Annexes to Chapter 3Hydrologic Methods
These annexes support Chapter 3. Annex 3C sets out benchmark test problems for software acceptance, and Forms 3-1 and 3-2 are the submittal forms required by Clause 3.17. Annexes 3A, 3B, 3D and 3E need survey, gauging or published report data that this draft does not yet contain; each gives the intended layout and the interim rule of Chapter 3 that applies until it is published. The forms are draft forms and have no statutory status.
Annex 3A — Assam soil series to HSG lookup; seasonal high water table map
Supports Clauses 3.7 and 3.10 of Chapter 3.
To be prepared. This annex will contain (a) a lookup from each soil series mapped in Assam to its hydrologic soil group (HSG), in both the drained and the undrained state, and (b) a map of the depth to the seasonal high groundwater table in the monsoon season (April–October). It needs NBSS&LUP and Agriculture Department, Assam (soil survey) [TBC] series maps with their scales, measured saturated hydraulic conductivity and depth to an impermeable layer for each series, and observation-well records from the Central Ground Water Board and the Irrigation Department, supplemented by piezometers in the flood plains of the Brahmaputra and the Barak, where nearly half the CGWB wells stood within 2 m of the surface in November 2022, the Silchar bowl, the char and chapori lands and Majuli, the beel basins and the margins of the beels and pukhuris, the land behind the embankments of the riverside towns, the terai belt of the northern foothills, and the valley floors and hill-foot land of Guwahati. Until it is published, use the interim rules of Chapter 3: assign HSG from measured saturated hydraulic conductivity and depth to an impermeable layer or water table by the criteria of NEH Part 630, Ch. 7 (Clause 3.7.2); verify it by site infiltration tests wherever retention relies on infiltration (Clause 3.7.3); take the seasonal high water table from site piezometers, trial pits or the nearest observation well (Clause 3.10.2); and assign HSG D wherever that level is within 0.6 m of the ground surface (Clause 3.10.1).
Table 3A.1 — Soil series to HSG lookup (layout)
| Soil series | District(s) | Taxonomic class | Surface texture | Saturated hydraulic conductivity (mm/h) | Depth to impermeable layer (m) | HSG, drained | HSG, undrained | Source map and scale |
|---|---|---|---|---|---|---|---|---|
Table 3A.2 — Seasonal high water table, by mapping unit (layout)
| Mapping unit or grid cell | Observation wells used | Years of April–October record | Highest April–October level below ground (m) | Within 0.6 m of ground (Clause 3.10.1)? | Data source |
|---|---|---|---|---|---|
Annex 3B — Assam CN calibration and supplementary land covers (hill forest, bunded rice fields, char and chapori land, beel beds and margins, bhabar boulder fans, cut hill slopes and fills, hola hollows)
Supports Clauses 3.8 and 3.15 of Chapter 3.
To be prepared. This annex will contain (a) curve numbers calibrated against observed rainfall and runoff in Assam catchments, compared with the TR-55 values of Table 3.5, and (b) curve numbers for land covers that Table 3.5 does not list: the forest that covers most of the hills, about 85% of the land of the CWC subzone 2(b) area by the report's land use; the rice fields of the plains, divided by field ridges (ali, আলি, a ridge across a rice field, which the Assam Embankment and Drainage Act 1953 excludes from "embankment"), and the riverbank grass and scrub that the subzone 2(b) report records as now cultivated; the char and chapori lands, river-deposited sand and silt with grass, bare at low water and submerged or saturated in floods; the beds and margins of beels, which are much smaller at the start of the season than in flood (Deepor Beel about 10.1 km² against up to 40.1 km² in floods, as reported); the boulder and gravel fans of the bhabar belt below the Bhutan and Arunachal foothills; the cut hill slopes, quarries and fills of the Guwahati hills; and hola (হোলা), hollow land where water lodges in the rains (Chandrakanta Abhidhan, p. 920). It needs paired rainfall–runoff records for small gauged catchments of known cover and soil, from WRD gauging sites, agricultural research stations and tank gauges, analysed by event and by antecedent moisture. Until it is published: the pre-development reference stays open space in good condition for every site (Clause 3.3.2), so these covers do not enter the pre-development run; for off-site existing conditions, use the nearest Table 3.5 or TR-55 cover row, including the cultivated rows (Clause 3.8.3(c)), and state the row chosen and the reason on Form 3-1; land under standing water at the start of the design storm is modelled as water surface with no losses (Table 3.5; Clause 3.10.4(b)). Any departure from these defaults requires calibration under Clause 3.15 (Clause 3.15.1(d)).
Table 3B.1 — Supplementary land covers, AMC II (layout)
| Cover type | HSG A | HSG B | HSG C | HSG D | Ia ratio | Basis (catchments, events, years) |
|---|---|---|---|---|---|---|
| Forest of the hills (Guwahati hills; Karbi and Dima Hasao hills; northern foothills), with the litter recorded | ||||||
| Rice fields of the plains, bunded by field ridges (ali), ponded or dry at the start of the storm | ||||||
| Char or chapori land, sand and silt with grass, above the river level at the start of the storm | ||||||
| Beel bed or margin, dry or shrunken at the start of the storm | ||||||
| Bhabar fan of boulders and gravel, northern foothills; losses to the fan credited only after a field test | ||||||
| Cut hill slope, quarry or fill (Guwahati hills), bare or newly vegetated | ||||||
| Hola: hollow land where water lodges in the rains, dry at the start of the storm | ||||||
| Other (state) |
Table 3B.2 — CN calibration catchments (layout)
| Catchment | District | Area (km²) | Dominant HSG and cover | Events used | Table 3.5 CN | Calibrated CN | Calibrated ÷ Table 3.5 |
|---|---|---|---|---|---|---|---|
Annex 3C — Benchmark test problems for software acceptance
Supports Clauses 3.5, 3.6, 3.8, 3.9, 3.11, 3.12 and 3.16 of Chapter 3.
Purpose. Software not listed in Clause 3.16.1 shall reproduce the results of the five problems below (Clause 3.16.3). Each problem is fully specified and uses only the methods and tables of Chapter 3, so every answer can be checked by hand. The acceptance tolerance is ±5% on each tabulated result, the equivalence threshold of Clause 3.16.2; for closed-form results (Problems 3C-1 to 3C-4), software should agree to the rounding shown. The submittal shall report the software result next to each answer below.
Illustrative — not design values. The inputs (areas, intensities, rainfall depths, slopes and the basin) are chosen for testing only. They are not design data for any site.
Problem 3C-1 — Rational Method peak (Clause 3.5)
Inputs. A 2.0 ha catchment draining to one inlet: 1.2 ha concrete paving and roofs, C = 0.90 (Table 3.2, upper half of 0.80–0.95); 0.8 ha lawns on sandy soil, average slope, C = 0.15 (Table 3.2, upper half of 0.10–0.15). Design AEP 1% (100-yr). Rainfall intensity at Tc, including the climate factor: i = 120 mm/h.
Part (b): a separate 0.5 ha fully paved catchment, C = 0.90, design AEP 1%, i = 150 mm/h.
Table 3C.1 — Problem 3C-1 solution
| Step | Calculation | Result |
|---|---|---|
| Composite C (Clause 3.5.4) | (1.2 × 0.90 + 0.8 × 0.15) / 2.0 | 0.60 |
| Frequency factor (Table 3.3) | 1% AEP | Cf = 1.25 |
| C · Cf (≤ 1.0) | 0.60 × 1.25 | 0.75 |
| Peak flow (Clause 3.5.1) | 0.75 × 120 × 2.0 / 360 | Q = 0.500 m³/s |
| Part (b): C · Cf | 0.90 × 1.25 = 1.125, capped at 1.0 (Clause 3.5.3) | 1.00 |
| Part (b): peak flow | 1.00 × 150 × 0.5 / 360 | Q = 0.208 m³/s |
Problem 3C-2 — Time of concentration by the segment method (Clause 3.6)
Inputs. Pre-development flow path: sheet flow over greenfield, n = 0.15 (Clause 3.6.3), L = 30 m, S = 0.01; P2 (50% AEP 24-hour rainfall, no climate factor) = 80 mm. Shallow concentrated flow, unpaved, L = 200 m, S = 0.01. Channel flow, L = 400 m, bank-full velocity V = 1.0 m/s (given).
Table 3C.2 — Problem 3C-2 solution
| Segment | Calculation | Travel time |
|---|---|---|
| Sheet flow (Clause 3.6.2(a)) | 0.091 × (0.15 × 30)^0.8 / (80^0.5 × 0.01^0.4) = 0.2138 h | 12.83 min |
| Shallow concentrated (Clause 3.6.2(c)) | V = 4.918 × 0.01^0.5 = 0.4918 m/s; 200 / (3,600 × 0.4918) = 0.1130 h | 6.78 min |
| Channel (Clause 3.6.2(d)) | 400 / (3,600 × 1.0) = 0.1111 h | 6.67 min |
| Tc (Clause 3.6.1; ≥ 10 min) | 12.83 + 6.78 + 6.67 | 26.27 min |
| Lag (Clause 3.6.5) | 0.6 × 26.27 | 15.76 min |
Problem 3C-3 — SCS-CN runoff depth, AMC and Ia sensitivity (Clause 3.8)
Inputs. Pre-development reference on HSG C: CN = 74 at AMC II (Table 3.5), all pervious. Cumulative rainfall P = 100 mm; second case P = 25 mm.
Table 3C.3 — Problem 3C-3 solution
| Case | S (mm) | Ia (mm) | Runoff Q (mm), P = 100 mm | Runoff Q (mm), P = 25 mm |
|---|---|---|---|---|
| (a) AMC II, Ia = 0.2S: S = 25,400 / 74 − 254 | 89.24 | 17.85 | 39.38 | 0.53 |
| (b) AMC III, Ia = 0.2S: CN(III) = 23 × 74 / (10 + 0.13 × 74) = 86.75 | 38.80 | 7.76 | 64.93 | — |
| (c) AMC II, Ia = 0.05S: S0.05 = 25.4 × 1.33 × (89.24 / 25.4)^1.15 | 143.31 | 7.17 | 36.49 | 1.97 |
Runoff is Q = (P − Ia)² / (P − Ia + S). Case (c) gives less runoff than case (a) at 100 mm but more at 25 mm, as Clause 3.8.5 and Figure 3.3 describe.
Problem 3C-4 — Separate vs composite impervious representation, and SCS unit hydrograph peak (Clauses 3.9 and 3.11.2)
Inputs, part (a). A site that is 50% directly connected impervious (CN 98) and 50% open space on HSG B (CNp = 61), AMC II, Ia = 0.2S, P = 25 mm.
Inputs, part (b). A sub-area of A = 2.5 km² with Tc = 1.0 h and computation interval Δt = 0.1 h.
Table 3C.4 — Problem 3C-4 solution
| Step | Calculation | Result |
|---|---|---|
| (a) Impervious half (Clause 3.9.2) | S = 5.18 mm, Ia = 1.04 mm; Q = 23.96² / (23.96 + 5.18) | 19.70 mm |
| (a) Pervious half | S = 162.39 mm, Ia = 32.48 mm > P | 0 mm |
| (a) Area-weighted runoff, separate sub-areas | 0.5 × 19.70 + 0.5 × 0 | 9.85 mm |
| (a) Composite CN (Clause 3.9.4) | 61 + 0.50 × (98 − 61) | 79.5 |
| (a) Runoff with composite CN | S = 65.50 mm, Ia = 13.10 mm; Q = 11.90² / (11.90 + 65.50) | 1.83 mm |
| (b) Interval check (Clause 3.11.3(a)) | 0.133 × 1.0 = 0.133 h ≥ Δt = 0.1 h | satisfied |
| (b) Lag and time to peak (Clause 3.11.2) | tL = 0.6 × 1.0 = 0.60 h; tp = 0.1 / 2 + 0.60 | tp = 0.65 h |
| (b) Unit hydrograph peak, Q = 1 mm | 0.208 × 2.5 × 1 / 0.65 | qp = 0.800 m³/s per mm |
Part (a) reproduces the comparison in the commentary to Clause 3.9 (about 9.9 mm vs 1.8 mm).
Problem 3C-5 — Level-pool (modified Puls) storage routing (Clause 3.12.1)
Inputs. A detention basin with vertical sides and plan area 500 m², with the stage–storage–discharge relationship of Table 3C.5. Triangular inflow hydrograph: 0 at t = 0, rising linearly to 0.50 m³/s at t = 30 min, falling linearly to 0 at t = 90 min. Basin empty at t = 0. Routing interval Δt = 10 min (600 s). No tailwater.
Table 3C.5 — Problem 3C-5 stage–storage–discharge relationship
| Stage (m) | Storage S (m³) | Outflow O (m³/s) |
|---|---|---|
| 0.0 | 0 | 0.00 |
| 0.5 | 250 | 0.05 |
| 1.0 | 500 | 0.10 |
| 1.5 | 750 | 0.15 |
| 2.0 | 1,000 | 0.20 |
| 2.5 | 1,250 | 0.25 |
Method. The storage-indication equation is (I1 + I2) + (2S1/Δt − O1) = (2S2/Δt + O2). The table gives O = S / 5,000 (S in m³, O in m³/s), so 2S/Δt + O = 17.667 O and 2S/Δt − O = 15.667 O, and each step is O2 = [(I1 + I2) + 15.667 O1] / 17.667. Software interpolating linearly in Table 3C.5 shall give the same result.
Table 3C.6 — Problem 3C-5 routed outflow
| Time (min) | Inflow I (m³/s) | Outflow O (m³/s) | Storage (m³) | Stage (m) |
|---|---|---|---|---|
| 0 | 0.0000 | 0.0000 | 0.0 | 0.000 |
| 10 | 0.1667 | 0.0094 | 47.2 | 0.094 |
| 20 | 0.3333 | 0.0367 | 183.3 | 0.367 |
| 30 | 0.5000 | 0.0797 | 398.4 | 0.797 |
| 40 | 0.4167 | 0.1226 | 612.8 | 1.226 |
| 50 | 0.3333 | 0.1511 | 755.7 | 1.511 |
| 60 | 0.2500 | 0.1670 | 835.2 | 1.670 |
| 70 | 0.1667 | 0.1717 | 858.6 | 1.717 |
| 80 | 0.0833 | 0.1664 | 832.1 | 1.664 |
| 90 | 0.0000 | 0.1523 | 761.5 | 1.523 |
| 120 | 0.0000 | 0.1062 | 531.1 | 1.062 |
| 180 | 0.0000 | 0.0517 | 258.3 | 0.517 |
Results. Peak outflow 0.172 m³/s at 70 min; peak storage 859 m³; peak stage 1.72 m. The inflow peak of 0.50 m³/s is reduced to 34% of its value.
Table 3C.7 — Benchmark results to be reported by the applicant
| Problem | Result | Benchmark | Software result | Difference (%) | Within ±5%? |
|---|---|---|---|---|---|
| 3C-1 | Q, main case (m³/s) | 0.500 | |||
| 3C-1 | Q, part (b) (m³/s) | 0.208 | |||
| 3C-2 | Tc (min) | 26.27 | |||
| 3C-3 | Q, case (a), P = 100 mm (mm) | 39.38 | |||
| 3C-3 | Q, case (b), P = 100 mm (mm) | 64.93 | |||
| 3C-3 | Q, case (c), P = 100 mm (mm) | 36.49 | |||
| 3C-3 | Q, case (c), P = 25 mm (mm) | 1.97 | |||
| 3C-4 | Runoff, separate sub-areas (mm) | 9.85 | |||
| 3C-4 | Runoff, composite CN (mm) | 1.83 | |||
| 3C-4 | qp (m³/s per mm) | 0.800 | |||
| 3C-5 | Peak outflow (m³/s) | 0.172 | |||
| 3C-5 | Peak storage (m³) | 859 |
Annex 3D — Peak rate factor study for flat coastal land
Supports Clauses 3.11.5 and 3.15 of Chapter 3.
Not required in Assam. Assam is landlocked, so no land in the State meets Clause 3.11.5(a), and the standard factor 484 (PRF′ = 0.208) applies to all land (Clause 3.11.5). The flood plains of the Brahmaputra and the Barak, the char lands, the beel basins and the land behind the embankments are flat and slow to drain, but they are not coastal plain; their slow response is represented by storage, pumping and backwater (Clauses 3.10.4, 3.12.1 and 3.12.4) and by the outfall-closed check of Chapter 5, not by a lower peak rate factor. The annex and the layout of Table 3D.1 are kept only so that the annex numbering is unchanged.
Table 3D.1 — Calibrated peak rate factors (layout)
| Catchment | Area (km²) | Mean slope (m/m) | Drainage condition | Events used | Calibrated PRF (US customary) | PRF′ (SI) | Range of applicability |
|---|---|---|---|---|---|---|---|
Annex 3E — CWC SUH parameters for subzones 2(a) and 2(b), with worked example
Supports Clauses 3.4.3 and 3.11.4 of Chapter 3.
To be prepared. This annex will tabulate, for CWC subzones 2(a) (North Brahmaputra) and 2(b) (South Brahmaputra), the regression relationships for the synthetic unit hydrograph parameters, the design storm duration, loss rate, base flow, areal reduction and time distribution, each with its reference to the Flood Estimation Report, and a worked example for one catchment. It needs the two CWC Flood Estimation Reports that cover Assam: the North Brahmaputra subzone 2(a) report (Design Office Report No. NB/18/1991), which covers the north bank of the Brahmaputra from Dhubri to Dhemaji, North Guwahati and Amingaon, and of which only the unit hydrograph relationships, the ratio table, Table 7 and Plate 9 were checked against the page images, its Plates 8 and 10 not being read for this draft; and the South Brahmaputra subzone 2(b) report (Revised; Design Office Report No. SB-2(b)/R-4/44/99, March 2000), which covers the south bank, Guwahati, the Karbi hills and the north of Dima Hasao, and of which Annexes 4.1 to 4.3 (heaviest rainfall and areal reduction) were read only by optical character recognition, the time distribution of Annex 4.4 was seen only through its worked example, and the positive Lc exponent of the simplified 100-year formula is to be checked with CWC (see the References of Chapter 3) [TBC]; written confirmation from CWC that no report for subzone 2(c) (Barak and others), which covers the Barak valley and the south of Dima Hasao, exists or is in preparation [TBC]; and the line between subzones 2(b) and 2(c) near Haflong, which is read by eye from the 2(b) plates and is still to be confirmed [TBC], transcribed and checked against the published reports, and a catchment with physiographic parameters measured from survey or a DEM. Until it is published, take all SUH inputs directly from the applicable Flood Estimation Report (Clause 3.11.4(a)), apply the 24-hour design rainfall of Clauses 2.3.3(b) and 2.7.3 with the climate factor of Clause 2.8 (Clause 3.11.4(b)), report the SUH result alongside the HEC-HMS or SWMM result for the existing natural condition (Clause 3.11.4(c)), and, where the hydrograph model gives a lower 1% AEP peak, either justify it by calibration under Clause 3.15 or adopt the SUH peak (Clause 3.11.4(d)).
Table 3E.1 — SUH relationships by subzone (layout)
| Parameter | Symbol | Unit | Subzone 2(a) (North Brahmaputra) relationship | Subzone 2(b) (South Brahmaputra) relationship |
|---|---|---|---|---|
| Peak discharge per unit area | qp | m³/s per km² | qp = 2.272 (L·Lc/S)^−0.409, with S as printed (not √S) | qp = Qp / A |
| Peak discharge of the 1-hour unit hydrograph | Qp | m³/s | Qp = qp · A | Qp = 0.905 A^0.758 (Eq. 3.4.3.2); the peak depends on the catchment area alone |
| Time from centre of unit rainfall to peak | tp | h | tp = 2.164 qp^−0.940 | tp = 2.87 qp^−0.839 |
| Width of UH at 50% of peak | W50 | h | W50 = 2.084 qp^−1.065 | W50 = 2.304 qp^−1.035 |
| Width of UH at 75% of peak | W75 | h | W75 = 1.028 qp^−1.071 | W75 = 1.339 qp^−0.978 |
| Width of rising limb at 50% of peak | WR50 | h | WR50 = 0.856 qp^−0.865 | WR50 = 0.814 qp^−1.018 |
| Width of rising limb at 75% of peak | WR75 | h | WR75 = 0.440 qp^−0.918 | WR75 = 0.494 qp^−0.966 (confirmed by the errata) |
| Base width of UH | TB | h | TB = 5.428 tp^0.852 | TB = 2.447 tp^1.157 |
| Time to peak from start of rise | Tm | h | Tm = tp + tr/2 | Tm = tp + tr/2 |
| Unit duration | tr | h | 1 | 1 |
| Design storm duration | TD | h | TD = TB (it gave the higher peak on 16 of the 21 catchments) | TD = 1.1 tp, "rounded off to nearest full hour", or any value that gives the maximum discharge |
| Design loss rate | — | mm/h | 2.4 (printed "0.24 cm/hr", the modal value); for rural SUH runs only | 3.5 (printed "0.35 cm/hr", the modal value of 100 flood events, kept from the report of 1984); for rural SUH runs only |
| Design base flow | — | m³/s per km² | 0.05 | 0.05 (68 of 100 events in the range 0.01–0.09) |
| Ratio of t-hour to 24-hour rainfall | — | — | 50-yr, 12 self-recording gauges: 1 h 0.260; 3 h 0.457; 6 h 0.615; 9 h 0.720; 12 h 0.805; 15 h 0.875; 18 h 0.930; 24 h 1.000. Used in this Manual in sub-areas AS-A, AS-A1 and AS-D1 (Clause 2.3.6(f)) | 10-yr, partial duration, mean of 6 self-recording gauges (the Shillong recording gauge and five in the Assam valley: Nowgong, Dibrugarh, Guwahati, Chabua and Jorhat), "beyond T = 5 years … comparable": 1 h 0.48; 3 h 0.62; 6 h 0.74; 9 h 0.81; 12 h 0.87; 15 h 0.91; 18 h 0.95; 24 h 1.00 (Table 4.1). Used in this Manual in sub-areas AS-B, AS-C, AS-C1, AS-D and AS-E (Clause 2.3.6(f)) |
| Time distribution of rainfall | — | cumulative fraction by hour | [TBC] | 1,040 storms in five duration groups (2–3 h: 229; 4–6 h: 286; 7–12 h: 322; 13–18 h: 116; 19–24 h: 87); for a 13-hour storm 0.26, 0.43, 0.56, 0.64, 0.70, 0.76, 0.82, 0.87, 0.90, 0.94, 0.96, 0.98, 1.00 (worked example); the tables of Annex 4.4 not read [TBC] |
| Conversion of 1-day to 24-hour rainfall | — | factor | 1.15 | 1.15 |
| Areal reduction factor | ARF | % of point rainfall | [TBC] | Annex 4.3, read by optical character recognition only [TBC]: at 50 km², 93.75 (1 h), 94.25 (3 h), 95.50 (6 h), 97.00 (12 h), 98.00 (24 h); at 100 km², 88.00, 90.00, 91.75, 94.50, 96.50; at 200 km², 78.50, 82.00, 85.50, 90.00, 94.00; at 300 km², 71.00, 75.50, 80.00, 87.50, 92.00; at 500 km², 64.50 (3 h), 71.25, 83.00, 88.50; at 1,000 km², 76.00 (12 h), 83.00; at 2,000 km², 77.50 (24 h); the errata correct the 24-hour value at 1,500 km² from 79.50 to 79.00 |
| Simplified formulae | — | m³/s | Given in the report, within ±15% of the detailed method; not transcribed for this draft [TBC] | A km², S m/km, L and Lc km, R the 24-hour point rainfall in cm: Q25 = 1.9194 A^0.4240 S^0.0917 L^0.9965 Lc^−0.5092 R25^0.3789; Q50 = 1.1368 A^0.4846 S^0.0540 L^0.8915 Lc^−0.5012 R50^0.6107; Q100 = 0.5160 A^0.5226 S^0.0552 L^0.7010 Lc^+0.3961 R100^0.9286, with the Lc exponent printed positive, unlike Q25 and Q50, probably a sign error [TBC]; not used for design in this Manual |
| Catchment area for which the relationships apply | A | km² | 25–2,500; up to 5,000 with judgement | more than 50 to 1,500; up to 5,000 "judiciously" |
| Report reference | — | — | NB/18/1991: the unit hydrograph relationships, the loss rate and the ratio table | SB-2(b)/R-4/44/99: §§3.4–3.7, Table 3.3, the simplified formulae (p. 17), Table 4.1 (p. 20), §4.3, Annexes 3.1, 3.2, 4.1–4.3, the errata and the worked example |
Note: relationships as printed in the two CWC reports that cover Assam (References of Chapter 3), read from scanned copies; Table 3.3 of the 2(b) report, its simplified formulae, its ratio table and its errata, and the 2(a) relationships and ratios, were checked against the page images. A is the catchment area in km², L the length of the main stream in km, Lc the length to the point nearest the catchment centroid in km and S the equivalent slope in m/km. Coverage. Assam is covered by two reports, not three. Subzone 2(a), North Brahmaputra, covers the north-bank tributaries of the Brahmaputra, among them the Manas (4,056.39 km²), the Pagladiya (1,702.68 km²) and the Subansiri (17,427.47 km²) (areas as read by optical character recognition), and the north-bank towns from Dhubri, which stands on the north bank, through Kokrajhar, Bongaigaon, Barpeta, Nalbari, Rangia, Mangaldoi and Tezpur to North Lakhimpur and Dhemaji, with North Guwahati and Amingaon. Subzone 2(b), South Brahmaputra, covers 73,556 km² of south-bank catchments, among them the Kulsi (5,007.90 km²), the Burhidihing (13,671.55 km²), the Dhansiri (S) (14,162.33 km²) and the Kopili (18,679.45 km²) (areas as read by optical character recognition), and the towns of Guwahati, Nagaon, Lumding, Diphu, Jorhat, Golaghat, Sivasagar, Dibrugarh, Tinsukia and Goalpara, with Haflong on its southern edge; it is bounded "on the south by Barak Subzone 2 (c)". The boundary between 2(a) and 2(b) is the Brahmaputra itself, so riverside towns straddle it (NEER's reading); Clause 2.3.6(b) deals with the rainfall, and where a catchment drains across the boundary this Manual requires the SUH to be computed with the parameters of each subzone and the higher 1% AEP peak to be adopted, unless calibration under Clause 3.15 supports the other (set by this Manual, as in the plains editions of this series). The subzone is chosen by the catchment's outfall, not by its district. No SUH in subzone 2(c). Subzone 2(c), "Barak and others" (the Barak, Kaladan and Manipur rivers), is listed in Annexure 1.1 of the 2(b) report, but no report was published: the 2(b) report's foreword lists 21 reports covering 24 of the 26 subzones, its back-page list has none for 2(c), and the Internet Archive index of CWC's downloads has none. Assam is the first edition of this series in which a plain, not only a hill slope, has no CWC report. In sub-area AS-E (the Barak valley: Silchar, Karimganj, Hailakandi, Badarpur) and in the south of Dima Hasao no CWC unit hydrograph applies; every cross-drainage structure and outfall of more than 1 km² there needs a site-specific hydrology study with the design rainfall of Clause 2.3.6(c)(ii), the AMC of Clause 3.8.4 and the routing of multi-day storms against the Barak or the Kushiyara behind its embankment (Chapter 5); the 2(b) relationships are not carried south of the line, because the Barak valley is a separate region whose moisture comes from the Bay of Bengal through Bangladesh and the Cachar and Mizo hills (NEER's reading of the rainfall notes). Basis. The 2(b) unit hydrograph rests on 14 catchments with 100 bridge-years of record, from 25 catchments of more than 25 km² collected by the Northeast Frontier Railway and RDSO in 1961–83 and 4 catchments gauged by CWC at Ministry of Surface Transport bridges since 1981 (71 bridge-years earlier and 29 added at bridges 463 and 414 and at MOT-3, MOT-4 and MOT-6); the 50-yr peaks it reproduces err by "+40.72% to −57.84%", "very small catchments have larger variation", and the steep MOT-4 and MOT-6 catchments (6.5 m/km against an average of 2.5 m/km) and bridges 184 and 186 are the outliers. The 2(a) relationships rest on 21 gauged catchments. Neither report rests on an urban, embanked or pumped catchment: every gauged site is a railway or road bridge on a rural stream. Area only. The 2(b) peak depends on A alone; slope enters nowhere, so the SUH gives the same unit hydrograph to a steep hill stream above Guwahati and a flat catchment of the same area on the valley floor, while the 2(a) peak uses L·Lc/S. At the same catchment the two can therefore differ greatly; that difference is a property of the reports, not of the river. Worked example. The 2(b) report's example is railway bridge 160 (mile 370/8-9 on the Lumding–Guwahati line, near Longpher, 25°47′N 93°04′48″E): A 470 km², L 56.35 km, Lc 31.40 km, S 2.02 m/km; Qp = 96 m³/s, qp = 0.20 m³/s per km², tp = 11.07 h, adjusted to 11.5 h, TB = 41 h and TD = 1.1 tp = 12.65 h, rounded to 13 h; 50-yr 24-hour point rainfall 22.5 cm (25-yr 19.0 cm; 100-yr 26.0 cm), 13-hour ratio 0.88, giving 19.80 cm, and ARF 0.8406, giving 16.64 cm; loss 0.35 cm/h and base flow 0.05 × 470 = 23.5 m³/s; Q50 = 1,094.81 m³/s. The simplified formulae give 815.18, 1,008.28 and 1,186.82 m³/s for Q25, Q50 and Q100, within 8.02%, 7.90% and 9.63% of the detailed method. The errata correct the example's loss rate from "0.36 cm/hr" to 0.35 cm/h. Use in the State. The SUHs apply only to the rural rivers of more than 25 km² (2(a)) or 50 km² (2(b)) that enter or pass the towns, and are computed only as the benchmark of their natural condition (Clause 3.11.4). The urban catchments of Guwahati, Dibrugarh, Silchar and the other towns behind embankments are designed by the Rational Method or SWMM under Clause 3.4, with storage–pump routing behind the sluice and the river level at the sluice as the tailwater (Chapter 5), and the hill streams of Guwahati, of about 10–120 km², by a hydrograph model with the segment Tc, the 2(b) SUH being only a check above 50 km² (Commentary to Clause 3.7). Below a dam the flood is set by releases (Chapter 5). The design loss rates of 2.4 and 3.5 mm/h are φ-indices fitted to floods of rural catchments; each is used only in rural SUH runs within its own subzone, is not a soil infiltration capacity and is not used to assign HSG (Clause 3.7), in urban SCS-CN or SWMM models, or to size infiltration practices (Chapter 4). The ratio tables are not used outside the sub-areas that Clause 2.3.6(f) assigns them, because the two reports disagree: for the same 24-hour depth the 2(b) 1-hour depth is about 1.8 times the 2(a) depth (NEER's computation), a step across the river at Guwahati that is an artefact of the reports, not of the climate.
Table 3E.2 — Worked example outline (layout)
| Step | Content | Clause |
|---|---|---|
| 1 | Catchment area, main stream length, length to centroid and equivalent slope, from survey or DEM | 3.11.4(a) |
| 2 | SUH parameters from Table 3E.1 and the plotted unit hydrograph | 3.11.4(a) |
| 3 | Design storm duration, point and areal 24-hour rainfall with climate factor, time distribution | 3.11.4(a), (b) |
| 4 | Effective rainfall after the design loss rate; convolution with the SUH; base flow added | 3.11.4(a) |
| 5 | 1% AEP peak compared with the HEC-HMS or SWMM peak for the existing natural condition | 3.11.4(c), (d) |
Form 3-1 — Hydrologic Calculation Summary
Supports Clauses 3.4, 3.6, 3.7, 3.8, 3.10–3.13, 3.15–3.17 of Chapter 3.
Draft form — Assam Stormwater Design Manual, Draft v1.0. One form per submittal. Attach the documents listed in Section H.
A. Project
Table 3F.1 — Form 3-1: project
| Field | Entry |
|---|---|
| A1. Project name and applicant | |
| A2. Location (village or ward, survey numbers, district) | |
| A3. Site area (ha) and number of points of comparison (POCs) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Design Rainfall Sheet reference (Form 2-1) |
B. Method and software (Clauses 3.4, 3.11, 3.12, 3.16)
Table 3F.2 — Form 3-1: method and software
| Field | Entry |
|---|---|
| B1. Purpose of each calculation (conveyance, storage, comparison, catchment study) | |
| B2. Contributing area for each purpose (ha or km²) | |
| B3. Method used and the row of Table 3.1 that permits it | |
| B4. Reason for the choice of method | |
| B5. Software and version; engine and version for packages built on SWMM or HEC (Clause 3.16.1, 3.16.2) | |
| B6. For other software: benchmark results of Annex 3C attached (Table 3C.7) and the 5% comparison of Clause 3.16.2 | |
| B7. Runoff transform (Clause 3.11.1) | |
| B8. Computation interval Δt (h), with 0.133 Tc of the smallest sub-area and the hyetograph time step (Clause 3.11.3(a)) | |
| B9. Storage routing and channel routing methods (Clauses 3.12.1, 3.12.2) | |
| B10. Dynamic-wave routing required? If yes, which condition of Clause 3.12.4 | |
| B11. CWC SUH benchmark required (25–5,000 km², Clause 3.11.4)? Result reference | |
| B12. Continuous simulation required (Clause 3.13.1)? Record used and starting tank levels (Clause 3.13.5) | |
| B13. Calibration required (Clause 3.15.1)? Calibration report reference |
C. Soils and groundwater (Clauses 3.3.3(b), 3.7, 3.10)
Table 3F.3 — Form 3-1: soils and groundwater
| Field | Entry |
|---|---|
| C1. HSG source map, scale and lookup used (Clause 3.7.1, Annex 3A) or NEH Part 630, Ch. 7 assignment (Clause 3.7.2) | |
| C2. Infiltration tests: number, locations, depths, results (Clause 3.7.3) | |
| C3. Seasonal high water table: depth below ground and source (Clause 3.10.2) | |
| C4. Areas within 0.6 m assigned HSG D (Clause 3.10.1) | |
| C5. Disturbed pervious areas and HSG downgrade applied (Clause 3.3.3(b)) |
D. Parameters by sub-area and condition (Clauses 3.3, 3.5, 3.8, 3.9; Clause 3.17 item 4)
Table 3F.4 — Form 3-1: parameters by sub-area and condition
| Sub-area | Condition (pre / post) | Area (ha) | Impervious: roofs / paved / roads (ha) | DCIA (ha) | Disconnected (ha) | HSG | CN, AMC II | CN, AMC III (pervious part) | C and Cf (if Rational) | Tc (min) |
|---|---|---|---|---|---|---|---|---|---|---|
E. Time of concentration worksheet (Clause 3.6)
One worksheet per sub-area and condition.
Table 3F.5 — Form 3-1: time of concentration worksheet
| Segment | Flow type | Surface and n (Table 3.4) | L (m) | S (m/m) | P2 (mm) | V (m/s) | Tt (min) |
|---|---|---|---|---|---|---|---|
| 1 | Sheet | — | |||||
| 2 | Shallow concentrated | — | |||||
| 3 | Channel or pipe | — | |||||
| Tc (not less than 10 min) |
E1. Is the post-development Tc shorter than the pre-development Tc? If not, explain (Clause 3.6.6): ______
F. Rainfall and losses (Clauses 3.8.4, 3.8.5, 3.11.5, 3.12, 3.3.5)
Table 3F.6 — Form 3-1: rainfall, losses and starting levels
| Field | Entry |
|---|---|
| F1. AEPs and durations run; climate factor applied (Chapter 2) | |
| F2. AMC used for each duration (Clause 3.8.4) | |
| F3. Ia ratio for design runs; Ia = 0.05S sensitivity run made (Clause 3.8.5) | |
| F4. Peak rate factor used; if lower than 484, the Annex 3D value and the land it applies to (Clause 3.11.5) | |
| F5. Starting water level of each tank or waterbody, and its basis (Clauses 3.12.5, 3.13.5) | |
| F6. Off-site run-on: land use assumed for conveyance and for the comparison (Clause 3.3.5) | |
| F7. Incidental storage counted? If yes, the authority's acceptance (Clause 3.12.3) |
G. Departures
Table 3F.7 — Form 3-1: departures from Chapter 3
| No. | Clause departed from | Value used in place of the Chapter 3 value | Justification |
|---|---|---|---|
| 1 | |||
| 2 |
H. Attachments (Clause 3.17)
Table 3F.8 — Form 3-1: attachments
| Item | Attached (yes / no / not applicable) | Reference |
|---|---|---|
| H1. Catchment maps, pre- and post-development, with sub-areas, Tc flow paths, POCs and off-site run-on | ||
| H2. HSG map, water-table data and infiltration test results | ||
| H3. Parameter tables (Section D) and Tc worksheets (Section E) | ||
| H4. Design Rainfall Sheet (Form 2-1) and hyetographs | ||
| H5. Hydrograph tables and plots; stage–storage and stage–discharge tables; routed outflows; peak water levels | ||
| H6. Form 3-2 for each POC | ||
| H7. Calibration report (Clause 3.15) | ||
| H8. Native model input and output files (Clause 3.16.4) |
I. Statement by the responsible engineer (Clause 3.17 item 10)
I state that the methods and parameters of Chapter 3 of the Assam Stormwater Design Manual (Draft v1.0) have been used in this submittal, and that every departure is listed and justified in Section G.
Table 3F.9 — Form 3-1: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Organisation | |
| Signature | |
| Date |
Draft form — Assam Stormwater Design Manual, Draft v1.0.
Form 3-2 — Pre- vs Post-Development Comparison
Supports Clauses 3.8.5, 3.11.5 and 3.14 of Chapter 3.
Draft form — Assam Stormwater Design Manual, Draft v1.0. One form for each point of comparison (POC). Flows in m³/s, volumes in m³.
A. Point of comparison (Clause 3.14.2)
Table 3F.10 — Form 3-2: point of comparison
| Field | Entry |
|---|---|
| A1. POC identifier and location | |
| A2. Area draining to the POC: site (ha) and off-site run-on (ha) | |
| A3. Off-site run-on passes through site storage? (Clause 3.14.2(c)) | |
| A4. Catchment class: standard (Clause 2.11.2) or flood-sensitive (Clause 2.11.3) | |
| A5. Tailwater applied, including joint cases of Clause 2.12 (Clause 3.14.9(c)) | |
| A6. Flood-sensitive only: largest 10% AEP pre-development peak over all durations, the cap of Clause 2.11.3 (Clause 3.14.7) | |
| A7. Flood-sensitive only: 50% AEP pre-development peak at the pre-development critical duration (Clause 2.11.3) |
B. Peak flows (Clauses 3.14.7–3.14.10)
Limit: standard catchments 0.9 × Q_pre for the same AEP and duration (Clause 3.14.10(a)); flood-sensitive catchments the caps A6 (for 1% AEP) and A7 (for 50% AEP) (Clause 3.14.10(b)).
Table 3F.11 — Form 3-2: peak flows by AEP and duration
| AEP | Duration (h) | AMC | Q_pre | Q_post, uncontrolled | Q_post, routed | Limit | Met? |
|---|---|---|---|---|---|---|---|
| 50% (2-yr) | 1 | II | |||||
| 50% (2-yr) | 2 | II | |||||
| 50% (2-yr) | 3 | II | |||||
| 50% (2-yr) | 6 | II | |||||
| 50% (2-yr) | 12 | III | |||||
| 50% (2-yr) | 24 | III | |||||
| 50% (2-yr) | 48 | III | |||||
| 50% (2-yr) | 72 | III | |||||
| 10% (10-yr) | 1 | II | |||||
| 10% (10-yr) | 2 | II | |||||
| 10% (10-yr) | 3 | II | |||||
| 10% (10-yr) | 6 | II | |||||
| 10% (10-yr) | 12 | III | |||||
| 10% (10-yr) | 24 | III | |||||
| 10% (10-yr) | 48 | III | |||||
| 10% (10-yr) | 72 | III | |||||
| 1% (100-yr) | 1 | II | |||||
| 1% (100-yr) | 2 | II | |||||
| 1% (100-yr) | 3 | II | |||||
| 1% (100-yr) | 6 | II | |||||
| 1% (100-yr) | 12 | III | |||||
| 1% (100-yr) | 24 | III | |||||
| 1% (100-yr) | 48 | III | |||||
| 1% (100-yr) | 72 | III |
C. Volumes and storage (Clauses 3.14.8–3.14.10)
Table 3F.12 — Form 3-2: volumes and storage
| AEP | Governing duration (h) | Runoff volume, pre | Runoff volume, post uncontrolled | Retention volume | Detention storage required | Peak water level in storage (m) |
|---|---|---|---|---|---|---|
| 50% (2-yr) | ||||||
| 10% (10-yr) | ||||||
| 1% (100-yr) |
C1. Governing duration for storage, and the 24, 48 and 72 h results (Clause 3.14.10): ______
D. Sensitivity runs (Clauses 3.8.5, 3.14.11)
Table 3F.13 — Form 3-2: sensitivity runs
| Run | Governing storm (AEP, duration) | Change in Q_post, routed (%) | Change in required storage (%) | Retention volume or WQv governing (Clause 3.8.5(c)) |
|---|---|---|---|---|
| Ia = 0.05S | ||||
| Standard peak rate factor (only where a lower factor is used) | — |
E. Associated checks (Clause 3.14.12)
Table 3F.14 — Form 3-2: associated checks
| Check | Result | Reference in submittal |
|---|---|---|
| Drawdown times (Chapter 4) | ||
| Minimum orifice and trash screen (Chapter 4) | ||
| Emergency spillway (Chapter 4) | ||
| Outfall-closed storage check (Chapter 5) | ||
| Downstream analysis (Chapter 5) |
F. Statement by the responsible engineer
I state that this comparison has been made by the procedure of Clause 3.14, with the same design storms in the pre- and post-development runs, and that no runoff has been diverted from one natural catchment to another to meet the criterion (Clause 3.14.2(b)).
Table 3F.15 — Form 3-2: statement by the responsible engineer
| Field | Entry |
|---|---|
| Name | |
| Qualification and registration number | |
| Signature | |
| Date |
Draft form — Assam Stormwater Design Manual, Draft v1.0.