Draft v1.0 prepared by NEER. Not adopted by the Government of Assam, any Autonomous Council, authority or local body, and has no legal force. About this draft

Chapter 8Water Quality and Recharge


8.1 Purpose and scope

8.1.1 This chapter sets the requirements for the quality of stormwater leaving a site or a public drainage system, and for groundwater recharge. It covers:

  • (a) the water quality volume (WQv) and the water quality design flow;
  • (b) the treatment train, and the selection and design of best management practices (BMPs);
  • (c) the criteria for infiltration and recharge;
  • (d) the exclusion of sewage and dry-weather flow from storm drains;
  • (e) gross pollutant traps, first-flush treatment and screens at outfalls to waterbodies;
  • (f) how rainwater harvesting (RWH) fits with retention and detention;
  • (g) erosion and sediment control during construction; and
  • (h) monitoring.

8.1.2 This chapter applies to every development and public work to which Chapter 4 applies (Chapter 1). Clauses 8.9 (sewage) and 8.12 (construction erosion and sediment control) apply to every development that needs a building permit or layout approval, and to every public drainage work, whatever its size.

8.1.3 Retention under Chapter 4 is the first and preferred form of water quality control. Runoff retained on site is treated in full. The rest of this chapter applies to the part of the WQv that is not retained.

Commentary. CPHEEO (2019) is the only Indian manual that covers stormwater quality in any detail. Its Chapter 9 reproduces US event mean concentrations, but cautions that "in an Indian context the values would be much higher" because drains receive night soil, urine and food waste, and it sets no Indian numeric criteria (CPHEEO 2019, Part A §9.5). Its Chapter 10 describes water-sensitive urban design, LID and SuDS treatment trains (CPHEEO 2019, Part A Ch. 10). This chapter turns that guidance into requirements. It follows the treatment approach of the MARC/APWA BMP Manual (2012), now merged into APWA 5600 (2025.01), with the Malaysian 3-month ARI water quality storm (MSMA 2, 2012) and the Georgia water quality volume (GSMM, 2016) as tropical and US benchmarks.


8.2 Definitions

Term Meaning in this Manual
Water quality volume (WQv) The runoff volume that must be retained or treated, from the water quality rainfall depth (Clause 8.4).
Water quality rainfall depth (P_wq) The greater of the retention depth (Annex 2E, Clause 2.10) and the 24-hour 3-month ARI depth (Annex 8A).
3-month ARI depth The 24-hour rainfall depth equalled or exceeded on average four times a year, from a partial-duration series of the long-term daily record.
Water quality design flow (Q_wq) The peak flow from the 3-month ARI storm, used to size flow-through devices and diversion structures (Clause 8.4.5).
Runoff coefficient for WQv (Rv) The volumetric runoff coefficient for small storms, Rv = 0.05 + 0.009·I.
BMP A best management practice: a structural or non-structural measure that reduces pollutant loads or runoff volume.
Treatment train Two or more BMPs in series, from source to site to regional scale (Clause 8.5).
Pretreatment A BMP that removes coarse sediment, litter and oil before runoff reaches a filter or infiltration BMP.
First flush The early part of a runoff event, which usually carries the highest concentrations of sediment, litter and oil.
Gross pollutant trap (GPT) A device that captures litter, plastics, vegetation and coarse sediment, typically above about 5 mm.
Dry-weather flow (DWF) Flow in a storm drain when it has not rained for at least 72 hours. In a separate storm system, DWF is evidence of sewage, sullage, groundwater infiltration or illicit discharge.
Cross-connection Any pipe, channel or opening that lets sewage or sullage (grey water from kitchens, bathrooms and laundries) enter a storm drain.
Infiltration facility A facility designed to store runoff below the ground surface, or in a depression, and let it soak into the soil: infiltration trenches and basins, unlined bioretention, permeable pavement with an open base, soakaways, recharge pits and recharge wells.
Seasonal high groundwater table As defined in Clause 3.10.2: the highest level in the monsoon season.
Hotspot A land use with a high risk of spills or contaminated runoff (Clause 8.8.8).
Level of Service (LoS) / Value Rating (VR) The scoring system of Clause 8.6, from the MARC/APWA BMP Manual (2012).

8.3 Objectives and pollutants of concern

8.3.1 Stormwater treatment under this Manual shall aim to:

  • (a) remove litter, plastics and other gross pollutants before they reach a waterbody;
  • (b) remove suspended sediment, and the metals, nutrients and oil carried on it;
  • (c) keep sewage and sullage out of storm drains and waterbodies;
  • (d) recharge groundwater where soils and groundwater depth allow, without polluting it; and
  • (e) prevent erosion and sediment discharge during construction.

8.3.2 The design shall address the following pollutants for every site, and the hotspot pollutants of Clause 8.8.8 where they apply:

Table 8.1 — Pollutants of concern, sources and primary controls

Pollutant Main sources in Assam towns Primary control
Gross pollutants (plastics, litter, vegetation) Streets, markets, open dumping in drains Source collection; GPTs and screens (Clause 8.10)
Suspended sediment Construction sites, unpaved roads and verges, road wear, drain silt Erosion and sediment control (Clause 8.12); pretreatment; filtration
Oil, grease and fuel Roads, parking, fuel stations, workshops, bus depots Oil-grit separators at hotspots; bioretention
Pathogens and organic load (BOD) Sewage and sullage cross-connections, animal waste Exclusion and DWF interception (Clause 8.9)
Nutrients (N, P) Sewage, fertiliser, food waste, detergents Exclusion; bioretention; wetlands
Heavy metals Roads, roofs, industrial yards Filtration; sedimentation

Commentary. Gross pollutants and sewage come first in Clause 8.3 because they dominate the pollution of urban waterbodies in Assam, and because no treatment BMP works for long if they are not removed. CPHEEO (2019) notes that Indian drains carry night soil, urine and food waste (Part A §9.5). In its WSUD procedure it lists TSS, total nitrogen, total phosphorus and gross pollutants as the key pollutants (Part A Ch. 10). AMRUT 2.0 funds the harvesting of rainwater "through storm water drains into water body (which is not receiving sewage/effluent)" (Lok Sabha unstarred question AU1419), which only works if sewage is first kept out of the drains.


8.4 Water quality volume and design flow

8.4.1 Water quality rainfall depth. The water quality rainfall depth is:

P_wq = max (P_ret, P_3m)

where:

  • P_ret = the retention depth for the site's zone (Annex 2E, Clause 2.10), mm; and
  • P_3m = the 24-hour 3-month ARI depth for the site's zone (Annex 8A), mm.

8.4.2 Water quality volume. The WQv shall be computed as:

WQv = (P_wq / 1000) × Rv × A

where:

  • WQv is in m³;
  • A = the contributing area, m²;
  • Rv = 0.05 + 0.009·I; and
  • I = the impervious percentage of the contributing area (0–100), after the connectivity rules of Clause 3.9.

The Rv form above may be used only for sites under 0.5 ha and under the Tier B simplified method (Clause 4.14). This is the same limit as for the retention volume (Clause 4.4.2). For all other sites the WQv shall be computed with the SCS-CN method, as the retention volume is: WQv (m³) = 10 × Q_wq × A, where Q_wq (mm) is the SCS-CN runoff from P_wq for each sub-area and A is in ha.

8.4.3 Climate factor. The climate factor of Clause 2.8 shall not be applied to P_wq. P_ret and P_3m are frequency statistics of ordinary rainfall, not AEP design depths.

8.4.4 WQv met by retention. The volume retained on site under Chapter 4 counts toward the WQv in full. Where the retained volume is equal to or greater than the WQv, no further treatment is required for that area, except:

  • (a) pretreatment of inflows to each retention facility (Clause 8.5.3);
  • (b) hotspot controls (Clause 8.8.8); and
  • (c) the outfall requirements of Clause 8.10, where the site discharges to a waterbody.

8.4.5 Water quality design flow. Flow-through devices (swales, filter strips, oil-grit separators, GPTs) and diversion weirs for off-line BMPs shall be sized for Q_wq. Q_wq shall be computed from the 3-month ARI intensity at the time of concentration of the contributing area:

  • (a) by the Rational Method, where Chapter 3 allows it (a single element draining no more than 16 ha); or
  • (b) as the peak of a hydrograph method using the 3-month ARI 24-hour depth with the alternating-block pattern of Clause 2.9.1.

8.4.6 Bypass. Flows above Q_wq shall bypass flow-through and off-line treatment devices without washing out the material already captured. The bypass shall be part of the minor or major system (Chapter 6).

8.4.7 Drawdown. Where the WQv is held in an extended-detention BMP (wet pond, constructed wetland or dry extended-detention basin), it shall be released over 24–48 hours (Chapter 4).

Commentary. The WQv depth is the runoff from the 3-month ARI storm or the retention depth, whichever is greater. The 3-month ARI is the Malaysian water quality design storm (MSMA 2, 2012). The Malaysian 2008 checklist gave its depth as about 40 mm and said it captures 90% or more of 24-hour storm runoff volume (DID, 2008). The Assam value must be computed (Annex 8A). Georgia sets its WQv as the runoff from 1.2 inches (about 30 mm), the depth that covers 85% of storms in an average year, and requires 80% removal of the average annual post-development TSS load (GSMM 2016, Vol 1, Standard #4). Kansas City's water quality storm is the 1.37-inch (about 35 mm) event that produces up to 90% of the runoff from all 24-hour storms in a year (MARC BMP Manual, 2012).

The Rv formula is from the MARC/APWA BMP Manual (2012), which computes WQv = P × Rv with Rv = 0.05 + 0.009·I. Rv is used instead of the SCS curve number because the CN method greatly understates runoff from small storms on pervious ground. Not applying the climate factor (Clause 8.4.3) has no direct precedent; this Manual does so because it treats P_wq like the retention depth, as a statistic of ordinary rainfall. Bypass of larger flows and the 24–48 hour drawdown follow Chapter 4; MARC (2012) required at least 40 hours of extended detention of the WQv.

Illustrative — not design values. For a 1.0 ha site with 80% impervious cover and an assumed P_wq of 50 mm:

  • Rv = 0.05 + 0.009 × 80 = 0.77
  • WQv = (50 / 1000) × 0.77 × 10,000 = 385 m³

8.5 Treatment train and pretreatment

8.5.1 Treatment train. Water quality control shall be designed as a treatment train, in the order shown in Figure 8.1:

  • (a) source controls on the plot: roof runoff to RWH, rain gardens, permeable paving, disconnection of impervious areas, and silt traps at inlets;
  • (b) site controls: bioretention, swales, filter strips, infiltration, oil-grit separators at hotspots, wet ponds and extended detention; and
  • (c) regional controls, for public drainage: GPTs and DWF interceptors at outfalls, constructed wetlands at tank inlets, and regional ponds.

8.5.2 A development shall meet the WQv on site, through (a) and (b). Regional controls under (c) may count toward a development's WQv only where a regional facility treating the same runoff has been built under a notified basin plan (Clause 7.11).

8.5.3 Pretreatment. Every bioretention cell, infiltration facility, permeable pavement receiving run-on, wet pond and constructed wetland shall have pretreatment at each concentrated inflow. Pretreatment shall be a sediment forebay, grass filter strip, silt trap or proprietary device that holds at least 10% of the WQv of its contributing area, or that is sized for Q_wq for flow-through devices.

8.5.4 Pretreatment shall be accessible for cleaning without entering or disturbing the main BMP.

Commentary. The treatment train follows CPHEEO (2019, Part A §10.2.3, SuDS treatment train) and CIRIA C753 The SuDS Manual (2015). It is also the order of priorities of this Manual: preserve, retain, detain, convey (Chapter 1). The 10% forebay volume has no Indian precedent; it is a common sizing rule for forebays in US manuals. In Assam, unpaved verges, construction sites and drain silt deliver a heavy sediment load. Bioretention and infiltration facilities without pretreatment clog, often within a year or two.

Stormwater treatment train: source, site and regional Treatment train: source → site → regional → receiving waterbody Runoff from roofs, roads, parking and open space: first flush carries most sediment, litter and oil 1. Source control on the plot, at the roof or kerb • Rooftop RWH: sump, recharge well • Rain garden, small bioretention • Permeable paving • Disconnect roofs onto lawns • Green roof, soil restoration • Silt trap / catch pit at inlets Retain first (Chapter 4) 2. Site control layout, campus, road corridor • Bioretention, swales, filter strips • Infiltration trench or basin • Oil-grit separator (hotspots) • Wet pond or extended detention • Sediment forebay pretreatment • Treat WQv, then detain Treat WQv (Clause 8.4) 3. Regional control basin or outfall, public land • Gross pollutant trap at outfall • Dry-weather flow interceptor • Constructed wetland at tank inlet (sedimentation zone) • Regional pond / restored tank (fee-in-lieu, Clause 7.11) Required at outfalls (8.10) Receiving waterbody tank, channel, marsh, estuary (Chapter 7) Each stage removes a different fraction. Coarse solids and litter are removed first so that filters and infiltration media do not clog. Flows above the WQ peak bypass treatment to detention (Chapter 4). Sewage and dry-weather flow are not stormwater No sewage or sullage connection to any storm drain (Clause 8.9). Dry-weather flow found at an outfall is intercepted and sent to the sewer or a treatment plant, not to the treatment train or the waterbody.

Figure 8.1 — Treatment train: source, site and regional controls before the receiving waterbody, with sewage and dry-weather flow kept out of the system. Original drawing for this Manual, adapted from CIRIA, The SuDS Manual (C753), 2015, and MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012.


8.6 BMP selection: Level of Service and Value Rating

8.6.1 Method. In Tier A areas, the BMPs for each site shall be selected by the Level of Service (LoS) method of this Clause. In Tier B areas, the simplified route of Clause 8.6.5 may be used.

8.6.2 Required Level of Service. For a site that is not redevelopment, the required LoS depends on the change in curve number (ΔCN) from pre- to post-development (Chapter 3):

Table 8.2 — Required Level of Service for sites that are not redevelopment

ΔCN Impact Required LoS
17 or more High 8
7 to 16 Moderate 7
4 to 6 Low 6
1 to 3 Minimal 5

For redevelopment (existing impervious cover of 20% or more of the site), the required LoS shall be taken from Annex 8B.

8.6.3 Value Rating. Each BMP treating the WQv has a Value Rating (VR) from Table 8.3. The site's composite VR is the area-weighted average of the VRs of the BMPs serving each part of the site. Treatment trains get a composite VR under Annex 8B. The composite VR shall be equal to or greater than the required LoS.

8.6.4 Conditions for a Value Rating. A BMP earns its VR only if:

  • (a) it is sized for the WQv (or Q_wq for flow-through devices) of the area credited to it;
  • (b) it meets the design requirements of Clause 8.7 and, for infiltration, Clause 8.8; and
  • (c) it has pretreatment under Clause 8.5.3.

8.6.5 Tier B simplified route. In Tier B areas, the requirement of Clause 8.6.3 is deemed met where the whole WQv of the site is either:

  • (a) retained on site under Chapter 4; or
  • (b) treated by a bioretention cell, rain garden or infiltration facility designed under Clauses 8.7 and 8.8, with pretreatment.

Table 8.3 — BMP Value Ratings and suitability in Assam

BMP VR (MARC 2012) Main pollutants removed Volume reduction / recharge Bhabar fans, river terraces and tested hill-foot colluvium (recharge rule) Laterite / hard rock Floodplain alluvium, char, beel and pukhuri margins / high water table Assam notes
Native vegetation (preserved) 9.25 All High Suited Suited Suited Counts only for preserved, undisturbed area
Rain garden / infiltration 9.0 Sediment, metals, oil, nutrients High Suited if 1.0 m separation met Conditional (test) Not suited Mosquito control: drain within 48 h
Bioretention 8.5 Sediment, metals, oil, nutrients Medium–high (unlined); low (lined) Suited Suited, with underdrain Lined, with underdrain Media source and phosphorus content to be specified
Permeable pavement 7.5 Sediment, metals, oil Medium–high Suited Conditional Lined only Not where run-on carries heavy silt
Extended detention wetland 7.0 Sediment, nutrients, metals Low Conditional (water balance) Suited Suited Good at tank inlets (Clause 7.9.7)
Media / sand filter 6.0 Sediment, metals Low Suited Suited Suited (lined) Needs frequent cleaning
Extended wet detention (wet pond) 5.0 Sediment, metals, some nutrients Low Conditional (water balance) Suited Suited Dry-season water balance (Clause 8.7.8)
Vegetated filter strip 5.0 Sediment Low–medium Suited Suited Suited Mostly as pretreatment
Native vegetation swale 4.0 Sediment, oil Low–medium Suited Suited Suited Not where Q_wq velocity is high
Extended dry detention 4.0 Coarse sediment Low Suited Suited Suited Combine with detention (Chapter 4)
Proprietary / hydrodynamic devices 3.0–5.0 Coarse sediment, oil, litter None Suited Suited Suited VR from verified test data only
Signage (public education) +0.25 — — — — — Added to composite VR

The VR column is from the MARC/APWA BMP Manual (2012), Table 4.4. The suitability columns and notes have no direct precedent and are set by this Manual.

Commentary. The LoS and VR method is from the MARC/APWA Manual of Best Management Practices for Stormwater Quality (2012), Tables 4.2 and 4.4. The VRs combine a water quality score, based on effluent TSS concentrations in the International Stormwater BMP Database, with scores for volume reduction, temperature, and oils and floatables. The method suits Assam for two reasons. It rewards volume reduction and preservation, which also serve recharge. It can also be checked by a reviewer without water quality modelling. Its weakness is that the scores come from US data. Assam stormwater carries more litter and more sewage than the US runoff behind the scores (CPHEEO 2019, §9.5), so this Manual requires GPTs and DWF exclusion separately (Clauses 8.9 and 8.10) and does not let a VR stand in for them.


8.7 BMP design summaries

8.7.1 General. Each BMP shall be designed to the requirements below and to Annex 8D (BMP design sheets). The dimensions given are recommended starting values where marked; the designer shall justify any departure. Every BMP shall be designed for safe passage of flows above Q_wq (Clause 8.4.6) and shall have access for maintenance (Chapter 10).

8.7.2 Bioretention and rain gardens (Figure 8.2).

  • (a) Surface ponding depth not more than 300 mm above the mulch, with an overflow at the maximum ponding level.
  • (b) Surface ponding drained within 48 hours.
  • (c) Filter media 600–900 mm deep: an engineered sandy loam with low fines and low phosphorus content (Annex 8D), with a 50–75 mm mulch layer.
  • (d) A transition (choker) layer and a gravel drainage layer below the media.
  • (e) A perforated underdrain where the design infiltration rate of the native soil (Clause 8.8.4) is below the rate needed to meet (b), or where the cell is lined.
  • (f) Unlined cells shall meet the infiltration criteria of Clause 8.8. Cells that cannot meet them, and cells at hotspots, shall be lined.
  • (g) Plants: native or naturalised species tolerant of both waterlogging and long dry spells.

8.7.3 Vegetated swales.

  • (a) Trapezoidal or parabolic section, with side slopes no steeper than 1V:3H.
  • (b) Longitudinal slope 0.5% to 4%, with check dams where steeper.
  • (c) Flow depth at Q_wq not more than the height of the grass, and velocity at Q_wq not more than 0.3 m/s.
  • (d) The 1% AEP flow (or the bypass) shall not erode the swale (Chapter 9 permissible velocities).
  • (e) Where longitudinal slopes are below 1% or the subsoil is poorly drained, an underdrained ("dry") swale with filter media.

8.7.4 Vegetated filter strips.

  • (a) Receive sheet flow only, with a level spreader where flow arrives concentrated.
  • (b) Length in the direction of flow at least 5 m, and slope 1% to 8%.
  • (c) Used mainly as pretreatment for bioretention, infiltration and swales.

8.7.5 Permeable pavement.

  • (a) Run-on from impervious areas not more than twice the permeable area, and no run-on from unpaved or eroding areas.
  • (b) Base reservoir of clean, open-graded aggregate, sized to hold its share of the WQv in its voids.
  • (c) An open base (infiltrating) only where Clause 8.8 is met; otherwise lined with an underdrain, and then counted as filtration only.
  • (d) Structural design for the traffic loading by the road authority's standards.
  • (e) Not at hotspots, and not where the surface will be resurfaced with impermeable material.

8.7.6 Infiltration trenches and basins (Figure 8.3).

  • (a) Pretreatment under Clause 8.5.3 in every case.
  • (b) Trenches filled with clean washed aggregate, with a void ratio confirmed by test, wrapped in geotextile on the sides and top, on a sand base.
  • (c) An observation well to the base of each trench.
  • (d) Storage volume = WQv (or the retention volume of Chapter 4, where greater) held in the voids; emptied within 72 hours at the design infiltration rate.
  • (e) An overflow to the minor or major system at grade.
  • (f) Not brought into service until the contributing area is stabilised (Chapter 10).

8.7.7 Wet ponds (extended wet detention).

  • (a) A permanent pool of at least the WQv, plus extended detention of the WQv above the pool, released over 24–48 hours.
  • (b) A sediment forebay at each inlet (Clause 8.5.3).
  • (c) Length-to-width ratio of the flow path at least 3:1, with no short-circuiting.
  • (d) Permanent pool depth 1.0–2.5 m, with a safety bench (Clause 7.9.4).
  • (e) A dry-season water balance (Clause 8.7.8).
  • (f) The detention storage of Chapter 4 may sit above the extended detention level.

8.7.8 Water balance for permanent pools. Wet ponds and wetlands shall be shown, by a monthly water balance using IMD rainfall and pan evaporation, to keep at least 50% of the permanent pool volume (or the minimum wetland depth) through the driest year in 10. They shall not be topped up with groundwater, potable water or sewage. Where the balance fails, a dry extended-detention basin or a constructed wetland with a smaller permanent pool shall be used instead.

8.7.9 Constructed wetlands.

  • (a) An inlet sedimentation pond (forebay) followed by a shallow vegetated macrophyte zone.
  • (b) Extended detention of the WQv above the normal water level, released over 24–48 hours, with an extended detention depth not more than 0.5 m.
  • (c) A flow path length-to-width ratio of at least 3:1, with deep zones across the flow path to spread the flow.
  • (d) A high-flow bypass so that floods do not scour the macrophyte zone.
  • (e) Where built at a tank inlet, the wetland shall sit within the tank's setback but outside its waterspread, and its storage shall not be counted as tank storage.

8.7.10 Gross pollutant traps.

  • (a) Sized to treat Q_wq, with all flows up to the 1% AEP passing without washing out captured material.
  • (b) Capture of gross pollutants down to about 5 mm.
  • (c) Head loss included in the hydraulic grade line of the drain (Chapter 9), with the screen assumed 50% blocked.
  • (d) Storage for captured material sized for the cleaning interval of the O&M plan, and not less than the 3-monthly cleaning of Chapter 10.
  • (e) Vehicle access for cleaning by suction or grab.

8.7.11 Oil-grit separators.

  • (a) Required at the hotspots of Clause 8.8.8 that involve fuel or oil: fuel stations, vehicle workshops and washing bays, bus and truck depots, and parking areas of more than 50 spaces.
  • (b) Sized for Q_wq, with a high-flow bypass.
  • (c) Not to be used as the only treatment: they shall be followed by a filtering BMP where the site needs a VR above 5.

8.7.12 Silt traps and catch pits.

  • (a) At every inlet that receives runoff from unpaved ground, and at the inlet of every drain discharging to a BMP or waterbody.
  • (b) A sump at least 300 mm below the outlet invert.
  • (c) Silt traps are pretreatment only and earn no VR.

Commentary. The design summaries draw on the MARC/APWA BMP Manual (2012), the Georgia Stormwater Management Manual (2016, Vol 2), CIRIA C753 The SuDS Manual (2015) and PUB Singapore's ABC Waters Design Guidelines. The dimensions are typical of those manuals but have not been calibrated in Assam. Three local issues drive changes from the source manuals:

  • Mosquitoes. Dengue is endemic in Assam. Surface ponding in bioretention and rain gardens must drain within 48 hours (Clause 8.7.2(b)), well inside the time mosquito larvae need to develop. This is consistent with the 24–48 hour WQv drawdown of Clause 8.4.7.
  • Dry seasons. Most of Assam's rain falls in the monsoon season of 1 April to 31 October: the CWC report for subzone 2(b) describes rain "generally spread over a period of eight months, i.e. from March to October", with "about 90 percent of the total rainfall" from May to October, and says that "The winter season from December to March is practically dry"; the State's normal is given as 2,262.95 mm on 144 rainy days (CGWB, 2007). From November to March the beels shrink (Deepor Beel from up to 40.1 km² in floods to about 10.1 km², as reported) and pukhuris fall, though on the floodplains the water table stays within a few metres of the ground (Clause 8.8.1). In the towns the dry-weather feed of a drain, jan or beel is sewage, because the drains carry it (Clause 8.9, Commentary). A wet pond or constructed wetland whose water balance (Clause 8.7.8) cannot keep its permanent pool from December to March on its own catchment's runoff is not to be used, and none is kept full with dry-weather flow; on the floodplain, where Clause 4.11 bars infiltration, the practical forms are lined bioretention with an underdrain, swales, storage for use and lined extended dry detention. Clause 8.7.8 applies to BMPs, which shall not be topped up with sewage; beels, pukhuris and wetlands are waterbodies under Chapter 7 and are not to be used as treatment for a development. Wet ponds that dry out turn into stagnant pools or are used for dumping. Clause 8.7.8 requires a water balance and bans topping up with sewage, which is a common practice for keeping urban ponds "full".
  • Litter and silt. GPTs and silt traps are treated as essential, not optional, because Assam drains carry heavy litter and silt loads. The 50% blockage factor for screens matches the grate clogging factor of Chapter 6.

The 50-space threshold for oil-grit separators, the 5 mm GPT capture size, the 0.3 m/s swale velocity and the other dimensions in this Clause have no direct precedent and are set by this Manual.

Bioretention cell: cross-section Bioretention cell (rain garden): section, not to scale Paved area Pretreatment: grass strip or forebay to drain ponding ≤ 300 mm filter media 600–900 mm overflow crest = max ponding mulch 50–75 mm engineered sandy-loam media (low fines, low phosphorus) transition (choker) layer gravel drainage layer perforated underdrain (if needed) Seasonal high groundwater table (post-monsoon) ≥ 1.0 m if unlined (infiltrating) Lined version (no infiltration): impermeable liner below the gravel layer. Required at pollution hotspots and wherever the 1.0 m separation to seasonal high groundwater cannot be met. Dimensions as set in Clause 8.7.2.

Figure 8.2 — Bioretention cell (rain garden) in section: pretreatment, surface ponding, filter media, transition and gravel layers, underdrain, overflow, and the 1.0 m separation to seasonal high groundwater for an unlined cell. Original drawing for this Manual, adapted from MARC/APWA, Manual of Best Management Practices for Stormwater Quality, 2012, and CIRIA, The SuDS Manual (C753), 2015.


8.8 Infiltration and recharge criteria

8.8.1 Groundwater separation. An infiltration facility is permitted only where the seasonal high groundwater table is at least 1.0 m below the base of the facility. There is no exception in Assam, which has no coastal sand areas (Clause 8.8.9). For this Clause the seasonal high groundwater table is the highest level found from April to November, which covers the season of 1 April to 31 October and the month after it (Clause 3.10.2). Assam needs the three rules of Clause 4.11 here, and Clause 8.8.1 applies with the following. (i) No infiltration on the floodplain (Clause 4.11, floodplain rule). No deliberate infiltration practice (soakaway, soak or percolation pit, recharge pit, shaft or well, infiltration trench, unlined bioretention, or permeable paving with an exfiltrating base) shall be built or credited on char or chapori land; on land below the 1% AEP flood level of a river or stream; inside an embankment-protected area that ponds when its sluices close; on the margins of a beel or pukhuri (its Zone 1 and Zone 2 under Chapter 7); or wherever the seasonal high water table is less than 2.0 m below ground. The last condition alone may be set aside where a piezometer record of at least one full April–November season shows that the water table stays at least 2.0 m below ground and at least 1.0 m below the base of the practice; the others may not. On such land the exception for roof water in Clause 8.11.3(c) does not apply; roof water goes to storage for use, retention is met by storage for use and by surface measures that do not infiltrate below ground, and detention under Chapter 4 is lined. The CGWB found the water in March 2022 "mostly in the range of 2-5 mbgl (57.43%)" and within 2 m at 20.27% of its Assam wells, and in November 2022 "within 5 mbgl (89.13%)" and within 2 m at 45.96%, with water-logged (under 2 m) and prone (2 to 3 m) ground after the monsoon in "almost all the districts of Assam"; in Kamrup (Metro) the wells read 1.39 to 4.08 m in March, 0.2 to 2.76 m in August and 1.29 to 2.64 m in November (Ground Water Year Book, North Eastern Region, 2022-23). (ii) No infiltration on hill slopes (Clause 4.11, hill rule). In the Guwahati hills, in sub-areas AS-D and AS-D1 and on any natural slope steeper than 10° elsewhere, no deliberate infiltration practice shall be built or credited on natural ground sloping more than 10°, on colluvium, fill or slide debris, in a mapped landslide zone (including the Hilly Area Zone of the Master Plan for Guwahati 2025 and land declared landslide-prone), or upslope of a cut slope or retaining wall within twice its height, unless a geotechnical certificate shows that the added water will not destabilise the slope; roof runoff goes to storage, with its overflow, and all other runoff, by a lined drain through a silt trap and an energy dissipator to a stable channel. The 10° threshold is the byelaws' own: "In hilly areas with slope greater than 10° special protection measures shall have to be provided" (byelaw 110(d)). (iii) Recharge only on tested ground outside both rules (Clause 4.11, recharge rule). Recharge is allowed, with pretreatment, the field test of Clause 8.8.3 and the separation of this Clause, with the seasonal high water table at least 2.0 m below ground, only on the bhabar fans of the northern foothills (a belt 11 to 15 km wide, CGWB), where debris and the shifting of channels govern siting, on river terraces above the 1% AEP level, and on Guwahati's hill-foot colluvium on slopes of 10° or less where the hill rule's certificate is given. Recharge is a choice, not a duty: the stage of groundwater extraction was 12.61% in the assessment of 2024 (as quoted, columns unlabelled) and 22%, with no over-exploited unit, in 2007 (CGWB). (iv) No recharge or injection well in the arsenic and fluoride districts. In the districts in which groundwater with arsenic above the limit has been found (isolated pockets in Barpeta, Goalpara, Golaghat, Karbi Anglong, Kokrajhar, Lakhimpur, Sibsagar, Nalbari and Karimganj, as quoted from a Lok Sabha answer of February 2025) or fluoride above 1.5 mg/L (parts of Goalpara, Kamrup, Karbi Anglong, Nagaon, Golaghat and Karimganj, as quoted), no recharge well, recharge shaft, borewell or injection well shall receive runoff of any kind, including roof water, and the exception for recharge wells in Clause 8.11.3(c) does not apply. (v) Quality. No runoff from roads with heavy traffic, fuel stations, workshops, industrial yards or solid-waste sites is led to any recharge structure, and a recharge structure on the bhabar or a terrace takes only roof water or runoff that has passed a filtering BMP. The 2.0 m limit, the April–November record, the districts rule and these conditions are set by this Manual; no Assam rule on infiltration near the water table was found. The seasonal high groundwater table shall be determined under Clause 3.10.2.

8.8.2 Other separation. The base of an infiltration facility shall also be at least 1.0 m above bedrock or any impermeable layer, unless the facility is designed to recharge a fractured or weathered rock aquifer under Clause 8.8.10.

8.8.3 Infiltration tests. The infiltration rate shall be measured at the proposed base level of the facility:

  • (a) by a double-ring infiltrometer test (ASTM D3385) for basins, bioretention and permeable pavement;
  • (b) by a falling-head borehole or trial-pit soakage test (for example BRE Digest 365) for trenches, soakaways, recharge pits and recharge wells;
  • (c) with at least 2 tests per facility, and at least 1 test per 100 m² of infiltration base area or per 50 m of trench length; and
  • (d) by a person competent in geotechnical testing, with the results reported on the Infiltration Test Record (Form 8-2).

Tests made in the dry season shall be reported with the groundwater level at the time of test and the seasonal high level of Clause 8.8.1.

8.8.4 Design infiltration rate. The design infiltration rate is the measured rate divided by a safety factor:

  • (a) 2.0 where the tests meet Clause 8.8.3(c) and the results vary by no more than a factor of 2; and
  • (b) 3.0 otherwise.

8.8.5 Minimum rates.

  • (a) Full infiltration (no underdrain) only where the design rate is at least 13 mm/h.
  • (b) Partial infiltration, with an underdrain, where the design rate is 3 mm/h to 13 mm/h. Only the volume that infiltrates within 72 hours is credited as retention.
  • (c) No infiltration credit where the design rate is below 3 mm/h.

8.8.6 Setbacks for infiltration facilities. Infiltration facilities receiving runoff from roads, parking or other paved surfaces shall be at least:

  • (a) 3 m from building foundations, and 5 m from a basement;
  • (b) 1.5 m from a property boundary, unless the neighbour agrees in writing;
  • (c) 30 m from a drinking-water well or borewell;
  • (d) 15 m from a septic tank or soak pit; and
  • (e) 6 m from the crest of a slope steeper than 1V:3H, unless a geotechnical report shows the slope remains stable.

Roof-only runoff to recharge structures is subject to (a) and (b) only, and to Clause 8.11.3.

8.8.7 Drawdown and verification. Every infiltration facility shall empty within 72 hours at the design rate (Chapter 4), and shall be tested after construction (Clause 10.9.3).

8.8.8 Hotspots. Runoff from the following shall not be infiltrated without treatment, and shall not be infiltrated at all where (d) or (e) applies:

  • (a) fuel stations;
  • (b) vehicle workshops, washing bays, and bus and truck depots;
  • (c) industrial yards and loading areas where hazardous materials are handled or stored;
  • (d) solid waste transfer stations and landfill areas; and
  • (e) land known or suspected to be contaminated.

Treatment for (a) to (c) shall include an oil-grit separator and a lined filtering BMP before any infiltration.

8.8.9 Sandy coastal aquifers. This Clause applies only to coastal sand aquifers. Assam has none, so the Clause has no effect in the State; it is kept only so that the clause numbers stay unchanged. The char and chapori sands of the Brahmaputra and Barak and the bhabar fans of the northern foothills are not coastal sand areas: Clause 8.8.1 applies there in full, with the floodplain rule and the recharge rule of Clause 4.11, and the reduced separation of item (d) does not. In coastal sand areas:

  • (a) infiltration is the preferred means of meeting retention and the WQv wherever Clause 8.8.1 is met;
  • (b) storm drains shall not be designed to lower the groundwater table: inverts below the seasonal high groundwater table shall be watertight, with no weep holes or subsoil drains that discharge groundwater to the outfall, unless a hydrogeological report shows no harm to the freshwater aquifer;
  • (c) no long-term pumping of groundwater into storm drains shall be approved (for example basement dewatering); and
  • (d) in notified coastal sand areas, roof-only runoff may be infiltrated with a separation of not less than 0.5 m to the seasonal high groundwater table, provided a groundwater mounding check shows that the mound stays at least 0.3 m below the facility base and does not reach adjacent foundations or basements. No other runoff may use this reduced separation;
  • (e) where neither the 1.0 m separation nor clause (d) can be met, the site shall use surface retention that does not infiltrate below ground (for example shallow vegetated depressions, disconnection of roofs onto lawns, and reuse), and detention under Chapter 4.

8.8.10 Laterite and hard-rock areas. In laterite and hard-rock terrain (for example the granite-gneiss of the Guwahati hills under thin red loams, and the gneiss, laterite and red loams of the Karbi hills and the Dima Hasao hills, for which no primary geological source was read for this Manual [TBC]; on any slope in these areas the hill rule of Clause 4.11 applies first under Clause 8.8.1):

  • (a) tests shall be made at the facility base, below any surface crust or hardpan;
  • (b) recharge into weathered or fractured rock is permitted only for roof runoff, or for runoff that has passed through a filtering BMP, because fractures give little treatment; and
  • (c) infiltration on or above slopes shall be checked for slope stability.

8.8.11 Delta clays and black cotton soils. In the silty clays and clays of the Brahmaputra and Barak floodplains, the clay beds of the beels, the low terraces and the Silchar bowl, and the silted beds of pukhuris, and in expansive black cotton soils:

  • (a) infiltration facilities will usually fail Clause 8.8.5 and need not be tested where the soil survey (Chapter 3) shows HSG D; and
  • (b) where infiltration is used near buildings on expansive soils, the setback of Clause 8.8.6(a) shall be doubled.

Commentary. The 1.0 m groundwater separation is a core requirement of this Manual. The other values in this Clause (the 1.0 m bedrock separation, test numbers, safety factors, minimum rates and setbacks) are typical of US and UK practice and have no Assam precedent. The well setback in Clause 8.8.6(c) applies to runoff from paved surfaces, not to roof water. Assam RWH practice routes roof water into open wells and recharge wells, and Clause 8.11 keeps that practice.

No map of hydrologic soil groups for Assam, no soil series of NBSS&LUP and no measured infiltration rate anywhere in the State was found [TBC]; every infiltration design needs the tests of Clause 8.8.3. "More than 75% of the state is underlain by unconsolidated formations comprising of clay, silt, sand, gravel, pebble and boulders"; along the northern foothills a bhabar belt 11 to 15 km wide gives way to the terai, and the Brahmaputra floodplains and the semi-consolidated formations of Cachar make up most of the rest (CGWB, 2007). "The flood plains covering the Dibrugarh, Mariani, Nowgong, Guwahati and Goalpara districts represent alluvial soils of recent origin" (CWC, FER 2(b)). The water is shallow almost everywhere on the plains: in March 2022 it stood "mostly in the range of 2-5 mbgl (57.43%)" and within 2 m at 20.27% of the CGWB's Assam wells, in November 2022 "within 5 mbgl (89.13%)" and within 2 m at 45.96%, and in Kamrup (Metro) at 1.39 to 4.08 m in March, 0.2 to 2.76 m in August and 1.29 to 2.64 m in November; water-logged (under 2 m) and prone (2 to 3 m) ground was found after the monsoon in "almost all the districts of Assam", and "Occurrence of water logging conditions in the region is due to high rainfall, shallow water level and a poor ground water draft in the vast flood plains" (CGWB, Ground Water Year Book, North Eastern Region, 2022-23). At Guwahati the rising Brahmaputra "reduces the rate of percolation" (ADB, 2017). The loss rates of the CWC reports, 0.35 cm/h in subzone 2(b) and 0.24 cm/h in 2(a), are low, as the saturated alluvium would lead one to expect (Chapter 3). Groundwater is not short: the stage of extraction was 12.61% in the assessment of 2024 (as quoted, columns unlabelled) and 22%, with no over-exploited unit, in 2007 (CGWB). Quality is the constraint: arsenic above the limit is reported in isolated pockets in Barpeta, Goalpara, Golaghat, Karbi Anglong, Kokrajhar, Lakhimpur, Sibsagar, Nalbari and Karimganj (as quoted from a Lok Sabha answer of February 2025), fluoride above 1.5 mg/L in parts of Goalpara, Kamrup, Karbi Anglong, Nagaon, Golaghat and Karimganj (as quoted), and iron on the north bank of the Brahmaputra (CGWB, 2007). This Manual's interim soil groups follow from these (Chapter 3): the recent floodplain alluvium C to D, and D in the beels, the low terraces and the Silchar bowl; the char and chapori sands A or B by texture but D in design through the monsoon, when the water is at or near the surface; the bhabar fans A, where debris and the shifting of channels govern; the terai B to C with a high water table; the Guwahati hills C to D, and cut slopes and fill D; the laterite and red loams of the Karbi and Dima Hasao hills C; and urban fill C (D if clayey or compacted). The State therefore needs three rules, not one (Clause 4.11). On the floodplain, which is most of the State, no water is put into the ground on purpose, under the floodplain rule, because in the storms that matter it would go into saturated ground. On hill slopes, on colluvium and fill and in landslide zones, no water is put into the ground on purpose, under the hill rule. On the bhabar fans, the river terraces above the 1% AEP level and Guwahati's hill-foot colluvium, recharge is allowed after testing, under the recharge rule, as a choice rather than a duty, and never through a well in the arsenic and fluoride districts. Everywhere, runoff from roads and open land goes to surface systems and never directly to a recharge well, borewell or shaft (Clause 8.11.3(b)). Clause 8.8.9 has no effect in Assam, which has no coast.

Infiltration trench: section with groundwater separation Infiltration trench: section, not to scale Seasonal high groundwater table (measured after the monsoon) Drinking-water well Sediment sump (pretreatment) Runoff in Observation well overflow clean washed aggregate (void ratio from test) geotextile on sides and top sand filter base ≥ 1.0 m Building foundation foundation setback well setback Test infiltration at the proposed base level. Design rate = measured rate ÷ safety factor. Empty within 72 h. Setback distances and test methods: Clauses 8.8.3 to 8.8.6. Road and parking runoff is never piped into a well. Sandy coastal soils: high rates, shallow groundwater. Laterite, hard rock: low rates. Delta clay: usually unsuitable.

Figure 8.3 — Infiltration trench in section: pretreatment sump, aggregate-filled trench in geotextile, observation well, overflow, the 1.0 m minimum separation to the seasonal high groundwater table, and setbacks to wells and foundations. Original drawing for this Manual, adapted from the Georgia Stormwater Management Manual, 2016 (Vol 2), and CIRIA, The SuDS Manual (C753), 2015.


8.9 Sewage cross-connections and dry-weather flow

8.9.1 No sewage in storm drains. No sewage or sullage (grey water from kitchens, bathrooms and laundries), septic tank effluent, or trade effluent shall be connected to, or discharged into, any storm drain, by any pipe, channel or opening.

8.9.2 Condition of approval. Before the completion certificate, the Applicant shall show, by a dye or smoke test witnessed by the Authority or the sewerage agency, that every sewage and sullage outlet on the site discharges to a sewer or to an approved on-site system, and that none discharges to a storm drain. Any existing cross-connection on the site shall be removed as a condition of approval, including on redevelopment and on additions to existing buildings.

8.9.3 Where no sewer exists. Where no sewer is available, sewage and sullage shall go to an approved on-site or decentralised treatment system. The treated effluent of such a system may be discharged to a storm drain only with the written consent of the Pollution Control Board, Assam (PCBA) and the drain owner.

8.9.4 Public drains: DWF survey. Every ULB in a Tier A area shall survey its storm drain outfalls to waterbodies for dry-weather flow at least once a year, before the monsoon, and record:

  • (a) the outfalls with DWF;
  • (b) the estimated DWF rate; and
  • (c) the upstream sources found by tracing, CCTV, dye or smoke testing.

The results shall be published in the register of Clause 10.17.

8.9.5 DWF interception. Until the sources are removed, every outfall to a waterbody that carries DWF shall have a DWF interceptor that:

  • (a) diverts the DWF to a sewer or a treatment plant;
  • (b) does not reduce the capacity of the storm drain for the minor or major event (Chapter 6), with its weir or diversion head losses included in the hydraulic design (Chapter 9);
  • (c) has a screen ahead of the diversion; and
  • (d) is not a substitute for removing the source connections.

8.9.6 Sewage overflows. No new sewage overflow, emergency bypass or pumping station overflow shall be designed to discharge into a storm drain or waterbody, except where the sewerage agency shows that no alternative exists, and then only with screening and with the overflow frequency stated.

Commentary. The prohibition of sewage connections and the removal of existing cross-connections as a condition of approval are core requirements of this Manual, and Clause 1.10.3 allows no variance from them. Sewage in storm drains is the single largest water quality problem of urban drainage in Assam. It defeats every other measure in this chapter: BMPs designed for stormwater are overloaded, GPTs fill with sludge, and the receiving tanks and channels become sewage lagoons. CPHEEO (2019) notes that Indian drains carry night soil and urine (Part A §9.5). DWF interception (Clause 8.9.5) is an interim measure. It protects the waterbody while the sources are traced and removed, but it can become permanent if the source work is not done, which is why the annual survey and publication of Clause 8.9.4 are required. The annual survey frequency is set by this Manual.

In Assam the storm drains are the sewers, and this Clause is the normal case, not the exception. "No ULB in the state has a centralized sewerage system, including Guwahati … about 90% of households have installed septic tanks or leach pits, no ULB has a systematic mechanism for septage collection" (ADB, RRP, 2025); in the towns the CAG test-checked, "natural drainage systems of the cities carried the sewage" (CAG Report No. 4 of 2019). In Guwahati "un-treaded or semi-treated sewage is disposed in to nearby drains and low-lying areas", with a drain BOD of "90 mg/l in 2013" (JICA, 2015). The Bharalu "has no natural flow of the river at present and only the domestic sewage and commercial sewage are being carried"; the Bahini, cut off by a sluice at Natun Bazar, "now becomes a sewerage drain"; about 39 outfalls discharge 70,740 KLD of untreated sewage (at 135 lpcd), expected to reach 75,060 KLD by 2030, and the BOD ranged from 6.0 to 54 mg/L between 2016 and April 2019, when it was 54 mg/L with a COD of 98 mg/L and no dissolved oxygen (PCBA, action plan for the Bharalu, Priority I). The State's report to the National Green Tribunal in O.A. 673/2018 placed the Bharalu, Borsola Beel and Silsako Beel in Priority I, Sorusola in Priority II and Deepar Beel in Priority III, polluted by the "Mora Bharalu channel", and found "no suitable land available" for a 75 MLD plant (August 2020); the CPCB's data for 2022–23 are reported to keep the Bharalu in Priority I and to list the Pamohi, the Digboi, the Mora Bharali at Tezpur and the Bega in Priority V and the Dhansiri in Priority IV (as reported), and a CPCB report of 18 July 2025 found faecal coliform in Deepor Beel (as reported). Outside Guwahati, Dibrugarh's DTP drain "receives sewage flows through secondary drain from a major part of the town" (ADB, 2017). Sewers are coming slowly. The JICA-assisted Guwahati Sewerage Project (loan agreement of 27 February 2015) was appraised at 187 MLD (189 MLD in a State report of 2024; the figures conflict); its first phase, of ₹1,460.37 crore with sewage treatment plants of 65 MLD at Silsako, 62 MLD at Borsola and 60 MLD at Paschim Boragaon and about 872 km of sewers, was approved in January 2024 (as reported; ₹1,178.75 crore and ₹2,365 crore in other sources, which conflict), and in March 2025 an official said "We have begun with the survey" (as reported). Against a sewage gap of about 435 MLD the State reported 338.5 MLD of plants planned for 435.5 MLD (report of 9 October 2024, as cited); GMDA treats 15 MLD at Silsako "with bacterial dosing" before release to the Brahmaputra, and a 20 KLD faecal sludge plant has run at Belortol since August 2024 (as cited). The law already points the same way: from a notified date "no sewage shall be discharged into any watercourse until it has been so treated" (Assam Municipal Corporation Act, 2022, s.171), and the Commissioner may require "an entirely separate drain for rain water" (s.176) or, in Guwahati, "an entirely distinct private drain" for rain-water (Gauhati Municipal Corporation Act, 1969, s.237(1)); but Appendix VI of the Unified Byelaws 2022 routes "All Rain water outlets/drains and waste water drains" to the road drain "through the percolation pit only", which mixes sullage with storm water on every plot that follows it. In Assam, therefore: (i) every storm-drain, nala and jan outfall to a beel, a pukhuri, the Bharalu, the Mora Bharalu, the Bondajan, the Bahini, any other town river or a water body scheduled under the water-bodies law is taken to carry dry-weather flow until the survey of Clause 8.9.4 shows that it does not, and has a DWF interceptor and a screen under Clause 8.9.5 before it reaches the water, and before any detention or retention pond; (ii) no new storm drain shall discharge into a scheduled beel, Deepor Beel or any other wetland of Clause 7.12.1 unless its dry-weather flow is intercepted and its first flush treated under Clause 8.10; (iii) no septic tank or leach pit overflow and no sullage pipe is connected to a storm drain, nala or percolation pit on any site approved under this Manual (Clauses 8.9.1 and 8.9.2): where no sewer exists, sullage goes with the sewage to the on-site system of Clause 8.9.3, and where Appendix VI asks for the waste-water drains to pass through the percolation pit, this Manual states the conflict and leaves the Applicant to seek the Authority's relaxation; (iv) until sewers connect, a drain that receives sewage is designed as a combined channel under Clause 6.3.6(d): for velocities that keep sludge moving in dry weather as well as for the storm flow, with access for cleaning, and with covers or screens where it passes homes; (v) where no sewer or treatment plant exists to receive the intercepted flow, the interceptor delivers it to an interim treatment unit that the PCBA approves, never to a beel, pukhuri or pond; and (vi) a retention pond, beel or basin that stores storm water mixed with sewage, as Silsako does and as the retention pond of the ADB's Bahini works and the diversion to Silsako will, has the dry-weather flow of its inflows intercepted ahead of it; keeps no permanent pool fed by dry-weather flow; is drawn down to its normal level, by gravity or by its pumps, as soon as the river stage allows and within the pumping period of Clause 5.8.5; has its inlets screened and set so that they do not stand exposed as the level falls; is cleared of sludge in the post-season clearance by 15 November, with the sludge tested under Clause 7.9.1(c) and disposed of as the PCBA directs; and leaves no isolated pool standing more than 72 hours after drawdown, because of mosquitoes. Every interceptor is sized from the measured dry-weather flow of its drain and does not reduce the drain's capacity for the minor and major events (Clause 8.9.5(b)); at an outfall that a sluice closes when the river is high, it and its chamber are placed above the 1% AEP level or made watertight, and work with the gate shut. These conditions are set by this Manual.


8.10 Outfalls to waterbodies: first flush, gross pollutant traps and screens

8.10.1 Requirement. Every new storm drain outfall to a waterbody, and every existing outfall on a drain that is rebuilt, widened or extended, shall have:

  • (a) a GPT designed under Clause 8.7.10; and
  • (b) first-flush treatment: treatment of the WQv (or Q_wq) of the contributing catchment by the BMPs of Clause 8.7, either on the contributing sites or at the outfall.

8.10.2 Where treatment at the outfall is impracticable. Where land is not available at a public outfall, first-flush treatment may be provided by:

  • (a) a proprietary first-flush or hydrodynamic device sized for Q_wq; or
  • (b) a treatment wetland or forebay within the waterbody setback (Clause 7.5.1(b)), outside the waterspread.

8.10.3 Screens and trash racks. Screens at outfalls, culvert inlets and pump sumps shall:

  • (a) be designed with 50% blockage for hydraulic capacity;
  • (b) have an overflow or bypass path so that a fully blocked screen does not flood property;
  • (c) have bar spacing chosen for the hazard: closer spacing for litter capture, wider spacing where blockage would cause flooding; and
  • (d) be cleanable from a safe platform, with vehicle access.

8.10.4 Existing outfalls. Each ULB shall prepare a programme to fit GPTs and DWF interceptors to its existing outfalls to waterbodies, starting with outfalls to tanks used for drinking water supply and to notified wetlands (Clause 7.12), and shall report progress in the register of Clause 10.17.

Commentary. This Manual requires first-flush treatment and gross pollutant traps at outfalls to waterbodies. Gross pollutants are the most visible form of pollution in Assam waterbodies, and plastics also block drains and culverts, which links water quality to flooding. The 50% screen blockage matches the grate clogging factor of Chapter 6. Clause 8.10.3(c) warns against fine screens on large drains, which block in the first hour of a storm and cause the flooding they were meant to prevent.


8.11 Rainwater harvesting integration

8.11.1 RWH mandate continues. The rainwater harvesting required by the Assam Unified Building Construction (Regulation) Byelaws 2022 (byelaw 114: "Every building shall provide one or more rainwater harvesting structures to collect the roof top run-off", with recharging or percolating pits or trenches of "at least 5 cubic metres dimension for every 100 sq. metres. of roof area"; byelaws 38(i) and 104(i) and Appendix VI, with percolation pits of 1.2 m by 1.2 m by 1.5 m for every 100 m² of plot area and "rain water harvesting storage and reuse" for every plot of 134 m² and above; byelaw 110(g) in hilly areas; byelaw 111, which keeps 20% of every plot for trees and greenery; and byelaw 92, as amended in 2024, which leaves half the landscaped open space unpaved; and, in a notified area under section 19 of the Assam Ground Water Control and Regulation Act, 2012, the directions of the State Ground Water Authority for premises of 100 m² or more, though no notified area was found) continues to apply, subject to the limits of Clause 8.8.1: where a percolation pit or recharge trench that the byelaws ask for falls on a site where Clause 4.11 bars infiltration, this Manual states the conflict, requires storage for use in its place, and leaves the Applicant to seek the Authority's relaxation of the byelaw, which this Manual does not override (Chapter 1). This Clause sets how RWH structures are counted under this Manual.

8.11.2 Three different functions. The designer shall keep apart, on the drawings and in the calculations:

  • (a) harvesting: storage for use (sumps and tanks);
  • (b) recharge: recharge pits, trenches, shafts and wells that put water into the ground; and
  • (c) detention: storage with an orifice outlet that is empty at the start of a storm (Chapter 4).

8.11.3 Recharge structures.

  • (a) Roof runoff may be led to recharge wells, open wells, recharge pits and shafts after a filter or settling chamber.
  • (b) Runoff from roads, parking and other paved areas shall not be led directly into any well, borewell or recharge shaft. It may be recharged only through an infiltration facility that meets Clause 8.8, with pretreatment.
  • (c) Recharge structures shall meet the groundwater separation of Clause 8.8.1, measured from the base of the pit or the bottom of the filter media, except recharge wells that receive filtered roof water only.

8.11.4 Credit toward retention and WQv. A recharge structure counts toward the retention volume of Chapter 4 and the WQv only where:

  • (a) its infiltration rate has been tested under Clause 8.8.3;
  • (b) it empties within 72 hours at the design rate; and
  • (c) it has pretreatment.

A harvesting sump counts toward retention only where its contents are used, by a demand stated in the drainage report, within 72 hours (Chapter 4).

8.11.5 No credit as detention. RWH storage does not count as detention unless it is a dedicated volume that is empty when a storm arrives, with an outlet. RWH sumps are assumed full at the start of every monsoon (April–October) design storm (Chapter 4).

8.11.6 Overflow. Every RWH structure shall have an overflow that discharges at grade to the site drainage, never onto a neighbouring plot or into a sewer.

8.11.7 Surface-runoff recharge in public spaces. Recharge trenches, shafts and percolation pits in roads, medians, parks and other public spaces shall meet Clause 8.8 in full, including the hotspot rules for roads with heavy traffic, and shall have a GPT or silt trap at each inlet.

Commentary. The rule that RWH storage does not count as detention is set in Chapter 4. Assam's building rules make rainwater harvesting compulsory for every building, but they size it by pits and set no storm, volume for use or detention rule. Byelaw 114 of the Unified Byelaws 2022 reads: "Every building shall provide one or more rainwater harvesting structures to collect the roof top run-off. The total dimension of recharging/percolating pits/trenches should be at least 5 cubic metres dimension for every 100 sq. metres. of roof area"; byelaws 38(i) and 104(i) require the provisions "as prescribed in the Appendix-VI", which asks for "percolation pits of size 1.2m x 1.2m x 1.5m … at the rate of 1 nos. such pit for every 100 sq.m. of Plot area", routes "All Rain water outlets/drains and waste water drains" to the road drain "through the percolation pit only", and, since 2022, requires that "All buildings with plot area 134sq m and above shall have the provision of rain water harvesting storage and reuse"; and the structures are "shown in plans while applying for planning permission". The pit rate gives about 2.16 m³ per 100 m² of plot and byelaw 114 asks for 5 m³ per 100 m² of roof; the two are not reconciled in the text, and neither is sized to a storm (NEER reading). Roof-water harvesting is "mandatory in hilly areas" (byelaw 110(g)); byelaw 111 keeps "at least 20% of the land" of every plot for trees and greenery (10% where 25% of the FAR is affordable housing); and byelaw 92, as amended in 2024, leaves half the landscaped open space unpaved and lets the rest be laid with permeable pavers "to allow rain water to percolate to underground". The Assam Ground Water Control and Regulation Act, 2012 defines rainwater harvesting as "collection and storage of rainwater at surface or in sub-surface aquifer" (s.2(f)) and lets the State Authority direct it for premises of 100 m² or more in a notified area (s.19); no notified area was found, and the "100 m² plot" threshold quoted elsewhere is that section's, not a byelaw's. In practice GMC began inspections for rainwater harvesting and green cover from 20 June 2025, with penalties up to the revocation of the occupancy certificate; builders are reported to "conveniently flout" the rules, and the builders' association says the Appendix VI structures "have proved to be faulty" (all as reported). In Assam a percolation pit on the floodplain, receiving grey water and standing in ground that is saturated through the monsoon, is a soakaway, not storage. This Manual therefore treats rainwater harvesting as storage for use for the dry months from December to March, and as storage on floodplain sites: where the floodplain or hill rule of Clause 4.11 bars infiltration, byelaw 114's 5 m³ per 100 m² of roof (about 50 mm over the roof) is provided as storage, credited as retention only through reuse, emptied within 72 hours by a continuous non-potable use (Clauses 4.4.3 and 8.11.4), assumed full at the start of every storm (Clause 4.11.2), and never counted as detention (Clause 8.11.5). On the bhabar fans, the river terraces and the tested hill-foot colluvium, recharge may be one function of harvesting where Clause 8.8.1 allows it (Clause 8.11.2(b)); where the byelaws' percolation pit falls on a site where Clause 4.11 bars infiltration, this Manual states the conflict and requires storage in its place (Clause 8.11.1). The byelaws' dry sump on flood-liable and hilly plots is a detention facility under Chapter 4, empty before each storm, and is never an RWH tank. RWH serves water supply and recharge. It is usually full, or its soil saturated, by the time a June to August monsoon storm, such as those of June 2022, arrives after weeks of rain, which is why it cannot be counted as detention.

Clause 8.11.3(b) has no direct precedent; this Manual sets it because road runoff carries oil, metals and pathogens. A recharge shaft or borewell bypasses the soil that would otherwise filter it and delivers it straight to the aquifer that supplies wells nearby. The CGWB Manual on Artificial Recharge of Ground Water (2007) gives recharge structure types and filter designs; this Manual adds the source-water restrictions.


8.12 Construction-stage erosion and sediment control

8.12.1 ESC plan. Every development with land disturbance of 0.1 ha or more, and every public drainage or road work, shall have an Erosion and Sediment Control (ESC) plan, approved with the drainage report. It shall show:

  • (a) the sequence of clearing, earthworks and stabilisation;
  • (b) the area exposed at each stage;
  • (c) the measures of Clause 8.12.3, with their locations and sizes;
  • (d) the protection of infiltration and retention areas (Chapter 10);
  • (e) stockpile, concrete washout and fuel storage locations; and
  • (f) the inspection and maintenance schedule.

8.12.2 Monsoon timing. Earthworks shall be planned so that:

  • (a) the area exposed during the monsoon (April to October) is as small as practicable;
  • (b) all completed earthworks are stabilised by vegetation, mulch, matting or paving by 31 March; and
  • (c) any area exposed between 1 April and 31 October has sediment controls in place before it is cleared.

8.12.3 Measures.

  • (a) Silt fences along the downslope edge of disturbed areas receiving sheet flow, with the area draining to each fence limited as set in Annex 8E.
  • (b) Sediment traps for concentrated flow from disturbed areas of up to 2 ha.
  • (c) Sediment basins for disturbed areas of more than 2 ha. The storage volume below the outlet shall be at least the greater of the runoff from the 50% AEP (2-yr) 24-hour storm and 250 m³ per hectare of drainage area, with a dewatering outlet that draws water from the surface.
  • (d) Inlet protection at every existing drain inlet that receives runoff from the site.
  • (e) Stabilised construction exits, with wheel washing where vehicles enter public roads.
  • (f) Stockpiles outside Zone 1 of any waterbody setback (Chapter 7), at least 10 m from any drain, and covered during the monsoon.
  • (g) Dewatering discharges passed through a sediment basin, settling tank or filter bag, never pumped directly into a drain or waterbody.
  • (h) Concrete washout in a lined pit, never into a drain.

8.12.4 Design storm for temporary works. Temporary ESC measures use the rainfall of Chapter 2 with a climate factor of 1.0 (Clause 2.8.2).

8.12.5 Inspection. ESC measures shall be inspected weekly and within 24 hours after every heavy-rainfall event (as defined in Chapter 10), repaired within 48 hours, and cleaned when half full of sediment.

8.12.6 Removal. Temporary measures shall be removed only after the area draining to them is stabilised. Sediment shall be removed from any permanent facility used for sediment control before its as-built survey (Chapter 10).

Commentary. The 0.1 ha threshold is the applicability threshold of Chapter 1. The sediment basin volume of 250 m³/ha is the US EPA Construction General Permit minimum of 3,600 ft³ per acre drained, converted to SI (US EPA, 2022 CGP); the CGP allows the alternative of the 2-year, 24-hour runoff. This Manual requires the greater of the two, because Assam's 2-year 24-hour depths are high and construction sites are commonly left exposed through the monsoon. The 2 ha division between traps and basins, the 31 March stabilisation date, the 10 m stockpile distance and the inspection frequency have no direct precedent and are set by this Manual. The 31 March date matches the pre-monsoon deadline of Chapter 10. Construction sediment is a direct flood hazard as well as a pollutant: it fills drains, culverts and tanks, and in Assam the silt of hill cutting travels with it: "indiscriminate cutting and quarrying of hill slopes for filling up of low lying areas results in sheet wash and blockage of channels", and the Bharalu's bed "has considerably risen" with silt (ADB, 2017); the Gauhati High Court found in 2025 that "hill cutting is still going on" (PIL/14/2024, 26.05.2025); and GMC spent ₹32.57 crore on desilting in five years (CAG Report No. 4 of 2019). The Unified Byelaws 2022 already ask for a "silt fence along plot boundary to prevent soil wasting into another's plot or into a common drainage network" on sites liable to flood (byelaw 74(iii)) and make one "mandatory" in hilly areas (byelaw 110(i)), with drainage "without causing soil erosion" (byelaw 110(c)); and since 2024 they penalise the dumping of construction and demolition waste "at road sides, Nalas, Rivers and other water bodies" (byelaw 120A). They give no size, area, date or inspection, which Clause 8.12 supplies. The stabilisation date of 31 March is set by this Manual, before its season begins on 1 April, because Guwahati's April storms and the State's May storms come before the south-west monsoon (Chapter 2). The reason given above for the larger basin volume, that the 2-year 24-hour depths are high, holds against the US basis it compares with: the CWC plates give no 2-year value, but the NIH-DHAARA reanalysis gives about 113 to 317 mm across the State (123 mm at Guwahati; comparison values only, not design values; Chapter 2), falls of 111 mm on 31 May 2025 and 117.4 mm on 20 April 2026 at the airport flooded Guwahati (as reported), and AMC III applies through much of the season (Chapter 3); the rule of Clause 8.12.3(c) is kept unchanged everywhere. In Assam the outlet of a sediment basin or trap under Clause 8.12 discharges to a lined drain or a stable channel and never onto an unprotected slope; no sediment basin or trap is designed to infiltrate where Clause 4.11 bars infiltration, which includes the whole floodplain and every slope steeper than 10°; no spoil, silt or debris from a site is placed in a beel, pukhuri, jan or juri, within its Zone 1, or on an embankment; and a site on the hill fringe of Guwahati keeps its sediment behind a silt trap at the hill–plain break (Clause 6.3.6(m)) before any drain reaches a beel.


8.13 Monitoring

8.13.1 Outfall monitoring. Each Tier A authority shall monitor water quality at a representative set of its outfalls to waterbodies, including every outfall to a drinking-water tank or notified wetland. Monitoring shall include:

  • (a) dry-weather sampling (Clause 8.9.4), at least once a year before the monsoon; and
  • (b) wet-weather sampling of at least three events each monsoon at a set of index outfalls.

8.13.2 Parameters. At minimum: TSS, BOD, COD, faecal coliform, total nitrogen, total phosphorus, oil and grease, and, for industrial catchments, heavy metals. Results shall be compared with the CPCB water quality criteria for the designated best use of the receiving waterbody.

8.13.3 Gross pollutant records. The mass or volume of material removed from each GPT and screen at each cleaning shall be recorded in the O&M records (Chapter 10).

8.13.4 BMP performance monitoring. The State Stormwater Technical Committee shall run a BMP performance calibration programme and shall revise Table 8.3 and Annex 8C from its results.

8.13.5 Publication. Monitoring results shall be published in the register of Clause 10.17.

Commentary. No Assam programme of stormwater quality monitoring was found during research for this Manual, and CPHEEO (2019) sets no Indian targets. The monitoring in Clause 8.13 is the minimum needed to calibrate Table 8.3 and to show whether DWF interception and source removal are working. The parameter list follows the key pollutants named in CPHEEO's WSUD procedure (TSS, nitrogen, phosphorus and gross pollutants), with BOD and faecal coliform added because of sewage contamination. The monitoring frequencies are set by this Manual.


8.14 Submittal requirements

Every drainage report under this chapter shall include:

  1. the Water Quality Sheet (Form 8-1): P_ret, P_3m and P_wq; the WQv and Q_wq for each drainage area; the volume retained under Chapter 4; and the BMP serving each area;
  2. for Tier A: the LoS calculation (ΔCN, required LoS) and the composite VR (Clause 8.6);
  3. the design of each BMP to Clause 8.7 and Annex 8D, with pretreatment;
  4. for infiltration and recharge: the Infiltration Test Record (Form 8-2), the seasonal high groundwater level and its source, the design rate, the drawdown time, and the setbacks of Clause 8.8.6;
  5. the sewage and sullage connection plan and the dye or smoke test record of Clause 8.9.2;
  6. the GPT and first-flush design for any outfall to a waterbody (Clause 8.10);
  7. the RWH layout, separating harvesting, recharge and detention (Clause 8.11); and
  8. the ESC plan (Clause 8.12).

8.15 Review and update

8.15.1 This chapter shall be reviewed with the rest of the Manual (Chapter 1). Table 8.3 shall also be reviewed when the calibration programme of Clause 8.13.4 reports, and in any case within 5 years of notification.


References (chapter)

Annexes and forms

Annex / Form Content
8A 3-month ARI 24-hour depth and IDF by zone
8B Redevelopment LoS table and treatment-train composite VR
8C Assam BMP performance calibration
8D BMP design sheets, media specification, plant lists
8E Erosion and sediment control standard details
Form 8-1 Water Quality Sheet
Form 8-2 Infiltration Test Record