Chapter 4Site Runoff Control: Retention and Detention
4.1 Purpose and scope
4.1.1 This chapter sets the performance standard that every regulated development shall meet for runoff leaving the site. It covers:
- (a) the order in which runoff-control measures are to be applied (Clause 4.3);
- (b) retention of frequent rainfall, and how retained volume is credited against detention (Clause 4.4);
- (c) release-rate criteria for standard and flood-sensitive catchments (Clause 4.5);
- (d) the procedure for sizing detention storage and outlets (Clauses 4.6 to 4.9);
- (e) facility types, rainwater harvesting (RWH) accounting, and high-groundwater sites (Clauses 4.10 to 4.12);
- (f) regional detention and fee-in-lieu (Clause 4.13);
- (g) simplified methods for small sites: the Tier B tables and the fixed-coefficient route (Clause 4.14); and
- (h) public safety (Clause 4.15).
4.1.2 This chapter applies to land disturbance of 0.1 ha or more, or new or replaced impervious area of 500 m² or more, as set in Chapter 1. Single dwellings below that threshold, and road resurfacing that adds no impervious area, are exempt. The existing RWH mandate of the building rules (rainwater harvesting structures for every building under byelaw 114 of the Unified Byelaws 2022, with recharging or percolating pits or trenches of at least 5 m³ for every 100 m² of roof; percolation pits, storage and reuse on plots of 134 m² and above, and grass paving, under Appendix VI; roof-water harvesting "mandatory in hilly areas" under byelaw 110(g); and, in a groundwater area notified under the Assam Ground Water Control and Regulation Act 2012, of which none was found, the directions of section 19 for premises of 100 m² or more; all are discussed in the Commentary to Clause 4.11) continues to apply to every building it covers, whether or not this chapter applies.
4.1.3 Rainfall inputs come from Chapter 2. Hydrologic methods come from Chapter 3. Tailwater, downstream analysis and the outfall-closed check come from Chapter 5. Water quality volume (WQv) treatment comes from Chapter 8. Where this chapter and those chapters overlap, the more stringent requirement governs.
4.2 Definitions
| Term | Meaning in this Manual |
|---|---|
| Retention | Permanent removal of runoff from the surface drainage system by infiltration, evapotranspiration or reuse, so that the water never reaches the outfall. |
| Retention depth | The 90th percentile wet-day 24-hour rainfall depth for the site's zone (Clause 2.10, Annex 2E). |
| Required retention volume (RRV) | The runoff volume from the retention depth over the post-development site (Clause 4.4.2). |
| Detention | Temporary storage of runoff, released through a controlled outlet at a rate set by Clause 4.5. |
| Retention credit | The reduction in required detention storage that results from retention practices, determined by routing under Clause 4.4.6. It is not the same as the retained volume. |
| Permissible site discharge (PSD) | The maximum rate at which a site may discharge for a stated AEP, in L/s or L/s/ha. |
| Site storage requirement (SSR) | The detention storage required per hectare of site under the simplified method of Clause 4.14. |
| Multi-stage outlet | An outlet structure with separate openings at different levels, each controlling a different AEP (Figure 4.2). |
| Drawdown time | Time from the peak stored volume until the stated fraction of that volume has been released. |
| Emergency spillway | A secondary overflow that passes flows above the primary outlet capacity, or all flow when the primary outlet is blocked, without overtopping the embankment. |
| Freeboard | Vertical distance between the maximum design water level and the embankment crest or other critical level. |
| Flood-sensitive catchment | A catchment listed in Clause 4.5.3 or notified under Clause 4.5.4. |
| Authority | The approving authority under Chapter 1 (in a notified Master Plan area, the Development Authority (GMDA in the Guwahati Metropolitan Area) for the planning permit and the Municipal Corporation (GMC in Guwahati), Municipal Board or Gaon Panchayat for the building permit, each under the Unified Byelaws 2022; the local body for its own drains and works under the Gauhati Municipal Corporation Act, 1969, the Assam Municipal Corporation Act, 2022 or the Assam Municipal Act, 1956; and, in an Autonomous District, the District Council or the authority it designates, only where the Council has notified that the byelaws or this Manual apply (none has), as applicable). |
| Tier A / Tier B | Adoption tiers defined in Chapter 1. Tier A: the Guwahati Municipal Corporation (GMC), GMDA and every other approving authority within the Guwahati Metropolitan Area, the area of the Master Plan for Guwahati 2025 (328 km²), whichever has jurisdiction over a site; the Dibrugarh Municipal Corporation, with the Development Authority of the Dibrugarh Master Plan area; and the Silchar Municipal Corporation, with the Development Authority of the Silchar Master Plan area (the names of the two Development Authorities are to be confirmed [TBC]). Tier B: Municipal Corporations, Municipal Boards, Development Authorities and other local bodies and Panchayats in notified Master Plan areas. |
4.3 Order of measures
4.3.1 Every site runoff-control design shall apply measures in the following order, and shall document in the submittal why each earlier step could not do more:
- Preserve. Keep existing waterbodies, pukhuris, natural drainage lines, wetlands, and permeable soils and vegetation. Avoid fill in flood storage (Chapter 7).
- Retain. Retain the RRV on site by infiltration, reuse or evapotranspiration (Clause 4.4).
- Detain. Detain the remaining runoff so that the release-rate criteria of Clause 4.5 are met for every design storm and duration (Clauses 4.6 to 4.9).
- Convey. Convey the 1% AEP (100-yr) flow safely through the site to the receiving system on a defined overland path (Chapter 6), and check the receiving system downstream (Chapter 5).
4.3.2 Preservation and retention reduce the detention required (Clauses 4.4.6 and 4.4.7). They do not relieve the site of the release-rate criteria of Clause 4.5 or of the downstream analysis of Chapter 5.
Commentary. This order follows the "layers of stormwater management" adopted in the Kansas City Metro APWA Section 5600 Version 2025.01: preserve or restore, retain, detain, convey, maintain (MARC factsheet; MARC Supplement, Nov 2025). Maintenance is the fifth layer and is set in Chapter 10. The 2025.01 manual credits retention and natural-area preservation against detention size (MARC Supplement, Nov 2025). Clause 4.4.6 adopts that credit, and defines it so that it cannot be claimed twice.
4.4 Retention
4.4.1 Requirement
The site shall retain the RRV. Retention shall be achieved by one or more of the following:
- infiltration practices (soakaways, infiltration trenches, permeable pavement with an infiltration base, bioretention);
- rainwater reuse that is drawn down by a demonstrated non-potable demand;
- green roofs and landscape areas that do not drain to the outfall in the retention-depth storm.
The limits of Clause 4.4.4 apply.
4.4.2 Computation of the RRV
RRV (m³) = 10 × Q_R × A
where:
- Q_R (mm) is the runoff depth from the retention depth P_R (Annex 2E). It is computed with the SCS-CN method for the post-development cover of each sub-area, at AMC II, with Ia = 0.2S (Chapter 3); and
- A (ha) is the area of the site that drains to the outfall.
Q_R shall be computed for each sub-area separately and summed. An area-weighted CN shall not be used where impervious and pervious areas differ by more than 20 CN points.
The volumetric method RRV = 10 × P_R × Rv × A, with Rv = 0.05 + 0.009 × I (I = percent impervious), may be used for sites under 0.5 ha and under the Tier B method.
Commentary. The Rv formula is the one used in the KC water quality volume (MARC BMP Manual 2012). It is simple to review for small sites. The SCS-CN form is required for larger sites so that the retention computation uses the same runoff model as the detention routing. That keeps the credit computation of Clause 4.4.6 consistent.
4.4.3 Verification
Retention by infiltration shall be supported by:
- (a) site infiltration tests at the location and depth of each practice, at the frequency set in Chapter 8;
- (b) a design infiltration rate of no more than half of the measured rate; and
- (c) groundwater evidence showing the seasonal high groundwater table at least 1.0 m below the base of the practice (Chapter 8).
Retention by reuse shall be supported by a demand calculation showing that the RRV is drawn down within 72 hours by a continuous non-potable use, such as toilet flushing, cooling or irrigation.
Commentary. The factor of 2 on measured infiltration rate has no direct precedent; this Manual sets it to allow for clogging and for the difference between a test pit and a full-scale practice. Chapter 8 may set a different factor; if it does, Chapter 8 governs.
4.4.4 Limits on retention
4.4.4.1 Infiltration practices shall not be used:
- where the seasonal high groundwater table is less than 1.0 m below the base (Chapter 8);
- on contaminated land;
- within the setbacks from foundations, wells and septic systems set in Chapter 8; or
- on fill, unless tested after placement.
4.4.4.2 Where the RRV cannot be fully retained, the shortfall shall be stated in the submittal. The shortfall shall be treated as WQv under Chapter 8 and shall get no retention credit.
4.4.5 Drawdown of retention
Retention storage shall be emptied by infiltration or reuse within 72 hours of the end of the retention-depth storm, verified by the tests of Clause 4.4.3.
4.4.6 Retention credit: definition and computation
4.4.6.1 What the credit is. The retention credit is the reduction in required detention storage that results when the retention practices are included in the post-development routing. It is computed. It is not assumed equal to the RRV.
4.4.6.2 Tier A method (routing). For each design storm and duration of Clause 4.6.3:
- (a) model each retention practice explicitly as a storage that is empty at the start of the storm, unless Clause 4.11 says otherwise;
- (b) let the practice fill from the front of the storm, and let it lose water during the storm only at the design infiltration or reuse rate of Clause 4.4.3;
- (c) once it is full, route its overflow to the detention facility; and
- (d) size the detention for the residual hydrograph.
The required detention storage is the largest storage over all storms and durations. The credit is the difference between that storage and the storage required with no retention. No further deduction shall be made.
4.4.6.3 Tier B method (simplified). The detention storage required by Clause 4.14 may be reduced by:
V_credit = C_R × RRV_provided
where C_R is the retention credit factor from Annex 4B for the zone, soil group and drawdown rate. Until Annex 4B is published, C_R = 0.
4.4.6.4 Retention that is not verified under Clause 4.4.3 gets no credit.
Commentary. "Credited against detention" (APWA 5600 2025.01) can be read in two ways. One reading subtracts the retained volume from the detention volume, cubic metre for cubic metre. The other routes the storms with retention in place and sees what detention is still needed. The two readings give very different answers in Assam, because the mandatory 48- and 72-hour storms (Clause 2.5.2) fill any retention practice on the first day, long before the peak arrives on the last day (Clause 2.9.2). Unless the practice keeps infiltrating during the storm, it is full at the peak and does nothing to reduce the peak storage.
The illustrative example in Clause 4.6.7 shows the size of the effect. A 2 ha site with 552 m³ of retention (no infiltration during the storm) needs 138 m³ less detention for the 24-hour storm. That is a credit of about a quarter of the retained volume. For the 48- and 72-hour storms, which govern, the credit is close to zero. Subtracting the retained volume directly would have under-sized the detention by about 545 m³ (about 19%).
This Manual therefore defines the credit as the result of routing. Retention on fast-draining sandy soils, which keeps infiltrating through a multi-day storm, will earn a real credit. Retention that only fills will earn little. Both outcomes are physically correct. Setting C_R = 0 until Annex 4B exists is a safe default for Tier B, not a judgement that retention has no value: retention is still required for water quality and recharge (Chapter 8).
4.4.7 Preservation credit
Areas of the site that are permanently preserved in natural cover may be modelled at their pre-development CN in the post-development condition, provided that:
- they are protected by a registered covenant or dedication; and
- their runoff is not concentrated onto impervious surfaces.
This lowers both the RRV and the detention required. No other preservation credit applies.
4.5 Release-rate criteria
4.5.1 General
4.5.1.1 Peak discharge from the site shall be computed by a hydrograph method (Chapter 3) for the pre-development and post-development conditions with identical design storms (Clause 2.11.1). The Rational Method shall not be used for any part of storage sizing.
4.5.1.2 Pre-development is greenfield: open land in good condition for the mapped HSG. Existing impervious cover is not counted (Clause 2.11.5, Chapter 3). This applies to redevelopment as well, subject only to the constrained-redevelopment route of Clause 4.5.6.
4.5.1.3 The criteria apply at each point where runoff leaves the site. Where a site drains to more than one outfall, the criteria apply to each outfall for the area draining to it. Runoff shall not be diverted between catchments.
4.5.2 Standard catchments
For each of the 50%, 10% and 1% AEP (2-, 10- and 100-yr) storms, and for every duration in {1, 2, 3, 6, 12, 24, 48, 72 h}:
Q_post(T, d) ≤ 0.9 × Q_pre(T, d)
4.5.3 Flood-sensitive catchments
4.5.3.1 In the catchments listed below, the mixed-frequency rule of Clause 2.11.3 applies, for every duration in Clause 2.5.2:
Q_post(1% AEP, 100-yr) ≤ Q_pre(10% AEP, 10-yr), and Q_post(50% AEP, 2-yr) ≤ Q_pre(50% AEP, 2-yr).
Each cap is the pre-development peak at the duration that maximises it: the 10-yr peak for the 100-yr check, and the 2-yr peak for the 2-yr check. The cap applies to every post-development duration (Clause 2.11.3).
4.5.3.2 The flood-sensitive catchments are:
- (a) Guwahati's Bharalu–Bahini basin: the catchment of the Bahini and the Bharalu down to the outfall at Bharalumukh, including the part of the Bahini's catchment in Meghalaya, the Noonmati basin that is pumped to the Bondajan, and the localities that flooded in June 2022 (among them Anil Nagar, Nabin Nagar, Rajgarh Link Road, Rukminigaon, Hatigaon and Krishna Nagar);
- (b) the Mora Bharalu–Deepor Beel–Khanajan system and the Silsako basin: the land that drains through the Mora Bharalu, the Basistha and the Kalmani to Deepor Beel and through the Khanajan to the Brahmaputra (a jan, Assamese জান: a stream or natural drainage channel, often the outlet of a beel), and the land that drains to Silsako Beel;
- (c) the hill streams of the Guwahati fringe: the catchments of the streams that rise in the hills of Meghalaya and enter Guwahati at Khanapara and Jorabat, with the hill-foot land below them;
- (d) Dibrugarh behind the DTP dyke: the land of Dibrugarh that drains to the DTP drain and through it to the Sessa, including Larua Jamira beel;
- (e) Silchar behind the Barak embankment: the land of the Silchar Master Plan area enclosed by the embankments of the Barak;
- (f) Karimganj on the Kushiyara, with Hailakandi and Badarpur: the land of these towns that drains to the Kushiyara, the Barak and their tributaries behind embankments;
- (g) Palasbari–Mirza: the land of the Palasbari–Mirza–Bijoynagar Master Plan area that drains to its channels and wetlands;
- (h) the north-bank towns on dam-release and flash-flood reaches: the land of North Lakhimpur that drains to the Ranganadi, of Dhemaji, of the towns on the Subansiri below the Lower Subansiri project, and of Tezpur that drains to the Jia Bharali;
- (i) Dhubri and Goalpara on the lower Brahmaputra: the land of the two towns that drains to the Brahmaputra and its embankment sluices;
- (j) Majuli and the char lands: Majuli and every char, chapori and river island on which a town or a development under this chapter lies;
- (k) Haflong and Diphu: the land of the two hill towns, with the landslide ground round them; and
- (l) any catchment notified under Clause 4.5.4.
The boundaries shall be those mapped in Annex 4A.
4.5.4 Notification of further flood-sensitive catchments
4.5.4.1 The Authority may propose that a catchment be notified as flood-sensitive where one or more of the following is documented:
- (a) buildings or arterial roads flooded in an event of 1% AEP or more frequent, on at least two occasions in the previous 20 years;
- (b) receiving drains or channels with capacity below the 10% AEP flow under existing conditions;
- (c) an outfall that is closed by a sluice, gate or flap gate in a river embankment when the Brahmaputra, the Barak, the Kushiyara or a tributary is high, or that depends on pumping, such as the Bharalumukh sluice and pumps in Guwahati and the outfall sluice of the DTP drain at Dibrugarh, or that discharges to a beel or retention pond held full behind such a gate, or to a reach below a dam that releases water, such as the Ranganadi, for part of the monsoon season (Chapter 5);
- (d) loss of more than a quarter of the mapped tank and pukhuri storage in the catchment since the earliest available survey; or
- (e) a basin master plan that relies on limiting site discharge.
4.5.4.2 The procedure shall be:
- The Authority prepares a technical note with the catchment boundary in GIS form and the evidence for 4.5.4.1.
- The State-level technical committee constituted under Chapter 1 reviews the note.
- The draft notification and map are published for public comment for at least 60 days.
- The Government notifies the catchment and the map is added to Annex 4A.
- The rule applies to applications received 6 months or more after notification. Applications received earlier are assessed under Clause 4.5.2.
4.5.4.3 A notified catchment may be de-notified only by the same procedure, and only after a basin study shows that the downstream system meets Chapter 5 with all development under Clause 4.5.2.
Commentary. The 0.9 factor is derived from the Denver (MHFD) analysis. In that analysis, ten basins each releasing 100% of the historic 100-yr peak still produced 106% of the historic peak at the outlet; releasing 90% at each gave 97% (UDFCD Full Spectrum Detention Release Rate Memorandum, 2012). The mixed-frequency rule has no direct precedent; the nearest is the Malaysian DID (2008) checklist, which required post-development 2-, 10-, 50- and 100-yr peaks below the pre-development 2-yr peak. The specific "100-yr post ≤ 10-yr pre" form appears in a New Berlin, Wisconsin planning discussion (not an adopted rule). The Guwahati entries follow the city's drains to the river. The Bahini rises at Umtyrnga in Meghalaya and runs 9.29 km to Jonali, where it becomes the Bharalu, which runs 6.2 km to the Brahmaputra at Bharalumukh; the catchment is about 120 km², roughly half hills, with about 10.94 km² draining the city (PCBA, Bharalu action plan; about 11 km² in a press article: the figures conflict). The Bahini is "cut off by a sluice at Natun Bazar" (PCBA), the Bharalumukh gates close when the Brahmaputra is high, and the pumps there could discharge "only seven Cumecs" against the river's 72 m³/s by gravity (2008, as reported); the Noonmati basin is pumped by four pumps of 1,000 L/s to the Bondajan (as reported). The CAG counted 14 waterlogging points flooding six or seven times a year and, in June 2014, seven flash-flood deaths and four electrocutions (Report No. 4 of 2019); in June 2022 Anil Nagar, Nabin Nagar, Rajgarh Link Road, Rukminigaon, Hatigaon and Krishna Nagar went under (as reported); and the ADB project for the basin targets the 434 ha of the Bahini basin that flood frequently, against a baseline of 616 ha, with 693 ha inundated in its design storm of 65.72 mm/h in initial modelling (ADB, PAM 57262-001, 2025; the baselines differ). The Deepor Beel entry follows the western city: the Basistha and the Kalmani feed the beel, which drains by the Khanajan to the Brahmaputra and grows from about 10.1 km² to about 40.1 km² in floods (as reported); it is Ramsar site 1207 (19 August 2002, as quoted), its sanctuary notification of 2009 was restored on appeal in 2023 and the State was directed not to denotify it (Gauhati High Court, PIL 18/2023, order of 05.04.2024), and its eco-sensitive zone is still a draft (as reported); the Mora Bharalu, with a capacity of about 45 m³/s (2008, as reported), carries polluted water into it (NGT, OA 673/2018, State progress report of August 2020). Silsako Beel, in Schedule III of the Guwahati Waterbodies (Preservation and Conservation) Act, 2008, which the Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024 repeals (the enacted text is to be confirmed [TBC]), is to receive part of the Bahini's runoff in a retention basin "gradually pumped out to the Brahmaputra" (ADB, RRP 57262-001, 2025), and byelaw 26(ix) sets 15 m from Deepar Beel and Silsako. The hill-fringe entry follows the rain: the 50-year 24-hour depth of the CWC subzone 2(b) plate rises from about 200–240 mm at the city to 280–320 mm at the Khanapara and Jorabat foothills and 400 mm on the border of Meghalaya (NEER's reading of Plate 9), and on 20 April 2026 the gauge at SIRD Khanapara took 215.9 mm overnight against 117.4 mm at the airport (as reported); "indiscriminate cutting and quarrying of hill slopes for filling up of low lying areas results in sheet wash and blockage of channels" (ADB IEE, 2017). The Dibrugarh entry follows the DTP drain: the 8.62-km DTP dyke of 1955 "closed all the drainage channels", the town is "1.5 m below the bed level of Bramhaputra", and the drain runs 32.053 km past Larua Jamira beel to the Sessa with capacities of 105.50, 142.97 and 61.11 m³/s by reach and an outfall sluice with "a flood level of 97.50 m" (ADB IEE, 2017); the Brahmaputra at Dibrugarh has a danger level of 105.70 m and a highest level of 106.48 m (3 September 1998) (CWC, as transcribed by SANDRP; datum not stated). The Silchar entry follows the Barak: the town is a bowl behind the embankment, whose cut at Bethukandi let the river in in June 2022 (as reported; Clause 4.16); the Barak at Annapurnaghat has a danger level of 19.83 m and a highest level of 21.84 m (1 August 1989) (CWC, as transcribed by SANDRP); the Barak valley has 731 km of embankments (as quoted from a Lok Sabha answer), 450 km of them "extremely vulnerable" (as reported); no CWC report covers the valley (Clause 2.3.6(c)(ii)); and the town's outfall channels were not researched [TBC]. The Karimganj entry follows the Kushiyara at Karimganj, danger level 14.94 m and highest level 16.57 m (10 June 2010), and the Barak at Badarpurghat, 16.85 m and 18.48 m (11 September 2007) (CWC, as transcribed by SANDRP); Karimganj district is reported to have been renamed Sribhumi [TBC]. The Palasbari entry follows the Gauhati High Court's finding that builders blocked channels and filled wetland, causing "artificial floods" (PIL/53/2023, order of 06.09.2024). The north-bank entry follows the dams: the Ranganadi project released 1,412.57 m³/s in 2017 (as quoted from an IIT Guwahati report for ASDMA); a discharge of "around 16000 cumec" on the Subansiri was reported on an undated occasion when both projects opened their gates (as reported), and the Lower Subansiri release rules were not found [TBC]; the Jia Bharali at its NT Road crossing has a danger level of 77.00 m and a highest level of 78.50 m (26 July 2007), and the Brahmaputra at Tezpur 65.23 m and 66.59 m (27 August 1988) (CWC, as transcribed by SANDRP); and the 50-year plate rises to 320 mm and more at Dhemaji (NEER's reading of Plate 9 of the subzone 2(a) report). The lower Brahmaputra entry follows the largest 24-hour record in the State that passes the record check, 479.3 mm at Dhubri (Rupsi) on 28 May 1989 (IMD Extremes), which raises the 1% AEP depth at Dhubri above the plate (Clause 2.3.6(h)), and the river at Dhubri, danger level 28.62 m and highest level 30.36 m (28 August 1988), or 30.37 m (17 July 2019) in a later bulletin, and at Goalpara, 36.27 m and 37.43 m (31 July 1954) or 37.35 m (13 July 2004) (CWC, as transcribed by SANDRP and as quoted: the values conflict). The Majuli and char entry follows land that moves: Majuli's area is given as 733.79 km² in 1940 and 524.29 km² in 2016 (as quoted from a Lok Sabha reply) and as 1,246 km² in 1951 and 487 km² in 2024 (a research abstract), baselines that conflict; 2,251 char villages lie on 3,60,927 ha (survey of 2002–03, as quoted); erosion is put at more than 4.27 lakh ha since 1950 or about 3.86 lakh ha since 1954 (both as reported); and these sites are hazard-first under Clause 2.3.6(i). The hill-town entry follows the rain and the slopes: Haflong, on the line between subzones 2(b) and 2(c), recorded 309.5 mm on 27 June 2012 and 1,428.5 mm in that month (IMD Extremes), Lumding, in the same Karbi rain shadow as Diphu (Annex 2A), recorded 410.0 mm on 3 August 1981 (IMD Extremes), and Dima Hasao has landslide ground (Clause 2.3.6(i)). Jorhat, Sivasagar, Nagaon, Tinsukia, North Guwahati and the other towns behind embankments are candidates for notification under Clause 4.5.4. The notification triggers in 4.5.4.1 have no direct precedent and are set by this Manual. The 6-month lead time follows the update rule of Clause 2.14.2. Clause 4.16 explains why releases below pre-development are needed at all.
4.5.5 Minimum outlet and short-duration 2-yr checks
4.5.5.1 Where the PSD for any AEP and duration is less than the discharge of a 50 mm orifice (Clause 4.8.2) at the corresponding stage, the 50 mm orifice is deemed to comply for that AEP and duration.
4.5.5.2 Where meeting the 2-yr criterion at a duration of 3 hours or less would require a low-flow orifice so small that the drawdown requirement of Clause 4.7 cannot be met, the designer shall:
- size the low-flow orifice as the smallest opening that meets Clause 4.7; and
- report the resulting 2-yr exceedance for those durations.
The Authority may accept the design if the exceedance is below the discharge of the 50 mm orifice at the 2-yr stage, or if the downstream analysis of Chapter 5 shows no adverse effect.
Commentary. Under AMC II, a greenfield site produces almost no runoff in a 1- or 2-hour, 2-yr storm, because most of the rain is lost to initial abstraction. A pre-development peak of a few litres per second, compared duration by duration, then forces a very small low-flow orifice. That orifice cannot release the 10-yr volume within 48 hours. Checked as if it were outside a flood-sensitive catchment, the illustrative example of Clause 4.6.7 would need a low-flow orifice of about 75 mm to match the 1-hour, 2-yr pre-development peak. 90% drawdown of the 10-yr volume would then take about 84 hours even with a clean orifice, against the 48-hour limit. The 170 mm orifice that meets drawdown with 50% blockage exceeds the 1-hour, 2-yr pre-development peak by about 11 L/s. Clause 4.5.5.2 resolves that conflict in favour of drawdown, because a basin that is still partly full when the next monsoon storm arrives fails in the event that matters more. KC APWA 5600 (2006) used a 75 mm (3 in) minimum orifice with trash racks. This Manual sets a 50 mm minimum (Clause 4.8.2).
4.5.6 Constrained redevelopment sites
4.5.6.1 Eligibility. The relief route of this clause is available only for redevelopment where all of the following hold:
- (a) the existing site is at least 60% impervious, as surveyed before demolition;
- (b) the site is 1 ha or less; and
- (c) the designer shows, in a Constraint Statement submitted with Form 4-1, that the greenfield criteria of Clauses 4.5.2 or 4.5.3 cannot be met on the site. The statement must show that every storage option of Clause 4.10 has been assessed: rooftop and podium storage, tanks under parking or landscape, permeable paving with sub-base storage, and landscape depressions. It must also give the storage each option can provide.
New development on undeveloped land is never eligible.
4.5.6.2 Minimum on-site performance. An eligible site shall provide all of the following on site:
- (a) the full retention volume (Clause 4.4) and the WQv treatment (Chapter 8), with no relief;
- (b) post-development peak discharge no more than 50% of the existing-condition peak for the 50%, 10% and 1% AEP storms, at each duration of Clause 2.5.2. The existing condition is modelled under Clause 3.3.4; and
- (c) no increase in the 1% AEP water level at any building or road downstream (Chapter 5).
4.5.6.3 Shortfall. The shortfall is the detention storage required to meet the greenfield criteria (Clause 4.6) minus the storage provided on site under 4.5.6.2. The applicant shall pay for the shortfall as a fee-in-lieu at the unit rate of Clause 4.13.3. The fee shall be:
- (a) paid into the ring-fenced account of the basin in which the site lies;
- (b) spent only on regional detention or on restoring pukhuri or tank flood storage identified in the basin stormwater master plan (Chapter 11); and
- (c) recorded in the public ledger of Clause 4.13.4, which shall show the volume owed and the volume delivered in each basin.
Where no basin master plan has yet been approved, the fee shall be held for up to 5 years. If no plan is approved in that time, it shall be spent on restoring tank flood storage in the same basin, with WRD agreement.
4.5.6.4 Flood-sensitive catchments. In the catchments of Clause 4.5.3, the route is available under the same conditions. The Authority may, however, refuse it where the downstream analysis of Chapter 5 shows existing flooding of buildings in the 10% AEP event within the analysis extent.
Commentary. Greenfield is the target for all redevelopment, because a dense city only reduces its runoff as it rebuilds. On small, fully built plots in areas such as the built-up localities of Guwahati that flooded in June 2022, among them Anil Nagar, Nabin Nagar and Rajgarh Link Road (as reported), or the old centres of Dibrugarh and Silchar [TBC], there is often no space for the full greenfield storage. A rule that cannot be met invites variances and non-compliance, which help no one downstream. This clause follows the approach of the UK Non-statutory Technical Standards for Sustainable Drainage (Defra, 2015, S2–S3). For previously developed sites, those standards require peak runoff "as close as reasonably practicable to the greenfield runoff rate" and never above the pre-redevelopment rate. The fixed 50% minimum reduction has no direct precedent; this Manual sets it to give reviewers a clear number in place of a "reasonably practicable" judgement. The fee-in-lieu turns the shortfall into regional storage in the same basin, so the basin still receives greenfield-equivalent control in total. Retention and water quality get no relief, because they are small volumes that almost every site can hold.
4.6 Detention sizing procedure
4.6.1 Method
Detention shall be sized by hydrograph routing through the stage–storage–discharge relationship of the facility, by level-pool (Modified Puls) or an equivalent numerical method (SWMM, HEC-HMS). Fixed-ratio and Rational-based storage formulae shall not be used. The simplified methods of Clause 4.14 (the Tier B tables and the fixed-coefficient route) are the only exceptions.
4.6.2 Steps
- Delineate the site and sub-areas. Map HSG and confirm by testing (Chapter 3).
- Extract design rainfall for 50%, 10% and 1% AEP and every duration in Clause 2.5.2, with the climate factor (Chapter 2, Form 2-1).
- Build design hyetographs: alternating block for ≤ 24 h; the "peak day last" pattern for 48 and 72 h (Clause 2.9).
- Compute pre-development hydrographs (greenfield CN; AMC III for storms of every duration from 1 June to 30 September in sub-areas AS-A, AS-A1, AS-B, AS-C, AS-C1 and AS-D1, from 1 May to 31 October in AS-E, and from 1 April to 31 October on floodplain land below the 1% AEP level, char and chapori land, beel and pukhuri margins and land behind embankments, at all times in catchments draining to a reservoir, its backwater or a release reach below a dam, and at other sites and times, including AS-D, after a 5-day total of more than 53 mm, AMC II otherwise).
- Compute the release caps for each AEP and duration under Clause 4.5.2 or 4.5.3.
- Compute post-development hydrographs with the same storms and AMC, including retention practices (Clause 4.4.6).
- Choose a trial facility geometry (stage–storage) and a multi-stage outlet (Clause 4.6.5).
- Route every storm and duration. Use a time step of no more than 5 minutes, and no more than Tc/3 of the post-development catchment.
- Check every release against its cap, and check drawdown (Clause 4.7). Adjust the outlet and storage and repeat.
- Check the tailwater condition of Clause 4.6.6 and the downstream analysis of Chapter 5.
- Size the emergency spillway and set freeboard (Clause 4.9).
- Report the governing storm for storage, for each outlet stage, and for the spillway (Clause 4.17).
4.6.3 Storms to be routed
Every facility shall be routed for the full matrix:
Table 4.1 — Design storms to be routed for detention sizing
| AEP | Durations (h) | AMC |
|---|---|---|
| 50% (2-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
| 10% (10-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
| 1% (100-yr) | 1, 2, 3, 6, 12, 24, 48, 72 | II for ≤ 6 h; III for ≥ 12 h |
The 24-, 48- and 72-hour runs are mandatory whatever the critical-duration result (Clause 2.5.2). Where Ia = 0.05S sensitivity is required by Chapter 3, it shall be run for the governing storage case.
4.6.4 Initial conditions
Each run shall start with:
- detention storage empty, down to the invert of the lowest outlet;
- any permanent pool full;
- retention practices empty, except as limited by Clause 4.11; and
- RWH storage full (Clause 4.11).
The 48- and 72-hour storms already contain their antecedent rain, so no further pre-filling is applied.
4.6.5 Multi-stage outlet design
4.6.5.1 The outlet shall have a separate control for each criterion, normally stacked as in Figure 4.2:
- Stage 1, at the invert: the low-flow orifice. It releases the WQv over 24–48 h (Chapter 8) and controls the 2-yr release.
- Stage 2: an orifice or slot set at or near the maximum 2-yr level. It controls the 10-yr release.
- Stage 3: a weir, riser crest or larger orifice set at or near the maximum 10-yr level. It controls the 100-yr release.
- Emergency spillway: separate from the primary outlet (Clause 4.9).
Stages may be combined where routing shows that every cap is met.
4.6.5.2 Orifices shall be computed with a discharge coefficient of 0.60 unless a rated device is used. Weirs shall use a coefficient appropriate to their shape. Submerged-outlet and tailwater effects shall be included (Clause 4.6.6).
4.6.5.3 Vortex flow controls and other proprietary devices may be used where the supplier provides a certified head–discharge curve and the minimum clear opening is at least 50 mm.
4.6.6 Tailwater on the outlet
The outlet shall be routed against the tailwater of the receiving system, not free outfall, wherever the receiving water level can rise above the outlet invert. The tailwater shall be:
- for a receiving drain: its water level in the same storm, from the Chapter 5 analysis or, for Tier B, the drain obvert;
- for tidal or backwater-affected outfalls: the levels and joint cases of Clause 2.12 and Chapter 5, including the outfall-closed check (Clause 5.10).
Where tailwater governs, a flap gate shall be fitted to the outlet (Clause 5.11). The storage below the tailwater level shall not be counted as available unless the routing includes the gate closure.
4.6.7 Illustrative example
Illustrative — not design values. This example shows the procedure and the sizes it produces. The inputs are invented to be plausible for a hill-fringe colony in south Guwahati draining to the Bahini. They are not NIH-DHAARA values and must not be used for design.
Inputs:
- Site: 2.0 ha, flood-sensitive catchment (Clause 4.5.3).
- Land cover: pre-development all pervious, CN 70. Post-development as two sub-areas (Clause 3.9.2): 1.57 ha of directly connected impervious surface at CN 98, never converted for AMC, and 0.43 ha of pervious open space at CN 70, on the same soil as pre-development; the area-weighted CN at AMC II is 92. For storms of 12 h and longer the pervious CN only is converted to AMC III: CN_III = 23·CN / (10 + 0.13·CN) = 84.3 (Clause 3.8.4).
- Time of concentration (Tc): 45 min pre-development, 15 min post-development (used for both sub-areas). SCS triangular unit hydrograph; 5-minute time step.
- 24-h depths: 110, 200 and 350 mm for 2-, 10- and 100-yr (the same 10- and 100-yr values as Clause 2.11).
- Shorter durations: P(t) = P24·(t/24)^0.40, an assumed ratio set and not Annex 2B.
- Longer durations: 48-h and 72-h depths taken as 1.25 and 1.40 × P24, laid out per Clause 2.9.2.
- Storage: vertical-walled, 2,500 m² plan area.
- Outlet, sized so that drawdown is met with the low-flow orifice 50% blocked (Clause 4.8.3). Annex 4C shows the trial outlet that failed this check.
- Stage 1: 170 mm orifice at the invert.
- Stage 2: 460 mm orifice with its invert 0.53 m above the floor.
- Stage 3: none needed, because the 100-yr cap is met by Stages 1 and 2.
Results (discharges in L/s; storage in m³):
Table 4.2 — Illustrative example: peak discharges and storage used, by duration (Illustrative — not design values)
| Duration (h) | 2-yr pre | 2-yr post, detained | 10-yr pre | 10-yr post, detained | 100-yr post, uncontrolled | 100-yr post, detained | 100-yr storage used | 10-yr drawdown, 50% blocked (h) |
|---|---|---|---|---|---|---|---|---|
| 1 | 4 | 15 | 51 | 28 | 922 | 42 | 1,426 | 31.3 |
| 2 | 14 | 20 | 84 | 34 | 961 | 79 | 1,911 | 32.1 |
| 3 | 19 | 22 | 104 | 37 | 981 | 139 | 1,999 | 32.8 |
| 6 | 32 | 25 | 150 | 41 | 1,010 | 194 | 2,154 | 34.2 |
| 12 | 127 | 30 | 302 | 46 | 1,074 | 276 | 2,512 | 39.0 |
| 24 | 149 | 32 | 327 | 49 | 1,081 | 320 | 2,766 | 45.3 |
| 48 | 173 | 34 | 349 | 82 | 1,087 | 343 | 2,913 | 44.8 |
| 72 | 180 | 34 | 356 | 84 | 1,089 | 343 | 2,911 | 44.7 |
How to read it:
- 100-yr cap. The cap is the largest pre-development 10-yr peak, 356 L/s (72 h). Every 100-yr detained peak is at or below it; the largest is 343 L/s.
- 2-yr cap. The site is flood-sensitive, so the 2-yr cap is the largest pre-development 2-yr peak, 180 L/s (72 h; Clause 4.5.3.1). The largest 2-yr detained peak is 34 L/s. At 1, 2 and 3 hours the detained 2-yr peak is above the pre-development peak of the same duration (15 against 4 L/s, 20 against 14 L/s, and 22 against 19 L/s). That comparison is not required here. It would be for a site under Clause 4.5.2, and Clause 4.5.5.2 would then apply.
- Governing storage. Storage is governed by the 48- and 72-hour storms: 2,913 m³, which is 0.146 m³ per m² of site, at a maximum depth of 1.17 m. A design that checked only the critical-duration peak storm (1–3 h here) would have provided about 2,000 m³, roughly two-thirds of what is needed.
- Drawdown. With the low-flow orifice 50% blocked (Clause 4.8.3), 90% of the 10-yr storage drains in at most 45.3 h (the 24-hour storm), within the 48 hours of Clause 4.7. A 120 mm orifice would drain it in about 42 h when clean but 54 to 75 h when half blocked, so it fails. Annex 4C shows that trial and the routing step by step.
- Retention credit. With an illustrative retention depth of 40 mm, RRV = 552 m³, computed for each sub-area (Clause 3.9.4). Modelled as filling from the start of the storm with no infiltration during it, the retention reduces the 24-hour storage by 138 m³ and the 48- and 72-hour storage by 7 m³ or less. The credit under Clause 4.4.6 is therefore effectively zero for this site.
The order of magnitude, about 0.15 m³ per m² of site, is consistent with the indication in Clause 2.11.
Figure 4.1 — Pre-development 10-yr, post-development 100-yr uncontrolled and detained hydrographs for the 24-hour storm of the illustrative example (Clause 4.6.7). Illustrative — not design values. Original drawing for this Manual, adapted from the pre/post-development hydrograph concept in MARC/KC APWA Section 5600 and the Georgia Stormwater Management Manual (2016).
Commentary. Figure 4.1 shows what detention does and does not do. It cuts and delays the peak. It does not reduce the volume: the area under the detained curve equals the area under the uncontrolled curve, more than twice the pre-development 10-yr volume. The extra volume leaves the site over many hours after the storm. That prolonged release can coincide with the peak of the larger catchment downstream (Clause 4.16), and it must still drain when the outfall is tide-locked (Chapter 5).
4.7 Drawdown
4.7.1 Detention. At least 90% of the maximum volume stored in the 10% AEP (10-yr) storm of each duration shall be released within 48 hours of the time of maximum storage, by gravity, with the tailwater of Clause 4.6.6.
4.7.2 Water quality volume. The WQv shall be released over not less than 24 hours and not more than 48 hours (Chapter 8).
4.7.3 Retention. Retention storage shall be emptied within 72 hours by infiltration or reuse (Clause 4.4.5).
4.7.4 Tidal outfalls. Where gravity drawdown is prevented by tide for part of each cycle, the 48-hour limit applies with the tidal tailwater modelled. Where it cannot be met by gravity, pumped drawdown shall be provided under Clause 5.12.
Commentary. KC APWA 5600 (2006) required dry basins to release at least 80% of storage within 24 hours of the inflow peak and to empty within 72 hours. Singapore PUB requires detention to be restored within 4 hours. The 48-hour, 90% rule is longer than PUB's because Assam storage must hold multi-day volumes. It is still short enough that a basin filled by one monsoon depression will have most of its volume back before the next, which in June 2022, when Guwahati's gauges recorded 84.6–88 mm on 14 June and the city 46 mm in the 24 hours from 08:30 on 15 June (as reported), and Cachar 251.20 mm on 19 June (as quoted from the district report) followed within days.
4.8 Outlet structures
4.8.1 General. Primary outlets shall be:
- unattended, with no moving parts, valves or pumps, except where Clause 5.12 permits pumped drawdown;
- accessible for inspection and cleaning from the surface without confined-space entry, where practicable; and
- built of durable materials. In coastal areas these shall be corrosion-resistant (Clause 4.12.5).
4.8.2 Minimum orifice. No control orifice shall be smaller than 50 mm in diameter, or 50 mm in least dimension for a slot.
4.8.3 Trash racks and screens. Every orifice and weir shall be protected by a trash rack or screen. The rack shall:
- have a clear bar spacing no greater than half the smallest opening it protects, and not less than 25 mm;
- have a clear open area at least 10 times the area of the opening it protects;
- be inclined, or set as a cage around the riser, so that debris rises with the water and does not pin against the bars;
- be removable or hinged for cleaning; and
- for routing, be assumed 50% blocked at the low-flow orifice when checking drawdown.
4.8.4 Anti-vortex devices. Riser crests and orifices that may run under more than 1.5 times their diameter of head shall have an anti-vortex plate or hood (Figure 4.2).
4.8.5 Outlet barrels. Outlet barrels through embankments shall:
- be at least 300 mm in diameter (Chapter 6);
- have watertight joints;
- have a filter diaphragm or seepage collars over the length within the embankment; and
- have an energy-dissipating outfall (Chapter 9).
4.8.6 Isolation. Facilities serving more than 1 ha shall have a means of isolating the outlet for maintenance, such as a stop-log slot or penstock. In normal service it shall be left fully open.
Commentary. The 50 mm minimum is smaller than the 75 mm (3 in) of KC APWA 5600 (2006), so the trash-rack requirements are correspondingly stricter. The ratios in 4.8.3 (bar spacing at half the opening, open area 10 times the opening, 50% blockage for the drawdown check) have no direct precedent and are set by this Manual. The blockage factor matches the 50% grate clogging factor for sag inlets in Chapter 6. Indian urban drains carry heavy loads of solid waste, so a low-flow orifice without an effective rack will block within one season.
Figure 4.2 — Detention storage stack (permanent pool, WQv, 2-yr, 10-yr and 100-yr zones, spillway surcharge and freeboard) and multi-stage riser outlet. Schematic, not to scale. Original drawing for this Manual, adapted from the multi-stage outlet and storage-zone concepts in MARC/KC APWA Section 5600 (2006, 2025.01) and the Mile High Flood District Urban Storm Drainage Criteria Manual, Volume 2 (full-spectrum detention).
4.9 Emergency spillway, freeboard and embankment safety
4.9.1 Spillway capacity. Every detention facility formed wholly or partly by an embankment, or whose overflow would reach buildings, shall have an emergency spillway that passes the 1% AEP (100-yr) peak inflow:
- with the primary outlet assumed fully blocked;
- with the facility full to the spillway crest at the start of the storm; and
- with at least 0.3 m freeboard from the maximum water level to the embankment crest.
4.9.2 High-hazard facilities. A facility is high-hazard if its failure or overflow could:
- endanger life;
- flood a habitable building or critical facility; or
- close an arterial road.
High-hazard facilities shall also be checked for the 0.2% AEP (500-yr) peak inflow under the conditions of 4.9.1, with the embankment not overtopped.
4.9.3 Spillway crest. The spillway crest shall be at or above the 1% AEP maximum water level from routing with the primary outlet working. The recommended clearance is 0.15 m.
4.9.4 Spillway location. The spillway shall be:
- on natural ground or a reinforced section, not on fill, unless protected against erosion for the full design flow;
- discharging to the 1% AEP overland flow path of Chapter 6; and
- placed so that its flow does not reach a building.
4.9.5 Underground and enclosed facilities. Tanks, vaults and podium storage shall have an overflow route that operates when the outlet is blocked. The route shall carry the 1% AEP inflow to the overland path without surcharging any building, basement or lift pit.
4.9.6 Embankments.
- (a) Embankments more than 2 m high (measured from the downstream toe to the crest) shall be designed by a qualified geotechnical engineer. The design shall include stability, seepage and settlement analysis.
- (b) Side slopes shall be no steeper than 3H:1V on any face that is mown or accessible to the public. Slopes shall be flatter where Clause 4.15 requires.
- (c) Embankments shall have:
- a crest width of at least 3 m;
- compacted, engineered fill with a core or cut-off where required by the seepage analysis; and
- no trees or large shrubs.
- (d) An embankment structure that falls within the Dam Safety Act, 2021 is subject to that Act in addition to this Manual.
4.9.7 Excavated facilities. Facilities wholly below the surrounding ground, with no embankment, need not meet 4.9.6. They shall still meet 4.9.1, with the overflow route treated as the spillway.
Commentary. The spillway criterion (1% inflow, outlet blocked, basin full, 0.3 m freeboard; 0.2% for high hazard) follows the KC APWA 5600 (2006) rule: the spillway passes the 1% storm with 1 ft (0.3 m) freeboard to the top of the dam, assuming zero storage and a clogged primary outlet, with the crest at least 0.5 ft (0.15 m) above the 1% maximum water surface. KC designed dams above 10 ft (3 m) to SCS TR-60 Class C. The 2 m embankment trigger, the 3H:1V slope (KC wet ponds), and the 3 m crest width have no direct precedent and are set by this Manual.
4.10 Facility types
4.10.1 General. Any storage that meets Clauses 4.5 to 4.9 may be used. Surface storage that is visible and can be inspected without confined-space entry is preferred. Storage shall not be placed in a habitable basement or in any space whose flooding would endanger life.
4.10.2 Underground tanks and vaults.
- (a) Gravity outlet is required where the receiving drain allows it. Pumped outlets are permitted only under Clause 5.12, with a registered maintenance declaration (Chapter 10).
- (b) Access openings shall be provided over the outlet chamber and over every inlet. In tanks over 500 m², they shall be no more than 30 m apart.
- (c) The floor shall fall at least 1% to a sump at the outlet, with a sediment pocket below the low-flow orifice invert.
- (d) The tank shall be ventilated.
- (e) Inlets shall pass through a silt trap or gross pollutant trap (Chapter 8).
- (f) Flotation and groundwater ingress shall be checked under Clause 4.12.
4.10.3 Rooftop detention.
- (a) It is permitted on flat roofs designed for the full ponded load with the outlet blocked. The ponding depth shall not exceed 150 mm unless a structural engineer certifies a greater depth.
- (b) Each roof outlet shall have a flow-control ring or weir with a certified rating, and every roof area shall have at least one overflow scupper, independent of the controlled outlets, that passes the 1% AEP inflow.
- (c) Roofs used for RWH collection may also provide rooftop detention. The detained volume is released through the control, not into the RWH sump.
4.10.4 Podium and landscape-deck detention.
- (a) It is permitted above ground level or above a basement car park, provided the structure is designed for full saturation and ponding, and waterproofed.
- (b) The release, overflow and safety rules for rooftop detention (4.10.3) apply.
4.10.5 Parking-lot detention.
- (a) It is permitted only on surface parking. Ponding depth shall not exceed:
- 200 mm in the 10% AEP storm and 300 mm in the 1% AEP storm at any parking bay;
- zero on accessible routes, ramps and pedestrian crossings; and
- zero in the 10% AEP storm on fire-tender access routes.
- (b) Signs shall warn that the area floods.
- (c) Ponding shall not reach a building wall unless the wall is waterproofed above the 1% level plus freeboard (Chapter 6).
4.10.6 Multi-use detention (parks, playfields, open space reservation).
- (a) Open space land may be used for detention, provided its primary use remains available in at least the 50% AEP storm.
- (b) The storage areas shall be graded to drain fully within the times of Clause 4.7.
- (c) A low-flow channel or underdrain shall carry dry-weather and frequent flows, so that the park is not waterlogged.
- (d) The depth and slope limits of Clause 4.15 apply.
- (e) Play equipment and seating shall be placed above the 10% AEP level.
4.10.7 Ponds and wet basins.
- (a) A permanent pool shall be at least 1.2 m deep over most of its area to discourage weed growth and mosquito breeding, with a vegetated safety bench at the edge (Clause 4.15).
- (b) Only storage above the permanent pool counts as detention.
Commentary.
- The rooftop depth (150 mm) and parking depths (200 and 300 mm) have no direct precedent. This Manual sets them so that a blocked outlet is noticed before it becomes dangerous.
- The 1.2 m pool depth equals the 4 ft minimum permanent pool of KC APWA 5600 (2006). This Manual adopts it mainly for weed and mosquito control.
- Pumped detention tanks need maintenance declarations in Singapore (PUB Addendum No. 3, April 2025). This Manual adopts the same approach through Chapter 10.
- Using open space for multi-use detention fits the green-area rules of the Unified Byelaws 2022, under which at least 20% of every plot is kept for trees and greenery (byelaw 111), group housing and multistoreyed developments use 20% of their area for "organized recreational area / gardening" (byelaw 26(vii)), hill plots keep 30% under vegetation (byelaw 110(k)), and, since 2024, 60% of the open space is landscaped, half of it "unpaved and green" (byelaw 92). Where the ground is outside the floodplain and hill rules of Clause 4.11, a detention area graded into the unpaved part of the open space below the level of the road keeps it pervious and usable, which is what 4.10.6 requires. On land to which the floodplain rule applies, much of the plains, the same surface storage is the preferred form (Clause 4.12.4), but it earns no infiltration credit, its floor is set above the design groundwater level of Clause 4.12.1 or it is lined, and the permeable pavers of byelaw 92 there are laid on a non-exfiltrating base with an underdrain; on hill-rule ground, slopes of more than 10°, colluvium, fill, slide debris and land within twice the height of a cut or wall downslope of it are not used for ponding, and detention is provided in lined tanks, on rooftops and podiums under 4.10.3 and 4.10.4, or on a level open space only where the hill rule's geotechnical certificate covers it. Four kinds of land are not open space for this purpose. A pukhuri on the land is preserved under step 1 of Clause 4.3.1 and modelled as a water surface (Clause 3.3.2(e)) that starts at its outlet level (Clause 3.12.5), so only its flood storage above that level can count, and only as Chapter 7 allows; a beel and its margins are never turned into a detention pond, and engineered storage is called a detention pond, never a pukhuri. The strips of byelaw 26(ix) (15 m from rivers, Deepar Beel and Silsako, 10 m from the Bharalu, Mora Bharalu and Bondajan and from large ponds, 6 m from other channels and other notified water bodies) and the Manual's corridor of Chapter 7 are flood land already: water reaches them first, so they are not counted as detention for the development beside them. Land in the Eco-Sensitive Zone of the Master Plan for Guwahati 2025, which includes "All notified forest, water bodies, rivers etc.", is not graded or paved for detention. And the char and chapori lands carry no permanent detention works at all (Clause 2.3.6(i)).
- Signs and depth markers under Clause 4.15.5, and the flood-warning signs of 4.10.5(b), are in Assamese and English; in the Barak valley districts (Cachar, Karimganj and Hailakandi) they are in Bengali and English, and Assamese may be added; and in the Bodoland Territorial Region they are in Bodo, Assamese and English (set by this Manual). The rule follows the official use of Bengali in the Barak valley districts and of Bodo in the Bodoland Territorial Region under the Assam Official Language Act, 1960, as amended (the amending Acts and the districts they name are to be confirmed [TBC]).
4.11 Rainwater harvesting versus detention accounting
4.11.1 No double counting. RWH storage (sumps, tanks, recharge pits and wells provided under the RWH mandate) shall not be counted as detention.
4.11.2 RWH sumps assumed full. For all routing under this chapter, RWH sumps and tanks shall be assumed full at the start of every storm, in every season. Their overflow shall be routed to the detention facility, or directly to the outfall if it bypasses detention. In the latter case the bypass flow counts against the PSD.
4.11.3 Combined tanks. A single tank may provide both RWH and detention only if:
- (a) the detention zone lies wholly above the RWH overflow level;
- (b) the detention zone is drained by its own gravity control orifice set at the RWH overflow level, meeting Clauses 4.7 and 4.8;
- (c) no pump, valve or user action can hold water in the detention zone; and
- (d) the two zones and the orifice level are shown on the drawings and in the maintenance declaration.
Only the volume between the RWH overflow level and the detention overflow level counts as detention.
4.11.4 Recharge structures. Recharge pits, trenches, shafts and wells may count as retention (not detention) if they meet Clauses 4.4.3 to 4.4.5. In particular, the seasonal high groundwater table shall be at least 1.0 m below their base. In the routing they are treated under Clause 4.4.6 with the groundwater level for the monsoon season.
4.11.5 RWH remains mandatory. Nothing in this chapter reduces the RWH requirement of byelaws 104(i), 110(g) and 114 and Appendix VI of the Unified Byelaws 2022, any direction of the State Ground Water Authority under section 19 of the Assam Ground Water Control and Regulation Act 2012 in a notified area, any condition of a building permit or occupancy certificate, or any rainwater harvesting rule of a District Council [TBC].
Commentary. Rainwater harvesting in Assam is required for every building, and the byelaws give it two sizes that do not agree, but they size it as infiltration, not as storage. Byelaw 114 of the Unified Byelaws 2022 reads: "Every building shall provide one or more rainwater harvesting structures to collect the roof top run-off. The total dimension of recharging/percolating pits/trenches should be at least 5 cubic metres dimension for every 100 sq. metres. of roof area", with the structures of Appendix VI also in apartment houses, institutional buildings and "buildings in hilly areas". Appendix VI, to be "shown in plans while applying for planning permission", requires for all buildings other than commercial and apartment buildings "percolation pits of size 1.2m x 1.2m x 1.5m … at the rate of 1 nos. such pit for every 100 sq.m. of Plot area", filled with pebbles, brick jelly or river sand, and adds that "All Rain water outlets/drains and waste water drains shall be connected to the roadside side through the percolation pit only"; since 2022, "All buildings with plot area 134sq m and above shall have the provision of rain water harvesting storage and reuse"; commercial, apartment, institutional, industrial and other buildings get the same pits and grass paving, "a type of perforated paving … where 10-15% of the area is covered by grass … in addition to the mandatory green space"; and a terrace sump with a first-flush valve and filter, open-ground percolation and piped well recharge are printed under a second heading, whose status (optional in the 2014 text) is unclear in the 2022 layout [TBC]. The pit rate gives 2.16 m³ of pit per 100 m² of plot, against byelaw 114's 5 m³ per 100 m² of roof, and the text does not reconcile the two (NEER's reading); neither is sized to a storm. Roof-water harvesting is "mandatory in hilly areas" (byelaw 110(g)). The 2024 amendment adds landscaping "unpaved and green" and permeable pavers "to allow rain water to percolate to underground" in open space (byelaw 92). The Assam Ground Water Control and Regulation Act, 2012 (Assam Act XVI of 2012) defines rainwater harvesting as "collection and storage of rainwater at surface or in sub-surface aquifer" (s.2(f)) and lets the State Ground Water Authority direct RWH structures in premises of 100 m² or more, and local authorities impose RWH conditions on building plans of 100 m² or more, but only in notified areas (s.19; the layout of its sub-sections is uncertain in the copy read), and no area has been found notified [TBC]; the "100 m² plot" often attributed to the building rules is this section, not a byelaw. In practice GMC began RWH inspections on 20 June 2025, with penalties up to revoking the occupancy certificate, while "most of the apartments and commercial buildings in Guwahati conveniently flout" the rule and the builders' association says the Appendix VI structures "have proved to be faulty" (as reported). The structures the byelaws describe are pits that put water into the ground, and on most of the State's town land the ground is full of water when it rains (Commentary to Clause 3.10): in Kamrup (Metro) the water table stood 0.2–2.76 m below ground in August 2022 and 1.29–2.64 m in November, and after the monsoon water-logged or prone ground was found in "almost all the districts of Assam" (CGWB, GWYB NER 2022-23); the rising Brahmaputra "reduces the rate of percolation" (ADB IEE, 2017). This Manual therefore sets three infiltration rules and one sizing rule for credit (all set by this Manual), and credits the byelaw structures as follows:
- An RWH tank or sump is RWH storage. It is not detention (Clause 4.11.1), and it is assumed full at the start of every storm (Clause 4.11.2), because in the monsoon season it is full after the first heavy rain. A tank may also provide detention only if it is built as a combined tank under Clause 4.11.3, with a detention zone above its RWH overflow level that drains through its own orifice; only that zone counts. The dry sump of byelaws 74 and 110(h) is never an RWH tank: it is a detention facility, empty before each storm (Commentary to Clause 4.1).
- RWH credit rule. Where the floodplain rule or the hill rule below bars infiltration, the volume of byelaw 114, 5 m³ for every 100 m² of roof (about 50 mm over the roof), is provided as storage in a tank in place of the pits. It counts toward the retention requirement of Clause 4.4 only to the extent that it is emptied within 72 hours by a continuous non-potable use, such as toilet flushing or washing, demonstrated under Clause 4.4.3, and is then modelled under Clause 4.4.6 like any other retention practice; it is assumed full at the start of every storm and never counted as detention. The rule takes the byelaw's own volume and changes only where it goes; a larger tank is always allowed. The store also serves the dry season: "The winter season from December to March is practically dry" (CWC subzone 2(b) report, §2.4.1).
- Recharge pits, trenches, shafts and wells count as retention only where they meet Clause 4.11.4 and the recharge rule below: they are credited only to the extent that they drain within 72 hours at half the rate measured in a site test (Clauses 4.4.3 and 4.4.5), with their base at least 1.0 m above the seasonal high water table, and the credit is found by routing under Clause 4.4.6, not by deducting their volume.
- Floodplain rule. No deliberate infiltration practice (soakaway, soak or percolation pit, recharge pit, shaft or well, infiltration trench, or permeable paving with an exfiltrating base) shall be built or credited: on char or chapori land; on land below the 1% AEP flood level of a river or stream; inside an embankment-protected area that ponds when its sluices close; on the margins of a beel or pukhuri (its Zone 1 and Zone 2 under Chapter 7); or wherever the seasonal high water table, the highest level from April to November, is less than 2.0 m below ground. The last condition alone may be set aside where a piezometer record of at least one full April–November season shows that the water table stays at least 2.0 m below ground and at least 1.0 m below the base of the practice (Clauses 4.11.4 and 4.12); the others may not, because a flood or a closed sluice puts water over the practice whatever the water table does. On such land roof runoff goes to storage under the RWH credit rule above, and detention is provided in lined, watertight storage (Clause 4.12.2). The rule is new in this series. It reaches much of the State's town land: the flood-prone area is 31.50 lakh ha, 40% of the State, by the Rashtriya Barh Ayog figure quoted by the CAG (Report No. 5 of 2018), or 31.05 lakh ha, 39.58%, on the WRD website (as quoted) — two figures in circulation; in November 2022, 45.96% of the CGWB's wells in Assam stood within 2 m of the surface (GWYB NER 2022-23); and the char and chapori lands alone hold 2,251 villages on 3,60,927 ha (survey of 2002–03, as quoted).
- Where Appendix VI requires a percolation pit on floodplain land. Appendix VI routes "All Rain water outlets/drains and waste water drains" to the road drain "through the percolation pit only". On land under the floodplain rule, with grey water mixed in and the water table near the surface, that pit is a soakaway in saturated ground, not storage. This Manual does not override the byelaw. It states the conflict plainly: on such a site the Manual requires storage in place of the pit, under the RWH credit rule, with the overflow and the waste water taken to the drain without passing through a pit, and the applicant seeks the Authority's relaxation of the pit requirement, citing this rule. Until the Authority relaxes it, the byelaw requirement stands, and a pit that the byelaw forces on such a site earns no credit under this Manual.
- Hill rule. On the Guwahati hills in sub-area AS-B, in sub-areas AS-D (Karbi hills) and AS-D1 (Dima Hasao hills), and on any natural slope of more than 10° elsewhere, no deliberate infiltration practice shall be built or credited: on natural ground sloping more than 10°; on colluvium, fill or slide debris, whatever its slope; in a mapped landslide zone, including the Hilly Area Zone of the Master Plan for Guwahati 2025 and any land declared landslide-prone; or upslope of a cut slope or retaining wall within twice the height of the cut or wall — unless a geotechnical certificate by a qualified geotechnical engineer or engineering geologist shows that the added water will not destabilise the slope. On such sites roof runoff goes to storage under the RWH credit rule, with overflow to a lined drain that discharges through a silt trap and an energy dissipator to a stable natural channel, never onto an unprotected slope. The 10° threshold is the byelaws' own: "In hilly areas with slope greater than 10° special protection measures shall have to be provided" (byelaw 110(d)); the other hooks are the cut limits of 110(e) ("generally … 4 m. to 6m", and over 6 m "not … ordinarily permitted"), the third-party slope checks of 110(f), drainage "without causing soil erosion" (110(c)), the RWH, dry sump and silt fence of 110(g)–(i), the 30% vegetation of 110(k), the 45° limit of byelaw 74, and the Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 (Assam Act V of 2007), which bars earth cutting that damages a hill in a Designated Area (s.3), requires the Advisory Committee's prior approval for guard walls and houses there (s.14) and punishes breach with up to six months or ₹5,000 (s.19); no Designated Area notification was found [TBC]. Where the third-party check of 110(f) is required, it shall also state whether the site's drainage, storage and any infiltration add water to the slope. The hazard is real: "indiscriminate cutting and quarrying of hill slopes for filling up of low lying areas results in sheet wash and blockage of channels" (ADB IEE, 2017); the Gauhati High Court recorded on 26.05.2025 that "hill cutting is still going on" (PIL/14/2024); four people were killed in a landslide at Nizarapar/Boragaon on 14 June 2022 and three at Bonda on 31 May 2025 (as reported).
- Recharge rule. Recharge is allowed only on tested ground outside the floodplain and hill rules: the bhabar fans of the northern foothills, a belt 11–15 km wide of boulders and gravel (CGWB, Assam State Profile, 2007), where debris and the shifting of channels govern the siting (Clause 2.3.6(i)); river terraces above the 1% AEP level; and the hill-foot colluvium of Guwahati on slopes of 10° or less, where the hill rule's certificate is given. There it needs a silt trap, a filter and a first-flush diverter ahead of the structure, a field infiltration test, a seasonal high water table at least 2.0 m below ground, and the separation of Clause 4.11.4. No recharge or injection well shall be built in a district where groundwater carries arsenic or fluoride above the drinking-water limits: arsenic was found in isolated pockets in Barpeta, Goalpara, Golaghat, Karbi Anglong, Kokrajhar, Lakhimpur, Sibsagar, Nalbari and Karimganj (as quoted from a Lok Sabha answer of February 2025), and fluoride above 1.5 mg/L in parts of Goalpara, Kamrup, Karbi Anglong, Nagaon, Golaghat and Karimganj (as quoted from the CGWB). Recharge is not a design objective in Assam: the stage of groundwater extraction was 22% in 2007, with no over-exploited, critical or semi-critical unit (CGWB, 2007), and 12.61% in the 2024 assessment (as quoted; columns unlabelled). Everywhere else rainwater harvesting is storage and reuse for the dry season, and on floodplain sites storage for the storm.
- Polluted runoff. Runoff from fuel stations, workshops, industrial premises and the like, and from any drain that carries sewage, as the drains of every town in the State do (Commentary to Clause 4.1), shall not be recharged; road and parking runoff shall be recharged, where the recharge rule allows it at all, only through a surface practice with a filter, such as a vegetated basin or trench, never directly into a pit, bore or well (Chapter 8).
On the flood plains, water put into the ground has nowhere to go in the monsoon, and on the hills it goes into the slope. In the monsoon season an RWH tank is full after the first heavy rain, and on the flood plain a pit sits in the water table. Treating RWH as detention would therefore credit storage that does not exist when it is needed. That is why this Manual assumes RWH tanks are full at the start of every storm. Applying the assumption to every season keeps one simple rule. The combined-tank provision (4.11.3) lets an owner build one structure, as long as the detention part is empty when the storm arrives. The RWH credit rule, the floodplain rule, the hill rule, the recharge rule, the treatment of the Appendix VI conflict and the polluted-runoff rule are set by this Manual. The 2.0 m water-table screen of the floodplain rule is set by this Manual from the CGWB depths above, because where the water table rises above it a pit of the 1.5 m depth of Appendix VI stands less than 0.5 m above the water, half the 1.0 m separation of Clause 4.11.4. The 10° slope of the hill rule is the byelaws' own, and the distance of twice the height of a cut or wall is set by this Manual as a precaution, as in the mountain editions of this series, pending guidance from a geotechnical study for the State [TBC].
4.12 High-groundwater and sandy coastal sites
4.12.1 Design groundwater level. Each site in the flood plains of the Brahmaputra and Barak valleys, where most CGWB wells stand within 5 m of the surface before and after the monsoon and nearly half within 2 m after it, the Silchar bowl, the char and chapori lands, the beel and pukhuri margins, the land behind embankments, the terai belt of the northern foothills, and the valley floors and hill-foot land of Guwahati, or any area where the groundwater table lies within 3 m of the surface at any time of year shall establish a design groundwater level (DGWL) for the facility. The DGWL is the seasonal high level during or after the monsoon, from:
- (a) site piezometer readings over at least one full April–November season; or
- (b) where (a) is not available, the higher of the CGWB or Irrigation Department record for the nearest observation well, plus 0.5 m, and the design flood level of any adjacent river, jan, beel or pukhuri, or of the water ponded behind any embankment that encloses the site.
For the flotation check of 4.12.3 at sites in the flood plains of the Brahmaputra and Barak valleys, the char and chapori lands, the beel and pukhuri margins and the land behind embankments, where (a) is not available, the DGWL shall be taken as existing ground level.
4.12.2 Lined storage. Where the DGWL is less than 1.0 m below the base of a storage facility:
- (a) the facility shall be watertight (lined or of watertight concrete), and no infiltration credit applies (Clause 4.4.4); or
- (b) if unlined, the volume below the DGWL shall not be counted as detention, and groundwater inflow shall be added to the routed inflow.
4.12.3 Uplift and flotation. Every below-ground tank, vault, lined pond or chamber shall be checked for flotation:
- with the facility empty;
- with groundwater at the DGWL; and
- for coastal sites, with groundwater also at the major-system tailwater level of Chapter 5, where that is higher.
The factor of safety against uplift, counting only permanent dead loads and ignoring wall friction unless supported by geotechnical design, shall be at least 1.2. Anchoring by ballast, toe extensions or tension piles may be used.
4.12.4 Shallow and above-ground storage preferred. On sites where the DGWL is within 1.5 m of ground, storage should be provided above ground where possible: rooftop, podium, landscape or surface storage. Deep tanks should be avoided.
4.12.5 Durability. Concrete and metal parts in contact with saline or brackish groundwater or tidal water shall be designed for the exposure class appropriate to coastal conditions under IS 456:2000. Outlet fittings, trash racks and gates shall be of stainless steel, HDPE, FRP or another corrosion-resistant material.
4.12.6 Sandy soils with deep groundwater. Where the DGWL is 1.0 m or more below the base, infiltration retention in sandy soils is encouraged. The design infiltration rate of Clause 4.4.3 applies, and the Chapter 8 requirements on pollution of shallow aquifers shall be met.
Commentary. Assam is landlocked, so the coastal provisions of this clause, the tidal water levels of 4.12.1 and 4.12.3 and the saline exposure of 4.12.5, do not apply in the State, and no saline groundwater was reported in the sources read for this Manual [TBC]. The CGWB reports high iron in groundwater on the "Northern Bank of Brahmaputra" (CGWB, Assam State Profile, 2007) and high iron and fluoride in Goalpara (CGWB district booklet, as quoted); where a site test shows aggressive groundwater, concrete and metal parts are designed for the exposure class that the test indicates under 4.12.5 (set by this Manual). The wet cases are most of the plains. The water table stood 2–5 m below ground at 57.43% of the CGWB's wells in March 2022 and within 2 m at 45.96% of them in November 2022; in Kamrup (Metro) it was 1.39–4.08 m below ground in March, 0.2–2.76 m in August and 1.29–2.64 m in November (CGWB, GWYB NER 2022-23), and it rises "with the rising of the Brahmaputra" (ADB IEE, 2017). On the char and chapori lands, the beel and pukhuri margins and the land behind embankments the ground is flooded or saturated when the river is high. There an unlined tank fills with groundwater before the storm, and an empty lined tank or dry sump can float, especially when a river in flood, a beel at its outlet level or water ponded behind an embankment raises the water table beside it. The design groundwater level of 4.12.1(b) therefore takes the design flood level of the adjacent river, jan, beel or pukhuri, or of the water ponded behind an embankment that encloses the site, where that is higher than the well record; and on the flood plains of the Brahmaputra and Barak valleys, the char and chapori lands, the beel and pukhuri margins and the land behind embankments it is taken as existing ground level for the flotation check unless piezometers show otherwise. Storage there is preferably above ground, on roofs, podiums and landscape (4.12.4), and a dry sump below ground is lined, anchored and checked for flotation with the sump empty (Commentary to Clause 4.1). On a hill site a deep tank is not preferred even where groundwater is deep, because a leaking tank on a slope is an infiltration practice by another name: storage on a slope shall be lined and watertight, and its leakage and overflow taken to a lined drain (Clause 4.11, hill rule). The April–November monitoring season of 4.12.1(a) is set by this Manual to cover the Manual's monsoon season of 1 April to 31 October and the post-monsoon high of November, when more of the CGWB's wells stood within 2 m of the surface (45.96%) than in March (20.27%); a reading taken in March understates the design level. Most of the State's observation wells are those of the CGWB, North Eastern Region, Guwahati (381 in 2007); whether the Irrigation Department, which administers the Assam Ground Water Control and Regulation Act, 2012, keeps observation wells was not found [TBC], and no water-table depths for individual town sites were obtained [TBC]. The factor of 1.2, the 0.5 m allowance, the "ground level" default for the plains, chars, waterbody margins and embanked land, and the exposure rule for aggressive groundwater have no direct precedent; this Manual sets them because no published site-scale seasonal groundwater depths for Assam were found during research.
4.13 Regional detention and fee-in-lieu
4.13.1 Where permitted. In a basin covered by a Basin Stormwater Master Plan approved under Chapter 11, a development may meet all or part of its detention requirement through:
- (a) a regional detention facility identified in the plan; or
- (b) a fee-in-lieu paid toward restoration of pukhuri or tank storage identified in the plan.
4.13.2 Conditions. Regional detention or fee-in-lieu shall be accepted only where:
- (a) the regional facility or restored tank is operational, or is funded and scheduled to be operational within 3 years. Until then, interim on-site detention is required.
- (b) the conveyance from the site to the facility carries the 1% AEP post-development flow without increasing water levels at buildings or roads between them (Chapter 5);
- (c) the storage credited at a tank is the flood storage only. This is the volume between full tank level (FTL) and the maximum water level the bund and surplus weir can safely hold, plus any volume below FTL that a notified operating rule commits to empty before the monsoon. Storage below FTL that is held for irrigation or supply through April to October shall not be credited.
- (d) the tank meets Chapter 7: surveyed FTL, a documented operating rule, and a maintained surplus weir;
- (e) the site still provides retention (Clause 4.4) and WQv treatment (Chapter 8) on site; and
- (f) in flood-sensitive catchments, the regional facility meets the mixed-frequency rule for its whole contributing area.
4.13.3 Fee. The fee-in-lieu shall be computed as:
Fee = (detention volume required on site under Clause 4.6, m³) × (unit rate, ₹/m³, notified by the Authority)
The unit rate shall include land, construction and 10 years of maintenance. Fees shall be held in a ring-fenced basin account and spent only on the facilities named in the plan.
4.13.4 Ledger. The Authority shall keep a public ledger of:
- detention volume credited to each regional facility;
- volume delivered; and
- fees received and spent.
Commentary. The Malaysian DID (2008) checklist favoured community ponds over on-site detention for sites above 0.1 ha. Studies of on-site detention show that its benefit depends on location and fades with distance downstream (Colorado State University thesis; McEnroe for Kansas City), and that a pond low in the catchment can synchronise with the main-stem peak (Water 2016). Regional storage therefore has to be sited by basin modelling, not simply aggregated.
Assam has no tank Act, but it has a statute that already treats a water body as storm-water storage. The Guwahati Waterbodies (Preservation and Conservation) Act, 2008 (Assam Act XX of 2008) defines "Waterbodies" as "the area or areas of land where the rain water accumulates and act as natural or storm water reservoir and shall include wetland" (s.2(e)) and bars filling, building and dumping in its four scheduled areas (s.4), Sarusola (as read from a garbled schedule heading), Borsola, Silsako and land near Deepor Beel (Schedule IV is land near the beel, not the beel itself); the Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024, passed on 29 August 2024, repeals the 2008 Act (s.22(1)) and extends the same definition to all notified Master Plan areas outside the Autonomous Districts, adding "all natural water channels (that are inflow or out flow channels into or from the waterbody)" and all ponds and tanks "irrespective of its size", but not private water bodies of less than 2 acres, those in reserved forests, sanctuaries and national parks, or Government fish farms (s.2(d)); it requires that a water body's "area is not diminished and character is not changed" without the State Level Committee's approval (s.3), forbids obstructing "the natural and normal course of inflow and outflow" (s.15) and punishes breach with up to three years or ₹1 lakh, with restoration (s.16) (Bill as introduced; the enacted Act, Assam Act XXV of 2024, and its Rules were not read [TBC]). Since 2024 no use is permitted in the scheduled plots without the Authority's permission (land-use note to the Unified Byelaws 2022). The State's regional storage is of four kinds: the beels (Assamese বিল), natural floodplain lakes and wetlands, which cover, with the State's other wetlands, 764,372 ha, 9.74% of Assam (National Wetland Atlas, 2011, as quoted), and of which the Fisheries statistics counted 2,072 registered beels of 71,843.5 ha in 2021-22 and then 447 registered and 1,625 unregistered beels, a change in counting (as quoted); the pukhuris, dug tanks and ponds; the retention ponds now being built, such as the ADB's nature-based pond of 59,000 m³ with a pump station of 1.6 m³/s for the Bahini basin (ADB, RRP 57262-001, 2025); and the river flood plain behind and between the embankments of WRD. Deepor Beel, Ramsar site 1207, is the one wetland of international importance (as quoted); the Assam State Wetlands Authority was constituted in 2018 (notification No. FRM.10/2010/Pt/16 of 01.11.2018, as quoted), but no wetland was found notified under rule 4 of the Wetlands (Conservation and Management) Rules 2017 [TBC]. Four points follow:
- A beel or pukhuri on the record may not be a working one. No inventory of the beels and pukhuris within the towns, with their beds, outlets and stage–storage relations, was found [TBC], and beels are being lost: Urpad Beel's water area fell from 4.84 km² in 2003 to 3.38 km² in 2023, and Deepor Beel is reported to have shrunk by about 35% since 1991 (both as reported; other figures conflict). A beel or pukhuri is credited only after a survey shows its bed, its outlet and its stage–storage relation, and only for the storage above its outlet level; a natural beel is never turned into a detention pond, and engineered storage is called a detention pond, never a pukhuri or a beel.
- The law already counts the storage. Because the 2008 Act and the 2024 Bill define a water body as a "natural or storm water reservoir", a design that counts a scheduled beel's storage, and a rule that forbids reducing it, restate the law rather than extend it. But the storage is the basin's, not a site's: it is held for the whole catchment, it is scheduled and supervised through the District Level Committee and the State Level Committee, and it can be credited to a development only through the basin stormwater master plan of Chapter 11, never by discharging a site's runoff into a beel.
- A beel behind a sluice is full when it is needed. The receiving beel or pond of a gated or pumped outfall starts full to its outlet level whenever the outfall is closed (Commentary to Clause 3.12; Clause 5.8.5(e)), as the Dibrugarh design assumes "that the beel is full and the drain is also flowing full" (ADB IEE, 2017); its storage below that level is not credited, and its storage above it is credited only when the routing includes the closure.
- An embankment, sluice or drainage scheme of WRD is not regional storage. Storm water spilled to a river through an embankment uses capacity that the river needs for its whole basin, and the sluice shuts when the river is high; in a notified area no one may build on, remove or alter an embankment or drain without the permission of the Deputy Commissioner or the Embankment Officer (Assam Embankment and Drainage Act, 1953, s.16), so a regional facility that relies on one needs WRD's written agreement for a stated flow and level. No notification assigns the Bharalu, the Mora Bharalu or the Bahini to one owner (NEER's reading), and the ADB names "fragmented institutional responsibilities involving multiple institutions, such as the Guwahati Metropolitan Development Authority (GMDA), Public Works Department, and Water Resources Department" as the problem (ADB, RRP 57262-001, 2025); until an order is made, this Manual follows the working assignment of Chapter 1, and each town keeps a drain register giving every reach its owner, its land status, whether it is a scheduled water body or an embankment drain under the 1953 Act, and its outfall.
The first point is the basis of condition 4.13.2(c) in Assam. A beel or pukhuri gives flood storage only above its outlet level, unless a notified operating rule commits it to be lowered before the monsoon season. The 3-year operational limit and the 10-year maintenance allowance have no direct precedent and are set by this Manual.
4.14 Simplified methods for small sites
4.14.1 Applicability. Tier B local bodies may permit the simplified method for sites of 2 ha or less outside flood-sensitive catchments. In flood-sensitive catchments, it may be used for sites of 0.5 ha or less. All other sites shall use Clause 4.6. Until Table 4.3 (Annex 4B) is published, all Tier B sites shall also use Clause 4.6.
4.14.2 Method.
- Read the PSD (L/s/ha) and SSR (m³/ha) for the site's zone, HSG and post-development imperviousness from Table 4.3 (Annex 4B).
- Required storage: V = SSR × A − V_credit (Clause 4.4.6.3).
- Permissible discharges: Q_PSD,T = PSD_T × A for the 2-yr and 100-yr stages.
- Select the low-flow orifice and upper control from the standard outlet table in Annex 4B (orifice sizes for the PSD at the stated depths), subject to the 50 mm minimum.
- Provide a spillway or overflow under Clause 4.9, the RWH accounting of Clause 4.11, and the safety provisions of Clause 4.15.
- Complete Form 4-2 (Tier B site sheet).
Table 4.3 — Tier B permissible site discharge and site storage requirement (template)
| Zone (Annex 2A) | HSG | Imperviousness | PSD 2-yr (L/s/ha) | PSD 100-yr (L/s/ha), standard | PSD 100-yr (L/s/ha), flood-sensitive | SSR (m³/ha), standard | SSR (m³/ha), flood-sensitive |
|---|---|---|---|---|---|---|---|
| AS-Z1 North bank: AS-A Lower north bank and Bhutan foothills (Dhubri–Kokrajhar–Bongaigaon–Barpeta–Nalbari–Rangia) | A / B / C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| AS-Z1 North bank: AS-A1 Central and upper north bank (Mangaldoi–Udalguri–Tezpur–Biswanath Chariali–North Lakhimpur–Dhemaji) | A / B / C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| AS-Z2 Guwahati: AS-B Guwahati metropolitan area (Guwahati–Dispur–North Guwahati–Amingaon) | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| AS-Z3 South bank: AS-C Lower and central south bank (Goalpara–Palasbari–Morigaon–Nagaon–Hojai–Golaghat) | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| AS-Z3 South bank: AS-C1 Upper Assam (Jorhat–Sivasagar–Charaideo–Dibrugarh–Tinsukia–Margherita) | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| AS-Z4 Hill districts: AS-D Karbi hills (Diphu–Hamren–Bokajan–Donkamokam) | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| AS-Z4 Hill districts: AS-D1 Dima Hasao hills (Haflong–Maibang–Umrangso–Jatinga) | C / D | 50% / 70% / 90% | [TBC] | [TBC] | [TBC] | [TBC] | [TBC] |
| AS-Z5 Barak valley: AS-E Barak valley (Silchar–Karimganj–Hailakandi–Badarpur) | — | — | Not tabulated: Clause 4.6 applies (Clause 2.3.6(c)(ii)) | — | — | — | — |
Worked example (illustrative — not design values).
A 0.4 ha residential layout in a Tier B Municipality, in a flood-sensitive catchment, with about 80% directly connected impervious area (area-weighted post-development CN about 92). Suppose Table 4.3 had been computed and gave the per-hectare equivalent of the Clause 4.6.7 example:
- PSD 100-yr = 356 / 2.0 = 178 L/s/ha
- SSR = 2,913 / 2.0 ≈ 1,460 m³/ha
- PSD 2-yr ≈ 17 L/s/ha
Then:
- Storage: V = 1,460 × 0.4 = 584 m³. C_R = 0, so there is no retention credit.
- 100-yr release: 178 × 0.4 = 71 L/s.
- 2-yr release: 17 × 0.4 = 7 L/s. At about 1 m head this needs a low-flow orifice of about 60 mm, above the 50 mm minimum (Clause 4.8.2).
- Layout options:
- a 400 m² underground tank 1.5 m deep; or
- 250 m² of podium storage at 0.3 m (75 m³) plus a 350 m² tank 1.5 m deep (525 m³).
- Rooftop storage at 150 mm over 1,200 m² of roof (180 m³) could replace part of the tank.
- RWH sumps are additional, and are assumed full (Clause 4.11).
Commentary. Australian councils use permissible site discharge and site storage requirement tables in the same way (Sydney Water OSD guide; the Upper Parramatta River Catchment Trust handbook listed SSR of about 455 m³/ha). The illustrative SSR here, about 1,460 m³/ha, is much larger. That is the expected effect of combining a mixed-frequency cap with mandatory 48–72-hour storms at AMC III. MSMA 2 in Malaysia offers a similar simplified OSD method for sites under 5 ha. The MARC policy supplement offers smaller Kansas City municipalities adoptable alternatives within the regional standard; Clause 4.14 follows that model for Tier B.
4.14.3 Fixed-coefficient route. As an alternative to Clauses 4.6 and 4.14.2, the designer of any site of 1 ha or less, under any Approving Authority and in any catchment, may size detention by Clauses 4.14.4 to 4.14.7. The route shall not be used where:
- (a) the site counts tank or waterbody storage in its design (Chapter 7);
- (b) any part of the site lies within a waterbody setback (Chapter 7); or
- (c) the site drains to a tank cascade whose storage is counted in a downstream design.
The route sets the release caps by fixed coefficients and does not need Table 4.3. It may therefore be used before Annex 4B is published. Retention (Clause 4.4), drawdown (Clause 4.7), outlets (Clause 4.8), the spillway (Clause 4.9), the downstream and tailwater checks (Chapter 5) and water quality (Chapter 8) still apply.
4.14.4 Release caps. Two caps apply at each point where runoff leaves the site:
Q_cap,10 = 2.78 × C_10 × i_10 × A and Q_cap,2 = 2.78 × C_2 × i_2 × A
where Q_cap is in L/s; A is the site area (ha); i_10 and i_2 are the 10% AEP (10-yr) and 50% AEP (2-yr) rainfall intensities (mm/h) for a 15-minute duration at the site, from the sources of Chapter 2, with the climate factor of Clause 2.8; and C_10 and C_2 are the fixed coefficients of Table 4.3A for the site's hydrologic soil group (Clause 3.7). For a site with more than one soil group, the coefficients are area-weighted.
Table 4.3A — Fixed release coefficients (provisional)
| Hydrologic soil group | C_10 | C_2 |
|---|---|---|
| A (sandy, well drained) | 0.05 | 0.02 |
| B | 0.08 | 0.03 |
| C | 0.15 | 0.08 |
| D (clay, poorly drained) | 0.25 | 0.15 |
Q_cap,10 is the maximum release for every storm up to and including the 1% AEP (100-yr) storm, in every catchment. Q_cap,2 is the maximum release for the 50% AEP (2-yr) storm. Where a cap is smaller than the discharge of a 50 mm orifice at the corresponding stage, the 50 mm orifice is deemed to comply (Clause 4.5.5.1).
4.14.5 Storage. The detention storage V (m³) is the larger of V_100 and V_2, each the largest over the durations d of Clause 2.5.2 (1 to 72 hours):
V_100 = max over d of [ 10 × C_v × P_100(d) × A − 1.8 × Q_cap,10 × d ]
V_2 = max over d of [ 10 × C_v × P_2(d) × A − 1.8 × Q_cap,2 × d ]
where P_100(d) and P_2(d) are the 1% and 50% AEP rainfall depths (mm) for duration d (hours), with the climate factor; and C_v is the post-development volumetric coefficient: the composite C of Table 3.2 (upper half of each range), multiplied by Cf of Table 3.3 for the 1% AEP. For durations of 12 hours or more, C for every pervious surface shall be taken as not less than 0.50. The factor 1.8 assumes an average release of half the cap over the storm (3.6 × 0.5).
4.14.6 Outlet. The outlet shall be a two-stage control: a low-flow orifice that passes Q_cap,2 when the storage holding V_2 is full, and an upper orifice or weir that limits the total release to Q_cap,10 at the top of V. The outlet table of Annex 4B may be used once it is published.
4.14.7 Retention. The retention volume of Clause 4.4 is provided in addition to V. No retention credit (Clause 4.4.6) is taken under this route.
Figure 4.3 — Fixed-coefficient route for sites of 1 ha or less (Clauses 4.14.3 to 4.14.7): the release caps Q_cap,10 and Q_cap,2 from Table 4.3A; the storage V as the largest gap, over the durations of Clause 2.5.2, between the cumulative inflow 10·C_v·P(d)·A and the release line 1.8·Q_cap·d, for the 1% and 50% AEP storms; and the two-stage outlet that passes Q_cap,2 at the top of V_2 and Q_cap,10 at the top of V. Schematic, not to scale. Original drawing for this Manual, adapted from the rainfall mass-curve (inflow minus outflow) storage concept and the single-coefficient peak cap of the PUB Code of Practice on Surface Water Drainage, 7th ed. (cl. 7.1.5).
Commentary. The fixed-coefficient route follows Singapore, which caps the peak runoff from every development of 0.2 ha or more with one runoff coefficient, C = 0.55, applied to the 10-yr storm (PUB Code of Practice on Surface Water Drainage, 7th ed., cl. 7.1.5, Addendum No. 3, 2025). It is quick to apply and quick to check: the cap needs only the site area, the soil group and two intensities. PUB's 0.55 is not used here, because Singapore's baseline is the existing urban drainage system, while this Manual's baseline is greenfield land (Clause 4.5.1.2). The coefficients of Table 4.3A are set by this Manual from the greenfield curve numbers of Clause 3.3 (CN 39, 61, 74 and 80 for soil groups A to D). They are the ratios of runoff to rainfall that those curve numbers give for 1-hour depths typical of the Brahmaputra valley floor, rounded down. They are therefore provisional. The State Stormwater Technical Committee shall confirm or revise them against NIH-DHAARA values for each zone when it issues Annex 4B.
The route is deliberately stricter than the full method, so that simplicity costs the developer storage rather than costing the people downstream. The 100-yr release is held to about the greenfield 10-yr peak everywhere, which is the flood-sensitive rule of Clause 4.5.3; the storage assumes the outlet releases only half the cap on average; pervious ground is assumed wet in long storms; and no retention credit is taken. A designer who wants a smaller tank can use the full method of Clause 4.6. The storage formula is the rainfall-mass (inflow minus outflow) method. Clause 3.4.2 otherwise forbids rainfall-based peak methods for storage, because they ignore the shape of the hydrograph; this route is a stated exception because its conservative assumptions cover that error for small sites, and the 24- to 72-hour durations are always checked.
4.15 Safety, fencing and multi-use
4.15.1 Depth limits for publicly accessible storage. Where the public has access to a storage area (parks, playfields, open space, school grounds):
- (a) maximum depth in the 10% AEP storm: 0.45 m;
- (b) maximum depth in the 1% AEP storm: 1.2 m, except in a fenced zone under 4.15.3;
- (c) side slopes: no steeper than 4H:1V, with at least a quarter of the perimeter at 6H:1V or flatter for escape; and
- (d) no vertical drop greater than 0.3 m within the storage area or at its edge.
4.15.2 Wet basins. Permanent pools shall have:
- a safety bench at least 3 m wide, no more than 0.3 m below the normal water level; and
- an emergent planting fringe that deters entry.
4.15.3 Fencing. A fence at least 1.2 m high, of a non-climbable design with a lockable gate, is required around any part of a storage that:
- has a vertical wall or headwall drop greater than 0.6 m;
- exceeds 1.2 m depth in the 1% AEP storm with slopes steeper than 4H:1V; or
- contains an outlet structure with an opening larger than 300 mm that is not grated.
4.15.4 Outlets. Every inlet and outlet opening larger than 300 mm accessible to the public shall be fitted with a grate or rack. The grate shall be designed so that a person pinned against it can escape: low approach velocity, inclined, with a large open area.
4.15.5 Signs and depth markers. Every publicly accessible storage shall have signs in Assamese and English stating that the area floods during rain, and a depth marker at the deepest point.
4.15.6 Confined spaces. Underground tanks shall have lockable covers. They shall be marked as confined spaces, and the maintenance declaration (Chapter 10) shall state the entry procedure.
4.15.7 Vector control. Dry storage shall drain completely (Clause 4.7) and have no low points that pond for more than 72 hours. Wet basins shall meet Clause 4.10.7.
Commentary. The numeric limits in Clause 4.15 have no single direct precedent. They are drawn from common international practice, for example KC APWA 5600 (2006), which required at least a quarter of a dry-pond perimeter at 5:1 or flatter, a 20 ft (6 m) clearance from property lines and a 15 ft (4.6 m) maintenance strip. They are made somewhat stricter here because multi-use storage on open space land and in schools will be used by children during the monsoon. Standing water in dry basins is a mosquito-breeding risk, so complete drainage (Clause 4.15.7) is a public-health requirement, not an amenity.
4.16 Basis: why peak matching alone fails
Commentary. This section has no requirements. It records why this chapter requires release below pre-development rates, retention, long-duration checks and a downstream analysis, rather than simple peak matching.
- Timing. Detention lowers a site's peak but stretches its hydrograph (Figure 4.1). Downstream, the stretched releases from many sites overlap with each other and with the main-stem peak. In Denver's study, ten basins each releasing 100% of the historic 100-yr peak produced 106% of the historic peak at the outlet. Only releasing 90% at each site brought it to 97% (UDFCD memo, 2012). A Colorado State University thesis found that location-blind on-site detention "can actually increase peak flows above post-development peaks". An optimisation study found that a downstream pond performed worse than upstream ponds because its outflow synchronised with the main stem (Water 2016, 8(7):290).
- Volume. Detention does not remove volume. In the illustrative example, the post-development 100-yr storm produces about three times the runoff volume of the pre-development 10-yr storm (Clause 2.11). Only retention, or storage that empties to somewhere other than the receiving drain, reduces volume.
- Scale. Kansas City modelling (McEnroe, 2005) found that uniform 3 cfs/ac control reduced Q100 by 36% in a 200-ac watershed. With the same control everywhere, Q100 still rose by 40% at 14 sq mi, and the benefit faded beyond about 1–2 sq mi. The KC committee concluded that "'match existing' can harm streams" (MARC Evolution deck). Georgia makes a ten-percent downstream analysis mandatory for the same reason: "Due to peak flow timing and runoff volume effects, some structural practices fail to reduce discharge peaks to pre-development levels downstream" (GSMM 2016).
- Design-storm dependence. An Australian study of 20 real on-site detention systems found that designs using even ten temporal patterns "cannot reliably produce an OSD system design that will always be effective" under real rainfall (Water Science and Engineering, 2019). This is why Clause 4.6.3 routes the full duration matrix rather than one critical storm.
- Closed outfalls. In Assam the closed outfall is not the exception but the normal monsoon case. The Water Resources Department describes it: "High stages of river Brahmaputra and Barak obstruct free discharge of tributaries causing back flow and congestion near outfalls. Inadequate countryside drainages through sluices in embankment system … cause prolonged inundation" (as quoted by the CAG, Report No. 5 of 2018). In Guwahati "the water level of the Brahmaputra River sometimes, is higher than the ground level of the city areas" (ADB IEE, 2017); when the river is high the Bharalumukh sluice is shut, and "the natural discharge capacity of the Bharalu is 72 Cumecs when its Bharalumukh sluice gates are kept open, while the pumps fitted to its sluice gates can discharge only seven Cumecs" (2008, as reported; the present capacity was not found [TBC]). At Dibrugarh the dyke built in 1955 to protect the town "closed all the drainage channels", "Dibrugarh town is 1.5 m below the bed level of Bramhaputra", and the town drains 32 km to the Sessa through a sluice designed "keeping in mind that the beel is full and the drain is also flowing full" (ADB IEE, 2017). At Silchar, a bowl behind the Barak embankment, the flood of June 2022 entered through a cut in the embankment at Bethukandi, and the town was under water for about 11 days, up to about 4 m deep in places, or for "about a week" in another account (as reported; the accounts conflict); the Barak at Annapurnaghat peaked at 21.59 m on 21 June 2022, 1.76 m above its danger level but 0.25 m below its highest level of 1989 (as quoted from the Cachar district report; NEER's arithmetic), so the disaster was a breach-and-ponding flood inside the embankment, not a record river. What fills behind the closed gate is storm water mixed with sewage, because no town in the State is sewered (Commentary to Clause 4.1). No record of how long any sluice stays shut was obtained, and WRD's sluice operating rules were not found [TBC]; Chapter 5 sets the river level and the closure to be assumed (Clause 5.8.5). A perfectly orificed basin behind a closed outfall simply fills. No release-rate rule can fix that; it is handled by the outfall-closed check of Chapter 5.
The response in this Manual is layered:
- release below pre-development (Clause 4.5);
- retain the frequent storms (Clause 4.4);
- route long monsoon storms (Clause 4.6.3);
- prefer regional storage in the pukhuri system (Clause 4.13); and
- check downstream and at the outfall (Chapter 5).
Kansas City's own history shows the price. On a test site, peak matching needed 3.0 ac-ft of storage and the 2011 comprehensive criteria needed 4.9 ac-ft (MARC Evolution deck). Over-detention costs more storage. That is the cost of protecting the catchment rather than only the site boundary.
4.17 Submittal requirements
Every site runoff-control submittal shall include a Site Runoff Control Report (Form 4-1) containing:
- the Design Rainfall Sheet (Form 2-1) and the hydrology inputs (Chapter 3);
- the evidence for the order of measures under Clause 4.3.1;
- the RRV computation, infiltration tests, groundwater evidence and drawdown calculation (Clause 4.4);
- the retention credit computation (Clause 4.4.6);
- the release-rate criterion applied, standard or flood-sensitive, with the Annex 4A map extract (Clause 4.5);
- a results table in the format of Clause 4.6.7 for every AEP and duration, with the governing case highlighted;
- stage–storage and stage–discharge tables and plots, and inflow/outflow hydrographs for the governing cases;
- the drawdown calculation (Clause 4.7);
- outlet details, including orifice sizes and levels, trash racks and anti-vortex devices (Clause 4.8);
- the spillway or overflow calculation, freeboard and hazard classification, and the geotechnical report where required (Clause 4.9);
- the RWH and detention accounting, with tank sections showing zone levels (Clause 4.11);
- the design groundwater level and flotation check (Clause 4.12);
- the downstream and tailwater report (Chapter 5, Form 5-1); and
- the safety provisions (Clause 4.15) and the draft maintenance declaration (Chapter 10).
Tier B sites using Clause 4.14.2 shall submit Form 4-2 in place of items 6 and 7. Sites using the fixed-coefficient route (Clause 4.14.3) shall submit Form 4-3 in place of items 6 and 7.
References (chapter)
- Kansas City Metro Chapter APWA (2025). Section 5600 Storm Drainage Systems and Facilities, Version 2025.01 (approved 10 Dec 2025). https://kcmetro.apwa.org/wp-content/uploads/sites/23/2026/01/APWA-Section-5600_Storm-Drainage-Systems-Facilities.pdf
- Mid-America Regional Council (2025). APWA 5600 Stormwater Standards Policy Supplement (7 Nov 2025); APWA 5600 Manual factsheet. https://www.marc.org/document/apwa-stormwater-standards-supplement ; https://www.marc.org/document/apwa-5600-manual-factsheet
- Kansas City Metro Chapter APWA (2006). Section 5600 Storm Drainage Systems and Facilities (5601.8, 5608.4). https://www.kcwater.us/wp-content/uploads/2020/08/Design-Criteria-%E2%80%93-Section-5600-%E2%80%93-Storm-Drainage-Systems-and-Facilities.pdf
- MARC / APWA (2012). Manual of Best Management Practices for Stormwater Quality. https://www.marc.org/sites/default/files/2022-05/Best_Management_Practices_for_Stormwater_Quality.pdf
- MARC. The Evolution of Regional Stormwater Design Standards (presentation; McEnroe 2005 results). https://www.marc2.org/Assets/Environment/WQEC/The_Evolution_of_Regional_Strormwater_Design_Standards.pdf
- Atlanta Regional Commission / Georgia EPD (2016). Georgia Stormwater Management Manual, Volume 1. https://documents.atlantaregional.com/gastormwater/GSMM_2016%20EDITION_FINAL_V1.pdf
- Urban Drainage and Flood Control District (now MHFD) (2012). Full Spectrum Detention Release Rate Memorandum. https://mhfd.specialdistrict.org/files/23cb85ce8/UDFCD_Full_Spectrum_Detention_Release_Rate_Memorandum.pdf
- Mile High Flood District. Urban Storm Drainage Criteria Manual, Volume 2 (Storage).
- Department of Irrigation and Drainage Malaysia (2008). Submission Checklist for Stormwater Management. https://www.water.gov.my/jps/resources/auto%20download%20images/5844dfbba8fc1.pdf
- Department of Irrigation and Drainage Malaysia (2012). Urban Stormwater Management Manual for Malaysia (MSMA), 2nd ed.
- PUB Singapore (2024). On-site Detention Tank Technical Guide, Rev. 3; Code of Practice on Surface Water Drainage, 7th ed., Addendum No. 3 (16 Apr 2025). https://www.pub.gov.sg/-/media/PUB/PDF/detentionTank.pdf
- Sydney Water (2020). On-site Stormwater Detention Guide (SW201). https://www.sydneywater.com.au/content/dam/sydneywater/documents/on-site-stormwater-detention-guide.pdf
- Upper Parramatta River Catchment Trust (2005). On-site Stormwater Detention Handbook, 4th ed.
- "On-site stormwater detention for Australian development projects: does it meet frequent flow management objectives?" Water Science and Engineering (2019). https://www.sciencedirect.com/science/article/pii/S1674237019300213
- Optimisation of urban detention (2016). Water 8(7):290. https://doi.org/10.3390/w8070290
- Colorado State University. Spatially Dependent On-Site Detention Policies (thesis). https://mountainscholar.org/bitstreams/f4dbec4e-a44f-4933-8d54-a097e741f44a/download
- Guwahati Waterbodies (Preservation and Conservation) Act, 2008 (Assam Act No. XX of 2008), Assam Gazette Extraordinary No. 243, 8 August 2008, notification No. LGL.103/2008/14 (dated 7 August in one scan and 9 August in the other): ss. 2(e), 4, 6 and 11 and Schedules I–IV. https://www.ielrc.org/content/e0845.pdf ; https://faolex.fao.org/docs/pdf/ind194963.pdf
- The Assam Urban Water Bodies (Preservation and Conservation) Bill, 2024 (Bill as introduced; passed by the Assam Legislative Assembly on 29 August 2024; Assam Act XXV of 2024, as quoted; the enacted text and the Rules of 2025 not read [TBC]): ss. 1(2), 2(d), 3–8, 15, 16 and 22. https://prsindia.org/files/bills_acts/bills_states/assam/2024/Assam_Urban_Water_Bodies_Bill_2024.pdf
- Environment and Forest Department, Government of Assam. Notification No. FRM.10/2010/Pt/16 of 01.11.2018, constituting the Assam State Wetlands Authority under rule 5 of the Wetlands (Conservation and Management) Rules 2017 (listing title only, as quoted).
- Ramsar Sites Information Service. Deepor Beel, site no. 1207, designated 19 August 2002 (as quoted).
- Space Applications Centre and Ministry of Environment and Forests (2011). National Wetland Atlas: Assam (area and share only, as quoted).
- Gauhati High Court. PIL 18/2023, Pramod Kalita & 2 Ors v. State of Assam, I.A.(C) 924/2024, order of 05.04.2024 (Deepor Beel sanctuary). https://www.livelaw.in/pdf_upload/gau-hc-deepor-beel-denotification-532923.pdf
- National Green Tribunal. OA 673/2018, monthly progress report of the State of Assam, August 2020 (Priority I to III stretches; the Mora Bharalu channel and Deepar Beel).
- Reports on the registered and unregistered beels (Statistical Handbook, as quoted in the NEDFI databank), Urpad Beel, Deepor Beel (water spread and shrinkage) and the Silsako evictions (EastMojo; Assam Tribune; Bar & Bench; as reported).
- MoHUA / CPHEEO (2019). Manual on Storm Water Drainage Systems, Part A (§8.5).
- Department of Housing and Urban Affairs, Government of Assam. Assam Unified Building Construction (Regulation) Byelaws, 2022, Assam Gazette Extraordinary No. 688, 15.10.2022, notification No. DoHUA/ECF No. 236697/2, under section 4 of the Assam Building Construction (Regulation) Act, 2010: byelaws 1(2), 2, 26(vii), 26(ix), 38(i), 44(iii), 44(ix), 45, 66, 67, 74, 94, 101, 104, 110–114, 117, 120, 121 and 131 and Appendices VI and IX (the numbering of 26(ix), 44(ix) and 44(iii) read from the OCR layout [TBC]). https://gmda.assam.gov.in/sites/default/files/swf_utility_folder/departments/gmda_webcomindia_org_oid_4/menu/document/no._688_dohua-ecf-236697-2_dated_15-10-22_compressed.pdf (Internet Archive copy of 3 April 2025); as amended by the Assam Unified Building Construction (Regulation) (Amendment) Byelaws, 2024, Gazette No. 667, 20.11.2024, No. DoHUA/ECF No. 420084/34: byelaws 92, 120 and 120A and the land-use permissibility table. https://gmda.assam.gov.in/sites/default/files/swf_utility_folder/departments/gmda_webcomindia_org_oid_4/menu/document/no._667_dohua-ecf_no._420084-34_dated_20-11-24.pdf (Internet Archive copy of 4 April 2025)
- Assam Building Construction (Regulation) Act, 2010 (Assam Act No. XVI of 2010, as the Guwahati Building Construction (Regulation) Act), with the (Amendment) Act, 2022 (Assam Act No. XXVII of 2022; Gazette Extraordinary No. 655, 29 September 2022). https://prsindia.org/files/bills_acts/acts_states/assam/2010/ActNo16of2010Assam.pdf
- Guwahati Building Construction (Regulation) Byelaws, 2014 (GMDA copy, cover and notification missing). https://gmda.assam.gov.in/sites/default/files/swf_utility_folder/departments/gmda_webcomindia_org_oid_4/menu/document/GUWAHATI%20BUILDING%20CONSTRUCTION%20%28REGULATION%29%20BYELAWS%2C%202014_0.pdf (Internet Archive copy of 29 July 2022)
- Guwahati Metropolitan Development Authority. Master Plan for Guwahati Metropolitan Area 2025 and its Zoning Regulation, Assam Gazette Extraordinary No. 198, 9 July 2009, and the Report Part II and the schedule of modifications (the Eco-Sensitive and Hilly Area Zones).
- Gauhati Municipal Corporation Act, 1969 (Assam Act I of 1973): ss. 231, 232, 234, 237, 239, 242, 244 and 250 (Legislative Department scans; amendments after 1983 not checked [TBC]). Assam Municipal Corporation Act, 2022 (Assam Act No. VIII of 2022): ss. 171, 173, 174, 176 and 177. https://prsindia.org/files/bills_acts/acts_states/assam/2022/ActNo.8of2022Assam.pdf
- Assam Embankment and Drainage Act, 1953 (Assam Act I of 1954): ss. 2, 4, 15, 16 and 18 (later amendments not checked [TBC]). https://www.ielrc.org/content/e5303.pdf
- Assam Hill Land and Ecological Sites (Protection and Management) Act, 2006 (Assam Act No. V of 2007; Assam Gazette Extraordinary No. 20, 20 January 2007): ss. 2, 3, 4, 14 and 19.
- Assam Ground Water Control and Regulation Act, 2012 (Assam Act No. XVI of 2012; Assam Gazette Extraordinary No. 226, 19 May 2012): ss. 2(f), 3, 5, 6 and 19.
- Central Ground Water Board, North Eastern Region. Ground Water Year Book 2022-23, North Eastern Region (depth to water, March, August and November 2022). https://cgwb.gov.in/cgwbpnm/public/uploads/documents/17032376731214418851file.pdf ; and Assam State Profile (2007).
- Asian Development Bank. Report and Recommendation of the President (August 2025) and Project Administration Manual (July 2025), Assam Urban Sector Development Project (57262-001). https://www.adb.org/sites/default/files/project-documents/57262/57262-001-rrp-en.pdf ; https://www.adb.org/sites/default/files/project-documents/57262/57262-001-pam-en.pdf ; and the IEEs of AUIIP Tranche 2 (42265-025), 2017 (References of Chapter 3).
- Comptroller and Auditor General of India. Reports No. 5 of 2018 (flood control), No. 4 of 2019 (core services of the urban local bodies) and No. 2 of 2024 (functioning of GMDA), Government of Assam. https://www.cag.gov.in/uploads/download_audit_report/2019/Chapter_1_Social_Sector_of_Report_no_4_of_2019_Social_General_and_Economic_(Non-PSUs)_Sectors_Government_of_Assam.pdf ; https://cag.gov.in/uploads/download_audit_report/2024/07-Chapter-3-066d9895d44d9e6.23377555.pdf
- Department of Housing and Urban Affairs. Town wise Status of Fund Release for Preparation of Drainage Master Plan (c. 2016).
- Gauhati High Court. PIL/14/2024, North East Eco Development Society v. State of Assam, orders of 23.09.2024 and 26.05.2025; PIL/53/2023, Khanindra Kalita & 8 Ors, order of 06.09.2024. https://livelaw.in/pdf_upload/gau-hc-water-logging-562406.pdf ; https://www.livelaw.in/pdf_upload/gau-hc-hill-cutting-601951.pdf ; https://livelaw.in/pdf_upload/gau-hc-artificial-flood-560072.pdf
- Pollution Control Board, Assam. Action Plan for the Bharalu River (Priority I). https://www.pcbassam.org/RRC%20Action%20Plan%20Final/Priority%20I/Action%20plan_Bharalu.pdf
- Lok Sabha, answer AU1482 (February 2025), arsenic in groundwater (as quoted). https://eparlib.sansad.in/bitstream/123456789/2988788/1/AU1482_VRvWv4.pdf
- Reports on GMC's rainwater harvesting drive of 2025, the builders' association's view of Appendix VI, the Bharalumukh sluice and pumps, the Guwahati floods of June 2022, the Silchar flood of June 2022 and the landslides of 2022 and 2025 (The Sentinel; Pratidin Time; Assam Tribune; EastMojo; Scroll; as reported).
- Bureau of Indian Standards. IS 456:2000 Plain and Reinforced Concrete — Code of Practice.
- Government of India. Dam Safety Act, 2021.
- Chow, V.T., Maidment, D.R. and Mays, L.W. (1988). Applied Hydrology. McGraw-Hill (AMC conversion).
Annexes and forms
| Annex / Form | Content |
|---|---|
| 4A | Flood-sensitive catchment boundaries (GIS); shallow-groundwater zone map |
| 4B | Tier B tables: PSD and SSR (Table 4.3), retention credit factor C_R, standard outlet sizes; confirmed fixed release coefficients (Table 4.3A) |
| 4C | Worked example (Tier A) with full routing tables |
| Form 4-1 | Site Runoff Control Report |
| Form 4-2 | Tier B Site Sheet |
| Form 4-3 | Fixed-coefficient Route Sheet (Clauses 4.14.3 to 4.14.7) |
Commentary. No Indian national rule or Assam rule found during research for this Manual limits the rate of discharge from a site, and none requires on-site detention or a storage volume sized to a storm. No Assam document found sets a design storm, a return period, a runoff coefficient or a time of concentration for any town drain. The building rules are the Assam Unified Building Construction (Regulation) Byelaws, 2022 (Assam Gazette Extraordinary No. 688, 15.10.2022, notification No. DoHUA/ECF No. 236697/2), as amended by the (Amendment) Byelaws, 2024 (Gazette No. 667, 20.11.2024, No. DoHUA/ECF No. 420084/34), made by DoHUA under section 4 of the Assam Building Construction (Regulation) Act, 2010 (Assam Act XVI of 2010, as amended by Assam Act XXVII of 2022, which renamed it and extended it "to the whole of the State of Assam"). They "extend to the master Plan areas or notified Planning areas of whole of Assam except for areas under Autonomous Districts", unless a District Council asks for them to apply there (byelaw 1(2)); no such notification and no building rules of the Bodoland Territorial Council, the Karbi Anglong Autonomous Council or the North Cachar Hills Autonomous Council were found [TBC], and outside the notified Master Plan areas the byelaws do not apply anywhere. Byelaw 131(1) repeals "The Guwahati Building Construction (Regulation) Byelaws, 2010", a year that matches no byelaws found (the 2010 instrument is the Act); the Guwahati Building Construction (Regulation) Byelaws, 2014, which already held the same drainage rules, are superseded in practice, but the repeal clause names 2010. A 2025 amendment was reported but no gazette was found, and it is not cited here. The Act defines a "drain-surface water" as "a drain used or constructed to use solely for conveying to any drain any rain water but shall not include any rainwater pipe" (s.2(20)), and requires the plans to show drains, sewers, the drainage of the roof and the "arrangement for proper drainage" (section number not confirmed [TBC]). The byelaws carry several drainage hooks, but every one of them protects the building, the plot or the watercourse; none sizes anything to a storm: Byelaw 26(ix), repeated as byelaw 44(ix) [TBC: numbering read from the OCR layout; confirm against a clean copy], sets the setbacks: "The minimum distance of any building from the edge of natural drainage channels shall be as given below": River (as marked in the plan) 15 m; Bharalu, Mora Bharalu and Bondajan 10 m; other channels 6 m; notified water bodies (Deepar Beel, Silsako) 15 m; other notified water bodies (Sarusola, Barsola and others) 6 m; other large ponds and water bodies marked in the plan 10 m; minor drains and small ponds not marked in the plan as for the building setbacks. The table names only Guwahati's channels and beels although the byelaws are statewide (NEER's reading); Chapter 7 compares it with the Manual's corridor. The Authority may refuse or modify a proposal if the site "is near a water body or water course" and the development is likely to contaminate it or change the course of the channel, if the site "is likely to be inundated and satisfactory arrangements for proper drainage is not possible", or if it is "a filled up tank or low lying" (byelaw 44(iii) [TBC: numbering read from the OCR layout; confirm against a clean copy]). Byelaw 117 excludes multistoreyed buildings from areas "on or abutting natural drainage channels" and "wetlands" and from "Government land in the hills and in the water bodies like beels". The plinth shall be "0.3 m higher than the highest recorded flood level as fixed by the local authority for ordinary buildings and 0.6 higher for lifeline buildings" (byelaw 45(c)); 0.5–0.75 m above the plot, with the ground not raised more than 0.5 m above the nearest street (45(a)). No local authority's "highest recorded flood level" was found for any town [TBC]; this Manual supplies the method (gauge, model or surveyed flood marks, with the return period stated), and its 1% AEP level plus 0.5 m governs where it is higher (Chapters 5 and 7). No building shall be erected "on a site liable to flood or on a slope forming an angle of more than 45 degree with the horizontal or on soil unsuitable for percolation" unless the owner proves it safe, and the permit is then subject to roof-water harvesting, "provision of dry sump (including design calculation) in all individual plots, capable of holding rain water during peak monsoon" and a silt fence along the plot boundary (byelaw 74). In hilly areas the same dry sump is required (byelaw 110(h)), with roof-water harvesting "mandatory" (110(g)), a silt fence "mandatory" (110(i)), drainage "without causing soil erosion" (110(c)), "special protection measures" on slopes of more than 10° (110(d)), cuts "generally … 4 m. to 6m" and not over 6 m "ordinarily" (110(e)), slope calculations vetted by a third party (110(f)) and 30% of the plot under vegetation (110(k)). The drawings show the provisions for conservation and harvesting of rain water and a "Detailed drainage plan for both internal and external required to be constructed upto the available permanent/pucca drain of municipal/other authority" (byelaw 94); "Improvement of drains up to the nearest outlet point is to be made as directed by the Authority. Additional 25% of the cost of improvement at PWD rate be imposed as penalty if such improvement is not done" (byelaw 101(vi)); the Authority may require the developer to build the roads and drains up to those abutting the plot (112(a)); and group housing gets "special regulations for drains" (113). At least 20% of every plot is kept for trees and greenery, or 10% where 25% of the floor area ratio is affordable housing (byelaw 111); ten trees with "unpaved soil surface of minimum 2(two) feet" (104(iii)); since 2024, 60% of the open space landscaped, half of it "unpaved and green" and the rest of the open space allowed to be "covered with permeable tiles/ pavers … to allow rain water to percolate to underground" (byelaw 92); and the green-building criterion "Minimize storm water run-off from site by reducing hard paving on site" (Appendix IX). RWH is required for every building (byelaw 114 and Appendix VI; Commentary to Clause 4.11). "Natural Hazard Prone Areas" are to be notified on the basis of hazard studies, among them "Flood zonation" (definition 2), and since 2024 each Master Plan is to map the natural-hazard areas "where construction is not permitted" (byelaw 120); byelaw 121 commits the byelaws to "flood risk management in a changing rainfall scenario including renovation and futuristic drainage systems and designs", a policy statement with no standard; and byelaw 120A (2024) penalises dumping construction and demolition waste in "Nalas, Rivers and other water bodies". An OCR search of the 2022 text found no storm-water detention, peak-runoff or release-rate rule. The dry sump is therefore the one storage duty in the State's building rules, and the byelaw itself asks for its "design calculation" without saying how to make it. This Manual supplies that calculation (set by this Manual): the dry sump of byelaws 74(ii) and 110(h) is a detention facility under this chapter. It is empty before each storm and is never an RWH tank or a store of RWH water; it drains through an orifice outlet that meets Clauses 4.7 and 4.8, by pump where the outfall is closed; it is sized for the site's detention volume under Clause 4.6 and, where the site's outfall is closed (Clause 5.8.5), for the outfall-closed volume of Chapter 5, so that "capable of holding rain water during peak monsoon" means the volume of the design storms of Chapter 2; and on land to which the floodplain rule of Clause 4.11 applies it is lined and watertight, earns no infiltration credit and is checked for flotation (Clause 4.12.3). Its drawings and calculation go with the byelaw 94 drainage plan (Chapter 10). Read this way, the byelaw's "soil unsuitable for percolation" is the normal case on the flood plains, not the exception. The municipal Acts give the local bodies drains to keep, not a standard to meet. The Gauhati Municipal Corporation Act, 1969 (Assam Act I of 1973) requires municipal drains to be kept "free from public nuisance" and flushed, cleaned and emptied (s.231), lets the Commissioner cause them "to empty into any place, whether within or without the city" (s.232, a power, not a duty), alter or close them (s.234), require "an entirely distinct private drain" for rain water (s.237(1)), and bars any drain into a municipal drain without permission (s.242); no building within one hundred feet of a municipal drain may be occupied until it is drained to it (s.244), and the connecting drain vests in the Corporation (s.250(2)). The Assam Municipal Corporation Act, 2022 (Assam Act VIII of 2022), which governs Dibrugarh and Silchar, goes further: the Corporation "shall … provide a safe and sufficient outfall … for effectual drainage and proper discharge of storm-water and sewage … in such manner as may not cause any nuisance, whether by flooding any part of the Municipal Corporation area, or of the areas surrounding the outfall" (s.171), public drains vest in it (s.173), and the Commissioner may require "an entirely separate drain for rain water" (s.176). Where a town's drain leaves through an embankment, the Assam Embankment and Drainage Act, 1953 (Assam Act I of 1954) applies: in a notified area no one may build on, remove or alter an embankment or drain without the permission of the Deputy Commissioner or the Embankment Officer (s.16), and cutting through an embankment or drain, or "opening, shutting or obstructing a sluice" without authority, carries up to three years' imprisonment (s.15(ii)). None of these sets a design storm, a release rate or a detention volume. The only design figures found in an official document are those of projects. The ADB's Assam Urban Sector Development Project aims to avoid inundation "from a 1-in-5-year storm or lower return period … in 434 ha of frequently flooded areas of Bahini Basin", against a baseline of 616 ha, and its initial flood modelling mapped "Inundation areas of 693 ha during the design storm of 65.72 mm hour" (ADB, Project Administration Manual 57262-001, July 2025, design and monitoring framework); the duration behind 65.72 mm/h and its return period are not stated, and the two baselines differ [TBC]. A 1-in-5-year target is below the 10% AEP minor-drain standard of Table 2.1 for the high-density areas of this Manual; the project's target is its own and is not a standard. Dibrugarh's DTP drain was designed by a "rainfall based approach … The peak discharge computed by rational method", with no return period given (ADB IEE, 2017), and the town drainage master plans of DoHUA "were prepared before 2015 as per previous FPS system" and await revision to the CPHEEO guideline of 2015 (DoHUA status sheet, c. 2016). The drains themselves are few: storm-water drainage covered "3 to 37 per cent only" of the test-checked urban local bodies, and GMC's storm-drain data "was not available as it was involved with works of drain desilting only", although ₹32.57 crore was spent on desilting from 2013–14 to 2017–18 (CAG, Report No. 4 of 2019); "Assam's stormwater drainage network in ULBs covers only about 30% of the required areas" (ADB, RRP 57262-001, 2025); and the CAG found "defective DPRs for Storm Water Drainage Project for Guwahati City" and no action against the consultants (Report No. 2 of 2024). A GIS-based Comprehensive Drainage Master Plan and DPR for Guwahati, for which GMDA engaged Haskoning DHV by an order of 21.08.2024 recorded by the Gauhati High Court (PIL/14/2024, order of 23.09.2024), was under revision in November 2026 and is not final (as reported). Basements are limited for drainage, but with no level. A basement "shall not be permitted in low-lying areas and areas without adequate drainage facilities to ensure drainage from the basement" (byelaw 66(3)), and "Adequate arrangements shall be made so that surface drainage do not enter the basement" (67(c)); no rule found sets a level for a basement ramp or opening. This Manual therefore adds its own requirements for every basement: no detention storage in a habitable basement (Clause 4.10.1); the crest of every basement ramp and the sill of every basement opening at least 0.5 m above the 1% AEP flood level, with basement drainage pumped to the surface drain through a non-return valve (Clauses 6.11.1 and 6.11.4); and no basement in Zone 2 (Clause 7.5.2). On land to which the floodplain rule of Clause 4.11 applies, in the flood-sensitive catchments of Clause 4.5.3.2 and in any catchment notified under Clause 4.5.4, it recommends that no basement be permitted where the 1% AEP flood level, or the level of water ponded behind an embankment when its sluices close, stands above the surrounding ground; and wherever a basement or lower floor is cut into a hill slope it shall carry the geotechnical certificate of the hill rule of Clause 4.11, with the water behind its walls drained to a lined drain and not to the ground. For a hill site, this chapter also supplies what byelaw 110(c) leaves open: runoff from the catchment above the site shall be intercepted and carried round the building in the design storms of Chapter 6, and every flow from the site shall discharge to a lined drain or a stable natural channel through an energy dissipator, never onto an unprotected slope or into fill. These are the Manual's proposals, not rules of the Unified Byelaws 2022. This chapter is written so that it can supply, as a technical companion to the Unified Byelaws 2022, the Master Plans and Zoning Regulations and the municipal Acts, the design storm, release rates and storage volumes that they leave open; a competent authority could adopt it for that purpose, for example DoHUA by an amendment to the Unified Byelaws 2022 under section 4 of the Act, but none has. In practice the storm drains of every Assam town are its sewers: "No ULB in the state has a centralized sewerage system, including Guwahati … about 90% of households have installed septic tanks or leach pits" (ADB, RRP 57262-001, 2025); the Bharalu "has no natural flow … only the domestic sewage and commercial sewage are being carried", and the Bahini, "cut off by a sluice at Natun Bazar", "now becomes a sewerage drain" (PCBA, Bharalu action plan); and Dibrugarh's DTP drain "receives sewage flows" (ADB IEE, 2017) (Clause 8.9). Retention and detention apply in full on every site whatever the drain carries: every litre a site releases at the peak of a storm takes up capacity in a drain that is already part-filled with sewage and, behind a closed sluice, has nowhere to go. The CPHEEO (2019) manual describes limiting outflow to the pre-development peak as typical practice, but it uses no "shall" and names no storm frequencies (CPHEEO Part A §8.5.1). This chapter turns that description into a development-control requirement.