" and the development is likely to contaminate it or "change the course of the channel", or if the site is likely to be inundated without proper drainage, or "is a filled up tank or low lying"; byelaw 117 excludes multistoreyed buildings from "Areas falling on or abutting natural drainage channels", "Areas falling on or abutting wetlands" and "Government land in the hills and in the water bodies like beels". Under the Assam Embankment and Drainage Act, 1953, no one may build on, remove or alter an embankment or drain in a notified area without the permission of the Deputy Commissioner or the Embankment Officer, on pain of up to three years and ₹1,000 and removal at the offender's cost (s.16), but no setback distance from an embankment was found [TBC]. The Gauhati Municipal Corporation Act, 1969 bars occupying a building "within one hundred feet of a municipal drain" until it is drained to that drain (s.244); that is a duty to connect, not a setback. The rules leave gaps for drainage: the table's distances run from a channel's "edge", which is not defined; the Bharalu, Mora Bharalu and Bondajan, which carry most of Guwahati's storm water and sewage, get 10 m and other channels 6 m; minor drains and small ponds not marked in a plan get only the building setbacks; nothing keeps building back from an embankment; and outside notified Master Plan areas, and in the Autonomous Districts unless a Council opts in, the byelaws do not apply at all. Clause 7.4.7 makes 15 m the floor of Zone 1 everywhere the Manual applies.
Disclosure. Assam has distances from water in its building rules, but they are narrow along the channels that carry most of the towns' water, they name only Guwahati's channels and beels, and they keep nothing back from an embankment: byelaw 26(ix), repeated as byelaw 44(ix), of the Unified Byelaws 2022 [sub-item numbers read from the OCR layout; TBC: confirm against a clean copy] gives 15 m from a river and from Deepor Beel and Silsako, 10 m from the Bharalu, Mora Bharalu and Bondajan and from large ponds, and 6 m from other channels and other notified water bodies, measured from "the edge of natural drainage channels", with only the building setbacks for minor drains and small ponds; it applies in notified Master Plan areas and, in the Autonomous Districts, only where a District Council opts in (byelaw 1(2); none has [TBC]); no distance from an embankment was found; and no floodplain zoning law has been enacted. The 15 m minimum Zone 1 of Clauses 7.4.3 and 7.4.7, and every value derived from it in Table 7.1, is set by this Manual as a hydraulic corridor where nothing wider binds: along every natural channel draining 8 ha or more, jan, juri or river, whether or not a plan marks it, and round every beel and pukhuri. So are the setback zones of Clause 7.4, the 1% AEP extent that governs Zone 2, this Manual's three reference lines, its reading of the boundary of a beel or pukhuri and of the ponded area behind an embankment, and its rules on char and chapori land (definitions after Clause 7.2). They are this Manual's proposal, not a statutory width or rule, and no government body, Authority, committee or District Council has adopted or endorsed them. The 15 m Zone 1 equals the byelaw for rivers and for Deepor Beel and Silsako, and is stricter than the byelaw for the Bharalu, Mora Bharalu and Bondajan and for large ponds (10 m), for other channels and other notified water bodies (6 m), and for minor drains and small ponds (building setbacks only). It applies to new development and redevelopment approved under this Manual, not to existing buildings; Clause 7.4.7 allows no variance below it; and where Zone 1 land is patta land, it is reserved in the Master Plan or secured by agreement with the owner, not taken (in an Autonomous District, through the District Council [TBC]). The byelaw measures from a channel's "edge"; this Manual measures Zone 1 from top of bank or FTL, and Zone 2 from the 1% AEP extent. The setback is applied as whichever of the three reference lines and its setback reaches furthest (definitions after Clause 7.2), so the Manual is stricter than statute along the town channels, the jans and the smaller beels and ponds, and no less strict anywhere. What exists, and governs wherever it is wider or stricter (Clause 7.4.5), is:
- The Unified Byelaws 2022, as amended in 2024. The distances of byelaw 26(ix) / 44(ix) above, which the Applicant states on Form 7-1; where 10 m or 6 m is narrower than Zone 1 it never governs alone. Byelaw 44(iii) [TBC: numbering] lets the Authority refuse a site near a water body or water course, a site likely to be inundated, or "a filled up tank or low lying" site; byelaw 117 keeps multistoreyed buildings off land on or abutting natural drainage channels and wetlands and off government land "in the water bodies like beels"; byelaw 45(c) sets the plinth 0.3 m (0.6 m for lifeline buildings) above "the highest recorded flood level as fixed by the local authority", and this Manual's floor of the 1% AEP level plus 0.5 m (Clause 7.6.6(b); Chapter 6) governs where it is higher; byelaw 66(3) bars basements "in low-lying areas and areas without adequate drainage facilities".
- The water-bodies law. The Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024 makes the District Level Committee "ensure no construction zone within a buffer around the Water Bodies as prescribed in the Notified Master Plan and Assam Unified Building Construction (Regulation) Bye law, 2022" (s.5), which is the byelaw table; it bars filling that may "reduce the size of the waterbodies", any structure "either Concrete or RCC or Iron except nature based solutions", and any "obstruction in the natural and normal course of inflow and outflow of water into or from the waterbody" without permission (s.15), with up to three years or ₹1 lakh or both and restoration (s.16). It repeals the Guwahati Waterbodies (Preservation and Conservation) Act, 2008 (s.22(1)); the enacted text was not read, so these are the Bill's section numbers [TBC]. The 2008 Act set no distance; its Schedule IV is land near Deepor Beel, not the beel itself.
- The Master Plans. In Guwahati, the 15 m no-construction strip from the Brahmaputra bank between Sonaram High School and the Kamakhya foothills, and the Eco-Sensitive Zone that takes in "All notified forest, water bodies, rivers etc." (Master Plan for Guwahati 2025, Gazette No. 198, 9 July 2009, and its schedule of modification); the draft Master Plan 2045 is not in force. The lines of the other towns' Master Plans were not read [TBC].
- The embankment law. Section 16 of the Assam Embankment and Drainage Act, 1953 requires permission for any building on, or removal or alteration of, an embankment or drain in a notified area; it sets no distance [TBC].
- Wetlands, courts and custodians. Deepor Beel Wildlife Sanctuary and the Ramsar site, whose denotification the Gauhati High Court has stayed (05.04.2024); its eco-sensitive zone exists only in draft (as reported); any wetland notified under the Wetlands (Conservation and Management) Rules, 2017 (none was found); the orders of the Gauhati High Court, the National Green Tribunal and the Supreme Court as they stand; and WRD's lines at its embankments and sluices.
This Manual sets 15 m as the floor because the town channels that carry most of the storm water and sewage get only 10 m or 6 m from an undefined edge, and the jans and ponds not marked in a plan get nothing beyond the building setbacks; because 15 m is the byelaws' own distance for a river and for the two largest notified water bodies, and above the smallest APWA default stream buffer (12 m) from which Table 7.1 is scaled; and because a town channel needs room for desilting by machine, which is the main maintenance the towns already do. The reasons for the corridor are the record: the drains and channels are silted and built over ("construction of buildings and roads over the manmade drains"; "indiscriminate cutting and quarrying of hill slopes for filling up of low lying areas results in sheet wash and blockage of channels", ADB, 2017); builders blocked channels and filled wetland at Palasbari, causing "artificial floods" (Gauhati High Court, PIL/53/2023, order of 06.09.2024); and Guwahati spent ₹32.57 crore on desilting between 2013-14 and 2017-18 while it had no data on its storm-water drains (CAG Report No. 4 of 2019). Until a byelaw amendment, a Master Plan, a schedule under the water-bodies law or a court adopts it, the 15 m minimum is this Manual's recommended standard, and the byelaws, the Master Plans, the water-bodies law and the orders above remain the only legal minimum. Approving authorities should state in each approval which was applied.
Figure 7.1 — Waterbody setback zones: section through a tank or channel showing FTL, the 1% AEP flood level, the 15 m minimum line, Zone 1 and Zone 2. Original drawing for this Manual, adapted from Kansas City Metro APWA, Section 5600 Version 2025.01 and Policy Supplement (MARC, 2025).
7.5 Uses permitted in each zone
7.5.1 Zone 1. No building, fill, paving, retaining wall, boundary wall, compound wall, dumping of earth, debris or solid waste, storage of materials, or construction-stage stockpile shall be placed in Zone 1. Only the following are permitted, each subject to the custodian's NOC:
- (a) road, rail and utility crossings that meet Clause 7.10.3;
- (b) flood and drainage works: outfalls, inlet structures, gross pollutant traps, sluices, surplus weirs, bund strengthening and bank protection;
- (c) native vegetation, planting and habitat works;
- (d) unpaved or permeable footpaths and maintenance tracks at existing ground level; and
- (e) waterbody restoration under Clause 7.9.
7.5.2 Zone 2. No habitable building, basement, school, hospital, fuel store or hazardous-material store shall be placed in Zone 2. The following are permitted:
- (a) all uses permitted in Zone 1;
- (b) parks, playgrounds, open-air sports fields and urban agriculture;
- (c) open-sided structures (shelters, pavilions) with no walls that obstruct flow;
- (d) surface parking with permeable surfacing at existing ground level, where the 1% AEP flood depth is not more than 0.3 m;
- (e) retention, detention and water quality facilities under Chapters 4 and 8, provided they are outside the floodway and their storage is not counted twice (Clause 7.6.5); and
- (f) fill, only for (a) to (e) or for essential public infrastructure, and only with compensatory storage under Clause 7.6.4.
7.5.3 Fences. Fences in Zone 1 and Zone 2 shall be open (chain-link or railing) with no plinth wall above existing ground level, so that they do not obstruct flow or trap debris.
7.5.4 Open space reservation. Zone 2 land may be counted toward the open space required by the Assam Unified Building Construction (Regulation) Byelaws 2022, where the Authority agrees. Zone 1 land shall be handed over to the custodian or kept free of private use, as the Authority decides.
Commentary. The permitted uses follow APWA 2025.01: in Zone 1, only utility and road crossings; in Zone 2, linear utilities, trails and open-sided structures; no clearing, grading, fill or paving in either zone without approval (MARC Supplement, 2025). Clause 7.5.2 adds parks and playgrounds, the uses URDPFI (2015) allows in the 10-year flood zone. The ban on walls in Clauses 7.5.1 and 7.5.3 responds to urban Assam practice: compound walls along channels and tanks act as dams in floods, and are often the first step toward encroachment. The 0.3 m depth limit for parking in Clause 7.5.2(d) has no direct precedent and is set by this Manual.
7.6 Floodway, flood fringe and compensatory storage
7.6.1 Floodway delineation. The floodway shall be delineated by a hydraulic model of the 1% AEP flood (with the climate factor), using the encroachment method: the conveyance of the flood fringe is removed equally from both banks until the 1% AEP water level rises by 0.1 m. Where the floodway has not been delineated, the whole 1% AEP flood extent shall be treated as floodway. For a tank, all land below MWL is floodway.
7.6.2 No fill in the floodway. No fill, building, embankment, raised road or other obstruction shall be placed below the 1% AEP flood level within the floodway, except the works permitted in Zone 1 under Clause 7.5.1(a) and (b). Those works shall be shown by hydraulic analysis to raise the 1% AEP water level by no more than 0.01 m, upstream or downstream, outside the Applicant's land.
7.6.3 Fill in the flood fringe. Fill below the 1% AEP flood level in the flood fringe is permitted only:
- (a) for uses permitted under Clause 7.5.2, or outside the setback where the Authority has notified a developed-fringe area under Clause 7.6.6; and
- (b) with compensatory storage under Clause 7.6.4.
7.6.4 Compensatory storage. Where fill is placed in the flood fringe, compensatory storage shall be provided that (Figure 7.2):
- (a) replaces at least 1.0 m³ of storage for each 1.0 m³ of fill placed below the 1% AEP flood level;
- (b) is provided at equivalent levels: the volume lost and the volume replaced shall be balanced in each elevation band of not more than 0.3 m, from the normal water level (or the 50% AEP level, where higher) up to the 1% AEP flood level;
- (c) is in the same reach of the same waterbody, hydraulically connected to it, and not further downstream than the fill;
- (d) drains freely by gravity back to the waterbody as the flood recedes, with no pumping and no permanent pool below the normal water level;
- (e) is built before, or at the same time as, the fill is placed; and
- (f) is secured by a covenant or handover so that it is never filled later.
7.6.5 No double counting. Compensatory storage shall not be counted as detention or retention storage under Chapter 4. Detention and retention storage placed within the 1% AEP flood extent shall be counted only for the volume above the 1% AEP flood level, unless a model of the joint event (Clause 2.12) shows that it is available.
7.6.6 Developed-fringe areas. The Authority may notify, by map, areas of existing built-up land within the 1% AEP flood extent but outside the floodway, where it is impractical to apply Zone 2 to redevelopment. In a notified developed-fringe area:
- (a) redevelopment may be approved without the Zone 2 restriction;
- (b) the lowest habitable floor and all openings shall be at least 0.5 m above the 1% AEP flood level (Chapter 6);
- (c) basements are not permitted;
- (d) the redevelopment shall cause no net loss of flood storage below the 1% AEP flood level (Clause 7.6.4), and stilt construction may be used for this; and
- (e) Zone 1 continues to apply in full.
Commentary. The 1:1 compensatory storage at equivalent levels is set by this Manual. A simple volume balance is not enough: storage excavated below the normal water level is full before the flood arrives and gives no flood benefit. Storage gained high up does not replace storage lost low down, because the low storage is used in every flood and the high storage only in the largest. Balancing volume within each elevation band avoids both problems. The 0.3 m band, the 0.01 m allowance for crossings, and the use of the encroachment method in Clause 7.6.1 are set by this Manual; the encroachment method is the standard way to delineate a floodway in a one-dimensional hydraulic model. The 0.1 m limit on the rise in the 1% AEP water level is tighter than the 1 ft (about 0.3 m) used by the US National Flood Insurance Program. The Brahmaputra and Barak floodplains are flat, the low ground of Guwahati and its beels lies below the high stage of the Brahmaputra, and Silchar is a bowl behind the Barak embankment, so a small rise in level spreads flooding over a wide area, and many small encroachments along the same channel add up.
In Assam the byelaws measure setbacks from "the edge of natural drainage channels", and the 2008 Act's schedules fix water bodies by dag number, but neither gives a line for the edge of a beel whose water spreads and shrinks through the year. The difference matters because the beels are shrinking: Deepor Beel's water spread is reported at about 10.1 km² in the dry season and up to 40.1 km² in floods, and its loss since 1991 at "about 35%" (figures of 14.1% and about 405 ha in other sources conflict); Urpad Beel's water area is reported to have fallen from 4.84 km² in 2003 to 3.38 km² in 2023, and Chandubi's from 203.2 ha in 1997 to 186.5 ha in 2007 (all as reported). A line drawn from the edge of the water in the dry months would leave the beel's own flood storage open to building, and one drawn from today's edge would give up its lost area for good. This Manual gives every beel and pukhuri a boundary measured from a high level, not from the water's edge on the day of survey: the edge of its water in the season and its recorded dag boundary are part of its boundary (definitions after Clause 7.2), and the foreshore up to MWL is its flood storage. Treating all land below MWL as floodway (Clause 7.6.1) means that no new building or fill is approved in a tank foreshore.
The developed-fringe mechanism of Clause 7.6.6 is set by this Manual. Large parts of Guwahati's Bharalu basin, where Anil Nagar, Nabin Nagar, Rajgarh Link Road, Rukminigaon, Hatigaon and Krishna Nagar were inundated in June 2022 (as reported), of Dibrugarh behind the DTP dyke, and of Silchar behind the Barak embankment already lie within the 1% AEP extent. A blanket Zone 2 ban on redevelopment there would stop the replacement of older, lower buildings with buildings raised above flood level. The mechanism follows the URDPFI (2015) approach for the 25-year flood zone (stilts, minimum plinth, no basements), applied here to the 1% AEP extent.
Figure 7.2 — Compensatory storage by elevation band: section through the flood fringe showing fill placed below the 1% AEP flood level and an equal or greater volume excavated within each band of not more than 0.3 m, from the normal water level (or 50% AEP level) up to the 1% AEP level, with the excavation draining back to the waterbody by gravity. Band-by-band calculation on Form 7-3. Original drawing for this Manual, illustrating the method of Clause 7.6.4, which is set by this Manual.
7.7 Tank cascades as design storage
Assam has no tank Act and no irrigation tank cascades, and its standing waters range from a village pukhuri to Deepor Beel. The storages that matter for urban drainage are of five kinds. The first is the beels that receive a town's runoff: in Guwahati, Deepor Beel, whose perennial water spread of about 10.1 km² is reported to reach 40.1 km² in floods (as reported; no stage–storage relation was found [TBC]), fed by the Basistha and the Kalmani and draining to the Brahmaputra by the Khanajan, with the Mora Bharalu a polluting inflow; Silsako, to which part of the Bahini's runoff is to be diverted "to a retention basin in the nearby Silsako Basin and gradually pumped out to the Brahmaputra River" (ADB, 2025); Borsola and Sorusola; and, at Dibrugarh, Larua Jamira beel on the town's drain to the Sessa. Elsewhere Son Beel in Karimganj district, Urpad Beel in Goalpara and Chandubi are among the large beels (their areas conflict and are given in Clause 7.12, Commentary). The second is the retention ponds now being built for flood storage, of which the first is the ADB's "nature-based flood retention pond of 59,000 m3 and a pumping station with capacity of 1.6 m3 per second" in the Bahini basin (ADB, RRP, 2025); these are detention ponds, never pukhuris or beels. The third is the ponded area behind an embankment, which stores the town's runoff while its sluices are shut (definitions after Clause 7.2). The fourth is the pukhuris, the dug tanks of the towns and villages, among them historic tanks such as Joysagar, Jor Pukhuri and Dighalipukhuri, named here only as examples of the word (not researched [TBC]); no levels, areas or outlet records were found for any of them [TBC], so their storage is modelled as an existing feature and not counted unless Clause 7.7.1 is met. The fifth is the village beels and hola land, modelled as existing features where they intercept runoff but never counted as storage, because they are not surveyed, have no controlled outlet and are full by the time of the peak storm. The Fisheries Department's register lists 2,072 beels with 71,843.5 ha in 2021-22, and 447 registered and 1,625 unregistered beels in the next count (as quoted from the Statistical Handbook; the change is in the counting); the National Wetland Atlas (2011) puts the State's wetlands at 764,372 ha, 9.74% of its area. These are the waterbodies for which Figure 7.3 and Clause 7.8 matter: in a floodplain town every drain ends in a jan or a beel, and every beel in a sluice through the embankment that the river closes. Any beel, pukhuri or pond whose storage is to be counted is subject to Clause 7.7.1 in full, with WRD where the outlet is its sluice and with the other custodian where it is not, and the custodian of each shall be confirmed for the inventory (Annex 7A) [TBC].
7.7.1 When tank storage may be counted. The storage of a tank or tank cascade may be counted as design storage (in a basin plan, a regional facility or a fee-in-lieu scheme under Clause 7.11) only where all of the following are met:
- (a) Surveyed levels. FTL, MWL, TBL, the surplus weir crest and length, and the sluice sill levels have been surveyed to the datum of Clause 7.3.5 within the previous 5 years.
- (b) Stage–storage curve. A stage–storage curve has been derived from a bathymetric and topographic survey of the waterspread and foreshore within the previous 5 years, or after the last desilting, whichever is later.
- (c) Operating rule. A documented operating rule has been agreed with the custodian (Clause 7.8).
- (d) Maintained structures. The surplus weir, sluices and bund are maintained under an O&M plan (Chapter 10), and the latest pre-monsoon inspection found them serviceable.
- (e) Custodian concurrence. WRD, or the other custodian, concurs in writing.
Storage in a tank that fails any of (a) to (e) shall not be counted, though the tank shall still be modelled as an existing feature (Chapter 3).
7.7.2 Modelling. Tank cascades shall be modelled under Clause 3.12.5 (level-pool routing of each tank, with surplus weir and sluice ratings) and Clause 3.13 (continuous simulation). The whole cascade, from the uppermost tank whose surplus can reach the site or facility to the next river, major drain or sea outfall, shall be modelled together, including, for a floodplain town behind an embankment, every beel and pukhuri that stores its runoff, the jans that join them, the outfall sluice and pumps through the embankment, and the river stage at the outfall that closes the sluice (Clause 5.8.5), as shown in Figure 7.3.
7.7.3 Starting level. The starting level in every tank shall be FTL for the design-storm analysis. A lower starting level may be used only under a flood-cushion operating rule that meets Clause 7.8.
7.7.4 Design maximum level. For the 1% AEP inflow with the climate factor, routed through the cascade:
- (a) the computed maximum level shall be not higher than MWL (as defined in Clause 7.2); and
- (b) the freeboard from the computed maximum level to the lowest point of the bund (TBL) shall be not less than WRD's freeboard standard for the tank.
Where (a) or (b) fails, the tank storage above FTL shall not be counted until the surplus weir capacity is increased or the bund raised under Clause 7.7.6.
7.7.5 Creditable volume. The creditable design storage of a tank is the volume between the starting level (Clause 7.7.3) and the computed maximum level of Clause 7.7.4, less any volume already committed to another facility or scheme.
7.7.6 Changes to FTL, weirs and bunds. No surplus weir crest shall be raised or lowered, no shutters or falling boards shall be added, and no bund shall be raised, cut or breached except under a design approved by the custodian that:
- (a) routes the cascade under Clause 7.7.2;
- (b) shows the effect on flood levels in the foreshore and upstream, and on flows in the surplus course and downstream; and
- (c) checks the bund under Clause 7.14.
Commentary. This Manual allows tank cascades to be used as design storage subject to three basic conditions (surveyed FTL, a documented operating rule and maintained surplus weirs). Clause 7.7.1 adds the stage–storage survey and the custodian's concurrence, because the storage a tank actually offers depends on its silt level and on who controls the sluices. The 5-year survey interval is set by this Manual.
The FTL starting level follows Clause 3.12.5. In Assam the starting level of a beel is its outlet level because the outlet is shut when the river is high. The design of Dibrugarh's drain outfall checks the "backwater affect … at the sluice with a flood level of 97.50 m", "keeping in mind that the beel is full and the drain is also flowing full" (ADB, 2017): this Manual takes the same case as the rule for every beel or pond that drains through a sluice or a gated pumped outfall (Clause 5.8.5(a) and (e)). At Guwahati the Brahmaputra reaches its danger level of 49.68 m at the DC Court gauge in most monsoons, and its highest flood level is 1.78 m higher (CWC levels as transcribed by SANDRP; NEER reading of the gap), so the outfalls are designed for gates closed for days to weeks; with the Bharalumukh sluice gates closed the city's main channel drains only by pumps, reported in 2008 at 7 m³/s against 72 m³/s by gravity (as reported; the present capacity was not found [TBC]). The beels themselves fill and spread through the season: Deepor Beel's water spread is reported at about 10.1 km² in the dry season and up to 40.1 km² in floods (as reported). The Manual's season begins on 1 April because large falls come before the south-west monsoon (Dibrugarh (Mohanbari) 231.5 mm on 10 May 1996 and Dhubri (Rupsi) 479.3 mm on 28 May 1989, IMD) as well as during it, so a beel or pukhuri may be full at any time from April to October. No record of how long any beel stays at or above its outlet level in a wet spell, or of how long any sluice stays closed, was found [TBC]. While a beel is full and its sluice shut, it stores nothing more below FTL, and the drains and jans that flow into it discharge against its level. A tank cascade passes floods from one tank to the next, so a design that counts storage in one tank and ignores the surplus arriving from the tank above it will overstate the benefit. That is why Clause 7.7.2 requires the whole cascade to be modelled.
Figure 7.3 — A floodplain town behind an embankment: its drains, jans, beel and pukhuri, and the outfall sluice at low and high river stage (schematic, not to scale; no particular town, beel, sluice or landmark is shown). A: in plan, the town stands on the floodplain behind a river embankment (mothauri). Its lined drains and nalas fall to a jan, a stream or natural drainage channel, which runs to a beel, the natural floodplain lake or wetland that stores the town's runoff; the beel drains by its outfall jan to a sluice (pani-duwar) through the embankment, with a flap gate on the river side and a pump station beside it (Clause 5.8.5; Chapter 9). Every drain outfall to the jan and the beel has a dry-weather-flow interceptor and a screen, because the drains carry sewage (Clause 8.9). A pukhuri, a dug tank, stands in the town; it is modelled as an existing feature and counted as storage only under Clause 7.7.1. On the hill fringe, juri streams from the hills pass silt traps at the break of slope before they reach the town's drains (Clauses 6.3.6(m) and 8.12). Zone 1 is at least 15 m from the top of bank of the jan and from the FTL of the beel and the pukhuri, and Zone 2 runs to the 1% AEP extent plus 10 m (Clause 7.4). No infiltration is credited on the floodplain (Clause 4.11, floodplain rule). A char in the river is marked as hazard-first ground with no permanent drainage works (Clause 2.3.6(i)). B: in section through the embankment, at low river stage the gate is open and the beel drains by gravity; at high stage the gate is shut, the beel starts full to its outlet level and stores the inflow, and the pumps lift it over the embankment (Clauses 5.8.5 and 7.7.3). The 15 m minimum, the interception rule, the starting level and the infiltration rule are this Manual's proposals; the Unified Byelaws 2022, the water-bodies law, the Assam Embankment and Drainage Act, 1953 and the courts' orders govern where they say more. Original drawing for this Manual.
7.8 Operating rules and pre-monsoon flood cushion
7.8.1 Operating rule content. Every tank whose storage is counted under Clause 7.7 shall have a written operating rule, agreed by the custodian and kept with the O&M plan (Chapter 10). It shall state:
- (a) the levels and dates for filling, holding and drawdown through the year;
- (b) the sluice and regulator settings at each level;
- (c) who operates the sluices and regulators, and who may order a release;
- (d) the maximum release rate, set so that the release, added to the flow from the downstream catchment, does not cause flooding of buildings downstream;
- (e) the forecast and warning triggers (IMD district warnings, ASDMA alerts, and city forecast systems where available) and the actions taken at each trigger;
- (f) communication with downstream ULBs and residents before any release; and
- (g) the records to be kept: daily levels in the monsoon, releases, and gate settings.
7.8.2 Flood cushion. A tank may be operated with a flood cushion (a level below FTL during part of the monsoon), and the cushion counted under Clause 7.7.3, only where:
- (a) the tank has a gated sluice, regulator or other controllable outlet able to draw the tank down to the cushion level in the time stated in the rule;
- (b) the operating rule fixes the cushion level and the dates it applies;
- (c) continuous simulation (Clause 3.13) shows that the cushion is available at the start of a design storm in at least 90% of monsoon seasons in the record, allowing for the rain that usually comes before the peak storm;
- (d) the custodian accepts any loss of irrigation or water-supply yield, and any agreed compensation is recorded; and
- (e) the release needed to create or restore the cushion meets Clause 7.8.1(d).
7.8.3 No storage credit without control. Where a tank has no controllable outlet, no flood cushion shall be assumed, whatever the past practice.
7.8.4 Coordination. For tanks under WRD control, the operating rule shall be WRD's rule. This Manual does not authorise any other body to operate a WRD tank.
Commentary. No beel or pukhuri in Assam was found with a written operating rule, and most have no gates to operate. Where a beel drains through an embankment, its only controllable outlet is a sluice that WRD holds, and WRD's sluice operating rules and closure periods were not found [TBC]; the sluices close because the river rises, not because a forecast is issued, and the law makes it an offence to open, shut or obstruct one without authority (Assam Embankment and Drainage Act, 1953, s.15(ii)). The town's pumps at the outfall, where they exist, are the only means of drawing a beel down while the river is high, and they are small for the floods they serve: at Bharalumukh 7 m³/s against 72 m³/s by gravity (2008, as reported), and the ADB's Bahini works add 7.8 m³/s in three stations and a pump of 1.6 m³/s at the new retention pond (ADB, 2025). Without an agreed rule with dates, levels, pumping rates and a named operator, storage in a beel cannot be relied on, and a release made without warning to the land downstream is itself a flood. Clause 7.8.2 turns that principle into a rule that can be checked, with a reliability test, because a cushion that is refilled by the April and May storms gives no protection when a June to August monsoon storm, such as those of June 2022, arrives after weeks of rain. The 90% reliability in Clause 7.8.2(c) has no direct precedent and is set by this Manual.
For a beel or pukhuri with no controllable outlet, Clause 7.8.3 is the governing condition: no cushion is assumed, a design that relies on it routes the storm through it from its outlet level, and the outflow is limited by the jan below it and, at the embankment, by the sluice and the river stage. A cushion made by pumping is counted only where the pumps, their standby power and their operator are in the rule and were certified ready by 31 March (Chapter 10). Many beels are fisheries, settled or registered by the Fisheries Department, and some pukhuris belong to religious institutions or private owners, which is why Clause 7.8.2(d) requires the custodian to accept any drawdown and any loss to the fishery, and why no detention pond built under this Manual is called a pukhuri or a beel.
7.9 Restoration, desilting and deepening
7.9.1 Pre-works survey. Before any desilting or restoration, the proponent shall:
- (a) survey the waterspread, foreshore, bund, weirs and sluices (Clause 7.7.1(a) and (b));
- (b) find the original bed level by test pits or augering on a grid, and from historical records where available; and
- (c) where the tank receives urban runoff or sewage, test the silt for heavy metals and other contaminants before disposal is planned.
7.9.2 Desilting limit. Desilting shall remove accumulated sediment down to the original bed level. It shall not deepen the tank below the original bed, except under Clause 7.9.3.
7.9.3 Deepening. Deepening below the original bed is permitted only where a hydrogeological report shows that:
- (a) it will not cut through a clay or silt layer that holds water in the tank or protects an aquifer from polluted water;
- (b) in coastal areas, it will not draw saline water into the tank or the aquifer; and
- (c) the extra storage will be refilled and used, and will not stand stagnant below the sluice sill.
Storage created below the lowest sluice sill shall not be counted as flood storage.
7.9.4 Safe edges. Where the public has access to the waterbody edge:
- (a) side slopes shall be no steeper than 1V:4H from 0.5 m above FTL down to 1.2 m below FTL, or a level safety bench at least 3 m wide shall be provided between 0.3 m and 0.5 m below FTL; and
- (b) no isolated deep pit or vertical cut shall be left in the bed.
7.9.5 Storage not to be reduced. Restoration shall not reduce the storage below MWL. Islands, walkways, bund widening into the waterspread, ring roads, parking, buildings and "lake-front" platforms within the waterspread or foreshore shall be counted as lost storage and shall be offset under Clause 7.6.4.
7.9.6 Silt disposal. Desilted material shall not be placed within the setback, on the bund (except for approved bund strengthening), or on any flood path. Silt found to be contaminated shall be disposed of as the Pollution Control Board, Assam (PCBA) directs.
7.9.7 Inlet treatment. Every restoration of a tank that receives urban runoff shall include sediment and gross pollutant control at each inlet: a sediment forebay, a constructed wetland inlet zone, or a gross pollutant trap (Chapter 8), so that the restored storage does not silt up again.
7.9.8 Timing. Desilting shall be completed, and the waterbody made safe, by 31 March each year (Chapter 10).
Commentary. No State or municipal order fixing a date for the pre-monsoon cleaning of drains, jans or beels was found: in Guwahati, drain cleaning was "expected to begin from mid-February" in 2026, desilting SOPs "issued in February 2025" are said to have been "largely ignored", and the Mayor said that "The necessary work will be completed before the monsoon" (all as reported). The cleaning is large and recurrent: GMC spent ₹32.57 crore on desilting from 2013-14 to 2017-18 (CAG Report No. 4 of 2019); "Most of the drains directly or indirectly fall into Bharalu River … due to siltation, the bed level of the river has considerably risen" (ADB, 2017); and GMDA is excavating Silsako as a retention basin (as reported). The date of 31 March in this Manual is set by this Manual, before its season begins on 1 April, because Guwahati's April storms come early (116.5 mm on 6 April 2004, IMD, and 117.4 mm at the airport on 20 April 2026, as reported) and four of the State's station 24-hour records are May storms (IMD); because storms also follow, the jans, racks and silt traps are cleared again by 31 May, before the south-west monsoon arrives, and after it by 15 November (Chapter 10). WRD's works dates in the press are for embankments, not drains, and remain WRD's. Excavation to "increase capacity" is governed by Clause 7.9.3. In a beel, the clay and silt of the bed hold the water above a water table that is near the surface in the monsoon (Chapter 8), and the silt of a town beel is laden with sewage: every desilting of a beel or pukhuri that receives town drains tests the silt under Clause 7.9.1(c) and disposes of it as the PCBA directs, and no work in Deepor Beel, its sanctuary or a scheduled water body is begun without the permissions of Clause 7.12. The 31 March deadline matches the pre-monsoon inspection date of Chapter 10. The limits on deepening are set by this Manual. Deepening tanks to "increase capacity" is common, but it can breach the silt and clay layer that holds water in the tank, it can let polluted urban water reach the aquifer, it can draw salt water toward the coast, and it creates storage below the sluice sill that never empties and gives no flood benefit. Deep pits with steep sides are also a drowning hazard. The slope and bench values in Clause 7.9.4 are adapted from common pond-safety practice; they have no Assam precedent.
7.10 Supply channels, surplus courses, inlets and outlets
7.10.1 Part of the major system. Supply channels and surplus courses are part of the major drainage system (Chapter 6). They shall be protected as waterbodies, with Zone 1 and Zone 2 setbacks under Clause 7.4.
7.10.2 No closure or covering. No supply channel or surplus course shall be closed, filled, diverted, covered, culverted along its length, or converted into a road or a closed drain, except under a design approved by the custodian that keeps or increases its 1% AEP capacity and its access for maintenance.
7.10.3 Crossings. Every road, rail, utility or access crossing of a waterbody, supply channel or surplus course shall:
- (a) pass the 1% AEP flow (with the climate factor), or the surplus of the upstream tank at its MWL, whichever is greater, with the freeboard required by Chapter 9;
- (b) not reduce the waterway width at the crossing below the full channel width as recorded in Revenue records or as surveyed, whichever is greater;
- (c) keep the channel bed level and grade; and
- (d) not raise the 1% AEP water level by more than the limit in Clause 7.6.2.
7.10.4 Capacity. The design capacity of a surplus course shall be the greater of the surplus weir discharge at MWL and the 1% AEP flow from its own catchment, combined as the cascade model (Clause 7.7.2) shows.
7.10.5 Protection at structures. Outlets of surplus weirs and sluices, and drain outfalls into waterbodies, shall have energy dissipation and scour protection designed under Chapter 9, so that the flow leaving them does not erode the bund, the bank or the channel bed.
7.10.6 Drain outfalls into waterbodies. A storm drain outfall into a tank, channel or wetland shall:
- (a) have its invert at or above the normal water level of the receiving waterbody, unless the drain is designed for submerged outfall under Chapter 5;
- (b) be located and aligned so that it does not cut through or weaken a tank bund;
- (c) have a gross pollutant trap and first-flush treatment (Chapter 8); and
- (d) not carry sewage or dry-weather flow (Chapter 8).
Commentary. This Manual protects supply channels and surplus courses as part of the major system. In urban areas they are often the first to be lost. Surplus courses are narrowed by culverts and compound walls, and supply channels are covered and turned into roads, which cuts the tank off from its source or leaves its surplus with nowhere to go. In Assam the municipal drains of Guwahati are the Corporation's to cleanse, alter and close (Gauhati Municipal Corporation Act, 1969, ss.231 and 234), the Commissioner may pull down a building erected "over any drain, conduit, water-course … vested in the Corporation" (s.239), no one may make a drain into a municipal drain without permission (s.242), and a connecting drain vests in the Corporation (s.250(2)); the outfall power is permissive (s.232), and no outfall duty like that of the Assam Municipal Corporation Act, 2022 was found in the 1969 Act [NEER reading]. In the other Municipal Corporations the public drains vest in the Corporation (AMC Act, s.173), which must provide "a safe and sufficient outfall … for effectual drainage and proper discharge of storm-water and sewage" (s.171). Embankments and the drains, sluices and "dongs" of the 1953 Act are WRD's, and vest in the State (s.14). Roadside drains are PWD's or NHAI's, and the Railways, OIL, the Army and others hold their own (as reported). No notification assigning the Bharalu, Mora Bharalu or Bahini to one owner was found [NEER reading], and the ADB names "fragmented institutional responsibilities involving multiple institutions, such as the Guwahati Metropolitan Development Authority (GMDA), Public Works Department, and Water Resources Department" as the problem (RRP, 2025); Chapter 6 gives this Manual's working split and each town's drain register. The record shows a network that is partial and has been built over: storm-water drainage coverage in the test-checked towns was "3 to 37 per cent only" (CAG Report No. 4 of 2019), and "Assam's stormwater drainage network in ULBs covers only about 30% of the required areas" (ADB, 2025); "Apart from 17 kilometres of drains built between 1973 and 1997, no other extensive and planned drainage network exists in the Guwahati Metropolitan Area" (as reported); the causes of waterlogging include "construction of buildings and roads over the manmade drains" and filled swamps (ADB, 2017); at Dibrugarh "The construction of the DTP dyke closed all the drainage channels" of the town (ADB, 2017); and at Palasbari builders blocked channels and filled wetland (Gauhati High Court, PIL/53/2023, 06.09.2024). The law reaches the channels of a beel: the Urban Water Bodies Bill counts "all natural water channels (that are inflow or out flow channels into or from the waterbody)" as part of it (s.2(d)) and forbids "obstruction in the natural and normal course of inflow and outflow" (s.15), and the Hill Land Act counts "a drainage system, feeding channel" as an ecological site once an area is designated (s.2(d)(ii)). None of these keeps a jan or a town channel at its recorded width once it has been lined, covered, built over or narrowed by a culvert, which is the failure Clauses 7.10.2 and 7.10.3 are written to prevent. Clause 7.10.3(b) prevents a crossing from narrowing a channel to its current, encroached width.
7.11 Fee-in-lieu and regional tank storage
7.11.1 Where a basin plan has been notified, and the Authority has adopted alternative S-5 of the Policy Supplement (Clause 1.7), a development may pay a fee in lieu of on-site detention under Chapter 4. The fee shall be applied to restoring or creating storage in a tank, pond or regional facility in the same basin.
7.11.2 Tank storage funded by fee-in-lieu shall:
- (a) meet Clause 7.7.1 in full before it is counted;
- (b) be downstream of the contributing development and upstream of the flood-prone area it is meant to protect;
- (c) be created, or under construction, before the development it serves is occupied, or within a period the basin plan fixes; and
- (d) be recorded in the register of Clause 10.17 with the developments that funded it, so that the same volume is not sold twice.
7.11.3 Fee-in-lieu does not replace:
- (a) the retention requirement of Chapter 4, which is always met on site; or
- (b) the water quality requirement of Chapter 8, which is met on site or in a regional facility treating the same runoff before it reaches the tank.
Commentary. Chapter 4 provides for fee-in-lieu toward restored pukhuri or tank storage in master-planned basins. Malaysia's 2008 DID checklist allowed on-site detention only for small sites and required community ponds for larger areas (DID, 2008). In Assam no shared form of storage is required by the building rules: the Unified Byelaws 2022 ask for a designed "dry sump … capable of holding rain water during peak monsoon" in each plot on sites liable to flood and in hilly areas (byelaws 74(ii) and 110(h)), which is on-site storage, and for rainwater harvesting, but have no detention, peak-flow or design-storm rule (Chapter 4). The first public storage built for flood control is the ADB's Bahini retention pond of 59,000 m³ with its pump, and the diversion of part of the Bahini's runoff to a retention basin at Silsako (ADB, 2025). The drainage master plans that T&CP "has started preparing … for all major towns" (ADB, RRP, 2025), and the court-supervised Comprehensive Drainage Master Plan for Guwahati (under revision, not final, as reported), are the natural home for basin storage targets (Chapter 11). None of these sets a technical standard for counting storage. Clause 7.11.2(b) matters because a tank downstream of the flood-prone area protects nothing. Clause 7.11.3 keeps retention on site: it is the volume-control layer of this Manual, and a regional tank cannot recharge the aquifer under the developed site.
7.12 Wetlands, marshes and estuaries
7.12.1 Scope. This clause applies to marshes, swamps, backwaters, estuaries, and tidal creeks and lagoons, including:
- (a) wetlands notified under the Wetlands (Conservation and Management) Rules, 2017 or listed by the Assam State Wetlands Authority;
- (b) any wetland notified under the 2017 Rules, to its notified boundary (none was found notified), and Deepor Beel, Ramsar site No. 1207 (designated 19 August 2002, as listed), to the larger of its Ramsar boundary and the boundary of Deepor Beel Wildlife Sanctuary;
- (c) every beel, and the other marshes and hola land of the Brahmaputra and Barak floodplains, within the 1% AEP extent of Clause 7.3.4, among them Silsako, Borsola and Sorusola in Guwahati, Larua Jamira on the Dibrugarh drain, Son Beel, Urpad Beel and Chandubi, and every water body scheduled under the water-bodies law (a river, jan or pukhuri itself is a waterbody under the rest of this chapter); and
- (d) any other beel, marsh or wetland that the Authority notifies, that the Assam State Wetlands Authority lists, or that the Gauhati High Court, the National Green Tribunal or the Supreme Court directs to be protected.
7.12.2 No drainage of wetlands. No drain, channel, cut or pump shall be designed to drain a wetland, to lower its normal water level, or to reduce the period for which it is wet, except under a plan approved by the wetland authority.
7.12.3 Inflows. Every drain discharging into a wetland in Clause 7.12.1 shall:
- (a) meet Clause 7.10.6;
- (b) pass through water quality treatment for the WQv of its catchment (Chapter 8) before entering the wetland; and
- (c) where practicable, spread its flow across a vegetated margin rather than discharge at one point.
7.12.4 Hydraulic connectivity. Roads, embankments and utility corridors across or along a wetland shall have openings that:
- (a) pass the 1% AEP flow without raising the 1% AEP water level by more than the limit in Clause 7.6.2; and
- (b) keep the wetland's normal water exchange, including tidal exchange in estuaries, with openings spread along the crossing so that no part of the wetland is cut off.
7.12.5 Storage counted at basin scale only. Wetland storage shall be included in basin and regional models. It shall not be counted as detention for any individual development.
7.12.6 Tidal wetlands and estuaries. For estuaries and tidal wetlands:
- (a) tailwater shall be taken from Chapter 5 (Clause 2.12 joint cases);
- (b) works shall also comply with the Coastal Regulation Zone Notification in force; and
- (c) mouth-opening works, training walls and dredging are outside the scope of this Manual and need their own studies.
7.12.7 No dumping. No solid waste, construction debris or dredged material shall be placed in a wetland or its setback.
Commentary. Assam's wetlands are the concern of the Assam State Wetlands Authority, constituted by notification No. FRM.10/2010/Pt/16 of 1 November 2018 under the Wetlands (Conservation and Management) Rules, 2017 (as listed; the notification was not read [TBC]); no wetland notified under rule 4 of the Rules was found. The State's wetlands cover 764,372 ha, 9.74% of its area (National Wetland Atlas, 2011, as cited; the counts in that and other inventories conflict and are not used). Its one Ramsar site (as reported) is Deepor Beel, site No. 1207, designated on 19 August 2002 (as listed). Deepor Beel was notified as a wildlife sanctuary in 2009; the notification was set aside in 2017 and restored on appeal in 2023, an appeal to the Supreme Court is pending, and when the Cabinet decided on 27 March 2024 to denotify it, the Gauhati High Court directed the State "not to issue any notification de-notifying" it (PIL 18/2023, I.A.(C) 924/2024, 05.04.2024). Its eco-sensitive zone exists only in draft: about 148.9 km² in 2021 and about 38.84 km² in 2025 (as reported); no final notification was found. The beel is fed by the Basistha and the Kalmani and drains to the Brahmaputra by the Khanajan (as cited in research), and the Mora Bharalu brings it the city's sewage (Clause 8.9, Commentary); the National Green Tribunal heard the dumping of waste at Boragaon beside it (O.A. 472/2018, order of 11.02.2020), and a later suo motu case (O.A. 99/2025/EZ) records a CPCB finding of faecal coliform (as reported; the outcome was not found). No source was found for any direct link between the Bharalu and Deepor Beel other than the Mora Bharalu. Elsewhere, Son Beel in Karimganj district, the largest in the State, is given as 3,458 ha in a study of 2024 and as 4,388 ha dry and 9,800 ha full in another source (the figures conflict); Urpad Beel in Goalpara and Chandubi are shrinking (Clause 7.6, Commentary); Rowmari–Donduwa is reported to be proposed as a Ramsar site and the Borjuli wetland to have been declared a Biodiversity Heritage Site in 2026 (both as reported). A drain outfall, desilting, diversion or gate operation in or next to Deepor Beel, a sanctuary or a notified wetland therefore needs the views or permission of the Assam State Wetlands Authority or the Environment and Forest Department where the Rules or the wildlife law reach it, and, for a scheduled water body, the permission that the water-bodies law requires, as well as compliance with this chapter; for the beels and marshes they do not reach, this chapter and the byelaws are the only controls. Clause 7.12.2 targets a specific risk: drains built to relieve flooding next to a marsh can drain the marsh itself, and once it is dry it is encroached. Sewage reaches Assam's beels through the drains (Clause 8.9, Commentary). The State's report to the National Green Tribunal placed Borsola Beel and Silsako Beel in Priority I, Sorusola in Priority II and Deepar Beel in Priority III, polluted by the "Mora Bharalu channel" (O.A. 673/2018, August 2020), and the Bharalu has "no natural flow" but sewage (PCBA). Clauses 7.10.6(d) and 7.12.3 therefore cannot yet be met by most existing outfalls in Guwahati. In Assam they apply in full to every new outfall, and every existing outfall to a beel, a pukhuri, a jan or a scheduled water body is taken to carry dry-weather flow and comes under the annual survey and the interception of Clauses 8.9.4 and 8.9.5 until its sources are removed. Where a drain falls from the hills, every drain that enters a beel also passes a silt trap at the hill–plain break first (Figure 7.3; Clause 6.3.6(m)), because the beel is the end of the slope's drainage and loses its storage to the silt of hill cutting.
7.13 Encroachment interfaces
7.13.1 Boundary. For design under this Manual, the boundary of a waterbody is the larger of its Revenue record boundary and its surveyed FTL (or top of bank), as in Clause 7.3.3. Setbacks are measured from that boundary.
7.13.2 No reliance on encroached land. No design shall:
- (a) count, as storage or conveyance, land within a waterbody boundary that is occupied by encroachment, unless its removal is ordered and funded; or
- (b) treat the encroached width of a channel as its design width.
7.13.3 Public works in encroached reaches. Where a public drainage work passes through an encroached reach:
- (a) it shall be designed for the full waterbody width (Clause 7.13.1);
- (b) where the full width cannot be cleared before the work is built, the design report shall state the interim capacity and the flood risk until it is cleared; and
- (c) the work shall be built so that the full width can be restored later without rebuilding it.
7.13.4 Boundary marking. Every development adjoining a waterbody shall, before the completion certificate:
- (a) mark the outer edge of Zone 1 on the ground with permanent survey markers at intervals of not more than 30 m and at every change of direction; and
- (b) show the setback zones on the approved layout plan and in the sale documents of every plot that includes setback land.
7.13.5 Retaining walls. No retaining wall, bund or embankment shall be built along the edge of a waterbody, within Zone 1, to protect or reclaim land, except to protect existing public infrastructure under the custodian's approval.
Commentary. Assam's controls on building and filling in its waterbodies have come mostly from the courts. On Silsako the Gauhati High Court held in 2023 that the 2008 Act "is not prospective, it [only] declares", and told the occupants of the beel, "Once it is a water body you have to move out" (writ appeals, 19 June 2023, as reported). In PIL/53/2023, Khanindra Kalita and others, it found that builders had blocked channels and filled wetland at Palasbari, causing "artificial floods", and appointed an Advocate Commissioner (06.09.2024). In PIL/14/2024, on the flooding of Guwahati, it recorded the engagement of Haskoning DHV for a "GIS-based Comprehensive Drainage Master Plan and Detailed Project Report (DPR) for Guwahati City" (23.09.2024) and found that "hill cutting is still going on" (26.05.2025). It stayed the denotification of Deepor Beel sanctuary (PIL 18/2023, 05.04.2024), and PWD was told in February 2025 to stop earth filling and construction near the beel (as reported). The National Green Tribunal heard the State say that "no encroachment exists in the notified area" of Deepor Beel and that dumping at Boragaon was to end (O.A. 472/2018, 11.02.2020). Eviction drives along drains and rivers were carried out in Guwahati from January 2023 under "Mission Flood Free Guwahati", for which no formal order was found (as reported). The statutes' penalties are up to three years or ₹50,000 under the 2008 Act (s.6), up to three years or ₹1 lakh with restoration under the Bill of 2024 (s.16), up to three years and ₹1,000 for cutting an embankment or obstructing a sluice under the 1953 Act (s.15(ii)), and up to six months or ₹5,000 under the Hill Land Act (s.19). The CAG found that GMDA was "not functioning as per the spirit" of its Act, with "very few technical staff" (Report No. 2 of 2024). The encroachment of low-lying land and the filling of swamps are among the causes of waterlogging that the ADB lists for Guwahati (2017). This Manual cannot evict anyone. It can stop designs from treating encroachment as permanent (Clause 7.13.2), make public works restorable to full width (Clause 7.13.3), and make the setback visible on the ground and in property documents so that new buyers know it is there (Clause 7.13.4). The 30 m marker interval is set by this Manual.
7.14 Safety of tank bunds and embankments
7.14.1 Dam Safety Act screening. For every tank, and every embankment built or altered under this Manual, the designer shall determine whether it is a "specified dam" under the Dam Safety Act, 2021. Under the Act, a specified dam is a dam:
- (a) more than 15 m high, measured from the lowest point of the general foundation area to the top of the dam; or
- (b) between 10 m and 15 m high, where the crest length is not less than 500 m, or the reservoir capacity is not less than one million m³, or the maximum flood discharge dealt with by the dam is not less than 2,000 m³/s, or the dam has specially difficult foundation problems, or the dam is of unusual design.
Where it is a specified dam, the Act and the requirements of the State Dam Safety Organisation govern, in addition to this Manual.
7.14.2 Hazard class. Every tank bund and detention embankment that is not a specified dam shall be given a hazard class:
- High hazard: a breach could flood a habitable building, a school, a hospital, an arterial road or critical infrastructure.
- Low hazard: any other case.
7.14.3 High-hazard embankments. For high-hazard tank bunds and embankments:
- (a) the surplus weir or spillway shall pass the 1% AEP inflow at MWL with the freeboard of Clause 7.7.4(b), and shall be checked for the 0.2% AEP (500-yr) inflow without overtopping the bund (as for detention basins in Chapter 4);
- (b) a breach analysis shall map the area flooded by a breach at MWL;
- (c) an emergency action plan shall be prepared, with the warning and evacuation arrangements for the breach area; and
- (d) the design shall be certified and independently checked under Clause 10.6.
7.14.4 Inspection. Every tank whose storage is counted under Clause 7.7, and every high-hazard embankment, shall be inspected before the monsoon (by 31 March) and after every heavy-rainfall event (Chapter 10) for seepage, slips, cracks, animal burrows, trees on the bund, and blockage of the weir and sluices.
7.14.5 No unauthorised cutting. No person shall cut, lower or breach a tank bund or surplus weir during a flood except under the custodian's emergency procedure.
Commentary. The definition of a specified dam is quoted from the Dam Safety Act, 2021 (Act 41 of 2021). The Act defines a "dam" as an artificial barrier constructed across rivers or tributaries to impound or divert water. It excludes flood embankments, dikes and guide bunds. Assam's embankments along the Brahmaputra and the Barak, given as 4,474.42 km by the CAG (March 2017) and 4,473.82 km by WRD (as cited), and as about 4,800 km in a later ministerial reply (as reported), are flood embankments, which the Act excludes; the dams of the hydroelectric projects upstream of Assam's towns (NEEPCO's Ranganadi and Kopili projects and NHPC's Lower Subansiri) are dams across rivers under the Act, and their heights were not obtained [TBC]. No beel or pukhuri in Assam was found to be held by a bund high enough to be a specified dam, though no bund or outlet was surveyed for this Manual [TBC]; each shall be screened under Clause 7.14.1. Where the storage of a beel or pukhuri is counted under Clause 7.7, the embankment or bund that holds it, with its sluice, is a tank bund for Clause 7.14.2 unless the Act applies. Whether a tank bund that is not across a river or tributary is a "dam" under the Act is not clear from its text. In Assam the embankment hazard is the breach. In May 2022 the Barak embankment at Bethukandi, upstream of Silchar, was cut, and in June the river entered the town through it (FIR for a breach of 23 May and one arrest, as reported); Silchar was under water for about 11 days, up to about 4 m deep in places ("about a week" in another report; both as reported), although the Barak at Annapurnaghat peaked at 21.59 m on 21 June, 0.25 m below its 1989 highest flood level (as quoted from the Cachar district report; NEER reading of the gap). Cutting an embankment without authority is an offence under section 15(ii) of the Assam Embankment and Drainage Act, 1953. In the Barak valley 450 km of the 731 km of embankments are reported to be "extremely vulnerable", and 71 breaches were reported in the State between mid-June and 20 July 2024 (both as reported). Releases from the dams upstream are the other hazard: in 2017 the Ranganadi project released 1,412.57 m³/s (as quoted in a report of IIT Guwahati for ASDMA). No breach map or emergency action plan for any embankment, dam, beel or pukhuri was read for this Manual. A failed embankment floods the land behind it, and a breach closes no sluice, which is why Clause 7.14.3 asks for breach mapping and an emergency action plan for high-hazard embankments counted under this Manual, and why Chapter 5 treats embankment-protected towns and release reaches as flood-sensitive outfalls. The hazard classes, the breach analysis and the emergency action plan for high-hazard tanks are set by this Manual. They extend the Chapter 4 requirement for detention basins (1% AEP spillway with outlet blocked, 0.2% AEP for high-hazard basins) to tanks that are counted as design storage.
7.15 Submittal requirements
Every drainage report for a development or work under Clause 7.1.2 shall include:
- the Waterbody Sheet (Form 7-1) under Clause 7.3.2, with the setback zones and their basis (mapped extent, hydraulic study or fixed width);
- the hydraulic study of the 1% AEP extent and floodway, where Clause 7.3.4 requires it;
- the Compensatory Storage Calculation (Form 7-3), by elevation band, where fill is proposed in the flood fringe;
- for any tank storage counted: the Tank Storage Credit Sheet (Form 7-2), with the survey, stage–storage curve, operating rule, cascade model results and custodian concurrence of Clause 7.7.1;
- for any crossing, outfall or work in Zone 1: the custodian's NOC and the hydraulic analysis of Clause 7.6.2 or 7.10.3;
- for restoration or desilting: the pre-works survey, silt tests and hydrogeological report of Clause 7.9; and
- for any embankment: the Dam Safety Act screening and hazard class of Clause 7.14.
7.16 Review and update
7.16.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). The fixed-width table of Clause 7.4.6 shall also be reviewed within 2 years of the Authority adopting 1% AEP flood maps for its area.
7.16.2 Where the Authority adopts new 1% AEP flood maps, they apply to new submittals 6 months after adoption, unless the Authority notifies otherwise.
References (chapter)
- Government of Assam, Department of Housing and Urban Affairs. Assam Unified Building Construction (Regulation) Byelaws, 2022, Assam Gazette Extraordinary No. 688, 15 October 2022, notification No. DoHUA/ECF No. 236697/2, byelaws 1(2), 2, 26(ix), 44(iii), 44(ix), 45, 66, 67, 74, 110, 117 and 120 [sub-item numbers read from the OCR layout; TBC], https://gmda.assam.gov.in/sites/default/files/swf_utility_folder/departments/gmda_webcomindia_org_oid_4/menu/document/no._688_dohua-ecf-236697-2_dated_15-10-22_compressed.pdf (Wayback 20250403152204); and (Amendment) Byelaws, 2024, Gazette No. 667, 20 November 2024, No. DoHUA/ECF No. 420084/34 (byelaws 92, 120 and 120A and the land-use table), https://gmda.assam.gov.in/sites/default/files/swf_utility_folder/departments/gmda_webcomindia_org_oid_4/menu/document/no._667_dohua-ecf_no._420084-34_dated_20-11-24.pdf (Wayback 20250404084916)
- Government of Assam. Guwahati Building Construction (Regulation) Byelaws, 2014 (GMDA copy; notification number not seen), https://gmda.assam.gov.in/sites/default/files/swf_utility_folder/departments/gmda_webcomindia_org_oid_4/menu/document/GUWAHATI%20BUILDING%20CONSTRUCTION%20%28REGULATION%29%20BYELAWS%2C%202014_0.pdf (Wayback 20220729194439)
- Government of Assam. Assam Building Construction (Regulation) Act, 2010 (Assam Act XVI of 2010), as amended by Assam Act XXVII of 2022 (Gazette Extraordinary No. 655, 29 September 2022), https://prsindia.org/files/bills_acts/acts_states/assam/2010/ActNo16of2010Assam.pdf
- Government of Assam. Guwahati Waterbodies (Preservation and Conservation) Act, 2008 (Assam Act XX of 2008), Assam Gazette Extraordinary No. 243, 8 August 2008, ss. 2(e), 4, 6 and 11 and Schedules I–IV, https://www.ielrc.org/content/e0845.pdf ; https://faolex.fao.org/docs/pdf/ind194963.pdf
- Assam Legislative Assembly. Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024 (Bill as introduced), ss. 1, 2(d), 3–8, 15, 16 and 22, https://prsindia.org/files/bills_acts/bills_states/assam/2024/Assam_Urban_Water_Bodies_Bill_2024.pdf ; business bulletin of 29 August 2024 (passage), https://assambidhansabha.org/assets/uploads/business-bulletin/business_bulletin_2024-08-29_en_KGIIV.pdf ; the Act (Assam Act XXV of 2024) and the Rules of 2025 were not read [TBC].
- Government of Assam. Assam Embankment and Drainage Act, 1953 (Assam Act I of 1954), ss. 2, 4, 14, 15, 16 and 18, https://www.ielrc.org/content/e5303.pdf
- Government of Assam. Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 (Assam Act V of 2007), Assam Gazette Extraordinary No. 20, 20 January 2007, ss. 2(d), 3, 4, 14 and 19, https://legislative.assam.gov.in/sites/default/files/swf_utility_folder/departments/legislative_medhassu_in_oid_3/menu/document/The%20Assam%20Hill%20Land%20and%20Ecological%20Sites%20%28Protection%20and%20Management%29%20Act%2C%202006..pdf (Wayback 20220810193315)
- Government of Assam. Gauhati Municipal Corporation Act, 1969 (Assam Act I of 1973), ss. 231, 232, 234, 237, 239, 242, 244 and 250 (Legislative Department scans; amendments after 1983 not checked), https://legislative.assam.gov.in/sites/default/files/swf_utility_folder/departments/legislative_medhassu_in_oid_3/menu/document/The%20Gauhati%20Municipal%20Corporation%20Act%2C1969%28Chapter%20XXI.pdf (Wayback 20220808142841); and Assam Municipal Corporation Act, 2022 (Assam Act VIII of 2022), ss. 171, 173, 174, 176 and 177, https://prsindia.org/files/bills_acts/acts_states/assam/2022/ActNo.8of2022Assam.pdf
- Guwahati Metropolitan Development Authority. Master Plan for Guwahati 2025 and Zoning Regulation, Assam Gazette Extraordinary No. 198, 9 July 2009; Report Part II, Land Use Zoning & Development Control Regulation; and Schedule of Modification of Master Plan 2025 (undated), https://gmda.assam.gov.in/sites/default/files/swf_utility_folder/departments/gmda_webcomindia_org_oid_4/menu/document/1.%20Gazette%20Notification%20No.%20198%20dt%2009-07-09-Master%20Plan%202025.pdf (Wayback 20220907212010)
- Comptroller and Auditor General of India. Report No. 5 of 2018 (Government of Assam), para 2.2, Flood Control in Assam; Report No. 4 of 2019, para 1.2, Delivery of Core Basic Services by ULBs; Report No. 2 of 2024, para 3.2, Functioning of GMDA, https://www.cag.gov.in/uploads/download_audit_report/2019/Chapter_1_Social_Sector_of_Report_no_4_of_2019_Social_General_and_Economic_(Non-PSUs)_Sectors_Government_of_Assam.pdf
- Asian Development Bank (2025). Report and Recommendation of the President, Assam Urban Sector Development Project (57262-001), https://www.adb.org/sites/default/files/project-documents/57262/57262-001-rrp-en.pdf ; and Project Administration Manual (July 2025), https://www.adb.org/sites/default/files/project-documents/57262/57262-001-pam-en.pdf
- Asian Development Bank (2017). Assam Urban Infrastructure Investment Program, Tranche 2 (42265-025): Initial Environmental Examinations, Guwahati subprojects and Dibrugarh DTP drain outfall, https://ewsdata.rightsindevelopment.org/files/documents/25/ADB-42265-025_QMl9sl8.pdf ; https://ewsdata.rightsindevelopment.org/files/documents/25/ADB-42265-025_D6ieyPo.pdf
- Gauhati High Court. PIL/14/2024, North East Eco Development Society v. State of Assam, orders of 23.09.2024 and 26.05.2025, https://livelaw.in/pdf_upload/gau-hc-water-logging-562406.pdf , https://www.livelaw.in/pdf_upload/gau-hc-hill-cutting-601951.pdf ; PIL/53/2023, Khanindra Kalita & 8 Ors, order of 06.09.2024, https://livelaw.in/pdf_upload/gau-hc-artificial-flood-560072.pdf ; PIL 18/2023, Pramod Kalita & 2 Ors, I.A.(C) 924/2024, order of 05.04.2024, https://www.livelaw.in/pdf_upload/gau-hc-deepor-beel-denotification-532923.pdf
- National Green Tribunal. O.A. 472/2018, Rohit Chowdhury v. Union of India, order of 11.02.2020, https://global-uploads.webflow.com/5d70c9269b8d7bd25d8b1696/604b1f959e6aa78d0005d43d_Deepor-Beel-NGT-order.pdf ; O.A. 673/2018, State of Assam's monthly progress report (August 2020).
- Pollution Control Board, Assam. Action Plan for the Bharalu River (Priority I), https://www.pcbassam.org/RRC%20Action%20Plan%20Final/Priority%20I/Action%20plan_Bharalu.pdf
- Government of Assam, Environment and Forest Department. Notification No. FRM.10/2010/Pt/16 of 01.11.2018 constituting the Assam State Wetlands Authority (listing title only), https://forest.assam.gov.in/node/93400
- Government of India. The Dam Safety Act, 2021 (Act 41 of 2021). https://www.casemine.com/act/in/626f9167714d58ef62b50d09 ; CWC, Specified Dam. https://rrssd.cwc.gov.in/specified-dam
- MoHUA (2015). Urban and Regional Development Plans Formulation and Implementation (URDPFI) Guidelines, Vol I. https://web.archive.org/web/2022/https://mohua.gov.in/upload/uploadfiles/files/URDPFI%20Guidelines%20Vol%20I(2).pdf
- Mid-America Regional Council (2025). APWA Stormwater Standards Supplement (Section 5600, Version 2025.01). https://www.marc.org/document/apwa-stormwater-standards-supplement
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (§5605.3 stream buffers). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- SANDRP (2019). "Overview of CWC's flood forecasting sites 2019: North East India" (secondary; CWC levels as transcribed), https://sandrp.in/2019/10/02/overview-of-cwcs-flood-forecasting-sites-2019-north-east-india/
- Press Information Bureau, Government of India: States that have enacted flood plain zoning legislation (as cited), https://pib.gov.in/PressReleasePage.aspx?PRID=1805812 ; and the report of a proposed Assam Flood Plain Zoning Bill (Drishti IAS, 7 November 2026; single source, unverified).
- Reports of the Silsako writ appeals (Bar & Bench, 2023), https://www.barandbench.com/amp/story/news/litigation/law-wetlands-gauhati-high-court-silsako-eviction ; of the District Level Committee for the GMDA area (The Sentinel, 12 July 2025); and of the eviction drives under "Mission Flood Free Guwahati" (EastMojo, 6 January 2023) (secondary).
- Reports of Deepor Beel's water spread and the drafts of its eco-sensitive zone (2021, 2025), of Urpad Beel (EastMojo, 9 September 2026), of Chandubi, Son Beel, Rowmari–Donduwa and the Borjuli wetland (secondary).
- Reports of the Silchar flood of June 2022 and the Bethukandi breach (Frontline, Scroll, EastMojo, 2 July 2022), of the embankments of the Barak valley and of the breaches of 2024 (secondary).
- Government of India, Ministry of Environment and Forests / Space Applications Centre (2011). National Wetland Atlas: Assam (as cited); and the Statistical Handbook of Assam (registered beels, as quoted by the NEDFI databank).
- Chandrakanta Abhidhan, 2nd ed. Guwahati: Gauhati University, 1962 (Digital South Asia Library), https://dsal.uchicago.edu/dictionaries/candrakanta/ ; Bronson, M. (1867). A Dictionary in Assamese and English. Sibsagar: American Baptist Mission Press (Internet Archive, dictionaryinassa00bronrich); and xobdo.org (a modern check only).
- Government of India. Wetlands (Conservation and Management) Rules, 2017; Coastal Regulation Zone Notification, 2019.
Annexes and forms
| Annex / Form | Content |
|---|---|
| 7A | Statewide waterbody GIS layer and inventory fields |
| 7B | Fixed-width setback table (alternative S-3, with Annex 1C) |
| 7C | Template tank operating rule, with flood cushion |
| 7D | Desilting and restoration specification |
| 7E | Glossary of Assamese waterbody terms and regional variants |
| Form 7-1 | Waterbody Sheet |
| Form 7-2 | Tank Storage Credit Sheet |
| Form 7-3 | Compensatory Storage Calculation (by elevation band) |
Commentary. Assam protects its waterbodies through its building rules, its water-bodies law, its embankment law and its Master Plans, with the wetland rules and the courts behind them; no law yet zones its floodplains. The Assam Unified Building Construction (Regulation) Byelaws, 2022 (Assam Gazette Extraordinary No. 688, 15.10.2022, notification No. DoHUA/ECF No. 236697/2), as amended by the (Amendment) Byelaws, 2024 (Gazette No. 667, 20.11.2024, No. DoHUA/ECF No. 420084/34), are made by DoHUA under section 4 of the Assam Building Construction (Regulation) Act, 2010 (Assam Act XVI of 2010, as amended by Assam Act XXVII of 2022, which renamed it and extended it "to the whole of the State of Assam"). They apply in "the master Plan areas or notified Planning areas of whole of Assam except for areas under Autonomous Districts", unless a District Council opts in (byelaw 1(2)). They set the minimum distance of a building "from the edge of natural drainage channels" and from notified water bodies and ponds (byelaw 26(ix), repeated as byelaw 44(ix) [sub-item numbers read from the OCR layout; TBC: confirm against a clean copy]); let the Authority refuse a site "near a water body or water course" that the development would contaminate or whose channel it would change, a site likely to be inundated without proper drainage, or "a filled up tank or low lying" site (byelaw 44(iii) [TBC: confirm the numbering]); keep multistoreyed buildings off land "on or abutting natural drainage channels" and "wetlands" (byelaw 117); and fix the plinth above "the highest recorded flood level as fixed by the local authority" (byelaw 45(c)) (Clause 7.4, Disclosure). The Guwahati Waterbodies (Preservation and Conservation) Act, 2008 (Assam Act XX of 2008) defines waterbodies as "the area or areas of land where the rain water accumulates and act as natural or storm water reservoir and shall include wetland" (s.2(e)) and forbids filling, building and dumping in the four areas of its schedules (s.4). The Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024, passed on 29 August 2024 and cited as Assam Act XXV of 2024, keeps that definition, extends it to "all natural water channels (that are inflow or out flow channels into or from the waterbody)" and to all ponds and tanks "irrespective of its size" in every notified Master Plan area outside the Autonomous Districts (s.2(d)), and repeals the 2008 Act (s.22(1)); the enacted text, its gazette date and the Rules of 2025 were not read, so the section numbers given in this Manual are the Bill's [TBC]. The Assam Embankment and Drainage Act, 1953 (Assam Act I of 1954) counts sluices as part of an embankment and "dongs", culverts, ditches, canals and sluices as drains (s.2), vests the works in the State (s.14), and makes it an offence to cut through an embankment or drain, or to open, shut or obstruct a sluice, without authority (s.15(ii)), and, in a notified area, to build on, remove or alter one without permission (s.16). The Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 counts "a drainage system, feeding channel, any water body" and "any marshy land, ponds, lakes and swamp" among its ecological sites (s.2(d)), which it protects once an area is designated (s.4); no designated area was found [TBC]. The Master Plan for Guwahati 2025 classes "All notified forest, water bodies, rivers etc." as Eco-Sensitive Zone. Within municipal limits the drains that connect to the municipal system vest in the Municipal Corporation (Gauhati Municipal Corporation Act, 1969, s.250(2); Assam Municipal Corporation Act, 2022, s.173). Wetlands are the concern of the Assam State Wetlands Authority (Clause 7.12, Commentary), and Deepor Beel is the State's only Ramsar site (as reported). In this chapter WRD means the Water Resources Department, which holds the embankments, sluices, drainage channels and dewatering pumps and whose Embankment Officers act under the 1953 Act. A beel or pukhuri has no gate of its own unless it drains through one of WRD's sluices, so WRD is the custodian this chapter names where a clause speaks of levels, a datum, freeboard or an operating rule; the other custodians are recorded one by one in the inventory (Annex 7A). Who regulates where in the Sixth Schedule areas, and who is the competent authority for the area, is set out in Chapter 1.
This Manual treats every recorded waterbody as drainage infrastructure. Five features set Assam apart. The first is the river behind the embankment: the towns stand on the floodplains of the Brahmaputra and the Barak behind about 4,474 km of embankments (mothauri, the Assamese word for a river embankment) and drain through sluices (pani-duwar) that close when the river is high, so the outfall is normally shut in the monsoon (Chapter 5). The second is the beel (Assamese বিল: a natural floodplain lake or wetland), which in Guwahati is the city's storage: Deepor Beel, whose water spread is reported to range from about 10.1 km² to 40.1 km² in floods; Silsako, which GMDA is excavating as a retention basin; Borsola and Sorusola; and, at Dibrugarh, Larua Jamira on the town's drain. The law already calls such land a "natural or storm water reservoir" (2008 Act, s.2(e); Bill, s.2(d)). The third is the jan (a stream or natural drainage channel, often the outlet of a beel), by which the beels drain to the river, as the Khanajan drains Deepor Beel, and whose name survives in the Bondajan and the Lakhimijan; with it goes the juri (a small hill stream), which brings water, silt and debris down from the Guwahati hills. The fourth is the pukhuri (Assamese পুখুৰী: a dug tank or pond; plural pukhuris), the dug tank of the towns and villages, which this Manual keeps apart from the beel. The fifth is the char and chapori land of the rivers, sand and silt that the river builds, floods and erodes, on which no permanent drainage work is relied on (Clause 2.3.6(i)). Assam has no irrigation tank cascades; the tank clauses of this chapter apply to pukhuris and to beels that drain through a jan or a sluice, and storage built under this Manual is a "detention pond", never a pukhuri or a beel. Because the storm drains are also the sewers (Clause 8.9, Commentary), most beels in the towns receive sewage. This chapter gives the design rules that protect the storage and conveyance of these waterbodies. It does not replace the byelaws, the water-bodies law, the embankment law, the Master Plans, the municipal Acts and the wetland procedures that record and protect them, or the directions of the Gauhati High Court, the National Green Tribunal and the Supreme Court.